HomeMy WebLinkAbout1992-02-05MINUTES
HUNTINGTON BEACH OFFICE OF ZONING ADMINISTRATOR
Room B-6 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, FEBRUARY
ZONING ADMINISTRATOR: Scott Hess
STAFF MEMBERS: Mike Connor, Wayne Carvalho
MINUTES: The Minutes of January 29, 1992
Zoning Administrator Meeting were
approved.
REGULAR AGENDA ITEMS:
ITEM 1: LOT LINE ADJUSTMENT NO 91-1 (CONTINUED FROM 1/29/92 ZONING
ADMINISTRATOR MEETING)
Applicant: Farhad Rezai
Coast Engineering
17931 Beach Street, #116
Huntington Beach, CA 92647
Request: To adjust the existing lot lines between three (3)
existing parcels of Parcel Map 83-555. Parcel 3 will
be enlarged to match the approved site plan for
Conditional Use Permit No. 91-28 while parcels 1 and 2
will be reduced accordingly.
Location: 8052 Adams (Seabridge Village Shopping Center)
Wayne Carvalho, Staff Planner, reported that the applicant had
requested another continuation to the February 26, 1992 Zoning
Administrator meeting to produce the additional information requested
by the Zoning Administrator. Staff concurred with the applicant's
request.
LOT LINE ADJUSTMENT NO. 91-1 WAS CONTINUED BY THE ZONING
ADMINISTRATOR TO THE ZONING ADMINISTRATOR MEETING OF FEBRUARY 26,
1992.
ITEM 2: USE PERMIT NO, 92-3
Applicant: Paul Roberts
15021 Goldenwest Street
Huntington Beach, CA 92647
Request: Temporary Outdoor Event (1 Day) for Oshman's Annual 15
Hour Ski Sale on February 8, 1992 which includes the
installation of a forty foot (40') by sixty foot (60')
tent in the parking lot.
Location: 15021 Goldenwest Street
Wayne Carvalho, Staff Planner, reported that the request is for a one
day, fifteen hour ski sale. The request includes a 40' x 60' tent in
the parking lot. Fire Department & Public Works had been notified
and had no concerns other than the standard conditions. Staff
concluded by recommending approval with findings and suggested
conditions of approval.
PUBLIC HEARING WAS OPENED.
Paul Roberts, the applicant, was present and advised that the sale
would be handled as it had been in the past.
Scott Hess, Zoning Administrator, asked if they have experienced
problems with circulation at the northerly driveway at the proposed
location of the tent. Paul Roberts advised that the access is wide
enough for vehicles.
There were no other persons present to speak for or against the
request and the public hearing was closed.
USE PERMIT NO. 92-3 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. THE ZONING
ADMINISTRATOR STATED THAT THE ACTION TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TWO
CALENDAR (2) DAYS.
FINDINGS FOR APPROVAL:
1. The temporary outdoor event will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building.
2. The granting of Use Permit No. 92-3 will not adversely affect
the General Plan of the City of Huntington Beach.
ZA Minutes - 2/5/92 -2- (2338d)
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan received and dated January 17, 1992 shall be the
conceptually approved layout.
2. Fire access lanes shall be maintained. If fire lane violations
occur and the services of the Fire Department are required, the
applicant will be liable for expenses incurred.
3. The applicant shall provide a Certificate of Insurance to the
Risk Management Division, Administrative Services Department,
to be executed prior to the event.
4. All parking shall be a minimum of forty (40) feet from the
proposed tent. In addition, the applicant shall provide an
adequate turnaround area for vehicles parked to the north of
the tent.
5. The proposed tent shall be of fire retardant material. Proof
of Certification shall be submitted to the Fire Department for
approval prior to the tent's installation on the site.
6. The proposed tent shall be secured against collapsing to the
satisfaction of the Fire Department.
ITEM 3• USE PERMIT NO, 92-6
Applicant: Bank of Westminster
M. J. Benson, AVP
16900 Goldenwest Street
Huntington Beach, CA 92649
Request: Temporary Outdoor Event for one day sale of
approximately 8-12 bank owned automobiles on February 8,
1992. This request includes temporary flags and signage.
Location: 16900 Goldenwest Street
Wayne Carvalho, Staff Planner, reported that the request is for an
auction of bank owned automobiles on February 8, 1992 between 8:00
AM and 5:00 PM. Staff advised that Fire and Public Works
Departments have no concerns with the request. Staff concluded by
recommending approval with findings and suggested conditions of
approval.
THE PUBLIC HEARING WAS OPENED.
Mike Benson, representing the applicant, advised that the sale is
not an auction as normally thought, but is conducted by silent
bids.
There were no other persons present to speak for or against the
request and the public hearing was closed.
ZA Minutes - 2/5/92 -3- (2338d)
USE PERMIT NO. 92-6 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. THE ZONING
ADMINISTRATOR STATED THAT THE ACTION TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TWO
CALENDAR (2) DAYS.
FINDINGS FOR APPROVAL:
1. The temporary outdoor event will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building.
2. The granting of Use Permit No. 92-6 will not adversely affect
the General Plan of the City of Huntington Beach.
,SPECIAL CONDITIONS OF APPROVAL:
1. The site plan received and dated January 28, 1992 shall be the
conceptually approved layout.
2. Fire access lanes shall be maintained. If fire lane violations
occur and the services of the Fire Department are required, the
applicant will be liable for expenses incurred.
3. The applicant shall provide a Certificate of Insurance to the
Risk Management Division Administrative Services Department, to
be executed prior to the event.
4. Bank employees shall park in remote areas of the parking lot to
give bank patrons the opportunity to park next to the bank.
THE MEETING WAS ADJOURNED AT 1:40 PM BY THE ZONING ADMINISTRATOR TO
THE NEXT REGULARLY SCHEDULED MEETING OF THE ZONING ADMINISTRATOR ON
WEDNES AY, FEBRUARY 12, 1992, AT 1:30 PM.
Scott Hess
Zoning Administrator
:jr
it
I
ZA Minutes - 2/5/92 -4- (2338d)