ITEM 1: NEGATIVE DECLARATION NO. 95-6
TENTATIVE PARCEL MAP NO. 95-136
CONDITIONAL USE PERMIT NO. 95-63
Applicant: Sharp Electronics Corporation
Property Owner: McDonnell Douglas Realty Corporation, 18101 Von Karman Avenue,
Suite 1800, Irvine, CA 92715-1007
Request: To subdivide a 42.16 acre parcel into one (1) 23.36 acre parcel for
development of an industrial facility. The request includes construction of
a new 538,859 square foot office headquarters and warehouse/distribution
facility for electronics products. The project is proposed to occur in three
(3) phases described as follows: Phase I consists of construction of
400,032 square feet of warehouse/distribution space, 88,139 square feet of
office space, a 300 space parking lot, employee recreational amenities, and
landscaping; Phase II consists of an additional 50,700 square feet of
warehouse/distribution area; and Phase III consists of a request by the
proponent to provide construction of 503 required parking stalls if and
when the proposed user vacates the site. The land necessary for the
additional parking spaces will be landscaped and held in reserve until such
time as the parking becomes necessary.
Location: 5901 Bolsa Avenue (northwest corner of Bolsa Avenue and Springdale
Street)
October 11, 1995 Zoning Administrator Minutes
Page 2
Jane Madera, staff planner, stated that this was a request to construct a new building at the
northwest corner of Bolsa Avenue and Springdale Street. Aerial photographs and site plans were
shown. Although this is one petition, Ms. Madera noted that there are two (2) applicants
involved. McDonnell Douglas Realty Corporation is the applicant for the Tentative Parcel Map
and Sharp Electronics Corporation represented by John Erskine is the applicant for the
Conditional Use Permit. The Negative Declaration has been used to cover and analyze both the
Tentative Parcel Map and Conditional Use Permit. Ms. Madera stated that action must be taken
on the Negative Declaration first. Ms. Madera then suggested that separate actions be taken on
the Tentative Parcel Map and Conditional Use Permit.
The first request involved subdividing an existing 42.16 acre parcel into one (1) 23.36 acre parcel
for Sharp Electronics Corporation and a remainer parcel of approximately 18.8 acres. Ms.
Madera stated that the site plan meets all of the requirements for both the Planning Division and
Public Works; it meets the minimum lot size and lot frontage; and that the remainder is subject to
entitlement for future subdivision. It was noted that there are private roads at Able Lane and
Skylab, bounded by the public streets Springdale Street and Bolsa Avenue. Staff recommended
approval of the Tentative Parcel Map, as it meets all of the requirements for subdivision. It was
noted that Public Works did state recommended conditions of approval, such as all access rights
to Bolsa Avenue and Springdale Street be dedicated to the City except at locations approved by
the Zoning Administrator. It was also recommended that a water system dedication and bus turn-
out dedication along Bolsa Avenue be made.
Ms. Madera stated that the Conditional Use Permit was a request to construct a large industrial
facility. It was noted that Sharp Electronics Corporation was the applicant for this request to
construct a 400,032 square foot warehouse and 88,139 square feet of office space during the first
phase of construction. A second phase of construction would consist of an additional 50,700
square feet of warehouse/distribution space. Ms. Madera stated that the applicant is requesting to
delay provision of parking for all of the required parking stalls until a proposed third phase which
consists of the construction of 503 required parking stalls if and when the proposed user vacates
the site. It was noted that Sharp Electronics Corporation has provided the land necessary for the
additional parking spaces and that the land will be landscaped and held in reserve until such time
as the parking becomes necessary. Ms. Madera stated that the proposed hours of operation
consisted of two (2) shifts, from 8:30 a.m. to 5:00 p.m. and from 5:00 p.m to 1:30 a.m. The
applicant does not anticipate any truck activity during the late night shift, from which staff made a
condition of approval. Ms. Madera noted mitigation measures that resulted from the Negative
Declaration. The applicant must provide evidence to the Public Works Department that staging
areas for grading or construction activities be located as far as possible from residential areas to
avoid potential impact. In addition, all truck traffic in Sharp's control must be instructed to use
the Bolsa Chica, Bolsa Avenue, and Able Lane route in order to get to the site. Ms. Madera
stated that prior to Certificate of Occupancy, a traffic signal at Bolsa Avenue and Able Lane shall
be provided. It was also noted that staff recommends the landscape plan be reviewed in
accordance with the Urban Design Element and the Circulation Element proposed in the new
update of the General Plan. The applicant requests that a nine (9) foot high wrought iron and
pilaster fence be provided within the required front setback at the south side of the property as
security. Staff stated that because of the substantial landscaping barrier between the fence and the
street, it would be buffered adequately. Staff recommended that the proposed chain link on the
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 3
east and west sides of the property be amended to wrought iron and pilaster, similar to the fence
proposed on the south side. Staff stated that coated green chain link fence on the north side
would be acceptable. Staff recommended approval of this request.
THE PUBLIC HEARING WAS OPENED.
John Erskine, representative of Sharp Electronics Corporation, was present to speak on behalf of
this request. Mr. Erskine stated that other representatives of Sharp were also present. It was
noted that Sharp wished to thank the Planning staff and Public Works staff for their diligent
efforts.
Dennis O'Neil, representative of McDonnell Douglas, was present and stated that McDonnell
Douglas would comply with all conditions of approval.
THERE WERE NO OTHER PERSONS PRESENT TO SPEAK FOR OR AGAINST THE
REQUEST AND THE PUBLIC HEARING WAS CLOSED.
NEGATIVE DECLARATION NO. 95-6 / TENTATIVE PARCEL MAP NO. 95-136 /
CONDITIONAL USE PERMIT NO. 95-63 WAS CONDITIONALLY APPROVED BY
THE ZONING ADMINISTRATOR. HE STATED THAT THE ACTION TAKEN BY
THE ZONING ADMINISTRATOR CAN BE APPEALED TO THE PLANNING
COMMISSION WITHIN TEN (10) CALENDAR DAYS,
FINDINGS FOR APPROVAL - TENTATIVE PARCEL MAP NO. 95-136:
1. The proposed subdivision of an existing 42.16 acre lot into one 23.36 acre parcel for industrial
purposes and a remainder 18.80 acre parcel is in compliance with the size and shape of
property necessary for that type of development. Each parcel contains at least 100 feet of
frontage and is greater than the minimum 20,000 square feet in size.
2. The General Plan has set forth provisions for this type of land use as well as setting forth
objectives for implementation of this type of use. This subdivision of land for future industrial
use assists the City in retaining the industrial land use base.
3. The property was previously studied for this intensity of land use at the time the land use
designation for General Industrial, allowing industrial uses was placed on the subject property.
4. The size, depth, frontage, street width and other design and improvement features of the
parcel are proposed to be constructed in compliance with standards, plans and specifications
on file with the City as well as in compliance with the State Map Act and supplemental City
Subdivision Ordinance.
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 4
CONDITIONS OF APPROVAL - TENTATIVE PARCEL MAP NO. 95-136/NEGATIVE
DECLARATION NO. 95-6:
1. Tentative Parcel Map No. 95-136 received by the Department of Community Development on
July 25, 1995 shall be the approved layout with the amendments as noted in these conditions
of approval. (PW)
2. Prior to recordation of this parcel map, the following shall be completed:
a. The surveyor/engineer preparing the map shall tie the boundary of the map into the
Horizontal Control System established by the County Surveyor in a manner described in
Sections 7-9-330 and 7-9-337 of the Orange County Subdivision Code and Orange County
Subdivision Manual, Subarticle 18. (PW)
b. The surveyor/engineer preparing the map shall submit to the County Surveyor a digital -
graphics file of said map in a manner described in Sections 7-9-330 and 7-9-337 of the
Orange County Subdivision Code and Orange County Subdivision Manual, Subarticle 18.
(PW)
All vehicular access rights to Bolsa Avenue and Springdale Street shall be released and
relinquished to the City of Huntington Beach except at locations approved by the City
Zoning Administrator. (PW)
d. The following dedications shall be required:
1) Access rights in, over, across, upon and through the private streets for the
purpose of maintaining, servicing, cleaning, repairing and replacing the
water system. (PW)
2) The water system and appurtenances as shown on the improvement plans
for this parcel map. (PW)
3) A bus turnout located on Bolsa Avenue as approved by the City Traffic Engineer.
(PW)
Prior to issuance of building permits for development on the subject parcel, the following shall
be completed:
a. Appropriate zoning entitlements shall be reviewed and approved pursuant to the
Huntington Beach Zoning and Subdivision Ordinance. (CDD)
4. Prior to Certificate of Occupancy for development on the subject parcel, the following shall be
completed:
a. Construction of all required infrastructure improvements, such as drainage, sewer, street,
and water, deemed necessary and defined by any subsequent entitlements. (PW)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 5
INFORMATION ON SPECIFIC CODE REQUIREMENTS
1, The development shall comply with all applicable provisions of the Huntington Beach
Zoning and Subdivision Ordinance, Building Division, and Fire Department. (CDD)
2. The applicant shall meet all applicable local, State, and Federal Fire Codes, Ordinances,
and standards. (CDD)
The Zoning Administrator reserves the right to revoke Tentative Parcel Map No. 95-136
if any violation of these conditions of the Huntington Beach Zoning and Subdivision
Ordinance occurs. (CDD)
FINDINGS FOR APPROVAL - CONDITIONAL USE PERMIT NO. 95-63:
The establishment, maintenance and operation of the three (3) phased, 538,859 square
foot industrial building including the nine (9) foot high fence within the front setback will
not be detrimental to the general welfare of persons residing or working in the vicinity nor
detrimental to the value of the property and improvements in the neighborhood based on
the following:
a. The project layout is designed so that truck shipping and receiving activities are
focused toward other industrial uses to the north and west of the subject site
and away from residential to the south and east. In contrast, the floor plan has
been designed so that the office area, which will generate the least noise, is
oriented toward the residential and commercial uses located across Springdale
Street and Bolsa Avenue to the east and south of the site. In addition, impacts
to adjacent uses will be minimized because the building will be constructed at
more than the minimum setback requirements.
b. Although the proposed use is an industrial facility, truck loading and unloading
activities will be focused during normal business hours. In addition, the three
(3) proposed access points to the site are designed to reduce traffic conflicts by
allowing not only adequate points of ingress and egress but also by separating
truck traffic from employee and visitor's passenger vehicles. A condition of
approval to require trucks to access the site from Able Lane at Bolsa Avenue
will further separate trucks and residential uses.
c. Visual impacts of the new building to the residents to the east of the site, across
Springdale, will be reduced by a substantial landscape buffer. The same
landscape area will serve to buffer the nine (9) foot high wrought iron and
pilaster fence.
d. In addition, the facility will not produce any offensive odors because Sharp
Electronics Corporation will utilize the structure for office, warehouse, and
distribution of electronics products. No manufacturing uses are proposed.
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 6
2. The granting of Conditional Use Permit No. 95-63 for the construction of a 538,859
square foot industrial building with a nine (9) foot high security fence surrounding the
property and within the front setback, will not adversely affect the General Plan of the City
of Huntington Beach. The project will be compatible with goals and standards of the
current and proposed update of the General Plan land use designation of General
Industrial. The industrial facility will assist the City in retaining an industrial land use base.
The proposed use will comply with the provisions of the base district and other applicable
provisions in Titles 20-25 and any specific condition required for the proposed use in the
district in which it would be located with the exception of the nine (9) foot high wrought
iron and pilaster fence located in the front setback. However, the fence will be set back a
substantial distance from the front property line (22 feet), will be constructed of
decorative materials, and will be somewhat screened by landscaping in order to reduce
bulk and soften the appearance of the fence.
SPECIAL CONDITIONS OF APPROVAL - CONDITIONAL USE PERMIT NO.
95-63/NEGATIVE DECLARATION NO. 95-6 :
The site plan, floor plans, and elevations received and dated August 8, 1995 shall be the
conceptually approved layout with the following modifications:
a. The Phase III site plan shall be revised to depict one (1) tree well every ten (10)
parking spaces. (CDD)
b. The Phase I, Phase II, and Phase III site plans and floor plan shall be revised to
reflect compliance with the Transportation Demand Management Ordinance,
including provision of parking for carpool vehicles, shower and locker facilities,
bicycle parking, commuter information areas, passenger loading areas, parking
for vanpool vehicles, and bus stops. (CDD)
The Phase I, Phase II, and Phase III site plans shall be revised to depict
decorative wrought iron fencing interspersed with pilasters along the east and
west sides of the property. The wrought iron and pilasters shall be identical in
design, style, and height as the materials proposed along the south side of the
property. The rear property line security fence may be green coated chain link
at nine (9) feet high. (CDD)
d. The Phase I, Phase II, and Phase III site plans shall be revised so that all
parking stalls adjacent to landscape planters are reduced by two (2) feet in
length. Conversely, landscape planters at the head of all parking stalls shall be
increased by two ( 2) feet. There shall be no concrete wheel stops for any
parking stalls adjacent to landscaping. (CDD)
e. Driveway approaches shall be a minimum of twenty-seven feet (27) in width
and shall be of radius type construction. (PW)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page %
2. Prior to issuance of grading permits, the following shall be completed:
a. Provide evidence acceptable to the City of Huntington Beach Public Works
Department that grading and construction staging areas will be located as far as
practical from residential areas. (CDD)
b. A drainage fee will be paid. This drainage fee will be reimbursed to payer upon
City acceptance of all required on -site and off -site drainage improvements.
(PW)
c. A National Pollution Discharge Elimination System (NPDES) permit for
construction activities shall be obtained from the Regional Water Quality
Control Board. Evidence that the NPDES permit has been obtained shall be
submitted to the City Engineer. (PW)
3. Prior to issuance of building permits, the following plans and items shall be submitted
and/or completed:
a. Plans depicting compliance with Condition of Approval #1, above, shall be
submitted for review and approval. (CDD)
b. A covenant which requires that any future user be subject to review and
approval by the City shall be submitted. The covenant shall be subject to review
and approval by the City Attorney's Office. The covenant shall identify that the
300 provided parking spaces have been deemed sufficient for the Sharp
Electronics Corporation requirements only and any other future user will be
subject to provision of the remaining 503 code required parking spaces pursuant
to the approved design and layout of Phase III. The covenant may specifiy that
a further parking study may be provided to determine if the additional 503
parking spaces are necessary at the time a new tenant is proposed. However,
any further parking study shall be subject to review and approval by the City.
After approval of the covenant by both City Attorney's Office and the
Community Development Department, but before Certificate of Occupancy, the
covenant shall be recorded on the property. (CDD)
c. A Landscape Construction Set for all on -site landscaping and landscape
medians in Springdale Street shall be submitted to the Department of Public
Works. The landscape construction set shall include a landscape plan prepared
and signed by a State Licensed Landscape Architect which includes all proposed
plant materials (location, type, size, quantity), irrigation plan, grading plan and
approved site plan, and copy of conditions of approval. The landscape plan
shall incorporate the goals and policies of the Urban Design Element and
Circulation Element contained in the proposed update of the General Plan and
shall also be in conformance with Chapter 232 of the Huntington Beach Zoning
and Subdivision Ordinance. The set must be complete and approved by both
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 8
Community Development Department and Public Works Department prior to
issuance of building permits. (PW/CDD)
d. Rooftop Mechanical Equipment Plan. Said plan shall indicate screening of all
rooftop mechanical equipment and shall delineate the type of material proposed
to screen said equipment. (CDD)
e. All applicable Public Works fees shall be paid. (PW)
f. All utility apparatuses such as but not limited to backflow devices and Edison
transformers, shall be prohibited in the front yard and exterior sideyards unless
properly screened by approved landscaping or any other method approved by
the Director of Planning. All such apparatuses shall be depicted on the site plan
prior to issuance of building permits. (PW)
g. Plans for an automatic fire sprinkler system will be required throughout the
building. This system shall be designed pursuant to National Fire Protection
Association Standards to cover any high piled stock commodity, in -racks, or
other storage areas. (FD)
h. Plans for standpipes with fire hose connections shall be provided per Article 81
of the Huntington Beach Fire Code. (FD)
i. Plans for curtain boards as required per Article 81 of the Huntington Beach Fire
Code. (FD)
j. Plans for a smoke removal system per Article 81 of the Huntington Beach Fire
Code. (FD)
k. Plans for Fire Department access doors designed for every 100 feet in exterior
walls that lead to high piled merchandise storage areas per Article 81 of the
Huntington Beach Fire Code. (FD)
1. Plans for approximately 13 new required fire hydrants, locations to be approved
by the Fire Department. (FD)
m. Plans for fire extinguishers as required per the Huntington Beach Fire Code.
(FD)
n. Plans for a 24 foot required fire access lane around the entire building. Turning
radius shall comply with City Specification #401. Turning radius shall be a
minimum of 17 ft. by 45 ft. Fire lanes shall be posted by approved signs per
City Specification #415. (FD)
o. Plans for building address numbers will comply with City Specification #428.
(FD)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 9
p. Plans for all electronic gates depicting "Knox" switches installed for
Emergency Personnel access. All gates shall comply with City Specification
4403. (FD)
q. Plans for two, ten (10) inch fire water main services shall be required for fire
protection. The 10 inch on -site fire water main shall loop the entire building.
Fire Department connections shall be located at each entrance. (FD)
r. A grading plan shall be submitted to the Department of Public Works for review
and approval. (PW)
s. A Parcel Map shall be recorded with the County Recorder's Office. (PW)
t. A complete and detailed hydrology and hydraulic study will be performed by an
engineer to design the required systems and verify that the existing facilities are
adequate. On -site and off -site systems will be designed per the approved
hydrology and hydraulic studies. City approval will be required. (PW)
u. Williamson & Schmid Consulting Engineers shall be hired to revise the City's
"Master Plan of Drainage" to reflect the proposed diversion of flow between
drainage districts. Revisions must be approved by the City. (PW)
v. Submit a separate utility plan, showing water system improvements including
service connections to each building, public and private fire hydrants, valves,
and other appurtenances in accordance with applicable U.P.C., City Ordinances,
Public Works Standards and Water Division Design Criteria prior to any
construction. These plans shall be approved, by the Public Works Water
Division and the City of Huntington Beach Fire Dept. (PW)
w. Street improvement plans shall be prepared to show proposed improvements.
Additionally, landscape and irrigation plans shall be required for Springdale
medians. (PW)
4. Prior to final building permit inspection or Certificate of Occupancy, the following items
shall be completed:
a. Installation of required on -site and off -site landscaping and irrigation systems
shall be completed prior to final inspection. (PW)
b. Traffic Impact fees shall be paid. (PW/CDD)
c. A copy of the recorded map shall be filed with the Department of Community
Development. (PW/CDD)
d. All Fire Department requirements and improvements as listed under Condition
of Approval No. 3 shall be installed. (FD)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 10
e. All Public Works Department requirements and improvements listed under
Condition of Approval No. 3 and in this Condition shall be installed. (PW)
f. The City will allow a proposed diversion of storm water flows from the existing
drainage area containing the easterly ±60 acres of the McDonnell Douglas
property, into the adjacent drainage area to the west. Written approval from
OCFCD to divert storm water into adjacent drainage area shall be obtained.
(PW)
g. Design and construct at no cost to the City, a new public storm drain line along
the south side of the McDonnell Douglas, Huntington Beach property to accept
the additional flow and relieve the existing storm drain line in Bolsa Avenue.
The new storm drain shall be designed to current City standards. The new
storm drain shall also be designed to bring tributary drainage areas of both the
new storm drain and the existing storm drain in Bolsa Avenue into
conformance with current flood protection standards. Only the main line of the
new storm drain will be public. All existing and proposed lateral pipes shall
remain private. (PW)
h. Nine acres of the proposed ±23 acre subject site will drain per the existing
master plan into the existing 54" storm drain in Springdale Street provided that
the existing storm drain in Springdale Street can accommodate the storm flow.
The remaining area will be diverted to the west. (PW)
i. All roof drains will be directly tied into the on -site storm drain system. (PW)
Connect to the existing 12" City sewer main in Springdale Street. If the
proposed site plans to connect into the sewer main in Able Lane, provisions will
be made to enlarge an existing segment of sewer line (approximately 1000 feet)
in Graham Street south of Bolsa Avenue. (PW)
k, The entire water and private fire systems shall be designed and installed per the
City of Huntington Beach Water Division's design criteria, standards plans and
specifications. (PW)
1. The proposed on -site water system shall consist of one domestic water service
sized per the Uniform Plumbing Code, one separate irrigation service sized per
the developer's landscape architect, and a separate private fire protection
system sized per the City of Huntington Beach Fire Department requirements.
Additionally, the site shall be serviced by public and private fire hydrants located
per the City of Huntington Beach Fire Department. Submit hydraulic
calculations supporting proposed water system design with the first plan check
submittal package. (PW)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 11
in. The private fire protection system shall consist of on -site piping looped around
the proposed structure, with connections to the water mains in Able Lane,
Springdale Street and Bolsa Avenue. The service connections shall consist of
meters and double check detector check backflow devices installed per the
Water Division Standard Plan No. 618. The private fire hydrants shall be
located per the City of Huntington Beach Fire Department and are not to be
painted the same color as public fire hydrants. Design and construction of the
underground portion of the private fire system shall be per the City of
Huntington Beach Water Division's Design Criteria, Standard Plans and
Specifications. (PW)
n. All existing water services along the frontages of the subject parcel shall be
abandoned at the main per the City of Huntington Beach Water Division
Standard Plans and Specifications. (PW)
o. The developer shall use "drought tolerant" plants and turf for all common area
landscaping. The developer shall submit irrigation demands to ensure proper
irrigation service sizing. (PW)
p. All underground construction shall be per the City of Huntington Beach Water
Division. (PW)
q. Backflow protection shall be installed per the City of Huntington Beach Water
Division Standard Plan No. 609 for both domestic and irrigation water services.
All backflow devices shall be painted to match the surrounding aesthetics, and
shall be screened from view to the satisfaction of the City of Huntington Beach
Fire Department, Landscape and Water Division. The markings, indicating the
size, model number and serial number shall be permanently affixed to the body
of the backflow device and must remain visible after painting. (PW)
Off -site conditions required for the subject development are dependent upon the
feasibility of McDonnell Douglas dedicating a well site to the City in the
northern corner of the property along Rancho Road. For this reason,
recommended off -site conditions for this development are described below as
Case I (with well site dedication) and Case II (without well site dedication). It
is understood that McDonnell Douglas, as part of the property sale to Sharp
Electronics Corporation, will work with Sharp to comply with the following:
(PW)
Case I
1. A well site, acceptable to the City, shall be dedicated in the
northwestern corner of the McDonnell Douglas Astronautics
property approximately 180 feet southeast of Rancho Road. In
addition to this well site, easements from the proposed well site,
across a portion of the McDonnell Douglas property to existing
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 12
Case II
water mains in Skylab Drive, Able Lane, Astronautics Drive,
and northwesterly to Rancho Road shall be dedicated to the
City.
2. Dedicate a 15-foot wide, City approved, to contain pipelines
from the well to a point where the proposed pipelines are in the
public right-of-way. The pipelines shall be designed and
constructed at no cost to the City.
3. Construct a 12-inch water main and appurtenances per the City
of Huntington Beach Water Division Standard Plans and
Specifications in Able Lane from Bolsa Avenue, north to Skylab
Drive to a projection of the northerly property line of the
proposed subject site.
4. The City shall be reimbursed for costs to return the existing 12"
waterline in Springdale Street to service. (Estimated cost:
$2,700.00)
1. Construct a 12-inch water main to the City of Huntington
Beach Water Division Standard Plans and Specifications in
Springdale Street from Bolsa Avenue northerly to the proposed
subject site's northern property line, including normally required
appurtenances such as fire hydrants (located by the Fire Dept.),
valves and blow -offs.
2. Construct a 12-inch water main as described in Case I, No. 3
above, in Able Lane from Bolsa Avenue northerly to the subject
site's northern property line.
s. All new utilities shall be constructed underground. (PW)
t. Underground all existing dry utilities less than 66 kv that front (or cross) the
property on Springdale Street and Bolsa Avenue. Existing dry utilities on Able
Lane will not require undergrounding. (PW)
u. Able Road and Bolsa Avenue will be widened to their ultimate widths
including curb, gutter, sidewalk and street pavement. New pavement thickness
will be based on a 20 year design life. The existing structural section in Bolsa
Avenue and Springdale Street may be inadequate to handle the increased truck
traffic generated by the site. Sections of Bolsa Avenue and Springdale Street,
may require overlay or reconstruction, pending a review of the proposed traffic
study and pavement/soils testing report, to upgrade one half of the frontage
streets to a 10 year design life. (PW)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 13
v. A bus turnout, built to OCTA standards, shall be required on westbound Bolsa
Avenue. (PW)
w. Construction of landscaped medians shall be required on Springdale Street to
the east of the subject parcel. (PW)
x. The existing raised median on Bolsa Avenue may require modification to
accommodate left turns at Able Lane and into the south entrance of the site.
(PW)
y. The entry gate on Springdale Street shall be located within 10' of the back of
sidewalk. (PW)
z. The entry gate on Bolsa Avenue shall be designed to allow a SU-30 standard
design vehicle (e.g. UPS truck) a complete turn to exit. (PW)
aa. Provide a "hammerhead" turn around with a "No Parking" area at the
security gate in the northerly drive aisle, east of the truck loading/unloading
bays. (PW)
bb. Installation of a traffic signal at the intersection of Bolsa Avenue and Able
Road shall be completed at no cost to the City. (PW/CDD)
cc. The developer shall revise the striping on Springdale Street to provide for left
turn pockets to the public streets on the east side. (PW)
dd. Provide a travel aisle next to and parallel with the fence located at the west
side parking area security gate, south of the truck entrance. (PW)
Hours of truck loading, unloading, and delivery operation shall be Monday through Friday
from 8:30 a.m. to 5:00 p.m. Occasional nighttime operations necessitated by
unanticipated operational requirements, such as heavy traffic conditions on the freeway,
may be permitted but should be avoided whenever possible. (CDD)
6. All truck traffic, which is oriented primarily to and from the Port of Long Beach, shall be
directed by the management to use the Bolsa Chica/Bolsa Avenue/Able Lane route to get
to and from the site. (CDD)
7. All building spoils, such as unusable lumber, wire, pipe, and other surplus or unusable
material, shall be disposed of at an off -site facility equipped to handle them. (CDD)
8. Low -volume heads shall be used on all spigots and water faucets. (CDD)
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 14
9. If lighting is included in the parking lot, high-pressure sodium vapor lamps shall be used
for energy savings. All outside lighting shall be directed to prevent "spillage" onto
adjacent properties. (CDD)
10. The Zoning Administrator shall be notified in writing if any changes in building height,
floor area, setbacks, building elevations or parking are proposed as a result of the plan
check process. Building permits shall not be issued until the Zoning Administrator has
reviewed and approved the proposed changes. The Zoning Administrator reserves the
right to require that an amendment to the original entitlement be processed if the proposed
changes are of a substantial nature. (CDD)
11. Conditions of approval shall be printed verbatim on the cover sheet of all working drawing
sets submitted for plancheck. (CDD)
INFORMATION ON SPECIFIC CODE REQUIREMENTS
The development shall comply with all applicable provisions of the Huntington Beach
Zoning and Subdivision Ordinance, Building Division, and Fire Department. (CDD)
2. The applicant shall meet all applicable local, State, and Federal Fire Codes, Ordinances,
and standards. (CDD)
3. The applicant shall obtain permits from the South Coast Air Quality Management District,
if necessary. (CDD)
4. A detailed soils analysis shall be prepared by a registered Soils Engineer. This analysis
shall include on -site soil sampling and laboratory testing of materials to provide detailed
recommendations regarding grading, chemical and fill properties, foundations, retaining
walls, streets, and utilities. (PW)
5. An encroachment permit shall be required for all work within City right-of-way. (PW)
6. The Zoning Administrator reserves the right to revoke Conditional Use Permit No. 95-63
if any violation of these conditions of the Huntington Beach Zoning and Subdivision
Ordinance occurs. (CDD)
ITEM 2: CONDITIONAL USE PERMIT NO. 95-37
COASTAL DEVELOPMENT PERMIT NO. 95-12
Applicant: B.J.'s Chicago Pizzeria
Property Owner: Robert Koury Properties, 200 Main Street, #206, Huntington Beach,
CA 92648
Request: To allow existing outdoor dining in conjunction with B.J.'s Chicago
Pizzeria. The dining area is located on private property.
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 15
Location: 200 Main Street, Unit 101 (northeast corner of Main Street and Walnut
Avenue)
CONDITIONAL USE PERMIT NO. 95-37 / COASTAL DEVELOPMENT PERMIT NO.
95-12 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
ITEM 3: CONDITIONAL USE PERMIT NO. 95-70
COASTAL DEVELOPMENT PERMIT NO. 95-13
Applicant: Baskin Robbins
Property Owner: Cheryl Caverly, 25512 Buckwood, Lake Forest, CA 92630
Request: To allow existing outdoor dining in conjunction with Baskin Robbins Ice
Cream Parlor. The outdoor dining area is located in the public right-of-
way.
Location: 201 Main Street, Suite B (northwest corner of Main Street and Walnut
Avenue)
CONDITIONAL USE PERMIT NO. 95-70 / COASTAL DEVELOPMENT PERMIT NO.
95-13 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
ITEM 4: CONDITIONAL USE PERMIT NO.95-81
COASTAL DEVELOPMENT PERMIT NO. 95-26
Applicant: David Abu
Property Owner: Thomas Caverly, 553 Temple Hills Drive, Laguna Beach, CA 92651
Request: To allow existing outdoor dining in conjunction with Midnite Espresso
Cafe. The outdoor dining area is located in the public right-of-way.
Location: 201 Main Street, Suite D (northwest corner of Main Street and Walnut
Avenue, approximately 120 feet west of Main Street)
CONDITIONAL USE PERMIT NO. 95-81 / COASTAL DEVELOPMENT PERMIT NO.
95-26 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 16
0
u
ITEM 5: CONDITIONAL USE PERMIT NO. 95-18
COASTAL DEVELOPMENT PERMIT NO. 95-14
Applicant: Becky Chen
Property Owner: Becky Chen, 209 Main Street, Huntington Beach, CA 92648
Request: To allow existing outdoor dining in conjunction with China Wok
Restaurant. The outdoor dining area is located in the public right-of-way.
Location: 209 Main Street (west side of Main Street, 110 feet north of Walnut
Avenue)
CONDITIONAL USE PERMIT NO. 95-18 / COASTAL DEVELOPMENT PERMIT NO.
95-14 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
ITEM 6: CONDITIONAL USE PERMIT NO. 95-22
COASTAL DEVELOPMENT PERMIT NO. 95-16
Applicant: Holly's Yogurt
Property Owner: Pauline Cooper, P.O. Box 723, Huntington Beach, CA 92648
Request: To allow existing outdoor dining in conjunction with Holly's Yogurt. The
outdoor dining area is located in the public right-of-way.
Location: 213 Main Street (west side of Main Street, approximately 170 feet north of
Walnut Avenue)
CONDITIONAL USE PERMIT NO. 95-22 / COASTAL DEVELOPMENT PERMIT NO.
95-16 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
ITEM 7: CONDITIONAL USE PERMIT NO. 95-23
COASTAL DEVELOPMENT PERMIT NO. 95-17
Applicant: Sugar Shack Cafe
Property Owner: Pauline Cooper, P.O. Box 723, Huntington Beach, CA 92648
(g:zamin1011)
October 11, 1995 Zoning Administrator Minutes
Page 17
1
Request: To allow existing outdoor dining in conjunction with the Sugar Shack
Cafe. The outdoor dining area is located in the public right-of-way.
Location: 213 1/2 Main Street (west side of Main Street, approximately 170 feet
north of Walnut Avenue)
CONDITIONAL USE PERMIT NO. 95-23 / COASTAL DEVELOPMENT PERMIT NO.
95-17 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
ITEM 8: CONDITIONAL USE PERMIT NO. 95-67
COASTAL DEVELOPMENT PERMIT NO. 95-18
Applicant: Larry Lawrence
Property Owner: Robert Koury, 200 Main Street, #206, Huntington Beach, CA 92648
Request: To allow existing outdoor dining in conjunction with the Bread Crumb
Restaurant. The outdoor dining area is located in the public right-of-
way.
Location: 215 Main Street (west side of Main Street, approximately 160 feet
south of Olive Avenue)
CONDITIONAL USE PERMIT NO. 95-67 / COASTAL DEVELOPMENT PERMIT NO.
95-18 WAS CONTINUED TO THE FEBRUARY 7, 1995 ZONING ADMINISTRATOR
MEETING BY THE ZONING ADMINISTRATOR.
THE MEETING WAS ADJOURNED AT 6:45 P.M. BY THE ZONING
ADMINISTRATOR TO THE NEXT REGULARLY SCHEDULED MEETING OF THE
ZONING ADMINISTRATOR ON WEDNESDAY, OCTOBER 18,1995.
Mike Strange
Zoning Administrator
MS:MBO:Iek
:min1011