HomeMy WebLinkAbout1998-02-180
MINUTES
HUNTINGTON BEACH OFFICE OF THE ZONING ADMINISTRATOR
Room B-6 - Civic Center
2000 Main Street
Huntington Beach California
WEDNESDAY, FEBRUARY 18,1998 -1:30 P.M.
ZONING ADMINISTRATOR: Herb Fauland
STAFF MEMBER: Wayne Carvalho, Ricky Ramos, Peter Vanek, Kim Langel
(recording secretary)
MINUTES: None
ORAL COMMUNICATION: None
ITEM 1: REVOCATION OF CONDITIONAL USE PERMIT NO.95-32/COASTAL
DEVELOPMENT PERMIT NO.95-21 (PETE'S MEXICAN FOOD OUTDOOR DINING
PERMIT)
APPLICANT: Pete's Mexican Food, c/o Mary Aparicio, 213-5th Street, Huntington
Beach, CA 92648
PROPERTY OWNER: Max E. Groussman, 421 Rolling Hills Pl., Anaheim, CA 92807
REQUEST: Revocation of Conditional Use Permit No. 95-32 and Coastal
Development Permit No. 95-21 for the outdoor dining permit for
Pete's Mexican Food for failure to comply with the conditions of
approval.
LOCATION: 213-5th Street (Pete's Mexican Food)
PROJECT PLANNER: Wayne Carvalho
Wayne Carvalho, Staff Planner, stated the request for Revocation of Conditional Use Permit No.
95-32 and Coastal Development No. 95-21 had been continued from the February 4, 1998
meeting to allow the applicant an opportunity to comply with the conditions of approval. Staff
stated that all necessary documentation had been submitted and all conditions of approval
complied with. Staff is recommending withdrawal of the request for revocation.
THE PUBLIC HEARING WAS OPENED.
Mary Aparicio, 213 51h Street, applicant, stated that she concurred with staff s report and
recommendation.
THERE WERE NO OTHER PERSONS PRESENT TO SPEAK FOR OR AGAINST THE
REQUEST AND THE PUBLIC HEARING WAS CLOSED.
THE ZONING ADMINISTRATOR WITHDREW REVOCATION OF CONDITIONAL
USE PERMIT NO.95-32 AND COASTAL DEVELOPMENT NO.95-21.
ITEM 2: REVOCATION OF CONDITIONAL USE PERMIT NO.95-41/ COASTAL
DEVELOPMENT PERMIT NO. 95-15 (LUIGI'S RESTAURANT OUTDOOR DINING)
APPLICANT: Ghassan Dahabreh, 221 Main Street, Suite B, Huntington Beach, CA
92648
PROPERTY OWNER: Ben Trainer, 2364-3`d Street, San Francisco, CA 94107
REQUEST: Revocation of Conditional Use Permit No. 95-51 for the outdoor
dining permit for Luigi's Restaurant for failure to comply with the
conditions of approval.
LOCATION: 221 Main Street, Suite B (Luigi's Restaurant)
PROJECT PLANNER: Wayne Carvalho
Wayne Carvalho, Staff Planner, stated the request for Revocation of Conditional Use Permit No.
95-51 had been continued from the February 4, 1998 meeting to allow the applicant an
opportunity to comply with the conditions of approval. Staff stated that all necessary
documentation had been submitted and all conditions of approval complied with. Staff is
recommending withdrawal of the request for revocation.
THE PUBLIC HEARING WAS OPENED.
THERE WERE NO PERSONS PRESENT TO SPEAK FOR OR AGAINST THE
REQUEST AND THE PUBLIC HEARING WAS CLOSED.
THE ZONING ADMINISTRATOR WITHDREW REVOCATION OF CONDITIONAL
USE PERMIT NO.95-51.
ITEM 3• COASTAL DEVELOPMENT PERMIT NO.97-19 (LLOVIO RESIDENCE)
APPLICANT Ali Davasligil, 14122 Sawston Circle, Westminster, CA 92683
PROPERTY OWNER: Mr. & Mrs. Sergio Llovio, 3282 Devon Circle, Huntington Beach, CA
92649
REQUEST: To permit demolition of an existing residence and construction of a new
4,210 square foot two-story single family residence with a 650 square
foot attached garage.
LOCATION: 16751 Bolero Lane
PROJECT PLANNER: Ricky Ramos
Ricky Ramos, Staff Planner, displayed photographs and site plan stating the request is to permit
demolition of an existing residence and construction of a new 4,210 square foot two (2) story
single family residence with a 650 square foot attached garage. The subject site is located at
16751 Bolero Lane. No comments, written or verbal, have been received from the public.
Staff is recommending approval of the proposed request as it will replace an existing residence
and will not impact public views or access. The proposed development will also conform with
all applicable City codes, including parking ,site coverage and setbacks.
Herb Fauland, Zoning Administrator, asked staff is the applicant had submitted the request to the
homeowners association for review and approval. Staff stated that the applicant had submitted
the request to the Huntington Harbour Homeowners Association and the Architectural Review
Committee and had a letter on file confirming their approval.
ZA Minutes — 2/18/98
(98=0218)
THE PUBLIC HEARING WAS OPENED.
Sergio Llovio, 3282 Devon Circle, property owner, concurred with staffs report and
recommendation.
Jim Andrews, Huntington Harbour Architectural Review Committee, stated the Committee had
reviewed and approved the proposed request.
THERE WERE NO OTHER PERSONS PRESENT TO SPEAK FOR OR AGAINST THE
REQUEST AND THE PUBLIC HEARING WAS CLOSED.
COASTAL DEVELOPMENT PERMIT NO.97-19 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT THE ACTION TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION
WITHIN TEN (10) CALENDAR DAYS.
FINDINGS FOR APPROVAL - COASTAL DEVELOPMENT PERMIT NO. 97-19:
1. Coastal Development Permit No. 97-19 for the development project, as proposed or as
modified by conditions of approval, conforms with the General Plan, including the Local
Coastal Program. The proposed residence will replace an existing residence and will not
impact public views or access.
2. The project is consistent with the requirements of the CZ Overlay District, the base zoning
district, as well as other applicable provisions of the Municipal Code. The proposed
development will conform with all applicable City codes, including use, parking, site
coverage and setbacks.
3. At the time of occupancy the proposed development can be provided with infrastructure in a
manner that is consistent with the Local Coastal Program. All infrastructure currently exist
to the site.
4. The development conforms with the public access and public recreation policies of Chapter 3
of the California Coastal Act. No public access or recreational opportunities will be affected
by the new construction.
CONDITIONS OF APPROVAL - COASTAL DEVELOPMENT PERMIT NO.97-19:
1. The site plan, floor plans and elevations received and dated January 12, 1998, shall be the
conceptually approved layout with the following modifications:
a. Site coverage shall not exceed a maximum of 50 percent.
b. Elevations shall depict colors and building materials proposed.
c. Depict all utility apparatus, such as but not limited to back flow devices and Edison
transformers on the site plan. Utility meters shall be screened from view from public
rights -of -way. Electric transformers in a required front or street side yard shall be
enclosed in subsurface vaults. Backflow prevention devices shall be prohibited in the
front yard setback and shall be screened from view.
ZA Minutes — 2/18/98 3 (98zm0218)
2. Prior to submittal for building permits, the following shall be completed:
a. Zoning entitlement conditions of approval shall be printed verbatim on the cover page of
all the working drawing sets used for issuance of building permits (architectural,
structural, electrical, mechanical and plumbing).
b. The following Fire Department requirements shall be noted on the building plans: (FD)
1) Address numbers will be installed to comply with City Specification #428.
Individual units will be sized a minimum of four (4) inches with a brush stroke of
one-half (1/2) inch.
2) The project will comply with all provisions of the Huntington Beach Fire Code and
City Specification #422 and #431 for the abandonment of oil wells and site
restoration.
3) The project will comply with all provisions of the Huntington Beach Municipal Code
Title 17.04.085 and City Specification #429 for new construction within the methane
gas overlay districts.
c. A detailed soils analysis shall be prepared by a registered Soils Engineer and submitted
with the building permit application. This analysis shall include on -site soil sampling and
laboratory testing of materials to provide detailed recommendations regarding: grading,
foundations, retaining walls, streets, utilities, and chemical and fill properties of
underground items including buried pipe and concrete and the protection thereof. (Code
Requirement)
d. Floor plans shall depict natural gas and 220V electrical shall be stubbed in at the location
of clothes dryers; natural gas shall be stubbed in at the locations of cooking facilities,
water heaters and central heating units.
3. Prior to issuance of building permits, the following shall be completed:
a. Submit copy of the revised site plan, floor plans and elevations pursuant to Condition No.
1 for review and approval and inclusion in the entitlement file to the Department of
Community Development.
b. A Landscape Construction Set must be submitted to the Department of Public Works and
approved by the Departments of Public Works and Community Development. The
Landscape Construction Set shall include a landscape plan prepared and signed by a State
Licensed Landscape Architect which identifies the location, type, size and quantity of all
existing plant materials to remain, existing plant materials to be removed and proposed
plant materials; an irrigation plan; a grading plan; an approved site plan and a copy of the
entitlement conditions of approval.
c. A grading plan, prepared by a registered Civil Engineer, shall be submitted to the
Department of Public Works for review and approval. (PW)
ZA Minutes — 2/18/98 4 (98=0218)
1
4. During construction, the applicant shall:
I
a. Use water trucks or sprinkler systems in all areas where vehicles travel to keep damp
enough to prevent dust raised when leaving the site:
b. Wet down areas in the late morning and after work is completed for the day;
c. Use low sulfur fuel (.05%) by weight for construction equipment;
d. Attempt to phase and schedule construction activities to avoid high ozone days (first
stage smog alerts);
e. Discontinue construction during second stage smog alerts.
5. Prior to final building permit inspection the following shall be completed:
a. All improvements to the property shall be completed in accordance with the approved
plans and conditions of approval specified herein, including landscaping.
b. Compliance with all conditions of approval specified herein shall be accomplished and
verified by the Community Development Department.
c. All building spoils, such as unusable lumber, wire, pipe, and other surplus or unusable
material, shall be disposed of at an off -site facility equipped to handle them.
6. All proposed improvements within the public waterways (dock and ramp) shall require
separate permits.
7. All proposed cantilevered deck improvements require separate permits.
8. The Community Development Director ensures that all conditions of approval herein are
complied with. The Community Development Director shall be notified in writing if any
changes to the site plan, elevations and floor plans are proposed as a result of the plan check
process. Building permits shall not be issued until the Community Development Director has
reviewed and approved the proposed changes for conformance with the intent of the Zoning
Administrator's action and the conditions herein. If the proposed changes are of a substantial
nature, an amendment to the original entitlement reviewed by the Zoning Administrator may
be required pursuant to the HBZSO.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. Coastal Development Permit No. 97-19 shall not become effective until the ten day appeal
period has elapsed.
1. Coastal Development Permit No. 97-19 shall become null and void unless exercised within
one year of the date of final approval or such extension of time as may be granted by the
Director pursuant to a written request submitted to the Department of Community
Development a minimum 30 days prior to the expiration date.
ZA Minutes — 2/18/98 5 (98zm0218)
3. The Zoning Administrator reserves the right to revoke Coastal Development Permit No. 97-
19, pursuant to a public hearing for revocation, if any violation of these conditions or the
Huntington Beach Zoning and Subdivision Ordinance or Municipal Code occurs.
4. All applicable Public Works fees shall be paid. The developer will be responsible for the
payment of any additional fees adopted in the "upcoming" Water Division Financial Master
Plan. (PW)
5. An encroachment permit shall be required for all work within the right-of-way. (PW)
6. State -mandated school impact fees shall be paid prior to issuance of building permits.
7. The development shall comply with all applicable provisions of the Municipal Code,
Building Division, and Fire Department as well as applicable local, State and Federal Fire
Codes, Ordinances, and standards, except as noted herein.
8. Construction shall be limited to Monday - Saturday 7:00 AM to 8:00 PM. Construction
shall be prohibited Sundays and Federal holidays.
9. The applicant shall submit a check in the amount of $38.00 for the posting of the Notice
of Exemption at the County of Orange Clerk's Office. The check shall be made out to
the County of Orange and submitted to the Department of Community Development
within two (2) days of the Zoning Administrator's action.
THE MEETING WAS ADJOURNED AT 1:47 PM BY THE ZONING
ADMINISTRATOR TO THE NEXT REGULARLY SCHEDULED MEETING OF THE
ZONING ADMINISTRATOR ON WEDNESDAY, FEBRUARY 25,1998 AT 1:30 PM.
Herb Fauland
Zoning Administrator
:kjl
ZA Minutes — 2/18/98 6 (98=0218)