HomeMy WebLinkAbout2005-04-13•
MINUTES
HUNTINGTON BEACH OFFICE OF THE ZONING ADMINISTRATOR
Room B-8 - Civic Center
2000 Main Street
Huntington Beach California
WEDNESDAY, APRIL 13 2005 - 1.30 P.M.
ZONING ADMINISTRATOR: Mary Beth Broeren
STAFF MEMBER: Ron Santos, Ramona Kohlmann (recording secretary)
MINUTES: February 23, 2005
March 2, 2005 (continued from the April 6, 2005 meeting)
APPROVED AS SUBMITTED
ORAL COMMUNICATION: NONE
ITEM 1: MITIGATED NEGATIVE DECLARATION NO. 04-09/CONDITIONAL USE PERMIT
NO. 04-31 (TOYOTA OF HUNTINGTON BEACH)
APPLICANT/
PROPERTY OWNER:
Studio IV Architects, 25691 Atlantic Ocean Drive, B-4, Lake
Forest, CA 92630-8838
REQUEST:
MND: To analyze the potential environmental impacts associated
with the implementation of the proposed project. CUP: To permit
a new Toyota vehicle sales and service facility consisting of an
approximately 39,500 sq. ft. sales, office, showroom and service
building and a 162,650 sq. ft. multi -level parking structure
(inventory, storage and customer parking), a service canopy and
grade level parking for display and customers. The existing
Toyota vehicle sales and service facility will be demolished.
LOCATION:
18881 Beach Boulevard (west side of Beach Boulevard, north of
Garfield Avenue)
PROJECT PLANNER:
Ron Santos
Ron Santos, Staff Planner, displayed project plans and models and stated the purpose,
location, zoning, and existing uses of the requested project. Staff presented a review of the
proposed project and the suggested findings and conditions of approval as outlined in the
executive summary.
Staff recommended approval of the request based upon the suggested findings and subject to
the suggested conditions as outlined in the executive summary. Staff stated that the Design
Review Board (DRB) recommended approval of the proposed project with one change as
reflected in the suggested conditions of approval; the Environmental Assessment Committee
recommended approval of the proposed project; the City's Environmental Board submitted a
letter with three concerns addressing landscaping, lighting and construction debris; and Cal
Trans requested a copy of the traffic analysis study. No written or verbal comments were
received in response to the public notification.
Staff stated that the applicant held a community meeting at City Hall and sent notices to within
the 500-ft. radius and no one from the radius area attended or called.
Staff suggested the addition of the following condition of approval:
Recyclable scrap construction material and demolition debris shall be recycled to the
greatest extent feasible Prior to issuance of demolition permit(s), the applicant shall
submit a plan for identifying recyclable material a means of recycling and a method of
documenting recycling efforts to the Department of Planning for review and approval by
the Departments of Planning Building & Safety and Public Works.
Mary Beth Broeren, Zoning Administrator, reviewed the plans and project models. Discussions
ensued concerning site coverage, FAR ratio and parking garage, minimum landscaping
requirements at the rear setback and parking area, parking requirements, the DRB's rationale
for the recommended red stripe along the rear of the parking structure, and type of trees along
the perimeter of the parking structure.
THE PUBLIC HEARING WAS OPENED.
THERE WERE NO PERSONS PRESENT TO SPEAK FOR OR AGAINST THE REQUEST
AND THE PUBLIC HEARING WAS CLOSED. 0
Discussion ensued with Casey Sowers, Sowers Construction, and the architect concerning the
proposed red band along the rear of the building, height of treatments, type of trees and
height. Ms. Broeren stated her agreement with the DRB's recommendation for some
adornment at the back of the building but questioned the recommended red stripe along the
rear of the building. Further discussion ensued concerning the overall site coverage.
Ms. Broeren confirmed with the applicant that they have reviewed the added condition as
recommended by staff during the course of today's meeting concerning recyclable material.
She complimented the applicant on the design of the proposed project and stated appreciation
for their efforts.
MITIGATED NEGATIVE DECLARATION NO. 04-09/CONDITIONAL USE PERMIT NO. 04-31
WERE APPROVED BY THE ZONING ADMINISTRATOR WITH THE FOLLOWING FINDINGS
AND MODIFIED CONDITIONS OF APPROVAL. THE ZONING ADMINISTRATOR STATED
THAT THE ACTION TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO
THE PLANNING COMMISSION WITHIN TEN (10) CALENDAR DAYS.
FINDINGS FOR APPROVAL — MITIGATED NEGATIVE DECLARATION
NO. 04-09:
1. The Mitigated Negative Declaration No. 04-09 has been prepared in compliance with
Article 6 of the California Environmental Quality Act (CEQA) Guidelines. It was advertised
and available for a public comment period of thirty (30) days. Any comments received 40
ZA Minutes 04/13/05 2 (05zm0413)
during the comment period were considered by the Zoning Administrator prior to action on
the Negative Declaration.
2. Mitigation measure(s) avoid or reduce the project's effects to a point where clearly no
significant effect on the environment will occur.
3. There is no substantial evidence in light of the whole record before the Zoning
Administrator that the project, as mitigated through the attached mitigation measures will
have a significant effect on the environment.
FINDINGS FOR APPROVAL - CONDITIONAL USE PERMIT NO. 04-31:
1. Conditional Use Permit No. 04-31 to permit a new Toyota vehicle sales and service facility
consisting of an approximately 39,500 sq. ft. sales, office, showroom and service building
and a 162,650 sq. ft. multi -level parking structure (inventory, storage and customer
parking), a service canopy and grade level parking for display and customers will not be
detrimental to the general welfare of persons working or residing in the vicinity or
detrimental to the value of the property and improvements in the neighborhood. The
proposed project's potential to negatively impact the surrounding neighborhood was
analyzed in conjunction with Mitigated Negative Declaration No. 04-09, which concluded
that no significant impacts will result with incorporation of appropriate mitigation. MND No.
04-09 considered a noise analysis, traffic generation analysis, geotechnical reports,
conceptual water quality management plan, storm water pollution prevention plan, the
project design and architecture, pedestrian and vehicular access, circulation and safety,
surrounding land uses, and the City of Huntington Beach Urban Design Guidelines.
2. The conditional use permit will be compatible with surrounding uses because the project
site is currently developed with a vehicle sales and service center and the proposed project
provides for demolition of existing improvements and construction of a new vehicle sales
and service center in conformance with applicable land use regulations and development
standards. The project site is located along the City's principal commercial corridor, is
surrounded on three sides by commercial uses and is in close proximity to other
automobile -oriented uses, including other vehicle sales and service facilities, a car wash
and a variety of businesses providing drive -through service (bank, pharmacy, fast food).
Existing two-story multi -family dwellings to the west of the subject property are located
approximately 120 feet away from the proposed parking structure, which is setback ten feet
from the west property line. The conceptual landscape plan provides for a row of trees to
be planted in the landscaped setback area between the parking structure and the west
property line, thus providing a visual buffer between the proposed buildings and the
existing residential property. In addition, the proposed parking structure is designed with a
maximum height of 18 feet within 45 feet of the west property line. Consequently, the
proposed structure will not exceed the height of the existing apartment buildings within a
spacing of 155 feet.
3. The proposed conditional use permit will comply with the provisions of the base district and
other applicable provisions in Titles 20-25 of the Huntington Beach Zoning and Subdivision
Ordinance including minimum building setbacks, parking and landscape requirements and
® maximum building height. No variance(s) to applicable development standards is
requested or required.
ZA Minutes 04/13/05 3 (05zm0413)
4. The granting of the conditional use permit will not adversely affect the General Plan. It is •
consistent with the Land Use Element designation of CG-F1 (Commercial General — 0.35
maximum floor area ratio) on the subject property. The project site is also located within a
General Plan sub -area (6G) which specifically identifies automobile sales as a desired use.
In addition, it is consistent with the following goals and policies of the General Plan:
LU 10.1 Provide for the continuation of existing and the development of a diversity of
retail and service commercial uses that are oriented to the needs of local
residences, serve the surrounding region, serve visitors to the City, and
capitalize on Huntington Beach's recreational resources.
LU 10.1.7 Require that parking structures located on commercial parcels abutting
residential uses (a) be designed to prevent adverse noise and air emission
impacts and (b) incorporate architectural design elements, such as fagade
articulation, offset planes, and landscape, to provide visual interest and
compatibility with the residences.
LU 10.1.12 Require that Commercial General uses be designed and developed to achieve
a high level of quality, distinctive character, and compatibility with existing
uses and development including the consideration of incorporation of site
landscape, particularly along street frontages and in parking lots.
The requested conditional use permit will provide for the continuation and expansion of an
existing commercial use serving both the needs of local residents (vehicle service and
sales) and the surrounding region (vehicle sales). The proposed parking structure is fully
enclosed (excepting the top level), thereby providing for the screening of stored/parked 40
vehicles, and features varied roof lines, setbacks and massing offsets. The proposed
parking structure also features fagade glazing and other attributes consistent with office
building architecture as well as a ten foot wide, tree -lined landscape setback along the
perimeter. The proposed project features quality site planning, architectural design and a
unique character.
MITIGATION MEASURES FOR ENVIRONMENTAL CONCERNS:
The service drive aisle proposed along the southerly property line shall be gated to prevent
public access via Beach Boulevard. Use of the drive aisle shall be limited to Toyota personnel
authorized to access the service bay via the roll -up doors on the south side of the service
building. Signs shall be installed at the drive aisle entrance, indicating that use of the drive
aisle is restricted. The design and location of the gate and signs shall be reviewed and
approved by the Departments of Fire, Planning and Public Works prior to installation.
CONDITIONS OF APPROVAL - CONDITIONAL USE PERMIT NO. 04-31:
1. The site plan, floor plans, and elevations received and dated January 27, 2005, shall be
the conceptually approved design with the following modification: A red band, matching
that proposed along the front of the building, shall be painted along the rear of the parking
structure. An alternative architectural treatment may be substituted, subject to review and
approval of the Department of Planning. (DRB)
•
ZA Minutes 04/13/05 4 (05zm0413)
i�
2. Recyclable scrap construction material and demolition debris shall be recycled to the
greatest extent feasible. Prior to issuance of demolition permit(s), the applicant shall
submit a plan for identifying recyclable material, a means of recycling and a method of
documenting recycling efforts to the Department of Planning, for review and approval by
the Departments of Planning, Building & Safety and Public Works.
INDEMNIFICATION AND HOLD HARMLESS CONDITION:
The owner of the property which is the subject of this project and the project applicant if
different from the property owner, and each of their heirs, successors and assigns, shall
defend, indemnify and hold harmless the City of Huntington Beach and its agents, officers,
and employees from any claim, action or proceedings, liability cost, including attorney's fees
and costs against the City or its agents, officers or employees, to attack, set aside, void or
annul any approval of the City, including but not limited to any approval granted by the City
Council, Planning Commission, or Design Review Board concerning this project. The City shall
promptly notify the applicant of any claim, action or proceeding and should cooperate fully in
the defense thereof.
THE MEETING WAS ADJOURNED AT 1:55 PM BY THE ZONING ADMINISTRATOR TO THE
NEXT REGULARLY SCHEDULED MEETING OF THE ZONING ADMINISTRATOR ON
WEDNESDAY, APRIL 20, 2005 AT 1:30 PM.
lat4BBzrLo�etn
Zoning Administrator
rmk
ZA Minutes 04/13/05 5 (05zm0413)