HomeMy WebLinkAboutOrdinance #3994 ORDINANCE NO. 3994 AN ORDINANCE OF THE CITY OF HUNTINGTON BEACH AMENDING CHAPTER 17.06 OF THE HUNTINGTON BEACH MUNICIPAL CODE RELATING TO THE GREEN BUILDING STANDARDS CODE The City Council of the City of Huntington Beach does hereby ordain as follows: SECTION I. Section 17.06.010 of the Huntington Beach Municipal Code is hereby amended to read as follows: 17.06.010 Adoption. There is hereby adopted by the City Council by reference that certain code known as the 2013 California Green Building Standards Code, and the whole thereof, excluding appendices. Such code, and amendments thereto, is hereby adopted and incorporated, pursuant to California Government Code §50022.2 et seq., and Health and Safety Code §18941.5, as fully as though set forth at length herein, for the purpose of improving public health, safety and general welfare by enhancing the design and construction of buildings through the use of building concepts having a reduced negative impact or positive environmental impact and encouraging sustainable construction practices. From the date on which this chapter takes effect, the provisions thereof shall be controlling within the corporate limits of the City of Huntington Beach. SECTION 2. Section 17.06.030 of the Huntington Beach Municipal Code is hereby added to read as follows: 17.06.030 Residential electric vehicle (EV) charsing, Subsection A4.106.8. Dwellings shall comply with the following requirements for the future installation of electric vehicle supply equipment(EVSE): A4.106.8.1 One-and two-family dwellings. Install a listed raceway to accommodate a dedicated branch circuit. The raceway shall not be less trade size 1 (nominal I-inch inside diameter). The raceway shall be securely fastened at the main service or subpanel and shall terminate in close proximity to the proposed location of the charging system into a listed cabinet, box or enclosure. Raceways are required to be continuous at enclosed or concealed areas and spaces. A raceway may terminate in an attic or other approved location when it can be demonstrated that the area is accessible and no removal of materials is necessary to complete the final installation. Exception: Other pre-installation methods approved by the local enforcing agency that provide sufficient conductor sizing and service capacity to install Level 2 electric vehicle supply equipment(EVSE). Note: Utility companies may have additional requirements for metering and EVSE installation, and should be consulted during the project design and installation. 13-3876/100501.doc I Ordinance No. 3994 A4.106.8.1.1 Labeling requirements. A label stating `EV CAPABLE" shall be posted in a conspicuous place at the service panel or subpanel and next to the raceway termination point. A4.106.8.2 Multifamily dwellings. At least 3 percent of the total parking spaces, but not less than one, shall be capable of supporting future electric vehicle supply equipment (EVSE). A4.106.106.8.2.1 Single charging space required. When only a single charging space is required, install a listed raceway capable of accommodating a dedicated branch circuit. The raceway shall not be less trade size 1 (nominal 1-inch inside diameter). The raceway shall be securely fastened at the main service or subpanel and shall terminate in close proximity to the proposed location of the charging system into a listed cabinet, box or enclosure. Exception: Other pre-installation methods approved by the local enforcing agency that provide sufficient conductor sizing and service capacity to install Level 2 electric vehicle supply equipment (EVSE). A4.106.8.2.2 Multiple charging_spaces required. When multiple charging spaces are required, plans shall include the location(s) and type of the EVSE, raceway method(s), wiring schematics and electrical calculations to verify that the electrical system has sufficient capacity to simultaneously charge all the electrical vehicles at all designated EV charging spaces at their full rated amperage. Plan design shall be based upon Level 2 EVSE at its maximum operating ampacity. Only underground raceways and related underground equipment are required to be installed at the time of construction. Note: Utilities may have additional requirements for metering and EVSE installation, and should be consulted during the project design and installation. A4.106.8.2.3 Labeling requirements. A label stating"EV CHARGE CAPABLE" shall be posted in a conspicuous place at the service panel or subpanel and the EV charging space. SECTION 3. Section 17.06.040 of the Huntington Beach Municipal Code is hereby added to read as follows: 17.06.040 Nonresidential electric vehicle charfiny,, Subsection A5.106.5.3. Provide facilities meeting Section 406.9 (Electric Vehicle) of the California Building Code and as follows: A5.106.5.3.1 Single charging space requirements. When only a single charging space is required, install a listed raceway capable of accommodating a dedicated branch circuit. The raceway shall not be less than trade size 1. The raceway shall be securely fastened at 13-3876/100501.doc 2 Ordinance No. 3994 the main service or subpanel and shall terminate in close proximity to the proposed location of the charging system into a listed cabinet, box or raceway. Exception: Other pre-installation methods approved by the local enforcing agency that provide sufficient conductor sizing and service capacity to install Level 2 electric vehicle supply equipment(EVSE). A5.106.5.3.2 Multiple charging spaces required. When multiple charging spaces are required, plans shall include the location(s) and type of the EVSE, raceway method(s), wiring schematics and electrical calculations to verify that the electrical system has sufficient capacity to simultaneously charge all the electrical vehicles at all designated EV charging spaces at their full rated amperage. Plan design shall be based upon Level 2 EVSE at its maximum operating ampacity. Only underground raceways and related underground equipment are required to be installed at the time of construction. Note: Utilities may have additional requirements for metering and EVSE installation, and should be consulted during the project design and installation. A5.106.5.3.3 Tier 1. At least 3 percent of the total parking spaces, but not less than one, shall be capable of supporting future electric vehicle supply equipment (EVSE). A5.106.5.3.5 Labeling requirements. A label stating "EV CHARGE CAPABLE" shall be posted in a conspicuous place at the service panel or subpanel and the EV charging space. SECTION 2. This ordinance shall become effective 30 days after its adoption. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 18th day of November , 2013. e Mayor ATTEST: APPROVED AS TO FO QP_noel) City Clerk ( � City Attorney t)kZ CZAI f 3 REVI ND APPROVED: INITIAT D AND APPROVED: GCit Yanager irector o Planning and Building 13-3876/10050 Ldoc 3 J Ord. No. 3994 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS: CITY OF HUNTINGTON BEACH ) I, JOAN L. FLYNN, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing ordinance was read to said City Council at a Regular meeting thereof held on October 21,2013, and was again read to said City Council at a Regular meeting thereof held on November 18, 2013, and was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council. AYES: Sullivan, Hardy, Boardman, Carchio, Shaw, Katapodis NOES: Harper ABSENT: None ABSTAIN: None I,Joan L.Flynn,CITY CLERK of the City of Huntington Beach and ex-officio Clerk of the City Council,do hereby certify that a synopsis of this ordinance has been published in the Huntington Beach Fountain Valley Independent on November 28,2013. In accordance with the City Charter of said City Joan L. Flynn, Ci. Clerk Cif/Clerk and ex-officio rk Senior Deputy City Clerk of the City Council of the City of Huntington Beach, California