HomeMy WebLinkAboutCity Council - 1230 RESOLUTION NO. 1Z.30
` A RESOIUTION OF THE CITY OF HUNTINGTON BFACH
ESTABLISHING THE GENERAL PREVAILDIG RATE OF
HOURLY WAGES FOR EACH CRAFT OR TYPE OF WORK-
MAN
OR MECHANIC NEEDED FOR THE CONSTRUCTION
AND INSTALLATION OF A REINFORCED CONCRETE WIPE
STORM DRAIN WITH ITS APPURTENANCES.. ON SEVENTH
STREET BEMEE OCEAN AVENUE AND WATNUT AVENUE
AND ON WALNUT AVENUE BETWEEN N FIFTH STREET AND
AMI EIGHTH STREET, ALL IN THE CITY OF HUNTINGTON
BEACH, CALIFORNIA,; AND AS SHOWN IN DETAIL ON
PLANS AND PROFILES*
ARE a, the City Council of the City of, Huntington Beach has
conducted a hearing for the purpose of establishing the general
prevailing rate of hourly wages in this locality for workmen
heeded for the construction and installation of a reinforced
concrete pipe storm drain with its appurtenances, on Seventh
Street between Ocean Avenue and 'Walnut Avenue, and on. Walnut
Avenue between Fifth Street and Eighth Street, all in the City
of Huntington Beach, and has considered evidence presented®
NOW THEREFORE, BE IT RESOLVED;. That the City Council of the
City of Huntington Beach does hereby find, establish and determine
that the general prevailing rate of hourly wages in this locality
for workmen needed for the construction and installation of a rein,-
forced concrete pipe storm drain with its appurtenances on Seventh
Street between ocean. Avenue and Walnut Avenue, and on Walnut avenue
between Fifth Street and Eighth Street, all in the City of
Huntington Beach, and the general,_prevaili.ng rate of legal
Holiday and overtime work, is as follows:
1
Resolution No. 1230
Hourly
Classification Wage "Rate
Carpenter....o*...a......o.. ... ... .....o...o 2.775
Cement Mason............... ......... .......e 2.70
laborer-General or Construction.o..oee...... 2* 7
Operators and Tenders of Pneumatic and
Electric Tools, Vibrating Machines,
and similar mechanical tools not
.p separately classified herein...e.......e. 2.285
Cribber or Shorer............... ..... ....... 2.43
Asphalt Raker and Ironer........... ......... 2.28
anbe...s.e.e.o.•er...o.ee ............e. 2.075
atel a ........ .o.eee.• 1.97
_w. Guinea Chaser....... 2.15�
Sewer Wipe Layer (Excluding Caulker)........ 2.38
Sewer Pipe Caulker (Using cualking tools)..e 2.265
Sewer Pipe Caulker—Ce-dent Joints.. ......... 2.125
Tarman and Mortarman......................e. 24125
Drivers of Damp Trucks of less than 4 Yds. Q
Water
Drivers of Dump Trucks--4 Yds. but less
than 8 Yds. water level................ 2.21
Drivers of Dump Trucks-8 Yds. but less
than 12 Yds. water leveLos ......o.s..le. 2.26
Drivers of Trucks—Legal Payload Capacity
Less than 6 tons.................e... .... 2.18
Drivers of Trucks—Legal Payload Capacity
between 6 and 10 tons.................... 2.21
Drivers of Trucks—Legal Payload Capacity
between 10 and 15 tons,....... 2.26
Drivers of Trucks--Legal Payload Capacity
between 15 and 20 tams................... 2.34
2
a Resolution No. 123,0
Hourly
Classification Wage Rate
Drivers of Trucks—legal Payload Capacity
20 tons or ®re.a. stor.aoi•ofi•frfo•®main••♦. 2.56
Drivers of Transit-- Trucks--Under 3 Yds.... 2.42
Drivers of Transit-- Trucks-- 3 Yds. or
'eaaowfrfwo.wo.oawf•••fisa•ai®ewf •ammoseato 2.56
Winch Truck Driver--12-:i hr. additional
when operating power winch A Frames, or
similar special aatt achments*o*o s.r o.;•.•.f.i o o 2-31
Pick Up Truck Drivers....•.f.afa. .a.a ..aiia.. w. 2.15
Drivers of Flat Pack Trucks--
under Y8, 4C ..•..rari.r...fa.•.ai.r•f.a®aa.a 2.19
ReinforcingIronWorker....... 9 a o a r••s f s r r o i o®. 2,80
N A®1 rame-w"BE'J Truck e i o f o r f f r•s a i a a f+w e f r r a s e 2.68
.fir Compressor (7perator.f..;f •+a..nir.n.fwri•. 2.37
Concrete MixerOperator-Skip Type.............. 2.52
Heavy Duty Repairman•......ofs•iswo• frwrr•riffi. 2,76
Heavy platy Repa an--Helperorifns.a. o.....raa. 2,2
Motor Patrol Operator, including any type
of power blade........ ro•nie..eoesao.rarwoao. 2. 2
Pavement Breaker Operator... ...... 2.60
Pump Cperatoroaifs.....f wioofrfr•o•fe sr•soaoef. 2.37
Roller Opel°ator..........ofoe.sasfoois.aaoi+f.. 2.60
Skip Loader Operator-Wheel T ....a.aoa..o.a. 2.68
Tractor Operator--Bulldozer, Tamper,
Scraper or Drag Type Shovel or Boma
2.76 cttacmnt .f.rfifw• rwfa•a4f..ffrrfia•.w.iff.
1 renching Machine Operat or.w r r o f•w•f...a....a r. 2.76
Universal Equipment Operator (Shovel, Drag-
line Derrick, rrick-Barge, Clamshell or
Craned..fn.e..wa.a.fian...•.ai. .aif..awa•...; 2.91
F
Resolution No. 1230
OVERTIME ICES
CARPENTERS - Double time .for all overtime, except for Pile Driver
Men ® Bridge or Rock Carpenters on tide work where
the overtime rate will be time and one-half;
providing that when men are called to work outside
} of the regular work day they will be guaranteed six (6)
hours pay at the overtime rate.
CEMENT MAZON -- Time and one-half for the first three hours after
the regularly constituted straight time shift, and
all other overtime shall be double time®
IG - Time and one-half except Sundays and Holidays which are
double time.
OPERATING ENGINEERS - Time and one-half for all overtime except
Sundays and Holidays which are double times 'Where
Operating Engineers, daring any one calendar day, are
working overtime on the same unit of a project on
which another craft is working overtime at the double
time rate, then the Operating Engineers on such unit
of work shall also be paid at the double time rate.
A unit of the project means any single building,
facility, utility, or any other single structure
which is independent of any other unit of the project.
w The operation of a crushing plant .for stock pile and
the servicing, repairing, and maintenance of equipment
on a project shall be at time and one-half, except in
4
Resolution No. 12.30
the following two instances:
(; 1. Sundays and Holidays.
2. 'Where the equipment operator is repairing his
equipment on a unit of the project where double
time is being paid in that calendar clay.
When the Operating Engineer is working on a project
as an integral part of a crew where another craft is
receiving overtime pay by virtue of a holiday not
specified in the Master labor Agreement, them the
Operating Engineer shall receive the same overtime
rate as the other craft.
PASSED AND ADOPTED by the City Council cil of the City of
Huntington Beach, California at a regular adjourned meeting thereof
held on the 15th dad- of November, 1954-
Mayor
ATTEST;
City Clerk
State of California,
ss:
County of Orange }
I. John L. Henricksen, City Clerk and ex-officio Clerk
of the City Council of the City of Huntington Beach, do hereby certify
5
Resolution NO.
that the foregoing Resolution 'Was read to the City Council of said
City at a regular adjourned meeting of said City Council held on
the 15th day of November, 1954, and was by said. City Council
passed and adapted by the following vote.-
AYES: Councilmen.: Terry, Lockett, Bartlett, Le . rd, Seabridge
NOES: Councilmen: None
A,BSENT: Councilmen.- None
ity Clerk and ex-officio Clerk
of the City Council of the_City
of Huntington Beach, California
i
I
I
f
6