HomeMy WebLinkAboutCity Council - 4891 RESOLUTION NO . 4891
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF HUNTINGTON BEACH ESTABLISHING FEE SCHEDULES
FOR BUILDING AND CONSTRUCTION SERVICES
WHEREAS, Chapters 17.02, 17.28, and 17.48 of the Huntington
Beach Municipal Code provide that the City Council, by resolution,
shall estbalish fees to be charged by the city for certain
building and construction services ,
NOW, THEREFORE, BE IT RESOLVED BY THE City Council of the
City of Huntington Beach that the following fees shall be charged
for building and construction services furnished by the city:
BUILDING PERMIT FEES
TOTAL VALUATION FEES
$1 to $500 $10
$501 to $2,000 $10 for the first $500 plus
$1.50 for each additional $100
or fraction thereof, to and
including $2,000
$2,001 to $25 ,000 $32 .50 for the first $2000 plus
$6 for each additional thousand
or fraction thereof, to and in-
cluding $25 ,000
$253001 to $50,000 $170.50 for the first $25,000
plus $4.50 for each additional
thousand or fraction thereof , to
and including $50,000
$50 ,001 to $100 ,000 $283 for the first $50,000 plus
$3 for each additional thousand
or fraction thereof, to and in-
cluding $100 ,000
$100,001 and up $433 for the first $1005000 plus
$2.50 for each additional thousand
or fraction thereof
/ahb 1 .
6/17/80
BUILDING PERMIT FEES contd.
PLAN CHECKING FEES : 65 percent of building permit fees.
FOUNDATION OR PARTIAL FEE: $30
INVESTIGATION FEE shall be equal to the amount of the standard per-
mit fee for the permit to which it applies , but not less than $15 .
REINSPECTION FEE: $15
CERTIFICATE OF OCCUPANCY FEE: $8
CHANGE OF OCCUPANCY INSPECTION FEE: $30
SPECIAL CERTIFICATE OF OCCUPANCY FEE: $30
PROCESSING FEE: $15
GRADING PLAN-CHECKING FEES
50 cubic yards or less No fee
51 to 100 cubic yards $12
101 to 1000 cubic yards $18
1001 to 10,000 cubic yards $24
10,001 to 100 ,000 cubic yards $24 for the first 10, 000 cubic
yards plus $12 for each additional
10, 000 cubic yards or fraction
thereof
100 ,001 to 200,000 cubic yards $132 for the first 1001000 cubic
yards plus $7 for each additional
10,000 cubic yards or fraction
thereof
200,001 cubic yards or more $202 for the first 2005000 cubic
yards plus $4 for each additional
10,000 cubic yards or fraction
thereof
GRADING PERMIT FEES
50 cubic yards or less $15
51 to 100 cubic yards $18
2.
GRADING PERMIT FEES contd.
101 to 1000 cubic yards $18 for the first 100 cubic yards
Y
plus $8 .50 for each additional
100 cubic yards or fraction
thereof
1001 to 10,000 cubic yards $94 .50 for the first 1000 cubic
yards plus $7 for each addi-
tional 1000 cubic yards or
fraction thereof
10,001 to 100,000 cubic yards $157.50 for the first 10,000
cubic yards plus $30 for each
additional 101000 cubic yards
or fraction thereof
100 ,001 cubic yards or more $427.50 for the first 100 ,000
cubic yards plus $18 for each
additional 10 ,000 cubic yards
or fraction thereof
BUILDING RELOCATION INSPECTION FEE: computed in accordance with
the fees established herein for special services , but in no event
less than $100.
MECHANICAL PERMIT FEES
For issuance of each permit . . . . . . . . . . . . . . . . . . . . . . . .$ 10.00
For installation or relocation of each forced-air
or gravity-type furnace or burner, including
ducts and vents attached to such appliance, up
to and including 100,000 Btu/h . . . . . . 0 . . . . . . . . 0 6.00
For installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts
and vents attached to such appliance over
100 ,000 Btu/h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50
For installation or relocation of each floor furnace,
including vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.00
For installation or relocation of each suspended
heater, recessed wall heater or floor-mounted
unit heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.00
For installation, relocation or replacement of each
appliance vent installed and not included in an
appliance permit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. 00
For repairing, altering or adding to each heating
appliance, refrigeration unit, cooling unit ,
absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, in-
cluding installation of controls regulated by
the Huntington Beach Mechanical Code . . . . . . . . . . 6.00
3•
MECHANICAL PERMIT FEES contd .
For installation or relocation of each boiler or
compressor to and including 3 hp, or each ab-
sorption system to and including 100 ,000 Btu/h$ 6 .00
For installation or relocation of each boiler or
compressor over 3 hp to and including 15 hp ,
or each absorption system over 100,000 Btu/h
and including 500,000 Btu/h . . . . . . . . . . . . . . . . . . 11.00
For installation or relocation of each boiler or
compressor over 15 hp to and including 30 hp,
or each absorption system over 500,000 Btu/h
to and including 1 ,000,000 Btu/h . . . . . . . . . . . . . 15.00
For installation or relocation of each boiler or
compressor over 30 hp to and including 50 hp, or
for each absorption system over I '000 ,000 Btu/h
to and including 1 ,750,000 Btu/h . . . . . . . . . . . . . 22. 50
For installation or relocation of each boiler or
refrigeration compressor over 50 hp, or each ab-
sorption system over 1 , 750 ,000 Btu/h . . . . . . . . . 37.50
For each air-handling unit to and including 10 ,000
cfm, including ducts attached thereto . . . . . . . . 4.50
NOTE: This fee shall not apply to an air-handling
unit which is a portion of a factory-assembled
appliance, cooling unit, evaporative cooler or
absorption unit for which a permit is required
elsewhere in the Huntington Beach Mechanical
Code.
For each air-handling unit over 10,000 cfm . . . . . . . . 7.50
For each evaporative cooler other than portable
type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.50
For each ventilation fan connected to a single duct . 3.00
For each ventilation system which is not a portion
of any heating or air conditioning system au-
thorized by a permit . . . . . . . . . . . . . . . . . . . . . . . . . 4.50
For installation of each hood served by mechanical
exhaust, including ducts for such hood . . . . . . . 4.50
For installation or relocation of each domestic
type incinerator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50
For installation or relocation of each commercial or
industrial type incinerator 30.00
For each appliance or piece of equipment regulated
by the Huntington Beach Mechanical Code but not
classed in other appliance categories or for which
no other fee is listed in such code . . . . . . . . . . 4.50
For new residential construction, in lieu of above
listed items, per square foot of dwelling area . .0075
For installation of each metal fireplace . . . . . . . . . .$ 7 .50
4 .
PLUMBING PERMIT FEES
For issuing each permit . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 10.00
For each plumbing fixture or trap or set of fixtures
on one trap ( including water, drainage piping and
backflow protection therefor) . . . . . . . . . . . . . . . . 4.00
For each building sewer and each trailer park sewer 10.00
Rainwater systems - per drain ( inside building) . . . 4.00
For each cesspool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00
For each private sewage disposal system . . . . . . . . . . . 30.00
For each water heater and/or vent . . . . . . . . . . . . . . . . . 5.00
For each gas piping system of 1 to 5 outlets . . . . . . 5.00
For each gas piping system of 5 or more outlets ,
per outlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. 00
For each industrial waste pretreatment interceptor,
including its trap and vent, excepting kitchen
grease interceptors functioning as fixture traps 8.00
For installation, alteration or repair of water
piping and/or water treating equipment . . . . . . . 5.00
For repair or alteration of drainage or vent piping 2. 00
For each lawn sprinkler system of 50 heads or less
or any one meter including backflow protection
devices therefor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6. 00
For vacuum breakers or backflow protective devices
on tanks , vats , etc. or for installation on un-
protected plumbing fixtures including necessary
water piping - 1 to 4 . . . . . . . . . . . . . . . . . . . . . . . . 5.00
Over 4 , each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00
ELECTRICAL PERMIT FEES
For issuing each permit . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 10.00
For single and multiple-family residential $0 .025 per
square foot.
For each service meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12. 50
For each sub panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.00
Each self-contained, factory-wired, approved unit
such as cooking appliances , home appliances ,
heating appliances , heaters , vegetables cases,
drinking fountains , etc . . . . . . . . . . . . . . . . . . . . . . 2. 40
Radiant ceiling heat per room . . . . . . . . . . . . . . . . . . . . . 1. 80
Fixtures:
First twenty (20) fixtures , each . . . . . . . . . . . . . .50
Each additional fixture . . . . . . . . . . . . . . . . . . . . . . . 30
Each mercury vapor fixture on pole . . . . . . . . . . . 1 . 80
Each additional mercury vapor fixture on same
pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60
5.
ELECTRICAL PERMIT FEES contd .
Generators, Motors and Transformers:
H .P. , K.W. , or K.V.A. Rating of Equipment up to
and including one ( 1) . . . . . . . . . . . . . . . . 0 . . . . .$ 2.40
Over one (1 ) and not over ten ( 10) . . . . . . . . . . . 5.00
Over ten (10) and not over fifty (50) . . . . . . . . 10.00
Over fifty (50) and not over 100 . . . . . . . . . . . . . 20.00
Over 100 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30.00
Outlets:
First twenty (20 ) outlets , each . . . . . . . . . . . . . . .50
Each additional outlet .30
Each five (5) feet or fraction thereof
multiple outlet assembly . . . . . . . . . . . . . . . . . . . .50
Each multiple appliance outlet assembly . . . . . . 2.00
Signs, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10.00
Temporary service:
Temporary work with service (each meter) . . . . . 30.00
Each temporary, permanent, subpole or con-
struction pole 10.00
Temporary Construction Lighting . . . . . . . . . . . . . . . . . . . 5.00
Inspections for which no fee is herein prescribed:
Each inspection, per hour (112 hour minimum) 15.00
Maintenance electrician certification (per year) 30.00
SOLAR ENERGY PERMIT FEES
1 . For issuing each permit . . . . . . . . . . . . . . . . . . . . . . .$ 10.00
In addition:
2 . For collectors (including relating piping and
regulating devices) :
Upto 1000 sq . ft . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.00
Between 1001 and 2000 sq . ft. . . . . . . . . . . . . . . . . . 10.00
More than 2000 sq. ft. , $10 .00 plus $1 . 20 per
1000 sq. ft. or fraction thereof over 2000 sq. ft .
3 . For storage tanks ( including related piping and
regulating devices) :
Upto 750 gallons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.00
Between 751 and 2000 gallons . . . . . . . . . . . . . . . . . . 10.00
More than 2000 gallons , $3. 60 plus $1 .20 per
1000 or fraction thereof over 2000 gallons
6 .
SOLAR ENERGY PERMIT FEES contd.
4 . For rock storage:
Upto 1500 cu. ft . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 5 .00
Between 1501 and 3000 cu. ft. . . . . . . . . . . . . . . . . 10 .00
More than 3000 cu. ft. , $3. 60 plus $1 .20 per
1000 cu. ft. or fraction thereof over 3000 cu. ft .
5 . For each appliance or piece of equipment regulated
by the Huntington Beach Solar Energy Code for which
no fee is listed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 .00
6 . Plan check fee . Where specific plans are required,
a plan check fee shall be charged equal to one-half
(1/2) of the total permit fee, excluding the permit
issuance fee .
NOTE: These fees do not include permit fees for any parts of
solar systems which are subject to the requirements of other
applicable codes .
SPECIAL SERVICES FEES AND CONDITIONS
Fees:
1 . For inspection personnel outside normal working
hours , per hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 22 .00
2 . For inspection personnel during normal working
hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 .00
3 . For plan check personnel outside normal working
hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 .00
4 . For plan check personnel during normal working
hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 .00
5 . For management (supervisory) personnel outside
normal working hours . . . . . . . . . . . . . . . . . . . . . . . . . . 30 .00
6 . For inspection resulting from change of occu-
pancy described in Section 502 of the Huntington
Beach Building Code . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 .00
7 . For general inspection and status report on Group
R, Division 3 occupancies . . . . . . . . . . . . . . . . . . . . . 30 .00
8 . For consultant - the actual cost of such consul-
tive services plus administrative costs of 10
percent of the consultive costs or $30, whichever
is greater.
Conditions:
1 . The payment of such fees shall be in addition to other re-
quired fees.
2 . Where the performance of the special services requires per-
sonnel to work other than normal working hours , the minimum
fee shall be based on not less than two (2) hours for each
7.
Conditions contd.
special service requested.
3 . I11i Where the special service is provided during normal working
hours , the fee shall be based on the actual time expended
but not less than one (1 ) hour.
4 . Where the performance of the special service requires per-
sonnel to work other than normal working hours , such per-
sonnel, except management personnel, shall be compensated
for a minimum of two (2) hours overtime.
Resolutions No. 4489 , 4706, and all other resolutions in
conflict herewith are hereby repealed.
This resolution shall become operative on the effective date
of Ordinance No. 2431 .
PASSED AND ADOPTED by the City Council of the City of
Adjou ne
Huntington Beach at a regular/ meeting thereof held on the 23rd
day of June , 1980.
e
Mayor
ATTEST: APPROVED AS TO FORM:
GAIL HUTTON, City Attorney
By
City Clerk Deputy Ci A ney
REVIEWED AND APPROVED: INITIATED AND APPROVED:
f
C' y Administrator Director of Development
Services
8 .
Res. No. 4 891
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) as:
CITY OF HUNTINGTON BEACH )
I, ALICIA M. WENTWORTH, the duly elected, qualified City
Clerk of the City of Huntington Beach, and ex-officio Clerk of the
City Council of said City, do hereby certify that the whole number of
members of the City Council of the City of Huntington Beach is seven;
that the foregoing resolution was passed and adopted by the affirmative
vote of more than a majority of all the members of said City Council
at a regular Adjourned meeting thereof held on the 23rd day
of June , 1980 , by the following vote:
AYES: Councilmen:
Pattinson, Finley, Bailey, MacAllister, Mandic
NOES: Councilmen:
None
ABSENT: Councilmen:
Thomas, Kelly
City Clerk and ex-officio Clerk
of the City Council of the City
of Huntington Beach, California