Loading...
HomeMy WebLinkAboutCity Council - 99-101 RESOLUTION NO.99-101 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH AUTHORIZING USING THE DESIGN-BUILD PROCESS FOR THE PECK RESERVOIR EXPANSION PROJECT WHEREAS, the use of DESIGN-BUILD methodologies have been shown to materially decrease the cost of construction, minimize change orders, accelerate completion, and improve project delivery; and The process allows the financial risk between design and construction to be shifted to the contracting entity, which creates added claim protection for the City; and The City of Huntington Beach desires to obtain the best value for public works projects; and The State of California, through the Public Contract Code, has allowed the use of DESIGN-BUILD construction under certain prescribed conditions; and The City Charter Section 614 authorizes City Council to create an exception to the public bidding process for projects for the extension, replacement or expansion of the transmission or distribution system of any existing utility operated by the City; and The Peck Reservoir Expansion Project (Project) is a part of the overall Water System Master Plan to provide emergency storage that is now lacking, and will provide additional operating storage to enhance operational flexibility. NOW THEREFORE, BE IT RESOLVED that the City Council of the City of Huntington Beach does hereby approve the use of the DESIGN-BUILD process for the Project and authorizes the Director of Public Works to pursue design and construction of the Project utilizing a single entity, meaning a partnership, corporation,joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services, as needed; and BE IT FURTHER RESOLVED, that the City Council of the City of Huntington Beach authorizes the Director of Public Works to develop the program setting forth the scope of the project; its desired characteristics; performance specifications for the materials, equipment, quality and workmanship; and other attributes deemed necessary; and The Public Works Department will develop the technical criteria and methodology including price,to evaluate DESIGN-BUILD proposals utilizing pre- qualification and short-listing of potential proposers to limit the field to three (3) to five (5) of the most qualified DESIGN-BUILD entities; and 1 Res. 99-101 The selection will be based on a competitive negotiation process considering the design approach, experience and track record; life cycle cost of proposed project, quality, project features and operating functions; and maintenance considerations to determine the best value and final selection. As a minimum, the DESIGN-BUILD entity shall: a. Possess all required Iicenses, registrations, and credentials in good standing that are required to design and construct the project. b. Submit evidence that establishes the DESIGN-.BUILD entity members have completed projects of similar size, scope or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project. C. Submit a proposed project management plan that establishes that the DESIGN-BUILD entity has the experience, competence, and capacity needed to effectively complete the project. d. Submit evidence that establishes the DESIGN-BUILD entity has the capacity to obtain all required payment and performance bonds, liability insurance, and errors and omissions insurance, as well as a financial statement that assures the City the DESIGN-BUILD entity has the capacity to complete the project. e. Submit information and a declaration providing details concerning at least the following: • Any construction or design claim or litigation totaling more than $500,000 or 5 percent of the annual value of work performed in the past five (5) years. • Serious violations of the Occupation Safety and Health Act, as provided in Part 1 Division 5 of the Labor Code, settled or filed against any member of the Design-Build entity. • Violations of federal or state law, including, but not limited to, those laws governing the payment of wages, benefits, or personal income tax withholding or a Federal Insurance Contribution Act (FICA) withholding requirements, State Disability Insurance withholding or Unemployment Insurance payment requirements, settled or filed against any member of the Design-Build entity over the past five (5) years. • Information required by Section 10162 of the Public Contracts Code. 2 Res. 99-101 • Violation of the Contractor State License Law (Chapter 9) commencing with Section 7000 (a Division 3 of the Business and Professions Code), excluding alleged violations or complaints. • Any criminal conviction or finding of liability or settlement in a civil action involving any member of the Design-Build entity of submitting a false, fraudulent claim to a public agency over the past five (5) years. • A declaration that the Design-Build entity will comply with all other provisions of law applicable to the project. The City Council of the City of Huntington Beach recognizes that because a DESIGN-BUILD contract will be awarded prior to the completion of a design, it is impractical for the DESIGN-BUILD entity to list all subcontractors at the time of the award. BE IT FURTHER RESOLVED THAT THE City Council of the City of Huntington Beach requires DESIGN-BUILD proposers to identify the types of subcontractors, or subcontractor license classifications deemed essential for proper completion of the project. All subcontracts or subcontractors not identified in the proposal shall be selected by the entity based on a competitive bid procedure as set forth by the department in the DESIGN-BUILD package that maintains protection for subcontractors; and Any DESIGN-BUILD entity that is selected to design and build the project shall possess or obtain sufficient bonding as required by law. Nothing in This resolution shall prohibit a general or engineering contractor from being designated as lead entity for the purposes of purchasing necessary bonding to cover the activities of the DESIGN-BUILD entity. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 15th Novem r , 1999. ATTEST: Mayor City Clerk APPROVED AS TO FORM: 0 t t I q REVIE«TED AND APPROVED: 16� City Attorney _, •� INITIATED AND APPROVED: Citf Administrator Director of Public Works 3 Res. No. 99-101 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) 1, CONNIE BROCKWAY, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a regular meeting thereof held on the 15th day of November, 1999 by the following vote: AYES: Julien, Bauer, Garofalo, Green, Dettloff, Harman, Sullivan NOES: None ABSENT: None ABSTAIN: None City Clerk and ex-of3icio Clerk of the City Council of the City of Huntington Beach, California