Loading...
HomeMy WebLinkAboutCity Council - 2000-80 This Resolution Supersedes Res. No. 2000-66 RES OLUTION NO. 2 0 0 d—s 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ADOPTING SPECIFIC PLAN NO. 13 TO CHANGE THE ZONING DESIGNATION ON REAL PROPERTY BOUNDED GENERALLY BY BEACH BOULEVARD, EDINGER AVENUE, CENTER AVENUE, AND THE SOUTHERN PACIFIC RAILROAD FROM GENERAL COMMERCIAL(CG) AND GENERAL COMMERCIAL-FLOOD PLAIN (CG-FP2) TO SPECIFIC PLAN NO. 13 (THE CROSSINGS AT HUNTINGTON BEACH SPECIFIC PLAN) WHEREAS, pursuant to the State Planning and Zoning Law, the Huntington Beach Planning Commission and Huntington Beach City Council have held separate public hearings relative to Specific Plan No. 13, wherein both bodies have carefully considered all information presented at said hearings, and after due consideration of the findings and recommendations of the Planning Commission and all evidence presented to said City Council, the City Council finds that such zoning map amendment and zoning text amendment is proper and consistent with the General plan. NOW, THEREFORE, the City Council of the City of Huntington Beach does hereby resolve as follows: 1. The Crossings at Huntington Beach Specific Plan No. 13, attached hereto as Exhibit A and incorporated by this reference as though fully set forth herein, is hereby adopted and approved. 2. That the real property generally described as bounded by Beach Boulevard, Edinger Avenue, Center Avenue, and the Southern Pacific Railroad and more particularly described in the legal description and sketch collectively attached hereto as Exhibit B and incorporated by this reference as though fully set forth herein, is hereby changed from General Commercial (CG) and General Commercial-Flood Plain(CG-FP2) to Specific Plan No. 13 (The Crossings at Huntington Beach Specific Plan.) Mayor ATTEST: �,, �,, APPROVED AS TO FORM: City Clerk la-II oa iy-City Attorney �`',� REVIEWED AND APPROVED: INITIAT D AND APPROVED: A CityA inistrator Director of Pl g 44/s:4-20 Resolutions:Crossings at H.S. RLS 00-616 6/22/00 Res. No.2000-50 This Resolution Supersedes Res.No. 2000-68 � ft r e, 5 - � _ i �3 �" � r+•/ a''k � o-al s•.'•'' I��� .Y+4 .,._.. 1 jdl��+�r � '�� � � �`' :x.. � ,-�, m - � �.:z;'I .�: r• :.h.R` - ,........,....f�",'.a3c_ I } � ,I I i� spa.{. rA � E d# �Il:.�"`wrj���.1;��xr�� t �� i its„`„' � -�." '�a`� n•'r �1d,fi�*'a ;7 1. !�"'"":"��— r,;'..`"'t�--�A(� ,1 i!`'-1.L _Ig r 'S �. I 1-�!t� � j � i-, l A �� �. 3 J r' � 1`" �'Z.MT, t �j¢-.. .�:y, '� '.o- I�1��/ ��., �' d�c '� �•i. l: s. d'.'�'•cr�` '�+, '° ��� k' _.-. u, ""}s"•u,; 4}'k.`�� � •"+t�,a f,�'3." :. s�,.'fY,';, �3 �C +r�, r r`r<�.g�N,�Ib!+rr c I '� �� ,fit; yS. � �' S ;`. { r, ,•�„�'�'6,�a, �` ��'���$���o F}I �d { , .S ,g,P .,"w r r; -✓' j y 4;.3' ;;." ;� _ ,1 , 1 ':`� .....f 'Il��':a,�, .-'-, •� , r � �?I- �Ae' '.c] la.s. r� ;i' ,"1.13 1 rn5��r ��� �'Y'=�:r-^;•�]'�R,�; k,... EE '��.: Y .1,��P Yr ,.� E�f; I _7 r1.p'� E •x, r. r 1,tl !S: °> °,>n�f� yg,% �~ °� � ,.-k�:��s�,- ��II-- , :�; s�: � - �. --�_ a+4 � � -•kv � N!}�� Y � *� INIQ N"eo, r l Jul .: 2"g� i"' 'aim Y n Aft 'eAi � ✓"'lk. r � W ��� '�� 7 S a.7 S�'� � C�/�P Y��i� r - i+ + € '"s'3„kRa;.X�,��1 g},�''. y?t3 � J :,� M -��,� .. -ti •. S '.,� G . � I NN tl,s^t,�'w�;. �:,,,,�,�''..: -$,iw.r�•c�,.��,�d!` ���t+.+w+-.�;:a� :me..a ..a,>v�:.>..,.5]. .a3;r r ir. 4 The Crossings at Huntington Beach City of Huntington Beach SPECIFIC PLAN NO . . 13 Prepared by City of Huntington Beach Planning Department Huntington Associates LLC. with Greenberg Farrow Architects EDAW v, Richard Sawyer a C O 'b ro ro 4 Iwo Adopted July 5, 2000—Resolution No. 2000-68 c a N N O o Reconsidered and Modified August 7,2000—Resolution No. 2000-80 co 0 TABLE OF CONTENTS 1. INTRODUCTION 3. DEVELOPMENT CONCEPT 1.0 Purpose and Intent 6 3.0 General Development Plan 23 1.1 Authority and Procedures 6 3.1 Regional Commercial Uses 25 1.2 Scope and Format 7 3.2 Pedestrian Plaza and Walkways 28 1.3 Project Area Description 9 3.3 Circulation Plan 33 1.4 General Plan.Designation 11 3.4 Public Facilities 35 1.5 Zoning Provisions . 12 3.5 Design Guidelines 42 1.6 State Mandated Requirements 12 3.5.1 Project Area Character 42 3.5.2 Site Planning Guidelines 42 2. IMPLEMENTATION 3.5.3 Common Area Guidelines 45 3.5.4 Architectural Guidelines 54 2.0 Administration 15 3.5.5 Landscape Guidelines 65 2.1 - Development Phasing Plan 15 3.5.6 Signage Guidelines 70 2.2 Methods and Procedures 15 2.3 Site Plan Review 16 4. DEVELOPMENT REGULATIONS 2.4 Parcel Maps 17 2.5 Reuse/Change of Use Review 18 4. Purpose 72 2.6 Environmental Determination 18 4.1 General Provisions 72 2.7 Request for Deviation is 4.2 Definitions 72 2.8 Specific Plan Amendment 19 4.3 Development Standards 74 2.9 Severability 19 4.3.1 Permitted Uses 74 4.3.2 Intensity 74 � 4.3.3 Building Height 74 4.3.4 Setbacks 74 4.3.5 Landscaping 74 4.3.6 Signs 74 4.3.7 Lighting 74 4.3.8 Parking 78 4.3.9 Parking Structures 79 4.3.10 Drive-Through Bakery 79 a . M Cp Fit 1W] O O O w 6 Oo O APPENDICES (Volume Two) A— Legal Description B —General Plan Consistency C—Sign Standards List of Exhibits Exhibit 1 Vicinity Maps 9 Exhibit 2 Aerial Photograph 10 Exhibit 3A Illustrative Conceptual Master Plan 21 Exhibit 3B Illustrative Conceptual Master Plan 22 Exhibit 4A Pedestrian Plaza/Walkways Plan 26 Exhibit 4B Pedestrian Plaza/Walkways Plan 27 Exhibit 5A Circulation Plan 29 Exhibit 5A Circulation Plan 30 Exhibit 5B Circulation Plan 31 Exhibit 5B Circulation Plan 32 Exhibit 6A Common Area Locations 45 Exhibit 6B Common Area Locations 46 Exhibit 7 Color and Materials of Common Areas 50-51 Exhibit 8 Typical Tenant Storefront 58 Exhibit 9A Landscape Concept Plan 63 Exhibit 9B Landscape Concept Plan 64 Exhibit 10 Plant Materials Palette 67 a Exhibit 11 A Permitted Uses Chart 75 Exhibit 11 B Temporary and Seasonal Events Chart 76 Exhibit 12 Development Regulations Chart 77 Exhibit 13 Parking Standards and Details 78 Exhibit 14 Development Regulations Check List 80 N Z � O Q The Crossings at Huntington Beach Specific Plan 4 o August 7, 2000 INTRODUCTION 0 � x �b sV � E nw � nl. S n k *Cd� r N N O 4 Iv N O O O [7 The Crossings at Huntington Beach Specific Plan 5 August 7, 2000 INTRODUCTION report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public 1.0 PURPOSE AND INTENT resource Code Section 21083.3 The Crossings at Huntington Beach Specific Plan is currently exempt The Crossings at Huntington Beach Specific Plan from preparation of an environmental assessment establishes the planning concept, design theme, until a site plan is submitted for approval by the City. development regulations and administrative Therefore, it would be "speculative". to provide an procedures necessary to achieve an orderly and assessment of impacts peculiar to the project. Once a compatible development of the project area, and to site plan is approved, an environmental assessment implement the goals, policies and objectives of the will be performed by the City of Huntington Beach, Huntington Beach General Plan. The intent is to and site plan mitigations will be applied to the project, establish a visitor serving, regional-commercial as necessary. shopping setting and achieve a high quality in retail and entertainment design. 1.1 AUTHORITY AND PROCEDURE The Crossings at Huntington Beach Specific PIan The State of California requires that all cities and identifies the location, character and intensities for a counties prepare and adopt a comprehensive General regional commercial complex. The Specific Plan Plan for the physical development of their area of creates a compatible design theme for the project area jurisdiction. and establishes the development regulations necessary to accomplish the identified objectives. Following the adoption of the General Plan, the entity is required to develop and adopt regulating programs The Specific Plan is regulatory in nature and serves as (zoning and subdivision ordinances, building and zoning for The Crossings at Huntington Beach. housing codes, and other regulations), which will Subsequent development plans, Parcel Maps and other implement the policies described in the General Plan. entitlement requests for the project area must be consistent with both the Specific Plan and the California State law authorizes cities with complete Huntington Beach General Plan. According to Public General Plans to prepare and adopt Specific Plans o Resources Code Section 21083.3(b), "if a development (Government Code Sections 65450 et. seq.). specific ' project is consistent with the general plan of a local Plans are intended to be a bridge between the local a agency and an environmental impact report was General Plan and individual development proposals, certified with respect to that general plan, the Specific Plans contain both planning policies and a application of this division [CEQA] to the approval of regulations, and may combine zoning regulations, that development project shall be limited to effects on capital improvement programs, detailed development the environment which are peculiar to the parcel or standards and other regulatory methods into one c to the project and which were not addressed as significant effects in the prior environmental impact o 0 The Crossings at Huntington Beach Specific Plan 6 0 Oho 4 August 7, 2000 document which can be tailored to meet the needs of a California Government Code, Title 7, Division 1, specific area. Chapter 3,Article 8,Sections 65450 through 65457. Local planning agencies or their legislative bodies may The Huntington Beach General Plan was adopted by designate areas within their jurisdictions as ones for the City Council on May 13, 1996. The General Plan which a Specific Plan is "necessary or convenient" designates the project area as Regional Commercial. (Government Code Section 65451). The Crossings at Huntington Beach Specific Plan is consistent with the �goals and policies of the A Specific Plan may either be adopted by ordinance or Huntington Beach General Plan. resolution (Government Code Section 65507). Should the legislative body wish to change a proposed Specific 1.2 SCOPE AND FORMAT Plan recommended by the Planning Commission, the change must first be referred back to the Commission The Crossings at Huntington Beach Specific Plan is for consideration, if not previously considered divided into four sequential sections. Section One is (Government Code Section 65504). the Introduction and describes the purpose and intent of the document along with a brief explanation of Adoption or amendment of a Specific Plan constitutes Specific Plan procedures and authorization. a project under the California Environmental Quality Act (CEQA) and the State's Environmental Impact Section One also presents the Project Area Description Report (EIR) guidelines. If the initial environmental and is intended to establish the reasons why the review shows that the proposed or amended plan Specific Plan process is logical and necessary for this could significantly affect the environment, the portion of the City. This section presents a general jurisdiction must prepare an EIR and submit it in draft description of the Specific Plan area; special form for public review. The need for an EIR in a characteristics and existing conditions which make particular case is determined by the local government. this area unique have been identified. .� In this case, since an EIR has been prepared for the City's adopted General Plan and the Specific Plan is Section Two presents the Implementation process and included within the umbrella of the General Plan and discusses how individual projects and tenant associated Certified EIR, the environmental assessment improvements will be reviewed and approved. This (to be completed at the site plan review/approval section outlines the project approval procedures and stage) for The Crossings at Huntington Beach Specific describes the process for project appeals and the Plan will be limited to the effects peculiar to the methods by which the Specific Plan can be modified or project (Public Resources Code Section 21083.3(b)). amended. Q The preparation, adoption and implementation of The Section Three describes the Development Concept. The M Crossings at Huntington Beach Specific Plan by the design concept evolves from the objectives identified ' !" City of Huntington Beach is authorized by the and existing conditions discussed in Section One. This o 0 NN 00 The Crossings at Huntington Beach Specific Plan 7 p g au o August 7, 2000 section also presents the circulation, public facilities, infrastructure and landscaping which will support the development concept and reinforce the design theme. Section Three also includes the Design Guidelines. This section identifies and describes the intended character 4 for the area and provides a framework for project implementation. Section Four establishes the Development Regulations for the Specific flan area and for individual project development. Section Four presents a detailed description of the Development Standards which are necessary to guide and control new projects and carry out the goals and policies of the Specific Plan and the View ofRol City's.General Plan. nuno's fmrn Fdingel avenue An Appendix (printed under separate cover) contains all the special studies and reports which have contributed to the formation of the Specific Plan. The Appendix (Volume Two) includes the Legal Description of the site, a General Plan Consistency Analysis, identifies the Mitigation Measures and Conditions of Approval desired in the Environmental Analysis and includes the proposed Sign Standards. � � s O a cc k`I'�' "'',�ed�� 'i�°i•i-S'S �- �; �� §i��y 'wrr.',�� yrs:"�"��",N�S�"� � ' Q(pp. br ' +"t1 eZ1 The view of The Owsings at Huntington Beach from Center Avenue 2z 00 NN 00 a The Crossings at Huntington Beach Specific Plan 8 cao August 7, 2000 a y� I.3 FROJECT AREA DESCRIPTION �0 PASADENA The Crossings at Huntington Beach Specific Plan LOS ANGELES covers 63 acres located in the northern portion of the • City of Huntington Beach. The area is generally o►Niicn d bounded on the north by Center Avenue, on the east by Beach Boulevard, on the south by Edinger Avenue, Los and on the west by Southern Pacific railroad right-of- rum M OML /6114PGRT way. LONG y, BEACH ANAHEWI A legal description of properties in the Specific Plan TORRANCE AIRPORT GARDEN • project area has been included in the Appendix. 0LONG sRov0 n SA LO1It1 BEAM A LOS AWaLES AH HAREOR SITE-* R*IRN HU"NGTON 6EACH� Regional Location Boisa Ave, The project area is surrounded by a variety of land m uses and activities. The San Diego Freeway (403) and NlcFeddenAve. an office retail complex create the northern boundary. Gordan To the south, office and retail uses are located across v,• t C.WwA" Edinger Avenue. To the east, commercial uses are CfWeW located across Beach Boulevard. To the west, is the o Southern Pacific Railroad Line. The property across c from the rail line is designated commercial: Edinger m P The croaainpa En at HunHngtan c9 Beach Vicinity Maps P Exhibit Y Z M Site Location y 00 Iv N O O The Crossings at Huntington Beach Specific Plan 9 O, � o August 7, 2000 *` :_ ; t ":1`'b 1 '-t""" 4'•,9 ��+;+r. �I ,' 'i _ ,.,,` 4'' r� * �`+� .:.,*.+ .rr,,ltarx�-- Mrrx z kt ',1�e i �/ �� �' � 'i� ,Ik �fT�'�F+`.�. � r `i I' ',,i. 7 � �r ti•"_�; 't ' , � �I�k{y����� k"r��1�� *� 1 0- rum some;6xv ANT, fir If3 'w r, r »✓. y war i k 'Y ,_•+'s. oar' ' afi h � ,�•, ,_ ::.w�r;,� ,�r,�_ ," ;. '�•?.. .* � � � � !i ��G�d°liktk�' � t .E z '1 iiY �7 SY�,i i li" �yj�'Z a 1; r��� W 4s }H ,����'.�,$y'[.fN� �eg,��`F��`�la,,+13��i�+''i�t ,r jt��x,'Y�*��'. ,a�.�. i1'x �� V�( 1 � .E-.i�` k•x��'�.�Mia �iW P������i { r �`",','� ,�' !I r F*`¢�� jr�I'+}:.r� rrKr 3 {,���i�.e};.^,�y,Vk_''�• yxU_,fr:4�'S..w.F���...,,�.u: 1 � � b `.-�, �i„ �1. '"234�'f +�.7''1�4�!�. �,.y: [� ��'1 f , r4 •rl sL '.{,�1 t. ��.,y. ti � ! - ,�. ,-.� �•M.+1... � y�i C, i���. i„1:� `'.ba�3_r �"MkgrM �a 4k � j ,��: f ' � a ir���,,�`'{ 1ar�5 >, ki4 ;d}(}i�j xrvq� 1 f'ilh'{�}.,. �' TT i� xi FT, �• 1 ifl • � 111 1.4 GENERAL PLAN DESIGNAWN The entire Crossings at Huntington Beach is currently c. Siting of a portion of the buildings in designated as CR-F2-SP-MU(F9)-Commercial Regional proximity to their primary street frontage - 0.5 FAR-Specific Plan Overlay-Mixed Use Overlay- to convey a visual relationship to the street 1.5 (MU-0.5 (C)/25du/acre in the City's General and sidewalks; Plan.The site has been designated for commercial land uses since the mid 1960s. The commercial regional c. Design of the exterior periphery of the designation anticipates anchor department stores, structures to contain shops, restaurants, promotional retail, restaurants, entertainment, and display windows, and other elements that similar region-serving uses. The site has been provide visual interest to parking area and designated within General Plan Subarea 5A requiring the street elevation; that a Specific Plan with special regulations and standards be established for "Huntington Center." The d. Inclusion of a "public square" as a following Design and Development policies are gathering place of public activity in multi- described in the General Plan for the mall property: tenant regional centers; Design and Development e. Clear identification of building entrances; LU 10.1.15 f. Use of landscaping that provides a three- Require that regional commercial developments be dimensional character; designed to convey the visual sense of an integrated center by consideration of the following principles: g. Encourage the provision of public art; a. Use of multiple building volumes and h. Inclusion of consistent and well-designed -1 masses and highly articulated facades to signage integrated with the building's reduce the visual sense of large scale architectural character, including "boxes"; pedestrian-oriented signage;and o c b. Use of roofline of height variations to i. Design of parking structures to be visually °a visually differentiate the building massing integrated with the commercial buildings. and incorporation of recesses and setbacks (1-LU 1. I-LU 4, I-LU 5, 1-LU 7, l-LU 10 and on any elevation above the second floor 1-LU 13) a above grade; . 0 0 The Crossings at Huntington Beach Specific Plan 11 � a August 7, 2000 w„. . 1.5 ZONING PROVISIONS The Crossings at Huntington Beach is presently zoned General Commercial ("CG") to accommodate a full range of retail and service businesses. The site is also within a sub-area of the merged Redevelopment Project Areas. The adoption of this Specific Plan will supersede the existing zoning and establish a new set of development regulations. The Crossings at Huntington Beach site currently consists of a number of activities. The site contains approximately 9G0,000 square feet of retail commercial space, some of which is currently unoccupied. This site has been developed in numerous phases over the past 30 years. Current market pressures and extent of adjacent competing retail View of Starbucks and Burnes&Noble from Center Avenue activities are driving the need to develop a new exciting commercial center for the City. 1.6 STATE MANDATED REQUIREMENTS To comply with the State of California legislated mandates, the City of Huntington Beach has adopted a several plans to deal with regional issues including Air W •Em Quality, Congestion Management, Growth Management and Transportation Demand c Management Plans. All development within the c Specific Plan area shall comply with the applicable provisions of the following plans: m 4 view ofMcnTn'som Center Avenue o c fr � N 00 The Crossings at Huntington Beach Specific Plan 12 , � o August 7, 2000 South Coast Air Quality Management Plan The South Coast Air Quality Management, Plan program, and a capital improvements program for (AQMP) requires measures to reduce traffic traffic and transit. congestion, improve air quality, and requires that cities develop Air Quality components within their Growth Management Plan General Plans. These measures include Regulation XV, a program which requires employers of more than one A Growth Management Plan (GMP) is required to hundred (100) persons to prepare trip reduction implement the passage of Orange County Measure M plans, and a requirement for jurisdictions to prepare approved in the 1990 election. Its purpose is to ensure an air quality component in the General Plan. that the planning, management, and implementation of traffic improvements and public facilities are The City of Huntington Beach is subject to all local adequate to meet current and projected needs. The jurisdiction requirements set forth by the AQMP. The City has an approved Growth Management Element, City has adopted an Air Quality Element and which meets the requirements for Measure M Transportation Demand Management Ordinance, funding, and an adopted Transportation Demand which incorporates AQMP measures. Management Ordinance. Congestion Management Plan Transportation Demand Management The Congestion Management Plan (CMP) is required Transportation Demand Management (TDM) by Assembly Bill 471 (Proposition 111), subsequently measures are generally directed at increasing auto modified by Assembly Bill 1791. This Bill requires occupancy, decreasing peak hour usage, and a every urbanized county to adopt a CMP; the County of managing demand for transportation facilities. The Orange has prepared a CMP which includes the City City's TDM Ordinance is part of its compliance with of Huntington Beach. The CMP requires mitigation of the Growth Management Plan. Development owners, e traffic impacts of development, as well as trip operators and tenants will be required to implement reduction programs.The City of Huntington Beach has the City's TDM Ordinance. y completed the mandated components of the CMP including level of service standards,trip reduction � z �Om F 0 0 1V N O O The Crossings at Huntington Beach Specific Plan 13 � Q August 7, 2000 r A 4 l ' p„' M I rR'i - s z *mow I t „IS r I r — �.f, r r°' % ��'�+1�` +�I--,��� V •tea 'P���� Yi 'i� 'die 4�rn�9v 'is ..5 1 .«..,�,Y'� �N i � 1 r I -: ���,�,,,,,� � l I �,�� �La ,p. r .rmxw.,,� � - -'wm-.. ,•. y„ .'� s ��`'�r �."+'''sttti� '.�x�$ {'-�(`? � �'� _ fl �r�,"�l '�1 �,a1a , 13 k: PT rrr2�� riotlppe�l rcAln�Y sr fw le �, ry�,I■C1!�,. �,- i d�yF'.. Jjy :ll* - - �..711r44q.,r� i Jt~ 1 jl 17€+t rill i., ■�- � ,1r ie ^^r. a'i � "+�. �t"lr� -+�tt. wt��#ri s ..,. . �4�x. "'""��`''� '� �! 1. s+a .h.J��va �xx.c�. � ""' �...ruarawr + _ A}�,,,,d"'.r"' `.•" Oz pp q ., i,��`•� I('^ � F ,`j r G «i". I � .:a ,a, ,�. �;..s�[' - r 1 .IS .ra:e� .J a. ,- ... -� _ �.:,�_ 'liF x. F:.ul:►_ .��.,;I..1+W NbW s f f r€ a � r w • 46 / !1S, • • i ' / IMFLEMENTA ON 2.0 ADMINISTRATION The City's Planning Director shall administer the Text Amendment and action by the Planning provisions of the Crossings at Huntington Beach Commission and City Council. Specific Plan in accordance with the State of California Government Code, Subdivision Map Act, the 2.1 DEVELOPMENT CONSTRUCTION PHASING Huntington Beach Municipal Code, and the City's PLAN General Plan. The Specific Plan development procedures The proposed Specific Plan project is anticipated to regulations, standards and specifications shall occur in one (1) phase. The existing Village Retail (Barnes & Noble, Staples, and Circuit City) and any supersede the relevant provisions of the City's Zoning remaining Department Stores (such as, Burlington Code (Huntington Beach Zoning and Subdivision Coat Factory, Montgomery Wards, or Mervyms) will Ordinance) as they currently exist or may be amended receive major exterior renovation, new enhanced in the future. Any development regulation and paving, and landscaping. The demolition, building requirement not addressed in the Specific infrastructure and utility work of the new Plan shall be subject to the City's adopted regulations construction, will be scheduled and built such that the in place at the time of an individual request. remaining center remains in operation with minimum inconvenience to the remaining tenants. Construction The Specific Plan may be amended. The Planning is anticipated to take IS-24 months from start of Director shall have the discretion to determine if demolition. requests for modification to the Specific Plan are minor or major. 2.2 METHODS AND PROCEDURES Minor modification is a simple amendment to the exhibits and /or text which does not change the The methods and procedures for implementation of c the Specific Plan shall be on a project by project basis. meaning or intent of the Specific Plan. Minor o modifications may be accomplished administratively The adoption of the Specific Plan alone will not y require infrastructure improvements to the project by the Director with a report to the Planning Commission. Major modifications are amendments to area. Physical improvements will only coincide with ro the exhibits and/or text which are intended to change the commencement of the first project and approval of a the meaning or intent of the Development Concept, a Site Plan Review. The Specific PIan is a regulatory a Design Guidelines,or Development Regulations.Major document and is not intended to be a DevelopmentAgreement. modifications require a Zoning o 0 N N The Crossings at Huntington Beach Specific Plan 15 g g August 7, 2000 2.3 SITE PLAN REVIEW All new projects within the Crossings at Huntington this service shall be established by a separate Beach Specific Plan project area shall be implemented resolution of the City Council. through a Site Plan Review process.A Site Plan review shall be required for all new development activity, The Planning Director has the authority to approve, with the exception of interior improvements, general conditionally approve, or deny a Site Plan Review. A maintenance and repair or other minor construction Site Plan Review application may also require analysis activities that do not result in an intensification of the and comments from various departments of the City. use. These exceptions may be subject to other Building In order to approve a Site Plan Review application, the and Public Works permits and approvals prior to Planning Director shall make the following findings: commencement. • The request is consistent with the City's Application to the City for a Site Plan Review shall General Plan and all applicable requirements include a narrative of the proposed activity along with of the Municipal Code;and preliminary development plans and drawings. The narrative shalt consist of a project description The requested activity will not be detrimental identifying the intended services offered with square to the general welfare of persons working or feet, hours and days of operation, number of residing in the vicinity nor detrimental to the employees, and other information as appropriate. value of the property and improvements in the Supplemental to the application submission, project neighborhood; and plans shall be prepared including the following preliminary plans: site plan, floor plans, elevations, The requested activity will not adversely affect landscaping,grading, fencing and signage plans;other the Circulation Plan;and plans may be required depending on the complexity of the project. The entire parcel shall be plotted with The requested activity will comply with the dimensions and all pertinent data and include provisions of the Crossings at Huntington ;0 dimensions to the nearest intersecting public street Beach Specific Plan and other applicable o and identify all street names. In addition, all existing regulations or special conditions required of and proposed physical features and structures on the the project. g subject property and abutting properties shall be plotted. The action of the Planning Director shall be final unless appealed to the Planning Commission by theCL The application shall also include a legal description of applicant submitting a Site Plan Review application a the property, identification of the uses for each room within ten calendar days of action. Such Appeals for a X X on the floor plans and a list of all the building Site Plan Review shall be subject to the procedures . P materials and exterior colors. An application fee for outlined in the City's Zoning and Subdivision o 0 Ordinance. o 0 The Crossings at Huntington Beach Specific Plan 16 4P Q co 0 August 7, 2000 •A Site Plan Review approval shall be valid for a period The proposed Tentative Map isconsistent with the General Plan, of one year. Additional one year extensions may be Specific Plan, and all other applicable requested for a maximum of two years. Such an provisions of the City's adopted codes extension request must be made in writing by the and regulations;and original applicant, property owners, and/or authorized designee, a minimum of thirty days prior to • The site is physically suitable for the the expiration of the current approval. if construction type and density of development activity does not commence within the approval or proposed; and extension period,the entitlement shall be terminated. All final decisions on site plan review proposals shall • The design of the subdivision or the be the responsibility of the Planning Director. proposed improvements will not cause serious health problems or substantial 2.4 PARCEL MAPS environmental damage or substantially and avoidably injure fish or wildlife or The project area may be subdivided through a Parcel their habitat;and Map process. Parcel Maps shall be prepared . The design of the subdivision or the consistent with the Mater Plan Concept to facilitate type of improvement will not conflict development. These maps shall identify the infrastructure and 'improvements necessary. to with easements acquired by the public support the anticipated projects, subject to review by at large, for access through or use the City's Public Works and Fire Departments. property within the proposed subdivision unless alternative Upon recordation, Parcel Maps may be further easements, for access or for use, will be provided. divided and/or adjusted by filing a subsequent Parcel Map or a Lot Line Adjustment, pursuant to the provisions of the Subdivision Map Act. A o Tentative and Parcel Map may be approved, or conditionally approved by the Planning Director and the City Engineer providing the proposal is found to be in compliance with the Specific Plan b1 In order to approve the Tentative Map the Planning Director shall make the following findings: ;i 0 0 N is 00 The Crossings at Huntington Beach Specific Plan 17 - -- oa o August 7, 2000 2.5 REUSUCHANGE OF USE REVIEW 2.7 REQUEST FOR DEVMATxON Any proposal to reuse and/or change the use of a The Crossings at Huntington Beach Specific Plan previously approved and constructed development, Development Regulations are intended to encourage within the project area, will be subject to additional projects which create an aesthetically pleasing review by the Planning Department. The additional appearance, enhance the environment, and facilitate review will follow the same procedures outlined in the innovative quality architectural design with an Site Plan Review process. A "like for like" change of adaptation to the surrounding environment. use shall only be subject to the requirements for a new certificate of occupancy; however any new Deviations pertain only to the Development construction beyond that shall require a new Site Plan Regulations of the Specific Plan and may be granted at Review. In addition any proposed physical the time of Site Plan Review for special circumstances modifications to the existing structure and/or site and/or unique architectural features. shall be subject to additional review and approval of the PIanning Director prior to the issuance of building Requests for Deviation may include but are not limited permits. The Planning Director may refer individual to building height, setbacks, open space, parking, and projects to Design Review Board for review and as landscaping. Deviation requests, up to ten (10) final arbiter of compliance with the Specific Plan. Any percent of any single standard, may be considered by decision by the Planning Department may be appealed the Planning Director. Deviations greater than ten within ten calendar days to the Planning Commission. (10) percent must be approved by a Variance application before the Zoning Administrator, subject 2.6 ENVIRONMENTAL DETERMINATION to the procedures outlined in the City's Zoning and Subdivision Ordinance. Development and construction The honing and Development Standards of all phasing of selected provisions and features may be anticipated development activity for the Crossings at approved by the Director concurrent with a Site Plan Huntington Beach area have been identified in the Review and shall not require a Request for Deviation Specific Plan. Development project requests shall be or Variance to the Specific Plan. subject to environmental review as mandated by the c California Environmental Quality Act (CEQA). The Deviations shall be allowed when, in the opinion of Planning Director shall impose any applicable the Planning Director, significantly greater benefits fi environmental mitigation measures, as specified in the from the project can be provided than would occur if environmental analysis, as conditions of approval on all the minimum requirements were met. Some individual Site Plan Reviews. Such conditions of additional benefits which may make a project eligible a approval shall describe the time period and manner in for consideration include: greater open space, greater .� which the mitigation measure must be satisfied. setbacks, unique or innovative designs, public open y space, and the use of energy conservation or innovative technology. The Planning Director may N 00 00 The Crossings at Huntington Beach Specific Plan 18 2 o August 7, 2000 approve the Request for Deviation in whole or in part 2.9 SEVERABHXfy upon making the following findings. If any section, subsection, sentence, clause, phrase, or • Promotes better design, environmental and land portion of this title, or any future amendments or planning techniques and contribute to the additions hereto,is for any reason held to be invalid or economic viability of the community, through unconstitutional by the decision of any court of aesthetically pleasing architecture, landscaping competent jurisdiction, such decision shall not affect and site layout; and the validity of the remaining portions of this title, or any future amendments or additions hereto. The City • Will not be detrimental to the general health, hereby declares that it would have adopted these titles welfare, safety and convenience of the and each sentence, subsection, clause, phrase, or neighborhood or City in general, nor detrimental portion or any future amendments or additions or injurious to the value of property or thereto, irrespective of the fact that any one or more improvements of the neighborhood or of the City sections, subsections, clauses, phrases, portions or any in general;and future amendments or additions thereto may be declared invalid or unconstitutional. • Is consistent with objectives of the Specific Plan in achieving a project adapted to the area and compatible with the surrounding environment; and • Is consistent with the goals and policies of the City's General Plan, and comply with State and Federal Law. a 2.8 SPECIFIC PLAN AMENDMEM Specific Plan Amendments, other than a Minor Modification as previously described (Section 2.0), shall be made through the Zoning Text Amendment process; subject to consideration and approval of the Planning Commission and City Council in accordance with the provisions of the Huntington Beach Zoning and Subdivision Ordinance. Such Amendments may include changes to the Development Concept, Design a Guidelines policies and the introduction of alternative o 0 Development Regulations. N , 20 The Crossings at Huntington Beach Specific Plan 19 cr, o August 7, 2000 t.. 9 .W q x Kll s. a n ..a:�• .`S ........... :ir o'o'i.�iiiY "'?;: :; 8ii: .::.};.: :iA:..,.J.... ,.:,.?�:::.d •Y ....:...:�":::.% ......... .: ;,;S'S:% �>�:.�:r•.:Rya.....,s.. Yr! ...bN"`.•::f:3�".":.'%; , � a�: f � :,;1(GS:::::::'<•rf::ii; i/' :�'xb' �r..�� �:::RAN:/ , �S+e.,� ..,•:•....::�: /, k4. :;:$iii: !.: :;{,: .. f•fi,:? ri Y./. .SY: x y r ....n,.. .... 'f�/?•iy:�::.::;:48a�f'�,tGS .: ..,.. �y , !.;:.::�5.:::. .?IS.�,: •./.:�rr u,r.f„f,.rr'S•�� / ..r',.:. �::,r.::: :: :::i, k:.;,.;;;Y ,!f'Y+'�! F ✓J:k3:� .JrS �f4;: }b:{ r "`.r.�,:,. �. i .v 4.../:..f. r':. •:r'+, i:'"� �:%:{:f: �:9':. ;�%: /r.!/!v: ,rf,. ,,{{ , :�i,.^... fr.+. `%�((kkF�.v/ •%�Y'i" 'i! i�4v:,r'� Y �'f::.� :v:f•:4 J , HIM .rF/ fi . , , ;.;;J,: :�4 '•r'ri,;.;H;.%' ,i+r7`.'S::'.%;'. ':i:.fF J x:: « ., rn� '�`..fi','Y4rr:: •s}�•:,!, ......:..: %l'y � �:J/,J;' S`i���r�' �l.I,.Ir/n4 �Y. .:.;/.•:, .;. J ,c.; ,. r> +f.+i%i:;:;l i:i:%ii t.:r, �%....• Y :.. vi �..}....ec., �::i�?'?�i., ,Sf /ry..g4S:if>/ ✓�,/d �'.t�r �.1. �� �,.ff/ %Jrfi,; f..arr, F•;.�:?i6;,. ,;>„yi!' ...9�::.::.:c,?; :/r /' �//• r+ .:.}! r,fnFJ/' ��% ,,.tv .a�.:£:`'%"�! y'.f 'f Yr'' +✓`:�:• ,../,./f,,:.f.?�/�t r� ...4Y/,;�� FS>�"���%cif %��,r' v�r.e.s'l.�.f v% ..f.!r. :: y fj ij4•::, r t 'r nn . ..r`f,.,�....;:¢�%'y'�'Y;:�i•r?Gi:,.,Jhn;. J f/ �i !aG'rJ/ t %r'�/' S F. '?9•', {"/`ir./,t..;fdi:.:::: � .Jf 'f:;%'+ !xf.'r"fi:is ,?::. y:y%i:� �.x r.:::. .K', .;4;�, ,t•/� f, �:. ?rr. h. ,�y�.;�Gj,., �.� :.��Jji::y' ::�'. ?fn. �•�••: /!. 1 ":�}'.:� :.,„f�h., n.f,. `� 'I!:4.1:i vWi:wKa,% ::,rr• 9�?,�::::rx�:::,. ... ,....O.Y :.c�:, � :< .�i%r'..r'. ,.ylj; � F•:... :3fd:.:,aS.........,:;%f.:' �y::.'%o::::�� :.Hl/:' y:. .. ..ic;ii:✓::Yb}%;.: "?{•r) '� �r'�,C•r;¢J:;�' of%`+'�i�%%Mfi'�iLirl;y.. ai{i`: ry�' 6:.;�f:�.3A•�:' S:�::i.`;:..: :;y<: - f � .Y�y... ',: � :... ..?G:4/'R+.??'R' ,F 2'{Yi +y �':4+1':c :.:�Y. .. ;f:t '!iii F `%' h•- .%�+'�. 4'?y' '?3ii '.:r.: '�3i;i. :.Y is :%%":" ' Gi� :.Je(: .'"' +! ;9. n/)n•. ':y.; d•xa9YM rq%urvi�l?.�F•. %,Qf! '�yf• %.: :: :>a;� CYFSS .::....... a:'f,.: aF ..w7�'` .f4'k, ..f,.�J.rh. .v y./,f ..:�/,'- •'';:'.; �;iyry:a%<?.4/.. �r •/., :X�Y!4::9G Yi.!•! �1, ,:•£.' J� ...?.......r./ :.+�i s.!baY: a,R:::�:! .... :. .../...,.. r... .. :ai:: .. Z:?� •:.4:•`.��i�.,.;.. %5'�.ei''` i�A� �ih:;�:: .}',�•... : ...:...,r:..: ,r, ...:..?'.M,n..4 .: ;:.: ..: �::� <i:,�,. %'.iY!%"''?iv�"i<a hi� �.}`r%<: �>;r'�if: ' +l f:i'JJ, ,.l{ Y4. F ,pei,,,, :?!✓}� rf''� JJ'�f�:�:4:i:.9:...�/:1>' .:X.:.f : :¢.. .«t .aG` '%j;}i �4�i,.1.,,f.,J��+'v!%4:•' hd/ �l.�x.r!. `?� :.bk�i::.,. :../�;uJ� f..a�rr� :..4',:r. .,t.. 'r'��i ,5.'•!yhr:: ,F,...n; f. 'rfr"' .k✓1.•:::JA/r.#//+09!�v:Jr.s.//J.%t' ,i��/�':f:.:.., :'"/.f�i!,.Y,. .:..{:^Y F::::f�:,fi...::.•Y%',. o!•}, l:l'�;.. .�;..l.fl•::%!sr': -fr:.� �::1..:. �::ri::::/�r .,v. .4. ...dRi' +:.•n:.6� '�.$'v.... .ti :i. .:.::ii:<� .v ...Y •,. .•'/�.' s.'fA..dc. / ,i'.`v`:.f... ?:!': 4¢ .:/"0.;�.9;R;.,,q.;.; , :. ai, . : ;�.%.yf....r:/✓,r f::;,4ir.,�::.u.,%/�.;:...:: ,fi::. . . a??%a.+. :.:.:.. ..?��.f�""w"`y"� i��c� .,/,. .:G:.•„ .rf.. :: ::�:#o�:Z;`.:Y�°`�:Y';4:: ::A.fbi:6ii� 085� ii4f�:: �.f,. ./ J✓Si�-i ::1;% is ;ly. y �11yy��::z.J ........ J ..F fr :I"ff;R:•if"?!..., A' ''S%%w:Z: ..:4T"'�%i'i: .:f%{;::r": ,.>�.4%�: r.!•'f.?/!� } ";:?ir ::tc.<f:.y';.r' ..+ 51/,y, ./f..,�r���•i<1!'f�,o-!�r/:��:.. •f �� .:.r.. Y��S`.%%!ri Y•:.;:.y J f l ff /p11 ��+:;f�fi:r(f < J r.,".r.1. 1,,,.,y�,...;ov^F' „rvy yn" N�,a.a�. -.,...Iw. �''. �.. � i°"". 'i....,> S"'� n•"l+ 1'f e�•,•-".`INE :;r�"""M"'""�='•r9''rr � � � """'"' ,,`�""�"i ,�,,'':'F'�,','.'h^"Y ."a`�""""L'pi'" ,w.�. '"q4"'� � Mw. .. `Y-- f�i� ! s��:a 10 I ftJ rFkf a InI i 1 f f C C r { r,4` ."y� 5 ¢. •7r „� >, "'+�•. 414 -0fyd jt+lrf9'swf_i` ,y s q f `Xr.:: 01 .� Z t': Y s'' Fl.ti t :.:L '�5.:# {r! r4Y s:py , l ..�C' rE Yi. �.4"� ~�" "+ ;nyai •,."`ry. '�,� Y's•t 6-4 r:r i•k�\��`w x�r� ^.,' i`r3Y3 R F" rC� S4t 7GNV .L'x1; urri -.r r ,Gx, r ",.. _ I ;, °� <,f rs> s. e f s.r sr"9 r r � a�' s � .f t" r - i� �r� mod,^ �` •� .ti.• i,t. y,. k r iy�pgt m ,,�,�i3 ,s:` ,, nv �t ss ticsi,c• /: Fx" e439Yri3Sr�f2Est WB _:4 .e .k "">v y sg ... f � " rt�" 's the»7S7G1 F rsfst e^�r. '�t,� 77 » -i 7S'SA'�° .:rrt :ar..a n.r-: x e rrs;t5r Hs n"- i. /�f;^,t k' S ,..G 'f ' i1 •tt 1•I�� s!F\. i, r h 31 � 1Y.i• � f�s5,� nY I.' � /. `(�''t. 111 04 -C ..,EN $y-y yF : f �/• f°r �l'r '/+�r:',%'>W<;' /"� �' �r�� '� r r.: 7vs / �� usd„� If➢ r ..�/ 1/r. frr']�f. : {�// :f/,' f �. �y r �fr' ,,, y S'' �- f:l :/,(i tuYi t ;�',,., {� 1? 9 '� ✓ r r :sxrrar xY £'J+r'dF�`/yr.!i 2 r' •,._,.,.w.' d1k 8" 3 i .it ;9 d<o>. �:,r,T " � ! `�'� '•yi;,� x'"r ,yy� ��,,,'9' i :./ ,..�,r,.. '''9' ,.' ..C:, •.Y as ,1',t� '^'w.m_...::.:.�,.,,�Y` a y 9 r �. P , . n51r xrri.6 •F., �C 9,t `t{p,� S:S 4. /.. j,Y�;• `/i it/S.f r •.�•,rig -.;�F r � '::Y �JJ{("F /r f .....E '..t,. /{ l /ff it.:..nn .;9 ?'.'rj.{s''f rrr ,. , ,.s y �/.� �p GY .biri'., v � ci." "�:: .rw >>�r/.tv,•mw- %'fY t;f!.t,::,fir..: v r- � 'r/r. 4 }' tr t+!" S .t ��2tt ,4I>a `'',,,. ,...f C f.••.FtS;v d;':: {� 7l. te�aa,,,,,, , 'r�L�:,,.��:c. %n9" ��,�s "-':. + K� 'Q. ' ° SwIP .x+.6•. r GS": fs 'k_ _ ^�4v': all S :>s% E r� Lmtf �<3. ",�y G�f' :.� y�•�y� c� awl nrY rt:: :xt ro_ +4§f F. �♦(?�' r^ :ns ffS..Y�,,..::'.>¢F n. ::# ., S �A ,:�.:. r Q�'_: `°F:; 1� f����•��.-��it:�vS" ��Jr',/,3.> �(�.: '�wG�ti� ! �irw. ....'�c.... 7: Is yt{ cst yp.. } �" f f �w (r" � � aq,�• t 5.. .,,y .':: "ia: !If'�is r:ff:.1�>]7:53({:F'i 1' f..ri%4. 7f17f7F ..,:j '"• ��{.'n'..� :FI ISiM,i;.�:i C � fi�: r ."•.� Y•"'++r-n•':. f:.:� �:: ir:d/rt, uiMr/,.�% ...../..... ri.f. .r i'LJ 'f:'r. .2:�: y iSL�r1:".wrvL�.'Y.G,�, i'i:C`•:.:R , C,s/ F:.:: ..:5. :il. '.� ._,rc......: ".. ___{_rv:/ :. ,.. .......::.::._ .,: .. ,....L.. ,.': ' 3 .; ncf,..'-"✓r:..r / uJ;. "fY:!4 :,...:, .f. .:..,r... .. fL>y.1..2'++'#7�:+•%w.�Qa.*,r,:. n -r r.: rr�'.c;zmzri" :i... :.; n..at.;`,r. :`..,s „^'ir'rt 'v. kz: :rr ., r.._ .. r... .. ...::. ,..:.... ..: .......:. ,..: -rf4"" may" , ry< x'-:.;.�.,'•s-wrta;iZ! /f^Y,c'.-%3!' .._.... - L..:d .. .,..,::, ....,_..,...:..,r,,d..,_:..••.f. -:::.:• .f,: ./.: .s7: .r. r. 3: i r d:r.r �... :::i7>v t•.` foCe7rhtlmof.'zexrr_---.'- 's'F�,%%Cr/'<�.,....,,c-a/.Y....L.�•'rtscw�'.�. � Ef?iN"..ci,K%.vr✓�3�.:..;.. :':.,r->rfr,Fn ,t$ks:,-- - -'-y,;;: YY .ts rcaxfal;t,los n�,gCoi:b.tt<roi`.cr. rtwn�.a LR>r5iskuww<riri7ss,s•,raa 4Ca Conceptuo. Master Plan Exhibit M 1voz �v p1lo calylt , 0 `rho rosin a P c pecfflc 1 n 1 Av stgu 7f 20,0 ---------------------- ------------------ i�t g=ns ot Or I : vtianRas4tv.}•.catroa-y;rraxnr.r.F.fz�cp.Fr'auaexrvc j Mf' _o•M•r•{• _,..,.r ',rr- •--•N,.` _,t,+r f»•nr 'a,/«.....,c<:ar rr+rr.�.�n<--2-^ k � ,...vi.a rrp»m"..r..>'-r- rna��¢�,�E,... }�s`.�#7t I,., •^ •<, s�o ss� s I s { r ss•f s� s {{ <Isss y� -✓s I .� I: II < I.�{ss t,. f. f { �' f aye "Cx7 06 '• „7 �: 'r} .5Fi4 x,,. s^ ?, t �r.`: � �.w.f .ems ,y�� .�#` � g5?.J S f .�,.. d:+� •.l:/,Y.Y. !Sffi. •�� jG%' f ,�f.f �y .may ��� �:r y { r�x:. :/..l l f F 'r✓ �' 4 39�°`^ y. �... 1�%._ .vY r• S : 'z:,If �' ,.a... 3;'.?rr:�. '. .r..Yx r/J%: �' `�!' :•f rr, F / ? 'ly:s f Ls� f •r"r�.'r/v/�l� i ,%,�` •. s ,9?'�:y�,�.•1�,�9,ce r 71r. 1 Sl sya;: � ¢ tj ¢}# 'll- f'`7.{{}{ .. % 'iji/ � >'�..%'. ,.!;:}"E�-f. {'.::�'/S'/ N •$'r� �'�P� ?7B' 4�?+�`4' •''' IYI: : w�,S y�/lam i f�,gfjcgK:7"t��F rF ... {'r lrr� r�y�✓t /� 4�� f; `+ .. r f.'r r'`s. frs t? •FY:a!yf ; �f-f yY'`;fri/r, N f( rs :%{ !i .�� :sue �.rff/., J'"%i'i'Ji��tfir✓I/ %< - t,Nisi°Y {l.• '. �.S .,P. f rfr �.y; .. 'X%%''.'.f•''., ./,,/ p:f.,{ C' fr.; :�: r ,.5�,a`'.}'`f, jf�f 1 ,^.�y{ ,s'-'.'�. ':� '.f�.f':'f,r. ''i:1::. i'• '.ir-'S ii, s:rt7 s, 5 I S 'ln,��' "n f'r. 7 ✓rf�F .�j'%X.,":.`,•l./ r -� >.t. . .< � ,r ', :` r i�iY'F/,''i';/•fir;,:<.�r"• !r � {y��E �.. I� : ,. a, t .; 3 r vv, rr't^^�`�:%flrir:' �'„'�jl l�Yf�• .f! f r d , f Nv/� !J: yt i�fi f� 6c ' > >Ir � �'/�J� �� S- ` 's•,l., rt '.�.I, ''� %� `'�i,,. r- rV,,. r <�:�/'�r'"%•�r r3:%�r�if %r y// :/}:ff$.�rtj :� a�G ./) dd t}r I r..� ,�`'r t-, -.{- '�i- :f:?4,%:.:,.!:%�' r r /rJ :f:.f t;,w..•Yr..%v.Y�fr•,y:r y #.%,l , �'•.,• �• :'t4•? 3" :!<f f irr lf,rr .vffr mg. : !f f .>✓ :.f�}r,. . , r%f- v..F. :�'\ � �..P. - �i�•'/r.fl`ilf. t.,•..d..r).<..:/. .4+. •� .f. •7 fa. rs' $ /.F 'r�%' � .�. ..-. !tr`: ..f,. ,.3, ,:^/ ✓;fr/3'i!4 �.�%f,''f•1'f%it%/.'y':,v:- 3!-:'+'�+ .t ::3�PJlhv#���.#��•. � -rJ;:r:;fy:y!.r//! - $ may, .�u� qr s: �' 'i; :<�v: ti` '�:'�� %n Z � �� :'�N � - .�%vr"tf;.:.::.;cs% -/r {f �L..;t.;,. r.✓'+, /r 7(F : :3 �<''.� r. I S / vlli/-%i'9„�/,: S„ .i •>1r,; r' '%- #+*f,, , `�js� r y. "'rl'";':R" r "fl-' � r :t f f k�, ✓. {�.rc•, „%�.'.:. Y..,, ..r• -y;?' .f, f '"t°j'p, •.c�r/ y�'!I >i �'� .s� #{ 7/��f,..f h�� Y.➢J3f ,l r{'•'' ''r.,1�F, 'i6 %�✓� �,. �n`s.-,,,�L giS" ,`t � t�^1 { �F'§ 'fls ft'�I ,,,3.>�X �Jr.'I°>S v Rf{ r,f6•,T� f`t�'f ,x :�`( "w F��, I m� ,1 } a� sr II�,.;>tyl�� s•Its s e 11,9�� i, ti r �is DEVELOPMENT CONCEPT 3.0 GENERAL DEVELOPMENT PLAN The Crossings at Huntington Beach Specific Plan The Crossings at Huntington Beach provides for a development concept provides for a planned retail, range of employment opportunities in professional, dining, and entertainment complex in the northern retail, service, food service, and entertainment; and portion of the City of Huntington Beach. The Specific will broaden the employment base of the community. Plan establishes the general type, location, The Specific Plan establishes a clear development architectural style and character of all development concept to assure the facilitation of a cohesive regional within the site's boundaries, while allowing for shopping center. Design measures encompassing site creative design ideas on individual projects consistent planning, area landscaping, building architecture, with an overall concept. streetscapes, pedestrian linkages, setbacks and signage have been established. Adherence to these details and The Crossings at Huntington Beach will be a 63 acre to the established Design Guidelines will create a master planned regional commercial retail, dining, unique and integrated development. and entertainment facility with supporting services. The Specific Plan is designed to allow for development The illustrative conceptual master plans (Exhibit 3A & in a manner that is compatible with the surrounding 3B) depict scenarios utilizing the various guidelines community and City of Huntington Beach. The described in the Specific Plan. The plans provide Crossings at Huntington Beach Specific Plan provides potential layouts identifying building orientation and an opportunity for a variety of quality regional serving placement, parking design and access, roadway commercial uses, consistent with the City's General configuration, entryways and landscaping. The plans Plan. are not intended to reflect an ultimate design situation because a large variety of other development patterns ~ The Crossings at Huntington Beach Specific Plan and activities may evolve which are also consistent provides the framework and guidelines necessary to with the Specific Plan policies, guidelines and c create a unique, high quality, visitor serving, regulations. retail/dining/entertainment complex. The site's proximity to regional transportation systems makes The Specific Plan recognizes that although the main c the area ideal for a variety of compatible uses and construction of the project will occur at one time, the activities. The development concept is designed in ultimate buildout of the property may not occur concert with the area's history of commercial activities immediately. In fact, building pads may be established and the community's need for a strong self-sufficient without associated building construction but shall be economy. landscaped in a park-like setting until such time as development is proposed. Therefore, this zoning a o document anticipates future expansions of the o 0 The Crossings at Huntington Beach Specific Plan 23 August 7, 2000 development site. In order to address this concern, flexibility has been incorporated into the Specific Plan Development Regulations (Section Four). This flexibility in development guidelines is intended to accommodate future market trends and tenant needs, without sacrificing the intended high-quality character of the project area. The objective of the Specific Plan is to implement the goals and policies of the Huntington Beach General Plan by defining the physical development of the Crossings at Huntington Beach site. Included in this approach are the establishment of land use, circulation, infrastructure, landscape and architectural design characteristics for the project area. The Specific Plan consists of a number of major components which will guide the development process including the Circulation Plan, Design Guidelines, and Development Regulations. Any reuse, subdivision, or new development shall be subject to the provisions of the Specific Plan. Refer to Section 2.3 Site Plan Review. The Specific Plan identifies and requires sufficient infrastructure and public facilities to adequately and �► efficiently support any and all anticipated uses and activities. These improvements will coincide with any ` upcoming development project. This upfront effort will allow for buildout of the Specific PIan in an expedited manner, subject to compliance with the fi Specific Plan and the Environmental Analysis. The Crossings at Huntington Beach Specific Plan . identifies effective land planning and design regulations techniques in a flexible format which can z a take advantage of ideas and opportunities presented by future tenants and users. o The Crossings at Huntington Beach Specific Plan 24 CO 0 August 7, 2000 3.T REGIONAL COMMERCIAL USES financial institutions, and similar regional-serving uses. However, regional commercial uses do not The Crossings at Huntington Beach Specific Plan include some commercial businesses, such as auto recognizes unique development opportunities within repair, which is typically a local serving commercial the project area. The purpose of the Specific Plan is to use. Future activities for the area will depend on create a distinct cluster of activities and allow for market conditions and may include a variety of individual project development and tenant occupancy activities consistent with the City's General Plan. These to occur in a timely manner, within an overall Master development activities may be either an expansion of Plan Concept. This approach recognizes development existing facilities and/or independent new projects. patterns, market conditions and establishes sufficient The project area can accommodate a total flexibility to provide for the opportunity of a variety of development of 1,100,640 square feet of regional activities within the Specific Plan area. commercial uses. The City of Huntington Beach General Plan identifies typical permitted uses under the Commercial Regional land use category. These uses include, but are not limited to, anchor department stores, outlet stores, promotional ("big box") retail, retail commercial, restaurants, entertainment, professional offices, a c o a y Q m�mI z7 to N � Z , o O N w 9 CDO o The Crossings at Huntington Beach Specific Plan 25 coo August 7, 2000 f r '0a --------------------- IRE,, ye€ r 1 kk_13.; � o-y:_ o s} �f t s.' E, 03 �**q ri fs.i..s, f�� ..i.s .fr. r � �• � E"' �y �+,',�, �rs _ +... ro° .. � 6 }d -g #3 Y s \K4 '"„t„5�` e�,Y. f ' a f 3 ifEki A5 E�2.'�' F �!°� 1; �.xl::�;£!u!£lat:�su:<:f.M,:.;;3sza:t;tt3f!337� �� f �� i �}. .�• ,� � r `� ! g-� r S:✓Gx >} d ...at`81Fiftt&sb$$SAi�! a f € Sf t .'!' }7 ;ii p f,_1�'y i,y w✓x $B &s3b � a363� �E aye<:f ' �,N r S):_� �'�• — �$Y'$�9f�f, !as 4 � ,oo tt 73x f y `�D ��3$'1n".�3� 9636 � �y�s 5 7r 5, '� �ios� i� -.:�h�` /. .}., ,.,`'2�f s_�j#E f]{}ss5ii3 S F' �s,�"• _.r.{,k io w^f•^^f �'s -�,f .t f��� ! a..zcP x�.. I i•' y 5::#i 5 $ � Van.x• ...f-:�-.�� --}9f �w'. v �a..� 1 /'",`;,#-5 4o �Fi'�fF(F�!3'!'f:fE °yr fi�;S .i� jr`r �"+,,;�~ 1 —.i•.�l_.. �/ 4i4 Y. �.��/.',^�{`(1 } tr"�1: 1 P._ -�� :R�✓.3 j'} ll l ,.%b:bf>.' 4, 'yWK-,•.N< 1. b, a. � ��f {`� ��- s �,_ s•5 i; �1A636i6�� '1 ���� AfBFAb�kl'� F�.,Eflh£f •,� �,�d: � �� � s ��� i .12 f_;fr s +a 0 9 �f••a 'Y 4l" -:S".{ " it;' k y�,:,c..,v S_'? a.. �e:'.< Sc''rr'�# ;f:t sa. 3 so st�� �i �.: #� 57 :.i ,.c""'3; '-� � #.. s is i Sys f f iv y ; wa..Fr .„fgx{ er s �E�. � £ -s# r ,s €tt33..iff.a r � ;5�, c.,'< c�%`f7n <3 # �, :�. �•-lrfir„ �,�%� �: �:�a f sr,.: s � z�t r�" r.:-� ^•---' ;,,s �;; F � fi> , %,a r,._ az r..:ia , !f::ayr�, � fi: , # Y.1:E£.•13:?lffn:S:.a£1r33Et££f.l,l E£EI,3;af.3'3.. ,3.t. sir• ,:: K i i{ . ;_a 5f< 1,;;..7, t., <': ��� J �� •. ni a r'fz p fs S..., f r;a fs, s s s P$"„`' .c:., �"""•"�,� 3 yF .acama.w�' i ..^e,,.,.-^...^�tt 3`X 5' ..fm.�t..c..s: rw. ,«?r - r.R..w '' 4 � 5 .f ff Pwtg .-....... ... y....y-0 N ...�.-m._n vim.. -: ... ...�..;:,..-r.wr w.:........... .-.... :"AY.M%A'Lf51^4k'MY/+J�IVA/+?%a%WC:a'W M-�'S6�AY}H4DIa'XiaYh y � -• 3�1} tr an Plaza WWkway il! Exhibit The r _.t ... ... .,f - r V..- ,.,.:.:�. '.,a„y�PF3.++Y.16 ''#°fs".# o f ,., E •.•' 72 f wEE FIEt1E31 fit 'ts �!1 ' i(I E i c i }ya �3.IEly.Yiq 11H4f 3' .t%id- {Sj SS`'I y_!. }.£�qf I.: -£ .:1. Yt t f LS'.' '\ •`r,� £nys 1£sE£" ...' -z �'S��Ka•z<„vy ,,�.'s,, ' _ f,�y c s x h 1kks 1 �s �x� : �y � -1 l:t ,�1 ,� <a�r. { x s,.a::4 ss 4z. ,z ;�l"r",, a- } � �y-- _,f k r �iy;>`, ti���." 5t`',t i4 �°4'�^• r f ��^-: sr 4YYrJ IG'rF .i "-'�B'�'�•�'�t'4c„X�C9S :''3: � £ 7 .# yr :'S`^ � L !lt r-_f i f ��, £ X �_ f1 It ✓..: w�yr l'. { l`r ...� T1$�a :'yp•' ,,� 'r` ��$..: •.s� _ t 1�::. °%P•sis,5r � ?'r�"} L•',..t f//�� �' T 51:�Y' P� y'i t,i I ss `:. )f r ! f; fessgr rrbE�r.'e rs'��?,g�g > ,•% ✓ r�F- fy. ;34fi3T;ti"3" ...� £ t t er',.> mg, t '� ����d r / r' ' -r�rr r r r r/r r �..: `• - I; �f? v.{"°' ;: •�.'�:i/ry"r^�"�''' r.'�rrr t y..�,:[tL�E?�J;6s s �f + ��': 'f f r�.Y�r v 3� f?'' � :�//•i�l �!%r •ar' j- �.}«�•s S us#,�,t,i s ,.�� u `'+� at.I .I.' -t ...r""^"^t _.r'�: - .' .w _%y r Z' r r�4 f rr..� G'r y r,,y�:.., u,p 'k• ^4 f. ffi16i5Ak7kt6�&!& ? 7r �"! / r � ` ii'Z tir:F t p< f / •r�. �J Via. S..f{' b4 yv ry xf.-..5 Y.-ha �.r./ Y'..� .Y.S :.s:fu< � nrr.. N:6Y�. :x•u �4 �:� 4 �; �. f r.f,. r '� ..rr. ./i .t•;{{ S:uf., ..sf a':k ✓.t ;9. t � ���,. �.#'�- •,r.,. sG; j't llj:� ,.f 3:f,^..0 r,� X. r�.. yT.i,^{ r:j�� ::E#f.l� 1,:,5( r •k. c.,� �' �:i :# !-% r,.�/-�:54• !}��... EE( ,7.`./Y �/r{ .-.S<�k y ..4't' �!:f;:1 : //r ;1 'x, ,} s, +`� f' £ �_ } �: � aBL� j f .c� � £.. t _ �`XA r t: x', .�al�F,•. � >`, y p! 1 `y f rFtrrt t � --Y� = •£• fi:�: > } .'k{?j¢s#$ ' '..kr eft< i f�-:• `: ..... ,;;r � +iwv .s ra asbx :,tie`:'ss .jf rR» '�'�" ' F f' ::tfsstt r,;if •t},Sf!•.E � .,t .}.�. '� ,f ,.r'•ta .,5; 1, 5 ,J �dS::I �,, ' �,_qp(� ] ,�� y�pp..�)+.�{ /�y�,y^• -ry� (, {�.,�� y�f$ yy,y. ,p/�q p� (t``,S{ {( 9r{ b%W'tdW.{-0S�K4>v50n}Ari?SdnNALR;lfM•X-0(KOCORrirdgYrnJE '�"a+� Ey' t za Walkways Plan Ex 9bU 4B AD .0 gu , 2000 REGIONAL COMMERCIAL USE POLICIES: Strada, the Plaza and the Colonnade. A pedestrian 3.1.1 Any expansion beyond the initial site plan walkway system is also used to connect the Crossings approval, shall be through the site plan review process at Huntington Beach with public transportation (see section 2.5). facilities and surrounding network of public streets (see Exhibit 4A and 4B). 3.1.2 Retail, dining, entertainment, and related uses PEDESTRIAN PLAZA AND WALKWAYS POLICIES: drawing from a regional commercial/market area shall be the primary intended activity within the project area. 3.2.1 Individual developments and activity areas within the specific plan area shall be linked through a 3.2 PEDESTRIAN PLAZA AND WALKWAYS series of pedestrian walkways which culminate in an interconnected system of pedestrian plazas crealing it The Crossings at Huntington Beach Master Plan variety of open spaces. identifies open space areas which can accommodate 3 2 2 A pedestrian walkway system will link or outdoor commercial activities, seasonal recreation and connect all future development pads to the central entertainment activities, and casual pedestrian portion of the Crossings at Huntington Beach. meeting places. These pedestrian plazas become the central focus of a number of commercial nodes within the project area. In addition to the major plaza areas, 3.2.3 All pedestrian. Walkways shall be designed and there are a number of entry nodes which serve as the landscaped consistent with the overall theme of the interfacing links between the vehicular and the Crossings at Huntington Beach. pedestrian areas. 3.2.4 Pedestrian walkways as shown on Exhibit 4A and The clustering of open space plazas are connected 4B shall be incorporated on the Landscape and �? through pedestrian walkways. These walkways also Technical Site Plans and shall comply with American : serve as a link between the variety of Village Disabilities Act requirements. The walkways shall o commercial facilities and the Entry Plaza, the Village include shade trees, seating every 200 feet, decorativerZ pavers,and lighting (see cross section on page 34). a W a o m a IA w 00 NN 00 The Crossings at Huntington Beach Specific Plan 28 g ao 0 August 7, 2000 rr u„✓ne as"` E P '�Mw ,,, x t f* t f't�1 (:'.ri:E #k3iP3,� .3.(T�f.ttEfskisi'k3"If 1t11i1P3?3oS1kt113.£$IEl • ,i/"! �[ >{t}<?{ EE C�"D�#I##?ili#E Et£i#£(£fRf�E11#;#f19...sl�fs+i#11�G_r. . .� ,w��;k •,�„'" ti�Fa ';` ,,r :� ! !� {f£ETk1T f E fks fei?k 'tf 7ks'S?1 If t1£fl kEf.>fil (ir t 5 f MI £i.. 'if '�, St: f'E3MItolIIE�11+I1Il,1 t 1if11 Si �ri•,r.�'.:f/i f <s t ,.;s �` I k. :. s f L', �3'sS 5 rwPYsff3� Y�#� 1 � f 1 ;i,s!afxs$ii;,il1 t .� � f #� ;3 ,I �, .. _ �'w .•.; ,, f b ., :fit r5 r`.: }•si ,:�', S --". S; � � ,�. f:1 f ��/y. # �- ;:: f_ .( L, •: {} ^v^ i�,i f. _ tiJ .�, is.k Sk•��V.. :.t•�/,(+ N•;a 952. :1J ✓. ,,+��{:-/,,:/'.Y:.,r� } f ".'i- vx. k-. f}�' }.x "3 : E :__ }. { 1'i .,: Yo.•4z _,rc >r 8R n < £ ff yy •fit //, , ..¢� .j{� ,�/ n-7+"•^'.'•.�- cfv r+Fra�: i r 3 Y S .. '�, .. „t:a oi,. .��.. a( C:4 S { iks �` fir_ � Q fr.` '< �:I f. c�:7 V l f 2 f r F t: r - y �1 •1 �.' 'E":: t.: s c o k__, :/' �'� :f � !i r F fas9chs' -.: .•. -- f,. Y n) •.r„ � - 1£fk.-{rf(.^R+I S0l11: '{_ S',`�'},S, t•r,� a y(e� -.... :�I r -� .y,•:.•.iS ror YYrf Fr/.: �f�'�',1,��/ f r, : ,? `u�if5:::,a'_ .:rr:f,•. �;r- :Sr A. •r:i ri y r 7 j{{ , ,/f.F!":.;.:,.r r 'F..-$ {r',.¢.:.a• ",(<: M ,,. t...✓ r. ..•..:f,:. �:SF_` _ %1S't{y,Y,j( S{}...f y}; -.i 1/ ,•?. :�� �.k V.: S ::/.5�.^,r,,F F 1. �' S ,(4: �....•�y�... �.t ,f�t.:.31,S.�i�,.�er f. :Ff ; .x. /,f �/rr 1/,,,�.���}ir }� :.:�_.t n �.�a',,;�G:• 'f`i�! l r .Y!':�� 9: ,.i �• I,' 1h,6:. +•:/: .i./;' 4$: y� .Fi!..,q tom. w Y =¢• f' , -3• rh'; ,../:+.,,/F {j{y,, ::fr. i.f..n:.•f. �.: ;>��i•YI��F .:. 1... :M "J -emu.,..kF:i -.I. 3''U:_�d J°l/.: 1 / '!''.6."6c,'i.'1+/ur✓r:.��:; .P h'r ::/,: �titi S,',///n��t.S f h:! �/.• 'S ��:J MIN 1, F...r!<"' // ' ...Y`� £ur�1r 'y-.Lra .t--J ' —_ -r __ :�:1 l i',<: ,fr. ::•+.. S i 5 .1:G;� •:f: �. t' Ff �. ,.may' /. / _ ":S •?'SFi. d _.-�� I.t: .f., �'- lr / `L:• .1'' !L if ^'Y S. -4. :�.<•:.:'%i;Y.lrr^r�'r,^h4 ..71?%.. Y,.5:� r,. ,13.:, 1:i , ..�.''/.i�:. ;5`y 1.,:r.. .s•.cf:. f. •.F ..7F } b s 'Z'i.;.-rf�:, ,%i f,•, 7 •ti) $ :;A frrf :/rr',':.:� ?`� � /. i' �}.c., '{/i k,, f 9 6`',` f !i :'7-r:..fy;"^".,F v x{:�Jiwk.t}%•:,:.: :5�..,� 2r ...p... ri-: r.:..<•.$y / E :�.rl. }. 5.. ..✓r. :,�: ,5."i .:f'rF : fW.n i'U is' :Ff } ? ?s3. 'tj '..,::. > w. •f•S,F ,n'ri^: ^.iR s:�'i, t. 3at£:i ia. .. ;� fxf •s .Z-": -.:5'.'. .`:;,+' yf,.,•Y.F "-'f'r,F•;�..i � I: -.r.,r:., � :1 • F. t : .....L>fu.,,f '117d :'w.' ;:`' ,,?' ,1., lY ';� �.s-: Y I�-: .._,.:, ,Y:., ....... ... fr'..yjc-:�. •.st ..! f;„a;. ....... ... ... ..f:;,;..::•:,.+. -,. ,. :i�i{P('— 2.'? ff �. � ,! -! f�.. <_fw..h+ ,f..••.i,. 4 "� --� #� yy �;' 4 -0lSf4 Y. 27J`'y�. -70 ?'I; .f.. 'S E -:rr.'r ,: .....�:: ::»:r'i.':::3.....:.«G !+ .S :17 Y �..> }'+ .I• ri--:. 'F.. ^y,$ %':; fnr/..;: -'r-%.' -<:5 '`st,. :IY+: fu r ,•Fr^tx, r '"�•.> S� n >;::1 �.s r. r f; ,�r.� /f....r;'??• 1 s+.'',._ 3, s- t r r•. �r `. _-.rl _ �:.. -.:C.,, s ."'.^�.:.fr.-...:+::rl� �} .. '?' -i-..,.,. � ::.:: :3::. ,. -:� aNn, :$. � - 4 :,��;, ,s�� kf ''`Yf,(! •r '+i: .Yi'r ) 9. 's? i.' -.s`= -::f:}• G �. F�-,£ 5 xovp uuv /� .x t �. .;/f /r11°J ln"`Y ;:�f f...fsbtlC ii$€ G o € t _.z z.__�..w:i � c'.• s } � t, s jf (fl �' �„ � :T :'fF% '6" S l F rf iY� } "� � �p.$ C I• ;� - i�Y _f.: .3.. �: '.'y. �� �, ,v1... fr,: h• �r`-:. fv S� -5„^ -�. }.L. y'i i�ff , Ff.. f -�' 3 r G t�f'... �, y.,.I S )..,.:i,i , C 807'g-•'� , t`^ - +..-.,f.,f,.,,:..✓.,i n. ... ...: r _ _,� �,... r�/°.!,�Y1 11>#Iiv l.�,.�^�":.... ..,. rc:mr, ,.�.,.. - Y a - A5.itu` : } '�fxW4aYGT4"�fA9g5'r#fGY/.ildX�bSfCS f6:M000fiAF�Y9S'l?K6KkU'LAZ {�_,-,,•SH,r>"s..y x.. ...1[t lfl','fi t.Y'�^ r,,.,, yJ .g'_.,-..ywr. �.q�r -S RZ '+Wahvtrw.tY.�KK. %7 1JYA�{JLWi'Gr•Y5!8�} '{8'�r 6 '(.F Y4.i�fS.RWi5YaK'Owla� Fiat».:i.IYAo _ dk( fhA•'hAx7�5pIC4�fUs6,4. .s n6r�gy[gg�� Qt "'�S$¢�' ' k<bta6iw4�a n.r:<w. 1 ul ati. ' Fropowd New Ce Wr Avd,6 V#"" als Off S The Crossings, at HmItInglorf Beach Speoft Plan 29 August 7$ 000 VON ? Isn& = rrj "yj Ind T x qgc qgp *SEA - +A`r+5"x•Ksmn>,awry awar.4Yrraxa�_ "v'�:,+, x{lafalen4>'tSai3YJ!^? &B&jqd �._ 4�' cas? .e mma aseiC+ ,,s, war, u eo ,00aeao„y.,sotq (6i<: oyar,axsyx�bt '$' ��aa �iraaa+�3twPtt Fp2: a�i�rr�tiaxaeiw+.�ar„srira � �a s `ate ®r .. S r wearxa?.mf arSoaSaaS'a•a�xYawarixht��'r.:w,vnzz>vx xmh rrrzcvr,x!�,'^"'.c- 4r o>vn.m','.'7•,'.ww.•,• �t�� '. l' 1:!'�lstl4 <2vs]'X� Jl- �i 4rNWH w,Y'9�f # �v .•rr..vr++,+., :.� K tS[ �^•.': .w.�1..:�,i-�` r.,r...:4rv}q4."n" ..: . -- :�.i15 �r r+�:r x r.-_rvr�i {;, :.' ..... >..1.'JJ'^'J ... �-' {i ,:•,-'vrS1.... :r r:^. ..: .. r i,^,.-,t r rs. iY f i, �l/4y�i cc}�:. Y�S {,J $ oil }^� h� #E: 1 i 1,E. 3#r,.£.1• r.1 1� t,S i,: .5 t-3:$ 's' J, : ,..;;s n-ft':C€1:'€JctJt#£,s.E4'33 r'-'s e;sf; r!`ri' fir)• 's r.o< ,. — < E E /,/, 3, ;rfi %RSiC' s , h'�' ##�i.-' " ?, Ifr V :'.:1 rs J�y....E,. - Ear, ,F s j s .?1 3zr .; f.. / ;' f ❑ S ;. q a fs'- ''�s-': s•� /•,� +(n.{: /r%rr�',F ff i 'i#'✓ s 3'ss>r` � %fir J- ��t�t r ,. : t<.,,�• ., i ; �33 '• ,� i x€<,r; E:� .'F:-}ss :<{T,y-: ,r,f;;rrrd l IfH•r l� "' 'il'; , £r'X.` 3{j{� {a -:� Y �: E' '.i ,/ ',�.�.. 1 '1:'/�'r/iri'Wj���r.,';�/�j�/��f•;5S 1f1,. �•y -�[-`s y,,r ti E: 'Dt r✓✓r '4 '.�':rY 'Sr/'r f/ :� s •err rwnv r.•.;:. .r.1:.. ,Y^i,5-J+•rfr f J •� r.>.� �.�•r^' r t rly 1 •,'G +//.'�., .rr(9s,r Vt :1FetrF�F� ( _:i::rl,.< r r f -Jt. ., ,:' ... +..::.....,..:G...9r... L + .-; r :.:;rr...,,,,.• 3// rr�� . " ::: S^' ''Si.r, :./H ,. e :� •.... , :}.....�: ,:: .�-. .;:•,-�,:..�.*. ., ... �f��,,.. :. -.Y-,. .4+.,..;«ram,+. ... rr 5.. y,..:, +!r, ,i, /::4 '::4',_11 '#F :�:� 1 ,{tn' i,;,, .5S�� el: -�...rF �,a,yapp�t ,oS r %` r :r ,*:''n' a" 'v�Nq.r'"'r.;,.:<•f-r,•:.✓. Y. -:'i -.,&.' W :<"•r,�� .a5ib.fi:; �'._ •� ,:i<: ;i tr:. �+'� � <� r I.a �'' �,3.,5; ::. .. -^,. -a !, 1.,v 4 .,S ";,=: 'i:r, r:',: :;si.f!,.;;:SS::W.?k:i ��9,triY.a�,%• <. �dfi+� v..y_ .�' „a'r. <f.. .i5:. a. o e J._ +/:5' ,4:h '., sj t,rn, �i% tS:mtafCr✓,,2a .Y.%4 r?afY.'�f�-i.pyy -n /'r.rfvati#•.S '=�* 'i-. � -. {f }, •,,. +.... r.....,;, .• �.�..;G/..�.,�. �:a v. { ,-::1}-/ •iC•�.:, b r.. ,.....:.;57,{r..°l,. ,.�iG..rr .r. +..5 - t r' � �',� ,, .,.,""� _ YwrQ��. SS::.c4,El�r„•„a`4:: r r }�Srr�,� a"L rr. / � t"�..,.r+" yts " .r '': rt rve-w v. : r f t �s'{r t{,o� ,.,./.cte,,nat'J c..ua•G�J�. �rti.^��,.�'K � s,..�`k, g7Z iDC# S#f a FI Gr ! WIN.i ( , X E Ito E 3: qL,. l t•iI .'`r,'.�, .:�s �'r:: xr '.,i.<✓S rY /• .�'t'{ ,....vuiJ:}"siFttaE,G'J•s.. �J 2 ;.l<rH:p•/Y / .,�.r,,..,,,!r r }.ryt 3 t• �, , t , :i r d K t "f _ ,,. ._ .. ,, rY{ .. ;tr,::,[.:., riU r,-;+a r r,•���(( r::-:� r, 's. r: Y, )( j j 1 •J::j/.,�r:: {`<F..•.rS!n., ..,Eli..f f'..4 rr,,. y�y�/ +; r :.rJ.� :.<^} J A„•••^^,rl.',/f 9._� J # rs , rR 4 y r r ,ts`3,.: fi .a>':fr ,,,,: . „ i{,g{ i c.'. 7rr. .,crn'Ox t((E .,4A�,`c)y'9 c.,, S+:` : s�33r. s,1.3,1l.l,Fs�.iJ# h_✓ �i..., !� Y. ii'r4SLA,Kxarf5 .,Y •',.,. : -:/ �.:.� F� �- ;: ..� :. ,t,...pro: ,..'."'S„r,4- µr f;,.;, � -.�y}� .`� GSSYQ>Lr <v r; < s� �F^ `✓0.K� ��,. r / f ;���,.� rr.�r p � �,. Y ; } a -s :; a } iF �/r rrl� ��:,.-..-. r t is-�tij' ? !r !1 .S, ( 1 P":1 f t 1 'lfr', �) •,:4. ,!e 'Yk�t/ fi >I,Cf W �..: .k � } :j� y Ph o I .ts •' <;� �x ''`r�+M�,,r � r� 3' � E •�o-� r� �.� r s t E t°}' yr t'sass bo # ::1 £€ '-., '�.;� 4,�. Y'y"^'�^��k <� ��is sltl£JJJJ3`;isl 3JJ#J£.{33JJ S#rife! Fr?� t PMI I<3"IiEFIFL:Jl3siJffl#641J3.E:f4£;L'.i�13 i;t£j' tf}l '3 fiflel�lll..;'.JYI�<r�r 000 hL -------------- -� � 3{ Pr+i%'RS�fSw�+Wvc.w 5CRt✓.vc� `"9'�2)'Xi.pslS'Y,ma'L?S �� N+wi.NX P,^'dN{zone YA1NM/d`phr '� -� »wx9trr>syiCaa;� fl.'4 _ '> S1YN7+k5 �` w � : : : - x¢4.<a'.tau�Yofi<sb74Y>DiENI^faf wnit�,cHnx,o,wors,,ow. :� � :� f� '• �'i' '�` :: �:: �r-.w fxs..w�""�"�..a-�t'�#3': 3� d'���d��� 5 5�� <7• � t-�'� s,+��;y �u:^" s a rirr nr.,.. >n,.v, o r .!r/.✓F.t:o'fr/r�ik' nrr.:rr.,r _ a.,..,..MT,� t3' S 3: r� ,;:' ..: .,,yr ... ,.,-,..- _ �✓ .,."..`: ... ..........: n ,.# f[`�?1.f'C333"�o1f#pot" `31�1[.if#�".ir.c1£I.'113:t 'i3s£c. ,}«$'.y:�::x y 11i £i^3Y£# 313,cs#cLYsl,t£.f 31 r£f13 $.3�} ��; a r; !w.J R... .L,.? :=� f% it wr y.,k ! i i r r 9:: .,ff'"i"Y� t .�"'% ,/(•,n "., S" 't•.::y. �- �: 1 :; k i.:::r{. A.I.I.I. ;Z G:.r^.{,,.a ��' t.;;A '� ..5`.;: � f ss99i3 :3•p: t L ::��F � fi: .f #...: srN. 3 : �'"-',rf -„is k: ',`s.0 ,si. �^•' Mm, � f:: 9%r,f s€t %:f�• L %[f<# ✓ .......... r , 4 r :"f, r/3 1f >!sr2:: .• fr/��ri� 4 J �,r..- 1�., ..y. ,��o ,�� S 3•{#}# uu' '•� f;!;fy .� ::f i'ff,N,�/ f ✓, �'• ..<is.,t:` �v.f//.. ,✓r S C � /.:. r k ::F •.:; a rr .�:r ,�:: l/. .Ca ,¢;.. }y,! #.f!y:j.�:%C.( j} � y �[`/�r' .! > 7 .� •.�Y� .J iI .J- I 7 C � } }f 3 4-�' .pi' �' f vr : .SY: e'.• .frfG ..r}•<A�A #1# _j:} j "t. ;N• 4 '[} C I .�?.#k i�'�,• ssw xi e:2<s, Y 7 5 5j 1 3 a:::f: .< lr/i.,:✓. ..5/rr rr, .J' !�. :^>,y.:.,.;.;7.,:%,� :t ,� ad1 .t ,.3#S ( �•'/•. lr/./, f'f f i��{,jr' -1 r�'..�i' %i!.'.:/(:.<:f!.fS s'i'�:% .t; ''k � <:2s r ' / rtifiPr% r✓ S / 'f9 /' %l/%'r•Y;3:Yr ri<'fY.:'��,., (',,:. 1 c t,;H�Lr.#r+3��e��J+� r'r r' ,c,����h ,r: :SC /h.;:.u.f,• .r.,{,•..{ :::.y .S.:. @ Y S' r :,i�: ,. r.':'-.)t: ,.:r�:•;•'•aif -c#a �,...�r is rf,r.?x r:ski-:; f ✓, .<f;; (�� ,. r r%,.Ly<.,.��,. �3, ,,,: .a .�Y-:r�::/: :L n..r #s.sN; r ✓/ .1 i;, :'� t f3 -�r S�St /. .� f��� ;4 h.r "��' •>. ,�':u,...�.1r"%'¢.. s. a:: � >#, SS. :.,� / f'� .;;:1N'�,%"' r,:;r r✓ Y .ir .r �. ,/ :�YtS{i i:( /, i f�' „2,:..c# ..a...:it<t."�' .p, ,iQ. .�,:{', f, ,�;'y.,,rt,f.�:• ,9: � 'ffr'Ht` r ;r f 3 a ^�" ff56f'fG.evG!'/�' }Yfj� � /, �:r .�h• .flr../� .�i r ;J.,.� iy,•s' �'`,lr.,,r���.� ,r,.<r:.'rrN "'y`S'1%` f l,YJJ rf � �".S� /l:Y' r :Y',`✓"v�. '�fn'�1''y ''A��� ,'r,<'/.�.f C{r%r," +.i✓S•%.;:;.rf :t i.. 9j ..}� n,�: rS..�; .' ,s'. /ham'-! :r ?.%',f fJ.{y:� .'f•E/'lJ� /< /r r ::� �� J:: r :-:f 4y ;:�- r�l•.r'ram,'.-'�/'L':'% l•'f > 'r _:;rf!i�-� .%` r r5'ryr�,.ih��r/yi.1'f'`.�f5:r'"'3"srr r1 � i#' ♦ y�r'f"r Y y, y�.:-",r'' ;,�/, '�'�� �!�' :!# ;:.� i/%H.,`.'f1'r�1.!: F{f` ' ✓ t '.a .-rr T'i r'/.r:l'sY'd ..1. Y r.rr r,lir.r.!r�:..;..:. �/ ,II:;)• <s .k ..: r /�{ } ::Qo'... r:'f-1. si '.✓•y :r +r.r1:- .j.y. ::` f rr,:f r"i a; >i�_f;:, ✓/ `/.� -pt,l'; :'Mr: irri r .,f f.. S.. ;.f '✓r�l��>��5`{• ,rr}'�i""���-... y I MITI t y;.V r r::-:gig # r r F '# _ ✓�.�-..-,1 - : r'xj� r./r,/.r,.f�l,, y � ' 7!� r 1 t Sr r h':"ram,'"r,//r'�s# �• r r l 3 ,S 5 k` ^y.`.;'�ir';:✓�,r('1 :.0 i'•/✓:c� �;�. •fi"'�r S �• ji. : < f {r J. Y '' •, v'' s t 1, b `�',..� �/ v# :}; t �.. _ " {. t 1 y? mv`¢ 7 aV". Sf S f :;..t;;fi # i 'f #.:.���� f # s, '' i s s s.. f ;/r1! : /;. 'y': /f�'♦.st`�r3' � I t� �, � ''M .,� `a�/f�f>`, z i : 't¢ ,s :iy ...? .rk r:! 2.=. z z..::✓�., x1. ,7' �. Y/r�Q�� r,r,✓{yY/r� f ^rfF?,r;�, s�y,`� �.'. .M1>q` `' 4 a�/,r f ,.: ,arr'/,-'!6.•r'.r 5 x. rr✓• r <r u c '-ri'` 'r"IY'2'`'N :.; ',✓rl' i, r f S .t f' �'••` �� `'y`,k}il 4�;``�{ '�' ��};;. 1 r' < � ..i � 61kt��t t(�# 'jo'�y> J i �•£�/' �,,..c "iv`':''r,., 4......a ,w,,:, ;'' t i 5 t 3 I •s 1 i s�w•.`F A x Eft fkf� 1131 E£'.f{T f#f t £fJ#1 fw1Y�� A�3I51ut#..t£1J 3 !£fftf£ff w33F'tk£JtJ.3 C 3#37,£�s3 ... ;£11 "'�, "�S`,�`. �";. w�V••", .,;.4,�1•c "-^ s• ..,.,,;°:""" ,..�rxir;' raurilc•M• .. a tL n n PI1.ploy Y SOU U01 ,fie $T at/I --------------- o; U. T + roarrs:v o'P+y .'l a:.rrn "w mn•�ry^'.+kaasuk6 �itr.'e ::�' yy�� w,,,,<g:,,.w.•SKf kJ: +rrr..,•.•yal orrwRwct 4.j Q :Y-r ; - - �� kr<ol'�ltywk// ylkKLl4Nf'hv45 r�kYu/e>,>V1.'�t K9t40Ewp!Si9r, _.9D_"3 ly,........... f. .v..;,,,......... :" ......... ........'?c. 3f"3#E#"+ tr#` $b£ ..s �3 .. .: s.-�'.'.,®,YA^ �'.,..`.,,"' _ i°7f-_y_-t•__. sv7<t3t<,,.E#F..##Etr1:'"tttsf.s�� ' i;�'`~��}"` ,, £}##ss�•:�r�r!3}#3�#}z:art�L�3,.#3#;£:r,:�r.£� y,...- .�,/f..::: �r# :p "'#�'/`• � s:^' S r-f t^--� : `�t c$- ',�£': Y/ � •,t, ; ! ¢ � a s--- s,: s.'� -E t33J.L?{I3 :9 ;t ;.i rrw�;:i# <i. { ;/,� =ti 5: :' `ft f:. �• �"" `.I rn.. F.+f ..y., r. •�7. r-�x ;2� .�,. / ,5 rw t JJrrv✓ :� 3 rnsal# ',� {��--�A 'vl:,. <tr 'R s'-., '#. is t- -<.- Cr / SS S• .v i,> ..Rk 4rRr"'> {N� r`r �' i � >r r ( f •' �: / Y rn ✓v .% �` :/::./•. -:-# r' b '1"'.;$'•" f jjf .K. ""'�'. ,:/%�. .4 ��EE ff 1.>7 ./,•' �� ,�,`r� �.• ,.� % f r,•^">{: F �',,.•/h Iitl�:tf.F„:; ;Y v,, £t.. vo a {'P/ho:,. f :"5110. a { ./S.^ .,, '�° lr. .,..�� S;fpt t i,.`•4: �x,�v r'.':�'!Y,< .,�y.}i bdf3'..,H S Y N. '.r•.nz ,�{. 7 I .t:,v. Q.S r t f f i >:k', ry '•r,/•/r':i t s'i•rrlr,u rit vf%S: fffr r.Nr! � 4�•; NO` t `� �\i E Yl:li-ti�:tt�'7ff 3��z# .Y, �4 /... :,.,�;j,r•y f,./ • r r:: 7,/ :'l< ,`lyj�,:,.::.:•; .� �.v.;�:/�li: :or,:r,`.�.,r '£ .d. ', f':��f`� r :.4.. ,r..•//;r �✓ �''! a/r,r.. '.v+,�' r .#f. m"`££7;'3r3". ,.�. � �a,•�'t r r�?`. E. t,'�` f'+{'' r;•r .. fi #„ r>S ?iy f# •:p s:s B�{}•...ffi'... i .`r �{ E i '�'r� o.t ...+ .. :,.f: , , ,srF r �'/'�%F�� .:::�n, ..f rS�'` ,�.,..F,' :r: r::2•.. +:ra,r :: ..r ,ff •: r S��r' .c: .✓✓.�,r:: r.+.f r'i•r .t-.c r II-# ,tit .t{[,-E%�{#i'p { ,Y,,. .'arl 9,;,r.. ..fi=ru�< / '::•, r,:�- .£.r,.x.r:...+ 1'E #. h..,t.sL,...1#.<%:, r s ' ''�,.+ `.w--- J/.,,..r r •/��'A... ,r; %SNAt... ;.ark -:'r: .`Y:....r.. .r,. ,r,/:•:. �':3 bf ,f r✓Y, f i' ,y'.,i, r:X�f !Si,:r .r : r c ,r .:rrri✓ r�,?'4j??h:5!i�,.. -) f ';,yh 's'n r ;--,t&Sj•" !: r!' f%, '.d + r ,6.a�.6.' ,.{,Yy;'i'.;%r;t::.,/,,.rrF .,f•r.v .... `S ..:r..,:-. /• ,r7 .r/� "kyn: :l•Cr: ..•lr rtf. i .k•,';!.;S!!rr rv' i.. :1 f .' 'q. .r::3 +�' :r, / .,/:. !„r!r✓✓...r,.Y r-::.;�::: ::1,-:i-..:r:ir+. 5 3E p F-' c. r � ✓ -'F'6x: .� r Yt., f/ s:' .f,.!rs,;:ii`�i.�1r < f,•E t -,:,. s•.,•,lr,�%'9:'%" I :.c �:� .c.. ;�_. 4:,}aaN'�:.':.:'.F,p� r.. :r, '�.r ✓�rn.w;;i/.rr:JrG://"rr/ r, '� f /r �1 }/ --5 t .�. .a„,..�✓✓.:r/,.Y r r .S lrr� rr,;� roS r rr rrrf <x � zt r`.ram/'. -/ uJ r'r! .»:,drf! / c.. 5. {. ~'}r�,#:i;w.. .,� f,� �.i'r�•Y)',S:,Sr33YJY)/.�t 4 L #l,t:rfy,'i„fvl ''{. !i"3 sr "'�;,;:;• f:; -'K F r /y r >S ,r:;'ra'::.r i? y7 -y :vx 1 f f:y i r ,,?✓ r ;7. ,f '::5 k.k.. .% y .,5f :-�t ! s �r -:t'�"`.r+. r r t >.,� -.fi./ it %sr#;7 ,it• S ,! .rNy�F� .,,L ' 4r ':•... ;•., :� 's,4. t/ ...`.�.._. .a ':!� ,..m :: .p.. ,.4Yv ,;..zSt .�` S,r ::Y slr.$iir��i'.:J1,Hr^'..f.•ir'.�'"-b�y�.frr..,!. ,-:•,�S .ysy� �- .�'.: .:t3'iNxhV�i�fii�"�.;F, /.`'.:, .it �• .: >,:#. � E $;. { rrr� r fss ,>'w frzL<.spa i'??3 vs �ri,„. , " [{ °i �',.'„a �i,: c7� � � -.£� y ... t :f: t'!- ..,'�.# ,t• µ� .!, er.•• �'r� � t( ,S, ',� '+, �rr ';� 4'•.y�`rr '� -3 j °Aw !ts { s;.f.l,!,.�I.lf f�f�i 'F 4 ti -yM1 A^-4tiyl o ti .;_ .n # ? r eFiFr1 #41#lil{!E£i 1t3'13 #fi! !91E11;t#3t##I� 7lltl °t93f Sj# lS�, ---------------------------------------- w 3.3 CIRCULATION PLAN The Circulation Plan illustrates the major and minor enhanced by a number of signalized entry drives and driveway entrances to the site, signalized intersections, public transportation facilities (Exhibit 5A and 5B). bus stops and bus pads supporting the development and surrounding areas, and the public street system The circulation plan relies on a hierarchy of within the Specific Plan boundaries. The Circulation circulation features ranging from major arterials to Plan is consistent with the Huntington Beach General local streets. The system is designed to accommodate Plan's Circulation Element and the Edinger Avenue customer, employee, and delivery traffic to and Precise Plan of Street Alignment. around the project area while discouraging through traffic from bisecting the project site. Primary access to the City of Huntington Beach and the Crossings at Huntington Beach is provided by A traffic study shall be required to analyze on-site and Interstate 405 (San Diego Freeway). The City's General off-site circulation patterns and necessary Plan designates the intersection of Beach Boulevard improvements. and Edinger Avenue as an internal node and a primary entry node to the City. Access to the project site is Alternative forms of transportation should also receive provided by a system of arterial highways including: careful consideration. The current OCTA bus route passes the project area on Edinger Avenue and Center • Beach Boulevard, a north-south principal arterial Avenue. The project Circulation Plan identifies street (120 foot right-of-way), designated as a state existing and proposed bus turnout locations along highway, a primary path/image corridor, major Edinger Avenue and Center Avenue. As a supplement urban scenic corridor,and transit service route. to vehicular access to the project area, potential future access such as a light rail system and stop shall be • Edinger Avenue, an east-west major arterial street pursued if available, from the existing rail line on the a (120 foot right-of-way), designated as a truck route, western boundary of the site. primary path/image corridor, and minor urban scenic corridor and transit service route. In addition, the Development Concept encourages the o creation of a pedestrian walkway system. As a means • Center Avenue,an east-west secondary arterial street of achieving a strong landscape image, pedestrian (80 foot right--of-way), designated as a transit walkways are required and shall be provided service route. throughout the development to facilitate pedestrian y access from adjacent developments to the project site. internal circulation is currently provided by a network The pedestrian walkway system shall include of private drives/streets serving as access to individual walkways around the perimeter of the site in the street y portions of the project area. Circulation is further right-of-way. z 0 0 00 ao The Crossings at Huntington Beach Specific Plan 33 , August 7, 2000 CIRCULAMON MAN FOUCIM Transportation Authority and pursed by the Crossings at 'Huntington Beach should a fight rail 33A Primary access to the project area shall be froi-a aarban transit system be developed in the future. theistia ,sig aali d irata rsa a✓fi r�s aal aag din r Existing bras ;strips shall bc- relocated as needed to Avenue and Center Avenue. New aaecess loeati(yna into conform to pedestrianpatterns. �41�a�r bps turnouts are the project area shall occur only where,traffic patterns planned alang Edinger Avenue and a new bias stop and n iedian openings allow, subject to review and slung Centel'Avenue, approval of the, Directors of public Works and Planning and thenro t:irief; Parking,Aries. 3.3.2 A new pnmaryaccess'in the prclect shall be 5`Planter IMand pursued', where the San Diego 'rjreew4y on and off .. tl'Mnips intersect with Center Avenue, sUbject to Cal- Trans. Department of Highways, approval and approval of the Directors of Public War s aand Plannit1 grad Ode,Fire Chiefs 3 Additional new d1fiveway access. points frrtn flu-, street system adJaaeent to the project', area 'shall be linnitc d and 0.OU'led 0111Y when the project size, � locaat101 Jr t l f Usewarr €�ants : 1 ana:°e s ,subject'to x .. review and approval of tfhe Dire-dor of t"a IC, Works, arid. fire Cfidcf. No new drivewaa.Ys a1,-r) g` Edinger >; &Vowe or Beath Boulevard will be permitted,' 3-3A Deceleration. and acceleration, lanes for drive-way aaccess poi .ts may bp rc aairtd- depetading on the locations of'the proposed access point, � pedes tVian W Alk%, eeti n r .5 are 31 h s fki 1 and reciprocal whic alar �Wce,s to and between individual on-site activities nmaay , be aka uted and/or r a a it rt Y the Director of Manning for adiacen t uses and pair ls. I � 311 Affe� ransportation, form,,, s-ul.h as a .11 :d ra E staff <� arll be axwdUlated with rfang ("'snap P The Ceos fay f , nflo,�fon 8 ach. Spedffl R ni 34 August , 2000 3.3.7 Pedestrian sideways shall be incorporated into the 3.4 PUBLIC FACIIXMS project as a component of the landscape plan. Sidewalks shall be installed throughout the The Public Facilities section discusses infrastructure, development to facilitate pedestrian access from storm drain, sewer, and water facility improvements adjacent developments to the project site. • The necessary to serve development within the Specific pedestrian walkway system shall include walkways Plan area. around the perimeter of the site in the street right-of- way and through the parking lot to the project area. PUBLIC FACILITIES POLICY' 3.3.8 Public landscape areas within the right-of-ways All public facilities infrastructure necessary to serve shall require a separate Parkway Landscape development within the specific plan area shall be Agreement for continued maintenance of the area, completed concurrent with initial project development, subject to review and approval of the 3.3.9 A traffic impact analysis/traffic signal warrant Director of Public Works. analysis shall be required, in association with a development proposal for the site. Future traffic impact analyses may be required due to unanticipated project developments not previously anaylzed. All traffic studies shall be subject to review and approval by the Directors of Planning and Public Works. 3.3.10 Circulation system improvements will be master planned to accommodate ultimate buildout of the Specific PIan. However, since the majority of the y project is anticipated to be constructed during the initial development stage, all on-site and off-site � circulation improvements shall be completed prior to a the first occupancy request. Future expansions permitted under the Specific Plan may generate additional circulation improvements as determined by future traffic impact analyses. 3.3.11 A Delivery and Fire Truck circulation plan, ' depicting on site access routes and manuverability, shall be subject to review and approval by the Director of Public Works and the Fire Chief, in association with o 0 a development proposal for the site. o The Crossings at Huntington Beach Specific Plan 35 CP 0 August 7, 2000 3.4.1 WATER SYSTEM Domestic water for the property will be provided Proposed architectural site changes will be reviewed by the Public Works Water Division of the City of by the Fire Department for code compliance and may Huntington Beach. require additional fire hydrant installation. These hydrants (if any) will be connected to the existing or The Water Division has use of both underground and proposed water line loop. The number of hydrants on imported water sources to service the area. The the system is not relevant to the flow delivered and, underground supply comes from nine existing wells, therefore, does not affect the system. The required fire and imported water is delivered to the City of suppression sprinkler flow rate is approximately Huntington Beach by the Metropolitan Water District 2,500 gpm. The existing and proposed fire sprinkler (MWD) at three locations. The Specific Plan area is systems will be required to meet this standard. It is not part of the City's Master Plan for Water Service and anticipated that the proposed modifications to the the ultimate development anticipated will be Crossings at Huntington Beach will require water flow adequately served by the City's existing systems, for fire protection above that which the existing system can deliver. MWD is the major wholesale water purveyor to the City of Huntington Beach which, in turn, is the retail All on-site water improvements will be designed to the provider to all water users in the City, including the City of Huntington Beach water standards. Water subject property. system improvements from the public right-of-way to the on-site meter shall be designed for future City The existing center has a looped water system. Water acceptance and maintenance. Locations of fire is delivered to the site by the City of Huntington hydrants and apparatuses will be reviewed by the Fire Beach's 12-inch line located in Edinger Avenue and a Department and Water Division of the City of I2-inch water main on Beach Boulevard. Huntington Beach to ensure adequate fire flow and a pressure. A final design analysis will be performed Zil The proposed modifications to the center will require during the site engineering stage to properly size the that a portion of the looped system be reconstructed. system, determine final alignments, and determine if o The required hydrant flow for fire sprinklers is 4,000 additional water improvements are necessary. c gallons per minute (gpm) at 20 pounds per square Construction of the redesigned water system shall be inch (psi). The existing and proposed upgraded fire completed prior to first occupancy. hydrant systems will be required to comply with this standard. Q. a - zX O D N N Q O Q C CD The Crossings at Huntington Beach Specific Plan 36 � o August 7, 2000 3.4.2 SEWER SYSTEM The City of Huntington Beach is responsible for The existing 10-inch sanitary sewer line exiting the the review and approval of the collection of site is adequately sized to carry the anticipated flows wastewater within the project area. The Orange from the reconstructed center. However, final design County Sanitation District (OCSD) is responsible for analysis will be performed during the site engineering the treatment of wastewater. The City system stage to properly size the system, determine final ultimately is collected by the Sanitation District via alignments, and determine if additional sewer their trunk and distribution lines to convey sewage to improvements are necessary. Construction of new District Plant #5, located in Fountain Valley, and sewer lines shall be completed prior to first District Plant#2 in Huntington Beach. occupancy. Sewage from the subject property is collected via a private on-site collection system with a singular outfall point at the southwest corner of the site. A 69 inch sanitation district trunk line runs beneath the concrete channel located along the west property line. No changes to this existing connection are anticipated. An existing on-site private system consists of a series of 4, 6, 8, and 10-inch lines collecting into one 10- inch line which is proposed to connect with the county system referenced above. Due to the reconfiguration of the development, it will be necessary to remove or abandon-in-place several o sanitary sewer lines and replace them. fi 0 ca o w 09 N ru ao 00 The Crossings at Huntington Beach Specific Plan 37 coo August 7, 2000 3.4.3 STORM DRAINAGE The City of Huntington Beach and the Orange and may include water storage in underground pipes. County Flood Control District are the agencies As a result, no ponding will occur at any point on site responsible for the flood control system in the project during a 100 year event. vicinity. A regional flood control channel exists along the western boundary of the site. The existing detention pond will be removed and be regraded as an additional parking area. The existing drainage system consists of two main lines, "A" and "B". Secondary line "C" drains a small There will be a need to add various new lines to drain area westerly of the existing Montgomery Ward store the open air section of the Crossings at Huntington in addition to secondary Iine "D", and numerous Beach. However, final design analysis will be performed during the site engineering stage to connecting laterals. All lines drain westerly into a City of Huntington Beach Flood Control Channel properly size the system, determine final alignments, (Huntington Beach Storm Channel C5-5CZ). Drainage and determine if additional storm drain improvements area boundaries have been identified based on existing are necessary. inlets and catch basins. Construction of storm drainage improvements shall be There is a small drainage area located at the northerly completed prior to first occupancy. perimeter of the Crossings at Huntington Beach which drains into a small basin located in the northwest corner of the site. Hydraulic calculations performed on the existing storm drain system revealed that ponding in a 100 year event will be as follows: average depths of 1 foot and a maximum depth of Z.8 feet were determined for (� the ponding over line "A." Average depths of 9 inches and a maximum depth of 1.4 feet were determined for the ponding over line "B." u, v The storm drainage discharge rates from the 151 remodeled Crossings at Huntington Beach will remain C similar with the exception of the discharge from the enclosed shopping area.This area will now become an lull open air shopping complex. Drainage areas will be c o redistributed to reduce ponding throughout the site N N oa 0 The Crossings at Huntington Beach Specific Plan 38 2o August 7, 2000 3.4.4 WATER QUALYrY Water quality in California is regulated by the use of oil and grease traps,detention basins,vegetation U.S. Environmental Protection Agency's (EPA) National filter strips,and other common techniques in order to Pollution Discharge Elimination System (NPDES), preclude discharge of pollutants into local storm which controls the discharge of pollutants to water drains and channels. bodies from point and non-point sources. A NPDES permit or other EPA review will be required for 3.4.5 UTILITIES individual construction projects. There are several public utility service providers Prior to issuance of any grading permit or demolition in the Specific Plan area. Adequate facilities exist for permit (including removal of any hazardous materials the current service needs of the area, however, such as, asbestos) the developer shall submit a "Notice additional facilities may be required as additional of Intent" (NDI), a Storm Water Pollution Prevention development occurs. Plan (SWPPP), and any required fees to the State Water- Resources Control Board. These documents 3.4.6 ELECTRICI'I'Y shall be filed under the terms covered by the State NPDES General Construction permit. The SWPPP shall Electrical service to the area is provided by the be on file with the Public Works Department prior to Southern California Edison Company. Existing any demolition or removal of hazardous materials. transmission and distribution lines are adequate to service current and potential future needs. Any new Through the NPDES Permit process, the City currently or existing overhead utilities (excluding 66kv) shall be requires contributors to non-point runoff pollution to undergrounded per the City's undergrounding establish Best Management Practices (BMP's) to ordinance (Chapter 17.64 HBMC). minimize the potential for pollution. Under this program, the developer is responsible for 3 4 7 NATURAL GAS identification and implementation of a program of o BMP's which can include special scheduling of project Natural gas Service in the Specific Plan area Is activities, prohibitions of certain practices, establishment of certain maintenance procedures, and provided by the Southern California Gas Company. other management practices to prevent or reduce the Adequate facilities exist for current and projected pollution of downstream waters. Typical elements of future needs. Relocation of existing facilities shall be � such a BMP program would include addressing the concurrent with project development. FX a o ao 00 The Crossings at Huntington Beach Specific Plan 39 cc August 7, 2000 3.4.8 COMMUNICATIONS Telephone service is the Specific Plan area is provided by General Telephone (GTE). Relocation of existing facilities and new installation shall be concurrent with project development. Provisions for fiber optic communications shall also be included in the overall site planning for the project area and shall be provided prior to the first occupancy request. Cable television service within Huntington Beach is provided by Time Warner Communications. Installation of new services shall be concurrent with project development. 3.4.8 SOLID WASTE DISPOSAL Rainbow Disposal Company currently provides solid waste disposal services for the area. Based on service projections and anticipated demand increase, an adequate level of service will be maintained. No solid waste disposal facilities are planned to be located in the Specific Plan area. 0 °a co �ng z co ftppJ N O O The Crossings at Huntington Beach Specific Plan 40 g 40 00 0 August 7, 2000 `i n V j6 E LJ t0000000w r P 33 } ? i r ``:Yc�,'4.s�t�'YG93tat x W7iG' A�r �roo>mmwm??ese.: 3.5 DESIGN GUIDELINES Huntington Beach as part of the Site PIan Review process. The Design Guidelines are general and may 3.5.1 PROEG"I'AM CHARACTER be interpreted with some flexibility in their application to specific projects. Variations may be considered for The project character and theme for the projects with special design characteristics that still Crossings at Huntington Beach is that of the Italian meet the objectives of the Guidelines. Village. Italian Villages derive their character and The Design Guidelines shall be used to promote a high classic charm from the ancient Roman and Greek level of design quality while at the same time provide architecture that was infused during the initial some flexibility, necessary to encourage creativity on construction of these villages. As the years and the part of individual/tenant designers. The Design centuries passed on, additional construction and Guidelines have been prepared to articulate the reconstruction occurred in these villages, adding even intended development standards of the Specific Plan. a more layered architectural identity. The styles of The Guidelines establish a framework for Classical, Neo-Classical, Baroque Rococo and even developers/designers of individual projects and design Modern and Post Modern Designs influenced these criteria, which the City will use to evaluate proposed village's over time. It is the intent to utilize this developments. montage of designs to tastefully develop a specific vernacular of architecture that best represents that of 3 5 2 SITE PLANNING GUIDELINES an Italian Village. The Design Guidelines establish the character and The positive shopping experience begins at style for the development of this retail, dining and landscaped entrances to the site, which lead to entertainment complex with buildings and convenient and ample parking. The center's open-air streetscapes that have a distinctive visual identity. The spaces of plazas, courtyards and passageways will be Guidelines accommodate individual project identities arranged in a non-linear pattern. Attention to lighting and promote interrelationships between and low level landscaping shall be given along non- complementary building storefronts and exterior linear passageways and pedestrian walkways to allow H spaces. The major elements of the Design Guidelines pedestrians to see ahead and around the walkways include: site planning, overall project/tenant clearly. Additionally, the main plazas will be accented o architecture, exterior pedestrian amenities, by water features. A pedestrian walkway will connect landscaping, and signage. All development projects east to the existing adjacent Village Retail center. within the Specific Plan area shall conform to the Italianate themed graphics add to the continuity of all Design Guidelines and shall incorporate appropriate the linked spaces. To facilitate the development of The C theme elements. Crossings at Huntington Beach into a unique resource a for the community the following site planning policies Z X The Design Guidelines shall be used by the Crossings shall apply: o 0 at Huntington Beach owner and the City of N N 0 The Crossings at Huntington Beach Specific Plan 42 0 ca 0 August 7, 2000 oo bL 4s nn �j t)I,jo i4ldop v j>oSurv, ojV!MA gyp atra out tM �i9m � loj (O�) fgl � N HOW, A 41VJ,', Vv7�,>g`� wg I 1,.0,1 Amlo'l UVIA TIM-2€..100 Ak-J€A € o oil gla"MV ailgTid guovi swa,''d9vam Pm ftPOVI 07'g,£ Xq Smu sowwmle aggrid om4 '.Raium€uo oqL IM)av .. ¢,)-,cfbad 'xmmoD mil olm poltmod oam -.)q Ilrgs pim am sjulml o l ? ,It 'P Pt AG J(T ;)q ski 5,aptm€.tro auci id t jujo- III JO t t€ Yr 4 air& undo c)llqncl xis MnUUU= V Z'T9'13 (� ..�1,1/1y .� f "�,f3� k i4� l ,d/$• 1 '( y�[y, y f�S/� (V yS}.� y p�'i[r Y.S)k�'[€{F'14�5�siy♦Lly}y7i��''�+xVJf4�y��(91fk9 t'U fy�'i�14a15 i :l`it/ ✓ ! ls' WW.::Si�'l+ Yl -11 !l/YY$J7j'/ �jj }y��},p'2 �L'�3y4-vasypi L'.l L llm..+1�STyJ�3€ S2Fib 4R f.9iiLWl. s/SL L�S.F»�Jy Fvs.[3A {'xb }�� Shy { h {� .p 't�0 .a Yyyp .} V}rnalsop, L`E b )1Y Y Af1fiYF 471.iP 3.5.2.7 Public Restroom Facilities shall be designed to minimize the corridor distance leading to public restrooms. The length of the corridor from the mall exterior to the door of the restroom shall not exceed thirty (30) feet. Restrooms shall be designed utilizing a single door to enter into the facility. Stall doors shall have purse hooks installed in both men's and women's restrooms. All hallways leading to the restrooms shall have surveillance cameras installed that shall be tape recorded.24 hours a day. 0 e 0 a CO . a m w co ha N The Crossings at Huntington Beach Specific Plan 44 $& � o August 7, 2000 Ooo "LISPOOV �am _�" f .t.....#. ¢ ;.:.v:.n-� ¢ - ff+ ,v+v �,r,u,.• N' ..� •S J.. {� t w .. �rf,Gr YJ!J r f4vf -,...t r,. :;,.,, �.r"S.y r/r,t'•.Ynsf :J .Y u....J... .,� .t £FL r,ts �..f r„ - .ti. �, ! N. -.'%^, ;>ry -,-;:: /i ;;,1331(fffts.??as;! 4Fr.3 #:•;.�G3, f f;: S: -c,` t..'r r .s _ :-r' !tY' .•'3"'. J.. r r•3 {;::1 -7 :'j 7. C:'.7:-1 d :1` {{ ).S�7 r ,k3#. .;. 3 >"C .•felt - -5. %�.. ...1 S #--:.i �f.. � i""3 � I•t '�' :s Y .3'.-�3; t��. 1� jai+ { f,, j. � ,y t �• P >f } ..�'� #%' 'lrc!¢ r.T> ,. SLd:, t � .!-. ;k 7•,t,.. 't, 1, s.; f � �t:9 ! L f 'o �} ,: • 3`i �o_:/: - r r -i 3: :F ka"£ t, iRt /' 1.... Sr.::: ;k'" #: 3 '.{ S S.i,F 1• ,C- ' ���; ¢ scr,.le: .�� 1 ;f.m #$.;d: '`• J .. '., ,$•:^% ri >.f5: 2�3 f. fN rr .;(.. i' ,d ,��.:. •,f. ..-.,.. _-"<.I:. .,r. ..r _.Sr�%. R: •r, X...7%.. 4.:..# -::fo.,�• .e'.io a:-.r?x EX: > eFw „3 k;:: r 2a4dy. :; .. f� .>(.::::S //..'?:.:rf•<:.,.J:r,-... ;x% �5?. S h>- •.A,:x.a,•+.•#fn. <z:�" s..... ., r,.....Jr . � J f,. .s,.:, ,r- ;. fjn+ r, ft� ..y -iy n. ;i'�iH,,tf.,:y. :r ^`, l..:. •.•<Y.., �' t.!-: :`.fq` f I;:3G � ,:c: s _J ) r. .a' f'fF "t '?' .✓ E,: � E ,,,.c- -�3 - 3.n� � w. `"a x. �,.Y,,.,t!tl., vi•. ,::t:;w:�x i tt< a3x�.sr-s : # ;��, }.f: t r": � f :� >. /rlAw e4w.. :r .., a .W: ? rr•!f':3.. . :.:: :/�: ,i/.rl is%_ f.��iii.f.::�l. J r A :# w...W �.. ..-.� i�,.:l tE� .,...;: .._ •: : t r, r.- /''i �.!� :,,,, - t .r .?"k rrfJ r y 'ar,��: Gs ,�'f/ r is rf #�" Nr �. ¢.frr,.�; :/f�.•, f� f � ! f.J � /32� '�:. r� .#'i �� #:fart> > 1r�rf9t.• fLL r/ ,'r:j;ns:.:,::�'., :,Y. ,H .,rr,:. -.rf�,,.rJ! ::5�'f+.�.s+'.J/., N",b�: r4OF...:f•,:rr ...s.: ..:1. 5 1 f! 'f i n r f:1rr ..} 11 � rh..cs-J ,.r• .S,..n.... -'.�ii�f'1:.:cr.1:.. ,f' 4.11 ::i � S •,:: q,`. -3lJ f,. ,:. ..,,, ..f 1•., •r ::2.F,"r:%o"' .r...: .$� 'N/' f :F/:,:, Rf4'%t. .�: {{ :f1; .:..,i y....,.ti'.sk: .. 5 t`h +/% fg rr E I}.t��3?pp'' 3), .t9 ✓C Y t4 RA E. `•�.3 �J4 B� 4 �•r gd�,� i����y,.,3.W „�� r -�� v::,2..e �' ,S'S9YPF- #S s # f 31�':`>l;S ,,,/r �:y� l � ti;. r- �, f. :r <3t ::i r:i.r c✓. � �#rJi � ## .>! f ..$3�1:: '.S) S• - /,f.r .3 �, � �` i,�c c 'ff�'�a t >' :_Sr:J.r r�z e'r,. j 1, _ ,..z.. x�;if::1E'4� !;p`<ly ¢''r �✓' ,'�'�.(44 .f fit. S yi X• .� 5,. r Ydd �', !/f< r � .1 ti{'itiit 11 �"^"F k t ,>,tF}.t '#�f.: s '',.3. s5>t t a S'1t••,4 c. � 4 f' S, _ '7 ::� $:: � �-r<rr h,/�+E»-r 1� :# G 1 F., � {+,.�5 33 J_ ¢ ¢yt'' £',}'lr �`' .i"!�'#3ft5ti�3 •2 tis`'t 4c yN� >< f t � 3t }z S Yr / �_r f„ _ � # � kC'f;rP #((1 ,.\ `\'�,tCF''� �EG Y �.. c �•� S ^'n C. .t' f 1(<?#Eff<t(f! frs I�4�'�4};{{<f�1Pf(�s PS{F�,�$SFEff3E ES 3� L S.S. '` 1'k: �:: '+;; P t 1"t� � ::t fy: 6 !' � <.' iS., !-1 Cn.,.Zr.:s•,i M #�'. y.r SSE P f '{ t{Ft 11 fffi ,?4i}k##E##1£.,.303}F13SJ! I r`,�..:..•� •. .,� : . ' 1:11.°rl s.+'.I,'.;<#£3333 fists at'1tt If sc s ., r 31.l f tt r ft#f f 1 •� a ! ,-_.s, ---._- 14 .t._�: ...,,.:.. �" � s�3ts1!3ls3sf3�33f43'^-r -'sue Ru a4f MIM,I-al101Ud J0103 V!m V 'O2vI.P r1l"l-I, € u jo ojs42;)j!j snoluoujavq per, juim ,)q4 pqpa jexfgj;sn-txmuv alp u 'j¢R `s. lr Fur, q Tjo, zvojs�?T qoz) ss" tIDIV PUV 1MMOP `UMkOj ?WIP'113111 9JU'a=j-�) U&5;aP f cmuxew .rmlyi�'''4, / ---"•°..:.vim f "le' m�..�.. "".".'�_` 'z'S iY �.�`.w,•�.� +•--.,I e4 'a yey, f��"�fr{�fsr}3I?tuE.,�cFif}..k�btftFi#f'Tf:,..'s,,.,.E.E;t1tFt3T`1�E'�:ft�fsi##?#f?,f},< •�`�"'>� .;•: r a,i) .c.•-� ,�%�,,,. �.' :` <,�`'* , 3rr w� �'. T"� r Y ��F3 3ki.F�iF ff�7 � �r ,i v a.S #- i ..�_L'/S'' ::<"L'"t �,':'•�^`• Ak�..t�'^ •�' U:.}d(w"s� � ��yy .�'•E >.`�,, r''r.f iF ✓ li 4 •^ }� ]1 f,iv�1? #}S,] _f-f # [. �. � +.:l �S �•9'F vy �1v \�\�'�'rtJ ��� EE E n•Cf/H�`��y/...r 4i3`'�',l�w fF,', t C .f t t. '�"y-" '� � �:: i �R' S i�r.. a / ,�s •.� f t 4�'n 2' >i s ,.??F: Y�X d✓✓ '� .::k� s:"� t#�. ,< •u �- y- r� ,.y..,:ws%e:�. r sY _»g� �S •,,k� "� 'S f. J^,✓ :x•' h. y,.,, uYft..�p t F G., -r+�,,,. >;< ./': .•Ss ``•..ti � 5'` �`q„! �y'/>'✓b S'rl.✓J,�.1`. .o .d '.'s'. :.r fA<✓I t:.r ,.!✓>%;'<' ! :: S f^, 3.,y i:.'v.,f.✓,,../,#.. . /.r.. ;.f r.,�n � �:. L„ - !y,,:'rJ r.s,l.: r.� .,. ✓/-., rl. >: '•,:�}i.sA. .r �, x. ..t4:-' �. �<s1l:IYrn ri� ,:s•r�'�.,1'rx� ,rJ'r/.:;.�::` :�, s.�s � ,-e � `� �� .;'aY .y' .rf5 J�756%/r.,. S } f t * .:sS: !. "r q?rh✓l;i�' ,, =w ;� 9!�-,:R::.x-r.. -r 3¢ <,yY+�f✓i.�'''Y' . :Sr„r:� r5'J f.: `c � i ..Y.. r M1 �;... ;;.J� f �F.. ,✓r. ;Y' .. f yr yfE ri r�r I". : �yf�l.•, ,�SfJ J F :i 4�j 3<Y.� >i N:' ;2; ;- }, ? ._ .•- #�� ,r .; :..:fir 1r/ % 1JF t> r rF: r ,, �ir �., 1 s !r /:. C t :.i l.✓A y�.y Y 9�yJ ..., r i v- r +wf,...:� !l,;.!, ,'C. ? ✓ +f✓ r Fr t c r�_. ::f t � :: L : S. exaisbxnxar�+.�Gsy •, i ,1 .e_ $t -:�,-. ,».� ::,r ,!<f.i? >r .,../.,'.{,f rr r is, r .•7 S :T �', i �3,�,,.13f.�cuf•#i.��f.&„s�flis�,��'.er• i:.;:F.�rri`J:' �' S'•a ra '1 f � - :z s: ;7' }, �{' x `��'� r, ' E ,l u �✓{ c��q {„C / J tr. :J ate✓ '' Pc.trB . 7 .- "S: C, s r {f rrr'-rr ,.:J .r .•:�,c "�3"� ..3'✓.,.s 3 � F 1i3 i'c. 4 EI '':r �Y.y Vi.rY.Y ✓%:�A 'i � ! '%1.>� r ra' _ o :t r z y, .t fyk ✓r,fin',. ,t ,r'y r7".s,'<;'9 11. t::�f .S .� ,' ° t .. '✓� q;...: '-' .,9� -.���:5 LC ...,.; .:;y •. `: 5�::: v r{lr J5' Y 3 //r4 � C v : n.; r •r S. {�y w .,Lf .:.I.;^.7':.Y •k,.�u.yyj�. r I. : ,.t4rlrr /. >/ ,r �Y'r ,J- ':•x'�#: :JfSs..c ...t �....r$';#i ��..��r/ "�"'- i ; < ' � i f'/ /, r'`.:?cY,:......:;,r,: .,�'..•n,.`' „'3�<,yr :.r°..���; •.. ; .> rJr: ':� ,/r. ;P'> ,:<�l .•r�tta Y}r r./ Y F. .. ,f.!:";✓ Fi6'-'.''::r%hjl'M '.. " :r./ /,(. -<J:h: l's'�'i ?n}!S.W!r'.f. :'< :) . r./,...!/.l,f! .� 'rY�;r .f 4'� rs.:�J! r.'� ��'r` •f:Y !+ I J / .i,✓,{. ;•r r F,G '.N r.� r.:..Jl,:,v':'::r.'; .'1Xs',�.1. Sr f •vr¢,s!✓r mr... �:n'". t ,f, f. .iWih','X*,.,:.�.. .'rJ ..i/,. :.✓. :�'. r. :�>�% t :c 3;'S„ {�..C.,., �, ;' ? ✓':Sre�•s'� {� /. ,;. '� a...s'' ����: ..:r lr .st,f,i sfi fsty >�4',/'F, r, 1 .� _�va. r t. ,f.:.. ��•: °' 1 r./. irl.•,,' i:;f� ,{- :'r-: ;s w�i g, 3, f`J`.':"�'i..:.,,i:?5:... �•y'�.+>:r >. •,,.r: ,J. i'h:.,.Jr(,'�. ..1•- J �r /a.:. :q rrp,;.rf6GFY£Yi;::�.A. ./r.- ,is ,>!. .'.,N.i., J:`.' rr� ..Ji.,....f.l .�i...,... �•.. ✓:rl r<{. , ;ycc l.,'r r,f,rr• :�': Sr ' ...aa �' -.y �, �, y +"t: i � �F .-/r ::f,is' rr r✓i, if�'..��` .�}r:%ifxi:G`:;%::s...r•'�..xrM. - ,li.' r �K ?r... 1 p.. �' y :�� ✓li/.•J ..rrvr..'r a. Yr; ':r''il•' .ny. •.tjr: ','?A/ !i '�l.�r.• : '1 f.fft'" /j- ,,.rf 5 -:k ',•,� .�,:/r.•r� `:'1/f fn/":.- .� -irr y J -r/,i ,,yr!' 'f 1 :::' Sl 1%r 1..,f.Frfi,,":'.f. r,��rf1r`fr .r.Y/r. A ✓:, 4l�$'$ 'Sr s-.... :r '�y'�::'k s N ...� /.'• .c;..ta. ..6xGxa. t r w fr w 'f . _...11��/..r r r'✓n:' »",ri o.. � !� SniliiY . r3`r.�s:.. •Jl r'` .<iF� 1 r•.'`'� //,•'r/; �� 't: �, "5. •� r rr f������ :��.•'�'!'�`.::J: .�� 'ir. .>� r ,f},{#�'54 / .� /'" /:✓ '.; - f%ref F:.' :.r�'r.3 r✓ :r ✓' /i "3,3 tf Etc f# Ml -0t�4 f N,. ,#,•. .:,,�f.'•,:. ✓��" J -'ti :/1"f. r: , .y :. :,,!, r ;z • ;sr � r'' r!� 5#s3sttII Sr :-.f i-iS':s *.+ ' :;` .:�`.:� ?x3" -/` y.1 Sj#{ .t�� � ' � ` '' r t '£ f r h �,>, �.` •r;'i/-: /:. W>d%�x� CG�i'G'. k 1!,� J' S'C ..lrrl"> f". +? #•., ��'%{ v '/ ... r ,.IAG.rr.i'/.-. :r$w ,✓HNiYilir/.1- !A6fJfi �..`�.Uf4 ��f, /. A.. � mC :G.>,cv.?.t: �a✓`. '�t..>f'y ::f.. , sfi:: S � �-�� £.. �: r ..',3C;.�,//i. • ''G.c-a -f 't, r n•-.- -,s ..tr... a > s co ,3: • f :.. �� .r. '�': J.s # :s / �:7 ..rz�..s r.,.f v..>.%�.t ^r!r 'f.::. .5:•rr: $r :'6.. 6. S: r..��;t„/. .' ..Y rrP r. �• t41.. .N ✓Y 5.. ✓ Y 5'r 1^' >t .95.: d S .f. .r/ J.•'J , _:. , S,S .. >:a7. :..:.. r. ,.•u:..,,. .. ..,.: b, r/. ::...:; S,:.r :,#. -'fr., '� :'S::::....!r':if{, lqi%1 'o; „Q .,r.: s, , n .... r .,•ri .a ..r. ... J/ rYr;., „ ...;,fr/!. ...... �r,N :.; 7./,. : './.. f'. :/. �.y { _ f! ( l 3..�:7r•. �r't6f a: �y ^,s,- £ � [.., ,y,. Sias.6 ' .3, r $o�`Ya57:L.�£�t8' :::1 rrfp�.. g ` .t �f..t -:.5.✓ !.� i f3rf...:h..?�'"l,w' Y :`y .f.3 •a',: rv. 5 : >:. / }:_3 i i J///��� `{ ::f ✓ s Y5 # :J` •f'�i 3' ftiA. � ,f{ c 5# f ,.;;. ✓ .#- 1,,,. .4 �y Cs �>' t -:E W.. ^`S .3G'.'<? �y �!$fif.;a;s .f �� ro�;:: f R•� � .,� s ,�, 4 :,1 ti E ::_f.�;/,.r: .r:,a;;r,rr,; ��; i t ✓ c, _'•',,,r� rs �'-;r" ---,{------i SY':::;�$ 3:. #;,„h< �' �. -.. .c c ?x S.. i'i� y . n .h.#: !^.,>•.-- G'✓'" y Y. ..j.' .:b ... --f j.. .i, G..J 4.---: 7 L.-S )-+� f . f'.. a. 3...3t.3.F ;.,.. .< ,.,.> ,.s a.,:. ;,i .c.^3?frtif a c: _L' w t (}... ffdstal �J.33,3.#.##.3,w EL.,......r,##tL... s:ssr,: t.,s,sf tE 1 E s3wr.::::.cf.Ilj 1},,J3 s#: # .. I,. fIt 3 �: -..r.::.. ..::. :..1.r.:F....r��..:rC• �9s-�....c�{}{y.��f fJ..'t�1`t�<3._�U�4�f1':d�#L.� �J��3 v r.,.4.-: ff� �:W � •S- F> �r F� Y _.^"•'w•Tn - hl,.'.. � �s3 jf' �-^<' s."` ___-- r:3f3" ..,,r .wxe_.u.,<.:ru-x� .�.^'."....K..!,..,-..L�.:. 7 �v»;u.r .< ....:; rrrutvwcµ �.:x°^^'�^"TM' _ "--�•,•»c.x-xxhz�.axa-<x,v 5c ._;: � -> , •wvt:uia+ra rtY<rv>C,(.'t nragcaJit s wt P;tt acuu saeoaoufv/ _ -�i o ' o The Crossings,at Huntington GO ch 'f , a.a m I BMW all m ------------ --------------- ... .................................... .............. .......... ........... ............ ... ......... ...................... ............. ......... ....... ....... .. ............................ ............ .......... ............. .............. ............W. .......... -X-X Zz ............ -)MR.`, ol Mm .�o.......... .................. .20 T-5 ........... ... ....... "IM Nor ........ ..... ............. ............ .......... Mix :";,& K� .ro IM ............ .............. .Z.X. ...................... ... .......... .. . ......... ............. I. ............ ............. .. ............ ....... . ... . ..... .......... . ......... ........ .......... .......................... .... . ... ...................................................................................X ........ ............... ....................... ....................... .................................. .... .. ................. .. ......... ............................ .......... .................... ............. ....................................................... .......... .................................................................................. ........................ ............... ...................................................... ................................................ ------------- .............. --------------- TBE VILLAGE STRADA Acting as the "MainStreet" of 'Me Cr ssitigs at Huntington Bea€b, f1w, 'Village St ada wdl have pockets, of landscaping, outdoor dinin tables, children's play areas, and seati�n, fir a respite from along q of shop inn, The buildings rill havevaryin architectural style, while styli complementing and nal corntra,stin�g with ea��li'other. The Intent of the Village Strada is`to insert modem bases in old buildings as i do-tie in an authentic W1.1i'an Villa e, . ,: lrJ..,•::6c:',.:....i..T,...i::.i<u6,:652dx/,r,.:/.::::1:/rt. r / Fr- r low, /�llr ri rf,,fr4i� r �/f r r r f✓ r �,. /r r rr/F irr f ✓ i >Y } r�l/f ' fr/,. ir• �r r �r n%�? t S 5«.�.^•tsS r� ,goyy��frJ _.�`. �3 :r �!: / �� a•Yy' '', ., rit ..,yf�• � �{ .. . .. - -.,G�rr u �r J t /F rr�rv�/ �, r fr l`':'7m,,,' �(.Yfl :,: ::-:� � ':: ... :� %+j /• '`✓i:.Y�� ¢yrrl•�,,, .�Kmr/rJ�;/f ?rf ��N ,ty.?"'r" . . . LU • mod,-'t� r,T .w�+N,� j r.'.r r� 7v{'hfY iirrr{ i1' i1 r2Sr .? �; ��� n�ri°rx%'.;,G:�..w y,,, ,. Y., � ': r:. M�fis#s;,ra �:ri�rv�' frri's✓freu:ri:+utiyi,�a x.G'isfyl�G' ....t•�- � :a:it:#� !J•Ys!�... fr %f r.4, rly�• i1 f h Y.. IJ h�i{' �X y Yifr iF r A .:`�f/S$ %l� .y �-r 4r lot � ..,...fr..:.;.:.:. ,.�.+ �:�'.::•. ....:.F;/d::r:+:..+,.n.:rv.:::S?..,r,. .r� r..:l. /..:r// :fi. ,:,.... ..1/.:+F. ,.lftr l t.'LJnr.. ,.r; ,/f 4r. J,%ls /.. f,f. .:,.. 1 f,t...r. v: Y/+/� ':;f :rl r•.l:•:::•:.•.:l r. !! .f': :i i ::: ....,::.,..,...:..::r..�..; �../r, r..,.a:i+t/..r;,..r..&, .:..://•:.. 2 X..�,?::.f+ ,.. r,+.:.a. .fr..:r:,r,.:..:: :.. :; ../ :'1•r n+:r.,.�r...> c:, :rr. .,.,.vr:r. :"%:�;'r'' n; : '�. I, ..:.....,..n.....• ... .,.,. .. ?A:)...a. �� .r:... ./..S ....t./.... ... .. .,r.f.J...:1/.:...r.✓. r.ff ll.r. 1.. .>.:o:..;. � ,C.r�/...rn, r..../.A.. u... ...,f,:r..:'xr....:../aY•:,/.,vf, J.,y,...,. ..f,,:.,f...f. ,r✓:1� .f,r.`$... ,r.•.. ,ci:...LC iv ..r ,l,.f.:.r' 5, .:r./....r..:, ..�i1r •:�f rxv=t:t>,+. .,f d. ,Sr."••{.. r.. ..'.�., f+>•.,+r•:..r... rf,.+ : �+.✓, r / r. � .•lF, r./:''r Y• .%r :.e. .,i,./a:•. .:� J r=s .<./ vir.` ;,/f. :..r;i.n../'•• ,./ r f J.. .r aY.:ua'{ ,.A„ ,:/.. .w/... +S• r.r, r.,.U'.•H .r,�:z. ..r y.l;.;. ,.{y i. ,x ,.� .t ' ,.,... ,.' F`.':. F,:+:.. . r� r ,. t �,.:rr ..,:�-. .r./.>.:r,:d . .:/r+„r/., /% :s.:.'•::/:..• r./'.• {{.f.;.., ri'.r3,.-,.:v.� �,�:r r .... ..r+:.:Y:.,,<rfff l .:..:..�.t:=.:,..i/,'%:f:'<: :'..lF. ff" �.:r':. /..., /„n.,:r..✓,. : .`�.:....{1 /. /f, rf: :. .�3..;.....,.... ..-.:.._...... ......fr ...ry.J !it,. ..A :..r.,.rf..,.y.��.::.: ....;%.x,.r'.•Y:........f. .F' .1,..�•�+ nY.n(�,rd:; <:.:.r..rr.,i.;�.:,a./.,�.. ;:<�':.�t�r. .:.lf „Y L.. ..:... ..... ..i... .,.,..... /fn`f..S .,r.. :,..a,:a-:•:: ./:. ,�f r.{'. :..,;:..f..... „ ... ,f....,r..f.r `>r,G:..+.✓//:,'; /:. y l, .u// ;t%:r, :,q...: r. r `r./ <� .li. .n � :.1,.. tf.: .:n .,/,:.J... f •.c /.. ..<.. �3 ,r:{/.�..�,� .:1•. .1r,,1. ..1.... :f; e:Eii 'v:.v...�.,n!v.{fv {...,...v.�: w,d/' r. lr/rr..:././..Sr:.ty:rrk:r....r,y.�.A......l,. ....U.. ,... .:ifi.F,. r;::.n::::::•�... _.,•...; a .l<.,.2 F,G/r ,( 'L JpI,S i`uf, /::nt. ..-,. ,.. �:::..1..4.+/::ems=:•�i�1.ri� ri' Fi:. v:./:tr/�.��{r.r ..: $: �v.:.... ..:h{•...• i.n.�:•i vY.. t�:Y :� / / � iI"fr'fiG:�i'4f%l/lti➢��!.lr':.n:rf/.I�GYI.RrJ/.rvV�c�C+/N/� hfu'Y,.,wS.,S3a.:.il� r..t%.4�.Lt+/ns;,c�✓.c{fj�:�vxs'�F+fr�ft•.iw��7rY+/:�,vr s rt./ rs,H'r.r,....�.<w'IY n� k tbifi r r Lr.:dl��,{,34rf-¢i�f�/+lr.r.{,v.31Xt�y.3:Yl.G.{ifu�i,{,�r..✓l+�lf ri.d 'i.�` 64 t13 ' i°1->8FY s3 � ' ro sy t u �� ��n Beact, ea., P �� t 1:7, 000 .e a«! as a r R a �& t' ;:{i;:.n!i:.i;ir::'•nl:!.:!%Nv!•.:%ivi{l::r,i%:•::!,.L.v::!.vv;.nni%%.!:v%f!i!v•%;i•'viivii i/ni:i,f%•F::i.i!:'iii:.i::ii{v.::•vl::.!i v.1i%:,i{vi%v.`!f:.n v..i::.vJ.v::%.f.h.vv vi.'i..:.%f.%:.%..::.:..F.v:.;r..F:.:vvv.:v:.:.,.:i{.{:.../:.:;..�.:;n..;.:i.;.:i.;.:i.;.:'.;..ii.;.ii.;.:i.1n.i.i:.:v!.:v-i.::'.:::.%::::�.F:::F v:vi%::vi::::F:::n"i:::ini:::ii:::v%i::::i:v::::!v.:%!.:.%.F:..:.!Lv.nSw....:v..:::x.:l:..ii:w.:.::::.:.:i::.:i:i::.:i:i::.:i:iv:.:i:i.:.:i.'.:�.:i.:.:%.:.:i.v:.:'.:..n,v..::!./:-!..:vv,i:ryi;:/ivrii.:.:%/.{..v..:.vi;:..F:::f+::v.l.J.�+.+:.v:.r::'.v F:.c:!.:::.:%:,.:F{.+:i:.%...:ia..i...i:.i:i;i;f.:.!/::.l.n.:.v..n.i...:i%...,:v.l:.fr:../%%.vf+:.hi:....s t.,!.%•.!.Jn.n..:.E/:/l...v/:...i/..:/....}/.r'.vv.yf:v.:...oi..a:"f'.v.•.F.::..i..,.f.i../.:..v...:!:....n:+%.iuy;.,;:.i;%'!nv.i:i%ii/i iiF:'r+'.n/f in.v..E. .F%;•i:i Fvii: .i.i.........i...:'...i...iv..i..%.... .v,.i..v.'..iv..i.../i.:iv.::.i..:.%..:...:.i...i vv...i f...v, v..:.i+•.i...vi v.'.::.%i.,:..%:r .:::.:i.!...v ..:.?'l . :::::::::::/v:. : .. , .... i:iii!!......................:::::::::.iii:i . :: :: . ........ .iiiiiiiiiiiii::i:::v:::: v:vf %:% .. :viiii::..: /v .... i l,...: ........ . i.:%: : // ..i �if..%: ni fN i..1.... .:: : :::::i:i:i:i iii � :,v iil::/. ::v 1.:f{!.,;�.;?n!.;,.;;;;•:v:,::!:::ii!Y„-!!J.ni%!'.:!vn!+!:r./..f!r.l.gn+i{.n..,v.....n.l v!'l+ ,v/..�::v:.�:. /... ./..... /.f. ,.F.....,...,. ,./..•......vv..1.. +/.•.v. iE%F:/FFlE:%F!.!N..if..:::%niiiiiiiii.............v. .:1.:!!•i}:::::::::::::%v: .l'Fii:::::::,: vN./r.... ./hi.... vif� ..... ....:.�:+ ......... .,n!..: .:/ ...........+{!:;}ii. v. ././•:i! %if`../J:%':'':•iiiiiiiii Fi::::iiiii�•iiii%'ni:. •:! f.:.. .Jav ;,l.,,!'nn:v� r/./.. ::::::v::v: f. ,iw:%{!.rr%.%aiii............r. !•>%.;•!a<`n'/';+.a.. /........!./. A........r :.�:.r :.nli.......,. ..n,. ::�:. .+•.ii'!!!.i......... ..:,r:l ..,:,..,r.......%. r/.... r.n..: r.. fl. i'r./.E :.r<1.........f..,:.. i o:::/.i-,,..:.,.!..>'%' :r:i;:. .../%r................ ,✓..,...... n/!,:/Fii%ii%:. Es>%rii:.i:•i:v:,...' /ri%!".i !!.n:•:::i%.!./>:!!.:-;%!!{!:.};!,. r;/.;c;{.%i %' ':Y'•F/ri:!:.;{,{r -_J;.. / ..!.{....;.,:,?•:/.. :.:,.::%. GFzEFFF%%� :!n:!%.iiiii%F%F`%:%E%:!�:%�` .: ..a: r %. .rr.•:...............:... ... :.., :::'{.i>:%.?.: .: •>i::. r ,.L: .:ni?. i/:,L .2•k-:!,..;!:,%:>'>%%!.>:<%oir.%,>o-iii:i:%::>:!%o-:c/:i%.:.i%/.... 'd... : :�../. Sic"-..• :a,c: .:f i'!�, ��:, r%F'G! '6. NJ .�E:: /!rh'a": •:.%is. n/ ,:•fr«':oii:niii:ai'!!n./`!if.,:..,r:r^. ....%,...:v::::!.fiv::!.!...�,91.+. :'ioG .... ::...:.... :'! r:. �.n .uGh..J::r -"¢rdC%z�'��%i+r' Ei°�FF�':.;':: ni✓s:j{,!{..;;, >i��/,. .:G.i!1F%%,1.!%1'+.'rr,>'J:,::z:::......:,:,,./. h %+fs.;.,,w::.; ...,.1�'.�'..:;�%%;,:: ..%n �'S'R'9:. .`%.%"d"" ;.ir.'i:f.,:x/ii� ,!i:',r,.r•%/.!f/li:. '•�/% f YJn rrr/c'r;�' :,r:>!/:n�::%,,,:1••r ;:i;:•:r', rAa+NF. ;rj+f,:•.: ,ii'/.�. ..-3i:6': !! :'�J-:�,� ;!�_�.�'�:Arh`i,/♦.;1. J/%G':n!:,::.; :v,::!.�.��!riP>%u'�n.!.�/'/!fr nr'`rfi:!%1,.»,., r.'.,bi'a;+�.:,a 1..,: •..yy�!'.-4, !�„i' ./.�;.;::;y:.. r Q`. i,r rts'3; /E:.S,,y4i.,...i f,!rt;..h.'?/J/:.!ili...47< FF�:; l.,, ..sr;,.,�..;:. ..r....::..-:: :..yy iR di S. .f:.�fF%FE ... .!lava.;?!!>fl,'', na: •.F i`N/.. nG::...�:::..:.+,,:,.:.::r-:::. "'F'''d'rE' +;.r Ar>:;n,;^%-u i!.,,x;•%,r,.;, ..,nn�:;� ''ii. .:F::. n,9 .n/:,::: :a::!.•;%" .1 it;!..v�'.,i'C�!.;?{rlr3::: r !;�lF.C+?%-¢ !l :�'%:3 Gr k.+r .:r,.......o.;.r;..;/.:..:: i•.:..n -'a�:••s:?�::;`.ws.: ;.a'.?fY..':;:;.. � y�' .'F::.- ..r%.::. .yt;.:. :Y',�+;�: - � ::Yss.y.y.'y.:,.:.r J i:s::n::..!.�s::!..✓`%:!1/r:.ro.i.t 4�:r, '��:E+, ...;.;f4:•!'s�fn,..1:!% ..J1.!-:n:.,,.,,. :.w:;rsiiS:Y'1.fF:'Y'b'-. .dv.. ..�/<%:j;:E :..d:,nc!!.;.✓. ..(.., :.:..;;�!.....:,.,:::f. .,/. 'a' .%:../ ..` .:!�r,,: ,.rG:°r"z:w.>:::... ::Sf..::::::'y.d: ,id/,...: .,.5<!•.. :i:4i::.,;. .,,g.-l.,,.j%:;ii:. .d: '.%o::..,: n;%c:.. r.,�,.`J iP,��,' . :kJ/�:G% ;�.`'/rv./.,r +!'�•...:., ::.:.F'J.r:, ,,,Ye.. •/:!.n: ..r.?!{.•..d.. .drn. .:r:.% a ...�. ��.'�::- �`.. ..w ram..'f:. .i, r. ir�#'%r' ::r:.a�:•.!.r ....i;..:/i.6i%%i:!n: :. r r.,.. :%-:M:....r.�/{. :% :..::,/..:k .:., :..,. ..f .r."lt. ..¢•'�r/G. :. .S // ::/{.1.+,•,,.,�,/,.,,.;:H,.:t�j..�.:rh.4,..fi.vv:::::::.v.+k? ,?� v:t�.FS.,�:„5...NY.Y ..,+. .:.%/rF :r/. 'v! '1hY�iCi%::j!'J..�!%�..'i:%�!';!n;s:v y� %d {. .';�,:'/ir{ .:1: .::r:r>3,{.:..,,Y:,!t,;.,, w../3; �y �. sr'y.'•.?�! ...�yi:�?�.+ ..�;':,'.'qY%% %:'t'�. ry'.,av/';�4%:,%�S ...3;::� ..•3f:�•,.•%':: 'y%%N.i'.,yy'f!.. .,'d✓`:Z;�1-.% +3ii�:;%%%!!J yb�'. - x.%.i ,�„�iy. ''>°;{i '?7F:%�f< %•:Z ..5,j:r'.. :.����'%:%!%gr• ,9��'fi' ''//,:al' ''•a�. : r ¢;/ ,F.-, n$,:/r: <{$#�:Y.. %:�,H.-I /:Jf'. .'Sv i v 1,�.; :%,J:..�' {Y' !:.y+ rW!jr: !r: •..f,% Y ..,,„ar{../... .�. .$G' r': �(,:5�,,4j:� .jstad�`s:y.�/,.r '�.'i`•''•:!' // ii j. : ",t { S 5 ,ON � , . r F:/F.. i if✓�. .�i��'.. �{ Fr': /:J: ./'.•:::'.Y H.:: fSS3J.`� .d -f.¢ -YKN.nf••.. , Fps.: :!/ .�%+g%: �y8:r...�../Y¢�S:.S:ir..S ../ .,I✓.:. ,j' , � •y F:Lv: .!'i�.'�;'..;:;�":;'%;�i�:''#::: �. ....r./,,.'J:,.,. ../`£,r,::F.n:S ✓ n:�::.F�� .:�2 %,a?'F- �nf/$��:'F': 4`y/. 'k�iYl-• i 1f r.,,/.,r.. i+n;. ,.f.,n-:r:.,,. ..rrgg+:r,.-�✓• .,r :� �^:r :r.- .ZS'%:/9.',+.i ,': .:r-.�., 'G.;iii>.,+,. .} .,J;/F�;::.�i$$*`v.'%Y`i,:!,.xr,'.,%'f";'1;'.':V'>:::aj:':i:rt,! .s;4'Y y� :"4:.:.r%isi�i Sx'6':." ,::'siYL' .diK'. vL:n.. :+6,:/:r•sF. !'ak• s .:*::. !i%'i Ci.:/:, /?%: %#:rN Gi., ,�/y/rE,�'�',.;:;:iy:/,.�f;:;%.;. !'•.. ,1 /,(�{,�{ .{�• '%k'9).rr., 6k.�},. ,t... 6�. '1,y, Y' .r'.:%:.i r::.- .,r/..�/.. ., ..4•� F:HFy.•:�:%�F'/.' Y.x"!°:::n,„rn:,%.1,.. '�Aa!? ':Tdfi '!!JW.'.'r. ,r S, :<,a.,, >. #;� �, i:/:.r 5�...S�.!+.;;,!.;.{.i..e n:¢ .d .. •i%`•� i.��gyf•�A.*, ': d. ..r, .✓...t i ":k+:f' K,'�i'`3'`>!c%.ac!�N.i %k.� �,F�"�y$y '"J/.<�:G6::;:,;lf:��l,'::' '' 'Sf' ,5 }.S.'f�A'-��a,♦ '}'SF '�' #� ..f. n'#• �.�• g .3 •fv! 'gj 1•t l rr/�+i ?Y.0 v-f. •!%Y%! .YMI... !4FR.1.. r .yy 4 ry. .Y .. .GCrL•: ri •J:G.;:i>: s+''k Me, g;f!. ��` r. v 'Y,/'`'r'�.Fr/.`t+�f`•f-f "!"'//F':j i ,J�' sY;:lrf.;y:ty E , j �,y_ r, r"y/ %q': � �r/.r'r i,'. r r.3'�'+.r, yf '�r •�t,om.. ,,�y ��p � iir 3°,fi •a�{..;(;¢._;.,ai: ;: ss , %y i.-•,,F ?r.: /:S..t"'•'r�,' .��E �i 1. F a 'r�''. '�f:.'' .,1....:.:rr: :rL^•,/..,..',::... ,,/ it/.'.kyyyyyy��,� �':{�a' rnf,'lc• r r/,.•S�d! a{;�<. ,.F%iEi%%:ii/,!. `:ff i"t%:ri..,;,..% ..0%ci..:.::q,,si'%'!Y'1:: /!`' cr'-�<.'w.',:r/•r;'Y�. �.:/+ir.++!' /!:r-:•:iiirl3,/.h', % lxf%,:!:�,5.•.- '.r-i !+`... :�/oii.%�.',.ii!G:.S!:OF;: % /r.•/ � /. y;; v ': � 1,,;r+:r::.✓ ,;�3iS,t.''#,'.`;rf'E.,.,..%/.,',..::,:.: / v ".R.�S// , f r '`•'ryrr>S- / :F r.:r. ,vr/r.%2:<';�✓';J.F,: r{yi:::;1,;¢,.;�i;:` y� r//.•//- ri%r;?rN.r.�/1, , >q r r 'G% % n�r,%i y.' r nJ..%-ij '..;�3'a•4,4f .! �i'� ii'i ::" ..+";?bG `ff+ �':s�.':'; ',:r-/ ✓rf%./�fl..� f �r, i"• ',/�.r l!/G F: .XpyA/.}�.;.°'9,,�v.riac"u.+Na'' �•,,•.,.,•.,�.•.,F;:;:;'�,'ii>:::::�:`�' rr;r/ l�'1/l.,v././f � �>n,: 'Jrr.j./.:.�:i �' :`'C: ?:yyy?j�.{1.ii��' ;i,';Gi' ::..•. `3`7 �/ FF:�iF'`F: l J✓3i �'!i:::•%/i .:N: :: ;,5; a. �"`' �r,,`yy %�,`,r;6,ri/ / %r!r;,/!/r:+' 'f.Y,jJ ^.,�; S.T Ag�J6��,r��.•,��1 h ..�..,1; v r::�.:. ':k.` 'i %i �Y Wyly !i. 4� ..u. � it ,o- `�" 4 l.+;' �� 'lr'y �F i»F•,�•iSfF'� ..,ff',.r?'i.,i.,.,, 'S'�:•.,. s'/F ./ .. � X. f /.�. � v. •; f} .p t!,$%���.!, 4�fir.:,/'�,.y .;/ ..y.. Y ,C� haJ• J G,'J/.,:/.,:.�:i%!%;:.i:'.%: :;!%%F.;%;�%%;!r.:X.<Gi, { ✓ •�' ! 4.s Y, f :;.r:: •'t,R;r�^,/;f��:;:.::.:r,/a/:;:,fF!,:>; i°i3;�, 4;!' J i f?";°,G,.':!f�y f11 x%7. J f fF•s /f f 2'�; t .nCeyY�� p s!+,. E grams P x r^ / J" f� ,v: :7Jr•, ,r,;c:; �' ''?f`" '�k�`d8s '4s��` r'� :�;.�. rryr .j{/fY✓Y."n :5�!yq,.... jSg�:i� .,,. nt1 f M:S-.;rc.. ! ..............�'....x....r........ . rr ^''i ;r.,.;:r.:r,;1;3r/r✓i!it ! � ....::::::::::.........................: :::::.:..... }l fi,,/'w;; fi{LU;`/r`5[�1.;:/, �lriry�;�/!'•'G r.,'j,, F' '11%%J i'. f% "%r '/iJ - �:.: `!� r f / r;r%rY/«% f,.;:,.s• •` f �r%J,r" i�/;:%?�!; ;�'?'`urr •;/�:',.�ffrr,::!r�•Yi�� .s!�,�: /: � �' ;L.>n,,:°. j r.:.!:.y.fJ};;/:;�`.;y;lf •:,Yil,��`S.'4%i�.y'•'r`riJ•' ':FY'. iY/''.r,fh cif 'F / .>/!f ,yF f:%r: r:,./' %`''v.+' J?' i' f%d' u%�/f?,',;2y., :;,;G,y /.�r,.� r,h'•:ar:•,,,ff:: �/j�: .,�s{. ,:/��rlr�', ,,1� 'i r :�✓!f�'!;/r.`�%f;;:��:�F. ,,..t r/ : ii�i �,/! f,/};fX.Sy,•.fi ,.:.1/l;: r•,r.r.y: ./t,,.%/Fr/,./il r ' ! ti! fr / l.f�. rJ• f. ."... {, •: % r,�lg., f�:..r.;,,ryG-r: %F:Fr,:i:ifrrr�, ir::'Iir:F.•,,n,,,,, n• ,,r ..::: {:ff n. f. %!'%s:::i% oy. 1. ;fy y {/sJr f�'!f://'r:;/ ..�`!. J; f �� fi'i/t"!...F":r ✓ ..,•7`1 F .•//ivr ,�,.� '.lrlF: :F'%{irl.t;:F,F/�.%�r rrdfi nr r�� .f rr fi//.vr�lf•%/$..: I :i:%:l,.:ii'::+�ii:,. ,;;% Y .,�r�J�,� %'r/fir .f,.." :r. .✓ �zF.':ii%i {% ;:Yz:%:<k;i%:;:: v: { :,::%::,!.iii:!!:.!!:,i:,'.+F::'{:'>:' f.!• ,�'`/ :...i' .v.•,, -,/ rx':�;1/,,1;''-y%.F"1.'r.,F'/.% f i;!! g` .::::iii%iiiy:::�:.:::.,:::. !.%ir,• .:�, > .!: ;;/'; :f: -. :. yr,+ry¢; i•/n..//l/ ;::.!:..::!!�;...y... 'yt r: -iiiiiii:::/... ..,......v..,,, r r. f !r Y. / :,,, :.. .:. .'C•,���?!�`.?,r.,,t i':%i'.'.,%;ter% .: %; ,:!G:!:i✓is^:% F:!+air:/%+..i::: f�Y Jr/•?3..}: !:. ". .!.: ;i '. ::•: ' .. ,:.;L:: ,•/.:::'✓-/f�� '�;t/:a<::.a,!.'r;f¢, r.,?,?�s'f.�!':�fb: . f%%.%if3 3'i:%"�i/A::is if,,J.3`� 4 �Jr��.Jr. .�f '. fi:,•.%'�%:., ;3;!; ;;: i /3F,f�;,,l:pf;,f., !%�•:r�': Y• f. i$�r�ii%%.5:•i! �F�:!''`:%i, .y� ../!:. :'C"'dz7 %%1. F r a.f/+: :'rF:G. .,{rr.%.w rr' �'Yf�r/,:r/,.+iP. '�S�Y,�. :yi. "`X ✓>:3 FF{....:{r{.:: J ;g' ;:"':%%..!:%/G:`%! i:a.::: ::%•"'yFf ! ::yy :v;:::v:::•, :: •i ! ':%%i,iii�'i:,/::..!i,: � i;%Ff':''i 'l/. S'i%:y. .� r:./. •rl /• Yp, !;,�;,+r:.;,:;.,..:::..;..:,.JG. •%f�� �rG,:!G': %r::>:.a.. i%.`';;':.::,:,f.,,/.,...,,/, r}.4•'//..!'fl "r,' .+. :f,G v. 3%.:.:.:::....:::,.!:::::i::::., z'Y,r?I%�'rr•3:'. <:...,.; i'::,,:.i ..f.Y f f ,f �s :.w .�: :.:•% .1. J/ ?;.!�. i 5 r 1H�)f'v :r�n!'�/ .%,.i::iF:,•;!1, ii:%:,'.;: !r.�. r.%....f ..3' ,l f r , l,wF'r S..r:,:f.:::/. :n/r:'.. .ri : •.,f!: f f. k. ii::iiYi;iiiiiiiii'::%................:G%J ,/. !: ::r.'.•''%�: ..../...:., ' v...r.:i!l:iiii F3F:'%<::ii':i::i'iii:yGiiiiii'„/:%r:/.Yl.,:rnl,:.u':: , ),( .............::::::::::::::....... ,„ AJr:� NV.y'y..r Y: F3iir%:!!;!:• ....,.:::,:::!.,!.:�..:..::.:::i :%' '%.r.G f.G/�::. .................................:...../jy;�+�,/. r , .,•.� :l, ;...::::.....,f,iii:!,.;.,.;..:wr /:::..{r:f:%;•::::f..:,...,.. /. ....,::,%3!3ii:v:/..fr.u.is%!r%:...../.. •••••••••••••••::::•ii:Giiiiiiiiiii::::. .. :.l.f. ...........:.A./,✓.<ff�x'/•.'b. 'ii, '� •. , 4 A : ' '; film:%! I' :.,+, ;; ly, .,�+;!. .:'�1:,/:;�f:a.Jf' � �fFr � ff:: f fl r::'�s:>:::I vJ�' f,.= •r /. l: � �SM1; ;s i Y �,' :�♦r11' �`'�fF�= � 'if.,!%,:.r/:!I� {lif//; �r% J,.y���l::i1`!!fy;' lc fy �:.x•::.:::••::: <: ��;y%' ..�, �i, r.�Goi6u�•u%.No. i�. w�f � '>,"•.�."+4';!>' :;�• � y ��sr. 'f� .',�,i f r ,�, ,��!1% ''y»;may'',:i�:%%•,:: �{�. :• ;:./.,;i..:>i „ INA:.JdlN`' ..y: , i INN , Il llo., . f% }�%•. 1 1. r.., ./r': '�r#>�as,#tf y4Ys�4'�•• ,�y../� �� r f�f/,.`JJ:^'`'J�: :•,"if`r/ir,,r,.y`i�f;!rss�r ',Yr,%r�:%:<•ff-!'% j:� :%�.::f�i%;.': ,%: h -iY'! /t !rF is H. }:{•f}r. .f. �! ! //.>:.;; .+1�. '1•rJ:,r1� 7 ;f�':li✓�!:,::1/l/, ,llf♦ H:Y r....>,r h:;' ';G.y�fi%4i"�i3'!� ::%�YS'f;i:Y.:i:�,,, fo7 �,^/r! ,< .l� .J�'f�: ,�':'Y,�IrYl./�`: .,i.. �,�..��: �.l r f xn.'.'�J;y:•' r; „nif.:r:8!:/r.�/f,G, •.1f' i♦ '�: �,r,{/•/+r:i�s'�"y�: �J•r:f.t,�,4i:,/:,:' ;:.%:.:;>::Jn:.:: /,l / !, !:!f. !:./,;r, ,r� %..:„.:;1•:•:�: l .,.r/.,//.,{.•Frn,n� �r•,:;./:',,./.,. �`�:.: „�!i ,f/r.J' ! !i �r r�r:::,.%:.<r,; ..%.! ,ur .� ./+!. ,:.%. o :f's%� �,r..%•:rla;;::,.,.:. 1,/�'Jc. r l ..fr �::�r,,. ,.4 �a1,,. �:., ,.4..F„..a-. lr�., rJ� >:fr1,.,,•„a k•..rr.. c Emil MOIR ,. �E:'%i r'.. 1 ., 1.. 9/�;z.,., .1i. ,v:•.:!.•,;::;. .::�'::!.;r,,:::,:,::r.�,:. .f.. rr r�. r.. n� %. �;:::i::�:;:�:'':�':'':�:� ...r/,...1/:,. .:y...•y "�%%: r:% %%'i �;/�,l• l,cv.:: ":::x�,:rn�:.. �.''r4#.:i:%i%�i '!ao://!':'/.:.':�� L.. .:r., ,.-C.J.:/♦,:: ,.//./.......... / / �/::::::^::.'.�:::;,.::.: .......:................. �:4i:,.4/•..,,..../,,,., .........;...;....;.;;.. !•f::!.......:.......... , „1•+../.-...! �ii%iiiiiiii:::::::::%. e. COMMON AREA POLICIES. r 3 3.3.1 COMMOn &-ea UAting will crude a Strong y ;y, kCO. F attractive sight i4r; ity for the project ;Seleace, elernents will be ft lilighte with illumination. 9. These 'elements are selected for their ability to ` � l ar 3 dimension a character tohe �GdW{N�F}h� building architecture, to promote the appropriate degree,r: e ap to the project,as well as to provide a mfc and so-cure enviromn- ent for visitors and ak:.7srF -•#,��f`.c'ir ' Exterior lighting sball. be located and deslign d, to Pt ear rrt y l rr�l a the parlong arces,', includi g l h irking Struct m Pa,rticu-1 attention shall tie, ald to y .s x 411 c g t € ill. nihia br,of rf a llti a f. and alcoves. All light standards shall be, consistent itlt r ; t t design", te rig Is, color and color of H it, and with the Ioverall aml�itc�t��al style t the Project ill iigl-atin shall be confined within the € cct shall not 1 � ect the jmgj- r �dr � t F f�F r✓ / '/ p��r...rr r QJ lid and landsc a. x- r,. F.. u'� d f3xPfxt:ings r, # 1 k3iC ro- t fi t . cP sttrCng d3S1$ e 'I f' g ij c 6 tts ° h �� t aConccal i i g igl ry. f . , lararlal�g iglligt rttractive la s �r'.. cry a� vadd y ct i�ti g l t�ls at 'entrie-y Ptazas, parki is ts, a Ofhe'r areas. where a twat y iS exlVaed will Crean= an exciting night time errrirolMent, Thei i s It Hu ti rPie €� t 9 0 00 ` zta V, �, � a € IarIp A € .€ z NORA waxy ;������� �� ������ ���x��x������oggn WWI r� �€ € w=A o-� 1, r-* e �� I 'F:. 'f ;�. I- a-,�. :t ;a�yys�av��ayy��/�55�..rr���.����/(�Iw�S�y����,�q ys�.��Y�,. � - ' !r// /./f 5 :..f. Y .:f/:S:f /.�_ :S _ •LR }A S*w , ,t U '�y,13.6�'.g Ste+ Ao Ot"41 .3'3. 5 '13 E. r'.+ 6Ic [3is •�'v�➢ ;Fr.c3'•,i.�s Sa-I�,€ J. s 's �'I �iyr ;y �if� , sf• ry'f ,,.¢ .o lzmga �im, fix::']^ Uo -. c "v4P 0 z- :.R'0,11 q'pu's -. %s / rS:alr�rcd/r{/,;,: :.. r j'�r rr!� ,.G,, ✓.t r :.... 3 ...: T _.'6'' 1 ld. 6 alpaj 5 RIM {{� /, �: �f f ...''���/``rrr,,,✓�yy'c��ig�f�� ..✓ ,i rr✓�'}/ {5 cr r✓,ly, r�•,yy� rlr�" �gr{ '�lF;a.:r try .d{r.. F����.� ,✓ :. °.�_' f { ;;r,.:'!Y; Cy.." )'Gr;✓r�j.l! 'y�','Syr-�. r 'r t 5 ,F ��y/f / .{ ar!/!.N Nfr'Y,r'r4/rjr./�r(;.r::{¢.;.;. r i i pf;,r -� ..:✓>' ' ,,rf ! {r�xtig���� , S!/h '4!� �;; ../ �9'd/f�f�/ /„rl• r >r.,. - '.;.,rS, rfrr.' f�� �r�fi?/j,. r/ r�r �%�/r :f _ � � �; f'�roif�✓jf/g r'rg �i:'r g{'/:"' y -.. _ ae'''•%rilyGfy/J - '�/ ff. r•/f-�`r:/,i rlFj�• i gr� ,!:. �,:;r.,...:.:., 'nf'�fi" .�. .. !,'/1'ilr-15.'f,rn'1 s, s jlr�, .t✓/''i - K/. .......,... g ! < pu. goy€I ;Io pgluoa Amu !'vf -:spin pta `Js IaJu€PUP'lai !i�}p IM91A P�)jAWd 3-ezr,I oup jai)q,3noaq# spq guilurl d Ilems u earl p'lr"Todl a I I w ties �, I a av a 3tpjap ape of vi,)4uvjd ap -AWTU MIYU �r a a s I�� I a s I " ' As t i s PTf pwo, saga nina uo sa le. poIoIivdR,,) pvljojslli Ipoal qoIq4m lgmta jjvd x g-P T.3 Uou &SAA New Sees and Theaters implementation of, the Specific Pan will ,Many of the elements of the Crossings at Huntington generate con,,�trnction of numerous new to-tine retail Beach architecture reflect tit of an Italian Village and anchor ,oiw and will likely include a multi- 1iVing e��'��i�onnient. 'The rchitect ral Gu' defines �r� ree `niovie theater, Desag n sits layout of ary intended to establish a chanacte° style and quality far newly proposed structures res shall comply with the each architecture-l category `'he cat.govies arc followill's policies. New Archor Stares and Theaters NEW ANCHOR TOR ND TMI'ERS General Tenant Storefronts �CMS. n Nonconfonu g, Bu ldings and t'ses PO TlSe d .s rr t r ° e guidelines is t intended.d to 3�5AA t Building massing and. �.��tio shall discourage individual inrt:ion .nd ct:it > t'tc3 posses 1nce' to form and tzsat. ; laze snupty provide a t'r a ne o�� . yitfiazl �ra�aic a� ��m all flat articulated Willing elevation's shall not be sense of place will i reinforced. Bnildirg desk n shall perm ttede The laiSe planes of the theater and counply with the fbflowlag aveh teetural policies, major tenant walls Ahould be enhanced with pat�:rns and gra lcs consistent with the Overall deAsln tl emp,of the centen E I % a' a� �;C.itrr7ui+r�.vr.,ar.Nrrrr�vwvnuarr 2-;MAW rff j!: ,'y 1' .... ""`rY - '} •. -" Y�{r9Y,'+l E Cw I r • u �rrl Ii � I E r I. ;�k I PA D'evic Plan s : i ------ August 7A 0 0 . ......... 31 AA.Z Building entries slr<ail have a clearly defined rher, are two basic types of Ceneial Tenant rm r j fed' tr&s E entr y 'Romfroftss.S€omfronts facing th loxter2t3v to,Wa Edinger Avenue and Center Avenue and storefronts , o � � € ors �€ i d facing the 'interior' toward the �'6n€ri on Areas, Both 3'1by, bra not r t cte by, the approved ComI n o storefront types may be��� �r�R�������as� Area. xGeletf.e. 'i'm e-e t ti n' s 1 e ept,', enae�a ' ernt� an 'or ie' each otber shall have ralying 3x5a4A.4 .�;hitecture of all � reS on t €r Property ml� rs parapet pez%g ,stall be refle�.ti�e;e�f ti€e q��iit� �� =�ildire;�, e��l.�irys, rhythms,milopies and sig ge. materialsf design, And presem,e as depicted ixt the; sample. a tas;'s rpnderings throughoat this b, jeetiv s of ken rit'storefront xi�eftes e � infie t, are t nsi:�re a lit �esi;11 an use of rraa.terials cOnsister t ��-ith tl t �f ��ie' proje t and to dAO General T r t Stme*onts.will concept .ally e Produce a �Yanety €�f tr€r�o'-dilmenst ai storefront � treated as an Italian Village. ,rz iant tee fi €its nay des€ r s, each Unique ly iffe3nent from€ its €neigh #ors b� de ignrd e ioO in., front a de �e ��erilar of bta treed together with Common ate�iais. I Va rAOUS Aschitfx-hu'al e lenlems. The-h; li re eat r di i oal tenant, storefront another creates a � 5,410 ping ex erience of o€€tiques rte ho si€:ni ar ` to a alidn, street in n Italian€ Villa ge, t .r; e s, rolu ns, tower element, om a and e; e5 shall e r yeti Wi is la.y bays balconies al€d ubal a ilia%ntl � alp' icE xarrri from many Furopean,st,Yltis send then€eas. The Crossings at Huntington Beach Spedfic Play5.5 Auguls -7, 0 0 NFXM,TENANT YJL OREFR N'P CMS: 3. .4B.3 Tenant nt, materials- may include but . a.are strtctd to: 3. .41:A All storeftont designs and plans shall be subject to t1,5o aplxoval of the property owner and the City of Huntington Beach. 110lishal metal.s Glass block „5.0,2 store�fronts are, encouragedto have nauhiplc mooth brick t�� and Rough ���tc� 'Etched glass lalaaie to create av�.�-id�� of`v��lt��t�cs and spaces G1�.;��Fiber Reinforced Canex�ete C�sacc glassglass and try i i c la c's visibility. Ft 'el a.an'and CIV the Victeal gritIwork lea€lltcd Of S inCd.)AF0 sd GIazcd ceramic the Smooth,Rough or polished stone Powder d coal s anodized t l cas t c as x-P l ste�6.0,�;olu=S,cornices) rr rr�rt-. v/S- r .rr r fiYf/ l I �f ----------------------- r� %O The Crossings at nt on.beach : Rd � 4k OO r w Sw `�`//::fr+,+�/y�;.:ss::r:,,'f�}- %;r,{r.< .i;+.&,:. <+G4+•f+�Sf!%�:£<:Yr.''-�J/ir'lY^''l..'{.;';+'%':f//!/i."+"-• �` ! :��r'+!,5..+�'.rf f f!%' r ✓.',fJ�'�:fA��d9�'.:.�'':''y' :y rr,.'f:i� / A° F. A # ��ff S�ri$'.. ,f••. /; . 5.: Aw.. ^ '3 ,�/f/// } 3 fdJ+.1R"%�f•+'s;rYt`f�i t � r Q f', ��//J,yyf%/yy/f-,•:r- 'ff//:'�.'Y%%f��,,�, `:�; `;`;Ji.. ::. 3 /:s%!/u ;r. j ,, rr§f f f.// .Vic:•'%1fr+,r; /.:;rl.;�r 'f %Y' ',1/i rr/>;/f!.�/r,.%G.'�J/i, Ir+v 1/r/,.+:+::::;•:+'/5/f,l%' � %f ffi" r/5Y'.:��,r r r,1fr/r�'���J;t/vfif!.,.•.::t•f„!,'•:..:!f/.:.;;rY`�r:;.%fi%%;�:Yf//'�J/`.y:�::.�,y{.r+Crf��/1;�.rf�i.• %;:.`;i•r/.:�r fa.'+..,.rY�4:% :;:. /.1. � r.��F+t/}J..{Jr.;.. f`'.:�: Y,lraj'G¢!4�.ti''fi/,t�:�YFf/.,+,�<�l{':%'/f%' �:; :%:6i5::'f.3% `;: ,;:�..b%•:r !l:•+Y%<f,`/�:.+'ff/%5/yVF+,';''.� Ya r�F"r+;;;'v Gt;S�'��y/•�'�ls�r{;r/s'+f.d>,!'�Y./,sfi,''y-�:f<>!:t�:.;!%�;: r.1/,f+: ,rr,;..'.:•„rf. ::::: : y ,,.;.i'.. •.y �; �.,, fyj, i'1.�, .%, ....Y.ff:+'ii f +Y,.,Cir!,3„rr/}YA % t ppppppyypp ..;..:Y: ✓kjy.".�,;f.;.�.ff Y' .{J .f/f > '•5'u' � ,-,yr�' µ"i>:�::::i;:.... rso;xb;;i. ..... r:....:: . r .Y::y:' ..,'W.' ".• ... :, :........;y.. 40);....: h. .,.t;:.;;::: ;."'%Y':a+ +:axa;: <�%f.::,;•;;:r+.wi@::'�� ::5::�"5::+.0::s;::s;s:::::.: ::r:::::::::.:: ;s::;ss o: ?.•. y ,p:::�. :.:!1; c, h+.•f:,. ;;:C•t'(.{,;:;:o'{.;; iiFosis:: �%l;;i;:a;;":3':::::i;;;;;:o;;:y:; :'ins:.: ' ..a." J Si'�'�'..� ::}:: ::o"r'%'.z� ::r ::rs;;;:: ::•k so. y.x+;S:.A. t,i;7q a: ..?¢!?pi 4 ..3�., ;�. .9.; a'•�: `'.: +v?-1::,.K(.`.:.i....h; v:F..... ::43.:�:$9�`::::::::::::5:::;:::::::::: .. v. v:.,. ....,.:.5•ii:is / ....�:;::iil.;F.vi:.:............:::....,. ( ., :f•s::::>:c::i:;:'.:c:c:c:c: �. :;:;✓ifs n'` r.%,: ;;j;',/�> ;:�f, :>;.,::.,; 4:�: .H'✓f ':S }::::.�'/i:}:ii:<�iiiiiiiiii:5!�iiii:.J. : i. S:;;:!!iii�.iiiiiiiiii.'�.• %r,.�Si: �%'K✓�,f,�''',�'''''i��i:�:ii:��iiiiiiiiii%�iii �,r//+/%/ r f/ ✓f err ✓`�J//�f}i H� �/rf:`':Yt �� i�3 l',C'j; r / �// r. _n i ..��✓+..J%•Y i+ +Y F /`�fn l 1/� ,,.,rv.'S..;+�i ///lz/f ,r/,• �/%r y�f' s ryY .f //.,r,..1G<;/..,s F./r. .f;, : rrr��} f 1/fr�r�% + , t' J'', `uY'•'4 i f� ''./ /r'ri'•5 ;1.3�j f�'i +.s j•'j', <„y:..`::; /:ljy f/`. /,!.'• - �. 1'1+r: +r. !! ifi' ,,�+/. :(G�f;/., Yf '%fry�G'':�'} ::,, 5;./;:r.,:r!',:;:;: o0oz In U RAd pod a s uoj&� un le ul-osoi o f R iE u .TS a of j z � J t � � f .. o r RCS l .. J! •J � .: ----------------------- ........................ S : �// 7.l1, r r � yr rryrrryrror V J: y y'f' r4".�I J r ttifi� r J 'J� r ,:-r J a/r r/y�f 1 !i !•'r r/ `J±'�in f%r �! /r:.�".rir°f :'' � �J �N: ` . c r 'J K! Jar r//r`l r r ,�J"' r; L• 9l,sr :�9i .!{�,!`.J 'k:�<rr r'J '.,f l:�f�' rJjj+r ,�`'�f�•r:-,'!,J �% i.5t y��J�� f-:. f Y�N/.. .: rrxar l J" lr rj rr��j rJ JJ�fr �rJj/11rt! ✓'' f`u+ir7 rTf/- f 3.5.4C Nonconforming Buildings and Uses land, buildings or structures used in conjunction with a nonconforming use or a Purpose — It is the intent of these regulations to building or structure nonconforming due to provide for the termination of nonconforming uses use and/or standards,except: and the remodel/ renovation of nonconforming buildings in order to promote the public health, a. Exterior building alterations to a building safety , and general welfare and to bring -such or structure nonconforming due to buildings and uses into conformity with the goals standards when the exterior alterations and policies of the City of Huntington Beach General comply with the design, architectural, and Plan and The Crossings at Huntington Beach Specific development policies and standards Plan No. 13. This section is intended to prevent the contained within the Specific Plan. expansion of nonconforming uses and buildings, b. To the extent required by a subsequently establish the circumstances under which they may be enacted or subsequently adopted law, continued and provide for the removal, correction, remodel,or change of such uses and buildings. ordinance or regulation, and the Director so finds. Such additions as are permitted by 3.5.4C.1 Regulations Applicable. The following the subsection shall not be construed to regulations shall apply to all nonconforming uses extend the termination date of the subject and to all buildings or structures nonconforming nonconforming use, or a building or a due to use and/or standards as specified herein: structure nonconforming due to use or standards. I. Continuation. A nonconforming use or a 3. Natural Act. A nonconforming building or building or structure nonconforming due to use and/or standards may be continuously structure that is damage or destroyed by fire, maintained provided there is. no alteration, earthquake,or other calamity,or by act of God, or by act of war, or by the public enemy, may enlargement, or addition to any building or be re-constructed provided that each of the structure; no increase in occupant load; nor any enlargement of area, space or volume following conditions is met: occupied by or devoted to such use, except as a otherwise provided in this Section. a. Such re-construction is permitted by the C Uniform Building Code. o' 9 Z. Additions to a Nonconforming Use, Building, b, Re construction is commenced within one or Structure. This section does not authorize year of the date of damage, unless the extension,expansion,or enlargement of the otherwise allowed by the Planning area of land or the area within a building or Commission, and be pursued diligently to . structure devoted to a nonconforming use, or completion. ; ro the alteration, enlargement of or addition to a building or structure nonconforming due to c e use and/or standards, or permit the addition of o The Crossings at Huntington Beach Specific Plan 59 Q August 7, 2000 remodeled and renovated to comply with the 3.5.4C.2 Termination Conditions and Time Limits standards enumerated in this Specific PIan The following regulations shall apply to all within the time frame specified in this section, nonconforming uses and buildings and structures except when extended or revoked as otherwise nonconforming due to use, and to buildings and provided in this section. structures nonconforming due to standards as specified in this section. In the case of nonconforming uses and buildings or structures nonconforming due to 1. Termination by Discontinuance. use, and those buildings or structures Discontinuance of a nonconforming use or of nonconforming due to standards enumerated the use of a building or structure in this Specific Plan: nonconforming due to use and/or standards as indicated herein shall immediately terminate a. Where a nonconforming use is carried on the right to operate or use such nonconforming in a conforming structure — three years use, building or structure, except when from the date of adoption of the Specific extended as otherwise provided in this Section: Plan. a. Changing a nonconforming use to a Where a nonconforming use is carried on conforming use; in a nonconforming structure due to standards enumerated in this Specific Plan b. Removal of a building or structure — three years from the date of adoption of nonconforming due to use and/or the Specific Plan. standards; or c. where a conforming use is carried on in a c. Discontinuance of a nonconforming use or nonconforming structure due to standards use of a building or structure enumerated in this Specific Plan — three nonconforming due to use and/or years from the date of adoption of the a standards as indicated herein for a Specific Plan. consecutive period of one or more years. M 3.5.4C.3 Review of Amortization Schedule or 2. Termination by Operation of Law. Substitution of Use o Nonconforming uses and buildings or y structures nonconforming due to use, shall be 1. Request for Review— An application may be discontinued and removed from their sites filed with the Planning Commission requesting (4 within the time specified in this section, except extension of the time within which a o. when extended or revoked as otherwise nonconforming use or building or structure provided in this section. Buildings or nonconforming due to use, or due to standards structures nonconforming due to standards where applicable, must be dicontinued and z z enumerated in this Specific Plan, shall be ° a IV N 00 The Crossings at Huntington Beach Specific Plan 60 m 0 co O August 7, 2000 removed from its site or remodeled and 3. ,jeopardize,endanger or otherwise renovated as specified in Section 3.4.5C. constitute a menace to the public health, safety or general welfare. The Planning Commission may accept such filing either before or after the date of 4. Findings and Decision—The Director of expiration of such nonconforming use, Planning shall recommend and the Planning building or structure. Commission shall approve an application for a nonconforming use,building or structure 2. Application and Procedure-Except as review, provided the burden of proof set forth specifically provided in this section,the above has been met by the applicant. application and all procedures relative to notification,public hearing and appeals shall 5. Conditions—The Planning Commission,in be the same as for a conditional use permit. approving an application for a nonconforming use and structure review may impose 3. Burden of Proof—in addition to the conditions it deems necessary to insure that the information required in the application,the approval will be in accord with the findings applicant shall substantiate to the satisfaction required. Conditions imposed by the Planning of the Planning Commission the following Commission may involve any pertinent factors facts: affecting the establishment,operation,and maintenance of the uses,buildings or a. That to require cessation of such use, structures requested. building or structure would impair the property rights of any person to such an extent as to be an unconstitutional taking of property;and/or b. That such use,building or structure does not now and will not during the extension :0 period requested: o 1. Adversely affect the health,peace or °a welfare of persons residing or working in the surrounding area,and, 2. Be materially detrimental to the use, enjoyment or valuation of the property y of other persons located in the vicinity of the site,and, o a � N 00 00 00 The Crossings of Huntington Beach Specific Plan 61 % o August 7, 2000 oog -------------- a UPI PlPH M ---------------- y t, - I f � Jf� ! b IT : � : _ ko.xo o x< >al�ct'r ru us d tT'6 „aib ott sf! -4n .t swa*lsc, -� s.r. _:y,�'" , •..y ..r T:frf.; am• ,,.�4N ff.. :F: ..;.^x ,., '. .^.�ro-s. nuneer�tsrv�ih am.,.iC.'!,; ! .:-^i s/!f,.ry.'.'t^'S".`"^.'- ,,--•�,,v^".ir ?9;w;.«f.,y,....a ';'�Af fh :,� .J,43.� rY ...r>i hY ,::.�•Lrr,..in-.1•y:-' .,:., �:r}:w t � dvn"G..� �,_r„ r✓c•• � r :'^.^"".."'Y. f .,.y£ 5 f'�.J,vriSsr•aooe e<r ✓ m r /r� 1 ..c.�,,.e..,-r//:^-�aer�a ..Sw.....».c. fo--`.�' P£33qjr _� 1f,; � � f Il :?'k •3A. 15s t i k >fslr sr" sl , ..I. ..t.rq,}. .I, k .I ° �9 c'. „ r Crl. _ f.:i<t1:,.3f. .1 t.'4ff •,{.w.i rs. F ��y� I tc,p�f, �i�, y��p 'E It pjy 5aw."J f I I .J�{t6`�ibx. '� :�4 � ;! '"' "tJ" ::r � :rf' � :.^fr'.-:""'" "� tzr`:_ •} - ( ell ipg� , �,,.� � t 7s rg `E' -r "�� �"a rt. .f .ta': 39`r?::�^� •,� "' LEE :R{,•y, iy :., � y .n ..fry d.;� �'}- yP� r- _. �y'" 4�T' -:"?k A•.� `-"' %{ CY -•3.::: •7E'^ m >•rra ti I, IV7 f �� y:{ir.- I �'�,: -'r %i5'•,�:,f�?; �.x.z.;r.rarnrr. .+` _ � .;./ 9ar1�,, ' ,¢j'x 5(K'•: pE T', A"' A��yT.SS ,4� H +N�i�.�iro+ {r/ !: �>.; '�JF.,fY h ��.S L4:4r x•W. � LV LF M'sMsy�>�5. f t ^+.x iT.yr.s• �. _.yor�t �,y:,.,�Es aa"� }7::r�F ;'�/•�f��4 / r' ,n -�:r / f�/ :.f P s� f�,, •s i , • ',�- ;. >r r+u $ Wy u'�` �.,:.. 'Jo<�£k'rl.,�l;{�.� 4 r -:.< ':v y,r /r � ,p, '9 i i f mika+ � �`-t3f":ri. ,r•' �'%.'.%r'�:. ,.f•f/�tif.' a�'�. rr, ,,. -/. :w y,h� •y�`�E I i...-'." -s...•, � 'k d' �ii'� fsryr s � '¢S� .rR' pr r dt �I 16 !.✓v /,`.,. ^' r ir r r; 4S;i � ��I -./ .� l'/ �'N r''t• r frC"f3i'n.4�r: ; � �Er3y �Y {_ IE { f` �t (/ .* f� r',Fr` rh fn r ..,f f.�(ty :� ri, �� .k;�,� /�<r•.��yy;. � {�,E *4c'', r //� # � � P � / fY p f r r ✓lr�� 'f f , xY� � '{ k'y{yp �p 7 •5y1 � r,1`/Yil� y r''' �,�:'� �'.�Y� rF/� ��' rf �51� I �' h�!r :3`" '•:.Ttt�•':�A!;?"aJ `C���'�'/r' y � r'/3�I' "S_ :�r -! irf r �'nts f >�E, i s;f J f �1�'.�'.. -� � d nrcr >,':td tc¢rx. s+r w.r�f/w � � �.. ..IE • r �.;2 ✓�t�'+ � r : r / r rl - _% f //r}r � r ,^ >1 F��} S``s r -`t.. �✓/ t;,^n a .yiti. n+sx! '��' mF` "z �?• �� a°.'-p' �'n �ary" nm � � ,� sc� z.. Tt re, a tf t J, :'�s•t•,X •E Zi �- •{ .3` ��+.yf F /c.:: .l ''�4 !� y^ <i "< R', �. 'J.t� "s •::f y I 1 I :ii'� .'I �. >ey� �.,f �``y`k •�ty �i° *�!' ,�?'�.�. �:.#�`' �' �'F' ;�.''vr. "�t ;.�`+ a i�'"`ea:`v3+ i Ifi i/ '� (:�'S�o Y p�, 9 •� �' .. i yu ., ��s K X 'ss :s, c I:f ` Sl 4, k..' ^st ,t•!� �t�, srt p�h "{ 5nwsrt � 'f Ri , \.. ,7r� �•7 '� 1 \ d i tr t a� c.: i. S4',. �Sr s f�} J wlu, � f .f�f I �., �F'�//i 4'�4.; •�4� Sr�� �,pr� :9.0 vuC �:.. s t 2�''°a�. ,F.� ��+ �5 .3�d'f "f➢ � F { £ �7%1 [y'T` ,�5jq✓� � f, ^. �3}'_ / 1�;'� p4 IXXl6 ^Jt 4aF .TFP d'Byy ar��LCG'�1..T'1��4k�� IN Y ik.,,� �'r,•M1 1� `v�� rj r'�:. _� `' .�3 '�XA S'Y r6s�' ^Crt` � 5��, £1 �5_.�SI£�.L- :.,�..wli3.Edo.L.v'��.l.vi:S�t�i ..�'"y� �. � �`�"`�'cc""•'.�, ':f�`_%u.,��"�f�r�, 'urv {µ`''•:^��9.ucr.•r�r� "':"' r»� d ' r 'd'r s✓/sc,G4�.�•�,.'rrw�-s�'v'`.:.�r3 E, ```,�.,� _ `� % 'z^r„�,v�w�sr .�.�.�.%�::.::•ay:..„��,'1...S'Ji r.�':%�.i,.a,'::xstt > ------------ _.-- ..... - - - y3/Yd So,oSA%KG XiCh.0Y C4SCS.4r,t[W.6h:4+P'/ YY.IhDY.<4w4 W, � f � : fp'�_..-..t.,..-�_•-,� -: �{ - _ __ .rr v.«fu.r y rr� '�f�y. ---- ----------•. 7k' ¢„-^-,^`.y� ..ae.'.. safl::. :..,�, ¢tt t i- 'n F.r..:w r=•=-»': .mar— -. -..w,cv.,rwi .F,,, -- k .'I t,,,,,�,..�,,,.vrmrtm �,4eaeeeoe�l { }.o,.w•...,. an.�v..'r>£Si.<«,,:r .,.w ( '}% 'f, r:, ,y��� i 1 s t f sr, re 'i'(i a' ' ,f��ofi f Si < i t,.�t #;• 17€t, �(��i > � '+" �;7- � f !I' �^ Jeff i / ! !•: i y; i � `�' '^7"-' rF -i : { f +, t'::.� ,. -ff�+�. ::h/.4�.j /'�j , �k... .., : :•r. � ../.-v..� -./,<.:if .fi' ybr� �" .j st "35•: 5:::f��^�i.�! "` :,` •..,.. `n'r ..G. � ..d:fi.� .�is!�.. .t.,- 'f, ..: :';I :7 � "} , ��r%35 �f fY"t��+o/' !'f f��} ?-Jf f:y j :' °W' YP�: ti '�..�+a'9C 'dW� �ZA t'?�, :�k �i !+tR !�::r'Fy S �::t• 77 •:..:f >jN.j lf,f•. .. .:i'1 Inr(§Y•'ff!/, /" +-:'' y.� �'• I f.'•/ �j��:,fl j�!/lffj,Jl: Y.; S i, /lJIT•J�` , .�J/% �J! '��yy y� f tl' h �/J!Jr � : ..f3?'f t1;f�. -.: ,� ff f �j F�f•,f,, J �, ::-:_:,,,7,� "� 5- 31»t 6 "f�: f ) L `. A �, ""'flFff`iff :r� r t,�C r>f,•, f'�Jf 4 • c4 sk''/rPa�f "Ff: •�" /xyc "' -t' ;% itr /.gq;f; �Rvf{,f,<a. Fq`•ta^csflF p rrt�;�j f f f f t r r ! f f - s,.',,tk ,,:/,'%` :,Y 1, fli'" �T';;: �S;g ��i'�y i p��yy y y' !z!m'ott f:' r ff r td::.!r•f.•=:,!� sty�.. /�_/f 2 S7.:yi9� /J yid- � �p` `'�`: �yf�Y;,Y,.%;:: �•'•= y yr ant :r. „f•,d r f,.55 '� 3" f�.• �.,rS t• .�: ,:5... - , ! i .J Jf 2--fs isyii ,1 t: r kf c t<;;:ji is y r 2:y `' t ��YR` `` �:.. ! t �.,d�. ",,�,^_ '�,t �hE;. �k% � ,f r. ff6 '{.�• � �>ik �f'i eY'tE i ciF. !cf;l '� .SN,:� _ :.�"S:� �c.:- ,Je� :;'�...;�:: ';<y f:;� s. '✓�4 y rrr tr '�{'•,. *.s s, ;!�;`%� ''Sf' `ta " Y % ,/ .�:',. .5s h': �. t'=fk :6y'//,r..,,.-ff �,5 ,��;/:;f,: rf;' L•y, kt7•. '.?,j °'" _' ,f�t dy rr/.>r "' W%,t •`r•,�r S! J:f-�f„�':r, 55�'.i :f�EY3:fR�'Y�kY�"1f�' �N v/�s ��� ��� :.:•'+ �� t,f.f�..iytf.tilt !!l��.s .F.; .c.j.�.i. ^Y.l�% j.. !R OWN '> ,�> °� ^wri--r� F �,�`f+'•+ftf�',,,�i'� % ..yi 1 I 1 i y f 1.0 y I:.r � s y •., \� 1 .....,,.,. .�.,. �^..., .�. ,. .._ - - -�"' ^s ...fit .{�'.�k� �-�^ � � 3.5.5 LANDSCAPE GUIDELINES The landscape for The Crossings at Huntington Beach 3.5.5.2 Existing healthy trees, where feasible, shall be is an integral component of the overall project design. preserved or relocated on site. If healthy trees are This design concept is urban in nature and has strong removed, replacement shall be as follows: Each elements of an Italian Village. These elements include existing Rhaphiolepis "Majestic Beauty" removed the use of strong vertical elements such as Italian shall be replaced with one (1) thirty-six (36) inch cypress and Palms at the main entrances in strategic box tree or palm equivalent. All other healthy tree areas for emphasis and continuity. Some of the other species with a ten (10) inch diameter trunk at elements that fit well with an Italian Village breast hieght or larger shall be replaced with two environment include the following which are (2) thirty-six (36) inch box trees or the palm indigenous to the California coast. i.e.: Bougainvillea, equivalent for each tree removed. Should the Ivy Geraniums, Hibiscus, Lupine, Azalea, Indian foregoing substitution of two (2) 36" box trees be Hawthorn and tree varieties such as Silk tree, Alder, impractical, the ratio may be modified to one (1) Strawberry tree, Deodar Cedar, Carob, Carrotwood, 36" box tree with the approval of the Directior of Crepe Myrtle and the like. The Landscape Concept is Public Works. Palms may be substituted for trees at composed of these elements as well as other elements, the ratio of half (1/2) foot of brown trunk height such as decorative paving, water features, public art, for each one (1) inch of box size. If the situation and lighting which are complementary to and assist in occurs where there is not enough planting area for the implementation of an integral landscape design. the trees required, the accumulative box inches of These Landscape Guidelines establish the design trees may be utilized, For example, two (2) thirty character and visual qualities for development within six (36) inch boxed trees could be combined into the Specific Plan. one seventy two (72) inch box tree. For palms, the requirement of eighteen feet of brown trunk for LANDSCAPE GUIDELINE POLICIES: each thirty six (36) inch tree would work as follows: two (2) thirty six (36) inch box trees could 3.5.5.1 Site layout shall respect and preserve as much of be combined into one (1) thirty six (36) foot the existing site features, including trees where (brown trunk) palm. All tree replacement shall be possible. A professional consulting arborist shall subject to review and approval and may be determine whether existing trees can be saved modified by the Director of Public Works. 0. during construction. y !D 9 . rmb ;U w a o The Crossings at Huntington Beach Specific Plan 65 � Q August 7, 2000 3.5.5.3 Landscape design shall provide formal or 3•5•5•5 Street tree planting in the parkway areas shall informal groupings of deciduous and evergreen include a minimum of one (1) thirty six (36) inch trees, flowering shrubs, and groundcover. Trees box tree for each forty five (45) feet of lineal shall be of even size and shape at the time of frontage. At the discretion of the Director of Public installation. Replacement trees shall be compatible Works, this planting may be modified to one (1) with the new landscape plan. A minimum of eight twenty four (24) inch box every thirty (30) feet. (8) percent of the net site area shall be landscape Tree planting shall be grouped in informal drifts and shall be provided on the perimeter of the site and tree quantities shall be determined by the and the parking lot. Additional landscaping is length of the property adjacent to the street divided requred in the Common Area (see policy 3.5:3.6). by the recommended spacing of each tree variety. Shrubs shall be planted flush to the walls, when All parkway planting shall be subject to review and feasible, thus not allowing a hiding place for an approval of the Director of Public Works. offender or privacy for transients between the shrub and wall. 3.5.5.4 Plant materials shall be selected to create an informal pattern of landscaping to reinforce the character of the tree plantings. A formal pattern of landscaping shall be created on-site at the project entries. Trees shall be selected based upon the size of the planting area to allow for mature growth without causing future damage to the improvements. A consulting, certified ISA arborist shall review and approve final tree planting plans for compliance. All trees shall be a minimum twenty-four (24) inch box size. Shrubbery o (evergreen and flowering) shall be low to medium in height; minimum size shall be five (5) gallon. All grass selections shall be made from the City's approved water efficient materials list. N O p IV N O O The Crossings at Huntington Beach Specific Plan 66 0c O August 7, 2000 PLAW PALETTE SUE . FRONTAGE TREE PYRUS KAWAKAMI[ EVERGREEN PEAR LAGERSTROEMIA FAUREI CRAPE MYRTLE METROSIDEROS EXCELSUS NEW ZEALAND CHRISTMAS TREE FRONTAGE HEDGE LIGUSTRUMJ.'TEXANUM' TEXAS PRIVET JUNIPERUS CHINENIS `PARSONII'JUMPER FRONTAGE ACCENT SHRUB BOUGAINVILLEA SP. BOUGAINVILLEA HIBISCUS ROSA--SINENSIS HIBISCUS FRONTAGE GROUNDCOVER GAZANIA SP. GAZANIA ZOYSIA TENUIFOCIA KOREAN GRASS ENTRY DRIVE THEME TREE OLEA EUROPAEA OLIVE ENTRY DRIVE TREE JACARANDA MIMOSIFOLIA JACARANDA PINUS CANARIENSIS CANARY ISLAND PINE PYRUS CALLERYANA'BRADFORD' BRADFORD PEAR ENTRY DRIVE ACCENT SHRUB AZALEA SP. AZALEA ENTRY DRIVE EDGE SHRUB PHORMIUM TENAX FLAX ENTRY DRIVE LOW SHRUB TRACHELOSPERMUM JASMINOIDES STARJASMINE END ISLAND TREE LAG£RSTROEMIA FAUREI CRAPE MYRTLE RHAPIOLEPIS'MAJESTIC BEAUTY' INDIA HAWTHORN TREE FORM END ISLAND LOW SHRUB ASPIDISTRA ELATIOR CAST-IRON PLANT TRACHELOSPERMUM JASMINOIDES STAR JASMINE ROSMARINUS OFFIC[NALIS SPREADING ROSEMARY END ISLAND ACCENT SHRUB ROSA SP. SHRUB ROSE PARKING LOT TREE PLATANUS ACERIFOLIA TLOODGOOD' LONDON PLANE TREE ULMUS PARVIFOLIA TRUE GREEN' TRUE GREEN ELM ZELKOVA 8rRRA7TA SAWLEAF 7ELKOVA ULMUS PARVII'OLIA CIIINESV MM SCREEN TREES EUCALPTUS SP. EUCALYPTUS PINUS SP. PINES _a AGONIS FLEXUOSA PEPPERMINT TREE PARKING GARAGE SCREEN TREE TRISTANIA CONFERTA BRISBANE BOX PARKING GARAGE PLANTING BOUGAINVILLEA SP. BOUGAINVILLEA TRACHELOSPERMUM JASMINOIDES STAR JASMINE P17 TOSPORUM TOBIRA `MINT JULIP' SCREEN TREES MELALEUCA QUINQUENERUTA CAJEPUT TREE TRISTANIA CONFERTA BRISBANE BOX FICUS RUBIGNOSA RUSFYLEAF FIG ° Plant Materials PaletteCL Exhibit 10 P � o N � g � The Crossings at Huntington Beach Specific Plan 67 g �o August 7, 2000 3.5.5.5 Pedestrian walkway systems shall be designed Perimeter parking lots adjacent to arterial streets to unify the entire - project area and provide shall be provided with additional landscape pedestrian site access to buildings, parking and site treatment to ensure that the parking areas are activity areas from the perimeter project area and adequately screened from adjacent street views, from within the site. Pedestrian walkways shall be a however, not hidden from the view of passersby minimum of five (5) feet clear in width with no and police on the adjacent streets. Berming in these vehicular overhang. areas is encouraged and shall be a maximum of three (3) feet high and have a natural appearance 3.5.5.7 Perimeter landscaping around the project areas in form. However, the fact that a successful retail shall provide a consistent edge treatment using a shopping center must be seen from the adjacent limited variety of plant materials. streets will be the determining factor in the selection and placement of all perimeter 3.5.5.8 Parking lots shall be planted at the rate of one (1) landscaping. tree for every ten (10) parking stalls. Parking lot Shrubbery shall be planted in areas where berms trees shall be twenty-four (24) inch box trees. All are not practical. Shrub planting shall be provided tree:planting areas shall be a minimum net width of in a minimum five (5) gallon size and spaced a four (4) feet in one direction and a net width of six maximum of three (3) feet apart. Shrubbery shall (6) feet in the other direction. Small trees (at not exceed three (3) feet in height. Hedges shall be maturity) shall be utilized in these planting areas. trimmed from the ground and maintain an eight Parking lot treatments shall be consistent and (8) inch clearance from the ground. contribute to the project landscaping unity. Parking Where cars overhang the curbs, ground cover lots shall be planted with trees in such a manner as planting shall be required;a maximum overhang of to provide maximum shade. An alternative which two (2) feet shall be permitted. The overhang area clusters or groups parking lot trees may be shall not be considered as part of the required considered. Larger trees may also be considered as minimum percentage of on-site landscaping or :0 substitutes for a number of smaller trees, subject to a review and approval of the Director of Public minimum planter width. c c pt Works. y a a m Q 41 N O G � N ao The Crossings at Huntington Beach Specific Plan 68 co August 7, 2000 3.5.5.9 Perimeter landscaping shall preserve or Exhibit 5, shah incorporate enhanced materials construct a minimum ten (10) foot wide landscape from the property line to the back of the adjacent buffer between the arterial highway and private landscape planter or a minimum of 15 feet. Minor project improvements, including buildings, walls, driveway entrances shaIl provide a minimum of ten parking areas, etc. Landscape improvements within (10) feet of enhanced treatment. the public right-of-way, adjacent to private improvements, shall be constructed by the project Pedestrian connections consisting of enhanced developer and maintained by the property owner paving materials shalt be provided along the front consistent with the overall landscape theme. The of the satellite buildings (Barnes and Noble, Circuit design shall be consistent with the approved City, and Staples) and within the pedestrian Edinger Corridor concept. walkway connecting these outlying buildings to the main mall. Enhanced paving materials shall also be 3.5.5.10 Entry drives shall be constructed in conformance provided throughout the public plazas and from with the Specific Plan (Policy 3.5.2.4) and City Edinger Avenue at the main project entrance design standards (Public Works Standard Plans) (across from Sher bane) along a pedestrian path to subject to the review by the Directors of Public the main plaza. Works and Planning. Project access points shall be designed to provide entering and exiting drives 3.5.5.11 Interior plaza areas and courtyards shall be with adequate views of approaching pedestrians provided as focal points. These areas shall be an and vehicles. integral part of the building architecture and be connected by a walkway system to the public Entry drives shall provide convenient access to pedestrian walkways. parking lots at various Iocations approved by the Director of Public Works. In addition to street trees 3.5.5.12 Irrigation systems shall comply with the City's and on-site landscaping, each entry shall be "Water Efficient Landscape Requirements." designated by grouted cover-planting, 8111111M, find (Ordinance #fill 52). � large specimen trees on each side of the entry. o These trees shall be located a minimum of ten (10) 3.5.5.13 All landscaping shall conform with the c feet back from the intersection of driveways and requirements of the Landscape Improvement property lines to avoid line-of-sight conflicts. chapter of the Huntington Beach Zoning and Subdivision ordinance, the City Arboricultural and Enhanced paving (pavers, interlocking bricks, Landscape Standards and Specifications, and City stamped concrete, or other similar material) shall Standard Plans, in addition to the Specific Plan be provided at all driveway entrances from the policies. public right-of-way to the project. Major driveway entrances,as identified on the Circulation Plan, c o NN 00 00 ao The Crossings at Huntington Beach Specific Plan fig o August 7, 2000 3.5.5.15 Landscape screening is intended to soften and 3.5.6 SIGNAGE GUIDELINES blend the connection of the building areas with the landscape of the parking lots. Trees shall be The Signage Guidelines identify a framework to provided to soften,and visually relieve,parking and advertise a place of business and provide directions or utility areas and to provide summer shade. information specific to that business. Attractive and effective signage can be designed without detracting Trash enclosure areas, where appropriate, shall be from the overall design quality of the project area. The provided with tree and shrub planting screens to Signage Guidelines also contribute to the overall soften the enclosure. Mechanical equipment and project area urban retail design theme. Design, color, transformer areas shall have Iandscape screening materials and placement are all important in creating E and/or low-level screen walls. Valves, meters, back signs that are architecturally attractive and integrated j flow preventers, etc., shall be screened by shrub into the overall project area design. The intent is to plantings and/or low level screen walls. create and promote a quality visual environment by allowing only signs which are compatible with their 3.5.5.16 Landscape lighting shall be provided in selected surroundings and which effectively communicate areas to aesthetically enhance the site. Pedestrian their message. walkways shall include adequate night lighting for public safety and crime prevention purposes. Signs shall be designed to be architecturally Courtyard lighting shall be a minimum maintained compatible with the colors and materials of the level of one foot-candle. adjacent building. All signing shall be consistent with the Crossings at Huntington Beach's sign standards 3.5.5.17 Conservation water measures shall be (Appendix Q. incorporated in the landscape design. A minimum of seventy-five (75) percent of the required landscape area shall be planted with ground cover and the balance (a maximum of 25 percent) with : turf. The use of shrubs, hedges, and berming shall ° be provided to screen cars in the parking lots from street view. ° ° ° ° Q m - ur zz , O ° pN N O � The Crossings at Huntington Beach Specific Plan 70 cca August 7, 2000 -"�EVELOPA4ENT REGULATIONS �a �� ,zy,....4 £.,aaw...w�.w„x•,.w....,� ,� � �.x...,,,,�..�.nw�,�.. ����� � f 4�m�t i e 44Wtta_ .T- Ift" w L.Y"L/n;YNtr>w.kMM�y/HF f� § i i5—a—u E ryE 3 ,1AµY x j. ri wy 't E Ers yEii��5 _ ��a E a y S L[ ---•--"..:^T•^ .S`y,lx.fif��Xs�xv 0. 0. : 4i:tf Nh h:Y.LY.! ....t.C✓a'N{`���L J,C.0 Y".`Y-ur"�'ri�.g �f�����•Y, -. 'j �s..'.r ,, r � 1 A.. .Y 4 ��: t i E s w-•- i` s y 1 i fz Four sectim. n. .. ... The Crossings at Huntington Beach Specift Plan 71 ---------- August 7, 2000 DEVELOPMENT REGULATIONS 4.1.0 DEVELOPMENT REGULATIONS POLICIES: 4.1.1 Not withstanding provisions to the contrary, all 4.0 PURPOSE grading shall be approved by both the Planning Director and Director of Public Works,or designee. The purpose of this section is to provide specific 4.1.2 Construction may commence only after the development regulations and standards that will be Planning Director finds that the project is consistent applied to development projects in the Specific Plan. with the regulations and applicable policies and Upon adoption by the City of Huntington Beach, the guidelines of the Specific Plan. Crossings at Huntington Beach Specific Plan will be the zoning document for the project area. 4.1.3 A11 structures in existence at the time of Specific 4.1 GENERAL PROVISIONS PIan adoption shall be deemed legal, non-conforming. All policies regarding Site Plan Review process and The provisions contained herein shall govern the fagade improvements shall apply. design and development of the Crossings at 4.2 DEFINITIONS Huntington Beach Specific Plan area. Standards and/or criteria for development and activities not specifically addressed in this Specific Plan shall For the purposes of the Specific Plan, words, phrases and terms shall have the meanings as de require referral to the current provisions of the fined below. Huntington Beach Zoning and Subdivision Ordinance Terms not specifically defined in the Specific Plan shall and Municipal Code. have the same definition as used in the City of Huntington Beach Zoning and Subdivision Ordinance Whenever a use has not been specifically listed as in effect at the time of any individual request. being a permitted use, the Planning Director shall determine if the use is consistent with the intent of this When not inconsistent with the context,words used in y Specific Plan and compatible with other permitted the present tense include the future tense; words used uses. In addition, all projects must comply with the in the singular number include the plural number; following policies: and words of the masculine gender include the b feminine and neutral gender. The word "shall" is always mandatory and the word "may" is permissive. The word "encouraged" shall mean every effort shall be made to conform to the policy but alternatives may be acceptable. 4.2.1 Architectural Features. Architectural features include elements that compliment the building z architecture such as, but not limited to, walls, o 0 N N The Crossings at Huntington Beach Specific Plan 72 a mo August 7, 2000 architectural towers and domes (with The Crossings at Design Guidelines,or Development Regulations. Major Huntington Beach logo), spires, and arches. modifications require a Zoning Text Amendment and Architectural features may include signage as depicted action by the planning Commission and City Council. in the attached signage guidelines. 4.2.9 Private drive. A privately owned and maintained 4.2.2 Communication Antenna. All types of receiving roadway used to provide vehicle access through the and transmitting antenna,except satellite dish antenna property. and wireless communication facilities. 4.2.10 Renovation. Any request to remodel, improve, 4.2.3 Deviation$. An adjustment in one or more renovate,upgrade,or refurbish the interior or exterior Development Regulations in order to accommodate of an existing building, including minor special circumstances and/or unique architectural improvements to accommodate new tenants or an features. Deviation shall be limited to ten (10) percent upgraded look for an existing tenant. of any single development regulation. 4.2.11 Site plait. A plan prepared to scale, showing accurate 4.2.4 Drive-Through Bakery. A shop where only bread, and complete dimensions of all buildings, structures, cake,,pastries, doughnuts,and similar goods are baked landscaping, parking, drive aisles, uses, etc. and the (and/or) fried and sold on the premises and is exact manner of development proposed for a specific designed to serve patrons who remain in their cars. parcel of land. Tables and chairs may also be provided indoors or within an outdoor patio but a minimum of one drive- 4.2.12 Street. A public or approved private thoroughfare or through lane and one outdoor pick-up window for road easement which affords the principal means of vehicle service of bakery goods must be provided. access to abutting property. 4.2.5 Entryway. The point of ingress and egress from a 4.2.13 Structural alteration. Any change in, or alterations public or private street to the individual project. to, the structure of a building involving: the bearing wall, column, beam or ceiling joints, roof rafters, roof y 4.2.6 Final Approval. Ten (10) days after approval by the diaphragms, foundations, retaining walls or similar ' discretionary body and no appeal of that decision has components• o been filed. 4.2.14 Ultimate Right-of-Way. The adopted maximum 0 4.2.7 Modification (Minor). An amendment to the width for any street, alley or thoroughfare as a exhibits and/or text which does not change the established by: the general plan, a precise plan of y meaning or intent of the Specific PIan. street, alley or private street alignment, a recorded parcel map, or a standard plan of the Department of 4.2.8 Modification (Major). An amendment to the Public Works. Such thoroughfares shall include any ;X exhibits and/or text which is intended to change the adjacent public easement used as a walkway and/or c meaning or intent of either the Development Concept, utility easement. N ov O Q The Crossings at Huntington Beach Specific Plan 73 g , Co August 7, 2000 4.2.15 Use. The purpose for which land or building is 4.3.1 Permitted Uses. Permitted uses shall be required to arranged, designed, or intended, or for which it is meet all applicable provisions of the Huntington Beach occupied or maintained. Zoning and Subdivision Ordinance Code. A Iist of permitted uses is provided in Exhibit I IA. 4.2.16 Wall or Fence. Any structure or devise forming a physical barrier. This definition shall include: 4.3.2 Intensity. The maximum intensity shall be consistent concrete, concrete block, brick, stone or ' other with the City's General Plan. masonry material, metal, and wrought iron,etc. 4.3.3 Building height. The maximum allowable building 4.2.17 Zone. A district as defined in the State Conservation height shall be seventy-five (75) feet and a maximum and Planning Act, shown on the official zoning maps of 4 stories. Rooftop mechanical equipment and and to which uniform regulations apply. parapet walls may exceed the maximum permitted building height by fifteen (15) feet, however 4.2.1 S Zoning Maps.The official zoning maps of the City of mechanincal equipment shall be screened from view. Huntington Beach which are a part of the Special themed architectural structures or elements comprehensive zoning ordinance. such as towers or domes may be allowed up to one �.. hundred-twenty (120) feet. 4.3 DEVELOPMENT STANDARDS 4.3.4 Setbacks. Refer to Exhibit 12. The Development Standards shall serve as the 4.3.5 Landscaping. Landscaping shall be permanently mechanism for the implementation of the Crossings at maintained in an attractive manner in all setback and Huntington Beach land uses. The standards set forth in parking lot areas fronting on, or visible from, adjacent this section will assure that future development within public streets. The Crossings at Huntington Beach is implemented in a manner consistent with the intent of the project area 4.3.6 Signs. All signs in the project area shall conform to till Master Plan. The standards contained herein provide the provisions of the sign standards in Appendix C. flexible mechanisms to anticipate future needs and achieve compatibility between land uses and the 4.3.7 Lighting. All illumination of interior circulation surrounding community. Standards and guidelines are streets, parking areas, and project sites, shall be c designed to be compatible with the existing land use coordinated to provide consistent illumination y categories of the City. The primary land uses in the intensity. Emphasis shall be placed on areas of high b Crossings at Huntington Beach shall be regional vehicular and pedestrian activity. Light fixtures and commercial, retail,dining, and entertainment. standards shall be consistent with building a architectural style. Public streetlights shall comply with the City of Huntington Beach guidelines for street y lighting. c o IV N C O The Crossings at Huntington Beach Specific Plan 74 Q 0 � o August 7, 2000 New building construction of the following uses and fagade improvements to existing buildings shall be permitted within the Crossings at Huntington Beach Specific Plan subject to review and approval of a Site Plan Review by the PIanning Director. Other changes in occupancy, such as, like for like tenant changes, new tenants established within existing buildings, and/or intensification of tenant uses shall be subject to building permit plan check review to verify compliance with parking and the Specific Plan review. _ ... A uarium aay Care Facilities Banks and other financial institutions Government Offices * Commercial recreation and live entertainment Public Safe Facilities Food Markets (Specialty Markets-max. 10,000 s . ft.) Utilities and Communication Facilities General Retail Parking Day Spa -surface Hotels Motels -structured Movie Theaters -valet Restaurants -with outdoor dining - with alcohol sales -*with live entertainment and dancing drive-throe h bake (limited to one location) Personal Services OFFICE Business and Professional a OTHER PERMITTED RETAIL Car stereo and alarm installation,if integrated into an anchor/major retail buildin and located within a building Portable carts and kiosks c a Note.Other similar uses may be permitted subject to re view by the Planning Director. m *Requires an entertainment permit Permitted Uses Chart Exhibit 11A a 0 NN 00 ao The Crossings at Huntington Beach Specific Plan 75 % o August 7, 2000 The following temporary and seasonal events maybe permitted outdoors within the mall's interior common areas only. The following temporary and seasonal events located within the parking lot shall follow permit procedures described in the Huntington Beach Zoning and Subdivision Ordinance. Art Shows Auto shows Carnivals Circus Commercial Filming Concerts Contests Farmer's Market Fund Raisers Health Fairs Live Entertainment Miscellaneous Exhibitions Outdoor Retail Sales Pet Shows Seasonal Displays and Events Theatrical Performances Note. Other similar temporary uses may be permitted subject to review by the Flanning Director c e a Temporary and Seasonal Events Chart 9.� Exhibit 11 B o 0 NN 00 00 The Crossings at Huntington Beach Specific Plan 76 co 0 o August 7, 2000 x,p. cc > is aR Minimum Niect Area (AC) 50 Minimum Lot Size (AC) None Minimum Lot Frontage None Maximum Building Height 75 feet Maximum Number of Stories 4 stories Maximum Additional Height for parapet walls, mechanical 15 feet equipment,communication antennas etc. Maximum Architectural Feature Height 120 feet Maximum Lot Coverage 50% Maximum Floor Area Ratio 0.5 Minimum Setback Street side (Edinger Ave.,Beach Blvd. and Center Ave.) 50 feet,or 25 feet if setback is fully landscaped Interior side (West Property Line) 10 feet Minimum Landscaping 8%of total site; 10% of common area Minimum Perimeter Landscaping Street side (Edinger Ave., Beach Blvd. and Center Ave.) 10 feet Interior side (West Property Line) 5 feet Minimum Standard Parking Stall Size 9 feet x 19 feet Minimum Compact Parking Stall Size 8 feet x 18 feet Minimum Drive Aisle Width 25 feet for 90 degree stalls Minimum Parking Required Shared parking based upon joint use of parking analysis with Site Plan Review Maximum Compact Spaces 20%of total spaces Handicapped Parking Comply with Uniform Building Code and Title 24 N Parking Structure Design Comply with Zoning and Subdivision Ordinance Public Amenity Requirement Minimum of six public amenities required; At least two public art a elements and two water features within common area Wireless Communication Facilities Comply with Zoning and Subdivision Ordinance Transportation Demand Management Comply with Zoning and Subdivision Ordinance �o y * Buildings exceeding fifty (50) feet in height shall increase the set back by one (1) foot for each one (1) foot of building height above fifty (50) feet. y Development Regulations Chart y Exhibit 12 NN oa The Crossings at Huntington Beach Specific Plan 77 g 0 August 7, 2000 toward the required landscape percentage or TYPICAL PARKING LAYOUT'S minimum landscape width. • A compact parking stall size of eight (8) feet, zero M (0) inches wide by eighteen (18) feet deep may be proposed for up to a maximum of twenty (20) percent of the total proposed parking spaces. All compact parking stalls shall be concentrated St'° around the perimeter of the site and shall be prohibited within the parking structure. i►a Total parking required by the Huntington Beach Zoning and Subdivision Ordinance (see below) �• shall be installed for each project prior to final 118- 18' 5 18' 26' 18' 1$' building inspection. s'''`NDAF°"""! NG SJ "� ' ""R/ QSF%`$. 57AMM4M'AWNW SPAMParking shall be provided in accordance with an approved Shared Parking Study. A shared parking program may allow for a reduction of the code required parking by up to twenty five (25) Parking Standards & Detaff percent,based upon a shared parking analysis. It is estimated that the New Shared Parking Study will Exhibit 13 suggest a ratio of 4.5 spaces for every 1,000 square feet of development. ti 4.3.9 Parking. All developments will be required to meet Handicap accessible parking spaces shall be the minimum on-site parking standards as provided in provided as required by the Uniform Building this Specific Plan document. The following shall Code and Title 24. o apply: o • Standard parking stall size shall be nine (9) feet wide by nineteen (19) feet deep and may be y reduced to provide a landscape curb or wheel stop (in parking structure) at seventeen (17) feet with a . two (2) foot overhang to expand the landscaping. CD This additional landscape area will not be credited v iV N O ['7 O O The Crossings at Huntington Beach Specific Plan 78 Q � o August 7, 2000 4.3.9 Parking StructureS shall be designed utilizing the Drive-through aisles shall provide adequate on- massing and basic design characteristics and Italian site queuing distance to accommodate five cars Village architectural guidelines found in this Specific (15o feet) before the first stopping stop (e.g. menu Plan. The structures shall be screened from view board, ordering speaker). No portion of the using trees and landscaping. queuing aisle should serve as a parking aisle. Parking structures shall include exterior, open-air Drive-through lanes shall not exit directly to the stairwells in the design of the parking structure. site's retain entrance. Drive-through aisles shall Stairwells shall be built to allow pedestrians to be seen provide at a minimum 25-Moot interior radius for in the stairwell from outside of the structure, and any curve. allowing the same pedestrians to see out. • The main structure should be sited so as to Parking structure lighting shall be a minimum level of maximize the distance for vehicle queuing while three foot-candles; preferably metal halide. Use screening the drive-through operations. lighting in the center of the parking structure aisles that throws light to the side, thus lighting pedestrians • All building elevations shall comply with the and parked cars. Design the structures to allow as architectural guidelines as specified herein. much natural light into the structures as possible. All interior wall surfaces in the structures shall be painted Buildings shall incorporate a FuII roof with built-in white to reflect ambient light. roof top wells for mechanical equipment screening. The structures shall follow the City of Huntington Beach Police Department Crime Prevention through • A canopy shall be provided over the drive-through Environmental Design Guidelines. lane at the pick-up window. The canopy shall be architecturally compatible and fully integrated as y 4.3.1 o Drive-Through Bakery shall comply with the part of the building design. y following Design and Development Standards: - • No individual freestanding or pole signs shall be o • The building shall be the predominant visual permitted for drive-though uses. element along street frontages, not parking lots or drive-through lanes. • A maximum of one drive-through bakery shall be permitted on the 63 acre site. • Drive-through aisles shall be screened from streets c and from adjacent parking areas. O 4 40 1V N The Crossings at Huntington Beach Specific Plan 79 � 0 cc G August 7, 2000 Intensit A.RI y (F. .) Building Height Architectural Feature Height Parapet, Mechanical f�jui ment Height Lot Coverage Setback Front Interior Side Exterior Side Landscape Percentage Perimeter Landscape Front Interior Side Exterior Side Parking Spaces y Parking Structure Design Public Amenities c Public Art Elements Water Features a Development Regulations Check List Exhibit 1.4 o a wN � a The Crossings at Huntington Beach Specific Plan $� o i August 7, 2000 Res. No.2000-80 This Resolution Supersedes Res. No. 2000-68 a �... Fees. No.2000-80 This Resolution Supersedes Res.No. 2000-68 A. Legal Description, The following provides the legal description for the entire Crossings at Huntington Beach Specific Plan Area,which is bounded by Center Avenue on the north,Pacific Railroad on the east,Edinger Avenue on the south and Beach Boulevard on the west. Refer to Exhibit 1 in the Specific Plan. Perimeter Legal Description Parcels I through 3,5 though 9 and that portion of Parcel 4,Parcel Map No.-S6-200, in the City of Huntington Beach,County of Orange,State of California as per map riled in book 27.5 pages 40 through 45,inclusive,of parcel snaps,in the office of the county recorder of said county,described as follows: Commencing at the intersection of the centerline of the Southern Pacific Railroad Right of Way(30 feet wide)with the centerline of Edinger Avenue(variable width),as said intersection is shown on said Parcel Map No.86-200;thence South 89 52112"East 45.00 feet along the centerline of said Edinger Avenue to the southerly prolongation of the westerly line of parcel I of said parcel map;thence North 00 15'57"East 50.00 feet to the southwest corner of said parcel 1 also biing the True Paint of BcginnirW.them North 00 I3'57"Fast 1120.67 feet along the westerly line of said parcel 1 to the northwest corner of said parcel 1;thence South 89 32'12"East 1803.57 feetalorls the northerly line of said parcel 1 and the northerly line of parcels 2,3 and 4 of said pareeI map to the northeasterly line of said parcel 4;thence along a hart-tangent curve in the northeasterly Tine of said parcel 4,concave southwesterly and having a radius of 504.00 feet,a radial line to said pointbcars North 43 06;3r East;thence southeasterly along said curve through a central angle of 1211'461 an arc distance of 107.28 fee% thence along the northeasterly line of said parcel 4 the following 5 courses:South 34 41'37a East 207.33,South 31 44'17" Fast 229.95 feat to the beginning of anon- tangent curve,concave northeasterly and having a radius of 300.00 feet,a radial line to said point bears South 75 10153"West;thence along said curve through a central angel of 50 58139"an arc distance of 266.92 feet,South 65 47'461 East 233.09 feet and South 351 FOG"East 70.61 feet;thence South 00 16'50"West 273.62 Feet along a line that is parallel with the easterly line of said parcel 4 and 9.00 feet v stcrly;th=ce South 42 16"20"West 41.42 feet along a line that that is parallel with the mutheastcrly line of said parcel 4 and 6.00 feet northwesterly to a point in the north line of pa cel 1 of an easement to the city of Hun}.ugtoa Beach recorded Novennber 9, 1972 in book 10418,page 968 official records in the office of the county recorded November 9, 1972 in book 10418,page 968 official records in the cifice of the coralty recorder of said county,thence North 89 32'12"West 583.76 feet'slong said north line to the southeasterly corner of parcel 2 of said easement;thenoe North 44"3Z'I2"West 41.01 feet along the riortheas;erly Bale of said parcel 2 to the north west corner of said Parcel 2;thence North 89 32'1 Z"Wv5t 32.50 feet along the north line of said parcel 2 to the northv;en corner of said parcel 2;thence South 00 2V48"West 37.00 fee:along the west line of said parcel 2 and said parcel I to the southerly line of parcel 4 of said Parcel map;thence North 89 321I2"West 197 4.15 feet along the southerly lines of parcels 1,2,3 and 4 of said parcel map to True Point of Beginning. Note: This description was prepared as a canvcnietice only and is not for us in the division and/or conveyance of land in violation of the subdivision map art of the State of California — - Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 Res.No.2000-80 This Resolution Supersedes Res, No. 2000-68 B. General Plan Consistency Analysis California State law requires that all cities and counties have a Iong-range general plan for their physical development. Once a local government has adopted its General Plan, it must be implemented, and local governments have a range of implementation tools from which to select.Most mechanisms for implementing a City's general plan derive from local government's corporate and police powers, such as: construction of streets, acquisition and development of parks, zoning, subdivision regulations, school dedication requirements, code enforcement, environmental and design review procedures and redevelopment. A specific plan is an effective implementation tool that is often used to address a single project or a master planned project such as the Crossings at Huntington Beach. The Specific Plan provides a bridge between the broad General Plan policies and individual project submittals (site plans, subdivision proposals, etc.) in a more area-specific manner than is possible with community wide zoning ordinances. As a result, a specific plan's emphasis focuses on establishing guidelines and concrete development standards to supplement those of the general plan. Specific plans must be consistent with all facets of the general plan, including the policy statements contained within the general plan document. In tarn, zoning, subdivisions, and public works projects must be consistent with the Specific PIan. The Crossings at Huntington Beach Specific Plan contains detailed regulations,guidelines and implementation measures that will serve as a guide, providing consistency with the City's General Plan and standards and guidelines by which future development will be approved. This section explains how the Crossings at Huntington Beach Specific Plan achieves consistency with the City of Huntington Beach General Plan. The four (4) points listed below provide the basis for the consistency analysis contained in this section. 1. California Government Code Section 65450-65553 permits adoption and administration of Specific Plans as an implementing tool for the General Plan. 2. The current General Plan designation for the site is "Commercial Regional' with a Floor Area Ratio (F.A.R.) of 0.5, a specific plan overlay, and a mixed-use overlay. The mixed-use overlay would allow 0.5 commercial FAR and 25/units/acre. The site is currently zoned "CG" General Commercial with a 1.5 PAR. The more restrictive 0.5 General Plan FAR takes precedence. The adoption of the Specific Plan will supersede the existing zoning and adopt a new set of zoning regulations. Adoption of the Specific Plan is consistent with the General Plan;therefore,a General Plan amendment is not required. 3. The Specific Plan must be consistent with the General Plan and serve to implement all aspects of the General Plan as it applies to the designated area. 4. The City of Huntington Beach's General Plan Update, adopted in 1995, is comprised of 16 separate elements: 1) land use, 2) urban design, 3) housing, 4) historic and cultural resources, 5) economic development, 6) growth management, 7) circulation, 8) public facilities and public services, 9) recreation and community services, 10) utilities, 11) environmental resources/ conservation, 12) air quality, 13) environmental hazards, 14) noise, 15) coastal and 16) hazardous materials. The following provides a brief discussion of these August 7,2000 1 Res. No.2000 80 This Resolution Supersedes Res.No. 2000-68 Elements, which are applicable to the project including a listing of applicable goals and policies. Although the General Plan identifies objectives within each element, the policies actually implement the objectives and therefore provide more specific criteria of how the identified goals will be achieved. The discussion below indicates how the Specific Plan project meets the applicable policies. 1. LAND USE ELEMENT The Land Use Element (LUE) for the City of Huntington Beach General Plan provides for the types, density/intensity, design, and distribution of commercial, residential, industrial, and agricultural land uses as well as public and private open space. The LUE includes goals designed to serve as a general guide for the future development of Huntington Beach in terms of location of uses,allowable residential densities,and other criteria. The LUE designates the 63-acre Crossings at Huntington Beach project site as Commercial Regional (CR) with a maximum building height of four (4) stories. Typical permitted uses of the Commercial Regional designation are anchor department stores, outlet stores, promotional ("big box") retail, retail commercial, restaurants, entertainment, professional offices, financial institutions, automobile sales facilities, and similar region-serving uses. The site is also designated as sub-area 5A in the General Plan with specific design and development standards for the mall property. The primary goal of the Land Use Element is to provide guidance regarding the manner in which lands are to be used in the City of Huntington Beach.Applicable goals include: 0 Achieve development that maintains or improves the City's fiscal viability and reflects economical demands while maintaining and improving the quality of Iife for the current and future residents of Huntington Beach. • Ensure that development is adequately served by transportation infrastructure, utility infrastructure,and public services. • Achieve and maintain a high quality of architecture, landscape, and public open spaces in the City. • Ensure that significant environmental habitats and resources are maintained. • Achieve a diversity of land uses that sustain the City's economic viability, while maintaining the City's environmental resources and scale and character. • Achieve a pattern of land uses that preserves, enhances, and establishes a distinctive identity for the City's neighborhoods, corridors, and centers. W Achieve the development of a range of commercial uses. • Achieve new development that enhances the City's quality of development and sense of place,goals for community character,and preserves significant historical resources. The following applicable Land Use Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. August 7,2000 2 Res. No.2000-80 This Resolution Supersedes Res,No. 2000-68 Correlation of Land Use Development with Market Demands Policies LU 1.1.1 Establish incentives for the development of uses to support the needs and reflect the economic demands of City residents and visitors. The majority of the Specific Plan area will be developed in a single phase as outlined rn Section Z.1 of the document. However, individual building pads may be developed in later phases along with expansions to the initial phase of construction. This approach will ensure that future economic development opportumbes will be implemented dependent upon market conditions Additionally, the Speck Plan allows for flexibility in the Specific Plan Development Regulations This flexibility in development standards is intended to accommodate future market trends and tenant needs, without sacrificing the intended high- quality character of the project area. During the formulation of the Specific Plan, staff identified uses to be permitted and prohibited within the document. "Future permitted uses"ha ve the incenti ve of a fast track"entitlement process since their approval shall be determined via the Planning Director vs. the Planning Commission or City Council LU 1.1.2 Promote development in accordance with the Economic Development EIement. The Speck Plan will encourage future development by promoting a comprehensive planned commercial project and allowing for future "fast-track" entitlement: This Specific Plan will promote development in accordance with the Economic Development Element. Additionally, the landowner is promoting development through its internal marketing strategies and real estate brokers. Correlation of Land Use Develo meat with ftportinS Public Infrastructure and Services Policies LU 2.1.1 Plan and construct public infrastructure and service improvements as demand necessitates to support the Iand uses specified in the Land Use Plan (as defined in the Circulation and Public Utilities and Services Elements of the General Plan). The Specific Plan area will be developed in a manner that would allow for private development to occur in a timely manner with an overall Master Plan concept. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project A Circulation Plan, and Public Facilities Plan for water, waste water and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Sections 3.3 and 3.4 of the Specific Plan). These plans will be approved by,the City, and the landowner will be constructing public infrastructure as required by the City m order to support the land uses proposed by the Specific Plan. August 7,2000 3 Res. No.2000-60 This Resolution Supersedes Res.No. 2000-68 -Additionally, once a definitive site plan and development project is proposed, an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an en wr7onmental impact report was cerh ed with respect to that general plan, the application of this division (CEQAJ to the approval of that development project shall be limited to effects on the environment which ar9e peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than desenbed in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Speck Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Speck Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. LU 2.1.2 Require that the type, amount,and location of development be correlated with the provision of adequate supporting infrastructure and services (as defined in the Circulation and Public Utilities and Service Elements). Development will be correlated with infrastructure needs Section 3.0 of the Specific Plan presents several conceptual development plans and discusses the circulation, public facilities and infrastructure improvements which will support the Land Use Plan and reinforce the design concept.Implementation of the proposed project will occur in a single phase, and it will be consistent with the intent of the Master Plan Concept. LU 2.1.3 Limit the type, location, and/or timing of development where there is inadequate public infrastructure and/or services to support land use development. Development will be correlated with infrastructure needs Section 3.0 of the Specific Plan presents several conceptual development plans and discusses the circulation, public facilities and infrastructure improvements which will support the Land Use Plan and reinforce the design concept.Implementation of the proposed project will occur in a single phase,and it will be consistent with the intent of the Master Plan Concept. Quality of the CiWs Built Environment Policies LU4.1.1 Require adherence to or consideration of the policies prescribed for Design and Development in this,Plan,as appropriate. Design Guidelines and Development Regulations are included as Sections 3.5 and 4.0 of the Specific Plan. Section 3.5 establishes a comprehensive set of design guidelines for the entire project area and for individual project development, while Section 4.0 presents a detailed description of the development regulations and standards which are necessary to guide and can trol new development and carry out the goals and policies of the Specific Plan and the CiVs General Plan. August 7,2000 4 Res.No.2000.80 This Resolution Supersedes Res.No.2000-68 LU 4.1.2 t Require that an appropriate landscape plan be submitted and implemented for development projects subject to discretionary review. Landscape standards which require development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Specif c Plan. Tlie landscape standards will apply to all development within the Specific Plan. LU 4.1.3 Require property owners to maintain landscaping, remove and abate weeds, and replace unhealthy or dead landscape. Landscape standards which requiry development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Speck Plan. The landscape standards will apply to all development within the Specific Plan. LU 4.1.4 Encourage developers to incorporate mature and specimen trees and other significant vegetation, as defined by the City, that may exist on a site into the design of a development project for that site. Landscape standards which require development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3 5 5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan. Me Landscape Plan also requires incorporation of mature and specimen trees that may exist on a site into the design. LU 4.1.5' Consider creating incentives for the use of drought-tolerant species in landscape design. Landscape standards which require development proposals to submit and ,implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan. Policies for the use of drought-tolerant species in landscape design is also addressed.in Section 3.0 of the Specific Plan and will be reviewed with the plans for development of in&vidual parcels LU 4.1.6 Require that commercial and industrial development incorporate adequate drought-conscious irrigation systems and maintain the health of the landscape. Landscape standards which require development proposals to implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Specific Plan. ne landscape standards well apply to all development within the Specific Plan. August 7,2000 5 Res.No.200MO This Resolution Supersedes Res. No.2000-68 The incorporation of adequate drought-conscious irrigation systems and maintenance of the health of the landscape is also addressed in Section 3.5.5 of the Specific Plan and will be reviewed With the plans for development ofin&wdual parcels. LU 4.1.7 Require that all commercial and industrial landscape be adequately irrigated with automatic irrigation systems. Landscape standards which require development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Spec Plan. The landscape standards will apply to all development within the Specific Plan. The incorporair"on of automatic irrigation systems is also addressed in Section 3.5.5 of the Specific Plan and will be reviewed with the plans for development ofindividual parcels LU 4.1.8 Use reclaimed water for the irrigation of public and private landscape,as feasible. The City does not currently have a reclaimed water supply system available. As indicated rn Section 3..a.5 of the Specific Plan, reclaimed water shall be utilized where and whenever feasible and shall comply with the City's "Water Efficient Landscape Requirements" (Or&nanc e#1492). Usage will be addressed with future individual requests for development if such a s)stem is a vailable at that time. LU 4.2.1 Require that all structures be constructed in accordance with the requirements of the City's building and other pertinent codes and regulations; including new, adaptively re-used, and renovated buildings. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Suh vlsron Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specifc Plan provides specific development reegulatians and standards that will be applied to the .Land Use Plain of this Specific Plan. All development regulations and building specifications related to new, adaptively reused, and renovated buildings not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time of any individual request. Additicnalh; once a site plan is proposed for development, an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), `?f a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division fCEQAI to the approval of that development project shall be limited to effects on the en vironment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or i;hich substantial new information shows will be more sigcant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 August 7,20N 6 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 and the.fact that the Speck Plan project falls within the development envelope analyzed in the General Plan EIR the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. LU 4.2.4 Require that all development be designed to provide adequate space for access, parldng, supporting functions,open space,and other pertinent elements. Section 3.9 Design Guidelines and Section 4.0 Development Regulations of the Specific Plan include requirements far parking,access requirements,supporting functions,open space,etc. LU 4.2.5 Require that all commercial, industrial, and public development incorporate appropriate design elements to facilitate access and use as required by State and Federal Laws such as the Americans with Disabilities Act. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Speck Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Qr&nance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specu c Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Fkn shall be subject to the City's adopted regulations m place at the time of any individual request. Appropriate design elements to facilitate access and use shall be incorporated in accordance with State and Federal Laws (refer to Section 3.S Design Guidelines of the Specific Plan). LU 4.2.6 Monitor the conditions of buildings in the City and enforce pertinent building, municipal and zoning codes to ensure their maintenance and quality. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the'Land Use Plan of this Specific Plan. All development regulations and building speccations not addressed in the Specific Plan shall be subject to the City's adopted rzegulatlons in place at the time of any individual request. Types and Densities of Lard Use to be Permitted Policies LU 7.1.1 Accommodate existing uses and new development in accordance with the Land Use and Density Schedules (Table LU-2 - see below). August 7,2000 7 Res.No.22000-80 This Resolution Supersedes Res.No. 2000-68 Table LU-2 Land Use Density and Intensify Schedule Land Use Cate o 'cal Permitted Uses COMMERCIAL. Anchor department stores,outlet stores,promotional ("big box") REGIONAL, retail,retail commercial,restaurants,entertainment,professional offices, financial institutions, automobile sales facilities, and similar region-se uses. The Specific Plan area will accommodate the development of a balance of land uses that maintains the City's fiscal viability and integrity of environmental resources The proposed permitted land uses arse consistent with the City's General Plan for the site. Individual building pads may be developed in later phases along with expansions to the initial phase of construction. This approach twU ensure that future economic development opportunities will be implemented dependent upon market conditions Additionally, the Specific Plan allows for tlembihty in the Specific Plan Development Regulations. This flexibility in development standards is intended to accommodate future market trends and tenant needs, without sacriricing the intended high-quality character of the project area. LU 7.1.6 Accommodate the development of additional jobs-generating land uses that improve the 1992 jobs to housing ratio of 0.82 to 1.0 or greater; to meet objectives of the Regional Comprehensive PIan (Southern California Association of Governments) and Air Quality Management Plan. These should capitalize upon existing industrial strengths and emphasizing the clustering of similar or complementary industries. The Specific Plan permits and encourages jabs generating land uses that will assist in improving the 1992 jobs to housing ratio. Additionally, during the formulation of the Specific Plan, staff identified uses to be permitted and prohibited within the document. `Future permitted uses"have the incentive of a "fast track"entitlement process since their approval shall be determined by the Planning Director vs the Planning Commission or City Council. Distribution and Pattern of Development Policies LU 8.1.1 Accommodate land use development in accordance with the patterns and distribution of use and density depicted on the Land Use Plan Map, and in accordance with the principles discussed below. a. Enhance a network of interrelated activity centers and corridors by their distinct functional role, activity, and/or form and scale of development. b. Increase diversification of community and local commercial nodes to serve adjacent residential neighborhoods. C. Intermix uses and densities in large-scale development projects. August 7,2000 S Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 d. Site development to capitalize upon potential long-term transit improvements. e. Establish linkages among community areas, which may include pedestrian and vehicular paths, landscape, signage, other streetscape elements, open space, transitions in forms, scale,and density of development,and other elements. The Specific Plan area will accommodate the development of a balance of land uses consistent with the patterns and distribution of use and intensity depicted on the Land Use Plan Map, specifically,regional commercial uses. Commercial Regional Permitted Uses Policies LU 10.1.14 Encourage the incorporation of community-oriented facilities in regional commercial developments, such as telecommunications centers, public meeting rooms, daycare facilities, and cultural uses. The Crossings at Huntington Beach Specific Plan development concept outlined art Section 3.0 of the Specific Plan provides for a planned Commercial Regional complex in the City of Huntington Beach allowing for a variety of uses, consistent with the goals and policies of the Huntington Beach General Plan. During the formulation of the Specific Plan, staff also identified uses to be permitted and prohibited within the document. Future permitted uses include telecommunication centers, public meeting rooms, daycare facilities, and cultural uses. Design and Development LU 10.1.15 Require that regional commercial developments be designed to convey the visual sense of an integrated center by consideration of the following principles: use of multiple building volumes and masses and highly articulated facades to reduce the visual sense of large scale "boxes"; use of roofline or height variations to visually differentiate the building massing and incorporation of recesses and setbacks on any elevation above the second floor above grade; • siting of a portion of the buildings in proximity to their primary street frontage to convey a visual relationship to the street and sidewalks; • design of the exterior periphery of the structures to contain shops, restaurants, display windows,and other elements that provide visual interest to parking areas and the street elevation; inclusion of a "public square" as a gathering place of public activity in multi-tenant regional centers; • clear identification of building entrances; • use of landscape that provides a three-dimensional character; August 7,2000 9 Res. No.2000-80 This Resolution Supersedes Res.No.2000--68 • encourage the provision of public art; • inclusion of consistent and well-designed signage integrated with the building's architectural character, including pedestrian-oriented signage;and design of parking structures to be visually integrated with the commercial buildings. Section 3.5 Design Guidelines and Section 4.0 Development Regulations of the Specific Plan address these issues The Crossings at Huntington Beach Specific Plan provides the framework andguidelrnes necessary to create a unique high quality regional commercial development. Development Policy: Cornmunii Subareas LU16.1.1 Accommodate development of the City's neighborhoods,boulevards,and districts according to the Community Districts and Subareas Schedule (Table LU-4). Table LU-4 Community District and Subarea Schedule Subarea Characteristic Standards and Principles 5A Permitted Uses Category: Commercial Regional (CR) - Region-serving Huntington commercial uses permitted by the "CR"land use category and Centermixed-use structures vertically-integrating housing with commercial uses permitted by the "-mu" overlay. Density/ Category: "172"—Maximum FAR of 0.5 Intensity • Height: four (4) stories Design and Category: Mixed Use (-mu);Specific Plan (-sp) Development . Require the preparation of an development in conformance with a specific or master plan • Design and site development as a cohesive and integrated center and a stipulated by Policy LU 10.1.1 6. Locate buildings around common courtyards and pedestrian areas. • Locate a portion of development along the Beach Boulevard frontage. Improve the signage and sense of entry from the Interstate 405 Freeway,Beach Boulevard,and other major access points. • Implement extensive streetscape improvements along the Beach Boulevard and Edinger street frontages. • Promote the economic enhancement and revitalization of the Center. The Crossings at Huntington Beach Specific Plan development concept outlined in Section 3.0 of the Specific Plan provides for a planned Commercial Regional complex m the City of Huntington Beach allowing for a variety of uses, consistent with the goals and policies of the Huntington Beach General Plan. August 7,2000 10 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 Section 3.5 Design Guidelines and Section 4.0 Development Regulations of the Specific Plan address design and development issues. The Crossings at Huntington Beach Specific Plan provides the framework and guidelines necessary to create a unique high quality regional commercial development. 2. URBAN DESIGN ELEMENT The Urban Design Element focuses on the quality of the City's physical and visual character, which is determined by the organization, scale, density and pattern of the community's built environment and open spaces. The primary goal of the Urban Design Element is to establish and strengthen community identity.An applicable goal includes: • Enhance the visual image of the City of Huntington Beach The following applicable Urban Design EIement policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Nodes Policies UD 1.2.1 Require public improvements to enhance the existing setting for all key nodes and pedestrian areas through the consideration of the following: a. provide pedestrian connections and visual continuity between the node and surrounding neighborhoods; b. incorporate shade trees to shelter pedestrians; C. incorporate the use of enhanced paving materials at the pedestrian crosswalks; d. widen the sidewalks at intersections where feasible to minimize the length of pedestrian crossings;and e. enhance the connections where feasible between the public sidewalk and private commercial interior open spaces/courtyards as described in the Land Use EIement by using: • decorative paving materials; • landscape materials;and • street furniture. Landscape standards which requh e development proposals to implement a landscape plan consistent with the overall Specific Plan standards arse included as Section 3.5.5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan. Section 3.5 Design Guidelines and Section 4.0 Development Regulations of the Specific Plan address design and development issues The Crossings at Huntington Beach Specific Plan proMes the framework and guidelines necessary to create a unique high quality regional commercial development. August 7,2000 11 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 LTD 1.2.2 Require that the nodes incorporate the public improvements specified in UD 1.2.1 and other elements that may be listed in the table,as feasible. Landscape standards which require development proposals to implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan Corridor Identity Policies LTD 1.3.1 Require a consistent design theme and/or landscape design character along the community's corridors, reflecting the unique qualities of each district. Ensure that streetscape standards for the major commercial corridors, the residential corridors, and primary and secondary image corridors provide each corridor with its own identity while promoting visual continuity throughout the City. landscape standards which require development proposals to implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5 5 of the Specific Plan. 77ie landscape standards will apply to all development within the Speck Plan. LTD 1.3.2 Provide for the implementation of streetscape and landscape improvements along the major commercial corridors, through public capital improvement programs, business distinct improvements,or other techniques as funding is available. a. Develop or enhance the pedestrian environment in those parts of the corridors where there is existing or the potential for pedestrian activity,this includes the use of: • sidewalk furniture; • shade trees; - • shade structures • special paving;and • pedestrian walkway linkages. b. Consider using special corridor oriented public signage, public art, or median monuments at prominent intersections. C. Discourage the excessive use of temporary signage including bunting and commercial banners. Section 3.5 Design Guidelines,Section 4.D Development Regulations,and Section 3.5.G Signage Guidelines of the Specific Plan address design and development issues. ne Crossings at Huntington Beach Specific Plan provides the framework and guidelines necessary to create a unique high quality regional commercial development. August 7,2000 I2 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 3. HOUSING ELEMENT The Housing Element, adopted in February 1999, is intended to direct residential development and preservation in a way that coincides with the overall economic and social values of the community. The Housing Element is an official municipal response to a growing awareness of the need to provide housing for all economic segments of the community, as well as legal requirements that housing policy be made a part of the planning process. As such, the Element establishes policies that will guide City officials in daily decision making and sets forth an action program designed to enable the City to realize its housing goals.The City of Huntington Beach has adopted three goals for its housing program which are consistent with State and Regional housing policies.'These goals are: • The attainment of decent housing within a satisfying living environment for households of all socioeconomic,racial and ethnic.groups in Huntington Beach. • The provision of a variety of housing opportunities by type, tenure, and cost for households of all sizes throughout the City. • The development of a balanced residential environment with access to employment opportunities,community facilities,and adequate services. These goals relate to issues, which are not directly applicable to the Crossings at Huntington Beach Specific Plan, since the Specific Plan is not designated for residential uses Me Housing Element objectives and policies are also not applicable. 4. HISTORIC AND CULTURAL RESOURCES ELEMENT The overall intent of the City of Huntington Beach Historical and Cultural Element is to identify the historical resources of the community, their current designations and community status, and the issues affecting their future. Goals include: To promote the preservation and restoration of the sites, structures and districts which have architectural, historical, and/or archaeological significance to the City of Huntington Beach. • Develop avenues for communication and participation in arts and cultural activities and programming to bring together diverse segments of the community. • Highlight the City's unique cultural heritage and enhance its visual appeal. + Expand opportunities for the City's children to receive quality experiences of arts and culture. • Establish a wide range of arts and cultural programs and facilities that address the needs and interest of residents,workers,and visitors. These goals relate to issues, which are not directly applicable to the Crossings at Huntington Beach Specific Plan, since the Speck Plan area does not contain any significant historic and cultural resources The Historic and Cultural Resources Element objectives and policies are also not applicable. August 7,2000 13 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 5. ECONOMIC DEVELOPMENT ELEMENT The Economic Development Element is specifically concerned with the identification of a strategy to address development potentials that will broaden and stabilize the City's economic base. Its goals and policies are formulated to provide new policy direction for the City and the planning area. The primary goal of the Economic Development Element is to provide for the economic opportunities of City's residents; business retention and expansion; and land use plan implementation.Applicable goals include: s Provide economic opportunities for present and future Huntington Beach residents and businesses through employment and local fiscal stability. • Aggressively retain and enhance the existing commercial, industrial and visitor serving uses while attracting new uses to Huntington Beach. • Enhance Huntington Beach's economic development potential through strategic land use planning and sound urban design practices. The following applicable Economic Development Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Economic Growth Policies ED 1.1.1 Maintain and expand economic and business development programs that encourage and stimulate business opportunities within the City. The Specific Plan will stimulate business opportunities within the City by allowing for and encouraging Regional Commercial development under an expedited entitlement process Additionally, the Specific Plan provides for a range of employment opportunities in the professional retail and service fields;thus stimulating business opportunities and strengthening the employee base of the community. Refer to Section 4.0 Development Standards for a list of permitted uses. Commercial Use Policies ED 2.4.1 Encourage and assist existing and potential commercial owners to update, modernize, and expand their commercial properties. ne Specific Plan will encourage fixture commercial development by promoting a comprehensive planned retail center and allowing for future "fast-track" entitlement. This Specific Plan will promote development in accordance with the Economic Development Element. Additionally, the landowner is promoting development through its internal marketing strategies and meal estate brokers. August 7,2000 14 Res. No.2000-80 This Resolution Supersedes Res. No. 2000-68 ED 2.4.2 Seek to capture "new growth"businesses such as,but not limited to: • telecommuting; "shop for value"or "big box"stores; entertainment-commercial developments; • knowledge-based retail and entertainment-information retail uses;and • high sales tax producing businesses. The Crossvgs at Huntington Beach Specific Plan seeks to capture `newgrowth"businesses by allowing for and encouraging Regional Commercial development under an expedited entitlement process. Additionally, the Specific Plan pmvides for a range of employment opportunities in the professional retail and service Fields;thus stimulafing business opportumfes and strengthening the employee base of the community. Refer to Section 4.D Development Standards fora list of permitted uses ED 2.4.3 Encourage the expansion of the range of goods and services provided in Huntington Beach to accommodate the needs of all residents in Huntington Beach and the market area. The Crossings at Huntington Beach Specific Plan encourages the expansion of the range of goods and services provided in Huntington Beach by allowing for and encouraging Regional Commercial development under an expedited entitlement process Additionally, the Specific Plan provides for a range of employment opportunities in the professional retail and service fields;thus stimulating business opportunities and strengthening the employee base of the community. Refer to Section 3.Q Development Standards for a list of permitted uses ED 3.1.4 Encourage the development of a "big box," "shop for value" businesses, especially along Edinger Avenue. The Crossings at Huntington Beach Specific Plan encourages the expansion of the range of goods and services provided in Huntington Beach by allowing for and encouraging Regional Commercial development consistent with the Specific Plan under an expedited entitlement process. 6. GROWTH MANAGEMENT ELEMENT The Growth Management Element, adopted in April 1992, is a pre-requisite to establish and continue eligibility to receive monies generated by the sales tax which was approved by Orange County voters in November 1990 as Measure M (Revised Traffic Improvement and Growth Management Ordinance).The purpose and intent of the Growth Management Element is to establish goals, policies and programs that will promote growth and development based upon the City's ability to provide an adequate circulation system and public facilities and services. August 7,2000 15 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 The applicable goals of the Growth Management Element are to: • Reduce traffic congestion. Ensure that adequate transportation and public facilities and public services are provided for existing and future residents of the City. The following applicable Growth Management Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Land Use Ph cies 5.8.1 Promote balanced growth of residential and non-residential land uses and supporting public facilities and services. The Specific Plan prepared for this project area promotes the development of a comprehensive planned regional commercial area, consistent with the CiVs land use designation. 7. CIRCULATION ELEMEW The purpose of the Circulation Element is to evaluate the transportation needs of the City and present a comprehensive transportation plan to accommodate those needs. The Circulation Element focuses on the City's arterial streets and highways; public transportation modes and services;water transportation;and air transportation. The primary goal of the Circulation Element is to provide a multi-mode transportation system that ensures the safe and efficient movement of people and goods.Applicable goals include: + Provide a balanced transportation system that supports the policies of the General Plan and facilitates the safe and efficient movement of people and goods throughout the City while minimizing environmental impacts. * Provide a circulation system which supports existing, approved and planned land uses throughout the City while maintaining a desired level of service on all streets and at all intersections. • Develop a balanced and integrated multi-modal transportation system. • Encourage and develop a transportation demand management (TDM) system to assist in mitigating traffic impacts and in maintaining a desired level of service on the circulation system. + Provide sufficient, well designed and convenient on and off street parking facilities throughout the City. The following applicable Circulation Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. August 7,2000 16 Res. No.2000-80 This Resolution Supersedes Res. No. 2000-68 Streets and Highway Palicies CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for intersections during the peak hours. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities to serve the proposed project A Circulation Plan (refer to Section 3.3 of the Specific Plan) for the project will be prepared consistent with the City of Huntington Beach's Circulation Element. Ms plan will be approved by the City and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. Additionally,once a definitive site plan and developmentproject is proposed, an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQAJ to the approval of that development project shall be limited to effects on the en vironment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan Ell, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. CE 2.1.2' Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for daily traffic with the exception of Pacific Coast Highway south of Brookhurst Street. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities to serve the proposed project. A Circulation Flan (refer to Section 3.3 of the Specific Plan) for the project will be prepared consistent with the City of Huntington Beach's Circulation Element. This plan will be approved by the City and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specif c Plan. Additionally, once a definitive site plan and de veloprnent project is proposed,an En vironmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agencv and an environmental impact report was certified with respect to that general plan, the application of this division /CEQA] to the approval of that development project shall be linuted to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report" Based upon Public August 7,2000 17 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 Resource Code Section 21083.3 and the fact that the Specific Flan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an en vironmental assessment until a site plan is submitted for approval by the City.. Public Transportation Policies CE 3.1.1 Encourage and support the various public transit agencies and companies, ride sharing programs,and other incentive programs, that allow residents to utilize forms of transportation other than the private automobile. The project Crreula on Plan identifies bus stop locations along the project frontage on Mriger Avenue and on Center Avenue. The Circulation Plan (Section 3.3) describes the various public transportation alternatives proposed In addition, the Specific Plan re iterates any future project's obligation to comply with the City's adopted Transportation Demand Management ordinance. CE 3.2.1 Require developers to include transit facilities, such as park-and ride sites, bus benches, shelters, pads or turn-outs in their development plans, where feasible as specified in the City's TDM Ordinance. The City of Huntington Beach has adopted a TDM ordinance.As discussed in Section 1.6 of the Specific Plan, the development within this Specific Plan project will comply with City requirements and bus pads and turnouts must be provided at the site. Transportation Demand Management/Transportation Systems Management Policies 4.1.1 Encourage non-residential development to provide employee incentives for utilizing alternatives to the conventional automobile (i.e., carpools, vanpools, buses, bicycles and walking. The Specific Plan indicates that alternative forms of transportation should also receive careeful consideration. The future development within the Specific Plan will be required to address this issue. In addition, the Specific Plan re-iterates any future prqject's obligation to comply with the City's adopted Transportation Demand Management ordinance. CE 4.1.5 Promote ride sharing through publicity and provision of information to the public. The Specific Plan indicates that alternative forms of transportation should also receive careful consideration. The future development within the Specific Plan will be required to address this issue. In addition, the Specific Plan re-iterates any future project-s obligation to comply with the City's adopted Transportation Demand Management ordinance. August 7,2000 18 Res. No.2000-a0 This Resolution Supersedes Res.No.2000-68 CE 4.1.6 Encourage that proposals for major new non-residential developments include submission of a TDM plan to the City. The City of Huntington Beach has adopted a TDM ordinance. As discussed in Section 1.6 of the Specific Plan, the development within this Snwi6c Plan project will comply with City requirements and bus pads and turn outs must be provided at the site. Parlor Facilities Pblicies CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand and allows for the expected increase in private transportation use. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate supply of parlctrrg that supports the present level of demand and allows for the expected increase in use to serve the proposed project. Section 4.3 Development Standards of the Specific Plan states that parking shall be provided Lased on the results of a shared parking analysis to be approved by the Directors ofPtiblic Works and Planning. Additionally, once a definitive site plan and development projectis proposed,an Enwronmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose nutigation measures, as necessary. Accor&-ng to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental Impact report was certified with respect to that general plan, the application of this division [CEQAJ to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is cur -ently exempt from preparation of an en v vnmental assessment until a site plan is submitted for approval by the City. CE 5.1.2 Provide safe and convenient parking that has minimal impacts of the natural environment, the community image,or quality of life. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate supply of parking that supports the present level of demand and allows for the expected increase in use to serve the proposed project. Section 4.3 Development Standards of the Spechic Plan states that parking shall be provided based on the results of a sham parking analysis to be approved by the Directors of Public Works and Planning. Additionally, once a definitive site plan and development project is proposed,an En vironmenrtal Assessment will be performed, which un71 analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project August 7,2000 19 Res. No.2000-80 This Resolution Supersedes Res. No. 2000-68 is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division ICEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more sign d cant than described in the prior en vironmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plant EIF, the Crossings at Huntington Beach Spec Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. Scenic Highways Policies CE 7.1.1 Require the roadways, as shown in Figure CE-12, to be improved and maintained as local scenic highways, major urban scenic highways, minor urban scenic highways, and landscape corridors with key entry points. Section 3.3 Circulation Plan identifies the roadways to be improved and maintained. Landscape standards which require development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan. CE 7.1.4 Establish landscape and urban streetscape design themes for landscape corridors, minor scenic ` urban corridors, and major urban scenic corridors which create a different character enhancing the corridor's surrounding land uses. For example, the design theme for corridors adjacent to residential neighborhoods should be different than the design theme for industrial or commercial uses. The Landscape Plan for the Crossings at Huntington Beach (Section 3.5:5 of the Specific Plan) has been prepared to establish the design character and visual qualities of the interior and perimeter of the project area. CE 7.3.1 Require that new development include landscaping that is compatible with the visual character of the designated scenic highways and corridors. Landscape standards which require development proposals to submit and implement a landscape plan consistent with the overall Specific Plan standards are included as Section 3.5.5 ` of the Specific Plan. The landscape standards will apply to all development within the Specific Plan. 8. PUBLIC FACII.MES AND PUBLIC SERVICES ELEMENT The Public Facilities and Public Services Element discusses public facility service provision for Huntington Beach residents and businesses.The services discussed in this element include: law enforcement, fire protection, marine safety, education, libraries, and governmental administration. August 7,2000 20 Res. No.2000-80 This Resolution supersedes Res.No.2000-68 Applicable goals include; • Protect the community from criminal activity, reduce the incidence of crime and provide other necessary services within the City. • Ensure adequate protection from fire and medical emergencies for Huntington Beach residents and property owners. • Promote a strong public school system which advocates quality education. Promote the maintenance and enhancement of the existing educational systems facilities, and opportunities for students and residents of the City to enhance the quality of life for existing and future residents. The following applicable Public Facilities and Public Services Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Police Policies PF 1.3.1 Ensure that project development site designs provide "defensible space". The Specific Plan includes policies for future development to reduce crime. Crime prevention guidelines are included in Section 3.5 Design Guidelines of the Specific Plan, and they will apply to all future development within the Specific Flan. The Police Department will review the de velopment plans/site designs once proposed. PF 1.3.2 Ensure.that new development and land use proposals a1v analyzed to determine the impact their operators, occupants, visitors or customers may have on the safety and welfare of the community. The Specific Plan includes policies for future development to reduce crime Crime prevention guidelines are included in Section 3.5 Design Guidelines of the Specific Plan, and they will apply to all future development within the Specific Plan. The Police Department will review the development plans/land use proposals once proposed. Fire/Paramedic Policies PF 2.3.2 Ensure that new construction is designed with fire and emergency access and safety in mind. The Specific Plan includes fire safety measures in Section 3.4.1, which will apply to all future development within the Specific Plan. The Fire Department will review the development plans once proposed. PF 2.3.3 Ensure that existing buildings are maintained in a manner which is consistent with fire safety. August 7,2000 Z] Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 The Specific Plan includes fire safety measures in Section 3.4.1, which w411 apply to all future development within the Specific Plan. The Fire Department will review the development plans once proposed. 9. RECREATION AND COAIWJNflY SERVICES ELEMENT The Recreation and Community Services Element has been adopted to identify, maintain and enhance local parks and recreational services and facilities. Applicable goals include: • Enrich the quality of life for all citizens of Huntington Beach by providing constructive and creative leisure opportunities. • Provide adequately sized and located active and passive parklands to meet the recreational needs of existing and future residents, and to preserve natural resources within the City of Huntington Beach and its sphere of influence. * Develop park sites to provide diverse recreational and sports facilities that meet the residents'and visitors'active and passive recreational needs. • Ensure recreation facilities are renovated and upgraded to meet the current recreational interests of adults and youth. • Provide parks and other open space areas that are efficiently designed to maximize use while providing cost efficient maintenance and operations. These goals relate to issues, which are not directly applicable to the Crossings at Huntington Beach Specific Plan, since the Specific Plan is not designated for residential or open space uses by the City General Plan. The Recreation and Community Services Element objectives and policies are also not applicable. 10. IJTTLTrIES ELEMENT The Utilities Element discusses water supply, sanitation treatment (wastewater), storm drainage, solid waste disposal,natural gas, electricity,and telecommunications. Applicable goals include: • Provide a water supply system which is able to meet the projected water demands; upgrade deficient systems and expand water treatment, supply, and distribution facilities;and pursue funding sources to reduce the costs of water provision in the City. • Provide a wastewater collection and treatment system which is able to support permitted Iand uses; upgrade existing deficient systems; and pursue funding sources to reduce costs of wastewater service prevision in the City. • Provide a flood control system which is able to support the permitted land uses while preserving the public safety; upgrade existing deficient systems; and pursue funding sources to reduce the costs of Mood control provision in the City. • Maintain solid waste collection and disposal services in accordance with the California Integrated Waste Management Act of 1989 (AB939), and pursue funding sources to reduce the cost of the collection and disposal services in the City. August 7,2000 22 Res. No.2000-80 This Resolution Supersedes Res,No. 2000»68 • Maintain and expand service provision to City of Huntington Beach residences and businesses. The following applicable Utilities Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Water Fblicies U1.2.1. Require that new and, existing development contain safeguards and mitigation measures preventing degradation. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project. A Public Facilities Plan for water, wastewater and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the Landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. Additionally, once a definthve site plan and development project is proposed, an En virortmental Assessment wi11 be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an en vironmental.impact report was cat*Yied with respect to that general plan, the application of this division [CEQAJ to the approval of that development project shall be limited to effects on the en vironment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior en0ronmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report" Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. U1.2.2 Require new development to connect to the sewer system. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project. A Public Facilities Plan for water, waste water and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner will be constructing public infrastructure as required by the Cityin order to support the land uses proposed by the Specific Plan. Additionally, once a definitive site plan and development project is proposed,an En wronmental Assessment toll be performed, which will analyze impacts peculiar to development proposed August 7,2000 23 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 for the Crossings at Huntington Beach Specific Plan, and propane mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an en vironmental impact report was cerftfied with respect to that general plan, the application of this division (CEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as signifcant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Speck Plan project falls within the development envelope analyzed in the General Plan Ell, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. U1.3.4 Require the use of reclaimed water for landscape irrigation, grading, and other non-contact uses in the new developments,where available or expected to be available. The Crossings at Huntington Beach Speck Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project A Public Facilities Plan for water, wastewater and storm drainage M11 be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner will be constructing public infrastructure as required by the City in order to support the Iand uses proposed by the Specific Plan. Additionally, once a definitive site plan and development project is proposed, an Fi70ronmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "if a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQAJ to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior en vironmental impact report" Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. Wastewater Treatment and Facilities Policies U2.1.6 Require that sewer capacity is available before building permits are issued for new development. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project A Public Facilities Plan for water, wastewater and storm drainage will be prepared for the project consistent with all standards August 7,2000 24 Res. No.2000-80 This Resolution Supersedes Res.No. 2000-68 and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner wi11 be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. Additionally,once a definitive site plan and developmentprojectisproposed,an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plait, and propose mitigation measures, as necessary. Accor&ng to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect .to that general.plan, the application of this division [CEQAJ to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an enOronmental assessment until a site plan is submitted for approval by the City. Storm Drainage Policies U3.1.5 Limit new development, when necessary, until adequate flood control facilities are constructed to protect existing development and acconuuodate the new development runoff, or until mitigation is provided in accordance with the Growth Management Element. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project. A Public Facilities Plan for water, wastewater and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner will be constructing public infrastructure as required by the City in order to supporY the land uses proposed by the Specific Flan. Additionally, once a definitive site plan and development project is proposed, an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed .for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division ICEQA] to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report" Based upon Public Resource Code Section 21083.9 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. August 7,2000 25 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 Solid Waste Policies U 4.1.1 Maintain adequate solid waste collection for commercial, industrial, and residential developments in accordance with state law. The Crossings at Huntington Beach Specific Plan shall ensure the provisions of adequate public facilities and utilities to serve the proposed project. A Public Facilities Plan for water, wastewater and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Speck Plan. Additionally, once a definitive site plan and development project is proposed an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "lf a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior en vironmental impact report.n Based upon?Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an en vironmental assessment until a site plan is submitted for approval by the City. Gas Supp]y,Telecommunication,Electricity Policies 5.1.1 Continue to work with service providers to maintain current levels of service and facilitate improved levels of service. The Crossings at Huntington Beach Specific Plan shall ensure the provision of adequate public facilities and utilities to serve the proposed project. A Public Facilities Plan for water, wastewater and storm drainage will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.4 of the Specific Plan). These plans will be approved by the City, and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. Additionally, once a definitive siteplan and development project is proposed,an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project August 7,2000 26 Res. No.2000-80 This Resolution Supersedes Res.No.,2000-68 is consistent R th the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQA1 to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the pr7or environmental impact report, or which suhstanhal new information shows wig be more significant than described in the prior environmental impact report.n Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan DR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is suhnuttedforapproval by the City. 11. E WMONMENTAL RESOURCES/CONSERVATION ELEMENT The Environmental Resources/Conservation Element addresses the City of Huntington Beach's environmental resources.Applicable goals include: • Improve and enhance the overall aesthetic value and appearance of the City of Huntington Beach through the provision and maintenance of local public and private open space. • Protect and preserve significant habitats of plant and wildlife species, including wetlands,for their intrinsic values. • Conserve the natural environment and resources of the community for the long-term benefit and enjoyment of its residents and visitors. The following applicable Environmental Resources/Conservation Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Olen Space Policies ERC 1.1.1 Encourage the provision of open space elements within the larger-scale development projects including but not limited to public plazas, entry courts, and planned development common areas. As indicated in Section 3.5.5 Landscape Concept of the Specif c Plan, each project development shall provide sufficient landscaping to continue the Landscape Plan concept and the Specifl-c Plan identifies an open space exhibit with plazas and pedestrian walkways throughout the project. Aesthetic Resources Policies ERC 4.1.8 Include conuuercial, residential, industrial, and natural areas in the electrical undergrounding prograin. August 7,2000 27 Res. No.2000.80 This Resolution Supersedes Res. No. 2000-68 The Specifc Plan requires undergrounding of utilities in association with development of future projects per Specific Plan Policy 3.4.6. Water,Electricity,and Gas Conservation Aolicies ERC 5.2.1 Require, the use of reclaimed water in common areas and landscape treatments of all proposed developments. The City does not currently have a reclaimed water supply system available. As indicated in Section 3.5.5 of the Specific Plan, reclaimed water shall be utr'hzed where and whenever feasible and shall comply with the City's Water Efficient .Landscape Requirements"" (Ordinance ##1452). Usage will he addressed with future individual requests for development if such a system is available at that time. ERC 5.2.2 Create standards for landscaping and irrigation, which are in compliance with State requirements. Landscape standards, which require development proposals to subndt and implement a landscape plan consistent with the overall Specific Plan standards and in compliance with State requirements, are included as Section 3 9 5 of the Specific Plan. The landscape standards will apply to all development within the Specific Plan 12. AIR{ UALFTY ELEMENT The purpose of the Air Quality Element is to address air quality factors affecting the City, and establish goals, policies and programs in order to help achieve the goals of the Air Quality Management Plan adopted by South Coast Air Quality Management District. An applicable goal includes: • Improve regional air quality by a) decreasing reliance on single occupancy vehicular trips, b) increasing efficiency of transit, c) shortening vehicle trips through a more efficient jobs-housing balance and a more efficient land use pattern, and d) increasing energy efficiency. The following applicable Air Quality Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Vehicle Work Trips Policies AQ 1.1.2 Require all businesses and multiple tenant centers with 100 or more employees to participate in a Transit Management Association or Organization. August 7,2000 Z8 - - Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 The City ofHunii'rrgton Beach has adopted a TDM ordinance, which addresses appropriate trip reducing activities As discussed in Section 1.6 of the Specific Plan, the development within this Specific Plan project will comply with City requirements. AQ 1.1.5 Encourage all new commercial, industrial, and residential structures to accommodate appropriate trip reducing activities such as alternative work schedules, on-site day-care facilities, on-site automated teller machines, "mail-in" applications, or telecommuting and/or teleconferencing facilities as technology becomes available. The City of Huntington Beach has adopted a TDM ordinance, which addresses appropriate trip reducing activities As discussed in Section 1.6 of the Specific Plan,all developments within this Speck Plan project will comply with City requirements Transit Trips Policies AQ 1.2.2 Require developers of employment centers with 100 or more employees and major activity centers to include transit amenities and transit access as an integrated part of their projects. The City of Huntington Beach has adopted a TDM ordinance, which addresses appropriate trip reducing activities As discussed in Section 1.6 of the Specific Plan, developments within this Specific Plan project will comply with City requirements. AQ 1.2.3 Encourage property owners in existing employment and activity centers (such as the Pier, Downtown, Huntington Beach Mall) to include transit amenities at their sites when these projects apply for additional planning permits or services. A Circulation Plan will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.3 of the Specific Plan). The circulation plan specifies locations for public transportation bus pads and bus turnouts and also includes a potential location fora light rail transit stop. This plan will be approved by the City and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Speck Plan. AQ 1.2.4 Encourage major commercial and industrial development projects located along transit routes to include integrated transit access points in the project design. A Circulation Plan will be prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.3 of the Specific Plan). The circulation plan specifies locations for public transportation bus pads and bus turnouts and also includes a potential location for a light rail transit stop. This plan will be approved by the City and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. August 7,2000 29 Res. No.200M0 This Resolution Supersedes Res. No. 2000-68 Carpool and Vanpool Trips Policies AQ 1.3.2 Require that employment centers with 100 or more employees increase the availability and the "attractiveness"of parking spaces for vans and carpools. The City of Huntington.beach has adopted a TDM ordinance, which addresses appropriate trip rducing activities As discussed in Section 1.6 of the Specific Plan, developments within this Specific Plan project will comply with City requirements Vehicle Trip Distances Policies AQ 1.5 Encourage residential and commercial growth to occur in and around existing activity centers and transportation corridors in accordance with the Land Use PIan Map. A Circulation Plan has been prepared for the project consistent with all standards and requirements of the applicable service agencies (refer to Section 3.3 of the Specific Plan). This plan will be approved by the City and the landowner will be constructing public infrastructure as required by the City in order to support the land uses proposed by the Specific Plan. AQ 1.5.2 Continue to encourage ,fob growth by maintaining the supply of commercial and industrial designated land in accordance with the Land Use Map. Consistent with the General Plan and in accordance with the Land Use Map, the Specific Plan permits job generating land uses that will assist in improving the 1992 jobs to housing ratio. The majority of the Specific Plan area will be developed in a single phase as outlined in Section 2.1 of the document. However, individual building pads may be developed in later phases along with expansions to the initial phase of construction. Particulate Emissions AQ 1.8.1 Continue to enforce construction site guidelines that require truck operators to minimize particulate emission. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoniny and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall he subject to the City's adopted regulations in place at the time of any individual request. Additionally, once a definiti ve site plan and development project is proposed,an En vironmental Assessment w111 be performed, which will analyze impacts peculiar to development proposed August 7,2000 so Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 for the Cilxsings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.30), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certffled with respect to that general plan, the application of this division ICEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as Significant effects in the prior environmental impact report, or which substantial new information shows will be f more significant than described in the prior en vrronmental impact report:" Based upon Pcrblic Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the j development envelope analyzed in the General Plan Ells the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an en wronmental assessment until a site plan is submitted for approval by the City. AQ 1.8.2 Require installation of temporary construction facilities (such as wheel washers) and implementation of construction practices that minimize dirt and soil transfer onto public roadways. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time of any individual request. Additionally, once a dehnidve site plan and development project is proposed,an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the'Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as sig Zl cant effects in the prior environmental impact report, or which substantial new infonnation shows will be more significant than describedin the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for appro val by the City. Energy Conservation AQ 1.10.1 Continue to require the utilization and installation of energy conservation features in all new construction. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the August 7,2000 3I Res.No.2000-80 This Resolution Supersedes Res.No.2000-68 relevant provisions of the City's zoning code (Huntington Beach Toning and Subdivision O.rdmance), as they currently exist or may he amended in the future: Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed rn the Specific Plan shall be subject to the City's adopted regulad'ons in place at the time of any individual request. Additionally, once a definitive site plan and development project is proposed an Environmental Assessment will be performed which will analyze Impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessmy..According to Public Resources Code Section 21053.30, "If a development project is consistent with the general plan of a local agency and an en vironmental impact report was cer tiFled with respect to that general plan, the application of this division XEQAJ to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior en vironmental impact report, or which substantial new information shows will he mom significant than described in the prior environmental impact report" Based upon Public Resource Code Section 2I083.3 and the fact that the Speck Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an en vironmental assessment until a site plan is submitted for approval by the City. AQ 1.10.3 Encourage energy use audits, and identify conservation measures, for all existing commercial and industrial structures. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordina.nce), as they currently exist or maybe amended in the future. Section 4.0 Development Regulations of the Specific Man provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time of any, individual request 13. COASTAL ELMEN]r The Coastal Element, Amended in 1992, includes information sufficiently detailed to indicate kinds, location and intensity of land use and applicable resource protection and development policies. The Coastal Element designates different categories of land uses which will be permitted within the coastal zone and specifies the areas where each land use map, categories and additional policies together constitute the Coastal Element, which is intended to reflect local conditions and needs while meeting the Coastal Act policies and requirements. The Coastal Element is organized around the following issue areas, which have been identified as relevant to the City's coastal zone: • Recreation and Shoreline Access • Visitor-Serving Facilities • VisuaI Resources August 7,2000 32 Res.No.2000-80 This Resolution Supersedes Res.No. 2000-68 • Water and Marine Resources and Diking,Dredging,filling and Shoreline Structures • Environmentally Sensitive Habitats • Energy • Community Facilities • Coastal Land Use Plan • Next Steps in Coastal Planning The goals and policies within the Coastal Element provide guidance and direction for development in the coastal zone. The goals of the Coastal Element relate to issues, which are not directly applicable to the Crossings at Huntington Beach Specific Plan, since the Specific Plan area is not within the coastal zone. The Coastal Element objectives and policies are also not applicable. 14. ENVIRONMENTAL HAZARDS ELEMENT The Environmental Hazards Element addresses flooding as it pertains to geologic, seismic and soils hazards. This Environmental Hazards Element and the referenced materials together satisfy the geologic and seismic portion of the Section 65302 (g) requirement. Applicable goals include: • Ensure that the number of deaths and injuries, levels of property damage, levels of economic and social disruption,and interruption of vital services resulting from seismic activity and geologic hazards shall be within levels of acceptable risk. • Ensure the safety of the City's businesses and residents from methane hazards. • Eliminate, to the greatest degree possible, the risk from flood hazards to life, property, public investment and social oiler in the City of Huntington Beach. • Ensure the safety of the City's businesses and resident from peat hazards. The following applicable Environmental Hazards Element policies are identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Geologic/Seismic Safety Policies EH 1.2.1 Require appropriate engineering and building practices for all new structures to withstand groundshaking and liquefaction such as stated in the Uniform Building Code (UBC). Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time ofanyindiwdual request. August 7,2000 33 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 EH 1.3.5 Encourage property owners to take adequate steps to protect their property against economic risks resulting from seismic and geologic hazards. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Hunbngton Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides speck development regulations and standards that will be applied to the Land Use Plan.of this Specific Plan. All development regulations and buildiing specifications not addressed rn the Specific Plan shall be subject to the City's adopted regulations in place at the time of any individual request. Additionally, once a defr'nibve site plan and development project is proposed,an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. Accorz*V to Public Resources Code Section 2I083.3(b), `If s development project is consistent with the general plan of a local agency and an environmental Impact report was certified with respect to that general plan, the application of this division ICEQAJ to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report" Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. Floodui Objective EH 4.1 Ensure that the City's flood prevention standards and practices provide satisfactory safeguards for public and private development. The Public lac.& es Section of the Specif c Plan (Section 3.4) addresses this policy. Additionally, upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that well be applied to the .Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time of any individual request August 7,2000 34 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 15. NOISE ELEMENT The purpose of the Noise Element is to identify and appraise noise problems in the community. The Noise Element recognizes the guidelines adopted by the Office of Noise Control in the State Department of Health Services and shall analyze and quantify to the extent practicable, as determined by the legislative body, current and projected noise levels for all of the following sources: • Highways and freeways; • Primary arterials and major local streets; • Passenger and freight on-line railroad operations and ground rapid transit systems; + Aviation and airport related operations;and • Other ground stationary noise sources contributing to community noise environment. An applicable goal includes: Ensure that all necessary and appropriate actions are taken to protect Huntington Beach residents, employees, visitors and noise sensitive uses from the adverse impacts created by excessive noise levels from stationary and ambient sources. The following applicable Noise Element policies are identified below,followed in italic typeface by an. explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Ambient Noise Impacts on the Community Policies N 1.2.2 Require new industrial and new commercial land uses or the major expansion of existing land uses to demonstrate that the new or expanded use would not be directly responsible for causing ambient noise levels to exceed an Ldn of 65 dB(A) exterior on areas containing "noise sensitive" land uses as depicted on Figure N-1. Upon the Ciiy's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides speclffc development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the CiVs adopted regulations in place at the time of any individual request The City Noise Ordinance addresses this policy. Additionally, once a definitive site plan and development project is proposed,an Em rtonmental Assessment will be performed, which mall analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an en w ronmental impact report was certified uith respect to that general plan, the application of this division ICEQA) to the August 7,2000 35 Res.No.2000-80 This Resolution Supersedes Res. No. 2000-68 approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new Information shows will be more significant than described in the prior enviroonmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. N 1.2.5 Require development that generates increased traffic and subsequent increases in the ambient noise levels adjacent to noise sensitive land uses to provide for appropriate mitigation measures in accordance with the acceptable limits of the City noise ordinance. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision Ordinance), as they currently exist or may be amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the Land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall be subject to the City's adopted regulations in place at the time of any individual request. The City Noise Ordinance addresses this policy. Additionally, once a site plan is approved, an Environmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.30), "If a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQAJ to the approval of that development project shall be lindted to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial newinfbrmation shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Specific Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City Traffic and Mechanical Equipment Related Noise Impacts Policies N 1.31 Require all new non-residential development to design and configure on-site ingress and egress points diverting traffic away from nearby "noise sensitive" land uses to the greatest degree practicable. Upon the City's adoption of the Crossings at Huntington Beach Specific Plan, the development procedures, regulations, standards and specifications of the Specific Plan shall supersede the relevant provisions of the City's zoning code (Huntington Beach Zoning and Subdivision August 7,2000 36 Res. No.2000-80 This Resolution Supersedes Res. No.2000-68 Ordinance), as they currently emst or maybe amended in the future. Section 4.0 Development Regulations of the Specific Plan provides specific development regulations and standards that will be applied to the land Use Plan of this Specific Plan. All development regulations and building specifications not addressed in the Specific Plan shall he subject to the CIVs adopted regulations in place at the time of any jn&vjdual request: The City Noise Ordinance addresses this policy. Additionally, once a definitive site plan and development project is proposed,an En vimnmental Assessment will be performed, which will analyze impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose nut;gation measures, as necessary. According to Public Resources Code Section 21083.3(b), "If a development project is consistent with the general plan of a local agency and an environmental Impact report was certified with respect to that general plan, the applicafion of this division ICEQAI to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described m the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Speck Plan project falls within the development envelope analyzed in the General Plan Ell, the Crossings at Huntington Beach Specific Plan is currently exempt from preparahon of an environmental assessment until a site plan is submjtted for approval by the Cjty. N 1.3.7 Provide for the development of alternate transportation modes such as bicycle paths and pedestrian walkways to minimize the number of noise generating automobile trips. Section S.3 of the Specific Plan indicates that alternative forms of transportation should receive careful consideration. The future development within the Specific Plan will he required to address this issue. The City of Huntington Beach has adopted a TDM ordinance, which addresses appropriate trip reducing activities as discussed in Section 1.6 of the Specific Plan, the development within this Speck Plan project will comply with City requirements N 1.3.8 Ensure that commercial and industrial uses, as required by the Air Quality Management Plan, implement Transportation Demand Management (TDM) programs such as incentives for car pooling,van pools, and the use of public transit. The City of Huntington-Beach has adopted a TDM ordinance, which addresses appropriate trip .reducing acfrvifies as discussed in Section 1.6 of the Specific Plan, the development within this Specific Plan project u011 comply with City requirements 16. HAZARDOUS MATERIALS The City of Huntington Beach adopted the Hazardous Materials Element as part of the overall General Plan. This Hazardous Materials Element identifies goals, objectives, policies, and programs related to hazardous materials. August 7,2000 37 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 Applicable goals include: • Reduce, to the greatest degree possible, the potential for harm to life, property and the environment from hazardous materials and hazardous waste. The following applicable Hazardous Materials Element policy is identified below, followed in italic typeface by an explanation of how the Crossings at Huntington Beach Specific Plan achieves consistency. Policy HM 1.1.4 Implement federal, state and local regulations for the handling, storage and disposal of hazardous materials. Once a definitive site plan and development project is proposed, an Environmental Assessment will be performed, which will analyze .impacts peculiar to development proposed for the Crossings at Huntington Beach Specific Plan, and propose mitigation measures, as necessary. According to Public Resources Code Section 21083.3(b), "Ifa development project is consistent with thegeneral plan of local agency and an environmental impact report was certified with respect to that general plan, the application of this division [CEQA] to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report." Based upon Public Resource Code Section 21083.3 and the fact that the Speck Plan project falls within the development envelope analyzed in the General Plan EIR, the Crossings at Huntington Beach Specific Plan is currently exempt from preparation of an environmental assessment until a site plan is submitted for approval by the City. August 7,2000 3$ Res. No.2000-80 This Resolution Supersedes Res. No.2000-68 Res.No.2000-80 This Resolutlan Supersedes Res.No.2000-68 THE CROSSINGS AT HLTN'I'INGTON BEACH Hunfing�on Beach, California Signage Standards The Crossings at Huntington Beach Signage Standards August 7, 2000 1 v:'U6,200� This Rawtugan SuporsedvtpM .are pI pros 4 S - � X. AR align plan ?ZLLflWR9Mi-'. Of 1 temporann mu brie%rid :' and E pxowd by, hot"I��d Val .tea r. 23VXA2 fl''t e Hu tip . ? g ordi r p � r � AV 14 Wh is not blu-14 '11, at a � r j:�:v tk� ;flxe Ca Off, Of euctatu' the ci:t x� a� �.a I c -'s �a�1 kma in lid big Wf gum willOr L�3 v &i:LTia'La sigt4 4I3 Y�oits A2a no b-- mciddrkiaea1c: s ira sit : mav, 'specified cs 1-0', 4 f�O'$ co e -and zM d mwli e a trr it daxa t xbili of t.=MuRms to, vlgw Onc' ning traffic, �i �' ��r� Awn MbnmtT of ;�fte:plalv 3. A rya M.sqA.waxnmu r d , L�lrlcl3 LL�a I two be calculogd tea lltlluzal area. s apt c €s d ,s�VL Un PrLymulf* ma cat . £'go U. Lf to location ( f 0 r F aaa 1i 1��, �fi Fxixa �s obqw� ��� r �y t3#Yd o_r� . t name r`b lrxc U& z �tt1 €c�Yz}, 4. vla xa rl� ctts l aYal � � t kl r xa s M S3' 3AY:L' t : € �I�YF.ti3 CiYICi3YYcIX 5 q v not calcWawd as tmrf of the 4 woy 4, g a Z0,01 sq:Ak, r nAMUM l�r d `€.pit-1 for pr*o Im" a . op it al 44 Sig II F tanant xms el& S. Project rame and non-',.me es# >. stsf :rel of mf YAala;l ak pm 4. >'€wrraatt nw-ne II'Mi'lls ;ands .mush he Arzl x putt of c vuall M 4�fir. niilm� and, placemirmi:must be oonsist6lf A), The XOSS ilWS ai:tz2-� liTk13 sfFf 'z. Sii}85. August 7, 2 00 �i SZU liar nt Site or name only ifiduded it e cul:afic�a��� maw or adjulmal,410 his p3"d � u sesia>ed,, a ea . 'IF o -� : o €"fan # saw An lNol 10, ;,4 en Xbove bW.1in parvet- t X Dimpti onal SA&rs(WAS EM s< ba a: s . b. maxi side �-S%fin 4;, Sage may be far€crow r rn��z�c€��r arluxia c... �k1'.v 2'��C 2ORIm lam. i rds August 7,2000 , 2£ 0 :This Resolution Supersedes R 3 �. IWA B UMAMSIGNLACM ------------- ar mast t-4 .QnS. C S3 3YS '3L Y 3€ 00 Milt tackl., The, reed 80ft.above, e:,i B, An - diftor l thy q.rtq for z m the tic, bu stm,au�e> has e ,Y� an a zm e.d JAI F�PM Pcr s131. zEt3 iy>g Pia<a and wst�3C�33i�if3a�3}up f)z� VIM not to c"2ic d E . .:tit. t gated r 6 Sar a� O,>4c;�Mi pl fea tubes wffl he: r£Yatte < mEx\ •\�•� `\ ri a s: r 'G'�v;_ s1.v ^w,� -' �w� �•.h�'a` o-�r-ah"- . >r�.,� t ter. CIAO*, \ , TEFLI'` S5i�3 Ql �F<g{r�t?3I ?t r' c Y ,Sa w1Fdali'e August 7,2000 :r s ou r UnIx"Uell , ark f IRV ` �, • in The crossipp,at Huhfir%joiq p:��h. �.c ppr .rat bra he vb: . All 'font -O b a box of< tad ~ 89 f0med ,around ffie ex, ��ara not include :ele en4s is ge l ors',ta�a C These di.e a s ro , .a� A gna visi. le from oleic ., d \ ,.a fovi of lsciilc$ing fro t e, foolt f f lua ;fro tie �£', :t;'3>�+.3. �i`XM ,'.dJ3' `3'.dF3G3' A3 faza.a F° k� k s #s, Timant c �� ` max: 2. Retail teftant� �as#a £ IMI,Qu;'n' c'B MR, g y 3,. 'Sign may roam' fetters or I��c:� PIW f ti 3r ai s rr fro t desjg mq Cmati ' w of 11,Ming Sources: is • '�a���xrad��.�x�.�l Via`�artdzr�e�. tbns x�i tt must l v net as an £. '.. � ��'"�\v�� ��$.♦ : v Cd. ��`� ��C�a'���a�ti2 5-r:;: #��P��`5.¢��t' +��S��cr .53.3 svbrrdHI� as pat O d�:Y#. S��x��T'.``�3.it : aorchmta.Ami az sc as me and iust a�s�t standar -M1 Winere used Odm iilan A et as, neca W nOt tt, considem'd a -c, ♦ ,: �£tT1� iS fwchl £fa t C Ca¢ y }s�F lC9 s ial Shad j ezc,3 are CMat'asV thew: zd&EXIM _ T#2e;,�Y2 August 7, '0,00 Res. No.2000-80 This Resolution Supersedes Res.No.2000-68 SIGN STANDARDS—COMPARATIVE STUDY EMa Freeway Monu"760 .above7otpve ering 60ft. / way of Sign 50 ft. sq.ft. freeway grade 00 sq.ft. (logo&legend) if Reader board 115 sq.ft.: 90 sq.ft.message 800 sq.ft. 25 sq.ft.other info EMb Primary Project 25 ft.tall Z5 ft.tall Monument (Gateway) 130 sq.ft. 300sq.ft. (logo&legend) I per street frontage EMc Secondary Project Not Addressed 15 ft.tall Monument 200sq.ft. (logo&legend) Tenant listings (3 names) 2 per street frontage EDa Vehicular Directional 4 ft.tall 6 ft.tall EDb Pedestrian Directional 2 sq.ft. 15 sq.ft. EDc Project Directory 1 per entry Tenant names incl. o business names Up to four per tenant EWa Primary Project Not addressed 15 ft.above grade Wall Sign 50sq.ft. (Gateway w!Cinema (I.D.) EWb econdary Project 1.5 sq.ft.per 200 s.f. Wall Sign I ft.of wall Height not to exceed Building parapet hannel Letters 1.5 sq.ft.per I ft.of wall 1.5 sq.ft.per I ft.of wall lus 15% lus 15% One per street or One per street or arking lot frontage Parldng lot frontage** abinet Type Sign of addressed 1.25 sq.ft.per 1 ft.of wall Must be integral part of torefront design" **unless tenant is grater than 3 5 k sq.ft,.or a 2 story configuration The Crossings at Huntington Beach Signage Standards August 7, 2000 7 rn _9_5 s .. a.. ......-.. •...,•• ,..p#.,.. £s d......:,ft Ks is .:. , ; , ;A� r:f;' ;.'iw/c.:! ,;.rrr x;m •r r .w.prr J :{ti c,f {;{....;. fi 7 .c,�G:;+..:: ,'`: .<.. •.y f,..`. �` �f Y f,iC F mz r. f Y:' i �. jy�'! -....yl' r 7�•. Y,y '� �"4..� 49 i°r.,e f f- �t�.0 a..„,�' tI S 3 F =:# :� £ } s'{{>:& � 3 t.t• J � (. „F: E �# j Sl t i i33 .S :#� ,•.s f' ''i>'lis,h C,,,y! 4 ::tttSS t r r ':i r £i- # 4 �" �':� r :#:; S s /-. .7 ra`_ .c.x, �3 ,""•`"""'a' `�X :`# '�y/4>: r' ar y H �ry s# a i S :i;, � � f �# fx b.J �Jr•� 9 ;'s.< .,{ f# .s.: -:?c? ^g `i#f, '-'+. .s r � # s � r #:: ..c., ,s. �„: e :s s"'.; k� y./n-.:11• .IY!.u•',•.. �,A :r '/c ,3 n f.,'i v<:� ..w�.f. �'; t 1 s '• ,.,. "�` .h .:.cs,r,.XXJ � t .�.w' .4,.: .f,';:f :' p """i" c.yy��^^S�� ,i" S �... ':, •,;,�::: fir., -.a:1' .:,: .,-6>,> ,�' �, r ;-s' g s � �., ' ':a. "✓+• G'. r1.R'7F "Ff ,,, ;{x 'kR 9li:fb ..s. a .?._ `{•' Jq't„� f,3•,.' � .rs r„s 4� �,/}.i:.r�' S..J`. G.-/r, b. ,.✓. Y9 riKtY. .;s.,t'i;< � .,.a.•41., ,.� �t r >�-rti.u.r,>lr.' .. .,.;:j:.^+r.. r;• f I :f 1 -i otif yyjS r e P s '..,,� •:.... :a.Y+iiS z� ,; #} f ,?'..;a J ,,`1' s-;x• ,�:s� E:r „#'�' t # i s �,+ y s�:. P.:.p.f 4fr•PNf ,� .f a� i ;y. J S' . .',''tS�' :�:�.. .%S; GS r.'r/,��• :at°.::f:..'- .l $s r �fA.': £ t . ,,.,' �, ..,r: >;; ,:,'�"� �` .,: s sfv.*s'C.s ::r..#>�.,1, r.•?k�- <.rs'p: s ss"✓ � : , -vz so.. $ .!. ..,1 ',. j S. f L' " ::�'qp -:r✓ �gg ssy'}� 1'.,".F;: T� <:,s t - ,:.y H 3! .. #• # 7, M� -:� f/», -:6'U ::. J,. 3,V.�f�S ,B Y;. -.# f'i J���rS..i 9 /• .y tF ?"n„ f': t•' ::c"'fr4 ': ... r�.c. t ,.y r,J s,;»: :.;. 9 s .:: ,�s.:.y ;w J y.v Lr mow'- � £ �'�. £,¢f.=3•;.r y y :fr, n �+o� ,`s 3.:,..•. :...,h Nt t#r / ':t > k..,. <S[.f• ":as. :r..c. �w"' 4'�,, 33 r#�,, �' s>LLss 5 �r,�t. nw r s.�f *,, ,.-. s .�, ; ;�.' s•". ;,!' >l J/.£„•e ,� _.r'--" t. 3, /���^eg". � �3 .� ,,S,K:: r .µ��, :� ! el f3Y�3,:i i"t:tY „c(S,._t•., r;.r.F' :7:: ��' fyiw.lt C'F"3Z.:'. _s �' �a .: {r''" ::J+,>s- 3.F ..;;.•r ,,rt ; .,r"h` + �.f: .:'.>rr. >. �• 'w'S s t s i' f ✓ ,. ass�t� �,�::„ >�. r{.;>wJ ',iH ✓ � �.t•.C' Js?' �C f�r:-;e # :/,r' f.:/ :.s;✓.':r„""7 • %,.,�xf/• ,"`"fj';5f .£..,;�'" , ss .! /, 4.�7 r':�/'� rt. p$ r� .�. s, tr' •~a :;u '! '4f^f jfu t m .f' g �. f3,•far.13'.Ftf •�./ ;1l •.! �.. .�:�" :'%�,t � t / sp gal �. �� � f ♦ � � oafs � s s 'f/� r} t,a4. ;4 y#£ .'Myh r..{_ ;�h„ r . 1'# •. i f fkk•"r d.rkr � rfi,�,.Jl���:':; '�, yw. F �SSY r' 4! .r-,s..t��i, .-��.. :. s b �?Y���42' ��p ✓ � "�i., a1lx�E i .. S _.'' .in,�.,::.J r �� �"'^-/r,'/ J �':' ."E.���rY���,,.ir(S k..} r �h'• f :: � fi :�:d '�5 .r,..v."".1�- '""# " '$��A r/JoY:v .Ok2 ��"Sv'•::"d .,.,,;� /�o r /.� h�,yJ,�' .�'. Y/f j �} rsw.��:.✓ "� �fc ;!„ � w 3 '�.o :t S" :,. ..% f r _ ,J .S:Y y', ,•sa /1. £,-,., „S: (+�,y f >: r: F' yy�y5, I-- -..cif 1 N.54� ':::RJR '�y� S' J. "^'RJ3 :. .: , f ..... I'i ,y� M• <vt- `"W w ...,yr•..,sue t r ., � t� r: 4jyt 15 Y a!'ff sr lfir s 'a S f�� ::( v .._.:t c >; r 7 S s i Sit 'fir ��ry.-:'t3 -�{,' -.� S :�,. �� ._�.� I• �:f £ f f s S � i. •�'y,s. �:� •, • rr a' `'• ��.� '"�•>.. ��' `'�r t �r m �• � f ; s, �.: sr�t f # S � � 3 yb.. •� <�� q� �5„`.:y�,3`'f3Uk`i9:24 '� }a�^�i # '� .� � :'..,✓'r�fp�•*� ;z�. ).- S:£ �-- ° � :�p 3 �p. ££ s.i:, -'`' ' '"ir��!�: tW:+'a4l�,,s<a cva�.s 'a ''c�S,L�./�v�s '� 5 r�" ....$ ...,/�,.•e .�.a., .xr+wr�'� .,�,3 #r' yt� s 3<-:. pS of _ .;}s� _I Q• s s�5�-�.•..-fS fi -;r �,e� iu k''M1 �+'.a,'� 1 \ts'.b 's/r`-- armr^C"c «.,.� F; r :.> c.Cs �,�`a"A�: c.£.,��#•..£�,�w..u.Y":i� .75 x T ,-f�, 4 �� - � j_"5 ro `:+: •�' 4�1� �`' ?.�� -:r �'a``'f�i S - � :::15:�:'"�'3`.��4N]:r - g t%'�»Sr y a'Y'- h 1 _� �"`+. '•�Nk'`� � 'ti •�'x wit �'%$s:7. s s.�. � y: y`t ���..�, �•/'"� �",'+w:� G�`'•>s $ n X,:,so 2Eb.. ���':s �l.S i,3�t€�,sM ��.f�, iss£�����t�s;, '�Ir:a t��,, • � r�� �r�#s,?� a#4�t�#xt ,.u� � 1 S f t' f s pi 5 f t - "`si �rr.....>�., �•r :y � F p u`".•„""'"-^�,.�� £ s44,..£3.£4144isL ,s���.#� r ,1,�,�`�i gg tt �y �``%,� .�� � � �D �..:: -ii.. �"'�nt �.,. �� �� nr� .z ..':5.w�r-ix� ,w»c•.syu�#�::h '� W38"lvm 3 £iD 3 i r4 e ty g e ktif'sorrna,s'.:ww]� fkl�{x tclrrt�y�rsf{tf#OA t #X RC-XN xa#3s+tsW0W 3 N7.NM-IXI III Ff t ssrs {�(tsnsf3ctuua{f } #'433cat;tssXr-yn*h,4—M33 NOS 3'44ab's�,11£�`�s3+6.YFa^1+F##�4 #t� 3*!>'kC3#3_S.eikK#Ki'vF##fi�,s;#.sE '#��� 6#`E33'tf'st•1C,fiv,��.�f.3�(sgk^rl'Y�l'�fi£§:�'£fi £"3'�1L� 4h:F3:$'C.;+H`}k�:i'K:4ts"t'�kFB �. s�zgsptsS:3a'�CE �dk7r �'sf4s#fl1.7;§CE 7AS.k s,#a.�EFss��py.3z'i� �/L� n!#'ifs�34#f,"p4:f43 M.3u:tt A �Sk Res. No.2000-80 This Resolution Supersedes Res.Na. 2000-68 " ,.3s k _ r, Res. No.2000-80 This Resolution Supersedes-Res.No. 2000-68 A. Legal Description The following provides the legal description for the entire Crossings at Huntington Beach Specific Plan Area,which is bounded by Center Avenue on the north,Pacific Railroad on the east,Edinger Avenue on the south and Beach Boulevard on the west Refer to Exhibit I in the Specific Plan. PerirncterLegal Description Parcels I through 3,5 though 9 and that portion of Parcel 4,Parcel Map No:86-200, in the City of Huntington Beach,County of Orange,State of California z9 per map Med in Took 225 pages 44 through 45,inclusive,of parcel maps,in the offsce of the county recorder of said county,described as follows: Commencing at the intersection of the Centerline of the Southern Pacific Failma.d Right of Way(30 feet wide)with the centerline of Edinger Avenue(variable width),as said intersection is shown on said Parcel Map No.86-200;thence South 89 32'1270 Fast 4 5.00 feet along the centerline of said Edinger Avenue to the southerly prolongation of the Westerly line of parcel I of said parcel map;thence North 00 15'5 7"Past 50.00 feet to the southwest corner of said parcel 1 also being the True Point of BeSi=h r.thence North 00 15'57"Past 1120.67 feet along the westerly line of said parcel I to the northwest corner of said parcel 1;thence South 89 32'12"East 1803.57 feet along the northerly line of said parcel 1 and the northerly line of parcels 2,3 and 4 of said parcel map to the northeasters}line of said parcel 4;thence along a non-tangent curve in the northeasterly litre of said parcel 4,concave southwesterly and having a radius of 504.00 feet,a radial line to said point bears North 43 06;S 7"East;thence southeasterly along said curve through a central angle.of 1211'46"an arc distance of 107.28 feet; thence along the northeasterly lino of said parcel 4 the following 5 courses:South 34 41'37"East 207.33,South 31441170 East 229.95 feet to the beginning of a non- tangent curve,concave northeasterly and having a radius of 300.00 feet,a radial Tine to said point bears South 75 10153"West;thence along said curve through a central angel. of 50$8139"an arc distance of 266.92 feet,South 65 47'46"East 233.09 feet and South 3519TV East 70.61 few thence South 00 16150-1 West 273.62 Feet along a line that is parallel with the easterly line of said parcel 4 and 9.00 feet u steriy,thence South 42 16"20"West 41.42 feet along a line that that is parallel with the :_2(37fl�k line of said parcel 4 and 6.00 feet northwesterl�v to a point in the north 1ofaneasement to the city ofHuntat%Wrt Beach recorded Nowniber 9, 19 10418,page 968 official records in the office of the county recorded November 9, 1972 in book 10418,page 968 official records in the office of the county recorder of said county;thence North 89 32'12"West'533.76 feet•along said north line to the southeasterly corner of parcel 2 of said easement;thence North 44"32'12"West 41.01 feet along the northeasterly Irate of said parcel 2 to the north west corner of said Parcel 2;thence North 89 32'12"West 32.50 feet along the north line of sold parcel 2 to the nortltwen corner of said parcel 2;thence South 00 27148" West 37.00 fee:along the west line of said parcel 2.and said parcel F to the southerly line of parcel 4 of said Parcel map;thence North 89 32'12:2 West 1874.15 feet along the southerly,lines of parcels 1,2,3 and 4 of said parcel map to True Point of Beginning. Note: This description was prepared as a convenience only and is not for us in the division and/or conveyance of Iand in violation of the subdivision map act of the State of California Res. No.2000-B0 � •Hxrx r.�xc � . DTPA Resolution Supersedes Res.No. 2000-68 k� SECTIONAL DISTRICT MAP 14-5-11 CM OF HUNTI NGTON BEACH = -_ o � ORANGE COUNTY, CALIFORNIA Lr�--•--� e _ e RI = 111 its � - j K i 1 f 1• - '" SUBJECT At PROPERTY �CF-E � R Q 3 1 C4 � . . I � J. C4 C2 C4 a. C2 C2 �s At • xy - 11� R3 �3 43 Al �1 Its ��A1 EN18TING ZONING MI . hil _ .. -111 .� CF-g RI RI 111 , , ,.:�... DESIGNATION at - , Al at FU SUBJECT PROPERTY= R2.6 CG AND CG— P2 .n. �i .o ., MI{75"1 IZ M . In p n C4 (CHANGE PROPOSED TO cm A THE CROSSINGS AT cF .1 C2— )a E[UNTINGTON BEACH .. Mt M1 a SPECIFIC PLAN NO. 13) M[ R3 xa .R.,.... MI C C2 •3 s3z1 _ „ _ Ml �z_ R3 Isr C4 Res. No. 2000-80 STATE OF CALIFORNIA } COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) 1, CONNIE BROCKWAY, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a regular meeting thereof held on the 7th day of August, 2000 by the following vote: AYES: Julien, Sullivan, Green, Bauer NOES: Dettloff ABSENT: Harman ABSTAIN: Garofalo City Clerk and ex-officio Cferk of the City Council of the City of Huntington Beach, California