Loading...
HomeMy WebLinkAboutCity Council - 2007-59 'AEG n v4F_ RESOLUTION NO. 2007-59 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ESTABLISHING A CITYWIDE DEVELOPMENT FEES SCHEDULE AND REPEALING RESOLUTION NO. 2005-75 AND ALL SUPPLEMENTAL RESOLUTIONS THERETO WHEREAS, in 2005 the City Council commissioned Public Resource Management Group, LLC ("PRM") to identify the cost of fee-related services to assure the City was charging the proper amount of fee for the service. The PRM study determined that labor cost was an appropriate component of fees based on a fair distribution of all Citywide and departmental overhead costs as described in the 2005 study across all activities; and The City Council approved the PRM study in 2005, finding that fees for any service should include a cost component that can be directly or indirectly associated with the service; and City Council now desires to update the current fee schedule until such time as the City undertakes an analysis similar to the 2005 PRM; and City Staff has determined that the Consumer Price Index ("CPI") is a well established statistical estimate of the level of prices of goods and services bought for consumption for purposes by households. The change in the CPI is a measure of inflation and can be used as a reasonable indexation or evaluation of the cost of goods and services; and City Staff has further determined that the CPI Index, for the period of November 2005 to April 2007 has increased by 5.96%, which is a reasonable calculation of the increase of the City's overhead costs to provide City services; and The City Council desires to update existing fees charged to the public and to increase fees consistent with City Staff s analysis, and impose fees that do not exceed the estimated reasonable cost of providing the service for which the fees are imposed, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Huntington Beach as follows: 1. The fees set forth in Exhibit "A" and adopted by this Resolution shall be effective sixty(60) days following the adoption of this Resolution, and continue thereafter. 2. The City Council hereby determines that the CPI for the period since November, 2005 is 5.96% and is an accurate reflection of the increased departmental overhead costs incurred by the City to provide the City services included in Exhibit A. 07-1191/13548-development 1 Resolution No. 2007-59 BE IT FURTHER RESOLVED by the City Council of the City of Huntington Beach that Resolution No. 2005-75 is hereby repealed. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 4th day of September , 2007. a Mayo WE AND APPROVED: INITIATE AND APPROVED: City Administrator Finance Director APPROVED AS TO FORM: �- City Attorney M✓ 9-da-b7 07-1191/13548-development 2 Resolution No.2007-59 Resolution No. 2007-59 Building &Safety Department--Development Fees Fee Description Recommended New Fee Amount Building Permit Fees Permit Processing(All permits,plan reviews,including change of $ 30.44 contractor,owner,special inspector program,etc.) Inspection Fees(based on valuation): $1 to$500 $ 41.07 $501 to$2,000 $41,07 for first$500+$2.65 for each additional$100 or fraction thereof $2,001 to$25,000 $80.93 for first$2,000+$11.90 for each additional$1,000 or fraction thereof $25,001 to$50,000 $355.14 for first$25,000+$8.59 for each additional$1,000 or fraction thereof $50,001 to$100,000 $570.15 for first$50,000+$5.94 for each additional$1,000 or fraction thereof , $100,001 to$500,000 $867.30 for first$100,000+$4.75 for each additional$1,000 or fraction thereof $500,001 to$1,000,000 $2,766.19 for first$500,000+$4.04 for each additional$1,000 or fraction thereof $1,000.000 and up $4,783.03 for first$1,000,000+$3.10 for each additional$1,000 or fraction thereof Building Plan Review Fees: Normal 76%of the Building Inspection Fee Exception(Standard Production Units after model unit reviewed; 25%of the Building Inspection Fee Projects requiring additional reviews,by valuation $100,000 or less-2 or more reviews Actual fully burdened costs $100,001-$1,000,000-3 or more reviews Actual fully burdened costs $1,000,001 or more-4 or more reviews Actual fully burdened costs Investigation Fee Equal to fully-burdened costs for the permit to which it applies,or actual time spent investigating,whichever is greater. (Not less than$195.03 for building permits) Foundation or partial Building Inspection Fee Based on Valuation Reinspection Fee $ 95.48 Expired Permits Reactivate permit for projects expired LESS than 6 months $31.48,PLUS 1/2 New Inspection Fees Reactivate permit for projects expired GREATER than 6 moni $31.48,PLUS New Inspection Fees Certificate of Occupancy: Certificate in conjunction with building permit $0.00 Modified certificate without additional inspection/admin. $ 30.44 Certificate when Inspection/Administrative Services required B&M Occupancies $ 150.00 All Other Occupancies $ 250.00 B&M Occupancies requiring services greater than 75 minute $91.40/hr All Other Occupancies requiring services greater than 250 mir $91.40/hr Temporary Certificate(hourly) Actual fully burdened costs($150.00 minimum for B&M Occupancies) Actual fully burdened costs($250,00 minimum for All Occupancies except B&M) Record Retention Fee: Each sheet of permitted drawings $ 4.01 Each Issued permit $ 1.04 Counter Staff Research/Special Services(More than 10 min.) hourly rates Resolution No. 2007-59 Building & Safety Department--Development Fees _T Fee Description Recommended New Fee Amount Copies of City Records on microfilm(16 or 35mm): 1st copy $ 3.00 Additional copy $1.50 each Xerox copies(per page) $ 0.10 Building Plan Review Extension $ 137.57 Building Permit Extension $ 133.18 Building Relocation Inspection fee hourly rates Building Demolition Review and inspection Calculated using building valuation table,based on $2.00/sf valuation Inspection Fee(Includes sewer cap) Electrical Permit Fees Inspection Fees: Minimum$30.45 New single and multiple-family residential buildings including $0.07/sq foot,$30.45 minimum additions and attached garages Each service meter $0.37/AMP,$30.45 minimum Each sub panel $ 18.10 Each self-contained,factory-wired,approved unit(2-HP max over 2-HP see generators,motors and transformers) $ 9.30 Lighting Fixtures: First 50 fixtures,each $ 1.48 Each additional fixture $ 0.75 Each pole with fixtures $ 9.30 Generators,Motors and Transformers: HP,kW,or KVA.Rating of Equipment up to and including two $ 9.30 Over two(2)and not over ten(10) $ 18.10 Over ten(10)and not over fifty(50) $ 37.49 Over fifty(50) $ 91.78 Receptacle and Switch Outlets: First fifty(50)outlets,each $ 1,48 Each additional outlet $ 0.75 Each section of track lighting or multiple outlet assembly $ 4.65 Signs: 1 st sign at one address $ 91_78 Each additional sign at the same address $ 37.49 Fuse up $ 74.98 Temporary service: Each temporary or construction pole(including lights and $ 37.49 outlets for outdoor uses) Each sub-pole with panel $ 18.10 Each misc.item regulated by HB Electrical Code where no fee listed Photovoltaic-Solar $0,00 Photovoltaic-with battery backup and emergency circuit panel $0.00 Each misc.item regulated by HB Electrical Code where no fee $ 18.10 Electrical Plan Review fee 123%of electrical inspection,minimum$49.50 Resolution No. 2007-59 Building & Safety Department--Development Fees Fee Description Recommended New Fee Amount Mechanical Permit Fees Inspection Fees: Minimum$30.45 Installation or relocation of each furnace,including ducts and/or vents attached to such appliance $ 31.74 Each Fire and/or Smoke Damper $ 13.22 Relocation or replacement of each appliance vent not included $ 13.22 in an appliance item also permitted HVAC Duct Extension/Relocation for 1 to 10 ducts $ 25.39 Each Additional Duct $ 3.17 Installation or relocation of each boiler to 15hp or compressor $ 31.74 to and including 5 tons,including attached cuts and/or vents Installation or relocation of each boiler over 15 hp or compressor over 5 tons,including attached ducts and/or vents $ 78.26 Each evaporative cooler(non-portable type) $ 15.33 Exhaust fan connected to a single environmental air duct (includes residential cooking hoods) $ 7.94 Each Air Handling unit not part of a factory-assembled applia $ 15,33 Each ventilation system less than or equal to 100,000 cfm which is not a portion of any HVAC system authorized by permit $ 15.33 Each ventilation system less more or equal to 100.000 cfm $ 31.74 which is not a portion of any HVAC system authorized by permit Hood served by mechanical exhaust including duct/fan $ 31.74 Miscellaneous items including all factory-built stoves,ovens, $ 15.33 Factory Built fireplaces $ 16.33 Each low pressure gas-piping system up to.5 psi $ 16.48 Each medium or high pressure gas piping system exceeding .5 psi $ 57.63 Each misc.item regulated by HB Mechanical Code where no fee listed $ 15.33 Mechanical Plan Review Fee 113%of inspection fee minimum$49.50 Resolution No. 2007-59 Building &Safety Department-- Development Fees _T Fee Description Recommended New Fee Amount Plumbing Permit Fee Inspection Fees: Minimum$30.45 Each plumbing fixture $ 18.74 Each building sewer $ 37.49 Rainwater systems-per drain $ 9.37 Each water heater and or vent $ 18-74 Each low pressure gas-piping system,up to.5 psi $ 16.48 Each medium or high pressure gas piping system exceeding.5 i $ 57.63 Each waste interceptor or each kitchen grease trap $ 37.49 Installation or alteration of water piping.including vacuum breakers or backflow devices $ 37.49 Water Treating Equipment $ 18.74 Floor Drain or floor sink $ 18.74 Each misc.item regulated by HB Plumbing Code where no fee is listed $ 18.74 Sump Pumps(sewage or rainwater) $ 18.74 Medical Gas System of 1 to 5 outlets $ 123.01 Each additional medical gas outlet $ 12.30 Each misc.item regulated by HB Plumbing Code where no fee $ 18.74 Plumbing Plan Review Fee 126%of inspection fee,minimum$49.50 Swimming Pool Permit Fees Building Inspection Fee 1.32x as established herein Building Plan Review Fee 76%of building inspection fee Planning Plan Review Fee 24%of building inspection fee Electrical Items $ 86.51 Exception:Above ground spas Plumbing Items $ 80.22 Exception:Above ground spas Pre-Site Inspection $ 91.40 Miscellaneous Fees Issuance of Revised Permits or Permits not listed $ 30.44 Automation fee 4.1%of all development fees for all Development Services in each Department Fee Refunds $ 67.68 Resolution No. 2007-59 Building & Safety Department-- Development Fees Fee Description Recommended New Fee Amount Special Services Fees and Conditions Counter Services during normal work hours-hourly rate $ 70.09 Inspection during normal work hours-hourly rate $ 91.40 Plan Review during normal work hours-hourly rate $ 117.28 Supervisory Services during normal work hours-hourly rate $ 130.91 Counter Services outside normal work hours-hourly rate $ 105.13 Inspection outside normal work hours-hourly rate $ 137.09 Plan Review outside normal work hours-hourly rate $ 175,91 Supervisory Services outside normal work hours-hourly rate $ 196.38 Recording and Release of Non-Compliance-Permit Expiration $ 95.36 Energy Systems Fees may be waived for Plumbing,Mechanical and Electrical permits issued by the Department of Building&Safety for electrical,mechanical or plumbing systems that either produce energy or save natural resources and exceed State and Federal minimum requirements. Examples include,but are not limited to,photovoltaic systems,solar water heating systems,high efficiency furnaces and high efficiency air conditioners. Solar Energy Permit Fees Inspection Fees: $0.00 Each appliance or piece of equipment regulated by HB Solar Energy code $0.00 Plan Review Fee $0.00 *Fees last updated November 21,2005,per Resolution No.2005.75 Resolution No. 2007-59 Community Services -- Development Fees Fee Description Recommended New Fee Amount Consulting/Meeting Fee - hourly rate N/A *Fees last updated November 21, 2005, per Resolution No. 2005-75 Resolution No. 2007-59 Fire Department - Development Fees Fee Description Recommended New Fee Amount Underground Tank Installation Permit $ 1,263.00 Underground Tank Install Inspection each additional tank $ 92.00 Underground Tank Removal Inspection $ 300.00 Underground Tank Removal Inspection each additional tank $ 92.00 Underground Tank Re-pipe Inspection/Permit $ 850.00 Aboveground -Storage Tank Installation Permit $ 759.00 Aboveground -Storage Tank Removal Permit $ 253.00 Aboveground -Storage Tank Removal- Each additional tank $ 92.00 Plan Check Fee- Methane Protection System: 0-5,000 sq feet $ 172.00 5,001-10,000 sq feet $ 319.00 10,001-25,000 sq feet $ 416.00 25,001 &over $ 612.00 Methane Protection System Inspection: 0 to 2,500 square feet with 2 risers $ 392.00 per square foot over 2,500 sq ft $ - additional risers $ 147.00 each additional floor over three stories $ 49.00 Methane Protection System Repair Inspection $ 220.00 Project Review-Soil Remediation: Soil Remediation Phase 1 $ 249.00 Soil Remediation Phase II or III $ 427.00 Soil Remediation - Each Subsequent review $ 427.00 Confirmation Testing/Site Closure Review $ 249.00 Consultant fee(deposit,final consultant fee charges based on actual per hour charges) See Footnote (a) Flammable Liquid Dispenser Removal & Replacement $ 300.00 Soil Gas Remediation Project Permit $ 495.00 Gas Staion Soil Gas Remediation Installation Permit $ 477.00 Resolution No. 2007-59 Fire Department - Development Fees Fee Description Recommended New Fee Amount Sprinkler System: Per Head $ 6.00 Plus base fee-single family $ 295.00 Multi Family Residences $ 392.00 Commercial/Industrial $ 392.00 Tenant Improvement $ 295.00 Hydraulic Calculation $ 196.00 Sprinkler Underground - Per Riser $ 588.00 Welded Pipe Inspection $ 367.00 Fire Alarm System: Per Device $ 16.00 Plus base fee-single family $ 196.00 Multi Family Residences $ 392.00 Commercial/Industrial $ 392.00 Tenant Improvement $ 196.00 Dry/Wet Chemical Protection System $ 392.00 Water System (flush test, water monitor, standpipe) $ 392.00 Spray Booth $ 491.00 Medical Gas System $ 392.00 Industrial Oven $ 392.00 Special Protection Systems (dust,vapor,halon,mechanical, air,CO2,methane or other) $ 588.00 Emergency Fire Access Gates, Pedestrian or Vehicular Plan Review and Inspection $ 379.00 Fire Lane Plan Review and Field Inspection $ 468.00 Street Name Change $ 723.00 New Street Name Review: 0-5 Names $ 427.00 6-10 Names $ 693.00 11-14 Names $ 959.00 15 + Names $ 1,226.00 Resolution No. 2007-59 Fire Department - Development Fees Fee Description Recommended New Fee Amount Plan Check- Cellular Site $ 69.00 Plan Check-Single Family Residence- New $ 69.00 Plan Check-Single Family Residence-Addition/Remodel $ 69.00 Plan Check- Pool/ Spa $ 41.00 Plan Check-Commerical/Industrial - New $ 176.00 Plan Check-Commerical/Industrial - Minor Remodel/Tenant Improvement $ 69.00 Plan Check-Commerical/Industrial - Major Remodel/Tenant Improvement $ 122.00 Plan Check- Rack/High pile Storage $ 97.00 Plan Check- Residential Complex/Subdivision $ 229.00 Plan Review- DPR, CUP, EIR- Residential, Subdivision, Commerical, Industrial $ 229.00 Plan Check- Rough/Precise Grading -Single Family Residence $ 69.00 Plan Check- Multi-family residential, subdivision, commerical, industrial, educational $ 122.00 Plan Check-School Sites $ 176.00 Special projects requiring Fire Department review See Footnote (b) *Fees last updated November 21, 2005,per Resolution No. 2005-75 Footnote(a)-There is a$350 deposit for the Consultant. NOTE. Final Consultant fee charges will be based on actual per hour charges. Footnote(b)-These fees will be charged at hourly rates based on employee providing the service. Footnote(c)-The fee structure for false alarms will remain the same, with the first two calls within one year free. Footnote(d)-Previously, the Fire Dept.charge for Building review was calculated using a percentage of the Building permit costs. The Fire Dept,will now charge a flat or hourly fee for plan checks. Footnote(e)-Other services not listed will be charged by hourly rate determined by the position required to perform the service. All after hours and nighttime inspections will be charged at time-and-a-half. Resolution No. 2007-59 Planning Department -- Development Fees Fee Description Recommended New Fee Amount/No recommended change at present Planning Commission Actions Annexation Request $ 16,445.00 Coastal Development Permit"* $ 4,255.00 Conditional Use Permit- New Residential $ 8,215.00 Conditional Use Permit-Comm/Ind/Mixed Use < 1/2 Block $ 6,668.00 Conditional Use Permit-Comm/Ind/Mixed Use> 1/2 Block $ 19,359.00 Entitlement Continuance $286 + costs of Notice of Publication, if applicable Development Agreement- Original Contract or Significant Amendment $29,310 deposit+ fully burdened cost Development Agreement Minor Amendment $17,620 deposit+ fully burdened cost Development Agreement-Annual Review-Administrative $ 3,249.00 Development Agreement-Annual Review- Planning Commission Hearing $ 3,686.00 Entitlement Plan Amendment- New Hearing $ 3,860.00 Entitlement Plan Amendment- Director Review $ 1,948.00 General Plan Amendment-GPA Major $ 31,650.00 General Plan Amendment-GPA Minor $ 17,289.00 General Plan Conformance $ 4,084.00 Local Coastal Program Amendment $ 7,018.00 Reversion to Acreage $ 2,762.00 Special Permit $ 1,971.00 Tentative Tract Map $20,317 plus$30/lot Variance $ 3,319.00 Zoning Map Amendment $ 18,512.00 Zoning Map Amendment- Precise Plan of Street Alignment $ 12,685.00 Zoning Map Amendment- Mobile Home Park Conversion Review $ 24,859.00 Zoning Text Amendment-Major $ 14,580.00 Zoning Text Amendment-Minor $ 8,105.00 Resolution No. 2007-59 Planning Department -- Development Fees Fee Description Recommended New Fee Amount/No recommended change at present* Zoning Administrator Actions: Coastal Development Permit-Single Family** $ 2,780.00 Coastal Development Permit-All Others** $ 2,896.00 Conditional Use Permit $ 3,427.00 Conditional Use Permit- Fences $ 1,895.00 Entitlement Continuance $ 202.00 Entitlement Plan Amendment- New Hearing $ 2,035.00 Entitlement Plan Amendment- Director Review $ 1,304.00 Temporary Use Permits $1,739 + $500 bond (if applicable) Tentative Parcel Map $ 3,908.00 Tentative Parcel Map Waiver $ 1,718.00 Tentative Tract Map $6,757 plus$30/lot Variance $ 2,350.00 Environmental Processing: Environmental Assessment $ 6,969.00 Mitigated Negative Declaration $2,000 + cost of environmental assessment study Mitigation Monitoring -Mit. Neg. Dec. $2,119 Environmental Processing -Mitigation Monitoring - EIR Plus 10% of EIR $2,491 + 8% of EIR EIR Consultant Prepared $53,883 deposit plus cost of studies EIR Staff Prepared $108,152 deposit plus cost of studies Resolution No. 2007-59 Planning Department -- Development Fees Fee Description Recommended New Fee Amount/No recommended change at present* Other Reviews and Services: Address Assignment Processing -Staff Review $ 847.00 Address Change-Staff Review $ 243.00 Animal Permits-Staff Review $ 177.00 Categorical Exclusion Letter-Staff Review $ 202.00 CC&R Review-Staff Review $ 972.00 Certificate of Compliance-Staff Review $ 493.00 Design Review Board $ 867.00 Extension of Time-Staff Review $ 327.00 Final Parcel Map-Staff Review $ 1,050.00 Final Tract Map-Staff Review $ 1,449.00 Initial Plan, Zoning Review-Staff Review $ 252.00 Limited Sign Permit-Staff Review $ 610.00 Planned Sign Program -Single User and Amendment $ 682.00 Planned Sign Program - Multiple Users $ 1,124.00 Sign Code Exception -Staff Review $ 780.00 Sign Code Exception - Design Review Board $ 1,507,00 Site Plan Review-Staff Review $ 4,153.00 Temporary Sign Permit-Staff Review $ 73.00 Temporary Sales/Event Sign Permit-Staff Review $ 270.00 Appeals to Planning Commission -Single Family Residence appealing decision $ 1,236.00 of own property Appeals to Planning Commission -All Others $ 1,507.00 Appeal Director's Decision - Public Hearing $ 475.00 Appeal Director's Interpretation - Non-Public Hearing $ 400.00 Appeals to City Council-Single Family Residence appealing decision of own $ 1,480.00 property Appeals to City Council-All Others $ 2,285.00 Lot Line Adjustment/Lot Merger Staff Review $ 530.00 Resolution No. 2007-59 Planning Department -- Development Fees Fee Description Recommended New Fee Amount/No recommended change at present* Administrative Permit- List 1**` $ 530.00 Administrative Permit- List 2*** $ 900.00 Administrative Permit- List 3*** $ 1,021.00 Outdoor dining license agreement application fee $ 30.00 Outdoor dining licence agreement Use Charge (per square foot) $ 0.01 Outdoor dining license agreement Code Enforcement Fee (per square foot) $ 4.00 Design Review Board-staff $ 270.00 Address Assignment-Meter Only $ 110.00 Code Enforcement Re-inspection Fee $ 163.00 Notice and Order $ 946.00 Vehicle Abatement $ 166.00 Planning Plan Review Standard 70% of building inspection fee Planning Plan Review Production Units 24% of building inspection fee *Fees last updated November 21, 2005,per Resolution No. 2005-75. Planning Department development fees listed on this schedule will not be adjusted at this time. Further study and research will be performed by Staff with recommendations to be forthcoming. **Reduced 50%when processed concurrently with a Conditional Use Permit, Tentative Map or Variance ***Administrative Permit List 1: Outdoor Dining,Eating and Drinking Establishments,Fence Extensions(<87, Personal Enrichment Services,and Home Occupations ***Administrative Permit List 2: Parking Reduction, Carts and Kiosks, Waiver of Development Standards,Medical Marijuana Dispensaries,Non-conforming structure additions ***Administrative Permit List 3: Privacy Gates, Game Centers,Accessory Dwelling Units, Manufactured Home Parks Resolution No. 2007-59 Public Works -- Development Fees Fee Description Current Fee Amount* Recommended New Fee Amount Bond reduction (partially completed projects) $ 1,089,00 $ 1,154.00 Cash Bond Processing $ 208.00 $ 220.00 Construction Water(per unit) $ 96.00 $ 102,00 Development Processing/Inspection by contract service Cost Dock Construction Plan Review/Inspection $ 466,00 $ 494.00 Encroachment Permit (plus inspection fee) $ 103.00 $ 109.00 Utility Co Encroachment Permit(plus inspection fee) $ 176.00 $ 186.00 Encroachment Permit Expired (Penalty) $ 67,00 $ 75,00 Encroachment Permit(None/working without) (Penalty) $ 140.00 $ 250.00 Excessive Plan Check >3 per sheet/per occurrence $ 345.00 $ 366.00 Final Parcel Map Check $ 2,041,00 $ 2,163.00 Final Tract Map Check $2,086 or$100 per lot whichever is greater $2207 or$106 per lot whichever is greater Fire Hydrant Flow Analysis (1 st run) $ 521.00 $ 552.00 Fire Hydrant Flow Analysis (each additional run) $ 115.00 $ 122.00 Grading Plan Check & Inspection: (0-300 cubic yards) $ 3,520.00 $ 3,730,00 (301-5,000 cubic yards) $ 4,066.00 $ 4,308.00 (5,001-10,000 cubic yards) $ 6,572.00 $ 6,964.00 (10,001-200,000 cubic yards) $ 8,178.00 $ 8,665.00 Each additional 10,000 cubic yards $ 611.00 $ 647,00 Hardscape Inspection Plus 3%of costs of on site improvements Plus 3%of costs of on site improvements Hardscape Plan Check Plus 2%of costs of on site improvements Plus 2%of costs of on site improvements Landscape Inspection: Less than or Equal to 1,000 sq ft $ 203.00 $ 215.00 Each additional 1,000 sq ft $ 51.00 $ 24.00 Residential Street Tree Only $ 51.00 $ 54.00 Resolution No. 2007-59 Public Works -- Development Fees Fee Description Current Fee Amount* Recommended New Fee Amount Landscape Plan Check: Single Family Dwelling $ 399.00 $ 423.00 Tract Map $ 859.00 $ 910.00 Commercial/Industrial/Multi-Family Dwelling per sheet $ 351.00 $ 372.00 Lot Line Adjustment (Public Works) $ 561.00 $ 594.00 Obstruction Permit $ 103.00 $ 109.00 Public Improvement Inspection (after hours) min 4 hours $ 372.00 $ 394.00 Public Improvement Inspection (after hours) 8 hours $ 743.00 $ 787.00 Public Improvement Inspection per hour for billed utility companies $ 92.00 $ 97.00 Public Improvement Plan Check: Single Family Dwelling 1-2 sheets $ 3,027.00 $ 3,207.00 All Others < 3 sheets $5,635 plus $750 per sheet >3 $5,956 plus $793 per sheet >3 Public Works Re-inspection (each) $ 92.00 $ 97.00 Recordation Fee (as-builts per sheet) $ 100.00 $ 106.00 Street Vacation: Full vacation $ 3,702,00 $ 3,923,00 Summary vacation $ 861.00 $ 912.00 Street Lighting Plan Check- Per Sheet $ 1,265.00 $ 1,340.00 Survey Fee (per point) $ 20.00 $ 21.00 Traffic Control Plan Check- Per sheet $ 1,167.00 $ 1,237.00 Traffic Signal Plan Check - Per sheet $ 2,556.00 $ 2,708.00 Traffic Signs &Striping Plan Check - Per Sheet $ 1,273.00 $ 1,349.00 *Fees last updated October 6, 2006, per Resolution No. 2006-47 Res. No. 2007-59 STATE OF CALIFORNIA COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a regular meeting thereof held on the 4th day of September, 2007 by the following vote: AYES: Bohr, Carchio, Cook, Coerper, Green, Hansen, Hardy NOES: None ABSENT: None ABSTAIN: None Ci lerk and ex-officio erk of the City Council of the City of Huntington Beach, California