HomeMy WebLinkAboutCity Council - 2009-32 RESOLUTION NO. 2009-32
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
HUNTINGTON BEACH ESTABLISHING A CITYWIDE DEVELOPMENT
FEE SCHEDULE AND REPEALING RESOLUTION NO. 2007-59 AND
ALL SUPPLEMENTAL RESOLUTIONS THERETO
WHEREAS, on September 4, 2007, the City Council adopted Resolution No. 2007-59
establishing a fee schedule for development fees; and
The City Council desire to update existing development fees charged to the public; and
The City Council has reviewed a comprehensive fee study prepared by MGT America dated
May 1, 2009 ("MGT report"). Pursuant to the MGT report and staff concurrence, the fees do not
exceed the reasonable cost of providing the service for which the fee is collected; and
The City Council desires to establish fees consistent with MGT's report and staff
recommendation, and finds that the fees hereinafter established do not exceed the estimated reasonable
cost of providing the service for which the fees are imposed.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Huntington Beach
that the fees set forth in Exhibit "A" and adopted by this Resolution shall be effective sixty (60) days
following the adoption of this Resolution, and continue thereafter.
BE IT FURTHER RESOLVED that the City Council of the City of Huntington Beach has
determined that due to current economic conditions, implementation of certain Development fees as
specifically identified in the attached Exhibit A, will go into effect in three phases to reach 100% of the
City's cost recovery.
BE IT FURTHER RESOLVED that Resolution No. 2007-59 and all supplemental resolutions
are hereby repealed.
PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular
meeting thereof held on the 15 t h day of June 2009.
0
Mayor
REVIE APPROVED: INIT TED AND APPRO D:
City tlistiator Finance Director
Z>�5iyPROVED AS TO FORM:
Att rney l(�' �t1 - c` �j•�'!1
09-1982f33848-development
Resolution No.2009-32
Building & Safety Department -- Development Fees
Fee Description Current Fee Amount Recommended"New,Fee"Amount"
Building Permit Fees
Permit Processing (All permits, plan reviews, including change of
contractor,owner, special inspector program,etc,) $ 30.44 $ 30.00
Inspection Fees(valuation based on valuation table presented on
pages 8-12):
$1 to$500 $ 41,07 $" 55,OQ
$41.07 for first$500+$2.65 for each additional$100 or $56:00 for first$500.00+1160 for each
$501 to$2,000 fraction thereof additional$100.0„0 or"fraction thereof
$80.93 for first$2,000+$11.90 for each additional ' $110.00 for first$2,000M+'-$16.18 for each
$2,001 to$25,000 $1,000 or fraction thereof additional$1,000.00 orfraction thereof
$355.14 for first$25,000+$8.59 for each additional $483.001or first$25',000.00"+$1.1.68 for each
$25,001 to$50,000 $1,000 or fraction thereof additional$1,00000,orfraction thereof
$570.15 for first$50,000+$5,94 for each additional " 1775.00 for first":$50 000;00'+",$8,08 for each
$50,001 to$100,000 $1,000 or fraction thereof" additional$1 000.0'0 orfraction thereof
$867,30 for first$100,000+$4.75 for each additional $1,180.00 for first$100,000M+$6.46 for
$100,001 to$500,000 $1,000 or fraction thereof each additional$1,000,00,orfraction thereof
$2,766.19 for first$500,000+ $4.04 for each additional $3,762.00 for first,$500,000.00+$5,49 for
$500,001 to$1,000,000 $1,000 or fraction thereof , each'additional$1",000.00 or fraction thereof
$4,783.03 for first$1,000,000+$3,10 for each additional $6,505.00 for first$1,000,000+`$4,22 for each
$1,000,000 and up $1,000 or fraction thereof additional$1,000.00 or"fraction thereof, 9
0
Building Plan Review Fees:
Normal 76%of the Building Inspection Fee 79%of the"Building1hspection Fee
Exception(Standard Production Units after model unit reviewed) 25%of the Building Inspection Fee 260/.of the Building Inspection Fee o
Projects requiring additional reviews, by valuation o
$100,000 or less-2 or more reviews Actual fully burdened costs Actual,fully burdened costs
$100,001 -$1,000,000-3 or more reviews Actual fully burdened costs Actual fully burdened costs ti
$1,000,001 or more-4 or more reviews Actual fully burdened costs Actual fully burdened,costs
Page 1
Building & Safety Department ea Development Fees
Fee Description Current Fee Amount Recommended New Fee Amount
Investigation Fee Equal to fully-burdened costs for the permit to
Equal to fully-burdened costs for the permit to which it which it applies,or actual time spent
applies,or actual time spent investigating,whichever is investigating,whichever is greater. '(Not less
greater, (Not less than$195.03 for building permits) than$250,00 for-building permits)
Foundation or partial Buildina Inspection Fee Based on Valuation Based,on Valuation
Reinspection Fee $ 95.48 $120.00
Expired Permits
Reactivate permit for projects expired LESS than 6 months $31,48, + 1/2 New Inspection Fees $32.00,+ 1/2 New,inspection Fees
Reactivate permit for projects expired GREATER than 6 months $ 31.48 , + New Inspection Fees $32.60, + New Inspection Fees
Certificate of Occupancy:
Certificate in conjunction with building permit $0.00 $ 0.00
Modified certificate without additional inspection/admin. $ 30.44 $ 30.00
Certificate when Inspection/Administrative Services required
B& M Occupancies $ 150.00 $ 100.00
All Other Occupancies $ 250.00 $. 225.00
B& M Occupancies requiring services greater than 75 minutes $91.40/hr $100.00/hr
All Other Occupancies requiring services greater than 250
minutes $91.40/hr $100.00/hr
Cn
cn
Actual fully burdened costs($150.00 minimum for B&M Actual fully burdened*to,($,gq,;00 minimum
Temporary Certificate(hourly) Occupancies) fo(B�&:M Occupancies) '
Actual fully burdened costs($250.00 minimum for All Actual_fully burdened oosts`($225:r00 minimum
Occupancies except B&M) for All Occupancies;except B&M) P
N
O
Record Retention Fee:
Each sheet of permitted drawings $ 4.01 $ : 5.00
Each Issued permit $ 1,04 $ 1.50
Counter Staff Research/Special Services(More than 10 min.) hourly rates hourly rates
Page 2
Building & Safety Department -- Development Fees
Fee Description Current Fee Amount Recommended New Fee Amount
Copies of City Records on microfilm(16 or 35mm):
1 st copy $ 3.00 $ 3.00
Additional copv $1.50 each $1.50 each
Xerox copies(per page) $ 0.10 $ 0.10
Building Plan Review Extension $ 137.57 $ 100.00
Building Permit Extension $ 133.18 $ 100.00
Building Relocation Inspection fee hourly rates hourly rates
Building Demolition Review and inspection Calculated using building valuation table, based on Calculated using building valuation table,
$2.00/sf valuation based on $2.00/sf valuation
Inspection Fee(Includes sewer cap)
Electrical Permit Fees
Inspection Fees: Minimum$30,45 $, 28.00
New single and multiple-family residential buildings including
additions and attached garages $0.07/sq foot,$30.45 minimum ,$0.12/sq,foot,$28.00 minimum
Each service meter $0.37/AMP, $30.45 minimum `$0:62/AMP,'$28.00 minimum
Each sub panel $ 18.10 . $ 30.00
Each self-contained,factory-wired, approved unit(2-HP max over 2-
HP see generators, motors and transformers) $ 9.30 $ 16.00
Lighting Fixtures:
CA
First 50 fixtures, each $ 1.48 $ 2.50
Each additional fixture $ 0.75 $ 1.25 0•
Each pole with fixtures $ 9.30 $ 16.00
z
0
Generators, Motors and Transformers: N
HP, kW,or KVA. Rating of Equipment up to and including two(2)
$ 9.30 $ 16.00 w
Over two(2)and not over ten(10) $ 18.10 $ 30.00
Over ten(10)and not over fifty(50) $ 37.49 $ 65:00
Over fifty(50) $ 91.78 ,.$ 155.00
Paae 3
Building & Safety Department -- Development Fees
Fee Description Current Fee Amount Recommended New Fee.Amount
Receptacle and Switch Outlets:
First fifty(50)outlets,each $ 1.48 $ 2.50
Each additional outlet $ 0.75 $ 1.25
Each section of track lighting or multiple outlet assembly $ 4.65 $ 8.00
Signs:
1 st sign at one address $ 91.78 $ 155.00
Each additional sign at the same address $ 37.49 $ 65.00
Fuse up $ 74.98 $" 40:00
Temporary service:
Each temporary or construction pole(including lights and outlets
for outdoor uses) $ 37.49 $ 65.00
Each sub-pole with panel $ 18.10 $ 30.00
Each misc. item regulated by HB Electrical Code where no fee
listed $ 30.00
Photovoltaic-Solar $0.00 $ 0,00
Photovoltaic-with battery backup and emergency circuit panel $0.00 $ 0.00
Each misc. item regulated by HB Electrical Code where no fee
listed $ 18.10 $ 30.00
Electrical Plan Review fee 123%of electrical inspection, minimum$49.50 75%of electrical inspection,minimum$55.00
Reviews in excess of 3 submittals Actual fully burdened hourly rate '
z
0
N
O
O
Ip
W
N
Building & Safety Department -- Development Fees
Fee Description Current Fee Amount Recommended New Fee Amount
Mechanical Permit Fees
Inspection Fees: Minimum$30.45 Minimum$28.00
Installation or relocation of each furnace, including ducts and/or
vents attached to such appliance $ 31.74 • $ 60.00
Each Fire and/or Smoke Damper $ 13.22 $ 26.00
Relocation or replacement of each appliance vent not included in
an appliance item also permitted $ 13.22 , $ 26,00
HVAC Duct Extension/Relocation for 1 to 10 ducts $ 25.39 $ 38.00
Each Additional Duct $ 3.17 $ 5.00
Installation or relocation of each boiler to 15hp or compressor to
and including 5 tons, including attached cuts and/or vents $ 31.74 $ 65.00
Installation or relocation of each boiler over 15 hp or compressor
over 5 tons, including attached ducts and/or vents $ 78.26 $ 155.00
Each evaporative cooler(non-portable type) $ 15.33 $ 31.00
Exhaust fan connected to a single environmental air duct(includes
residential cooking hoods) $ 7.94 $ 16.00
Each Air Handling unit not part of a factory-assembled appliance
$ 15.33 $ 31.00
Each ventilation system less than or equal to 100,000 cfm which is
not a portion of any HVAC system authorized by permit $ 15.33 $ 31.00
Each ventilation system less more or equal to 100,000 cfm which o
is not a portion of any HVAC system authorized by permit $ 31.74 $ 65.00 2.
Hood served by mechanical exhaust including duct/fan 31.74 $ 65.00 0'
Miscellaneous items including all factory-built stoves,ovens, etc. $ 15.33 $ 31.00 z
Factory Built fireplaces $ 15.33 $ 31.00 P
Each low pressure gas-piping system up to .5 psi $ 16,48 $ 25.00 c
Each medium or high pressure gas piping system exceeding .5 psi
$ 57.63 $ 85.00 N
Each misc. item regulated by HB Mechanical Code where no fee listed
$ 15.33 $ 31.00
Mechanical Plan Review Fee 113%of inspection fee minimum$49.50 81%of inspection fee minimum$55.OQ
Reviews in excess of 3 submittals Actual fully burdened hourly rates
Pa0P.5
Building & Safety Department --,Development Fees
Fee Description Current Fee Amount Recommended New Fee Amount
Plumbing Permit Fee
Inspection Fees: Minimum$30.45 -Minimum$28.00
Each plumbing fixture $ 18.74 $ 28,00
Each building sewer $ 37.49 $ 55`.00
Rainwater systems-per drain $ 9.37 $ 14.00
Each water heater and or vent $ 18.74 $ 28.00
Each low pressure gas-piping system, up to .5 psi $ 16.48 $ 25.00
Each medium or high pressure gas piping system exceeding .5 psi
$ 57.63 $ 85.00
Each waste interceptor or each kitchen grease trap $ 37.49 $ 55.00
Installation or alteration of water piping, including vacuum breakers
or backflow devices $ 37.49 $ . 55.00
Water Treating Equipment $ 18.74 $ 28.00
Floor Drain or floor sink $ 18.74 $ 28,00
Each misc. item regulated by HB Plumbing Code where no fee is
listed $ 18.74 $ 28.00
Sump Pumps(sewage or rainwater) $ 18.74 $ 28.00
Medical Gas System of 1 to 5 outlets $ 123.01 $ 185.00
Each additional medical gas outlet $ 12.30 $ 18.00
Each misc. item regulated by HB Plumbing Code where no fee
listed $ 18.74 $ 28.00
Plumbing Plan Review Fee 126%of inspection fee, minimum$49,50 76%of inspection fee, minimum$55.00
Reviews in excess of 3 submittals Actual fully'burdened hourly rates 0'
Swimming Pool Permit Fees o
Building Inspection Fee 1.32 x as established herein 1.0 x as established herein o
Building Plan Review Fee 76%of building inspection fee 79%of building,inspection fee o
Planning Plan Review Fee 24%of building inspection fee 26%of buildinginspection.fee N
Electrical Items $ 86.51 $ 85.00
Exception:Above ground spas
Plumbing Items $ 80.22 .$ ., 80.00
Exception:Above ground spas
Pre-Site Inspection $ 91.40 $ 85,00
Pana R
Building & Safety Department-- Development Fees
Fee Description Current Fee Amount 'Recommended New Fee Amount
Miscellaneous Fees
Issuance of Revised Permits or Permits not listed $ 30.44 $ 30.00
Automation fee 4.1%of all development fees for all Development 4.0%of all,development fees for all
Services in each Department Development Services in each Department
Fee Refunds $ 67.68 _$ 60.00
Special Services Fees and Conditions
Counter Services during normal work hours-hourly rate $ 70.09 $ 75.00
Inspection during normal work hours-hourly rate $ 91.40 $ 85.0,0
Plan Review during normal work hours-hourly rate $ 117,28 $ 125.0
Supervisory Services during normal work hours-hourly rate $ 130.91 $ 135.00
Counter Services outside normal work hours-hourly rate $ 105.13 $ 110.00
Inspection outside normal work hours-hourly rate $ 137.09 $ 125.Q0
Plan Review outside normal work hours-hourly rate $ 175.91 $ 190,00
Supervisory Services outside normal work hours-hourly rate $ 196.38 $ 200.00
Recording and Release of Non-Compliance-Permit Expiration $ 95,36 $ 110.00
Energy Systems Fees may be waived for Plumbing, Mechanical
,and,Electrical permits,!ssued',by the Department
Fees may be waived for Plumbing, Mechanical and of Building&Safety for electrical;mechanical or
Electrical permits issued by the Department of Building& plumbing systems that either produce energy or
Safety for electrical, mechanical or plumbing systems that save natural resources and exceed State°and o
either produce energy or save natural resources and Federal-minimum;r"equirements.,Examples
exceed State and Federal minimum requirements. include;,but are not limited to;photovoltaic
Examples include, but are not limited to, photovoltaic systems,solar water beating systems, high z
systems,solar water heating systems, high efficiency efficiency furnaces and hlgh efficiency air P
furnaces and high efficiency air conditioners. " conditioners: o
Solar Energy Permit Fees
Inspection Fees: $0.00 $; '0.00
Each appliance or piece of equipment regulated by HB Solar
Energy code $0.00 $ 0.00
Plan Review Fee $0.00 $ 0,00
Pane 7
Resolution No.2009-32
Current Valutaion
Building Safety Journal (July-August 2008)
Occ/Construction Cost per Square
Current Code Per Cit View IType Basis I Foot
1.APARTMENT,CONDOMINIUM,
TOWNHOUSE:
Type I or 11 F.R* R-2/IB $ 125.33
Type V-Masonry or Type III R-2NB $ 89.32
Type V---Wood Frame R-2NB $ 89.32
Tvpe I -Basement R-2 a. $ 37.72
2.AUDITORIUMS:
Type I or 11 F.R A-1/8 $ 173.01
Type 11-1 Hour A 1/IIA $ 168.56
Type 11-N A 1/11B $ 160.71
Type III-1 Hour A-1/IIIA $ 150.24
Type III-N A-1/IIIB $ 145.26
Type V-1 Hour A-1NA $ 135.45
Type V-N IA-I/VB $ 129.78
3.BANKS:
Type I or II F.R' B/IB $ 147.81
Type 11- 1 Hour B/IIA $ 143.08
Type If-N B/11B $ 136.34
Type III- 1 Hour B/IIIA $ 124.01
Type III-N B/IIIB $ 119.35
Type V-1 Hour JBNA $ 108.67
Type V-N IBNB $ 104.20
4. BOWLING ALLEYS:
Type 11-1 Hour A-3/IIA $ 171.71
Ty2e 11-N A-3/11 B $ 163.86
Type III-1 Hour A-3/IIIA $ 153.36
Type III-N A-3/111B $ 148.38
Type V-1 Hour A-3NA $ 138.57
5.CHURCHES:
Tvpe I or It F.R A-3/6 $ 176.16
Type Il- 1 Hour A-3/IIA $ 171.71
Type 11-N A-3/11B $ 163.86
Type III- 1 Hour A-3/IIIA $ 153.36
TVpe III-N A-3/111B $ 148.38
Type V- 1 Hour A-3NA $ 138.57
Type V-N IA-3NB $ 132.90
6.CONVALESCENT HOSPTALS:
Type I or II F.R' 1-2/6 $ 174.93
Type II-1 Hour 1-2/11A $ 170.20
Type III-1 Hour 1-2/IIIA $ 151.54
Type V-1 Hour 1-2NA $ 136.20
7. DETACHED SFD'S:
Type V-Mason R-3NB $ 96.83
Type V-Wood Frame R-3NB $ 96.83
Basements Unfinished R-3 a. $ 37.72
Page 8
Resolution No.2009-32
Current Valutaion
Building Safety Journal (July-August 2008)
Occ/Construction Cost per Square
Current Code Per Cit View Type Basis Foot
8. FIRE STATIONS:
Type I or 11 F.R BAB $ 147.81
Type II-1 Hour BAIA $ 143.08
Type 11-N BAIB $ 136.34
Type III-1 Hour B/IIIA $ 124.01
Type III-N BAIIB $ 119.35'
Type V-1 Hour BNA $ 108.67
Type V-N IBNB $ 104.20
9. HOMES FOR ELDERLY:
Tvpe I or 11 F.R R-4/6 $ 148.53
Type II-1 Hour R-411A $ 144.55
Type II_-N R-411B $ 138.69
Type III-1 Hour R-4/IIIA $ 129.50
TVpe III-N R-4/111B $ 125.96
Type V-1 Hour R-4NA $ 117.23
Type V-N IR-4NB $ 112.64
10. HOSPITALS:
Tvpe I or II F.R.* 1-2/0 $ 252.55
Type III-1 Hour 1-2/IIIA $ 228.10
Type V-1 Hour 1-2/VA $ 212.76
11.HOTELS&MOTELS:
Type I or II F. R.* R-1/6 $ 150.50
Type III-1 Hour R-1/IIIA $ 131.24
Type III-N R-1/IIIB $ 127.69
Type V-1 Hour R-1NA $ 118.97
Type V-N R-1NB $ 114.37
12.INDUSTRIAL PLANTS:
Type I or II F.R F-2/IB $ 87.72
Type II-1 Hour F-2/IIA $ 83.61
Type Il-N F-2/I6 $ 79.88
Type III- Hour F-2/IIIA $ 72.40
Type III-N F-2/111B $ 68.23
Tilt-Up F-2NB less 20% $ 44.33
Type V-1 Hour F-2NA $ 59.62
T e V-N F-2NB $ 55.41
13.JAILS:
Type I or II F.R 1-3/IB $ 170.71
Type III-1 Hour 1-3/IIIA $ 148.16
Type V-1 Hour 1-3NA $ 132.82
14. LIBRARIES:
Type I or II F.R A-3/0 $ 147.97
Type 11-1 Hour A-3/IIA $ 142.51
Type 11-N A-3/11B $ 135.66
Type III-1 Hour A-3/IIIA $ 123.58
TVpe III-N A-31111E $ 120.18
Type V-1 Hour A-3NA is 109.37
Ty2e V-N A-3NN $ 104.69
Page 9
Resolution No.2009-32
Current Valutalon
Building Safety Journal (July-August 2008)
Occ/Construction Cost per Square
Current Code Per Ci Viewr Type Basis Foot
15.(MEDICAL OFFICES:
Tvpe I or II F.R* BAB $ 147.81
Type 11-1 Hour B/IIA $ 143.08
Type 11-N 13/1113 $ 136.34
Type III-1 Hour 13/111A $ 124.01
Tvpe III-N B/IIIB $ 119.35
Type V-1 Hour BNA $ 108.67
T e V-N BNB rs 104.20
16.OFFICES:**
TVpe I or II F.R 13/113 $ 147.81
Type II-1 Hour B/IIA $ 143.08
Type 11-N 13/1113 $ 136.34
Type III-1 Hour B/IIIA $ 124.01
TVpe III-N B/IIIB $ 119.35
Type V- 1 Hour BNA $ 108.67
Type V-N BNB $ 104.20
17. PRIVATE GARAGES:
All IUNB f$ 37.72
18.PUBLIC BUILDINGS:
Type I or II F.R* B/IB $ 147.81
Type V-N BNB $ 104.20
Type 11-1 Hour BAIA $ 143.08
Type 11-N 1311113 $ 136.34
Type III-1 Hour B/IIIA $ 124.01
Type III-N B/1116 $ 119.35
Type V-1 Hour BNA $ 108.67
19. PUBLIC GARAGES:
Type I or 11 F. R. * S-2/I13 $ 80.89
Type I or II Open Parking* S-2/I13 less 20% $ 64.71
Type l l-N S-2/116 $ 73.05
Type III- 1 Hour S-2/111A $ 65.75
Type III-N S-2/11113 is 61.57
Type V- 1 HourIS-2/VA $ 52.97
20. RESTAURANTS:
Type III-1 Hour A-2/IIIA $ 127.74
Type III-N A-2/III13 $ 125.09
Type V-1 Hour A-2NA $ 115.61
Type V-N A-2NB $ 112.65
21.SCHOOLS:
Type I or 11 F.R E/IB $ 162.47
Type II-1 Hour E/IIA $ 157.86
Type III- 1 Hour E/IIIA $ 141.50
Ty2e III-N E/IIIB $ 134.27
Type V-1 Hour ENA $ 124.54
Type V-N ENB $ 119.84
Page 10
Resolution No.2009-32
Current Valutaion
Building Safety Journal (July-August 2008)
Occ/Construction Cost per Square
Current Code Per Ci View Type Basis Foot
22.SERVICE STATIONS:
Type 11-N B/lIB $ 136.34
Type III-1 Hour B/IIIA $ 124.01
Type V-1 Hour BNA '$ 108.67
Canopies S-2NB less 20% $ 58.51
23.STORES:
Type 1 or II F.R* M/IB $ 108.26
Type II-1 Hour M/IIA $ 103.52
Type II-N MAIB $ 98.92.
Type III-1 Hour M/IIIA $ 90.48
Ty2e III-N M/111B $ 87.82
Type V-1 Hour IMNA Is 78.34
Type V-N IMNB $ 75.38
24.THEATERS:
Type i or II F.R A-1/1B $ 173.01
Type III-1 Hour A-1/IIIA $ 150.24
Type III-N A-111I6 $ 145.26
Type V-1 Hour A-1NA $ 135.45
Ty2e V-N A-1N6 Is 129.78
25.WAREHOUSES:
Type I or 11 F.R S-2/6 $ 80.89
Type 11 or V-1 Hour S-2NA $ 52.97
Type II or V-N S-2NB $ 48.76
Type III-1 Hour S-2/IIIA $ 65.75
Type III-N S-2/111B $ 61.57
27.DETACHED RECREATION
BLDG ACCESSORY TO RES:
All R-3NB $ 96.83
28.TYS&REMODELS:
Below Average Same/Existing $ 10.00
Average Same/Existing $ 20.00
Above Average Same/Existing $ 30.00
29.CONCRETE CANTILEVER
All $ 30.00
30.RE-ROOFS PER SO.FT.:
Rock/Comp. w/o tear off Same/Existing $ 200.00
Rock/Comp. w/tear off Same/Existing $ 250.00
Wood w/o tear off Same/Existing $ 350.00
Wood w/tear off Same/Existing $ 400.00
Metal Roofing Same/Existin $ 400.00
Tile w/tear off Same/Existin $ 475.00
Page 11
Resolution No.2009-32
Current Valutai®n
Building Safety Journal (July-August 2008)
Occ/Construction Cost per Square
Current Code Per Cit View Type Basis Foot
31.BLOCK FENCE PER FT.:
8 foot Same/Existing $ 72.00
7 foot Same/Existing $ 66.00
6 foot Same/Existing $ 60.00
5 foot Same/Existing $ 54.00
4 foot Same/Existin $ 48.00
3 foot SamelExistin $ 39.00
2 foot ISame/Existing $ 30.00
32.BLOCK RETAINING WALL
PER LINEAL FT.:
10 foot Same/Existing $ 180.00
9 foot Same/Existing $ 160.00
8 foot Same/Existing $ 140.00
7 foot Same/Existing $ 120.00
6 foot Same/Existing $ 100.00
5 foot Same/Existing $ 80.00
4 foot Same/Existing $ 60.00
3 foot Same/Existing $ 45.00
2 foot ISame/Existing $ 30.00
33.CHAIN LINK OR WOOD
FENCE PER LINEAL FT.:
All Same/Existing $ 20.00
34.PATIO COVER PER SQ.FT.:
All ISame/Existing $ 15.00
35.SCREEN&GLASSENE
COVERS&ENCL PER SQ.
All ]Same/Existing $ 26.00
36.BALCONY,ROOF OR DECK
DECK PER SQ. FT.:
All Same/Existing $ 20.00
36.SWIMMING POOL PER SO.
FT.
All Same/Existing $ 55.00
Plus features and raised areas
Page 12
Fire Department - Development Fees
Fee Description Current Fee Amount Recommended,,New Fee
Amount
Underground Tank Installation Permit $ 1,263.00 $ 920:00
Underground Tank Install Inspection each additional tank $ 92.00 $ 225.00
Underground Tank Removal Inspection/Permit $ 300.00 $ 1,020.00
Underground Tank Removal Inspection each additional tank $ 92.00 $ 335.00
Underground Tank Re-pipe Inspection/Permit $ 850.00 $ 375.00
Aboveground -Storage Tank Installation Permit $ 759.00 $ 465.00
Aboveground -Storage Tank Removal Inspection/Permit $ 253.00 $ 395.00
Aboveground -Storage Tank Removal - Each additional tank $ 92.00 $ 55.00
Plan Check Fee - Methane Protection System:
0-5,000 sq feet $ 172.00 $ 155.00
5,001-10,000 sq feet $ 319.00 $" 190.00
10,001-25,000 sq feet $ 416.00 $ 330.00
25,001 &over $ 612.00 $ 430.00
Methane Protection System Inspection:
0 to 2,500 square feet with 2 risers $ 392,00 $ 640.00
per square foot over 2,500 sq ft $ 0.04 $ 0.03 °
additional risers $ 147.00 $ 35.00 0
each additional floor over three stories $ 49.00 $ 35.00 z
0
Methane Protection System Repair Inspection $ 220.00 NIA' o
Methane Protection System Repair Inspection -0 - 100 sq. ft. $ 220.00 $ 190.00
Methane Protection System Repair Inspection - 101 -500 sq. ft. $ 220.00 $ 260.00 N
Methane Protection System Repair Inspection - > 500 sq.ft. $ 220.00 $ 365:00
Paqe 1
Fire Department a Development Fees
Fee Description Current Fee Amount Recommended New Fee
'Amount
Project Review-Soil Remediation;
Soil Remedlation Phase 1 $ 249.00 $ 270.00
$ 427.00 WA
Soil Remediation Phase II or III - Basic $ 427.00 $ 490.00
Soil Remediation Phase II or III - Moderate $ 427.00 $ 565.00
Soil Remediation Phase II or III -Complex $ 427.00 $ 710.00
Soil Remediation - Each Subsequent review $ 427.00 $ 160,00
Confirmation TeSt'199/Sit8 G106UFe Re Q 249.00 N/A
Confirmation Testing/Site Closure Review- Basic $ 249,00 $ 270,00
Confirmation Testing/Site Closure Review- Moderate $ 249.00 $ 420.00
Confirmation Testing/Site Closure Review- Complex* $ 249.00 $ 565.00
$350.00 deposit+actual per $350.00 deposit+actual,per
Consultant Fee(Deposit, Final consultant fee charges based on actual per hour charges) hour charges for consultant hour charges.for consultant
Gas Station Soil Gas Remediation Installation Permit $ 477.00 $ 470.00
Sell Gas Remediation PFeieet Peffnit $ 495.00 NA
Soil Gas Remediation Project Permit- Basic $ 495.00 $ 270.00
Soil Gas Remediation Project Permit- Moderate $ 495.00 $ 420.00
Soil Gas Remediation Project Permit- Complex` $ 495.00 $ 565.00
F=OFFneF Gas Station Genfiffnat'OR test review/site OSIGSUFe 7�
$ 249.00 N/A
Former Gas Station -Confirmation test review/site closure - Basic $ 249,00 $ 235.00
Former Gas Station -Confirmation test review/site closure- Moderate $ 249.00 $ 270.00
Former Gas Station -Confirmation test review/site closure-Complex* $ 249.00 $ 310.00 0
N
Sprinkler System:
Per Head $ 6.00 $ 4.00 w
Plus base fee-single family (up to 30 heads) $ 295.00 $ 640.00 N
Multi Family Residences (up to 120 heads) $ 392,00 $ 975.00
Commercial/Industrial (up to 50 heads) $ 392.00 $ 750.00
Tenant Improvement(up to 20 heads) $ 295.00 $ 555.00
$ 196;00 N/A
Sprinkler Underground - Per Riser $ 588.00 $ 800.00
Welded Pipe IR6peGt'()R $- 367.00 N/A
Page 2
Fire Department - Development Fees
Fee Description Current Fee Amount Recommended New Fee
Amount
Hydrant Underground Plan check/Inspection - Initial NEW FEE $ 445.00
Hydrant Underground Plan check/Inspection -each additional NEW FEE $ 95.-00
Fire Alarm System:
Per Device $ 16.00
Plus base fee-single family(up to 8 devices) $ 196.00 $ 260.00
Multi Family Residences (up to 25 devices) $ 392.00 $ 626.00
Commercial/Industrial (up to 15 devices) $ 632.00 $ 720:00
Tenant Improvement(up to 5 devices) $ 276.00 $ 350.00
Chemical Protection System (Dry, Wet, Gas, etc.) $ 392.00 $ 565.00
Water System (flush test, water monitor, standpipe) $ 392,00 $ 740.00
Spray Booth $ 491.00 $ 625.00
Medical Gas System $ 392.00 $ 390.00
Industrial Oven $ 392.00 $ 565.00
Special Protection Systems (dust,vapor,halon,mechanical, air, CO2,methane or other) $ 588.00 $ 625.00
Emergency Fire Access Gates Check $ 379.00 $ 175:00
Fire Lane Plan Review $ 468.00 $: 200.00
Street Name Change $ 723.00 $ 125.00
New Street Name Review: o'
0-5 Names $ 427.00 $ 455.00 z
6-10 Names $ 693.00 $ 675.00 N
11-14 Names $ 959.00 $ 1,080.00 0
15 + Names $ 1,226.00 $ 1,630.00' 1P
N
Plan Check- Flammable LiquidNapor Processing Equip $ 300.00 $ 390.00
Plan Check- Cellular Site $ 69.00 $ 210,00
Plan Cheek Single Family ResidenGe New $ 69.0-0 N/A
Plan Check-Single Family Residence-New- Basic $ 69.00 $ 1,75.00
Plan Check-Single Family Residence- New- Moderate $ 69.00 $ 250,00
Plan Check-Single Family Residence- New- Complex $ 69.00 $ 320.00
Page 3
Fire Department - Development Fees
Fee Description Current Fee Amount Recommended New Fee
Amount_
Plan Check-Single Family Residence-Addition/Remodel - Basic $ 69.00 $ 140.00
Plan Check-Single Family Residence-Addition/Remodel - Moderate $ 69.00 ,$ 175.00
Plan Check-Single Family Residence -Addition/Remodel -Complex $ 69.00 , $ 210.00
$ --10 WA
$ 176.00 N/A
Plan Check- Commercial / Industrial - New- Basic $ 176.00 $ 250.00
Plan Check-Commercial / Industrial - New- Moderate $ 176.00 $ 320.00
Plan Check- Commercial / Industrial - New- Complex $ 176.00 $ 395.00
- -69.09- N/A
Plan Check- Commercial / Industrial - Remodel /Tenant Improvement- Basic $ 69.00 $ 175.00
Plan Check-Commercial/ Industrial - Remodel /Tenant Improvement- Moderate $ 69.00 $ 250.00
Plan Check-Commercial / Industrial - Remodel /Tenant Improvement-Complex $ 69.00 $ 320,00
Plan GheGk Raek 1 High pile Storage $- 97,00 N/A
Plan Check- Rack/ High pile Storage- Basic $ 97.00 $ 175.00
Plan Check- Rack/ High pile Storage- Moderate $ 97.00 $ 210.00 0
Plan Check- Rack/ High pile Storage- Complex $ 97.00 $ 250.00 �.
0
Rack Seismic/Structural Only $ 97.00 $ 140.00 0
N
O
Plan Check- Residential Complex/Subdivision - Basic $ 229.00 $ 395.00 N
Plan Check- Residential Complex/Subdivision - Moderate $ 229.00 $ 615.00
Plan Check- Residential Complex/Subdivision - Complex $ 229.00 $ 835.00
Paae 4
Fire Department a Development Fees
Fee Description Current Fee Amount Recommended,New Fee
Amount-
N/A
Plan Review- Other Departments - Basic $ 229.00 $ , 175.00
Plan Review-Other Departments - Moderate $ 229.00 $ 250.00
Plan Review- Other Departments -Complex $ 229.00 $ 320,00
Plan Check- Rough/Precise Grading - Basic $ 69.00 $ 175.00
Plan Check- Rough/ Precise Grading- Moderate $ 69.00 $ 250.00
Plan Check- Rough/ Precise Grading -Complex $ 69.00 $ 320.00
, $ 12 N/A
Plan Check- MFR, subdivision, commercial, industrial, educational - Basic $ 122.00 $ 250.00
Plan Check- MFR, subdivision, commercial, industrial, educational - Moderate $ 122.00 $ 395.00
Plan Check- MFR, subdivision, commercial, industrial, educational -Complex $ 122.00 $ 540.00
Plan Cheek SGheel Sites $ 1:76:0o N/A
Plan Check-School Sites- Basic $ 176.00 $ 250.00
Plan Check-School Sites - Moderate $ 176.00 $ 320.00
Plan Check-School Sites -Complex $ 176.00 $ 395.00
7
FIRE CLEARANCE INSPECTION 0
See "Final Fire Inspection" o
Restructed Fees immediately
z
$ 163.3T below o
60 N/A N
0
. $ 31-1.52 N/A C)
9ueF 60,000 Sq-€t-. $ ----366.62 N/A N
Final Fire Inspection - Basic RESTRUCTURED FEE $ 160.00
Final Fire Inspection - Moderate RESTRUCTURED FEE $ 215.,00
Final Fire Inspection -Complex RESTRUCTURED FEE $ 370.00.
Special projects requiring Fire Department review Fully Burdened Rate (FBR) Fully Burdened Rate (FBRIA
*For these services, the fully burdened rate(FBR)for the appropriate staff person will be used for projects deemed In excess of the"complex"range.
Page 5
Planning Department -- Development Fees
Recommended New Fee Full Cost Recovery Amount,
Amount,.Effective 08/16/2009
Fee Description Current Fee Amount Effective 10/01/2011 (Pending
(Pending City Council' City Council Approval)-
approval)
Planning Commission Actions
$10,000.00 deposit+fully $10,000.00 deposit+fully
Annexation Request $ 16,445.00 burdened cost burdened cost
Coastal Development Permit+ $ 4,255.00 $ 5,080.00 $ 6,348.00
Conditional Use Permit-New Residential $ 8,215.00 $ 7,685.00 $ 9,605.00
Conditional Use Permit-Comm/Ind/Mixed Use< 1/2 Block $ 6,668.00 $ 6,670.00 $ 8,098.00
Conditional Use Permit-Minor $ 3,334.00 $ 3,800.00 $ 4,749.00
Conditional Use Permit-Comm/Ind/Mixed Use> 1/2 Block $ 19,359.00 $ 17,795.00 $ 17,798.00
Entitlement Continuance $286.00+costs of Notice of $285.00+costs of Notice of $346+costs of Notice of
Publication, if applicable Publication,if applicable Publication, if applicable
Development Agreement- Original Contract or Significant Amendment $29,310,00 deposit+fully $29,31 O.60 deposit+fully $29,310.00 deposit+fully
burdened cost burdened cost burdened cost
$17,620,00 deposit+fully $17,620.00 deposit+fully $17,620.00 deposit+fully
Development Agreement Minor Amendment burdened cost burdened cost burdened cost
Development Agreement-Annual Review-Administrative $ 3,249.00 $ 3,255.00 $ 3,258.00
Development Agreement-Annual Review-Planning Commission Hearing $ 3,686.00 •$. 3,685.00 $ 4,121.00
Entitlement Plan Amendment-New Hearing $ 3,860.00 .$ 3,760.00 $ 3,760.00
Entitlement Plan Amendment-Director Review $ 1,948.00 $ 1,950.00 $ 2,187.00
General Plan Amendment(GPA)-Major $ 31,650.00 $ 35;830.00 $ 44,789.00
General Plan Amendment(GPA)-Minor $ 17,289.00 $ 19,145.00 $ 23,933.00 °
General Plan Conformance $ 4,084.00 $ 4,085,00 $ 4,900.00 0
Local Coastal Program Amendment $ 7,018.00 $ 10,770.00 $ 13,464.00
Reversion to Acreage $ 2,762.00 $ 2,905.00 $ 3,630.00 0
Special Permit $ 1,971.00 $ 2,430.00 $ 3,040.00 No
Tentative Tract Map $20,317.00+$30.00/lot $20,320.00+$30.00/lot $22,977 plus$30/lot
Variance" $ 3,319.00 $ 3,320.00 $ 4,071.00 h,
Zoning Map Amendment $ 18,512.00 $ 18,700.00 $ 23,374.00
Zoning Map Amendment-Precise Plan of Street Alignment $ 12,685.00 $ 12,730.00 $ 15,910.00
Zoning Map Amendment-Mobile Home Park Conversion Review $ 24,859.00 $ 28,575.00 $ 35,719.00
Zoning Text Amendment-Major $ 14,580.00 $ 14,580.00 $ 14,580.00
Zoning Text Amendment-Minor $ 8:105.00 $ 8,105.00 $ 8,105.00
Paae 1
Planning Department -- Development Fees
Recommended New Fee Full Cost Recovery Amount,
Fee Description Current Fee Amount Amount,Effective 08/16/2009 Effective 10/01/2011 (Pending
(Pending City Council City Council Approval)
approval)
Zoning Administrator Actions:
Coastal Development Permit-Single Family+ $ 2,780.00 $ 2,780.00 $ 2,853.00
Coastal Development Permit-All Others+ $ 2,896.00 $ 2,895.00 $ 3,397.00
Conditional Use Permit $ 3,427.00 $ 3;490.00 $ 4,361.00
Conditional Use Permit-Fences $ 1,895.00 $ 1,895.00 $ 2,193.00
Entitlement Continuance $ 202,00 $ 200.00 $ 250.00
Entitlement Plan Amendment-New Hearing $ 2,035.00 $ 2,020.60 $ 2,024.00
Entitlement Plan Amendment-Director Review $ 1,304.00 $ 1,305.00 $ 1,461.00
$1,739.00+$500.00 bond(if $1,740.00+$500.00 bond(if
Temporary Use Permits applicable) applicable) $2,057+$500 bond(if applicable)
Tentative Parcel Map $ 3,908.00 $ 3,910.00 $ 4,460.00
Tentative Parcel Map Waiver $ 1,718.00 $ 1,720.00 $ 2,138,00
Tentative Tract Map $6,757.00+$30.00/lot $6,760.00+$30.00/lot $7,417 plus$30/lot
Variance'+ $ 2,350.00 $ 2,350.00 $ 2,811.00
Environmental Processing:
Environmental Assessment $ 6,969.00 $ 8,215.00 $ 10,268.00
Environmental Assessment--Historic $ 3,484.50 $ 4,030,06 $ 5,040.00
Mitigated Negative Declaration $2,000.00+cost of environmental $2,475.00+cost of o
assessment study environmental assessment"study $3,091 +cost of environmental E
assessment study 5'
Mitigation Monitoring-Mit. Neg. Dec. $ 2,119.00 $ 2,120.00 $ 2,619.00 Z
Environmental Processing-Mitigation Monitoring-EIR Plus 10%of EIR $2,491.00+8%of EIR 8%,of EIR 8%of EIR o
EIR Consultant Prepared $53,883.00 deposit+cost of $76,865.00 deposit+cost of $96,079 deposit plus cost of o
studies studies studies o
EIR Staff Prepared $108,152.00 deposit+cost of $108,150.10 deposit+cost of $128,563 deposit plus cost of h,
studies studies studies
Page 2
Planning Department-- Development Fees
Recommended New Fee" Full Cost Recovery Amount,
Fee Description Current Fee Amount Amount,Effective 08/16/2009 Effective 10/01/2011 (Pending
(Pending City Council approval) City Council Approval
Other Reviews and Services:
Address Assignment Processing-Staff Review $ 847.00 $ 965.00 $ 1,208.00
Address Change-Staff Review $ 243.00 $ 245.06 $ 245.00
Animal Permits-Staff Review $ 177.00 $ 180.00 $ 207.00
Categorical Exclusion Letter-Staff Review $ 202,00 $ 200.00 $ 250.00
CC&R Review-Staff Review $ 972.00 $ 970.00 $ 1,206.00
Certificate of Compliance-Staff Review $ 493.00 $ 580.00 $ 726.00
Design Review Board $ 867.00 ' $ 870.00 $ 870.00
Extension of Time-Staff Review $ 327.00 $ 370.00 $ 461.00
Final Parcel Map-Staff Review $ 1,050.00 $ 1,060:00 $ 1,321.00
Final Tract Map-Staff Review $ 1,449.00 $ 1,510.00 $ 1,887.00
Initial Plan,Zoning Review-Staff Review $ 252.00 $ 275.00 $ 343.00
Limited Sign Permit-Staff Review $ 610.00 $ 645.00 $ 805.00
Planned Sign Program-Single User and Amendment $ 682.00 "$ 680.00 $ 846.00
Planned Sign Program-Multiple Users $ 1,124.00 $ 1,140.00 $ 1,427,00
Sign Code Exception-Staff Review $ 780.00 $ 780.00 $ 958.00
Sign Code Exception-Design Review Board $ 1,507.00 $ 1,505,00 $ 1,860.00
Site Plan Review-Staff Review $ 4,153.00 $ 4,245.00 $ 5,307.00 ;U
Temporary Sign Permit-Staff Review $ 73.00 $ 75.00 $ 75.00 2
Temporary Sales/Event Sign Permit-Staff Review $ 270.00 $ 270.00 $ 270.00
Appeals to Planning Commission-Single Family Residence $ 1,236.00 $ 1,475.00 $ 1,843.00 '
Appeals to Planning Commission-All Others $ 1,507,00 $ 1,925.00 $ 2,405.00 z
Appeal Director's Decision-Public Hearing $ 475.00 $ 475.00 $ 475.00 0
Appeal Director's Interpretation-Non-Public Hearing $ 400.00 $ 400.00 $ 400.00 c
Appeals to City Council-Single Family Residence $ 1,480.00 $ 1,480.00 $ 1,695.00
Appeals to City Council-All Others $ 2,285.00 $ 21600,00 $ 3,253.00 N
Lot Line Adjustment/Lot Merger Staff Review $ 530.00 $ 530,00 $ 530.00
Administrative Permit-List 1+++ $ 530.00 $ 530.00 $ 588.00
Administrative Permit-List 2+++ $ 900.00 $ 900.00 $ 1,048,00
Administrative Permit-List 3+++ $ 1,021.00 $ 1,115.00 $ 1,395.00
Page 3
Planning Department-- Development Fees
Recommended New Fee Full Cost Recovery Amount,
Fee Description Current Fee Amount Amount, Effective 08/1'8l2009 Effective 10/01/2011 (Pending
(Pending City Council approval) City Council Approval)
Outdoor dining license agreement application fee $ 30.00 "$ 30.00 $ 30.00
Outdoor dining license agreement Use Charge(per square foot) $ 0.01 $ 0.01 $ 0.01
Outdoor dining license agreement Code Enforcement Fee(per square foot) $ 4.00 $ 4.00 $ 4.00
Design Review Board-staff $ 270.00 $ 270.00 $ 270.00
Address Assignment-Meter Only $ 110.00 $ 110.00 $ 130.00
Code Enforcement Re-inspection Fee $ 163.00 $ 135,00 $ 136.00
Notice and Order $ 946.00 $ 870.00 $ 874.00
Vehicle Abatement $ 166.00 . $ 165.00 $ 201.00
Planning Plan Review Standard 70%of building inspection fee 70%of building'inspection fee 70%of building inspection fee
Planning Plan Review Production Units/Tenant Improvements++++ 24%of building inspection fee 24%of building Inspection fee 24%of building inspection fee
$1.84/$1,000,00 of building value
General Plan Maintenance Fee NEW FEE $1.84/$1,000 of building value
+Reduced 50%when processed concurrently with a Conditional Use Permit, Tentative Map or Variance
++Reduced 50%when processed with a Conditional Use Permit;no fee applied if Variance is a result of a condition imposed by Public Judicial Body
+++Administrative Permit List 1: Outdoor Dining,Eating and Drinking Establishments,Fence Extensions(<87,and Home Occupations
+++Administrative Permit List 2: Parking Reduction, Carts and K/osks, Waiver of Development Standards,Non-conforming structure additions
+++Administrative Permit List 3: Privacy Gates, Game Centers,Accessory Dwelling Units,Manufactured Home Parks
++++Tenant Improvements,and other plan reviews o
o'
a
z
0
N
O
O
W
N
Page 4
Public Works ®® Development Fees
Fee Description Current Fee Amount Recommended New Fee
Amount
$1,150.00 Deposit+ Fully
Bond reduction (partially completed projects) $ 1,154.00 Burdened Rate (FBR)
Cash Bond Processing $ 220.00 $ 240.00
Construction Water(per dwelling unit) $ 102.00 $ 110.00
Development Processing/Inspection by contract service Cost .Cost
Dock Construction Plan Review/Inspection $ 494.00 $ 540.00
Encroachment Permit (plus inspection fee) $ 109.00 $ 115.00
Utility Co Encroachment Permit (plus 8% inspection fee) $ 186.00 $ 275,00
Encroachment Permit Expired $ 75.00 $ 80.00
Encroachment Permit(None/working without) $ 250.00 $ 195.00
Excessive Plan Check >3 per sheet/per occurrence $ 366.00 FBR
Final Parcel Map Check $ 2,163.00 $2,500.00 Deposit + FBR
$2,207.00 or$106.00 per lot
Final Tract Map Check whichever is greater $2,200.00 Deposit + FBR
Fire Hydrant Flow Analysis (1 st run) $ 552.00 $ 750.00
Fire Hydrant Flow Analysis (each additional run) $ 122.00 $ 140.00
Grading Plan Check& Inspection: Deposit& FBR
(0-300 cubic yards) $ 3,730.00 $ 4,000.00
(301-5,000 cubic yards) $ 4,308.00 "$ 5,000:00 '
(5,001-10,000 cubic yards) $ 6,964.00 $ 8,000.00, 0
(10,001-200,000 cubic yards) $ 8,665.00 $ 109,000.00 N
Each additional 10,000 cubic yards $ 647.00 $" 800.00 0
N
Hardscape Inspection $ 1,846.00 $2,000.00 Deposit+ FBR
Hardscape Plan Check $ 1,231,00 $1,000.00 Deposit+ FBR
Landscape Inspection:
Less than or Equal to 1,000 sq ft $ 215.00 $ 235.00
Each additional 1,000 sq ft $ 24.00 $ 60.00
Residential Street Tree Only $ 54.00 $ 60.00
Page 1
Public Works -® Development Fees
Fee Description Current Fee Amount Recommended New Fee
Amount
Landscape Plan Check:
Single Family Dwelling $ 423.00 $ 495.00
Tract Map $ 910.00 $ 1,000.0.0
Commercial/Industrial/Multi-Family Dwelling per sheet $ 372.00 $ 380.'00
Lot Line Adjustment(Public Works) $ 594.00 $550.00 Deposit + FBR
Obstruction Permit $ 109.00 $ 155.00
Public Improvement Inspection (after hours) min 4 hours $ 394.00 $ 465,00`
Public Improvement Inspection (after hours) 8 hours $ 787.00 $ 880.60
Public Improvement Inspection per hour for billed utility companies $ 97.00 $ 110.00
Public Improvement Plan Check:
Single Family Dwelling 1-2 sheets $ 3,207.00 $4,000.00 Deposit+ FBR
All Others < 3 sheets $5,956.00 + $793.00 per sheet
>3 $7,000.00 Deposit + FBR
Public Works Re-inspection (each) $ 97.00 $ 110,00
Recordation Fee (as-builts per sheet) $ 106.00 $ 120.00 ,
o'
Street Vacation: z
O
Full vacation $ 3,923.00 $3;900.00,Deposit+.FBR- o
Summary vacation $ 912.00 $900.00 Deposit+ FBR
W
N
Street Lighting Plan Check- Per Sheet $ 1,340.00 $ 1,950.00
Survey Fee (per point) $ 21.00 $ 23.00
Traffic Control Plan Check- Per sheet $ 1,237.00 $ 1,805.00,
Traffic Signal Plan Check- Per sheet $ 2,708.00 $ 3,945,00
Traffic Signs &Striping Plan Check- Per Sheet $ 1,349.00 $ 1,935.00
Plan Check- Misc/Minor-
No Field Review NEW FEE $ 300.00
With Field Review NEW FEE 1 $ 430.00
Page 2
Res. No. 2009-32
STATE OF CALIFORNIA
COUNTY OF ORANGE ) ss:
CITY OF HUNTINGTON BEACH )
I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of
Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby
certify that the whole number of members of the City Council of the City of
Huntington Beach is seven; that the foregoing resolution was passed and adopted
by the affirmative vote of at least a majority of all the members of said City Council
at a regular meeting thereof held on June 15, 2009 by the following vote:
AYES: Green, Bohr, Coerper, Hardy
NOES: Carchio, Dwyer
ABSENT: Hansen
ABSTAIN: None
My Clerk and ex-officio Clerk of the
City Council of the City of
Huntington Beach, California