HomeMy WebLinkAboutCity Council - 2013-34 RESOLUTION NO. 2013-34
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF HUNTINGTON BEACH ADOPTING
A CAPITAL IMPROVEMENT PROGRAM FOR
THE YEARS 2013/2014 THROUGH 2O19/2020 FOR
COMPLIANCE WITH RENEWED MEASURE M ELIGIBILITY
REQUIREMENTS
WHEREAS, on November 6, 1990,the Orange County voters approved the original Measure M,
the revised Traffic Improvement and Growth Management Ordinance, for twenty years(1991 2011).
On November 7, 2006 the Orange County Voters approved Renewed Measure M. Renewed Measure M
is a thirty year(2011-2041), multi-billion dollar program extension of the original Measure M; and
Renewed Measure M Net Revenues are generated from the transaction and use tax plus any
interest or other earnings-after allowable deductions. Net Revenues maybe allocated to local
jurisdictions for a variety of programs identified in Ordinance No. 3. Compliance with the eligibility
requirements established in Ordinance No. 3 must be established and maintained in order for local
jurisdictions to receive Net Revenues.
One of the elegibility requirements for Measure M is the adoption of a Capital Improvement
Program for the years of 2013/2014 through 2019/2020.
NOW, THEREFORE, the City Council of the City of Huntington Beach does hereby resolve as
follows:
That the Capital Improvement Program for Renewed Measure M, as set forth in the attached
Exhibit "A" and incorporated by this reference is hereby adopted.
PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular
meeting thereof held on the 5t.h day of Auaust ; 2011
Mayor
ATTEST: APPROVED AS TO FORM:
City C1 �ty Attorney
REVIE APPROVED: INITIATED AND APPROVED'
Citl$a9gier irector of Public W rks
13-3 792.001/98776.doc
Resolution No. 2013-34
EX IBIT G`
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 1
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Adams Ave.Traffic Signal Synchronization and FUMD"N/��NE_< `ESTiMARED COSTS, 0 iECTED COST,, :NOTES __ _.v _„„
Communication Equipment Upgrades TSSP 77.44 $725,979 $725,979
Project Limits: From Beach Blvd.to City Boundary(Multi Other 19.36 $181,495 $181,495 AQMD
Jurisdictional)
Type or work: Traffic Signals Unfunded 3.2 $29,999 $29,999
Additional TOW: Interconnect traffic signals to improve
coordination and communication $937,473 $937,473
Project Description: Provide operational and infrastructure
improvements
oject Phase, # 13/14 14/15', 15116 16/17 17118 18/19 19120., E timaitetl Cosh Protected'-ost
_ _
E �. _.. $57,600 $0 $0 $0� �$0 $D $0� $57,600 $57,600 j
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $849,873 $0 $0 $0 $0 $0 $0 $849,873 $849,873
O&M $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 $30,000
$907,473 $5,000 $6,000 $5,000 $5,000 $6,000 $5,000 $937,473 $937,473
Agency: Huntington Beach
Project Name: Arterial Highway Rehabilitation F--NDNAl1tiE_.,. _ ,,., _ iPEFtGENT ,. ESTIAIiA[ DCOST• _PA20lECiEDCOS7 _,: O E :,. _ ._ µ<___._ _.___
M2 Fairshare 72 $2,097,360 $2,097,360
Project Limits: Goldenwest St.from Yorktown Ave.to PC and General 28 $815,640 $815,64D
Garfield Ave.from Magnolia St.to Bushard St. Capital Improvement Reserve
Type of work: Road Maintenance
$2,913,000 $2,913,000
Additional TOW: Rehabilitation of roadway
Project Description: Rehabilitation of arterial highways to meet goals
of Pavement Management Plan
�
:: inatetl � OfeCEed Gdst �
$ire $0 $0
$0 $0 $ $0� $ $0
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $2,913,000 $0 $0 $0 $0 $0 $0 $2,913,000 $2,913,000
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$2,913,000 $0 $0 $0 $0 $0 $0 $2,913,000 $2,913,000
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 2
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Atlanta Avenue Widening FUND PdAAAE.„_ ._, PEG ESTIMATED
MPAH 35.16 $1,651,964 $1,665,220
Project Limits: Atlanta Avenue(Huntington St.to Delaware St.) Other 6.31 $296,470 $298,849 Traffic Impact Fee
Type of work: Road Widening Prop42 58.53 $2,749,985 $2,772,051
Additional TOW: Add 1 lane to existing roadway in project limits
Project Description: This project will widen the south side of Atlanta $4,698,420 $4,736,120
Avenue
:Project Phase',. 13114 14/15 15/16 �6/1 17.-/18 18H 9 19/20"
Estimated Gosf Projected host
E 77
$496,000 $0 $0 $0 $0 $0=v m M$0 $496,000 $496,000
R $2,902,420 $0 $0 $0 $0 $0 $0 $2,902,420 $2,902,420
C/I $0 $1,300,000 $0 $0 $0 $0 $0 $1,300,000 $1,337,700
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$3,398,420 $1,300,000 $0 $0 $0 $0 $0 $4,698,420 $4,736,120
Agency: Huntington Beach
Project Name: Banning Median Retrofit Project F.UNDNAME _PERCENT. ,�»,ESTiAAATEDCOST`_....PROJECTED°GOST.M
Gas Tax 8 $50,000 $51,206
Project Limits: Banning Ave.and Bushard Ave. General 38.4 $240,000 $245,791
Type of work: Storm Water Pollution Mitigation Unfunded 48 $300,000 $343,083 Applied for OCTA Tier 11 Grant
Additional TOW: Irrigation system retrofits to reduce runoff (pending)
Project Description: Retrofit asphalt frontage median on Banning $625,000 $640,080
Avenue with bio-retention swales for Water
Qaulity
Project Phase
13/14 r 14/15 . ..15/16 16! 7, 18 EM* ated;Cost f?r jeeted Gost
E $70,000 $0 $0 „ $0_ $0 M_ _ $O .__$0.._ $70,000 $70,000
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $0 $520,000 $0 $0 $0 $0 $0 $520,000 $535,080
O&M $0 $0 $7,000 $7,000 $7,000 $7,000 $7,000 $35,000 $35,000
$70,000 $520,000 $7,000 $7,000 $7,000 $7,000 $7,000 $625,000 $640,080
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 3
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Beach Blvd 4th NorthBound Lane wa
Gas Tax 25 $87,991 $87,991
Project Limits: 500'South of Edinger Ave.to 460'North of ACE 75 $263,972 $263,972
12-HBCH-ACE-3597
Edinger Ave.
Type of Work: Road Widening
$351,962 $351,962
Additional TOW: Add 1 lane to existing roadway in project limits
Project Description: Re-stripe to add a fourth NB thru lane on Beach
Blvd
Proiecf Phase-- 13/14 1516 17/ 8415 ted Cost iected Cost
"Pro
E $174,100 $0 $0 $0 � � $0_ $0 $0� $174,100 �$174,100
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $177,862 $0 $0 $0 $0 $0 $0 $177,862 $177,862
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$351,962 $0 $0 $0 $0 $0 $0 $351,962 $351,962
Agency: Huntington Beach
Project Name: Beach Boulevard and Warner Avenue __PERCENT _., E$BMATED�CM-,._,PROJECTED.COST_..:_
Intersection Improvement Gas Tax 8 $35,224 $35,224
Project Limits: Intersection of Beach Blvd.and Warner Ave. ICE 23.9 $105,232 $105,232 11-HBCH-ICE-3525
Type of Work: Intersection GMA 68.1 $299,844 $299,844 08-HBCH-GMA-3070
Additional TOW: Add right turn lane(s)to intersection
Project Description: Install northbound and westbound right turn $440,300 $440,300
pockets to improve traffic flow and reduce
congestion
Projected°Cost
IProjeetPhase I
1,.. . _ ,�, ._x.. .... ._.
E $440,300 $0 $0 $0 $0 $0 $0 $440,300�" $440,300
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $0 $0 $0 $0 $0 $0 $0 $0 $0
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$440,300 $0 $0 $0 $0 $0 $0 $440,300 $440,300
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 4
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach _
Project Name: Brookhurst Street and Adams Avenue FUND NAIWE_ _ RE CEidT m, ESTIMATED CO&1 tt>. PROJECTED:�OBT _t `NOTEs:,..._ . . .,.. _ w _ _
Intersection Improvement Gas Tax 10.0 $88,535 $88,535
Project Limits: Intersection of Brookhurst St.and Adams Ave. ICE 30.1 $266,490 $266,490 11-HBCH-ICE-3526
Type of work: Intersection GMA 59.9 $530,325 $530,325 08-HBCH-GMA-3071
Additional TOW: Add through and right turn lanes to intersection
Project Description: Add through lanes and right turn pockets to $886,360 $885,360
intersection to improve traffic flow and reduce
congestion.
_,
iProiectPhase: 13l:14: <` 14H5;:` 15/.18 16M7 1<7/18 18/19 19/20 edCost �rolectedGost
Estimat
E $885,350 $0 $0 $0 $0 $0 $0 $885,350 $885,350
R $0 $0 $0 $0 $0 $0 $0 $0 $0
CA $0 $0 $0 $0 $0 $0 $0 $0 $0
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$885,350 $0 $0 $0 $0 $0 $0 $885,350 $806,350
Agency: Huntington Beach
Project Name: Bushard/Adams Water Quality Project FUNDNAME, �a. PEFfCENT,_.:.m_,ESTIRAA�EDCOS� PROJECr�D` _._:; TES:' , .._ _ .._
Gas Tax 12.71 $149,978 $153,369
Project Limits: Frontage median on Bushard and Adams General 43.22 $509,996 $521,527
Type of work: Storm Water Pollution Mitigation Unfunded 38,98 $459,964 $531,784 Application for OCTA Tier II
Additional TOW: Irrigation system retrofits to reduce runoff Grant(pending)
Project Description: Retrofit asphalt frontage medians on Bushard $1,180,000 $1,206,680
Street and Adams Avenue with bio-retention
swales for water quality
�Proiectphase:w. , ':..-: ,- 31 (14 w 14/15;. 11�6 .-F ;_,'�,6/17 .. 17a8 � 18/19 ,,, , .- 9'�120� � Es4imatetltyost �Ar6ieetedCost
E� $200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000
R $0 $0 $0 $0 $0 $0 $0 $0 $0
CA $0 $920,000 $0 $0 $0 $0 $0 $920,000 $946,680
O&M $0 $0 $12,000 $12,000 $12,000 $12,000 $12,000 $60,000 $60,000
$200,000 $920,000 $12,000 $12,000 $12,000 $12,000 $12,000 $1,180,000 $1,206,680
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 5
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Edinger Avenue Traffic Signal Synchronization
TSSP 70A4 $161,396 $161,396 12-OCTA-TSP-3625
Project Limits: Edinger Ave.from Boise Chica St.to State Other 17.61 $40,349 $40,349 AQMD
Route-55
Type of Work: Traffic Signals Unfunded 11.95 $27,380 $27,380 Funds for O&M
Additional TOW: Interconnect traffic signals to improve
coordination and communication
Project Description: Provide operational and infrastructure $229,125 $229,125
improvements(multijurisdictional project including
Caltrans,Westminster,Fountain Valley,and
Santa Ana) City work includes signal timing and
traffic signal interconnect cable.
zProiectPhase,,> 13/14` 14/15 ;15/1 16/17 7/18 18/99 19/20 EsElma Gost Prole#ed.Gost
E $70,975 $0 $0 $0 $0 $0 $0 $70,975 $70,975
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $128,150 $0 $0 $0 $0 $0 $0 $128,150 $12&150
O&M $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 $30,000
$199,126 $5,000 $6,000 $5,000 $6,000 $6,000 $5,000 $229,126 $229,125
Agency: Huntington Beach
. .
Project Name: First Street Diversion FUND NAME PERCENT,,,; ..ESTIMATED COST_ PROJECTED COST.m.,w OT
General 25.44 $48,795 $48,795 r �� �w
Project Limits: First St.near Pacific Coast Highway ECP-Tier II 32.85 $63,008 $63,008
Type of work: Other Other 41.71 $80,002 $80,002 Sewer Fund
Additional TOW: Other
Project Description: Design and install a SCADA system and flow $191,806 $191,806
weir for the First Street Urban Runoff Discharge
Permit with OCSD to protect water quatiity of City
and Pacific Ocean
w.
,1 11 18119 A9r2o Esti atedxCost Froiected`Gos#,
Project Phase RL
w_..
E $20,000 $0 $0 $0 $0ry -$0 $0 $20,000 $20,000
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $163,000 $0 $0 $0 $0 $0 $0 $163,000 $163.000
O&M $1,258 $1,258 $1,258 $1,258 $1,258 $1,258 $1,258 $8,806 $8,806
$184,258 $1,268 $1,258 $1,258 $1,258 $1,268 $1,258 $191,806 $191,806
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 6
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Goldenwest Street Traffic Signal Synchronization
and Communication Equipment Upgrades TSSP 64.69 $236,332 $236,332 11-OCTA-TSP-3554
Project Limits: Goldenwest St.from State Route 22 to Pacific Other 27.10 $99,004 $99,004 AQMD
Coast Highway
Type of work: Traffic Signals Unfunded 8.21 $29,994 $29,994 Funds for O&M
Additional TOW: Coordinate signals within project limits
Project Description: Provide operational and infrastructure upgrades $365,330 $366,330
including signal timing and installation of fiber
optic cable along Goldenwest Street.
Multijurisdictional project includes Calstrans and
City of Westminster
`ProiechPhase` 13M4 14/1S 15/16 16/17 ' 17/18 18M9 19/20' Estimated Cost PfolectedPFost
E $89,818 $0 $0 $0 $0 $0 .._-
$0 . r,.. $89,818 $89,818
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $245,512 $0 $0 $0 $0 $0 $0 $245,512 $245,512
O&M $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 $30,000
$336,330 $5,000 $5,000 $6,000 $5,000 $5,000 $6,000 $366,330 $365,330
Agency: Huntington Beach
Project Name: McFadden/Edwards and Heil/Algonquin Catch FUND;NAME _�.____, .,, _._..PR09ECTED':COST.,_. _�NOTES
Basin Retrofit Project General 100.00 $35,525 $35,525 Funds for O&M
Project Limits: City-wide
$36,626 $35,525
Type of work: Storm Water Pollution Mitigation
Additional TOW: Automatic Retractable Screen and other debris
screens or inserts
Project Description: Provide maintenance for catch basin screens
Proiei t Phase 13 _�_ L _ �_ 1 / Este ated Cost F'roiec#ed Gos
-_- _.
E.� $0 $0 $0 vn$0 $0 $0 $0 $0 _$0
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $0 $0 $0 $0 $0 $0 $0 $0 $0
O&M $5,075 $5,075 $5,075 $5,075 $5,075 $5,075 $5,075 $35,525 $35,525
$5,076 $6,076 $6,075 $5,076 $6,075 $5,076 $5,075 $36,626 $36,525
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 7
Seven Year Capital Improvement Program(Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
Project Name: Northwest Catch Basin Retrofit Project Phase I FUND.NAMEa� _ .PERCENT___ ESTIMATED__COST��_PROJECTED COST___,_NOTES— _]
Unfunded 100.00 $200,000 $200,000 Application OCTA Tier I Grant
(pending)
Project Limits: City-wide in Northwest Part of City
$200,000 $200,000
Type of work: Storm Water Pollution Mitigation
Additional TOW: Catchment Retrofit
Project Description: Retrofit 126 existing catch basins with Bio Clean
Round Curb Inlet Filters and Skimmer Box
i Proiect Phase.: 13/14 14/15 15/116 16/17 17l18,., 18/19 19/20" Estimated Cost Y Projected Cost
E $0 $0 $0 $0 $0 $0 $0 $0 $0}
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000
Agency: Huntington Beach
Project Name: Northwest Catch Basin Retrofit Project Phase II FUND NAME___ .-PERCENT_—ESTIMATED COS T_PROJECTED'COST___NOTES ____.,___
Unfunded 100.00 $136,000 $136,000 Application OCTA Tier I Grant
(pending)
Project Limits: City-wide
$136,000 $136,000
Type of work: Storm Water Pollution Mitigation
Additional TOW: Catchment Retrofit
Project Description: Retrofit 84 existing catch basins with Bio Clean
Round Curb Inlet Filters
j Proiect Phase; 14/15 15/16 1"6117 4 R 7 18 ,-18/19 19 0 Estimated Cost Projected Cost
$0., ``__,__$0�0.�,_�_ $O_:__.____-.__$0 _.,...._.,,�.�$0_,.�v.________ ,_..$0 __.�__. _.$O__._�._..,_,_..u�.$0 $0
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $136,000 $0 $0 $0 $0 $0 $0 $136,000 $136,000
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$136,000 $0 $0 $0 $0 $0 $0 $136,000 $136,000
Resolution 2013-34
6/24/2013 Measure M and Renewed Measure M (M2) 8
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2013/2014 through 2019/2020
Agency: Huntington Beach
7- �'M
Project Name: Talbert Avenue Traffic Signal Synchronization
and Communication Equipment Upgrades TSSP 75.90 $22,254 $22,254 11-OCTA-TSP-3555
Project Limits: Talbert Ave/MacArthur Blvd.from Beach Blvd.to Other 24.10 $7,066 $7,066 AQMD
State Route 55
Type of Work: Traffic Signals $29,320 $29,320
Additional TOW: Coordinate signals within project limits
Project Description: Proivde operational and infrastructure upgrades
including signal timing and instllation of fiber optic
along Talbert Avenue. Multijurisdictional project
includes Caltrans and Cities of Fountain Valley
and Santa Ana and managed my OCTA.
Project Phase % -16/17 17/18,, 1i#/18 19/20;. Estimated Cast Fojecteii.Gost
E 514,000 $0 $0 $0 $0 $0 $0 $14,000 $14,000
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $15,320 $0 $0 $0 $0 $0 $0 $15,320 $15,320
O&M $0 $0 $0 $0 $0 $0 $0 $0 $0
$29,320 $0 $0 $0 $0 $0 $0 $29,320 $29,320
Agency: Huntington Beach
,,
Project Name: Warner Avenue Traffic Signal Synchronization PERCIIENT"
and Communication Equipment Upgrade TSSP 62.32 $248,070 $248,070 11-OCTA-TSP-3558
Project Limits: Warner Ave.from Pacific Coast Hwy to Red Hill Other 30.14 $119,975 $119,975 AQMD
Ave.
Type of Work: Traffic Signals Unfunded 7.54 $30,014 $30,014 Funds for O&M
Additional TOW: Coordinate signals within project limits
Project Description: Proivde operational and infrastructure upgrades $398,069 $398,059
including signal timing and installation of fiber
optic along Warner Avenue. Multijurisdictional
project includes Caltrans and Cities of Fountain
Valley,Santa Ana and Tustin
ro ec e Gast
ProiedCP
7,z;-- ......1" 4,-
,-; �-'T A :
7" "7
at
3 "X'x.
7777�11
e 7777777'
E $88,707 $0 $0 $0 $0 $0 $0 $88,707 $88,707
R $0 $0 $0 $0 $0 $0 $0 $0 $0
C/I $279,352 $0 $0 $0 $0 $0 $0 $279,352 $279,352
O&M $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 $30,000
$368,059 $6,000 $5,000 $5,000 $5,000 $5,000 $6,000 $398,059 $398,059
Res. No. 2013-34
STATE OF CALIFORNIA
COUNTY OF ORANGE ) ss:
CITY OF HUNTINGTON BEACH )
I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of
Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby
certify that the whole number of members of the City Council of the City of
Huntington Beach is seven, that the foregoing resolution was passed and adopted
by the affirmative vote of at least a majority of all the members of said City Council
at a Regular meeting thereof held on August 5, 2013 by the following vote:
AYES: Sullivan, Hardy, Harper, Boardman, Carchio, Shaw, Katapodis
NOES: None
ABSENT: None
ABSTAIN: None
00".) 0,(dv�
Cit Jerk and ex-officio t erk of the
City Council of the City of
Huntington Beach, California