Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Accord Engineering, Inc. - 2007-08-06
RECEIVED BY: A�v (Name) V hh (Date) CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office after signing/dating CITY OF HUNTINGTON BEACH B INTERDEPARTMENTAL COMMUNICATION TO: Shar' Freidenrich, City Treasurer FROM: 7 �, � (f Z-CA DATE: �z SUBJECT: Bond Acceptance I have received the bonds for Faithful Performance Bond No. Labor and Material Bond No. Monument Bond No. Mainteriance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. MSC No. Approved ,r (Cout4cil Approval Date) (Company Name) Agenda Item No. City Clerk Vault No #27 g1followup/bondletter.doc City of Huntington Beach [OLD INTER-DEPARTMENT COMMMUNICATION HUNTINGTON BEACH TO: THOSE LISTED HEREON FROM: Duane D. Wentworth - Contract Administrator DATE: April 4, 2008 SUBJECT: Retention Release Payment Company Name: Accord Engineeering, Inc. Address: 1231 Dyer Road, Suite 265 City, State and Zip Code: Santa Ana, CA 92705 Phone Number: (714) 241-2323 Business License Number: A 267023 Local Address: N/A Notice of Completion Date: March 20, 2008 Contract Purpose: Retention Release for Cash Contract 1238, Watermain Replacement Project The conformed copy of the Notice of Completion for the above contract has been filed. The -thirty-five (35) day waiting period has elapsed or will elapse before payment is made. Processing of the retention payment is recommended so long as no stop notices or outstanding invoices are on file with the City. I certify that no stop notices are on file on the subject at this time. �4 Cog Date Travis K. Hopkins PE, Public Works Director I certify that there are no outstanding invoices on file. Lf-9-0� Date Shatpi' Freidenrich, City Treasurer I certify that no stop notices are on file on the subject contract, and that a guaranty bond has been filed with this office. Date ✓Joad Flynn, City 1238 Retention Memo C&AA I. erk 4/4/2008 1:54:00 PM PLEASE COMPLETE THIS INFORMATION RECORDING REQUESTED BY: Recorded in Official Records, Orange County Tom Daly, Clerk -Recorder AND WHEN RECORDED MAIL TO: IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII NO FEE 200800017662711.30am 04116108 WHEN RECORDED MAIL TO: 45 N12 1 illCITY OF HUNTINGTON BEACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 Attn: Robert A. Martinez P.O. Box 190 - 2000 Main Street - - --- - - - -- - - - Huntington Beach, CA 92648 THIS SPACE FOR RECORDER'S USE ONLY 0 1/ a TITLE OF -DOCUMENT: - NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN by the City of Huntington Beach, owner in fee, 2000 Main Street, Huntington Beach, CA 92648, that the contract heretofore awarded to ACCORD ENGINEERING INC. who was the company thereon for doing the following work to -wit: r WATERMAIN REPLACEMENT PROJECT, CC# 1238 That said work was completed March 13, 2008 by said company according to plans and specifications and to the satisfaction of the City Engineer of the City of Huntington Beach and that said work was accepted by the Director of Public Works on March 13, 2008, per City Council Resolution No. 2003-70 adopted October 6, 2003. That upon said contract Hartford Insurance was surety for the bond given by the said company as required by law. This document is solely for the official business of the City of Huntington Beach, as contemplated under Government Code Section 6103 and should be recorded free of charge. Dated at Huntington Beach, California, this April 8, 2008. Director of Publi orks or City Engineer City of Huntington Beach, California STATE OF.CALIFORNIA) County of Orange ) ss: City of Huntington Beach ) I, the undersigned, say: I am an Agent of the City of Huntington Beach, owner in fee, in the foregoing NOTICE OF COMPLETION. I have read said NOTICE OF COMPLETION and know the contents thereof; the same is true of my knowledge. I declare under penalty of perjury that the foregoing is true and correct, and that said NOTICE OF COMPLETION was duly and regularly ordered to be recorded in the Office of the County Recorder of Orange County. Dated at Huntington Beach, California, this April 8, 2008. irector of Public W rks or City Engineer ineer City of Huntington Beach, California THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) '01.059-TITLE PAGE (R7/95) Certification of Compliance with Prevailing Wage Laws To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Prevailing Wage Laws Contract: C C 123 0 Project: W&-wWb'(►J' The undersigned contractor on the above -referenced project ("Project") hereby certifies that all laborers, mechanics, apprentices, trainees, watchmen and guards employed by him or by any subcontractor performing work under the contract for the Project have been paid pursuant to the minimum wage and bona fide fringe benefit requirements specified for each particular classification of work, as set forth in the wage -rate determinations of the State of California, Department of Industrial Relations, and/or the United States Department of Labor. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of mh4ciA ,200 b, at California. (Type Contractor Name) By: V1L5 ftOV74__� Name: [Type Name] Title: [Type Title] Aid "0 id. c iR.A. �J CITY AI"�RNEY i"LS o3.2t - mp 247542.1 CONTRACTOR'S CERTIFICATE I, M A-x PAIp , state and certify that: (Name of Declarant) �l�v 2Q ;Gii n�zC�2t+J� , (,MC. is the general contractor to the City of Huntington Beach ("City") on Contract No. G G 1 2 3W6 (the "Contract") for the construction of the public work of improvement entitled: (the "Project"). 2. All work to be performed pursuant to the Contract has been completed in accordance with the Contract Documents (as such term is defined in the Contract). Except for the claims listed.below and the disputed claims listed in paragraph five (5), all persons supplying labor, services, materials and equipment to the Project, including all claims against the Contractor arising from the performance of the Contract, have been paid and satisfied (list unpaid debts and claims; if none, write "NONE"): 4. Attached hereto are the lien waivers required by the Contract Documents, which lien waivers have been executed by all persons who performed work on or supplied labor, services, materials, and/or equipment for use at the Project. 5. Set forth below is a list of disputed claims or claims that are the subject of a Notice to Withhold filed pursuant to the Civil Code of the State of California (list all disputed claims; if none, write "NONE"): �J 0 I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed at glm-o, on this day of M(U-C� , 20 0�3 (Signature of Declarant) APPROVED AS TO FORM By: 4�22� "U 3• Zo•OCP Name: [Type Name] Title: [Type Title] 245914.1 Certification of Compliance with Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 Contract: C G l Z 3 S Project: U1�.iA�t� API-6�CMiT The undersigned contractor on the above -referenced project ("Project") hereby certifies that it has complied with Title VII of the Civil Rights Act, the Equal Opportunity Act of 1972 and Executive Order 11246, and has not discriminated against any employee or applicant for employment because of race, creed, color, sex, national origin, age or disability. The undersigned contractor also certifies that it has not maintained any segregated facilities at its establishments on the basis of race, creed, color, sex, national origin, age or disability (with the exception of access for the disabled). I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this 43 4" day of , 20, at <iN-Ci. lkN ,California. kezow (Type Contractor Name) By: 1/ IC'E C�c-�l�nl�( Name: [Type Name] Title: [Type Title] R A ORNEX _j1J 3.2yb - Cto 245911A RECEIVED BY: (Name) (Date) FIE CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office after signing/dating CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: Shar' Freidenrich, City Treasurer FROM: C�%C DATE: el At 4 SUBJECT: Bond Acceptance I have received the bonds for Faithful Performance Bond No. Labor and Material Bond No. Monument Bond No. Maintenance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. MSC No. Approved (Co cil Ap /,0 -�,- roval Date) (Company Name) Agenda Item No. City Clerk Vault No. IQUU ' v ) /Wz�� #27 g1followup/bondletter.doc Maintenance Bond X THE HARTFORO Bond No 728CSEM8620-A KNOW ALL MEN 8Y THESE PRESENTS, That we, Accord Engineering, Inc. as Principal, hereinafter called Principal, end Hartford Fire Insurance Company a corporation organized and ex" under the laws of the State of Connecticut , with Its principal office in the City of Brea, California as Surely, hereinafter called Surety, are held and firmly bound unto of Huntington Beach as Oblig", hereinafter caffed 0oreee, ,n the sum of Two Hundred tVinety Six ThousanTwo Rundred orty ix an 0 (s 296,246.31 ) Dollars, for the payment of which, wall and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. Sealed with our seals and dated this 26th day o1 March A D 2008 WHEREAS, the Principal entered into a certain written contract with thgate m dated the -day of , A D. 19 o ain Replacement Project Cash Contract 1238 t which corarad Is hereby referred to as the Contract. WHEREAS, the Contract contains provisions for the correction of any defects due to defective materials or workmanship In fhe work pefforrned under Bald Contract. NOW, THEREFORE, the condition of ttds obligation is such that it the Principal shall well and truly, upon receipt of written notification from the Obligee, remedy arty defects which are discovered and reported during a period of 1 year(s) from Marr,.h VA )nnA provided such defects are caused by defective materials or workmanship, then this obligaton shall t» void; otherwise to be and remain In full force and effect. Any suit under this bond must be instituted before the expiration of one (1) year from the date of the written notification referred to In the paragraph above, it being understood, however, that it any limitation emboded in this bond is pmhibitad by any law comrolfing the consbudfon hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation pennetted by such law. The penal sum of this bond shag be reduced by and to the extent of any payment or payments made in good faith. No right of action shall accrue on this bond to or for the use of any person or corporation other than the Oblgee named herein or Its heirs, executors, administrators or successors. Accord Engineering, Inc. Witness (Seal) (11 Individual) (Principal) Attest�C«yd Y �d Wires (Sea) (If Corporation) 4 (Title) (Seal) Ana or witness: Hartford Fire-Inpurance Company � r BY (James Baldassare, Jr., Attor y- n- ac i Form S-40M-0 Printed in U.S.A. Direct Inquiries/Claims to: POWER OF ATTORNEY BOND, " o P.O.Bo O ASYLUM HARTFORD. CONNECTICUT 06115 call: 888-266-3488 or fax. 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 72-160200 I_^J Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut L� Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: James R. Sommerville, Valerie M. Pearce, Lawrence F. McMahon, Leticia San Martin, James Baldassare, Jr., Penny E. Kelley of San Diego, CA their true and lawful Attorney(syin-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. C Cd toai �sNAV :/earro.e, o'�i=' �•i,'�'°W°rNrta r '�!r♦.r e''`��YIUhrY�� ��a1+IM►.,i� �i 1670fo= 'mil 1979 ♦ ?: Jn.,�i �t[♦ !p .'e. rY • 'tv t��N J` \'.o,a.� `�"Fl J_./ Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT I ss. Hartford COUNTY OF HARTFORD David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts: that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. Scott E. Paseka 0 Notary Public CERTIFICATE N1y Commission Expires October 31. 2007 i, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above �p41€pr2jwW6�rue and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of 1N1/1h( Signed and sealed at the City of Hartford. tY l "'"WEtr•74`"`` ,� t r S ' j � an�+a,. ���'a,, 4 �1 A i 1C0a rl P..trai i Y 1v M r ♦�pIJ011♦�y 3 �r`yro0.tla j�,ALOA�AT�O Ig79 o ij _... a♦ ♦. ^'� a` `�Y`:•'v� .{ NtATA rA 0 AO • ':,♦yKnMw`NaP`� +' �OIA14 �F "+�,PrJq�N'., 4 Gary W- Stumper, Assistant `(Vice President POA 2005 CONSENT OF OWNER ❑ ARCHITECT ❑ SURETY COMPANY CORTRYCTOR El SU TO FINAL PAYMENT OTHER ❑ AIA DOCUMENT G707 PROJECT Watermain Replacement Project Cash Contract 1238 (name, address) TO (Owner): ARCHITECT'S PROJECT NO: City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 CONTRACT DATE: L J CONTRACTOR: Accord Engineering, Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) Hartford Fire Insurance Company One Pointe Drive, Suite 220 Brea, CA 92821 ,Surety On bond Of (here insert name and address of Contractor) Accord Engineering, Inc. 1231 E. Dyer Road, Suite 265 Santa Ana, CA 92705 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 ,OWNER, as set forth in the said Surety Company's bond no.. 72BCSEM8620 IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 26th day of March , 2008. Signat re o u oriz Representative Attest: (Seal): Hard Fire Insurance Com Surety many Sign ture of Authoriz y Representative 0 Penny E. Kelley, Attorney -In -Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition AIA DOCUMENT G707 • CONSENT OF SURETY COMPANY TO FINAL PAYMENT • APRIL 1970 EDITION • AIA® ONE PAGE 0 1970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of San Diego OnMAR 2 6 2008 before me, Audrey Rodriguez, Notary Public Date Here Iruert Name and T7 a ot the Officer personally appeared Penny E. Kelley Name e of Signer(s) who proved to me on the basis of satisfactory evidence to be the personN whose name0o is/a(K subscribed to the within instrument and acknowledged to me that j(e/she/tNW executed the same in Ms/her/#Wr authorized capacity(M), and that by Vs/her/tA& slgnature(A on the Instrument the person(k), or the entity upon behalf of which the personW acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws Comm r `' of the State of California that the foregoing paragraph is a • & « a°T� - NOTARY PUBLIC-&-V C71ttj3A �5 SAN DIEGO COUt,',T ° true and correct. ! Itii Commission Expires I ECEMSER WITNESS my and and off* • I sell. Signature bbqw/h- Place Notary Seal Above rgonthe ure of Nota ublic OPTIONAL Though the Information below Is not required bylaw, if may prove valuable to perso document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name: ❑ Individual • Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT THIAMPRINT OF SIGNLH Top of thumb hers Number of Pages: Signer's Nat ❑ Individual ❑ Corporate Officer —. Tftle(s): ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact C7 Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT THUMBPRINT OF SIGNER �?,...�i"�'x�;•L'�;•C�X:4=L� . ,:- -. .. • . .. • . ' . • .. � . - , . ... �i`��-.4."Rr.'?^L•'Cti �t?G� 02C07 Natkriaf NotPTy Amoclation- 9M N Soto Ave;. P.D. Brix tam-Ghahrr wi CA 91313.2402 • www Na§o4NelarAor2 (tarn 75967 �:Reortler Call ToIFFkee 1-e00-671W.27 Direct Inquiries/Claims to: POWER OF ATTORNEY P.O. BTHE OX 2103, 690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 72-160200 X= Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut X� Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: James R. Sommerville, Valerie M. Pearce, Lawrence F. McMahon, Leticia San Martin, James Baldassare, Jr., Penny E. Kelley of San Diego, CA their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. SY iN �• t�Ees d � � t[tp`q`* .g ir`��*R• o �o4[•Mr M y� weone+rr:�' 19 0 7' y y,�NPlnAy�c3% 0U. �ncouxorwiEc • ' �"u3e4tCai:�`�TN xR �JdYA aAa�b • ^'•h4 r�t1AU15 A� r[O14[P , ���.i Jit19� _ �rNNbWWA1 �n ^" Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss, Hartford COUNTY OF HARTFORD David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. t5 E. p 1 x��R 1 �d Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of Signed and sealed at the City of Hartford. LIAR 2 6 2008 �SY INS L� `1u N •mires .br t tA�p �, ecra",r`1i ��ro�rM :!wao.rr.rt� a 190T +fe I,xroWrim= .�nzfl�rNa `r 'Obr►� �:;- a'°�°++rr nc�Jm • f•auM' ,roe S" 1979 --af sf° , I914 $ • ' .rye19�'• �rN bra o� A�5b4 • ~ ?r5x �.t' �� +oin�'� - Zo'o ..... _..... _. �d t 4� Gary W. Stumper, Assistant Vice President POA 2005 CITY FUNDED CONSTRUCTION CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND � FOR Pk c 1� c- TABLE OF CONTENTS Page No. 1. STATE OF WORK; ACCEPTANCE OF RISK 1 2. ACCEPTANCE OF CONDITIONS OF WORK; PLANS 2 3. COMPENSATION 4 4. COMMENCEMENT OF PROJECT 4 5. TIME OF THE ESSENCE 4 6. CHANGES 5 7. NOTICE TO PROCEED 6 8. BONDS 6 9. WARRANTIES 6 10. INDEPENDENT CONTRACTOR 7 11. LIQUIDATED DAMAGES/DELAYS 7 12. DIFFERING SITE CONDITIONS 9 13. VARIATIONS IN ESTIMATED QUANTITIES 10 14. PROGRESS PAYMENTS 10 15. WITHHELD CONTRACT FUNDS, SUBSTITUTION OF SECURITIES 11 16. AFFIDAVITS OF SATISFACTION OF CLAIMS 11 17. WAIVER OF CLAIMS 12 18. INDEMNIFICATION, DEFENSE, HOLD HARMLESS 12 19. WORKERS' COMPENSATION INSURANCE 13 20. INSURANCE 13 21. CERTIFICATES OF INSURANCE; ADDITIONAL INSURED 14 22. NOTICE OF THIRD PARTY CLAIM 15 23. DEFAULT & TERMINATION 15 24. TERMINATION FOR CONVENIENCE 16 25. DISPOSITION OF PLANS, ESTIMATES AND OTHER 16 26. NON -ASSIGNABILITY 16 27. CITY EMPLOYEES AND OFFICIALS 16 28. STOP NOTICES 17 29. NOTICES 17 30. SECTION HEADINGS 18 31. IMMIGRATION 18 32. LEGAL SERVICES SUBCONTRACTING PROHIBITED 18 33. ATTORNEY'S FEES 18 34 INTERPRETATION OF THIS AGREEMENT 19 35. GOVERNING LAW 19 36. DUPLICATE ORIGINAL 19 37. CONSENT 20 38. SURVIVAL 20 39. MODIFICATION 20 40. ENTIRETY 20 CITY FUNDED CONSTRUCTION CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND �CCC�kAD FN(of N CEe-INb zt�C: FOR cc 038 p2 CU ECG THIS AGREEMENT ("Agreement") made and entered into this day of 20_, by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and Ac-Lon . -r iy C. , a California Cry (LPCJ� —Q CA-) hereinafter referred to as "CONTRACTOR." WHEREAS, CITY has solicited bids for a public works project, hereinafter referred to as "PROJECT," more fully described as C -12 ss CLa t4-~i-q- M A I N Tk pcf-VOL k. A-t- ".3 C c i in the City of Huntington Beach; and CONTRACTOR has been selected to perform said services, NOW, THEREFORE, in consideration of the promises and agreements hereinafter made and exchanged, the parties covenant and agree as follows: 1. STATEMENT OF WORK; ACCEPTANCE OF RISK CONTRACTOR shall complete and construct the PROJECT pursuant to this Agreement and the Contract Documents (as hereinafter defined) and furnish, at its own cost and expense, all labor, plans, tools, equipment, supplies, transportation, utilities and all other items, services and facilities necessary to complete and construct the PROJECT in a good and workmanlike manner. CONTRACTOR agrees to fully assume the risk of all loss or damage arising out of the nature of the PROJECT, during its progress or prior to acceptance by CITY, from agree/forms/city consd4-03 I the action of the elements, from any unforeseen difficulties which may arise or be encountered in the prosecution of work, and for all other risks of any description in connection with the work, including, but not limited to, all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as are herein expressly stipulated to be borne by CITY, and for well and faithfully completing the work within the stipulated time and in the manner shown and described in this Agreement, and in accordance with the requirements of CITY for the compensation set forth in the accepted bid proposal. 2. ACCEPTANCE OF CONDITIONS OF WORK; PLANS AND SPECIFICATIONS CONTRACTOR acknowledges that it is fully familiar with all the terms, conditions and obligations of this Agreement and the Contract Documents (as defined below in this Section), the location of the job site, and the conditions under which the work is to be performed, and that it enters into this Agreement based upon its thorough investigation of all such matters and is relying in no way upon any opinions or representations of CITY. It is agreed that the Contract Documents are incorporated into this Agreement by this reference, with the same force and effect as if the same were set forth at length herein, and that CONTRACTOR and its subcontractors, if any, shall be bound by the Contract Documents insofar as they relate in part or in any way, directly or indirectly, to the work covered by this Agreement. "Contract Documents" as defined herein mean and include: A. This Agreement; B. Bonds covering the work herein agreed upon; agree/forms/city const/4-03 2 C. The CITY's standard Plans and Specifications and special contractual provisions, including those on file in the office of the Director of Public Works of CITY and adopted by the City Council, and any revisions, amendments or addenda thereto; D. The current edition of Standard Specifications for Public Works Construction, published by Builders' News, Inc., 10801 National Boulevard, Los Angeles, CA 90064, and all amendments thereto, written and promulgated by the Southern California chapter of the American Public Works Association and the Southern California District Associated General Contractors of the California Joint Cooperative Committee; E. Bid documents including the Notice Inviting Bids, the Special Instructions to Bidders and the CONTRACTOR's proposal, (which is attached hereto as Exhibit "A" and incorporated herein by this reference); F. The particular Plans, Specifications, Special Provisions and Addenda applicable to the PROJECT. Anything mentioned in the Specifications and not indicated in the Plans or indicated in the Plans and not mentioned in the Specifications, shall be of like effect as if indicated and mentioned in both. In case of a discrepancy between any Plans, Specifications, Special provisions, or Addenda, the matter shall be immediately submitted by CONTRACTOR to the Department of Public Works of CITY (hereinafter referred to as "DPW"), and agree/forms/city const/4-03 3 CONTRACTOR shall not attempt to resolve or adjust the discrepancy without the decision of DPW, save only at its own risk and expense. Should there be any conflict between the terms of this Agreement and the bid or proposal of CONTRACTOR, then this Agreement shall control and nothing herein shall be considered as an acceptance of the terms of the bid or proposal which is in conflict herewith. 3. COMPENSATION CITY agrees to pay and CONTRACTOR agrees to accept as full compensation for the faithful performance of this Agreement, subject to any additions or deductions made under the provisions of this Agreement or the Contract Documents, a sum not to exceed �}✓/�'a d p,,_o � taT1 v apt. i-Nc vSia�'� / 00 d�� Ml« ���', �' Dollars ($ 1 ) 9 31� �!f 5 ° ), as set forth 'r l64r A�Aa f0QU-r r1r'4'0'v0 Cc L"7-1. in the Contract Documents, to be paid as provided in this Agreement. 4. COMMENCEMENT OF PROJECT CONTRACTOR agrees to commence the PROJECT within ten (10) working days after the Notice To Proceed is issued and diligently prosecute the PROJECT to completion within Tt d consecutive Wog- t. «l- S) K'O'rom the day the Notice to Proceed is issued by DPW, excluding delays provided for in this Agreement. 5. TIME OF THE ESSENCE The parties hereto recognize and agree that time is of the essence in the performance of this Agreement and each and every provision of the Contract Documents. CONTRACTOR shall prepare and obtain approval as required by the Contract Documents for all shop drawings, details and samples, and do all other things necessary and incidental to the prosecution of its work in conformance with the progress schedule set forth in the Contract Documents. CONTRACTOR shall coordinate its work with the work of all agree/forms/city const/4-03 4 other contractors, subcontractors, and CITY forces working on the PROJECT in a manner that will facilitate the efficient completion of the PROJECT and in accordance with the terms and provisions of this Agreement. CITY shall have complete control of the premises on which the work is to be performed and shall have the right to decide the time and order in which the various portions of the work shall be performed and the priority of the work of other contractors, subcontractors and CITY forces and, in general, all matters concerning the timely and orderly conduct of the work of CONTRACTOR on the premises. 6 CHANGES CONTRACTOR shall adhere strictly to the plans and specifications set forth in the Contract Documents unless a change therefrom is authorized in writing by DPW. CONTRACTOR agrees to make any and all changes, furnish materials and perform all work necessary within the scope of the PROJECT as DPW may require in writing. Under no condition shall CONTRACTOR make any changes without the prior written order or acceptance of DPW, and CITY shall not pay any extra charges made by CONTRACTOR that have not been agreed upon in writing by DPW. When directed to change the work, CONTRACTOR shall submit immediately to DPW a written cost proposal reflecting the effect of the change. Should DPW not agree to such cost proposal, the work shall be performed according to the changes ordered in writing by DPW and the proper cost thereof shall be negotiated by the parties upon cost and pricing data submitted by CONTRACTOR; thereupon, CIiTY will promptly issue an adjusted change order to CONTRACTOR and the contract price will be adjusted upward or downward accordingly. agree/forms/city const/4-03 5 7. NOTICE TO PROCEED No work, services, material, or equipment shall be performed or furnished under this Agreement unless and until a Notice to Proceed has been given to CONTRACTOR by CITY. CITY does not warrant that the work will be available on the date the Notice to Proceed is issued. In the event of a delay in commencement of the work due to unavailability of the job site, for any reason, relief to CONTRACTOR shall be limited to a time extension equal to the delay due to such unavailability. 8. BONDS Only bonds issued by California admitted sureties will be accepted. CONTRACTOR shall, prior to its performance of this Agreement, furnish the following two (2) bonds approved by the City Attorney: One in the amount of one hundred percent (100%) of the contract price to guarantee the CONTRACTOR's faithful performance of the work, and one in the amount of one hundred percent of the contract price to guarantee payment of all claims for labor and materials furnished. In addition, CONTRACTOR shall submit to CITY a bond in the amount of one hundred percent (100%) of the final contract price, including all change orders, to warrant such performance for a period of one (1) year after CITY's acceptance thereof within ten (10) days of filing of the Notice of Completion. 9. WARRANTIES CONTRACTOR unconditionally guarantees all work done under this Agreement including, but not limited to, any workmanship, installation, fabrication, material or structural facilities constructed. CONTRACTOR, within ten (10) days after notice by CITY of any defect in the work, shall have the option to make appropriate repairs or replace agree/forms/city const/4-03 6 the defective item or items. Upon expiration of such ten (10) day period, CITY may then make appropriate repair or replacement at CONTRACTOR's risk and own cost and expense. 10. INDEPENDENT CONTRACTOR It is understood and agreed that CONTRACTOR is, and shall be, acting at all times hereunder as an independent contractor and not an employee of CITY. CONTRACTOR shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONTRACTOR and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services performed hereunder. 11. LIQUIDATED DAMAGES/DELAYS It is agreed by the parties hereto that in case the total work called for hereunder is not in all parts and requirements finished or completed within the number of calendar days as set forth herein, damage will be sustained by CITY; and that it is, and would be, impractical and extremely difficult to ascertain and determine the actual damage which CITY would sustain in the event of and by reason of such delay. It is, therefore, agreed that CONTRACTOR will pay to CITY, as liquidated damages and not as a penalty, the sum of (-- W �- -�u�'oIL! 0 Dollars ($ �-O0 ) per day for each and every working day's delay in completing the work in excess of the number of working/calendar days set forth herein, which represents a reasonable endeavor by the parties hereto to estimate a fair compensation for the foreseeable damages CITY would sustain in the event of and by reason of such delay; and CONTRACTOR agrees to pay these damages herein provided, and agree/forms/city const/4-03 7 further agrees that CITY may deduct the amount thereof from any monies due or that may become due to CONTRACTOR hereunder. CONTRACTOR will be granted an extension of time and will not be assessed damages for any portion of the delay in the completion of the work due to unforeseeable causes beyond the control and without the fault or negligence of CONTRACTOR, including, but not limited to, acts of God or of the public enemy, fire, floods, epidemics, quarantine restrictions, strikes, unsuitable weather, or delays of subcontractors due to such causes. CONTRACTOR shall, within fifteen (15) days from the beginning of any such delay (unless DPW shall grant a further period of time), notify DPW in writing of the cause of the delay and CITY shall extend the time for completing the work if, in its judgment, the findings of fact thereon justify the delay; and the decision of DPW shall be conclusive on the parties hereto. Should CONTRACTOR be delayed in the prosecution or completion of the work by the act, neglect or default of CITY, or should CONTRACTOR be delayed by waiting for materials required by this Agreement to be furnished by CITY, or by damage caused by fire or other casualty at the job site for which CONTRACTOR is not responsible, or by the combined action of the workers, in no way caused by or resulting from default or collusion on the part of CONTRACTOR, or in the event of a lockout by CITY, then the time herein fixed for the completion of the work shall be extended by the number of days CONTRACTOR has thus been delayed, but no allowance or extension shall be made unless a claim therefor is presented in writing to CITY within fifteen (15) days of the commencement of such delay. No claims for additional compensation or damages for delays, irrespective of the cause thereof, and including without limitation the furnishing of materials by CITY or agree/forms/city const/4-03 8 delays by other contractors or subcontractors, will be allowed and an extension of time for completion shall be the sole remedy of CONTRACTOR. 12. DIFFERING SITE CONDITIONS A. Notice: CONTRACTOR shall promptly, and before such conditions are disturbed, notify DPW in writing of: (1) Subsurface or latent physical conditions at the job site differing materially from those indicated in this Agreement or the Contract Documents; or (2) Unknown physical conditions at the job site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent to work of the character to be performed under this Agreement. DPW shall promptly investigate the conditions and if it finds that such conditions do materially so differ and cause an increase or decrease in the time required for performance of any part of the work under this Agreement, whether or not changed as a result of such conditions, an equitable adjustment shall be made and the agreement modified in writing accordingly. B. Time Extension: No claim of CONTRACTOR under this Section shall be allowed unless CONTRACTOR has given the notice required hereunder provided, however, the time prescribed therefor may be extended by CITY. agree/forms/city const/4-03 9 13. VARIATIONS IN ESTIMATED QUANTITIES The quantities listed in the bid schedule will not govern final payment. Payment to CONTRACTOR will be made only for the actual quantities of contract items used in construction of the PROJECT, in accordance with the plans and specifications. Upon completion of the PROJECT, if the actual quantities used are either more than or less than the quantities listed in the bid schedule, the bid price shall prevail subject to the provisions of this Section. DPW may, at its sole discretion, when warranted by the facts and circumstances, order an equitable adjustment, upwards or downwards, in payment to CONTRACTOR where the actual quantities used in construction of the PROJECT are in variation to the quantities listed in the bid schedule. No claim by CONTRACTOR for an equitable adjustment in price or time for completion shall be allowed if asserted after final payment under this Agreement. If the quantity variation is such as to cause an increase in the time necessary for completion, DPW shall ascertain the facts and circumstances and make such adjustment for extending the completion date as in its sole judgment the findings warrant. 14. PROGRESS PAYMENTS Each month DPW will make an estimate in writing of the work performed by CONTRACTOR and the value thereof. From each progress estimate, ten percent (10%) will be deducted and retained by CITY and the remainder of the progress estimate, less the amount of all previous payments since commencement of the work, will be paid to CONTRACTOR. When CONTRACTOR has, in the judgment of DPW, faithfully executed fifty percent (50%) or more of the value of the work as determined from the bid schedule, and if DPW finds that satisfactory progress has been and is being made, CONTRACTOR may be paid such sum as will bring the payments of each month up to one hundred percent (100%) of agree/forms/city const/4-03 10 the value of the work completed since the commencement of the PROJECT, as determined in its sole discretion by DPW, less all previous payments and less all previous retained amounts. CITY's final payment to CONTRACTOR, if unencumbered, or any part thereof unencumbered, shall be made thirty-five (35) days after the acceptance of the work and the filing of a Notice of Completion by CITY. Payments shall be made on demands drawn in the manner required by law, each payment to be accompanied by a certificate signed by DPW, affirming that the work for which payment is demanded has been performed in accordance with the terms of the Agreement and that the amount stated in the certificate is due under the terms of the Agreement. Partial payments on the contract price shall not be considered as a acceptance of any part of the work. 15. WITHHELD CONTRACT FUNDS, SUBSTITUTION OF SECURITIES At the request and at the sole cost and expense of CONTRACTOR, who shall retain beneficial ownership and receive interest, if any thereon, CITY shall permit the substitution and deposit therewith of securities equivalent to the amount of any monies withheld by CITY to ensure performance under the terms of this Agreement. 16, AFFIDAVITS OF SATISFACTION OF CLAIMS After the completion of the work contemplated by this Agreement, CONTRACTOR shall file with DPW its affidavit stating that all workers and persons employed, all firms supplying materials and all subcontractors working upon the PROJECT have been paid in full and that there are no claims outstanding against the PROJECT for either labor or material, except certain items, if any, to be set forth in CONTRACTOR's affidavit covering disputed claims, or items in connection with Notices to Withhold, which have been filed under the provisions of the statutes of the State of California. agree/forms/city const/4-03 11 17. WAIVER OF CLAIMS The acceptance by CONTRACTOR of the payment of the final certificate shall constitute a waiver of all claims against CITY under or arising out of this Agreement. 18. INDEMNIFICATION, DEFENSE, HOLD HARMLESS CONTRACTOR hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents, and volunteers from and against any and all, claims, damages, losses, expenses, judgments, demands defense costs, and consequential damage or liability of any kind or nature, however caused, including those resulting from death or injury to CONTRACTOR's employees and damage to CONTRACTOR's property, arising directly or indirectly out of the obligations or operations herein undertaken by CONTRACTOR, caused in whole or in part by any negligent act or omission of the CONTRACTOR, any subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including but not limited to concurrent active or passive negligence, except where caused by the active negligence, sole negligence, or willful misconduct of the CITY. CONTRACTOR will conduct all defense at its sole cost and expense and CITY shall approve selection of CONTRACTOR's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR. 19. WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE Pursuant to California Labor Code Section 1861, CONTRACTOR acknowledges awareness of Section 3700 et seq. of this Code, which requires every employer agree/forms/city const/4-03 12 to be insured against liability for workers' compensation; CONTRACTOR covenants that it will comply with such provisions prior to commencing performance of the work hereunder. CONTRACTOR shall obtain and furnish to City workers' compensation and employer's liability insurance in an amount of not less than the State statutory limits. CONTRACTOR shall require all subcontractors to provide such workers' compensation and employer's liability insurance for all of the subcontractors' employees. CONTRACTOR shall furnish to CITY a certificate of waiver of subrogation under the terms of the workers' compensation and employer's liability insurance and CONTRACTOR shall similarly require all subcontractors to waive subrogation. 20. INSURANCE In addition to the workers' compensation and employer's liability insurance and CONTRACTOR's covenant to defend, hold harmless and indemnify CITY, CONTRACTOR shall obtain and furnish to CITY, a policy of general public liability insurance, including motor vehicle coverage covering the PROJECT. This policy shall indemnify CONTRACTOR, its officers, employees and agents while acting within the scope of their duties, against any and all claims arising out or in connection with the PROJECT, and shall provide coverage in not less than the following amount: combined single limit bodily injury and property damage, including products/completed operations liability and blanket contractual liability, of One Million Dollars ($1,000,000) per occurrence. If coverage is provided under a form which includes a designated general aggregate limit, the aggregate limit must be no less than One Million Dollars ($1,000,000) for this PROJECT. This policy shall name CITY, its officers, elected or appointed officials, employees, agents, and volunteers as Additional Insureds, and shall specifically provide that any other insurance agree/forms/city const/4-03 13 coverage which may be applicable to the PROJECT shall be deemed excess coverage and that CONTRACTOR's insurance shall be primary. Under no circumstances shall said above -mentioned insurance contain a self -insured retention, or a "deductible" or any other similar form of limitation on the required coverage. 21. CERTIFICATES OF INSURANCE; ADDITIONAL INSURED ENDORSEMENTS Prior to commencing performance of the work hereunder, CONTRACTOR shall furnish to CITY certificates of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverages as required by this Agreement; the certificates shall: 1. provide the name and policy number of each carrier and policy; 2. state that the policy is currently in force; and 3. promise to provide that such policies will not be canceled or modified without thirty (30) days' prior written notice of CITY. CONTRACTOR shall maintain the foregoing insurance coverages in force until the work under this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverages shall not derogate from the CONTRACTOR's defense, hold harmless and indemnification obligations as set forth under this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of all the policies of insurance. CONTRACTOR shall pay, in a prompt and timely manner, the premiums on all insurance hereinabove required. CONTRACTOR shall provide a separate copy of the additional insured endorsement to each of CONTRACTOR's insurance policies, naming CITY, its officers, agree/forms/city const/4-03 14 elected and appointed officials, employees, agents and volunteers as Additional Insureds, to the City Attorney for approval prior to any payment hereunder. 22. NOTICE OF THIRD PARTY CLAIM Pursuant to Public Contracts Code §9202, CITY shall provide notice to CONTRACTOR of receipt of any claim filed with CITY or a court of competent jurisdiction which arises out of performance of this agreement within ten (10) days of receipt of such claim or claims. 23. DEFAULT AND TERMINATION If CONTRACTOR fails or refuses to prosecute the work hereunder with diligence, or fails to complete the work within the time specified, or is adjudged bankrupt or makes an assignment for the benefit of creditors or becomes insolvent, or violates any provision of this Agreement or the Contract Documents, CITY may give CONTRACTOR notice in writing of its intention to terminate this Agreement. Unless the violation is cured within ten (10) days after such Notice of Intention has been served on CONTRACTOR, CITY may, without prejudice to any other remedy it may have, terminate this Agreement upon the expiration of that time. Upon such default by CONTRACTOR, CITY may elect not to terminate this Agreement; in such event CITY may make good the deficiency in.which the default consists and deduct the resulting costs from the progress payments then or to become due to CONTRACTOR. If it is subsequently determined by a court of competent jurisdiction that CITY's termination of this Agreement under this Section was wrongful, such termination shall be converted to a termination for convenience under Section 23 and any damages shall be assessed as set forth in Section 23. agree/forms/city const/4-03 15 24. TERMINATION FOR CONVENIENCE CITY may terminate this Agreement for convenience at any time with or without cause, and whether or not PROJECT is fully complete upon seven (7) calendar days written notice to CONTRACTOR. In the event of termination, under this Section CITY shall pay CONTRACTOR for value of work in place on the PROJECT through the termination period plus seven and one-half percent (7 %2 %) for overhead and profit less all such payments already made. Such payment by CITY shall be CONTRACTOR's sole and exclusive remedy for termination by CITY for its convenience and CITY shall have not further obligation to CONTRACTOR. 25. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS CONTRACTOR agrees that upon completion of the work to be performed hereunder, or upon expiration or earlier termination of this Agreement, all original plans, specifications, drawings, reports, calculations, maps and other documents pertaining to this Agreement shall be delivered to CITY and become its sole property at no further cost. 26. NONASSIGNABILITY CONTRACTOR shall not sell, assign, transfer, convey or encumber this Agreement, or any part hereof, or any right or duty created herein, without the prior written consent of CITY and the surety. 27. CITY EMPLOYEES AND OFFICIALS CONTRACTOR shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the California Government Code. agree/forms/city const/4-03 16 28. STOP NOTICES; RECOVERY OF ADMINISTRATIVE COSTS CITY shall be entitled to all reasonable administrative costs and necessary disbursements arising out of the processing of Stop Notices, Notices to Withhold, or any similar legal document. This obligation shall be provided for in the labor and materials payment bond required of CONTRACTOR. CITY may charge an administrative fee of One Hundred Dollars ($100) for every Stop Notice filed in excess of two (2), regardless of whether or not CITY is named in an action to enforce such stop notices. CITY may set off any unreimbursed cost or expense so incurred against any sum or sums owed by CITY to CONTRACTOR under this Agreement. 29. NOTICES Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONTRACTOR's agent (as designated in Section I hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below; provided that CITY and CONTRACTOR may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, reputable overnight carrier or U. S. certified mail -return receipt requested: TO CITY: City of Huntington Beach ATTN: D UANi � . V) 2000 Main Street Huntington Beach, CA 92648 TO CONTRACTOR: agree/forms/city const/4-03 17 30. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of maters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. 31. IMMIGRATION CONTRACTOR shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of United States Code Section 1324a regarding employment verification. 32. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONTRACTOR and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONTRACTOR understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONTRACTOR. 33. ATTORNEY'S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party agree/forms/city const/4-03 18 shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the non -prevailing party. 34. INTERPRETATION OF THIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 35. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. 36. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, agree/forms/city const/4-03 19 irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 37. CONSENT Where CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be consent/approval to any subsequent occurrence of the same or any other transaction or event. 38. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement shall so survive. 39. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 40. ENTIRETY The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached Exhibit "A", contain the entire agreement between the parties respecting the subject matter agree/forms/city const/4-03 20 of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized offices the day, month and year first above written. CONTRACTOR By print name ITS: (circle one) Chairma reside ice President AND By: YJo & -/ TACT 9-t46 _W )t nAt-1 print name ITS: (circle one) ecretary/ hief Financial Officer/Asst. Secretary - Treasurer REVIEWED AND APPROVED: Ck Administrator CITY OF HUNTINGTON BEACH, a municipal corporation of the State of California .f • ATTEST: Vy Clerk APPROVED AS TO FORM: 7-kv 167 City Attorney l: INITIATED AND APPROVED: �e'-f r i Director o ublic Works agree/forms/city const/4-03 21 EXt�I617- SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No..1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The V Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all 'appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find in the amount of $ which said amount is not less than 10%1of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Receh ed - Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS TvY_AQeA\-\cxksan� $iTo aLi� $f`�,Sxx�,00 2. Install 8-inch Class 200 PVC oVNe N�f\6c' d pipeline in the Alley between geve�ty-;ve Geneva Avenue and Frankfort Avenue 765 LF $ 11 5.cx� $153�'d 0 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF $co _ $1.3Oo-00 4. Provide temporary water service 1 LS $�?"54 o; $36ta;0.Oo 5. Construct waterline Twenty��� connection in Hill Street 1 LS $Q5�ov U�6'coo, oo 6. Construct fire hydrant 'c \C�_ksc'r\d assembly 1 EA P,-% v e $S.5O0•CO $ 5, 600, W 7. Cut and cap/seal existing waterline 3 EA $tc-c-Q,C $ ►,St�o.oy 8. Remove and dispose of �nree N��c�ree� existing valve 2 EA $W0_,nD $cp co. cxo 9. Relocation of sewer laterals 15 EA dY�e �1�ou5a nGi $1 a> oc� $l,oao•no 10. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS �,gY�'r h�sec� �y� $�i $1, ec) 11. Traffic control 1 LS F01Ar +V\0,ASand $_q4-co eo $(4,500 Q �C'we i-\u n r 12. Sheeting, shoring, and/or -Chcee_ bracing 1 LS $340MCa $_lo0o.c0 13. Additional potholing 20 EA �`'O �``�` r $�sp,00 $5,Qm. 14. Demobilization and Cleanup 1 LS wo 15. Install 4-inch cut in valve Tv.x> assembly 1 EA Seve�-\ $Lic-0 W $&0C.00S 16. Install new 1-inch polyethylene water service 5 EA $5,L0.00 C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Descripition Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch on e �Y�ousa rZd polyethylene water service, connect to existing 3/-inch meter 11 EA $ ;� 18. Install new 1-inch polyethylene water service, v s connect to existing 1-inch meter 7 EA r>ne ilr<o�xs nd�-- 19. Install 4-inch pump -outs �� 6�c0 'SDo, .ag),�•0d assembly 1 EA Qa 20. Replace Existing Traffic v 11unL� Pd Control Loop 1 EA •, � tt 0100 Sub -Total Amount for All Bid Items — SCHEDULE A $22S C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $evc'� �`"`i5�`"� $sco.co 2. Install 8-inch Class 150 PVC pipeline in -Yt�o runc�ret� Indianapolis Avenue - at Beach Boulevard 110 LF $&Sol $ , 3. Install 12-inch Class 350 DI pipeline in Indianapolis r1'ivc hex �rec Avenue at Beach Boulevard. 172 LF $=100 4. Install 12-inch Class 200 PVC pipeline in k1_1_kr hu(\&CEd Indianapolis Avenue at Beach Boulevard 45 LF 5. Install 24-inch steel casing in Indianapolis Avenue at Beach Boulevard, with receiving pit, and jacking pit 164 LF $500-OD $ �__,_Q_Q 6. Install 12-inch cut in valve assembly 1 EA ;mac3 $�oQ $y,SlaoCo 7. Flushing, Pressure Testing, OhOk�anc\ Disinfection, Dechlorination 1 LS 8. Traffic control 1 LS Seen {11cfi�sc�rld $162C C0 $25Lm.00 9. Water Pollutant Control ore.�sand Program 1 LS $i.cxx�.�'t� $1.0'0.co 10. Sheeting, shoring, and/or ge�en h �s�xnc� bracing 1 LS 'vV2 sco,co SO $JO.W 11. Additional potholing 15 EA A�,,,o $C�90.Cx) 12. Demobilization and �" Cleanup 1 LS �Ue hunc\r-ecc\ U-01 °.cx? 13. Replace Existing Traffic `"� h�nC�ced Control Loop 8 EA $`moo $,c�co•c Sub -Total Amount for All Bid Items — SCHEDULE B C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 12-inch Class 150 PVC pipeline in Beach Boulevard 500 LF'��Cy 3. Install 8-inch Class 150 PVC pipeline in Beach -k vo K"Af"&ec Boulevard 25 LF -�q-1Y 4. Flushing, Pressure Testing, �e �*C�-kscanck Disinfection, Dechlorination 1 LS e'► c ed $wpm-oc� $1a isoU.oc� 5. Traffic control 1 LS s i y a is ��r-ex3 $ eo, oac�, ex5 6. Water Pollutant Control Semen h�-i nClrec�' Program 1 LS G + f � $2wL.QQ 7. Sheeting, shoring, and/or -duo }hc� -�Sa rA bracing 1 LS 8. Additional potholing 20 EA At,)o hncL-ed $S,t.oc� 9. Demobilization and Cleanup 1 LS w� hi,�rlCidC'U 4 'O .Oa $1�0. 10. Replace Existing Traffic Control Loop 4 EA+undd $o,� $t,co,ca Sub -Total Amount for All Bid Items — SCHEDULE C $1�y_, 500,co C-6 PROJECT BID SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS S`+X f fLOusal-1 %�5�?� scea00.cX) 2. Install 8-inch Class 150 PVC pipeline in Joliet Avenue 325 LF 3. Install 8-inch Class 150 and 200 PVC pipeline in �1\urnd-f0_a Georgia Street at Joliet Avenue 115 LF 4. Install 4-inch cut in valve tworsa�� assembly 2 EA r `�ur�dtec` $Li-o . $G Soo =(.n 5. Construct . fire hydrant saver) 41�ocLof n assembly 1 EA jr`ve % ��itc '2 U4 - $ ,VM1(_ 6. Remove and salvage We � 6tvhtfVe existing fire hydrant 1 EA"101 7. Remove existing valve box -*IV ee V\, pcS�rec� and cover 3 EA xv $3 $��- 8. Cut and cap/seal existing waterline 2 EA yco.CD 9. Install 2-inch air and vacuum assembly 1 EA c o,00 $gXWQ,00 10. Relocation of sewer laterals 6 EA Ah u�SUh S(X $ Sp.DD $gX9 00, pD 11. Flushing, Pressure Testing, ooe-tho(ASU V1 Disinfection, Dechlorination 1 LS e' M )r\tkMteJ $((VO.00 $ (AW _00 12. Traffic control 1 LS FuY ono G n $ 5 u .OD $ DU CD J 13. Sheeting, shoring, and/or thy% %USQ bracing 1 LS $_ Oo A $ 3 000 .Oco 14. Additional potholing 20 EA WA"ayfd fifVj $ LSO.0b $_54Lq0:00 15. Demobilization and Cleanup 1 LS °Vo h�y� "0 16. Install new 1-inch 0 M Aim) UgLAnA polyethylene water service, connect to existing 3/-inches meter 5 EA $1 $ 17. Install new 2-inch copper nd water service, connect to'�b��� existing 1 1/2-inch meter 1 EA over 11,_krao-eJ SOt-1_o0kv Sub -Total Amount for All Bid Items — SCHEDULE D $ I Y -7, S6D-00 C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS k\Ve A -in oUsq rld $ C Q Q0.0C, $ 5,000 -00 2. Install 8-inch Class 150 and U'1e Nh d m 200 PVC pipeline in Utica Avenue 590 LF S jXt Ifive $j-(gsA0 $ 35(1�00 3. Construct fire hydrant StveY1 th0usu nd assembly 2 EA $ 000.0 $1 L bD0 00 4. Remove and salvage��(� fire hydrant 2 $no $ existing EA •i%Q 5. Remove existing valve box -2 and cover 6 EA $3So .00 $ 100 . uo 6. Cut and cap/seal existing waterline 2 EA ©y1�lOUSdtn� FWl� \()U $r Oa D) $ D-QO'04 7. Relocation of sewer lateral 6 EA t 14Q VVt cK,"CA Y1 d $ � 00 $_�0� .1Z1� 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS OMQ 'r%1(AISU hd ei hA UY►drPd $1 NO, a0 $ .00 9. Traffic control 1 LS $34-U0_-00 $3 1000 .00 10. Sheeting, shoring, and/or bracing 1 LS -ftuSA or) hV4 1Aundrt'd $3 Do C6 $ 3�500- DO 11. Additional potholing 20 EA IM h\A t)dX ed ff $W.0 •dd $ Sr00 p •Q0 12. Demobilization and 0he .�I ww nd Cleanup 1 LS $igap $ 1.00o.00 13. Install new 1-inch p Thug lid polyethylene water service, connect to existing 3/-inch meter 7 EA $ r0� 00 $ 00 14. Install new 1-inch rjvw 1-10(Asa "d polyethylene water service, oa ViO dyed connect to existing 1-inch meter 1 EA V A $1(�p 11100.00 15. Install new 2-inch copper TM ' h*Aso od water service, connect to existing 2-inch meter 3 EA $ 16. Install new 2-inch copper `Fowp_ %uq hd water service, connect to existing 1 1/2-inch meter 1 EA $3, W0.00 $. K_-00 Sub -Total Amount for All Bid Items - SCHEDULE E l b LI. o • 0D C-s .J x �` h PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost- 1 . Mobilization 1 LS f1VQ TVW0 AS d VIJ $ -0D $ 00.00 2. Install 6-inch, 8-inch and ()VP �A H &ed 12-inch Class 150 and 200 �lic �N fi Ve PVC pipeline in Beach Boulevard 1300 LF $1bC • DO $ 20 ,So0.00 3. Construct 12-inch D.I. inverted siphon assembly 31 LF ' bV1 t �J rAlnd re d $3SD • OD $ (t?T$SD ,0t7 4. Install 12-inch Class 150�(Q U hdl(Pd PVC watermain in Beach Boulevard at Yorktown Avenue 24 LF fit r �� $3S0.0o $-9,1-0-0-0 5. Construct 12-inch D.I. �/W h d rid siphon assembly 49 LF 6. Construct waterline�C�Sa h d connection in Beach Boulevard 1 LS $IQms_ $39'.00,0,00 7. Remove and salvage existing fire hydrant 2 EA f iW h h d N $ &Q0 SZO $_0D 8. Construct fire hydrant 2 EA R U ty Omc - $ $_1fiQ •� assembly t=_ 9. Remove existing valve box 1 �\WNdred and cover 5 EA He 10. Cut and cap/seal existing waterline 6 EA ' Quv NV14ed $ %0- $2 11. Remove and dispose of. �Wu �Ikpa d existing valve and interfering piping 1 EA $1L0 •0i) $ XD•C?u 12. Flushing, Pressure Testing, Vv\A �hGZCAV1 Disinfection, Dechlorination 1 LS %Ay 00 13. Traffic control 1 LS -�\fjee h �MEQY14 $I W $ 1ST ono . ov 14. Water Pollutant Control Program 1 LS QV1t 1-huuSu nd $ $ 1 1©()D • Db 15. Sheeting, shoring, and/or SJ vM\'C1 O tkM d bracing 1 LS y@ VkAV1JlreJ $!FDO•CD $ SQP- 16. Additional potholing 30 EA �'� Ye $ 2S0 •� $�D 17. Demobilization and We OUSO V1 d Cleanup �UhdYQd 1 LS $JA��� 1 $-421 •CA C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve +VVO %MA h assembly 2 EA qp, V1U hdred $'-%"-00 $-�I QW -0 19. Install 4-inch pump -out ThWe i-NaWld assembly 1 EA $�•� $'LDOo�L� 20. Install 2-inch air and CjWe -I OUS4 vid vacuum assembly 2 EA NA-) $1'�n1)•0D $ DD 21. Install new 1-inch 0V'E� polyethylene water service, connect to existing 1-inch meter 2 EA 22. Install new 2-inch copper 0040 � hd water service, connect to existing 2-inch meter 4 EA fUUY 1(1VIh(�C d $� OrJ $�� boo �0 23. Replace Existing Trafficvti EA tilUVldi $� • � Control . Loop 8 1 Sub -Total Amount for All Bid Items — SCHEDULE F $:;::z-I �S� •� C-10 PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS thOUSCkV1 d $ DO,u $ 0 2. Cut and cap/seal existing f�Ve waterline 4 EA 1 $SOD r�� $ 2 pip Tp0 3. Remove existing valve box 4 EA �51 vt ,,vv and cover 4. Construct fire hydrant assembly 1 EA Olth AmQhd $ % /qo0 .Ub 5. Remove and salvage existing fire hydrant 1 EA �,p tv�, V\UhdrQ d $5bb $ � D��.. � . ( 6. Traffic control 1 LS UOVZY) 7. Water Pollutant Control Program 1 LS • V \v l��,! r U _ 8. Sheeting, shoring, and/or ONt Vl bracing 1 LS k �� $ $_ 9. Additional potholing 10 EA �U"d*d C'f#''� $2So $ _2 0 10. Demobilization and Cleanup 1 LS e\0A �\\00 hf 4 11. Install new 1-inch polyethylene water service, connect to existing 1-inch EA $ $ meter 2 12. Install new 1-inch polyethylene water service, connect to existing 3/4-inch f6-v Y by w v% meter 1 EA I $ _ $ LI.O 13. Install new 2-inch copper V bO water service, connect to existing 2-inch meter 6 EA h\1Y �► �11ndYed $� $ I� ��9 14. Install new 2-inch copper water service, connect toGi existing 1 1/2-inch meter 3 EA $ZLMo• Qri $ b 001D Sub -Total Amount for All Bid Items — SCHEDULE G $ '4Q, 2�00 C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS tQ L4 \V t W o d 2. Install 8-inch Class 150 DNS VVVIdwri PVC pipeline in Clay Avenue 565 LF WN fl W $ $ 3. Install 12-inch Class 350 WV, �\v1 Vl D.I. pipeline in Clay Avenue 0 l $ L% w $ 7i-im at Beach Boulevard 120 LF .co 4. Install 24-inch steel casing V\ YPd in Clay Avenue across Beach Boulevard, with receiving pit and jacking pit 96 LF $ S00 $ oom 5. Install 8-inch Class 150 W\Z V\ UVq� VPd PVC pipeline at the Beach Boulevard and Clay Avenue kvvQ L/\A� - i vp intersection 55 LF 6. Install 8-inch Class 200 PVC in Coenson,. pipeline Circle at Clay Avenue 17 LF $1SO .DO $ 2,G�0.00 7. Remove and salvage existing fire hydrant 2 EA tfv �u (�� $3'90 . Ob $ 700'0, 8. Construct fire hydrant SRVQ [�1o�S(� �W assembly 3 EA $1M.CQ $_21 2—Q0 9. Cut and cap/seal existing �uV< waterline 4 EA $ $ 10. Remove existing valve box Fbu Y. U �� YivC� and cover 5 EA $� $ Zo00 11. Remove and dispose of existing valve and interfering pipeline 1 EA Sots 12. Relocation of sewer laterals 10 EA $D_� 13. Flushing, Pressure Testing, I +� h�300' 3 Disinfection, Dechlorination 1 LS $ 14. Traffic control 1 LS ( Sq Yl(� $� 000: $ 000 •0 15. Sheeting, shoring, and/or V��e U �� y bracing 1 LS $SLD�01) `0 $ 00) Q0 16. Additional potholing 20 EA %\VV\J—' f�l _VP $ -C,OOU-0�0 17. Demobilization and Cleanup 1bU LS �a (,� 0 000.00 C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard RID TTF.Mfi Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve neVY) assembly 1 EA $_ $ 19. Install 12-inch cut in valve fV Sq h assembly 1 EA 20. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 8 EA l 21. install new 1-inch U polyethylene water service, \Y connect to existing 3/4-inch meter 1 EA�`t�' Sub -Total Amount for All Bid Items — SCHEDULE H CC) Co C'T 0Q C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quanti Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF 0- C)b 3. Construct connection in c> 'Y . -.qr ( Ellis Avenue 1 LS i J� h�t��� $ 2 00, $ co 4. Remove and dispose of�� ttx existing valve and interfering pipeline 1 EA aY\e- i-A (Nat eCf $,}la0 $ 1 OD C- 5. Cut and cap/seal existing waterline 2 EA $a!�• O $ b5D• oD 6. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS A_�_Va -'hL-11ASQ RCl $2 6tQ- $ 7. Traffic control 1 LS eA <31`� ��� � $,Qae 8. Water Pollutant Control O n(2 *he_-,ASq,ti Program 1 LS $ 9. Sheeting, shoring, and/or A4'L0.4C_0'-)cd bracing 1 LS 10. Additional potholing 18 EA Jf wu eft J $2&0•iD $ZJ 00.00 11. Replace Existing Traffic �> V\,4 ecl Control Loop 4 EA '�:tfA $_00 $_f,000.00 12. Demobilization and Cleanup 1 LS }h SQ6d $ =.db $—I &OU 0� Sub -Total Amount for All Bid Items — SCHEDULE 1 $ 1 kj- 3QU'b C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost` 1. Install Aggregate Base (AB) 1200 Tons $ l70 $ Z�OOD -go 2. Install AC 500 Tons $J 0p $`$ �p u 3. Unclassified Excavation 300 CY kDD r� �( 'ie $ 00 $ QO.Ob 4. Adjust Utility Cover 30 EA +fk,red\qpr_,Vk:i � 4r $_1%• 00 $ lot, 5. Adjust Water Cover 1 EA VVkree 1'1drELj $ dp $ 6. Adjust Sewer/Storm Drain 2 EA Manholes 7. Remove/Construct 160 SF - $ i 0100 Concrete Sidewalk $ 8. Remove/Construct 2400 SF $ ft)• �� Concrete V-Ditch $i 9. Remove/Construct 500 SF 4; \\ $moo_ Concrete Drive Approach n including adjacent gutter $ 00a®0 10. Remove/Construct Concrete Curb Gutter 50 LF %\Ykl I $ •0� and $ Sub -Total Amount for All Bid Items — SCHEDULE J $A0 9-012•Od C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules TOTAL BID AMOUNT IN WORDS: b W_Jtp o� Aq?Z'ru_ 2 q-o, qSo MR O-)i 1I i r, n In n P W�- �--eCA Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion . o f 'Work Name.and Address of Subcontractor State License Number Class -AN�tiE+•r► CA q2scq- rkAA& AAA c'°a-` 2t2s A V.Wee5a06 , CA. 4A-zS .P b85'►Sy .a ��� GW=ap�n�4 'BoiQ.lri,{ � `�'� is • �cy�s�•� � ©�lG , cA a28c�u co�b�►oao A By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange being first duly sworn, deposes and says that he or she is �i✓GS� ✓� G' of GeSra' <' r <w the parry making the foregoing bid that the bid is not made in the interest 6f, or on VNe behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Name of Bidder `d Signature of Bidder z 3 / 6. �/ �e�a° 5�/e ems' , w-_z- 14 , Address of Bidder Subscribed and sworn to before me this day of 2007. NOTARY PUBLIC C-18 NOTARY SEAL CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State Of California County of ORANGE On o " b fore me, Clayton L. Dixon a Notary Public, Perso all appef.ared, (4ye,� p or proved to me on the basis of satisfactory evidence) to be the person( s), whose name (o isAw6 subscribed to the within instrument and acknowledged to me that he/sheAhey executed the same in his/lair authorized capacity4es�, and that by hisfterhheir signatureja�on the instrument the person r the entity upon behalf of which the person(cted, executed the instrument. my hand pjIftvfikcial seal. Description of Att_ _'_ Title or Type of E Documents Date CLA TY ON L, DIXON �VMY Comm.# 1645979 NOTARY PUBLIC-CALIFORNIA ORANGE COUNTY Comm. EXP. MAR. 15, 2010 i Signer(s) Other Than Named Above: &&-t UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Contractor By 1 � 'yuw�o � ,'RwesAve,T" Title Date: Io 12A C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes 0 No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: C-21 Contractor By Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-422-4133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor :A Title Date: Note: This form is required for emery Dig Alert Identification Number issued by U.S.A. during the course of the Work Additional forms may be obtained from the AGENCY upon request. C-22 I BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder Name �Z.3\ C-• -v,4e --WD y -%MR ?was Business Address Ste. M� CA q2�S City, ( '4" ) Z4% — -42 x> Telephone Number # 813`t3g --a State Contractor's License No. and Class Original Date Issued Expiration Date State Zip The work site was inspected by of our office on - ` 2007. The following are persons, firms, and corporations having a principal interest in this proposal: C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Company Name Signature of Bidder kwr.�c� `UA'3%0 ' Printed or Typed Signature Subscribed and sworn to before me this 0% day of ?u-�S- , 2007. NOTARY PUBLIC �� ��I� Gci l G NOTARY SEAL Listed below are the names, address and telephone numbers for: three public agencies for which the bidder has performed similar work within the past two years: C_" Cq 5V=M4&, Z,o CA-w CMG- 6 `Plf ZJI- , SMsm A IA.P CA 01Zao2 Name and Address of Public Agency Name and Telephone No. of Project Manager: tiw-A t' 40to , ww— • n0- cl�: Mc�Q , .tea Vlo� L4 I 2 `?ao'} Contract Amount Type of Work Date Completed 2. tx t ' A- ca,)fta Tc'J `51-w 8 , *X ►x � -, st t A&-, tqx q , v►. `t2.40ft-4 Name and Address of Public Agency Name and Telephone No. of Project Manager: t+%tce. ''E`-low-A , 440k " - 7-SS t Contract Amount Type of Work `11 2.cP Date Completed 3. 'DWr- OFF--%6-V! S"ctt"m- t4ftgFAr— 11 t?.%% cA 92►3Z Name and Address of Public Agency Name and Telephone No. of Project Manager: c"I'l 4.t9 6$2. � 2 '� 2 �a , 36to • 3 Y.sw.xi , ��'C�aNw � ¢ua.9 cucu..lc.r L rZ�j Contract Amount Type of Work Date Completed C-24 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State Of California County of ORANGE On fJ - / befbre me, Clayton L. Dixon, a Notary Public, Personally appeared, / UZW— 6 pZ roved to me on the basis of satisfactory evidence) to be the person(�vhose names is,4 subscribed to the within instrument and acknowledged to me that helsir y executed the same in his/hobk*eir authorized capacity (ios), and that by his, r ignature &-) on the instrument the perso(s), or the entity upon behalf of which the perso cted, executed the instrument. CLAYTON L. DIXON S my hand an official seal. COYP# 1645919 ►� '' '"� NOTARY PUBLIC -CALIFORNIA ;J ORANGE COUNTY Q aiY COMM. F.XP. MAR. 15T 2®1U� Description of Attached Document Title or Type of Document: Documents Date: k 1U e -7 Number of Pages Signer(s) Other Than Named Above: THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we Accord Engineering, Inc. as Principal, hereinafter called the Principal, and Hartford Fire Insurance Company a corporation duly organized under the laws of the State of Connecticut as Surety, hereinafter called the Surety, are held and firmly bound unto City of Huntington Beach as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of Bid Amount Dollars ($10%), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Annual Watermain Replacement Project (Bid Date 6121/07) NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 19th day of June, 2007. Accord Engineering, Inc. (Principal) (Seel) (Witness) y eL (Title Fire Insurance Company (Witness) AIA DOCUMENT A310 • BID BOND • AIA ® • FEBRUARY 1970 ED • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE_ N.W., WASHINGTON, D.C. 20006 a OALIFORNIA ALL-PURPOSE AOKNOWLEDGMENT State of California ss. County of SAN DIEGO On JUN 19 2007 before me, AUDREY RODRIGUEZ, NOTARY PUBLIC [late WW..WW is 7 Jot» Oa, WtW AW personally appeared PENNY E. KELLEY _ NmN(a) of ftrAKe) V personally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(Q whose nameiR) IsW6 subscribed to the within instrument and acknowledged to me that &sheM executed the same In IM/herADW authorized capacity(ies), and that by MberMIKU signaturek) on the instrument the person(g, or the entity upon behalf of which the person(jo ,,•• �_• AUDREY RODRIGUEZ acted, executed the instrument. COMM. #1631526 n tF NOTARY PUBLIC-CAUFORNIA es cr!SAN DIEGO COUNTY n W ES my han d fficial seal. MCommission Expires 9EMBER 18, 2008 or Naar OPTIONAL Though the kdommilon below & not requlred bylaw, d may pmm valuable to persons rely0g on.the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer Signer's Name: b Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Umited ❑ General ❑ Attomey-In-Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other, Signer Is Representing: RIGHT THUM13PRINT OF SIGNER 0 1999 National Notary Aeaodatlon - 0360 De Soto Ave., P.O. Box 2402 - Chatsworth, CA 01313-2402 - ww%naltonalnotary.otg Prod. No. 6907 Reorder: Call Ta"ree 1400.979.9927 Direct Inquiries/Claims to: HARTFOR POWER OF ATTORNEY P.O. eo "0 BOND S-4 DENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 72-160200 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut L.J Hartford Casualty insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana O Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited. James R. Sommerville, Valerie M. Pearce, Lawrence F. McMahon, Leticia San Martin, James Baldassare, Jr., Penny E. Kelley of San Diego, CA their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. �r .. ' I'�irl��.xv1+, ��stMM► ►� `; 1970 s.• 1D 79 a r .I111o015, Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of JUN 19 2007 Signed and sealed at the City of Hartford. �7v irk 41^tlS i` �it Cpy, �i.. �Ay� e rw " $ Ply 188Y a i +,- �,y .�+vinenv1` A�suWt► ��1 t079 � ♦ rF,e��• "bewvN♦ ifA :� �0�1 • � ��tSual!.� .pebU�. Gary W. Stumper, Assistant Vice President RECEIVED BY: CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office (Name) after signing/dating (Date) CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: Sh,{i Freidenrich, City Treasurer FROM: DATE: SUBJECT: Bond Acceptance e' I have received the bonds for L464s) -1 (Company Name) Faithful Performance Bond No. + CS E M Labor and Material Bond No. Monument Bond No. Maintenance Bond -�No. �o.''—}��" Re: Tract No. CC No. MSC No. Approved (Courkil Approval Date) �a�Cs Er�-� Agenda Item No. City Clerk Vault No. #27 gJfollowup/bondletter doc Executed In Duplicate Bond No. 72BCSEM8620 Premium: Included 7 PAYMENT BOND (LABOR AND MATERIALS) KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS, the City of Huntington Beach (hereinafter referred to as "City") has awarded to Accord Engineering,Inc. 1231 E. Dyer Road, Suite 265, Santa Ana, CA 92705 (rain atld 8ddr885 of GontF&C-Wr) (hereinafter referred to as "Principal"), a contract ("Contract") for the work described as follows: atermain Replacement Proiect Cash Contract 1238 (project duu) WHEREAS, Principal is required under the terns of the Contract and the California Civil Code to secure the payment ur claims of laborers, mcohanics, materialmen, and other persons as provided by law. NOW THERCr'ORE, we, the undersigned Principal, and Hartford Fire Insurance Company One Point Drive. Suite 220. Brea, CA U821 (name and address of Surety) (a duty af�dyymitted surety insurer under the laws of the State of California and hereinafter referred to One Mileli5n �NanSurety, ure yi arieT old arnd firmly bound untoCity In the penal sum of dollars, ($ 1,931,885.00 1, this amount being not less than one hundred percent (100%) of the total price set forth in the Contract, in lawful money of the United States of America, for the payment of wh1oh eum, well and truly to by made. we bind ourselves, and each of our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal, his, her, or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Section 3181 of the Califurnia Civil Code ("Claimants") for aq labor, materials or services used or reasonably required for use In performance of the work described in the Contract, or any amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such Claimant or prevailing wages due and penalties incurred pursuant to Sections V74, 1776, 1813 or 1816 of the Labor Code, or any amounts required to be deducted, withhold and paid over to the Employment Development Department from the wages of employees of the Principal and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work or labor performed under the Contract, Surety will pay for the some, in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall be null and void. This bored shall inure to the benefit of any of the persons named In Section 3181 of the California Civil Code so as to give a right of action to such persons or their assigns. In case any action is brought upon this bond, Surety further agrees to pay all court costs and a reasonable attorney's fee in an amount fixed by the court Surety stipulates and agrees, for value received, that no change, extension of time, alteration, addition or modification to the terms of the Contract, or any contract document or any work to be performed thereunder, whether made after notice or not, shall in any way affect, impair or release the obligations of Surety under this bond. Surety hereby waives notice of any such change, 377599.1 PAYMENT BOND Wage 1 of 2 Bond No. 72BCSEM8620 extension of time, alteration, addition, or modification to the terms -of the Contract, the contract documents or the work thereunder. Surety also waives the provisions of California Civil Code §§ 2845 and 2849. IN WITNESS WHEROF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto Is such party's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its goveming body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Princlpal to execute or properly cxccute this bond. Dated: July 26, 2007 ATTEST (Corporate Seal) ATTEST (Corporate Seal) (Attach Attorney -in -Fact Certificate) Accord Engineering, Inc. (Principal Name) Hartford Fire Insurance Company (Surety Name) By: .. Name: P nn E. KelleI orne -In-Fact (Signature of Attorney -in -Fact for Sure `714j 674-1223 (Area Code & Telephone Number of Surety) APPROVED AS TO FORM: CITY OF HUNTINGTON BEACH B enniferytM rath torneyy AS� f 5 d6 Note. This bond must be executed In duplicate and dated, all signatures must be notarized, and evidence of the Who* of any person Ogningr as atromey--Jn-tact must be attachrd. PAYMENT BOND Page 2 of 2 CALIFORNIA ALL-PURP0813 ACKNOWLEDGMENT State of California 88. County of SAN DIEGO On 'JUL 2 6 2007 before me, AUDREY RODRIGUEZ, NOTARY PUBLIC Die personally appeared PEW E. KELLEY d Blpwp) AUDRO' jFOD nUS COMM. #&'t152GNOTARY PUBLIC-CALIFORNIA t3 SAN DIEGI ' COUNn' my COMMlSSiOn 1" xprres DPCEMBER 1g, 2cog * personally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(3p whose name ft) Is/tib subscribed to the within Instrument and acknowledged to me that &/shut executed the same in IM/herMM authorized capacity(ies), and that by 3fiYs/her signaturek) on the Instrument the person(lo, or the entity upon behalf of which the person(IO acted, executed the Instrument. Wn SS /ny handed gfficiat seal. d "j, OPTIONAL . Though the trdomration bekw is not required by law, it may prove valuable to persons re Eft on. the document and OMM prevent fraudulent renwval and reattachment of thls form to another document. Description of Attached Document Title or Type of Document: Document Date: Slgner(s) Other Than Named Above: Capaclty(les) Claimed by Signer Signer's Name: ❑ Individual ❑ Corporate Offroer — Title(s): ❑ Partner—❑Umfted ❑General ❑ Attorney -In -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: __ Signer Is Representing: Number of Pages: RIGI IT 11IUPASPRINT OF SIGNER 0 Me Naftel Notary AesWalm - 0300 De Solo Ave., P.O. Box 2402 • Chateworth, CA 81813-2402 • www nallonakt*ry.org Pmd. No. 6607 Reord9r. Cap ToN-Frae 1.600.670-=7 Direct Inquirles/Claims to: POWER OF ATTORNEY P.0 Bo " 03, BOND, HARTFORD HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 72-160200 Hartford Fire insurance Crompany, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited. James R. Sommerville, Valerie M. Pearce, Lawrence F. McMahon, Leticia San Martin, James Baldassare, Jr., Penny E. Kelley of San Diego, CA their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by S. and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. -f - 0(' f>� Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD � r ot.-- %� 9 1p79 David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto'by like authority. a ,6��x/.mow-��'"'��-.....-- sss"""«<--- Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of Qt IL 2 6_ 2007 Signed and sealed at the City of Hartford. �.�.�- a l 1667 �i fp79 e gg 1a79 18 I9t4 e i 1/NHohcA�l� E �901�♦ r 3 11 ♦ 4` ♦ ' ��� y+rA '. A♦�y • b�tilj191?♦ A[/tfM' Gary W. Stumper, Assistant Vice President POA 2005 Executed In Duplicate j PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: Bond No. 72BCSEM8620 Premium: $28,476.00 Premium is for Contract Term and Subject to Adjustment Based on Final Contract Price WHEREAS, City of Huntington Beach (hereinafter referred to as "Cite') has, by written agreement dated , 20_, entered into a contract with Accord Engineering, Inc. 1231 E. Dyer Road, Suite 265, Santa Ana, CA 92705 (name and address of Contractor) (hereinafter referred to as "Principal"), for performance of the work described as follows: Watermain Replacement Project Cash Contract 1238 (Project Intle) WHEREAS, said contract, and all documents referenced therein (hereinafter collectively 'Contract"), are incorporated herein by this reference made a part hereof as though set forth herein in full. WHEREAS, said Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt, full and faithful performance of said Contract. NOW THEREFORE, We, the undersigned, as Principal, and Hartford Fire Insurance Company One Pointe Drive Suite 220 Brea CA 92821 (name and addrnxa of Surety) (a duly admitted surety insurer under the laws of the State of California and hereinafter referred to as "Surety") a5 Surety are held and firmly bound unto City in the penal sum of One Million Nine Hundred Thirty One Eight Hundred Eighty Five I ot less than one hundred percent of the price set forth in the Contract, in lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, joinfiy and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION iS SUCH THAT if the Principal shall promptly, fully and faithfully perform each and all of the covenants, obligations and things to be done and performed by the Principal In strict accordance with the terms of the Contract as said contract may be altered, amended or modified from time to time; and if the Principal shall indemnify and save harmless City and oil of City's officers, agents and employees (hereinafter collectively referred to as "Obligees") from any and all losses, liability and damages, claims, judgments, stop notices, fees and costs of every description, whether imposed by law or in equity, which may be incurred by the Obligees by reason of the failure or default on the part of the Principal in the performance of any or all of the terms or the obligations of the Contract, including all alterations, amendments and modifications thereto, and any warranties or guarantees required thereunder; then this obligation shall be void; otherwise, it shall be and shall remain In full force and effect. Surety stipulates and agrees, for value received, that no adjustment of the time or price in the Contract or any alteration, change, deletion, addition or other modification to the Contract, or the work to be pertommnea thereunder, shall In any way affect, limit, restrlut, impair or release the obligations of the Surety under this Bond. Surety waives notice of any adjustment of contract time or contract price, and 277;.91,1 PERFORMANCE BOND Page I of 2 Bond No. 72BCSEM8620 any other alteration, change, deletion, addition or other modification to the Contract, or the work to be performed thereunder, and agrees to automatically adjust the penal sum of this Bond to reflect such adJustments, alterations, changes, deletions, auditions or other modifications. Surety agrees to provide written confirmation of such adjustments In the penal sum to City on not less than a quarterly basis. Surety also waives the provisions of Civil Code §§ 2845 and 2849. The obligations of this Bond shall survive the completion of the work described in the Contract as to all obligations and liabilities of the Principal which eurvive completion of the work. IN WITNESS WHEREOF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto is such party's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its governing body. Surely, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: July 26, 2007 ATTEST (Corporate Seal) ATTEST (Corporate Seal) (Attach Attorney -In -Fact Certificate) Accord Engineering, Inc. (Principal Name) 41 Name: Title: �s'AaXOC Hartford Fire Insurance Company (-Llj4 674-1223 (Area Code & Telephone Number of Surety) APPROVED AS TO FORM: CITY OLUNTINGTON BEACH TP )'�Ity nnifer Mc ath �ii5I1SG Attorney Note, This opno must be executed in duplicate alai Qared, all signatures must br aufarkt 1, and ovkfance of tha acdhorfty of any person signing as affomeywact must be attsolted. �liS91,1 PERFORMANCE BOND Page 2 of 2 CAUFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of Califomia 88, County of SAN DIEGO On JUL 2_6 2007 before me, AUDREY RODRIGUEZ, NOTARY PUBLIC .aa personally appeared PENNY E. KELLEY HMWN Of 6Q-W * personally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(3p whose nameft) is/6 subscribed to the within Instrument and acknowledged to me that l/sheMW executed the same In )MJ` tef authorized capacity(ies), and that by ATis/her signaturek) on the instrument the person(jo, or sw or>Nr AUDREY irODR ifEZ the entity upon behalf of which the person(jo COM #1631526 � acted, executed the Instrument. 0 - NOTARY PUBLIC-CAUFORNIA (a SAN DIEGO COUNTY 0 fJi COMMiss€ors Expires '� W&Smy rad official seal.. ECEMBER somium of Na Pub9c OPTIONAL Though Via 6tfomration below is Trot required by law, If may prove valuable to persons relying on.Um document and could prevent fraudulent removal and reattadtmenf of tltls form to another document. Description of Attached Document Title or Type of Document: Document Date: Slgner(s) Other Than Named Above: Capacity(les) Claimed by Signer Signer's Name: ❑ Indivldual ❑ Corporate Officer — T1tle(s): _ ❑ Partner — ❑ Umfted ❑ General ❑ Attorney -In -Fact ❑ Trustee O Guardian or Conservator ❑ Other. Signer is Representing: Number of Pages: PoGHT TI IUMPRiNTI OFSIGN[R 01999 Na*nat Notary Assodatbn - 0360 De Sots Ave., P.O. Box 2402 - Chatsworth, CA 91919-2402 - wwa,natbnahwtary,org Prod. No. 6907 Reorder. cap To Free 1.9MM-W Direct inqulrles/Claims to: POWER OF ATTORNEY THEND,T-4HARTFORD BOND, Trt P.O. BOX 2103, 690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Aaencv Code: 72-160200 Hartford Fire insurance Crompany, a corporation duly organized under the laws of the State of Connecticut Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana l� Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: James R. Sommerville, Valerie M. Pearce, Lawrence F. McMahon, Leticia San Martin, James Baldassare, Jr., Penny E. Kelley of San Diego, CA their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. �w�, {tw/h/.rye ► tV 0 r 2^ — _� t• '►O �� =� t �Lr.:i9%� ' Agt�1A► R� ty70 .€ 9 tY7=�_ ' � E • `-I ♦ ' Whaff`; �� !�A '/ /♦�� ♦ � '�rlr/Ar5• "pn.N V '� vl Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ♦� • Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above an and flgsr�u and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of / U Signed and sealed at the City of Hartford. Gary W. Stumper, Assistant Mice President POA 2005 08/28/2007 09:14 949-852-1131 MILESTONE RISK MANAG PAGE 02/04 C)RD CERTIFICATE OF LIABILITY INSURANCE PRODUCER (949)852-0909 FAX (949)852-1131 THIS CERTIFICATE IS ISSUED AS A MATT) Milestone Insurance 0-okers ONLY AND CONFERS NO RIGHTS UPON T HOLDER. THIS CERTIFICATE DOES NOT A 8 Corporate Park, St( 130 ALTER THE COVERAGE AFFORDED BY TI Irvine, CA 92606 Sheri Flournoy INSURERS AFFORDING COVERAGE INSURED Accord Engineer.' ng, 16c. INSURERN Westchester Surplus Lines 1231 E. Dyer Ror�A, Ste.265 INSURERS: Hartford Insurance Group Santa Ana, CA 9,;705 INsuRERc: Granite State Insurance INSURER D: INSURER E: .QVERAO,CS THE POLICIES OF INSURANCE .1STED BELOW HAVE BESN ISSUED TO THE INSURED NAMED ABOVE FOR THE P ANY REQUIREMENT, TERM OF CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHIC MAY PERTAIN, THE INSURANC - AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TER POLICIES. AGGREGATE LIMIT: SHOWN MAY TYPE OF 1N3URA ICE HAVE BEEN REDUCED BY PAID POLICY NUMBER CLAIMS. POLI Y EFFECYIV 05/04/42007 POLL XPSRA N 05/04/2008 JS DD'L GENERAL LIABILITY G22074817-002 X COMMERCIAL OENEF kL LIABILITY APPNI-141 O F A CLAIMS MADE + X I OCCUR 'TIII i, oat; ?/ GEN'LAGOPFCATE LIMIT .PPUES PER: POLICY PRO LOG JECT AUTOMOBILE LIABILITY OWNED AUTOS ANY AUTO 72UECAMS429 10/02/2006 10/02/2007 X ALL OWNED AUTOS SCHEOULEDAUTOS X HIRED AUTOS IRED & NON -OWNED ONLY X NON-OWNEDAUTOE C22074817-002 05/04/2007 05/04/2008 GARAGE LIABILITY 7 ANY AUTO A I �ESSfUM9RELLA LUII :IL1TY X OCCUR � '.LAIMS MACE DEDUCTIBLE RETENTION $ WORKERS COMPENSATION A[ 0 3363396 01/01/2 EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNERIE �ECUTIVE OFPICERIMEMSER EXCLUDED fro essional Liatility G22074817-002 05/04/2007 05/04/2008 A and Pollution included in GL ]ESC TION OF OPERATIONS I LO ;ATIONS f v HICLES I EXCLUSIONS DDED BY END RSEa,4ENT f 9PECIA P VISIONS E: ontract Signatw-es - watermain Replacement Project Cas�+ ontract 123 ertificate Holder is included as Additional Insured per CG2010 11/85. 10 Days Notice of (ancellation for Non -Payment of Premium. DATE (MMIDDIYYYY) 09/28/2007 VFORMATION ,TIFICATE EXTEND OR NAIC # OLICY PERIOD INDICATED. NOTWITHSTANDING H THIS CERTIFICATE MAY BE ISSUED OR MS, EXCLUSIONS AND CONDITIONS OF SUCH LIMITS EACH OCCURRENCE _ s 1 000, QQ aRX SFsOE8_01aU cee) 3 50, ON MEO EXP (Any mte person) S 5,000 PERSONAL & ADV INJURY $ 1,000,000 GF.NERALAGGREGATE S 2,000,000 PRODUCTS-COMPIOP AGO S 21000, O00 COMBINED SINGLE LIMIT $ (Ca sccldonq 1, 000.000 BODILY INJURY $ (Per person) BODILY INJURY S (Par e001aent) PROPERTY DAMAGE $ (Per accldord) AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC S AUTO ONI.Y: AGG $ EACH OCCURRENCE $ 4,000 AGGREGATE $ 4,000,000 $ 5 X VUCSTATU- 07H- 7ABY1was E.L. EACH ACCIDENT $ 1,000,00 E.L.DISEASE - EA EMPLOYE S 1 000,000 E.L.OISEASE- POLICY LIMIT S 1,000 000 1,000,000/1,000,000 Subjec to Excess Liability Cov 8. :E$TjFICATE HOLDER CANCELL8TION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL 1QftXWYM MAIL 1 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT; City of Huntington Beach Df176 7E11( 6�6 1{d4lb1 i�1f1Ed41t]()<dkii Wt Y> K�(a1L16iEXX; 2000 stain Str iet Huntington Beach, CA 92648 ACORD 25 (2001108) AUTHORIZED REPRESENTATIVE ©ACORD CORPORATION 1988 :E$TjFICATE HOLDER CANCELL8TION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL 1QftXWYM MAIL 1 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT; City of Huntington Beach Df176 7E11( 6�6 1{d4lb1 i�1f1Ed41t]()<dkii Wt Y> K�(a1L16iEXX; 2000 stain Str iet Huntington Beach, CA 92648 ACORD 25 (2001108) AUTHORIZED REPRESENTATIVE ©ACORD CORPORATION 1988 08/28/2007 09:14 949-852-1131 MILESTONE RISK MANAG PAGE 03/04 IMPORTANT If the certifii ate holder is an ADDITIONAL. INSURED, the policy(ies) must be endorsed. A statement on this cent, icate does not confer rights to the certificate holder in lieu of such endorsement(s), If SUBROC AiION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an 1 ,ndorsernent, A statement on this certificate does not Confer rights to the certificate holder in lip u of such endorsement(s). DISCLAIMER The Certifc ;ate of insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmative � or negatively amend, extend or sitar the coverage afforded by the policies listed thereon, ACORD 25 (2001M) 08/28/2007 09:14 949-852-1131 MILESTONE RISK MANAG PAGE 04/04 POLICY NIIMBFsR: G22074817-02 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS (rORINI B) This endorsemen . modifies insurance provided under the following; CGMM.E: tCTAL GENERAL .LlAT3ILITY COVERAGE PART, SCHEDULE Name of Person or Organization: The City of Huntington Beach, its Officers, elected or appointed officials, employees, agents and volunteers. (If not entry al pears above, information required to complete this endorsement will be shown in the Declarations as ; .pplieable to this endorsement) WHO IS AN TN iURED (Section 11) is amended to include as an insured the person or organization shown in the Schedule, bt t only with respect to liability arising out of "your work" for that insured by or for you. Coveri ge provided by this policy to the Additional Tnsured.(s) shown in the Schedule shall be pri.mar r insurance and any other insurance maintained by the Additional Insured(s) shall be excess and non-contributory, but only as respects and claim or liability determined to be the result if the sole negligence or responsibility of the Named Insured and only if required of the Na ned .Insured by written contract. CG 2d 10 1.1 t 5 Copyright, Insurance Services Office, Inc. 1984 Page 1 of 1 City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK Accord Engineering, Inc. 1231 E. Dyer Rd., Suite 265 Santa Ana, CA 92705 Re: Watermain Replacement Project — CC-1238 The City Council awarded the bid to your company for the above referenced project. Enclosed is a copy of the executed contract with the City of Huntington Beach. A Certification of Compliance with Title VII of the Civil Rights Act, Certification of Compliance with Prevailing Wage Laws and Contractor's Certificate form must be returned to this office after the protect is completed but prior to the release of retention funds. In addition, the following item must also be on file, with this office before the City can release any retention funds: A warranty bond guaranteeing the final amount of work and materials for one year. If your performance bond does not include specific wording for a one-year warranty, then a rider or separate bond must be submitted. Should you have any questions or concerns regarding the enclosures or items that must be on file in this office prior to release of retention funds, please call the Economic Development Department at 536-5582. Sincerely, CanFlynn ity Clerk JF:pe Enclosures: Copy of Contract including Proposal Copies of insurance/bonds Contractor's Certificate Certificate of Compliances Bid Bond (original) Sister CitiAf° nj8 1cfapan \caS' ai}a ft ereo $New Zealand (Telephone: 714-536-52271 J CITY OF HUNTINGTON BEACH 2000 Main Street P.O. Box 190 Huntington Beach, CA 92648 LETTER OF TRANSMITTAL Attention: Joan FIVnn To: City Clerk's Office 2000 Main Street Huntington Beach, CA 92648 Fax (714) 374-1573 Date: August 21, 2007 Project/C.C. No.: CC1238 Regarding:Beach Blvd. Water Main Replacement Project ❑ We are sending you: ❑ By Mail ❑ By Fax Mail(Number of pages including this sheet:) ® We are hand delivering: ❑ Attached ❑ Under a separate cover via the following items: ElShop drawings ElPrints 1-1Plans ❑ Samples ElSpecifications ❑ Copy of letter ❑ Change Order ® Other: Oriaina/ Proposals for CC1238 Item # 'Copies Pages._[., YDescri ;lion 1 1 na Proposals from the following contractors: Accord Engineering, SJ& B Group, Cedro Construction, Majich Brothers, Haden Buntich, BRH Garver, Steve Bubalo, J. De Si io, and Zondiros 2 3 4 5 These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ For your action ❑ Returned for corrections ❑ Return corrected prints ❑ For review/comment ® Other: Remarks: Return Original Bidders Proposals fo Please contact me at extension 5291 with any c: file GAENGINEERING DIVISI0N\FERRIGN0\CC1238 TRANSNIITAL TO CLERK, RETURN BIDS.DOC oy— RCCORD ENGINEERING 1231 E. Dyer Road, Suite 265, Santa Ana, CA 92705 (714) 241-7200 (0) (714)241-7233 (F) website: www.accordeng.com TO: City of Huntington Beach Attn: City Clerk 2000 Main St., Huntington Beach, CA 92648 *Sealed Bid* For Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard in the CITY OF HUNTINGTON BEACH - DO NOT OPEN WITH REGULAR MAIL Council/Agency Meeting Held: Deferred/Continued to:i„� Approved �- ❑a Conditionally Approved ❑ Denied e5L 7� City Clerk's Sign re Council Meeting Date: 8/6/2007 Department ID Number: PW07-041 CITY OF HUNTINGTON BEACH REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS SUBMITTED BY: PEN OP&U LB RETH-64R)10T, DPA, CITY ADM INISTRA4�/ PREPARED BY: TRAVIS K. HOPKINS, PE, ACTING DIREC R OF PUBLICRKS- ENGINEERING SUBJECT: Award Annual Water Main Replacement Project, Various Locations Along Beach Boulevard CC-1238 Statement of Issue, Funding Source, Recommended Action, Alternative Action(s), Analysis, Environmental Status, Attachment(s) Statement of Issue: On June 21, 2007, bids were opened for the Annual Water Main Replacement Project, Various Locations along Beach Boulevard, CC-1238. Staff requests that City Council award the contract to Accord, Engineering, Inc., the lowest responsive and responsible bidder. Funding Source: Funds for this project will be appropriated from the Water Master Plan unappropriated fund balance to Water Master Plan, Water Main Replacements, Water Improvements Account, No. 50791017.82100. The engineer's estimate for this project is $2,500,000. Recommended Action: Motion to: 1. Approve the project plans and specifications for Annual Water Main Replacement Project, Various Locations Along Beach Boulevard, CC-1238; 2. Accept the lowest responsive and responsible bid submitted by Accord Engineering, Inc., in the amount of $1,931,885; 3. Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney; and 4. Authorize the Director of Public Works to approve up to fifteen percent (15%) in construction change orders. 5. Appropriate $2,500,000 from the Water Master Plan undesignated fund balance to the project account. Alternative Action(s): Reject all bids, and provide staff with an alternative direction. r - /a REQUEST FOR CITY COUNCIL ACTION MEETING DATE: 8/6/2007 DEPARTMENT ID NUMBER: PW07-041 Analysis: This annual water main replacement project addresses deficiencies in the water distribution system including replacing old pipe, completing connections along Beach Boulevard, and the abandoning aged pipe in the Beach Boulevard right-of-way. The purpose of the project is to increase the efficiency and the reliability of the water distribution system. This project will install or replace approximately 5,100 lineal feet of 8-inch, and 12-inch diameter pipeline. Bids were opened publicly on June 21, 2007, and are listed in ascending order: Bidding Contractor Bid Amount Bid Amount Corrected Accord Engineering, Inc. $1,975,900.00 $1,931,885.00 S J & B Group $2,251,084.00 NO CORRECTION Cedro Construction $2,376,766.00 $2,372,766.00 Majich Brothers, Inc. $2,578,075.00 NO CORRECTION Mladen Buntich Construction $2,643,055.00 $2,643,005.00 Steve Bubalo Construction $2,659,310.00 NO CORRECTION BRH Garver West, Inc. $2,658,065.00 $2,661,065.00 J. DeSi lio Construction, Inc. $2,722,210.00 NO CORRECTION Zondiros $3,010,850.00 $3,004,450.00 Bid amounts were verified. The reference check for Accord Engineering, Inc. provided acceptable responses from past clients. The engineer's cost estimate for this contract is $2,500,000; however, the bid result was approximately $568,000 under estimate. Declining work opportunities for contractors could be responsible for favorable competitive bids. With contingency and supplemental expenses, the full project cost is estimated to be $2,318,500. A fifteen percent construction contingency is requested, anticipating the potential to encounter unforeseen site conditions, such as external corrosion on existing pipelines or undocumented conflict with other utilities. In addition to construction contract costs, the project will require supplemental services such as soils and materials testing by outside firms. On -call contractors are retained to perform these services. City staff will provide construction management and additional engineering support. The project was planned as a Water Fund expenditure in the adopted FY 2006/07 budget. Upon further review, it was determined that the improvements fall within the scope of the Water Master Plan (WMP) recommendations, and allocation of WMP funds is requested. Strategic Plan Goal: (1-1) Improve the City's plan for funding and completing infrastructure needs, and develop strategies for resolving crucial infrastructure problems to preserve the physical foundation of the community and enable the community's value to grow. Public Works Commission Action: The Public Works Commission reviewed and approved this project on April 19, 2006, with a vote of 6-0-1. (Commissioner Scheid was absent) -2- 7/24/2007 5:15 PM REQUEST FOR CITY COUNCIL ACTION MEETING DATE: 8/6/2007 DEPARTMENT ID NUMBER: PW07-041 Environmental Status: This project consists of rehabilitating an existing, City owned water main involving no expansion of capacity. The project is, therefore, Categorically Exempt pursuant to Class 2, Section 15302(c) of CEQA. Attachment(s): -3- 7/24/2007 5:15 PM ATTACHMENT #1 ,a.�d ��w_ ��Ut - � �� p t� % K i f � • t 4 Lx_ .t e tj[¢i 1T4\ t NOT TO SCALE PROJECT LOCATIONS VICINITY MAP NO'T TO SCALE Annual Water Main Replacement Project, CC1238. ATTACHMENT #2 CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION FINANCE DEPARTMENT TO, PENELOPE CULBRETH GRAFT, DPA, CITY ADMINISTRATOR FROM: DAN T. VILLELLA, cPA, FINANCE DIRECTOR SUBJECT: FIS 2006-07-20 Award Annual Water Main Replacement Project, Various Locations Along Beach Boulevard CC, 1238 DATE: JULY 24, 2007 As required by Resolution 4832, this Fiscal Impact Statement has been prepared for" Award Annual Water Main Replacement Project, Various Locations Along Beach Boulevard CC- 1238" If the City Council approves this action (total appropriation $2,500,000) , the estimated working capital of the Water Master Plan Fund will be reduced to $28,335,000 Dan T. Villella Finance Director RCA ROUTING SHEET INITIATING DEPARTMENT: Public Works SUBJECT: Award Annual Water Main Replacement Project, Various Locations and Along Beach Blvd., CC-1238 COUNCIL MEETING DATE: August 7, 2007 RCA ATTACHMENTS STATUS Ordinance (w/exhibits & legislative draft if applicable) Attached ❑ Not Applicable Resolution (w/exhibits & legislative draft if applicable) Attached ❑ Not Applicable Tract Map, Location Map and/or other Exhibits Attached Not Applicable ❑ Contract/Agreement (w/exhibits if applicable) Attached ❑ (Signed in full by the City Attorney) Not Applicable Subleases, Third Party Agreements, etc. Attached ❑ (Approved as to form by City Attorney) Not Applicable Certificates of Insurance (Approved by the City Attorney) Attached ❑ Not Applicable Fiscal Impact Statement (Unbudgeted, over $5,000) Attached ❑ Not Applicable Bonds (If applicable) Attached ❑ Not Applicable Staff Report (If applicable) Attached ❑ Not Applicable Commission, Board or Committee Report (If applicable) Attached ❑ Not Applicable Findings/Conditions for Approval and/or Denial Attached ❑ Not Ap licable EXPLANATION 'FOR MISSING.ATTACHMENTS REVIEWED RETURNED FO RDED. Administrative Staff ( ) ) Deputy City Administrator (initial) ( P City Administrator (Initial) ) ) City Clerk ( ) EXPLANATION•- RETURN OFITEW (Below Space For City Clerk's Use Only) RCA Author: A. Ferrigno:jg CITY OF HUNTINGTON BEACH Annual Watermain Replacement Various Locations & Along Beach Blvd. CC1 238 BID DATE: June 21, 2007 TIME: 2:00 PM ENGINEER'S ESTIMATE: $2.6 Million BID OPENING LIST NAME -OUNTRRE1 b AGS Underground 2 Beader Construction Co. Inc 3 BRH Garver West Inc. 0 6 4 lCedro Construction 5 IDominguez General Engineering 6 Excel Paving 7 Garcia Jaurez Construction Inc. 8 Groeniger & Company 9 I J Fletcher Creamer & Son 110 J. DeSigio Construction Inc. 11 Ken Thompson Inc 7-- 12 Majich Bros., Inc. 0 13 Mike Bubalo Construction 1-4 Mladen Buntich Construction Co., Inc. 15 Robert Castongia, Inc 16 S J & B Group 17 Simich Construction 18 Special Service Contractors 19 SRID Construction SO STEVE BUBALO CONST. 21 United Rentals Highway Technologies, Inc. 22 JVASILJ CONST, INC dba IVANKO 23 W A Rasic Construction 24 West Valley Construction 25 Zondiros /0, 26 4_b (a/pj L--?,A-lj6 9�� 27 28 29 30 31 321 33 34 35 t'a 00 :3 WJ I Z fiff LODZ 11 7 PROOF OF PUBLICATION STATE OF CALIFORNIA) ) ss. COUNTY OF ORANGE ) I am a Citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am .a principal clerk of the HUNTINGTON BEACH INDEPENDENT, a newspaper of general circulation, printed and published in the City of Huntington Beach, County of Orange, State of California, and that attached Notice is a true and complete copy, as was printed and published in the Huntington Beach issue of said newspaper to wit the Issue(s) of: MAY 31,2007 JUNE 07,2007 I declare, under penalty of perjury, that the foregoing is true and correct. Executed on JUNE 07,2007 at Costa Mesa, California. Signature SECTION A NOTICE INVITING SEALED BIDS for the Construction of. Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to . Indianapolis Avenue I Watermain Replacement. Project; Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170feet North of. . Joliet Avenue... Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktovin Avenue Watermain; Removal Project, Beach Boulevard, from Clay Avenue to, Garfield Avenue Watermain Replacement Project; Clay Avenue, from•Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, ; from Florida Street to Beach.Boulevard CASH CONTRACT NO.1238 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON' BEACH, as AGENCY, in- vites sealed bids for the above stated projects' and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, Cali- fornia 92648; up to the hour of 2:00 PM on June 21, 2007. Bids will be publicly open in the Council Chambers un- less otherwise posted. Copies, ,of the . Plans, 'Specifications, and con- tract documents are available from the Office of the Director of Public Works, 2000 Main, Street, Huntington Beach, CA 92648; uppon; payment of a $100,00 nonrefundable fee if picked up, or payment of a $120.00 nonrefun-' dable fee if mailed via U.S.. Postal Service, FedEx� UPS or any other delivery service. Any contract entered in- to pursuant .to this no- l tice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of. the Labor Code of the State of California, the mini mum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the, contract shall be those deter- mined, by.the Director of Industrial Relations of the State of California, which"'are on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach'; CA 92648. The AGENCY will deduct a 10% retention -from all progress payments. The Contractor .may substi- tute an escrow holder surety of equal value to the retention in actor- dancewith the provi- sions of the California Government Code, Sec- tion 4590. The Contrac- tor shall be beneficial owner of the surety and shall receive any inter- est thereon. The AGENCY hereby af- firmatively ensures that minority business enter- prises' will be afforded full opportunity to sub- mit bids in response to this notice and- will not be discriminated against on the basis of race, color,-. 'national origin, ancestry, sex, or reli- gion in any consider- ation leading to the award of contract. No bid shall be consid- Bredd 'unless .it _is pre- pared on the approved Proposal forms in con- formance with . the Instructions to Bidders. The bid must be accom- panied by a certified check .cashier's check, or bidder's bond made payable. to the AGENCY for an amount no .less than 10% of the amount bid. The successful bid- der shall be licensed in signs '.of the Business and. Professions Code and shall possess a State Contractor's Li- cense Class at the time of the bid opening. The successful Contractor and his subcontractors will be required to pos- sess business licenses from the AGENCY. r Project Description: The work generally includes the. construction of ap> proximately 5,300 lineal feet of 12-inch, .and 8- .inch buried pipe along Beach Boulevard and nearby local streets and alleys in the City of Huntington Beach. The contract allows the con- tractor a period, of time) to successfully procure) materials' required to � construct this project, with -200 working days for construction to com -� plete the contract. The Engineer's preliminary, estimate is $2.5-millon.. Any construction in the alleys shall not be per-' formed during the fol lowing periods: November 17, 2007 to, January 8, 2008 The AGENCY reserves' the right to reject any or all bids, to waive any irregularity• and to take all bids under advise- ment for a maximum period of 60 days. , BY ORDER of the PUB- LIC WORKS, COMMIS- SION of the CITY OF HUNTINGTON, BEACH, CALIFORNIA, this 19th day of April 2006. Attest: Joan L. Flynn . CITY CLERK OF THE CITY OF HUNTINGTON BEACH Published Huntington Beach-Independent.May 31, June 7, 2007 052- 501 PROOF OF PUBLICATION STATE OF CALIFORNIA) ) ss. COUNTY OF ORANGE ) I am a Citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am a principal clerk of the HUNTINGTON BEACH INDEPENDENT, a newspaper of general circulation, printed and published in the City of Huntington Beach, County of Orange, State of California, and that attached Notice is a true and complete copy,, as was printed and published in the Huntington Beach issue of said newspaper to wit the Issue(s) of: MAY 31,2007 JUNE 07,2007 I declare, under penalty of perjury, that the foregoing is true and correct. Executed on JUNE 0 7, 2 0 0 7 at Costa Mesa, California. ��M_�� i//Z Signature SECTIONA lions of the Bi1sness- NOTICE INVITING nonrefundable fee if `and Professions. Code SEALED BIDS picked up, or payment and' shall . possess a for the Construction of of a $120.00 nonrefun- State Contractor's Li- Watermain Replacement' dable,fee if mailed via U.S. Postal Service, cense Class at the time of the bid opening.'The Project,,Alley Between Geneva Avenue and FedEx, UPS or any other successful Contractor Frankfort Avenue, delivery service. and his subcontractors from Hill Street to Any contract entered in- will be required -to pos- Indianapolis Avenue to pursuant to this no- sess business licenses Watermain Replacement tice will incorporate the provisions of the State from the AGENCY. Project Description: The Project; Indianapolis Avenue and Beach Labor;, Code. Pursuant to work generally includes Boulevard Intersection the provisions of the 'State the construction of ap- Watermain Replacement Labor; Code of the proximately 5,300 lineal Project, Beach Boulevard, of California, the mini- feet of 12-inch, and 8- from Indianapolis Avenue mum prevailing rate of inch buried pipe along to 170 feet North of per diem wages for each Beach Boulevard . and Avenue craft, classification or nearby local streets and -Joliet --- - type of workman needed alleys in the City of to execute the contract Huntington Beach. ;The Watermain Replacement shall , be those deter- contract allows the con- Proje ct, Joliet Avenue, minedby-the Director of tractor a period of time from Georgia Street to. Industrial Relations .of to successfully procure . Beach Boulevard the State of California, materials required to Watermain Replacement which are on file at the construct this project„ Project, Utica Avenue, Office of the Director of with 200 working days from Florida Street to Public Works, 2000 Main Jor construction to com- Beach Boulevard Street, ,Huntington) plete the contract. Thel Watermain Replacement Beach; CA 92648. Engineer's preliminary Project, Beach Boulevard, I The AGENCY will deduct estimate is $2.5-millon. from Utica Avenue to a 10% retention from all Any construction in the', Yorktown Avenue progress payments. The alleys shall not be per- Watermain Removal Contractor may substi- l foremd during the fol-' Project, Beach Boulevard, l tute an escrow holder to lowing periods: - from Clay Avenue to surety, of equal value November 17, 2007 to Garfield Avenue I the retention in accor- January 8, 2008 Watermain Replacement dance .with the provi- The AGENCY reserves Project, Clay Avenue, sions lof the California the right to reject any from Florida Street to Government Code, Sec- or all bids, to - waive any Beach Boulevard " tion 4590. The Contrac- irregularity and to take Watermain Replacement for shall be beneficial { all bids under advise - Project, Main Street, owner of the surety and ment , for a maximum . from Florida Street to shall receive any inter- period of 60 days. Beach Boulevard CASH CONTRACT NO.1238i est thereon. The AGENCY hereby af- - 'in the • . ' firmatively ensures that BY ORDER of the PUB - CITY OF HUNTINGTON minority business enter- LIC WORKS COMMIS - BEACH prises; will be afforded SION of the. CITY " OF PUBLIC NOTICE IS full opportunity to sub- HUNTINGTON BEACH, HEREBY GIVEN that the mit bids in response to CALIFORNIA, this 19th day of April 2006. CITY OF HUNTINGTON BEACH, as�AGENCY, in- this notice and will not be discriminated against Attest: Joan L. Flynn vites sealed bids for the .on the basis of race, ' CITY CLERK OF THE CITY OF HUNTINGTON above stated projects color, national origin, BEACH and will receive such bids in the office of the: ancestry, sex, or reli- gion in any consider- Published Huntington City Clerk, Second ation !' leading to the Beach' Independent May Floor, 2000 Main Street, award'of contract. 31, June 7, 2007 052- Huntington Beach, Cali- No bid shall be consid- 501 _,_.__ fornia 92648, up. to the ered unless it is pre - hour of 2:00 PM on June pared on the approved 21, 2007. Bids will be Proposal forms in con - publicly. open' in the formance with the Council Chambers un- Instructions to Bidders. less otherwise posted.- The bid must be accom-. Copies of the Plans, panied' by a certified Specifications, and con- check, cashier's check, tract documents are or bidder's bond made available from the Office payable to the AGENCY of the Director of Public for an amount no less Works, ,2000 Main than 10% of the amount Street, Huntington, bid. The successful bid - ,Beach, CA 92648,.upon der shall be licensed in 'payment of a,$100.00 accordance with lirovi- 7A W L V-Z:-7- �14-,L- - s/maylo,7-- ---121 A � SECTION A '�%�--Ao4 NOTICE INVITING SEALED BIDS for the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT NO. 1238 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites sealed bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, California 92648, up to the hour of 2:00 PM on June 21, 2007. Bids will be publicly open in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $100.00 nonrefundable fee if picked up, or payment of a $120.00 nonrefundable fee if mailed via U.S. Postal Service, FedEx, UPS or any other delivery service. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations A-1 of the State of California, which are on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The AGENCY will deduct a 10% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the California Government Code, Section 4590. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. Project Description: The work generally includes the construction of approximately 5,300 lineal feet of 12-inch, and 8-inch buried pipe along Beach Boulevard and nearby local streets and alleys in the City of Huntington Beach. The contract allows the contractor a period of time to successfully procure materials required to construct this project, with 200 working days for construction to complete the contract. The Engineer's preliminary estimate is $2.5-millon. Any construction in the alleys shall not be performed during the following periods: November 17, 2007 to January 8, 2008 The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the PUBLIC WORKS COMMISSION of the CITY OF HUNTINGTON BEACH, CALIFORNIA, this 19th day of April 2006. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH A-2 AT J� [ 0 CITY OF HUNTINGTON BEACH 2000 Main Street P.O. Box 190 Huntington Beach, CA 92648 LETTER OF TRANSMITTAL Attention: Joan FIVnn To: City Clerk's Office 2000 Main Street Huntington Beach, CA 92648 Fax (714) 374-1573 Date: May 24, 2007 Project/C.C. No.: CC1238 Regarding: Annual Water Main Replacement Proiecf ❑ We are sending you: ❑ By Mail ❑ By Fax Mail(Number of pages including this sheet:) ® We are hand delivering: ❑ Attached ❑ Under a separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change Order ® Other: Notice Inviting Sealed Bids These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ® For your use ❑ Approved as noted ❑ Submit copies for distribution ® For your action ❑ Returned for corrections ❑ Return corrected prints ❑ For review/comment ❑ Other: Remarks: On April 19, 2006, the Public Works Commission authorized the advertisement of the Annual Water Main Replacement Project CC1238. Please find attached the Notice Inviting Bids for this project. Please contact me at extension 5291 with any questions c: file y�l_U . e . By: GAENGiwERiNG DIVISI0N\FERRIGN0\CC1238 03 04 WATER MAIN REPLACEMENT\BID PACKAGE\CC1238 TRANsmrrAL To CLERK 052407.Doc SECTION A NOTICE INVITING SEALED BIDS for the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT NO. 1238 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites sealed bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, California 92648, up to the hour of 2:00 PM on June 21, 2007. Bids will be publicly open in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $100.00 nonrefundable fee if picked up, or payment of a $120.00 nonrefundable fee if mailed via U.S. Postal Service, FedEx, UPS or any other delivery service. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations A-1 of the State of California, which are on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The AGENCY will deduct a 10% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the California Government Code, Section 4590. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. Project Description: The work generally includes the construction of approximately 5,300 lineal feet of 12-inch, and 8-inch buried pipe along Beach Boulevard and nearby local streets and alleys in the City of Huntington Beach. The contract allows the contractor a period of time to successfully procure materials required to construct this project, with 200 working days for construction to complete the contract. The Engineer's preliminary estimate is $2.5-millon. Any construction in the alleys shall not be performed during the following periods: November 17, 2007 to January 8, 2008 The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the PUBLIC WORKS COMMISSION of the CITY OF HUNTINGTON BEACH, CALIFORNIA, this 19th day of April 2006. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH A-2 UNSUCCESSFUL BIDS CC-123 8 Water Main Replacement Project City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 Zondiros Corporation 2401 208 th St, Suite C-8 Torrance, CA 90501 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand (Telephone, 714-536-5227 ) "°�'°"`° r (e 11'I�VN' c01,11 an QonZ SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The 1st Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find in the amount of $ which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost - Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 200 PVC pipeline in the Alley between Geneva Avenue and Frankfort Avenue 765 LF 22q 7goD— $_ 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF $ 3� 4. Provide temporary water service 1 LS '= CO - 5. Construct waterline connection in Hill Street 1 LS 6. Construct fire hydrant assembly 1 EA $ 7. Cut and cap/seal existing waterline 3 EA $ 8. Remove and dispose of existing valve 2 EA `g— $ $ LA 9. Relocation of sewer laterals 15 EA $ 1Soo $ 2ZSbo `' 10. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $1``'t`�� 11. Traffic control 1 LS 12. Sheeting, shoring, and/or bracing 1 LS 13. Additional potholing 20 EA 14. Demobilization and Cleanup 1 LS 15. Install 4-inch cut in valve assembly 1 EA $ Oil - 16. Install new 1-inch .polyethylene water service 5 EA `= $ C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch polyethylene water service, connect to existing 3/-inch meter 11 EA $ l _!Ey 18. Install new 1-inch polyethylene water service, connect to existing 1-inch w� cx meter 7 EA $ $ I 19. Install 4-inch pump -out ``e c9e assembly 1 EA $ $ S-ocn-C-) 20. Replace Existing Traffic Control Loop 1 EA $ t Sub -Total Amount for All Bid Items — SCHEDULE A $....4 3 5—?_ ()0 C4 PROJECT BID SCHEDULE B VVatermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LSD $ l-t `r- 2. Install 8-inch Class 150 PVC pipeline in Indianapolis Avenue at 3Q d— -- 33, 0 DD Beach Boulevard 110 LF $ $ 3. Install 12-inch Class 350 DI pipeline in Indianapolis Avenue at Beach A CIDBoulevard. 172 LF $�Ob $ 4. Install 12-inch Class 200 PVC pipeline. in Indianapolis Avenue at $ $ Beach Boulevard 45 LF 5. Install 24-inch steel casing in Indianapolis Avenue at Beach Boulevard, with 0111- receiving pit, and jacking pit 164 LF 6. Install 12-inch cut in valve assembly 1 EA $ 4s� 7. Flushing, Pressure Testing, 2- ck Disinfection, Dechlorination 1 LS $ to $ 8. Traffic control 1 LS 9. Water Pollutant Control Program 1 LS $ $ 2S�o 10. Sheeting, shoring, and/or (&- `= bracing 1 LS $/o,19j $ /olo©o 11. Additional potholing 15 EA iZs'Z> — -1-2 -Demobilization- - and --__ ___-- - __ __ _____ Cleanup 1 LS 13. Replace Existing Traffic Control Loop 8 EA. $ Sub -Total Amount for All Bid Items — SCHEDULE B C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $,`�`-'� 2. Install 12-inch Class 150 PVC pipeline in Beach $ Boulevard 500 LF �_ 3. Install 8-inch Class 150 PVC pipeline in Beach Boulevard 25 $306— %t Sd b $ LF 4. Flushing, Pressure Testing, L__ cm Disinfection, Dechlorination 1 LS $/ 5. Traffic control 1 LS $ $ s_o 6. Water Pollutant Control vim- cs_ Program 1 LS $ ZS�� 7. Sheeting, shoring, and/or We bracing 1 LS $ $ �_*� 8. Additional potholing 20 EA $=Z -o`er $ LSWC� 9. Demobilization and `= Cleanup 1 LS $ $ 10. Replace Existing Traffic "— $ $ y� Control Loop 4 EA Sub -Total Amount for All Bid Items - SCHEDULE C $ 1 00 b - C-6 PROJECT BID SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Joliet-1�s(�o Avenue 325 LF 3. Install 8-inch Class 150 and 200 PVC pipeline in Georgia Street at Joliet Avenue 115 LF 4. Install 4-inch cut in valve cc assembly 2 EA $1 $ �qe'-o 5. Construct . fire hydrant 015 assembly 1 EA $ $ SS�n 6. Remove and salvage existing fire hydrant 1 EA $tom $ �c9� 7. Remove existing valve box and cover 3 EA $Z�r $-7S-C) 8. Cut and cap/seal existing — - waterline 2 EA $ $ 9. Install 2-inch air and - - vacuum assembly 1 EA 10. Relocation of sewer laterals 6 EA 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ t -Z) 12. Traffic control 1 LS $ ss� 13. Sheeting, shoring, and/or - - bracing 1 LS $ 10 Z) $ t 0tDo 14. Additional potholing 20 EA 15. Demobilization and Cleanup 1 LS $� $� 16. Install new 1-inch polyethylene water service, connect to existing %-inch meter 5 EA-- 17. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE D C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS O'C $? 2. Install 8-inch Class 150 and 200 PVC pipeline in Utica bb 7 7,O DO Avenue 590 LF $ 3. Construct fire hydrant assembly 2 EA $ $ I ace c7 4. Remove and salvage , existing fire hydrant 2 EA 5. Remove existing valve box — and cover . 6 EA $ 6. Cut and cap/seal existing _ — waterline 2 EA $3 $ N� 7. Relocation of sewer lateral 6 EA $ 8. Flushing, Pressure Testing, — Disinfection, Dechlorination 1 LS $ (04�7 9. Traffic control 1 LS 10. Sheeting, shoring, and/or — bracing 1 LS $��'� 11. Additional potholing 20 EA $ 7NX2 $ 1S"Lc� 12. Demobilization and — — Cleanup 1 LS 13. Install new 1-inch polyethylene water service, connect to existing 3/-inch — — meter 7 EA $� $ ii 14. Install ___ _ new __-1-inch.. _ polyethylene water service, connect to existing 1-inch meter 1 EA $—`� 15. Install new 2-inch copper water service, connect to existing 2-inch meter 3 EA_- 16. Install new 2-inch copper water service, connect to _ existing 1 1/2-inch meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE E $ 2q i S DD _ C-s PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 6-inch, 8-inch and 12-inch Class 150 and 200 PVC pipeline in Beach 3b O _ 3qo 1000 $ Boulevard 1300 LF $ 3. Construct 12-inch D.l. $ 300 _ Gi �3pp $ inverted siphon assembly 31 LF 4. Install 12-inch Class 150 PVC watermain in Beach Boulevard at Yorktown 30 6 — $ 71200 $ Avenue 24 LF 5. Construct 12-inch D.I. 30 — 14t700 siphon assembly 49 LF $ $ 6. Construct waterline connection in Beach Boulevard 1 LS $ $ 7. Remove and salvage — — existing fire hydrant 2 EA $ $ 8. Construct fire hydrant $ $ assembly 2 EA 9. Remove existing valve box and cover 5 EA $ 2S� $ IZS� 10. Cut and cap/seal existing waterline 6 EA 11. Remove and dispose of existing valve and — — interfering piping 1 EA 12. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS L 13. Traffic control 1 LS $-! 14. Water Pollutant Control — — Program 1 LS $ 25`5C) — 15. Sheeting, shoring, and/or — bracing 1 LS $ c $ a),oems' 16. Additional potholing 30 EA $� 17. Demobilization and Cleanup 1 LS C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve -- assembly 2 EA 19. Install 4-inch pump -out assembly 1 EA $rLSLT7 $ ZS� 20. install 2-inch air and vacuum assembly 2 EA $ 21. Install new 1-inch polyethylene water service, connect to existing 1-inch ``- meter 2 EA $ $ N 22. Install new 2-inch copper water service, connect to existing 2-inch meter 4 EA $ $ 23. Replace Existing Traffic -- r Control Loop 8 EA $ l $ Sub -Total Amount for All Bid Items — SCHEDULE F $ 56 9 C-iu PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $701 2. Cut and cap/seal existing waterline 4 EA 11�0 3. Remove existing valve box — and cover 4 EA $25_ $ 1 4. Construct fire hydrant — assembly 1 EA 5. Remove and salvage -- — existing fire hydrant 1 EA 6. Traffic control 1 LS $ Sc'� 7. Water Pollutant Control r Program 1 LS 8. Sheeting, shoring, and/or bracing 1 LS 9. Additional ,potholing 10 EA 10. Demobilization and Cleanup 1 LS $ S' 11. Install new 1-inch polyethylene water service, connect to existing 1-inch $�-"`� $ meter 2 EA 12. Install new 1-inch polyethylene water .service, connect to existing 3/4-inch — v� meter 1 EA 13. Install new 2-inch copper water service, connect to existing 2-inch meter 6 EA 14. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 3 EA Sub -Total Amount for All Bid Items — SCHEDULE G C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Clay Avenue 565 LF 3. Install 12-inch Class 350 D.I. pipeline in Clay Avenue $ $36- at Beach Boulevard 120 LF 4. Install 24-inch steel casing in Clay Avenue across Beach Boulevard, with $ $ receiving pit and jacking pit 96 LF 5. Install 8-inch Class 150 PVC pipeline at the Beach Boulevard and Clay Avenue 300- 16 900 intersection 55 LF $ $ 6. Install 8-inch Class 200 PVC pipeline in Coenson Circle at Clay Avenue 17 LF $ $ 7. Remove and salvage --- .- existing fire hydrant 2 EA $ $� 8. Construct fire hydrant _ assembly 3 EA 9. Cut and cap/seal existing _ waterline 4 EA $ $ 10. Remove existing valve box — and cover 5 EA $2_ $ �ZS� 11. Remove and dispose of existing valve and. — interfering pipeline 1 EA $ $ ZS 12. Relocation of sewer laterals 10 EA $ $ 1 Se C"C> 13. Flushing, Pressure Testing, — Disinfection, Dechlorination 1 LS $ 14. Traffic control 1 LS $ �`- 15. Sheeting, shoring, and/or -- — bracing 1 LS 16. Additional potholing 20 EA $_�-r-�S 17. Demobilization and Cleanup 1 LS C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clad, Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve — — assembly 1 EA eK=)_ 19. Install 12-inch cut in valve — assembly 1 EA $ LKOC) $ _ Ll 20. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 8 EA $ $7 21. I-nstall new 1-inch polyethylene water service, connect to existing 3/4-inch ` meter 1 EA $Z� $ 27 Sub -Total Amount for All Bid Items — SCHEDULE H $ l C-13 PROJECT BID SCHEDULE I V1'atermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $IE?4__.0 2. Install 8-inch Class 150 $ 1w,D�d $ PVC pipeline in Main Street 600 LF 3. Construct connection in _ — Ellis Avenue 1 LS $ $ 4. Remove and dispose of existing valve and interfering pipeline 1 EA 5. Cut and cap/seal existing waterline 2 EA 6. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ r, $ P4eC� 7. Traffic control 1 LS $ 8. Water Pollutant Control -- Program 1 LS 9. Sheeting, shoring, and/or bracing 1 LS -� 10. Additional potholing 18 EA 11. Replace Existing Traffic — Control Loop 4 EA 12. Demobilization and — OR Cleanup 1 LS (� $ ��-"� $ Sub -Total Amount for All Bid Items — SCHEDULE 1 $ a'75100 b C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons $� _� $_ , 2. Install AC 500 Tons 3. Unclassified Excavation 300 CY $ �-tS�' $ L-&s 4. Adjust Utility Cover 30 EA $��-�` $_ J ex� 5. Adjust Water Cover 1 EA $ J! 6. Adjust Sewer/Storm Drain Manholes 2 EA $ /Lk>6 — $ 7. Remove/Construct Concrete Sidewalk 160 SF $ 1 C $ 8. Remove/Construct Concrete V-Ditch 2400 SF $ 1S — $6� 9. Remove/Construct Concrete Drive Approach including adjacent gutter 500 SF $ J S — $ S� 10. Remove/Construct Concrete Curb and Gutter 50 LF $ So ` $ Sub -Total Amount for All Bid Items — SCHEDULE J $ 24 I C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMA.IN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules A-J) TOTAL BID AMOUNT IN WORDS: uw i oil -key► e us a d �i 1�-� )flu d DR(IfS and 2PCA (eVI.4 435 ' 000 2bOA60 LG`r� 000 23'9 , 3S 0 211,500 So r qS0 7 t5d0 2i5►d00 0 2Jq,650 C3,010,�50 red qv1d Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. n Name and Address of Subcontractor State License Class FoP_f_o:wto0,rk I Number By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California SS. County of Orange -7'0 M Zcat f ro S , being first duly sworn, deposes and says that he r /% is PV1<-S i Gil,!!+- of SOU ry-5 the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a.collusive or sh _� ci . IKb k\\ &n Name of Signature of Bidder` i3�i 3c sf � - t-fetCV- q'az ,5-L Address of Bidder Subscribed and sworn to before me this 2-CYA day of 76 � , 2007. NOTARY PUBLIC Y-1111A- C-1 8 --------------------------------------------- . INA OI I T FAN , COMM. #1716106 NOTARY PUBLIC • MWOMIA , LOS ANGELES COUNTY CanmisSbn Expires Jan.1Z 2011 NOTARY SEAL UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: I A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necesassure compliance by any said subcontractor or subcontractors with the requirements co twine erein. Date: C-19 0 By Title —Tar---, 2 BOA VS DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes XN 0 If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performa Date: Z� C-21 Title T-aM Z- 0 UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed_only by -the -awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-422-4133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor ME Title Date: Note: This form is required for eve7)� Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: zoYI// Bidder Name Business Address `11 --- mw City, State Zip Telephone Number State Contractor's License No.. and Class Original Date Issued Expiration Date The work site was inspected by 00 2 of our office on (v �� 2007. OF The following are persons, firms, and corporations having a principal interest in this proposal: Z-0� yz)S WZ2 '921-C, a4A hie a ct C-23 The undersigned is prepared to satisfy the financially or otherwise, to perform the accordance with the plans and specificatio z and. Company Name of the City of Huntington Beach of its ability, kr the proposed work and improvements in set os Signature of Bidder T o ✓1 l 2-DrGe c S Printed or Typed Signature Subscribed and sworn to before me this 26 day of , 2007. #1716106 WL.NOTARY PUBLIC • CALIFORNIA Los COMM.MGELES COUNTY NOTARY PUBLIC Commission Expires Jan.12, 2011 NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: VF�7 2. 3 Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Name and Address of Public Agency Type of Work Name and Telephone No. of Project Manager: Contract Amount Type of Work Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work C-24 Date Completed Date Completed Date Completed Zondiros Corporation 2401 208th Street License # 766708-A Suite C-8 Torrance, CA 90501 Job Name Owner Total Job Cost Job Description Completion Date Depth 1-905 Utility Relocation Design Otay Water District $ 938,982.19 700' of 12" CML&C In Progress 15' Contact: Richard Shackle (619)670-2222 Estimated Completion: September 2007 National City Pump Station Rehab City of National City $ 589,000.00 4 Pump stations In Progress Contact: Albert Grie o (619)336-4380 / 4386 Estimated Completion: September 2007 Sewer Realignment and Sag Repair City of Ventura $ 314,814.00 10" Sewer In Progress Contact: Ken Star (805)654-7800 Estimated Completion: August, 2007 Adelfa Water Elsinore Valley Water District $ 1,734,888.00 12" Water In Progress 5' Contact: Steve Simmons (951)674-3146 Estimated Completion: June 2007 11a1398 Caltrans $ 46,052.00 Install concrete lined ditch In Progress Contact: Trung Tran (619)688-3378 Estimated Completion: June 2007 Beach Area Sewage City of San Diego $ 2,292,000.00 Low Flow Diversion In progress 25' Contact: Graham Hufford (858)495-4727 Estimated Completion: June 2007 County of Kern Manhole 5175 to 5176 $ 76,890.00 Manholes on Monroe St, Ford City In progress 15' Contact: Bakari Sanyu (661)862-8900 Estimated Completion: May 2007 Maple Ave Sewer City of Corona $ 674,340.00 2500 LF May-07 12' Contact: Barry Ghaemi (951) 739-4961 12inch sewer clay Raw Water Line Extension City of Escondido $ 1,190,550.00 Raw water line May-07 10, Contact: Neil Greenwood 760)839-4078 Raceway Sewer Pump Station City of Vista $ 1,576,000.00 Pump station May-07 Contact: Jan Meermans (760)-479-2911 Nardo Avenue Sewer Main Susan Wheeler $ 58,000.00 Sewer main and laterals in Solana Beach April-07 8' Contact: Susan Wheeler (858)344-5953 South Solana Sewer Assessment City of Solana Beach $ 596,749.00 Sewer work April-07 15' Contact: Jim Greenstein (858)720-2476 Seabright Lane Rehabilitation City of Solana Beach $ 206,812.00 Street rehab April-07 10, Contact: Jim Greenstein (858)720-2477 Isolation Valve for Lake Jennings Helix Water District $ 628,193.00 200' 48" & 54" CML&C, Isolation Valve April-07 20' Contact: Aneld Anub (619)667-6273 Storm Drain City of Torrance $ 299,909.00 Storm drain March-07 Contract: Beth Overstreet (310)618-3074 2006 Street & Drainage Improvement City of Del Mar $ 478,913.05 Street and drainage improvements February-07 Contact: Scott Adamson (858)413-2400 Hillcrest and Misson Hills Sewer City of San Diego $ 1,014,541.16 Sewer repairs January-07 Contact: Margarita Bor'a (619)533-4488 11a1328 Caltrans District 11 $ 411,170.15 150" Liner Plate January-07 25' Contact: Mau Leneau (858)413-2401 Jackson Park Restroom City of La Mesa $ 196,200.00 Restroom building January-07 Contact: Jennifer Flor (619)667-1152 11-243404 Caltrans District 11 $ 552,389.00 September-06 Contract: Greg McClendon (760)594-2115 Zondiros Corporation 2401 208th Street License # 766708-A Suite C-8 Torrance, CA 90501 Job Name Owner Total Job Cost Job Description Completion Date Depth Dove Library Children's Garden City of Carlsbad $ 88,000.00 Concrete September-06 Contact: Duane Soileau (760)602-2780 x 7316 Grand Avenue Street Improvements City of San Marcos $ 1,320,040.00 Storm drain 36 inch road widening August-06 15' Contact: Jim Chafe (760)752-7550 x 3305 Engineering Repairs on Newton St. City of Torrance $ 55,456.00 15' Storm Drain July-06 5' Contact: Craig Bilezerian (310)618-3054 Grading & Drainage for Office Bldgs Ken Dubs $ 64,900.00 Grading and drainage May-06 Contract: Ken Dubs (760)591-4100 Sewer Tract 750 Salton City $ 398,925.00 12,000 Lf March-06 15' Contact: Tom Cannell (760) 394-4446 6 inch sewer Sewer Main Replacement 2002-2003 Elsinore Valley Water District $ 716,000.00 4000 feet of 8inch sewer October-05 10, Contact: Bill Eckman (951)453-3707 LAX DEMO City of Los Angeles $ 2,042,000.00 Demo 100 homes for airport expansion August-05 Contact: Mr. Kit Yee (310)417-6100 Punchlist Work Rancho Diego Estates $ 120,000.00 Punchlist work June-05 Contact: Todd Peters (858)756-9401 2004 Street & Drainage Improvement City of Del Mar $ 440,000.00 Improvements September-05 Contact: Jan Meermans (760)479-2911 Camino Del Mar Street Improvements City of Del Mar $ 372,000.00 25th and 29th Street December-05 Contact: Jan Meermans (760)479-2911 Camino Del Mar Streetscape City of Del Mar $ 521,000.00 4th to 9th street December-05 Contact: Jan Meermans (760)479-2911 Emergency Work Route 247 Caltrans District 8 $ 665,381.00 Storm Drainage November-05 Contract: Romano Verlengia (951)-922-1745 roadway Emergency Work Route 62 Caltrans District 8 $ 814,701.00 Storm Drainage November-05 Contact: Roadway Improvements Equipment Rental San Diego School $ 42,000.00 Emergency work August-05 Contact: Tracy Higgins (858) 627-7269 Dana Middle School Retaining Wall San Diego Unified school $ 640,000.00 Concrete repairs & 500 feet reinforced earth August-05 Contact: Mike Jones (858)573-5707 retaining wall Lake Forest Bus Shelters City of Lake Forest $ 388,350.00 Install 44 bus shelters December-04 Contact: Fred Wickman (714)568-7300 Repairs Culverts Caltrans $ 849,000.00 54" storm drain rehab, cured in place lining November-04 15' Contact: Ricardo Padilla (619)688-3111 Coachella Storm Water Coachella Valley Water District $ 252,800.00 Sheet pile cofferdam & flow meter installation November-04 Contact: Robert Robinson (760)398-2651 Indian Wells Fore Main Coachella Valley Water District $ 237,546.00 14" Diameter sewer force main October-04 12' Contact: Jorge Meza (760)398-2651 Storm Drain Rehab CIPP Warner Brothers $ 116,750.00 24" Storm Drain cured in place lining September-04 Contact: Jerry McGor (818)954-1245 Street & Drainage repairs City of Encinitas $ 550,000.00 Road and drainage repair August-04 Contact: Todd Baumbach (760)633-2796 Zondiros Corporation 2401 208th Street License # 766708-A Suite C-8 Torrance, CA 90501 Job Name Owner Total Job Cost Job Description Completion Date Depth Mission Avenue Median City of Oceanside $ 240,000.00 Median installation July-04 Contact: Brian Grove (760)436-5106 Date Ave Storm Drain City of Imperial Beach $ 184,000.00 Sewer install & Pump station repairs July-04 Contact: Vicki Madrid (619)424-2214 Torrance Strom Drain City of Torrance $ 584,000.00 Storm drain rehab, cured in place lining August-04 Contact: Craig Bilezerian (310)781-6902 Emergency Fire Damage Caltrans $ 1,650,000.00 Emergency Erosion Control May-04 Contact: Hasan Daabas (858)616-6586 Avenida Encinas Sewer Rehab City of Carlsbad $ 170,000.00 Sewer rehab June-04 15' Contact: Duane Soileau (760)602-2780 x 7316 Valley Avenue Sewer Main City of Solana Beach $ 116,000.00 Sewer Main October-03 12' Contact: Jim Greenstein (760)720-2476 Bus Shelters City of Lancaster $ 410,000.00 install 40 bus shelters September-03 Contact: Dave Heather (661)723-6173 Kurtz and Smith Street Sewer Main City of San Diego $ 180,000.00 Sewer main July-03 12' Contact: Mark Spears (619)980-6150 San Dieguito Road Water Main Olivenhain Municipal Water $ 200,000.00 Road Water Main February-04 5' Contact: George Breist (760)632-4640 Demolition State Parks $ 627,000.00 Demo 30 homes May-03 Contact: Harry Miller (619)220-5357 Landscape Irrigation San Diego Unified School $ 297,000.00 Landscaping July-03 Contact: Doug Jacobson (619)701-1541 Water Line San Diego Unified School $ 120,000.00 Water line April-03 5' Contact: Doug Jacobson (619)571-2684 Harbor Drive Sewer City of San Diego $ 309,000.00 Sewer Line April-03 12' Contact: Samir Abu -Quad (858)627-3268 La Jolla Cove Stairs City of San Diego $ 260,000.00 concrete April-03 Contact: Danny Schrotber er 619)533-3778 Mission Beach Sewer City of San Diego $ 260,000.00 Sewer Line February-03 10, Contact: Na aman (310)627-3286 Debris Basin Landscaping LA County Depart of Public wrks $ 160,000.00 Landscaping May-03 Contact: Rubin (626)458-4947 Topanga Park Demolition California State Parks $ 367,000.00 Park May-03 Contact: Harry Miller (619)220-5357 La Cienaga Sewer City of West Hollywood $ 185,000.00 Sewer Line August-02 10, contact: Kieth Williams (323)848-6377 Cornfield Info Site California State Parks $ 245,000.00 Park November-02 Contact: Jeff Brown (619)688-6492 (Veterans Memorial Project City of Torrance $ 160,000.00 Park March-02 Contact: Jon Landis (310)781-7140 Zondiros Corporation 2401 208th Street License # 766708-A Suite C-8 Torrance, CA 90501 Job Name Contact: Diane Caseltine Landscaping Contactl- Mike Garrett Sewer Line Contact: Bob Duramus Bus Shelters Contact: Dennis Conte 54" Storm Drain Contact: Martin Varga Bus Shelters Contact: Ike Mabelu 8" Sewer Main Contact: Alan Bratvedt Robotic Pipe repair Contact: Mike Bedard Median Landscape Contact: Andy Clark JV with Peninsula Landscaping 4" Drain Line Contact: Terry Curson Various Channel Repair Contact: John Reagan 12" Storm Drain Contact: Sam Wise Robotic Pipe repair Contact: Ben Oroomchi Contact: Iggy Ruiz Concrete Channel Contact: Vince Gonzales A.0 Storage Site Contact: Tony Gridillas Sewer Rehab 8" C-900 Contact: Tony Gridillas Robotic Pipe repair Contact: Ben Oroomchi Contact: Greg Weiss Slope Repair Project Contact: Miguel Hernandez Earth Drainage Channel Contact: David Wu Treatment Plant Improvements Contact: Tony Gridillas Owner (310)781-7151 Caltrans (559)445-6356 LA County Depart of Public wrks (310)864-1984 City of Montebello (323)887-4625 Kern Water Agency (661)634-1448 City of Compton (310)644-6868 City of Culver City (310)329-0102 City of San Diego (619)654-4154 City of Rolling Hills (310)377-1577 City of Simi Valley LA County Depart of Public wrks (626)358-3122 City of Rolling Hills (310)377-1577 LA County Depart of Public wrks (818)896-0594 (562)861-0316 Orange County Flood Control (661)274-0753 Lake Arrowhead Community (909)337-8555 Lake Arrowhead Community (909)337-8555 LA County Depart of Public wrks (818)896-0594 (626)458-3122 City of West Covina (626)814-8425 City of Palmdale (805)267-8425 Lake Arrowhead Community (909)337-8555 Total Job Cost Job Description $ 252,000.00 Landscaping $ 400,000.00 Sewer Line $ 157,000.00 Install 20 Bus Shelters $ 87,800.00 54" Storm Drain $ 206,000.00 Bus shelters-Design/Build $ 192,000.00 8" sewer main $ 450,000.00 Sewer rehab CIPP $ 525,000.00 Landscaping $ 60,000.00 4" Drain Line Casarin Ave Well Drain $ 310,000.00 Concrete channel $ 40,000.00 12" Storm Drain 62 Strawberry Lane $ 100,000.00 Storm Drain Rehab $ 98,000.00 Concrete channel $ 110,000.00 Parking lot improvements $ 150,000.00 sewer line $ 339,000.00 Storm Drain rehab $ 80,000.00 Slope repair $ 19,000.00 Drainage channel $ 82,000.00 Treatment plant improvements ion Date October-01 January-02 June-01 January-01 March-01 October-00 12' 25' October-00 February-00 5' January-00 December-99 5' December-99 September-99 October-99 September-99 12' December-98 4 Zondiros Corporation 2401 208th Street License # 766708-A Suite C-8 Torrance, CA 90501 Job Name Owner Total Job Cost Job Description Completion Date Depth Storm Drain 36" RCP City of Rancho P. Verdes $ 214,000.00 36" Storm Drain December-98 Contact: David McBride (760)435-5097 15' 3 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond BOND # NIA KNOW ALL MEN BY THESE PRESENTS, that we ZONDIROS CORPORATION 2401 208TH STREET, STE. C8 TORRANCE, CA 90501 (Here insert full name ,and address or legal title of Contractor) as Principal, hereinafter called the Principal, and SURETEC INSURANCE COMPANY 3033 5TH AVENUE, SUITE 300 SAN DIEGO, CA 92103 (Here insert full name ,and address or legal title of Surety) a corporation duly organized under the laws of the State of TEXAS as Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF HUNTINGTON BEACH 2000 MAIN ST. HUNTINGTON BEACH, CA 92648 (Here insert full name ,and address or legal title of Owner) as Obligee, hereinafter called the Obligee, in the sum of TEN AND 001100 PERCENT----------------------------------------- Dollars ( $ 10 % ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for WATERMAIN REPLACEMENT PROJECT CASH CONTRACT # 1238 (Here insert full name, address and description of project) NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, o . the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal s II pa to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid a d such arger amount for which the Obligee may in good faith contract with another party to perform the Work c ered by aid bid then this obligation shall be null and void, otherwise to remain in full force and effect. 11 Signed and sealed this 15th day of June 2007 ZONDIRO '01;X-61qr � (P� Itness SU�t (Witness) YUNG T. M J J AIA DOCUMENT A310 BID BOND AIA ® FEBRUARY 1970 ED THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W. WASHINGTON, D.C. 20006 (Title) (Seal) 0 CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT STATE OF CALIFORNIA COUNTY OF ORANGE ) On �� 1 before me, JENNIFER K. SMITH, Notary Public NAME OF NOTARY PUBLIC personally appeared, YUNG T. MULLICK, ATTORNEY -IN -FACT personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. OPTIONAL INFORMATION TITLE OR TYPE OF DOCUMENT DATE OF DOCUMENT yfrLOFr JENNIFER K. SMITH N :fit s" COMM. # 1479028 X u C 1 c NOTARY PUB- J.CALIFORNIA a p� ORANGE COUNTY N a� My Comm, Expirae MAR 26, 2008 PUA #; , 510002 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Metz by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make, constitute and appoint Jennifer C. Giboney, James W. Moilanen, Yung T. Mullick of Mission Viejo, CA its true and lawful Attorneys) -in -fact, with frill power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds,. recognizances; undertakings or other instruments or .contracts of suretyship to include waivers to -the conditions of contracts and consents of surety; providing the bond penalty does not exceed Five Million Dollars and no/100 ($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the Company and duty attested by its Secretary, hereby ratifying. and confirming all that the said Attorneys) -in -Fact may do in the premises. Said appointment shall continue in force until 10/31/08 and is made under and by authority of the following resolutions of the Board of Directors. of the SureTec Insurance Company: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary ar any Assistant Secretary shall be and is hereby vested with full power and authority to appoint;any one or more suitable persons as.Attorney(s)-in-Fact to represent and as for and on behalf of die Company subject to the. following provisions: Attorney -in -Fact may be given full power and authority' for and: in the name of and of behalf of the Company, to: execute, acknowledge and deliver, any and all bonds; recognizances, contracts, agreements or indemnity and other conditiotial or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and, any such instruments so executed by any such Attorney -in -Fact shall bebinding upon: the Company as if signed by the President and sealed and.effected,by the Corporate Secretary. Be 4t Resolved, that;the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power ofattorney or certificate bearing;faosunile signature or facsimile seal. shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201* of April, 1999.) In WhIness ftereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its .corporate seal to be hereto affixed this 20th day of June, A.D. 2005. sonc TEC RANGE CUIVIPANY 4-1 0/ By:. �} u, � �p"� B.J Ki g, reside t State of Texas ss: t �-�-•� County of Harris On this 20th day of June, A.D. 2005 before me personally came B:7: King, to me known, who, being by me duly sworn, did depose. and say, that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Company; and that he signed his name thereto by like order. csaommomenceeeee Nj1Ci18A8 Denny yatQt"`� Notary Ptd)AC • Sidle M Texal My C ffV* s(on Expires August 27 2008 Michelle Denny, Notary P tic My commission expires August 27, ZOOS 1, M. Brent Beaty, Assistant.Secretary. of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing, is a trite and correct copy of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore,'the resolutions ar the hoard of Directors, set out in the Power of Attorney are in°full force and effect. Given under my hand and the seal of said Company at Houston, Texas this 15 day 91 June 2f� U-, A. . Brent -Bea , istarit: See tart' Any instrument issued In excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call (713) 812-0800 any business day between:8:00 am and 5:00 pm CST. City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 J. DeSigio Construction, Inc 935 S Mayflower Arcadia, CA 91006 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand ( Telephone: 714-536-5227 ) J. De Sigio Conte, kc- 935 S. Mayflower Arcauia, CA 91006 CITY CLERX CITY OF HUNTINGTON BE, ACH -a<>cvc;> .. S' Fc> v-. e ms► �-; . v . 10 c� \,c! A-rCC- NAA t ,,.t r s� R ,. ��„� uas�..—r 7 A c..�-JE—E --,r �aE ; w r a GE.r--SG—VA Air F a c Av rRcM HiL.L ` —r. "Cc:> Vl( A i CP- T-Z!P>..AC.EMC &'T "F',vSrr.T T ht"b era N AS�7�..15 7BZ-P\C.;oA r--.5 t_.. d �/.lf�'�f2. M A L r.[ ..`�`'f—� ME1.,t" � `r�� ��i't"r T�'�'a`Ef'Gb-� � t_. � �i�.�� �,r�iD � ✓��PkF'c,�L.,t a A,�t�. '�'© �"_b� ° 'vctA _ MAb�.1 t?—�C'ir+ MEar1'C" f'T �—r --:S�c>—. E < AV WA -Mg— M A e ►.i i�E r��ac.�M n► �f'..r� sGr,T V � l C.P.. Air �, 1 �- Lr"r' � r' i , A a i, e c> -1 E�EAC,�,4 C,a L. 0 MA'rJ lZr--'Pt.._ACf MC-4 \ "P'ZC>�7— 'SCAC*A "BL- i FU i 1C.,A : W ,a,`MZ,- M A i J V-J—:r i`lPL oa , .Ar=C ACJA `B(r) 1=> ' A`,CF k C> AIN �-7 SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The I" Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2nd Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. ,j3 i Accompanying this proposal of bid, find mat 0 in the amount of $ JO c' /U which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Receired Bidder's Signature C-2 PROJECT BID SCttEDLJLE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS e � p~`�`'�"`�° $14f +� � $ t 5� q 2. Install 8-inch Class 200 PVC C>me 1-vf4cx� pipeline in the Alley between ; cxt'J Geneva Avenue and Frankfort Avenue 765 LF `r>0L4-ArZ-S $ Zt�� sqzL S&5•.`.- 3. Remove and dispose of SE,vC-*-,1 � i. ✓ ,. existing 4-inch Cl pipeline 650 LF --0C>LA -4.2 $ $ 4. Provide temporary water 1 LS (>JE t�-'r-tcw �o SX- $ » $ I service FRS 5. Construct waterline connection in Hill Street 1 LS tjut:a No�sAuaC�S $ L t + � $j o04"� 6. Construct fire hydrant S17C-I-sA�D `114P-6F- -ca assembly 1 EA 7. Cut and cap/seal existing -Twc> —f1- out - �. cv waterline 3 EA �� $ $ 0=-7 8. Remove and dispose of c7/�£ t•tv�.31� av existing valve 2 EA Si✓VCta `Y t`)\/E 9. Relocation of sewer laterals 15 EAF,,rV�'�,0 �c��s $ �S $'Z.E 10. Flushing, Pressure Testing, SIR Disinfection, Dechlorination 1 LS �fL� $13�cxa, $ ij 11. Traffic control 1 LS S »c )Y1 HU)14�-C>R�D TN (r-0 $ ��_ $ s 12. Sheeting, shoring, and/or bracing �Novsp�n0 c�v co 1 LS 13. Additional potholing 20 EA � �-�4.�pvsAn� $ f ��� $' a� 14. Demobilization and Cleanup 1 LS ;ice r+v An O 15. Install 4-inch cut in valve assembly 1 EA` $ $ I. Go, _ 16. Install new 1-inch polyethylene water service 5 EA �o A $ L -5 $ -7. ,SDO, C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch No6 i4U"JCRJ5:-f1 polyethylene water service, connect to existing3/-inch meter 11 EA � $9s�-�" $ i_0�450, 18. Install new 1-inch JJ 19%,7 i4V4VVJSD polyethylene water service, A ` connect to existing 1-inch $a $ l� meter 7 EA 19. Install 4-inch pump -out' assembly 1 EA U'J $1 $3� ° 20. Replace Existing Traffic Control "v?'X>2Q0 FVF ` j-A�Q, $ $��d Loop 1 EA Sub -Total Amount for All Bid Items — SCHEDULE A $33Z- L44+ >. C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS F: I P i ,O Q% $ +W.- $4!; 2. Install 8-inch Class 150 RQ-: Hu)aORW PVC pipeline in Indianapolis Avenue at on Beach Boulevard 110 LF $ $ 3� 3. Install 12-inch Class 350 DI ©me - pipeline in Indianapolis SIXTH' a uv0 Avenue at Beach Boulevard. 172 LF L�tA� $_ $� 4. Install 12-inch Class 200 1�t \16 4uwDfZA PVC pipeline in Indianapolis Avenue at Beach Boulevard 45 LF� 5. Install 24-inch steel casing t4u in Indianapolis Avenue at Beach Boulevard, with c $ �� $ �ta, receiving pit, and jacking pit 164 LF�'' 6. Install 12-inch cut in valve fy assembly 1 EA t.x.-At�S $ 7. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 8. Traffic control 1 LS S $i 0 000 $ y 9. Water Pollutant Control �VD -��� Z Program 1 LS R,� $�, $ _ 10. Sheeting, shoring, and/or bracing t NINE "L*4C>R.E0 $'` 1 LSD 11. Additional potholing 15 EA t>CX_LAtLcD $ $� 12. Demobilization and FI\lE. -- SANfl C Cleanup 1 LS IMP- Vj $_q� IO $ + 13. Replace Existing Traffic —TVJ D Hs.ani( w_o �1 ' 00- Control Loop 8 EA Sub -Total Amount for All Bid Items — SCHEDULE B $ lmi 1° C-_5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS PovS" $ 2. Install 12-inch Class 150 F VMC>IZQC) PVC pipeline in Beach EA(*.VT-t' "C"rst `Dcx__t.� , (4 Cam' Boulevard 500 LF s $�: $ 3. Install 8-inch Class 150 1X-_ k4u',)00 PVC pipeline in Beach '5r__\r_L T` j sa_',F J — Boulevard 25 LF ` ' i t.,A `� $ 77.E $14 5"4 4. Flushing, Pressure Testing, •fit �sAr.a Disinfection, Dechlorination 1 LS 5. Traffic control 1 LS"'� 6. Water Pollutant Control Program 1 LS���� 7. Sheeting, shoring, and/or bracing 1 LS 8. Additional potholing 20 EA -r Zs' a, n VD'_� $ $ 9. Demobilization and Cleanup 1 l�E ®L k-iC�1�SA �1 L3 Flq&� $ LS 10. Replace Existing Traffic dv r Control Loop 4 EAR ��-� $2�r� $ Sub -Total Amount for All Bid Items — SCHEDULE C $ 45" C-6 PROJECT BID SCHEDULED Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LSD "`' $ 2. Install 8-inch Class 150 O)UF- RUN MO PVC pipeline in Joliet Avenue 325 31V_rY C,tGk-r $J $ LF� 3. Install 8-inch Class 150 and `TLLr_> 14UM_VYZ60 200 PVC pipeline in Georgia Street at Joliet= Avenue 115 LF 4. Install 4-inch cut in valve��"�'�� RE' �`�"� $1 $z_, assembly 2 EA 5. Construct . fire hydrant assembly 1 EA N. _' ACXX! ,J 0 -�� rIAZOE $ + v� $ 6. Remove and salvage Cwe—t-Hc>O&A rJo existing fire hydrant 1 EA eAG`'vT� f> $� $ 7. Remove existing valve box OBE E- Uc JMZD and cover 3 EA ,a.Atz $ i''" $- 8. Cut and cap/seal existing 0 cad waterline 2 EA `pA25 $ $ . ®' 9. Install 2-inch air and vacuum assembly 1 EA + i Tb"1cx�Sran®_ "� �"' $ $ (t _5� 10. Relocation of sewer laterals 6 EA O►sE- $A!5—:2' $ ( O a0,� 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 12. Traffic control 1 LS S nc Stu ¢� $ 13. Sheeting, shoring, and/or bracing 1 LSl..l..��-S 14. Additional potholing 20 EA 4&►E ) �NLC. $�_ Or- $2 15. Demobilization and Cleanup 1 LS Frqr_'TAY1 FwF- too - --1-- 16. Install new 1-inch �o Js polyethylene water service, connect to existing 3/4-inch �Cxz.s meter 5 EA 17. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA $ $ _ Sub -Total Amount for All Bid Items - SCHEDULE D $ ' C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS sm` I400SIPA10 $I $ fa C7cO+ 2. Install 8-inch Class 150 and �lUh►� 200 PVC pipeline in Utica Avenue E1GWr`f 0"11�1 �[�� 00 $ 590 LF �1„ (.„ (Z S.$1C�►_�_ 3. Construct fire hydrant assembly 2 EA 4. Remove and salvage existing fire hydrant 2 EA $0 1 --ice-- $ �' -+ 5. Remove existing valve box 0kJF_ n' n and cover 6 EA �q�'' ��' $ � $ 6. Cut and cap/seal existing -tNou��nfl waterline 2 EA $ zp_x, $ y 7. Relocation of sewer lateral 6 EA $ 115':` — $_4 �±CZ:1- L 8. Flushing, Pressure Testing, ` � �°" 0 ap Disinfection, Dechlorination 1 LS$i 9. Traffic control 1 LS SiX ur�r�l.�� s $ ' -- $_ 10. Sheeting, shoring, and/or bracing 1 LS D $ +a $Z � �D. . 11. Additional potholing 20 EAN��s rar' $ i � $ 12. Demobilization and i ►q= Tl__� D Cleanup 1 LS vD $ 13. Install new 1-inch p polyethylene water service, connect to existing '/-inch meter 7 EA 14. Install new 1-inch f�11ht- polyethylene water service, connect to existing 1-inch 1 meter EA 15. Install new 2-inch copper vsa `T��np -rNREC rtup?-+Cr�,p water service, connect to existing 2-inch meter 3 EA 00 16. Install new 2-inch copper water service, connect to THRBE-tv��r� existing 11/2-inch meter 1 EA _T__1ttC)..,AC5 $ Sub -Total Amount for All Bid Items — SCHEDULE E Coal PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 'KIKW $i a $`7 2. Install 6-inch, 8-inch and '"CW�C> �-F�►u�tl t� 12-inch Class 150 and 200� PVC pipeline in Beach Boulevard 1300 LF5 $ $� 3. Construct 12-inch D.I. G-'i NOV 5 �1n U � inverted siphon assembly 31 LF �"� µoLJ $�.7bfl+_ $ S 74;YO, 4. Install 12-inch Class 150 Fr i€ 4L)MDRIF-:�t) PVC watermain in Beach Boulevard at Yorktown' $�•� $ Avenue 24 LFt.l--.� 5. Construct 12-inch D.I. 49 `ay')0 $ 09 siphon assembly LF � 6. Construct waterline VJe-1LvE" -TaAOUSAuO connection in Beach 0 Boulevard 1 LS -t>0Ll.A9-a $ iZ. $ 7. Remove and salvage existing fire hydrant 2 EA ��-CNt7t75A 010 �+ $ 8. Construct fire hydrant assembly 2 EA�t`� 9. Remove existing valve box ONE 4 $ i? $_ � and cover 5 EA -t:)oLLAV-!E� 10. Cut and cap/seal existing -Mr-> -'»w-.01 �I�RF-� W- � waterline 6 EA �5—>L, $��t $ i�-,04 11. Remove and dispose of�F^`- existing valve and interfering piping 1 EA 12. Flushing, Pressure Testing, tisA�►�' Disinfection, Dechlorination 1 LS 13. Traffic control 1 LS $ ley $_r 14. Water Pollutant Control "rHCv>ANO "7%,euC7Fcx , Program 1 LS $'a $`c 15. Sheeting, shoring, and/or E Ua+ bracing 1 LS V-X-'1.—A.'V.5 $ $. 16. Additional potholing 30 EA �'� �`'��LACS. $ 1 $Zx�> 17. Demobilization and F`wE--HcwsA,.,O Cleanup DIVES 1 LSt.(LS $ —--' C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quanti Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve b HW V�JVQfJ_r30 assembly 2 EA $ $ 19. Install 4-inch pump -out assembly 1 EA c $ 7z 20. Install 2-inch air and vacuum assembly 2 EA �fHcx�rar•�� 1�t �� $ Co - s] MA 21. Install new 1-inch 1 HOL)G" polyethylene water service, connect to existing 1-inch meter 2 EA I-��`, $ $��J 22. Install new 2-inch copper water service, connect to existing 2-inch meter 4 EA _LX_—CLAfkcD $ $ILA 23. Replace Existing Traffic Control Loop 8 EA - I AC> 7 _ Sub -Total Amount for All Bid Items — SCHEDULE F $ 9 4 C-10 PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quanti Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS `��� $''M_�. 2. Cut and cap/seal existing waterline 4 EA Tx,-S $ a $ � 3. Remove existing valve boxG 4 and cover EA 4. Construct fire hydrant assembly 1 EA $2 $��Zoq_ 5. Remove and salvage ���' _ 00- existing fire hydrant 1 EAR 6. Traffic control 1 LS K ,,,ter T)DU-41S $ _ $ 7. Water Pollutant Control T4Ac>JSPv-40 �r)c),u Program 1 LS oqL-> 8. Sheeting, shoring, and/or -rwca Np,�scan[� Siyc-R bracing 1 LS 9. Additional potholing 10 EA Oa $1 $ + 10. Demobilization and Cleanup 1 LS �P, u2r1s $za $ 11. Install new 1-inch polyethylene water service, QL-"T �L*JUZGD connect to existing 1-inch 2 EA ^rRr CV $�,r CIO $ meter 12. Install new 1-inch -S-IIy, —TOOC-64Y)o polyethylene water service, SE�.fElt 1-tv connect to existing 3/4-inch'' meter 1 EA '� o $�..-- 13. Install new 2-inch copper 'tHpusA+r�Q water service, connect to`'� existing 2-inch meter 6 EA _D0 LJ_A9_ $:7 $ `"E`"f4, 14. Install new 2-inch copper SEs.lW -r"CXJ5AwO UrJDr�01 water service, connect to existing 1 1/2-inch meter 3 EA T)DLL^R& Sub -Total Amount for All Bid Items — SCHEDULE G $_ C-1 l PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS09- 41 D e $ �� $ iia�• 2. Install 8-inch Class 150 C*H.UmDa&D PVC pipeline in Clay .� 'TµR£ $1-13 $_ ? ` Avenue 565 LF �; �� 3. Install 12-inch Class 350�-� D.I. pipeline in Clay Avenue at Beach Boulevard 120 LF $6 _ $'Zap 4. Install 24-inch steel casing }=NE in Clay Avenue across 14 t>aE.ry Beach Boulevard, with receiving pit and jacking pit 96 LF -D $ $1S(C.-6;6n 5. Install 8-inch Class 150 RU)J PVC pipeline at the Beach N#.A Boulevard and Clay Avenue intersection 55 LF $� $ 6. Install 8-inch Class 200 PVC pipeline in Coenson N Circle at Clay Avenue 17 LF e-�. 7. Remove and salvage fire hydrant EA p �"�A~`� r k-rk- o� $ $ existing 2 8. Construct fire hydrant Six `TVACK.>sA.T-10 assembly 3 EA E-vZ $tom 9. Cut and cap/seal existing "C1-k>USA�.cta waterline 4 EA -bQt.LZ $� $ g 10. Remove existing valve box and cover 5 EA- �� $1~7�� 11. Remove and dispose of existing valve and interfering pipeline 1 EA m>'- L. -A2a $1 0004 $W'000+ 12. Relocation of sewer laterals 10 EA' $ i'lg m COCR $ 13. Flushing, Pressure Testing,1-10 t -s�� Disinfection, Dechlorination 1 LS $� $'' 14. Traffic control 1 LS 009 �Ac 15. Sheeting, shoring, and/or bracing -1149CE rT vsr�,o N��2tt law 1 LS tX $ 16. Additional potholing 20 EA-�� 17. Demobilization and�� Cleanup 1 LS Tt i r' $s 5i 4'` $S_""" C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve 1 EA�� TW4k)SCnID assembly 19. Install 12-inch cut in valve 1 zlxfZ.-'C►-tbusa NVrtO2.n $�, $_ assembly EA � 20. Install new 1-inch i mFl l-lU i 9 polyethylene water service, Fl,Ve connect to existing 1-inch 8 1-tr�.� $ -7 $ meter EA 21. Install new 1-inch service, ttie, �4 U,'D polyethylene water connect to existing 3/4-inch 1 $ meter EA Sub -Total Amount for All Bid Items — SCHEDULE H $ C-13 PROJECT BID SCHEDULE I Mlatermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 'm ''-A sAe�C tm $ 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF ` c;; k+u)4bMD 6.t-L, $�%d� $�� 3. Construct connection in Ellis Avenue 1 LS J 4. Remove and dispose of-� existing valve and I V54 Z1 cop interfering pipeline 1 EA 5. Cut and cap/seal existing CM waterline 2 EA -CX:,->Lk AjL.5 $ p22' $ 6. Flushing, Pressure Testing, -rH co Disinfection, Dechlorination 1 LS "rHC>Q5r4n0 s $ 7. Traffic control 1 LS cam 8. Water Pollutant Control Program 1 LS �� ov $`Z4L4CO' 9. Sheeting, shoring, and/or bracing 1 �CP $�- 7- M'-�- $ LS 10. Additional potholing 18 EA ©� ago c $ ` Cry $ i 11. Replace Existing Traffic r� r co c Control Loop 4 EA F:l PIP` 'bO-LLAJZS $1...0a 12. Demobilization and Cleanup 1 LS Sub -Total Amount for All Bid Items — SCHEDULE 1 $ . C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons 6%� -A_A $�" , _ 2. Install AC 500 Tons �` U''c as 3. Unclassified Excavation 300 CY "'o �' sm $ � 4. Adjust Utility Cover 30 EA � $G' "' $ 9- -& " 5. Adjust Water Cover 1 EA ea f�,�, $ $ 6. Adjust Sewer/Storm Drain Manholes 2 EA ' j � NL>mV'(r-0 � b14� f I X si $ 7. Remove/Construct 160 SF %f)� $�� _`__ Concrete Sidewalk 8. Remove/Construct 2400 SF F41� rY $ � Concrete V-Ditch tou*sl 9. Remove/Construct 500 SF Ir.AZ 01--' Concrete Drive Approach including SEA t3,"Zvi adjacent gutter mot. L�4i'L S $ 10. Remove/Construct Concrete Curb Gutter 50 LF� $"� rr 11 dr' and S Sub -Total Amount for All Bid Items — SCHEDULE J C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A 33Z04('Ji0'� Sub -Total Bid Schedule B 1 1 ' Sub -Total Bid Schedule Ct�..-- Sub-Total Bid Schedule D Sub -Total BidSchedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G a Sub -Total Bid Schedule H Sub -Total Bid Schedule 1 71a op Sub -Total Bid Schedule JZ C �� TOTAL BID AMOUNT (Schedules A-J) TOTAL BID AMOUNT IN WORDS: t AD 1 A �LUO*.! 4y LZD� Mir to Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion of Work Name and Address of Subcontractor State License Number Class A(r, ^\t rALL- Ghil d 73 A CCIV�1W_� A C, k , Z . --1 (,/,j o �w By submission of this proposal, the Bidder certifies: That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND STJBMITTED WITH BID State of California as. County of Orange D. Scott Walker , being first duly swum, deposes and says that he or she is Vice President of J. DeSigio Construction, Ifparty snaking the foregoing bid that the bid is not made in the interest of. or on the behalf of, any undisclosed persnn� partnership, company, association, organization. or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put ina false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding, that the bidder has not in any rnamer, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statetnercta contained in the bid are true; and, fb ther, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof. or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a -collusive or sham bid. A J. De Name o! t1on, Inc. By: c Signature of Bi der D. Scott Walker — Vice President 935 S. Mayflower Arcadia, CA 91006 Address of Bidder Subscribed and swom to before me this 13thday of June 2007, cam omm NOTARYFUB NOTARYSEAL C-ts UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved." The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: Contra r By \i ice - Title C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes ;R No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: L k Contractor By Title C-21 UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-4224133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor Title Date: Note: This form is required for ever), Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder Name Business Address A,�C,(-N®kA 11 c A - :-,I l City, State Zip (6dzlo ) -6<E5-1 sq Telephone Number 7S`7Sq-25 A State Contractor's License No. and Class 61---z>9i \ lot<t`4 Original Date Issued %\ -Z Expiration Date The work site was inspected by 7 >ZIA i j -pr-, S16alt--yf our office on 1-5- 92007. The following are persons, firms, and corporations having a principal interest in this proposal: �VtJA�.I'1 SICato ViC£P :��L`G►.�T�`�EG—" A � C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the roposed work and improvements in accordance with the plans and specifications set forth. J. DeSigio Conqpructio , nc. Signature of Bidder D. Scott Walker — Vice President Printed or Typed Signature MAW UAMM Subscribed and sworn to before me this 13 day of June 200 a a CR=SS CMCM o� 0. SW NOTARY PUBLIC NOTARY SEAT, Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: Name and Address of Public Agency Name and Telephone No. of Project Manager. KF Date Completed Name and Address of Public Agency Name and Telephone No, of Project Manager. a VAJ-I LAU&, 11� 7t'd6.. q5q °lllv A �� o� t4 i<A-TEJu-► AV F 9� 'v Contract Amount Type of Work Date Completed 3. CaLEAJ17LIFA IL 0-4 �-t l '+L1 • G l-1DAt�c. AyE G�lc..►�i Lr: ��(A Name and Address of Public Agency Name and Telephone No. of project Manager, t�-fctJ irF2N a (� 1-:44e.-°� r9 Amount Type of Work Date Completed C-Za 13 FIRST NATIONAL INSURANCE COMPANY OF AMERICA KNOW ALL MEN BY THESE PRESENTS, That we J. DeSigio Construction, Inc. Proposal Bond Bond no 049 as Principal, and the First National Insurance Company of America, a corporation under the laws of the State of Washington, authorized to transact business in the State of CA, as Surety are held and firmly bound unto: City of Huntington Beach (hereinafter called the obligee) in the full and just sum of TEN PERCENT OF THE AMOUNT OF THE BID (10X for the payment whereof in lawful money of the United States, we bind ourselves, our heirs, administrators, executors or successors, jointly and severally, firmly by these presents. WHEREAS, the said PRINCIPAL has submitted the accompanying bid for Construction of Water -main Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet -Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to 'Yorktomm Avenue; Watermain Removal project, Beach Boulevard, from Clay Avenut to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard NOW, THEREFORE, if said contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the contract in writing, and give bond, with surety acceptable to the Obligee for the faithful per- formance of the said contract, then this obligation shall be void; otherwise to remain in full force and effect. Provided, however, that if said contract is not awarded within 60 days of the date of bid opening, this bond shall be void and of no force and affect. Signed and Sealed this 13th day of June 2007 J. DeSi o stru i Inc. • vp� li D. Scd Walker — Vice President FIRST NATIONAL INSURANCE COMPANY OF AMERICA By_ — \ Les M. Mantle Attorney -in -tact CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California ss. County of Orange On (S before me, Mary Martignoni — Notary Public Date Name and Title of Officer (e.g-. -Jane Doe. Notary Public") personally appeared Les M. Mantle Name(s) of Signer(s) Upersonally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed MARy R to the within instrument and acknowledged to me that CC)M%I. �4� he/she/they executed the same in his/her/their NOT cAt�y authorized capacity(ies), and that by his/her/their 0PAKEMy GW0EP 9, Y signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Place Notary Seal Above `� `� Si to of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Les M. Mantle ❑ Individual ❑ Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General M Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: First National Insurance Company of America RIGHT THUMBPRINT OF SIGNER Number of Pages: Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): _ ❑ Partner —❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT THUMBPRINT OF SIGNER ® 2004National Notary Association • 9350 De Soto Ave-, P.O- Box 2402 • Chatsworth, CA 91313-2402 item No. 5907 Reorder: Call Toll -Free 1-800-876-6827 -{ CO KNOW ALL BY THESE PRESENTS: POWER OF ATTORNEY No. 9018 First National insurance Company of America Safeco Plaza Seattle, WA 98185 That FIRST NATIONAL INSURANCE COMPANY OF AMERICA, a Washington corporation, does hereby appoint M. MANTLE; Fullerton, its true and lawful attorney(s)-in-fact, with full authority to execute on behalf of the company fidelity and surety bonds or undertakings and other documents of a similar character issued by the company in the course of its business, and to bind FIRST NATIONAL INSURANCE COMPANY OF AMERICA thereby as fully as if such instruments had been duly executed by its regularly elected officers at its home office. IN WITNESS WHEREOF, FIRST NATIONAL INSURANCE COMPANY OF AMERICA has executed and attested these presents this 15th day of MaY 2007 STEPHANIE DALEY-WATSON, SECRETARY TIM MIKOLAJEWSKI, SENIOR VICE-PRESIDENT, SURETY CERTIFICATE Extract from the By -Laws of FIRST NATIONAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business-_. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of FIRST NATIONAL INSURANCE COMPANY OF AMERICA adopted July 28,1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V, Section 13 of the By -Laws, and (ii) A copy of the power -of -attorney appointment, executed pursuant thereto, and (iii) Certifying that said power -of -attorney appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." I, Stephanie Daley -Watson , Secretary of FIRST NATIONAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of this corporation, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are stiff in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation this 13th day of June 2007 IN -A a: SEAL s6�y CAI WAS�t+y'�y' STEPHANIE DALEY-WATSON, SECRETARY S-1049/DF 4/05 • « Safeco@" and the Safeco logo are registered trademarks of Safeco Corporation. WEB PDF City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 Steve Bubalo Construction Co PO Box 1048 Monrovia, CA 91017 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand (Telephone: 714-536-5227 ) Steve Bubalo Construction Co. I P.O. Box 1048 2001 JU�� 2 I PM I Monrovia, CA 91017 53 CITY 6F F'Y U t Y l U k, O I'm B E tit C i'7 0 u^Q.,bi1 `�. Ca V� 4kz OQ CAe�t SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The 1St Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Bidder's Accompanying this proposal of bid, find Bond in the amount of $10% of Bid which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. ' Date Received. Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS D f $ �L�b0'C1 $ Z'S7,11900 2. Install 8-inch Class 200 PVC pipeline in the Alley between Geneva Avenue and Frankfort Avenue 765 LF �7 $ $�� 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF�,�,� $ 1®� $� 4. Provide temporary water service 1 LSD a $ a= $®� 5. Construct waterline connection in Hill Street 1 LS _ F k 4n11, $L �'-- $ 1C ®0 -- + 6. Construct fire hydrant assembly 1 EA t �tvQ 6 d9 �rs $ 1" 7. Cut and cap/seal existing`q waterline 3 EA �( <1 $ �� $ 2-1 Lf ®® 8. Remove and dispose of existing valve 2 EA � _ $ j0101W�0 60 $ 'Z 9. Relocation of sewer laterals 15 EA �'` $ $ �o00. 10. Flushing, Pressure Testing, Disinfection, Dechiorination 1 LS $3i,00 $ 11. Traffic control 1 LS 12. Sheeting, shoring, and/ort.�� bracing 1 LS d $1 J 000 - $ �, 08o_ -- r-- 13. Additional potholing 20 EA �t � $_ 0 C $__L / ot_o 14. Demobilization and Cleanup 1 LS lv� a �,� $—' pep $ � 00 15. Install 4-inch cut in valve assembly 1 EA 6ua-4 t- "J d@QArs $ 3 �, p 0 $_ 3 _q 16. Install new 1-inch polyethylene water service 5 EA _M'�4L' $_1 -3O 0 $_ 5 0 0 C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch polyethylene water service,i connect to existing 3/-inch 11 EA 1'390 (q)3,00 meter $ $ 18. Install new 1-inch polyethylene water service, t�7` connect to existing 1-inch meter 7 EA dp $ 1 30 0 $ 00 _ 19. Install 4-inch pump -out -A 0 assembly 1 EA kWjrU C.O $ 3Z00 $ 3 Zo 0 20, Replace Existing Traffic Control Fkv`e 5 0 S Loop 1 EAR $ $ Sub -Total Amount for All Bid Items — SCHEDULE A $ 3 � 'A05- C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS -f�' $ a000 $ A o _ 2. Install 8-inch Class 150 -'('- k+l PVC pipeline in SWAN k�3 Seu'kA ° Indianapolis Avenue at Beach Boulevard 110 bhixrS r �h�' �� LF $ $_ 3. Install 12-inch Class 350 DI pipeline in Indianapolis Avenue at Beach ` L\��2 Boulevard. 172 LF�d.TS $Z�• $ 4. Install 12-inch Class 200 PVC pipeline in Indianapolis Avenue aCl t ��� c �t C ��--O Beach Boulevard 45 LF $ $ I 5. Install 24-inch steel casing in in Indianapolis Avenue at Beach Boulevard, with ago ©. 8 receiving pit, and jacking pit 164 LF $ $_ 6. Install 12-inch cut in valve assembly 1 EA �` t`S $ �i', $ 7. Flushing, Pressure Testing, "�W 0— u,so'4 Disinfection, Dechlorination 1 LS d0g1�S $ 2L 000 • 8. Traffic control 1 LS t $ oo $ �� coo' 9. Water Pollutant Control -rw 0-- AL(s 1 �n ✓n Program 1 LS 44- f 10. Sheeting, shoring, and/or y'(r�r� - 0u_54'd 6% bracing 1 LS j $ 3Lbm- $ 3��00 11. Additional potholing 15 EA q I I $ 12. Demobilization and -,®u G Cleanup 1 LS j, i Ict,d•.S .- $ l cno $ _, w 13. Replace Existing Traffic Control lilt 4 L'.'" do �n0 °= 4 000+' Loop 8 EA .�` $ $ Sub -Total Amount for All Bid Items — SCHEDULE B $ 2 3'7 eq COW PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Description Mobilization Quantity 1 Unit LS�� Unit Cost in Words ks Unit Cost $ 880 Total Cost $_0@O Item No. 1. 2. Install 12-inch Class 150 PVC pipeline in Beach Boulevard 500 LF fiWo 3. Install 8-inch Class 150 PVC pipeline in Beach Boulevard 25 LF "��n`^� roc J(atS J $ 23o . $ 6 95n , 4. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS I_kLI�101_S "`94-A ��� $ 1500; $ 5. Traffic control 1 LS ,�, d arS $ Water Pollutant Control Program 1 LS �' � '0 "� dt9 ([Aff 3 e00 $ ' $ 3 6b-0 6. 7. Sheeting, shoring, and/or bracing Additional potholing 1 20 LS EA r- Rue fyus,0 A tiev — 'i $ () 8. 9. Demobilization and Cleanup 1 LS �W V 4,0US d'l .VS $ 10. Replace Existing Traffic Fjve. $ .r19!) $ '� ®t p Control Loop 4 EA :14t S � c, sti_Tntmi bLmni int fr►r All Rid Items —SCHEDULE C $ �®' r7!�(D C-6 PROJECT BID SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS IEle $-k4— $ fo®0_ 2. Install 8-inch Class 150 7"w o_ KL'%' ,e � PVC pipeline in Joliet Avenue 325 SQv Sev�.`ci0 $ Z"�� $���©� LF �� 3. Install 8-inch Class 150 and -rV ID-- eQ 200 PVC pipeline in Se�e�: seue" Georgia Street at Joliet Avenue 115 LF©ljaxS $ 7--1 �5 $ }__ 4. Install 4-inch cut in valve assembly 2 EA $3 $ 5. Construct . fire hydrant assembly 1 EA �} o $ 5 U O $_ S z o 0 ATE 6. Remove and salvage existing fire hydrant 1 EA t $ 0®_ $ 7. Remove existing valve box EA tLr $ -��� $ and cover 3 8. Cut and cap/seal existing EA � $ 0 $ �� 600 waterline 2 . f 9. Install 2-inch air and vacuum assembly 1 EA At $,J�A0_a $ I 00 10. Relocation of sewer laterals 6 EA atrs Wl� $ � $-a Z'ao 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 7 ` Tit S'" 441A`S' $30190 $ 3, n00 12. Traffic control 1 LS $ 000 $ q OOo 13. Sheeting, shoring, and/or bracing 1 LS pVX - $_ of 6 apt 14. Additional potholing 20 EA -E $ 00 $_ 0 15. Demobilization and Cleanup 1 LS .� $ 3000 $ 3 16. Install new 1-inch Tn�uts polyethylene water service, f connect to existing %-inch meter 5 EA ®�� �^ � $ 1430 0 $ip TO O 17. Install new 2-inch copper 6J4 water service, connect to existing 1 1/2-inch meter 1 EA .S j �n!S $ $ �� _G? 0 Sub -Total Amount for All Bid Items - SCHEDULE D $ i q-7 C 60 C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit ' Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 and 200 PVC pipeline in Utica Avenue 590 LF K4 SaAle., 2,7! ` $ `6 3. Construct fire hydrant 2 EA I PrJ7 _Wp D$ O D D assembly 4. Remove and salvage existing fire hydrant 2 EA (E:.�-} j` $ �p® $ t/ �O0 5. Remove existing valve box EA r— ,('8'�K � $� $�q00 and cover 6 6. Cut and cap/seal existing e%awr4aw ev �0 waterline 2 EA $ $ 7. Relocation of sewer lateral 6 EA Z® 0 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $'3O00 $ � 0 �0® 9. Traffic control 1 LS ��- Had $ 000 00 -T----- 10. Sheeting, shoring, and/or•U bracing 1 LS i; 11. Additional potholing 20 EA ��}�(':+.W $ 00 $ 1 tpl t0® 12. Demobilization and " (-c t,� 6 .ADO Cleanup 1 LS v $_ $ 13. Install new 1-inch TT40"SALX polyethylene water service, 3/-inch connect to existing 9i n meter 7 EA $t-300 $ 14. Install new 1-inch polyethylene water service, connect to existing 1-inch �3�0 $ 1300 meter 1 EA $ 15. Install new 2-inch copper QN fG'i">1�0u�a water service, connect to EA S*- X-VO'Fp'. $ k 402 - $Ab existing 2-inch meter 3 16. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA S! k Tr""''�� $ UO $ k � 0 Sub -Total Amount for All Bid Items — SCHEDULE E $— IVY, Li-sa C-a PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS �,_ $ ��°° $ Z� 2. Install 6-inch, 8-inch and -fw10- kL,„A-"S 12-inch Class 150 and 200 S2V SQ-10-RA PVC pipeline in Beach 1 t �-�+ p®O Boulevard 1300 LF 3. Construct 12-inch D.I. inverted 31 $ ` $ siphon assembly LF ` 4. Install 12-inch Class 150 PVC watermain in Beach Boulevard at Yorktown _ WrA.- ,� Avenue 24 LF $ $ )�0� 5. Construct 12-inch D.I. 49 siphon assembly LF 6. Construct waterlinev�`�45'q(N connection in Beach Boulevard 1 LSD �p 7. Remove and salvage hydrant 2 EA existing fire 8. Construct fire hydrant 2 EA ,r- ub $ $ ��►BO assembly l�U 9. Remove existing valve box =F6co"IQ $ LtC® $ -Z I ()dO and cover 5 EA 10. Cut and cap/seal existing IFI &4+T- too $ ��gj0b waterline 6 EA $ 11. Remove and dispose of existing valve and interfering piping 1 EA 12. Flushing, Pressure Testing, ODD $_�p0t� Disinfection, Dechlorination 1 LS -+�.y�j�,�,,k},� $ _ 13. Traffic control 1 LS- 14. Water Pollutant Control Program 1 LS 15. Sheeting, shoring, and/or bracing 1 LS ^T --p}{jU_S f b.-l4P $ �C �® $_� - 00 - 16. Additional potholing 30 EA �� $ n0 $ Z 17. Demobilization and L V' Cleanup 1 G0.% (� $ ���� $ SJ�Oo LS C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve V �''t ©® assembly 2 EAin -, LA 2GID $00 $ 19. Install 4-inch pump-out i�'� assembly 1 EA $ 3 Ze t� $ 20. Install 2-inch air and EA j�►•16t�F5�i1� ' "' $ vacuum assembly 2 21. Install new 1-inch C*��-Frtugsffl P polyethylene water service, connect to existing 1-inchtfl I'�l✓OR� `I` 2 EA $ (300 $_ meter 22. Install new 2-inch copper C40C-T'�U'%&TIJ water service, connect to existing 2-inch meter 4 EA �( ' `'�" $ 1 f Do $ t o o 23. Replace Existing Trafficj 57100 y -1 ®Oj Control Loop 8 EA R $ $ Sub -Total Amount for All Bid Items — SCHEDULE F $_S�i C-10 PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS L $ ©n0 $ 000 2. Cut and cap/seal existing 4 b}0 31 waterline EA $ $ 3. Remove existing valve box 4 Q and cover EA — $= 4. Construct fire hydrant i U S U0 ZD 0 assembly 1 EA $ $- 5. Remove and salvage fire hydrant 01D C0 existing 1 EA $ $ 6. Traffic control 1 LS $0(90 $ ► f 94� 7. Water Pollutant Control 71667f Program 1 LS $ Z 08® $ �, Q00 8. Sheeting, shoring, and/or bracing 1 LS kj6 $ ZL®o® $ �► Q 9. Additional potholing 10 EA $ Opp 10. Demobilization and Cleanup 1 LS i '%� ►-�� $ 0o0 $ 00 11. Install new 1-inch�-'"'[{}(rj polyethylene water service, to 1-inch connect existing ���� meter 2 EA 12. Install new 1-inch polyethylene water service, Qlc connect to existing 3/4-inch 1 EA rj $ L0t) $ `30® meter 13. Install new 2-inch copper fJi�E'T'�'EotlaN� water service, connect to Q- Q� 011 00 existing 2-inch meter 6 EA $ $ 14. Install new 2-inch copper water service, connect to 1 1/2-inch S✓xjZ_�V 80 boo existing meter 3 EA $ $__- Sub -Total Amount for All Bid Items - SCHEDULE G $_ C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS -a� �+ $ 3Z-�®e t? 2. Install 8-inch Class 150 PVC pipeline in Clay St � Avenue 565 LF joeu'S $ $ 3. Install 12-inch Class 350 -Fwo- kv-jxe D.I. pipeline in Clay Avenue S:eV-en- $Z�� d at Beach Boulevard 120 LF $� 4. Install 24-inch steel casing SAX,-}4IpQp in Clay Avenue across Beach Boulevard, with Z4 W-t— LF $ $ (�i receiving pit and jacking pit 96 5. Install 8-inch Class 150 -^�- PVC pipeline at the Beach Boulevard and Clay Avenue $ intersection 55 LF 1 6. Install 8-inch Class 200Uc�R--t-ttx�u. PVC pipeline in Coenson ` 7 Circle at Clay Avenue 17 LF $� 7. Remove and salvage existing fire hydrant 2 EA 't; 1� �/T 7"TG�IJmg:p $ $ lJ ba0 8. Construct fire hydrant EA $ �� assembly 3 9. Cut and cap/seal existing $ �� ? 0 waterline 4 EA®0 10. Remove existing valve box EA €3 Q and cover 5 11. Remove and dispose of SL- existing valve and interfering pipeline 1 EA p $�-�© $ 0 12. Relocation of sewer laterals 10 EA 1 $ $_ z L° 0 0 13. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS t Q-' --r� $�80 14_ Traffic control 1 LS 15. Sheeting, shoring, and/or Otrt.Q d to bracing 1 LS 16. Additional potholing 20 EA $ 00c) $ Do C 17. Demobilization and Cleanup 1 0 $ Zta 0 $ �� 0 LS C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve 1 ~ o -�(XJ(I $ i�" 50 `G 50 0 assembly EA , $ 19. Install 12-inch cut in valve 1 tie 00 assembly EA 20. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 8 EA 21. Install new 1-inch polyethylene water service, connect to existing 3/4-inch t3 (A) meter 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE H cc 1 3 C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS QAtjtr- t& trQP4 $ i�00 $ 8,6k 0 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF` -f'wv- kL1 S Vim' $ 2-9 rl+ t $ 3. Construct connection in Ellis Avenue �b� Qu•Sr�D ' �� 1 LS S% $ $ -�4 4. Remove and dispose of Iwo existing valve and interfering pipeline 1 EA Z pEiQ $ 1 Y 'Z tin $ J 5. Cut and cap/seal existing waterline 2 EA ,�4A 1 $ ® $ ki (000 6. Flushing, Pressure Testing, 1 LS Disinfection, Dechlorination $ .3QO0 $ 7. Traffic control 1 LS $ O C 8. Water Pollutant Control Program 1 LS Two $Z�}o $ 9. Sheeting, shoring, and/or bracing 1 LS $ Oda 10. Additional potholing 18 EA $b b $ 11. Replace Existing Traffic fU r'- Control Loop 4 EA 12. Demobilization and Cleanup 1 LS Q213r $ 3t nCD Sub -Total Amount for All Bid Items - SCHEDULE I $ 2-t 0 C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons ` w $ 3S $ + Z t 0o0 2. Install AC 500 Tons 3. Unclassified Excavation 300 CY v $� $ IZ ®ab 4. Adjust Utility Cover 30 EA ` Vim. 4 $ 0 000 — 5. Adjust Water Cover 1 EA e $ n D $ -5flD 6. Adjust Sewer/Storm Drain Manholes 2 EA i Six�tls $ is 0t7 $ 7. Remove/Construct Concrete Sidewalk 160 SF p $_ 8. Remove/Construct Concrete V-Ditch 2400 SF 9. Remove/Construct Concrete Drive Approach including adjacent gutter 500 SF V $ •'� $ p0® 10. Remove/Construct Concrete Curb and Gutter 50 LF h JJ Fi u®�t'j $ 0 ' $ 1 StiC) Sub -Total Amount for All Bid Items — SCHEDULE J $ Zq3 Co . ✓ C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules A-J) TOTAL BID AMOUNT IN WORDS: Ll -2-Lf �Lt7—.1 g00I ___S0-3 2Ir4 bQQ '2A 3 Lt®0 cc, Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion of Work Name and Address of Subcontractor State License Number Class SG� A\Iq, s� �{ �0� Si�� ct. Coins`irrtie�� � 31- C nccy ta_ , JT' d Z"1 `� � St-k�►��k� tj Co"^.pn, ---t,A. ri5z3�e A By submission of this proposal, the Bidder certifies: That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange John C. Schiller , being first duly sworn, deposes and says that he or she is President & Gen. Mgr. of Steve Bubalo Construction 'party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation, that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Steve Bubalo Construction Co. Name of Bidder Si ature of Bidder John C. Schiller President and General Manager Address of Bidder Subscribed and sworn to before me this 21 s t day of June , 2007. RMMARY NOV 6''MV NORMY r,_fw County e ecNOTARY PUBLIC NOTARY SEAL C-18 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach; Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach, Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: June 21, 2007 Steve Bubalo Construction rn_ Contractor y ohn C— Schiller Pre I ent and General Manager Title C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes X3 No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. Date: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. June 21, 2007 C-21 Steve Bubalo Construction Ca - Contractor I C. Schiller President and General Manager Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-8004224133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor I1 Title Date: Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Steve Bubalo Construction Co. Bidder Name 128 E. Live Oak Avenue (P.O. Box 1048) Business Address Monrovia, CA 91016 (91017) City, State Zip ( 626) 574-7570 Telephone Number 296169 A StategContractor's License No. and Class 6 '7 -z, Original Date Issued September 30, 2008 Expiration Date The work site was inspected by-, 0-k ssek , of our office on 12007. The following are persons, firms, and corporations having a principal interest in this proposal: John C. Schiller - President_ and General Manager Nick Bubalo - Vice President Louise Bubalo - Secretary/Treasurer C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Steve Bubalo Construction Co. Company Name Signa of Bidden n C. Schiller - President and Genazal Manager Printed or Typed Signature Subscribed and sworn to before me this 21stlay of .Tune , 2007. 10 ►a Vic r NOTARY PUBLIC Listed below are the names, address and to phone numbers for three the bidder has performed similar work within the past two years: 1. 2. 3. Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Name and Address of Pub i Agency Name and Telephone No. f�Prqject M ag Contract Amount of Work Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work _ Co 1673116 - Colilorrda COS Mgeles I My Comm. Expires Jul . NOTARY SEAL blic agencies for which 9008WWV 110MLJENOVIC COMMIsSIM #F 1613116 Noloby hOo - CCWWft courity IN5%V/ bM Camm. EM*n JAW 4.101 leted Date Completed Date Completed C-24 i cpa„ 170W. JOBS IN PROGRESS (As of May 2007) 06-3 FLAMINGO ROAD RECONSTRUCTION PROJECT City of Laguna Beach 505 Forest Avenue P, d, Tax 1048 ?&4* zq,a., &4 91017 (626) 574-7570 lax (626) 574'7642 Page 1 Laguna Beach, CA 92651 Contact: Mr. Craig Greenman (The Moote Group) Telephone No. (714) 875-5756 Contract Amount: $12,000,000.00 Description: Removal and recompaction of approximately 600,000 cubic yards of landslide material from Bluebird Canyon. Reconstruction of Flamingo Road. Installation of storm drains, sewers, and water lines. Placement of approximately 55,000 cubic yards of soil cement. Date Completed: Final Contract Amount: A0. Vax 1049 7ifon�auca, e,4 991017 (626) 574-7570 (626) 574- 7642 JOBS IN PROGRESS (As of May 2007) Page 2 06-7 District 21 Interceptor Sewer, Sections 1, 2 & 3 Rehabilitation .City of Industry Los Angeles County Sanitation District P.O. Box 4998 Whittier, CA 90604-4998 Contact: Ms. Jenny M. Hsu, P.E. Telephone No.: (626) 962-8605, ext. 6214 Contract Amount: $1,079,079.00 Description: Rehabilitation of County sewers Including concrete encasements of 42, 48, and 51-inch concrete sewers, demolition and replace- ment of manhole shafts at six locations, rehabilitation of 9 manholes with fiberglass lining, and sliplining approximately 200 feet of 54-inch RCP with 48-inch fiberglass liner pipe. Date Completed: Final Contract Amount: Steve Bubalo Construction Co. 2006 - Completed Projects 06-5 STARLIT STORM DRAIN Citv of Laauna Beach 505�Forest �Avenue Laguna Beach, CA 92651 Contact: Mr. Steve May - City Engineer Telephone: (949) 497-0351 Description: Installation of approximately 360 feet of 42-inch H.D.P.E. storm drain through residential backyards. Construction of concrete structures. Abandonment of existing 30-inch storm drain. Date Completed: February 2007 Final Contract Amount: $164,415.00 Steve Bubalo Construction Cc 2005 - Completed Projects 05-14 ATLANTIC WAY STORM DRAIN City of Laguna Beach 505 Forest Avenue Laguna Beach, CA 92651 Contact: Mr. Derek Wieske (949) 497-0792 Contract Amount: T & M Work - $560,000 to $630,000 Description: Emergency repair of eroded slope. Installation of 12" HDPE storm drain, 8" sub -drain, grouted rip rap, and concrete catch basins and dissipator structure. Date Completed: February 15, 2006 Final Contract Amount: $560,000.00 05-15 JOINT OUTFALL "B" UNIT 1D TRUNK SEWER SECTION 2 PROTECTION Contract #4169 County Sanitation Districts of L.A. County P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. James Kahle (626) 962-8605 Contract Amount: $750,000.00. Description: Emergency stabilization and protection of exposed sewer line in flood channel including installation of imported backfill, filter fabric, and rip rap. Date Completed: December 2005 Final Contract Amount: $990,555.00 Steve Bubalo Construction Co. 2005 - Completed Projects 05-13 PROJECT MAGNOLIA TRUNK SEWER & 5-25 SEWER LIFT MODIFICATION Project No. WD-2712 Long Beach Water Department 1800 E. Wardlow Road Long Beach, CA 90807-4994 Contact: Mr. Isaac Pai, Director of Engineering (562) 570-2336 Contract Amount: $1,525,440.00 Description: Installation of new trunk sewer main consisting of 818 if of 21" VCP, 401 of 8" VCP, pre -cast manholes and utility relocations. Rehabilitation of existing sewer lift station. Date Completed: November 2006 Final Contract Amount: $1,617,478.00 q'I`P�TP R,. :1--a-)I r. C.onstructi.�iii Co. 2005 - Completed Projects 05-9 BLUEBIRD CANYON WINTERIZATION SLIDE REPAIR City of Laguna Beach 505 Forest Avenue Laguna Beach, CA 92651 Contact: Mr. Craig Greenman (Moote Group) (714) 875-5756 Contract Amount: $3,000,000.00 Description: Emergency winterization of landslide area. Excavation, backfill, and compaction for retaining walls. Installation of 72" RCP storm drain and 16" water main. Date Completed: September 2006 Final Contract Amount: $6,083,356.00 05-12 MALIBU BRANCH FEEDER REPAIRS PHASE II County of Los Angeles Dept. of Public Works P.O. Box 1460 Alhambra, CA 91802-1460 Contact: Mr. Harry Cong (626) 458-3157 Contract Amount: $1,321,680.00 Description: Removal and replacement of various air and vacuum release valves, fire hydrants, underground vaults, vault ventilation covers & water main shutoff valves and other appurtenant work to upgrade County's existing water main system. Date Completed: September 2006 Final Contract Amount: Change Orders Pending Steve Bubalo Construction Co. 2004 - Completed Projects 04-7 LONG BEACH MAIN PUMPING PLANT SURGE TANK Contract #4084 Co. Sanitation Districts of L.A. Co. P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. Walter Ackerman (310) 830-8050, Ext. 5817 Contract Amount: $949,250.00 Description: Furnishing materials, equipment and labor to install reinforced concrete foundation, steel surge tank (pressure vessel), piping, valves, mechanical and electrical components, and appurtenances at the County's Long Beach Main Pumping Plant located at 1238 West 16th Street, Long Beach, CA 90813. Date Completed: November 2006 Final Contract Amount: Change Orders Pending 04-9 2004/2005 SEWER RECONSTRUCTION PROJECT-25 LOCATIONS City of Laguna Beach 505 Forest Avenue Laguna Beach, CA 92651 Contact: Mr. Fred Shahidi (949) 497-0345 Contract Amount: $3,311,910.00 Description: Furnishing labor, equipment and materials to construct sanitary sewer improvements at 25 locations within the City of Laguna Beach. Work includes the removal and replacement of existing gravity sewers, force mains and concrete manholes. Date Completed: May 2006 Final Contract Amount: $3,516,804.00 Steve Bubalo Construction Co. 2004 - Completed Projects (Continued) 04-4 COLDEN AVENUE RELIEF TRUNK SEWER Contract #4013 County Sanitation Districts of Los Angeles County P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. Richard Koskola (310) 830-8050 Contract Amount: $5,036,000.00 Description: Installation of approximately 15,000 LF of 18" VCP and appurtenant sewer manhole structures by open cut method. Also includes the jacking of 72" diameter steel casing and the installation of VCP within casing. Date Completed: August 2005 Final Contract Amount: Change Orders and Retention Pending 04-5 L.A./GLENDALE WATER RECLAMATION PLANT (LAG) NdeN Chemical Addition System CIP Project No. 4145 Contract/W.O. #SZL11143 City of Los Angeles Department of Public Works Bureau of Engineering 650 So. Spring St., Ste. 200 Los Angeles, CA 90014-1911 Contact: Mr. Sinh Pham (310) 648-6130 Contract Amount: $1,985,000.00 Description: Performing work under the Wastewater Treatment Plant Emergency Contractor List Program for the City of Los Angeles, the construction of the Nitrogen Removal Conversion Phase I Project at the L.A.-Glendale Water Reclamation Plant. Work includes the installation of cavity pumps, flow meters and appurtenances. Date Completed: January 2006 Final Contract Amount: Change Orders and Retention Pending Steve Bubalo Construction Co. 2004 - Completed Projects (Continued) 04-2 BASELINE FEEDER EXTENSION SOUTH PIPELINE Spec. No. 03-8 San Bernardino Valley Municipal Water District P.O. Box 5906 San Bernardino, CA 92412-5906 Contact: Mr. Robert M. Tincher, P.E. (909) 387-9200, Contract Amount: $21,550,000.00 Description: Installation of approximately 24,142 LF of 78" CML & C Steel water line by open cut and tunnel installation (1,600 LF) methods and the installation of appurtenant structures and valves. Date Completed: September, 2005 Final Contract Amount: Change Orders and Retention Pending 04-3 ERS-ECIS - COMPACTION GROUTING Emergency Repair Services and urgent Necessity Project North Outfall Sewer - East Central Interceptor Sewer Contract/W.O. #SZC11388 City of Los Angeles, Dept. of Public Works Bureau of Engineering 650 So. Spring St., Ste. 200 Los Angeles, CA 90014-1911 Contact: Mr. Marte San Diego (323) 266-7504 Contract Amount: $2,500,000.00 (not to exceed) Description: Performing work at the direction of the City of L.A. under the Emergency Repair Services and Urgent Necessity Projects Program, providing all necessary manpower, equipment and material to perform compaction grouting along the North Outfall Sewer - East Central Interceptor Sewer alignment. All compaction grouting work performed by subcontractor, Hayward Baker, Inc. Date Completed: February 2005 Final Contract Amount: $2,424,000.00 Steve Bubalo Construction Co. 2003 Completed Projects (Continued) 03-5 HERMOSA AVENUE STORM DRAIN AND STREET FROM 280' NORTH OF BASELINE ROAD T CHANNEL PHASE III Contract No. 03-082 The City of Rancho Cucamonga P:O. Box 807 Rancho Cucamonga, CA 91729-0807 Contact: Cindy Hackett, Associate (909) 477-2740, ext. 4066 Contract Amount: $3,522,410.00 IMPROVEMENTS O ALTA LOMA Engineer Description: Installation of storm drain, including 4,200 ft. of 8' X 8' reinforced concrete box, concrete structures, and street widening. Date Completed: July 2004 Final Contract Amount: $3,895,704.51 03-7 PUENTE HILLS LANDFILL FACILITIES SEWER & POWER DELIVERY LINES DUCT BANK Contract #4001 County Sanitation Districts of Los Angeles Co. P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. Ted Brodeur (626) 962-8605 Contract Amount: $1,386,557.00 Description: Installation of approximately 2,200 of 15" VCP, appurtenant sewer manhole structures, 4,100 LF of electrical conduit duct bank, and appurtenant concrete vaults by open cut method. includes the jacking of 45" diameter steel casing under railroad tracks and the installation of VCP conduits within the casing. Date Completed: July 2004 Final Contract Amount: $1,425,782.85 LF Also and Steve Bubalo Construction Co. 2003 - Completed Projects 03-1 JOINT OUTFALL "H" UNITS 1B AND 1C TRUNK SEWER REHABILITATION BETWEEN MANHOLES H46 AND H53 Contract #3968 County Sanitation Districts of L.A. County P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. Lenny Blackman (310) 830-8050 Contract Amount: $2,601,340.00 Description: Rehabilitation of existing sewer. Approximately 1,729 if of 72" Hobas HDPE in 78" RCP, 1,334 if of 54" Hobas HDPE in 60" RCP, 469 if of 33" Hobas HDPE in 39" RCP. Date Completed: May 2004 Final Contract Amount: $2,645,986.91 03-4 BULLIS ROAD REPLACEMENT TRUNK SEWER SECTION 1 Contract No. 3973 County Sanitation Districts of L.A. County P.O. Box 4998 Whittier, CA 90607-4998 Contact: Mr. Jon Ganz (310) 830-8050 Contract Amount: $1,788,224.00 Description: Installation of new sewer consisting of approximately 3,134 if of 36" VCP, 196 if of 48" RCP and relocation and installation of 1,450 if of 4" and 8" CIP waterline and appurtenant structures. Date Completed: March 2004 Final Contract Amount: $1,956,166.72 Steve Bubalo Construction Co. 2002 - Completed Projects (Continued) 02-1 BAKER PARKWAY STORM DRAINS Contract #GCD-0305 Industry Urban Development Agency, Project 0305 C/O CNC Engineering 255 N. Hacienda Boulevard, Suite 222 City of Industry, CA 91744 (626) 333-0336 Contact: Mr. Gerry Perez Contract Amount: $3,167,880.00 Description: Installation of storm drain including 7,800 Ft. of 18"-78" diameter R.C.P. and 2,400 ft. of reinforced concrete double box, 5.5' X 6.75'. Also includes concrete structures and roadway excavation. Date Completed: August 2003 Final Contract Amount: $3,688,401.80 02-3 DISTRICT 32 MAIN RELIEF TRUNK SEWER Contract #3926 County Sanitation Districts of Los Angeles County P.O. Box 4998 Whittier, CA 90607-4998 (562) 699-7411 Contact: Mr. Anthony Mahinda @ (626) 962-8,605 Contract Amount: $500,980.00 Description: Installation of approximately 300 if of 36" VCP sewer and approximately 1,500 if of grooved 14" ductile iron sewer force main. Construction of 96" diameter pump plant wet well including installation of two (2) 40 hp submersible non -clog pumps and associated electrical appurtenances. Date Completed: April 2003 Final Contract Amount: $512,628.99 02-4 CALLEGUAS CONDUIT NORTH BRANCH BLOW -OFF REPLACEMENT Specifications No. 453 Calleguas Municipal Water District 2100 Olsen Road Thousand Oaks, CA 91360-6800 (805) 579-7173 Contact: Ms. Kristine McCaffrey Contract Amount: $1,166,950.00 Description: Demolition of existing blow -off piping from - eight (8) locations along the Calleguas Conduit North Branch and Replacement with new piping. Pipe size ranges from 8" to 12". Work has strict District -imposed timelines during mainline shutdowns. Dated Completed: April 2003 Final Contract Amount: $630,938.08 Steve Bubalo Construction Co. 2001 - Completed Projects (Continued) 01-4 JOSEPH JENSEN FILTRATION PLANT, SERVICE CENTER DEMOLITION AND RECLAIMED WASHWATER LINE INSTALLATION Contract No.'1539, Specifications No. 1350 Metropolitan Water District of Southern California P.O. Box 54153 Los Angeles, CA 90054-0153 (909) 392-5060 Contact: Mr. Houman Emami Contract Amount: $2,030,000.00 Description: Installation of approximately 1,100 feet of welded steel reclaimed water line, 30" to 66" in diameter. Demolition and disposal of existing Service Center Bldg. Removal of underground fuel storage tanks. Date Completed: October 2002 Final Contract Amount: $2,034,125.00 2002 - Completed Projects 02-2 BENEDICT :CANYON DRIVE RELIEF SEWER W.O. SZC11218 City of Los Angeles Department of .Public Works 650 So. Spring Street, 1#200 Los Angeles, CA 90014-1911 (213 ) 473-8622 Contact: Mr. Dave Martin, P.E. Contract Amount: $362,610.00 Description: Emergency removal and replacement of existing sewer system. Approximately 1,150 feet of new 15-inch VCP Sewer was installed. Date Completed: November 2002 Final Contract Amount: $383,502.87 Steve Bubalo Construction Co. 2001 - Completed Projects 01-1 AVERILL AVENUE EMERGENCY STORM DRAIN REPAIR C.T ^ _ �...T :... v 5- City of Los Angeles Department of Public Works 650 South Spring Street, Suite 200 Los Angeles, California 90014-1911 (213) 580-1394 Contact: Mr. L. Carovski Contract Amount: $65,200.00 Description: Emergency replacement of 36 ft. of 1811 storm drain. Remove and replace one catch basin. Date Completed: April, 2001 Final Contract Amount: $65,200.00 01-2 RIO HONDO PUMP STATION POTABLE BACKUP PROJECT Contract No. C-1098 Central Basin Municipal Water District 17140 S. Avalon Boulevard, Suite 210 Carson, CA 90746-1296 (310) 217-2222 Contact: Ray Pang @ (310) 660-6232 Contract Amount: $264,220.00 Description: Construct 680 feet of 16-inch diameter steel pipe for potable water bypass system. Install gate vales, blow -off assemblies, magnetic flow meter, and air -vacs. Date Completed: 8/20:01 Final Contract Amount: $265,624.78 01-3 TEMPLE AVENUE DRAIN., SUNKIST AVENUE DRAIN AND AMAR ROAD AND DRAIN - La Puente, CA Contract No. FCC0000757 County of Los Angeles Department of Public Works P.O. Box 1460 Alhambra, CA 91802-1460 (626) 458-5100 Contact: Mr. Jaime Engler @ (626) 458-4955 Contract Amount: $2,979,000.00 Description: Construct new storm drain system, approximately 14,500 feet of R.C.P., 18" to 66" diameter. Various street improvements and reconstruction. Date Completed: April, 2002 Final Contract Amount: $3,248,044.00 BID BOND Travelers Casualty and Surety Company of America One Tower Square 3PB, Hartford, CT 06183 Bond No. N/A KNOW ALL MEN BY THESE PRESENTS, That we, Steve Bubalo Construction Co., Inc., as Principal, hereinafter called the Principal, and Travelers Casualty and Surety Company of America, of One Tower Square 3PB, Hartford, CT 06183, a corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held and firmly bound unto City of Huntington Beach, as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of Total Bid Amount Dollars ($10% of Bid), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Project No. 1238 - Watermian Replacement Proiects at various location. NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 15th day of June, 2007. Witness By: Witness Steve Bubalo Construction Co., Inc. (Seal) Jon C.--Schiller - President and General Manager Pri ipal Travelers Casualty and Surety Company of America \� (Sea!) J a M. White, Attorney -in -Fact Printed in cooperation with the American Institute of Architects (AIA) by Travelers Casualty and Surety Company of America. The language in this document conforms exactly to the language used in AIA Document A310, February 1970 edition. 5-1869-G (08-99) ACKNOWLEDGEMENT State of California County of Orange On Jime 15 h. 2007 before me, Z. Hinton, Notary Public (here insert name and title of the officer) personally appeared PatriciaM.White----------------------------------------- personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledge to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument Z. HINTON Commission # 1729969 WITNESS my hand and official se I, ,-r: Notary Public - California Orange County Signature�& �' AAar9.2011 qP (Seal) OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE S-4067/GE 1/06 FRP WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER " TRAVELERS POWER OF ATTORNEY Farmington Casualty Company St. Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company Seaboard Surety Company Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company Attorney -In Fact No. 218523 Certificate No. O O 1 5 8 3 H 3 H KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint John Forest Monroe, William R. Curtis, Eugene T. Zondlo, Patricia M. White, and Edith Garibay of the City of Irvine , State of California , their true and lawful Attome s -m-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. 20th IN WITNE,S WHEREOF, the Comp%ed�ave caused this instrument -to be signed and their, corporate seals to be hereto affixed, this day of AA GZUUUU Farmington Casualty Company St. Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance 'Underwriters, Inc. Travelers Casualty and Surety Company Seaboard Surety Company Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company Lf.5L�1�� � Jtutriy J Ft RE 5 y�"4'y \*N INyG •p� �N SUg9µz Jp� r a,yoS tt°��r� ��Y'1,y0 3 G1 �.t0 RAIFi ? 4 4C RP ONgt.._ IW:F:, �—\ t89G i 1977 1927 s �E z; --- , NARTFORD.ilanxrl �n: ice• a 1951 sq # a i o. �aSE AL,�o: �'.�a .SEAL..D : � CONK. cotua 2 _ r State of Connecticut City of Hartford ss. By: Georg Thompson, enior ice President 20th April 2007 On this the day of before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. p,Tl7 In Witness Whereof, I hereunto set my hand and official seal. Tai My Commission expires the 30th day of June, 2011. Ar `A an;.ti C . �_A�� Marie C. Tetreau It, Notary Public 58440-8-06 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shalt be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duty attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company4TAmericj;. nd United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attomey executed by sa`id'Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of satdT ukri-nies this _1 5iLb day of .Time 20 QZ. Kori M. Johans Assistant Secretary ri�� t \^� 1 � Y'�.,, pytY Ary0 O((;D Y� •_•-., � ,{JP;.�-, ��<r 0_SEALA' � SEAI.of <®fYl�AtN ..,ate. To verify the authenticity of this Power of Attorney, tali 1-800-421-3880 or contact us at www.stpauItravelersbond.com_ Please refer to the Attorney -In -Fact number, the above -named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California ss. County of Los Angeles On June 21, 2007 Date beforeme, Rosemary Tomljenovic — Notary Public Name and Title of Officer (e.g., "Jane Doe, Notary Public") personally appeared John C. Schiller tOIY�„r�lv'VIC # 1673116 IRtlC - c4ambaft E toaAroma CCU* if *COWL &PYft Jul 4. ?Ai Name(s) of Signers) XX personally known to me ❑ proved to me on the basis of satisfactory evidence to be the persono r whose nameV(2Dre subscribed to the within instrument and acknowledged to me th y he/they executed the same in is er/their authorized capacity(jasT, and that by Cht, er/their signaturepron the instrument the personj8), or the entity upon behalf of which the personw acted, executed the instrument. my hand and of OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: John C. Schiller , _ ❑ Individual Top um of thb here XX Corporate Officer — Title(s): President and General Manager ❑ Partner — ❑ Limited ❑ General ❑ Attorney -in -Fact ❑ Trustee ❑I Guardian or Conservator El Other: Signer Is Representing: Steve Bubalo Construction Co. © 1999 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402 • www.nationalnotary org Prod. No. 5907 Reorder: Call Toll -Free 1-800-876-6827 City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 BRH-Garver West, Inc 6910 Mission Gorge Rd San Diego, CA 92120 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand (Telephone: 714-536-5227 ) BRH-Garver West, Inc. 6910 Mission Gorge Road San Diego, CA 92120 2007 RN', 21 PN 1: 50 CITY OF HUTINGTON BEACH Rid Onening For SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No.1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The 1't Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 7 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. a Accompanying this proposal of bid, findI�LD in the amount of $ a which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda 1V Date Received Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS�T�` `" D— $ �a0 � $ S bon °b UJ dU ^---f- 2. Install 8-inch Class 200 PVC pipeline in the Alley between kku-e -13 Geneva Avenue and T — — ���T UJ Frankfort Avenue 765 LF $A $ I 1So•0° 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF 1, 4. Provide temporary water service 1 LS ___ _- $ ►� uoJ .�' $ tS,�u= 5. Construct waterline — connection in Hill Street 1 LS -- u� 1, �� --- $ 1 v�ULO--"' $ 10 6. Construct fire hydrant assembly 1 EAR 7. Cut and cap/seal existing waterline 3 EA —' u`'/svP — $ 1,Daw $ 3,�0<�•°� 8. Remove and dispose of existing valve 2 EA — u��,.�— $ �o�, "" $ ocx�• °` 9. Relocation of sewer laterals 15 EA-�`.�r� �'""'o`- $ 7 `� $ -.,'•' tlV a 10. Flushing, Pressure Testing, -TIA64=' ,_0 Disinfection, Dechlorination 1 LS uIS h $ $ 11. Traffic control 1 LS F'"` r- bo $ d-S, oap $ oo-* , z'tt-a a 5•aN o � aJ-- 12. Sheeting, shoring, and/or Tom"'' -rW"s°'"'" bracing 1 LS u 1) u $ 10 D $ (cam `" 13. Additional potholing 20 EA "'� P0"�_e $ So').' $ l 0 14. Demobilization and Cleanup 1 LS os $__°a 15. Install 4-inch cut in valve :r"Yc �' "°I A" assembly 1 EA 16. Install new 1-inch �pd -7.$�•°° polyethylene water service 5 EA �`'w "— $ 1 •"' $ C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch 4>tjle.-"°*-J"J" r) polyethylene water service, t- connect to existing 3/-inch i da meter 11 EA °" $ l500.°0 $ Ib SW . °o 18. Install new 1-inch b"T_ _kwulov-0 polyethylene water service, -- connect to existing 1-inch .--- �� ��� meter 7 EA u�r"'- $ l Scx3 • °' $ p 5 0�. °� 19. Install 4-inch pump -out assembly 1 EA '"`�e'1..,.-a`•1-�'°�aL $�S�,o� $ 7.s°Q•6° 20. Replace Existing Traffic Control Loop 1 EA r e• $ Sub -Total Amount for All Bid Items — SCHEDULE A Ca PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS �`��£" -r-�\0 45*-As $ 5,0U0•6° $ 57004 • pe 2. Install 8-inch Class 150 PVC pipeline in Indianapolis Avenue at Beach Boulevard 110 LF $3a0.`" $ 33,0�0• °' 3. install 12-inch Class 350 DI i yf- O*.wwLf-�) pipeline in Indianapolis -��,e►,.}y -- o �a,� Avenue at Beach Boulevard. 172 LF $ 2s3."' $ as q 40,'` 4. Install 12-inch Class 200�� }��,n�► PVC pipeline in Indianapolis Avenue at %W Beach Boulevard 45 LF $5W "' $a�.�cro•'' 5. Install 24-inch steel casing t-\j- M0 in Indianapolis Avenue at°au-- Beach Boulevard, with receiving pit, and jacking pit 164 LF $�00 $ l'��"L0°•'" 6. Install 12-inch cut in valve -T15,4 ''Mo" t "►-o assembly 1 EA $ u1� $ to,00,3. sa 7. Flushing, Pressure Testing, n-r--''' Disinfection, Dechlorination 1 LS -- ��� °u---- $ ta60> 8. Traffic control 1 LS T�-r*+ssw.o OJ r°r $.° $ 00 9. Water Pollutant Control Program 1 LS 10. Sheeting, shoring, and/or bracing 1 LS $ k"tlu's" 11. Additional potholing 15 EA �`"'� $ • "' $ "1.5 00• ° 12. Demobilization and Cleanup 1 LS --uV,o"--' $ �'," $ `moo°�•�° 13. Replace Existing Traffic Control Loop 8 EA "—Od�iou �- $ I,ouJ•" $ 000, no Sub -Total Amount for All Bid Items - SCHEDULE B $ 3s% h40. 00 C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS '� F`i6`' - $ 5, 000. /you 2. Install 12-inch Class 150 Two Ho'-QW.&A PVC pipeline in Beach w --- Boulevard 500 LF $ OW 3. Install 8-inch Class 150 PVC pipeline in Beach Boulevard 25 LF -- ��t ov $ aa� $_sue 4. Flushing, Pressure Testing,iv� ••r+tJ�s Disinfection, Dechlorination 1 LS $50LU "' $ S,°V'• °' 5. Traffic control 1 LS"' o"�;; $1Q_ $ lo.ow• w 6. Water Pollutant Control Program 1 LS 7. Sheeting, shoring, and/or -TWA,*.- bracing 1 LS -- uo "„h,_ $ Sow• $ 5ioa� . o� 8. Additional potholing 20 EA �www%.' 9. Demobilization and T+OU$A -*, Cleanup 1 LS v;*34 $ Ste•" 10. Replace Existing Traffic Control Loop 4 EA $ ` 4u�• Sub -Total Amount for All Bid Items — SCHEDULE C $ l —7 1P- 5`• °a C-6 PROJECT BID SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS Fwc --74 sAI-9 $ 5Ja0 04 $ Too o, n• ua 2. Install 8-inch Class 150 O&,I. #4.,rjui PVC pipeline in Joliet at A0: Avenue 325 LF 3. Install 8-inch Class 150 and 200 PVC pipeline in Georgia Street at Joliet Avenue 115 LF $ i5or°' $ l*7't-So ` 4. Install 4-inch cut in valve assembly 2 EA $ Suoa.°, $ g000.w 5. Construct . fire hydrant assembly 1 EA $ (40w , 6. Remove and salvage -Y- -+-Was••-a existing fire hydrant 1 EA P--I '4 --Y.- $ z.4- 7. Remove existing valve box T';04%)$.% ° and cover 3 EA ,_ w f`,-_ $ t�u�•' $ °3'�a'.''_ 8. Cut and cap/seal existing ae-c . nvru%A o waterline 2 EA — w/1.0'r_ $ taw.w 9. Install 2-inch air and S-ems vacuum assembly 1 EA f=f �•-�^^ $ •'� $ "o °' 10. Relocation of sewer laterals 6 EA �`'� "`';, $ sou•°O $ SWJ0 • s' �,, _ 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS -- w , u $ to"oo01• $ IQ is e° 12. Traffic control 1 LS 13. Sheeting, shoring, and/or bracing 1 LS �-cw�«, -- $Saw°' $ S uoc•"` 14. Additional potholing 20 EA �`�'� �""``=' �.. $ SN• "' $ t01463• 15. Demobilization and Cleanup 1 LS $ suco.'" 16. Install new 1-inch o..� TNT-►s+�n polyethylene water service, F,.,c H►.A-*,.W connect to existing 3/<-inch --- "Ai meter 5 EA $ tSo�." $ -1�,5 °• 17. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA _ W `° $ S0� $ Sub -Total Amount for All Bid Items — SCHEDULE D $ l G 7 5 La C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit 'Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS MVO -c%1 $ 2. Install 8-inch Class 150 and ot. kkwo4-F.0 200 PVC pipeline in Utica �� F" — °`� Avenue 590 LF $ t`��.°O $�• 3. Construct fire hydrant tA "'n assembly 2 EA tyIt-%____ $ 6,=." 4. Remove and salvage Tt►+SAW-h H,-"P� existing fire hydrant 2 EA 4 5. Remove existing valve box owc r{wusa.. n and cover 6 EA $tom" 6. Cut and cap/seal existing aw T�wJy►►I waterline 2 EA $ �rq�• ea 7. Relocation of sewer lateral 6 EA"'� �"""O1'E.' � $� • `" $_ 3• �' 8. Flushing, Pressure Testing, �... e-rds�►�� 5 0a Disinfection, Dechlorination 1 LS 9. Traffic control 1 LS Tom"' T•�''° 's' $ ��. "'�•" $fie' „r 10. Sheeting, shoring, and/or F..+�- �t •ut�-0 bracing 1 LS —uJ/���--- $ �•"' $ S_ 6"`� 11. Additional potholing 20 EA"'�- N+•-n`� �� $ �°� $ I i °" 12. Demobilization and, ��,,� -t{*�•�ss+•-n Cleanup 1 LS Ctu-.1• 13. Install new 1-inch -t ^'op polyethylene water service, ��.� ►-}a-0"n connect to existing %-inch meter 7 EA --i �� $ ua 14. Install new 1-inch-rk�o�-" polyethylene water service, �..� connect to existing 1-inch �l meter 1 EA 15. Install new 2-inch copper �•�c •-rkFo�t'r-� water service, connect to existing 2-inch meter 3 EA"�- $5•'° $ I �d? 6' 16. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA __-v /� 0 $ 5cw • °' $ Odd• oa Sub -Total Amount for All Bid Items — SCHEDULE E $ (S!E 450t3. ° U C-s PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS Teti -�kw.►x-n $ I � uw. 0 _ $_I 2. Install 6-inch, 8-inch and 12-inch Class 150 and 200 PVC pipeline in Beach —U co -- Boulevard 1300 LF $ate $9bo 3. Construct 12-inch D.I.� inverted siphon assembly 31 LF -- Witt,-- $ 5 o� $ 5 5w. �" 4. Install 12-inch Class 150 PVC watermain in Beach Boulevard Yorktown -' `''��+ a u- at Avenue 24 LF $ IZ ,ocaet. °0 5. Construct 12-inch D.I. siphon assembly 49 LF 6. Construct waterline i �t�-�-r�/ T4V.L"M6 connection in Beach Boulevard 1 LS "— ���"- $� � p $3`;0d0> 7. Remove and salvage existing fire hydrant 2 EA F�� t4�tr, $ 2Sw $ 5 4od. •4 8. Construct fire hydrant S }t-r.4kt�sa assembly 2 EA 9. Remove existing valve box and cover 5 EA �� , $ i.�u� $ 'S,cca." 10. Cut and cap/seal existing waterline 6 EA -- 06h 11. Remove and dispose of existing valve and interfering piping 1 EA $ ISQ - $ a�`'` • 01 12. Flushing, Pressure Testing, -«r '-j FkJJLA►-Q Disinfection, Dechlorination 1 LS 13. Traffic control 1 LS .w ,,,�.- $°0u° 14. Water Pollutant Control �•rc "ftSw�`� Program 1 LS — f, _ 15. Sheeting, shoring, and/or bracing 1 LS 16. Additional potholing 30 EA ��� �. $ Snr� $ 17. Demobilization and vC--V-�OUSAt-. Cleanup —JJ l'�'�U 1 LS C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve assembly 2 EA `-'"� $ !iw- $ sxvw� " 19. Install 4-inch pump -out assembly 1 EA ��"`" � ' $ 7,Sun.'� $ -7 Sga,Q. 20. Install 2-inch air and sC>/6'' vacuum assembly 2 EA`�`"�-9v,w- $Itim 21. Install new 1-inch or F__ -V+W so" polyethylene water service, 4 connect to existing 1-inch meter 2 EA -,, U� 22. Install new 2-inch copper water service, connect to _. U 01. av, 5 uoa, 2 0•� ct� w existing 2-inch meter 4 EA $ $ 23. Replace Existing Traffic -'t"A-A Control Loop 8 EA - 01,t4 _ $tom• w $ ��°�"• `� Sub -Total Amount for All Bid Items - SCHEDULE F $ 31 ��`�• °� C-io PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 'Tam '4� � $ iv_ °J , $ 2. Cut and cap/seal existing 01-C-Vkwu waterline 4 EA �� 3. Remove existing valve box and cover 4 EA 4. Construct fire hydrant assembly 1 EA 5. Remove and salvage 'r"' ° -r� ��►.-n existing -fire hydrant 1 EA $? 6. Traffic control 1 LS Tom''' °"'^`�,�, $ to aut" $ k o, ow--- 7. Water Pollutant Control Program 1 LS } $}Sw $ 8. Sheeting, shoring, and/or bracing 1 LS $ nu�,- 9. Additional potholing 10 EA _ $ sw $ ��►'- 10. Demobilization and Cleanup 1 LS�� 11. Install new 1-inch��c.^Ct��us.� polyethylene water service, connect to existing 1-inch meter 2 EA 12. Install new 1-inch �i�- "fktuul�•A polyethylene water service, connect to existing 3/4-inch meter 1 EA 13. Install new 2-inch copper .e''w-w-A water service, connect to 2-inch ._._emu UL�"" _ $�°""_ _$ 3�•`�''"'' existing meter 6 EA 14. Install new 2-inch copper �"iae-�H�w9�•'� water service, connect to existing 1 1/2-inch meter 3 EA Sub-Total Amount for All Bid Items — SCHEDULE G $__I o lo_,U w C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Clay Avenue 565 LF $ t�°• "� $ $,� 3. Install 12-inch Class 350 D.I. pipeline in Clay Avenue at Beach Boulevard 120 LF $ 3W . $ 3 % uUD " 4. Install 24-inch steel casing 654 %.W-T tk-+W^r� in Clay Avenue across Beach Boulevard, with receiving pit and jacking pit 96 LF $ �b l�y� 5. Install 8-inch Class 150 0..-ft%c-o PVC pipeline at the Beach Boulevard Clay Avenue and intersection 55 LF $ Zw $ 6. Install 8-inch Class 200 PVC pipeline in CoensonJ� Circle at Clay Avenue 17 LF 7. Remove and salvage F'"e' fA'".`4 $'2X"S existing fire hydrant 2 EA „/ 8. Construct fire hydrant S r-r- -t A+&PSOA assembly 3 EA $twow $ 1 $'.uw -- 9. Cut and cap/seal existing ow waterline 4 EA $ I8 $ d"`- 10. Remove existing valve box and cover 5 EA 6W 11. Remove and dispose of r-�,� T"hpJS�►-t% existing valve and. interfering pipeline 1 EA- $�� $ $°"�• `� 12. Relocation of sewer laterals 10 EA+�� 13. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS .--w/u.., $ $ Soc�u,• 14. Traffic control 1 LSD'-%,,,,�_i,•�'�- 15. Sheeting, shoring, and/or'�'t bracing 1 LS ""'��,,,, $ 2�,�'- $ Za, e. 16. Additional potholing 20 EA '�"/,,,. $ 17. Demobilization and -t-ft".00-0 Cleanup 1 LS —w /,,..,._—. $ _ C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve assembly 1 EA"'� -V*UAJ -O $15Uo"` $ 7, Sau 19. Install 12-inch cut in valve assembly 1 EA —'"z ic, $!? $ t • 20. Install new 1-inch 6O.R-T"'' polyethylene water service,"'c` connect to existing 1-inch meter 8 EA $1�w' 21. Install new 1-inch polyethylene water service,��- connect to existing 3/4-inch meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE H C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 1�7"`- nio-' $ a $ sOC 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF ow- 3. Construct connection in Ellis Avenue 1 LS '""` ��w---- $1�?uwr- $ u ,�-- 4. Remove and dispose of{�-��t existing valve and — interfering pipeline 1 EA 5. Cut and cap/seal existing o,,,F.. -rk+v Asa+•.-r+ waterline 2 EA --��,c,•-- $� ouc�"� $ 2�6�- "' 6. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 7. Traffic control 1 LS `"``'� $ E�+'- 8. Water Pollutant Control Program 1 LS $ •$°� - 9. Sheeting, shoring, and/or bracing 1 LS $ 1; $ Ac->Q10 " 10. Additional potholing 18 EA �`"� �'''"p'"`�� , _ $ $ 11. Replace Existing Traffic Control Loop 4 EA --wy' $ $ `'QW---- 12. Demobilization and Cleanup 1 LS .-w' $ Sow- $ Sub -Total Amount for All Bid Items — SCHEDULE 1 $ 1153,Sw C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons °'�°�— $ t $ 120, nw` 2. Install AC 500 Tons 3. Unclassified Excavation 300 Cy 4. Adjust Utility Cover 30 EA 5. Adjust Water Cover 1 EA 6. Adjust Sewer/Storm Drain 2 EA °"'� �"`"'`'�"`� ``XS $ l Qx— Manholes --- $ 7. Remove/Construct 160 SF Concrete Sidewalk 8. Remove/Construct 2400 SF Twe►-4-7 $ 0,00 Concrete V-Ditch llhav--- $ i 9. Remove/Construct 500 SF i=l FT"1 $ Concrete Drive Approach including adjacent gutter 10. Remove/Construct 50 LF ° 1''` `��`" U $ t �• �" Concrete Curb and Gutter $ `51 Sub -Total Amount for All Bid Items — SCHEDULE J C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A sa`h�c7• p8 Sub -Total Bid Schedule B Sub -Total Bid Schedule C -79 (2-6• "D Sub -Total Bid Schedule D ,. I57 Too, Sub -Total Bid Schedule E ,8 5� 8'614 00 Sub -Total Bid Schedule F �1' Sa l , u V0, Sub -Total Bid Schedule G 4\ I0L,; cw• Sub -Total Bid Schedule H 3 4-7, 0Sa, Sub -Total Bid Schedule I 1 - 3 7 oo. U' Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules A-J �-� b�l) a, b Sf� O b�, u" TOTAL BID AMOUNT IN WORDS: t=-,� Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion of Work Name.and Address of Subcontractor State.License Number Class V ot;* �iSSrciu tr..a Q�( 1 73Z� 4?21 u�/ cam' iSX 1S CoSi-p�eS.o► JJ4� ORLt t/,-G$ / ojeiAv /O d-© P44 r Nr1L 64, ?233 1"S % -1 By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. 74tyj Oran 2� e X4,r -e- , bei-n f st my sworn, depo es d says that he or she is '� -e� of v L-- Cl ��/ 1� ��� the parry making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or shaip bid. Nam of Bidde of Bidder n !1 Address of Bidder Subscribed and sworn to before me this d () day of , 2007. NOTARYPUB co 1091- 0101M NOTARY SEAL C-18 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements,, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: IYtle C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes VNo If the answer is.yes, explain the circumstances in. the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: U 60 0-� Title C-21 UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-422-4133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Title Date: " ou Q 1 di Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bid der der Name (00710 Business Address City, _ State Zip Telephone Number State Contractor's License No. and Class Original Date ued 9 1�I �7 Expiration Date The work site was inspected by-, of our office on C2 , 2007. The following are persons, firms, and corporations having a principal interest in this proposal: %Cmr-L ram _ ?r CS(�e...� C -1 (1-4 % 5 G l�fl,lclt f . C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and �pec�?catigns set forth. ame Si . aturk Biddf r Printed or Typed Signature Subscribed and swo re me day of . tAMA Comn*don i 1691280 Now Ktft - cGoomb kin 0*90 Coto*MyCOM. Expges Sep 27,201 NOTARY PUBL NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 1. S-e- c Pr 4- (ic A — 2. 3 Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed C-Z4 Project: San Jacinto Valley Interceptor Sewer Phase 1 Location: San Jacinto / Hemet, CA Owner: Eastern Municipal Water District Value: $ 13,728,148 Contact Name: Gabriel Necochea Phone #: (951) 928-3777 Project: Sewer Main Repl and Alley Resurfacing for Blocks 55,56, and 95 Location: Coronado, CA Owner: City of Coronado Value: $ 444,230 Contact Name: Ngyra Stebbins Phone #:(619) 522-7383 Project: Reach 16 Recycled Water Pipeline Location: Hemet, CA Owner: Eastern Municipal Water District Value: $ 5,973,017.00 Contact Name: Karl Roland Phone #: (951) 928-3777 ext 4442 28000 feet of 24" reclaimed water main Project: 36" & 42" Watermain Corrosion and Rehab Project Location: Huntington Beach, CA Owner: City of Huntington Beach Value: $ 2,987,500.00 Contact Name: David Verone Phone #: (714) 375-8471 Corrosion repair of 36" and 42" water mains cn BRH GARVERWEST BRH Garver West, Inc. 6910 "ission Gorge, Road, San Diego, CA 92120 www,brhgarverv✓est.com tic# 845819 A PH 619-265-0537 FX 619-265-8672 Project: CC1262-Watermain Replacement Location: Huntington Beach, CA Owner: City of Huntington Beach Value: $ 2,791,103.00 Contact Name: Duane Wentworth Phone #: (714) 536-5431 12000 feet of water main construction in Downtown Huntington Beach. Project: Murrieta Valley Trunk Sewer Phase 1 Location: Murrieta, CA Owner: Rancho California Water District Value: $ 8,796,346.00 Contact Name: Craig Mapes Phone #: (951) 296-6900 15000 feet of 42" sewer, 12 to 28 feet deep. Project: Construction of Linda Vista Drive Sewer Replacement Project Location: San Marcos, CA Owner: Vallecitos Water District Value: $ 619,575.00 Contact Name: James Gumpel Phone #:(760) 744-5989 4500 feet of 15" sewer Project: Construction of Margarita Road Recycled Water Pipeline Location: Temecula, CA Owner: Rancho California Water District Value: $ 485,000.00 Contact Name: Craig Mapes Phone #:(951) 296-6900 800 feet of 24" HDPE slipline Project: Construction of Pipeline Project 240 Location: El Cajon, CA Owner: Helix Water District Value: $ 547,375 Contact Name: Chris McCrae Phone #:(619) 667-6720 BRH on GARVERWEST BRH Garter West, Inc. 6910 Mission Gorge Road, San Diego, CA 92120 www.brhgarveewest.com Licw 845819 A PH 619-265-0537 FX 619-265-8672 ,r Project: Construction of Pipeline Project 237 Location: El Cajon, CA Owner: Helix Water District Value: $827,910.00 Contact Name: Darrell Williams Phone #:(619) 667-6280 Project: Block 171 Sewer Main Replacement and Repaving Project Location: Coronado, CA Owner: City of Coronado Value: $ 186,395.00 Contact Name: Ngyra Stebbins Phone #:(619) 522-7383 Project: Phase IV Sewer Rehabilitation Location: Lemon Grove, CA Owner: City of Lemon Grove Value: $ 519,468.00 Contact Name: Rafael Munoz Phone #:(619) 825-3810 Project: Water Replacement Group 536 & 538 Location: Downtown San Diego, CA Owner:City of San Diego Value: $ 2,286,795.00 Contact Name:Saeed Askari Phone #:(858) 627-3200 Project: Construction of Sewer and Water Group 545 Location: Downtown San Diego, CA Owner:City of San Diego Value: $2,496,990.00 Contact Name: Jason Guise Phone #:(858) 627-3200 CBRH GARVERWEST BRH Garver West: Inc, 6910 Mission Gorge Road, San Diego, C.A 92120 w,vwbrhgarverwest,corn Uc# 845819 A PH 619-265-0537 FX 619-265-8672 Project: Construction of Half Moon Bend Sewer Replacement Proj. Location: Coronado, CA Owner: City of Coronado Value: $ 293,752.00 Contact Name: Ngyra Stebbins Phone #:(619) 522-7383 Project: Construction of Sewer Group 704 Location: Downtown San Diego, CA Owner:City of San Diego Value: $2,286,942.00 Contact Name:Eddie Wibowo Phone #:(858) 627-3263 Project: Construction of Sewer Group 464C Location: Downtown San Diego, CA Owner:City of San Diego Value: $2,249,818.00 Contact Name:Robert Hannah Phone #:(858) 627-3265 Project: SEWER REHAB PHASE "B" Location: Various Locations, San Diego Owner:City of San Diego Value: $5,175,823.00 Contact Name:Coselyn Goodrich Phone #:(858) 627-3200 Project: Ocean Blvd. Sewer Main and Storm Drain Diverters Project Location: Coronado, CA Owner: City of Coronado Value: $ 1,118,248.00 Contact Name: Ngyra Stebbins Phone #:(619) 522-7383 BRH on GARVERWEST BRH Garver West, Inc. 6910 Mission Gorge Road, San D ego. CA 92120 w,vw,brhgarvenvest.corn Esc# 845819 A PH 619-265-0537 FX 619-265-8672 Project: Construction of Sewer Replacement Group 623B Location: Downtown San Diego, CA Owner:City of San Diego Value: $3,296,956.00 Contact Name:Dick Giron Phone #:(858) 573-5048 Project: East Linda Vista Trunk Sewer Phase 2 Location: Linda Vista Area Owner:City of San Diego Value: $2,249,818.00 Contact Name:Isidro DeAllende Phone #:(858) 573-5024 Project: Construction of Sewer Group 539 Location: Downtown San Diego, CA Owner:City of San Diego Value: $5,415,000.00 Contact Name:Joseph Diab Phone #:(858) 627-3252 Project: Construction of Sewer Group 652 Location: Kensington Area, San Diego, CA Owner:City of San Diego Value: $3,297,000.00 Contact Name:Henry Gimutao Phone #:(858) 627-3258 Project:As Needed: Minor Street Improvements - Contract 2 Location: Various locations, San Diego, CA (as needed Owner:City of San Diego Value: $1,800,000.00 Contact Name:Danny Schrotberger Phone #:(619) 533-3778 Project:Torrey Pines Rd. Trunk Sewer Location : La Jolla, CA BRH GARVERWEST BRH Gamer West, Inc. 6910 Mission Gorge, Road, San Diego, CA 92120 www.brhgarverwest.com Uc# 845819 A PH 619-265-0537 FX 619-265-8672 Owner:City of San Diego Value: $2,784,000.00 Contact Name:Joe Aroyo - RBKA Phone #:(858) 638-9518 Project: Sanitary Sewer Upgrade FY 00-01 Location: Coronado, CA Owner:City of Coronado Value: $397,000.00 Contact Name:Joe Bride Phone #:(619) 522-6571 Project: Marina Interceptor Sewer Location:Marina del Rey, CA Owner:City of Los Angeles Value: $5,780,000.00 Contact Name:John Hughey Phone #: Project: La Jolla -Pacific Beach Trunk Sewer - Manhole & Vault Location:La Jolla & Pacific Beach areas, San Diego, CA Owner:City of San Diego Value: $2,168,450.00 Contact Name:Ralph Adamos Phone #:(858) 627-3266 Project: Construction of Sewer Group Job 635 Location: Downtown San Diego, CA Owner:City of San Diego Value: $1,476,000.00 Contact Name:Joseph Diab Phone #:(858) 627-3272 Project:West Linda Vista Trunk Sewer Phase 2 Location:Linda Vista area, San Diego, CA Owner:City of San Diego Value: $1,146,000.00 Contact Name:Douglas Cook - SKE Phone #:(858) 654-4215 Project: Elsinore - Regional Reclamation Facilities (BRH Garver worked as sub to BRH on GARVERWEST BRH Ga ver West. Inc. 6910 Mission Gorge Road, San Dego, CA 92120 www.brhgarvewest.com Lic# 845819 A PH 619-265-0537 FX 619-265-8672 NDB) Location:Lake Elsinore, CA Owner:Elsinore Valley Municipal Water Dist. Value: $500,000.00 Contact Name:Joe Stengle (NDB General Contractor Phone #:(619) 291-6330 Project:Sewer Group Job 530 Location:Point Loma area, San Diego, CA Owner:City of San Diego Value: $759,000.00 Contact Name:Alejandro Ruiz Phone #:(858) 627-3298 Project: Construction of Sewer Group 641 Location: La Jolla,CA Owner:City of San Diego Value: $3,100,000.00 Contact Name:Saeed Askari Phone #:(619) 533-3147 Project:As Needed -Minor Street Improvement Project - Contract 1 Location: Various locations, San Diego, CA (as needed Owner:City of San Diego Value: $2,000,000.00 Contact Name:Danny Schrotberger Phone #:(619) 533-3778 Project:Sewer Main Replacement Group 607 Location: South/East San Diego, CA Owner:City of San Diego Value: $867,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 con BRH GARVERWEST BRH Garver West, Inc. 6910 Mission Gorge Road, San Diego, CA 92120 www.brhgarverwest.com Lic# 845819 A PH 619-265-0537 FX 619-265-8672 .. 0 Project: North Mission Valley Interceptor Sewer Phase 2 Location: Mission Valley area, San Diego, CA Owner:City of San Diego Value: $5,293,000.00 Contact Name:Ralph Adamos Phone #:(858) 627-3266 Project: Sewer Group 629 Location: South/East San Diego, CA Owner:City of San Diego Value: $1,500,000.00 Contact Name:Ralph Adamos Phone #:(858) 627-3266 Project: East Linda Vista Trunk Sewer Phase 1 Location:Linda Vista area, San Diego, CA Owner:City of San Diego Value: $2,400,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 Project: Sewer Group 507 Location:Golden Hills area, San Diego, CA Owner:City of San Diego Value: $1,500,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 Project: Miramar Pipeline Rehabilitation Location: Miramar area, San Diego, CA Owner:City of San Diego Value: $1,850,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 Project: Water Group 508 Location:Golden Hills area, San Diego, CA Completion Date:August 94 BRH on GARVERWEST BRH Garver West: Inc. 6910 Mission Gorge Road, San Diego, CA 92120 www.brhgarverwest.com Ucw 845819 A PH 619-265-0537 FX 619-265-8672 ,y F Owner:City of San Diego Value: $1,100,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 Project: North Mission Valley Interceptor Phase 1 Location: Mission Valley area, San Diego, CA Owner:City of San Diego Value: $11,000,000.00 Contact Name:Dave Zoumaras Phone #:(858) 627-3252 cBRH on GARVERWEST BRH Garver West, Inc. 6910 Mission Gorge Road, San Diego, CA 92120 www..brhgarnerwest.corn Lic# 845819 A PH 619-265-0537 FX 619-265-8672 ITT HA Bid Bond Surety Department Bond No.n/a KNOW ALL MEN BY THESE PRESENTS, That we, BRH-Garver West, Inc. as Principal, hereinafter called the Principal, and the Hartford Casualty Insurance Company , a corporation created and existing under the laws of the State of Indiana , whose principal office is in Hartford, Connecticut , as Surety, hereinafter called the Surety, are held and firmly bound unto City of Huntington Beach as Obligee, hereinafter called the Obligee, in the sum of ten percent (10%) of amount bid Dollars ( $ 10% A.B. ), for the payment of which sum, well and truly to be made, the said Principal and the said Surety.. bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Whereas, the Principal has submitted a bid for Construction of Watermain Replacement Project - Cash Contract 1238 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the biddings or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 21st day of June A.D. 20 07. Attest Michael Cole Witness Form S-32664 Printed in U.S.A. 12-70 Hartford Casualty Insurance Company By Sao -in -Fact (Title) Houstoun, Woodard, Eason, Gentle, Tomforde, and Anderson, Inc. dba Insurance Alliance 1776 Yorktown, Suite 200 Houston, Texas 77056-4114 —� TDI License #1381 FEIN #760362043 (SEAL) (SEAL) (SEAL) (SEAL) (SI-Al_) Direct Inquiries/Claims to: TOWER OF ATTORNEY HARTFORD D a FORD BOND, 690 A NUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 61-600074 & 46-505987 X� Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut X� Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana X� Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Donald E. Woodard, Jr., Harlan J. Berger, Andrew J. Janda, C. W. Adams, Sue Kohler. Leland L. Rauch, Sharon Cavanaugh, Cheryl R. Colson, Michael Cole, JoAnn Parker of Houston, TX their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. Yip• ♦+. ra � s `o a` •�...w♦. �,. c �►AM1' ,. ::�ee..,r.r :; : w tv 0 i �,:oa'+'o `� �oueaa F� a' xvoxAr v„� ec��,,, �ranlM► lg 70 _ 1 t97q o • a�,.yi%� 'beArrP I'A .t�� • �'n+ti m�,o.:u`a^. •,eo,aea'� `�..:�Toxi9` �,o 0-k . Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD w David T. Akers, Assistant Vice President On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts, that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument, that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. 7 , / ._ -ice. Scott E Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 1, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of June 21, 2007. Signed and sealed at the City of Hartford. ,af%�Y tB=G�L-�be[�3r 11LI -irva•u!!Nr► s_,.-.y.9u.e.o7 ,�+5*A .,e,a9._r,♦ #£,NcottlWxA� Gary W. Stumper, Assistant Vice President POA 2004 State of Texas County of Harris On this 21st day of June, 2007 before me personally came Sue Kohler to me known to be an Attorney -in -Fact of Hartford Casualty Insurance Company, the corporation described in the within instrument, and she acknowledged that she executed the within instrument as the act of the said Hartford Casualty Insurance Company in accordance with authority duly conferred upon her by said company. Michael Cole, Notary Public MWCHM COLE My COMM M EXPW December 11. 2= City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 Mladen Buntich Construction Co Inc 1500 W 9th St Upland, CA 91786 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, r-; Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anio, Japan • Waitakere, New Zealand 1 Telephon e: 714-536-5227 ) en D UNIC u onstructlon Co ,1 2007 JUN 2 i PSI 1 54 2007 JUN 2 t PM I General Engineering Contractor {, t k ��r {) { +'p 1500 W. 9th St, Upland, fi�v k iJ �7i'CiH�1`' 86 Lr (909) 920. 9977 Upland) 92 91705 Fax (909) 920-9905 City of Hunting Beach 2000 Main Street Huntington Beach, Ca. 92648 BID PROPOSAL FOR: Watermain Replacement Project Contract No. 1238 Bid Date: June 21, 2007 at 2:00 PM SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The 1" Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2nd Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find 6006e 3&bin the amount of $ WX which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Si -nature C-2 I PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1_ Mobilization 1 LS fjjVt f�6V$(�jvl $ 5,000 $ rj�001� 2. Install 8-inch Class 200 PVC pipeline in the Alley between Geneva Avenue and Frankfort Avenue 765 LF �VY1 0�tFFd .1�1(� $Z'4 0 $ 1 T6�600 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF , s jx IlarS $ lam_ $3-5-9Q_ 4. Provide temporary water service 1 LS Se10'C�✓�" V °L d $ 750o $7G0(j _ 5. Construct waterline connection in Hill Street 1 LS six s Vof ,l i1nd fG $ $_ ?°b 6. Construct fire hydrant assembly 1 EA tCY1 tl'►O1*4'Y1 01 $�4� $ -9IO� 7. Cut and cap/seal existing waterline 3 EA two - th 0 V� n d $2000 $ 600 O 8. Remove and dispose of existing valve 2 EA Clllcvt $ $ 3 Fo 0 9. Relocation of sewer laterals 15 EA f l k,t ,d /fd $ $? dQ 10. Flushing, Pressure Testing, Disinfection, Dechlorination, 1 LS SOK x f VC vn�y� d $ � $ 0`0 00 11. Traffic control 1 LS V50 Yj O $ 2C? $1 � V 12. Sheeting, shoring, and/or bracing 1 LS 4CA 1ho �aYI� 0 $ c� /v $ � 0a 13. Additional potholing 20 EA �WV ��' $_2(; 0 $_57 14. Demobilization and Cleanup 1 LS twel Uc thOV5AYl $!Z O D 0 $ n� 15. Install 4-inch cut in valve assembly 1 EA �c q thovsa r,� $10ow $ � 16. Install new 1-inch polyethylene water service 5 EA fwe4y 6Ve ( V-a d e�J_ $25 00 C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words. Unit Cost Total Cost 17. Install new 1-inch J*o 4KR66 polyethylene water service, connect to existing 3/-inch meter 11 EA $ 2400O $ 22 OaD 18. Install new 1-inch w`�y . fh rm polyethylene water service, ) �Vyyd T connect to existing 1-inch 7 EA $ 10 o $ (7_ meter 19. Install 4-inch pump -out l 1 EA 2assembly -J�lV��� $ ��D� $ $Koo 20. Replace Existing Traffic six h m d fe-d Control Loop 1 EA $_t5 a $ 600 Sub -Total Amount for All Bid Items — SCHEDULE A $ 3 7, 3 Q 0 C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 4VC, Jh0(/5,Ot4 d $5,0(-2 $ d Q 2. Install 8-inch Class 150�ree S�\> PVC pipeline in Indianapolis .Avenue at Beach Boulevard 110 LF $� 3. Install 12-inch Class 350 DI three SCVcfy pipeline in Indianapolis Avenue at Beach Boulevard. 172 LF �-�,� $__ESL $ 63 4. Install 12-inch Class 200 two Jr PVC Ipipeline in Indianapolis Avenue at Beach Boulevard 45 LF �h $ 21 0 $ qq so 5. Install 24-inch steel casing -� 2 c J j ��� ? tjb in Indianapolis Avenue at �J Beach Boulevard, with receiving pit, and jacking pit 164 LF DAV VV $ $-q-, �2 00 6. Install 12-inch cut in valve assembly 1 EA Yl))7c'I-lnov544 h jl $ tQ $ 5 vy' 7. Flushing, Pressure Testing, FGUr if ov5a k16 $ 0 $dy Disinfection, Dechlorination 1 LS 8. Traffic control 1 LS SevcyV " ci(/5and $ ?L000 $ ? 17 b(7 9. Water Pollutant Control Program 1 LS fIwm;� ft VC ht,4d"A $ZSaV $ 2sQ(J 10. Sheeting, shoring, and/or bracing 1 LS lwc#/ 7fi V e fh �pd $ax) $Z-S Od b 11. Additional potholing 15 EA 12. Demobilization and Cleanup 1 LS flVe-fho>rsand $U $ s�vyb 13. Replace Existing Traffic Control Loop EA six han,d� I Gj $-QQu $ 8 Sub -Total Amount for All Bid Items - SCHEDULE B 3 q I I tl�b C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS ::;RVr, Iho"ri 2. Install 12-inch Class 150 +wO hvnA1 8 PVC pipeline in Beach Boulevard 500 LF D 1 o 4T� c 4 2 $ 2_ $ J 22,5 C j 3. Install 8-inch Class 150 tu/p hvvo re8 PVC pipeline in Beach Boulevard 25 LF SCVCiA�y f yve $ 2?S $ 6 9 7 G 4. Flushing, Pressure Testing, Disinfection, Dechlorination 1 �pv�` 'tJnousc�n $ d0 $ _, dUu LS J 5. Traffic control 1 LS eLqh,4 th ousa nd $ S'�Ovo $_ 9 000 6. Water Pollutant Control Program 1 LS IweW'�' Ftve rjLy��� $Z O4 $ 25nb 7. Sheeting, shoring, and/or bracing 1 LS te✓1 �i10(�SaVtd $ %%4yb 8. Additional potholing 20 EA tWo "I,- ft $ J�� DUO 9. Demobilization and Cleanup 1 LS fvlr-Ihvvsand $3(00(3 $0013 10. Replace Existing Traffic E,fhewl Control Loop 4 EA $( $--6- 000 Sub -Total Amount for All Bid Items — SCHEDULE C $ ? 3 $' 7 C'_^ C-6 PROJECT BID SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS RVC JJI0 L,,5ay1 d $ 5, 0 a0 $ 5, C7y 2. Install , 8-inch Class 150 4WO h V64 fed PVC pipeline in Joliet Avenue 325 LF $Q $ 1�1� 2 3. Install 8-inch Class 150 and Wp h 200 PVC pipeline in Georgia Street at Joliet S VY FIVe 3,0�47S Avenue 115 LF $ 4. Install 4-inch cut in valve assembly 2 EA fd vy{- -ohm / fl d $ 300 $ 5. Construct . fire hydrant t ' hd Gn tovs I Y1 $ I Qt $ /0 J0 o assembly 1 EA 6. Remove and salvage existing fire hydrant 1 EA - hOtSAVICI hwnd roc{ se cn 7. Remove existing ,valve box Fifie6n htm d �� 1500 Uou and cover 3 EA $ $ 8. Cut and cap/seal existing waterline 2 EA i✓ve-Af y O f) %mod $ �10 0 $ t{z CCU 9. Install 2-inch air and vacuum assembly 1 EA .� LSl $13,0o� $ 3, 66b 10. Relocation of sewer laterals 6 EA F ve- k vwd re $ 5 eo ll. Flushing, Pressure Testing, 16 'YkG(/$a 4 d $5,y Vl� $ Si 0 U� Disinfection, Dechlorination 1 LS 12. Traffic control 1 LS fh►y4L-eri qho(/sand $ ! 3, dyb 13. Sheeting, shoring, and/or bracing �jnto .ju5� d $ $ Dom 1 LS 14. Additional potholing 20 EA y {Wohwjdly, ff1y $_25d $ o V 15. Demobilization and Cleanup 1 LS f6Vr- thovSa4 $ qq� $ 0QQ 16. Install new 1-inch polyethylene water service, 3/-inch JJ V-504 U connect to existing meter 5 EA $ 17. Install new 2-inch copper co water service, connect to vY' 1�O Gt +tick $_��� $ ql WU existing 1 1/2-inch meter 1 EA Sub -Total Amount for All Bid Items - SCHEDULE D $__2J G� 7 2 5 C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 1 l VG' ko V qn d $tea 2. Install 8-inch Class 150 and ale IVY► r:Yl� d 200 PVC pipeline in Utica Avenue 590 LF �� r �lv� $ f 8� $ lA150 3. Construct fire hydrant assembly 2 EA n5h, `t'V�N h,,yl I $ t�20�7 $�6� di 4. Remove and salvage existing fire hydrant 2 EA 50'Vtn hV fr'd 6 $ 11, (400 5. Remove existing valve box f" G V-e�l Z m 2�%u and cover 6 EA �V d $ - $14 - r--- 6. Cut and cap/seal existing waterline 2 EA +h fey } hpW-4ryd $ b $ 40 ow 7. Relocation of sewer lateral 6 EA iwar4 iutr hMdy $ jqf On $_N_�Oy 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS StOy fl V e hvndlrd $ 6 5o $ 6S OO 9. Traffic control 1 LS Sevr�n tA0 SGrnc( $7,w $ 7� 001) 10. Sheeting, shoring, and/or bracing 1 LS thOV$a► d $ 000 $ L�- 11. Additional potholing 20 EA 'five hUnd yf, p $ GOO $'� ov 12. Demobilization and Cleanup 1 LS Fov r` fhbv�eny $ yOW $ q, QV 13. Install new 1-inch l�egn polyethylene water service, connect to existing 3/-inch meter 7 EA � $��7 `� 5 $ J 14. Install new 1-inch VVD lk L's o ►1•(� polyethylene water service, Q Ve�r 1 ' G �p connect to existing 1-inch meter 1 EA $ Z; $ Db $ 2 $ OC7 15. Install new 2-inch copper '�VM/ / Sj1� water service, connect to 2-inch / existing meter 3 EA 16. Install new 2-inch copper f WV l by ti$ 6v* water service, connect to existing 1 1/2-inch meter 1 EA so hvn d I -CA Sub -Total Amount for All Bid Items - SCHEDULE E $_23 q50___ C-s PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS tR 4w vsan $ koOCD $ 4000 2. Install 6-inch, 8-inch and atle rWY�drUCr 12-inch Class 150 and 200 fwrmt y �6ve PVC pipeline in Beach Boulevard 1300 LF $ lZS $ 1'r.0 Soo 3. Construct 12-inch D.I. 31 inverted siphon assembly LF 4. Install 12-inch Class 150 Fp us- k"d it PVC watermain in Beach fin Boulevard at Yorktown $�`� Avenue 24 LF 5. Construct 12-inch D.I. 49 LF rfl� $ d $ 7 6yc> siphon assembly so( 6. Construct waterline e1-5h fy G tie connection in Beach hosdrtA �� °p Boulevard 1 LS $ $ 7. Remove and salvage fire hydrant 2 EA h f17 favr #i drr- d _ $S y n r7 $ existing n 8. Construct fire hydrant assembly 2 EA Irl ' Ummd $ 9 7C.) D°� 9. Remove existing valve box P1 f cw) and cover 5 EA 4 k4d tr"d $ �o ° $ 7 :5"* 0 10. Cut and cap/seal existing iwb +b04q`A4 waterline 6 EA 11. Remove and dispose of th)r�y. SevYrr� existing valve and interfering EA h /� d liPi� $ 3 ?o o$ o 0 piping 1 12. Flushing, Pressure Testing, Pl f ✓t��1 e yd Disinfection, Dechlorination 1 LS h lPA $ t5 900 $ s- 9 ° 13. Traffic control 1 LS n;n lhrce hk4dfr { $ 5?.? d o $ 3 o 14. Water Pollutant Control F) ftee,n Program 1 LS 15. Sheeting, shoring, and/or -MOV3,44'd oo a bracing 1 LS 16. Additional potholing 30 EA fon ho dl�,d $ Soo $ !S o o 0 17. Demobilization and Vr Cleanup J'hOv5awd 1 LS ISM PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve SPi fwl Vf, assembly 2 EA k&O Z $��°a $ �S ��a 19. Install 4-inch pump -out M44 PJ5hf �a assembly 1 EA d $ 20. Install 2-inch air and 2 EA Mifilone vacuum assembly 21. Install new 1-inch polyethylene water service, J 41144 l� connect to existing 1-inch 2 3 `f 6 0 0 meter 2 EA $ $ 22. Install new 2-inch copperWeyy��C fb J water service, connect to S� �� existing 2-inch meter 4 EA $Z $ 23. Replace Existing Traffic h�,yyd �/ Control Loop 8 EA $ �od $ 6 Y o 0 Sub -Total Amount for All Bid Items — SCHEDULE F $ 369A5-�( 0 , 0 0 C-io PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 4c-✓L �11p� $ /o oeo $ A c 0 0 2. Cut and cap/seal existing * waterline 4 EA f__ hi l tiLw�O4 $ 3000 $ 3. Remove existing valve box lwe&f, five 2 spc p a o 0 and cover 4 EA h�yti re $ $ 4. Construct fire hydrant YI4 Ste✓ assembly 1 EA h l/ridreJ� $ g7oo i �o 0 $ — 5. Remove and salvage �oU "fhb' existing fire hydrant 1 EA a_r hVX u"� e $ -� °� $ oa y 6. Traffic control 1 LS It Hem +kk sAwd $ /Sao o $ / S 000 7. Water Pollutant Control fi_f4een i?&%h,cd Program 1 LS $ / S OO $ /S'o 0 8. Sheeting, shoring, and/or risk Oov:wpy bracing 1 LS $ ° 0O $ 9. Additional potholing 10 EA fiVeIAwdrrel $ Soo $ o00 10. Demobilization and Cleanup 1 LS (ox NovSaryd $ VOO 0 11. Install new 1-inch fav,�iy 1`Ye polyethylene water service,nd connect to existing 1-inch /Sao 9000 meter 2 EA $ $ 12. Install new 1-inch fo1/ % 64re polyethylene water service, hv� connect to existing 3/4-inch �Soa ` S o o meter 1 EA $ $ 13. Install new 2-inch copper water service, connect to existing 2-inch meter 6 EA %U/1 $ 27 6 14. Install new 2-inch copper 1�1 lGfy one water service, connect to h'ndft�� 5-_3 existing 1 1/2-inch meter 3 EA $_I [Sub -Total Amount for All Bid Items — SCHEDULE G C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ S 000 $ -5 60 0 2. Install 8-inch Class 150 py1p, kwa41 PVC pipeline in Clay Avenue 565 LF �1��5o Koo 3. Install 12-inch Class 350 +VW jyt�yat� D.I. pipeline in Clay Avenue Beach Z S 3 ! �o 0 at Boulevard 120 LF $ $ 4. Install 24-inch steel casing in Clay Avenue across Beach Boulevard, with receiving pit and jacking pit 96 LF $ _ $ 5. Install 8-inch Class 150 -� Jyvyyd PVC pipeline at the Beach Boulevard and Clay Avenue Cvety' j o intersection 55 LF 6. Install 8-inch Class 200 one, h"&�dw PVC pipeline in Coenson e1-5 � �� 3 /`� S Circle at Clay Avenue 17 LF $`— $ 7. Remove and salvage 4 j yr. 1 t3 ` Qv existing fire hydrant 2 EA $ 3 000 $ 8. Construct fire hydrant assembly 3 EA 9. Cut and cap/seal existing ✓llrjt��/l waterline 4 EA 10. Remove existing valve box /W- %kn dr ld and cover 5 EA 11. Remove and dispose of - lWV5*n existing valve and interfering pipeline 1 EA S�Veiy hdi`P/°� $37oU $ 3�00 12. Relocation of sewer laterals 10 EA five dig,4 $_� "_`� $_ S °r'a 13. Flushing, Pressure Testing, F04/'T2e fDv Disinfection, Dechlorination 1 LS 4W4�1'Y d $ YY60 ° $ 14. Traffic control 1 LS ( ;*irft vlh"w-d $ /�000 15. Sheeting, shoring, and/or bracing 1 LS �W I Ve "� t VSC�' $120�° $ <L o4d 16. Additional potholing 20 EA ko hk44tad !c $ 2So $ ,E b oy 17. Demobilization and Cleanup $ $� 1 LS C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve assembly 1 EA / 3 00 � $_ $ / 3 o o— 19. Install 12-inch cut in valve e.t�VW assembly 1 EA t anlo $ _�� $ it a & `' 20. Install new 1-inch �hlrf evl polyethylene water service, &W'd /30� connect to existing 1-inch meter EA $_ 10 lye, o $ 8 _ 21. Install new 1-inch polyethylene water service,dd connect to existing 3/4-inch ov / ,Soc meter 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE H $ ,3'721 g s C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS fiAT, J vuW?yd $ Sado $ Sono 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 $ 2--a $ t Z0 0 0 0 3. Construct connection in d Ellis Avenue 1 LS a/i.�j� � +� V5 $ g° n o $ 9000 4. Remove and dispose of existing valve and interfering pipeline 1 EA ►ll/Yl $ $ 5. Cut and cap/seal existing +" it Ire waterline 2 EA h �, CI $ 2 s coo $ 5o C n 6. Flushing, Pressure Testing, PO vt�'r pw Disinfection, Dechlorination 1 LS At'ndrr-J $ `/500 $ 41Soo 7. Traffic control 1 LS &eA �ho v5a,# d $ LS °oO $ ! 8. Water Pollutant Control 07? 2 Program 1 LS 9. Sheeting, shoring, and/or�� bracing 1 LS fhvvSaW $ 10. Additional potholing 18 EA 4j o �"Af4, / I 11 $ 2 50 $ y So 0 11. Replace Existing Traffic �Ix „D� �` b `� 2 `�0 Control Loop 4 EA $ $ 12. Demobilization and br Aov5,on Yy co You Cleanup 1 LS $ $ Sub -Total Amount for All Bid Items — SCHEDULE 1 $ f g`f P o 0 C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons �00 2. Install AC 500 Tons f}*,kw $ 1 iQ $ o 3. Unclassified Excavation 300 CY O'ne yl f $ $22 4. Adjust Utility Cover 30 EA i ivti 5. Adjust Water Cover 1 EA OYte ,,rr $ Ob $L020 6. Adjust Sewer/Storm Drain Manholes 2 EA oy�6 4�0 IlKhA 1 Old XIA $ 1/0() $� 7. Remove/Construct Concrete Sidewalk 160 SF 8. Remove/Construct Concrete V-Ditch 2400 SF �� $�__ 3 $" 9. Remove/Construct Concrete Drive Approach including adjacent gutter 500 SF 4w T $_ 10. Remove/Construct Concrete Curb and Gutter 50 LF &t ;Zz �V c $ f25 $ C� LSD Sub -Total Amount for All Bid Items — SCHEDULE J $q5 C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B '3 q 1111 Sub -Total Bid Schedule C 7� � V C2 Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H _ V? f 75 Sub -Total Bid Schedule I �] I , 10Q Sub -Total Bid Schedule J 2 �-��Z�i cG l S� TOTAL BID AMOUNT (Schedules A-J) W„ `� PJ TOTAL BID AMOUNT IN WORDS: twb ,4►1� r lld� f0�r+-v Ares Usan f1 rvg IL 044_� Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall, set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion Name and Address of Subcontractor State License ; Class of Work Number By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange I--' LAU-1.1 A)rpi 04 �32. , being first duly sworn, deposes and says that he or she is 3M61D&11T" of/►J(40Cv,JAWTW L214=" Cox ihfG • the parry making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Address of Bidder Subscribed and sworn to before me this �_ day of , 2007. NOTARY PUBLIC-. NOTARY SEAL C-18 CALIFORNIAALL-PURPOSE• • s�C_s.t•..�....z�•..ca.4_s�C_c�S..c� s�S•�a. _s�c•�s�c_a�'fs.'_S..v..aS ..a�CC..c 4✓.T4_T._.a>..T•S_•.aC.Qrs�<,T. State of California Q_� County of oi';T)hG1�1�,nL 0 On 1Lm, tit Dat personally appeared MARCIA COGAN Commission # 1712001 -a Notary Public • California = San Bernardino County WCwm80wD9c21,2010 Place Notary Seal Above CY`personally known to me ❑ (or proved to me on the basis of satisfactory evidence) to be the person(e) whose name(,&) is/af&subscribed to the within instrument and acknowledged to me that he/ehe44W executed the same in his/4@Aheipauthorized capacity(es), and that by his/3er4#eii: signature(e) on the instrument the person(s), or the entity upon behalf of which the person(,&) acted, executed the instrument. ESS my hand and official seal. OPTIONAL Signature of Though the information below is not required by law, it may prove va uable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: �1i1-ii—(/lJ� Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing RIGHT THUMBPRINT OF SIGNER ... Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing RIGHT THUMBPRINT OF SIGNER Top of © 2006 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402 Item No. 5907 Reorder: Call Toll -Free 1-800-876-6827 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from - Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. C• Title Date: �•21'�7 C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes ;�No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in .accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: C-21 �4(-74T Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid.. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-8004224133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor LIM Title Date: Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained f•om the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder Name l Ict . fir• L�fac-A,,.1� . 4 • A l-18G Business Address City, State Zip (qoq) %2o •oi'i1 Telephone Number ,'32c,oA A - State Contractor's License No. and Class Original Date Issued 6 --' • os Expiration Date The work site was inspected by L45110 M09121S of our office on *-TOO* 15 , 2007. The following are persons, firms, and corporations having a principal interest in this proposal: C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the 1 Printed or Typed Signature Subscribed and sworn to before me this ? I day of LJLnE , 2007. NOTARY PUBLIC NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 2. 3. Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed C-24 CALIFORNIA•ACKNOWLEDGMENT ..�. _.� .r Q,.a._c�S_.v_c�`/-s�.S•C�s�S•_c�Ce•..�Cs�C•tsa•/-�.5's�•..T•�wsa. _sv_.�•_s�•_a�v3.CaC C _c�4c.C�C/..�• State of CaliforniaS` County of %,j On, wj&21, ZC Date personally appeared a MARCIA COGAN Commission#F1712001Notary Public - CaliforniaSan Bernardino County Z W Canm. 6q*es Dec 21, 2010 Place Notary Seal Above X personally known to me ❑ (or proved to me on the basis of satisfactory evidence) to be the person(&) whose name(.@) is/aF&subscribed to the within instrument and acknowledged to me that hekA@AlaQ*executed the same in his/hemitheir-authorized capacity(, and that by his/hef44e4 signature(,} on the instrument the person(o, or the entity upon behalf of which the personM acted, executed the instrument. WITNESS my hand and official seal. Wa4al-1- �_ * oca OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document nOM Title or Type of Document: 01 Document Date:-,JLLnI, Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — [:]Limited ❑ Attorney in Fact ❑ Trustee ❑ General ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT THUMBPRINT OF SIGNER Top of Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing RIGHT THUMBPRINT OF SIGNER © 2006 National Notary Association - 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402 Item No. 5907 Reorder: Call Toll -Free 1-800-876-6827 Mladen Buntich Construction Company, Inc. Job References -Work in Progress Name of Owner Type of Work Year Work Contract Completed Amount City of Los Angeles 600 S. Spring Street 300 LF Los Angeles, Ca. 90014 36" VCP Attn: Mr. Keith Hanks 213-847-8770 Open Cut/Tunnel Slauson/Van Ness COS Sewer Diversion Sewer Pipeline 2007 $2,858,500 City of Santa Monica 1685 Main Street 1900 LF Santa Monica, Ca. 90401 27"/36" VCP Attn: Eugenia Chusid 310-434-2618 Open Cut Montana/Wilshire Storm Water Diversion Storm Drain Diversion 2007 $4,081,450 Los Angeles County Sanitation District 1955 Workman Mill Road 9200 LF I Whittier, Ca. 90601 90"/84" RCP Attn: Mr. Tommy Sung 562-699-741 1 TunnelOpen Cut Joint Outfall "H" Unit 1B Section 4 Sewer Pipeline 2008 $31,736,160 City of Los Angeles 600 S. Spring Street 12,000 LF Los Angeles, Ca. 90014 42" VCP Attn: Mr. Keith Hanks 213-847-8770 Tunnel/Open Cut Avenue 45 & Arroyo Drive Relief Sewer Sewer Pipeline 2009 $43,568,000 Confidential Page 1 6/20/2007 Mladen Buntich Construction Company, Inc. Job References -Rehabilitation of Sewers and Storm Drains Name of Owner Type of Work Year Work Contract ComDleted Amount Orange County Sanitation District P.O. Box 8127 10,000 LF Fountain Valley, Ca. 92728 90" RCP Attn: Mr. John Linder 714-962-241 1 12"- 18" VCP Baker -Gisler Sewer Interceptor Sewer Pipeline 1995 $8,810,716 City of Los Angeles 600 S. Spring Street 8,000 LF Los Angeles, Ca. 90014 42" RCP Attn: Mr. Keith Hanks 213-847-8770 Microtunnel- Vicksburgh Avenue Sewer Interceptor Sewer Pipeline 1996 $5,671,015 County of Los Angeles -Department of Public Works 900 South Fremont Avenue 15,000 LF Alhambra, Ca. 91803 12"- 54" RCP Attn: Mr. Keith Lehto 818-458-3104 84"- 104" RCP Project 9050 Storm Drain 1996 $3,762,159 Canyon Storm Drain -Monrovia Storm Drain 1993 $4,149,911 City of San Diego Metropolitan Wastewater Department 9291 Topaz Way San Diego, Ca. 92123 9,200 LF Attn: Mr. Wayne Papac 619-533-5403 12" Ductile Iron Pipe Digested Sludge Pipeline/PIG Station PIG Station/Pipeline 1997 $2,849,000 City of Los Angeles 600 S. Spring Street 6,200 LF Los Angeles, Ca. 90014 99" HOBAS Attn: Mr. Keith Hanks 213-847-8770 Slipliner- MAZE II Interceptor Sewer Sewer Pipeline 1998 $8,746,319 Los Angeles County Sanitation District 1955 Workman Mill Road 2,500 LF Whittier, Ca. 90601 33" HOBAS Attn: Mr. Tommy Sung 562-699-7411 Slipliner- Joint Outfall "C" Trunk Sewer Sewer Pipeline 1998 $3,811,528 Los Angeles County Sanitation District 1955 Workman Mill Road Whittier, Ca. 90601 5,000 LF Attn: Mr. Tommy Sung 562-699-7411 42"- 60" RCP North Long Beach Sewer Sewer Pipeline 1998 $2,594,260 Los Angeles County Sanitation District 1955 Workman Mill Road 3,500 LF Whittier, Ca. 90601 57" HOBAS Attn: Mr. Tommy Sung 562-699-741 1 Slipliner- Joint Outfall "D" Sewer Pipeline 1998 $1,977,824 Los Angeles County Sanitation District 1955 Workman Mill Road 8,000 LF Whittier, Ca. 90601 36" VYLON Attn: Mr. Tommy Sung 562-699-741 1 Slipliner- District 5 Interceptor Sewer Sewer Pipeline 1998 $2,829,427 Confidential Page 1 6/20/2007 Mladen Buntich Construction Co., Inc. Job References Name of Owner Type of Work Year Work Contract Completed Amount City of Los Angeles 600 S. Spring Street Los Angeles, Ca. 90014 6,500 LF Attn: Mr. Keith Hanks 213-847-8770 24" DIP Terminal Island Sewer Pipeline Sewer Pipeline 1998 $1,410,568 Orange County Sanitation District P.O. Box 8127 Fountain Valley, Ca. 92728 11,000 LF Attn: Mr. John Linder 714-962-2411 36"/42" VCP Miller -Holder Sewer Sewer Pipeline 1999 $5,804,592 City of Santa Monica 1685 Main Street 3,000 LF Santa Monica, Ca. 90401 24"-42" RCP/DIP Attn: Ms. Susan Lowell 310-458-8721 Microtunnel- Appian Way Influent Sewer & Force Main Sewer Pipeline 1999 $1,957,762 City of Los Angeles 600 S. Spring Street 1,500 LF Los Angeles, Ca. 90014 24" STEEL/DIP Attn: Mr. Keith Hanks 213-847-8770 Microtunnel- Fries Avenue Force Main Sewer Pipeline 1999 $3,947,995 Los Angeles County Sanitation District 1955 Workman Mill Road Whittier, Ca. 90601 10,000 LF Attn: Mr. Tommy Sung 562-699-7411 72" RGRCP Joint Outfall "B" Interceptor Sewer Sewer Pipeline 2000 $7,022,318 City of Los Angeles 600 S. Spring Street 3,285 LF Los Angeles, Ca. 90014 12"/18" VCP Attn: Mr. Keith Hanks 213-847-8770 Microtunnel Muskingum Diversion Sewer Sewer Pipeline 2000 $5,898,092 City of Los Angeles 600 S. Spring Street 10,000 LF Los Angeles, Ca. 90014 39"/45" VCP Attn: Mr. Keith Hanks 213-847-8770 Tunnel/Microtunnel Rosewood Interceptor Sewer Sewer Pipeline 2000/2001 $14,850,550 City of Long Beach 1800 East Wardlow Road 12,825 LF Long Beach, Ca. 90807 8"-15" VCP Attn: Ms. Rosemary Hoerning 562-492-9631 Microtunnel Ocean Blvd. Sewer Replacement Sewer Pipeline 2000/2001 $2,585,008 City of Los Angeles 600 S. Spring Street 500 LF Los Angeles, Ca. 90014 12" RCP Attn: Mr. Phillip Wilson 310-575-8387 Ozeta Storm Drain Emergency Repair Storm Drain Pipeline 2001 $77,000 City of Los Angeles 650 S. Spring Street 600 LF Los Angeles, Ca. 90014 12" RCP Attn: Mr. Carl Mills 213-847-6516 Lincoln Avenue Storm Drain Repair Storm Drain Pipeline 2002 $48,000 Confidential Page 2 6/20/2007 Mladen Buntich Construction Co., Inc. Job References Name of Owner Type of Work Year Work Contract Completed Amount City of Los Angeles 650 S. Spring Street 575 LF Los Angeles, Ca. 90014 18" VCP Attn: Mr. Carl Mills 213-847-6516 Glencarin Storm Drain Replacement Storm Drain Pipeline 2002 $269,673 City of Los Angeles 600 S. Spring Street 5,300 LF Los Angeles, Ca. 90014 72" HOBAS Attn: Mr. Keith Hanks 213-847-8770 Slipliner- MAZE 3 Interceptor Sewer Sewer Pipeline 2002 $9,435,247 City of Los Angeles 600 S. Spring Street 15,300 LF Los Angeles, Ca. 90014 42"/39" HOBAS Attn: Mr. Keith Hanks 213-847-8770 Slipliner- Hollywood Main Interceptor Sewer Sewer Pipeline 2002 $8,332,724 AMOROSO Construction/City of Los Angeles 275 East Baker Street, Suite "B" 1,800 LF Costa Mesa, Ca. 92626 66" RGRCP Attn: Mr. Roger Schotter 714-433-2326 66" Sewer Replacement in Maple Street Sewer Pipeline 2003 $2,108,673 Los Angeles County Sanitation District 1955 Workman Mill Road 470 LF Whittier, Ca. 90601 54" HOBAS Attn: Mr. Tommy Sung 562-699-7411 Slipliner- South Gate Sewer Repair Sewer Pipeline 2003 $430,209 Los Angeles County Sanitation District 1955 Workman Mill Road Whittier, Ca. 90601 8158 LF Attn: Mr. Tommy Sung 562-699-7411 90" RGRCP Joint Outfall "H" Interceptor Sewer Sewer Pipeline 2005 $15,304,147 Irvine Ranch Water District 15600 Sand Canyon Avenue Irvine, Ca. 92718 3,100 LF MICROTUNNEL Attn: Mr. Bill Stewart 714-453-5610 36" HOBAS Jeffrey Road Sewer Pipeline 2005 $4,827,000 County of Los Angeles -Department of Public Works 900 South Fremont Avenue 2,155 LF MICROTUNNEL Alhambra, Ca. 91803 78"/84" RGRCP Attn: Mr. James Enriquez 626-458-7844 Hollyhills Drain Unit 8B (Phase 1) Storm Drain 2005 $5,240,903 Los Angeles County Sanitation District 1955 Workman Mill Road 1900 LF Whittier, Ca. 90601 27"/36" VCP Attn: Mr. Tommy Sung 562-699-7411 Open Cut District No. 21 Trunk Sewer Sewer Pipeline 2006 $856,000 Los Angeles County Sanitation District 1955 Workman Mill Road 8000 LF Whittier, Ca. 90601 T-lock Attn: Mr. Tommy Sung 562-699-7411 Rehabilitation Joint Outfall "A" Trunk Sewer Sewer Pipeline 2006 $12,618,068 Confidential Page 3 6/20/2007 Mladen Buntich Construction Co., Inc. Job References Name of Owner Type of Work Year Work Completed Contract Amount Orange County Sanitation District P.O. Box 8127 Fountain Valley, Ca. 92728 1500 LF Attn: Mr. John Linder 714-962-2411 36" VCP Newport Beach Pump Station Sewer Pipeline Sewer Pipeline 2006 $1,325,000 City of Anaheim 200 South Anaheim Blvd. 2770 LF Anaheim, Ca. 92805 181, VCP Attn: Mr. Stephen Stoewer 714-765-4338 Open Cut Lincoln Avenue Relief Sewer Sewer Pipeline 2007 $2,476,000 Confidential Page 4 6/20/2007 JUN. -19' 07 (TUE) 13: 47 A LAWRENCE ASSOC. TEL 1818 348 5472 P. 001 Fidelity and Deposit Company POST OFFICE BOX 1227 OF MARYLAND BALITMORE, AM 21203-1227 I: 11 : 4 1li KNOW ALL MEN BY THESE PRESENTS: Bid not June 21. 2M7 'That we, Mladen Bantich Construction Ca. the 15W W. a Street. Upland,,, CA 91780 as Principal, (hereinafter called the '`Principal"), and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, P.O. Box 1227, Baltimore, Maryland 21203a corporation duly organized under the laws of the State of Maryland, as Surety, (hereinafter called the "Surety"), are held and firmly bound unto Clty of Huntington !Heath, 2000 Main Street, Huntington Beach, CA 92648 Obligee (hereinafter called the "Obligee"), in the sum of Ten EMent Of The Total Amount Bid Dollars 1� 0%) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves our heirs, cxeeutors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Water Main Replacement NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished is the prosecution thereof, or in the event of the failure of the Principal to enter into such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to petform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and et%ct. Signed and sealed this 19th day of J tre_ A.D., 2001 ---- witam 02%ft 1.92 2lii7e foabrms to Awuiw irnihte of Arthihm comment A.110 Pamper 1910 Edition Mladen ` tic nstruc a Co. Inc. Principal Mlade un Jr. Presiden Title F ELITY AND DEPOSIT CO A YLAND S C. iehael Healey, Attorney in Fact CALIFORNIAiACKNOWLEDGMENT ..�C 4......'15�..•.atS/a...4c�:�...>•c...T4 e�CN'�.: SS>�>•�:.�t�C4�.•_o�S..'1. State of California County of sAte) &RnPv;_29I no On TtLnE ?1, 7-007 before me, Af A.4 C&;,RrJNO-Mr"6G Name and Title of Officer (e.g., "Jane Doe, Notary/Public") a • 1 i �f personally appeared AIARICImissio COGAN Commission ;P 1712001 Nofafy Public - California .r Son Sernofdino County kilgconirn apo DIec21, 4A10 Place Notary Seal Above 1 personally known to me ❑ (or proved to me on the basis of satisfactory evidence) to be the person(&) whose name(.&) is/ace-subscribed to the within instrument and acknowledged to me that he/shel#gey executed the same in his/4eirfth& authorized capacity(+es), and that by his/per�iheirsignature(* on the instrument the person(@), or the entity upon behalf of Which the person(s) acted, executed the instrument. OPTIONAL handand official seal. Signature of Notary Public Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document , (D l D Title or Type of Document: Document Date: �u-n , Z001 Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General _ ❑ Attorney in Fact • ❑ Trustee Top of thumb here ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Individual ❑ Corporate Officer — ❑ Partner — ❑ Limited Title(s): ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT THUMBPRINT OF SIGNER of thumb here © 2006 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402 Item No. 5907 Reorder: Call Toll -Free 1-800-876-6827 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by PAUL C. ROGERS, Vice President, and T. E. SMITH, Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said Company, w set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof d s nate, constitute and appoint C. Michael HENLEY, of Canoga Park, California, its true a e A n-Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and a a d undertakings, and the execution of such bonds or undertakings in purs ent g upon said Company, as fully and amply, to all intents and purposes, a u e wledged by the regularly elected officers of the Company at its office in , ' pans. This power of attorney revokes that issued on behalf of C. Michae e an The said Assistant t t the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By- p any, and is now in force. IN WITNESS W OF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of April, A.D.2003. ATTEST: 'gyp DEPps�1 O G a P, 1190 ? I FIDELITY AND DEPOSIT COMPANY OF MARYLAND T E. Smith Assistant Secretary State of Maryland ss. City of Baltimore By: Paul C. Rogers vice President On this 15th day of April, A.D. 2003, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came PAUL C. ROGERS, Vice President, and T. E. SMITH, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Sandra Lynn Mooney Notary Public My Commission Expires: January 1, 2004 POA-F 012-4874 EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attomeys-in-Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,...and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND_ This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 1 Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shalt be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this %1 day of �L. (� 2 cncq Assistant Secretary City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 Majich Bros, Inc PO Box 337 Altadena, CA 91003 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand ____ (Telephone: 714-536-5227) zuu t JUN 21 PM CITY CI CRI CITY OF HUNITIP G7-OH er `A � Cam"' I ' ��- .•�-S r �5 � N C� SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, . from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The I" Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2°d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit.prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find 13i'u, 'OvsP in the amount of $ 10 �71 I'PAI which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS 2Vaoeg 2. Install 8-inch Class 200 PVC pipeline in the Alley between Geneva . Avenue and Frankfort Avenue 765 LF o0 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF ,/` $ 3�• $ 3?-(ev, 4. Provide temporary water service 1 LS $�� 5. Construct waterline connection in Hill Street 1 LS $/new, $/0000• 6. Construct fire hydrant assembly 1 EA $40m. $ avo• �- 7. Cut and cap/seal existing waterline 3 EA $- $a. 8. Remove and dispose of existing valve 2 EA $ $ 9. Relocation of sewer laterals 15 EA $ �'• '� $ 10. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 11. Traffic control 1 LS $ fad'. $ ddar. 12. Sheeting, shoring, and/or bracing 1 LS 13. Additional potholing 20 EA $ $CJf�(7• 14. Demobilization and Cleanup 1 LS $._ o� $ 7 0O 15. Install 4-inch cut in valve assembly 1 EA $17D- 16. Install new 1-inch polyethylene water service 5 EA $'• $ 7�'' C-3 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch polyethylene water service, connect to existing %-inch meter 11 EA $ $ 18. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 7 EA $a° $ 19. Install 4-inch pump -out $cao, assembly 1 EA 20 Replace Existing Traffic 71�' Control Loop. 1 EA $ • $ Sub -Total Amount for All Bid Items = SCHEDULE A $ '`o✓ 000- C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $/D $ m a 2. Install 8-inch Class 150 PVC pipeline in Indianapolis Avenue at $ ! $_J0 Beach Boulevard 110 LF o _ 3. Install 12-inch Class 350 DI pipeline in Indianapolis Avenue at Beach Boulevard. 172 LF 4. Install 12-inch Class 200 PVC Ipipeline in Indianapolis Avenue at I®' Beach Boulevard 45 LF $�®• $ 5. Install 24-inch steel casing in Indianapolis Avenue at Beach Boulevard, with receiving pit, and jacking pit 164 LF $ $�� 6. Install 12-inch cut in valve assembly 1 EA $ $ 7. Flushing, Pressure Testing, Disinfection, Dechlorination 1 $ LS./nc 8. Traffic control 1 LS lcdw. 9. Water Pollutant Control Program LSD° 1 . 10. Sheeting, shoring, and/or $ bracing 1 LS 11. Additional potholing 15 EA 12. Demobilization and Cleanup 1 LS 13. Replace Existing Traffic $� Control Loop 8 EA $ Sub -Total Amount for All Bid Items — SCHEDULE B $ C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ 'w $ / L000� 2. Install 12-inch Class 150 PVC pipeline in Beach Boulevard 500 LF $2 $____ 3. Install 8-inch Class 150 PVC pipeline in Beach $®�Q• Boulevard 25 LF $ 4. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ 5. Traffic control 1 LS $ZSmo $ 7-P: r- 6. Water Pollutant Control s, $ ' Program 1 LS 7. Sheeting, shoring, and/or 0 �^ 7� D� bracing 1 LS $ $ 8. Additional potholing 20 EA $9= $ ecap 9. Demobilization and $ :Y�. Cleanup 1 LS 10. Replace Existing Traffic ,^ ���' Control Loop 4 EA $ $��'® Sub -Total Amount for All Bid Items - SCHEDULE C $ coon C-6 PROJECT BID SCHEDULED Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ 2. Install 8-inch Class 150 PVC pipeline in Joliet Avenue 325 LF 3. Install 8-inch Class 150 and 200 PVC pipeline in Georgia Street at Joliet .3z�7.7,5 Avenue 115 LF $� $ 4. Install 4-inch cut in valve s��/ `7Q� assembly 2 EA $ $ 5. Construct . fire hydrant assembly 1 EA 6. Remove and salvage fire hydrant 1 EA $ $ existing 7. Remove existing valve box and cover 3 EAR 8. Cut and cap/seal existing (� f®Q'9• waterline 2 EA $-`1 $ 9. Install 2-inch air and 1 EA vacuum assembly 10. Relocation of sewer laterals 6 EA $ $ ,3" ®0p 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS'- 12. Traffic control 1 LS 13. Sheeting, shoring, and/or bracing 1 LS 14. Additional potholing 20 EA 15. Demobilization and Cleanup 1 LS 16. Install new 1-inch polyethylene water service, connect to existing 3/-inch $- meter 5 EA $D 17. Install new 2-inch copper water service, connect to existing.1 1/2-inch meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE D C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $�°�- 2. Install 8-inch Class 150 and 200 PVC pipeline in Utica Avenue 590 LF 3. Construct fire hydrant 2 EA $�? assembly 4. Remove and salvage ©DD $�Q� existing fire hydrant 2 EA $ 5. Remove existing valve box p /�. and cover 6 EA $ $ 6. Cut and cap/seal existing waterline 2 EA $ $ 7. Relocation of sewer lateral 6 EA 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $- $ 9. Traffic control 1 LS $. Z a? $ 10. Sheeting, shoring, and/or 1 LS $_ bracing 11. Additional potholing 20 EA $,,,�3cc�� � ® 12. Demobilization and Cleanup 1 LS 13. Install new 1-inch polyethylene water service, connect to existing 3/-inch '- meter 7 EA $Q $ 14. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 1 EA $ O,_ $ 15. Install new 2-inch copper water service, connect to 2-inch EA $ /&V $ existing meter 3 _ 16. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA $fJ Sub -Total Amount for All Bid Items — SCHEDULE E $_2� — C-8 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 6-inch, 8-inch and 12-inch Class 150 and 200 PVC pipeline in Beach $ 3c' $� O� Boulevard 1300 LF 3. Construct 12-inch D.I. inverted siphon assembly 31 LF $✓sue. $ 4. Install 12-inch Class 150 PVC watermain in Beach Boulevard at Yorktown $ �°�• Avenue 24 LF $-'- 5. Construct 12-inch D.I.7� siphon assembly 49 LF 6. Construct waterline connection in Beach Boulevard 1 LS 7. Remove and salvage $ %_ ZVO, 0 existing fire hydrant 2 EA $ 8. Construct fire hydrant assembly 2 EA $i $ 9. Remove existing valve box ; and cover 5 EA $ . 10. Cut and cap/seal existing waterline 6 EA $� $� 11. Remove and dispose of existing valve and $� interfering piping 1 EA 12. Flushing, Pressure Testing, // 71'P®. ` Disinfection, Dechlorination 1 LS $ $ 13. Traffic control 1 LS $�'. yPD, 14. Water Pollutant Control Program 1 LS $ 15. Sheeting, shoring, and/or Js $_ / OG� bracing 1 LS $ .16. Additional potholing 30 EA $ l $ %co 17. Demobilization and Cleanup 1 LS j $ ( ` $ l� coo , C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve assembly 2 EA 19. Install 4-inch pump -out 1 EA �''• $�'�._ assembly 20. Install 2-inch air and vacuum assembly 2 EA 21. install new 1-inch polyethylene water service, connect to existing 1-inch meter 2 EA 22. Install new 2-inch copper water service, connect to $� $�- existing 2-inch meter 4 EA 23. Replace Existing Traffic �, ���• Control Loop 8 EA $ $ '-'cco, Sub -Total Amount for All Bid Items — SCHEDULE F $S7• .-- C-10 PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ 7-.- $® 2. Cut and cap/seal existing waterline 4 EA $ $�� 3. Remove_ existing valve box 4 EA $_ $�� and cover 4. Construct fire hydrant 1 EA $ /"- $ assembly 5. Remove and salvage 19 $ �V,0 �� 0 existing fire hydrant 1 EA � $ 6. Traffic control 1 LS $ % —er $ S�tro 7. Water Pollutant Control Program 1 $ LS 8. Sheeting, shoring, and/or ��d, bracing 1 LS $ $ —� 9. Additional potholing 10 EA $�d�. 10. Demobilization and Cleanup 1 LS 11. Install new 1-inch polyethylene water service, connect to existing 1-inch 2 EA G $ for $ meter 12. Install new 1-inch polyethylene water service, connect to existing 3/4-inch ��� &v. meter 1 EA $ $ 13. Install new 2-inch copper water service, connect to $� existing 2-inch meter 6 EA $__�_ 14. Install new 2-inch copper water service, connect to�� 1 1/2-inch existing meter 3 EA Sub -Total Amount for All Bid Items — SCHEDULE G C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Clay Avenue $ Gam. $ 565 LF 3. Install 12-inch Class 350 D.I. pipeline in Clay Avenue Beach Boulevard $ 2`�0. $ at 120 LF 4. Install 24-inch steel casing in Clay Avenue across Beach Boulevard, with receiving pit and jacking pit 96 LF 5. Install 8-inch Class 150 PVC pipeline at the Beach Boulevard and Clay Avenue 55 $ fee) intersection LF 6. Install 8-inch Class 200 PVC pipeline in Coenson $ Circle at Clay Avenue 17 LF 7. Remove and salvage //��,-,�, $ �cC- existing fire hydrant 2 EA $�` 8. Construct fire hydrant assembly 3 EA $ $ 9. Cut and cap/seal existing waterline 4 EA $ $. 10. Remove existing valve box S o, and cover 5 EA $ $ 11. Remove and dispose of existing valve and. ',� $ interfering pipeline 1 EA $La% 12. Relocation of sewer laterals 10 EA $ O "^ $ - Oy 13. Flushing, Pressure Testing, Disinfection, $ $� Dechlorination 1 LS 14. Traffic control 1 LS 15. Sheeting, shoring, and/or bracing $ $ 1 LS 16. Additional potholing 20 EA 17. Demobilization and Cleanup 1 LS $ C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve Ce assembly 1 EA $ � $ 19. Install 12-inch cut in valve assembly 1 EA $� $ 20. Install new 1-inch polyethylene water service, connect to existing 1-inch t meter 8 EA 21. Install new 1-inch polyethylene water service, connect to existing 3/4-inch meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE H $ -33 � C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $l�_ 2. Install 8-inch Class 150� PVC pipeline in Main Street 600 LF $ $ 3. Construct connection in Ellis 1 $ Avenue LS 4. Remove and dispose of existing valve and interfering pipeline 1 EA 5. Cut and cap/seal existing waterline 2 EA 6. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $® $; _ 7. Traffic control 1 LS 8. Water Pollutant Control Program 1 LS $ $ 9. Sheeting, shoring, and/or 7�o. bracing 1 LS $ $ 10. Additional potholing 18 EA $ 11. Replace Existing Traffic 7fp- Joc9a, Control Loop 4 EA $ $ 12. Demobilization and lo Cleanup 1 LS $ $ Sub -Total Amount for All Bid Items — SCHEDULE I $ Z2p;, q'00. C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons 2. Install AC 500 Tons $ %• ' $ 3. Unclassified Excavation 300 CY 4. Adjust Utility Cover 30 EA $, ' $ 5. Adjust Water Cover 1 EA 6. Adjust Sewer/Storm Drain Manholes 2 EA / $ ! 1610 _ 7. Remove/Construct Concrete Sidewalk 160 SF $ $ 8. Remove/Construct Concrete V-Ditch 2400 SF $ 9. Remove/Construct Concrete Drive Approach including adjacent gutter 500 SF $ %Z, .— $ l� 10. Remove/Construct Concrete Curb and Gutter 50 LF $. '- Sub -Total Amount for All Bid Items — SCHEDULE J $!/Z C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules A-J) TOTAL BID AMOUNT IN WORDS: —T z/5, 63a 2- 3r�.- �� 25. -7cc, Ali C--),J - S Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion -. o f :Work Name and Address of Subcontractor StateLicense ; Number Class I3C LP tX '�'£ ,�►£ S, A,u C-A �CE ? ,� �A!' ST t s� Zfz�d Z4" 70'7 3 .WlA--;' 2747,5- YM jam&_ c, t Gd. / SC Al.Tl'T�Ia�X..YL K�QLTD CA By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange ��Z- a'vc-�j , being first duly sworn, deposes and says that he or she is - -177' S of X- A! lCq IS —S� — 'C the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired -- connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a.collusive or sham bid. N dder Signature of Bidder T © 33.7 A27 A C� Address of Bidder Subscribed and sworn to before me this d- I day of J U-i 1 L , 2007 NOTARY PUBLIC NOTARY SEAL C-18 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. ".f l c-14 2 t ss:, �G By Title Date: /7, IP-7 C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: Z ! fl C-21 /C 9 Contrac or By Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-422-4133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor Title Date: Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder N Business Address At7 City, Telephone Number C4 . q%P©,3 State Zip 5-e-70 / A State Contractor's License No. and Class Original Date Issu d Expiration Date The work site was inspected by �� I- of our office on Ju!,- 1le , 2007. The following are persons, firms, and corporations having a principal interest in this proposal: c "Ar --�C-/rL�S C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Company N Signature of Bidder ��! L � ,� �—t/ 4 C Printed or Typed Signature Subscribed and sworn to before me this ,�A- day of Jl L r) C— , 2007 C CATHLEEN L. VITAL orrxnbslon #� 1667M N0l1ry PubMc - Canomb Los Mpeles County 1&,MV CC ff1 "Jun 11.'Oi NOTARY PUBLIC�1 NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar, work within the past two years: 1. C-i"�� d� ��,��! ,�td�✓lC.�q %�%� �t-l.�-l.�✓ ��s�i�/pT� ��tC,Q, �-�i. Name and Address of Public Agency Name and Telephone No. of Project Manager: Z-17 ea ACC % Contract Amount Tvne of Work Date ompleted 2. �� �i� 4 Z-&-,V7"-2 6 /.-- 3 3 c-. 027- - Name a6d Address of Public Agency Name and Telephone No. of Project Manager: Con act Amount Type of Work Date C mpleted Name Ind of Pi lic Agency 33er All Name and Telephone No. of Project Manager: 1, /ye) 2� Type of Work C-24 AY S. C-,d r Date ompleted BID BOND KNOW ALL BY THESE PRESENTS, That we, Majich Bros., Inc. of PO Box 337, Altadena, Ca 91003-0337 (hereinafter called the Principal), as Principal, and ARCH INSURANCE COMPANY (hereinafter called the Surety), as Surety are held and firmly bound unto City of Huntington Beach (hereinafter called the Obligee) in the penal sum of 10%of Bid Amount, -------------------------------------- -------------------------------- Dollars($ 10%of Bid Amount ) for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That WHEREAS, the Principal has submitted or is about to submit a proposal to the Obligee on a contract for Watermain Replacement Project - Cash Contract No. 1238 NOW, THEREFORE, If the said Contract be timely awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing, and give bond, if bond is required, with surety acceptable to the Obligee for the faithful performance of the said Contract, then this obligation shall be void; otherwise to remain in full force and effect. Signed and sealed this 19th day of June 1 2007 Majich Bros., Inc. (Seal) Principal Witness � ZZ - 77L"ks Title ARCH INSURANCE COMPANY Witness By Frank y ones Attorney -in -Fact S-0053/GEEF 10/99 Testimony Whereof, thz Ccm.pcny has this i.,strurasnt to be signed and its corporate seal to be affixed by their thohzed officers, this 3rd day of _April 2006 tested and Certified utance C �$ o .L` C�SroMTF 'G U 5LAL Tlartin J. Nilse ecretary >TATE OF NEW YORK SS OUNTY OF NEW YORK SS Arch Insurance Company Edward M. Ti us ice President Peter J. Called, a Notary Public, do hereby certify that Edward M. Titus and Martin J. Nilsen personally known to me to be the same persons whose names are respectively as Vice President and Secretary of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free voluntary act said corporation and as their own free and voluntary acts for the uses and purposes therein set forth. PETER J. CALLEO, ESQ.ary P. Nat" State o1 Now York No,.02CA6109336 of :Ilfled In New York County. Nota ublic Commission Explres May 3, 2008 My commiss expires 5-03-2008 CERTIFICATION I, Martin J. Nilsen, Secretary of the Arch Insurance Company, do hereby certify that the attached Power of Attorney dated on behalf of the person(s) as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate; and 1 do further certify that the said Edward M. Titus, who executed the Power of Attorney as Vice President, was on the date of execution of the attached Power of Attorney the duly elected Vice President of the Arch insurance Company. IN TESTIMONY I have here nt^ subscribed My name and affi d the corpora se I of the Arch Insurance Company on this 1 9th day of _jUne 20. 07 Martin J. Nils , Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated. PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Contractors & Developers Group 135 N. Robles Ave., Ste. 825 Pasadena, CA 91101 Page 2 of 2 vvance C cg °� fi Coaroa..rF � II U sw n �ItaoF�l Printed in U.S.A. CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT State of California County of Oran On June 19th, 2007 before me, PHILIP VEGA, NOTARY PUBLIC Name and Title of Officer (e.g.. "Jane Doe. Notary Public") personally appeared FRANK MORONES Name(s) of Signer(s) ® personally known to me -OR- ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their 1.4 - - signature(s)on the instrument the person(s), or the entity upon .P ), y P 1. £g >,\ PSIi VEGA behalf of which the person(s) acted, executed the instrument. A Comrr;ission # 1474231 z -WMy ;, Notary f'ubi;c - California z D Grande Counry Comm. Expires Mar A, 20M WITNESS my hand and official seal. OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on and reattachment of this form to another docum Description of Attached Document Title or Type of Document: Document Date. Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer ❑ Titles(s): ❑ Partner - ❑ Limited ❑ General ❑ Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Top of Thumb here Number of Pages: Signer's Name: ry Public and could prevent fraudulent removal ❑ Individual ❑ Corporate Officer ❑ Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: I Top of Thumb here Signer Is Representing: BD-1133 09/00 City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 Cedro Construction Inc 120 E Santa Maria St Santa Paula, CA 93060 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand (Telephone: 714-536-5227 ) L SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard,. from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The Vt Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find in the amount of $ which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 V PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unitt Cost Total Cost 1. Mobilization 1 LS �ftr TE#�us���,. $,46 2. Install 8-inch Class 200 PVC pipeline in the Alley between ldtNv©/2�C� Geneva Avenue and Frankfort Avenue 765 LF t G�f $ do eM $ /91 ;rQ> 3.. Remove and dispose of 4-inch Cl 7WIp, j y icc&(R existing pipeline 650 LF $� $ 4. Provide temporary water service 1 LS i�JS/l.%'9 �.oui�n -, � � �'� $ $/ 5. Construct waterline in Hill Street X T'l�u>�nr0 $61 177 connection 1 LS �,�g /f�s�t2�O _ 6. Construct fire hydrant assembly 1 EA -$iA s O ' H'0*2 1 pl`? 7" 499f -T- 7. Cut and cap/seal existing waterline 3 EA caO pywu,a*r-O $ $ % '5 4-Z 8. Remove and dispose of 5/x #U^4W-'*-0 existing valve 2 EA $ 9. Relocation of sewer laterals 15 EA O' 10. Flushing, Pressure Testing, Disinfection, Dechlorination TIM" t7dau5r!-� SZ A"0 $_ 140 $ 3 74-0 1 LS R 11. Traffic control 1 LS 6 � ou�x*..o�7f^,, $�7,010 $%d 12. Sheeting, shoring, and/or bracing O c1`u /L�v $ [y/COS 1 LS $-34 13. Additional potholing 20 EA 5/X $_&A $ f_ 14. Demobilization and Cleanup 1 LS 6trr��Ite" $ J 7 $_f 15. Install 4-inch cut in valve ? Tt�9coihirvd £�6l�y' y,,i N� $1 U� $ l i assembly 1 EA 16. Install new 1-inch O� P7tsrc�S'9+�►v polyethylene water service 5 EA S/.t1*r1 C-3 7�2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch oL4 r(1`t 1M c7 polyethylene water service, mXX'>ksp connect to existing 3/-inch 11 rcM�+ OA'2- $1��1 meter EA $ 18. Install new 1-inch pxz TffWjg�A,p polyethylene water service, 6A n connect to existing 1-inch 7 EA �� �!(fL -- $ �1 - $ /i t75 meter 1 19. Install 4-inch pump -out 1 7lWt9us�+''t� rat tru'_'0&t0 $3 2- $ assembly EA 20. Replace Existing Traffic 64r4A-Aa-R40 Control Loop 1 EA q'A)5AP7 $� $ Sub -Total Amount for All Bid Items — SCHEDULE A $ 3/43 C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item Unit No. Description Quanti Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS ' " r6:744'"0' AZdu^&rim nOM A $ � 2. Install 8-inch Class 150 PVC pipeline in Indianapolis Avenue at Boulevard Q=/=j o0 NOBeach $ / 110 LF $ 3. Install 12-inch Class 350 DI ©£� pipeline in Indianapolis Avenue at Beach 5'9r7 vo Boulevard. 172 LF $16� $,2�3 4. Install 12-inch Class 200 PVC pipeline in Indianapolis Avenue at Beach Boulevard 45 LF 5. Install 24-inch steel casing f, "laepo in Indianapolis Avenue at �s Beach Boulevard, with fl,54 0 receiving pit, and jacking pit 164 LF $ $ 6. Install 12-inch cut in valve f-i "�- t'tfvusrTa SK idu&oiet o Noe,$ � S �� assembly 1 EA $ 7. Flushing, Pressure Testing, Disinfection, Dechlorination -rbwL-t 7Ht9usA%10 �'(6«r �u"Iese $ $ �jt1U 1 LS i 8. Traffic control 1 9. Water Pollutant Control &&t 0-1044>6-N0 C'!t-2 Program 1 LS 4kwAoIQV_-Z) $4 10. Sheeting, shoring, and/or bracing V-63wo Sf X 1 LS !12 $`��� 11. Additional potholing 15 EA 12. Demobilization and 1=1 f-tto a5OMZ 0'7 5l©75 Cleanup 1 LS :Pi"44 Ft(I-Z $ $ 13. Replace Existing Traffic Control is��� Loop 8 EA Sub -Total Amount for All Bid Items - SCHEDULE B C-5 PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS Ratstil C, /1. ravu3^ ;&161w !} ► caeca $ $ 2. Install 12-inch Class 150 PVC pipeline in Beach Boulevard 500 LF 5' X.117 3. Install 8-inch Class 150 PVC pipeline in Beach Boulevard 25 LF 4. Flushing, Pressure Testing, 7F *lN,9usL� Disinfection, Dechlorination 1 LS 5. Traffic control 1 LS T1%ty4A1,,e> $!�.040 $ vO 6. Water Pollutant Control Program 1 LS TOO 7'Hs%e5~ rfv'F 6�0&,P $ 2-1 M6 7. Sheeting, shoring, and/or bracing 1 LS Y-�.�► i H'�K $ 7 50 8. Additional potholing 20 EA 9. Demobilization and LS *x r- (V1ti�' $ $ Cleanup 1 10. Replace Existing Traffic £tY�ltT tfiuM�c� Control Loop 4 EA Sub -Total Amount for All Bid Items — SCHEDULE C C-6 PROJECT BID SCHEDULE D ZO 160 2 p 9#0 Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $2 Mt NJ A,0".0 2. Install 8-inch Class 150 6)4"7- JOW&VRjO PVC pipeline in Joliet Avenue 325 LF f-0kr4 55rl, i� $ ��%�'" / $ K� 3. Install 8-inch Class 150 and ��Ate M�so 200 PVC pipeline in Georgia Street at Joliet ti= fP'-M 0 Avenue 115 LF $157 $ 4. Install 4-inch cut in valve -IbWVt TOOU.560W aGU assembly 2 EA $ $_ 5. Construct . fire hydrant 564 rlfeus✓ A'0 assembly 1 EA 7r A Lae4 0%4";P0at4' 6. Remove and salvage existing fire hydrant 1 EA �o� � S� LIL (%Um'e-r'p $ © $4-7 � 7. Remove existing valve box S(A tfi-U Nips and cover 3 EA S X $ $ 8. Cut and cap/seal existing waterline 2 EA vbhyus&.� rt ✓1 4k4^6WZ -c- .. $ $�G�Z- 9. Install 2-inch air and vacuum assembly 1 EA 70&a>&%A4A Qwme' #AgrZ6'C> $ -2-7a'q $ `ZI 10. Relocation of sewer laterals 6 EA O� f?ctr c $Ae; 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS f� _ �/7d�uSR�' .4_V0a ,� $ $ J � 12. Traffic control 1 LS Tel&"C#S 13. Sheeting, shoring, and/or bracing 1 LS oM� '`'�`' $�?�� $ 14. Additional potholing 20 EA 5q" tA4A'r''14S'' 15. Demobilization and Cleanup 1 LS�v�n.rT>��5 $ $�� !�lfr r�crr-olt+�.J 16. Install new 1-inch polyethylene water service, 0Al'�' ?1,40us19-/w connect to existing %-inch 4F N? ctu AA:h meter 5 EA U'ti15n $ $ 17. Install new 2-inch copper JZ.?"� p u-So6� water service, connect to existing 1 1/2-inch meter 1 EA !tu Aoc�Q*A> $ 0 Sub -Total Amount for All Bid Items - SCHEDULE D $ 1465E l��g I I (do) s19 C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS � A rµous �s rluru�Ria �t�rzJ 2. Install 8-inch Class 150 and 04Z, &*-'04160 200 PVC pipeline in Utica Avenue 590 LF G IPTr7 OAAr $ 1 `0 $2y—QoO 3. Construct fire hydrant assembly 2 EA W 50" r-lv'f OfA!`PAWL-) 4. Remove and salvage existing fire hydrant 2 EA 7WO 7-t'V4t'$ 7W FIv4 6(~00L ca $� $ono 5. Remove existing valve box Sty star-fl/?•� $� ��© and cover 6 EA �� $ 6. Cut and cap/seal existing 7-up; 7-"u 5/81Gt,J $ waterline 2 EA it -A (svi-vteleo 7. Relocation of sewer lateral 6 EA ���`' F"'� `� s / $�_�C� 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS Ttjp-,t? F'1APus4fW j'<d 0r tdu/,•orW $ 9. Traffic control 1 LS Ptd��F o $ U $ 7, 500 10. Sheeting, shoring, and/or EtGlf{ &V6Cl4r_0 9-L bracing 1 LS (-j Yj Kj $ $ 11. Additional potholing 20 EA :�10( 12. Demobilization and Cleanup 1 LS r W-74 � V-(t0C45 P-( f-1 0- 4fvO1U0 $` $ f Z/ 1 ' 13. Install new 1-inch 0 � rGd�u 5 � polyethylene water service, 01" 6kA 1Vv fZ1$ > connect to existing 3/-inch EA 707 $ Z $ meter 7 / 14. Install new 1-inch 6 NS "040us #?%4> polyethylene water service, d 0Vh,v2,e.0 connect to existing 1-inch p [f '�C �' rT meter 1 EA 15. Install new 2-inch copper Q-0.0700ad water service, connect to 2-inch EA f--t rr£ 010A.1094.1> existing meter 3 16. Install new 2-inch copper F'400 4-0�0 c;*+'''U water service, connect to VP'gg hf'u/>Iew r-f ► 3 5 existing 1 1/2-inch meter 1 EA le r7 $1) $ Sub -Total Amount for All Bid Items - SCHEDULE E $ �-✓�� C-s PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS FY �''�'� $ $171!rIZ19 2. Install 6-inch, 8-inch and dAWZ o 12-inch Class 150 and 200 PVC pipeline in Beach Boulevard 1300 LF F(F 11 AK $ 3. Construct 12-inch D.I. tt`a 14�C4 n.PIQ inverted siphon assembly 31 LF $ m0 $ %S�0 4. Install 12-inch Class 150 (TuJiD, PVC watermain in Beach Boulevard at Yorktown 24 01 ro-117 f"I vet $ K67a Avenue LF 5. Construct 12-inch D.I. 1 ju% "Pow r / $ &0�� siphon assembly 49 LF �l $�S4 6. Construct waterline TWA. n T4,-ou5Ato connection in Beach Boulevard 1 LS f t Vt Vu t-vF2it> $125e0 $ �gSTbU 7. Remove and salvage fire IMA>0 TW44')d-A10 C-tvl $ 4l $ 51 00® existing hydrant 2 EA O'AupaR 'o 8. Construct fire hydrant 2 EA 51Z 7- t a)4A v $ p assembly _ 9. Remove existing valve box /K (dur%.,tCv !�C and cover 5 EA (JL�nz $ $ 10. Cut and cap/seal existing waterline 6 EA 7-Wv Af%.� F1V2 td-I,c $ 614- $ / O 11. Remove and dispose of t-0040A&, existing valve and interfering T4� � $ $_ piping 1 EA 12. Flushing, Pressure Testing, ro uoe 7OV43 O Disinfection, Dechlorination 1 LS r,(v-,J tJU?vD)l.,g.7 $ ``'`" $ 13. Traffic control 1 LS r f jV*Al $ CW $_LS�L� 14. Water Pollutant Control r-442g? r&6(.q*A4> o ; Program 1 LS C-( v'1 gc4hlO�fl $ �, $ 15. Sheeting, shoring, and/or `r(64(r T,fowAo--> � bracing 1 LS 9::� IV:? t, fr t t jqgv $_AVO $ 16. Additional potholing 30 EA s IA 6"_tf A*0 RE $ 17. Demobilization and Cleanup Fr v'2 H-u mmAf4> 1 LS $_T $ /—_fV C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cosh Total Cost 18. Install 8-inch cut in valve 2 "1412 �rJ4076"4 4-> QP-4f ^' $Gt'��� assembly EA $ 19. Install 4-inch pump -out assembly 1 EA �Lg�r �` � // �1 $ ��—�- 20. Install 2-inch air and vacuum assembly 2 EA 21. Install new 1-inch O&Z At" polyethylene water service, 7WO No u Alp Zr_ J connect to existing 1-inch 2 r�1 $/ Z $ `fib meter EA 22. Install new 2-inch copper qZ&' nhh&SO&O water service, connect to existing 2-inch meter 4 EA F-(" l,;,,ft_45,e+co TihPt'7 �t►i'�_ $� $ Al 23. Replace Existing Traffic Control Loop 8 EA��,�z? $ Sub -Total Amount for All Bid Items — SCHEDULE F $�f62 �v01 soR PROJECT BID SCHEDULE G Watermain Replacement Project, Beach from Clay Avenue to Garfield Avt BID ITEMS Item Unit No. Description Quanti Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS r'Ou hrV0cd3 � $ $^ 2. Cut and cap/seal existing 4 EA F`OVUs44vo r` �'Z waterline 41+4 3. Remove existing valve box 4 EA 519 d'uhOr2%A> $ $ � and cover 51 trs a t � 4. Construct fire hydrant $! �L P#O'u S y ^ '- V5 z �? assembly 1 EA tfZ.�F•1� p, $ $ 5. Remove and salvage fire dtG�A �F $ existing hydrant 1 EA 4_1 6. Traffic control 1 LS 7. Water Pollutant Control Program 1 LS 811t?' 7t�a�uSJ t(1V'7 tdL4*VQt9 8. Sheeting, shoring, and/or V*42 uS' S � o � 1 ZJ bracing 1 LS s $ e / $ 9. Additional potholing 10 EA 5.''` $_6,77 $—Ze'-7-00 10. Demobilization and Cleanup1 LS �t q f7tous�n �I^ E}-ttn�R�� l�JSh '3 Z'� $% $ 11. Install new 1-inch ©A^ 471VU" 12_0 polyethylene water service, ok'-1 Wt trVn jQ%'v connect to existing 1-inch EA ��� �� $ $ meter 2 12. Install new 1-inch �f9uS�fr� polyethylene water service, connect to existing 3/4-inch ©i1/`) dwVn R4D meter 1 EA 13. Install new 2-inch copper water service, connect to existing 2-inch meter 6 EA 14. Install new 2-inch copper TufgfiJ water service, connect to existing 1 1/2-inch meter 3 EA F (V-5 Sub -Total Amount for All Bid Items — SCHEDULE G $_77 76'&� 0.� C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 a f a caR � 2. Install 8-inch Class 150 PVC pipeline in Clay Avenue 565 LF��I� 3. Install 12-inch Class 350 49AI-2 eu D.I. pipeline in Clay Avenue at Beach Boulevard 120 LF cSs 57 4. Install 24-inch steel casing ::Gap h4W f P-0Q> in Clay Avenue across Beach Boulevard, with /, �receiving pit and jacking pit 96 LF $K ✓ 46A 5. Install 8-inch Class 150 PVC pipeline at the Beach Boulevard and Clay Avenue intersection 55 LF $ d%o $ 2;10,. 6. Install 8-inch Class 200 �cJlr� (-iuN»Rrr,C� PVC pipeline in Coenson Circle at Clay Avenue 17 LF ,�J I"� �� �` $ Gl $��� 7. Remove and salvage a TNT k5 F'�M� 6 $_,7 $ p existing fire hydrant 2 EA -Sf 8. Construct fire hy drant assembly 3 EA 5! . 5� $_�___� $ i 9. Cut and cap/seal existing Two TwFstowvo 1:IV% $ lei a!� waterline 4 EA b 1= 10. Remove existing valve box and cover 5 EA 11. Remove and dispose of s ? X R existing valve and interfering pipeline 1 EA 5? XT7 12. Relocation of sewer laterals 10 EAI'AV17 $� 13. Flushing, Pressure Testing, 5o a Disinfection, Dechlorination 1 LS Aran $_�=- $ 14. Traffic control 1 LS �Gr'-' 15. Sheeting, shoring, and/or tir �� TC�us�nw 'I bracing 1 LS w 16. Additional potholing 20 EA 5;IX 17. Demobilization and ir=ii. Cleanup 1 LS D $ 1 C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve `7 /,( T(/V a�� assembly 1 EA r ( j/"j �RJ.4> $ $ 1 19. Install 12-inch cut in valve iwr r#4905 v�2F,� ®- -- assembly 1 EA P wi lfu�- $ 20. Install new 1-inch Oi�i1j P(�u 5 f}Mv polyethylene water service, connect to existing 1-inch Dlt,7 lNt�i2�O meter 8 EA TcJS�i. (Ir'Z $��Zt 21. I.nstall new 1-inch polyethylene water service, p 4" connect to existing 3/4-inch �0 4 meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE H C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization Tj 1 LS r oa� - $�4 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF 0;^ d-C400R40 F (Ftef Pf $ �✓� $ Qua 3. Construct connection in Ellis Avenue 1*Rr"R1 f- me-0 Aoaq 1 LS T fqa S l KL2 $ $ 4. Remove and dispose of Qi4/-, T (f o(A,- }nly existing valve and Z wp (+tl N1*F20 �� , / ` interfering pipeline 1 EA P- ii $ $ 5. Cut and cap/seal existing waterline 2 EA T(Vftt 'j"(cj0"W4' I P1 ILU t-VQZ j $ 0 $_ -t UCH 6. Flushing, Pressure Testing, Disinfection, Dechlorination (E l T ""544vp $ 1 LS .{ jr/� I $ � 7. Traffic control 1 LS t (W q $ 8. Water Pollutant Control Program 1 LS Tf 7#'Vu'd-0'V 9. Sheeting, shoring, and/or bracing 1 LS t(#&L"16-NZ> �2�o� $� --tYft 1HAv 10. Additional potholing 18 EA btu. (2 $_ $ 11. Replace Existing Traffic Yc� Control Loop 4 EA $ $ 12. Demobilization and Cleanup 1 LS fW P'(y'0Urj/AV0 r400 F'a'�� G $ � � $ Sub -Total Amount for All Bid Items — SCHEDULE I $ C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons 37VT`7 $ Q© $_jsc2aQ 2. Install AC 500 Tons A/: x* r / 61 3. Unclassified Excavation 300 Cy 0A,7__tvi 4. Adjust Utility Cover 30 EA Th"O.Sd IV $ 3 50 $_ O:50 o 5. Adjust Water Cover 1 EA $5' $-AL 6. Adjust Sewer/Storm Drain 2 EA 17_7� Manholes 5 'r Tr_7 $ 7. Remove/Construct Concrete Sidewalk 160 SF $2090 8. Remove/Construct V-Ditch 2400 SF Concrete 9. Remove/Construct 500 SF Gr„�5 —z� $ 20 Concrete Drive Approach including $ adjacent gutter 10. Remove/Construct 50 LF S r x 4-c-1 l L-� $ 6S Concrete Curb and Gutter $_ Sub -Total Amount for All Bid Items — SCHEDULE J $ C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules TOTAL BID AMOUNT IN WORDS: ?W- V s S 5� trS wig► 0 Mk4� 15'( 250 69 5- 2 ( 71ro 3IY6 2 66 i n Notes: All extensions of unit prices will be subject to verific ion by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion ; Name and Address of Subcontractor State License'. Class o f Work Number p,Qv�•✓ �� ,��1�-/ cam! By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange .L •¢izrCt.� ll��°"® ,being first duly sworn, deposes and says that he or she is of �' Nr/—n X17 G. the parry making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder ,has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Name of Bidder Signature of Bidder 120 '5'A� ky dl,4'pr j' 5�f'tliw ""C"e-4 Address of Bidder C a � � o CC) Subscribed and sworn to before me this W 11 day of , 2007. NOTARY PUBLIC C-18 lSTEPNMIE HERNANDEZ Commission # 1684371 R .� Notary PubHe - Caftmia . Ventuto County MY Comm. Expfree JW 28, 2010 NOTARY SEAL UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: A9 -7 C-19 (f e_,�A— o �l�OlS • .�i7 Contractor B y145 �s- Title DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE. Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes U'No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: C-21 .�76. Contractor By Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Govermnent Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-8W 422-4133 a minimum of two working.days before scheduled excavation. Dig Alert Identification Number: Contractor By /�- 71 Title Date: Note: This form is required for eneiy Dig Alert Identification Number issued by U.S.A. during the course of the Work . Additional forms may be obtained from the AGENCY upon request. C-22 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: e!f a q S J'_/ets -2 /7 G Bidder Name Business Address City, State Zip Telephone Number State Contractor's License No. and Class Original Date Issued /7,77i Z,,� ExDi ation Date The work site was inspected by A t &, of our office on % , 2007. The following are persons, firms, and corporations having a principal interest in this proposal: C-23 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Company Name Sign tune of Bidder 413 Printed or Typed Signature Subscribed and sworn to before me this -V%ay of , 2007. s1EPHAMIE HERNANDEZ _ Commbslon # 1684371 ,, Notan, Public - California vemra county 1MV Gomm. Expires Jul 28, 2010 NOTARY PUBLIC \ NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 2. 3. Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Name and Address of Public Agency Type of Work Name and Telephone No. of Project Manager: Contract Amount Name and Address of Public Agency Type of Work Name and Telephone No. of Project Manager: Date Completed Date Completed Contract Amount Type of Work Date Completed C-24 PROJECT: SANFORD STORM DRAIN IMPROVEMENTS OXNARD AIRPORT STORM DRAIN IMPROVEMENTS CALABASAS RECYCLED WATER LINE LEWIS ROAD & DAILY DRIVE WATER LINE RELOCATION PLEASANT VALLEY ROAD IMPROVEMENTS DORLAND & MILTON WATER IMPROVEMENT OC-9 TRANSMISSION MAIN SKYLINE RESERVOIR PIPELINE LONG BEACH WATER LINE CEDRO CONSTRUCTION INC OWNER: CITY OF OXNARD 305 WEST THIRD STREET OXNARD, CALIFORNIA 93030 (805) 385-7832 DOC DELFIN VENTURA COUNTY DEPARTMENT OF AIRPORTS (805) 388-4205 LAS VIRGENES MUNICIPAL WATER DISTRICT (818) 251-5100 LI N DSAY CAO CITY OF CAMARILLO (805) 444-6383 DAVID KLOTZLE CITY OF PORT HUENEME (805) 986-6563 LUIS LUNA CITY OF WHITTIER DAVID COLLOSI (562) 464-3520 CITY OF HUNTINGTON BEACH (714) 536-5431 VENTURA COUNTY WATER (805) 654-3805 CITY OF LYNNWOOD (310) 603-0220 ELIAS SAIKALY YEAR DOLLAR AMOUNT 2003 $ 1,300,125.00 2002 $ 825,000.00 2002 $ 531,645.00 2002 $ 365,000.00 2001 $ 600,125.00 2003 $ 556,123.00 2004 $ 3,000,000.00 2005-2006 $ 1,150,000.00 2006 $ 985,000.00 t INTERNATIONAL FIDELITY INSURANCE COMPANY Bond No..CEDCO-213 KNOW ALL MEN BY THESE PRESENTS: That we, CEDRO CONSTRUCTION, INC., (hereinafter called the Principal), and INTERNATIONAL FIDELITY INSURANCE COMPANY, a corporation organized and doing business under and by virtue of the laws of the State of NEW JERSEY, and duly licensed for the purpose of making, guaranteeing or becoming sole surety upon bonds or undertakings required or authorized by the laws of the State of CALIFORNIA, as Surety, are held and firmly bound unto THE CITY OF HUNTINGTON BEACH (hereinafter called the obligee) in the sum equal to 10% of the accompanying bid of the Principal, not, however, in excess of TEN PERCENT OF THE TOTAL AMOUNT BID Dollars ($10% OF BID AMOUNT), for the payment of which, well and truly to be made, we hereby bind ourselves and our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT WHEREAS, the above bounden Principal as aforesaid, is about to hand in and submit to the obligee a bid for WATERMAIN REPLACEMENT AND REMOVAL PROJECT IN VARIOUS LOCATIONS IN THE CITY OF HUNTINGTON BEACH. 1238 in accordance with the plans and specifications filed in the office of the obligee and under the notice inviting proposals therefore. NOW, THEREFORE, if the bid or proposal of said principal shall be accepted, and the contract for such work be awarded to the principal thereupon by the said obligee, and said principal shall enter into a contract and bond for the completion of said work as required by law, then this obligation to be null and void, otherwise to be and remain in full force and effect. IN WITNESS WHEREOF, said principal and said Surety have caused these presents to be duly signed and sealed this 18TH day of JUNE, 2007. C� 1W CEDRO CONSTRUCTION, INC. r Tel (973) 624-7200 POWER OF ATTORNEY INTERNATIONAL FIDELITY INSURANCE COMPANY HOME OFFICE: ONE NEWARK CENTER, 20TH FLOOR NEWARK, NEW JERSEY 07102-5207 FOR BID BOND/RIDER/CONSENTS/AFFIDAVITS KNOW ALL MEN BY THESE PRESENTS: That INTERNATIONAL FIDELITY INSURANCE COMPANY, a corporation organized and existing laws of the State of New Jersey, and having its principal office in the City of Newark, New Jersey, does hereby constitute and appoint ..................... ..................................................................................................................................................... ........................................................................................................... , RANDY SPOHN, MATTHEW R. DOBYNS f } Santa Ana, CA. } ..................................................................................................................................................................................................................................................................................... its true and lawful attomey(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, stature, rule regulation, co tractor otherwise and the execution of such instrument(s) in pursuance of these presents, shall be as binding upon the said INTERNATIONAL FIDELITY INSURANCE COMPANY, as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal office. This Power of Attorney is executed, and may be revoked, pursuant to and by authority of Article 3-Section 3, of the By -Laws adopted by the Board of Directors of INTERNATIONAL FIDELITY INSURANCE COMPANY at a meeting called and held on the 7th day of February, 1974. The President or any Vice President, Executive Vice President, Secretary or Assistant Secretary, shall have power and authority (1) To appoint Attorneys -in -fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and, (2) To remove, at any time, any such attorney -in -fact and revoke the authority given. Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of said Company adopted at a meeting duly called and held on the 29th day of April, 1982 of which the following is a true excerpt: Now therefore the signatures of such officers and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. �.iTY /Nf IN TESTIMONY WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY has caused this instrument to be po (/ signed and its corporate seal to be affixed by its authorized officer, this 29th day of August, A.D. 2003. SEAL �'y INTERNATIONAL FIDELITY INSURANCE CO � � ,y 1904 r STATE OF NEW JERSEY ERS� �� County of Essex rNi * T►a Secretar On this 29th day of August 2003, before me came the individual who executed the preceding instrument, to me personally known and, being by me duly sworn, said the he is the therein described and authorized officer of the INTERNATIONAL FIDELITY INSURANCE COMPANY; that the seal affixed to said instrument is the Corporate Seal of said Company; that the said Corporate Seal and his signature were duly affixed by order of the Board of Directors of said Company. /�1ARq� IN TESTIMONY WHEREOF, I have hereunto set my hand affixed my Official Seal, r���• �� at the City of Newark, New Jersey the day and year first above written. C NOTARY "� PUBLIC !� •k �r yJER`�' A NOTARY PUBLIC OF NEW JERSEY CERTIFICATION My Commission Expires Nov. 21. 2010 I, the undersigned officer of INTERNATIONAL FIDELITY INSURANCE COMPANY do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Section of the By -Laws of said Company as set forth In said Power of Attorney. with the ORIGINALS ON IN THE HOME OFFICE OF SAID COMPANY, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect IN TESTIMONY WHEREOF, I have hereunto set my hand this 18th day of June, 2007 Assistant Secretary CALIPORNIA ALL-PURPOSE ACKNOWLEDGMENT State of CALIFORNIA County of ORANGE On June 18th, 2007 before me Erika Guido NOTARY PUBLIC personally appeared RANDY SPOHN , ® personally known to me -OR- ❑ proved to me on the basis of satisfactory evidence to be the person(s) Whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument ERIKA (31JIM I �M.ii ti57 F10f/QtV WITNE SS my hand and official seal. �j&U /CA44(f Signature of Notary Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER ❑ PARTNER(S) ❑ LIMITED ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTTTY(IES) DESCRIPTION OF ATTACHED DOCUMENT City of Huntington Beach 2000 Main Street • Huntington Beach, CA 92648 OFFICE OF THE CITY CLERK JOAN L. FLYNN CITY CLERK August 30, 2007 S. J. & B. Group, Inc 1115 W La Cadena Dr; Suite 200 Riverside, CA 92501 RE: WATER MAIN REPLACEMENT PROJECT - CASH CONTRACT No. 1238 Enclosed please find your original bid bond for this project. Sincerely, Joan L. Flynn City Clerk JF:pe enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand (Telephone: 714-536-5227 ) a J O: A VLLup, 1. u 115 W. La Cadena Dr.; Ste. 200 Riverside, CA 92501 2007 JUIN 21 PSI 1: 4 7 "SF,4M BID' For Construction of V` ,a C:!`i Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue; `" "'f` from Hill Street to Indianapolis Avenue Watenmin Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, fran Indianapolis Avenue to 170 feet North of Joliet Avenue Watennin Replacenent Project, Joliet Avenue, fran Georgia Street to Beach Boulevard Waternnin Replacerent Project ,Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacerent Project, Beach Boulevard, From Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, fran Florida Street to Beach Boul;evard WatenBin Replacement Project, Main Street, fran Florida Street to Beach Boulevard SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard CASH CONTRACT No. 1238 . in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The 1" Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 C materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2nd Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER .agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find Ib` s in the amount of $ which said amount is not less than 10% of the aggregate of the total bid price; as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 1. Mobilization 1 LS $'�o�a� $4r._oac� 2. Install 8-inch Class 200 PVC pipeline in the Alley between Geneva Avenue and Frankfort Avenue 765 LF $ 12 3 3. Remove and dispose of existing 4-inch Cl pipeline 650 LF $.1-1_ $ 1l OSo 4. Provide temporary water service 1 LS $10000 $ 104 oDo 5. Construct waterline connection in Hill Street 1 LS $ $ 6. Construct fire hydrant assembly 1 EA $ IF-7oa 7. Cut and cap/seal existing waterline 3 EA $ zcc-- $ Lo 8. Remove and dispose of existing valve 2 EA $ 9. Relocation of sewer laterals 15 EA $ t000 $_ l5 .oaf 10. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 11. Traffic control 1 LS 12. Sheeting, shoring, and/or bracing 1 LS 13. Additional potholing 20 EA $ � $_1C>• Cco� 14. Demobilization and Cleanup 1 LS 15. Install 4-inch cut in valve assembly 1 EA $ `Eta $ 41st�_ 16. Install new 1-inch polyethylene water service 5 EA $ L - t PROJECT BID SCHEDULE A Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue BID ITEMS Item No. Description Quantity Unit Unit Cost in Words Unit Cost Total Cost 17. Install new 1-inch polyethylene water service, connect to existing 3/-inch meter 11 EA $ 1L $ l , CXDc� 18. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 7 EA $ t�0 $ "� 000 19. Install 4-inch pump -out assembly 1 EA 20, Replace Existing Traffic Control Loop 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE A $ 2A5, '795 C-4 PROJECT BID SCHEDULE B Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection BID ITEMS Item IUnit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $2 $ vs, 2. Install 8-inch Class 150 PVC pipeline in Indianapolis Avenue at Beach Boulevard 110 LF $ Iq \ $-U+( O 3. Install 12-inch Class 350 DI pipeline in Indianapolis Avenue at Beach Boulevard. 172 LF 4. Install '12-inch Class 200 PVC pipeline. in Indianapolis Avenue at Beach Boulevard 45 LF $ l55a 5. Install 24-inch steel casing in Indianapolis Avenue at Beach Boulevard, with receiving pit, and jacking pit 164 LF $ �3}� 6. Install 12-inch cut in valve assembly 1 EA $55So $ s5Sfl 7. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ !fs=�o 8. Traffic control 1 LS 9. Water Pollutant Control Program 1 LS $ 2 $ Z�c 10. Sheeting, shoring, and/or bracing 1 LS $ tom' $ 1 ©� 11. Additional potholing 15 EA 12. Demobilization and Cleanup 1 LS $ 5000 $ StAnc-3 13. Replace Existing Traffic Control Loop 8 EA $ $Acx-c�- Sub -Total Amount for All Bid Items — SCHEDULE B $ 3co C-5 , PROJECT BID SCHEDULE C Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $yo,000r $.!! to oco- 2. Install 12-inch Class 150 PVC pipeline in Beach Boulevard 500 LF 3. Install 8-inch Class 150 PVC pipeline in Beach Boulevard 25 LF $ 111 $ 14 Z-7S 4. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 5. Traffic control 1 LS $gam' $ q000 6. Water Pollutant Control Program 1 LS $ 2sxaa $ Z000 7. Sheeting, shoring, and/or bracing 1 LS $ 1oe>o $ aoo 8. Additional potholing 20 EA $_t- � DO $ 5 o00 9. Demobilization and - Cleanup 1 LS 10. Replace Existing Traffic Control Loop 4 EA Sub -Total Amount for All Bid Items — SCHEDULE C $ / 7 5 7 IS- 7- C-6 S PROJECT BID. SCHEDULE D Watermain Replacement Project, Joliet Avenue, from Georgia Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $loco $ io, moo 2. Install 8-inch Class 150 PVC pipeline in Joliet Avenue 325 LF $ $ 4 S 3. Install 8-inch Class 150 and 200 PVC pipeline in Georgia Street at Joliet Avenue 115 LF $ � I $ t5'(o&S 4. Install 4-inch cut in valve assembly 2 EA 5. Construct _ fire hydrant assembly 1 EA $ $ 5ck�' 6. Remove and salvage existing fire hydrant 1 EA $ lgoo 7. Remove existing valve box and cover 3 EA $ _ 8. Cut and cap/seal existing waterline 2 EA 9. Install 2-inch ' air and vacuum assembly 1 EA $ S"C)C' $_ Ssao 10. Relocation of sewer laterals 6 EA $ $ (o 11. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ moo 12. Traffic control 1 LS $ -LC:.Co 13. Sheeting, shoring, and/or bracing 1 LS $ t tx� 14. Additional potholing 20 EA $ Sm $ 15. Demobilization and Cleanup 1 LS $ 31 000 $ 'l�cx'yp 16. Install new 1-inch polyethylene water service, connect to existing %-inch meter 5 EA $ IZM $ 17. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA Z $ '�1� $ Z3� Sub -Total Amount for All Bid Items — SCHEDULED $ 15 8 X50— C-7 PROJECT BID SCHEDULE E Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 and 200 PVC pipeline in Utica Avenue 590 LF $1 z7 3. Construct fire hydrant assembly 2 EA $ g �� $_�t�_"� 4. Remove and salvage existing fire hydrant 2 EA $ Z $ Sao 5. Remove existing valve box. and cover 6 EA $ Z. $ 6. Cut and cap/seal existing waterline 2 EA $ SV'0 $scoop 7. Relocation of sewer lateral 6 EA $_I Coo_ 8. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ 4or� 9. Traffic control 1 LS $ Sbco $ C o 10. Sheeting, shoring, and/or bracing 1 LS $ tam 11. Additional potholing 20 EA 12. Demobilization and Cleanup 1 LS $ 5SCX> 13. Install new 1-inch polyethylene water service, connect to existing 3/-inch meter 7 EA $ to�c 14. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 1 EA $ hc7 15. Install new 2-inch copper water service, connect to existing 2-inch meter 3 EA $rhpn 16. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 1 EA $_2-5-1�!-� $?-_ Sub -Total Amount for All Bid Items — SCHEDULE E $ 18_3 `130 C-s PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ $_40, Coo- 2. Install 6-inch, 8-inch and 12-inch Class 150 and 200 PVC pipeline in Beach Boulevard 1300 LF $ �ez-� / � 3. Construct 12-inch D.I. inverted siphon assembly .31 LF 4. Install 12-inch Class 150 PVC watermain in Beach Boulevard at Yorktown Avenue 24 LF $ 37 $ g�a t 5. Construct 12-inch D.I. siphon assembly 49 LF 6. Construct waterline connection in Beach Boulevard 1 LS $1k. 7. Remove and salvage existing fire hydrant 2 EA $ 1G%cc> $ 3 8. Construct fire hydrant assembly 2 EA 9. Remove existing valve box and cover , 5 EA $ oo $ 15'Do 10. Cut and cap/seal existing waterline 6 EA $_35�_ 11. Remove and dispose of valve and _existing interfering piping 1 EA $ qlCX> $ q 7yo 12. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ Born 13. Traffic control 1 LS 14. Water Pollutant Control Program 1 LS $ 1*c> $ "3 15. Sheeting, shoring, and/or bracing 1 LS 16. Additional potholing 30 EA $_ S� 17. Demobilization and Cleanup 1 LS C-9 PROJECT BID SCHEDULE F Watermain Removal Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut in valve assembly 2 EA $ t $ r�.+o•?�'� 19. Install 4-inch pump -out assembly 1 EA $ $ S7CXo 20. Install 2-inch air and vacuum assembly 2 EA $ ('� $ I-L600 21. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 2 EA 22. Install new 2-inch copper water service, connect to existing 2-inch meter 4 EA 23. Replace Existing Traffic Control Loop 8 EA $ S $ '-Fcpx=� Sub -Total Amount for All Bid Items — SCHEDULE F $ S S _ qco C-1 o PROJECT BID SCHEDULE G Watermain Replacement Project, Beach Boulevard, from Clay Avenue to Garfield Avenue BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ to.« 2. Cut and cap/seal existing waterline 4 EA 3. Remove existing valve box and cover 4 EA 4. Construct fire hydrant assembly 1 EA 5. Remove and salvage existing fire hydrant 1 EA 6. Traffic control 1 LS 7. Water Pollutant Control Program 1 LS $?c-u $ Z—J 8. Sheeting, shoring, and/or bracing 1 LS $ 1 9. Additional potholing 10 EA $ 1ocQ� 10. Demobilization and Cleanup 1 LS $`{eoo $ (o. coo 11. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 2 EA $�soo $ 3eo� 12. Install new 1-inch polyethylene water .service, connect to existing 3/4-inch meter 1 EA $kse>C> $ k46oc, 13. Install new 2-inch copper water service, connect to existing 2-inch meter 6 EA $? > $ Is,_�E' 14. Install new 2-inch copper water service, connect to existing 1 1/2-inch meter 3 EA sl Sub -Total Amount for All Bid Items — SCHEDULE G C-11 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS 2. Install 8-inch Class 150 PVC pipeline in Clay _ Avenue 565 LF $ /R $� 3. Install 12-inch Class 350 D.I. pipeline in Clay Avenue at Beach Boulevard 120 LF 4. Install 24-inch steel casing in Clay Avenue across Beach Boulevard, with receiving pit and jacking pit 96 LF $ �µ{v $ 4Z 2,�{0 5. Install 8-inch Class 150 PVC pipeline at the Beach Boulevard and Clay Avenue intersection 55 LF 6. Install 8-inch Class 200 PVC pipeline in Coenson Circle at Clay Avenue 17 LF 7. Remove and salvage existing fire hydrant 2 EA 8. Construct fire hydrant assembly 3 EA 9. Cut and cap/seal existing waterline 4 EA 10. Remove existing valve box and cover 5 EA $_ : --;t>c> 11. Remove and dispose of existing valve and interfering pipeline 1 EA 12. Relocation of sewer laterals 10 EA 13. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS 14. Traffic control 1 LS 15. Sheeting, shoring, and/or bracing 1 LS 16. Additional potholing 20 EA $ %o,oC p 17. Demobilization and Cleanup 1 LS $ "? �'� $ ��`"'u C-12 PROJECT BID SCHEDULE H Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 18. Install 8-inch cut, in valve assembly 1 EA $4100 $ 41 C%-., 19. Install 12-inch cut in valve assembly 1 EA $%.e'l $ to1C)q 20. Install new 1-inch polyethylene water service, connect to existing 1-inch meter 8 EA $ k $ 21. Install new 1-inch polyethylene water service, connect to existing 3/4-inch meter 1 EA Sub -Total Amount for All Bid Items — SCHEDULE H $ 3 , o^Z` C-13 PROJECT BID SCHEDULE I Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Mobilization 1 LS $ t5 00c� $ t6 � 2. Install 8-inch Class 150 PVC pipeline in Main Street 600 LF $ 3. Construct connection in Ellis Avenue 1 LS $00 $ '7�t�0 4. Remove and dispose of existing valve and interfering pipeline 1 EA $ (p10A _ 5. Cut and cap/seal existing waterline 2 EA 6. Flushing, Pressure Testing, Disinfection, Dechlorination 1 LS $ke.cco $ (.0. expo 7. Traffic control 1 LS $ tocx�o 8. Water Pollutant Control Program 1 LS $? 9. Sheeting, shoring, and/or bracing 1 LS 10. Additional potholing 18 EA $ stn $ F 11. Replace Existing Traffic Control Loop 4 EA $_5P-0 $ 12. Demobilization and Cleanup 1 LS $ 5.t1oo $ S Sub -Total Amount for All Bid Items — SCHEDULE 1 $ (-I C-14 PROJECT BID SCHEDULE J Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item Unit No. Description Quantity Unit Unit Cost in Words Cost Total Cost 1. Install Aggregate Base (AB) 1200 Tons $ 3"i $ yLkILvc>c> 2. Install AC 500 Tons $ 15 $ 4-7 5cx--> 3. Unclassified Excavation 300 CY 4. Adjust Utility Cover 30 EA $ ISOa $ �-i5 rOGD 5. Adjust Water Cover 1 EA $ --,s Co 6. Adjust Sewer/Storm Drain 2 EA $ �o Manholes $YI voc>- 7. Remove/Construct 160 SF Concrete Sidewalk $ 3tz oc> 8. Remove/Construct 2400 SF $ k� Concrete V-Ditch $?- V-4 4 CC�� 9. Remove/Construct 500 SF $' Concrete Drive Approach including adjacent gutter 10. Remove/Construct 50 LF $ y35 Concrete Curb and Gutter Sub -Total Amount for All Bid Items — SCHEDULE J C-15 PROJECT BID SCHEDULE BID ITEMS PROJECT BID SCHEDULE TOTALS CC-1238 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J TOTAL BID AMOUNT (Schedules A-J) TOTAL BID AMOUNT IN WORDS: 235, -1ct5— tgZ,843to -7'' S $ Cot -2 Oct P �l'L Z 00 — Loc7 � 050' --T Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-16 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion Name:and Address of Subcontractor State.License Class of Work Number All oi_,& C64 q1- 7-6 0'73 fi By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2.. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-17 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange 1L)&gE A. VN «.LE , being first duly sworn, deposes and says that he or she is e.F-v of "[KW SSA I C 9-6yP &-4 the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a.collusive or sham bid. Name of Bidder Signature of Bidder G c its, W. (. Ab iz g A VA?Xjo G Wt�LS t Oe' Address of Bidder CA 4� 2. 5 4) t Subscribed and sworn to before me this 15rday of J�� , 2007. NOTARY PUBLIC C-18 FRANKNOAH SCHMITZ Commission # 1505021 .m Notary Public - California Riverside County My Comm. Expires Aug 1, 2008 NOTARY SEAL ALL-PURPOSE CALIFORNIA ACKNOWLEDGEMENT ************************************************************************************************************************************** * * * * State of California SS. County of tv/ cVLS tOE * * On (Au kb-) before me, ( ATE) (NOTARY) * * * * personally appeared * * * personally known to me (or proved to me on the basis of satisfactory evidence) to be the personH whose name(s)-is/,w@ subscribed to the within instrument and acknowledged to me that he/sike4 r y executed the * * same in his/h=4heir authorized capacity(.i4es�, and that by his/l ap"r signature(s) on the instrument the * * * * person(&), or the entity upon behalf of which the person(-s) acted, executed the instrument. * * * * NOAH FRANK SCHMI?Z Commission # 1505021 * Nofary Public - California * WITNESS my hand and official seal. •� Riverside county * Comm. Expires Aug 1, 2008 * WlY * * * * * * * * * * Signature (seal) * * * * * * * * * * * * * * * * * * * * * *****************OPTIONAL INFORMATION***************** * * * The following information is not required by law, however it may be helpful in preventing fraudulent use * of this acknowledgement. * * * * * * * * * * * * * * * DOCUMENT TITLE OR DESCRIPTION * * o * * * Z DOCUMENT DATE: NUMBER OF PAGES: * * * COMMENTS: a * * * * * * * * * i w * N * Z * a * ©2004, USA Signing Services, Inc. • (800) 699-8522 • www.USAsigning.com UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Alley Between Geneva Avenue and Frankfort Avenue, from Hill Street to Indianapolis Avenue; Watermain Replacement Project, Indianapolis Avenue and Beach Boulevard Intersection; Watermain Replacement Project, Beach Boulevard, from Indianapolis Avenue to 170 feet North of Joliet Avenue; Watermain Replacement Project, Joliet. Avenue, from Georgia Street to Beach Boulevard; Watermain Replacement Project, Utica Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Beach Boulevard, from Utica Avenue to Yorktown Avenue; Watermain Removal Project, Beach Boulevard, from Clay Avenue to Garfield Avenue; Watermain Replacement Project, Clay Avenue, from Florida Street to Beach Boulevard; Watermain Replacement Project, Main Street, from Florida Street to Beach Boulevard (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility. Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. fi t f--C 'S-T 8 G j1.,� (, 2..• L Contractor By C_ o Title Date: G - 'L 1 —� 1 C-19 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes VNo If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-20 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: 16 ^--t' I - 0 -) C-21 Contractor By C-4 V Title UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-422-4133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor LM Title Date: Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work Additional forms may be obtained from the AGENCY upon request. C-22 t BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: S 3- Bidder Name Business Address CAA Q2sn I City, State Zip Telephone Number --? (o I o i 1 11� State Contractor's License No. and Class y-30 -- 1Ci 9 1 Original Date Issued y—.30 — -2,v 0 Expiration Date The work site was inspected by Sett of our office on lP '$ 1 0-1 , 2007. The following are persons, firms, and corporations having a principal interest in this proposal: R-'�- C-23 ALL-PURPOSE CALIFORNIA ACKNOWLEDGEMENT State of California SS. County of 2 j %Ij 0 E On (Q,Lt It=,-) before me, N0-0,0 5(Aj (DATE) (NOTARY) personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person() whose name(gj is/axe subscribed to the within instrument and acknowledged to me that he/s#e4wy executed the same in his/lwr4hti-authorized capacity(-i-I and that by his/her/their signature(s) on the instrument the personksa , or the entity upon behalf of which the person(s) acted, executed the instrument. NOAHomm FRANK 150502 CHMITZ Commission # 1505021 WITNESS my hand and official seal. Notary Public . California Riverside County . 2008 My Comm. Expires Aug Signature (seal) *****************OPTIONAL INFORMATION***************** The following information is not required by law, however it may be helpful in preventing fraudulent use of this acknowledgement. DOCUMENT TITLE OR DESCRIPTION DOCUMENT DATE: NUMBER OF PAGES: COMMENTS: ©2004, USA Signing Services, Inc. - (800) 699-8522 - www.USAsigning.com g 0 O z Z a m a� 2 a The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Company Name C_ Signature of Bidder ]'_') Ufb4 E _ Printed or Typed Signature � Subscribed and sworn to before me this � �day of �E 20 NOAH FRANK SCHMITZ Commission # 1505021 ,.a Notary Public -California Riverside County My Comm. Expires Aug 1, 2008 NOTARY PUBLIC 1% v NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: C %-N py C,oi �, 12A S L,J, Name and Address of Public Agency Name and Telephone No. of Project Manager: Ug>-P l• �►bu�� ,,� 9g%-13�-4%A 0 1 e13'�� Contract Amount Type of Work Date Completed 2. -�u t�'ao. C_C%' �VA t=&JhCA0' ►dlo"&0-* Name and Address of Public Agency qVI (A - Name and Telephone No. of Project Manager: u+''1� `J��►w ob1. Contract Amount Type of Work Date 1 .t om`- ° o�L C 3W-L Kibmea Ave V_%%V41,4dr. CA Name and Address of Public Agency SZ S-CK Name and Telephone No. of Project Manager: M Vow- ee-- 0%51- (.%-(-5go1 Contract Amount Type of Work Date Completed C-24 5AFEC® KNOW ALL BY THESE PRESENTS, That we. SAFECO INSURANCE COMPANY OF AMERICA GENERAL INSURANCE COMPANY OF AMERICA FIRST NATIONAL INSURANCE_ COMPANY OF AMERICA HOME OFFICE: SAFECO PLAZA SEATTLE, WASHINGTON 98185 THE S. J. & B GROUP, INC. 115 W. LA CADENA DR. #200, RIVERSIDE CA 92501 of (hereinafter called the Principal), as Principal, and SAFECO INSURANCE COMPANY OF AMERICA (hereinafter called the Surety), as Surety, are held and firmly bound unto CITY OF HUNTINGTON BEACH (hereinafter called the Obligee) in the penal sum of TEN PERCENT OF THE AMOUNT OF THE BID Dollars ($ 10% OF BID ) for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That WHEREAS, the Principal has submitted or is about to submit a proposal to the Obligee on a contract for WATERMAIN REPLACEMENT — VARIOUS LOCATIONS NOW, THEREFORE, if the said Contract be timely awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing, and give bond, if bond is required, with surety acceptable to the Obligee for the faithful performance of the said Contract, then this obligation shall be void; otherwise to remain in full force and effect. Signed and sealed this 14th day of Witness JUNE 2007 THE S . J . & B GROUP, {NC. (Seal) Principal C-�CTitle SAFECO INSURANCE COMPANY OF AMERICA M"ELD. T Attorney}iri*tFact S-53 R8 11/75 PRINTED IN U.S.A. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California SS. County of RIVERSIDE On IIN107 -before me, R. CISNEROS "NOTARY PUBLIC" Date Name and Title of Officer fe.g-,'Jane Doe, Notary Pllblic7 personally appeared MICHAEL D. STONG Name(a)of Signer(a) R. CISNEROS CO- COMM. #1488731 2 NOTARY PUBLIC -CALIFORNIA RIVERSIDE COUNTY °4 •^ " M Comm. Expires June 7, 2008 ® personally known to me ❑ proved to me on the basis of satisfactory evidence to be the person whose nameis/VL!r subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/hagOieir authorized capacity(ies�, and that by his/he4their signature(sWon the instrument the personA, or the entity upon behalf of which the person(4 acted, executed the instrument. WITNESS my hand and official seal. Place Notary Seal Above Signature ofNotary Public OPTIONAL Though the information below is not required by taw, it may prove valuable to persons retying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: ❑ Individual Top of thumb here ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 0 1%9 National Notary Aaw:il lion • 9350 Oe Soto Ave., P-O. Box 2402 • Chatawom. CA 91313.2402 • www.natlonnlroloryorg Prod. No. 5007 Aeordo Call Taa-Free 1-900.676.6927 POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS: No. 6966 Safeco Insurance Company of America General Insurance Company of America Safeco Plaza Seattle, WA 98185 That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appoint **********SHAWN BLUME; ROSEMARY CISNEROS; JEREMY PENDERGAST; MICHAEL D. STONG; Riverside, California********* its true and lawful attorney(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character issued in the course of its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this 8th day of March 2007 STEPHANIE_DALEY-WATSON,SECRETARY TIM MIKOLAJEWSKI, SENIOR VICE-PRESIDENT, SURETY CERTIFICATE Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V, Section 13 of the By -Laws, and 00 A copy of the power -of -attorney appointment, executed pursuant thereto, and (iii) Certifying that said power -of -attorney appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." I, Stephanie Daley -Watson , Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation this / / day of ? I �' CO�ORATE SEAL W SEAL s l 1953 & �� tsZy d'lOf wisttrD(Nla1�+�id S-0974/DS 4105 STEPHANIE DALEY-WATSON, SECRETARY Safeco® and the Safeco logo are registered trademarks of Safeco Corporation. WEB PDF bs k ALL-PURPOSE CALIFORNIA ACKNOWLEDGEMENT State of California ss. County of On ('0116n before me, Qm.Pr*Jc_ CA„„, % (D TE) (NOTARY) personally appeared C Tt� A • Il i i "F— personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(it) whose name(.&) is/arse subscribed to the within instrument and acknowledged to me that he/s4e4he9 executed the same in his/hopAhrir authorized capacity(+es.), and that by his/hap� signature() on the instrument the person(s), or the entity upon behalf of which the person(&) acted, executed the instrument. T;;.I�NoAH FRANK SCHMIR Commission # i 505021 WITNESS my hand and official seal. i0my Noiary Public - CGIWOMiaRiverside County Comm. Expires Aug 1, 2008 Signature (seal) *****************OPTIONAL INFORMATION***************** The following information is not required by law, however it may be helpful in preventing fraudulent use of this acknowledgement. DOCUMENT TITLE OR DESCRIPTION DOCUMENT DATE: NUMBER OF PAGES: COMMENTS: ©2004, USA Signing Services, Inc. - (800) 699-8522 - www.USAsigning.com 4N (J N Z a m I� c� S