HomeMy WebLinkAboutBelczak and Sons Inc. - 1988-02-16j go 2000 MAIN STREET CALIFORNIA 926.48 OFFICE OF THE CITY CLERK Febru4ry 19, 1988 Solid Structures Construction, Inc. 749 S. Brea Blvd., Suite 42, La Brea, CA 92621 We are returning your Bid Bond which was submitted with your proposal for Heil Avenue Flood Control Improvements, CC:-649, in said City of ffuntincton Beach. The contract for this job was awarded to Belczak and Sons Inc. o° Orange. We would like to take this opfvrtur._.:-y to thank you for your interest in submitting a proposal. Alicia M. Wentworth City Clerk AK4: pm Enclosure (T66POW .11"*4Zrf CITY OF HUNTINGT13N BEACH 2000 MAIN STREET CALIFORNIA 9260 OFFICE OF THE CITY CLERK February 19, 1986 N. A. Artukovich Construction Co. 11 Cambria Drive Corona Del tsar, CA 92625 We are returning your Bid Bond which was submitted with your proposal for Heil Avenue Flood Control Improvements, CC-649, in said City of Hunt+.ngton Beach. The contract for this job was awarded to Selczak and Sons Inc. of orange. We would like to take this opportunity to think you for your interest in sub-mitting a proposal Alicia 14. Wentworth City Clerk A!6"W: pm Enclosure (Tires+: 7 t 4 4*4227 ) 1 Bia PAarosAL Firms Name To the Honorable Mayor and City Council, City of Huntington !leach, California: 1 In compliance with the notice Inviting sealed proposals for the HEIL AVENUE r LOM CONTROL IMPROVEMENTS -- PHASE I I hereby propose and agree to enter Into a contract to perform th.r work heroin described and to furnish the materials therefore according to the plans, specifications and special provisions for the said work and to the satisfaction of and under the supervision of the Director of Public Works of said City of Huntington Beach, California. The undersigned has not accepted any bid from any subcontractor or materlalman through any bid depository, the by -lags, rules or regulations of which prohibit or prevent the i contractor from considering any bid from any subcontractor o. material man which if not procsssed through said bid depository, or which prevent any subcontractor or materialman 1 from bidding to any contractor who does not use the facilities of or accept bids train or through such bid depository. For the furnishing of all labor, materials and equipment, and or all incidontal work necessary to deliver all the improvements complete In place In strict conformity with the plans, specifications and special provisions, an file In the afflict of the Director of Public Works, City of Huntington peach, California, I propose and agree to take full payment therefore at the following unit prices; to wit: ITEM APPROXIMATE ITEM WITH UNiT PRICE UNIT NO. QUANTITY WRITTEN IN WORDS PRICE TOTAL All work relating to canstnx:ticn of the daub le P® under Heil Av am e including !xcavatien, rwgNa.l of single RCB, backfiU utility reloca- tion (except waterline) , cut and 1. urp Sun clutter, driveway removal acid ocrr- strucrticn and cmtrol of ground and surface water, ccWlete in place for tom. i,a,�inp►-Sin Ct Asphalt aonc ete in place P.1 • • ITEM APPROXIMATE ITEM WITH UNIT PRICE UNIT NO. QUANTITY WRITTEN IN WORDS PRICE TOTAL Aggregate base in phaaa Arc 3. 4 a0 7tms per ton. IY ffic control- 4. L T sum pPsAPS 1)X-P Sum. r Removal of existing 12•-inch Ialterllne in Heil Ave. as izhown cn plans includirq 5. 135 lineal ft. excavation and bat*fi ll, ocuplete in plae for the unit price of .1 Installation of 1.2-inch Clms 52 ducti iron pipe as shown an plans including 6. 40 lineal ft. excavation and backfill, cmplete in place f,-w the unit price of •.:_t. t Installation of 1. -inch Cla,s 150 PW pipe as shown on plans including ex- 7. 90 lineal ft. backfill, trio l -in= butterfly Icavat-4cn, valves, cmplete in pl x fc r the unit price c" All work relating to sheeting and shorirg for worker protection including all Labcr, 8. DMP C:kn equipment, materials, and appurtenant work,, complete in p laoe for the lug sum of BASE TCJI'AL ADDITIVE BID rrEMS Construction of r&w 36--inch ACP (1750D) and removal of existing 24-inch FCP . between Stations 1+52.25 and 2+65.64 including excmtian, backfill, drivewn , 1. 133 lines I ft. romwal and ccnstructi cr cc p lete in lase for the unit price of `ram r Yea., ..N, .•..- � � , (' 1. , • L_.,• _ � P -2 V 04 in ITEM APPROXIMATE ITEM WITH UNIT PRICE UNIT NO. QUANTITY WRITTEN IN WORDS PRICE TOTAL construct junction strac=e Type A 2. 1 each (mrxUfied) pur std. p3mn 306 .+ e`,.t.. 0 00- 1 construct junction stricture Zype A ' per std. ply 306 • --t 3. 1 each --t��•,L>�,R,.,� �i=>>,`-titi}n� peer each. v cau AODITIVF.S zCxi'AI, (Base L A,d&tive I tars ) 1 � P-3 It Is understood and agreed that the approximate quantities shorn in the foregoing proposal schedule are solely for the purpose of facilitating the comparison of bids and that the contractor's compensation will he computed open the basis of the actual quantities In the completed work, whether they be were or loss that Sese shown Mersin at the volt prices bid in the proposal schedule. The undersigned understands the contract time limit allotted for the contract Is _ 180 _ c.1endar ydlys .—.• If awarded the contract, the undersigned hereby afire as to sign said contract and furnish the necessary bonds within ton (10) days of the award of said contract, and to begin work within ten (10) days from the date of approval of the contract by the Ci!y of Huntington leach, California. The undertigned has examined carefully the site of toe work contemplated, the plans and specifications, and th` proposal and contract forms therefor. The submission of a bid shall be conclusive evidence that the bidder has Investigated and Is satisfied as to the conditions to be encountered, as to the character, quality, and scope of work to be performed, the quantities of materials to be furnished, and as to the requirements of the proposal, plans, specifications$.and the contract. Accompsaying this proposal !s "E3jddpr15 13f,nd" (f )• NOTICE: Insert the words 'Cash,''Certified Check,' or bidder's Oond,e as the case may be, In an amount equal to at least 10 percent of the total bid price, payable to the City of Huntington Reach. 'The undersigned deposits the above reamed security as a proposai guaranty and agrees that it shall be forfeited to the City of Huntington baacA as liquidated damages in case this proposal Is accepted by the City and the undersigned shall fall to execute a contract for doing said work and to furnish good and sufficient bonds In the form sot forth in the specifications and contract documents of the City, with surety satisfactory to the City within 10 days after the bidder has received written notice of the award -of the contract; otherwise said security shall be returned to the undersigned. Licensed In accordance with an act providing for the registration of contract License No. _ •,q1 1 n, r • Be czak & Scn Tim S. �/Iczak-ef/7 s cte f - Signaturs of Bidder, Business Address P.O. Box 3196, Orange, CA 92:565 t l a s e of Resident* 98„5, $r-arrze2 ti-i=tMrV a t if 3 n a l i e i m, CA Da,e this 28th ety of J-nnuary . 193d Bidder shall signify receipt of all Addenda here, If any: Addandum He. Date Received Bidder's Sianaturs P-4 1 rRorosEo 4ORMATION REQUIRED OF SIDIN Bidder Is required to supply the fallowing Information. Additional shoots May be attached If necessary. , 1. F I 0 N a m e: .�,iie �s- 7 a k & Snn r. r..�..:�"�._.._� P.O. Box 3196 2. Address: _aneti,--4.40.36653• Telephone: 7„�ggp_592n +4. Type of firmAndlridual, partnership, or corporation: L24Lr�.r.'�� g.il S. Corporation organized tinder the lass of the State of: r p i t rn i a 6. Contractor's License Number: 221101A ). List the names and address of all members of the firm or names and titles of all officers of the corporation: JiM S. BelCzak -Preai t:n_ ,-;mac 1T3gas._,,, John J. Belezak-Vice President S. Number of years experience as a contractor In construction work: l vPr3r,�,,r 9. Llst at least six projects completed as of recent date: CONTRACT CLASS OF DATE AMOUNT WORK COMPLETED NAME, ADDRESS R PHONE NUMBER OF OWNER 589,300. Dec.1987 Hillman Prop.West, Inc. Storm 450 Newport Dr.Ste.304 San Bernardino Co. Flood Control Dist. 967,256. Storm Oct.1986 825 E. 3rd.St. Drain an ernar ino o. Flood -control Dist. 1.879,214. Storm Oct.1986 825 E. 3rd. St. Drain avzaa-d inn CA n Ventura Co.Flood Control Dist. 1,283,849. Storm Drain March 1?86 1 600 S. Victoria ran%Je Storm ..UJ6YY 34],242. Drain Oct.I985 400 Civic Center Dr. r r Control. 642..556. ...�CA Storms July i935 --P.O. Box 14GO 818-458-3104 10. Lisv the name of the person who Inspected the site of the proposal wprk for your firm: Tim R_ RP_]r k Date of Inspection: January 19, 1988 it. If requested by the City, the bidder shall furnish a notarized financial statement, financial data, or other infetmatlen and references sufficiently comprehensive to permit an appraisal of his current flnanclai tenditles. P-5 DANATION Of SUBCONTRACTOR In compliance with the "Subletting and Subcontracting fair Practices Act' being Section 4100-4113 of the Government Code of the State of California, and any amoadmolits thereto, each bidder shall set forth below the name and location of the place of busincrs of each subcontractor who will perform work or labor or render service to the prime contractor in or about the conssruction of the work or Improvement In an amount III excess of one4alf (1/2) of ono percent (196) of the prime contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only eae subcontractor for each portion shall be listed. If the contractor fails to specify s subcontractor for any portion of the work to be performed under the contract, he shall be doomed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth. Subletting of subcontracting of any portion of the work to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the Legislative Body of the owner. PORTION OF WORK SUBCONTRACTORS NAME AND ADDRESS STATE LICENSE NUMBER CLASS 1 By ;ubmission of this proposal, the contractor sbrtlfles: 1. That he Is able to and will perform the balance of all work which Is covered In the above subcontractor listing. 2. That the City will be furnished copies of all sub —Contracts entered Into and bonds furnished by subcontractor for this project. V= 0 REQUE6-i' FOR CITY COUNCI ►CTION Date February 2, 1988 Submitted to: honorable Mayor and City Council oboo G� Subtr�ittad bY: Paul E. Cook, City AdministratorV �.f GZK� PtOWIdbY: Les G. Evans, Director of Public Works V r f� � Subject: Heil Avenue Flood Control Improvements; C�'� GLti� Consistent with Council Policy? (Xj Yes [ j New Policy or Exception Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions, Attachments: M State -en � oZ ,sue: Pursuant co C_,uncil authorization of December 1, 1986, bids were received on January 28, 1988 for t.ly-, construction of the Heil Avenue Flood Control Improvements. Reccmrendat- on: 1.) Accept the la4 bid submitted to Belczak and Sons, Inc. and authorize the Mayor and City Clerk to execute the appropriate contract in the ar;runt of $333,125.00. 2.) Approve the transfer of an additional $113,626.00 from the drainage fund (M301) into the project account (826490) to cover project costs. 3.) Authorize tho Director of Finance to encumtxer $15,000.00 for anticipated project "incidentals." ,'Ina1� s& On Deco rr er 1, 1986, Council approved plans and specifications for Heil Avenue Flood Control Inprctiemen`- and authorized staff to solicit construction bids. On January 21, 1987, two bids .,ere receive(! ($272.000 and $502, 000) and the low bidder refused to execute the contract. Staff again solicited bids on May 20, 1987, receiving only one bid (5520,000). Staff at that time found that the reason for the inflated hid and low turr out was because of the high construction activities during that period. Staff reca-anended rejecting the bid. The bids, as suranarized belrr4, s..vre received on January 28, 1988: Contractor Bids 1. Belczak & Sons, Inc. c333,125.00 2. Fleming Engineering 375,310.00 3. G. B. Cook Construction 395, 560.00 4. Solid STructures Construction 399,663.00 5. Matt Zaich S Sons Construction y05,800.00 6. Duffy Construction 422,140.00 7. M.A. Artukovich Construction 440,000.00 8. Pentaco 6 A.M. Galbreath 548,803.00 Staff has reviewed the bid proposals and reccmrnends the acceptance of the Aelezak a :tons, Incorporated bid. 9 1 Flo 510 Request for Council Action Heil Avenue Flood Control Improvements; CC-049 February 2, 1988 Page 2 However, because the low bid exceeds the $267,812.011 set aside for this project, staff requests Council approval o" an addit-oval $1 1 3,52G.00 from the unappropriated drainage fund balance because of this rlraintige project's high priority. Funding Source: Contract Arnottrt $313,125.00 Less Cont'saagencies (10 %) 33,313.00 Project "Incidentals" 15,000.00 Total $3H i,43R.00 Unallocated funds of $267,1312.00 are available in tree project :ar-count: t,,,wever, there, is a :shortfall of $113,626.00. Thereforc, staff requests approval to transfer $113,626.00 from account IvI301 (unappropriated drain age funds) to tht, project acrnunt (i.e. 026490). This approval will provide_ sufficient projt.ct funds to cover construction costs, contingencies, and project "incidentals". However, staff is not authorized to encumber funds for the "incidentals" withcat 7ou,)cil approval. Therefore, the Actinrl Director of Public Vlort•s recommends that the Director of Finance be authorjzfnd to enc+an-,hi!r $15,00f).00 for tho anticipate project "incidentals". Alternative Action Reject all bids :and direct st.+ff to c,it wr rfs-arivertise or Wi andon the tarojec't. Attachments: F.I.S. 1-4int) 151Pita/14 SECTIONAL DISTRICT MA;' 23-5-II CITY OF HUNTINGTON BEACH ORANGE COUNTY, CALIFORNIA USE OF PRO ERTY MAP CpwwY[A •+rt P; 4, 7 FFE , " II � J rl, 1 � ..t• • t CF-E Joe 7:,:3L . c . c . r•Y/ MaeA i CITY OF HUNTINGTON WVJ&CH INTER -DEPARTMENT COMMUNICATION HU(Tli'1GIf]M �tKN To PAUL C. COOK From ROBFRT J. FRANZ City Administrator Deputy City Administrator Subject APPROPRIATION FOR Date= FEBRUARY 5, 1988 HEIL AVENUE FLOOD CONTROL PROJECT (CC 649) FIS 88-1 As requested under the authority of' Resolution 4832, a Fiscal Impact Statement has been prerared and submitted relative to the proposed appropriation for the cnnstructlon of the Hell Avenue Flood Control improvements. Estimates are that an appropriation of $113,626 would be acequate for this project. An affirmative response by the City Council would reduce the balance of the City's unappropriated Wintersb rg Channel Drainage Fund to $73,879. Deputy City R JF:skd 36303 Fisca► impact Statement VEIL AVENTIE FLOOD CYII`ITROL. IMPROVEMENTS: CC, 649 1. E:Iuclgot tat:LI_; The project budgeted. Hot• evor , ht-.?c.:rtj ,ie con.struc-:t i can bid-, were s l r gh t I v h i gher Char, antic i p 3 ted, it %,: i} 1 he necessary to ►icr r?as,e t li :smulsn t c►f the (.- on i. i rt(lerrc y f U n d s r tined t c) the 3rC-) E?Ct;. ..). Total l,05•,tc, ii r E'C i : °+1 1 .-�� b26 c,ne-1 I rrtr-' e E'rICI I I:Ur u f r oru tt1F' C. I t.y Cr a i nagr f=tind. Funds true':; pendi-?d on th I `.i proisact to i 1 1 r ­vf-r t t :., ±:hv-' i)r :-. I nago Fund. h . I IId i r rr t-: : e? _.s of -mr n t nq . ot, Funds, i f e:. t,er-And . 'I. Fund I rscl c e el . { Urtllc,: 1.) r f, + ('r r l!t Cj ( ttit►lorIF'� f �_tftli�, fiutit o(t C sjpos i t i r, the City Or M 301 t wi 1 1 tit_ tr •3nr - J iwIPCI Ir,t,., thr' fir rtJr,,: t. aCC.ClUrlt; 0 b. Rr,,r--fall? ';otit "t'i?: I;yv(?11-35)Irlt-flt, ff,, .3. � %�1 tE.Y ftrlt �'.E' }• (lrt,:llfl,i �-�rl�lr i f': ii:"f't-�f} E'UfIfISi. r':. ItUrn 111A,"1: t)i?erl rr+,j J,►r f;•at.lrCf? Of t trrt;} i, pf---ndc,c1 t'i'. 1, to I = pur pci,;,F' I r, t tic jsr)L t. Author+led to Publish Adverlisemonts of all kinds sncludinp public notice$ by Dec:aa of the Superior Co60r1 of 0►11"* County. California. Number A•6214, dated 29 September. 1991. rnd A•24631, armed 11 tuna. 1943 STATE OF CALIFORNIA County of Orange .yo.c r+.aea •N.en*" corwny by "s oA+teA is Mr '.4 r pl�rlt w e% team a c oroww wrr w I pm a Citizen of the United States and a resident of the County aforesaid; 1 am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am a principal clerk of the Orange Coast DAILY PILOT, with which is combinfld the NEWS -PRESS. a newspaper of general circulatlon, printed and published to the City of Costa Mesa, County of Orange. State of California, and that a Notice of Inviting Bids of which copy attached hereto is a trve and complete copy, was printed and published to the Costa Mesa, Newport Beach, Huntington Beach, Fountain Valley, Irvine, the South Coast communities and Laguna Beach issues of said newspaper for two consecutive weeks to wit the tss e(s.) of Dec. 17 - Dec. 24 198 7 7 198 _- , 198. 198 I declare, under psnalty of perjury, that the foregoing is true and correct. Executed on _ Dec. 24 198 � at Costa Mesa, California. Signature 0 ,rniw - -' — rt.� PROOF JF PUBLICATM s 0 44 DATE s Jarsry 28, 1988/2 pm RIGIMUR' S ESTIMATE: 275K JOB AND CC KUM UR s Heil Avenue Flood Ctntml 1Wrovwmts/between Gw ;md Godard; OC-649 KIDDERS HAMS TOTAL BID AMOt;';' !15:. -�• 3. M A Ait7UWJI(M (S- ON 4. EIC7AK AND SONS, IWORPORATE D 5. C Ka "IRX ioN 6. ChLIMPNIA ESTIMTiNG, LMT 9. C ONNOLGY PACIFIC C(3viPANY 10. G B COOKE, INMM:'0RATQ) — -.S` ` c3 v .�,...... �....� - -- y'- 11. DO 11 BFC 111EFtS 12. rJFFY CCNSrfL1CTICN, INOORPORATED 13. EXCEL PAVING COMPANY 14 _ RONALD L HNMS. CX S'I. i ION 15. I P 5 SEWICES 16. JOHN JEZ vSKI, INCORPORA:£D 17. K E C COMPANY le. M11KICa1• PACIFIC CONSR=ION 20. R and D STEEL, INCORPORATED 21. S S C CX3NSTfiUGTION, INODRPORA= 22. SAVALA CONS7R ON 23. SUNSLT OONCREPE 24. EEMOND J 1AOlr kES 25. MATT J Will AND SONS ti lie r•� NOTICE INVITING BIDS CC- 6 49 Notice is hereby given that sealed bids will be received by the City of Huntington Beach at the office of the City Clerk at City Hall, 2000 Main Street, Huntington Beach, California, until the hour of 2:00 p.m. on January U, 19881 at which time they will be opened publicly and read aloud in the Council Chambers for the Heil Avenue Flood Control Improvements in the City of Hurtington Beach. A set of plans, specifications, and other contract documents may be obtainad on December 15, 1987 at the Department of Public Works, 2000 Main Street, Huntington Beach, California, upon receipt of a non-refundable fee of $15.00. Each bid shall be made on the Proposal Form and in the manner provided in the contract, documents, and shall be accompanied by a certified or cashier's check or a bid bond for not less than 10% of the a-,iount of the bid, made payable to the City of Huntington Beach. The Contractor shall, in the performance of the work and improvements, t:untorm to the Labor Code of the State of California and other laws of the State of California applicable thereto, with the exception only of such variations that may be required under the special statutes pursuant to which proceedings hereunder are taken and which have not been superseded by the provisions of the Labor Code. Preference to labor shall be given only in the manner provided by law. No bid shall be considered unless it is made on a form furnished by the City of Huntington Beach and is made in accordance with the provisions of the proposal requirements. Ear.h bidder must be licensed and also orequalified as required by law. The City C:ounci, of the City of H(intinnton Beach reserves the rinht to reject any or all bias. By order of the City Council of the city of Huntington Beach, California the lst of December, 1996. Alicia Wentworth `city Clerk of the City of Hiintinaton ticach 20nf1 Main Street (714) 536-5431 1472q REQUL -r FOR CITY COUNCIP ACTION SubmKiedto: Honorable Mayor and City Council Submitted by: Charles W. Thompson, City Administrato � r PROVEp IIy CITY cOvvell. Prapovd by: Paul E. Cook, Director of Public Works '------ �- - / 19 FJ Subim: Heil/Gothard Storm Drain - Phase I; CC-619 • v err'• cc.KRK CorW~t with Council Policyi [ d Yes [ J New Policy or Exception Statenwt of Issue, Recvmrnmidetion, A; alysis, Funding Source, Alternative Actiom, At"-od~t%: STATEMENT OF ISSUE: Pursuant to Council approval December 1, 1986, bids were received on May 20, 1987 for the fieil/Gothard Storm Drain Project - Phase I. RECOMMENDATION: Reject the bid submitte6 by Pentaco Inc., A.M. Galbreath, a Joint Venture, and direct staff' to re -bid at a future date. ANALYSIS: On December 1, 1986, the Ci.ty Council approved the plans and speci- ficiAtions for CC-649 and authorized staff to solicit construction bids. The bid as summarized below, was received on May 20, 1987. Contractor Base Did Additive Bid Total Pentaco, Inc., A.M. Galbreath, 454, 101.00 $65,313.00 $519,416.00 a Joint 'Denture Staff contacted the contractors who purchased plans and they responded, stating that they were too busy to bid on this project. We also spoke to the consultant who prepared the estimate and he was confident that his $240,000 estimate was accurate. The one bid received is more than double the estimated contract cost, therefore in staff's opinion it was only a token bid. The Department of Public Works recommends the bid be rejected and the project re -advertised at a future date. FUNDING SOURCE: N/A ALTERNATIVE ACTION: 1. Abandon the! project. ATTACHMENTS: Location Map CWT:PEC: ERC:lw Mom n PI!"hkFi�MC+. i SECTIONAL DISTRICT MAP 23-5--11 CITY OF HUNTINGTON BEACH ORANGE COUNTY, CALIFORNIA USE OF PROPERTY MAP 1 9 EDINGER AVE a npuj —^� w+U1rtR wt v. 4''v+'� ZONING, SECTIONAL DISTRICT MAP s 22-5-I1 CITY IAOF Cltr CCub:t,, IY • O W 40 A1"28I4s1 {17 �T 7 TONCH&:1213 f{ I1 LJ �1 TING BLJ��II I,.{: its 1•a•a. loi, AMENDED BY ZONE CASE t14. 2{l,2N. H! tti. t{f l2 t, lN,3!•.W.l1., »! lf1, •y,N,..�:, lC7. !0l.LQl;lU f0 .li •.T, lt_{, {i.� to-N t.11 /• Ca_^ /. j,r• *• i�:•f � w EDINGER 1 pry ! • r —i . = r, RI R I 7tc' lualf r— RI Rl �t R1 } J R 1 f-1 r 1 l'.! air. I � ( ,. ,�., • �y i I I• RI J I ! R1 ofi,uc c R I!' RI RI R 1 I I R 1 R 1 I R I ., CRF?I jif R I RI f •20•N 1011 2•It {. IOfI f•2•l. Iwt T•M•N rO t. { + {\ lost rI i•N n0{ ••!••0 nf2 !.1•t! nit t.t!•tf nl11 It Ju%t fm t,la too.%A•Cl 010 ttl 1101M MR b^ {-ro•ll 111$ 0110.1{ If{! 1•!-N U!, 12•i•70 {Il Io-r•/� iln [7 20 rl IN! 11-m T. ;,OC 1 7- b fi7• DM 25 a01E Ai .M •�M. •N • rl. t n rq •M• f1 utl� v r.• a\•1• Lf.GE►.D 14J Mftitr,M MUM t,'f.\ pi71K, i,•Ip 6dptat44 ••tt.it u ce.n\,•a, wwrr tract l �i1 r'ak$ 1•t4g1 1161-1T r..�... IMrt•rJi �,.*•, �'17 taa•.,1 wKsr i1Wu17 are c[wrA,r rock,•tl IILRN+.\/{If,KT . Pf,,.,. r.�...•i. IM f1K1tt1Y\it •li•}St Iwa.t•••r C1••<• _ _ N•fKr trfl r .. uu AVE ' C ata RI RI + RI �i s RI a —� 1R11 . . . .11r� i R1 I R1--- RI RI rTC ; RI R I ,�R 1 RI R1'f'` �R .I.��.•J�I1r � RI �,i _ .__.—f 1 -- j�l RIJ 1'RI� At R I_ R I �— R I --� .n R I �. H 1 x1 ti . R I _' I I its.^� --rr C'� —C 4 RI a ii ---- ,�� RI Ire RI RI R' Rl�tlf C F-R } �~ - •IrRI I • bo+.r ! ' raY-ii '�� t 1 _ l RI ... _J ! RI RI �. r?r R) RI I �1 R RI RI RI ! 1 RI , ' r I i —� RI��� RI •� Y, �l:'�ti. ! R �M•• 4 .. ;`1 Y.Ri I .. „ . ,.... R 3 N L i. MH R3 R 3 J+ fell M13RhE N .. •.J CF-R A s KI RII tR1 RI RI —� R I C2 AtiE Dote r 21 • • -I-'- atiI to: Honorable Mayor and city Comcdl Sulrn+itW by: Charles Mxxrpem, city Administrator �•��' � G ,� Y Prepwid by: Paul E. Cbok, Director of Public i+b A Subject: Phase I - Heil Avenue Flood Control Improvement C 64�,..••�r i I i , Consistent with Council Policy? N Y" ( ) New Policyor Statement of Issue. Recommendation, Analysis, Funding Source, AFterr►ative Actions, Attachments: Statement of Issue: Boyle Engineering Corporation has eoapleted plans and specifications for the izpmvemients to the Heil Avenue Channel and Drainage System. Council authorization is sought to solicit bids fur Phase I of this construction. Aecomaendation: 1. Appmve plans and specifications. 2. Dire:t staff to solicit bids for construction of Phase I -- Heil Avenue Flood Cbnt_ l Izrprovements . Anal�s is : On September 17, 1984, Council selected the firm of Boyle Engineering Cbrporatien to prepare final design, plans and specifications for the Heil Avenue Flood Control Inprovenmts. Phase I of this construction consists of the construction of a rein- 5orced box culvert .miler Heil Avenue for the CS--SC2 Cannel and the installation of 113' lineal feet of new 36" RCP storm drain. The engineers estimate for the construc- tion of Phase I is S220, 000. 00. This project has an envirrnn�ntal categorical exetpticn. Funding Source: Construction cos is : $2 20 , 000.00 Cbnstruction Contingencies: 22,000.00 Tbtal Funding $242,000.00 Aeypsu-s have been budgeted in Account 826490. U*'inage District No. 5 S 43, 000.00 urainage District No. 5 c 9 3, 00.00 Wintersbuurg Drainage District 94,000.00 City Flood Funds 12,000.00 Total Funds $242,000,.00 Alternative Action: Deny approval of plans end specifications and delay construction. Attar meets : Location Map 6'e CWT: PEC: EC: dw P4o sea M n Sly we w COST OF SPECS 15 455 (n©n-refundab e OTHER (i.e. AHFP, F.A.U. etc.) PROJECT:�� Fl_t.Q fT..l-lid. LOCAT ION : Ljr _ ACCOUNT # : ZA 0e) BIDDING INFORMATION: 1. OUT TO BID:�,�,. �g'f 2. BID OPENING: 1,0r1gq t-7 `2,2_R . 3. LOW BID TO COUNCIL: ARCHITECT: NAME: ADDRESS: I&�1_�^ REP.:... PAS �!PHONE PUBLIC WORKS PROJECT COORDINATOR: j�&j ESTIMATED COST OF PROJECT: 2&?, &22M 4Al 4