Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BRH Garver West, Inc. - 2005-08-15 (5)
J.FLETCHER CREAMER & SON, INC. "SEALED BID" CONTRACT DOCUMENTS SPECIFICATIONS AND STANDARD DRAWINGS for the Construction of Watermain Replacement Project, Orange Avenue, from 3rd Street to 111h Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 61h Street to 9th Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 15th Street to Alley Between 151h Street and 16th Street Watermain Replacement Project, Alley Between 6th Street and 7th Street, from Alley North of Pacific Coast Highway to Orange Avenue Watermain Replacement Project, Alley Between 51h Street and 6th Street, from Walnut Avenue to Orange Avenue Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 71h Street Watermain Replacement Project, 7th Street from Alley Between Pecan Avenue and 7th Street to Palm Avenue Watermain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between loth Street and I1th Street to llth Street Watermain Replacement Project, Walnut Avenue, from Alley Between llth Street and 12th Street to 12th Street Watermain Replacement Project, Olive Avenue and Alley Between llth Street and 12th Street CASH CONTRACT No. 1262 in the CITY OF HUNTINGTON BEACH R MAIL 2000 MAIN STREET HUNTINGTON BEACH, CALIFORNIA 92648 (714) 536-5431 RTDC nrlF.- DULY 14, 2005, 2:00 PM, 2ND FLOOR City Clerk's Office R(IRF.RT F RFARDCT,F.V_ ntRF.C'.TOR SAFECO INSURANCE COMPANY OF AMERICA eGENERAL INSURANCE COMPANY OF AMERICAME FIRST NATIONAL INSURANCE COMPANY OF ARICA �0� HOME OFFICE: SAFECO PLAZA SEATTLE. WASHINGTON 9011115 KNOW ALL BY THESE PRESENTS, That we, J. FLETCHER CREAMER & SON, INC. of 12874 SAN FERNANDO ROAD, SYLMAR, CA 91342 (hereinafter called the Principal), as Principal, and SAFECO INSURANCE COMPANY OF AMERICA(hereinafter called the Surety), as Surety, are held and firmly bound unto CITY OF HUNTINGTON BEACH, 2000 MAIN STREET, HUNTINGTON BEACH, CA 92648 (hereinafter called the Obligee) in the penal sum of TEN PERCENT OF THE TOTAL AMOUNT BID -------------- Dollars ($-10%--)for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That WHEREAS, the Principal has submitted or is about to submit a proposal to the Obligee on a contract for CONSTRUCTION OF (SEE ATTACHED EXHIBIT "A") - CASH CONTRACT NO. 1262 IN THE CITY OF HUNTINGTON BEACH, CA. NOW, THEREFORE, If the said Contract be timely awarded to the Principal and the Principal shall, within such time as may be specified, enter into the contract in writing, and give bond, if bond is required, with surety acceptable to the Obligee, for the faithful performance of the said Contract, then this obligation shall be void; otherwise to in remain in full force and effect. Signed and sealed this 14TH day of JULY , 2005. J Witne s A +TANTSEWEiARY J. FLETCHER CREAMER & SON, INC. BY: z z—&, �-� Dale A. Creamer Title & Seal Vice President Iv%/��, SAFECO INSURANCE CO Y OF AMERICA L�4M 0J /ii BY ALh A,--- CHRIS REDER, A6 TO SURETY CHERYL R. CO, ATTORNEY -IN -FACT e SAFEMP INSURANCE COMPANY OF AMERICA GENERAL INSURANCE COMPANY OF AMERICA FIRST NATIONAL INSURANCE COMPANY OF AMERICA NOME OFFICE SAFECO PLAZA .`�® SEATTLE. WASMNOTON 98186 CONSENT OF SURETY We, the undersigned, SAFECO INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Washington and authorized to do business in the State CALIFORNIA with offices at 1200 MACARTHUR BLVD., MAHWAH, NJ 07430 do hereby consent and agree with CITY OF HUNTINGTON BEACH, CA that if the foregoing proposal of J. FLETCHER CREAMER & SON, INC. for CONSTRUCTION OF (SEE ATTACHED EXHIBIT "A") - CASH CONTRACT NO. 1262 IN THE CITY OF HUNTINGTON BEACH, CA be accepted and the contract be timely awarded and executed by J. FLETCHER CREAMER & SON, INC. we will, upon its being so awarded and entered into, become surety for the said J. FLETCHER CREAMER & SON, INC. in a sum not to exceed ONE HUNDRED PERCENT OF THE TOTAL CONTRACT AMOUNT Dollars ($---- 100% ----- )for the faithful performance and payment of said contract. Signed, sealed and dated this 14TH day of JULY, 2005. SAFECO INSURANCE COMPANY OF AMERICA BY:W-UX f PalznA4-- Cheryl n Coleman, Attorney -In -Fact -=- - EXHIBIT "A" CONTRACT DOCUMENTS SPECIFICATIONS AND STANDARD DRAWINGS for the Construction of Watermain Replacement Project, Orange Avenue, from 30 Street to I Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 6* Street to 9"' Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 15tt` Street to Alley Between 15t° Street and 16`h Street Watermain Replacement Project, Alley Between 6th Street and 7`h Street, from Alley North of Pacific Coast Highway to Orange Avenue Watermain Replacement Project, Alley Between 56 Street and 6th Street, from Walnut Avenue to Orange Avenue Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 7`' Street Watermain Replacement Project, Vh Street from Alley Between Pecan Avenue and 7th Street to Palen Avenue Wateri rain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between 10th Street and 11'h Street to llm Street Watermain Replacement Project, Walnut Avenue, from Alley Between 11th Street and 1P Street to 12th Street Watermain Replacement Project, Olive Avenue and Alley Between 11th Street and 12th Street CASH CONTRACT No.1262 in the CITY OF HUNTINGTON BEACH ACKNOWLEDGMENT BY PRINCIPAL, IF A CORPORATION STATE OF NEW JERSEY COUNTY OF Bergen On this 14TH day of JULY 2005 before me personally came Dale A. Creamer to me known to be the person duly sworn, did depose and say, that he/ske resides in Ramsey, NJ that he% is Vice President of J. FLETCHER CREAMER & SON, INC. the corporation described in and which executed the foregoing instrument; that he/she knew the seal of said corporation; that the seal affixed to said instrument was such corporate seal; that it was affixed by order of the Board of Directors of said corporation, and that he/she signed his/her name thereto by like order. Sworn before me the date set forth above IINotary Public RAFFASIA BEU M NOTARY PUBLIC STATE OF NEW JERSEY MY COMMISSION EXPIRES SEPT. 20, 2007 10 # 2292025 ACKNOWLEGEMENT OF SURETY STATE OF NEW JERSEY COUNTY OF MORRIS On this 14th day of July 2005, before -me personally Came Cheryl R. Coleman , tome known, who being duly sworn, did depose and say that he/she is an Attorney -In -Fact of Safeco Insurance Company of America and knows the -corporate seal thereof; that the seal affixed to said"annexed instrument is such corporate seal; and was thereto affixed by authority of the Power of Attorney of said Company, of which a Certified Copy is hereto attached, and that he/she signed said instrument as an Attorney -In -Fact of said Company by like authority: My Commission Expires &� � V4, X�� CHARLOTTE GOODMAN Notary Public Notary Public Of New Jersey My commission Expires April 21, 2008 C /� C E C a POWER GENERA INSURANCE COMPANY OF AMERICA ' +7 Y► !— �v OF A T RNEY HomE oF�lm BAFEEco PLAZA GENERAL INSURANCE COMPAW OF AMERICA SEATTLE, WASHINGTON '891115 No. 12893 KNOW ALL BY THESE PRESENTS: That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appolyd **JHFRtEY R. XANE; MARIA RODRIGUPS; JEROMfi N. WALDOR MARC N• WAIMR; PETER R. WALDOIt; CMRYL R COLEW4 3: Florhe-z►Paxk, New Jsse * Its true and lawful attomey(s)win-fact, With full authority to execute -on its behalf fidelity and surety bonds or undertakings and other documents of a sirnilar character Issued in the course of Its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA apd GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this 20th day of Au�guest/ 2003 401 If r'1' `..� ✓! Mom- CV l� ' CHRISTINE MEAD, SECRETARY MIKE MCGAVICK, PRESIDENT CERTIFICATE Extract from the By-laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Amide V. Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assis4mt Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attoneys4n tact or under other appropriate titles with authority to execute on behalf.of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any Instrument making or evidencing such appointment the signatures may be affixed by facs4tttile. On any instrument cortfef V such authority or on any bond or undertaidrg of the company, the seal, or a facsunfie thereof, may be impressed or affixed or In any other manner reproduced; provided, however, that the seat shall not be necessary to the validity of any such Instrument or undertaking' Extract from a Resolution of the Board of Directors of SAPECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 29. 1970. *On any certificate executed by the Secretary or an assistant secretary of the Company setting out, 0) The provisions of Arlrcie V, Section 13 of the By -Laws, and (t) A copy of the power -of -attorney appointment, executed pursuant thereto, and {iii) Cettifying that said power -of -attorney appointment Is in full forte and effect, the signature of the certpfyfng officer may be by facsimile, and the seal of the Company may be a facsimile thereof.' 1, Christine Mead, Secretary of SAFECO INSURANCE COMPANY OF AMP-RICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attomey are stilt in full force and effect IN VATNESS WHEREOP, I have hereuft sat my hand and affixed the facsimile seal of said corpombon this 14TH day of JULY , 2005 SEAL CHMSTINE MEAD, SECRETARY 8-0'741SABF ZMI t A reglswred trademark of SAFECO Corgoratton =20=03 PDF 5af,�co Assets SAFECO INSURANCE COMPANY OF AMERICA FINANCIAL STATEMENT — DECEMBER 31, 2004 Cash and Bank Deposits ..................................... $ (52,492,321) *Bonds —U.S Government ...................... ..................... 251,982,058 *Other Bonds........................................................... 2,582,533,516 * Stocks.................................................................... 444,878,607 Real Estate............................................................... 9,485,908 Agents' Balances or Uncollected Premiums ................. 367,916,616 Accrued Interest and Rents .................................... 39,230,044 Other Admitted Assets ........................................... 142.067.106 Total Admitted Assets ................................... S �,ZRS Ol i34 Liabilities Unearned Premiums .............................................. $ 710,499,599 Reserve for Claims and Claims Expense...................1,590,324,590 Funds Held Under Reinsurance Treaties ............... 114,417 Reserve for Dividends to Policyholders...............................836,898 Additional Statutory Reserve ................................ _ Reserve for Commissions, Taxes and Other Liabilities .............................................. 440,428.802 Total........................................................... $2,742,204,306 Capital Stock. ............... ............ $ 5,000,000 Paid in Surplus ...................... .......... 233,187,958 Unassigned Surplus ................... 805.209.270 Surplus to Policyholders .......................... 1,043.397,228 Total Liabilities and Surplus .............................. 53.7Ri_ &1-5-34 Bonds are stated at amortized or investment value; Stocks at Association Market Values. Securities carried at $153,000,775 are deposited as required by law. SEAL b 1 aAr 1953 1, MICHAEL C. PETERS, president of SAFECO Insurance Company, do hereby certify that the foregoing is a true, and correct statement of the Assets and Liabilities of said Corporation, as of December 31, 2004, to the best of my knowledge and belief. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Corporation at Seattle, Washington, this 1st day of March, 2005. President S-1262a UO2 ® A registered trademark of SAFECO Corporation SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project Orange Avenue, from P Street to 11`h Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 6th Street to 9th Street Watermain Replacement Project; Alley North of Pacific Coast Highway, from 15th Street to Alley Between 15th Street and 16th Street Watermain Replacement Project Alley Between 6th Street and 7th Street, from Alley North of Pacific Coast Highway to Orange Avenue Watermain Replacement Project, Alley Between 5th Street and 6th Street, from Walnut Avenue to Orange Avenue Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 7th Street Watermain Replacement Project, 7th Street from Alley Between Pecan Avenue and 7th Street to Palm Avenue Watermain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between 10th Street and 1lth Street -to 11th Street Watermain Replacement Project, Walnut Avenue, from Alley Between I1th Street and 12th Street to 12th Street Watermain Replacement Project, Olive Avenue and Alley Between I Ph Street and 12th Street CASH CONTRACT No. 1262 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The Vt Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ D�00 $ 15,0WOO 2. Furnish and install 12-inch PVC pipeline in Orange Ave. with nitrile (NBR) gaskets, and connection to the existing watermain, at 11th Street and 3rd Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as $ $ D Sfoo shown on these plans, complete and in place. 2,509 LF — 3. Construct 8-inch PVC pipeline in alley between 10th Street and 11th Street, and connection to existing watermains, with nitrite (NBR) gaskets, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these plans, complete and $ 250.00 2y 25L)•w $ , operative in place. 97 LF 4. Construct 8-inch PVC pipeline in alley between 9th Street and 10th Street, with nitrite (NBR) gaskets and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, $ bo 6 $ 2)r, 4tam complete and operative in place. 88 LF 5. Construct 6-inch PVC pipeline in alley between 8th Street and gth Street, with nitrite (NBR) gaskets and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in place. 67 LF C-3 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to llth Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 6. Construct 8-inch PVC pipeline in alley between 71h Street and 8th Street, with nitrile (NBR) gaskets and connection to existing watermain, including all valving, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in place. 45 LF $ yDD,OD $ (g 1 DOO- OD 7. Construct 8-inch D.I. siphon assembly, including all fittings and appurtenances, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 53 LF $ y D.0 $ Z3,156-DD 8. Construct 8-inch PVC pipeline in 6th Street with nitrite (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on these plans, complete and operative in place. 15 LF $ 556.DD $ ��Z�O-i p 9. Construct 14-LF 8-inch PVC pipeline and construct 37-LF 12-inch PVC pipeline in 5th Street with nitrile (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on these plans, complete and operative in place. 51 LF $ D .Oz� $ 5, 1yo -00 10. Construct 8-inch PVC pipeline in alley between 5th Street and Main Street, with nitrile (NBR) gaskets, connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, cement slurry backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in place. 22 LF $Viso•DD $ `1,,qw-o C-4 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 111h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Construct 8-inch PVC pipeline in Main Street with nitrile (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on these plans, complete and operative in place. 15 LF $15b.00 II, Z5u Ov 12. Construct 8-inch PVC pipeline in alley between 3rd Street and Main Street, with nitrile (NBR) gaskets, and connection to existing watermains, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in place. 95 LF $ 1000 $ 13. Remove and salvage (to the City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 7 EA $ 1,20D.CD $ S?1y00.Oc7 14. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, complete and in place. 7 EA $ 200.06 $ 3a L400. 15. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these $IZ''� $12� 3oc�.pp plans, complete and in place. 1 EA 16. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on these plans, complete and in place. 2 EA $5,454 $ 1u,g00.O0 17. Cut and cap/sea[ existing waterline, including all appurtenances, as shown on these plans, complete and in place. 20 EA $1 150. VD $ 7-3,, pop. M C-5 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 111h Street BID ITEMS Item Unit No. Description Unit Cost Total Cost 18. Remove existing valve box and cover, including -Quantity excavation, backfill, and surface repair, complete and in place. 20 EA $ SO •DO $ il,Q00.1DO 19. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans complete and in place. 19 EA $ 700.1) $ M DD. DU 20. Construct 12-inch inverted siphon assembly, including all fittings and appurtenances, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 84 LF $ 560• DO $ µ71_0D0. DO 21. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ to 000.00 $ IDS �Do.l� 22. Furnish and Install new 1-inch polyethylene water service to Existing Water Quality Test Station, including piping, fittings, valving, removal and disposal of existing meter box, connection to Sampling Can, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ 3,JO� DD $D 23. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $15 DOD.DD $ D .00 24. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $ ObD. D $ 800. 00 25. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 10 EA $ Zw•oD $ L, DoO.00 26. Demobilization and Cleanup 1 LS $54bo.Vo 27. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 9 EA $y,300.00 $ 3$,7U0 C-6 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to llth Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 28. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 2 EA $ 5, 050. DD $ D ►p0. D0 29. Furnish and install new 2-inch copper water service, including pipe fittings, valves and connection to existing 2-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place 2 EA $ f 00 •D0 $ Y M • D0 30. Remove, and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these plans, complete and in place. 11 EA $ 000•DO $ U, bD0.00 31. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $ 3 O.DD $ 14350.00 32. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 2-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 2 EA $ 00.0b Sub -Total Amount for All Bid Items — SCHEDULE A $ /,ZDD C-7 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11th Street BID ITEMS ALTERNATIVE BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost A-1 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 6-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and +- �- operative in place. 5 Epp° y , i,o0 NA EA $ $ A-2 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 8-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic so - Protection, and appurtenances, complete and 5 , 5 po 5 ,500 operative in place. NA EA $ $ `t A-3 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 12-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic A Protection, and appurtenances, complete and r\50 h�SO� operative in place. NA EA $ $ A-4 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 6-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, >` .` complete and operative in place. NA EA $ 5 � o00 $ 5, o00 A-5 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 8-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, !a — complete and operative in place. NA EA $ g,5GO $ y'SoO r C-8 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from Yd Street to IIth Street BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost A-6 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 12-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA f` $ ''1,500 $ rl 5 obi C-9 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 6ch Street to 91h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS 2. Furnish and install 8-inch D.I. pipeline in the alley north of Pacific Coast Highway with nitrite (NBR) gaskets, and connection to the existing 8-inch PVC watermain at 8th Street, and 12-inch PVC at 9th Street, and the alley between 8th Street and 9th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on $ aoo $ these plans, complete and in place. 368 LF 3. Furnish and install 6-inch D.I. pipeline in the alley north of Pacific Coast Highway with nitrite (NBR) gaskets, and connecting to the existing 8-inch PVC watermain at 8th Street, the alley between 7th Street and 8th Street, and the 12-inch PVC watermain at 6th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as $ $ shown on these plans, complete and in place. 679 LF 4. Remove and salvage (to the City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in $ I $ IJ D place. 1 EA 5. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, 1 EA $ 11 too $ +,TOD complete and in place. 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, $ ��(cjp00 $ fp1 �%DD so complete and in place. 6 EA 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete al � ��3lXJ• and in place. 6 EA $ $ C-10 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast highway from 6tn Street to 9' Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as is s� shown on these plans, complete and in place. 6 EA $ $ 26n 9. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ 2,1 $ 2 150'' 10. Traffic control throughout work area, including e preparation of traffic control plans. 1 LS $SLOW $ S,Orav 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance a, with these plans and as required by law. 1 LS $ Z, $ 2, 12. Pothole existing utilities as directed by and in the presence of the City inspector, including ?d0' pavement repair and traffic control. 10 EA $ $ 13. Demobilization and Cleanup 1 LS $ 2,5W0* $ 14. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in SAW �, complete and place. 1 EA $ $ 15. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 or D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on w these plans, complete and in place. 4 EA $ 16. Furnish and install new 1-inch copper water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in 3 EA D00� �AU� place. $1 $ C-11 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast highway from 6th Street to 9th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 17. Furnish and install new 1-inch copper water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA $ 2,i'm $ 7,100 18. Furnish and install new 2-inch copper water service, including pipe, fittings, valves, connection to existing 1 1/2-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, in complete and operative place. 1 EA $1,4 $ 19. Furnish and install new 2-inch copper water service, including pipe, fittings, valves, connection to existing 2-3-inch comp metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, IV complete and operative in place. 1 EA $ $ JJ0 20. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these 3� plans, complete and in place. 5 EA $ b�ac $ 21. Furnish and install 6-inch cut in valve assembly, including valve, D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $ N,t/56 $ 50 22. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place. 1 EA 23. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Ito 215;600 Huntington Beach requirements. 250 Cy $ $ 24. Import soil. 250 CY $ 36AD $ '4, C-12 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 6th Street to 9th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 25. Furnish and Install new 1-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and in 3 EA 2,1m N $ appurtenances, complete and operative place. $ , 26. Furnish and Install new 1-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and in 1 EA io $, $ appurtenances, complete and operative place. 27. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1Y2-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry ' backfill, compaction, reconnection to customer side, and 9b 10 appurtenances, complete and operative in place. 1 EA $ZiXJ $ 28. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 2-3-inch comp meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and in 1 EA a $upw appurtenances, complete and operative place. Sub -Total Amount for All Bid Items — SCHEDULE B , 6 %0 C-13 PROJECT BID SCHEDULE C Watermain Replacement Project, Alley North of Pacific Coast Highway, From 151h Street to Alley between 15`h Street and 16th Street BID ITEMS Item Unit No. Description Quantity Unit ost Total Cost 1. Mobilization 1 LS $ 4 6Wa $Z*V&V 2. Furnish and install 6-inch DIP pipeline in the alley north of Pacific Coast Highway with nitrile (NBR) gaskets, and connection to the existing watermain at 15t' Street and alley between 15 Street and 16h Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as 163 � ZB,�gY shown on these plans, complete and in place. LF $ $ 3. Provide temporary water service to properties isolated from during 1 LS $(166 $ ( 50'� the watermain construction. 4. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as 416' shown on these plans, complete and in place. 2 EA $ $ 1, 476' 5. Chlorination and testing of all new watermain and 1 $ el fit) appurtenances, complete and in place. LS $Q1610 6. Traffic control throughout work area, including ,b of 2,1649 preparation of traffic control plans. 1 LS $ $ 7. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance 00 f�00 with these plans and as required by law. 1 LS $ 1, 8. Pothole existing utilities as directed by- and in the presence of the City inspector, including 4 1q� �' $ 464*1 pavement repair and traffic control. EA $ 9. Demobilization and Cleanup 1 LS $' $ tea' 10. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/4-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and in 1 EA $J $ i� PAS operative place C-14 PROJECT BID SCHEDULE C Watermain Replacement Project, Alley North of Pacific Coast Highway, From 151h Street to Alley between 151h Street and 16th Street BID ITEMS Item Unit No. Description -Quantity Unit Cost Total Cost 11. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 2 EA $ j MDs° $Lw 12. Furnish and install 6-inch cut in valve assembly, including valve, D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in complete and place. 1 EA $ 13. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach requirements. 75 CY $ l l4 $ 9.95000 14. Import soil. 75 CY $ 33�° $ 15. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $1►960� $ l #q0p 16. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ ��qb0 $ 1 96iv Sub -Total Amount for All Bid Items — SCHEDULE C $ 6mn% C-15 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between 6th Street and 7th Street From Alley North of Pacific Coast Highway to Orange Avenue BID ITEMS - Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $60M* $ g,0M' 2. Furnish and install 8-inch PVC pipeline in alley between 6th St. and 7th St. with nitrite (NBR) gaskets, and connection to the existing watermain north of Orange Avenue, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, in /P,Go complete and place. 1,083 LF $ $ 3. Remove and salvage (to the City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 2 EA $ $ ZiZd� 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, complete and in place. 2 EA $ �SU� $ 15'65w4l 5. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place. 1 EA 6. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on these Complete P5, 3150k 5,-5U� plans. and in place. 1 EA $ $ 7. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, complete and in place. 5 EA $ ASP'50a 8. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete in 6O5'�" li Gq�� and place. 3 EA $ $ 9. Furnish and install 2-inch temporary.blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 4 F�4 $ 5�4AD $ Zr t 3(opD C-16 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between 6th Street and 7th Street From Alley North of Pacific Coast Highway to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 10. Construct 8-inch inverted siphon assembly, including all fittings and appurtenances, cathodic protection, excavation, backfill, and , surface repair, as shown on these plans, complete and in Za' �17ia'" place. 56 LF $� $ •T 11. Chlorination and testing of all new water mains in LS p, $ and appurtenances, complete and place. 1 $� 12. Traffic control throughout work area, including 5,000 preparation of traffic control plans. 1 LS $ $ 13. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance cjlXJK' tr"AV with these plans and as required by law. 1 LS $ $ 14. Pothole existing utilities as directed by and in the q55 0e presence of the City inspector, including MOO Mfj" pavement repair and traffic control. 5 EA $ $ 15. Demobilization and Cleanup 1 LS $ (► 5dD $ 4; 5bo4° 16. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slung backfill, compaction and appurtenances, complete and o, !►V' 3S'o0l) operative in place 20 EA $ $ 17. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and in EA lila�Dg' l4,250 operative place. 9 $ $ 18. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these plans, complete and in place. 2 EA $'�q4� 19. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of ��� ZD, q01 Huntington Beach requirements. 240 CY $ $ 20. Import Soil 240 CY $ $ 5 C-17 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between 6tn Street and 7tn Street From Alley North of Pacific Coast Highway to Orange Avenue Item Unit No. Description Quantity Unit Cost Total Cost 21. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances. Complete and operative in place. 20 EA $1 85 $ �SACYJ� 22. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and 7t to 2! appurtenances, complete and operative in place. 8 EA $ $ Sub -Total Amount for All Bid Items - SCHEDULE D $ ,3.s /d C-18 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 5ch Street and 6`h Street, From Walnut Avenue to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $'S,0009' 2. Furnish and install 8-inch PVC pipeline in alley between 5t' St. and 6"' St., with nitrite (NBR) gaskets, and connection to the existing watermain at Walnut Ave. and Orange Ave., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, tyq.00 complete and in place. 837 LF $ $ 3. Provide temporary water service to properties isolated from the watermain during construction. 1 LS $ 11005e $ 4V5Q0- 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, in EA 00 4p% $ f 5,100.°� complete and place. 2 $ 5. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on EA �.�� these plans, complete and in place. 2 $ $ 6. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as EA ►'7 3.� shown on these plans, complete and in place. 5 $ $ 7. Chlorination and testing of all new water mains LS 2, 50 and appurtenances, complete and in place. 1 $ $ 8. Traffic control throughout work area, including LS 5,oa preparation of traffic control plans. 1 $ 9. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance PI' 2,'$ with these plans and as required by law. 1 LS $ 10. Pothole existing utilities as directed by and in the presence of the City inspector, including lgZ'O pavement repair and traffic control. 5 EA $ $ 11. j Demobilization and Cleanup 1 LS $ 1� $ l,'b C-19 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 5th Street and 6th Street, From Walnut Avenue to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 12. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $ 5,QTV* $ 5,0050 �D 13. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and A6 operative in place 7 EA $ I �'�� $ (211150 14. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 8 EA $1 r � $ l loco �� 15. Furnish and install new 2-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1Y2-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero . sack slurry backfill, compaction and appurtenances, 00 complete and operative in place. 1 EA $ 16. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including. surface repair, as shown on these plans, complete and in place. 2 EA $ 17. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach CY tv Aa 23► �� requirements. 280 $ $ 18. Import Soil 280 Cy $ 2�a' $�� 19. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing %4-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and 1,0� appurtenances, complete and operative in place. 7 EA $ C-20 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 5'h Street and 61` Street, From Walnut Avenue to Orange Avenue RTD TTF,MS Item Unit No. Description Quantity Unit Cost Total Cost 20. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 8 EA 600 21. Furnish and Install new 2-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1Y2-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ i� (cU°�' $ '?-� t �DaD Sub -Total Amount for All Bid Items — SCHEDULE E $ 28Z�, D/ , Qp C-21 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 71h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $10500 $ 2, �bo� 2. Furnish and install 8-inch PVC pipeline in Acacia Street with nitrile (NBR) gaskets, and connection to the existing watermain at Lake Ave., Main St., and alley between Lake St. and Main St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and in place. 601 LF $ i�o� $ 9to,Wo 3. Construct 8-inch PVC pipeline in alley between Lake St. and Main St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, cathodic protection, fittings, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these $Z�' 16+ 5°fi plans, complete and operative in place. 58 LF $ •d1D $ 4. Furnish and install 2-inch air and vacuum assembly, including all valuing, fittings, zero sack slurry backfill, and appurtenances, as shown on lf,'' these plans, complete and in place. 1 EA $ U4 S $ qbo 5. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, Z, ift complete and in place. 2 EA $ 6 UOa $ 6. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete and in place. 2 EA $ 5'13.0d $ I,1 y �• bO 7. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 6 EA $ 7 S 1. 00 $ 4,00-20 8. Construct 8-inch inverted siphon assembly, including all fittings, cathodic protection and appurtenances, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 74 LF $ 313•00 $ Z3, IIoT. 00 9. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ 2q 3 Do $ MS-00 10. Provide temporary water service to properties isolated from the water main pipe during construction. 1 LS $ j D4• oo $ %D4• oo C-22 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 7t11 Street BID ITEMS Item I Unit No. Description Quantity Unit Cost Total Cost 11. 1Traffic control throughout work area, including preparation of traffic control plans. 1 LS $ Z,SoO.00 $ 2,5� 12. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $1,5oo.a) $ l,500.00 13. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $ Igy.00 $ 'lta.0o 14. Demobilization and Cleanup 1 LS $ SDb.00 $ 500.00 15. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, ZS,000-00 complete and in place. 5 EA $ 5, bob. tt $*e&ap 16. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA $ 2, $00. $ Z, $Oa00 17. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these plans, complete and in place. 5 EA $ 573•Do $ 2, $b5. lob 18. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing %-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA $ Z, $ ou • $ 2, S oo. bD 19. Furnish and Install new 1-inch polyethylene water service, including piping, fittings, valuing, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $z Di). $ 2,`1� •OD C-23 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 7th Street BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost 20. Furnish and Install new 1-inch polyethylene water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $Z.4D�•oo $ Z,goo.oc� Sub -Total Amount for All Bid Items — SCHEDULE F $g3 , �ga . 00 C-24 PROJECT BID SCHEDULE G Watermain Replacement Project, 7th Street From Alley Between Pecan Avenue and 7th Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ Z oo.00 $ J5oo.no 2. Furnish and install 8-inch PVC pipeline in 7th Street, and in the alley between Pecan Avenue and 7th Street including 20+/- LF 12-inch PVC pTe and connection to the existing water main at 7 Street & Palm Avenue, and connection south of Arcadia Avenue at the alley between Pecan Ave. and 71h St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as 49 shown on these plans, complete and in place. 509 LF $ 141b $ 3. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box, and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 2 EA $ /, / 50. $ 21300 . oo 4. Construct new fire hydrant. assembly, including furnishing and installing new, bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, complete and in place. 2 EA $G ?, oo.00 $13,400•00 5. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on these plans, complete and in place. 1 EA $ Zoo.00 $ 5,?W• 00 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, complete and in place. 2 EA $1 ZD0.00 $ Z,Yoo•oo 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete and in place. 1 EA $ 573.Do $ 5 3.00 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 2 EA $ %1 .00 $ I, 34oL• 00 9. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $!,DW-0 $ !,Opo.o� 10. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $ 500 • DD $ 2, 500 • ob C-25 PROJECT BID SCHEDULE G Watermain Replacement Project, 70' Street From Alley Between Pecan Avenue and 7 h Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $1,5to-D $ I,Soo.00 12. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $ 0 •00 $ 77y. 00 13. Demobilization and Cleanup 1 LS $ 5a0.OD $ 5d0.010 14. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $1141o.0 $ 1"l,y56.00 15. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 2 EA $7, 450. $1;,g0o. p0 16. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing Y-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 4 EA $ I, Z50. oo $ 5, poo .00 17. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA $ oD • 0 $ 1, 300.00 18. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these plans, complete and in place. 3 EA $5173•M $ I,1I11.00 19. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach requirements. 95 CY $ 75.00 $ S, 01T.00 20. Import soil 95 CY $ ZLI • bo $ 2, 2-70 , oa C-26 PROJECT BID SCHEDULE G Watermain Replacement Project, 7th Street From Alley Between Pecan Avenue and 7th Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 21. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 4 EA $1 Jo-00 $ 5 qoo. oo 22. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $1 400.O0 $ I, t}Do.o0 Sub -Total Amount for All Bid Items — SCHEDULE G $ ► V1 , o er► .00 C-27 PROJECT BID SCHEDULE H Watermain Replacement Project, Alley North of Pacific Coast Highway From Alley Between loth Street and 11`h Street to 11`h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ Z 56D .00 $ 2,6DD 2. Furnish and install 8-inch PVC pipeline and 6- inch PVC pipeline in alley north of Pack Coast Highway with nitrite (NBR) gaskets, and connection to the existing watermain at 11'h Street and alley between 10th Street and 11t' Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and in place. 272 LF $ oo $ 47 71Z. co 3. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place. 1 EA $10,$5o.D $ lo, '7650. o0 4. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, complete and in place. 3 EA $ I, VX.Db $ 3,W0. 00 5. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete and in place. 2 EA $ 5-73.o0 6. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 4 EA $ l lob. 0 00 7. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ 5$7•00 8. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $ 1,50.0o $ 1,5V0 -OD 9. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $ ),00v.W $ 11Ob0.1>0 10. Pothole existing utilities as directed by and in the presence of the City inspector, including 1OW" 4T' pavement repair and traffic control. 4 EA $ $ 11. Demobilization and Cleanup 1 LS $ �Da $ 600 Va C-28 PROJECT BID SCHEDULE H Watermain Replacement Project, Alley North of Pacific Coast Highway From Alley Between 10t' Street and 11t' Street to 11' Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 12. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 3 EA $ y,� $ 13. Provide temporary water service to properties from during LS 41651)w $ 2,5U0° isolated the watermain construction. 1 $ 14. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch, metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slung backfill, compaction and appurtenances, complete and in EA G"b i,I b0� operative place. 2 $ $ 15. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these EA 40up° 3,6� plans, complete and in place. 5 $ $ 16. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 141;0V) complete and place. 1 EA $!,S $ 17. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and 1101�' appurtenances, complete and operative in place. 1 EA $ I $ Sub -Total Amount for All Bid Items — SCHEDULE H $ (bq, gkgm- C-29 PROJECT BID SCHEDULE I Watermaiin Replacement Project, Walnut Avenue Alley Between 11th Street and 12th Street to 12th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ I,+oSbOw $ (,56b�O 2. Furnish and install 8-inch PVC pipeline in Walnut Avenue with nitrile (NBR) gaskets, and connection to the existing watermain at 12th St., and the alley between 11th St. and 12th St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, 143 LF law $ Z1, I bra' complete and in place. $ 3. Construct 8-inch PVC pipeline in alley between 11th St. and 12th St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, fittings, cathodic protection, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these Zr, l (Pg 60 plans, complete and operative in place. 63 LF $ $ 4. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in °f0a' 00 place 1 EA ►I 1,150 5. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, in 1 EA i0 $ mmoo complete and place. $ 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, 00 2460 complete and in place. 2 EA $11W $ 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete in 2 EA A, 106 and place. $3 $ 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as 3 EA �ii �0 $ Zi 21?2 shown on these plans, complete and in place. $ 9. Chlorination and testing of all new water mains q,� 101 901-co and appurtenances, complete and in place. 1 LS $ $ 10. Traffic control throughout work area, including y .0 preparation of traffic control plans. 1 LS $ I %6YgV $ 11 5Gy C-30 PROJECT BID SCHEDULE I Watermain Replacement Project, Walnut Avenue Alley Between llth Street and 12th Street to 121h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance I a0 with these plans and as required by law. 1 LS $ &Q $ 12. Pothole existing utilities as directed by and in the presence of the City inspector, including «q' qq-�a1 pavement repair and traffic control. 4 EA $ $ 13. Demobilization and Cleanup 1 LS $ moo $ 14. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 2 EA as LQ*CV q, ZaD complete and place. $ $ Sub -Total Amount for All Bid Items — SCHEDULE 1 C-31 PROJECT BID SCHEDULE J Watermain Replacement Project, Olive Avenue and Alley Between 111h Street and 12th Street BID ITEMS Item Unit No. Description Quanti Unit Cost Total Cost 1. Mobilization 1 LS $ (,Moo $ WO 2. Construct 8-inch PVC pipeline in alley between 11th St. and 12t`' St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, fittings, cathodic protection, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these LF 2$��" plans, complete and operative in place. 60 $ $ 3. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in 1 EA place 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, EA 14 MOO dv 9,400 complete and in place. 1 $ $ 5. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as 491-00 shown on these plans, complete and in place. 2 EA $ $ 6. Chlorination and testing of all new water mains LS qqq* 1 $ g q9 and appurtenances, complete and in place. 1 $ 7. Traffic control throughout work area, including (,bDO preparation of traffic control plans. 1 LS $ 1 00 $ 8. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance b ed with these plans and as required by law. 1 LS $ 1;A*9 $ 150 9. Pothole existing utilities as directed by and in the presence of the City inspector, including �Q� pavement repair and traffic control. 2 EA $ $ 10. Demobilization and Cleanup 1 LS $ �° $ 250 C-32 PROJECT BID SCHEDULE J Watermain Replacement Project, Olive Avenue and Alley Between IItb Street and 12tb Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 2 EA $yA joy $ 8, 0 Do . o0 12. Furnish and install flinch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place 1 EA $II,%a. $ I 400. Sub -Total Amount for All Bid Items — SCHEDULE J $ 52, to tq. o0 C-33 PROJECT BID SCHEDULE K Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost 1. Install Aggregate Base (AB) 1,376 Tons $ 0-40 $ 2. Install AC 513 Tons $ m $6 3. Install Slurry Seal 13,441 SF $ I 0 $ 13,u41. oU 4. Cold Milling 1,242 SF $ a SID -" 5. Unclassified Excavation 1,356 Cy $ .ao $ 6. Adjust Utility Cover 123 EA $ 125.Da $ 5 75.aa 7. Adjust Water Cover 26 EA $ 300. $ S00. 00 8. Adjust Sewer/Storm Drain Manholes 7 EA $ T150.00 $ 50.OD 9. Adjust Survey Monuments 6 EA $ 1630.0D $ 11OD. 00 10. Remove/Construct Concrete Sidewalk 689 SF $ % as± $ ra,S%-XpO 11. Remove/Construct Concrete V-Ditch 9,880 SF $ .00 $ -Ag , 04o 12. Remove/Construct Concrete Drive Approach 5,262 SF $ ►o •" $ 5-.0 . wip 13. Remove/Construct Concrete Curb 28 LF $ 50 $ %too'� 14. Remove/Construct Concrete Curb and Gutter 72 LF $ 55 $ % *oo 15. Install Slurry Seal (detail sheets to be provided) 13,100 SF $ 1 $ I-S, goo 16. Remove/Construct Concrete Drive Approach (detail sheets to be provided by Agency) 3,600 SF o Sub -Total Amount for All Bid Items — SCHEDULE K $ 00 C-34 PROJECT BID SCHEDULE TOTALS CC-1262 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A �/%Q, �,�'S, 00 Sub -Total Bid Schedule B —A'6to, lobo OR - Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I Sub -Total Bid Schedule J Sub -Total Bid Schedule K TOTAL BID AMOUNT (Schedules A-K) TOTAL BID AMOUNT IN WORDS: 3 3s3, L4. 3a-7. ob 357 Z82, D/( ,Oa T 1 ck , `tc\% . 00 IQg' I(A6. 00 11, 5 b-1- 00 52,blR.DD SZZ� �g�i.QO Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-35 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion of Work Name and Address of Subcontractor State License Number Class Mdregl� 06 A i By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-36 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of 0MIgN Los Angeles B r e e Z i n s me i s t e r , being first duly sworn, deposes and says that XK or she is Corporate Agent of J. Fletcher Creamer the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Bree Zinsmpistpr Name of Bidder Signature of Bid 12874 San Fernando Road Sylmar. Ca- 91 347 Address of Bidder Subscribed and swornto before me this 14 they of July , 2005. NOTARY PUBLIC W �.J.t PEas Comm uor 1e914ft Nosy ruok - Caftwft NOTARY SEAL C-37 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Orange Avenue, from 3"d Street to 11th Street; Watermain Replacement Project, Alley North of Pacific Coast Highway, from 6th Street to 9th Street; Watermain Replacement Project, Alley North of Pacific Coast Highway, from 15th Street to Alley Between 15th Street and 16th Street; Watermain Replacement Project, Alley Between 6th Street and 7th Street, from Alley North of Pacific Coast Highway to Orange Avenue; Watermain Replacement Project, Alley Between 5th Street and 6th Street, from Walnut Avenue to Orange Avenue; Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 7th Street; Watermain Replacement Project, 7th Street, from Alley Between 6th Street and 7th Street to Palm Avenue; Watermain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between loth Street and 11th Street to llth Street; Watermain Replacement Project, Walnut Avenue, from Alley Between 11th Street and 12th Street to 12th Street (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that. all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: July 14, 2005 Contract By Corporate Agent Title C-38 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes W No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-39 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: July 14, 2005 J.Fletcher Creamer & Son, Inc. Contractor $ree Zinsmeiste By Corporate Agent Title C40 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: IT- QW11-.u- •� Bidder .i 12874 San Fernando Road Business Address Sylmar CA 91342 City, State Zip ( 818) 367.9748 x 306_ Telephone Number 587920 Class "A" State Contractor's License No. and Class Original Date Issued 2/28/2006 Expiration Date The work site was inspected by R - 7 i ng mP i s r AY of our office on j.1"7 , 2005. The following are persons, firms, and corporations having a principal interest in this proposal: See Attached C-42 COMPANY OFFICERS & HOME ADDRESSES J. Fletcher Creamer, CEO* 216 Bears Wood Road Chief Executive Officer * * Park Ridge, NJ 07656 J. Fletcher Creamer, Jr.* 158 Ashley Place President ** Park Ridge, NJ 07656 Glenn L. Creamer* 175 Chestnut Ridge Road Executive Vice President Saddle River, NJ 07458 Dale A. Creamer* 426 Airmount Avenue Vice President/Assistant Ramsey, NJ 07446 Treasurer John L. Martin 3 Newark Avenue Treasurer Westwood, NJ 07675 George Kreis 47 Mill Road Vice President of Woodcliff Lake, NJ 07675 Operations Anthony C. Suppa 150 Glengarry Lane Vice President/Assistant Hainesport, NJ 08036 Secretary Christine Valiante 201 Yorktown Blvd. Assistant Secretary Hammonton, NJ 08037 Brad R. Jorrey RD #2, Box 755 Vice -President -Heavy Bart Bull Road Construction Middletown, NY 10940 Joseph T. Walsh 23 Winding Brook Way Vice President -Utilities Shrewsbury, NJ 07702 Andrew C. Wood 40 Sheffield Road Chief Financial Officer Summit, NJ 07901 Estelle R. Marafino 41 Van Orden Road Corporate Secretary Harrington Park, NJ 07640 Juergen R. Hoheinz 250 Kipp Avenue Assistant Secretary Hasbrouck Heights, NJ 07604 Incorporated Under The Laws of the State of New Jersey June 16, 1954 *Board of Directors **These individuals own 10% or more of the stock of J. Fletcher Creamer & Son, Inc. The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. r & Son, Inc. y Name Signature of Bidder Bree Zinsmeister/1) Printed or Typed Signa Subscribed and sworn to before me this 14 day of July , codM-1 "ok" ,. .. NOTARY PUBLIC �NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 1. See A-F "I) . Name and Address of Public Agency 2. 3. Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Name and Address of Public Agency Name and Telephone No. of Project Manager: Date Completed Contract Amount Type of Work Date Completed C-43 J. Fletcher Creamer & Son, Inc. List of Successful Most Recent Projects for the Company Year Project Name Owner Contact / Phone No-T Construction Costs Etiwanda Extension & Whittram Ave. Inland Empire Utilities Agency 2004 Recycled Water Pipeline RP-1 6075 Kimball Avenue, Bldg. B Nasrin Maleki $ 2,148,804.50 12-20" PVC & 30 CIVIL & C Chino, CA 91710 909-993-1696 Water Reuse Project City of San Luis Obispo John Moss 2004 7.6 miles of 8" thru 20" DIP 955 Morro Street 805-781-7220 $ 5,054,528.50 Recycled Water Mains San Luis Obispo, CA 93401 Ocean Blvd. Utilities The Port of Long Beach David Fargo 2002 Relocation 925 Harbor Plaza 562-590-4172 $ 3,826,997.00 8-20" DIP Long Beach, CA 90802 2,849 LF 15" gravity sewer & City of Carlsbad Sheri Howard $ 648,979.00 2002 2,230 LF of force main 1635 Faraday Avenue 760-602-2460 Carlsbad, CA 92008 Water Recycling Facilities Padre Dam Municipal Water District AI Lau $ 1,347,745.00 2002 Force Main 10887 Woodside Ave. 619-596-1804 Santee, CA 92072 J. RITHIR CREAMER R SON, INC. To Whom It May Concern: This will confirm that Natalie Bree Zinsmeister, of J. Fletcher Creamer & Son, Inc., has authority to sign bids for work to be performed on behalf of the Company. J. FLETCHER CREAMER & SON, INC. By:,? J PAttest: Seal Jue en . Hofheinz, A istant Se tary 91003-0337 CITY LsM B CH- CA fjUjNT1NGTQ'td JUL ILI `�ri.cz -- �� �Yt. nc►�cU 1 2�'�-r- -ry �, 5�,� r ,�-Z L45 0-T'1 ►j ;--o-� �� • SAFECO' ` /� SAFECO Insurance Company J, J A F E C O' PO Box 34526 P Seattle, WA 98124-1526 FIRST NATIONAL SURETY BID BOND Conforms with The American Institute of Architects, A.I.A. Document No. A-310 KNOW ALL BY THESE PRESENTS, That we, Majich Bros., Inc. as Principal, hereinafter called the Principal, and the FIRST NATIONAL INSURANCE COMPANY OF AMERICA of 120 Vantis, Aliso Viejo, CA 92656 a corporation duly organized under the laws of the State of Washington as Surety, hereinafter called the Surety, are held and firmly bound unto City of Huntington Beach as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of the Total Amount Bid in --------------------------------------------------- I Dollars ($ 10%-- ) , for the payment of which sum well and truly to be made, the said Principal and the said Suretv, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Cash Contract #1262 - Watermain Replacement Project NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Docwnents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished u1 the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 11th day of July _ 2005 Majich Bros., Inc. (Seal) Principal Witness Title FIRST NATIONAL INSURANCE COMPANY OF AMERIC Witness { gy", Eugene T. Iflondlo Attorrey-in-Fact S-0054/FNEF 12/00 V A registered trademark of SAFECO Corporation FRP IMPORTANT NOTICE TO SURETY BOND CUSTOMERS REGARDING THE TERRORISM RISK INSURANCE ACT OF 2002 As a surety bond customer of one of the SAFECO insurance companies (SAFECO Insurance Company of America, General Insurance Company of America, First National Insurance Company of America, American States Insurance Company or American Economy Insurance Company), it is our duty to notify you that the Terrorism Risk Insurance Act of 2002 extends to "surety insurance". This means that under certain circum- stances we may be eligible for reimbursement of certain surety bond losses by the United States government under a formula established by this Act. Under this formula, the United States government pays 90% of losses caused by certified acts of terrorism that exceed a statutorily established deductible to be paid by the insurance company providing the bond. The Act also establishes a $100 billion cap for the total of all losses to be paid by all insurers for certified acts of terrorism. Losses on some or all of your bonds may be subject to this cap. This notice does not modify any of the existing terms and conditions of this bond, the underlying agreement guaranteed by this bond, any statutes governing the terms of this bond or any generally applicable rules of law. At this time there is no premium change resulting from this Act. 5-6248 3/03 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT No.5907 State of California County of Orange On July 11 2005 before me, Patricia M. White, Notary Public**************************** DATE NAME, TITLE OF OFFICER - E.G., "JANE DOE, NOTARY PUBLIC' personally appeared Eugene T.Zondlo**************************************************************** NAME(S) OF SIGNER(S) ® personally known to me - OR - ❑ proved tome on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. PATRICIA M. WHITE Comffftsion # 1553664 WITNESS my hand and official seal. - w Notary PUft - Ccom-,ia Orange ComIy MY Comm. Bq*es Mar 16, 2009 SIGNATURE OF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ® ATTORNEY -IN -FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE S-4067/GEEF 2f98 U 1993 NATIONAL NOTARY ASSOCIATION • 8236 Remmet Ave, P.O. Box 7184 - Canoga Park, CA 91309-7184 . w POWER OF ATTORNEY No. 8063 KNOW ALL BY THESE PRESENTS: Safeco Insurance Companies PO Box 34526 Seattle, WA 98124-1526 That FIRST NATIONAL INSURANCE COMPANY OF AMERICA, a Washington corporation, does hereby appoint ******WILLIAM R. CURTIS; JUDY GRANDUSKY; LOURDES LANDA; JOI-IN MONROE; PATRICIA M. WHITE; EUGENE T. ZONDLO; Irvine, California***** its true and lawful attorney(s)-in-fact, with full authority to execute on behalf of the company fidelity and surety bonds or undertakings and other documents of a similar character issued by the company in the course of its business, and to bind FIRST NATIONAL INSURANCE COMPANY OF AMERICA thereby as fully as if such instruments had been duly executed by its regularly elected officers at its home office. IN WITNESS WHEREOF, FIRST NATIONAL INSURANCE COMPANY OF AMERICA has executed and attested these presents this 8th - Oldc- 1 STEPHANIE DALEY-WATSON, SECRETARY CERTIFICATE day of June Azl�� MIKE PETERS, PRESIDENT, SURETY Extract from the By -Laws of FIRST NATIONAL INSURANCE COMPANY OF AMERICA: 2005 "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of FIRST NATIONAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V, Section 13 of the By -Laws, and (ii) A copy of the power -of -attorney appointment, executed pursuant thereto, and (iii) Certifying that said power -of -attorney appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." I, Stephanie Daiey-Watson, Secretary of FIRST NATIONAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of this corporation, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed the facsimile seal of said corporation this 11th SEAL \.Tr 19 2 8�v r day of July 2005 STEPHANIE DALEY-WATSON, SECRETARY S-1049/DF 4105 Safeco and the Safeco logo are registered trademarks of Safeco Corporation. WEB PDF SECTION C PROPOSAL for the CONSTRUCTION OF Watermain Replacement Project Orange Avenue, from 3rd Street to Ilth Street Watermain Replacement Project, Alley North of Pacific Coast Highway, from 6th Street to 91h Street Watermain Replacement Project; Alley North of Pacific Coast Highway, from 15t" Street to Alley Between 15th Street and 161h Street Watermain Replacement Project Alley Between 6th Street and 71h Street, from Alley North of Pacific Coast Highway to Orange Avenue Watermain Replacement Project, Alley Between 5th Street and 61h Street, from Walnut Avenue to Orange Avenue Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 7th Street Watermain Replacement Project, 71h Street from Alley Between Pecan Avenue and 71h Street to Palm Avenue Watermain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between loth Street and llth Street to llth Street Watermain Replacement Project, Walnut Avenue, from Alley Between llth Street and 121h Street to 12th Street Watermain Replacement Project, Olive Avenue and Alley Between Ilth Street and 12th Street CASH CONTRACT No. 1262 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The lst Notice to Proceed will be issued for materials procurement. After undersigned submits proof of C-1 materials procurement and a detailed construction schedule to AGENCY, and after AGENCY issues a written approval of undersigned's construction schedule, AGENCY will then issue a 2"d Notice to Proceed to the undersigned to commence immediately with the physical site work thereafter to be completed within a Two Hundred (200) working day Construction Period. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find $16 49cwb in the amount of $ A0 % 01:-�which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3'd Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $//0aV, $ ODQ. —' 2. Furnish and install 12-inch PVC pipeline in Orange Ave. with nitrile (NBR) gaskets, and connection to the existing watermain, at 11th Street and 3`d Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and in place. 2,509 LF 3. Construct 8-inch PVC pipeline in alley between 10th Street and 11th Street, and connection to existing watermains, with nitrile (NBR) gaskets, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these plans, complete and $ 2 $ Z/ operative in place. 97 LF 4. Construct 8-inch PVC pipeline in alley between 9th Street and 10th Street, with nitrile (NBR) gaskets and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, $ �� -- $ ,C� qq complete and operative in place. 88 LF 5. Construct 6-inch PVC pipeline in alley between 8th Street and gth Street, with nitrile (NBR) gaskets and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, 67 LF $ I complete and operative in place. C-3 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11'h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 6. Construct 8-inch PVC pipeline in alley between 7th Street and 8th Street, with nitrite (NBR) gaskets and connection to existing watermain, including all valving, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, 45 LF complete and operative in place. $21e $'- 7. Construct 8-inch D.I. siphon assembly, including all fittings and appurtenances, excavation, backfill, and surface repair, as shown on these complete and in 53 LF $ $% plans, place. 8. Construct 8-inch PVC pipeline in 61h Street with nitrile (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on 15 LF 219 these plans, complete and operative in place. $ 9. Construct 14-LF 8-inch PVC pipeline and construct 37-LF 12-inch PVC pipeline in 51h Street with nitrile (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on these plans, complete and operative in 51 LF place. $S 10. Construct 8-inch PVC pipeline in alley between 5th Street and Main Street, with nitrile (NBR) gaskets, connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, cement slurry backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in 22 LF - $ place. C-4 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Construct 8-inch PVC pipeline in Main Street with nitrite (NBR) gaskets, and connection to existing watermain, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair and thrust restraint, as shown on these plans, complete and operative in place. 15 LF $ 32-70_ -- 12. Construct 8-inch PVC pipeline in alley between 3`d Street and Main Street, with nitrite (NBR) gaskets, and connection to existing watermains, including all valves, fittings, cathodic protection, and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and operative in place. 95 LF $ 13. Remove and salvage (to the City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 7 EA $ 14. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, complete and in place. 7 EA $ 15. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place. 1 EA $ 2odn $� 16. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on these plans, complete and in place. 2 EA $ ��. $ 17. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, complete and in place. 20 EA $ $ C-5 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 18. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete and in place. 20 EA $ /0, $ 19. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans complete and in place. 19 EA $ � ./� $ '%69' 20. Construct 12-inch inverted siphon assembly, including all fittings and appurtenances, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 84 LF $ $ % to — 21. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS / $ Jan / 22. Furnish and Install new 1-inch polyethylene water service to Existing Water Quality Test Station, including piping, fittings, valving, removal and disposal of existing meter box, connection to Sampling Can, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ 41a $ 4100- 23. Traffic control throughout work area, including preparation of traffic control plans. 1 LS / $ ,Lm $ 24. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $161W. $ 25. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 10 EA $ $ 26. Demobilization and Cleanup 1 LS $ r6e $ 1 ppC� 27. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 9 EA C-6 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 28. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 2 EA complete and place. $�. $aoQ 29. Furnish and install new 2-inch copper water service, including pipe fittings, valves and connection to existing 2-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and % operative in place 2 EA $ $ 30. Remove, and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on // these plans, complete and in place. 11 EA $ SGa. $ J,Sov. 31. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in ' ` 4y complete and place. 1 EA $ 32. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 2-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and Elm appurtenances, complete and operative in place. 2 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE A $ I©, 7/ CIO C-7 PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3rd Street to 111h Street BID ITEMS ALTERNATIVE BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost A-1 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 6-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA $ A-2 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 8-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA $ f $ a® A-3 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 12-inch pipeline. Vertical Offset to include, 2-each 45-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA ? $oao . $©� A-4 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 6-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA $ $Qp. A-5 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 8-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA $ Z�. � .— $ C-S PROJECT BID SCHEDULE A Watermain Replacement Project Orange Avenue from 3'd Street to 11t" Street BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost A-6 Furnish and Install new Vertical Offset, maximum of 3-vertical feet for 12-inch pipeline. Vertical Offset to include, 2-each 22.5-degree DI fittings, Thrust blocks per City Plan 614, trench excavation, pipe bedding, compaction, Cathodic Protection, and appurtenances, complete and operative in place. NA EA $�. C-9 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 6th Street to 9th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $AzXr- $ 1,00M. 2. Furnish and install 8-inch D.I. pipeline in the alley north of Pacific Coast Highway with nitrile (NBR) gaskets, and connection to the existing 8-inch PVC watermain at 8th Street, and 12-inch PVC at 91h Street, and the alley between 8th Street and 9th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on $$ r $z these plans, complete and in place. 368 LF 3. Furnish and install 6-inch D.I. pipeline in the alley north of Pacific Coast Highway with nitrile (NBR) gaskets, and connecting to the existing 8-inch PVC watermain at 8th Street, the alley between 71h Street and 8th Street, and the 12-inch PVC watermain at 6th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and in place. 679 LF 4. Remove and salvage (to the City) existing fire hydrant, including removal and disposal, of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in � as place. 1 EA 5. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, 1 EAS�,o. 60 complete and in place. 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, $ complete and in place. 6 EA 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete J/ and in place. 6 EA $ C-10 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 6th Street to 9th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 6 EA $ $ 9. Chlorination and testing of all new water mains in 1 LS and appurtenances, complete and place. av_ $ 10. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $ $ 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance �. with these plans and as required by law. 1 LS $ $ 12. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 10 EA $ ��. $ 13. Demobilization and Cleanup 1 LS $ $ Qt ^ 14. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 1 EA ��// 7tatr. m� complete and place. $ $ 15. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 or D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 4 EA $ $ 16. Furnish and install new 1-inch copper water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and in 3 EA $ ��. $ 2-yM, -- operative place. C-11 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 61h Street to 9ch Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 17. Furnish and install new 1-inch copper water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA 18. Furnish and install new 2-inch copper water service, including pipe, fittings, valves, connection to existing 1 1/2-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, / complete and operative in place. 1 EA 19. Furnish and install new 2-inch copper water service, including pipe, fittings, valves, connection to existing 2-3-inch comp metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA 20. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these plans, complete and in place. 5 EA$�� 21. Furnish and install 6-inch cut in valve assembly, including valve, D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $� �i $ i 22. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these plans, complete and in place. 1 EA $ay. $ 23. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of �- Huntington Beach requirements. 250 CY $ 24. Import soil. 250 Cy C-12 PROJECT BID SCHEDULE B Watermain Replacement Project, Alley North of Pacific Coast Highway from 6th Street to 9th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 25. Furnish and Install new 1-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and in 3 EA 9 la6. $ appurtenances, complete and operative place. $ 26. Furnish and Install new 1-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and Ar0• appurtenances, complete and operative in place. 1 EA $,la• $ 27. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1 Y2-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ 28. Furnish and Install new 2-inch copper water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 2-3-inch comp meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and �a0• �a�• appurtenances, complete and operative in place. 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE B $ Sal/ T C-13 PROJECT BID SCHEDULE C Watermain Replacement Project, Alley North of Pacific Coast Highway, From 15th Street to Alley between 151h Street and 16th Street BID ITEMS Item Unit No. Description Quantity Unit Cos Total Cost 1. Mobilization 1 LS $ 2. Furnish and install 6-inch DIP pipeline in the alley north of Pacific Coast Highway with nitrile (NBR) gaskets, and connection to the existingq watermain at 15th Street and alley between 15t Street and 16th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as in 163 LF shown on these plans, complete and place. $ 3. Provide temporary water service to properties isolated from the watermain during construction. 1 LS $ 4. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 2 EA $ $ 5. Chlorination and testing of all new watermain and in 1 LS $ bap appurtenances, complete and place. $ 6. Traffic control throughout work area, including 6� preparation of traffic control plans. 1 LS $ 7. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance �p_ with these plans and as required by law. 1 LS $ ✓ s ��', 8. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $ o; 9. Demobilization and Cleanup 1 LS $ 10. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and / operative in place 1 EA $ C-14 PROJECT BID SCHEDULE C Watermain Replacement Project, Alley North of Pacific Coast Highway, From 15th Street to Alley between 151h Street and 161h Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and `� Alay ' operative in place. 2 EA $ /��. $ 12. Furnish and install 6-inch cut in valve assembly, including valve, D.I. Class 350 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA 13. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach 75 CY // r requirements. $ ac;. 14. Import soil. 75 CY $ $ 15. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and / appurtenances, complete and operative in place. 1 EA $ (moo. $ p• 16. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA Sub -Total Amount for All Bid Items — SCHEDULE C $ %11 C-15 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between 61h Street and 7th Street From Alley North of Pacific Coast Highway to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ $ �Ot�Dp• �` T 2. Furnish and install 8-inch PVC pipeline in alley between 6tn St. and 7tn St. with nitrile (NBR) gaskets, and connection to the existing watermain north of Orange Avenue, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans in 2/y complete and place. 1,083 LF $ $_�> 3. Remove and salvage (to the City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 2 EA $�_ 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, in complete and place. 2 EA $ $�G'd 5. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these in Loa, plans, complete and place. 1 EA $ 6. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on these Complete in / 2,SPo �- plans. and place. 1 EA $2�. $ 7. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, in complete and place. 5 EA $p. $ 8. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete in and place. 3 EA $ 140. $ 9. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 4 EA $ $ C-16 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between 61h Street and 7th Street From Alley North of Pacific Coast Highway to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 10. Construct 8-inch inverted siphon assembly, including all fittings and appurtenances, cathodic protection, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 56 LF $ IZV• $ &/7 -- 11. Chlorination and testing of all new water mains ' �ac� and appurtenances, complete and in place. 1 LS $o_ $ 12. Traffic control throughout work area, including preparation of traffic control plans. 1 LS 13. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance these by law. with plans and as required 1 LS $ $ 14. Pothole existing utilities as directed by and in the presence of the City inspector, including traffic pavement repair and control. 5 EA $ 15. Demobilization and Cleanup 1 LS-- 16. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and 640. operative in place 20 EA $ 17. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and in operative place. 9 EA $ $, -� 18. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these //' ✓✓ plans, complete and in place. 2 EA $ v, $ /40-P 19. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach ' requirements. 240 CY $� $ U 20. Import Soil 240 CY $ C-17 PROJECT BID SCHEDULE D Watermain Replacement Project, Alley between bth Street and 7th Street From Alley North of Pacific Coast Highway to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 21. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances. Complete and operative in 6V. place. 20 EA $ $ 22. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and '"� ev, appurtenances, complete and operative in place. 8 EA $ /m $ Sub -Total Amount for All Bid Items — SCHEDULE D $ , C-18 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 5th Street and 6th Street, From Walnut Avenue to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ $ 2. Furnish and install 8-inch PVC pipeline in alley between 5th St. and 6th St., with nitrile (NBR) gaskets, and connection to the existing watermain at Walnut Ave. and Orange Ave., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, in LF $ Z complete and place. 837 $ 3. Provide temporary water service to properties isolated from 1 LS $ 000,0. the watermain during construction. 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill and surface repair as shown on these plans, in 2 EA $�ov�. $p_ complete and place. 5. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on 2 EA �� b�Q these plans, complete and in place. $ $ 6. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as gyp. / �1�© shown on these plans, complete and in place. 5 EA $ $ 7. Chlorination and testing of all new water mains Cove.$ �' S ooa9_ and appurtenances, complete and in place. 1 LS $ 8. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $ 9. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance Kocw C4�e. with these plans and as required by law. 1 LS $ . $ 10. Pothole existing utilities as directed by and in the presence of the City inspector, including ,— pavement repair and traffic control. 5 EA $'- 11. Demobilization and Cleanup 1 LS $ $ CPP -- C-19 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 5th Street and 6th Street, From Walnut Avenue to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 12. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 1 EA 0-tvQ $ complete and place. $ 13. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing 3/-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and �• �. -- operative in place 7 EA $ $ 14. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 8 EA $ 15. Furnish and install new 2-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1'/2-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, EA 1004P, ��L'p complete and operative in place. 1 $ $ 16. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including- surface repair, as shown on ff these plans, complete and in place. 2 EA $ 17. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of Huntington Beach requirements. 280 CY $ $ 18. Import Soil 280 CY $ 19. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and in 7 EA / $ (�br- ' $ `7��a_- appurtenances, complete and operative place. C-20 PROJECT BID SCHEDULE E Watermain Replacement Project, Alley between 51h Street and 6th Street, From Walnut Avenue to Orange Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 20. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and �j appurtenances, complete and operative in place. 8 EA $ /10V $® 21. Furnish and Install new 2-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1%2-inch meter, new meter box and abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and ao appurtenances, complete and operative in place. 1 EA $ $ Sub -Total Amount for All Bid Items — SCHEDULE E $ 2,87 3&47 '"— C-21 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 7th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ $ 7 ao 2. Furnish and install 8-inch PVC pipeline in Acacia Street with nitrite (NBR) gaskets, and connection to the existing watermain at Lake Ave., Main St., and alley between Lake St. and Main St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, in 601 LF complete and place. 3. Construct 8-inch PVC pipeline in alley between Lake St. and Main St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, cathodic protection, fittings, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these in 58 plans, complete and operative place. LF $� $ 4. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on 1 EA Z O� these plans, complete and in place. $ $ 5. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, in ,S, complete and place. 2 EA $ $ 6. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete in by ZOO and place. 2 EA $ $ 7. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as ' shown on these plans, complete and in place. 6 EA $ ado, $oo© 8. Construct 8-inch inverted siphon assembly, including all fittings, cathodic protection and appurtenances, excavation, backfill, and surface repair, as shown on these plans, complete and in place. 74 LF $ $ 9. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $JLvvV_ 10. Provide temporary water service to properties isolated from the water main pipe during 1 LS $ Acoa. $ waPp, construction. C-22 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 7th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Traffic control throughout work area, including LS��"� preparation of traffic control plans. 1 12. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance these by 1 LS $ $ with plans and as required law. o0 13. Pothole existing utilities as directed by and in the presence of the City inspector, including Lft. pavement repair and traffic control. 4 EA $_J $ao_ 14. Demobilization and Cleanup 1 LS $ $-- 15. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, jn©'vo. complete and in place. 5 EA $ $ 16. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and � 1BQ operative in place. 1 EA $ 17. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on EA $ 3 7 S b- these plans, complete and in place. 5 $ 18. Furnish and install new 1-inch polyethylene water service, including pipe fittings, valves and connection to existing %-inch metering assembly, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and operative in place. 1 EA $ $ 19. Furnish and Install new 1-inch polyethylene water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA C-23 PROJECT BID SCHEDULE F Watermain Replacement Project, Acacia Avenue From Lake Street to Alley Between Pecan Avenue and 71h Street BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost 20. Furnish and Install new 1-inch polyethylene water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and / ��_ _ ZVP appurtenances, complete and operative in place. 1 EA $ [�✓A $ Sub -Total Amount for All Bid Items — SCHEDULE F $ 207 hq2 . '- C-24 PROJECT BID SCHEDULE G Watermain Replacement Project, 7th Street From Alley Between Pecan Avenue and 71h Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $7 2. Furnish and install 8-inch PVC pipeline in 71h Street, and in the alley between Pecan Avenue and 71h Street including 20+/- LF 12-inch PVC pipe and connection to the existing water main at 7th Street & Palm Avenue, and connection south of Arcadia Avenue at the alley between Pecan Ave. and 7th St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as these in 509 LF shown on plans, complete and place. 3. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box, and valve cover, backfill, and surface repair, as shown on these plans, complete and in place. 2 EA $ $ 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, f / complete and in place. 2 EA T�. $ (� 5. Furnish and install 2-inch air and vacuum assembly, including all valving, fittings, zero sack slurry backfill, and appurtenances, as shown on f these plans, complete and in place. 1 EA $� 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, complete and in place. 2 EA $o, 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete Aor and in place. 1 EA 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 2 EA $ 9. Chlorination and testing of all new water mains 1 LS -� $ ^ and appurtenances, complete and in place. �. --5c'_ 10. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $� C-25 PROJECT BID SCHEDULE G Watermain Replacement Project, 71h Street From Alley Between Pecan Avenue and 71h Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance these by law. 1 LS with plans and as required $ $ 12. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $ $ 13. Demobilization and Cleanup 1 LS $ 14. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 1 EA $ $ 15. Furnish and install 12-inch cut in valve assembly, including valve, PVC Class 200 pipe transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, complete and in place. 2 EA $ $ 16. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 3/-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and f operative in place. 4 EA 17. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and ��P. operative in place. 1 EA $ $ 18. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on � these plans, complete and in place. 3 EA $ 19. Remove and dispose of hydrocarbon contaminated soil per OSHA and City of / t__70v. Huntington Beach requirements. 95 CY $ 20. Import soil 95 Cy $ 2,'' $ Z3 75 C-26 PROJECT BID SCHEDULE G Watermain Replacement Project, 7th Street From Alley Between Pecan Avenue and 7th Street to Palm Avenue BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 21. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 3/-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and �� appurtenances, complete and operative in place. 4 EA $� $ 22. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and appurtenances, complete and operative in place. 1 EA $ Sub -Total Amount for All Bid Items — SCHEDULE G C-27 PROJECT BID SCHEDULE H Watermain Replacement Project, Alley North of Pacific Coast Highway From Alley Between 10th Street and 11'h Street to 11th Street BID ITEMS Item Unit No. Description Quantity Unit Co Total Cost 1. Mobilization 1 LS�- 2. Furnish and install 8-inch PVC pipeline and 6- inch PVC pipeline in alley north of Pacific Coast Highway with nitrile (NBR) gaskets, and connection to the existing watermain at 11th Street and alley between 10th Street and 11th Street, including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, complete and in place. 272 LF $ 3. Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these 20" ZOO©- plans, complete and in place. 1 EA $ $ 4. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, in ' (� /gyp complete and place. 3 EA $o. $ 5. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete f�°.'- and in place. 2 EA $ $°_ 6. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 4 EA °. 7. Chlorination and testing of all new water mains in J�Q and appurtenances, complete and place. 1 LS $ 8. Traffic control throughout work area, including preparation of traffic control plans. 1 LS $'Z0" 9. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance with these plans and as required by law. 1 LS $ oo 10. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $ • ®o. $o. 11. Demobilization and Cleanup 1 LS $_ $ Son. C-28 PROJECT BID SCHEDULE H Watermain Replacement Project, Alley North of Pacific Coast Highway From Alley Between loth Street and 111h Street to 111' Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 12. Furnish and install 8-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in 4-Goo. complete and place. 3 EA $ ,FA2eV $ 13. Provide temporary water service to properties isolated from the watermain during construction. 1 LS $ a $ 14. Furnish and install new 1-inch polyethylene water service, including pipe, fittings, valves, connection to existing 1-inch metering assembly abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction and appurtenances, complete and in ` operative place. 2 EA $ 00 $ 15. Remove and dispose of existing valve. Dispose of interfering pipeline, and seal existing pipe ends, including surface repair, as shown on these f plans, complete and in place. 5 EA 16. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, in complete and place. 1 EA��U 17. Furnish and Install new 1-inch polyethelyne water service, including piping, fittings, valving, removal and disposal of existing meter box, connection to existing 1-inch meter, new meter box, abandonment of existing line, trench excavation, pipe bedding, zero sack slurry backfill, compaction, reconnection to customer side, and 7oy, appurtenances, complete and operative in place. 1 EA $_/00. $ Sub -Total Amount for All Bid Items - SCHEDULE H $ C7q -- C-29 PROJECT BID SCHEDULE I Watermain Replacement Project, Walnut Avenue Alley Between Ilth Street and 121h Street to 12th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 1. Mobilization 1 LS $ 2. Furnish and install 8-inch PVC pipeline in Walnut Avenue with nitrile (NBR) gaskets, and connection to the existing watermain at 12th St., and the alley between 11t' St. and 12th St., including all valves, fittings, cathodic protection and appurtenances, pavement sawcutting and removal, excavation, backfill, surface repair, and thrust restraint, as shown on these plans, in 143 LF $ f/9, $ % complete and place. 3. Construct 8-inch PVC pipeline in alley between 11th St. and 12th St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, fittings, cathodic protection, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these in 63 LF r $ 7, plans, complete and operative place. $ J , 4. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in 1 place EA 'Cov. !?� 5. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, " complete and in place. 1 EA $a_' $ 6. Cut and cap/seal existing waterline, including all appurtenances, as shown on these plans, in 2 $ rz'Q complete and place. EA $�y© 7. Remove existing valve box and cover, including excavation, backfill, and surface repair, complete Zp and in place. 2 EA $ $ 8. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as shown on these plans, complete and in place. 3 EA $ $ 9. Chlorination and testing of all new water mains $_ 2Sy40- and appurtenances, complete and in place. 1 LS $ 10. Traffic control throughout work area, including 1 LS preparation of traffic control plans. C-30 PROJECT BID SCHEDULE I Watermain Replacement Project, Walnut Avenue Alley Between 11th Street and 12th Street to 12th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance these by law. 1 LS with plans and as required 12. Pothole existing utilities as directed by and in the presence of the City inspector, including pavement repair and traffic control. 4 EA $_ 13. Demobilization and Cleanup 1 LS $ 9—Coo �- 14. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, EA �SQP complete and in place. 2 $ $ Sub -Total Amount for All Bid Items — SCHEDULE 1 $ 7/ 20 C-31 0 PROJECT BID SCHEDULE J Watermain Replacement Project, Olive Avenue and Alley Between 11th Street and 12th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total ost 1. Mobilization 1 LS 2. Construct 8-inch PVC pipeline in alley between 11" St. and 121h St. with nitrile (NBR gaskets), and connection to existing watermain, including all valves, fittings, cathodic protection, temporary blowoffs, and appurtenances, pavement sawcutting and removal, excavation, surface repair, and thrust restraint, as shown on these g plans, complete and operative in place. 60 LF $ $ 3. Remove and salvage (to City) existing fire hydrant, including removal and disposal of bury, valve box and valve cover, backfill, and surface repair, as shown on these plans, complete and in CAP place 1 EA 4. Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances, zero sack slurry backfill, and surface repair, as shown on these plans, in EA $ complete and place. 1 $ ..o 5. Furnish and install 2-inch temporary blowoff for pressure testing, including all appurtenances, as / shown on these plans, complete and in place. 2 EA $ 6. Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ /.��• $ 7. Traffic control throughout work area, including ,/ /S f preparation of traffic control plans. 1 LS $ At_ 8. Install sheeting, shoring, and/or bracing as required for all trenching and excavation operations, and confined spaces in accordance law. 1 LS I O with these plans and as required by 9. Pothole existing utilities as directed by and in the �1 presence of the City inspector, including pavement repair and traffic control. 2 EA $ $ 10. Demobilization and Cleanup 1 LS $ &P $ C-32 PROJECT BID SCHEDULE J Watermain Replacement Project, Olive Avenue and Alley Between 11th Street and 12th Street BID ITEMS Item Unit No. Description Quantity Unit Cost Total Cost 11. Furnish and install 6-inch cut in valve assembly, including valve, PVC Class 200 pipe, transition couplings, removal and disposal of existing pipe and appurtenances as shown on these plans, EA I�Ab• �gOt? complete and in place. 2 $ $ 1Z Furnish and install 4-inch pump -out assembly, including all valving, fittings, zero sack slurry backfill and appurtenances, as shown on these EA plans, complete and in place 1 $ $ Sub -Total Amount for All Bid Items — SCHEDULE J C-33 PROJECT BID SCHEDULE K Watermain Replacement Project Alley Rehabilitation for All Sites BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost 1. Install Aggregate Base (AB) 1,376 Tons $ .fib. $ Li; zg,0. 2. Install AC 513 Tons $ $zw, Zf S 3. Install Slurry Seal 13,441 SF $ $ 4. Cold Milling 1,242 SF $ 'r $ %t '- 5. Unclassified Excavation 1,356 Cy $ O. ' $ 4lv�n 6. Adjust Utility Cover 123 EA $ /w. $ /Z ion 7. Adjust Water Cover 26 EA $ 717C. 8. Adjust Sewer/Storm Drain Manholes 7 EA $ �®Q $ 2iA . loo. 9. Adjust Survey Monuments 6 EA $ S�cn, ' $ 10. Remove/Construct Concrete Sidewalk 689 SF $� $l — 11. Remove/Construct Concrete V-Ditch 9,880 SF $_[�= 12. Remove/Construct Concrete Drive Approach 5,262 SF $ 13. Remove/Construct Concrete Curb 28 LF $ �'t. 14. Remove/Construct Concrete Curb and Gutter 72 LF $ CC), 15. Install Slurry Seal (detail sheets to be provided) 13,100 SF $ • 294- $ 32-75 �- 16. Remove/Construct Concrete Drive Approach (detail sheets to be provided by Agency) 3,600 SF $A won Sub -Total Amount for All Bid Items — SCHEDULE K $ .51 q1V Bz. C-34 PROJECT BID SCHEDULE TOTALS CC-1262 WATERMAIN REPLACEMENT PROJECT Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H 74,22-0. 2-0-71 Zoe 192. Ilo 9, ! 3-7, 98g'7G,- Sub -Total Bid Schedule 1 .% /, 2p 9. to Sub -Total Bid Schedule J ���✓�'M . / zs' Sub -Total Bid Schedule K J 44, ,7&O — TOTAL BID AMOUNT (Schedules A K)"` TOTAL BID AMOUNT IN WORDS: Z , �� D6J 2S % luo 1-AI AI _/01X,67Tj C-V-x, 1-7I n' `z}�� 1 Notes: All extensions of unit prices will be subject to verification by Owner. In case of a verification between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. C-35 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid and the portion of the work to be done by such subcontractor. Portion Name and Address of Subcontractor State License Class of Work I Number --P f c. 45 ' 2 z z a C—A . i J" A. AIA +��t s � I,,- /evz E. Z-1� �r A f k�. 1 �d �" - A. IJA ,rz ✓¢ �� C-4- Arw; P , d %/ A By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-36 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ss. County of Orange ( !cam! , being first duly sworn, deposes and says that he or she is c - % /rcx of �q /C & IS" S- Wu-C. the party making the Foregoing bid that is not made in the i rest of, or on the be behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. "4 /Gg 6" s , J-, c Name o idder IF z- Signature of Bidder "fir 0. I'S x 33-7 AL-7V�-_XA GA Address of Bidder 9 ID-0 3 Subscribed and sworn to before me this I L_ day of , 2005. CATMLEEW L WIAL comr4wn # 1368780 Le Nebo �••�n n kVCWM 1W=Jun 14, 2W NOTARY PUBLIC U`_L-n1 NOTARY SEAL C-37 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Construction of Watermain Replacement Project, Orange Avenue, from P Street to llth Street; Watermain Replacement Project, Alley North of Pacific Coast Highway, from 6th Street to 9th Street; Watermain Replacement Project, Alley North of Pacific Coast Highway, from 151h Street to Alley Between 151h Street and 16th Street; Watermain Replacement Project, Alley Between 6th Street and 71h Street, from Alley North of Pacific Coast Highway to Orange Avenue; Watermain Replacement Project, Alley Between 5th Street and 6th Street, from Walnut Avenue to Orange Avenue; Watermain Replacement Project, Acacia Avenue, from Lake Street to Alley Between Pecan Avenue and 7th Street; Watermain Replacement Project, 7th Street, from Alley Between 6th Street and 71h Street to Palm Avenue; Watermain Replacement Project, Alley North of Pacific Coast Highway, from Alley Between loth Street and llth Street to llth Street; Watermain Replacement Project, Walnut Avenue, from Alley Between llth Street and 12th Street to 12th Street (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: 7 > lb� . 4f/C-�/ S- .�/C_ Contractor By Title C-38 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes LN"No If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-39 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: -7 ! P r— �,4 r 6c( 1TXG S . �A1 Contra By Title — -7-n- S C-40 UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER (To be completed only by the awarded Contractor prior to excavation) No excavation will be permitted until this form is completed and returned to the AGENCY. Section 4216/4217 of the Government Code requires a Dig Alert Identification Number be issued before a Permit to Excavate will be valid. To obtain a Dig Alert Identification Number, call Underground Service Alert at 1-800-4224133 a minimum of two working days before scheduled excavation. Dig Alert Identification Number: Contractor Title Date: Note: This form is required for every Dig Alert Identification Number issued by U.S.A. during the course of the Work. Additional forms may be obtained from the AGENCY upon request. C-41 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder 'Fo - % .33.7 Business Address City, State Zip ( d,Z6) 3 -7 q 2-- Telephone Number 5-2-6 -70f A State Contractor's License No. and Class 41,16 19'g- Original Date Issued :�-n /a 6, Expiration The work site was inspected byof our office on 2005. The following are persons, firm, and corporations having a principal interest in this proposal: I�1,� r r r--rl S • , �` x�� C-42 - � r The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. "Q r/c.<l 1-5� "s --7�-C. Company N Signature dder Printed or Typed Subscribed and sworn to before me this "L day of CATHLEEN L-1tIT� ConwrAft n 01368760 Notary Public - commit Los Afig" County Pon W IIAyJw114+�AiiO NOTARY PUBLIC NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 1. C17vI ©f V&--1f7W&,4 Q / j // Sr. E TN12,4 Name and Address of Public Agency Name and Telephone No. of Project Manager: lwk/! - Z-.4 7;WQ /K 77- 5t7, 3 2 �I©c boo, — Zv.-r2�-� / o Contract Amount Type of Work D4 Completed Name ang Address of Pub c Agency Name and Telephone No. of Project Manager: A. Kir -- v- 7AJAC Ml �// / J 0 0 0. — ZcJA— _ b Contract Amount Type of Work Date Completed 3. —C-1' 7-i Name 0-F- —S4-;x/-tea A---teW i c:4 and Address of Public Agency Name and Telephone No. of Project Manager: AZ-4-Al S�'-79 r /(.60 00 Contract Amou Type of Work 510 - 5�9-- 97 3Z Date C-43