HomeMy WebLinkAboutCity of Fountain Valley - 1963-01-01AGREEMENT
THIS AGREEMENT is made and entered into by and between the City
of Huntington Beach, a Municipal Corporation and City of Fountain
Valley, a Municipal Corporation.
RECITALS:
The City of Huntington Beach and the City of Fountain Valley
have coordinated their storm drain construction in such a manner as
to be mutually beneficial to each City.
The City of Huntington Beach has acquired right-of-way and
excavated an ultimate storm drain channel for the first leg of the
proposed East Valley Channel.
The City of Huntington Beach has constructed temporary storm
drain culverts underneath Bushard Street.
The City of Fountain Valley has purchased right-of-way for the
second leg of the storm drain channel for 1320 feet from Garfield
southerly.
Contractors for the City of Fountain Valley shall construct
the second leg of the channel from Garfield 1320 feet southerly.
City of Fountain Valley recognizes the inability of present
structures at Bushard Street in the City of Huntington Beach to
transmit the run-off that could ultimately be delivered to that
point.
The parties hereto desire to enter into this Agreement and do
agree as follows:
1. The City of Fountain Valley agrees to accept the responsibility
of constructing an ultimate Reinforced Concrete box culvert from
right-of-way to right-of-way and transitions at Bushard Street to
replace the present temporary facilities.
2. The City of Fountain Valley agrees to perform said con-
struction at such time as the land developed for housing, commercial,
-1-
industrial or other improved uses within the City of Fountain Valley
which is contributary to this drainage channel exceeds 250 acres.
3. The City of Huntington Beach and the City of Fountain
Valley shall jointly share in the maintenance of the section of this
East Valley Flood Control Channel from a point 1200 feet South of
Garfield to Garfield Avenue.
4. The maintenance services to be performed by the City of
Fountain Valley shall be a semi-annual removal of weed growth including
the costs of acquiring and spraying of chemicals and sterilents as
necessary to keep the channel in a well maintained condition.
5. The City of Fountain Valley will grant to the City of
Huntington Beach whatever rights are necessary for and pertinent to
the performance of necessary repair work and for restoration of flow.
A k� iv a-t
C�6f
Date: June 27, 1963
Date: June 27, 1963
Date: June 18, 1963
Date: June 18, 1963
CITY OF HUNTINGTON K
BY
Mayo
BY
City Ckokk
CITY OF FOUNTAIN VALLEY
Piavor
BY �c
Citv Clerk
CITY OF HUNTINGTON BEACH
ENGINEERING DEPARTMENT
Huntington Beach, California
June 17, 1963
Honorable Mayor
and City Council
City of Huntington Beach
Huntington Beach, California
Gentlemen:.
r
Subject: East Valley Channel
Agreement between
Cities of Huntington
Beach & Fountain Valley
Transmitted herewith is an agreement between the Cities of
Huntington Beach and Fountain Valley pertaining to a cooperative
flood control project. Per the terms of the agreement the City
of Fountain Valley agrees to construct a reinforced concrete
structure at Bushard Street at such time as necessary. The City
of Huntington Beach per the agreement is being obligated. to share
only in the maintenance of a section of the flood control channel.
The City of Fountain Valley requested, by a letter dated
March 21, 1963, the cooperation of this city to obtain necessary
right of way for the channel within Huntington Beach, This right
of way has been obtained and construction has commenced.
The agreement has been approved for form by the City Attorney's
office. It is the recommendation of this office that the agreement
be approved.
Very truly yours,
ame s H. r
City Engineer
JRff:iEH:en
Eno 1,