Loading...
HomeMy WebLinkAboutCity of Westminster - 1972-06-21 A ' A G R E E M E N T This Agreement by and between CITY Of WESTMINSTER, a Municipal Corporation of the State of California, hereinafter ri-ferred to as r °44EST;11NSTER", and CITY CF HUNTINGTON 3EACH, a Municipal Corporation of the State cf California, hereinafter referred to as "HUNTINGTON BEACH". W I T N E S S E T H WHEREAS, Bolsa Avenue, 'Goldenwest Street and Edwards Street are on the boune,iry line of the cities of Westminster and Huntington Beach; and 1-e intersections of Boise Avenue at Goldenwest Streit, Solsa Avenue at Victoria Lane and Bolsa Avenue at Edwards Street are on the boundary line of the cities of Wc:stminst,�r and Huntington Beach; and Certain portions of Bolsa Avenue and Goldenwest Street are unimproved; and Through study, street improvements and traffic signals are warranted at the above indicated locations; and At meetings and conferences ha,etofcre and between the citii-.s, through ¢!-•sir staffs, it has been orally agreed between the cities that street improvements and traffic signals should' be constructed since it is for the benefit of both cities, NOW THEREFORE, in consideration of the covenants and conditions herein contained, the parties hereto agree as follows: 1. Westminste; shall prepare plans and specifications for the widening and improvements on portions of Bolsa Avenue and Goldenwest Street. 2. Westminster shall prepare plans and specifications for the traffic signal modifications .at ti;-: intersection of Bolsa Avenue and Goldenwest Street, new traffic signals at Balsa Avenue and Victoria Lane and traffic signal modifications at Bolsa Avenue.-, and Edwards Street. 3. Huntington Beach and Westminster shall have the rinht of approval of said plans and specifications. 4. After approval by Huntington Be.ac! , Westminster shall advertise for bids using the same procedures it used in making its public bid for a new public_ work within the City and award it to the lowest responsible bidder. 5. Westminster -,hall be in charge of the construction. 6. The cost of the street improvements shall be the responsibility of the City within which said portion of street improvement is located. 7. The cost of the traffic signals at the varioL. intersections shall be paid by the parties hereto In the ft,,-01owirg proportion: a Niel I III 7. (continued) Gvndenwest and Bolsa Fe -ards and Bolsa Huntington Beach - 12.50 Huntington Beach - 25% Westminster - 37.5% Westminster - 25% County AHFP - 50.0% County AHFP - 50% Victoria and Bolsa Interconnect System Huntington Beach 25% Huntington Beach - 25% Westm%nster 25% Westminster - 25% County AHFP - 25% County AHFP 25% Sears Roebuck -� 25% Sears 'Roebuck 25% 8. Engineering , inspection and other misc_llareous applicable costs shared on a,pro rata basis as established in Items 6 and 7 of this Agreement. Said costs are not to exceed the amounts ai'.owed by the Orange County Arterial Highway Financing Program. g. Huntington Beach will pay its p:-oportior.ate share upon completion of the constrLction contracts. 10. Upon completion of the installation of the signals, maintenance of same shali be perfurmed by Westminster. The roost of said maintenance shall be prorated bet%eeen the cities following the same schedule as the installal.ion of sz0d- signals. 11. Any controversy or claim arising out of or related to this agreement or to the interpretation, breach or enforcement thereof shall be submitted to three (3) arbitrators, one being the Orange Road Commissioner, County of Orange, or an engineer member of his staff, and the remaining two (2) to be chosen by the respective cities or by an engineer associated with the Public, Wo'rks Department of a municipality. Any decision made bj the majority of said arbitrators shall be final, binding and conclusive. 12. Each party hereto pledges its full faith and credit to pass said necessary resolution and take proper legal steps to perform and to effect this agreement. IN WITNESS WHEREOF, Westminster has caused its corporate name and sear to be hereunto affixed by its Mayor and attested by its City Clerk thereto authorized, and Huntington Beach has caused its, corporate name and seal to be hereunto affixed by its Mayor and attested by its City Clerk t'iereto authorized, the day, month and year appearing below. CITY OF WESTMINSTER, a Municipal Ccrporation GATED: / 1972 BY: mayor ATTEST: City Clerk CITY OF HqJrlNGTON BEACH, a Mu ipal Corp a DATED— {� , 1972 BY .- 0-e"* Mayor ATTEST:. FAUL C. JONES . City Clerk B ) 1l y'�•*,- { &2 1�t: t:y C I Arlt � � CG-�tSa• s�,: "�i3'1�9�f�l&.*.B" T�:•7t�:'.... �rt•�, �. t" "" •, y: � .I�,.I;.F,�. �585, # ,r: .. 573 peratiee Agreemnt with � t.Sir f; i�J*iTeirG'(1 City of Westraletater u"" of t,%e C+iy a EXEMPT ►iuntera tt1a1 t*.+ett.G3.e4 92fr ca @.3�9 59 MY]ICF M if RUY (.IVV_N tlu, tht- contract }Seretafo€e neArded b% thr City Loxxaci i of the City of Huntington Bauch. teal i fornis to Qmat:y of OramSe S4=ta Am, California _ho was the comgany therecm for i as*tnr, the following work to-vic i Street improvem=ta of -r-*Iva Avenue between Golde=eat Street and Edwards Street inciudirg Jaotatilstioa, wdificatioa and intarccatiact of ssipzla at: Aloha and. Gold-o2vaet:, BolsaE and Victoria said Boma and 9d"rda within the cititas of amt:ingtoa Beach and. W"t:Tincates. '3(c'g tR O'i<SCIAL FMi&Q,opm ` cat�tarr.ca(Fts�adsa JUL 'S a i emYu.cawrAt That sa:d work vas r,�xVleted by said copy according to plans and specifications and to the satisfaction f the City Engineer -:J the City of Hrmcingtore Beach and that sold work use accepted by the City Council of tw City of HLntinBtou beach at a regulax zaacing thereof held on the bnt_(iay ctf 3uly, 1974 N A e Bated at Huntington Beach. Californiz, this `z� day of ?ui� 19 74 , City Clark masts ex-officto Clerk of the City cic.zacil of the city of r=tiratm 34ach, California STATE OF CALIT04Wa.® } C40*4=ty Of Ors * } as: City of tluntiaffiton Beach ) I. ALYCLA M. WZWMWS, time utl;f Yleetcd tam r=,s IM,4d City' CIt'rk and ex- offficia Clark of hbm City Cowmil of the City of Runtingtra 16&=r, Ulifomi.A do hereby Cartifp Mder POasaalt9• of }Grua th8t: tbO f*T*,-WM3 MnCZ OF CM9WAMY f.a true i and cot-race, orA-than acid MICZ W CMM=IW v= duly cud regul rly ordered. to recorded in 00 ffffficQ of tI4 sty RecoxvIAr of Gems 02r� by aa" City C V aril.. Dated at stantleetaft seta Cautwmiaa, ttaia Zod dAy of -_July 19 14 Cft3 Glork. and ,-officio CIPT+ d DIVISION OF COSTS COUNTY FUNDS AHFP 585 COUNTY FUNDS HUNTINGTON HUNTINGTON AHFP 586 BEACH WESTMINSTER OTHEP TOTAL BFPCft WESTMINSTER_ FUNDS rUNOS FUNDS A14OU_€dT Cantract Cost 45,470.75 72,580.57 53,683.24 114 ,643.07 57,204.10 343,581.73 1 Right of Way - - - - - Extra Vork A Change Orders. •- - - - - - y Work 6y City Forces a,%d Pthers 4,749.68 13 419.34 5,529.82 17,415.01 929t713.24 965,827.09 TOTALS $60.220.43 $85,999.91 $59,213.06 $132,058.08 $981 ,917.34 $7 ,309,408. AWM r; C'" ' „ of Westminster, by agreement, gas the Contracting Agency for the project. County AHFP Funds- Due M City oaf Huntington Beach, AHFP 585 $50,220.43 less County incurred costs of $628,36 $49,592.07 City of Uesta.iinster, A'IFP 586 $85,999.91 less County incurred costs of $649.01 ,and less previous payment of $66,520.04. M 19,830.83 TOTAL $6%47.2,40 ;Y.Y ae r..�z.,.s.:<«,,,b..-`s�.�v..�,...<_{.e;..�...,._r-,.,:�._..4....te,,...,.=,.r..,c.-.a.:',.._.�*•�y r.,;-a;;:.:�K<...::�,',,�,.�i«✓•.1V!r,..arf'a�."'K�t'.r,s1�,.-,:.......-..�:a�..e*:..Ri°.,.',>t_.,�_.S v.'_.3�y.tromva•.ti.1,..:.,.s:..,�..,.-._'.6^,�%..ax,.r...'S,t,'t.:.;5',3..:��,x:x t µ�z a.s-`tfa�t ,_::.,',.:r-:s.:..',,E,..�-��t e,.,..;<.k..r�a�..s-w.",,',yt.J.�.7�,i xwr9,,`.�dS t.ra x�,�.{.�4a�S._..,-....,.',:.:,u,�...:..t-.�.t.Ff.*r,,..,:.z,..,-.,a....>r';.T,.,fiP`t��.,.:',,S..?a•,'Sv��r�'.�.�k�-._.,.....,-ct si�:::*.��xx*,+�,,._,.-,`s.1';u-!��„.-�e:�.r.`ts..,.arn._.+.s•.<?.{^1,N..b+.,r.��-!.'.�,`,>rr;,,dn.�3,r�.[�.:,wa,.;,r�.'s{� �"..,��,";` -,+0'("•L�4"",�„`,',';i.^t,Yt,'r+S--�v'...4.7'.`Z.',�37`%"�4l^=,`v.;.�Y�.'n-c^ . r a `�r�r�'L:"+4v•:^�:.�@c�.Wx.1...�.�._ �.,.� 2-.-t�Casr.�v::.�.. :. ..u-e,� e J s .. .,n.,.�C:�.-'i,t'a�x."x: '`''���fi"c,�:`'" _.'r,p_ ,,. .i, .,.�'�,�,'.'�1°?4:�:As1v`�w:v..3:�' ka:.�:.,:.,..+,...;..za;,.�i�.#w::.�zu.1„�„w.a:.�,::«'•.c',, �"°,�71-':7- r` 4-. ,"n^r 7-w'+r" v "" ""_"�.°y`'..- ,. '.,-: _.�.r.. �'�•ar•",r„tj..,. ._-. '�tT rr�N",z^',. 1^s^•+^•+r.+;-'ems:..+e"'F`r.-r 3 t ,., , r.�rt�t� a,. ,. .: •�,� R � A ._.' ^,�..� �-.r�:.,h- .'t -.�E;.,d „v,,.,.. +, x q'^��.•�".�',�. 'z?3�yP. a i�-•. .4 y_ _ ..�..�. �- .. s. � ..��. ;- ..�'" ,. ;... r .F.,. ,,..r,a�.v�' ,,.,'•. .. ..#: a�. :t.h..,,a. s- ;,,,...°.e.',=iy.... i..- ..:5' f -, fi:. -f;,:.,x"t x:,rs,,.,. ..y:-... xa •,, .,- .,.2 v a... ,.c:rr'a z ,.:<. ",sue*:.., •.v'.�.r w, ....."�`e3C�t � s...:?` ,c: �_k. ���G �:�' i'"r.-.s .c-3. ..i a... ,x._..}� .-.Y 4' :R .,. ~ti,.. bats:.,. .,..-,ts`.r ., r�'#:.,�a � '�_,yr ,r: gg y+a �- :-�.tr+r' •,,..tr. L"N".a.� +t � i' ,u '1. ,� v 5'.� 't ,.f .S:k r.. s. �.. n -...,..fie t .:-� 1 .�.. :.o- �Y'-..., :,.....:. �+�'.�..' s.. ...r.:: �.,,.•..+.,.. �„ T.�� ,-'S r:A.�a i'.. d•J .f�".,.,+7. L :., -.ef .. �'.. 'x-F ...... i' 4 fi ., „�,.,.. �r.,, -^tir _.,- �r„::-.- :r.. .•.z �_.tt' --ter,:✓° � �`�,e"�,rrmY'd+=;"_2': f'�'+r! ��L: -:� ..;. :.4,. �_ : '":a ....+f r�--,= ::.,.,.. .7 t A1,•,-.:..,i. . ..�. ,..,.'fin....-r�c` v�r:���u �,` - f._ ��. .'4' +s�.r,.,,t.F�- x+-r,���+`4 ?it3� -- -..- ,,.-,.T .r ,...,... tw>"n t :sv _�, •, �. M, ,.,b.,:--^x Ka..,..,�„ a.'ar.,,n,,, :,...Yt x., x, A +7.iy ,t�r'� rt 'a."o ?4,i�s r.s ,`'++•. ...��, ... ,.r,- :.,. �'.rt _u. '^r"4 �:., s3`.F.?.� z s +o-i ^,� ,si �,'^"- �w ��z` i r r x ;a.�.r+.�, z a". x Aft AIM 1-- City of Huntington Beach P.O. Box too CALIFORMA MWO June 21, 1974 . An- Honorable k Y,# eta, >r and City City- of Huntington Feach { Attention: David D. Rowlands City Adminisrratorrrl, Subject: Cooperative Agreement with City of Westminster for A.H.F.P. 4585 Westminster Project $S-185, CC-200 Gentlemen: The work on the subject Arterial Highway Financing Program Project No. 585 for stzjet improvements of Balsa Avenue between Goldenwest Street and Edwards Street- including installation, modification and interconnect of signals at Balsa and Goldenwest, � M. Boise and VLctoria and Balsa and Edwards within the cities of *x Huntington Beach and Westminate_- has been completed. The city of Westminster's cost is $1,310,158.82 and the city of Huntington Beach's cost is '1109,433.49. This is per ,Agreervant dated June 20, 1972, between the two cities. The County of Orai.ge will pay $50,220. 43 of Huntington Beach's share making a total cost of } S°9,213.06 for Huntington Beach. s` aa�.7g It is recommended that your Honorable Body accept the work and instruct the City Clerk to file the notice of completion. P �", Vt-ry truly yours, 11�� Director 6k Public Worke �z � -M. t ANIL CITY OF WESi"�9i G ITFA 8200 its"vaie z%r Avo. ftstalneftr, Callforols 6017 l"Wice K� 0' June 3s 1974 _purchaseP Nw2ber M: Cit o ' anon ton Beach < v' r3 r P.' O. Box 190 iiuntington eeacb, Calif. 91648 Attn: H. E. Hart Director og Pu l c Wow ubn4 i tv Un I t $ i Ioni^ AWP #585 & 586 (8185) Eolsa Ave., Goldenwest to Edwards Improvements Requas,'- for reimbursement of expenditure on behalf of City of Huntington Saaci per agreement dated June .t , 4jt 3 i { 1 1 Yellow Acm0flog Grow ® OrIg IrAt v vaperftmt pir • rot i i 26TION OF M BOARD OF SUPE , SORS 3F 2 OR}'s�E COUY Y, CALIFORNIA 3 Jum 16, 1974 f+'f 4 on motion of Supervisor Baker, duly seconded and carried, the 5 following Resolution was adopted-, b WHEREAS, by minute order of May 21, 1974, this Board directed she Road Cocaasni.tsicner and County Surveyor to prepare an estimate of � s :. costs necessary to repair arterial intersections where adverse dip '9 conditions exist; and j 10 WFIEREAB, the Road Co=isaioner and County Surveyor has Pre" c 11 sented his report on cost of repairs for said intersections; 12 NOW, 'THERErOYZE, BE IT RESOLVED that this Board hereby en- 1{ courages cities to submit Arterial liigway Financing Program projects 14 which will upgrade arterial intersections which have poor aiding . i; V'S qu alities. 0 0 maw "d 16 BE IT FUMER RESCL4€a S that the Art-%rial Highway Financing 'u C p a 1 Program staff is directed to give particular emphasis to intersect'-on Is design *ahen reviewing plans for Arterial Highway Financt" Program +� 19 ptojacts. 20 BE IT sFUR<THER. RESOLVED that the Road Commissioner is directed 21 to cooperstaa lwi.th cities to develop Projects in County islaxtida to i 12 Improve intersection riding quality. 4 23 BE 1'T FUFZM FMOLIM chat the Road Comissicner is directed i 24 to begin on those projects available for correct Lon at this tizo. 25 26 27 A 29 29 AYES: Si'JtEZrISOs OagM L. h �. 0. �4� , A. W. BATTIN, O RMLM A. D CR 30 12 . import S•a say of Intersectims with Advezve DLp CavdLti - ., 7 t I SATE OF a�Y' $ a COUM OF a "$ Z, tea Z. ST J , Co ty C'LexEt and ez-offtcLo Clark of tbA Bated 4 of Supervisors of Ord County, California, hey certify that the f3 , tbt ---nd foregofo,- €solution was daily and rejulaxly a4aptad by the said Board at a regular meeting thereof hold om the _... ,�., day of 7 ,7utze a 1974 , and passed by a unanimous vats 0 of said F-mrd meinherr, present. 9 IN WITMM WMEOF, I have 1sr3rounto set m' hand and seal this Io �.3t day of Ita:l , 1974. 17. I W. E. ST JOH1 Clerk sand ex-offfclo Ciark Zs of the So=d of Supervisors oZ ftange Ccvmty, California 16 �� I� Ay � x 1 �t` �'.� ...Y J• 16 Oty 17 IL Ids I9 21 ► 1 r ! 29 4 f so 33 , 32, 2. - 9MMUTES OF THE BOARD OF SUpERVIS0 OF ORANGE COUNTY, CALIFORNIA Jung: 27, 1972 IN RE: AGREEMENT ARTERIAT HIGHWAY FINANCING PROGRAM BOLSA AVENUE CITY OF WESTMINSTER 'ROJECT NO. 586 ( On motion of Supervisor Baker, duly seconded and unanimously carried by Board members present, the Chairman and the Clerk ace author- ized to sign the Arterial Highway Financing Program Agreement dated June 27, 1972, between the County of Orange and the City of Westminster, for the•improvenL,st of Balsa Avenue, between Edwards Street and Golden West Street, Project No. 586, IN RE: AGREEMENT ARTERIAL HIGHWAY FINANCING PROGRAM BOLSA AVENUE CITY OF HUNTINGTON BEACH PROJECT NO, 585 On motion of Supervisor Baker, duly seconded and unanimously i carried by Board members present, the Chairman and the Clerk are author- --zed tc sign the Arterial High"ay Financing Program Agreement dated. June 27, 19'f2, between the County of Orange and the City of Huntington Beach, for the improvement of Bolsa Avenue, from Edwards Street to Golden West Street, Project No, 585. IN RE: RE FISIOY OF CLASS SPECIFICATIONS On motion of Supervisor Phillips, duly seconded and unanimously carried by Board members present, the following Revised Class Specifica- tions are adopted as submitted by the Personnel Plrector in his letter dated June 27, 1972: Safe Deposit Box Examiner Air Conditioning Mechanic ; Locksmith Effective June 27, 1972. IN RE, REPORT CONDITION OF STA.MWAY FROM COAST HIGHWAY TO THE c BEAC'.f, SOUTH LAGUNA NI?rfH AVEDnSE BEACH ACCESS DIRECTOR $ OF BUILDING AND SAFETY On motion of Superviscr Cespers, duly seconded and unanimously carried by Hoard Members present, the report submitted by the Director of Building and Safety dated June 19, 1972, regarding the condition of stairway from Coast Highway to the Beach, Ninth Avenue Beach access, South La�sna, which to adjacent to property •",.nvolved in Division of Land No. 1309, is reviewod and ordered filed. , 2 PROJECT # 565 WqANDP:,Ay AG E' entered into this 7 day of 19 8asleas �.?t�, by deed beL'wza 4 G024an Wa01t atrew» C:ITY OF Taut=' ten Besuh a municipal.corporation, hereinafter referrtA to as the City, and Q COUNTY OF ORANGE, u political subdi lision of the State of California, hereinafter 7 referred to as the county.WITnSSZTH- 9 W 'EREhS, the Paa.d of Supervisors by Resolution of lay 31, 1956 10 adopted the taster Plar. of Arterial Highways to serve the entire county 11 including the incorporated cities thereof, and i2 WH=X .S, Article 2 and 3 of chapter 9, Division Z of the Streets 1$ and Highways Code authorize a< county if it sJ desires to expend funds 14 apportioned to it out of the California Highway Users Tax Fund for aid 16 to cities and in the ucpro-ement. construction, or repair of streets 16 within a city, and t 17 KHMUM, the Orange County Soard of Supervisors and the Orange 1$ County Division of the League of California Cities have agreed upon a � 19 cooperrtive financial program for the establiahmernt, construction and 20 maintenance o" a county Arterial Higtrvsy System known os the Arterial 211 Highway Financing Program, and 2 WHMMM, the Board of Supervisors has, by appropriate action, 2$ provided .in the budget of the Spo^.ial Ro&d improvemnt Fund for the 24 fiscal yoar 1971-72 funds for the improvament of streets within the 26 j incorporated cit on of that County, which streets are a ,part of than 26 County'a Master .Plan of Arterial Ki.ghways, and 21 WHEREAS, the Board of Superviaors on dos* ter 5, 1958 has by 28 formal reaalutic*ts adopted the forzal procodusv For the admizistrcation of the Arterial Highway Financing dram, which pros a is outlined 80 in a docuuent on file with the Ca=ty Clara, fox l.l.y known as the $ meaty of -Or-Ange Artaria3 MLVhvay PLaanclAq Program Procedure Mnurt.1, 82 raad WELMLWI it i4tually agreed between the ploes that BOkM AVe=&O fYm Mvor.a -trews $v Go A-a boast Strael, � f 4 a etreGt include in the Orange County I ter Plan of Arterial Highways, .s' 6 is a street of general County interest and should be ioaroved in accord- 6 ance with the policies of the Arterial aignwaay Fiaanciag Program. Said } 7 worle of such improve,4nt shall be referred to hereinafter as the Project. g b"t.#s3, T2MRZEORZ, IT IS ;4REM by the parties -.e et.o ss Follows. 9 1. The procedures outlined in the Arterial aighwaay Financing Program � 10 Procedure'Kanua.L herein referred to shall be made i part of :his 11 agroentent. 12 2. The Contracting M"_hority for the Project is hf--reb- designated 12 as Est axes+ '4 3. The Project Engineer for the Project as hereby designated as 16 tto Cites 10 4. The Construcrtior. 'engineer for the .Project in beraby d,aaignated 17 as 1$ S. All coils angi„tee:ing and material and coustructioa: tostinc; neces- 19 wary for the Pro;cct shall be resformi&6 by the County. Thi$ shall 20 include preliminary sails investigations, structure fr�undaation 21 invostigations, recorztendatioos for structural soctions and 22 L-ompactiron requiremonfz,, and quality control of materials and 23 canntruction 24 6. The wvwrk ashmll be mxbject at all t.izwn to Inspection by the 26 authorixed rseprozontativei of berth pastica. 26 7. Fvadss to ism uesr.d for the jOct; 2-7 (A) Cite aantimatsed coast of tho Project covered by this aag rew4*st isa s28 Rl= O WhY &atF=STT101Xt 29 77r3W30 ' ..� T 81 g 77,YJO 32 -2- .oaw.e 1 (b) On th% of the ar,cave estanmte, this Project Brill, be 2 fi.namccge. fW,lows a ODDNW ?r=S wo 2 CITY FUMS: ;( d i'+l✓iL: ay 77,34X 5 (c) if upon ccozpletion of detailed design, it appears that the 6 project eatimate will exceed the original allocation by more 7 than 15%, the Contracting Authority shall request the City 8 Couaci 1. and Souris' of. Supervisors for additional funds. The 9 City Couruil and the Board of Suparvisora shall adapt resolu- 10 tionm allocating the addita.oral funds prior to advertAsiaq for 11 bids. The request for additional al lrations Shall follow the 12 procedures as set forth zn the A$£a Procedure Wnmal. 12 (d) Final adjustments of Projoct costs will he made on the basis 14 of the County _50 percent, the City �.� percent on etlig�.blu 16• it o in the Contsmct. 16 (e) Final adjustments of project storm drain tits will be made on 17 the basis of matching runds up to a maxiaru-n of fifty percent 18 (5074) of the total cost of eligible items: that is, County 19 participation shall not exceed as m xim= of twenty-five percent 20 (25%) of tho total cout of eligi,bl€: vWm drain construction. 21 (f) it is the intent of the p&rtiea hereto to camp+ly with all 22 applicable rules reagardinq tim expenditure of State wags Tax 22 :tmdas. Eligibility of a y &to= drain item mill be s;abjecst to 24 final audit mild dasterzination by tl- State Control.leoral office. 25 Any futureadjustment ragoire4 by said Controller's Office 'ehall .06 bo made by the city with City funds, including complete rafund 27 to tho County of any county tax funds declared by the Controller to have ba" e9pomded on it l.,iclible traactian. 29 (g) Any furvU spent prior to �*971 cbaal1 not be so considered ,in the fLnal accomating a2 thin Project. �2 a. After completion of coewtruction, the party havi.aag rw ibili ty 3 for maintmmate of the Project ehasml maintain the roadway stiructures e 3,. 1t6N5 I�1 4 1 saeatl facili,. az in thz vafo and usable c=ditian to which they have �3! been LMPr0V0d or c'0�trrar Uftd . this Prs, 5act. 8 B. County—vide t. on of A.rtorial ,xasta a: 4 To promote uniformity of County Arterial Highway System with Clay 6m=ter Plan of *tor Str"—Ua, both partioa agree to continue the } promralgatiar of the, A.H.P.P. as cutlinva l in the aforementioned 7 Procedure dual. is IN SIT"S5 Mm0m3P, City has caused this agreement to be e3xacuted ! by ite Mayor and wated by -ts Clerk. srd County has caused this t 10 agreement to h-- executed by the Chair-.an of its F--ard of Supervisors 11 &nd attASted by stO Clerk CM the date v written opposite their signatures, 12 all theraaunto duly authorized by the City Counc.l and the Board of super-1 + I3 visors, r€spoctively. 1 CI'1"£ or B a municipal corporation. 1.6 Dated: iq 71 By 17 f MAYOR is A T: � s 19 Cork of the ncil./ 20 21 COUM C? ORANcam', a political subdi.vizion of t-he St t= of California E2 2$ Das t.&d x . . f 19 By f I o- ftard o. S ery v}. f1Ca °2A 5 : ATMSTa W. $. ST J county clerk and ex-oLfioSss 27 clot of the poard of S pervii s '' `` m P% HIGHWAY DESIGN REPORT RECEIVED BY [DESIGN DATE DESIGN REPORT FOP BOLSA AVENUE f AHFP NO. 585 & NO. 586 f } BETWEEN ED�IARDS STREET a GOLDEN HEST STREET . • LENGTH 0.5 MILES ESTIMATE OF COST HIGHWAY REVIEWED BY DATE c P^ �wRO CT0 L L APPROVED APPROVED 4 pp CITY QF it S l i t'SN R COUNTY SURVEYOR Alai i DATE `� ROAD COHNISSYONER a ' JANk PROJECT REPORT C I. GENERAL I. This report concerns the improvement of Bolsa Avenue, a major highway, between Edwards Street and Golden West Avenue. This project requires the relocation of the existing Orange County Flood Control District CO-4 G channel to the north to allow sufficient width to pro- vide the proposed street improvement. The O.C.F.C.D. � in conjunction with the property owner on the north side of Bolsa Avenue (Sears), plan to construct a tri- ple reinforced concrete box to replace the present s� earth-lined open channel . 2. The AHFP portion of the project includes: � a. Kodi,ication of the existinv traffic signals at Edwards Street and at Golden West Street. b. Installation of a traffic signal at Victoria Lane. � f c. The improvement of Bolsa Avenue to provide a mimi- mum of three travel lanes in each direction. Cer- tain improvements will be exchanged for voluntary ! right-of-spay dedications by the adjoining property 0 owners. 3. The proposed work Is located in the Cities of Huntington Beach and Westminster. The City boundary lies approxi- mately on the ultimate centerline of Bolsa avenue, II . PRESENT ROAD 1. Belsa Avenue is now partially Improved to ultimate. i On the South side, which lies within the City of Huntington Beach the street is fully improved except for a 460 foot section near Golden West Street. In this - area the street has 24 feet of existing paving. The Ma- terials Laboratory has determined that the existing pave- ment South of centerline will require capping. North of centerline, the existing pavement extends 24 feet with an earth shoulder adjoining. This existing pavement will also require capping. 2. Some work is proposed oc Edwards Street north of the intersection, includlnq the extension of the existing triple box cultert under Edwards Street to allow the ultimmte curb returin to be constructed. Edwards Street 3 is a Secondary highway with 2 existinq northbound lanes north of Bolsa Avenue and with ultimate Imurovement South. A left turn Island Is or000sed for Golden West � >w Street, South of Solso Avenue. Soo bodification is proposed north of Soisa Avenue to allots a right turn A F� IBM h PRESE?IT ROAn icont. ) k' movement on to 101sa. t . 111. REFERENCE DATA 1. The Orange County Road Department Materials Laboratory has conducted soils invesvipations and recommended a strueturel section for the road construction. Reference: "Materials Report for the Proposed Construction of Balsa Avenue from Edwards Street to holden West Street." Crated November 10, 1971. v TRAFFIC REPORT YEAR A.D.T. ee TPOC#S 1970-71 11, t10 6.0 1971-81 25'an 6.0 f a� Traffic Index factor 8.2 t Design spend 45 M.P.H. There are two traffic sianal modifications olanned for this project, and installation of three new signals. � ' . If 2. Cooperative transactions with other agencies. a> County of Orange for purpoSG of financing (AHFP) ° g. Ib. City of Huntington: Beach. C. City of Westminster for sianalization. , i d> Orange County Florid Control District for channel ! relocation. e. Sears Poebl_sck. Co. for signalization and Aiobt of Way. IV. PROPOSED CONSTPUCTION 1. The existing traffic signals at Edwards Street and at k Golden test Street will be modified to arovide Droner . ± $ traffic floor. i4ew signals will be installed at: ap- proximately 66n feet cast of Edwards Street, at Victoria Lane: and aporoximately 66.0 feet west of Golden West Street. Balsa Avenue will be imaroved to ultimate on both sines with a raised divider. Left torn Pockets will be Ora- vided at the ooeninas. The new constructions will be 4¢ Asphaltic Concrete over 9" Aaareoate 9ase. The ex- Istine oavement north of centerline w;ll be canped acith , 21; of Asphaltic Concrete. and with 216�' soU'th of center°- i 10 P t � f�• PROPOSED CON:STRUCT104 �eont. litre. Curb and gutter will be constructed to provides C full imtirovement. Some improvements will be included in exchange for voluntary dedication of required right- of-way. 2. In general the grade will approximate the existing ground and will be coordinated to match existing improvements. i 3. See: Exhibit II for typical sections. d, Typical section will be 4" AsDhaltic Concrete over 9" Aggreaa¢e Base for Aew construction, with 2" x 2" As- phaltic Concrete cap -of existino navement in areas de- signated on the plan. This construction is as recom- mended by the Orange County Paterials Report. f _. Y. OESInN CRITERIA ' 1. Balsa Avenue is being designed on the basis of a 45 H.P.H. speed limit. 2. Centerline of construction is approximately the ces,- terline of right-of-way. VI. DRAINAGE 1. The rain ritensity for his az•eu is in tLie "X" done. 2. With resp. to drainage, there are no flooding problems in the area. YII. OBSTRUCTIONS i e 1. Power poles, telephone poles, water meters and miscells ; nexus obstructions In the proposed construction ,rea are to be removed or relocated as required. 2. No structures are in the proposed Improvement area, VIII. RIANT-OF-VAY 1. Additional right-of-way Is required on the north side. This is to he acquired by voluntary dedication to pro- 4 vidt an ultimate 54 -reet. IX. RISte,CEL!,.A dEi3 S €Y'�MS 1. Vim, catch basins vIll be constructed at the aporoxi- Plate quarter ;points. t 41 ,.'fit f�'�i i:, •xsf %. DATA ACCOMPANYING REPORT EXHIBIT I Preliminary estimates of cost incledina '.m breakdown, of costs to participating aoen- z>. cies. EXHIBIT lI flaps to show location of right-of-way changes , project 11miis and alignments , k t y, i yZtR�-Fv,'s Y f t a u: Y COUNTY OF ORANGE CITY OF WESTMINSTER CITY OF HUNTINGTON BEACH jp - i 7 r FINAL REPORT FOR IMPR0VEMENT OF j BOLSA AVENUE FROM EDWARDS STREET TO GOLDENWEST STREET j e r AHFP NO. 585, HUNTINGTON BEACH 1 AHFP NO. 585, WESTMINSTER a 5-185 qN C j}[ G Januarys 1974 Prepared by j TERRA! A ASSOCIATES t Ciyll and Consultini Engineers 44, i CONTRACT COST SEE EXHIBIT "A" ,y TOTAL CONTRACT COST $343,581 .73 EXTRA WORK AND CHANGE ORDERS None WORK 8Y CITY FORCES & OTHERS a: Design Engineering (City) Consulting Engineer• Contract 27,555,10 Labor 926.44 Overhead (18% of Labor) 166.76 28',648.30 Construction Engineering (City) Consultinc Engineer Contract 2,039,00 Labor 570.73 z_. Overhead (18% of Labor) 102.73 2,712.46 Construction Engineering (County) Labo, 333.10 Equipment 58.89 4 •Overhead 59.08 451 .07 Soil Pests (County) Labor 595.61 { Equipment 60.91 f Overhead 106.0s 762.61 Signs (County) Labor 33.49 Equipment 4.32 Material 20.00 Overhead 5155 63.76 Median Irrigation tWestminster) Labor 104.00 Equipment 40.00 Material 1 ,136.90 1 ,280.90 1 rr Striping (Westminster) Labor 156.00 Equipment 70.00 Material 214.04 440.04 Intersection Improvement @ Edwards (O.C.F.C.O.) 6,200.00 Street Lighting (S•CE) 5,988.75 C0-4 Channel Covering •(O.C.E.C.O. & Sears) 919,279.20 Total Work by City Forces and Others Total Cost of ProJec.t $1 ,309,408,82 4 ter, i COUNTY Or ORANGE t� FINAL REPORT FOR IMPROVEMENT OF Bolsa Avenue from Edwards Street to Goldenwest Street Type of Improvement Widening of Existing Highway Description of work perforned A. Widened the existing street to provide a minimum of four travel lanes with a raised center divider. Removed and replaced failed sections, and capped with asphaltic concrete to provide adequate structural strength. B. Modified traffic signals at Edwards Street and at Goldenwest Street. Installed new traffic signals at three intersections s between these streets. r Length in Miles 0,50 Contractor El Camino Contractinq Co. (Road) Paul Gardner Corporation (Signals) Engineer in Charge Marren Cavanagh i Assistant City Administrator Mile x Work Began January=1973,__�__�,� Work Completed October, 1973 S 1� k Tuly 6, 1972 ' Mr. James Uneelar Director of Public Works ,Y City of Huntington Baaw-*h '. d. Boy 190 Huntington Beach, California 92648 3. Attention; Mr. H. E. Range SUBJMT: AHFP ITO. 585 - Bolae. Avenue 1 Dear Mr. Wheelor! ,!' Transmitted hero vi.th are tiwo fully executed copies of the above mferenced AEWP Agri botwen than City of Mmtingtoa Beach and the County of Orange. A x u Also attached are two copies of Bicard of Supervisors Minute Order h ,4. authorizing Countv's =ecutim, v' Verf truly you=, N� L. McCOMILGE Road Cc=isrioaar and Ccmaty Sw-veyor iy Nei Y {ry3 By W. L. Division Rngineer- Emiginneri4ig WM:BDM:am .G Attach a; r�F N Y W � F l b 4�7 � q J,l 88 PiPae ti L. v e_C f Huntington Beach ENGINEERING DEPARTIONT August 5; 1976 Honorable Mayor a and City Council City of Huntington Beach Attention: Floyd G. Belsito City Administrator Subject: Resolution to Assign Ccunty Gas Tax Monies Directly to City of Westminster AHFP 0585; CC #200 ` . Dear Council Members% Transmitted herewith is a resolution which will assign the City's entitlement of Orange County's G4s Tax money to the City of gestminster. ' The City of Huntington Beach ARFP #585 project for the con- struction of street improvements in Bolsa Avenue between Edwards Street and Goldenwiest Street was accomplished in conjunction with the City of Westminster AHFP #586. The City of Westminster acted as lead &gency for these two projects. The total cost for AHFP #585 was $101,596.80 of which the City of Huntington Beach has paid Wea;tm2inster $55,294.72 from City Gas Tax funds. The mining $46,302.08 is the County's share of AHFP 0585, and is due and payable to the City of WestWnster. 8f {' It is therefore recommended that the City Council adopt thin �F resolution and instruct the Mayor and City Clergy: to execute. Very truly yours, ffiktgt3 R Director of Public ►Berke 9EH:W=:jy Trans. 'a �4 r f z 9P ArP ys. City of Huntington Beach April 28, 1976 Honorable tdyor and City Council. City of Huntington Beach Attention: David D. Rowlands U City Aftinistrator Subject: Balsa Avenue, ARFP 8595 Reallocation Resolution Dear Council. Members: Transmitted herewith is a reallocation resolution for the Boiea Avenue improvement project within the Arterial Highway Financing Program. Ths original Resolution No. 3269, passed on December 21, 1970, was to request $38,-650.00 (one-half the cost of the: project) � free the Board of Supervisors. The actual cost of construction i exceeded phis amount, therefore, a reallocation resolution is requ it ed. It is therefore recomended that your Honorable Body approve thin resolution and instruct the Mayor and City Clark to execute. very truly yours, OC Director of Public Worms Trans. 1 j P ff RESOLUTION NO 4236 A h?SO:,'JTsO?d 3F THE CITE 3? ;;t.�:Y INGTON BEAC-: REQUESTING TI-re COU. :Y aF G"Sttit'GE TO INCREASE *� TIMIR ALLOCATION FROM ARTERIAL HIGAWAY FIKANCI dG PROGfU104 POP, TIM DMWP?(E);T OF BOLSA Aj'E.' ROM EDWARI. 21 RF—V ' TO aOLDEae'�e EST S-`!.LET WHFREAS, on Oecen4ter 21, 1970, the City Council of the of Huntington Beach adopted Resolution No. 3269 requesting th- County of Orange to ir*.clade the development of Boisa Avenue within the Arterial Highway FizuncinS Program; and The original estimate for the I:gprovemer, of Bolsa Avenue from Edwards Stree; to Goldenwest Street WLF? Project No. 585) was $77,300, hooever, upon completion of project the final construction cost is1^q,;33%, g, and The City Council of the City of Huntington Beaci. had origi- naily revuested that the Board of Supervisory of the County of Orange allocate one-half of $77,300 or $38,650 from the Arterial Highway Financing Program, Ila,?, ': MRf:?0RE, BE IT RESOLVED that the City Council of the City of Muntington Beach hereby requests the Board of Supervisors of the +:aunty of Orange to allocate to said project the sum of $46002,08 In lieu of them 138,650 previously requested from the Arterial Aighway Finanaing Program, yaid amount to be matched by funds from the City of Huntington Beach. PASSED AND ADOPTED by the City Co=cil of the City cf Huntington Beach at a regular nacting thereof' hold on the 3rd day of May, 1976. .��� .. A'I"sEZSi; y er APB' V� AS TO re"I'E,A `: Par'PRONSD AS TO s �•a t,y to, FISM 4,49 •- 4°r REQUIFES FWANCIAL RADA T e ..,.....�...r.,,...w..,,..,,,.�.................w...+.�:.,...-nvs...w,e+..ww war...:»aM....w.era.r� +:wti,...r..w..�..+M�:...�saara:ww..:u.. ..»...w..rw+... ...'t.. :.., S*TKll: (W CPcUFMNIA ? c atss'€rf OF i#A:£ Li7Y tat" H LAW E?5Yi3cn BEACH } � s 1, A1.1C1A 14, WEMMM, trap duly elected, qualified Ciiw Cicrk of the City of Hunttngtoaa Beach, and ex-offfcio Clerk of the t City Counci'. of $aid City, do hereby certify that the mole muzubaer of members of tb*t City Cou aci l of tlse City of kh=tingtom Ba=h is seven, Mat the foregoing r 4olutiva was pagan aid atlrptoci by than of$is t l ve vote of more than a =mjority of a18 the arm of said City Cm mcil at as regular meetimS thereof held aaa tho 3rd day of Maly 19 76 by the follwing meta- E ; AYES: Counccile-an: Bartlett, Pattinson. ('.`on, Glbbc, Siebert, Slt*nk=o, 619ede. P�£S: Csi>oacilt�taa: ABSENT- Coaxes£1man- City Clara. -14 vz—of.ftcio Cltr& . of the City Cs+aam-€1 of eha City � - of &4aCicat F. ;ali#a�a~a1 �a TM tolemog irgumvit AS I'WrAd Ma of tht odgiaa!on No Ail the,AM f u C [C..A cky untyt at try;;tp nt,itaA;Rto�Beek(fit. z 4 �q ti _ ..-..- _ , ..._...�.N...._._..w....•.�._.--r,�...y....,,.,.� �+....._....,,...._ _ .&..,....... ? ,AAA>: R RESOLUTION? No. 4303 ' A F.ESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ASSIGNING ORANGE rOUNTY'S ALLOCATION OF THE COSTS OF THE AHFI #585 PROJECT DUE THE CITY OF HUNTINGTON BEACH TO THE CITY OF WESTMINSIER k. WHEREAS, the construction contracts have been completed for the Arterial Highway Financing Program for the development of Bolsa Avenue from Edwards Street to Golden West Street; and The City of Huntington Beach has agreed to pay its prc-- portionate share upon completion of the construction contracts per agreement entered into with the City of Westminster dated .'une 20, 1972; and The City of Westminster has been in charge of the oonstruc- tion; and The County of Orange has agreed to provide matching funds up to fifty (50) percent on e_ gible items in the AHFP contract per its agreement with the City of Huntington Beach dated June 27, 1972, i NOW, THEREFORE, BE IT RESOVVTED by the City Council of the City of Huntington Beach as follows: 1. That the total cost for the AHFP #585 was $101,596.80 of which amount the City of Huntington Beach has paid the City of Westminster•$55,294.72 from the city gaff tax funds; 2. That the remaining $46,302.08 is Orange County's promised contribution due and payable to the City of Huntington Beach, and that; this amount is due and payab'e to the City of Westminster per the June 20, 1972 ragr-t�ement; t-nd 3. That the City of Huntington Beach hereby asai,ns t:� the City of Westminster its rights to payment of $46,302.08 from the County of Orange under the AH F agreement between the County of Orange and the City of Huntington Beach. JG;cs 1, PASSED AND ADOPTED by the City Coanci: of the cit.7 or iiantington Beach at a, regular meeting thereof held on the 16th �a �� day of Auguist, 147E. APPRWED AS TO CONTEIff: APPROVED AS TO rORJM-��4�o r ty lwr u { �^tA'ti3i�F APPROVED, INITIATING DEPAF2�`�'% "�'��'f `} NO i SM Ufa!!Y'lCT- 4TxS''�j iv�• ,S V;. FES IMPACT -- 29 r ETE0 �4 t,F REQUiRU FI F` L IUMT MOB S ` ug l: h AI" �1 3, X"ter" -'�+�;' • s s �a s 430 fit% t�v STATE OF ULL4 IA COMM OF OR&= CITY Ow PMUMIW BUM 4 M I, ALICIA. N. ta'f.a3'�TSaOM, the drily elocted, qualified City Clerk of the City of ?kwti 4= Desch and ex--of:ficfo Clerk of the City council of naI" q, do .'A� y certify that cbe ebole sir of memd�cra of the City tell of the City of t- on Beach it eleven; that the foaergoing resolution e-ed ar-%d- 81 by the affirzative vote of more tharl a Mjorit:y of all the errs of said City CoI at a regular m atftm tbdraoff held cc tbo 16th day of Ass oat 19 76 'ry the following vat*: ` AYES: Counc L I ten: y r rtlert vAttfnRor Stek:�rt Rheyill Wieder NOES: cou=ibmm one. } 0692ff: Ccrsew 11mn: ar " Coin, Cilxhrs City C1eez azd -Offeeio, Cleft of the Cdtp CM=il of ebe City of Div, tom. California e a � t 4 j `.ueMa-..ww-•---•-+iVwra.w-xrxn.ws.•++xv-+r......:., .. ...�..... «.., .. ... All 7hi,s will certify that no charges incurred by the City of Westminster prior to March i, 1971 are included in the preceding figures. .4 : �- a City* Engineer t This will certify that no charges incurred hY the MY Of Huntingtan Beach prior to March 10 1971 are Included in the preceding figures. K ¢` Director of public °cor?s r t REMARKS During the course of construction there was a considerable increase in the amount of asphaltic concrete used, over the initial estimate. This was caused by a number of factors. First, the existing pavement t which was to be capped had large variations in section and in order to achieve a desirable travel surface, additional A.C. vas used to to fill local depressions. Secondly, because of unusually heavy truck traffic, the existing paversant showed evidence of failure which was not apparent when the field investigation wal made by the Soils Lab. � This necessitated removal and replacement of large areas not initially f Included in the design. Third, maintenance of traffic flora required j - a deviation from nornal operation which resulted in a thicker depth � of A.C. in one travel lane because A.C. was used to bring the lane up to the level of the adjacent existing pavement rather than have traffic iAM driving on compacted base. J The project required close coordination of a number of agencies because of construction of a flood control box culvert and the development of a major shopping center on the north side. The work, in spite of the complexity of the overall project. proceeded in an orderly fashion and resulted in a unusually fine completed facility. do-, i C0NTRACTORS PERFORMANCE The contras U rs performed in a very capable manner, coor:iinating their work, and with a minimum disruption of traffic requirements. QULITY OF WORK r The quality of the finished project is excellent. i hereby certify that the above is a true and correct 3t&tement of the work pert rmed and coasts incurred on the above � r project 1 r' q t Carl E. gerry Cite Engineer city of #imnlipston e-Au k r e Director of Public M-orks 4