SUBJECT: Bond Acceptance
I have received the bonds for'��'`"1
%� (Company Name) ) / -
,?-? 4d�. / ' mac. N- � � /, r Ls./ 1� -� - I / t� e r'"> ,� ep G:
CAPITAL PROJECTS (Includes CC's and MSC's) `~
Performance Bond No.
Payment Bond (Labor and Materials) Bond No.
Warranty or Maintenance Bond No.
TRACT AND DEVELOPMENT
Faithful Performance Bond No.
Labor and Material Bond No.
Guarantee and Warranty Bond No.
Monument Bond No.
Franchise Bond No.
Letter of Credit Bond No.
Other
Re: Tract No.
CC No.
MSC No.
Other No.
g:/forms/bond transmittal to treasurer
Approved
Agenda Item No.
City Clerk Vault No.
SIRE System ID No.
, � - e",3 - c,—b/ 5
(Council Approval Date)
� '77
COOPERATIVE AGREEMENT
BETWEEN
COUNTYTHE O ORANGE AND
BEACHTHE CITY OF HUNTINGTON
This COOPERATIVE AGREEMENT (Agreement) FOR THE HUNTINGTON
HARBOUR WATERLINE PROJECT is made and entered into thisday of
sf , 2015, (herein "Effective Date") by and between the COUNTY OF
ORANGE, a political subdivision of the State of California (hereafter the "County"), and
the CITY OF HUNTINGTON BEACH, a municipal corporation (hereafter the "City")
The County and City may be referred to herein individually as a "Party," or collectively
as the "Parties "
RECITALS
WHEREAS, the County has a maintenance protect to dredge the
Sunset/Huntington Harbour main channel in areas shown on "Exhibit A —
Sunset/Huntington Harbour Dredging Areas", attached hereto, and such project is
known as the Sunset/Huntington Harbour Maintenance Dredging Protect (hereafter the
`Dredging Protect"), and
WHEREAS, the City has a Capital Improvement Protect to construct a waterline
in the Huntington Harbour area, and such protect is known as the Huntington Harbour
Waterline Protect (hereafter the "Waterline Protect") as shown on "Exhibit B —
Huntington Harbour Waterline Protect Area", attached hereto, and
WHEREAS, the City desires to construct the proposed Waterline Project jointly
with the Dredging Project to take advantage of the cost of a mobilized dredging
contractor to dredge a trench area in the harbor to construct the Waterline Project that
is not included in the Dredging Project area and
WHEREAS, the County has agreed to construct the Waterline Project jointly
with the Dredging Project with the City financially responsible to pay for all costs
associated with the construction of the Waterline Project, and
WHEREAS, the County will be responsible for advertising, bidding, and
awarding both Projects jointly and facilitating the construction of the Waterline Project'
with the Dredging Project, and
WHEREAS the City and the County desire to enter into this Agreement to
describe the City's and County's responsibility for the construction of the Waterline
Project, and
15-4567/121550
NOW THEREFORE, the County and the City agree as follows
1 The Parties agree that the above recitals are true and correct to the best of
each Party's knowledge, and shall incorporate into this Agreement the full
terms set forth herein
2 After both the County and the City have reviewed and approved the Plans
and Specifications, the County agrees to advertise both Dredging Project
and Waterline Project (hereafter the "Project") Should the County award the
Project, the County agrees to award the Project under one contract
approved by the County Board of Supervisors and construct the Project
jointly
3 After opening the bids for the Project, the County shall notify the City of the
bid contents as soon as is reasonably feasible The County will determine
whether it will or will not award a contract and inform the City of such
decision as soon as reasonably feasible The County Reserves the right to
reject all bids as consistent with the law
If the County determines it will not proceed with awarding the Project, this
Agreement shall terminate immediately The City shall be financially
responsible for any applicable expenses incurred by the County with regard
to advertising the Waterline Project
If the County determines it will proceed with the Dredging portion of the
project, then the terms of this Agreement shall remain in effect and the
County shall award the Project consistent with public bidding and award
procedures
4 If the County awards the a contract for the Project, the City will provide the
County with a lump sum check for an amount not to exceed
aM 414> 7HR&C ?V_lullo dollars
($_/, vc"000.00 ) at least thirty (30) calendar days prior to the County
Board of Supervisors awarding the contract to the contractor The lump sum
amount to the County will include all costs related to the construction of the
Waterline Project including and not limited to the contractor's bid proposal
plus fifteen (15%) contingency, construction management, specialty
inspection and testing, eelgrass mitigation and monitoring, water turbidity
monitoring, and bird nesting survey
5 The County agrees to facilitate the construction of the Waterline Project with
the Dredging Project and use City's pre -paid funds to pay for all cost
associated with the Waterline Project
2
15-4567/121550
6 Should the cost of constructing the Waterline Project exceed the City's lump
sum amount provided to the County the City shall allocate additional funds
within thirty (30) calendar days to the County to pay for any additional costs
related to constructing the Waterline Project
7 The County shall separately file a Notice of Completion (NOC) for the
Dredging Project and Waterline Project The NOC for the Waterline Project
shall identify the City as the owner of the newly constructed waterline
8 The County shall request and obtain from the contractor a one-year
Warranty Bond, in an amount equal to the total payments made to the
contractor for the construction of the Waterline Project. The County shall
include in the contract document a requirement for the contractor to provide
the County with a Warranty Bond and name the City as the bond holder of
such Warranty Bond for the Waterline Project The County shall provide the
City with the original bond within fourteen (14) calendar days after release of
the final retention payment to the contractor Upon the City's receipt of the
bond, the City shall be responsible for tracking and releasing the bond to the
contractor As deemed appropriate and as applicable by both Parties, the
City shall accept any warranties, including manufacturer's warranty, related
to the Waterline Project as provided by the contractor.
9 The County shall reimburse the City all unused pre -paid funds for the
Waterline Project within ninety (90) calendar days from the effective date of
the Notice of Completion for the Waterline Project filed with the Orange
County Recorder's Office
10 The Parties agree to pay a pro-rata share of the cost for eeigrass mitigation
and monitoring or alternate approaches to eeigrass mitigation for eeigrass
impacted by each Party's individual project Each Party is financially
responsible to pay for their fair share of costs for the mitigation measures
identified in the eeigrass mitigation plan approved by the California Coastal
Commission and referenced in the approved Coastal Development Permit
(CDP) issued under one permit for both projects Each Party is also
financially responsible to pay a pro-rata share of the cost for eeigrass
mitigation requirements/conditions specified in the approved CDP, U S
Army Corps of Engineer permit, and California Regional Water Quality
Control Board 401 permit
11 Indemnification
A County Neither City nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by County under or in connection with any work or
3
15-4567/121550
activity under this Agreement It is understood and agreed that, pursuant to
Government Code Section 895 4, County shall fully indemnify and hold City
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted to be done
by County under or in connection with any work or activity under this
Agreement
B City Neither County nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by City under or in connection with any work or
activity under this Agreement It is understood and agreed that, pursuant to
Government Code Section 895 4, City shall fully indemnify and hold County
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted to be done
by City under or in connection with any work or activity under this
Agreement
12 Governing Law The City and County understand and agree that the laws of
the State of California shall govern the rights, obligations, duties and
liabilities of the Parties to this Agreement and also govern the interpretation
of this Agreement In the event of any legal action to enforce or interpret this
Agreement, the sole and exclusive venue shall be a court of competent
jurisdiction located in Grange County, California, and the Parties hereto
agree to and to hereby submit to the jurisdiction of such court,
notwithstanding Code of Civil Procedure Section 394 Furthermore, the
Parties specifically agree to waive any and all rights to request that an action
be transferred for trial to another County
13 Assignment This Agreement shall be binding upon and inure to the benefit
of the successors and assigns of the Parties No assignment of County's
interest in this Agreement shall be made without the written consent of the
City Furthermore County agrees that any City funds received under this
Agreement shall not be expended on, given to, shared with, or otherwise
provided to any other city, local agency or other entity not contemplated
under this Agreement
14 Amendments This Agreement is the sole and only Agreement between the
Parties regarding the subject matter hereof, and other agreements on this
subject matter either oral or written are void Any amendments to this
Agreement shall be in writing and shall be properly executed by both Parties
and approved as to form by County's County Counsel and City's City
Attorney
4
15-4567/121550
15 Integration This Agreement constitutes the entire agreement of the Parties
No other agreement, oral or written, pertaining to the work to be performed
under this Agreement shall be of any force or effect unless it is in writing and
signed by both Parties
16 Severability If any part of this Agreement is held, determined or
adjudicated to be illegal, void, or unenforceable by a court of competent
jurisdiction, the remainder of this Agreement shall be given effect to the
fullest extent reasonably possible
17 Termination This Agreement shall terminate under the following
circumstances
(a) The County determines it will withdraw from the Project during the
bidding process or
(b) The County determines it will not proceed to award a contract after
bids are received, or
(c) The Project is completed and a NOC is filed
Either Party may terminate this Agreement under the following
circumstances
(a) Material breach is committed by the other Party and has not been
cured within a reasonable amount of time after a "Notice of
Termination" is given to the other Party or mutually agreed upon plan
for curing the breach is not entered into by both Parties
A Party alleging breach by the other Party must provide written notice of the
breach in a "Notice of Termination' which shall be effective the date that the
Notice is received The Notice shall clearly state the reason for the
termination, explain the material breach that is alleged, and the date upon
which the termination is effective If this Agreement is terminated for
material breach, the City shall reimburse the County within thirty (30)
calendar days of termination for all applicable costs incurred by the County
on the City s behalf under this Agreement and the County shall reimburse
the City all used pre -paid funds per the terms and conditions specified in this
Agreement
18 Breach The failure of the County or City to comply with any of the terms
and conditions of this Agreement shall be a material breach of this
Agreement
5
1545671121550
19 Binding Obligation The Parties to this Agreement represent and warrant
that this Agreement has been duly authorized and executed and constitutes
the legally binding obligation of their respective organization or entity
enforceable in accordance with its terms
20 Attorneys' Fees In any action or proceeding to enforce or interpret any
provision of this Agreement, or where any provision hereof is validly asserted
as a defePse each Party shall bear its own attorney's fees, costs and
expenses
21 Reserved
22 Counterparts This Agreement may be executed in two or more counterpart,
each of which shall be deemed an original but all of which together shall
constitute one and the same instrument
23 Notices Except as otherwise provided herein, all notices required under this
Agreement shall be in writing and delivered personally or by first class mail
postage prepaid, to each Party at the address listed below Either Party may
change the notice address by notifying the other Party in writing Notices
may be sent by either facsimile or U S Mail Notices shall be deemed
received upon receipt of same or within 3 days of deposit in the U S Mail,
whichever is earlier Notices sent by facsimile shall be deemed received on
the date of the facsimile transmission
To County County of Orange
OC Parks
13042 Old Myford Road
Irvine, CA 92602-2304
Attn Director OC Parks
Fax (714) 667-6511
To City City of Huntington Beach
2000 Main Street
P O Box 190
Huntington Beach, CA 92643
Attn Director of Public Works
Fax (714) 374-1573
24 Attachments This Agreement includes the following which are attached
hereto and made a part hereof
I Exhibit A — Sunset/Huntington Harbour Dredging Areas
11 Exhibit B — Huntington Harbour Waterline Project Area
6
15-4567/121550
IN WITNESS WHEREOF, the PailleS have executed this Agreement by and through
their authorized officers as o- the dazes writien bejow
CITY
City of Huntington Beacn, a I—afforma
municipal corporation
APPROVED A,%TO FORM
mey
�����r ofPbtfitWoft
15-4 567/121550
County of Orange, a political
subdivision of the State of California
Date
0
ChadigoiYrd ofBuhe
Signed and terTified that a copy of this
Document has been delivered to the
Chair of the Board per G C Sec 25103,
Resolution 79-1535
Attest I
C86
90 12
14N�erk of Board of Supervisors
Orange Counsel
Orange County, California
Date ?-- � — I Y-
0
Appp"-i
OFFICEC--, COUNSEL
CA 1FOR1111A
epuly
COOPERATIVE AGREEMENT
BETWEEN
THE COUNTY OF ORANGE AND
THE CITY OF HUNTINGTON BEACH FOR
HUNTINGTON HARBOUR WATERLINE PROJECT
This COOPERATIVE AGREEMENT (Agreement) FOR THE HUNTINGTON
HARBOUR WATERLINE PROJECT is made and entered into this _day of
"wsil , 2015, (herein "Effective Date") by and between the COUNTY OF
ORANGE, a political subdivision of the State of California (hereafter the "County"), and
the CITY OF HUNTINGTON BEACH, a municipal corporation (hereafter the "City")
The County and City may be referred to herein individually as a "Party," or collectively
as the "Parties "
RECITALS
WHEREAS, the County has a maintenance project to dredge the
Sunset/Huntington Harbour main channel in areas shown on "Exhibit A —
Sunset/Huntington Harbour Dredging Areas", attached hereto, and such project is
known as the Sunset/Huntington Harbour Maintenance Dredging Protect (hereafter the
`Dredging Project"), and
WHEREAS, the City has a Capital Improvement Project to construct a waterline
in the Huntington Harbour area, and such project is known as the Huntington Harbour
Waterline Project (hereafter the Waterline Project") as shown on "Exhibit B —
Huntington Harbour Waterline Project Area", attached hereto, and
WHEREAS, the City desires to construct the proposed Waterline Project jointly
with the Dredging Project to take advantage of the cost of a mobilized dredging
contractor to dredge a trench area in the harbor to construct the Waterline Project that
is not included in the Dredging Project area, and
WHEREAS, the County has agreed to construct the Waterline Project jointly
with the Dredging Project with the City financially responsible to pay for all costs
associated with the construction of the Waterline Project, and
WHEREAS, the County will be responsible for advertising, bidding, and
awarding both Projects jointly and facilitating the construction of the Waterline Project
with the Dredging Project, and
WHEREAS the City and the County desire to enter into this Agreement to
describe the City's and County's responsibility for the construction of the Waterline
Project, and
15-4567/121550
NOW THEREFORE, the County and the City agree as follows
1 The Parties agree that the above recitals are true and correct to the best of
each Party's knowledge, and shall incorporate into this Agreement the full
terms set forth herein
2 After both the County and the City have reviewed and approved the Plans
and Specifications, the County agrees to advertise both Dredging Project
and Waterline Project (hereafter the "Project") Should the County award the
Project, the County agrees to award the Project under one contract
approved by the County Board of Supervisors and construct the Project
jointly
3 After opening the bids for the Project, the County shall notify the City of the
bid contents as soon as is reasonably feasible The County will determine
whether it will or will not award a contract and inform the City of such
decision as soon as reasonably feasible The County Reserves the right to
reject all bids as consistent with the law
If the County determines it will not proceed with awarding the Project, this
Agreement shall terminate immediately The City shall be financially
responsible for any applicable expenses incurred by the County with regard
to advertising the Waterline Project
If the County determines it will proceed with the Dredging portion of the
project, then the terms of this Agreement shall remain in effect and the
County shall award the Project consistent with public bidding and award
procedures
4 If the County awards the a contract for the Project, the City will provide the
County with a lump sum check for an amount not to exceed
014 1-7/c_i0.11 A/y,0 77T2rE_ KvAlD2&Z� 7;4,e1UJ x-10 dollars
($ /, boo, 000 a o ) at least thirty (30) calendar days prior to the County
Board of Supervisors awarding the contract to the contractor The lump sum
amount to the County will include all costs related to the construction of the
Waterline Project including and not limited to the contractor's bid proposal
plus fifteen (15%) contingency, construction management, specialty
inspection and testing, eelgrass mitigation and monitoring, water turbidity
monitoring, and bird nesting survey
5 The County agrees to facilitate the construction of the Waterline Project with
the Dredging Project and use City's pre -paid funds to pay for all cost
associated with the Waterline Project
2
15-4567/121550
0 Should the cost of constructing the Waterline Project exceed the City's lump
sum amount provided to the County the City shall allocate additional funds
within thirty (30) calendar days to the County to pay for any additional costs
related to constructing the Waterline Project
7 The County shall separately file a Notice of Completion (NOC) for the
Dredging Project and Waterline Project The NOC for the Waterline Project
shall identify the City as the owner of the newly constructed waterline
8 The County shall request and obtain from the contractor a one-year
Warranty Bond, in an amount equal to the total payments made to the
contractor for the construction of the Waterline Project_ The County shall
include in the contract document a requirement for the contractor to provide
the County with a Warranty Bond and name the City as the bond holder of
such Warranty Bond for the Waterline Project The County shall provide the
City with the original bond within fourteen (14) calendar days after release of
the final retention payment to the contractor Upon the City's receipt of the
bond, the City shall be responsible for tracking and releasing the bond to the
contractor As deemed appropriate and as applicable by both Parties, the
City shall accept any warranties, including manufacturer's warranty, related
to the Waterline Project as provided by the contractor
9 The County shall reimburse the City all unused pre -paid funds for the
Waterline Project within ninety (90) calendar days from the effective date of
the Notice of Completion for the Waterline Project Tiled with the Orange
County Recorder's Office
10 The Parties agree to pay a pro-rata share of the cost for eelgrass mitigation
and monitoring or alternate approaches to eelgrass mitigation for eelgrass
impacted by each Party's individual project Each Party is financially
responsible to pay for their fair share of costs for the mitigation measures
identified in the eelgrass mitigation plan approved by the California Coastal
Commission and referenced in the approved Coastal Development Permit
(CDP) issued under one permit for both projects. Each Party is also
financially responsible to pay a pro-rata share of the cost for eelgrass
mitigation requirements/conditions specified in the approved CDP, U S
Army Corps of Engineer permit, and California Regional Water Quality
Control Board 401 permit
11 Indemnification
A County Neither City nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by County under or in connection with any work or
z
15-4567/121550
activity under this Agreement It is understood and agreed that, pursuant to
Government Code Section 895 4, County shall fully indemnrfy and hold City
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted to be done
by County under or in connection with any work or activity under this
Agreement
B City Neither County nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by City under or in connection with any work or
activity under this Agreement It is understood and agreed that, pursuant to
Government Code Section 895 4, City shall fully indemnify and hold County
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted to be done
by City under or in connection with any work or activity under this
Agreement
12 Governing Law The City and County understand and agree that the laws of
the State of California shall govern the rights, obligations, duties and
liabilities of the Parties to this Agreement and also govern the interpretation
of this Agreement In the event of any legal action to enforce or interpret this
Agreement, the sole and exclusive venue shall be a court of competent
jurisdiction located in Grange County, California, and the Parties hereto
agree to and to hereby submit to the jurisdiction of such court,
notwithstanding Code of Civil Procedure Section 394 Furthermore, the
Parties specifically agree to waive any and all rights to request that an action
be transferred for trial to another County
13 Assignment This Agreement shall be binding upon and inure to the benefit
of the successors and assigns of the Parties No assignment of County's
interest in this Agreement shall be made without the written consent of the
City Furthermore County agrees that any City funds received under this
Agreement shall not be expended on, given to, shared with, or otherwise
provided to any other city, local agency or other entity not contemplated
under this Agreement
14 Amendments This Agreement is the sole and only Agreement between the
Parties regarding the subject matter hereof, and other agreements on this
subject matter either oral or written are void Any amendments to this
Agreement shall be in writing and shall be properly executed by both Parties
and approved as to form by County's County Counsel and City's City
Attorney
4
15-4567/121550
15 Integration This Agreement constitutes the entire agreement of the Parties
No other agreement, oral or written, pertaining to the work to be performed
under this Agreement shall be of any force or effect unless it is in writing and
signed by both Parties
16 Severabihty If any part of this Agreement is held, determined, or
adjudicated to be illegal, void, or unenforceable by a court of competent
jurisdiction, the remainder of this Agreement shall be given effect to the
fullest extent reasonably possible
17 Termination This Agreement shall terminate under the following
circumstances
(a) The County determines it will withdraw from the Project during the
bidding process or
(b) The County determines it will not proceed to award a contract after
bids are received, or
(c) The Project is completed and a NOC is filed
Either Party may terminate this Agreement under the following
circumstances
(a) Material breach is committed by the other Party and has not been
cured within a reasonable amount of time after a "Notice of
Termination" is given to the other Party, or mutually agreed upon plan
for curing the breach is not entered into by both Parties
A Party alleging breach by the other Party must provide written notice of the
breach in a "Notice of Termination" which shall be effective the date that the
Notice is received The Notice shall clearly state the reason for the
termination, explain the material breach that is alleged, and the date upon
which the termination is effective if this Agreement is terminated for
material breach, the City shall reimburse the County within thirty (30)
calendar days of termination for all applicable costs incurred by the County
on the City s behalf under this Agreement and the County shall reimburse
the City all used pre -paid funds per the terms and conditions specified in this
Agreement
18 Breach The failure of the County or City to comply with any of the terms
and conditions of this Agreement shall be a material breach of this
Agreement
5
15A567/121550
19 Binding Obligation The Parties to this Agreement represent and warrant
that this Agreement has been duly authorized and executed and constitutes
the legally binding obligation of their respective organization or entity
enforceable in accordance with its terms
20 Attorneys' Fees In any action or proceeding to enforce or interpret any
provision of this Agreement, or where any provision hereof is validly asserted
as a defense each Party shall bear its own attorney's fees, costs and
expenses
21 Reserved
22 Counterparts This Agreement may be executed in two or more counterpart,
each of which shall be deemed an original but all of which together shall
constitute one and the same instrument
23 Notices Except as otherwise provided herein, all notices required under this
Agreement shall be in writing and delivered personally Or by first class mail,
postage prepaid, to each Party at the address listed below Either Party may
change the notice address by notifying the other Party in writing Notices
may be sent by either facsimile or U S Mail Notices shall be deemed
received upon receipt of same or within 3 days of deposit in the U S Mail,
whichever is earlier Notices sent by facsimile shall be deemed received on
the date of the facsimile transmission
To County County of Orange
OC Parks
13042 Old Myford Road
Irvine, CA 92602-2304
Attn Director OC Parks
Fax (714) 667-6511
To City City of Huntington Beach
2000 Main Street
P O Box 190
Huntington Beach, CA 92643
Attn Director of Public Works
Fax (714) 374-1573
24 Attachments This Agreement includes the following, which are attached
hereto and made a part hereof
I Exhibit A — Sunset/Huntington Harbour Dredging Areas
11 Exhibit B — Huntington Harbour Waterline Project Area
s
'' 5-4567/121550
IN WITNESS WHEREOF, the Parties have executed tnis Agreement by and through
their authorized o:Ticers as o� the da_es written l below
CITY
City of Huntington Beacn, a I—aliforma
municipal corporation
90 Mwp,�i � M-Mmm
i
APPROVED AS3:aFORM
rney
INITIATED AND APPROVED
/ , 1�2
Dir r of/c o
C5�109-)
. armor
15 4567/121550
COUNTY
County of Orange, a political
subdivision of the State of California
Date-
C
rvisors
Signed and bertified that a copy of this
Document has been delivered to the
Chair of the Board per G C Sec 25103.
Resolution i 9-1535
Attest )
Clerk of Board of Supervisors
Orange Counsel
Orange County California
`,� `"Date �`" 15
In
APPRG „
OFfiCE C = I CC%tINSEI
ORANGE ,,O!*7TY CA',IFORN1A
ORANGE COUNTY BOARD OF SUPERVISORS
MI101UTE ORDER
August 25, 2015
SubmzttingAgency/Department OC PUBLIC WORKS
Approve plans and specifications and set bid opening for 9/16/15, 2 00 p in for Sunset/Huntington Harbour Maintenance
Dredging and Waterline Installation Project, approve cooperative agreement with City of Huntington Beach, and consider
application of prior Mitigated Negative Declaration No IP 14-148 and other findings - District 2
The following is action taken by the Board of Supervisors:
APPROVED AS RECOMMENDED ® OTHER ❑
Unanimous ® (1) DO Y (2) STEEL Y (3) SPITZER Y (4) NELSON Y (5) BARTLETT Y
Vote Key Y=Yes, N=No, A=Abstain, X=Excused, B O =Board Order
Documents accompanying this matter:
❑ Resolution(s)
❑ Ordinances(s)
❑ Contract(s)
Item No 21
Special Notes
Copies sent to OCPW/Wendy Brown
OCPW/Eric Swint
OCCR/Steve Franks
City of Huntington Beach/Duncan Lee
I certify that the foregoing is a true and correct copy of the Minute Order adopted
by the Board of Supervisors, Orange County, State of California
Robin Stieler, Interim Clerk of the Board
By
Deputy
Agenda Item
AGENDA STAFF REPORT
LEGAL ENTITY TAKING ACTION:
BOARD OF SUPERVISORS DISTRICT(S):
SUBMITTING AGENCY/DEPARTMENT:
DEPARTMENT CONTACT PERSON(S):
ASR Control 15-001003
08/25/ 15
Board of Supervisors
2
OC Public Works (Approved)
Shane Silsby (714) 667-9700
Stacy Blackwood (949) 923-3743
r�
SUBJECT: Advertise Sunset/Huntington Harbour Maintenance Dredging and Waterline Install`
CEO CONCUR COUNTY COUNSEL REvIEw CLERK OF THE BOARD
Concur Approved Agreement to Form Consent Calendar
3 Votes Board Majority
Budgeted: Yes Current Year Cost: N/A Annual Cost: N/A
Staffing Impact: No # of Positions: Sole Source: No
Current Fiscal Year Revenue: N/A
Funding Source: See Financial Impact Section County Audit in last 3 years: No
Prior Board Action: N/A
RECOMMENDED ACTION(S):
1. Find that Mitigated Negative Declaration No. IP 14-148, previously approved by Board of
Supervisors on January 27, 2015 reflects the independent judgment of the County of Orange and is
adequate to satisfy the requirements of the California Environmental Quality Act (CEQA) for the
Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project based on the
following additional findings:
a. The circumstances of the project are substantially the same and Mitigated Negative Declaration
No. IP 14-148 adequately addressed the effects of the proposed project. No substantial changes
have been made to the project, no substantial changes have occurred in the circumstances under
which the project is being undertaken and no new information of substantial importance to the
project which was not known or could not have been known when the previous Mitigated
Negative Declaration No. IP 14-148, was adopted had become known; therefore no further
environmental review is required.
b. Mitigated Negative Declaration No. IP 14-148 is adequate to satisfy the requirements of CEQA
for the Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project.
r 2. Approve plans, specifications and bid documents for the Sunset/Huntington Harbour Maintenance
Dredging and Waterline Installation Project.
Page 1
3. Approve the Cooperative Agreement between the County and the City of Huntington Beach for the
Waterline Project.
4. Authorize the Clerk of the Board to advertise the Sunset/Huntington Harbour Maintenance Dredging
and Waterline Installation Project for bids and set 2.00 PM, Wednesday, September 16, 2015, as the
time and date for bid opening unless extended pursuant to Public Contract Code 4104.5.
SUMMARY:
Approval of the plans, specifications, and bid documents and authorizing the Clerk of the Board to
advertise the Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project will
enhance waterway navigation, increase fire protection, and restore critical habitat.
BACKGROUND INFORMATION:
Sunset/Huntington Harbour is located in the cities of Seal Beach and Huntington Beach. The County of
Orange is responsible for maintaining the manna depths in Sunset Aquatic Marina (Sunset Harbour) and
the channel depths in the Main Channel between the Pacific Coast Highway bridge in Seal Beach and
Warner Avenue in Huntington Harbour. The County of Orange has carried out previous maintenance
dredging projects in Sunset Harbour with the most recent maintenance dredging cycle occurring in 2001.
New maintenance dredging needs to be accomplished for waterway navigational purposes both in Sunset
Harbour and the Main Channel.
The overall Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Projec
(project) also includes the installation of a 14-inch-diameter waterline under the Huntington Harbour
channel. The waterline is the responsibility of City of Huntington Beach and is being installed for fire
protection purposes. Because dredging equipment will be required to complete both the maintenance
dredging and the waterline installation components of the project, considerable cost and scheduling
efficiencies can be achieved by installing the waterline during the maintenance dredging work. A
Cooperative Agreement has been prepared to cover the City's portion of the project.
The disposal sites for dredged material will be at an open ocean Environmental Protection Agency
approved site, with a small amount of dredge material to be deposited in the Surfside/Sunset Beach surf
zone and a portion at the Seal Beach National Wildlife Refuge for habitat restoration of marsh areas
located adjacent to the harbor. The purpose of the marsh restoration pilot project is to study the effects of
applying a thin layer of dredge material to low elevation salt marsh while monitoring and recording marsh
conditions for up to one year before and for five years after the application of the dredge material.
The estimated construction cost for the dredging project is $6,400,000 and the estimated cost of the
waterline project is $925,000.
A copy of the plans, specifications, and bid documents is on file with the Clerk of the Board.
Compliance with CEQA: This project is a necessarily included element of the project considered in
Mitigated Negative Declaration No. IP 14-148, approved by the Board of Supervisors on January 2;`__` ;
2015 for the Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project whic
adequately addressed the effects of the proposed project. No substantial changes have been made in the
Page 2
project, no substantial changes have occurred in the circumstances under which the project is being
undertaken and no new information of substantial importance to the project which was not known or
0 ould not have been known when the Mitigated Negative Declaration IP 14-148 was approved has
ecome known; therefore no further environmental review is required.
FINANCIAL. INTACT:
OC Parks has budgeted sufficient appropriations to pay for this Project. The City of Huntington Beach
will pay all costs associated with the waterline project. OC Parks Capital Projects Fund 406: 87%; City of
Huntington Beach: 13 %.
STAFFING INTACT:
N/A
REVIEWING AGENCIES:
OC Community Resources
ATTACHN1ENT(S):
Attachment A - Notice to Contractors
Attachment B - Project Location Map
s Attachment C - Public Contract Code 4104.5
Attachment D - Cooperative Agreement
Page 3
Dept ID PW 15-045 Page 1 of 2
Meeting Date 8/3/2015
•
•
CITY OF HUNTINGTON BEACH
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE:
8/3/2015
SUBMITTED TO:
Honorable Mayor and City Council Members
SUBMITTED BY:
Fred A Wilson, City Manager
PREPARED BY:
Travis K Hopkins, PE, Director of Public Works
SUBJECT:
Approve and authorize execution of a Cooperative Agreement with the County of
Orange for the Huntington Harbour Waterline Project, CC1446, appropriate
$850,000 from the undesignated Water Fund, and, authorize the Director of
Public Works to pay the County of Orange a deposit of not -to -exceed amount of
$1,300,000 from the Water Fund
Statement of Issue
The Public Works Department desires to construct a new waterline crossing one of the channels;In
Huntington Harbour to improve redundancy and reliability The City has the opportunity to construct
this project along with the County of Orange ("County") Main Channel Harbor Dredging Project
This will allow the City to take advantage of the cost of mobilizing a dredging contractor to dredge a
trench area in the harbor for the City waterline and to piggy -back on their environmental document
therefore reducing project costs and conserving on staff time and resources
Financial Impact -
Funds in the amount of $450,000 are available in the Water Fund, Account No 50691006 82100,
and $850,000 is available from undesignated Water Fund (506) balance
Recommended Action
A) Approve and authorize the Mayor and City Clerk to execute the "Cooperative Agreement
Between The County of Orange and The City of Huntington Beach For Huntington Harbour
Waterline Project," and,
B) Appropriate $850,000 from the undesignated Water Fund (506) balance to Business unit
50691006 82100, and,
C) Authorize Director of Public Works to pay the County of Orange a deposit of not -to -exceed
amount of $1,300,000 from the Water Fund, Account No 50691006 82100
Alternative Action(s)
Do not approve the Cooperative Agreement and forego opportunity to collaborate with the County
to reduce construction costs and to provide reliability of water resources for the Huntington Harbour
residents
Analysis
To improve the redundancy and reliability of the water supply to the Huntington Harbour and Sunset
Beach areas, the City proposes to construct the Huntington Harbour Waterline to serve as a backup
to an existing 12-inch ductile iron waterline located beneath the harbor channel near Peter's
HB -227-
Item 9. - I
Dept ID PW 15-045 Page 2 of 2
Meeting Date 8/3/2015
Landing The Huntington Harbour Waterline Project will consist of constructing approximately 670
lineal feet of 14-inch diameter pipeline across the harbor main channel
The existing 12-inch ductile iron pipeline is a critical pipeline segment that provides a loop
(redundant) waterline for the two areas and supports the water flow necessary for fire protection
purposes A pipeline failure or shutdown of the 12-inch water pipeline would result in a significant
reduction in fire flow capacity to these areas, ranging between 37 to 58 percent
The County of Orange currently has a maintenance dredging project in the Sunset/Huntington
Harbour area, and has agreed to include the City's proposed waterline project Since the pipeline
project will also require dredging of a section of the harbor, staff believed this was an opportune
time to work together with the County since the City's waterline must address environmentally
sensitive issues, testing, and permitting similar to the County's dredging project This collaboration
with the County is saving the City hundreds of hours of staff time and will accelerate the
construction of the waterline project by piggy -backing on the County's dredging project
The County's legal counsel notified City staff on July 8, 2015, requiring the Cooperative Agreement
("Agreement") to be approved and signed by the City, prior to the County seeking their
authorization to advertise the dredging and waterline projects The Agreement describes the
conditions under which each party agrees to facilitate the construction of the waterline project
After County awards both projects, County will need to sign the Agreement and the City to provide
the County with a lump sum payment, not to exceed $1 3 million, for construction, contingency,
construction support, inspection, and other relevant costs associated with the new waterline After
completion of the waterline project, the County will return any unused funds to the City
® The County staff recently revised their tentative advertising for both projects to as early as August
2015 and awarding the contract in October 2015 The County is tentatively scheduled to begin
construction in fall of 2015, and complete the waterline project and dredging maintenance work; in
spring of 2016 The total estimated project cost is estimated to be $1,300,000 00 to account for
costs of construction, contingency, construction management, and inspection While the engineer's
estimate is approximately $700,000, the difference takes into consideration the complexity in
construction, higher contingency, and to assure the County that the City is committed to fund the
water project
Public Works Commission Action:
Not required However, informational presentation was given to the Commission on November 19,
2014
Environmental Status
Not applicable as all permits and environmental documentations were prepared through the
County
Strategic Plan Goal
Enhance and maintain infrastructure
Attachment(s)
1 Location Map - Waterline
2 Cooperative Agreement Between the County of Orange and the City of Huntington Beach
for Huntington Harbour Waterline Project
Item 9. - 2 HB -228-
ATTACHMENT 1
HUNTINGTON HARBOUR WATERLINE PROJECT
•
0
VICINITY MAP
PRCHB_229__tEA Item 9. - 3
COOPERATIVE AGREEMENT
BETWEEN
THE COUNTY OF ORANGE iE
THE CITY OF'HUNTINGTON BEACH
HUNTINGTONA��
This COOPERATIVE AGREEMENT (Agreement) FOR THE HUNTINGTON
HARBOUR WATERLINE PROJECT is made and entered into this 30 day of
" iksf , 2015, (herein "Effective Date") by and between the COUNTY OF
ORANGE, a political subdivision of the State of California (hereafter the "County"), and
the CITY OF HUNTINGTON BEACH, a municipal corporation (hereafter the "City")
The County and City may be referred to herein individually as a "Party," or collectively
as the "Parties "
RECITALS
WHEREAS, the County has a maintenance project to dredge the
Sunset/Huntington Harbour main channel in areas shown on "Exhibit A -
SunsettHuntington Harbour Dredging Areas", attached hereto; and such project is
known as the Sunset/Huntington Harbour Maintenance Dredging Project (hereafter the
`Dredging Project"); and
WHEREAS, the City has a Capital Improvement Project to construct a waterline
in the Huntington Harbour area, and such project is known as the Huntington Harbour
Waterline Project (hereafter the "Waterline Project") as shown on "Exhibit B -
Huntington Harbour Waterline Project Area", attached hereto, and
WHEREAS, the City desires to construct the proposed Waterline Project jointly
with the Dredging Project to take advantage of the cost of a mobilized dredging
contractor to dredge a trench area in the harbor to construct the Waterline Project that
is not included in the Dredging Project area and
WHEREAS, the County has agreed to construct the Waterline Project jointly
with the Dredging Project with the City financially responsible to pay for all costs
associated with the construction of the Waterline Project, and
WHEREAS, the County will be responsible for advertising, bidding, and
awarding both Projects jointly and facilitating the construction of the Waterline Project
with the Dredging Project, and
WHEREAS the City and the County desire to enter into this Agreement to
describe the City's and County's responsibility for the construction of the Waterline
Project, and
15-4567/124550
NOW THEREFORE, the County and the City agree as follows
1 The Parties agree that the above recitals are true and correct to the best of
each Party's knowledge, and shall incorporate into this Agreement the full
terms set forth herein 4
2 After both the County and the City have reviewed and approved the Plans
and Specifications, the County agrees to advertise both Dredging Project
and Waterline Project (hereafter the "Project") Should the County award the
Project, the County agrees to award the Project under one contract
approved by the County Board of Supervisors and construct the Project
jointly
3 After opening the bids for the Project, the County shall notify the City of the
bid contents as soon as is reasonably feasible The County will determine
whether it will or will not award a contract and inform the City of such
decision as soon as reasonably feasible The County Reserves the right to
reject all bids as consistent with the law
If the County determines it will not proceed with awarding the Project, this
Agreement shall terminate immediately The City shall be financially
responsible for any applicable expenses incurred by the County with regard
to advertising the Waterline Project
If the County determines it will proceed with the Dredging portion of the
project, then the terms of this Agreement shall remain in effect and the
County shall award the Project consistent with public bidding and award
procedures
4 If the County awards the a contract for the Project, the City will provide the
County with a lump sum check for an amount not to exceed
dM� Ml�Ciu,�. fl�A 712 K��7>2�� 77sL�UJO dollars
($ , 000 . a u ) at least thirty (30) calendar days prior to the County
Board of Supervisors awarding the contract to the contractor The lump sum
amount to the County will include all costs related to the construction of the
Waterline Project including and not limited to the contractor's bid proposal
plus fifteen (15%) contingency, construction management, specialty
inspection and testing, eelgrass mitigation and monitoring, water turbidity
monitoring, and bird nesting survey
5 The County agrees to facilitate the construction of the Waterline Project with
the Dredging Project and use City's pre -paid funds to pay for all cost
associated with the Waterline Project
2
15-45671121550
►a Should the cost of constructing the Waterline Project exceed the City lump
sum amount provided to the County, the City shall allocate additional funds
within thirty (30) calendar days to the County to pay for any additional costs
related to constructing the Water4ne Project
7 The County shall separately file a Notice of Completion (NOG) for the
Dredging Project and Waterline Project The NOC for the Waterline Project
shall identify the City as the owner of the newly constructed waterline
3 The County shall request and obtain from the contractor a one-year
Warranty Bond, in an amount equal to the total payments made to the
contractor for the construction of the Waterline Project The County shall
include in the contract document a requirement for the contractor to provide
the County with a Warranty Bond and name the City as the bond holder of
such Warranty Bond for the Waterline Project The County shall provide the
City with the original bond within fourteen (14) calendar days after release of
the final retention payment to the contractor Upon the City's receipt of the
bond, the City shall be responsible for tracking and releasing the bond to the
contractor As deemed appropriate and as applicable by both Parties, the
City shall accept any warranties, including manufacturer's warranty, related
to the Waterline Project as provided by the contractor
9 The County shall reimburse the City all unused pre -paid funds for the
Waterline Project within ninety (90) calendar days from the effective date of
the Notice of Completion for the Waterline Project filed with the change
County Recorder's Office
10 The Parties agree to pay a pro-rata share of the cost for eelgrass mitigation
and monitoring or alternate approaches to eelgrass mitigation for eelgrass
impacted by each Party's individual project Eaeri Party is financially
responsible to pay for their fair share of costs for the mitigation measures
identified in the eelgrass mitigation plan approved by the California Coastal
Commission and referenced in the approved Coastal Development Permit
(CDP) issued under one permit for both projects. Each Party is also
financially responsible to pay a pro-rata share of the cost for eelgrass
mitigation requ€rementslconditions specified in the approved CDP, U S
Army Corps of Engineer permit, and California Regional Water Quality
Control Board 401 permit
11. indemnification
A County Neither City nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by County under or in connection with any work or
154567/121550 v
activity under this Agreement It is understood and agreed that, pursuant to
Government Code Section 805 4, County shall fully indemnify and hold City
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted io be done
by County under or in connection with any work or activity under this
Agreement
B City Neither County nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything done
or omitted to be done by City under or in connection with any work or
activity under this Agreement It is understood and agreed that, pursuant to
Govemment Code Section 895 4, City shall fully indemnify and hold County
harmless from any liability imposed injury (as defined by Government Code
Section 810 8) occurring by reason of anything done or omitted to be done
by City under or in connection with any work or activity under this
Agreement
12 Governing Lave The City and County understand and agree that the laws of
the State of California shall govern the rights, obligations, duties and
liabilities of the Parties to this Agreement and also govern the interpretation
of this Agreement In the event of any legal action to enforce or interpret this
Agreement, the sole and exclusive venue shall be a court of competent
jurisdiction located in Grange County, California, and the Parties hereto
agree to and to hereby submit to the jurisdiction of such court,
notwithstanding Code of Civil Procedure Section 394 Furthermore, the
Parties specifically agree to waive any and all rights to request that an action
be transferred for trial to another County
13 Assignment. This Agreement shall be binding upon and inure to the benefit
of the successors and assigns of the Parties No assignment of County's
interest in this Agreement shall be made without the written consent of the
City Furthermore County agrees that any City funds received under this
Agreement shall not be expended on, givers to, shared with, or otherwise
provided to any other city, local agency or other entity not contemplated
under this Agreement
14 Amendments This Agreement is the sole and only Agreement between the
Parties regarding the subject matter hereof, and other agreements on this
subject matter either oral or written are void Any amendments to this
Agreement shall be in writing and shall be properly executed by both Parties
and approved as to form by County's County Counsel and City's City
Attorney
15-4567/121550
15 Integration This Agreement constitutes the entire agreement of the Parties
No other agreement, oral or written, pertaining to the worm to be performed
under this Agreement shall be of any force or effect unless it is in writing and
signed by both Parties
16 Severability. If any part of this Agreement is held, determined or
adjudicated to be illegal, void, or unenforceable by a court of competent
jurisdiction, the remainder of this Agreement shall be given effect to the
fullest extent reasonably possible
17 Termination This Agreement shall terminate under the following
circumstances
(a) The County determines it will withdraw from the Project during the
bidding process or
(b) The County determines it will not proceed to award a contract after
bids are received, or
(c) The Project is completed and a IOC is filed
Either Party may terminate this Agreement under the following
circumstances
(a) Material breach is committed by the other Party and has not been
cured within a reasonable amount of time after a "Notice of
Termination" is given to the other Party or mutually agreed upon plan
for curing the breach is not entered into by both Parties
A Party alleging breach by the other Party must provide written notice of the
breach in a "Notice of Termination' which shall be effective the date that the
Notice is received The Notice shall cleariv state the reason for the
termination, explain the material breach that is alleged, and the date upon
which the termination is effective If this Agreement is terminated for
material breach, the City shall reimburse the County within thirty (30)
calendar days of termination for all applicable costs incurred by the County
on the City s behalf under this Agreement and the County shall reimburse
the City all used pre -paid funds per the terms and conditions specified in this
Agreement
16 Breach The failure of the County or City to comply with any of the terms
and conditions of this Agreement shall be a material breach of this
Agreement
5
15-4567/121550
19 Binding Obligation The Parties to this Agreement represent and warrant
that this Agreement has been duly authorized and executed and constitutes
the legally binding obligation of their respective organization or entity
enforceable in accordance with its terms
20.Attomeys' Fees In any action or proceeding to enforce or interpret any
provision of this Agreement, or where any provision hereof is validly asserted
as a defense each Party shall bear its own attorney's fees, costs and
expenses
21 Reserved.
22 Counterparts This Agreement may be executed in two or more counterpart,
each of which shall be deemed an original but all of which together shall
constitute one and the same instrument
23 notices Except as otherwise provided herein, all notices required under this
Agreement shall be in writing and delivered personally or by first class mail
postage prepaid, to each Party at the address listed below Either Party may
change the notice address by notifying the other Party in writing notices
may be sent by either facsimile or U S Mail notices shall be deemed
received upon receipt of same or within 3 days of deposit in the U S Mail,
whichever is earlier notices sent by facsimile shall be deemed received on
the date of the facsimile transmission
To County County of Orange
OC Parks
13042 Old Myford Road
Irvine, CA 92602-2304
Attn Director OC Parks
Fax (714) 667-6511
To City City of Huntington Beach
2000 Main Street
P.O Box 190
Huntington Beach, CA 92643
Attn Director of Public Works
Fax. (714) 3 7 4-1573
24 Attachments This Agreement includes the following which are attached
hereto and made a part hereof
I Exhibit A — Sunset/Huntington Harbour Dredging Areas
11 Exhibit B — Huntington Harbour Waterline Project Area
6
15-4567/121550
IN WITNESS WHEREOF, the Fames have executed triis Agreement by and through
their authorized officers, as o' the dazes written below
Nifej
City of Huntington Beach, a California
municipal corporation
APPROVED AS 3a FORM
IN[TiATED AND APPROVED
Der r C,
O-K�-�c vvom�
154567/121550
KUK2�
County of Orange, a political
subdivision of the State of California
Date -
Chair, Board of Supervisors
Signed and certified that a copy of this
Document has been delivered to the
Chair of the Board per G.C. Sec. 25103,
Resolution 79-1535
Attest.
Clerk of Board of Super -visors
Orange Counsel
Orange County. California
Date
0
EXHIBIT A
SUNSET/HUNTINGTON HARBOUR DREDGING AREAS
heri,
b
� �'
fib•
-��t,M '� � U� a� �°"
(pR &
- � `� g,:.. ��
Legend
County Dredging Area
s.......; City Dredging Area
oar
t�
J k ryg .rgC�G ;.
REFER TO APPROVED COUNTY SUNSET/HUNTING TON HARBOUR
MAINTENANCE DREDGING AND WATERLINE PLANS FOR DREDGING LIMITS
COUNTY DREDGING AREAS
EXHIBIT B
HUNTINGTON HARBOUR WATERLINE PROJECT AREA
G
VICINITY MAP
STATE ROPERTY
iYP ON LA E
PROPOSED HUNTI7LIMITS.
GENERAL HARBOUR WATER
Rl q� LANF DREDGE AREA*
4
R FER APPROVED COUNTY SUN TMUNTINGTON HA
MA TENA CE DREDGING AND WATER INE PLANS FOR D
CITY PROJECT AREA
Esparza, Patty
From
Sent.
To
Cc:
Subject:
Hi Duncan,
Here is your reminder
Thanks,
Susan
Brodeur, Susan [Susan Brodeur@ocparks com]
Tuesday, August 04, 2015 11 27 AM
Lee, Duncan
Esparza, Patty, Ferrigno, Andrew
RE Sunset/Huntington Harbour
is the plan still on track for delivery of signed agreement today?
From: Lee, Duncan [mailto•DLee@surfcity-hb org]
Sent: Monday, July 27, 2015 2.27 PM
To: Brodeur, Susan
Cc: Esparza, Patty, Ferrigno, Andrew
Subject: RE Sunset/Huntington Harbour
So 4 pm would be o k for you? We aim to please, even more so when you're helping us with our project Thanks[
Duncan Lee, P E , Principal Civil Engineer
Public Works Department
2000 Main Street
Huntington Beach, California 92648
Office (714) 375-5118 / Fax _(7_t4)_37_4-1573 / Email dlee surfc►ty-hb org
From: Brodeur, Susan [mailto Susan Brodeur@ocparks com]
Set IVlon ay, July 27, 2015 2 22
To: Lee, Duncan
Cc: Esparza, Patty, Ferrigno, Andrew
Subject: RE Sunset/Huntington Harbour
Wow —what service) If it is dropped off on Tuesday to my attention, that would be perfect
Thanks,
Susan
From: Lee, Duncan [madto•DLeeCcbsurfcity-hb.org]
Sent: Monday, July 27, 2015 2.00 PM
To: Brodeur, Susan
Cc: Esparza, Patty, Ferrigno, Andrew
Subject: RE. Sunset/Huntington Harbour
Hello Susan I am finalizing our end to have 3 signed sets of the agreement Patty from our end knows to have it ready
early for me the next day after Council approval, which is 8/4/15 I will either personally drop it off or have one of my
staff drop it off on his way home If I have someone drop it off at 4 pm Tuesday, 8/4/2015, and have it under your
attention, would that work? If the three signed originals need to go to someone else, please let me know so that I can
do that
Thanks
Duncan Lee, P E , Principal Civil Engineer
Public Works Department
1
2000 Main Street
Huntington Beach, California 92648
Office (714) 375-5118 / Fax (714) 374-1573 / Email dlee _surfcity-hb org
From: Brodeur, Susan [mailto Susan Brodeur@ocparks com]
Sent: Thursday, July 23, 2015 5 46 PM
To: Lee, Duncan
Cc: Esparza, Patty, Ferrigno, Andrew
Subject: Re Sunset/Huntington Harbour
Yep, Duncan I have full confidence in you Thanks for taking care of these requests
On Jul 23, 2015, at 5 20 PM, "Lee, Duncan" <DLeeAsurfcity-hb org> wrote
Ok Susan Glad you told me Will be a challenge but you know me It will be done
Patty, I have one set with you so far I will need to make two more duplicate packages with our
City Attorney signatures early next week for you This is the 8-3-15 RCA, cooperative
agreement for Huntington Harbour Waterline
Thanks
Thanks Susan)
Duncan Lee, P E , Principal Cavil Engineer
Public Works Department
2000 Main Street
Huntington Beach, California 92648
Office (714) 375-5118 /Fax (714) 3 74-15 73 /Email dlee(djrfcity-hb org
On Jul 23, 2015, at 3 49 PM, Brodeur, Susan <Susan Brodeurkocparks com> wrote
Hi Duncan,
I just found out we will need 3 original signatures to take to our Board I will
remind you again on August 3 to get the documents from you but can you make
sure there are 3 9
Thanks,
Susan
On Jul 16, 2015, at 3 56 PM, Lee, Duncan <DLee &surfcit�g> wrote
Hello Susan, I already draft up our City Council agenda to get the
agreement signed on our end for the 8/3/2015 City Council Meeting
Please make a note of this and call me to remind me (in case I don't
contact You first) to get the signed agreement to you ASAP after Council
approval I need two specific information from you The first one is
regarding the signed Cooperative Agreement, as to where to send it to
and who to send it to? Should that be sent to you, if so, please give me
the mailing address