Loading...
HomeMy WebLinkAboutFederal Highway Administration (FHWA) Administered by Caltrans - 2006-07-032066 JUN 21 PH 4: 37 Council/Agency Meeting Held:--I,3 OG via , I� ,CI�' `! HUNTINGT Deferred/Continued to: Approved ❑ Conditionally Approved ❑ Denied i ler s Si ature Council Meeting Date: 7/3/2006 Department ID Number: PW 06-044 CITY OF HUNTINGTON BEACH REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: 'HONORABLE MAYOR AND CI UNCIL MEMBERS SUBMITTED BY: PEN LOPE ULBRETH-GRAFT -C t Ad inistrator GPREPARED BY: ROBERT F. BEARDSLEY, PE, rector of Public Works SUBJECT: Adopt Resolution Authorizing Federal Funding for Traffic Signal Modifications Statement of Issue, Funding Source, Recommended Action, Alternative Action(s), Analysis, Environmental Status, Attachment(s) Statement of Issue: This resolution will authorize the Mayor and City Clerk to execute Program Supplement Agreements for Federal Aid projects related to the Federal Highway Administration (FHWA) grant programs. Three traffic signal modification projects have been authorized by FHWA to receive funding. Funding Source: The grant amount, including construction is $184,500. Matching funds are budgeted in the Gas Tax Fund. Recommended Action: Motion to: 1. Adopt Resolution No. &Q6 -3"+ A resolution of the City Council of the City of Huntington Beach authorizing the Mayor and City Clerk to execute Program Supplement Nos. M030, M031, M032 to Agreement No 12-5181 for intersections of Gothard Street and Warner Avenue, Gothard Street and Edinger Avenue and Edwards Street and Warner Avenue. Alternative Action(s): Deny adoption of the authorizing Resolution and forfeit Federal Aid project funding of approximately $184,500. . C:2 ,O -13EACirI REQUEST FOR CITY COUNCIL ACTION MEETING DATE: 7/3/2006 DEPARTMENT ID NUMBER: PW 06-044 Analysis: On February 7, 1978, the City entered into an agreement with the State of California for the Federal Aid Program, identified as Master Agreement 12*5181. On June 16, 1997, the State and City entered into an updated Agreement that included new provisions of the Intermodal Surface Transportation Efficiency Act (ISTEA) and the reengineered Local Assistance procedures. Adopting the resolution will allow the City to execute Program Supplement Nos. M030 through M032, which cover project preliminary engineering costs for the intersections of Gothard Street and Warner Avenue, Gothard Street and Edinger Avenue and Edwards Street and Warner Avenue. A grant for design and construction has been awarded through the Hazard Elimination Safety (HES) program. Construction work consists of installing east -west protected left turn arrows at Gothard Street and Warner Avenue, installing north -south left turn arrows at Gothard Street and Edinger Avenue and installing east -west protected left turn arrows at Edwards Street and Warner Avenue. This work will include the installation of new traffic signal poles, signal heads and conduit installation required to accomplish the proposed operation. This agreement is for preliminary engineering funds only, with Federal Funds totaling $16,200 with a City share of $1,800. The city share of the preliminary engineering costs is made up of staff time. The Program Supplement Agreements for construction funds will follow at a later date after Caltrans approval of the plans and specifications. Public Works Commission Action: Not required. Environmental Status: Not applicable. Attachment(s): -2- 6/21/2006 2:51 PM ATTACHMENT #1 CITY OF HUNTINGTON BEACH * PUBLIC WORKS * TRAFFIC ENGINEERING VICINITY MAP mo •� ,� GOTHARD AND WARNER, GOTHARD AND EDINGER & EDWARDS AND WARNER ATTACHMENT #2 RESOLUTION NO. 2006-37 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE PROGRAM SUPPLEMENT NOS. M030, M031, AND M032 TO AGREEMENT NO. 12-5181 FOR THE INTERSECTIONS OF GOTHARD STREET AND WARNER AVENUE, GOTHARD STREET AND EDINGER AVENUE AND WARNER AVENUE AND EDWARDS STREET WHEREAS, on June 16, 1997, the City entered into an agreement with the State of California for the Federal Aid Program, identified as Agreement No. 12-5181 ("Master Agreement"); and Program Supplemental Nos. M030, M031 and M032 to the above mentioned Master Agreement have been found eligible for funding under the Hazard Elimination Safety program administered by the Federal Highway Administration and the California State Department of Transportation; and The estimated project cost for each agreement is as follows: M030 (Warner Avenue and Edwards Street) $102,620; M031 (Edinger Avenue and Gothard Street) $160,783; and M032 (Warner Avenue and Gothard Street) $52,826. The sum of the estimated project cost of three agreements is $316,229 ($18,000 preliminary engineering and $298,229 construction); and From the estimated project cost, the following dollar amounts will be appropriated from Federal and State funds to their respective project as shown on Attachments A hereto: M030 (Warner Avenue and Edwards Street) $54,000 ($4,500 preliminary engineering and $49,500 construction); M031 (Edinger Avenue and Gothard Street) $76,500 ($7,200 preliminary engineering and $69,300 construction), and M032 (Warner Avenue and Gothard Street) $54,000 ($4,500 preliminary engineering and $49,500 construction). The sum of the Federal and State funds allocated for three projects is $184,500 ($16,200 preliminary engineering and $168-1300 construction); and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Huntington Beach that the Mayor and City Clerk are authorized and directed to execute the necessary documents to implement Program Supplement Nos. M030, M031 and M032 to Master Agreement No. 12-5181 for the preliminary engineering for the traffic signal modifications for the intersections of Gothard Street and Warner Avenue, Gothard Street and Edinger Avenue and 06-300/2647 Resolution No. 2006-37 Warner Avenue and Edwards Street. The program supplements are only for engineering and do not include construction funds. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 3rd day of July , 200 6. Mayor REVIEWED AND APPROVED: APPROVED AS TO FORM: ity Administrator V C ty Attorney\o� ED AND A ROVED: Director of Public Works 06-300/26,47 2 ATTACHMENT A ONFOR PROGRAM SUPPLEMENT NO. M030 Date: May 02,2006 to COPY Location:12-ORA-0-HNTB ADMINISTERING AGENCY -STATE AGREEMENT Project Number:STPLH-5181(153) FOR FEDERAL -AID PROJECTS NO. 12-5181 E.A. Number:12-931681 — Or2161.,V14c_ IA)i lit e SOLc c--77610 — This Program Supplement hereby incorporates the Administering Agency -State Agreement for Federal Aid which was entered into jetween the Administering Agency and the State on 06/29/97 and is subject to all the terms and conditions thereof. This Program Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. 2 0 0 6— 3 7 1 approved by the Administering Agency on 7/ 3/ 2 0 0 6 (See copy attached). The Administering Agency further stipulates that as a condition to the payment by State of any funds derived from sources noted )elow obligated to this project, the Administering Agency accepts and will comply with the Special covenants or Remarks setforth )n the following pages. PROJECT LOCATION: Intersection of Warner Avenue and Edwards Street TYPE OF WORK: Modify signal phasing LENGTH: 0.1(MILES) Estimated Cost Federal Funds Matching Funds $5,000.00 14210 $4,500.00 LOCAL $500.00 $0.00 OTHER $0.00 CITY OF HUNTINGTON BEACH By 4�L Mayor Date T„ 1 — -7 n n r- Atte Title STATE OF CALIFORNIA Department of Transpo tation By Chief, Office of Project Implementation a Division of Local Assistance Date L1, I hereby certify upon m' personal knowledge that budgeted funds are available for this encumbrance: Accounting` Date 5 Officer� /��Urn. � �i��-P _ /�7 �p $4,500.00 Chapter I Statutes I Item I Year I ProcAram I Bc I Category I Fund Source I AMOUNT 38 2005 2660-102-890 2005-2006 20.30.010.530 C 255020 892-F 4,500.00 Program Supplement 12-5181-M030- ISTEA Page 1 of 5 12-ORA-0-HNTB STPLH-5181(153) 05/02/2006 SPECIAL COVENANTS OR REMARKS 1. All project repair, replacement and maintenance involving the physical condition and the operation of project improvements referred to in Article III MAINTENANCE, of the aforementioned Master Agreement will be the responsibility of the ADMINISTERING AGENCY and shall be performed at regular intervals and as required for efficient operation of the completed project improvements. 2. The ADMINISTERING AGENCY will reimburse the STATE for the ADMINISTERING AGENCY share of costs for work requested to be performed by the STATE. 3. The ADMINISTERING AGENCY agrees that payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration (FHWA) in the Federal -Aid Project Authorization/Agreement or Amendment/Modification (E-76) and accepts any resultant increases in ADMINISTERING AGENCY funds as shown on the Finance Letter, any modification thereof as approved by the Division of Local Assistance, Office of Project Implementation. 4. The ADMINISTERING AGENCY will advertise, award and administer this project in accordance with the most current published Local Assistance Procedures Manual. 5. The ADMINISTERING AGENCY is required to have an audit in accordance with the Single Audit Act and OMB A-133 if it receives a total of $500,000 or more in federal funds in a single fiscal year. The federal funds received under this project are a part of the Catalogue of Federal Domestic Assistance (CFDA) 20.205, Highway Planning & Research. OMB A-133 superceded OMB A-128 in 1996. A reference to OMB A-128 in a Master Agreement (if any) is superceded by this covenant to conform to OMB A-133. 6. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer immediately after the project contract award. A copy of the award package shall also be included with the submittal of the ADMINISTERING AGENCY's first invoice for the construction contract to: Department of Transportation Division of Accounting Local Programs Accounting Branch, MS#33 Program Supplement 12-5181-M030- ISTEA Page 2 of 5 12-ORA-0-1*4TB 3TPLH-5181(153) 05/02/2006 SPECIAL COVENANTS OR REMARKS P. O. Box 942874 Sacramento, CA 94274-0001 Failure to do so will cause a delay in the State processing invoices for the construction phase. Please refer to Section 15.7 "Award Package" of the Local Assistance Procedures Manual and LPP 01-06. 7. STATE and ADMINISTERING AGENCY agree that any additional funds which might be made available for new phase(s) of work by future Federal obligations will be encumbered on this PROJECT by use of a STATE approved "Authorization to Proceed" and Finance Letter. ADMINISTERING AGENCY agrees that Federal funds available for reimbursement will be limited to the amounts obligated by the Federal Highway Administration. 8.. ADMINISTERING AGENCY agrees that it will only proceed with work authorized for specific phase(s) with an "Authorization to Proceed" and will not proceed with future phase(s) of this project prior to receiving an "Authorization to Proceed" from the STATE for that phase(s) unless no further State or Federal funds are needed for those future phase(s). 9. Any State and Federal funds that may have been encumbered for this project are only available for disbursement for a period of five (5) years and seven (7) years, respectively, from the start of the fiscal year(s) that those funds were appropriated within the State Budget Act. All project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested and is approved by the California Department of Finance per Government Code Section 16304. The exact date of each fund reversion will be reflected in the approved finance letter(s) issued for this project. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement that is not submitted to the Department on or before 60 days after that applicable fixed fund reversion date will not be paid from that fiscal year's encumbered funds because all of these unexpended funds will be irrevocably reverted by the Department's Division of Accounting Program Supplementl2-5181-M030- ISTEA Page 3 of 5 12-ORA-0-HNTB 3TPLH-5181(153) 05/02/2006 SPECIAL COVENANTS OR REMARKS on that date. Pursuant to a directive from the State Controller's Office and the Department of Finance, the last.date to submit invoices for reimbursed work in each fiscal year is May 15th in order for payment to be made out of those then current appropriations. Project work performed and invoiced after May 15th will be reimbursed only out of available funding that might be encumbered in the subsequent fiscal year, and then only when those funds are actually allocated and encumbered as authorized by the California Transportation Commission and the Department's Accounting Office. 10."ADMINISTERING AGENCY certifies that neither the ADMINISTERING AGENCY nor its principals are suspended or debarred at the time of the execution of this agreement. ADMINISTERING AGENCY agrees that it will notify the STATE immediately, in the event a suspension or a debarment happened after the execution of this agreement." 11.The Administering Agency shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT -assisted contract or in the administration of its DBE Program or the requirements of 49 CFR Part 26. The Administering Agency shall take all necessary and reasonable steps under 49 CFE Part 26 to ensure nondiscrimination in the award and administration of DOT -assisted contracts. The Administering Agency's DBE Program, as required by 49 CFE Part 26 and as approved by Caltrans, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the recepient of its failure to carry out its approved program, Caltrans may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 es seq.). 12.Billing Cycle ADMINISTERING AGENCY agrees to submit invoices in arrears for reimbursement of participating PROJECT costs at least once every six months commencing after the funds are encumbered for each Program Supplementl2-5181-M030- ISTEA Page 4 of 5 12-ORA-0-HNTB 05/02/2006 3TPLH-5181(153) SPECIAL COVENANTS OR REMARKS phase by the execution of this PROJECT PROGRAM SUPPLEMENT or by STATE's future approval of an applicable Finance Letter. The total of all invoiced amounts claimed, plus any required matching funds, must not exceed the actual total cost allowable under this PROGRAM SUPPLEMENT for all authorized and completed PROJECT engineering work, right of way acquisition, and construction. If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY shall submit a written explanation (with target billing date and target billing amount) of the absence of PROJECT activity. Should ADMINSTERING AGENCY fail to invoice for participating PROJECT costs incurred (including a written explanation when no .invoice is submitted) within one year of the issuance of the PROJECT authorization to proceed by STATE or from the next invoice due date following the last PROJECT invoice, STATE may de -obligate and reassign to another party any unexpended Federal funds without notice to ADMINSTERING AGENCY. STATE may also not process any future request for authorization to proceed submitted by the ADMINSTERING AGENCY. Final Billing ADMINISTERING AGENCY agrees that it shall submit the Final Invoice and Final Detail Estimate within 180 days of PROJECT completion. ADMINISTERING AGENCY's failure to submit these documents will result in sanctions imposed upon ADMINISTERING AGENCY by STATE in accordance with Chapter 17.6, "Consequences For Non -Compliance", of the Local Assistance Procedures Manual. De -obligate Federal Funds for Construction Phase ADMINISTERING AGENCY agrees that if the estimated PROJECT construction cost is less than the obligated amount for construction by more than $50,000, that excess amount of federal funds initially obligated is subject to de -obligation by STATE once the project has been awarded by ADMINSTERING AGENCY. Program Supplement 12-5181-M030- ISTEA Page 5 of 5 �CSU!_tcT)D � SriINWA, PRC'vC%-AM SUPPLEMENT NO. M031 Date: May 15, 2006 ;` to � a 31 (?SEL,Ns Location:12-ORA-0-HNTB ADMINISTERING AGENCY -STATE AGREEMENT ;.�'� Project Number:STPLH-5181(152) FOR FEDERAL -AID PROJECTS NO. 12-5181 5,;"±;+ E.A. Number:12-931680 /,10 cam/ Ttf This Program Supplement hereby incorporates the Administering Agency -State Agreement for Federal Aid which was entered into between the Administering Agency and the State on 06/29/97 and is subject to all the terms and conditions thereof. This Program Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. 2 0 0 6— 3 7 approved by the Administering Agency on 7/ 3/ 2 0 0 6 (See copy attached). The Administering Agency further stipulates that as a condition to the payment by State of any funds derived from sources noted below obligated to this project, the Administering Agency accepts and will comply with the Special covenants or Remarks setforth :)n the following pages. PROJECT LOCATION: Intersection of Edinger Avenue and Gothard Street TYPE OF WORK: Modify signal phasing LENGTH: 0.1(MILES) Estimated Cost Federal Funds Matching Funds $8,000.00 H210 $7,200.00 LOCAL $800.00 $0.00 OTHER $0.00 CITY OF HUNTINGTON BEACH MayorBy Date_11 • Attest _ Bali 7i y • I - / STATE OF CALIFORNIA Departmen of Transpo tation By , Chief, Office of Project Implementation Division of Local Assistance Date2�%s�40 I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Officer �lx�r/o �f Date 51 o� $7,200.00 Chapter I Statutes I Item I Year 1 J Program I BC I Category I Fund Source I AMOUNT 38 2005 2660-102-890 2005-2006 20.30.010.530 C 255020 892-F Program Supplement 12-5181-M031- ISTEA 7,200.00 Page 1 of 5 12-ORA-0-HNTB 3TPL4-5181(152) 05/ 15/2006 SPECIAL COVENANTS OR REMARKS 1. All project repair, replacement and maintenance involving the physical condition and the operation of project improvements referred to in Article III MAINTENANCE, of the aforementioned Master Agreement will be the responsibility of the ADMINISTERING AGENCY and shall be performed at regular intervals and as required for efficient operation of the completed project improvements. 2. The ADMINISTERING AGENCY will reimburse the STATE for the ADMINISTERING AGENCY share of costs for work requested to be performed by the STATE. 3. The ADMINISTERING AGENCY agrees that payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration (FHWA) in the Federal -Aid Project Authorization/Agreement or Amendment/Modification (E-76) and accepts any resultant increases in ADMINISTERING AGENCY funds as shown on the Finance Letter, any modification thereof as approved by the Division of Local Assistance, Office of Project Implementation. 4. The ADMINISTERING AGENCY will advertise, award and administer this project in accordance with the most current published Local Assistance Procedures Manual. 5. The ADMINISTERING AGENCY is required to have an audit in accordance with the Single Audit Act and OMB A-133 if it receives a total of $500,000 or more in federal funds in a single fiscal year. The federal funds received under this project are a part of the Catalogue of Federal Domestic Assistance (CFDA) 20.205, Highway Planning & Research. OMB A-133 superceded OMB A-128 in 1996. A reference to OMB A-128 in a Master Agreement (if any) is superceded by this covenant to conform to OMB A-133. 6. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer immediately after the project contract award. A copy of the award package shall also be included with the submittal of the ADMINISTERING AGENCY's first invoice for the construction contract to: Department of Transportation Division of Accounting Local Programs Accounting Branch, MS#33 Program Supplementl2-5181-M031- ISTEA Page 2 of 5 12-ORA-0-14NTB STPLH-5181(152) 05/ 15/2006 SPECIAL COVENANTS OR REMARKS P. O. Box 942874 Sacramento, CA 94274-0001 Failure to do so will cause a delay in the State processing invoices for the construction phase. Please refer to Section 15.7 "Award Package" of the Local Assistance Procedures Manual and LPP 01-06. 7. STATE and ADMINISTERING AGENCY agree that any additional funds which might be made available for new phase(s) of work by future Federal obligations will be encumbered on this PROJECT by use of a STATE approved "Authorization to Proceed" and Finance Letter. ADMINISTERING AGENCY agrees that Federal funds available for reimbursement will be limited to the amounts obligated by the Federal Highway Administration. 8. ADMINISTERING AGENCY agrees that it will only proceed with work authorized for specific phase(s) with an "Authorization to Proceed" and will not proceed with future phase(s) of this project prior to receiving an "Authorization to Proceed" from the STATE for that phase(s) unless no further State or Federal funds are needed for those future phase(s). 9. Any State and Federal funds that may have been encumbered for this project are only available for disbursement for a period of five (5) years and seven (7) years, respectively, from the start of the fiscal year(s) that those funds were appropriated within the State Budget Act. All project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested and is approved by the California Department of Finance per Government Code Section 16304. The exact date of each fund reversion will be reflected in the approved finance letter(s) issued for this project. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement that is not submitted to the Department on or before 60 days after that applicable fixed fund reversion date will not be paid from that fiscal year's encumbered funds because all of these unexpended funds will be irrevocably reverted by the Department's Division of Accounting Program Supplementl2-5181-M031- ISTEA Page 3 of 5 12-0?,A-0-HNTB 3TPLH-5181(152) 05/ 15/2006 SPECIAL COVENANTS OR REMARKS on that date. Pursuant to a directive from the State Controller's Office and the Department of Finance, the last date to submit invoices for reimbursed work in each fiscal year is May 15th in order for payment to be made out of those then current appropriations. Project work performed and invoiced after May 15th will be reimbursed only out of available funding that might be encumbered in the subsequent fiscal year, and then only when those funds are actually allocated and encumbered as authorized by the California Transportation Commission and the Department's Accounting Office. 10."ADMINISTERING AGENCY certifies that neither the ADMINISTERING AGENCY nor its principals are suspended or debarred at the time of the execution of this agreement. ADMINISTERING AGENCY agrees that it will notify the STATE immediately, in the event a suspension or a debarment happened after the execution of this agreement." 11.The Administering Agency shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT -assisted contract or in the administration of its DBE Program or the requirements of 49 CFR Part 26. The Administering Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of DOT -assisted contracts. The Administering Agency's DBE Program, as required by 49 CFR Part 26 and as approved by Caltrans, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the recepient of its failure to carry out its approved program, Caltrans may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). 12.Billing Cycle ADMINISTERING AGENCY agrees to submit invoices in arrears for reimbursement of participating PROJECT costs at least once every six months commencing after the funds are encumbered for each Program Supplementl2-5181-M031- ISTEA Page 4 of 5 12-ORA-0-HNTB STPLH-5181(152) 05/ 15/2006 SPECIAL COVENANTS OR REMARKS phase by the execution of this PROJECT PROGRAM SUPPLEMENT or by STATE's future approval of an applicable Finance Letter. The total of all invoiced amounts claimed, plus any required matching funds, must not exceed the actual total cost allowable under this PROGRAM SUPPLEMENT for all authorized and completed PROJECT engineering work, right of way acquisition, and construction. If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY shall submit a written explanation (with target billing date and target billing amount) of the absence of PROJECT activity. Should ADMINSTERING AGENCY fail to invoice for participating PROJECT costs incurred (including a written explanation when no invoice is submitted) within one year of the issuance of the PROJECT authorization to proceed by STATE or from the next invoice due date following the last PROJECT invoice, STATE may de -obligate and reassign to another party any unexpended Federal funds without notice to ADMINSTERING AGENCY. STATE may also not process any future request for authorization to proceed submitted by the ADMINSTERING AGENCY. Final Billing ADMINISTERING AGENCY agrees that it shall submit the Final Invoice and Final Detail Estimate within 180 days of PROJECT completion. ADMINISTERING AGENCY's failure to submit these documents will result in sanctions imposed upon ADMINISTERING AGENCY by STATE in accordance with Chapter 17.6, "Consequences For Non -Compliance", of the Local Assistance Procedures Manual. De -obligate Federal Funds for Construction Phase ADMINISTERING AGENCY agrees that if the estimated PROJECT construction cost is less than the obligated amount for construction by more than $50,000, that excess amount of federal funds initially obligated is subject to de -obligation by STATE once the project has been awarded by ADMINSTERING AGENCY. Program Supplementl2-5181-M031- ISTEA Page 5 of 5 PROGRAM SUPPLEMENT NO. M032 C 1i\I ORMEVk Date: May 15, 2006 to ! J 1 V Location:12-ORA-0-HNTB ADMINISTERING AGENCY -STATE AGREEMENT COPY Project Number:STPLH-5181(151) FOR FEDERAL -AID PROJECTS NO. 12-5181 E.A. Number:12-931679 LOA16 z'). 7ESOLu/70.J — This Program Supplement hereby incorporates the Administering Agency -State Agreement for Federal Aid which was entered into between the Administering Agency and.the State on 06/29/97 and is subject to all the terms and conditions thereof. This Program Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. 2 0 0 6— 3 7 approved by the Administering Agency on 7/ 3/ 2 0 0 6 (See copy attached). The Administering Agency further stipulates that as a condition to the payment by State of any funds derived from sources noted below obligated to this project, the Administering Agency accepts and will comply with the Special covenants or Remarks setforth on the following pages. PROJECT LOCATION: Intersection of Warner Avenue and Gothard Street TYPE OF WORK: [Modify signal phasing LENGTH: 0.1(MILES) Estimated Cost Federal Funds Matching Funds $5,000.00 H210 $4,500.00 LOCAL $500.00 $0.00 OTHER $0.00 :!ITY OF HUNTINGTON BEACH By _ )4, Mayor Date Attest Title Clerk STATE OF CALIFORNIA Department of Transport tion + c By Chief, Office of Project Implementation Division of Local Assistance Date 0 I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Officer Date / �$4,500.00 Chapter I Statutes Item Year I Pr gram I BC I Category I Fund Source I AMOUNT 38 2005 2660-102-890 2005-2006 20.30.010.530 C 255020 892-F Program Supplement 12-5181-M032- ISTEA 4,500.00 Page 1 of 5 12-ORA-0-IINNTB 05/ 15/2006 STPL.H-5181(151) SPECIAL COVENANTS OR REMARKS 1. All project repair, replacement and maintenance involving the physical condition and the operation of project improvements referred to in Article III MAINTENANCE, of the aforementioned Master Agreement will be the responsibility of the ADMINISTERING AGENCY and shall be performed at regular intervals and as required for efficient operation of the completed project improvements. 2. The ADMINISTERING AGENCY will reimburse the STATE for the ADMINISTERING AGENCY share of costs for work requested to be performed by the STATE. 3. The ADMINISTERING AGENCY agrees that payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration (FHWA) in the Federal -Aid Project Authorization/Agreement or Amendment/Modification (E-76) and accepts any resultant increases in ADMINISTERING AGENCY funds as shown on the Finance Letter, any modification thereof as approved by the Division of Local Assistance, Office of Project Implementation. 4. The ADMINISTERING AGENCY will advertise, award and administer this project in accordance with the most current published Local Assistance Procedures Manual. 5. The ADMINISTERING AGENCY is required to have an audit in accordance with the Single Audit Act and OMB A-133 if it receives a total of $500,000 or more in federal funds in a single fiscal year. The federal funds received under this project are a part of the Catalogue of Federal Domestic Assistance (CFDA) 20.205, Highway Planning & Research. OMB A-133 superceded OMB A-128 in 1996. A reference to OMB A-128 in a Master Agreement (if any) is superceded-.,•by this covenant to conform to OMB A-133. 6. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer immediately after the project contract award. A copy of the award package shall also be included with the submittal of the ADMINISTERING AGENCY's first invoice for the construction contract to: Department of Transportation Division of Accounting Local Programs Accounting Branch, MS#33 Program Supplementl2-5181-M032- ISTEA Page 2 of 5 12-ORA-0-HNTB ' 05/ 15/2006 STPI :H-5181(151) SPECIAL COVENANTS OR REMARKS P. O. Box 942874 Sacramento, CA 94274-0001 Failure to do so will cause a delay in the State processing invoices for the construction phase. Please refer to Section 15.7 "Award Package" of the Local Assistance Procedures Manual and LPP 01-06. 7. STATE and ADMINISTERING AGENCY agree that any additional funds which might be made available for new phase(s) of work by future Federal obligations will be encumbered on this PROJECT by use of a STATE approved "Authorization to Proceed" and Finance Letter. ADMINISTERING AGENCY agrees that Federal funds available for reimbursement will be limited to the amounts obligated by the Federal Highway Administration. 8. ADMINISTERING AGENCY agrees that it will only proceed with work authorized for specific phase(s) with an "Authorization to Proceed" and will not proceed with future phase(s) of this project prior to receiving an "Authorization to Proceed" from the STATE for that phase(s) unless no further State or Federal funds are needed for those future phase(s). 9. Any State and Federal funds that may have been encumbered for this project are only available for disbursement for a period of five (5) years and seven (7) years, respectively, from the start of the fiscal year(s) that those funds were appropriated within the State Budget Act. All project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested and is approved by the California Department of Finance per Government Code Section 16304. The exact date of'each fund reversion will be reflected in the approved finance letter(s) issued for this project. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement that is not submitted to the Department on or before 60 days after that applicable fixed fund reversion date will not be paid from that fiscal year's encumbered funds because all of these unexpended funds will be irrevocably reverted by the Department's Division of Accounting Program Supplementl2-5181-M032- ISTEA Page 3 of 5 12-0RA-0-HNTB 05/15/2006 STPLH-5181(151) SPECIAL COVENANTS OR REMARKS on that date. Pursuant to a directive from the State Controller's Office and the Department of Finance, the last date to submit invoices for reimbursed work in each fiscal year is May 15th in order for payment to be made out of those then current appropriations. Project work performed and invoiced after May 15th will be reimbursed only out of available funding that might be encumbered in the subsequent fiscal year, and then only when those funds are actually allocated and encumbered as authorized by -the California Transportation Commission and the Department's Accounting Office. 10."ADMINISTERING AGENCY certifies that neither the ADMINISTERING AGENCY nor its principals are suspended or debarred at the time of the execution of this agreement. ADMINISTERING AGENCY agrees that it will notify the STATE immediately, in the event a suspension or a debarment happened after the execution of this agreement." 11.The Administering Agency shall not.discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT -assisted contract or in the administration of its DBE Program or the requirements of 49 CFR Part 26. The Administering Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of DOT -assisted contracts. The Administering Agency's DBE Program, as required by 49 CFR Part 26 and as approved by Caltrans, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the recepient of its failure to carry out its approved program, Caltrans may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). 12. Billing Cycle ADMINISTERING AGENCY agrees to submit invoices in arrears for reimbursement of participating PROJECT costs at least once every six months commencing after the funds are encumbered for each Program Supplementl2-5181-M032- ISTEA Page 4 of 5 12-ORA-0-HNTB 05/ 15/2006 3TPLH-5181(151) SPECIAL COVENANTS OR REMARKS phase by the execution of this PROJECT PROGRAM SUPPLEMENT or by STATE's future approval of an applicable Finance Letter. The total of all invoiced amounts claimed, plus any required matching funds, must not exceed the actual total cost allowable under this PROGRAM SUPPLEMENT for all authorized and completed PROJECT engineering work, right of way acquisition, and construction. If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY shall submit a written explanation (with target billing date and target billing amount) of the absence of PROJECT activity. Should ADMINSTERING AGENCY fail to invoice for participating PROJECT costs incurred (including a written explanation when no invoice is submitted) within one'year of the issuance of the PROJECT authorization to proceed by STATE or from the next invoice due date following the last PROJECT invoice, STATE may de -obligate and reassign to another party any unexpended Federal funds without notice to ADMINSTERING AGENCY. STATE may also not process any future request for authorization to proceed submitted by the ADMINSTERING AGENCY. Final Billing ADMINISTERING AGENCY agrees that it shall submit the Final Invoice and Final Detail Estimate within 180 days of PROJECT completion. ADMINISTERING AGENCY's failure to submit these documents will result in sanctions imposed upon ADMINISTERING AGENCY by STATE in accordance with Chapter 17.6, "Consequences For Non -Compliance", of the Local Assistance Procedures Manual. De -obligate Federal Funds for Construction Phase ADMINISTERING AGENCY agrees that if the estimated PROJECT construction cost is less than the obligated amount for construction by more than $50,000, that excess amount of federal funds initially obligated is subject to de -obligation by STATE once the project has been awarded by ADMINSTERING AGENCY. Program Supplementl2-5181-M032- ISTEA Page 5 of 5 Res. No. 2006-37 STATE OF CALIFORNIA COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at an regular meeting thereof held on the 3rd day of July, 2006 by the following vote: AYES: Bohr, Green, Coerper, Sullivan, Hardy, Hansen, Cook NOES: None ABSENT: None ABSTAIN: None Cit Jerk and ex-officio erk of the City Council of the City of Huntington Beach, California STATE OF CALIFORNIA. BUSINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916) 654-3151 Fax (916) 653-7621 May 10, 2006 Ms. Erick Charlonne DBE Liaison Officer City of Huntington Beach 2000 Main Street Huntington Beach, CA 92866 Attn: Mr. Doug Kato Dear Ms. Charlonne: File: 12-ORA-0-HNTB STPLH-5181(153) Intersection of Warner Avenue and Edwards Street Enclosed are two originals of the Program Supplement Agreement No. 030-M to Administering Agency -State Agreement No. 12-5181 and an approved Finance Letter for the subject project. Please retain the signed Finance Letter for your records. We have included two new special covenants that allow any funding for future phases of this project be encumbered upon approval of the "Request for Authorization" and Finance Letter. The Program Supplement Agreement need not be revised for that purpose. However, please note that federal funding will be lost if you proceed with future phase(s) of the project prior to getting the "Authorization to Proceed" with that phase. Please review the covenants and sign both copies of this Agreement and return both to this office, Office of Project Implementation - MS1 within 60 days from the date of this letter. If the signed Agreements are not received back in this office within 60 days, funds will be disencumbered and/or deobligated. Alterations should not be made to the agreement language or funding. Attach your local agency's certified authorizing resolution that clearly identifies the project and the official authorized to execute the agreement. A fully executed copy of the agreement will be returned to you upon ratification by Caltrans. No invoices for reimbursement can be processed until the agreement is fully executed. In accordance to Government Code 16304, Federal funds appropriated by the State budget are available for liquidation only for seven years and the State funds are available only for five years. The attached Finance Letter shows these deadlines as the "Reversion Date". Please ensure that your invoices are submitted at least 60 days prior to the reversion date to avoid any lapse of funds. If your agency is unable to seek reimbursement by this date you may. request an extension through a Cooperative Work Agreement (CWA). A CWA is subject to the final approval of the State Department of Finance. If approved, the CWA may extend the deadline for up to one year for federal funds and up to three years for State funds. Please note that Government Code 16304 does not supersede any other more restrictive expenditure deadlines. Your prompt action is requested. If you have questions, please contact your District Local Assistance Engineer. Sincerely, 442�z DENIX ANBIAH, Chief Office of Project Implementation Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams DEPARTMENT OF TRANSPORTATION DIVISION OF ACCOUNTING - LOCAL PROGRAM ACCOUNTING BRANCH Attention: City of Huntington Beach C KIAAIr`C I ==M Date: 05/10/2006 Agency: 12-O RA-0-H NTB ProlectNo: STPLH-5181(153) EA No: 12-931681 L- FINANCE ITEMS TOTAL COST OF FEDERAL PART. FED. FEDERAL LOCAL FUNDS WORK COST REIMB % FUNDS I H210 Agency Preliminary Engineering $5,000 $5,000 90.00 $4,500 $500 Totals: $5,000 $5,000 $4,500 $500 Fed. Partic: 100.00% This Finance Letter was created based on specific financial information provided by the responsible local agency. The following encumbrance history is prepared by Local Assistance Accounting Office and is provided here for local agency's information and action. J 4 Signature: ' For questions regarding finance letter, contact: Title: HQ Local Assistance Area Engineer Printed Name : Patrick Louie Telephone No: (916) 653-7349 Remarks: HES #2816. Reimbursement ratio = 90%. ACCOUNTING INFORMATION- STPLH-5181(153) Fund Program Fed/State Encumbrance Amount Approp Year Expenditure Amount Reversion Date 06BH L.A. HAZRD ELEM SFT F 1 $4,500 2005 $0 06/30/12 Page 1 of 1 STATE OF CALIFORNIA. BUSINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916)654-3151 Fax (916) 653-7621 May 19, 2006 Mr. Robert F. Beardsley Director of Public Works City of Huntington Beach P.O. Box 190 Huntington Beach, CA 92648 Attn: Mr. Doug Kato Dear Mr. Beardsley: File: 12-ORA-0-HNTB STPLH-5181(152) Intersection of Edinger Avenue and Gothard Street Enclosed are two originals of the Program Supplement Agreement No. 031-M to Administering Agency -State Agreement No. 12-5181 and an approved Finance Letter for the subject project. Please retain the signed Finance Letter for your records. We have included two new special covenants that allow any funding for future phases of this project be encumbered upon approval of the "Request for Authorization" and Finance Letter. The Program Supplement Agreement need not be revised for that purpose. However, please note that federal funding will be lost if you proceed with future phase(s) of the project prior to getting the "Authorization to Proceed" with that phase. Please review the covenants and sign both copies of this Agreement and return both to this office, Office of Project Implementation - MS1 within 60 days from the date of this letter. If the signed Agreements are not received back in this office within 60 days, funds will be disencumbered and/or deobligated. Alterations should not be made to the agreement language or funding. Attach your local agency's certified authorizing resolution that clearly identifies the project and the official authorized to execute the agreement. A fully executed copy of the agreement will be returned to you upon ratification by Caltrans. No invoices for reimbursement can be processed until the agreement is fully executed. In accordance to Government Code 16304, Federal funds appropriated by the State budget are available for liquidation only for seven years and the State funds are available only for five years. The attached Finance Letter shows these deadlines as the "Reversion Date". Please ensure that your invoices are submitted at least 60 days prior to the reversion date to avoid any lapse of funds. If your agency is unable to seek reimbursement by this date you may request an extension through a Cooperative Work Agreement (CWA). A CWA is subject to the final approval of the State Department of Finance. If approved, the CWA may extend the deadline for up to one year for federal funds and up to three years for State funds. Please note that Government Code 16304 does not supersede any other more restrictive expenditure deadlines. Your prompt action is requested. If you have questions, please contact your District Local Assistance Engineer. Sincerely, DENIX ANBIAH, Chief Office of Project Implementation Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams DEPARTMENT OF TRANSPORTATION FINANCE LETTER Date: 05/18/2006 DIVISION OF ACCOUNTING Agency: 12-ORA-0-HNTB LOCAL PROGRAM ACCOUNTING BRANCH Protect No: STPLH-5181(152) EA No: 12-931680 L- Attention: City of Huntington Beach FINANCE ITEMS TOTAL COST OF FEDERAL PART. FED. FEDERAL LOCAL FUNDS WORK COST REIMB % FUNDS I ! I H210 I Agency Preliminary Engineering $8,000 $8,000 90.00 $7,200 $800 Totals: $8,000 $8,000 $7,200 $800 Fed. Partic: 100.00% This Finance Letter was created based on specific financial information provided by the responsible local agency. The following encumbrance history is prepared by Loc ssistance Accounting Office and is provided here for local agency's information and action. Signature: For questions regarding finance letter, contact: Title: HQ Local Assistance Area Engineer Printed Name : Patrick Louie Telephone No: (916) 653-7349 Remarks: HES 42814 03/04 moved to scag 05/06 amend 417 3/10/06. Reimbursement ratio = 90%. ACCOUNTING INFORMATION- STPLH-5181(152) Fund Program Fed/State Encumbrance Amount Approp Year Expenditure Amount Reversion Date 06BH L.A. HAZRD ELEM SFT F $7,200 2005 $0 06/30/12 Page 1 of 1 STATE OF CALIFORNIA. BUSINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916) 654-3151 Fax (916) 653-7621 May 19, 2006 Mr. Robert F. Beardsley Director of Public Works City of Huntington Beach P.O. Box 190 Huntington Beach, CA 92648 Attn: Mr. Doug Kato Dear Mr. Beardsley: 4 File: 12-ORA-0-HNTB STPLH-5181(151) Intersection of Warner Avenue and Gothard Street Enclosed are two originals of the Program Supplement Agreement No. 032-M to Administering Agency -State Agreement No. 12-5181 and an approved Finance Letter for the subject project. Please retain the signed Finance Letter for your records. We have included two new special covenants that allow any funding for future phases of this project be encumbered upon approval of the "Request for Authorization" and Finance Letter. The Program Supplement Agreement need not be revised for that purpose. However, please note that federal funding will be lost if you proceed with future phase(s) of the project prior to getting the "Authorization to Proceed" with that phase. Please review the covenants and sign both copies of this Agreement and return both to this office, Office of Project Implementation - MS1 within 60 days from the date of this letter. If the signed Agreements are not received back in this office within 60 days, funds will be disencumbered and/or deobligated. Alterations should not be made to the agreement language or funding. Attach your local agency's certified authorizing resolution that clearly identifies the project and the official authorized to execute the agreement. A fully executed copy of the agreement will be returned to you upon ratification by Caltrans. No invoices for reimbursement can be processed until the agreement is fully executed. In accordance to Government Code 16304, Federal funds appropriated by the State budget are available for liquidation only for seven years and the State funds are available only for five years. The attached Finance Letter shows these deadlines as the "Reversion Date". Please ensure that your invoices are submitted at least 60 days prior to the reversion date to avoid any lapse of funds. If your agency is unable to seek reimbursement by this date you may request an extension through a Cooperative Work Agreement (CWA). A CWA is subject to the final approval of the State Department of Finance. If approved, the CWA may extend the deadline for up to one year for federal funds and up to three years for State funds. Please note that Government Code 16304 does not supersede any other more restrictive expenditure deadlines. Your prompt action is requested. If you have questions, please contact your District Local Assistance Engineer. Sincerely, ��Z � J DENIX ANBIAH, Chief Office of Project Implementation Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams DEPARTMENT OF TRANSPORTATION DIVISION OF ACCOUNTING LOCAL PROGRAM ACCOUNTING BRANCH Attention: City of Huntington Beach FINANCE LETTER Date: 05/18/2006 Agency: 12-ORA-0-HNTB Project No: STPLH-5181(151) EA No: 12-931679-L FINANCE ITEMS TOTAL COST OF FEDERAL PART. FED. FEDERAL LOCAL FUNDS WORK COST REIMB % FUNDS H210 Agency Preliminary Engineering $5,000 $5,000 90.00 $4,500 $500 Totals: $5,000 $5,000 I $4,500 $500 Fed. Partic: 100.00% This Finance Letter was created based on specific financial information provided by the responsible local agency. The following encumbrance history is prepared by Local Assistance Accounting Office and is provided here for local agency's information and action. Signature: For questions regarding finance letter, contact: A" r4L le_� I Title: HO Local Assistance Area Engineer Printed Name : Patrick Louie Telephone No: (916) 653-7349 Remarks: HES #2815. Reimbursement ratio = 90%. ACCOUNTING INFORMATION- STPLH-5181(151) Fund Program Fed/State Encumbrance Amount 06BH L.A. HAZRD ELEM SFT F $4,500 Approp Year Expenditure Amount Reversion Date 2005 $0 06/30/12 Page 1 of 1 RCA ROUTING SHEET INITIATING DEPARTMENT: PUBLIC WORKS SUBJECT: Adopt Resolution Authorizing Federal Funding for Traffic Signal Modifications COUNCIL MEETING DATE: July 3, 2006 RCA ATTACHMENTS .. - STATUS Ordinance (w/exhibits & legislative draft if applicable) Attached ❑ Not Applicable Resolution (w/exhibits & legislative draft if applicable) Attached Not Applicable ❑ Tract Map, Location Map and/or other Exhibits Attached Not Applicable ❑ Contract/Agreement (w/exhibits if applicable) Attached ❑ Signed in full by the City Attorney Not Applicable Subleases, Third Party Agreements, etc. Attached ❑ (Approved as to form by City Attorney) Not Applicable Certificates of Insurance (Approved by the City Attorney) Attached ❑ Not Applicable Fiscal Impact Statement (Unbudgeted, over $5,000) Attached ❑ Not Applicable Bonds (If applicable) Attached ❑ Not Applicable Staff Report (If applicable) Attached ❑ Not Applicable Commission, Board or Committee Report (If applicable) Attached ❑ Not Applicable Findings/Conditions for Approval and/or Denial Attached ❑ Not Applicable EXPLANATION FOR MISSING ATTACHMENTS REVIEWED RETURNED FORWARDED Administrative Staff ) ) Assistant City Administrator Initial City Administrator Initial City Clerk ) EXPLANATION FOR RETURN OF ITEM: RCA Author: W. Janusz STATE OF CALIFORNIA. BUSINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916) 654-3151 Fax (916) 653-7621 July 24, 2006 Ms. Erick Charlonne DBE Liaison Officer City of Huntington Beach 2000 Main Street Huntington Beach, CA 92866 Attn: Mr. Doug Kato Dear Ms. Charlonne: 4 File: 12-ORA-0-HNTB STPLH-5181(153) Intersection of Warner Avenue and Edwards Street Enclosed is your fully executed copy of Program Supplement Agreement No. 030-M to Administering Agency -State Agreement No. 12-5181 . Sincerely, ANBIAH, Chief /,�VODENIX ffice of Project Implementation Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams STATE OF CALIFORNIA. BUSINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916) 654-3151 File: 12-ORA-0-HNTB Fax (916) 653-7621 STPLH-5181(152) July 24, 2006 Intersection of Edinger Avenue and Gothard Street Mr. Robert F. Beardsley Director of Public Works City of Huntington Beach P.O. Box 190 Huntington Beach, CA 92648 Attn: Mr. Doug Kato Dear Mr. Beardsley: Enclosed is your fully executed copy of Program Supplement Agreement No. 031-M to Administering Agency -State Agreement No. 12-5181 . Sincerely, t DENIX ANBIAH, Chief Office of Project Implementation !Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams STATE OF CALIFORNIA. I USINESS,TRANSPORTATION AND HOUSING AGENCY Arnold Schwarzenegger, Governor DEPARTMENT OF TRANSPORTATION Division of Local Assistance 1120 N STREET P.O. BOX 942874, MS# 1 Sacramento, CA 94274-0001 TDD (916) 654-4014 (916) 654-3151 Fax (916) 653-7621 July 24, 2006 Mr. Robert F. Beardsley Director of Public Works City of Huntington Beach P.O. Box 190 Huntington Beach, CA 92648 Attn: Mr. Doug Kato Dear Mr. Beardsley: (4 File: 12-ORA-0-HNTB STPLH-5181(151) Intersection of Warner Avenue and Gothard Street Enclosed is your fully executed copy of Program Supplement Agreement No. 032-M to Administering Agency -State Agreement No. 12-5181 . Sincerely, ENIX ANBIAH, Chief Office of Project Implementation Division of Local Assistance Enclosure c: DLA AE Project Files (12) DLAE - Alan Williams