Loading...
HomeMy WebLinkAboutKana Pipeline, Inc. - 2012-08-20March 24, 2014 City Clerk City of Huntington Beach 2000 Main St. Huntington Beach, CA 92648-2702 �cJ f�Gee.Ic. Gc.%S CENTER FOR CONTRACT COMPLIANCE Orange County Office 2651 E. Chapman Ave., Suite #206 • Fullerton, CA 92831 TEL. (714) 459-4177 • FAX (714) 871-9539 ®. W..3�-.. . When replying, please refer to case #12558527 RE: Water Main Replacement Sunset Beach #CC1412 ;various locations, Huntington Beach, CA 92605 GENERAL CONTRACTOR Dear Sir/Madam: Kana Pipeline Inc. 1639 E. Miraloma Ave. Placentia, CA 92870-6623 (714) 986-1400 License #: 461487 This is a formal request from the Center for Contract Compliance in accordance with the Labor Code Section 1776 for copies of certified payroll records and fringe benefit statement on the above -noted contractor. We are requesting the records from May 16, 2013 through the present. As a Joint Labor - Management Committee, please ensure that the name and addresses of the workers are not omitted, only redacting social security numbers of the workers as indicated under section 1776 (e) of the California Labor Code. We have enclosed a copy of our agreement indicating that we are a joint Labor - Management Committee under the Cooperation Act of 1978. We also enclosed the Department of Industrial Relations payroll reporting form and fringe benefit statement that you can provide to the contractor as an example when reporting wages and hours. Labor Code Section 1777.1 (c) states, "Whenever a contractor or subcontractor performing a public works project has failed to provide a timely response to a request by the Division of Labor Standards Enforcement, the Division of Apprenticeship Standards Enforcement or the awarding body to produce certified payroll records pursuant to Section 1776, the Labor Commissioner shall notify the contractor or subcontractor that, in addition to any other penalties provided by law, the contractor or subcontractor will be subject to debarment under this section if the certified payroll records are not produced within 30 days after receipt of the written notice..." Please take cognizance of this section to ensure that the contractor complies in a timely manner. Our office will gladly cover the cost of reproduction as set forth on California Code of Regulation 16402 which states, "The cost of preparation to each contractor, subcontractor or public entity when the request was made shall be provided in advance by the person seeking the payroll record. Such cost shall be $1 for the first page of the payroll record and 25 cents for each page thereafter, plus $10 to the contractor or subcontractor for handling costs. City Clerk City of Huntington Beach March 24, 2014 Page Two Payment in the form of cash, check or certified money order shall be made prior to release of the documents to cover the actual costs of preparation." It will be very helpful if you also send a copy of this code to the contractor so that they are aware of the costs also. Please send us a copy of your letter to the contractor in which you request submission of certified payroll records. If you have any questions, please call me at (714) 459-4177 ext. 501. 1 look forward to your prompt response. Sincerely, 4-41&-Oa"44� Paul Valdovinos Pauly@socalccc.orz Investigator Enclosure Statement of Employer Payments Date: In Reply, Refer to Case No: �RL or t Prime: o , Subcontractor: �< ° frD n PROJECT NAME: PROJECT CONTRACT NO.: County/location: HEALTH AND WELFARE NAME OF PLAN ADMINISTRATOR Address, City and Zip Address, City and Zip CLASSIFICATION(S) USED CONTRIBUTION PER CLASSIFICATION PER HOUR CONTRIBUTIONS: WEEKLY MONTHLY QUARTERLY ANNUALLY PENSION NAME OF PLAN ADMINISTRATOR Address, City and Zip Address, City and Zip CLASSIFICATIONS) USED CONTRIBUTION PER CLASSIFICATION PER HOUR CONTRIBUTIONS: WEEKLY MONTHLY QUARTERLY ANNUALLY VACATION/HOLIDAY NAME OF PLAN ADMINISTRATOR Address, City and Zip Address, City and Zip CLASSIFICATION(S) USED CONTRIBUTION PER CLASSLFICATION PER .HOUR CONTRIBUTIONS: WEEKLY MONTHLY QUARTERLY ANNUALLY TRAINING NAME OF PLAN ADMINISTRATOR Address, City and Zip Address, City and Zip CLASS.IFICATI.ON(S) USED CONTRIBUTION PER CLASSIFICATION PER HOUR CONTRIBUTIONS: WEEKLY MONTHLY QUARTERLY ANNUALLY L i vv uor- v.l ri-r-tc YLAIVS NOT .LIS 1 ED ABUVE, YOU MAY USE THE BACK OF THIS FORM TO PROVIDE THIS ADDITIONAL INFORMATION PW 26 I ® California PUBLIC WORKS PAYROLL REPORTING FORM 1 Department of 1 Industrial Rclalicns Page NAME OF CONTRACTOR CONTRACTOR'S LICENSE NO.: ADDRESS: . OR SUBCONTRACTOR: SPECIALITY LICENSE NO.: PAYROLL NO.: FOR WEEK ENDING: SELF -INSURED CERTIFICATE NO.: PROJECT OR CONTRACT NO.: (4) DAY (5) (6) WORKERS' COMPENSATION POLICY NO.: PROJECT AND LOCATION: (1) (2) 1 (3) M T W TH F S S (9) DATE NET WOR CHECK NAME, ADDRESS AND 1 = z I WORK TOTAL HOURLY RATE GROSS AMOUNT SOCIAL SECURITY NUMBER CLASSIFICATION HOURS OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID FOR NO. OF EMPLOYEE 1 065 °z °x 1 HOURS WORKED EACH DAY THIS ALL FED. FICA STATE VAC/ HEALTH 1 PROJECT PROJECTS TAX (SOC. SEC.) TAX SDI HOLIDAY & WELF. PENSION S 1 1 1 TRAING. FUND DUES SUBS. SAVINGS OTHER' DED C- 1 ADMIN TIONS 1 0 I THIS ALL FED. FICA STATE VAC/ HEALTH PROJECT PROJECTS TAX (SOC. SEC.) TAX SDI HOLIDAY & WELF. PENSION 1 S 1 1 TRAING. FUND DUES / SUBS. SAVINGS OTHER' TOTAL DEDUC- I ADMIN TIONS 1 0 ( THIS ALL FED. FICA STATE VAC/ HEALTH ( PROJECT PROJECTS TAX (SOC. SEC.) TAX SDI HOLIDAY & WELF. PENSION I S 1 TRAV TRAING. FUND DUES SUUBS' SAVINGS OTHER- DEDUC- ADMIN TIONS I I 0 THIS ALL FICA E STATE VACI HEALTH I PROTECT PROJECTS TAX. SOC. SEC. ( ) SDI HOLIDAY & WEL PENSION 1 S 1 TRAING. FUND DUES SUBS. SAVINGS OTHER' DEDUC- 1 1 ADMIN TIONS I 0 s-s3RAlolurTIME -oT1itiR-Any other deductions, contributions and/or paymen(s whether or not included or required by prevailing CERTIFICATION MUST be completed Form A-1.131 (N-2-Ee) O= OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side) SDI - STATE DISABILITY INSURANCE . STATEMENT OF COMPLIANCE (CERTIFICATION UNDER PENALTY OF PERJURY) Date the (Name of signatory party) (1) That all of the information in this report is true and correct. at (Title) do certify under penally of perjury: (2) That I pay or supervise the payment of the persons employed by (Contractor or subcontractor) , that during the payroll period commencing on the day of on (Building or work) 19 and ending the day of 19 , all persons employed on said project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said from the full weekly wages earned by any person and that no deductions have been (Contractor or subcontractor) made either directly or indirectly from the full wages earned by any person, other than permissible deductions, as described below: (3) That any payrolls otherwise under this contract required to be submitted for the above period are correct and complete; that the wage rate for laborers or mechanics contained therein are not less than the applicable wage rates contained In any wage determination incorporated Into the contract; that the classifications set forth therein for each laborer or mechanic conform with the work he performed. (4) That any apprentices employed in the above period are duly registered In a bona fide apprenticeship program registered with a Stale appren- ticeship agency. (5) That: (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS ❑ In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced payroll, payments of fringe benefits as listed in the contract have been or will be made to appropriate programs for the benefit of such employees, except as noted in Section 5(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH ❑ Each Laborer, or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed In the contract, except as noted In Section 5(c) below: (c) EXCEPTIONS EXCEPTION CRAFT EXPLANATION Remarks:_[ NAME AND TITLE SIGNATURE Information in this report is submitted pursuant to Sections 1770 thru 1780 of the California Labor Code. On federally -funded projects. permissible deductions are defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act, as amended (48 Slat. 948 63 Slat. 108. 72 Slat. 967: 76 Slat. 357: 40 U.S.C. 276c). Also, the willful falsification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (see Section 1001 of Title 18 and Section 231 of Title 31 of the United Slates Code). NOTICE TO PUBLIC ENTITY For Privacy Considerations Fold back along dotted line prior to copying for release to general public (private persons). (Paper Size then 8-1/2 x 11 inches) I, (Name — print) (Position in business) the undersigned, am the with the authority to act for and on behalf of , certify under penalty of perjury (Name of business and/or contractor) that the records or copies thereof submitted and consisting of (Description, number of pages) are, the originals or true, full, and correct copies of the originals which depict the payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. Date: Signature: A public entity may require a stricter and/or more extensive form of certification. T.ARC1R C T)V.. 1776. (a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. (b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis: (1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor. (c) The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division. The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a). (d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft -Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labor-management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number. (f) (1) Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency included in the Joint Enforcement Strike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. (2) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good ,faith in compliance with this subdivision. (g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address. (h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section. (i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. (j) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section. RESTATED AGREEMENT AND DECLARATION OF TRUST FOR THE CENTER FOR CONTRACT COMPLIANCE This Agreement and Declaration of Trust is made and entered into in the County of Los Angeles, State of California, upon the considerations hereinafter set forth, by and among the following parties: EMPLOYER ASSOCIATIONS: 1. Associated General Contractors of California, Inc. 2. Building Industry Association of Southern California Inc. 3. Engineering Contractors Association 4. Southern California Contractors Association, Inc. UNIONS: 1. Southern California District Council of Laborers and its Affiliated Local Unions TRUSTEES: Employer Trustees Union Trustees Dick Chapman Mike Quevedo, Jr. Jerald Laird Sergio Rascon Ted Page John Smith Tom Salata Joe Ward ARTICLE 1. REASONS FOR AGREEMENT 1.1 The Unions and Associations have entered into Collective Bargaining Agreements which provide, among other things, for the maintenance of the Center for Contract Compliance. 1.2 The Unions and Associations desire to maintain the Center for Contract Compliance as a committee within the meaning of the Labor Management Cooperation Act of 1978 for purposes of improving job security, enhancing economic development and improving labor-management relationships and organizational effectiveness by educating employers, employees and public agencies of the governmental requirements for payment of wages and fringe benefits on public works construction projects, by monitoring the compliance of employers, employees and public agencies with these governmental requirements and by duly petitioning the government for redress or otherwise taking responsible legal action to secure compliance with the laws governing employment on public works construction projects by such Associtations. If such procedures provide for the appointment, removal or replacement of one or more Trustees by particular Association or group thereof, the Fund shall be advised in writig by the Associations as to which of the Associations has such right as to which Employer Trustee. Should any such particular Association no longer be a party to this Trust and to the Collective Bargaining Agreements, then the remaining Associations shall advise the Fund in writing which of the remaining Associations then has'such right as to which Trustee. ARTICLE 4. CREATION OF COMMITTEE 4.1 Name of Committee — There is established the Center for Contract Compliance, which shall be a committee within the meaning of the Labor Management Cooperation Act of 1978, 29 U.S.C. § 175a(a)(1). 4.2 . Purpose of Committee — The purposes of the Committee shall be those enumerated in § 6(c)(2) of the Labor Management Cooperation Act of 1978, 29 U.S.C. § 175a(a)(1)(3), and specifically, for improving labor-management relationships, job security, organizational effectiveness, and enhancing econorr�ic development. 4.3 Assets of Committee — The assets of the Committee shall consist of contributions from Employers and Unions and from any other source, together with any other monies or property which the Trustees acquire. RECEIVED BY: -(Name) (Date) ' CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office after signing/dating J j CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: Shari=Freidenrich, City Treasurer DATE: SUBJECT: Bond Acceptance I have received the bonds for (Company Name) Faithful Performance Bond No. Labor and Material Bond No. Monument Bond No. Maintenance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. MSC No. Approved g /1 ' ,��.- A enda Item No.l (Co/ hcil Approval,Date) City Clerk Vault No. .� #27 g1followup/bondletter.doc °�� City 9 Of Huntington Beach INTER -DEPARTMENT COMMMUNICATION HUNTINGTON BEACH TO: THOSE LISTED HEREON FROM: Duane D. Wentworth, Contract Administrator DATE: 7/3/13 SUBJECT: Retention Release Payment Company Name: Kana Pipeline, Inc. Address: 1639 Miraloma Ave. City, State and Zip Code: Placentia, CA 92870 Phone Number: (714) 968-1400 Business License Number: A153104 Local Address: NSA Notice of Completion Date: 6/7/13 Contract Purpose: CC 1412 -Sunset Beach Water Main Replacement The conformed copy of the Notice of Completion for the above contract has been filed. The thirty-five (35) day waiting period has elapsed or will elapse before payment is made. Processing of the retention payment is recommended so long as no stop notices or outstanding invoices are on file with the City. I certify that no stop notices are on file on the subject at this time. t Z_� `. ate Travis K. tiHgA�1ns, Public Works Director I certify that there' are no outstanding invoices on file. -�JI(f13 Date cks, Dop�ty City Treasurer I certify that no stop notices are on file on the subject contract, and that a guaranty bond has been filed with this office. J DO e Jan Flynn Clerk 1412 Retention Release 3 signatue form 7/2/2013 2:53:00 PM PLEASE COMPLETE THIS INFORMATION This Document was electronically recorded by City of Huntington Beach RECORDING REQUESTED BY: WHEN RECORDED MAIL TO: CITY OF HUNTINGTON BEACH -Attn: Duane D. Wentworth P.O. Box 190 — 2000 Main Street Huntington Beach, CA 92648 TITLE OF DOCUMENT Recorded in Official Records, Orange County Hugh Nguyen, Clerk -Recorder II IIIII III 11111111111111111111111111111111111111111111111111111111111 IIIIINO FEE 2013000346483 09:07am 06/07/13 93 406 N12 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 THIS SPACE FOR RECORDER'S USE ONLY NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN by the City of Huntington Beach, owner in fee, 2000 Main Street, Huntington Beach, CA 92648, that the contract heretofore awarded to Kana Pipeline, Inc. who was the company thereon for doing the following work to -wit: WATER MAIN REPLACEMENT PROJECT -SUNSET BEACH, CONSTRUCTION CONTRACT-1412 That said work was completed June 7, 2013 by said company according to plans and specifications and to the satisfaction of the City Engineer of the City of Huntington Beach and that said work was accepted by the Director of Public Works on June 7, 2013, per City Council Resolution No. 2003-70 adopted October 6, 2003. That upon said contract Fidelity and Deposit Company of Maryland was surety for the bond given by the said company as required by law. This document is solely for the official business of the City of Huntington Beach, as contemplated under Government Code Section 6103 and should be recorded free of charge. Dated at Huntington Beach, California, this June 7, 2013 .4Jt r of orks or City Engineer 1 City of Huntington Beach, California STATE OF CALIFORNIA) County of Orange ) ss: City of Huntington Beach ) I, the undersigned, say: I am an Agent of the City of Huntington Beach, owner in fee, in the foregoing NOTICE OF COMPLETION. I have read said NOTICE OF COMPLETION and know the contents thereof; the same is true of my knowledge. I declare under penalty of perjury that the foregoing is true and correct, and that said NOTICE OF COMPLETION was duly and regularly ordered to be recorded in the Office of the County Recorder of Orange County. Dated at Huntington Beach, California, this October 4, 2012. D' ector of Public Works or City Engineer This document is solely the official business of ity of Huntington Beach, California the City of Huntington Beach, as contemplated 4tt under Government code section. 6103 and should be recorded free of charge. THIS PAGE IS ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) Certification of Compliance with Prevailing Wage Laws To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Prevailing Wage Laws Contract: Project: j I A& C h UA 0 e WA+ -aa The undersigned contractor on the above -referenced project (" Project) hereby certifies that all laborers, mechanics, apprentices, trainees, watchmen and guards employed by him or by any subcontractor performing work under the contract for the Project have been paid pursuant to the minimum wage and bona fide fringe benefit -requirements specified for each particular classification of work, as set forth in the wage -rate determinations of the State of California, Department of Industrial Relations, and/or the United States Department of Labor. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this 2 S' day ofy-y r' c , 20j_.L at t �� �� ,� , California. (7jpe Contractor Name) By: _ Name Title: [Type Name] [Type Title] TO low cC�tA =-.6 Y M 1iPigsY -rUy 03• ab - 04 197SaI Certifficatton of Compliance with Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 Contract: CC I y 1 Z The undersigned contractor on the above -referenced project CProjeco hereby certifies that it has complied with Title VII of the Civil Rights Act, the Equal Opportunity Act of 1972 and Executive Order 11246, and has not discriminated against any employee or applicant for employment because of race, creed, color, sex, national origin, age or disability. The undersigned contractor also certifies that it has not maintained any segregated facilities at its establishments on the basis of race, creed, color, sex, national origin, age or disability (with the exception of access for the disabled). I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this -ZS - day of tTUX e- , 20/, at 114c.e'114, California. /t.,o -e A (Type Contractor Name) By: Nam Title JU B • up U5911.1 RECEIVED BY: CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office (Name) after signing/dating (Date) 0 . CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: Slha r-Fr-eide ch, Qity Treasurer FROM: �t DATE:��� SUBJECT: Bond Acceptance I have received the bonds for (Company Name) Faithful Performance Bond No. Labor and Material Bond No. Monument Bond No. Maintenance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. MSC No. Approved�1, Agenda Item No. (Cod nctrAppro�a4Date) City Clerk Vault No. #27 g1followup/bondletter.doc Bond No.: 9075508-M R WNTENANCE EON® KNOW ALL MEN BY THESE PRESENTS: That Kane Pipeline, Inc. rconmKI rs namel 1639 E, Miraloma Avenue 1oonhad0ft ste>st aide, city and oft and zip code] as Principal (hereinafter called Contractor), and: Fidelity and Deposit Company of Maryland tsuretys name] 1400 American Lane, Schaumburg, IL 60196 tsuftft sheet address, city and state and zip code] a corporation organized and exisdng under the laws of the State of Maryland with its principal office in the City of Los Angeles as Surety (hereinafter oiled Surety), are held firmly bound unto CITY OF HUNTINGTON BEACH as Obligee (hereinafter called Owner), in the amount of Payment whereof Contractor anc and assigns, jointly and severally, (s 1,324,306.75-- ), for the executors, administrators, suers, 'Six and 75/100 WHEREAS, Contractor has by written agreement dated entered into a contract with Owner for the Water Main Replacement Project, Sunset Beach - Various Locations from Anderson Street to Warner Avenue CC No. 1412 In ac ordarim with drawings and specifications prepared by which contract Is by reference made a part hereof (hereinafter referred to as the Contract); and WHEREAS, the Contract provides that the principal will guarantee, for a period of 20l year, the work performed as part of the Contract from and against all deflects in materials and workmanship; and WHEREAS, the Contrast also provides that the Contractor shall secure Contractors obligations during the one- year period with a bond executed by a surety duly admitted in the state of California; and the Contract has been completed, and the Owner, Contractor and Surety agree that the commencement date for this Guarantee and Bond shall be June 7 2013 NOW, THEREFORE, THE CONDITION OF THIS OBUGATION is such that If Contractor shall, for a penod of one year from and after the date of completion and acceptance of the Contract by Owner, repair and/or replace any and all defects arising in the Work, whether resulting from defective materials or defective workmanship, then this obligation shall be null and void; otherwise it will remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the Owner. Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Surety shall, within thirty (30) folloining Owners written notice of default either. (a) remedy the default or (b) shall promptly complete the Contract to accordance with its terms and conditions. Surety shall save the Owner harmless from any claims, judgments, liens or losses arising from the Surety's failure to ether remedy the default or to complete the Contract in accordance with its terms and conditions in a timely manner. Whenever the Principal shall be, and declared by the Owner to be in default under the Contract which shall include without limitation, any breach or default of the Contract , then, after written notice frorn the Owner to the Surety, as provided for below, the Surety shall either: (a) remedy the default or breach by the Principal; or (b) shall promptly and faithfully take charge of the Work and complete the Work In accordance with the requirements of the Contract with a contractor ether than the Principal, at its own expense, and make available 10-2567130583 as work program sufficient funds to pay the cost of completion less the unpaid balance of the CaibW Including other coals and damages for which the surely may be liable hereunder, provided, however, that the procedure by which the Surety undertakes to discharge ils obligations under this Bond shall be subject to the advance written approval of the Owner. Min thirty (30) days after Surety's receipt of a written notice from Owner of the fallure of performance of the Contract by the Principal, I tell be the duty of the Surety to give to the Owner a notice, In writing, of the Surety's election to (a) remedy the defaults) of the Principal promptly, or (b) arrange for performance of the Contract promptly by a contractor other than the Principal, time being of essence to this Bond. In said Notice of Election, the Surety shall state the date of commencement of Its cure or remedy of the Principal's defaults) or Its Performance of the Contract. The Surety's obligations for cure or remedy, Include but are not limited to: correction of defective work and completion of the Contract additional legal, design professional and delay costs arising from Surety's actions or failure to act and liquidated damages (or if no liquidated damages are specified in the Contract, actual damages caused by delayed performance or non- performance by the Principal). The Surety shall give prompt written notice to the Owner upon completion of the cure or remedy of the Prindpars Betake) of its performance of the Contract. If the Surety does Issue its Notice of Election and does not proceed to cure or remedy the Principars defaults) of its performance of the Work within thirty (30) days Mar reoeipt of a written notice from Owner, Surety shall be deemed to be in default on this bond, and the Owner shall be entitled to enforce any remedy available to Owner. No right of action shall acme on this bond to or for the use of any person or corporation other than the Owner named herein or the successors of Owner. Signed and sealed this 24th ' day of Principal Raised Corporate Seal (f1 MBE AFFIXED] Principal Raised Corporate Seal (Al1t W BE AFFIXED] NOTES: AdteWA8ftffwft Met be wn1pleWd and MIumed as W of ft bond. Raised Corporate Seats are rnamatm Please WaM Power of Atarney. June 20 13 Kane Pipeline, Inc. (Contn�cor Name) By: (sear �?A�►�L_ Loch, przG:sr('1--1.Ti- l� i 09)T (ram) Fidelity and Deposit Company of Maryland (Surety Name) By: _--. A / (Seal)Kim I_ u, Attomey-in-Fad Califomia AH-Pu rR®se Acknowledgement State of California County of _ Orange On 2(0 -.b I-3) before me, Hernes Salvador-Tabadero Notary Public We Name & Tide of Officer personally appeared Daniel Locke Name(s) of Sigrtws) who proved to me on the basis of satisfactory evidence to be the person(a) whose name(s) islae subscribed to the within instrument and acknowledged to me that he/she/they executed the same in hislwdtheir authorized capacity(ies), and that by his/her/their signatures(-s) on the instrument the person(s), or the entity upon behalf of which the person( racted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true & correct. WITNESS my hand & official seal. I� SAEY� f�pERp + - V cOIVeM- # 18914SI V�+�— • �oraer iwwe - WHIM A Sipa of Notary Public ®� COIINlnI n CQEIY. 6JfPIRES MAY 2814 -` Notary Seal Optional Information Description of Attached Document: Title or Type of Document: W A 10 TE� �) �, Pee, '�oU D -- ,91,9 fia-kt-- Document Date: rP 1-24I20 / -,;'j Number of Pages: Signer(s) Other Than Named Above: K r M LW Other information: CALIFORNIA AL61PURPOSE ACKNOWLEDGMENT =�=�r._•�--�_ay��_ e::ns_� a�..�,. aa+:__'.��'iat:�t_._ akac..3��,�:�...a�a<�a..ai... a .>sa. �,L a,._ a�a.�%. v State of California County of Orange On JUN 2 4 2013 before me, Heather R. Saltarelli, Notary Public Data a and TiN Of IW ON= personally appeared Kim Luu a HEATHER R. SALTAREW CommlBsion # 1097303 z Notary Public • California z Z Orange County %F AAy Comm. Expires Jul 27. 2014 Pwce ►,emry seal Above who proved to me on the basis of satisfactory evidence to be the person(S) whose name($) is/W subscribed to the within instrument and acknowledged to me that WsheflNt3fy executed the same in Ms/her/tMW authorized capacity(!), and that by UtherAV Ot signature(b) on the instrument the person(b), or the entity upon behalf of which the person($) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature signature of not"'Ir OPTIONAL Though the informallon below is not required by taw, it may prove valuable to persons relying on the do=nent and could prevent fraudulent removal and reattachment of this form to another document Description of Attached Document Title or Type of Document Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signers Name: ❑ individual ❑ Corporate Officer—Title(s): — ❑ Partner — ❑ Umited ❑ General IN Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: !RIG1a3:THUt.18pR1(JT e OF., SIutJEF ., `a Number of Pages: Signers Name: ❑ individual ❑ Corporate Officer — Tftle(s): _ ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Al HTTH UI 3Pr-1tlT. GF,SIGYER,n ®2arr Mattare nteery &%So*aaon• s3so oa soro AM. as egxiao2• cnatworm, cn $1313.2aaz• atbmN w i"g uam a5em . canToo-F= j eoaera5W 9075508—M Bond Number City of Huntington Beach Obligee ZURICH AMERICAN INSURANCE COMPANY COLONIAL. AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by THOMAS 0. MCCLELLEN, Vice President, in pursuance of authority granted by Article V. Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and arc hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint James A. SCHALLER, Mike PARIZINO, Nanette MYERS, Rochelle RHEAULT, Rhonda C. ABEL, Kim LUU and Jeri APODACA, as of Newport Beach, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York. New Yak., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at it-, office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills. Maryland., in their own proper persons. This power of attorney revokes that issued on behalf of James A. SCHALLER. Mike PARAZINO. Nanette MYERS, Rochelle RHEAULT. Rhonda C. ABEL. Kim LUU. Jeri APODACA. dated June 23. 2011. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V. Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 25th day of July, A.D. 2011. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND soup SBAL ip YP/l r4 Bir"tent Secretor ice President •nc D. Barlies ronras 7(;Iellen State of Maryland City of Baltimore On this 251h day of July. A.D. 2011. before Thar subscriber, a Notary 1aJblh: of the State of Maryland, duly commissioned and qualined. THOMAS O. MCCLELLk N, Vice President, and ERIC D. BARNES, Assistant Secretary, of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of saint. and being by nit duly sworn. depuseth and safth, that he/she is the said otlicer of the Company aforesaid, and that the "— K affixed to the preceding instrument are the Corporate Seals of said Companies, and that The said Corporate Seals and the signature a such officer were duly : rlixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF. I have hereunto set my hand and a� ►,ted wy Official Seal the day and year first above written. POA-F 012-9310Q l RECEIVED BY- ` `(Name),, (Date) CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office after signing/dating CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: Shari Freidenrich, City Treasurer FROM: 0_Z,&A _j ' DATE: 916 SUBJECT: Bond Acceptance I have received the bonds for Faithful Performance Bond No. Labor and Material Bond No. Monument Bond No. Maintenance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. Z�� MSC No. Approved (Council Approval Date) (Company Name) 90 Jr Agenda Item No. City Clerk Vault No #27 gAollowup/bondletter.doc CITY FUNDED CONSTRUCTION CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND KANA PIPELINE, INC. FOR WATERMAIN REPLACEMENT PROJECT, SUNSET BEACH - VARIOUS LOCATIONS - CC# 1412 TABLE OF CONTENTS Page No. 1. STATE OF WORK; ACCEPTANCE OF RISK 1 2. ACCEPTANCE OF CONDITIONS OF WORK; PLANS 2 3. COMPENSATION 4 4. COMMENCEMENT OF PROJECT 4 5. TIME OF THE ESSENCE 4 6. CHANGES 5 7. NOTICE TO PROCEED 6 8. BONDS 6 9. WARRANTIES 7 10. INDEPENDENT CONTRACTOR 7 11. LIQUIDATED DAMAGES/DELAYS 7 12. DIFFERING SITE CONDITIONS 9 13. VARIATIONS IN ESTIMATED QUANTITIES 10 14. PROGRESS PAYMENTS 11 15. WITHHELD CONTRACT FUNDS, SUBSTITUTION OF SECURITIES 11 16. AFFIDAVITS OF SATISFACTION OF CLAIMS 12 17. WAIVER OF CLAIMS 12 18. INDEMNIFICATION, DEFENSE, HOLD HARMLESS 12 19. WORKERS' COMPENSATION INSURANCE 13 20. INSURANCE 14 21, CERTIFICATES OF INSURANCE; ADDITIONAL INSURED 14 22. NOTICE OF THIRD PARTY CLAIM 15 23. DEFAULT & TERMINATION 16 24. TERMINATION FOR CONVENIENCE 16 25. DISPOSITION OF PLANS, ESTIMATES AND OTHER 17 26. NON -ASSIGNABILITY 17 27. CITY EMPLOYEES AND OFFICIALS 17 28. STOP NOTICES 17 29. NOTICES 18 30. SECTION HEADINGS 18 31. IMMIGRATION 19 32. LEGAL SERVICES SUBCONTRACTING PROHIBITED 19 33. ATTORNEY'S FEES 19 34 INTERPRETATION OF THIS AGREEMENT 19 35. GOVERNING LAW 20 36. DUPLICATE ORIGINAL 21 37. CONSENT 21 38. SURVIVAL 21 39, MODIFICATION 21 40. SIGNATORIES 21 41. ENTIRETY 21 CITY FUNDED CONSTRUCTION CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND KANA PIPELINE, INC. FOR WATERMAIN REPLACEMENT PROJECT, SUNSET BEACH - VARIOUS LOCATIONS -CC# 1412 THIS AGREEMENT ("Agreement") made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and KANA PIPELINE, INC., a California Corporation, hereinafter referred to as "CONTRACTOR." WHEREAS, CITY has solicited bids for a public works project, hereinafter referred to as "PROJECT," more fully described as WATERMAIN REPLACEMENT PROJECT, SUNSET BEACH - VARIOUS LOCATIONS -CC# 1412 in the City of Huntington Beach; and CONTRACTOR has been selected to perform said services, NOW, THEREFORE, in consideration of the promises and agreements hereinafter made and exchanged, the parties covenant and agree as follows: 1. STATEMENT OF WORK; ACCEPTANCE OF RISK CONTRACTOR shall complete and construct the PROJECT pursuant to this Agreement and the Contract Documents (as hereinafter defined) and furnish, at its own cost and expense, all labor, plans, tools, equipment, supplies, transportation, utilities and all other items, services and facilities necessary to complete and construct the PROJECT in a good and workmanlike manner. CONTRACTOR agrees to fully assume the risk of all loss or damage arising out of the nature of the PROJECT, during its progress or prior to acceptance by g/agree/surfnet/cityconst 1 of 22 12/11 CITY, from the action of the elements, from any unforeseen difficulties which may arise or be encountered in the prosecution of work, and for all other risks of any description in connection with the work, including, but not limited to, all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as are herein expressly stipulated to be borne by CITY, and for well and faithfully completing the work within the stipulated time and in the manner shown and described in this Agreement, and in accordance with the requirements of CITY for the compensation set forth in the accepted bid proposal. 2. ACCEPTANCE OF CONDITIONS OF WORK; PLANS AND SPECIFICATIONS CONTRACTOR acknowledges that it is fully familiar with all the terms, conditions and obligations of this Agreement and the Contract Documents (as defined below in this Section), the location of the job site, and the conditions under which the work is to be performed, and that it enters into this Agreement based upon its thorough investigation of all such matters and is relying in no way upon any opinions or representations of CITY. It is agreed that the Contract Documents are incorporated into this Agreement by this reference, with the same force and effect as if the same were set forth at length herein, and that CONTRACTOR and its subcontractors, if any, shall be bound by the Contract Documents insofar as they relate in part or in any way, directly or indirectly, to the work covered by this Agreement. "Contract Documents" as defined herein mean and include: A. This Agreement; g/agree/surfnet/cityconst 2 of 22 12/11 B. Bonds covering the work herein agreed upon; C. The CITY's standard Plans and Specifications and special contractual provisions, including those on file in the office of the Director of Public Works of CITY and adopted by the City Council, and any revisions, amendments or addenda thereto; D. The current edition of Standard Specifications for Public Works Construction, published by Builders' News, Inc., 10801 National Boulevard, Los Angeles, CA 90064, and all amendments thereto, written and promulgated by the Southern California chapter of the American Public Works Association and the Southern California District Associated General Contractors of the California Joint Cooperative Committee; E. Bid documents including the Notice Inviting Bids, the Special Instructions to Bidders and the CONTRACTOR's proposal, (which is attached hereto as Exhibit "A" and incorporated herein by this reference); F. The particular Plans, Specifications, Special Provisions and Addenda applicable to the PROJECT. Anything mentioned in the Specifications and not indicated in the Plans or indicated in the Plans and not mentioned in the Specifications, shall be of like effect as if indicated and mentioned in both. In case of a discrepancy between any Plans, Specifications, Special provisions, or Addenda, the matter shall be immediately submitted by CONTRACTOR to the g/agree/surfnet/cityconst 3 of 22 12/11 Department of Public Works of CITY (hereinafter referred to as "DPW"), and CONTRACTOR shall not attempt to resolve or adjust the discrepancy without the decision of DPW, save only at its own risk and expense. Should there be any conflict between the terms of this Agreement and the bid or proposal of CONTRACTOR, then this Agreement shall control and nothing herein shall be considered as an acceptance of the terms of the bid or proposal which is in conflict herewith. 3. COMPENSATION CITY agrees to pay and CONTRACTOR agrees to accept as full compensation for the faithful performance of this Agreement, subject to any additions or deductions made under the provisions of this Agreement or the Contract Documents, a sum not to exceed One million, two hundred and ninety five thousand, four hundred and thirty Dollars ($1,295,430.00), as set forth in the Contract Documents, to be paid as provided in this Agreement. 4. COMMENCEMENT OF PROJECT CONTRACTOR agrees to commence the PROJECT within ten (10) working days after the Notice To Proceed is issued and diligently prosecute the PROJECT to completion within two hundred (200) consecutive working days from the day the Notice to Proceed is issued by DPW, excluding delays provided for in this Agreement. 5. TIME OF THE ESSENCE The parties hereto recognize and agree that time is of the essence in the performance of this Agreement and each and every provision of the Contract Documents. g/agree/surfnet/cityconst 4 of 22 12/11 CONTRACTOR shall prepare and obtain approval as required by the Contract Documents for all shop drawings, details and samples, and do all other things necessary and incidental to the prosecution of its work in conformance with the progress schedule set forth in the Contract Documents. CONTRACTOR shall coordinate its work with the work of all other contractors, subcontractors, and CITY forces working on the PROJECT in a manner that will facilitate the efficient completion of the PROJECT and in accordance with the terms and provisions of this Agreement. CITY shall have complete control of the premises on which the work is to be performed and shall have the right to decide the time and order in which the various portions of the work shall be performed and the priority of the work of other contractors, subcontractors and CITY forces and, in general, all matters concerning the timely and orderly conduct of the work of CONTRACTOR on the premises. 6. CHANGES CONTRACTOR shall adhere strictly to the plans and specifications set forth in the Contract Documents unless a change therefrom is authorized in writing by DPW. CONTRACTOR agrees to make any and all changes, furnish materials and perform all work necessary within the scope of the PROJECT as DPW may require in writing. Under no condition shall CONTRACTOR make any changes without the prior written order or acceptance of DPW, and CITY shall not pay any extra charges made by CONTRACTOR that have not been agreed upon in writing by DPW. When directed to change the work, CONTRACTOR shall submit immediately to DPW a written cost proposal reflecting the effect of the change. Should DPW not agree to such cost proposal, the work shall be performed according to the g/agree/surfnet/cityconst 5 of 22 12/11 changes ordered in writing by DPW and the proper cost thereof shall be negotiated by the parties upon cost and pricing data submitted by CONTRACTOR; thereupon, CITY will promptly issue an adjusted change order to CONTRACTOR and the contract price will be adjusted upward or downward accordingly. 7. NOTICE TO PROCEED No work, services, material, or equipment shall be performed or furnished under this Agreement unless and until a Notice to Proceed has been given to CONTRACTOR by CITY. CITY does not warrant that the work will be available on the date the Notice to Proceed is issued. In the event of a delay in commencement of the work due to unavailability of the job site, for any reason, relief to CONTRACTOR shall be limited to a time extension equal to the delay due to such unavailability. Only bonds issued by California admitted sureties will be accepted. CONTRACTOR shall, prior to its performance of this Agreement, furnish the following two (2) bonds approved by the City Attorney: One in the amount of one hundred percent (100%) of the contract price to guarantee the CONTRACTOR's faithful performance of the work, and one in the amount of one hundred percent of the contract price to guarantee payment of all claims for labor and materials furnished. In addition, CONTRACTOR shall submit to CITY a bond in the amount of one hundred percent (100%) of the final contract price, including all change orders, to warrant such performance for a period of one (1) year after CITY's acceptance thereof within ten (10) days of filing of the Notice of Completion. g/agree/surfnet/cityconst 6 of 22 12/11 9. WARRANTIES CONTRACTOR unconditionally guarantees all work done under this Agreement including, but not limited to, any workmanship, installation, fabrication, material or structural facilities constructed. CONTRACTOR, within ten (10) days after notice by CITY of any defect in the work, shall have the option to make appropriate repairs or replace the defective item or items. Upon expiration of such ten (10) day period, CITY may then make appropriate repair or replacement at CONTRACTOR's risk and own cost and expense. 10. INDEPENDENT CONTRACTOR It is understood and agreed that CONTRACTOR is, and shall be, acting at all times hereunder as an independent contractor and not an employee of CITY. CONTRACTOR shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONTRACTOR and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services performed hereunder. 11. LIQUIDATED DAMAGES/DELAYS It is agreed by the parties hereto that in case the total work called for hereunder is not in all parts and requirements finished or completed within the number of calendar days as set forth herein, damage will be sustained by CITY; and that it is, and would be, impractical and extremely difficult to ascertain and determine the actual damage which CITY would sustain in the event of and by reason of such delay. It is, therefore, agreed that CONTRACTOR will pay to CITY, as liquidated damages and not as a penalty, g/agree/surfnet/cityconst 7 of 22 12/11 the sum of Five Hundred Dollars ($500) per day for each and every working day's delay in completing the work in excess of the number of working/calendar days set forth herein, which represents a reasonable endeavor by the parties hereto to estimate a fair compensation for the foreseeable damages CITY would sustain in the event of and by reason of such delay; and CONTRACTOR agrees to pay these damages herein provided, and further agrees that CITY may deduct the amount thereof from any monies due or that may become due to CONTRACTOR hereunder. CONTRACTOR will be granted an extension of time and will not be assessed damages for any portion of the delay in the completion of the work due to unforeseeable causes beyond the control and without the fault or negligence of CONTRACTOR, including, but not limited to, acts of God or of the public enemy, fire, floods, epidemics, quarantine restrictions, strikes, unsuitable weather, or delays of subcontractors due to such causes. CONTRACTOR shall, within fifteen (15) days from the beginning of any such delay (unless DPW shall grant a further period of time), notify DPW in writing of the cause of the delay and CITY shall extend the time for completing the work if, in its judgment, the findings of fact thereon justify the delay; and the decision of DPW shall be conclusive on the parties hereto. Should CONTRACTOR be delayed in the prosecution or completion of the work by the act, neglect or default of CITY, or should CONTRACTOR be delayed by waiting for materials required by this Agreement to be furnished by CITY, or by damage caused by fire or other casualty at the job site for which CONTRACTOR is not responsible, or by the combined action of the workers, in no way caused by or resulting g/agree/surfnet/cityconst 8 of 22 12/11 from default or collusion on the part of CONTRACTOR, or in the event of a lockout by CITY, then the time herein fixed for the completion of the work shall be extended by the number of days CONTRACTOR has thus been delayed, but no allowance or extension shall be made unless a claim therefor is presented in writing to CITY within fifteen (15) days of the commencement of such delay. No claims for additional compensation or damages for delays, irrespective of the cause thereof, and including without limitation the furnishing of materials by CITY or delays by other contractors or subcontractors, will be allowed and an extension of time for completion shall be the sole remedy of CONTRACTOR. 12. DIFFERING SITE CONDITIONS A. Notice: CONTRACTOR shall promptly, and before such conditions are disturbed, notify DPW in writing of: (1) Subsurface or latent physical conditions at the job site differing materially from those indicated in this Agreement or the Contract Documents; or (2) Unknown physical conditions at the job site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent to work of the character to be performed under this Agreement. DPW shall promptly investigate the conditions and if it finds that such conditions do materially so differ and cause an increase or decrease in the time required for performance of any part of the work under this Agreement, whether or not changed as a result of g/agree/surfnet/cityconst 9 of 22 12/11 such conditions, an equitable adjustment shall be made and the agreement modified in writing accordingly. B. Time Extension: No claim of CONTRACTOR under this Section shall be allowed unless CONTRACTOR has given the notice required hereunder provided, however, the time prescribed therefor may be extended by CITY. 13. VARIATIONS IN ESTIMATED QUANTITIES The quantities listed in the bid schedule will not govern final payment. Payment to CONTRACTOR will be made only for the actual quantities of contract items used in construction of the PROJECT, in accordance with the plans and specifications. Upon completion of the PROJECT, if the actual quantities used are either more than or less than the quantities listed in the bid schedule, the bid price shall prevail subject to the provisions of this Section. DPW may, at its sole discretion, when warranted by the facts and circumstances, order an equitable adjustment, upwards or downwards, in payment to CONTRACTOR where the actual quantities used in construction of the PROJECT are in variation to the quantities listed in the bid schedule. No claim by CONTRACTOR for an equitable adjustment in price or time for completion shall be allowed if asserted after final payment under this Agreement. If the quantity variation is such as to cause an increase in the time necessary for completion, DPW shall ascertain the facts and circumstances and make such adjustment for extending the completion date as in its sole judgment the findings warrant. g/agree/surfnet/cityconst 10 of 22 12/11 14. PROGRESS PAYMENTS Each month DPW will make an estimate in writing of the work performed by CONTRACTOR and the value thereof. From each progress estimate, five percent (5%) will be deducted and retained by CITY and the remainder of the progress estimate, less the amount of all previous payments since commencement of the work, will be paid to CONTRACTOR. When CONTRACTOR has, in the judgment of DPW, faithfully executed fifty percent (50%) or more of the value of the work as determined from the bid schedule, and if DPW finds that satisfactory progress has been and is being made, CONTRACTOR may be paid such sum as will bring the payments of each month up to one hundred percent (100%) of the value of the work completed since the commencement of the PROJECT, as determined in its sole discretion by DPW, less all previous payments and less all previous retained amounts. CITY's final payment to CONTRACTOR, if unencumbered, or any part thereof unencumbered, shall be made thirty-five (35) days after the acceptance of the work and the filing of a Notice of Completion by CITY. Provided, however, that in the event of a dispute between CITY and CONTRACTOR, CITY may withhold from the final payment an amount not to exceed 150 percent of the value of any disputed amount of work. Payments shall be made on demands drawn in the manner required by law, each payment to be accompanied by a certificate signed by DPW, affirming that the work for which payment is demanded has been performed in accordance with the terms of the Agreement and that the amount stated in the certificate is due under the terms of the Agreement. Partial payments on the contract price shall not be considered as a acceptance of any part of the work. g/agree/surfnet/cityconst 11 of 22 12/11 15. WITHHELD CONTRACT FUNDS, SUBSTITUTION OF SECURITIES At the request and at the sole cost and expense of CONTRACTOR, who shall retain beneficial ownership and receive interest, if any thereon, CITY shall permit the substitution and deposit therewith of securities equivalent to the amount of any monies withheld by CITY to ensure performance under the terms of this Agreement. 16. AFFIDAVITS OF SATISFACTION OF CLAIMS After the completion of the work contemplated by this Agreement, CONTRACTOR shall file with DPW its affidavit stating that all workers and persons employed, all firms supplying materials and all subcontractors working upon the PROJECT have been paid in full and that there are no claims outstanding against the PROJECT for either labor or material, except certain items, if any, to be set forth in CONTRACTOR's affidavit covering disputed claims, or items in connection with Notices to Withhold, which have been filed under the provisions of the statutes of the State of California. 17. WAIVER OF CLAIMS The acceptance by CONTRACTOR of the payment of the final certificate shall constitute a waiver of all claims against CITY under or arising out of this Agreement. 18. INDEMNIFICATION, DEFENSE, HOLD HARMLESS CONTRACTOR hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents, and volunteers from and against any and all, claims, damages, losses, expenses, judgments, demands defense costs, and consequential damage or liability of any kind or nature, however caused, including those resulting from death or injury to CONTRACTOR's g/agree/surfnet/cityconst 12 of 22 12/11 employees and damage to CONTRACTOR's property, arising directly or indirectly out of the obligations or operations herein undertaken by CONTRACTOR, caused in whole or in part by any negligent act or omission of the CONTRACTOR, any subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including but not limited to concurrent active or passive negligence, except where caused by the active negligence, sole negligence, or willful misconduct of the CITY, its officers, elected or appointed officials, employees, agents, and volunteers. CONTRACTOR will conduct all defense at its sole cost and expense and CITY shall approve selection of CONTRACTOR's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR. 19. WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE Pursuant to California Labor Code Section 1861, CONTRACTOR acknowledges awareness of Section 3700 et seq. of this Code, which requires every employer to be insured against liability for workers' compensation; CONTRACTOR covenants that it will comply with such provisions prior to commencing performance of the work hereunder. CONTRACTOR shall obtain and furnish to City workers' compensation and employer's liability insurance in an amount of not less than the State statutory limits. CONTRACTOR shall require all subcontractors to provide such workers' compensation and employer's liability insurance for all of the subcontractors' employees. g/agree/surfnet/cityconst 13 of 22 12/11 CONTRACTOR shall furnish to CITY a certificate of waiver of subrogation under the terms of the workers' compensation and employer's liability insurance and CONTRACTOR shall similarly require all subcontractors to waive subrogation. 20. INSURANCE In addition to the workers' compensation and employer's liability insurance and CONTRACTOR's covenant to defend, hold harmless and indemnify CITY, CONTRACTOR shall obtain and furnish to CITY, a policy of general public liability insurance, including motor vehicle coverage covering the PROJECT. This policy shall indemnify CONTRACTOR, its officers, employees and agents while acting within the scope of their duties, against any and all claims arising out or in connection with the PROJECT, and shall provide coverage in not less than the following amount: combined single limit bodily injury and property damage, including products/completed operations liability and blanket contractual liability, of One Million Dollars ($1,000,000) per occurrence. If coverage is provided under a form which includes a designated general aggregate limit, the aggregate limit must be no less than One Million Dollars ($1,000,000) for this PROJECT. This policy shall name CITY, its officers, elected or appointed officials, employees, agents, and volunteers as Additional Insureds, and shall specifically provide that any other insurance coverage which may be applicable to the PROJECT shall be deemed excess coverage and that CONTRACTOR's insurance shall be primary. Under no circumstances shall said above -mentioned insurance contain a self - insured retention without the express written consent of CITY; however an insurance policy "deductible" of $5,000.00 is permitted. g/aggee/surfnet/cityconst 14 of 22 12/11 21. CERTIFICATES OF INSURANCE, ADDITIONAL INSURED ENDORSEMENTS Prior to commencing performance of the work hereunder, CONTRACTOR shall furnish to CITY certificates of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverages as required by this Agreement; the certificates shall: 1. provide the name and policy number of each carrier and policy; 2. state that the policy is currently in force; and 3. promise to provide that such policies will not be canceled or modified without thirty (30) days' prior written notice of CITY. CONTRACTOR shall maintain the foregoing insurance coverages in force until the work under this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverages shall not derogate from the CONTRACTOR's defense, hold harmless and indemnification obligations as set forth under this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of all the policies of insurance. CONTRACTOR shall pay, in a prompt and timely manner, the premiums on all insurance hereinabove required. CONTRACTOR shall provide a separate copy of the additional insured endorsement to each of CONTRACTOR's insurance policies, naming CITY, its officers, elected and appointed officials, employees, agents and volunteers as Additional Insureds, to the City Attorney for approval prior to any payment hereunder. g/agree/surfnet/cityconst 15 of 22 12/11 22. NOTICE OF THIRD PARTY CLAIM Pursuant to Public Contracts Code §9202, CITY shall provide notice to CONTRACTOR of receipt of any claim filed with CITY or a court of competent jurisdiction which arises out of performance of this agreement within ten (10) days of receipt of such claim or claims. 23. DEFAULT AND TERMINATION If CONTRACTOR fails or refuses to prosecute the work hereunder with diligence, or fails to complete the work within the time specified, or is adjudged bankrupt or makes an assignment for the benefit of creditors or becomes insolvent, or violates any provision of this Agreement or the Contract Documents, CITY may give CONTRACTOR notice in writing of its intention to terminate this Agreement. Unless the violation is cured within ten (10) days after such Notice of Intention has been served on CONTRACTOR, CITY may, without prejudice to any other remedy it may have, terminate this Agreement upon the expiration of that time. Upon such default by CONTRACTOR, CITY may elect not to terminate this Agreement; in such event CITY may make good the deficiency in which the default consists and deduct the resulting costs from the progress payments then or to become due to CONTRACTOR. If it is subsequently determined by a court of competent jurisdiction that CITY's termination of this Agreement under this Section was wrongful, such termination shall be converted to a termination for convenience under Section 24 and any damages shall be assessed as set forth in Section 24. g/agree/surfnet/cityconst 16 of 22 12/11 24. TERMINATION FOR CONVENIENCE CITY may terminate this Agreement for convenience at any time with or without cause, and whether or not PROJECT is fully complete upon seven (7) calendar days written notice to CONTRACTOR. In the event of termination, under this Section CITY shall pay CONTRACTOR for value of work in place on the PROJECT through the termination period less all such payments already made. In case of such termination for convenience, the CONTRACTOR shall be entitled to receive payment for work executed, and costs incurred by reason of such termination. In no event shall CONTRACTOR be entitled to recover overhead, profit or CONTRACTOR's fee on work not performed. Such payment by CITY shall be CONTRACTOR's sole and exclusive remedy for termination by CITY for its convenience and CITY shall have no further obligation to CONTRACTOR. 25. DISPOSITION OF PLANS ESTIMATES AND OTHER DOCUMENTS CONTRACTOR agrees that upon completion of the work to be performed hereunder, or upon expiration or earlier termination of this Agreement, all original plans, specifications, drawings, reports, calculations, maps and other documents pertaining to this Agreement shall be delivered to CITY and become its sole property at no further cost. 26. NONASSIGNABILITY CONTRACTOR shall not sell, assign, transfer, convey or encumber this Agreement, or any part hereof, or any right or duty created herein, without the prior written consent of CITY and the surety. 27. CITY EMPLOYEES AND OFFICIALS CONTRACTOR shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of g/agree/surfnet/cityconst 17 of 22 12/11 CITY shall have any financial interest in this Agreement in violation of the California Government Code. 28. STOP NOTICES; RECOVERY OF ADMINISTRATIVE COSTS CITY shall be entitled to all reasonable administrative costs and necessary disbursements arising out of the processing of Stop Notices, Notices to Withhold, or any similar legal document. This obligation shall be provided for in the labor and materials payment bond required of CONTRACTOR. CITY may charge an administrative fee of One Hundred Dollars ($100) for every Stop Notice filed in excess of two (2), regardless of whether or not CITY is named in an action to enforce such stop notices. CITY may set off any unreimbursed cost or expense so incurred against any sum or sums owed by CITY to CONTRACTOR under this Agreement. 29. NOTICES Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONTRACTOR's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below; provided that CITY and CONTRACTOR may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, reputable overnight carrier or U. S. certified mail -return receipt requested: TO CITY: City of Huntington Beach ATTN: Duane D. Wentworth 2000 Main Street g/agree/surfnet/cityconst 12/11 TO CONTRACTOR: Kana Pipeline, Inc 1639 W. Miraloma Avenue Placentia, CA. 92870 18 of 22 Huntington Beach, CA 92648 30. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of maters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. 31. IMMIGRATION CONTRACTOR shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of United States Code Section 1324a regarding employment verification. 32. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONTRACTOR and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONTRACTOR understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONTRACTOR. g/agree/surfnet/cityconst 19 of 22 12/11 33. ATTORNEY'S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the non -prevailing party. 34. INTERPRETATION OF THIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 35. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. g/agree/surfnet/cityconst 20 of 22 12/11 36. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 37. CONSENT Where CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be consent/approval to any subsequent occurrence of the same or any other transaction or event. 38. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement shall so survive. 39. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 40. SIGNATORIES Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. g/agree/surfnet/cityconst 21 Of 22 12/11 41. ENTIRETY The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached Exhibit "A", contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers on zqu,z L--- 20� g/agree/surfnet/cityconst 22 of 22 12/11 CONTRACTOR Kana Pipeline, Inc. By: print name ITS: (circle one) Chairman/PresidentNice President AND print name ITS: (circle one) Secretary/Chief Financial Officer/Asst. Secretary- Treasurer CITY OF HUNTINGTON BEACH, a municipal corporation of the State qf Call fo is ivlayvi Cy Clerk i �r INITIATED AND APPROVED: 04---Director of Public Works REV W&AD APPROVED: g/agree/surfnet/cityconst 23 of 22 12/11 X�1161 SECTION C PROPOSAL for the construction of Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC No. 1412 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL. OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefore, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The undersigned agrees to complete the work within 200 working days, starting from the date of the Notice to Proceed. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. C-1 0 If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. 15mpt-5�S WIV 1 07o OF "Sly WOU P't Accompanying this proposal of bid, find in the amount of $ which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 SECTION C PROJECT BID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 11TH AND 12TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY DID ITEMS Item No:. Descri tion - A Q uantity Unit.- Unit Cost Total u. (Extension) 1 Mobilization 1 LS $13;oDo $ j3ivooDo 2 Demobilization and cleanup 1 LS $ 3; God—$ 1 �; Go 0 v 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ 4 Furnish and install new 1-inch polyethylene water service and 34-inch water meter 5 EA on $ $ (b, SOD assembly and meter box +?'6 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter 1W o� assembly and meter box 1 EA $ lj 4cry $ i 6 Furnish and install new 2-inch polyethylene water service and 3/ -inch water meter 3 EA ^ $ 1 oe) $ 5+ oa assembly and meter box ;�(0y 7 Remove existing meter assembly and box and furnish and install pipeline, fittings and 1 od appurtenances to connect to new water meter EA 8 Chlorination and testing of all new water mains and appurtenances, complete and in ✓.fin place 1 LS $ 31 O $ �� a 9 Cut, cap, remove and legally dispose of --fv $ 4126V $ existing Asbestos Cement (AC) pipe 1 LS 10 Construct 4-inch blow -off assembly, pipe, OD valve, riser, box, and all appurtenances, $ 2, 50r'> $ 'S"c� complete and in place 1 EA 11 Remodel existing sewer house connection 4 EA '0c $ 2, $Cb 00 $ \,?.o® laterals conflicting with proposed waterline 12 Remove and salvage existing fire hydrant 00 including removing bury, valve and , k1J ' 1-7 appurtenances 1 EA $ + $ 1 C-2.1 SECTION C PROJECT BID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 11TH AND 121H STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY Item No. _ ' : Description , ` Quantity. nit' Unit Cost-' _. Total Cosi".:. :. (Extension) 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and o submission of all required reports, videos and J $ ' $ 3, 50'> photographs complete. 1 LS ,5(x> 14 Provide temporary water service and connect LS (0,3 00 to existing water services 1 15 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA `00 S, won 16 Furnish traffic control in accordance with City of Huntington Beach requirements, LS $ 2t °p complete and in place 1 17 Furnish and install temporary plug with outlet 1 EA $ 'ISO $ 18 Furnish and install temporary blow -off and fittings required to jump temporary water $ $ 2 service and new water main 1 EA �� ;moo SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE A $ 061 I (6 SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.2 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 10TH AND I ITH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Ilern► No Description Quaritaty Jnat iJaaIll Cost Total Cost`"' 1 Mobilization 1 LS $ � 3, rxa $ 1�, c�o`"v- 2 Demobilization and cleanup 1 LS $,� $ 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and o0 $ 00 C6 $ 2-8,5C0 appurtenances 150 LF 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter EA 00 `t'j0© k2* assembly and meter box 7 $ 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter 2 EA $ y� $ 2c 0 c', o assembly and meter box 6 Furnish and install new 2-inch polyethylene water service and 3/ -inch water meter 2 EA 0d $ 1,-7oo $ 40® assembly and meter box 7 Furnish and install new 2-inch polyethylene �' water service and 1'/z -inch water meter EA 0_0 $ � IC0 $ �r 1300 assembly and meter box 2 8 Cut, cap and abandon existing waterline 1 LS $ !�i 0QV_ $ 9 Remove and salvage existing wharf hydrant including removing valve, valve box and a appurtenances, abandoning lateral in place 1 EA 10 Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ 0041 $ S,C900 Construct 4-inch blow -off assembly pipe, 11 valve, riser, box, and all appurtenances, 1 EA complete and in place C-2.3 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 10TH AND 11T" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS gtem No a . DescriptionQu�natiiy T�ITangt� IT�nat Cost �' TotallCost� (Exte�. ion) 12 Remodel existing sewer house connection 900 ae! 9;1400 laterals conflicting with proposed waterline 3 EA $ $ 13 Furnish and install temporary 4-inch hot tap EA 640 $ 151500 06 $ 51'500 on existing 6-inch AC pipeline with valve 1 14 Furnish and install 6-inch hot tap on existing EA ��pp q 00 $ " $ C-? 00 r 6-inch AC pipeline with gate valve 1 1, ,C4 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and LS • $ �� $©� photographs complete 1 16 Furnish traffic control in accordance with City of Huntington Beach requirements, il0 $ 2i'000 ;o0 $ 00' complete and in place 1 LS z 17 Furnish and install temporary plug with outlet 1 EA $ G1'SD $ �1�50 SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE B SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.4 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4TH AND 5TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Rena No Description Qunmtigy. Unfit Unfit t CosI C TOta OST z 4 (Extension) 1 Mobilization 1 LS $ l3�00000 $ isic)00 2 Demobilization and cleanup 1 LS $ 3, 603o $ 3, (bcoo'� 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 205 LF asp $ 1'7 $'�� appurtenances 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter C� assembly and meter box 16 EA $�00 ' $ 'ems �Od 5 Cut, cap, remove and legally dispose of Asbestos Cement 1 LS $ 4r7,0 $ existing (AC) pipe 6 Provide temporary water service and connect LS 00 $ $ G,19 �- to existing water meters 1 7 Construct new fire hydrant assembly, including furnishing and installing new bury, 140 valve and appurtenances 3 EA $ 5400 $ ) (fr, L'v D .— S Chlorination and testing of all new water mains and appurtenances, complete and in J0 ,00 place. 1 LS $ '? i 00p_ $ 00 9 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off 00 (,_,cj O 7� '90 assembly, blind flange, and appurtenances 25 LF $ $ 10 Furnish and install bollards 2 EA $D` $ 11 Furnish and install No Parking Sign per Caltrans permit requirements 1 EA $ 'Ze fodo $ ► ��� 12 Remodel existing sewer house connection laterals 3 EA $tSD_ $ conflicting with proposed waterline �� C-2.5 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4TH AND 5TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item IVo Description Quaaegity µ Unit ' Unit Cost F Total C®si 13 Construct 4-inch blow -off assembly, pipe, valve, riser, box, and all appurtenances, EA 10N, $ Z, 50C' d,� complete and in place. 1 14 Furnish and install temporary 4-inch hot tap EA 1 5 S00 on existing 6-inch AC pipeline with valve 1 $ 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and �� 'ba50 $ photographs complete 1 LS $ 16 Furnish traffic control in accordance with City of Huntington Beach and Caltrans 16ko 100 requirements, complete and in place 1 LS $ �r $O-R> 17 Furnish and install temporary plug with outlet 1 EA $ 05V � $ � S-0 18 Furnish and install temporary blow -off and fittings required to jump temporary water `aQ 2 $ service to new water main 1 EA $ �' SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE C $ 1 1-7 � SUB -TOTAL BID AMOUNT IN WORDS: R Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.6 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 12TH AND BROADWAY STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No.,;..*. Description Quantity Ufiit ; Unit Cost Total Cosf (Exensioai) 1 Mobilization 1 LS $ O 000 1A 000 2 Demobilization and cleanup 1 LS $ 3,6©a '� $ '3,& 3 Furnish and install 12-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 240 LF 117-0 $ 250 0-0 $�� ©� appurtenances 4 Furnish and install Restrained 12-inch 00 diameter PC 150 Ductile Iron AWWA C150 1 LF 00 $ ii ��°�' pipeline and siphon assembly 5 Furnish and install 2-inch air and vacuum 1 EA assembly 6 Furnish and install new 2-inch polyethylene water service and 3/-inch water meter assembly and meter box 5 EA $ �, o $ 7 Cut, cap, remove and legally dispose of 1 LS $ $ existing Asbestos Cement (AC) pipe ► i� 8 Provide temporary water service and connect 1 LS $ v� %,�vc� to existing water meters 9 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place. 1 EA $ 10 Chlorination and testing of all new water mains and appurtenances, complete and in to 00 place 1 LS $ 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ 4�a 12 Remodel existing sewer house connection EA 00 laterals conflicting with proposed waterline 2 C-2.7 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 12T11 AND BROADWAY STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Items No Description Quniniy Unit ry . i7nnt"C0st Total Cost (EXtensiori),. 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and f photographs complete 1 LS $ 1T$ �j 500 14 Remove and replace existing concrete � �® 00 sidewalk 45 SF $ $ 15 Remove and replace existing landscape and 1 LS $ -a, V V0 $ ";; r 4 0c, grass 16 Remove and relocate existing bench 1 LS $ t , $ ,1-100 "7 17 Furnish traffic control in accordance with City of Huntington Beach requirements, LS vim? $ complete and in place 1 18 Furnish and install temporary plug with outlet 2 EA $ 61:N0 t�� $ 19 Furnish and install temporary blow -off and fittings required to jump temporary water EA G` $ 12- - $ 1-,7-00 service to new water main 1 SUBTOTAL BID AMOUNT (IN FIGURES) — SCHEDULE D $ SUB -TOTAL BID AMOUNT IN WORDS: o LJ7 IFiPl`--(q�� Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.s SECTION C PROJECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15TH AND 16TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item -No - Description Quantity Unit: ,Unit Cost Total Cost: (Extensi6n). 1 Mobilization 1 LS $ 93; 000 LIP- $ 2 Demobilization and cleanup 1 LS $ 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and LF �' 0 appurtenances 150 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter assembly and meter box 4 EA 010 — $ 1' ' 00 $ 5"2 0 -.- 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter 3 EA $ 1 09 $ 4+�® assembly and meter box i'4M 6 Furnish and install new 2-inch polyethylene water service and 3/ -inch water meter assembly and meter box 2 EA $ 1 1 (�U' 06 $ 3. 4'0� 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter 1 EA $ 1 ?jw oej $ assembly and meter box } r 8 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $isco $ Z, c o o 9 Chlorination and testing of all new water mains and appurtenances, complete and in IC14 $ �� 6bo CIO $ '6L OL G place 1 LS 10 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place 1 EA 11 Furnish and install temporary 4-inch hot tap 1 EA $, mod° $ on existing 6-inch AC pipeline with valve 12 Provide temporary water service and connect O)CO to existing water meters 1 LS $ $ C-2.9 SECTION C PROJECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15TH AND 16TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS gtena N0."' I)eSCrxptaOn �i1�Hlt1� Ua�flt Um�t Cost TOtal CoSt ; 1" 4 (Extensi , . 13 Furnish and install 6 feet by 10 feet rolling chain link locking gate with two rail supports 1 LS $+ 14 Remodel existing sewer house connection.- $ '+'30b �a laterals conflicting with proposed waterline 6 EA 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and �� submission of all required reports, videos and photographs complete 1 LS 16 Furnish traffic control in accordance with City of Huntington Beach requirements, $ � 1()00 complete and in place 1 LS 17 Furnish and install temporary plug with outlet 1 EA leo $ $" 18 Furnish and install temporary blow -off and fittings required to jump temporary water EA $ service to new water main 1 + �c> SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE E $ SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.10 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 14TH AND 15T11 STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY DID ITEMS Item NO 4, IIDeSCa iptflOn Quan$iiy:. �Uni ':Unfit Cost. Total Cost, _ a 1 Mobilization 1 LS $ Otk'' $ ko'00— 2 Demobilization and cleanup 1 LS $ $ Si (ocX' 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 175 LF 00 $ '30, $ S5i DOD appurtenances 4 Furnish and install new 1-inch polyethylene water service and 34-inch water meter EA 010 $ `� �o assembly and meter box 7 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter �►'� assembly and meter box 2 EA $ $ 6 Furnish and install new 2-inch polyethylene water service and 3/-inch water meter r -701" assembly and meter box 1 EA $ ' $ 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter ' r 00 assembly and meter box 1 EA $ i` $ 8 Cut, cap, remove and legally dispose of Asbestos 1 LS $f $ existing Cement (AC) pipe 9 Construct new fire hydrant assembly, including furnishing and installing new bury, n valve and appurtenances 2 EA $ 5i $ 10 Remove and salvage existing wharf hydrant including removing valve, valve box and p +J appurtenances 1 EA $ 11 Furnish and install temporary 4-inch hot tap 6-inch AC 1 EA $ Si o on existing pipeline with valve C-2.11 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 14'" AND 15'" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Rein No Descripiioa� Quantity iTnrt s �iTmrt Cost Total Cost '°; (Extension), }� 12 Provide temporary water service and connect LS $ &+�� ad to existing water meters 1 13 Chlorination and testing of all new water mains and appurtenances, complete and in 0® place 1 LSK-- 14 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off .� �� assembly, blind flange, and appurtenances 15 LF 15 Install 12-inch steel casing under Caltrans LF alley approach with receiving and jacking pit 15 16 Remodel existing sewer house connection EA t�t� laterals conflicting with proposed waterline 2 17 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and O submission of all required reports, videos and LS $ 3+SOo photographs complete 1 18 Furnish traffic control in accordance with City of Huntington Beach and Caltrans LS W- $ 5, $� C70 requirements, complete and in place 1 19 Furnish and install temporary plug with outlet 1 EA $ T $ 20 Furnish and install temporary blow -off and fittings required to jump temporary water EA $1" 12'00 09 $ +tea service to new water main 1 SUB BID AMOUNT (IN FIGURES) - SCHEDULE F $�-.- -TOTAL SUBTOTAL BID AMOUNT IN WORDS: �-r-Dup- � Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.12 SECTION C PROJECT BID SCHEDULE G WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 23RD AND 24TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Itean No I)escription Quatriy' Unit LTnat`Cost �" otal C®st }g MEOW I Mobilization 1 LS 00 2 Demobilization and cleanup 1 LS $ 5 W! $ -31600 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and ; s hQ mo $'6(�(5so appurtenances 215 LF $ 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter assembly and meter box 3 EA O—C, $ 1 i300 a $ 1-61 C1 co 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter 7 EA - $ \ $ assembly and meter box 140c> 6 Furnish and install new 2-inch polyethylene water service and 3/a-inch water meter box 2 EA $ j co m�? $ '3,�'� assembly and meter 7 Cut, cap, remove and legally dispose of 1 LS 40 $ $ /4, Z existing Asbestos Cement (AC) pipe 1'�X 8 Provide temporary water service and connect LS 190,,, $ 0m V! $ G"7; O0 to existing water meters 1 9 Furnish and install temporary 4-inch hot tap fp rsv on existing 6-inch AC pipeline with valve 1 EA $ s00 $ 5; 50 10 Construct new fire hydrant assembly, including furnishing and installing new bury, 0 valve and appurtenances 1 EA $ $ � 400 11 Chlorination and testing of all new water mains and appurtenances, complete and in '1 00 place. 1 LS p� $ $ 5, vivo C-2.13 I SECTION C PROJECT DID SCHEDULE G WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 23RD AND 24" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Y>teni No Description, Quaiitity Unat Ull Cost Tkail C®st (EXlensa®aa) 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, $ 2,500 S ZFS complete and in place. 1 EA 13 Remodel existing sewer house connection EA t3�'O(> laterals conflicting with proposed waterline 2 r 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and �� '?�'sC�C> photographs complete. 1 LS $ $ 15 Furnish traffic control in accordance with City of Huntington Beach requirements, in 1 LS $ .2-,066 $�©� complete and place. 16 Furnish and install temporary plug with outlet 1 EA $� $ 17 Furnish and install temporary blow -off and fittings required to jump temporary water 1 EA q $ 2 t cD $� service to new water main TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE G SUB -TOTAL BID AMOUNT IN WORDS: ��ia- tou-P'V� Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.14 SECTION C PROJECT BID SCHEDULE II WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 16TH AND 17TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Itean No L Ilescrptioia _ Quantaty Unii. +n Unit ,Cost Total Cost r (Extension) b 1 Mobilization 1 LS "- 2 Demobilization and cleanup 1 LS $ 5j bO0 ' $4 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 130 LF '9 2.5J0 $ appurtenances $ 4 Furnish and install new 1-inch polyethylene water service and 1-inch water meter 3 EA 0® — $ Jj 06 $ -/+iSoo .- assembly and meter box ; 5 Furnish and install new 2-inch polyethylene water service and 3/ -inch water meter 1 EA $ $ assembly and meter box 6 Furnish and install new 2-inch polyethylene water service and 1-inch water meter 06 assembly and meter box 1 EA $ i�bz $ 7 Cut, cap, remove and legally dispose of 1 LS pin $� c7j $ existing Asbestos Cement (AC) pipe 8 Provide temporary water service and connect ^�s 61 CIA to existing water meters 1 LS $ ),0f' $ 9 Furnish and install temporary 4-inch hot tap 6-inch AC EA 00 on existing pipeline with valve 1 10 Remove and salvage existing wharf hydrant including removing valve, valve box and tso appurtenances 1 EA $ $ 11 Chlorination and testing of all new water mains and appurtenances, complete and in 010 place C-2.15 SECTION C PROTECT BID SCHEDULE II WATERMAIN REPLACEMENT PROTECT, CC 1412 ALLEY BETWEEN 16TH AND 17TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS ItCIn'NO Descrip ion Quanitityµ UIlnit{;,,iTnit Cost Total_ ost.'t'' (Extension) 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, in 1 EA $ '2 00 $ St`Y� complete and place 1 13 Remodel existing sewer house connection 1 EA 00 $ 100 $ 21,,boo laterals conflicting with proposed waterline 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and 010 submission of all required reports, videos and photographs complete 1 LS $ o $ 15 Furnish traffic control in accordance with City of Huntington Beach requirements, in 1 LS 04 $ 2-,000 $ ` complete and place 17 Furnish and install temporary plug with outlet 1 EA $ q5V.W_ $ 18 Furnish and install temporary blow -off and fittings required to jump temporary water 1 EA �= $ ��' $ service to new water main TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE H $%� SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.16 SECTION C PROJECT BID SCHEDULE I WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS Items No ➢)escriptacjn : Ottant t* l<Tnit Unit Cost- TqtafCc&,. f PJ I Mobilization I LS jog. 2060 2 Demobilization and cleanup I LS r7 3 Clearing and Grubbing I LS $ -?,I *tSw AP $ 4 Install AC and AC overlay 480 Tons $ 5 Install Aggregate Base (AB) 650 Tons $ 6 Unclassified Excavation 700 CY $ $ 7 Cold mill 8,700 SF i 8 Construct Concrete V-Ditch Gutter 3,600 LF 104,+oo 9 Furnish and install redwood header 385 LF 10 Adjust Water Cover to Grade 26 EA 3151b Igo 11 Adjust Cleanout to Grade 5 EA j­"'ec' 12 Adjust Electric and Telephone Pull Box and dz!� Vault to Grade 7 EA 13 Adjust Meter to Grade 66 EA wo 14 Reconstruct PCC sidewalk 300 SF 15 Remove/Reconstruct Concrete V-Ditch 90 SF 16 Remove and replace wheel stop 2 EA '20 0 17 Remove trees 3 EA 1->'510 Vk/ 00 18 Replant new trees 6 EA 5-ar-0 19 Install Temporary "Parking By Permit Only" signs along Greenbelt on North Pacific and 00 ca South Pacific Avenue 3 EA -7 5-0 C-2.17 R1 SECTION C PROTECT BID SCHEDULE I WATERMAIN REPLACEMENT PROTECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS Item No Description Quantity , IJnyt Unit Cost TotaI C®st a. (Extensi®n ' 20 Stop Bar, Legend, Curb and Parking Painting 1 LS $ ' �l $ 21 Furnish traffic control in accordance with the Contract Traffic Control Plan, City of Huntington Beach requirements, and Caltrans � ? toopermit $ s oo c> requirements, complete and in place. 1 LS $ i SUB -TOTAL BID AMOUNT( IN FIGURES) — SCHEDULE 1 $ k SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.18 SECTION C PROJECT BIB SCHEDULE TOTALS WATERMAIN REPLACEMENT PROJECT, CC 1412 Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I TOTAL BID AMOUNT, BASIS OF AWARD (Schedules A-1) TOTAL BID AMOUNT IN WORDS: r� 0 1 C' " � _-- Notes: All extensions of unit prices will be subject to verification by Owner. In case verification is required between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. Refer to Section 9, Measure and Payment for description of each Item on Bid Schedules. C-2.19 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid or $10,000, whichever is greater, and the portion of the work to be done by such subcontractor. Bid Items) Name and Address of Subcontractor State License Number Class Dollar Amount % of Contract 14 -7 �'P Ca-0 &s'9 z{�o N',; . &AIA 3� • `26-70-73C) V �% 5y lc a I�cNC� i tr�2` C,27 'PACt10 co �v co By submission of this proposal, the Bidder certifies: That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-3 10 ONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDEN AND SUBMITTED WITH BID I declare under penalty of perjury under the laws of the tat of California that the foregoing is true and correct and that this declaration is executed on �% iz atC ate City State being first duly sworn, deposes and says that he or she is of Y'A' t- pfQ�1;1►-t�, i r i �i. the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Name of Signature of Address of Bidder U�4JC, . 1 >4 G C-4 CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE § 8202 �7 See Attached Document (Notary to cross out lines 1-6 below) ❑ See Statement Below (Lines 1-6 to be completed only by document signer[s], not Notary) Signature of Document Signer No. 1 State of California N County of o& K.ELLEE JEAN SMITH-RAMELOT COMM. #1829630 W co NOTARY PUBLIC-CALIFORNIA0..j ORANGE COUNTY to My Comm Expires Jan. 06. 2013 Le Place Notary Seal Above Signature of Document Signer No. 2 (if any) Subscribed and sworn to (or affirmed) before me on this �� day of 20 Q_ , Date Mont1i Year by J)A , �b Name of Signer proved to me on the basis of satisfactory evidence to be the person who appeared before me (.) (and Name of Signer proved to me on the basis of satisfactory evidence to be the rs ho ` p d before me.) Signature ll Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Further Description of Any Attached Document Title or Type of Document: Umit l,)o U t' 1 r Document Date:Tu l Ul I U 1'2-, Number of Pages: Signer(s) Other Than Named Above: ® 2010 National Notary Association • NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5910 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITE' OF HUNTINGTON REACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC 1412, (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: 25 2olZ kA PI&I Contractor qz l�ma- J r Title C-5 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ®Yes 2No If the answer is yes, explain the circumstances in the space provided. P0P- -- Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-6 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: —7 1 1S 1 n.., A, V') , V U H g�- I 114b Contractor By Title C-7 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: M4k, VIPF'o Bidder Name Business Address per- 1 ze)i 0 City, State Zip Telephone Number 461`T6-7 State Contractor's License No. and Class Original Date 0z-1�ZD / -Zni Expiration Date The work site was inspected by M ' O L-- of our office on -1 1 1-b , 201 '2:- The following are persons, firms, and corporations having a principal interest in this proposal: �LCAO L C-s The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Pi Y-)a�u . I �-A C . Company Name Signature of Printed or Typed Signature Subscribed and sworn to before me this _ day of NOTARY PUBLIC NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: G 1'T'`I (?F Ur} 144zl o 1. 142,E �;-. -.>00 kNE M JF- plyTNzi (o , C-4-S, °i 1-7 (- I Name and Address of Public Agency fz�YAIW &I Name and Telephone No. of Project Manager: (q 0g) 3q — GI7a12a10 Contract Amount Type of Work Date Completed 2. 21 l --, C Name and Address of Public Agency Name and Telephone No. of Project Manager: K 2i Contract Amount Type of Work Date Completed 6tt"I of 3. ?CioCC) T F'I4QZe,: 10 .0- Name and Address of Public Agency Name and Telephone No. of Project Manager: 0 �1\ 43?14=� -- S;: q Z6_ If G 67, Contract Amount Type of Work Date C-9 CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE § 8202 )7 See Attached Document (Notary to cross out lines 1-6 below) ❑ See Statement Below (Lines 1-6 to be completed only by document signer[s], not Notary) Signature of Document Signer No. 1 State of California County of KELLEE •JEAN SMITH-RAMELOT COMM. #1829630 W NOTARY PUBLIC-CALIFORNIA 0 ORANGE COUNTY tG f.4y Comm Exoues Jan. 06. 2013 Place Notary Seal Above Signature of Document Signer No. 2 (if any) Subscribed and sworn to (or affirmed) before me on this 2� day of 201�, Date Month Year by (1) Y)ie L CAP Name of Signer proved to me on the basis of satisfactory evidence to be the person who appeared before me (.) (an-d- (2) Name of Signer proved to me on the basis of satisfactory evidence to be the person jWgo, a_pykaTifore me.) Signatures Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Further Description of Any Attached Document Title or Type of Document: � �yl Document Date: JUW l.r I jv 17— Number of Pages: V I Signer(s) Other Than Named Above: © 2010 National Notary Association • NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) of thumb here I I Top of thumb Item #5910 Document A310 TM m 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: ('Xame, legal status and address)r Kana Pipeline, Inc. 1639 E. Miraloma Avenue Placentia, CA 92870 OWNER: (Same, legal staltts and address) City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 BOND AMOUNT: $ 10% SURETY: (:chine, legal status and principal place tf business) Fidelity and Deposit Company of Maryland 1400 American Lane Schaumburg, IL 60196-1056 Mailing Address for Notices same as above Ten Percent of Amount Bid This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT: (Xame, location or address and Project number,, if ar;t j Water Main Replacement Project Sunset Beach - Various Locations from Anderson Street to Warner Avenue, CC No. 1412 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their hairs, executors, administrators, successors and assigns, joints} and severally, as provided herein. The conditions of tlus Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the O%viier and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the teens of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pars to the Owner the difference, not to exceed the amount of this Bond, behveen the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perlimn the work covered by said bid, then this obligation shall be null and void, otherwise to remain in lid) three and ell'ect. The Surety hereby wanes any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time liar acceptance ol'bids speciled in the bid documents, and the Owner and Contractor shall obtain the Surety's consent fir an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid ton Contractor, the tern Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location ol'lhe Project any provision in this Bond conllicling with said statutory or legal requirement shall be deemed deleted herelrom and provisions confirm» ng to such statutory or other legal requirement shall be deemed incorporated herein. When so lumished. the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and scaled this 24th day of July, 2012 TLL avi tens) MACzi N o ,�U ir- ar nnex) K'pi Lu u Kana Pipeline, I (Principal) (seal) B: mlie) �A 1 �L- i•�%cK� iD Fidelity and Deposit Company of Maryland GYtt (Seal) By: (Tille) Nanette Myers Attorney -in -Fact S-0054/AS 8/10 CIVIL CODE § 1189 State of California County of Cran(l, �'pOn 2�Jkn before me,� Date p Here Insert Name and Title of the Offi er personally appeared�n Name(s) of Signer(s) KELLEE JEAN SMITH-RAMELOT �°.. �L COMM. #1829630 to �% •. ,`"1 NOTARYPUBLIC-CALIFORNIA i m ORANGE COUNTY to My Comm, Expires Jan. 06. 2013 who proved to me on the basis of satisfactory evidence to be the persorjks' whose name,W is/ subscribed to the within instrument and acknowledged to me that he/sPeftfa.ey executed the same in his/her/their authorized capacity(iias), and that by his/big?rtKeir signatureK on the instrument the person(sj, or the entity upon behalf of which the perso�acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my Signature: Place Notary Seal Above nn AA,, //q� ' Y Signature df Notary Public ®rT�®ItlI'i� 1 Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of DocumenlIt:D(CGtf>12Y1�' NO-2210 - LC N3, IL412, Document Date: �U ��i I CVO I ✓�7?i Number of Pages: S-wq { Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Nwi &I c 4 Corporate Officer — Title(s):fhi&%( igner's Name: ❑ LQrporate Officer — Title(s): ❑ Individual ❑ Indi ' ual 0 ❑ Partner — ❑ Limited []General Top of thumb here ❑ Partner ❑ Limited ❑ Attorney in Fact ❑Attorney in t ❑ Trustee ❑ Trustee ❑ Guardian or Conservator ❑ Guardia r Conservi ❑ Other: ❑ Othe . Signer Is epresenting: l igner Is Representing: YOU Y�I�I VYI. © 2010 National Notary Association • NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 CALIFORNIA ALL=PURPOSE ACKNOWLEDGMENT -�sc �,�.'�ac,�ai...-a ..- �ssa 3.�¢6 9s.�• s�a.ai..aa,asras.�as �>v�'•-a,,.•�sG:-�w.as,.�S,.�a..�c� �vs�,,.-�., a� • �,�a�.. �. State of California County of Orange On 7/24/12 before me, K. Luu, Notary Public Date Here Insert Name and Title of the Officer ' personally appeared Nanette Myers Name(s) of Signer(s) K. LUU Commission # 1955906 Notary Public - California z z Orange County D My Comm. Expires Nov 6, 2015 who proved to me on the basis of satisfactory evidence to be the person($) whose name($) is/moo subscribed to the within instrument and acknowledged to me that hb/she/ttYb`y executed the same in Ns/her/tit authorized capacity(W), and that by I` lher/ftit signature(6) on the instrument the person(t), or the entity upon behalf of which the person($) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand allo official seal. Signature Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by few, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General IN Attorney in Fact ❑ Trustee Top of thumb here ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Number of Pages: Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIG_ HTTHUMBPR_INTi OF SIGNERi ©2007 National Notary Association- 9350 De Soto Ave., P.C. Box 2402 - Chatsworth, CA 91313.2402- www.Nationa]Notaryorg Item #5907 Reorder. CatlToll-Free 1-800-876-6827 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said �y, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the d ereby nominate, constitute and appoint James A. SCHALLER, Mike PARIZINO, Na#n�i ell AULT, Rhonda C. ABEL, Kim LUU and Jeri APOIDACA, all of Newport Be e 1 agent and Attorney - in -Fact, to make, execute, seal and deliver, for, and o ety eed: any and all bonds and undertakings, and the execution of such ; in s se presents, shall be as binding upon said Company, as fully and ampl t�17 nut t� � een duly executed and acknowledged by the regularly elected o C�3n i ore, Md., in their own proper persons. This power of attorney revokes that issued of s�`� R, Mike PARAZINO, Nanette MYERS, Rachelle RHEAULT, Rhonda C. ABEL, Kim LUU,,.Js ,"" r3ated June 23, 2011. The said Assistant y does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By -Laws of said Company, and is now in force. IN WITNESS WHEREOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 25th day of July, A.D. 2011. ATTEST: 'gyp 9fPOsrr �a �t0pjv o J bgyy � W State of Maryland ss: City of Baltimore FIDELITY AND DEPOSIT COMPANY OF MARYLAND Eric D. Barnes Assistant Secretary By: Frank E. Martin Jr. Vice President On this 25th day of July, A.D. 2011, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. ��i k� G ,11:� J• Maria D. Adamski - Notary Public My Commission Expires: July 8, 2015 PDXF 012-9310P KANA PIPELINE, INC. 1639 E. MIRALOMA AVENUE PLACENTIA, CA 92870 TEL# (714) 986-1400 oy $112155-)430 "SEALED DID" for Water Main Replacement Project, Sunset Beach - Various Locations From Anderson Street to Warner Avenue CC No. 1412 in the CITY OF HUNTINGTONO NOT OPEN WITH REGULAR DELIVER TO THE OFFICE OF THE CITY CLERK, 2000 MAIN STREET, SECOND FLOOR BID LOCATION: CITY HALL/OFFICE OF THE CITY CLERK, 2ND FLOOR 2000 MAIN STREET HUNTINGTON BEACH, CA 92648 BID DATE: THURSDAY JULY 26, 2012 @ 11 A.M. A ��� 10 V. CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 8/16/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements . PRODUCER Alliant Insurance Services, Inc. 1301 Dove Street, Suite 200 Newport Beach CA 92660-2436 A NAME: PHONE FAX AIC No E-MAIL ADDRESS: IIO I Ili ntin r n m INSURERS AFFORDING COVERAGE NAIC # INSURER A:0Id Republic General Ins Corp 41 INSURED INSURER B :AXIS Surplus In INSURER C: t rr Indemnity & Liability Kana Pipeline, Inc. INSURERD: 1639 E. Miraloma Ave. Placentia CA 92870 7!d INSURER E: INSURER F COVERAGES CERTIFICATE NUMBER: 14R1649919 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSR SUBR WVD POLICY NUMBER POLICY EFF MM/DDIYY POLICY EXP MM/DD LIMITS A GENERAL LIABILITY AOCG01071201 /1/2012 /1/2013 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $100,000 MED EXP (Any one person) $5,000 CLAIMS -MADE K OCCUR PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $2,000,000 Deductible $25,000 POLICY X PRO- LOC A AUTOMOBILE LIABILITY AlCA01071201 /1/2012 /1/2013 MBIN D SINGLE LIMIT Ea accident $1,000,000 BODILY INJURY (Per person) $ ANY AUTO BODILY INJURY (Per accident) $ ALL OWNED SCHEDULED AUTOS AUTOS X X NON -OWNED HIRED AUTOS AUTOS PROPERTY TntDAMAGE $ Comp/Coll Deductibles $1,000/1,000 C UMBRELLA LIAB X OCCUR SISCCCLO1871312 /1/2012 /1/2013 EACH OCCURRENCE $5,000,000 AGGREGATE $5,000,000 X EXCESS LIAB CLAIMS -MADE DIED I I RETENTION $ Other AggrApelicable $5,000,000 A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y/ N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) N I A 1CW01071201 /1/2012 /1/2013 X WCSTATU- OTH- RY MIT E.L. EACH ACCIDENT $1,000,000 E L. DISEASE - EA EMPLOYEE $1,000,000 E.L. DISEASE - POLICY LIMIT $1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below B Professional Liability and Pollution Liability ESZ768468012012 /1/2012 /1/2013 Each Claim Limit 2,000,000 Aggregate Limit 2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Re: Water Main Replacement Project, CC 1412, Sunset Beach - Various Locations from Anderson Street to Warner Avenue City of Huntington Beach, its officers, elected or appointed officials, employees, agents, and volunteers are named as Additional Insured on Primary and Non -Contributory basis. Waiver of Subrogation applies to Workers Compensation per attached endorsements. City of Huntington Beach Attn: Duane D. Wentworth 2000 Main Street Huntington Beach CA 92648 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE 4.✓ aalcu/ © 1988-2010 ACORD GVRPORAI IVN. All rignts reservea. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: AlCG01071201 COMMERCIAL GENERAL LIABILITY CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Additional Insured Person(s) or Organization(s) I Location(s) of Covered Operations Where required by written contract. The City of Huntington Beach, it's officers, elected or appointed officials, employees, agents and volunteers Information required to complete the Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury," property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissi ons of those acting on your behalf; In the performance of your ongoing operations for the additional insureds) at the location(s) deslgnated above. With respect to the insurance afforded to these additional insureds, the follow ing exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the to cation of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 07 04 @ ISO Properties, Inc., 2004 Page 1 of 1 POLICY NUMBER: AlCGO1071201 Commercial General Liability THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Marne of Person or Organization: Where required by written contract, but only when coverage for Completed Operations is specifically required by that contract. The City of Huntington Beach, it's officers, elected or appointed officials, employees, agents and volunteers Information required to complete this Schedule, if not shown above, will be show in the Declarations. Section II — Who Is An Insured is amended to in elude as an additional insured the person(s) or organization(s) shown in the Schedule, but only with re spect to liability for "bodily injury" or "property damage" caused, in whole or in part by "your wo rk" at the location designated and described in the schedule of this endorsement performed for that additional insured and included in the "product completed operations hazard". CG 20 37 07 04 © ISO Properties, Inc., 2000 Page 1 of 1 OLD REPUBLIC GENERAL INSURANCE CORPORATION CHANGES ADDITIONAL INSURED PRIMARY WORDING SCHEDULE THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: COMMERCIAL GENERAL LIABILITY COVERAGE FORM Name of Additional Insured Person(s) Or Organization(s): Location(s) of Covered Operations As required by written contract: The City of Huntington Beach, it's officers, elected or appointed officials, employees, agents and volunteers Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The insurance provided by this endorsement is primary insurance and we will not seek contribution from any other Insurance of a like kind available to the person or organization shown In the schedule above unless the other insurance is provided by a contractor other than the person or organization shown in the schedule above for the same operation and job location. If so, we will share with that other insurance by the method described in paragraph 4.c. of Section IV — Commercial General Liability Conditions. All other terms and conditions remain unchanged. Named Insured Kana Pipeline, Inc. Policy Number AICG01071201 Endorsement No. Policy Period 8/1/12 to 8/1/13 Endorsement Effective Date: 8/1/12 Alliant Insurance Services. Inc. AUTHORIZED REPRESENTATIVE CG EN GN 0029 09 06 DATE POLICY NUMBER: AlCG01071201 COMMERCIAL GENERAL LIABILITY CG 25 03 03 97 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATE® CONSTRUCTION PROJECT(S) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): ALL OF YOUR DESIGNATED CONSTRUCTION PROJECTS. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under COVERAGE A (SECTION 1), and for all medical expenses caused by accidents under COVERAGE C (SECTION 1), which can be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Designated Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under COVERAGE A, except damages because of "bodily injury" or "property damage" Included in the "products - completed operations hazard," and for medical expenses under COVERAGE C regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits." 3. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the Designated Construction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Construction Project General Aggregate Limit for any other designated construction project shown in the Schedule above. 4. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Construction Project General Aggregate Limit. B. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under COVERAGE A (SECTION 1), and for all medical expenses caused by accidents under COVERAGE C (SECTION 1), which cannot be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -Completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. C. When coverage for liability arising out of the "products -completed operations hazard" Is provided, any payments for damages because of 'bodily injury" or "property damage" included in the "products - completed operations hazard" will reduce the Products -Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. D. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. The Provisions of the Limits of Insurance (Section 111) not otherwise modified by this endorsement shall continue to apply as stipulated. CG 25 03 03 97 Copyright, Insurance Services Office, Inc., 1996 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY CG 24 04 10 93 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART This endorsement changes the policy effective on the inception date of the policy unless another date is Indicated below. Endorsement 8/1/12 - 8/1/13 I Policy No.: AICG01071201 Effective: A.M. standard time Named Insured: Kana Pipeline, Inc. I Countersigned by: Aliiant Insurance Services, Inc. SCHEDULE Name of Person or Organization: As Required By Written Contract. The City of Huntington Beach, it's officers, elected or appointed officials, employees, agents and volunteers (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) The TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US Condition (Section IV — COMMERCIAL GENERAL LIABILITY CONDITIONS) Is amended by the addition of the following: We waive any right of recovery we may have agai nst the person or organization shown in the Schedule above because of payments we make for Injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and Included in the "products -completed operations hazard.' This waiver applies only to the person or organization shown in the Schedule above. CG 24 02 10 93 Copyright, Insurance Services Office, Inc., 1992 Page 1 of 1 OLD REPUBLIC GENERAL INSURANCE CORPORATION ADDITIONAL INSURANCE WHERE REQUIRED UNDER CONTRACT OR AGREEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: BUSINESS AUTO COVERAGE FORM The following is added to Section li — Liability Coverage, A. — Coverage, 1. Who is an Insured: Any person or organization to whom you become obligated to include as an additional insured under this policy, as a result of any contract or agreement you enter into which required you to furnish insurance to that person or organization o the type provided by this policy, but only with respect to liability arising out of your operations or premises owned by or rented to you. However, the insurance provided will not exceed the lesser of. (1) The coverage or limits of this policy, or (2) The coverage or limits required by said contract or agreement Named Insured Kana Pipeline, Inc. Policy Number AICA01071201 Policy Period 8/1/12 to 8/1/13 Endorsement Effective Date: 8/1/12 Alliant Insurance Services Inc. AUTHORIZED REPRESENTATIVE CA EN GN 0020 03 07 As per certificate DATE OLD REPUBLIC GENERAL INSURANCE CORPORATION WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: BUSINESS AUTO COVERAGE FORM The following is added to Section IV — Business Auto conditions, A — Loss Conditions, 5. — Transfer of Rights of Recovery against Others to Us: However, we will waive any right of recovery we have against any person or organization with whom you have entered into a contract or agreement because of payments we make under this Coverage Form arising out of an "accident' or "loss" if: (1) The "accident" or "loss" is due to operations undertaken in accordance with a Written contract existing between you and such person or organization; and (2) The contract or agreement was entered into prior to any "accident" or "loss" No waiver of the right or recovery will directly or indirectly apply to your employees or employees of the person or organization, and we reserve our rights of lien to he reimbursed for any recovery funds obtained by any injured employee. Named Insured Kana Pipeline, Inc. Policy Number A I CA01071201 Policy Period 8/1/12 to 8/l/13 Endorsement Effective Date: 8/1/12 CA EN GN 0021 09 06 OLD REPUBLIC GENERAL INSURANCE CORPORATION WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIS ENDORSEMENT MODIFIES INSURANCE PROVIDED UNDER THE FOLLOWING: WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY INSURANCE We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us. This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Name of Person or Organization: WHERE REQUIRED BY WRITTEN CONTRACT. The City of Huntington Beach, it's officers, elected or appointed officials, employees, agents and volunteers The premium charge for this endorsement is $0.00 Named Insured Kana Pipeline, Inc. Policy Number AICW01071201 Policy Period 8/1/12 to 8/1/13 Endorsement Effective Date 8/1/12 WC 99 03 15 (09/06) RECEIVED BY: (Name) (Date) 0 A MR11121511A, Ir jjj� 1111] ''1 ril 11, All TO: Shari Freidenrich, City Treasurer FROM: DATE: SUBJECT: Bond Acceptance I have received the bonds for Faithful Performance Bond No. Labor and Material Bond No Monument Bond No. Maintenance Bond No. Guarantee and Warranty Bond No. Re: Tract No. CC No. MSC No. Approved — )-6 (C"nVApproVa1bate) -17UVI T (Company Name) 1-1 9-0 Agenda Item No. City Clerk Vault No CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office after signing/dating #27 g1followup/bondletter.doc "Executed'In Triplicate",. Bond No. 9075508 Premium: $12,011.00 premium is for Contract Term and Subject PERFORMANCE BON® to Adjustment Based on Final Price KNOW ALL PERSONS BY THESE PRESENTS: WHEREAS, City of Huntington Beach (hereinafter referred to as"City") has, by written agreement dated 20 1? , entered into a contract with Kana Pipeline Inc. 1639 E. Miraloma Avenue. Placentia. CA 92870 (name and address of Contractor) (hereinafter referred to as "Principal'), for performance of the work described as follows: Water Main Replacement Project, Sunset Beach - Various Locations from Anderson Street to Warner Avenue CC No. 1412 (Project Title) ' WHEREAS, said contract, and all documents referenced therein (hereinafter collectively "Contract"), are incorporated herein by this reference made a part hereof as though set forth herein in full. WHEREAS, said Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt, full and faithful performance of said Contract. NOW THEREFORE, we, the undersigned, as Principal, and _ Fidelity and Deposit Company of Maryland 1400 American Lane Schaumburg IL 60196 (name and address of Surety) (a duly admitted surety insurer under the laws of the State of California and hereinafter referred to as "Surety"), as Surety, are held and firmly bound unto City in the penal sum of One Million Two Hundred Ninety Five Thousand Four Hundred Thirty and No/100 --------------------------------- Dollars ($ 1,295,430. 00 ------------ this amount being not less than one hundred percent of the price set forth in the Contract, in lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT if the Principal shall promptly, fully and faithfully perform each -and all ofthe covenants; obligations and things to be done -and -performed -by -the Principal in strict accordance with the terms of the Contract as said contract may be altered, amended or modified from time to time; and if the Principal shall indemnify and save harmless City and all of City's officers, agents and employees (hereinafter collectively referred to as "Obligees") from any and all losses, liability and damages, claims, judgments, stop notices, fees and costs of every description, whether imposed by law or in equity, which may be incurred by the Obligees by reason of the failure or default on the part of the Principal in the performance of any or all of the terms or the obligations of the Contract, including all alterations, amendments and modifications thereto, and any warranties or guarantees required thereunder; then this obligation shall be void; otherwise, it shall be and shall remain in full force and effect. Surety stipulates and agrees, for value received, that no adjustment of the time or price in the Contract or any alteration, change, deletion, addition or other modification to the Contract, or the work to be performed thereunder, shall in any way affect, limit, restrict, impair or release the obligations of the Surety under this Bond. Surety waives notice of any adjustment of contract time or contract price, and 277591.1 PERFORMANCE BOND Page 1 of 2 Bond No. 9075508 any other alteration, change, deletion, addition or other modification to the Contract, or the work to be performed thereunder, and agrees to automatically adjust the penal sum of this Bond to reflect such adjustments, alterations, changes, deletions, additions or other modifications. Surety agrees to provide written confirmation of such adjustments in the penal sum to City on not less than a quarterly basis. Surety also waives the provisions of Civil Code §§ 2845 and 2849. The obligations of this Bond shall survive the completion of the work described in the Contract as to all obligations and liabilities of the Principal which survive completion of the work. IN WITNESS WHEREOF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto is such party's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its governing body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: Auaust 16. 2012 ATTEST Kana Pipeline, Inc. 1639 E. Miraloma Avenue, Placentia, CA 92870 (Corporate Seal) (rinc' al Name) By: Name: izt 10 Title: r2✓, ATTEST Please see attached Power of Attorney (Corporate Seal) (Attach Attorney -in -Fact Certificate) Fidelity and Deposit Company of Maryland 1400 American Lane, Schaumburg, IL 60196 (Surety Name) By: Name: Nanette Myers, orney-In-Fact (Signature of Attorney -in -Fact for Surety) ( 949 ) 756-0271 (Area Code & Telephone Number -of Surety) APPROVED AS TO FORM: CITY O UNTINGTON BEACH f By a�� ennifer Mc ath ity Attorney Note: This bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attomey-in-fact must be attached. 277591.1 PERFORMANCE BOND Page 2 of 2 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 State of California /y County of �Vl On �_�%/ before me, Date Here Insert Name and Title of the Officer personally appearedNames) of Signer(s) KELLEE jEM SMITH-RAMELOT COMM. #1829630 W V ' •; m NOTARY PUBLIC-CALIFORNIA 0 ORANGE COUNTY fD DAy Comm Expires Jan. 06. 2013 who proved to me on the basis of satisfactory evidence to be the person (Xwhose nameis/ subscribed to the within instrument and acknowledged to me that he/Sh-,5­/>Drexecuted the same in his/bier/their authorized capacioes), and that by his/0.ef1V_;T signature,(. —on the instrument the persong, or the entity upon behalf of which the person�"cted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my han an ffici seal. Signature: Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: RlAymance qUITM Document Date: U% I �/ Number of Pages: Signer(s) Other Than Na d Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Dmid WA L Nner's Name: Corporate Officer — Title(s): I'eS1 n L r`P Officer ❑ Individual ❑ Individu� ❑ Partner — ❑ Limited ❑ General To of thumb re ❑ Partner — CI LirT>a; CI Attorney in Fact ❑ Attorney in Fact ❑ Trustee ❑ Trustee ❑ Guardian or Conservator ❑ Guardian or Con: ❑ Other: ❑ Other: Title(s): i ner Is gpresenting: Sigh r Is Representing: ❑ General 0 2010 National Notary Association • NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) item voaw CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of Orange On 8/16/12 before me, K. Luu, Notary Public Date Here Insert Name and Title of the Officer personally appeared Nanette Myers Name(s) of Signer(s) W y K. LUU Commission # 1955906 Notary Public California Z>=' M Orange County Comm. Expires Nov 6, 2015� who proved to me on the basis of satisfactory evidence to be the person(S) whose name() is/M subscribed to the within instrument and acknowledged to me that db/she/t1Yb'y executed the same in His/her/eft authorized capacity(M), and that by f'M/her/i' Y& signature(6) on the instrument the person(6), or the entity upon behalf of which the person($) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand glpd official seal. i Place Notary Seal Above Signature Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): — ❑ Partner — ❑ Limited ❑ General IN Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHUHUMBPRINTi t' rOF SIGNER -,:. of thumb here Number of Pages: Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT1THUMBPRINT .10F.SIGNER 02007 National Notary Association- 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313.2402• www.NationalNotaryorg Item #5907 Reorder: Call Toll -Free 1.800-376-6827 "Executed In Triplicate" Bond No. Premium a —v r 71IJ'i1r_3 (LABOR AND MATERIALS) KNOW ALL PERSONS BY THESE PRESENTS that: 9075508 Incl. In Perf. Bond WHEREAS, the City of Huntington Beach (hereinafter referred to as "City") has awarded to Kana Pipeline, Inc. 1639 E. Miraloma Avenue, Placentia, CA 92870 (name and address of Contractor) (hereinafter referred to as "Principal"), a contract ("Contract") for the work described as follows: Water Main Replacement Project, Sunset Beach - Various Locations from Anderson Street to Warner Avenue CC No. 1412 (project title) WHEREAS, Principal is required under the terms of the Contract and the California Civil Code to secure the payment of claims of laborers, mechanics, materialmen, and other persons as provided by law. NOW THEREFORE, we, the undersigned Principal, and Fidelity and Deposit Companv of Marvland 1400 American Lane, Schaumburg, IL 60196 (name and address of Surety) (a duly admitted surety insurer under the laws of the State of California and hereinafter referred to as "Surety"), as Surety, are held and firmly bound unto City in the penal sum of One Million Two Hundred Ninetv Five Thousand Four Hundred Thirtv and No/1 00 ---------------------------------- ------------------------------------- dollars, ($ 1,295,430.00--------------------------- ), this amount being not less than one hundred percent (100%) of the total price set forth in the Contract, in lawful money of the United States of America, for the payment of which sum, well and truly to be made, we bind ourselves, and each of our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal, his, her, or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Section 3181 of the California Civil Code ("Claimants") for all labor, materials or services used or reasonably required for use in performance of the work described in the Contract, or any amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such Claimant, or prevailing wages due and penalties incurred pursuant to Sections 1774, 1775; 1813 or 1815 of the Labor -Code, or any amounts required -to be -deducted; withheld and paid over to the Employment Development Department from the wages of employees of the Principal and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work or labor performed under the Contract, Surety will pay for the same, in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall be null and void. This bond shall inure to the benefit of any of the persons named in Section 3181 of the California Civil Code so as to give a right of action to such persons or their assigns. In case any action is brought upon this bond, Surety further agrees to pay all court costs and a reasonable attorney's fee in an amount fixed by the court. Surety stipulates and agrees, for value received, that no change, extension of time, alteration, addition or modification to the terms of the Contract, or any contract document or any work to be performed thereunder, whether made after notice or not, shall in any way affect, impair or release the obligations of Surety under this bond. Surety hereby waives notice of any such change, 277589.1 PAYMENT BOND Page 1 of 2 CIVIL CODE § 1189 State of California County of On�WAXAIYVbefore me, ��Y1A tVt�'l lic' Date Here Insert Name and Title of the Officer personally appeared V1i e, Wlit� k Name(s) of Signer(s) KELLEE JEAN SMITH-RAMELOT COMM. #1829630 W 0 ' �'�'_` ' NOTARY PUBLIC-CALIFORNIA .A.,O M ORANGE COUNTY to My Comm Expires Jan. 06. 2013 who proved to me on the basis of satisfactory evidence to be the person(sl'whose name(.s°)`isa4 subscribed to the within instrument and acknowledged to me that he/ah,e?>Wexecuted the same in his/D,ar/th-elr authorized capaci c6), and, that by his/I � i signaturgkW on the instrument the person; or the entity upon behalf of which the person( cted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature. Place Notary Seal Above n p� ^ / Signature of Notary Public o!' TIo/ YPi 6 Though the information below Is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Documpnt q) , Title or Type of Docu Document Date: Signer(s) Other Than Named Above: IA �1Z Number of Pages: Zo 2 Capacity(ies) Claimed by Signeer,�(s) Signer's Name: (Xt A Corporate Officer — Title(s)licsi ❑ Individual ..p ❑ Partner — ❑ Limited Cl General To of thumb e EI Attorney in Fact ❑ Trustee Guardian or Conservator CI Other: i n�/er Is ,presenting: KIAAY.. is Name: ❑ CoPorate Officer — Title(s): ❑ Individu�l� ❑ Partner — ❑ 12�?d ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conse-wa or ❑ Other: s Representing: © 2010 National Notary Association • NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #bJui Bond No. 9075508 extension of time, alteration, addition, or modification to the terms of the Contract, the contract documents or the work thereunder. Surety also waives the provisions of California Civil Code §§ 2845 and 2849. IN WITNESS WHEROF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto is such parry's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its governing body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: August 16, 2012 ATTEST (Corporate Seal) ATTEST Please see attached Power of Attorney (Corporate Seal) (Attach Attorney -in -Fact Certificate) Kana Pipeline, Inc. 1639 E. Miralom Avenue, Placentia, CA 92870 Q riRd,,ipal Name) By: Name: 1�l�n1iE2 Its: Fidelity and Deposit Company of Maryland 1400 American Lane, Schamburg, IL 60196 (Surety Name) By: Name: Nanette Myers, A me -In-Fact (Signature of Attorney -in -Fact for Surety) _ ( 949) 756-0271 (Area Code & Telephone Number of Surety) APPROVED AS TO FORM: CITY OF HUNTINGTON BEACH By• l' y i en"ife*rMath tryAttorney S�l 5�66 Note: This bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attomey-in-fect must be attached. 277599.1 PAYMENT BOND Page 2 of 2 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of Orange On 8/16/12 before me, K. Luu, Notary Public Date Here Insert Name and Title or the Officer personally appeared Nanette Myers Name(s) of Signer(s) K. LUU Commission # 1955906 z �.�,�` 4 Notary Public -California D Orange County y My Comm. Expires Nov 6, 2015 who proved to me on the basis of satisfactory evidence to be the person(S) whose name($) is/00 subscribed to the within instrument and acknowledged to me that htb/she/tdbH executed the same in Wis/her/ it authorized capacity(adg), and that by fM/her/ftff signature() on the instrument the person(), or the entity upon behalf of which the person($) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand andi-seal. Signature Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): _ ❑ Partner — ❑ Limited ❑ General IN Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: RIGHT+THUMBPRINT 'OPSIGNEW _- Number of Pages: Signer's Nam ❑ individual ❑ Corporate Officer — Title(s): — El Partner — ❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: �RIGHTTHUMBPRIN' a '_tOFSIGNER;_' ©2007 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402• www.NationaiNotary.org Item #5907 Reorder: Call Toll -Free 1-800-876-6827 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF (MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said 7wany, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the dal l e b.�s--hereby nominate, constitute and appoint James A. SCHALLER, Mike PARIZINO, Nan ,' ?ae[ielle Rid AULT, Rhonda C. ABEL, Kim LUU and Jeri APODACA, all of Newport Be ta, 1 agent and Attorney - in -Fact, to make, execute, seal and deliver, for, and etyeed: any and all bonds and undertakings, and the execution of such bqn in s iia xlr�se presents, shall be as binding upon said .—, .' l+ Company, as fully and ampI tl iu t aai p �s ;t een duly executed and acknowledged by the regularly elected of C%in' _ nX� i � lti riore, Md., in their own proper persons. This power of attorney revokes that issued �;�" of stR, Mike PARAZINO, Nanette MYERS, Rachelle RHEAULT, Rhonda C. ABEL, Kim LU_Q Je bated June 23, 2011. The said Assistant iry does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By -Laws of said Company, and is now in force. IN WITNESS WHEREOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 25th day of July, A.D. 2011. ATTEST: 'gy'D DUOS�l _ O P a p yo Im ? State of Maryland ss.. City of Baltimore FIDELITY AND DEPOSIT COMPANY OF MARYLAND Eric D. Barnes Assistant Secretary Frank E. Martin Jr. Vice President On this 25th day of July, A.D. 2011, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. ill It % Maria D. Adamski Notary Public My Commission Expires: July 8, 2015 POA-F 012-9310P EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages .... and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 1 Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this day of AUG 16 20Q Assistant Secretary Certification of Compliance with 'Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Title VII of the Civil Rights Act and Equal Employment Opportunity Act of 1972 Contract: Project: The undersigned contractor on the above -referenced project ("Project") hereby certifies that it has complied with Title VII of the Civil Rights Act, the Equal Opportunity Act of 1972 and Executive Order 11246, and has not discriminated against any employee or applicant for employment because of race, creed, color, sex, national origin, age or disability. The undersigned contractor also certifies that it has not maintained any segregated facilities at its establishments on the basis of race, creed, color, sex, national origin, age or disability (with the exception of access for the disabled). I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of , 20_, at , California. (Type Contractor Name) By: Name: [Type Name] Title: [Type Title] E > IF R g- n A C RNEY 3 -2F6 . tP 245911 1 I, , state and certify that: (Name of Declarant) l . is the general contractor to the City of Huntington Beach ("City') on Contract No. (the "Contract") for the construction of the public work of improvement entitled: (the "Project"). 2. All work to be performed pursuant to the Contract has been completed in accordance with the Contract Documents (as such term is defined in the Contract). 3. Except for the claims listed.below and the disputed claims listed in paragraph five (5), all persons supplying labor, services, materials and equipment to the Project, including all claims against the Contractor arising from the performance of the Contract, have been paid and satisfied (list unpaid debts and claims; if none, write "NONE"): 4. Attached hereto are the lien waivers required by the Contract Documents, which lien waivers have been executed by all persons who performed work on or supplied labor, services, materials, and/or equipment for use at the Project. 5. Set forth below is a list of disputed claims or claims that are the subject of a Notice to Withhold filed pursuant to the Civil Code of the State of California (list all disputed claims; if none, write "NONE"): I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed at on this day of , 20 (Signature of Declarant) APPROVED AS TO FORM By: t -7/a U 3. Zo 0CP Name: [Type Name] Title: [Type Title] 2459141 Certification of Compliance with Prevailing Wage haws To: City of Huntington Beach Department of Public Works 2000 Main Street/P.O. Box 190 Huntington Beach, CA 92648 Re: Certification of Compliance with Prevailing Wage Laws Contract: Project: The undersigned contractor on the above -referenced project ("Project") hereby certifies that all laborers, mechanics, apprentices, trainees, watchmen and guards employed by him or by any subcontractor performing work under the contract for the Project have been paid pursuant to the minimum wage and bona fide fringe benefit requirements specified for each particular classification of work, as set forth in the wage -rate determinations of the State of California, Department of Industrial Relations, and/or the United States Department of Labor. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of 20, at (Type Contractor Name) By: _ Name: Title: [Type Name] [Type Title] { t : i- �r California. 247542.1 City ®f Huntington Beach 2000 Main Street ® Huntington Beach, CA 92648 (714) 536-5227 ® www.huntingtonbeachca.gov ®ice of the City Clerk Joan L. Flynn, City Clerk September 6, 2012 Kana Pipeline, Inc. 1639 E. Miraloma Avenue Placentia, CA 92870 Re: Water Main Replacement Project, Sunset Beacht — CC-1412 The City Council awarded the bid to your company for the above referenced project. Enclosed is a copy of the executed contract with the City of Huntington Beach. A Certification of Compliance with Title VII of the Civil Rights Act, Certification of Compliance with Prevailing Wage Laws and Contractor's Certificate form must be returned to this office after the project is completed but prior to the release of retention funds. In addition, the following item must also be on file, with this office before the City can release any retention funds: A warranty bond guaranteeing the final amount of work and materials for one year. If your performance bond does not include specific wording for a one-year warranty, then a rider or separate bond must be submitted. Should you have any questions or concerns regarding the enclosures or items that must be on file in this office prior to release of retention funds, please call the Public Works Department at 536-5517. Sincerely, Jo L. Flynn, C C City Clerk JF:pe Enclosures: Copy of Contract including Proposal Copies of insurance/bonds Contractor's Certificate Certificate of Compliances Bid Bond (original) Sg; avG ,.co �oh,oaptgr.4ocWaitakere, New Zealand Council/Agency Meeting Held: &2Q ZL.-- Deferred/Continued to: lit Ap oved ❑Conditionally Approved ❑Denied .Soi C' y le�Kes Sig ure Council Meeting Date: August 20, 2012 Departme ID Number: PW12-043 CITY OF HUNTINGTON BEACH REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Travis K. Hopkins, PE, Director of Public Works SUBJECT: Approve plans and specifications, award and authorize execution of a Construction Contract in the amount of $1,295,430 to Kana Pipeline, Inc., for the Sunset Beach Water Main Replacement Project, CC-1412 Statement of Issue: On July 26, 2012, bids were publicly opened for the Sunset Beach Water Main Replacement Project, CC1412. Staff requests that the City Council award the contract to Kana Pipeline, Inc., the lowest responsive and responsible bidder. Financial Impact: Funds in the amount of $1,150,000.00 for CC1412 are available in Water Fund, Water Main Replacement, Account No. 50691006.82100, and $600,000 is available in the Water Fund, Distribution Improvements, Account No. 50691025.82100 to fully fund the construction of this project. Recommended Action: Motion to: A) Accept the lowest responsive and responsible bid submitted by Kana Pipeline, Inc., in the amount of $1,295,430.00; and, B) Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney. Alternative A►ction(s): Reject all bids, and provide staff with alternative direction. HB -55- Item 5. - I REQUEST FOR COUNCIL ACTION MEETING DATE: 8/20/2012 DEPARTMENT ID NUMBER: PW12-043 Analysis: In the Sunset Beach Area from Warner Avenue to Anderson Street, there exist old and substandard water facilities located along 15 alleys that need to be replaced. This water main replacement project will remove and replace the water facilities along 8 out of the 15 alleys, including existing fire hydrants currently located in the alleys to a more accessible location along Pacific Coast Highway with no impact to existing parking in that region. The project will repave the alleys due to the construction activities required to remove and install the new water facilities. This project will increase the efficiency and reliability of the water distribution system and enhance fire protection to the area. It will install and replace approximately 1,525 lineal feet of 6-inch and 12-inch diameter pipelines. A complete set of plans and specifications are available for review at the Public Works counter during regular business hours. Bids were opened publicly on July 26, 2012, and are listed in ascending order: BIDDER'S NAME BID AMOUNT BID AMOUNT CORRECTED Kana Pipeline, Inc. $1,295,430.00 Correct as bid GRFCO, Inc. $1,360,735.00 Correct as bid Mike Bubalo Construction Co. Inc. $1,638,050.00 Correct as bid Bid amounts were verified and the lowest responsive bidder was determined to be Kana Pipeline, Inc. The reference check for Kana Pipeline, Inc. provided acceptable responses from past clients. With contingency, supplemental expenses, construction management, inspection, and expected staff costs, the full project cost is estimated to be $1,750,000, which was approximately twenty five (25%) percent higher than the $1,400,000 originally budgeted for this project. This disparity for the higher bid results maybe due to the complexity of the project, and the non -typical short lengths of all 8 alleys. Public Works Commission Action: The Public Works Commission reviewed and approved CC-1412 on May 16, 2012, with a vote of 6-0-1 (Cook absent). Environmental Status: The project consists of the rehabilitation of existing City -owned facilities, with little or no negligible expansion of an existing use. The project is, therefore, categorically exempt from CEQA per Article 19, Section 15301. Strategic Plan Goal: Improve the City's infrastructure Attachment(s): Item 5. - 2 HB -56- ATTACHMENT #1 IL - BB -57- Item 5. - 3 SUNSET BEACH WATER MAIN REPLACEMENT PROJECT WATER UNE PROJECT PAVING PROJECT CC1412 9t i, AVE usr WUM ?ft 2 Item 5. - 4 BB -58- Copies of the' Plans, On a 0 , " - -, ' t o �•� 1 q� .m �t. J j COUNTY OF ®RANGE SECTION A NOTICE INVITING SEALEDBIDS I am a citizen of the United States and a resident of the County of Los Angeles; I ' for the construction of Water Main am over the age of eighteen years and � ect Replacement VaProrious Sunset Sunset Beach -Various party not a art to or interested in the notice Locations S from Anderson Street to ' published. I am a principal clerk of the Warner Avenue -CC No. 1412 HUNTINGTON BEACH in the CITY OF HUNTINGTON INDEPENDENT, which .was adjudged a P_uBLII BEACH Is newspaper of general circulation on HEREBY GIVEN.that the CITY OF HUNTINGTON September 29, 1961, case A6214, and BEACH, as'A ids for in - vites sealed bids for the June 11, 1963, case A24831, for the and ewilltareceiver such City of Huntington Beach, County of bids in the office of the City clerk, Second Floor, Orange, and the State of California. 2000 Main Street, Hun - tington Beach, California Attached to this Affidavit is a true and 92648, up to the hour of 11:00 AM on July .26, complete copy as was printed and 2012. Bids will be pub - licly open in the Council published on the following date(s): Chambers e p stedunless other - Thursday, July 5, 2012 Thursday, July 19, 2012 certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed on August 8, 2012 at Los Angeles, California W&w� Signature Specifications, and con- tract documents are available from the Office of the Director of Public Works, 2000 Main Street,, Huntington, Beach„ CA 92648, upon payment of a $40.00 nonrefundable ,fee if picked up, or payment' of. a - $65.00 nonrefun- dable fee if sent by UPS ground delivery (bidder shall pay additional: costs for special deliv- ery). Any contract entered in- to pursuant to this no- tice will incorporate the provisions of .the State:' Labor. Code. Pursuant to the provisions! of the Labor Code of the State, of California, the mini- mum prevailing' rate of per diem wages for each craft, classification or type of workman needed to execute the'contracti shall be those deter- mined by the Director ofi Industrial Relations of the .State of California, which are on file at 'the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The, AGENCY will deduct 5% retention from all' progress payments. The Contractor maysubsti- tute. an ,escrow holder' surety of equal value to; 'the retention in accor- dance with the provi- sions of the California Government, Code, Sec- tion 4590. The Contrac for shall be beneficial owner of the surety andj shall receive any inter -I estthereon' The AGENCY hereby of-1 firmatively ensures thati minority business enter-,J prises will be afforded, full opportunity to sub-j mit bids in response toi this notice and will not, be discriminated against] on the basis of race„ color, national origin,i ancestry, sex, or religion) in any consideration; leading to the award ofi contract. J No bid shall be consid-f ered unless it is pre-1 pared on the approved) ,Proposal forms in con-i formance with the; Instructions to Biddersf as determined by the; AGENCY. The bid must' be. accompanied by ` a certified check, cashier's; check, or bidder's bond, made payable to thel AGENCY- for an amount no less than 10% of the i amount bid. The- suc cessfulbidder shall be, licensed in accordance, with provisions of. the' Business and Profes- sions Code and .shall' possess a State Con tractor's License Class A, at the time of the bid opening. The successful', Contractor._ and his sub- contractors will be re- quired to possess busi-' ness,licenses from' the' AGENCY. All extension; of unit prices will be subject to verification; by the AGENCY. Incase, of a variation between the unit price and the extension, the unit price,' will govern. Project Description: The work generally in-,l eludes the constructions of approximately 1,525 lineal feet of 14-inch and 6-inch buried pipe within eight alleys in the.Sun-� set area of the City of', Huntington Beach. The; project consist of re- moving and replacing existing water pipelines, fire hydrants, and ap- purtenances; and also constructing highline pipelines to, provide tem- porary water service during construction. The alley rehabilitation por- tion of the work will consist of recon- structing or overlaying the alleys by removing the .existing AC pave- ment and base and con- structing coldmill and AC overlay, and PCC gutters. •. The contract shall al- low the Contractor two hundred (200) working days to complete the contract. • The engineer's esti- mate of probable con- struction cost 'for the work included in, the ba- sis of award is $650,000. The AGENCY reserves the 'right to reject any or all bids, to waive any irregularity and to take all bids under advise- ment for a maximum period of 60 days. BY ORDER -of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 6th day of September 2011, by Resolution No. 2011-68. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH Publised H.B. Indepen- danr hdv S 19 1Q 9n19 in I SEaI0N A CITY OF HUNTINGTON NOTICE INVITING SEALED BEACH BIDS PUBLIC NOTICE, IS HEREBY GIVEN that the for the construction of , CITY OF HUNTINGTON Water Main BEACH, as AGENCY, in - Replacement Project vites sealed bids for the PROOF Sunset Beach -Various above stated projects Locations from and will receive such Anderson Street to bids in the office of the Warner Avenue - CC City Clerk, Second Floor, No 1412 STATE OF CALIFORNIA) ) SS. COUNTY OF ORANGE ) I am a citizen of the United States and a resident of the County of Los Angeles; I am over the age of eighteen years, and not a party to or interested in the notice published. I am a principal clerk of the HUNTINGTON BEACH INDEPENDENT, which was adjudged a newspaper of general circulation on September 29, 1961, case A6214, and June 11, 1963, case A24831, for the City of Huntington Beach, County of Orange, and the State of California. Attached to this Affidavit is a true and complete copy as was printed and published on the following date(s): Thursday, June 23, 2011 Thursday, June 30, 2011 Thursday, July 7, 2011 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed on July 14, 2011 at Los Angeles, California Copies of the Plans, of a $65.00 nonrefun-, 2000 Main Street, Hun- tington Beach, California Specifications, and con- dable fee if sent by UPS, 92648, up to the hour of tract documents are ground delivery (bidder 11:00, AM on July 26, available from the Office shall pay additional 2012, Bids will be pub- of the Director of Public costs for special deliv-i licly open in the Council Works,' 2000 Main ery). Chambers unless other- Street, Huntington wise posted. Beach, 'CA 92648, upon payment of a $40.00 nonrefundable fee if Ticked up; or payment Any contract entered in to pursuant to this no- Itice will incorporate the (provisions-of,the State I Labor Code. Pursuant to ithe provisions of the Labor Code of the State of California, the mini- mum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract 'shall' be those deter- mined by the Director of ,Industrial Relations of . the State 'of California, which are on file at the Office of the Director of ;Public Works; 2000 Main iStreet, Huntington Beach, CA 92648. t ,The AGENCY will deduct 5% retention from all progress payments. The Contractor may substi- tute an escrow' holder surety of equal value to ;the retention in' accor- dance with the provi- sions of the California .Government Code, Sec- tion 4590. The Contrac- Aor shall be beneficial owner of the surety and 'shall receive any inter- !estthereon. The AGENCY hereby af- firmatively ensures that .minority business enter- prises will be afforded full opportunity to sub- imit bids in response to this notice and will not ,be discriminated against on the basis of race, color, national origin, ancestry, sex, or -religion in any consideration ' leading to the award of contract.- No bid shall be consid- ered unless it is pre- �pared on the approved Proposal forms in con- formance. with the Instructions to Bidders ,as determined by the AGENCY. The bid .must be accompanied' by. a certified check, cashier's „check, or bidder's bond invade payable to the 'AGENCY for an amount no less than 10% of the amount bid. The suc- cessful bidder shall be icensed in accordance with provisions of the Business and Profes- sions. Code and shall possess a State Con- tractor's License Class A at the time of the bid opening. The successful Contractor and his sub- contractors will be re- quired to possess busi- ness licenses from the AGENCY. All extension of unit prices will be subject to verification, by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern. Project Description: The work generally in- cludes the construction of. approximately 1,525 .lineal feet of 12-inch and 6-inch buried pipe within eight alleys in the Sun- set area of the City of Huntington Beach. The project consist of, re- moving and replacing existing water pipelines, fire hydrants, and ap- purtenances; and also constructing highline pipelines to provide tem- porary water service during construction. The alley- rehabilitation por- tion' of the work will consist of recon- structing "or overlaying the alleys by removing the existing AC pave- ment and base and con- structing coldmill anc AC overlay, and PCC gutters., • The contract shall al low the Contractor twc hundred (200) workini days to complete the contract. e The engineer's esti mate of probable con ,struction cost for thi work included in the ba sis of award is $650,000 The AGENCY reserve the right to reject any Dr all bids, to waive any irregularity and to take all bids under advise- ment for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFDRNIA, the 6th day of September 2011, by Resolution No. 2011-68. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH Publised H.B. Indepen- dent July 5, 12, 19, 2012 CITY OF HUNTINGTON BEACH SUNSET BEACH WATER MAIN REPLACEMENT - VARIOUS LOCATIONS BID DATE: JULY 26, 2012 TIME: 11:00 AM ENGINEER'S ESTIMATE: $650,000 BID OPENING LIST .......... DN M .... . ........ .. . ..... HE)) R TE 1 JABECS 2 Atas Allied 3 CCL Contracting, Inc. 4 Cedro Construction 5 Charles King Company, Inc. 6 Colich & Sons, LP 7 E & R Construction, Inc. 8 EAR Engineering, Const & Support Svcs 9 Excel Paving Co. 10 Garcia Juarez Construction 11 GRFCO, Inc. 12 HD Water Works 13 John T. Malloy, Inc. 14 Kana Pipeline, Inc. 15 Lone Rock 16 Mike Bubalo Construction Co. e. 31, 6-5D 06 17 Mode Engineenn I g 18 Southwest Pipeline & Trenchless Corp. 19 T.E. Roberts, Inc. 20 VC1 Construction, Inc. 21 lVeear , Inc. 122 WilliamslPipeline Contractors, Inc, GAConstruction Contracts (CCs)\CC1412 Sunset Beach Water Main Replacement\Pre Award\Bid Project\Bid Summary CC141207-26- 12.xlsx 00-11,WV CITY OF HUNTINGTON BEACH 2000 Main Street P.O. Box 190 Huntington Beach, CA 92648 LETTER OF TRANSMITTAL Attention: Joan Flynn Fax (714) 374-1573 Date: June 29, 2012 To: City Clerk's Office Project/C.C. No.: CC1412 2000 Main Street Regarding Sunset Beach Watermain Replacement Proiect. Huntington Beach, CA 92648 ❑ We are sending you: ❑ By Mail ❑ By Fax Mail(Number of pages including this sheet:) ® We are hand delivering: ❑ Attached ❑ Under a separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change Order ® Other: Notice Inviting Sealed Bids Item # I Copies I Pages Description 1 1 2 Notice Invitin Sealed Bids 2 3 4 5 These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ® For your use ❑ Approved as noted ❑ Submit copies for distribution ® For your action ❑ Returned for corrections ❑ Return corrected prints ❑ For review/comment ❑ Other: Remarks: On May 161h, 2012, the Public Works Commission authorized the advertisement of the SUNSET BEACH WATERMAIN REPLACEMENT Project, CC1412. Please advertise on July 5th, 12th and 19th. Attached is the Notice Inviting Bids for this project. Bid opening will be July 26th, 2012. Please contact me at extension 5118 with any questions you may have. c: file Duncan Lee, P.E. Principal Civil Engineer GACONSTRUCTION CONTRACTS (CCSACC1412 SUNSET BEACH WATER MAIN REPLACEMENT (PHASE 1)\PRE AWARD\BID FROJECT\CC1412 TRANSMTTAL TO CLERK 062912 NOTICE INVITE BIDSMOC SECTION A NOTICE INVITING SEALED BIDS for the construction of Water Main Replacement Project Sunset Beach — Various Locations from Anderson Street to Warner Avenue - CC No. 1412 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites sealed bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, California 92648, up to the hour of 11:00 AM on July 26, 2012. Bids will be publicly open in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $40.00 nonrefundable fee if picked up, or payment of a $65.00 nonrefundable fee if sent by UPS ground delivery (bidder shall pay additional costs for special delivery). Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The AGENCY will deduct 5% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the California Government Code, Section 4590. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class A at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All extension of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern. Project Description: The work generally includes the construction of approximately 1,525 lineal feet of 12-inch and 6-inch buried pipe within eight alleys in the Sunset area of the City of Huntington Beach. The project consist of removing and replacing existing water pipelines, fire hydrants, and appurtenances; and also constructing highline pipelines to provide temporary water service during construction. The alley rehabilitation portion of the work will consist of reconstructing or overlaying the alleys by removing the existing AC pavement and base and constructing coldmill and AC overlay, and PCC gutters. • The contract shall allow the Contractor two hundred (200) working days to complete the contract. • The engineer's estimate of probable construction cost for the work included in the basis of award is $650,000. The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 6th day of September 2011, by Resolution No. 2011-68. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH - �• - ,r 1�4 r • r Ad copy: SECTION A NOTICE INVITING SEALED BIDS for the construction of Water Main Replace- ment Project Sunset Beach - Various Locations from Anderson Street to Warner Avenue - CC No. 1412 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVER that the CITY Of HUNTINGTON BEACH, as AGENCY, invites seated bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, Cali- fornia 92648, up to the hour of 11:00 AM on July 26, 2012, Bids will be publicly open in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $40.00 nonrefundable fee if picked up, or payment of a $65.00 nonrefund- able fee if sent by UPS ground delivery (bidder shall pay additional costs for special deliv- ery). Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pur- suant to the provisions of the Labor Cade of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman — ad proof pg. 1 --- needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file at the Office of the Director of Public Works, 2000 Main Street, Hun- tington Beach, CA92648, The AGENCY will deduct 5% retention from all progress payments. The Contractor may substi- tute an escrow holder surety of equal value to the retention in accor- dance with the provi- sions of the California Government Code, Sec- tion 4590. The Con- tractor shall be benefi- cial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in re, sponse to this notice and will not be dis- criminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be consid- ered unless it is pre- pared on the approved Proposal forms in con- formance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. The suc- cessful bidder shall be licensed in accordance with provisions of the Business and Profes- sions Code and shall possess a State Con- tractor's License Class A at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All exten- sion of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern. Project Description.- The work generally includes the construction of approximately 1,525 lineal feet of 12-inch and 6-inch buried pipe within eight alleys in the Sunset area of the City of Huntington Beach. The project consist of removing and replacing existing water pipelines, fire hydrants, and appurtenances; and also _. ._._ _-.._...-._....._..,_._.._.-.-.-..._,...�.w._._...__.__ . Y._..........,_......_._._-. __............................. ad proof pg. 2 --- 130 OR Printed by 0602 Patricia Gamino JW 2, 2012, 9,38am OkiOki An _6i"_ Ua� q- Phone: Ad Y 35083992 PIP elines to provide temporary water service during construction. The alley rehabilitation portion of the work will consist of reconstructing or overlaying the alleys by removing the existing AC pavement and base and constructing cold - mill and AC overlay, and PCC gutters. • The contract shall allow the Contractor two hundred (200) working days to complete the contract. • The engineer's esti- mate of probable con- struction cost for the work included in the basis of award is $650,000. The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advise- ment for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 6th day of September 2011, by Resolution No. 2011-68. Attest: Joan L. Flynn CITY CLERK OF THE CITY OF HUNTINGTON BEACH Publised H.B.indepen- dent July 5, 12, 19, 2012 --- ad proof pg. 3 --- UNSUCCESSFUL BIDS CC-1412 Sunset Beach Watermain Replacement Project li+iH�TE� CITY OF HUNTINGTON BEACH SUNSET BEACH WATER MAIN REPLACEMENT - VARIOUS LOCATIONS BID DATE: JULY 26, 2012 TIME: 11:00 AM ENGINEER'S ESTIMATE: $650,000 BID OPENING LIST . ...B .D AMOP.,UNT M:AMOUNT—::::::::::::::::::::::::::::::::::::::.:::.:.:.:.:.:.:::.:::.:::.:.:.::.::::::::::::::::::::: T . CORREGfl 1 JABECS 2 Atas Allied 3 CCL Contracting, Inc. 4 Cedro Construction 5 Charles King Company, Inc. 6 Colich & Sons, LP 7 E & R Construction, Inc. 8 EAR Engineering, Const & Support Svcs 9 Excel Paving Co. 10 Garcia Juarez Construction 11 GRFCO, Inc. ° 12 /, 12 HD Water Works 13 John T. Malloy, Inc. 14 Kana Pipeline, Inc. 15 Lone Rock 16 Mike Bubalo Construction Co. ® 6, 0'"® `== 17 Mode Engineering 18 Southwest Pipeline & Trenchless Corp. 19 T.E. Roberts, Inc. 20 VCI Construction, Inc. 21 Veeare, Inc. 22 lWilliams Pipeline Contractors, Inc. G:\Construction Contracts (CCs)\CC1412 Sunset Beach Water Main Replacement\Pre Award\Bid Project\Bid Summary CC1412_07-26- 12.xlsx City ®f Huntington Beach 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ www.huntingtonbeachea.gov I . . Office of the City Clerk Joan L. Flynn, City Clerk October 15, 2012 GRFCO, Inc. PO Box 7689 Moreno Valley, CA 92522 RE: Sunset Beach Watermain Replacement Project — CC-1412 Enclosed please find your original bid bond for CC-1412. Sincerely, oan L. Flynn, CMC City Clerk JF:pe enclosure Sister Cities: Anjo, Japan ♦ Waitakere, New Zealand - a;Y i E< S #•i�t?6+'a�`• "f. "`e;€ s' ,' rf t L GRFCO, Inc. PO Box 7689 Moreno Valley, CA 92522 City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 Project: Water Main Replacement Project Sunset Beach — Various Locations Bid Date: July 26, 2012 @ 11:00AM if SECTION C PROPOSAL for the construction of Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC No. 1412 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefore, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The undersigned agrees to complete the work within 200 working days, starting from the date of the Notice to Proceed. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. C-1 If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find h � Weis b,, in the amount of $ /y % which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature C-2 SECTION C PROJECT DID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN IIT" AND 12' STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY DID ITEMS Iteyn No Desca-iption Quantaty iTnit , t Unit Cost, . Total Cost-', �E%tenS10Y�) 1 Mobilization 1 LS $ 56vo.- $ $oC,0,- 2 Demobilization and cleanup 1 LS $ /r o&,— $ /D00,-- 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ .2- 5.- $ 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 5 EA $ 1!5oO. " $-- 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $ /6op.- $ la 0)0 6 Furnish and install new 2-inch polyethylene water service and 3/4 -inch water meter assembly and meter box 3 EA $ ,' Cap .— $ 0O0 -- 7 Remove existing meter assembly and box and furnish and install pipeline, fittings and 1 appurtenances to connect to new water meter EA $ 2000.— $ ,2 Gd0:-- 8 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $ /00c) $ /Ode'. 9 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ 3acv,-- $ .3000l -- 10 Construct 4-inch blow -off assembly, pipe, valve, riser, box, and all appurtenances, in 1 EA $ GDG �- complete and place 11 Remodel existing sewer house connection laterals conflicting with proposed waterline 4 EA $ ,3ocrja — $- 12 Remove and salvage existing fire hydrant including removing bury, valve'and appurtenances I EA $ SOU. r $ C-2.1 SECTION C PROJECT BID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 11TH AND 12TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY Item No. Description Quantity Unit Unit Cost Total Cost (Extension),, 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete. 1 LS $ 3c;00 $ 14 Provide temporary water service and connect to existing water services 1 LS $5�j,— $ 5"00d-- 15 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ So00- $ 5000— 16 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 3C,— $ c'd 17 Furnish and install temporary plug with outlet 1 EA $ goa1c'.— $ 3CCW, — 18 Furnish and install temporary blow -off and fittings required to jump temporary water service and new water main 1 EA $ 3c>. — $ SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE A $ SUB -TOTAL BID AMOUNT IN WORDS: �01� g,e.cr- n Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.2 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 10TH AND 11TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit Cost ; Total Cost (Extension) 1 Mobilization 1 LS $ <,oeq. _ $ Soaa r 2 Demobilization and cleanup 1 LS $ Icep. - $ /0010 r' 3 Furnish and instal 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ 275. $ /.2-50r- 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 7 EA $ /5oo. $ 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter l(oo. $ assembly and meter box 2 EA $ 3,2 00 — 6 Furnish and install new 2-inch polyethylene water service and 3/4 -inch water meter assembly and meter box 2 EA $2oev, — $ 600 —' 7 Furnish and install new 2-inch polyethylene water service and 11/2 -inch water meter assembly and meter box 2 EA $ moo.— $ 5000— 8 Cut, cap and abandon existing waterline 1 LS $ 3evy,— $ -30 dr%" 9 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances, abandoning lateral in place 1 EA $ /aDo, -- $ /OOO,� 10 Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ OCO.-- $1= Construct 4-inch blow -off assembly pipe, 11 valve, riser, box, and all appurtenances, complete and in place I EA $ 000,— $ � ©d C-2.3 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 10TH AND I I'" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost (Extension) 12 Remodel existing sewer house connection laterals conflicting with proposed waterline 3 EA $ 3000, — $ 9 -- 13 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ oaa.— $ 5c-, 0�; 14 Furnish and install 6-inch hot tap on existing 6-inch AC pipeline with gate valve 1 EA $ COCO. $ �000 — 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $ 3000.— $ 3© od �-- 16 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 3CCV, — $ ,3 oov -- 17 Furnish and install temporary plug with outlet 1 EA $ 3ayo• _ $ 30OD. " SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE B $ D 7, 9S0 ,- SUB -TOTAL BID AMOUNT IN WORDS: Gk t- k,"�Cf Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.4 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4TH AND 5Tx STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost (Extension) 1 Mobilization 1 LS $ Soco'— $ 5cleci 2 Demobilization and cleanup 1 LS $ /ovv,- $ 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 205 LF $ 275.— $ SZ 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 16 EA $1 500, -- $ Do �. 5 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ 3oyO, — $ 2000 6 Provide temporary water service and connect to existing water meters 1 LS $ SooO,-- $ :50 00, 7 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances 3 EA $ $ 1��, 000,— 8 Chlorination and testing of all new water mains and appurtenances, complete and in place. 9 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off assembly, blind flange, and appurtenances 25 LF $ 32s. - $ S/.25 10 Furnish and install bollards 2 EA $ 3oo, — $ VCO. - 11 Furnish and install No Parking Sign per Caltrans permit requirements 1 EA $ �2UCJ. — $ 2ao . — 12 Remodel existing sewer house connection laterals conflicting with proposed waterline 3 EA $ 3000,_ $ 9 00 . — C-2.5 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4TH AND 5TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No Description Quantity .. Unit . Unit Cost Total Cost '' - E (EXtensaon') 13 Construct 4-inch blow -off assembly, pipe, valve, riser, box, and all appurtenances, complete and in place. 1 EA $ 5oc-Y),- $ hoc ,- 14 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve I EA $ 5w0.— $ 5_600 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete I LS $ 3.- $ 16 Furnish traffic control in accordance with City of Huntington Beach and Caltrans requirements, complete and in place 1 LS $-3 000.— $ ;? d 00,.- 17 Furnish and install temporary plug with outlet 1 EA $ 2G , -- $ ?0C1C''- 18 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main I EA SUB -TOTAL BID AMOUNT (IN FIGURES) - SCHEDULE C�- SUB-TOTAL BID AMOUNT IN WORDS: 0 elfm Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.6 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 12TH AND BROADWAY STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit'Cost Total `Cost (Extension)"' 1 Mobilization 1 LS $ SDc7' $ -5oor',- 2 Demobilization and cleanup 1 LS $ /oac. - $ /cI 3 Furnish and install 12-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 240 LF $ 32 S. - $ Colo. 4 Furnish and install Restrained 12-inch diameter PC 150 Ductile Iron AWWA C150 pipeline and siphon assembly 1 LF $ o $ 5 Furnish and install 2-inch air and vacuum assembly 1 EA $ yocy. - $ 6 Furnish and install new 2-inch polyethylene water service and 3/4-inch water meter assembly and meter box 5 EA $ 3600, - $ :S ©Do;- 7 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ oow.- $ 3000- 8 Provide temporary water service and connect to existing water meters 1 LS $ ocb -- $ 6'000.— 9 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place. 1 EA $ 3 ate', - $ 10 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $/CVO. $ /GOO,' 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ -5 $ o- 12 Remodel existing sewer house connection laterals conflicting with proposed waterline 2 EA $ elnco. -- $ - COO.- C-2.7 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROTECT, CC 1412 ALLEY BETWEEN 12TH AND BROADWAV STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWV BID ITEMS Item No. Description; Quant! - .�U 'it Unit" Cost '� Total Cost ff ttensioOY 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $301070.- $ cScY� - 14 Remove and replace existing concrete sidewalk 45 SF $ / 0 . "— $ Zf S o — 15 Remove and replace existing landscape and grass 1 LS $ 16 Remove and relocate existing bench 1 LS $ loc . —-- 17 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 3 vod . —- 18 Furnish and install temporary plug with outlet 2 EA $ 2 p o0. -- $ Z16V Q --- 19 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA 3 000 SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE D $ 5--- SUB-TOTAL BID AMOUNT IN WORDS: er- Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.8 SECTION C PROTECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15TH AND 16TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Ilescritan. Quantflty Unit Un1t Cost Total Cost (Extension) 1 Mobilization 1 LS ScoO, 2 Demobilization and cleanup 1 LS $ / m r-,- $ /00C 3 ! Furnish and install 6-inch diameter DR-1.4 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ 75,-- $ / 50 -- 4 Furnish and install new 1-inch polyethylene water service and 1/4-inch water meter assembly and meter box 4 EA $16o6 $ 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 3 EA $199C $ 5y00 r- 6 Furnish and install new 2-inch polyethylene water service and 1/4 -inch water meter assembly and meter box 2 EA $ 5vO $ _'5C00- 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA OG -- $ 1 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $_- S 3OCb,'- 9 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $ WO.- S /000,- 10 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place 1 EA 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $S0C6. $ -50©G ,- 12 Provide temporary water service and connect 1 LS _ $ &C� $ OOd to existing water meters C-2.9 SECTION C PROJECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15TH AND 16TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity -Unit Unit Cost . 'Total Cost „ (Extension).,, 13 Furnish and install 6 feet by 10 feet rolling chain link locking gate with two rail supports 1 LS $ .3CqO, — $ 3®CD0;-- 14 Remodel existing sewer house connection laterals conflicting with proposed waterline 6 EA $ $ 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $ �OCAO $ _30o®r- 16 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 306V _ $ 3CX � 17 Furnish and install temporary plug with outlet 1 EA $ 4-100 G ,— $ �CQO<- 18 Furnish and install temporary blow -off and fittings required to jump temporary water 1 EA $ I'COd. $ 360'0 — service to new water main SUB -TO AL BID AMOUNT (IN FIGURES) — SCHEDULE E $ // 5. �EO -- SUB-TOTAL BID AMOUNT IN WORDS: Gnu �,,w,dtt.c �V rle a-11 Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.10 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 14TH AND 15TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost (Extension) 1 Mobilization 1 LS $ ooa, $ 5gg0 I 2 Demobilization and cleanup 1 LS $ /06V.— $ IC C)r-- 3 Furnish and install 6-inch diameter DR-14 PVC AW WA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 175 LF $ 2 75. — $ ,4g, i2 5.-- 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 7 EA $15;VO. " $ /0 SDo '- 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 2 EA $ /ecoo. — $ 6 Furnish and install new 2-inch polyethylene water service and 3/4-inch water meter assembly and meter box 1 EA $ 25oo. $ 2_5o0,- 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $ 25cy,-- $ 25Oo�' 8 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ 30OC 9 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances 2 EA $ $ 960Or-- 10 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances 1 EA $ 1000. — $ 6�� Cep — 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ Sop4.— $ 5000.' C-2.11 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 14TH AND 15TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No cri p tfl 1)es_on Quantaty Unit Unit Cost Total Cost . .. Ex Sion 12 Provide temporary water service and connect 4/06v,— �000 to existing water meters I LS $ $ 13 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $ /off. - $ 2!�! 14 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off assembly, blind flange, and appurtenances 15 LF $ 5on,— $ 75oo;--- 15 Install 12-inch steel casing under Caltrans alley approach with receiving and jacking pit 15 LF $ loco.— $ 16 Remodel existing sewer house connection laterals conflicting with proposed waterline 2 EA $ 3C+l-9C,— $ 17 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $ 3n�.— $ 18 Furnish traffic control in accordance with City of Huntington Beach and Caltrans requirements, complete and in place I LS $ — $ �OlSo-- 19 Furnish and install temporary plug with outlet 1 EA $1pDd,— $ ,2©ma -- 20 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA $ SUB -TOTAL BID AMOUNT (IN FIGURES) - SCHEDULE F $ 3,25..- SUBTOTAL BID AMOUNT IN WORDS: G7 dl'4_fs Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.12 SECTION C PROJECT BID SCHEDULE G WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 23RD AND 24T" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST 14WY BID ITEMS ,,Item No. Description Quantity Unit Unit Cost Total,Cost (Extension)` 1 Mobilization 1 LS $ $ ,so0°.- 2 Demobilization and cleanup 1 LS $ /ocb.— $ /©oo�-- 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 215 LF $ 275.— $ .S appurtenances 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 3 EA $ Soa,— $ Z(50C�,— 5 Furnish and install new 1-inch polyethylene water service and I -inch water meter assembly and meter box 7 EA $ 6� oa, — $ 6 Furnish and install new 2-inch polyethylene water service and 3/4-inch water meter assembly and meter box 2 EA $ 2�00.— $ :5 7 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS — $ 3 0 00!- 8 Provide temporary water service and connect to existing water meters 1 LS $ OOD," $ OO�r- 9 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ 500c - 10 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances 1 EA $ 60c� — $ "/000 11 Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ OGG. $110610, C-2.13 SECTION C PROTECT BID SCHEDULE G WATERMAIN REPLACEMENT PROTECT, CC 1412 ALLEY BETWEEN 23RD AND 24TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS �Item No. .. Description Quantaty Unflt Unit'Cost Total Cost (Extension) 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place. 1 EA $. $ 5c,00,- 13 Remodel existing sewer house connection laterals conflicting with proposed waterline 2 EA $ .3pp0.— $ ao pp4� 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete. 1 LS $ 3000 $ 15 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place. 1 LS $ 3ovo, — $ 2�,b0; 16 Furnish and install temporary plug with outlet 1 EA $ 3ce;o.-- $ 17 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA $ Sopd $ -56 oD TOTAL RID AMOUNT (IN FIGURES) — SCHEDULE G SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.14 SECTION C PROJECT BID SCHEDULE H WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 16TH AND 17TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No. Description Quantity Unit Unit Cost Total Cost (Extension) , 1 Mobilization 1 LS $ 5�t , $ Saol�.- 2 Demobilization and cleanup 1 LS $ l000.— $ /000.- 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 130 LF $ 2-7S .^ $ 25�� 4 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 3 EA $ /Soo. — $ 'r 50a- 5 Furnish and install new 2-inch polyethylene. water service and 3/4-inch water meter assembly and meter box 1 EA $ 2.56W,— $ ?_5CP0,- 6 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $,25:�r,-- $ -2_5o0,-- 7 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ pLo," $ .3 o oo! 8 Provide temporary water service and connect to existing water meters 1 LS $ 4OM,-- $ /-y600— 9 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ aob — $ 5000 10 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances 1 EA $ /o® $ / 0 CCO • 11 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $ $ D • `� C-2.15 SECTION C PROJECT BID SCHEDULE H WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 16TH AND 17T" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS Item No.. Description Quantity Unit Unit Cost... Total Cost (Extension) <. 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place 1 EA $_ $ -s000 13 Remodel existing sewer house connection laterals conflicting with proposed waterline 1 EA $ ,3000.— $ 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $ 3000,- $ 3000 - 15 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ o00,— $ oon,-- 17 Furnish and install temporary plug with outlet 1 EA $ 060.— $ 4106W r- 18 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA $ DCVO,- $ ,50100.-­ TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE H $ 8 2SO SUB -TOTAL BID AMOUNT IN WORDS: clt t' `A 0( 'I (IfiO Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.16 SECTION C PROJECT BID SCHEDULE I WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS Item No. Description Quantity Limit Limit Cost, Total Cost (Extension) 1 Mobilization 1 LS $ 2eo.- $ ScbC)� 2 Demobilization and cleanup 1 LS $ pbCJ ,- $ 3 Clearing and Grubbing 1 LS $ /5,000, $ 1: ,000� 4 Install AC and AC overlay 480 Tons $ eo ,'-' $ 8G0; 5 Install Aggregate Base (AB) 650 Tons $ $ ,Z ?50- 6 Unclassified Excavation 700 CY $ .65, -- $ SoO:- 7 Cold mill 8,700 SF $ , 50 $ CP35Cj . 8 Construct Concrete V-Ditch Gutter 3,600 I LF $ _ $ 9 Furnish and install redwood header 385 LF ! $.- $ to Adjust Adjust Water Cover to Grade 26 EA��tSOr- 11 Adjust Cleanout to Grade 5 EA $ �5,_ $ /6257-- 12 Adjust Electric and Telephone Pull Box and Vault to Grade 7 EA $ �00,- $ zi' 13 Adjust Meter to Grade 66 EA $ O©^ $ %0- 14 Reconstruct PCC sidewalk 300 SF $ _ $ WO - 15 Remove/Reconstruct Concrete V-Ditch 90 SF $12 . - $ fG � 16 Remove and replace wheel stop 2 EA $ �o 0,- $ 26oD '- 17 Remove trees 3 EA $ /NCO. - $ 3 God 18 Replant new trees 6 EA $ 57.!2)O, -- $ 3®� '- 19 Install Temporary "Parking By Permit Only" signs along Greenbelt on North Pacific and South Pacific Avenue 3 EA $ 2 .5)0 . C-2.17 SECTION C PROJECT BID SCHEDULE I WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS Item.No. Description Quantity Unit Unit Cost Total. Cost . (Extension) 20 Stop Bar, Legend, Curb and Parking Painting 1 LS $ 7-000r- $ .24900," 21 Furnish traffic control in accordance with the Contract Traffic Control Plan, City of Huntington Beach requirements, and Caltrans permit requirements, complete and in place. 1 LS $ 50610. $ 57000.— SUB-TOTAL BID AMOUNT( IN FIGURES) — SCHEDULE 1 $ 7 13 S __ SUB -TOTAL BID AMOUNT IN WORDS: �� �-�--�cf s�v �•, `fig -+tee - t rf��-�°�����l�-S Note: Refer to Section 9, Measure and Payment for description of each Item on Bid` SCl�ieaule. C-2.18 SECTION C PROJECT BID SCHEDULE TOTALS WATERMAIN REPLACEMENT PROJECT, CC 1412 Sub -Total Bid Schedule A Sub -Total Bid Schedule B f o 7 �O -- Sub-Total Bid Schedule C I el(, goo. Sub -Total Bid Schedule D f 5,44 5, •S©.. - Sub -Total Bid Schedule E, Sub -Total Bid Schedule F Sub -Total Bid Schedule G �2�• '— Sub -Total Bid Schedule H�, Sub -Total Bid Schedule 1 3 7 TOTAL BID AMOUNT, BASIS OF AWARD (Schedules A-1) 1 3 0 1 7 ?, S TOTAL BID AMOUNT IN WORDS: �,� � • `�f� �a ✓� ir��P h.u-K.�-�ec0 S• �C 1---�1 �� �Sc..•�c� Notes: All extensions of unit prices will be subject to verification by Owner. In case verification is required between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. Refer to Section 9, Measure and Payment for description of each Item on Bid Schedules. C-2.19 In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid or $10,000, whichever is greater, and the portion of the work to be done by such subcontractor. Bid dtem(s) Name and Address of Subcontractor State License Number Class Dollar Amount % of Contract By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balanee of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-3 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 7/.1G /s , at Date City State Gem�se 11 cS-r , being first duly sworn, deposes and says that he or she is r of G R FCG _ ";, c the party making the foregoing bid that the bid is not made in the inf, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation, that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, -or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the !bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay =ee to any corporation, partnership, company association, organization, bid depository, or to any rr_ember or agent thereof to effectuate a collusive or sham bid. FC? 9cox 76 9'1, I-lvr- I/e Address of Bidder C,4 92S52- C-4 • I I m I TjW • ! State of California County of Riverside On .To (!i 2 64,2d 1'Z before me, Leon Lopez, Notary Public T Here Insert Name and Tide of the officer personally appeared FIZ.o6T Names) of Signer(s) LEONNORIE�GA LOPEZ COMM. #1907501 NOTARY PUBLIC • CALIFORNIA y RIVERSIDE COUNTY My Comm. Expires Oct. 9, 2014 Place Notary Seal Above who proved to me on the basis of satisfactory evidence to be the person(&•) whose name( is/rare subscribed to the within instrument and acknowledged to me that he/sheM"y executed the same in his/hadgi& authorized capacity(ies), and that by his/be##;eix signatures} on the instrument the person(*, or the entity upon behalf of which the person* acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand ZI seal. Signature ignaNd of Notary Public OPTIONAL UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC 1412, (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retaine rmployed by the undersigned, and that the undersigned shall take steps as are necessa to assure compliance by any said subcontractor or subcontractors with the requirements con fined herein\ Date: -J p l y 2, O t 2- 1 C_ w By 7- Title C-5 CALIFORNIA•ACKNOWLEDGMENT .. �14 � � c,.=�e�:3.•�s���:��,. : State of California County of Riverside On ,T- tY -7 (;,, P G ('1— before me, Leon Lopez, Notary Public f— Date,Here Insert Name and Title of the Officer personally appeared GEC1z60-0 FROST Names) of Signer(s) LEON NOR EGA LOPEZ COMM. #1907501 NOTARY PUBLIC - CALIFORNIA d� RIVERSIDE COUNTY A My Comm. Expires Oct. 9, 2014 Place Notary Seat Above who proved to me on the basis of satisfactory evidence to be the person(&) whose name(s) is/we subscribed to the within instrument and acknowledged to me that hPJshe" executed the same in him authorized capacity(), and that by his/ha0he* signature(4 on the instrument the person(*,, or the entity upon behalf of which the person* acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand a ial seal. Signature i tu) of Notary Public OPTIONAL DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ® Yes ®No If the answer is yes; explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-6 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the perform Date: OZ. CyZ— Title C-7 BIDDER certifies that the following information is true and correct: C2 F--:7-00 Bidder Name Pa & cax -7 Business Address ,1`7c, "ems V& l r� q 2 S sZ City, State Zip ( 3io) YFl— Ci3$6 Telephone Number 2 91 o 13 A State Contractor's License No. and Class .2,21 Original Date Issi ioA Date The work site was inspected by 6eyt-g e F--tc-Dsf of our office on J-�v 2 S , 2012. The following are persons, firms, and corporations having a principal interest in this proposal: C-8 i M1 The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perfo "ontract for the proposed work and improvements in accordance with the plans and ecifications set forth. -7;. C . Signature of Kidder e ,rc sl- Printed or Typed Signature Subscribed and sworn to before me this _ day of , 201_ . NOTARY PUBLIC NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: G°s� s �a ^ s J Icy 1. roc a Name'and Address of Public Agency Name and Telephone No. of Proj ect Manager: Q0,M'P0 P" fir) y 7 7- 0 :2 7 y 0 -#yo76 2011 Contract Amount Type of Work Date Completed 2. 6 df 1-K� ,, �<-(an Name and Address of Publi Agency 91 Name and Telephone No. of Project Manager: ('71 y) s 36 - 5 V 3 0 �T.2:2 g COD ()'I ftp-.P- Sr- F� 2-11 Contract caca Amount Type of Work Date Completed Name an6 Address of Public Agency Name and Telephone No. of Project Manager: PL'Betio W e��-worel'� 67 `0 536- 5'S1 77 265 07 6 Contract Amount /� '' w !►,' Type of Work kV0 zdi) Date Completed C-9 The Guarantee Company of North America USA 25800 Northwestern Highway, Suite 720 Southfield, Michigan 48075 Phone: 248-281-0281 Fax: 248-750-0431 BID BOND BOND NO. Not Applicable KNOW ALL MEN BY THESE PRESENTS, That we, GRFCO, Inc. as Principal, and The Guarantee Company of North America USA, a corporation duly organized under the laws of the State of Michigan, as Surety, are held and firmly bound unto City of Huntington Beach as Obligee, in the sum of Ten Percent of the Amount of the Total Bid ($10%) Dollars for the payment of which Principal and Surety bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Principal has submitted a bid for Water Main Replacement Project CC No. 1412, the Project. NOW, THEREFORE, if the Obligee accepts the bid of the Principal and the Principal enters into a Contract with the Obligee for the Project; or, if the Principal pays the Obligee the aMeunlof this Bond or the difference between Principal's bid and the next lowest bid for the Project, 7.&ever is ss: this obligation is null aria void, otherwise to remain in full force and effect. Signed and sealed this 23rd day of July, 2012. GRFCO, Inc. Witness Principal ITS: The Guarantee C pany f North America USA BY: L 1 Vif ess Mark Shrecken st, AAttoirney-lh4act Bid Bond 1 of 1 7/22/2012 CS0025 State of California County of Los Angeles On July 23, 2012 ACKNOWLEDGMENT before me, Julie M. Shreckengast, Notary Public (insert name and title of the officer) personally appeared Mark E. Shreckengast who.proved to me on the basis of satisfactory evidence to be the person() whose namem is/9M subscribed to the within instrument and acknowledged to me that he/gWkWexecuted the same in hisftK/IWK authorized capacity0a), and that by his/1NUMi41' signaturei(O on the instrument the person(, or the entity upon behalf of which the personM acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature n�' AkFN"-\ JULIE M. SHRECKENGAST �. COMM. #1846034 m NOTARY PUBLIC - CALIFORNIA cn LOS ANGELES COUNTY iI My Comm. Expires Apr. 26, 2013 (Seal) THE GUARANTEE COMPANY OF NORTH AMERICA USA Southfield, Michigan POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Mark E. Shreckengast Summit Surety Insurance Services its true and lawful attorneys) -in -fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise. The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attorney is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31st day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appoint Attorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2. To revoke, at any time, any such Attorney -in -fact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. 4. in connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner — Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 6th day of December 2011, of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 23rd day of February, 2012. THE GUARANTEE COMPANY OF NORTH AMERICA USA r STATE OF MICHIGAN Stephen C. Ruschak, Vice President Randall Musselman, Secretary County of Oakland On this 23rd day of February, 2012 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of Cynthia A. Takai r Notary Public, State of Michigan County of Oakland i 4u4 ti � kn My Commission Expires February 27, 2018 Acting in Oakland County IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of North America USA offices the day and year above written.- e�At� a. Tom. 1, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. ereEN IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 23rd day of July 2012 6J its � O Randall Musselman, Secretary City ®f Huntington Beach 2000 Main Street ® Huntington Beach, CA 92648 (714) 536-5227 ® www.huntingtonbeachca.gov Office of the City Clerk Joan L. Flynn, City Clerk October 15, 2012 Mike Bubalo Construction Co., Inc. 5102 Gayhurst Ave. Baldwin Park, CA 01706-1814 RE: Sunset Beach Watermain Replacement Project — CC-1412 Enclosed please find your original bid bond for CC-1412. Sincerely, oan L. Flynn, CIVIC City Clerk JF:pe Enclosure Sister Cities: Anjo, Japan ® Waitakere, New Zealand BID OF: Mike Bubalo Construction Co., Inc. 5102 Gayhurst Avenue Baldwin Park, California 91706-1814 CSLB# 771279-A 20i2.".`I._ t 6 f'�9 Proposal to. - City Of Huntington Beach Proposal for: Watermain Replacement Project CC 1412 Sunset Beach - Various Locations From Anderson Street To Warner Avenue Proposal due: July 26, 2012 11.00A �ff SECTION C PROPOSAL for the construction of Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC No. 1412 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefore, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The undersigned agrees to complete the work within 200 working days, starting from the date of the Notice to Proceed. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. Mike Bu6a`o Construetaon Co., Inc. 5102 Gayhurst Avenue Baldwin Park, CA 91706 C-1 If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. Accompanying this proposal of bid, find F/DffiaAI% in the amount of $ 0 ® w- 4/.Which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice Inviting Sealed Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond", as the case may be). Bidder shall signify receipt of all Addenda here, if any: Mee Bubafv Cmtnrrtarrrt (70., jrte. 5102 Gayhurst Avenue Baldwin Park, CA, 91706 C-2 SECTION C PROJECT BID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 11TH AND 12T11 STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS I Mobilization 1 LS 000 •" $ IS. 000. 2 Demobilization and cleanup 1 LS $ (�D00 $ w. OcQ . 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter assembly and meter box 5 EA 14,D00. 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $ o?50O. aS00 . 6 Furnish and install new 2-inch polyethylene water service and 3/ -inch water meter assembly and meter box 3 EA $ ,3SOo. — $ /0, SDO. O 7 Remove existing meter assembly and box and furnish and install pipeline, fittings and appurtenances to to 1 EA $ $ 07000. connect new water meter o700D.' 8 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $ 5060. 5000. 9 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $J000. $ 5000 . 10 Construct 4-inch blow -off assembly, pipe, valve, riser, box, and all appurtenances, in 1 EA $ a 000.` $ 0,')1 complete and place o . 11 Remodel existing sewer house connection laterals conflicting with proposed waterline 4 EA $ f3oO. r $ j01.0(_. 12 Remove and salvage existing fire hydrant including removing bury, valve and 606 �d00 �- appurtenances 1 EA $ - $ • C-2.1 uoaw Cvrzst7uction Co,, Inc. 5102 Gayf�urst A venue 8"ddvin Park, CA 91706 SECTION C PROJECT BID SCHEDULE A WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 11TH AND 12TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY Item>allo�,Y, "x-D.escri hon �.: ..e � ` �r�.?.. uanti nrt�iiniias� �: oal Cost \��� F ,\��e\��ia ' u� � �u �\ r\� \ � � �\' � H`a\ � K a�k;a � e� �� a $ ' \�.\ � \ ��\�+ �'��.t'' ��aa S`v+J • ,\'�^;' .•;,, u.a�� x3:. "z r' `t �.;1e'.'1 ,a. ,;,..r:t...i _:a��:.r \'�. �.N , e,(, N�.�"„„,x.�\�Gt`�+'$ � a .t,M ..; ..`t "„'xee� a���^.a`$. .r+�����.�.a�"W:`: W\\\ \Z\,"�w�.'"a*.4�""`��������Q\`. \��. 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete. 1 LS $ 1,C, DO[) _ $ P 000 . 14 Provide temporary water service and connect to existing water services 1 LS $ & o . — $ 6000 . 15 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ a%e $ A00 16 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 6000 - $ �O 17 Furnish and install temporary plug with outlet 1 EA $ SX— $ -SOD 18 Furnish and install temporary blow -off and fittings required to jump temporary water service and new water main 1 EA $ SOD $ -SDD. SUBTOTAL BID AMOUNT (IN FIGURES) — SCHEDULE A $ 13)T SUB -TOTAL BID AMOUNT IN WORDS: e ku n.-dr�h�� _ ie�,�4ho�5a�a1,��I�+ heed �ol�a 710DJ- dN Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.2 Mif�e outiaro Const,,to, CO., Inc. 5102 GayhurstAvenue Baldwin 'ark, CA 91706 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN LOTH AND 11 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 1 Mobilization I LS S�QQQ 2 Demobilization and cleanup I LS $ 6000, $ (coe) o 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ $ DOD 4 Furnish and install new 1 -inch polyethylene water service and'/ -inch water meter assembly and meter box 7 EA $200D.",-$ 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 2 EA $150Q. $ 500D 6 Furnish and install new 2-inch polyethylene water service and Y4 -inch water meter assembly and meter box 2 EA $,�6QO. $ ?Q00 7 Furnish and install new 2-inch polyethylene water service and 11/2 -inch water meter assembly and meter box 2 EA $ 6L)QQ- $ ID 000 8 Cut, cap and abandon existing waterline I LS saocb.-- $_zo 9 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances, abandoning lateral in place I EA $dQ00--__ $ o QOQ- 10 Chlorination and testing of all new water mains and appurtenances, complete and in place. I LS $6000. - $ 5D00. Construct 4-inch blow -off assembly pipe, 11 valve, riser, box, and all appurtenances, EA 000Q,-' $ aD00, complete and in place I C-2.3 Mke �%akP Ct7nStivetion Co., 5102 Gayhurst Avenue Baldtr*`n Park, CA 91706 SECTION C PROJECT BID SCHEDULE B WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN LOTH AND 11T" STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS �\� \� ��'\ �„ • ��\;,\ ., �� � �; >\\ee �e�e�� \ \a"� �. � \,\ eee��a„ \ ee�4e . ��� � �e „ r�ee \\ � �>„�����.e���' „ e����� \�F� � ka"�`$ \W,� \ ��"a. �` ��'n� W �.:� ���:�a. •,��' �'�� Y 4 �� 3 \e\,e \4 \d�\, ';a^tm�k.\a L�il OlVll�i�.�p 12 Remodel existing sewer house connection 3 EA $ �00 laterals conflicting with proposed waterline , 13 Furnish and install temporary 4-inch hot tap EA $ JDDO•— $ on existing 6-inch AC pipeline with valve 1 C2DOD. 14 Furnish and install 6-inch hot tap on existing EA $ �000 6-inch AC pipeline with gate valve 1 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 LS $AW^^$ i5 ,DOC). 16 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 LS $ 17 Furnish and install temporary plug with outlet 1 EA $SOD •' $ SDO:'__ o c'� SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE B $ 9 cc. SUB -TOTAL BID AMOUNT IN WORDS: Da fie Ku►1dre& 4ur� oRf- 4� \DL)5a�, f)1VAe%vnd.,r'ed doRav-s 4 //C)6A- Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.4 mik-e Bubaly Crmst=tion Co., qnc. 5102 Gayhurst Avenue Baklwin P8rk, GA 91706 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4TH AND 5Tx STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS \ x \, 1 Mobilization 1 LS $IS{a00 Oda �w 2 Demobilization and cleanup 1 LS $ Cod 000 - o� $ &, 000 — 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 205 LF $ 300 appurtenances 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter �a . . assembly and meter box 16 EA $ Z,000 $ '�Z j CCoD 5 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS 00 $ rj,00O 6 Provide temporary water service and connect to existing water meters 1 LS $ S,000 $ 8,000 —" 7 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances 3 EA '= $ 1v,000 $ 'JD,Ooo 8 Chlorination and testing of all new water mains and appurtenances, complete and in place. 1 LS $ S,oco $ 5,000 .e 9 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off _ assembly, blind flange, and appurtenances 25 LF $ A00` $ I0 0O0- 10 Furnish and install bollards 2 EA $ 1, E)00 $ Z.�00(D- 11 Furnish and install No Parking Sign per oa Caltrans permit requirements 1 EA $ SC $ SDo 12 Remodel existing sewer house connection laterals conflicting with proposed waterline 3 EA $ 6650 $ Z,_AoZ) C-2.5 Mike 21uu-W� Coagjwtfarj Co _7,c 5102 GaYhurst Avenue Baldwin Park, CA 917(e5 SECTION C PROJECT BID SCHEDULE C WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 4'" AND 5 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 13 Construct 4-inch blow -off assembly, pipe, valve, riser, box, and all appurtenances, complete and in place. I EA $000" Z.Z. $ Z_.,po0-0 14 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve I EA $ 'Z, Octo $ 2—poo 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and oo 00 photographs complete I LS $ k5f000 $ 151000 16 Furnish traffic control in accordance with City of Huntington Beach and Caltrans requirements, complete and in place I LS $S, 000 $ 5, oc)e) 17 Furnish and install temporary plug with outlet 1 EA $ 500 $ 18 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA $ 600*' $ -5oo'* SUB-TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE C SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. Mi�eftbafir C01'struction Co., qnc. C-2.6 5102 Gayhurst A ve,,e Baldw'n 0ark, CA, 91706 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 12TH AND BROADWAY STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS \\ �\,. U\� �l\�\�, t 1 Mobilization 1 LS $ i5, ck) $ 1S,000 2 Demobilization and cleanup 1 LS $ (p,000 $ (o noo .0 3 Furnish and install 12-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and „ eo appurtenances 240 LF $ %� $ 944coo 4 Furnish and install Restrained 12-inch diameter PC 150 Ductile Iron AWWA C150 pipeline and siphon assembly 1 LF $ to 000 $ i u�poD 5 Furnish and install 2-inch air and vacuum o� assembly 1 EA $ -5,bco.' $ -5GOOD 6 Furnish and install new 2-inch polyethylene water service and Y4-inch water meter assembly and meter box 5 EA $ 5,Soo~ $ n , S©O 7 Cut, cap, remove and legally dispose of do existing Asbestos Cement (AC) pipe 1 LS $ 5,oc o $ 5, �a 8 Provide temporary water service and connect ,e to existing water meters 1 LS $ 8,000� $ 5'.000 9 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, 100 complete and in place. 1 EA $ Z,000 $ Z4000 10 Chlorination and testing of all new water mains and appurtenances, complete and in ,y place 1 LS $ 5, om $ 5,.000 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ Z000 $ Z_ Oqo 12 Remodel existing sewer house connection ,,,, laterals conflicting with proposed waterline 2 EA $ bOO $ 1, (.0O0 C-2.7 M e Bubafe, c nr.,st-major ca., inc. 5102 Gayhurst Avenue Baldwin Park, CA 91706 SECTION C PROJECT BID SCHEDULE D WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 12'" AND BROADWAY STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS AR Ig "w TSC 7PT1"' T % M 01M 7 10NOW."'N' 13 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete I LS $ 15, 0 CC) $ 14 Remove and replace existing concrete '0 'o sidewalk 45 SF $ k00 $ -A.-sc)o 15 Remove and replace existing landscape and grass I LS $ 7,000 0a $ 000 16 Remove and relocate existing bench I LS $ Z' 000 $ "Z-, 000 17 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place I LS $ 5,000 $ 15, 000 18 Furnish and install temporary plug with outlet 2 EA $ Scab $ 1 19 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main I EA 500 SUB -TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE D $ zo) 6, , ) G CD SUB -TOTAL BID AMOUNT IN WORDS: SkYC, OrIT_ 4LX309AL> V00_A-?_ ':> Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.8 Mike Bubaflo Cmtructjon co., 1nc. 5102 Gayhurst Avenue Baldwin Park, CA, 91706 SECTION C PROJECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15TH AND 16TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 1 Mobilization 1 LS $ �5wo $OJT 00,9 2 Demobilization and cleanup 1 LS $ ,� l d 0, 6b $ 00a 00 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 150 LF $ SOO 06 $ �✓5 Ov 4 Furnish and install new 1-inch polyethylene water service and 3/-inch water meter assembly and meter box 4 EA $,7, ZZo co $ CVO. 06 5 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 3 EA $Z6�U. 0o $ 7g_ 00_ GU 6 Furnish and install new 2-inch polyethylene water service and % -inch water meter assembly and meter box 2 EA $3 6a).. w $ 7,&o. GG 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $ � .06 $ ©d 8 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $ / . 6a 9 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS $�j l 60 $ `?�by". 06 10 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place 1 EA 54a.0. Co $ ©Z. l� 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $Za&'. Cho $ ezo• GG 12 Provide temporary water service and connect to existing water meters 1 LS $��2:�-'Z $ 9'�W.'X C-2.9 5102 Gayhursi Avenue Baldwin Park, CA 91706 SECTION C PROJECT BID SCHEDULE E WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 15 TH AND 16 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS A Aw, N' A ta, e \11 \4A ..... 13 Furnish and install 6 feet by 10 feet rolling link locking I LS $ $ qzw. 0 0 chain gate with two rail supports 7G2Frp 14 Remodel existing sewer house connection 00. ao 00 laterals conflicting with proposed waterline 6 EA $ 15 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and I LS $�tW.06 $ 14GY 06 photographs complete ,- 16 Furnish traffic control in accordance with City of Huntington Beach requirements, in LS $J 000. 60 $J 00 complete and place I 17 Furnish and install temporary plug with outlet I EA $60.00 $,660.,:90 18 Furnish and install temporary blow -off and fittings required to jump temporary water I EA $3�- 60 $ CV service to new water main SUB BID AMOUNT FIGURES) SCHEDULE E $ -TOTAL (IN — SUB -TOTAL BID AMOUNT IN WORDS: zfgn Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. Mke t8ubaki qnc. C-2.10 5102 GayllufstAvenue Baldwin Park, CA 91705 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROTECT, CC 1412 ALLEY BETWEEN 14TH AND 15TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS ak` p \ xx .�.Yx`4 \'U"\,e � 1 Mobilization 1 LS $15* Go $ 155,_X6. 60 2 Demobilization and cleanup 1 LS aO.00 $ 666, &V 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 175 LF $_�60 06 $y'Z appurtenances 4 Furnish and install new 1-inch polyethylene water service and 3/4-inch water meter assembly and meter box 7 EA $2,66o 06 $ 5 Furnish and install new 1-inch polyethylene water service and I -inch water meter assembly and meter box 2 EA $ fi0. W $ D 6 Furnish and install new 2-inch polyethylene water service and Y4-inch water meter assembly and meter box 1 EA 7 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box 1 EA $% $ CI 8 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe 1 LS $J 9 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances 2 EA $/�0 $ ?,OMJ. PAL 10 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances 1 EA $ r! (V $ 2 ®b�G0 11 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve 1 EA $ Z, 6W. 00 7-- $ 7,600U 0 e C-2.11 Mike Buba x c-omstr $ m Co., inc. 5102 Gayhuist Aherne 3- ald rin Park, CA 9170 SECTION C PROJECT BID SCHEDULE F WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 14TH AND 15TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 12 Provide temporary water service and connect LS wo ob /, $ 9 au-i 00 to existing water meters 1 T 13 Chlorination and testing of all new water mains and appurtenances, complete and in place 1 LS 1 $ k7 7- $ ( (mod 14 Furnish and install 12-inch diameter DR-18 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings, blow -off assembly, blind flange, and appurtenances 15 LF $ Gr? Gb $ 7600- �o 15 Install 12-inch steel casing under Caltrans 15 LF $IGD I "'��' $ Pis alley approach with receiving and jacking pit 16 Remodel existing sewer house connection laterals conflicting with proposed waterline 2 EA $�f�� $ 17 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and LS / dom $ / $ %Ea6 o. GG photographs complete 1 � 18 Furnish traffic control in accordance with City of Huntington Beach and Caltrans in 1 LS $,�DDd �d $ �l%(G. oo requirements, complete and place 19 Furnish and install temporary plug with outlet 1 EA $RV- GO $ 60 20 Furnish and install temporary blow -off and fittings required to jump temporary water $ ��` 60 $ ��� service to new water main 1 EA SUBTOTAL BID AMOUNT (IN FIGURES) — SCHEDULE F $ 1 7q 106. 400 SUBTOTAL BID AMOUNT IN WORDS: URIC 110�1Q7eD XGy&7u 'TY f 0U� 1 tJ00,<X1Q CiUE1ZU10 QFf2 /UD Z &X 0 L )Lf Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. C-2.12 Mke Bub Cv -5tnictim Co., 1nc. 5102 Gayfivrst Awrenue Seidwir, a,- , � :A 91706 SECTION C PROJECT BID SCHEDULE G WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 23RD AND 24 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS YK "'_ '1:' \y m, 1 4' g g\\" 1 Mobilization I LS $115.66(0�0- $ vop-a- _*9_ 2 Demobilization and cleanup I LS $A�o ®-qm- $ AAM. 00 3 Furnish and install 6-inch diameter DR-14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and 215 LF $ $ 6t(l <_00- appurtenances 4 Furnish and install new 1 -inch polyethylene water service and 3/-inch water meter assembly and meter box 3 EA $ 6P080 5 Furnish and install new 1 -inch polyethylene water service and 1-inch water meter assembly and meter box 7 EA $ -z,6bD.9A_ $ U, S-00 6 Furnish and install new 2-inch polyethylene water service and %-inch water meter assembly and meter box 2 EA $ 3:SCO-41- $ jqqp. 7 Cut, cap, remove and legally dispose of existing Asbestos Cement (AC) pipe I LS $5,000."' $ 5.'060- 8 Provide temporary water service and connect to existing water meters I LS $ 0 i ow $ BAOD. 9 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve I EA $ S 006.'_"=- $ Z—,O= 10 Construct new fire hydrant assembly, including furnishing and installing new bury, valve and appurtenances I EA $ 10P_0c6,Q2_ 11 Chlorination and testing of all new water mains and appurtenances, complete and in place. I LS OR $__15f000. 00 $ 51,D00- C-2.13 Mke Buba,C) cons4tuction co., ia. 5102 Gayhurst Avenue Baldwin Park, CA 91706 SECTION C PROJECT BID SCHEDULE G WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 23RD AND 24 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS �g sioni" , A", 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place. I EA $ Z� 000. $ ?_! 0 00 - 13 Remodel existing sewer house connection EA oe $ I'(o $ laterals conflicting with proposed waterline 2 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and 00 photographs complete. I LS 15 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place. I LS $ 50M. $ 5,6M., 16 Furnish and install temporary plug with outlet I EA 17 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main I EA $ 500, $ TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE G $ 170FUOU-Sw— SUB-TOTAL BID AMOUNT IN WORDS: Or)e I-)L)4vJ SU� �tAOL)Sayj , sty.VNo,,dv-e_d &ftow-c- 4- Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. ro !> C-2.14 Mike Bubafo Constriction Co., Inc. 5102 Gayhurst Avenue Baldwin Park. CA 91706 SECTION C PROJECT BID SCHEDULE H WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 16 TH AND 17 TH STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 1 Mobilization I LS $15,000. $ 15, 00b 2 Demobilization and cleanup I LS $AAM.0-0 $ 3 Furnish and install 6-inch diameter DR- 14 PVC AWWA C900 pipeline, including and not limited to all potholing, pipe valves, shoring, cathodic protection, fittings and appurtenances 130 LF $ 50p."— $ 5!11000. 4 Furnish and install new 1-inch polyethylene water service and 1-inch water meter assembly and meter box 3 EA $ Z60O.'—`0 $ 7 5 Furnish and install new 2-inch polyethylene water service and 3/-inch water meter assembly and meter box I EA $'59 500. $ 13 6 Furnish and install new 2-inch polyethylene water service and 1-inch water meter assembly and meter box I EA $awm_ $ q 5-00. 7 Cut, cap, remove and legally dispose of 00 existing Asbestos Cement (AC) pipe I LS $ $ 5.000. 8 Provide temporary water service and connect to existing water meters I LS 010 S. ow - 9 Furnish and install temporary 4-inch hot tap on existing 6-inch AC pipeline with valve I EA $ Z_"p. $ 10 Remove and salvage existing wharf hydrant including removing valve, valve box and appurtenances I EA $ZC00. 4A $ Z.06e) - CD -. Chlorination and testing of all new water mains and appurtenances, complete and in place I I LS $ SDI. $ Mi�e Bu6af C-2.15 v cm1stlIxtion Co., qnc, 5102 GaYhurst Avenue Baldwin Park, CA 01706 SECTION C PROJECT BID SCHEDULE II WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY BETWEEN 16TH AND 17T11 STREET, FROM NORTH PACIFIC AVENUE TO PACIFIC COAST HWY BID ITEMS 12 Construct 4-inch blow -off assembly pipe, valve, riser, box, and all appurtenances, complete and in place 1 EA $ Z,p�•°'� $ Z,DOC' 13 Remodel existing sewer house connection laterals conflicting with proposed waterline 1 EA ®o $ &0. $ 3Q . 14 Conduct preconstruction survey of existing homes and street as required by the Contract Documents, including preparation and submission of all required reports, videos and photographs complete 1 L5 $15 00D.011 AV $ S,000• 15 Furnish traffic control in accordance with City of Huntington Beach requirements, complete and in place 1 L5 $'5 � $ 17 Furnish and install temporary plug with outlet 1 EA $ Spp. e $ _ 5;,Q 0 18 Furnish and install temporary blow -off and fittings required to jump temporary water service to new water main 1 EA $ 5©o.i40 $ Soo C—" TOTAL BID AMOUNT (IN FIGURES) — SCHEDULE H $ /Z�1, 300. - SUB -TOTAL BID AMOUNT IN WORDS: Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. MdCe BZibW, , cm,_,bwti0rd (-0., C-2.16 5102, GayllurstAvenue Ra?'dwin park,, CA 9170 SECTION C PROJECT BID SCHEDULE I WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS 14 @gm,ggma Mobilization I 1A q1111N1111Ipq LS $ $ 2 Demobilization and cleanup I LS $ $ -5.000. 3 Clearing and Grubbing I LS $3AM-&—v $ 5.Q0t7 - 4 Install AC and AC overlay 480 Tons $JZt-b.0-0 $ 57 goo. 5 Install Aggregate Base (AB) 650 Tons $ 60.leo $ 54000. 6 Unclassified Excavation 700 Cy $ .50. 0-0 $ 35 7 Cold mill 8,700 SF $ 1. av-- 1 $ 1700- 8 Construct Concrete V-Ditch Gutter 3,600 LF $ 2.6-412- $ 7A=-� 9 Furnish and install redwood header 385 LF $ 10 - $ 10 Adjust Water Cover to Grade 26 EA $ 500. $ 11 Adjust Cleanout to Grade 5 EA $ 5bo.qm $ Z, 1560 12 Adjust Electric and Telephone Pull Box and Vault to Grade 7 EA 5C0. 5on. 13 Adjust Meter to Grade 66 EA $ Soo.o—* $ 3:jk f2 Do. 14 Reconstruct PCC sidewalk 300 SF $ 50. 0-9- $ 15,600.1 15 Remove/Reconstruct Concrete V-Ditch 90 SF $ 56 .'—" $ 4 0 50D - 16 Remove and replace wheel stop 2 EA $ Z00.0-Q- oa $ Ll 00 17 Remove trees 3 EA $_5ao.o—' $ ),'506 od 18 Replant new trees 6 EA $ I $ 1p,wo- 19 Install Temporary "Parking By Permit Only" signs along Greenbelt on North Pacific and South Pacific Avenue 3 EA $ 5; Co. 6-0 Aeg- $ 1,5 0 C) - C-2.17 Mike Buba,67 Cc,., ypj-, 5102 Gayhqrs t Avenue Baldwin Park, CA Q 1706 SECTION C PROJECT BID SCHEDULE I WATERMAIN REPLACEMENT PROJECT, CC 1412 ALLEY REHABILITATION FOR ALL SITES BID ITEMS atH aimilm "OPP 20 Stop Bar, Legend, Curb and Parking Painting I LS $ I'D po- $ 1. 006 21 Furnish traffic control in accordance with the Contract Traffic Control Plan, City of Huntington Beach requirements, and Caltrans I permit requirements, complete and in place. I LS 00, $ 5,000. $ SUB -TOTAL BID AMOUNT( IN FIGURES) — SCHEDULE 1 $ -61501.6 50. l SUB -TOTAL BID AMOUNT IN WORDS: Wo C614 Note: Refer to Section 9, Measure and Payment for description of each Item on Bid Schedule. Mr. ,e Buba(o Cmistim-tiort CO., Inc. C-2.18 5102 Gaytiurst Avenue Baldwin Park, CA 91706 SECTION C PROJECT BID SCHEDULE TOTALS WATERMAIN REPLACEMENT PROJECT, CC 1412 Sub -Total Bid Schedule A Sub -Total Bid Schedule B Sub -Total Bid Schedule C Sub -Total Bid Schedule D Sub -Total Bid Schedule E Sub -Total Bid Schedule F Sub -Total Bid Schedule G Sub -Total Bid Schedule H Sub -Total Bid Schedule I TOTAL BID AMOUNT, BASIS OF AWARD (Schedules A-1) 0 «-71 boo v� 2v2. 4yo. Z © tom, t C�o =® 144 Vol T� TOTAL BID AMOUNT IN WORDS: One rvit (I too. 5tx hutndr d -e_(eNk+ `i`hi�Ynt� . -�EL" 4D(IQ�S Glv�d. oOyioo� Notes: All extensions of unit prices will be subject to verification by Owner. In case verification is required between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. Refer to Section 9, Measure and Payment for description of each Item on Bid Schedules. Mke Bubato cmutructian Co., Inc.. 5102 Ga11hurstAvenue C-2.19 Bald m !�,-_),x-k. C4,914706 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid or $10,000, whichever is greater, and the portion of the work to be done by such subcontractor. Bid Name and Address of Subcontractor State Class Dollar % of Item(s) License Amount Contract Number Aso lu 4 07 3 By submission of this proposal, the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-3 Mke Bubdo Consst=tion Co., Inc. .5102 Gayhurst Avenue Baldwin Park, CA 91706 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on.-%& i. , at Q P,4-y %v t*t , J Date City State ]*Vf being first duly sworn, deposes and says that he or,ske is g�G of Mtn , i811N,D (,�ST.,l,'�G. the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. (ko�� e")OA O �TroN Name of Bidder ignature of Bidder UffC Bubafo Constructtara Co., qnc. 590.E CaYl7ursf Avenue BaldtiJin par1T, CA 99706 C-4 CALIFORNIA JURAT State of California SS. County of Los Angeles Subscribed and sworn to (or affirmed) before me on this 26th , day of July 2012 , Dave Sorem, proved to me on the basis of satisfactory evidence to be the persons who appeared before me. qlj"-j A-am�- Heidi Granic, Notary Public (Notary Seal) HEIDI S. GRANIC Commission # 1890398 @My Notary Public - California zLos Angeles County Comm. Expires May 21, 2014 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH, CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Water Main Replacement Project, Sunset Beach — Various Locations from Anderson Street to Warner Avenue CC 1412, (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved. " The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal -OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Date: _-Jt L'? ?i?1 Z A&J� F, 191A8Q1'r'�W3/'1P�►���vn� CD tic Contrac,Wr----- y C-5 Title Mue ButEa(o co wtnxt prg C,.o LPPC. 5102 Gayhurst Avenue Baldwin Park, GA 91706 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 14310.5, the Bidder shall complete, under penalty of perjury, the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ® Yes VN o If the answer is yes, explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-6 Ma fCe Buffalo Gansu tivn Co., _Inc, 5102 Geyhursl Avenue Baldwin park, CA 91705 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Date: 77TO" 24-0,-2-012 h8k.t ry..:I-0 Cont or By Title C-7 Mike Bubb Cmhwt`on co, inc. 5102 Gayhursl Avenue Baldwin ,Park, CA 91706 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidaer Name s Address Z6JJ21A AJ eA9K- - R 17 cal. City, State Zip (bet,) CC'(eo- `?g-7 Telephone Number --7-212-=--7 cg %k State Contractor's License No. and Class Q;)V. 3®. 1 191i9 Ci Original Date Issued Expiration Date The work site was inspected by QW 5Af4lbmC of our office on .SuG , 201 Z. The following are persons, firms, and corporations having a principal interest in this proposal: C-a MffCe Bu6a(o Construct,,,a Co., Inc. 5102 Gayhurst Avenue 8aldwi a Park, CA 9170E The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Printed or Typed Signature Subscribed and sworn to before me this UP day of 1-., 201'2, NOTARY PUBLIC NOTARY SEAL Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past two years: 7tG 1. 7 Name and Address of Public Agency 2. 3. Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed Name and Address of Public Agency Name and Telephone No. of Project Manager: Contract Amount Type of Work Date Completed C-9 ` it !Bu6q(o Cm%tioti Co., ZPac. 5102 Gayhursl Avenue Baldvvirl Park, CA 9 1706 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California SS. County of Los Angeles On July 26, 2012 before me, Heidi S. Granic, Notary Public, personally appeared Dave Sorem, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. Heidi S. Granic, Notary Public (Notary Seal) HEIDI S. GRANIC Commission # 1890398 Notary Public . California Z Z ` Type of Document: Los Angeles County My Comm. Expires Ma 21, 2014 Bid Documents Capacity Claimed By Signer: _Individual X Corporate Officer(s) V.P./Sec. Treasurer _Partner(s) Limited Trustee(s) Attorney -in -Fact Other: General Signer is representing: Mike Bubalo Construction Co► wane. Inc 41 0 Water Construction Contracts Open Public Bid Contracts 11-09 City of Industry Recycled Water Project Phase IIB, Recycled Water System Customer Retrofits Award Value: $ 911,820.00 Final Contract: $ In Progress Orig. Duration: 4 Months Total Duration: In Progress Progress: 90 % Completion Date: Scope: 5000' of 2" to 8" Recycled Water Line Replacements Owner: Upper San Gabriel Valley Municipal Water District Contact: Reymundo Trejo, P.E. 602 East Huntington Drive, Suite B, Monrovia, CA 91016 Phone: 626-443-2297 Fax: 626-443-0617 E Mail: reymundo@usgvmwd.org 11-08 Ocean Ave. Alley Water Line and Sewer Replacements Project, CIP No. WT1105 Award Value: $ 1,127,320.00 Final Contract: Orig. Duration: 3 Months Total Duration: Progress: 95 % Completion Date: Scope: 1600' each of Water & Sewer Line Replacement Owner: City of Seal Beach Contact: Cesar Rangel 211 Eighth Street, Seal Beach, CA 90740 Phone: 562-431-2852 ext. 1328 Fax: E Mail: 10-06 Southeast Water Reliability Project, Phase IC Award Value: $ 2,138,000.00 Final Contract: Orig. Duration: 4 Months Total Duration: Progress: 100 % Completion Date: Scope: Mines Ave., Recycled Water Pipeline Extension Owner: Central Basin Municipal Water District Contact: Art Aguilar, General Manger 6252 Telegraph Road, Commerce, CA 90040 Phone: 323-201-5500 Fax: $ In Progress In Progress $ 2,138,000.00 4 Months 323-201-5550 r] 10-04 Fairplex Waterline Award Value: $ 48,517.45 Final Contract: $ 48,517.45 Orig. Duration: 1 Month Total Duration: 2 weeks Progress: 100 % Completion Date: April 30, 2010 Scope: Install 6" hydrant at White Ave @ Fairplex Owner: Fairplex Contact: Bill Shacklett 1101 W. McKinley, Pomona, CA 91768 Phone: 909-865-4150 Fax: 909-865-6707 09-02 Trancas Canyon Cross County Award Value: $ 535,925.00 Final Contract: $895,925.00 Orig. Duration: 4 Months Total Duration: 9 months Progress: 100 % Completion Date: 8/31/2010 Scope: Waterline and Regulating Station Replacement Owner: L.A. County Dept of Public Works Contact: Daryl Hamilton 900 S. Fremont Ave. Alhambra, CA 91803 Phone: (626) 458-5100 Fax: (626) 458-2197 Contact: Robert Eisenhamer (626)458-3155 4 StormDrain Constructionon Open PublicBid Contracts 10-12 Halls, Pickens Dunsirr>iuir and Shields Canyons Emergency Repair of Crib Structures and Slope Protection Award Value: $ 750,000.00 Final Contract: $856,255.15 Orig. Duration: 6 Months Total Duration: 5 Months Progress: 100 % Completion Date: 04/15/2011 Scope: Consulting Services for the Halls, Pickens, Dunsmuir and Shields Canyon Emergency Repair of crib structures and Slope Protection Owner: Los Angeles County Dept of Public Works Contact: Ruben Amezcua 900 So. Fremont Ave., Alhambra, CA 91803-1331 Phone: 626-458-4942 Fax: E Mail: 10-11 Eaton Canyon Golf Course Storm Drain Award Value: $ 57,500.00 Final Contract: $ 57,000 Orig. Duration: 3 Months Total Duration: 1.5 Months Progress: 100 % Completion Date: 2012 Scope: Remove 30" CMP and Replace it with 30" RCP and Replace Manhole at Riviera Dr Owner: Los Angeles County Dept of Parks and Recreation DC Golf, Doug Colliflower, 1456 E. Mendocino St., Altadena, CA 91001 Contact: David Mesa 433 So. Vermont Ave., Los Angeles, CA 90020 (213)738-2951/fax 213-738-6444 Phone: 626-821-4647 Fax: E Mail: rDmesa ftarks.lacounty.gov Award Value: $ 995,000.00 Final Contract: $ 1,028,000.00 Orig. Duration: 6 Months Total Duration: 4 Months Progress: 100 % Completion Date: September 30, 2010 Scope: Design and Build Conversion of Open Channel to Reinforced Concrete Box Owner: Fairplex Contact: Bill Shacklett 1101 W. McKinley, Pomona, CA 91768 Phone: 909-865-4150 Fax: 909-865-6707 09-06 Magnolia Channel Restoration Award Value: $ 1,030,000.00 Final Contract: In Progress Orig. Duration: 9 Months Total Duration: In Progress Progress: 99.9 % Completion Date: Scope: Detention ponds and stream and channel restoration Owner: Inland Empire Utilities District Contact: Matt Poeske, P.E., 6075 Kimball Avenue, Chino, CA 91710 Phone: (909) 993-1600 Fax: (909) 923-0468 09-01 Project 1225 Unit 2, Storm Drain Ext Award Value: $ 298,659.00 Final Contract: $318,658.75 Orig. Duration: 4 Months Total Duration: 2 Months Progress: 100% Completion Date: December 2009 Scope: Replace 12" Water main and Pressure Regulating Station Owner: L.A. County Dept of Public Works Contact: Johnny Oghoorian 900 S. Fremont Ave. Alhambra, CA 91803 Phone: (626) 458-3122 Fax: (626)458-2197 08-13 Seven Facilities Storm Drain Award Value: $ 588,339.76 Final Contract: $696,221.33 Orig. Duration: 12 Months Total Duration: 8 months Progress: 100% Completion Date: May 2009 Scope: 2350 cubic yards of debris clean -out in storm drain facilities including the installation of access manholes. Owner: L.A. County Dept of Public Works Contact: Daryl Hamilton 900 S. Fremont Ave. Alhambra, CA 91803 Phone: (626) 458-3122 Fax: (626) 458-2197 e 08-06 Beryl Street Storer Drain Improvements Award Value: $ 3,135,950.00 Final Contract: $ 3,318,379.22 Orig. Duration: 175 Cal Days. Total Duration: 175 Progress: 100 % Completion Date: October 2008 Scope: Construct new storm drain consisting of 90", 72" reinforced concrete pipes, catch basins, manholes, and appurtenant structures. Work included installation within paved traffic lanes, storm water pollution control, water and sewer relocations and landscape and hardscape restorations. Owner: City of Rancho Cucamonga, California Contact: Romeo M. David, Associate Engineer 10500 Civic Center Drive, Rancho Cucamonga, CA 91729-0807 Phone: (909) 477-2740 ext. 4070 Fax: (909) 477-2849 08-04 Storer Drain Modifications at Pomona Water Reclamation Plant Award Value: $ 103,000.00 Final Contract: $ 103,000.00 Orig. Duration: n/a Total Duration: 1 Month Progress: 100 % Completion Date: July 2008 Scope: Reconstruction of an open grate storm drain trough and modification of an existing manhole. Owner: Sanitation Districts of Los Angeles County Contact: Tommy Sung, 1955 Workman Mill Road, Whittier CA 90607 Phone: (562)699-7411 Fax: (562)695-2897 08-02 11t' Street Reconstruction Award Value: $ 3,541,345.00 Final Contract: $ 3,910,111.89 Progress: 100% Completion Date: 12/31/2008 Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90" to 18" and appurtenant structures. Owner: City of Upland Contact: Bob Critchfield, Senior Engineer 460 North Euclid Ave., Upland, CA 91786-4732 Phone: (909)291-2946 Fax: (909) 291-2946 1 i7►K KNOW ALL MEN BY THESE PRESENTS: That we, Mike Bubalo Construction Co., Inc. as Principal, (hereinafter called the "Principal"), and Fidelity and Deposit Company of Maryland , a corporation duly organized under the laws of the State of Maryland as Surety, (hereinafter called the "Surety"), are held and firmly bound unto City of Huntington Beach as Obligee, (hereinafter called the "Obligee"), in the sum of ten percent of the total amount of the bid Dollars ($ 10% ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Water Main Replacement Project Sunset Beach Various Locations from Anderson Street to Warner Ave, CC No. 1412 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter into such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 25th Witness Witness day of July A.D., 2012 Mike B ctio ., Inc. _ Pr' ipal (SEAL) ave orem Secretary Fidelity and Deposit Company of Maryland urety By (SEAL) Emily Pre 'ado Attorney -in -Fact Printed in cooperation with the American Institute of Architects (AIA) by Fidelity and Deposit Company of Maryland Fidelity and Deposit Company of Maryland vouches that the language in the document conforms exactly to the language used in AIA Document A-310, February 1970 Edition. BID70000ZZ0701 f CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California SS. County of Los Angeles On July 26, 2012 before me, Heidi S. Granic, Notary Public, personally appeared Dave Sorem, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the..State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. 4i�4 "d Heidi S. Granic, Notary Public (Notary Seal) HEIDI S. GRANIC Commission # 1890398 z a -m Notary Public - California z Type of Document: i Los Angeles County My Comm. Expires May 21, 2014 Bid Documents Capacity Claimed By Signer: _Individual X Corporate Officer(s) V.P./Sec. Treasurer _Partner(s)_Limited _Trustee(s) Attorney -in -Fact Other: General Signer is representing: Mike Bubalo Construction Comnany. Inc CALIFORNIA ALL-PURPOSE ,aBa% ACKNOWLEDGMENT __ .t O9D mac: ,��'. ,?.S;v,;.,.y,,,•i. -.. c.» . � ��;. _ ..�tf��,:i �.>._»c.�t�:>...n. .>3_»<,:,t::..ri3_+is :,�u.,ti�::n3,.y,..+y�.+9stis :ic.tti..*a�ti �i ,�r9�n ,.� . .,n �»r d_.� State of California County of Los Angeles On 7/25/12 before me, Carmen T. Pedroza, Notary Public rate H9fa MfPa FP etd i B personally appeared Emily Preciado, Attorney hi Fact Na�xRi «as7 CARMEN T. PI DROZA Commission # 1858221 IL z ; -as Notary Public - California z Z ' Los Angeles County My Comm. Expires Aug 14, 2013 who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) istare subscdtbed to the within instrument and acknowledged to me that he/shelthey executed the same in hisiber/their authorized capacity(es), and that by his/her/their *nature(s) on the Instrument the person(s), or the entity upon. behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS mhand and official se�i, Signature '��i/. 'Q Face Notny Smil Ahr.-A �,. flffiIR otafr u c OPTIONAL Though the information below is not required by law, if may prove valuable fo persons retying on the dooument and could prevent trat4ilant removal and reaffac*ment of lhie form to another docmrrenf. Description of Attached Document Titre or Type of Document: Document Date: Number of Pages. Signer(s) OtherThan Named Above: Capacity(lies) Claimed by Signer(s) Signer's Name: C Individual ❑ Corporate Officer—Tide(s): _ artner — C Limited ❑ General Attorney In Fact -1 Trustee ❑ Guardian or Conservator ❑ Other: - Signer Is Representing: HIi�Hf iHUhIHPPifrti= Signer's Name: _. ❑ Individual C Corporate Officer —Tltle(s): Partner — _t Limited ❑ General .1 Attorney in Fact L.1 Trustee np a rhumb !sere '] Guardian or Conservator Ll Other: Signer Is Representing:_ 42007NAlierta WitryAswaa6w-W500e$oioAye„PO. D=2402-Cha1..w#,.CA 9131324B2•erwnr.NaEcnaW wy..arp 'domllSAO� :7Bcxckr:Ca�t ai.peal•AOA9T8�827 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by THEODORE G. MARTINEZ, Vice President, and GREGORY E. MURRAY, Assistant Secretary, in pursuance of authority granted by Article V1, Section 2, of the By-Law�,q� icd Company, which are set forth on the reverse side hereof and are hereby certified to be in full force and effeq reof, does hereby nominate, constitute and appoint Emily PRECIADO and Carmen PED t"ca California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute ea 1• �, rri' surety, and as its act and deed: any and all bonds and undertakings pf u�� rags m pursuance of these presents, shall be as binding upon said Co y arnl , 1Piits�and purposes, as if they had been duly executed and acknowledged�b k� 1;5 cted Zany at its office in Baltimore, Md., in their own ff proper persons.�J� „ S` The said Assistant Section 2, of the By- �ert{fhat the extract set forth on the reverse side hereof is a true copy of Article VI, and is now in force. IN WITNESS WI#_RPOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of June, A.D. 2010. ATTEST: ',�Q DfPOs�t o c IE9Q :' t State of Maryland ss.. City of Baltimore FIDELITY AND DEPOSIT COMPANY OF MARYLAND All • 1 'JJ Gregory E. Murray Assistant Secretary Theodore G. Martinez On this 15th day of June, A.D. 2010, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came THEODORE G. MARTINEZ, Vice President, and GREGORY E. MURRAY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. lee Maria D. Adamski Notary Public My Commission Expires: July 8, 2011 POA-F 012-5096B