Loading...
HomeMy WebLinkAboutMcGuire Construction, Inc - 1977-07-05RECORDINCI WHEt,I RECORDED MAIL TO: REQUE81ljo CITY OF HUNTINGTON BEAC Office of the City Clerk N. 0. 19ox 190 Nulifinl.101, Heilcli, Calif. 92648 EXEMPT 1e4 C5No'1'10E CAMPIION :ORDED IN OFFICK-!k)RCS ORA1406 COUNTY, CALIFORNIA 35 A.M. MAR 3olJlj IVUE CARLYLE, County Rmn* NOTICE IS HEREBY CIVI:N tlifit the contract heretofore awarded 1-y the City Council of the City of Huntington Bearli, California to 706 S. Fee Ana, Placentia, California S2670 MC GUIRE CONSTRUCTION, INC. who 'was the company thereon for doing the following work to -wit: construction of asbestos cement water mains and appurtenance in Newman Avenue from Beach Boulevard to 1330 feet westerly; in Beach Boulevard from Warner Avenue to 1362 feet southerly; and 3n Beach Boulevard from Speer Avenue to Ronald Road, Project CC-411. That said work was completed by said company according to plans and specifications and to the satisfaction of the City Engineer of the City of Huntington Beach and that said work was accepted by the City Council of the City of Huntington Beach at a .jgular meeting thereof held on the 2Uth day of March, 1976 That upon said contract the 11nyt-ed- States Fidelity and Guaranty Company was surety for the bond given by the said company as required by law. Dated at Huntington Beach, California, this _ 2 1� day of L J_J 19 as City Cle4ela6d ex-officio Clerk of the City Council ox the City of Huntington Beach, California STATE OF CALIFORNIA ) County of Orange ) se: City of Huntington Beach ) I, ALICIA M. WENTWORTH, the duly elected and qualified City Clerk and ex- officio Clerk of the City Council of the City of Huntington Beach, California do hereby certify under penalty of perjury, that the foregoing NOTICE OF COMPLETION is true and correct, and that said NOTICE OF COMPLETION wao duly and regularly ordered to be recorded in the Office of the County Recorder of Orange County by said City Council. Dated at Huntington Beach, California, this =�-Z% This document is solely for the official business of the City of Huntinrto:: Bench, as contem- plated under Government Code Sao. 6103 and should be recorded free of charge. day of 7101erz19 79 . G ity C1 rk and ex-officio Clerk o: the City Council of the City of Huntington Beach, California City of Huntin ton Beach P.O. DOX Is* CALIFORNIA 92 M OFFICE OF THE CITY CLERK March 29, 1978 J. Wylie Carlyle, Recorder County of Orange P . 0. 5ux 238 Santa Ana, CA 92702 Dear Sir: Enclosed please find a Notice of Completion to be recorded and returned to the Office of the City Clerk, City of Huntington Beach, P. O. Box 190, Huntington Beach, California 92648. Enclosed also is a copy of the Notice of Completion. Please return the conformed copy - doctunent nutuber, recording date, book and page number. Sincerely yours, a -VI Yl. , Alicia M. Wentworth City Clerk AMW/sh Enclosure CC-411 t4"fA Irv. WHEN P,ECORDED IWL M. CITY OF HUN.INGTON It Office of the City CWk P. 0. pox 190 Nunfinglan Beach, CAL 9264E N(YrICF. IS HEREBY CIVLN that. NOTICE OF COKPRETION the contract herotofore awarded b) the City Council of the City of Huntington Beach, California to MC GUIRE CONSTRUCTION, INC_ 706 S. Pee Ana, Placentia. California 92670 who was the company thereon for doing the following work to -wit: construction of asbestos caaent water trains anC. appurtenance in Newman Avonje from Beach Boulevard to 1330 feat weatorlyt in B..ach Boulevard frota Warner Avenue to 1362 feet southerlyt and in Beach Boulevard from Speer A«nUe to Ronald Road, Project CC-411. That said work was conpleted by said company according to plans and specifications and to the satisfaction of the City Enginear of the City of Huntington Beach and that said work was accepted by t1's City Council of the City of Huntington Beach at a regular meeting thereof held on the 20th day of March, 1978 , That upon said contract the _ nni tea ,gt tea Fidelity and Guarilrlty Company was surety for the bond given by the said company as req•:1red by law. Dated at Huntington Beach, California, this - �+�q -- day of A, 19.U. City Cie and etc-of'!.cio Clerk of the City Council of the City of Huntington Beach, California STATE OF CALIFORNIA ) County of Orange ) Be: City of Huntington Beach ) I, ALICIA H. WENIVORTH, the duly elected and qualifies' City Clerk and ex- officto Clerk of the City Council of the City of Huntington Beach, California do hereby certify under penalty of perjury, that the foregoing NOTICE OF C"IXTION Le true and correct. and that said NOTICZ OF COMPLETION was duly and regularly ordered to be recorded in the Office of the County Recorder of Orange County by said City Council. 1x 7 Dated at Huntington Beach, California, this _ day of 19 7e This document in solely for the official business of the CRT of Huntington Beach, as eontem- plated under Govornaent Code Sec. 0103 and should be recorded froe of charge. ACl rk and ex-officio Clerk of the City Council of the City of Huntington Beach, California i .If o o City of Huntington Beach P.O. BOX 190 GA1.IFORNIA 99688 ENGINEERING DEPARTMENT TO: Honorable Mayor and City Council ATTN: Floyd G. Belsito, City Administrator FROM: H. E. Hartge, Director of Public Works DATE: March 13, 1978 APPRPYED BY ,CITY COUNCIL � CIVY CLLMIC SUBJECT: Notice of Completion and Change Orders 1 thru 3 for CC-411, Water Mains in Beach and Newman STATEMENT OF PROBLEM: McGuire Construction, Inc. has completed the work on the subject contract for a total cost of $100,045.18. Three change orders were issued on this contract, increasing the contract price from $86,981.80 to $100,045.18. RECOMMENDED ACTI0IN : Approve Change Orders 1 thru 3 for $13,063.38, accept the work completed by McGuire Construction, Inc. and instruct the City Clerk to file the Notice of Completion upon receipt of the required 10% Guarantee Bond. ANALYSIS: The following is a summary of the contract cost and discussion of the contract changes: Original contract bid $ 86,981.80 Change Order amount 13,063.38 Total contract price , The following is an analysis of the change orders: Chan4e Order No. 1 - It was necessary to relocate a fare hydrant because the hydrant was shown on the plans in an area in which the City had not yet acquired the right of way. The added cost of this change order is $1,380.55. Change Order No. 2 - It was necessary- to relocate a fire hydrant lateral to avoid interference with utility lines encountered during construction. The total oost of this change order is $705.18. Change Order No. 3 - Installation of additional pavement thickness was required by Caltrans. The subject contract called for the installation of 4" of asphalt concrete over 8" of base material. The Caltrans permit which was received after the award of the City's contract required 6" of asphalt concrete over 10" of base material. Also included in this change order is the added cost of removing and replacing an additional 2 1/2 ft. width of pavement along the trench because of the thickness of the exist- ing pavement. The total cost of this change order is $10,977.55. The compensation to the contractor for Change Order #3 was just recently negotiated and resulted in Council approval of the change orders concur- rently with final acceptance of the work. FUNDING, SOURCE: The project is being financed with City Water funds. HEH : JWW : j y Project Locations I . (CC 411) CITY OF HUNTINGTON BE, ORANGE COUNTY CALIF City of Huntington Beach P P POP P.0. BOX 190 CALIFORNIA 92648 ENGINEERING DEPARTMENT March 14, 1978 Frank B. Arguello Finance Director City of Huntington Subject: Dear Mr. Arguello: Water Well No. 8 CC-441, Account No. 920916 Transmitted herewith is an invoice and request for progress payment No. 1 from Beylik Drilling, Inc., 591 S. Walnut Street, La Habra, Calif. 90631, for work performed on the subject con- tract. The contract summary, to date, is as follows: MONTHLY PROGRESS ESTIKATE NO. 1 DATED FEBRUARY 9, 1978 Total amount earned $122,592.32 Retention (10%) 12,259.23 Amount paid or payable 110,333.09 Total amount previously paid -0- Amount due under this estimate 110,333.09 Total contract bid price $129,744.00 It is recommended that the request be approved and the Finance Department be instructed to prepare a check in the amount of $110,333.09. Very truly yours,. Ii . E . Hartge Director of Public Works HEH:JWW:mc Encl. cc: Administration City Clerk t,/" /r 0, City- of Huntington Beach P.O. BOX 190 CALIFORNIA 92648 ENGINEERING DEPARTMENT September 29, 1977 Frank B. Arguello Finance Director City of Huntington Beach Subject: Beach Blvd./Newman Avenue Water Main, CC-411 Account No. 920942 Dear Mr. Arguello: Transmitted herewith is an invoice and request for progress payment No. 1 from McGuire Construction, Inc., 706 S. Fee Ana St., Placentia, Calif. 92670, for work performed on the subject con- tract. The contract summary, to date, is as follows: MONTHLY PROGRESS ESTIMATE NO. 1 DATED SEPTEMBER 91 1977 Total amount earned $52,582.00 Retention (10%) 5,258.20 Amount paid or payable 47,323.80 Total amount previously paid -0- Amount due under this estimate 47,323.80 Total contract bid price $86,981.80 It is recommended that the request be approved and the Finance Department be instructed to prepare a check in the amount of $47,323.30. Very truly yours, I-1. E. Hartge Director of Public Works HEfi : J«4: me Encl.. cc: Administration City Clerk L- // ff City of Huntington Beach P.O. BOX 190 CALIFORNIA 92648 ENGINEERING DEPARTMENT September 14, 1977 Frank B. Arguello Finance Director City of Huntington Beach Subject: Beach Blvd./Newman Avenue Water Main, CC-411 Account No. 920942 Dear Mr. Arguello: ,Transmitted herewith is an invoice and request for progress payment No. l from ?4cGu re Construction, -Inc. 706 S. Fee Ana St., Placentia, Calif. 92670, for work performed on the subject con- tract. The contract summary, to date, is as follows: MONTHLY PROGRESS ESTIMATE NO. 1 DATED SEPTEMBER 91 1977 Total amount earned Retention (10%) $52,582.00 Amount paid or payable 47,323.80 Total amount previously paid -0-- Amount due under this estimate 47,323.80 Total contract bid price $86,981.80 It is recommended that the request be approved and the Finance Department be instructed to prepare a check in the amount of $47,323.80. Very truly yours, , H. E. Hartge Director of Public Works HEN: J6VW : me Encl. cc: Administration City Clerk •-1 6 41 City of Huntington Beach P.O. PDX ISO CALIFORNIA l�iN OFFICE Or THE CITY CLERK July 25, 1977 McGuire Construction, Inc. 70b 3-. Fee Ana Street Placentia, CA 92670 Gentlemen: Enclosed is an executed copy of the Contract with the City of Huntington Beach for the construction of asbestos cement water mains ai:d appurtenances, Project CC-411, in said City of Huntington Reach. Also enclosed is your Bid Bond which was submitted with your proposal. sincerely yours, klicia M. Wentworth City Clerk AMW/SH Enclosures u City of Huntington Beach 0-40%~ P.O. BOX 190 CALIFPO RNIA •1M� OFFICE OF THE CITY CLERK July 7, 1977 McGuire Construction, Inc. 706 S. Fee Ana Street Placentia, CA 92670 Gentlemen: We are transmitting four (4) copies of a contract for the construction of asbestos cement water mains and appurtenances in�yewman Avenue from Beach Boulevard to 1330 feet westerlY1 in Beach Boulevard from Warner Avenue to 1362 feet southerlyl and in Beach -Boulevard from Speer Avenue to Ronald Road in the City of Huntington Beach, Project CC-411. The contract was awarded to your firm at the adjourned regular meeting of the City Council held Tuesday, July 5, 1977. Will you kindly execu on all copies and ret Materials Bond equal Also enclosed are two This insurance form is of Huntington Beach. contracts. u to the c rn to to fifty sets of the on Please ontracts and have all signatures notarized this office, together with the Labor and percent (100%) of the contract price. a Certificate of Insurance in quadruplicate. ly one that will be accepted by the City return one set with the bonds and executed Following approval of these bonds and insurance, the City will execute the contract and return a copy to ye.u. Sincerely, Alicia M. Wentworth City Clerk AA -Ash Enclosures 711 City of Huntingtoil Beach P.O. Box ISO CALIFORNIA 925411 ENGINEERING DEPARTMENT Honorable Mayor and Council Members City of Huntingtcn Beach June 27, 1977/ `�'',�• CUU>�, Attention: Floyd G. Belsito, City Administrator Subject: Construction of Water Mains in Bea.ch Boulevard and in Newman Avenue, CC-411 Dear Council Members: The bids received June 27, 1977,.for the construction of asbestos cement water main and appurtenances in Newman Avenue from Peach Boulevard to 1330 feet westerly; in Beach Boulevard from Warner Avenue to 1362 feet southerly, and in Beach Boulevard from Speer Avenue to Ronald Road have been reviewed and found,to be satisfactory. The project was estimated to cost $106,000.00 and the bids received are listed below in order of dollar amount. 1. McGuire Construction Inc. $ 86,981.80 2. Valverde Construction 98,576.00 3. East Bay Construction 102,557.00 4. Peter C. David Company 104,871.00 5. The Gallacher Company 114,154.00 The project's Negative Declaration No. 77-44 has been granted by the City's Environmental Review Committee. The Planning Com- mission has found the project to be in conformance with the City's General Plan. The project will be financed from City Water Funds. It is recommended that your Honorable Body accept the low bid and award the contract too McGuire Construction Inc.; in the amount of. $86,981.80 and reject all other bids. Very truly yours, H . E . Hart Director of Public Work, HEH:DBB:lw t