Loading...
HomeMy WebLinkAboutOffice of Traffic Safety - 1978-11-20REQUEST FOR CITY COUNCIL ACTION Submitted by Chief Carle IV. Robitai l le Department - Police t�L Date Prepared October 27, , 1978 Backup Materiel Attached a Yes F1 No Subject Communications Integrated Traffic Records System City Administrator's Comments Approve as recommended. YEn Y co.l. 77.7CU i Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions: A Statement of Issue: The Huntington Beach Police Department has operated an Automated Traffic Records System for the last eight (8) years. This system was used to analyze traffic accident information so that appropriate enforcement and engineering steps could Le taken by the Police Department and Public Works to effectively reduce accidents. Tile system, while once considered effective, is now considered slow, burdensome and costly. Money is available through federal funding administered by the California Office of Traffic Safety for necessary program modification. Recommendation: It is recommended that the City Council pass the appropriate resolution authorizing the Huntington Beach Police Department to make application for an 584,000 grant to redesign the existing Automated Traffic Reporting System. Analysis: In 1970 the: City of Huntington Beach received a Department of Transportation, Office of Traffic Safety grant to develop an Automated Traffic Records System. Tlis system was designed and implemented by the consultant firm of Arthur Young. We operated this system since that date as a tool to assist us in developing intelligent traffic enforce- ment programs directed at the cause of accidents. The Traffic CnQi;ieering Department of the City of Huntington Beach uses the information furnished to identify engineering problems Fnd correct deficiencies in our roadway systems. A comprehensive traffic analysis system is essential in maintaining safe streets for the motoring public. In recent mont}.s, we have had cause to more closely analyze the automated system to determine if it has been truly cost effective and is meeting the objectives for which it was designed. Tile results of this analysis, which was conducted approximately 18 months ago, indicated we were spending excessive amounts of time collecting the data that was utilized by the systerr. Our estimates have run as high as 4,000 man-hours a year in data collection. During the subsequent months, we have made plans to rewrite the ATRS program, thereby reducing its maintenance costs. These plans, because of the unavailability of Data P10 3n e REQUEST FOR CITY COUNCIL. *N � OCTOEER 27, 1978 Analysis (Continued): Processing staff and other priorities that existed, for the use of programmer time delayed this effort. We now hav, the possibility of obtaining federal funds which will so modify the project that we may save as many as 3,000 man-hours a year, while improving the program significantly. The improved program will result in the capturing of more timely information that can be acted upon and should have a significant effect in reducing serious accidents at high accident locations. There will be no direct cost to the City in employees' who would contribute towards the requested provides for contractual services minimal. Alternative Actions: this program, other than the time of the development of the program. The amount so the City's contribution in time will be The Police Department and Traffic Engineering has the alternatives of continuing the existing program, or over-riding all costs associated with the rewriting of the existing Automated Traffic Reporting System. The third alternative would be to eliminate the ATRS program which would require that we manually compile all traffic and enforcement related data. The latter would result in increased costs for producing the traffic related reports. Funding Source: Absorbed within existing departmental budget. J CAPTAIN L3ERT T. EKST OM Acting Chief of Police EWR:MCB:s1:d RESOLUTION NO. 4699 A RESOLUTION OF THE CITY COUNCIL OF THE CITi OF HUNTINGTON BEACH AUTHORIZING APPLICATION FOR A GRANT FOR LAW ENFORCEMENT/TRAFFIC ENGINEERING PURPOSES WITH THE STATE OF CALIFORNIA BUSINESS AND TRANSPORTATION AGENCY, OFFICE OF TRAFFIC SAFETY WHEREAS, the City of Huntington Beach desires to under- take that certain project designated as Communications Integrated Traffic Records System, administered by the Office of Traffic Safety, State of California Business and Transportation Agency, hereinafter referred to as OTS, flow, THEREFORE, BE IT RESOLVED by the City Council of the City of Huntington Beach that it does hereby approve the appli- cation for a grant to undertake that certain project designated as Communications Integrated Traffic Records System, including any extensions or amendments thereto, pursuant to the Traffic Safety Project Agreement attached hereto and by this reference made a part hereof as though set forth fully herein. BE IT FURTHER RESOLVED ths.t grant funds received under such application shall riot supplant ongoing law enforcement/ traffic engineering expenc'itures. PASSED AND ADOPTED by the City Count1-1 of the City of Huntington Beacti at a regular mee_%ing thereof held on the loth day of November, 1978. /lr 4 �r. Mlayor ATTEST: APPROVED AS TO WORM: City Clerk City Attorney , /ahb 10/31/78 1. • _ JI ■ 1 R REVIEWED AND APPROVED: r AND APPROVED: Y 4Y Administrator (5fLPolice " M r. .S + Y 1 w M I - '1 407 Re . 4699 STATE OF CALIFORNIA ) COUNTY OF ORANGE CITY OF HUNTINGTON BEACH ) I, ALICIA M. WENTWORTH, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and Rdopted by the affirmative vote of more than a majority of all the members of said City Council tt a regular meeting thereof held on the 20 1--h day of November , 19 78 , by the following vote: AYES: Councilmen: Shenkman, Thomas, MacAllister, Bailey, Mandic, Siebert, Pattinson NOES: Councilmen: None ABSENT: Councilmen: None 7 . City Clerk and ex--officio Clerk of the City Council of the City of Huntington Beach, CPlifornia The foregoing instrument is a correct copy of the original on file in this office. Attest `r }�:t-•.�`! 1.... City -,r u' LY f.�� !% �h '-r fl� Glff vUUnCI� of t7 v;iy' 11J1!fii1jL0!' 'C" Ch, Cal. By ...' -. &-lt Ctputy �neri:i and '1'ransparLaLlon Agenc0 ro ect um er OF FIGE OF TRAFFIC SAFETY THAF'F1C SAFETY 111tWECT ACaEEM.0T Revision Number (Under Section 29U7, California Vehicle n„rr,►a,rn Criflo, and ;;er:t.Jon 4()2((;) of Public I.nw Date �'Q, Icl ,idlurld srl by 1'liblic Lau 91-60) Project Budget Estimate Fiscal Yr. Amount PART 1 1 To be Completed b1 Applicant Agency) 1. Project Title' Cournurije;ations Intekwated 1ra£fic Records System �'----- 2. Name of Applicant k1elicy TOTAL ( City of Huntington teach, Cali£orrtia Project Period Month - Dav - Year From: 01 Oi 79 3. Agency Unit to Handle Project Huntington Beach Police Department To: : 12 31 79 5. Project Description "Phis pi-N:)ject will automate the input of traffic accident and enforcement related data. a'he rv-cord will be created at ::he time of the conmunicatior► dispatch transaction, eliminating; hundreds of hours of police personnel time in the manual manipulation of traffic relate,i data. Tnis will insure ;Iiat critical accident and enforce- � rrtent information is immediately availatle to develop special enforcement programs and response to unique traffic problems. The project will. riot only improve the quality of Information, it will provide simplified, usable formats. The system will. be on-line and enable not only the more efficient deployment of traffic officers, but also provide a nitoring system for their enforcerwnt activity to instLre that they are directing their ttent:ion to critical locations and collision factors. b• Federal Yunds Allocated Under this Agreement Shall Not Exceed Z. 843000.00 7. ACCEPTANCE OF CONDITIONS - The provisions on the Reverse Side Hereof Constitute a ;gar', of this a reement. _ A. Project Director B. Authurizing Official of Applicant ,,,,cne Nnrnc Earle W. Robitailie Phone Name rloyd Belsito Phone Address (714) 536-5902 Address (714) 536-5201 Huntington beach Police Department City of Huntington Beach P.O. Box. 70, 2000 i-'lain Street P.O. Box 190, 2009 Hain Street H11nti11pton Beacin California 92648 Huntingto Beach, Califo is 92648 V Signature Signature Title Chief of Po ce Title Ci y Administrator C. Fiscal or Accounting, Official D. Office Authorized to Receive Pa_ymenL:: Name Ben ArLntello Name City of 11:1rit:ington Beach Title Director of Finance Departrrx!nt Address p. 0. box 190, 2000 Kain Street Phone (714) 536-5236 l lunt i nr;t.on F�-nch, Cril i fornin 92648 I Finance i)oartnx:nt 8. ATTACHWJ'TS . ' Project Description Schedule A lProject Task & Cost Category sunmary,.�chodt,le I- Priority and Contributions Schedule A--1 Traffic Data summary schedule I% Detailed Budget Schedule B Non -Duplication Certificate Time and Cost Estimate Schedule C hatch Act and E.O.A. Forms U'TS-F- t ( ltvv . t,/76 ) S SCHEDULE A I PROJECT DZSCIUPTION � FART 1 - Item 6 MCKGROUNP A. General Charvacteri`stics The City of Huntington Beach is situated on the coast between the cities of Long Beach and Newport: Beach. It is composed of 31.4 square miles in land area encompassing recreational, commercial, industrial and residential land uses. Within the incorporated city limits are eight miles of recreational beach, a large recreational and residential harbor, a 250 acre reglorkal park, as well as one of the larger community colleges in the Southern Ua.l4.fornia area. The city, at this time, is approximately 80% developed with several high density populated areas separated by open land. Population patterns and densities as relate to vehicle flow and volume varies on a seasonal basis. During four ninths of the year, we suffer heavy traffic congestion on major arterial highways which comprise approximately 36% of the roadway miles within .the city limits. The area is subject to moderate rains and dense fogs. The resident population of the city is approximately 166,000 with seasonal influxes raising this figure to in excess of a quarter of a million. B. Streets and Highways The total public roadway mileage within the City of Huntington Beach is 346.70 miles. Encompassed within the jurisdiction of the city are two state highways and one interstate freeway: 0 Highway 1. . . . . . . . . .Pacific Coast Highway. . . . . . . . 10 miles Highway 39 . . . . . . . . .Bea0i Boulevard. . . . . . . . . . . 5.8 miles Interstate 405 . . . . . . .`b:,�, 71ego Freeway. . . . . . . . . . 1.2 miles C. Operating Departments 1. Police Communications Bureau The Police Communications Bureau operates 211 hours a day, seven days a week and is charged with the responsibility of aJerierating the .Initial dispatch complaint on all incidents which require the deployment or dispatch of police field personnel. They must man the department's incoming business and emergency telephone lines, as well as a number of radio frequencies utilized by the Huntington Beach Police Department and other related public safety agencies. It will be their responsibility to input, into the comt)iit;er format all Information relating to traffic accidents and traffic enforcemr_rrt, along with the reltited dispositlons. 2. Police Patrol Bureau This is the uniform patrol force of the }{urit:irif t.on Beach Police Officers assigned to this bureau are di tributed on a geographical basis and respond to all calla for service. It is their responsibility to -investigate crime, as well as conduct accident investigations Wid enforce traffic infractions. At this time, the Patrol Bureau is responsible for approximately 58% of all the hazardous citations issued by the Department. OTT-F-1 (Rev. 6/73) • SCHEDULE A PROJECT DZSCRIPTIoti • I PART 1 - Item 6 (Continued) ; The final auroiriated report is the combination of 20 independent reporting categories principally concerned with accidents and citations developed by location, time, violation, collision factors, roadway conditions, frequencies and other, complex reporting criteria. Due to the nature of the report formats, the multitude of data, and the age of the data, the Police Traffic Bureau concur',ently compiles running tabulations. These ninning tabulations consist of :0,hirteen additional report.- dealing principally with the same information reported by the ATRS p: :;,,ram. Involved in the data collection and editing process, are personnel from the Police Traffic Bureau, City Traffic Engineers, Data Processing and Police Special Operations. T}-,e combined manpower necessary to produce tti-z reports exceeds 4,000 man-hours a year. The ability of any police organization to respond to the community's needs for adequate and proper traffic engineering and enforcement can only be met if it has reliable and timely data relating to accident and enforcement history. It is only with this information that the agency can identify engineering deficiencies, make the necessary improvements and attempt to change driving habits and eliminate hazards by developing intelligent enforcem.nt programs. Although the automated reporting program developed by Arthur Young was comprehensive and innovative for its time, in its application over the years it has proven to be less than effective. It not only fails to ny-�et the need f'or timeliness of Information, the formats are so cumbersome that the report is not being used to its full-!st potential. With the passage of titres, we have experienced a resurgence of manual reports to compensate for t.e deficiencies in the automated system. These problems, coupled with the fact that all govenumntal agencies are facing; serious budget restrictions, r-?quires we more closely eyvnine the utilization of personnel for tasks such as data collection. Even the most; cursory evaluation of the cost effectiveness of the existing program reflects that the experditl:� of over 4,000 ra r: -hours does not represent a sound management ri ac:ti ce . Before we consider abandoning the ATRS Program, weimist considei the nature of our traffic problem. During the year 1977, the City of Huntington Beach had 1,150 injury. accidents, with 19 fatalities. This represented a 20% increase over, the preceding year. While this increase is alarming, we find the current years statistics even more so. In the first nine months of the 1978 calendar year, we find that injury accidents have increased an additional 1.4%, with fatalities up U.l%. An-xamination of our, eriforcerwnt efforts does not refloct: a hip-Ji con -elation hetween the citations issued and accident history. In tact, the. Patrol Bwxau, which i:• responsible for issu1nt; 58% of the hard -dour vio.laLIonn, has no ::eJective e-iifur (:c:nk:nL program. Iliese deficiencies can be directly related to the inef'fectiveneso c,t' the ATRS Program. 0 • It appears essential that police agencies maintain comprehensive traffic systems to insure the PPficient utilization of their personnel resources and to provide for the safety of the motor'nr public. The only way this can be accomplished within the fiscal. limits impose -a' -on the majority of agencies is to reduce the cost of data collection while improving the efficiency of tht� systern itself. �� oTS-r- i ( Rev 6/73 ) SCHEDULE A PROJECr D%SCRIPTIGN I PART 1 - Item 6 (Continued) � I 3. Police Traffic Bureau The Police Traffic Bureau's primarS responsibility is that of traffic enforcement and accident investigat'.,n. This bureau compiles alp the traffic related data utilized in spE-ial enforcement efforts and coordinates the city's traffic enfom,�ment program with the Department of Public Works, traffic engineering; projects. The bureau is comprised of 17 motors, four traffic investigation officers, and a five man Selective Enforcement Team. b. Police Special Operations Division The Special Operations Division has the responsibility of advanced planning, planning and research, and statistical reporting. This division coordinates the development of all data processing programs both on un intra and inter -departmental basis. It is further responsible for the consolidation and distribution of statistical data on traffic related efforts. 5. Public Works Department, Traffic Engineering Division The Traffic Engineering Division consists of the planning and design, construction, traffic and maintenance of the city streets and related traffic control devices. In this process, they review all traffic accident data to assist them in identifying engineering needs in the design or modification of existing roadways or traffic control devices. 6. City Data Processing Department The Data Processing Department is responsible for the operation and maintenance of the city's data processing systems. It is their responsibility to design and develop programs necessary to meet the needs of the various operating departments in the city's structure. It is this department that handles manual data input and produces the output reports utilized by both Police Traffic and City Traffic Engineering. Their's Is a continuing responsibility of the maintenance and rmdification of ATRS programs. D. Existing System In May of 1.970, the City of Huntington Beach filed application with the Office of Traffic Safety for funds to develop an Automated Traffic Reporting System. The grants were awarded and contracts let to Arthur Young, Tnc., who ultimately completed the project which has been used b,i tails agency iru:c: 1, nI. 1-hir. Wnile the program was) well thou2bt out and provided the c3 ty w) c)) a mull, i t.ud( of statistics acid information which could be used in ort;ani.:ing and administvi.- ing both engineering and enforcement plans, it, had inherent failing, of all system concepts conceived in that era. The program requires clerical personnel review the srurce documents, which primarily consist of accident re;)orts and traffic citations, preparing the Information for a keypunch process. After that, there is a lengthy program In keypunching and verifying before the data can be used to produce the automated traffic report;. The data in the final report is between 30 and 45 days old, depending upon the reporting cycle. oTS-F-1 (Rev. 6/73) E SCHEDULE A PROJECT^ D SCRIPTION PART f - Item 6 (Continued) _. ATI'Etfl'S TO SOLVE PROBLEM The attempts made by the city to solve the problem have consisted of minor rewrites of the software to accomplish some humanization of the ATRS format and the elimination of non -essential data from the report itself. The objective of this effort w--,s to encourage the various managers and supervisors to use the report and reduce the input tine. These efforts have proven futile and we have found ourselves relying more heavily on manually produced running tabulations. WJth a loss of manpower created by recent tax reforms, we are faced with the elimination of the manually compiled report which will further cause a degradation of our selective traffic enforcement program. PRMARX OBJECrIVFS Such a project would allow the department to continue the collection and manipulation of traffic related data in a cost effective manner and improve the traffic pro,Tam by making the enforcement personnel rwre effective while allowing the administrator to reallocate wore resources into, an enforcement role. As a significant-, objective, it is our, intention to eliminate the majority of the 4,018 man-hours currently used to collect data for the existing ATRS Program. .Developing a hig)ner correlation between accident history and enforcement deployment. .Early identification of accident problems. .Tirprove selective enforcement. .Better utilization of resources. .Reduction of accidents. .Improved engineering of roadways. .Provide selective enforcement guidelines for non -specialized patrol. .Reduce accidents at high accident locations. .Reduce costs of AIRS maintenance. - VMIOD OF PROCEDURE It Is proposed that the Autom ted Reporting System as it exists, be redesigned to interface with existing Computer Aided Dispatching Systems. This solution would allow the capture of traffic enforcement data at the time it occurred instead of weeks later when the reports are pro^essed tY.,ough a statistical unit. At the conclusion of the initial investigation, the disposition and case coding currveritly provided by the officer, is incorporated into the Computer Aided Dispatch ixlport . ` o. Atli: oma0.od Reportint; System would extr-act this data, thumti,by providing the Llrr>'�, location, primary collision fa -tors and other information on which enforcement action may be planned. Also processed through the conrmi nications computer is the officer's field activity. This is done in the form of a niaber of status changes and includes the locations and license numbers of vehicles stopped or traffic related violations. It in proposed that attached to the officer's identification number and the time and location of the tra, ffic stop will be an enforcenr.nt disposition. This - r, be accomplished wiLh nu more effort that it takes to manually change the unic's status on +..'v Computer Aided OTS-r.., (Rev. 6/73) t' "N SCHEDULE A PF40JECT MZSCRIPTIOU PART I- Item 6 (Continued Dispatch format. In opet-ation, when a unit cleared the scene of an enforcement activity, he would simply give a code similar to "118" which would be interrr•eted as an oral warning on a turning violation. A simple three digit dispositlon could handle ten types of enforcement activity on 99 principle classifications of traffic violations. This proposal would allow the captut,ing of relevant traffic accident and enforcement data without the massive expenditures of tim. used in c:i.rrrent .,yst1.e1W,. Not only would the cost associated with the data collection lie eliminated, the data would be housed within the coiputer at the exact time of the transaction. It is our, proposal that we interface the oiTput-er Vf ded Dispatching, computer with the computer that etarently houses the Automated Traffic honorting Program. This would allow an instantaneous transfer of tlye traffic data to the comrq)uter program that produces the Automated Traffic Reporting reports. The data would be carried in disk on-line in the Automated Traffic Reporting computer and recoverable from terminals located both in Traffic Engineering and the Police Trafi'ic Bwreau. In order to provide more ccxrplex data elen>Lnts required by Traffic Engineering and not by police, the record which was initiated during a police comrninication transaction would be recoverable on the n-affic I-ritririeering tei-ndrial. From this terminal, the Traffic Eng,Inee ring persorinel could eater detailed data elements not collected in police coniriuiications transactions. Based on variable reportl.ng stwxiards, Lhc-, I I ic- Traffic Bureau :.upervisor will have accessto the data base on which he van base .r►fc?rct�mrnt; dec.i::ion:;, develop p3an3 and make assij,7inent.s. Utili::i.ti, the data collt!rt:ed ci..rinF, the traffic related :status changes, lie can measure his enforcement respnnse, con:;1derinh; all types of enforcement from, written warnings to written citations, the violations cc-Ai4jar.ing them with his accident profile. 'Kaffir, Engineering, on the other hTid, can extract nnre detailed Information in the formats they feel are more suitable in meeting their engineering needs. 'lie prcposed project will serve aS a ni)del .7nr �;,<� m-iy agencies who u-e ctu,rently either, utilizing; or considering C'nirputer Aida? Dispatch SystErris. As the design will not only provide t.im-l;; and a, r,cw,at e irSor-,iation, it: will serve to enhance existing Coi�uter Aided DI -patching ;,ysteiro, making them nnre cost effective. While we area der.ling with pibbleri.,; we have- faced In tlx� past, this innovative approach des-ervc:s serious consideration because ()f t-h-- timr_ly natur-: of the information that will be produced, and the low cost of pr,c�ciuction of ,Mr h information, as well as the fact that it will enhance the effectiveness L-ind efficiency of the Traffic Engineering anti Police Traffic Fiiforcerrent Programs. Phase I = Detai lud Ana; yyjl s anti System D21 ic-i W uivar�y 1 - 3 i , i �)79 ) A Pro,jrc;t: Corn:' `.tee will be established eoctl'-rised of of t,hr. 1'011ce ::t"-Clal Q)erations Division, Cornnurri cat ions/Pec-)r11, , 1'ol ici - W.aff i t Dii rr71i, City ' vri f'fl c Engineering- aixi Data ProcessOng. This C0r-Tr11tA,Cc• hU f'ur. co')1-dinat.111F. the p] arriin ; of the system rrx-)di ficatiorl and coorciinat; inE; the efforts of Uil. various: user departrmnus . `Me ertiinittee shall produce a detailed arialysis cif' all the report,:.) required 1.0 imet the objective of the traffic; enforcement and engineering progranrs. is oTs-;-1 (Rev. 6/73) • 0 SCHEDULE A PROJECT n::SCRIPTICV PART t - Item 6 (Continued Identify those data elements that will be transferrved from the Police Computer Aided Di.,patching System rind those non -critical elements in the reference of time twat can be entered subsequent to the initial transaction by Traffic Engineering. Tdentify required hardware interfaces between Police Computer Aided Dispatch arK1 the City Burroughs System, including terminals and printers within Police 7affic Bureau and City 'Traffic engineering. Phase II - P:.�eparation and Invitation for Bid, Selection of Contractor (Feb. 1-28 '79, Development of bid specification.-, and solicitation of vendors for software and hard- ware designs, procurement and development. Obtair bids on system. Conduct vendor conferences and interviews, selection of vendor. Pha:,e II1 - Inpjementatrion (March 1 -- NoverMer 30, 1.979) Refine, design and development of the system. Review progress reports on a rrrxnt:hly basis, meeting iTith the vendor to assure proper perforTrrance of contract. Installation of the system with all proper interfaces and hardware. Inventory and mechanical checkout of system. Phase IV - Evaluation (Decerrl)er 1 - '411 1979) Preliminary evaluation which will consist, of conducting specified acceptance tests to determine that all har dwa e .ar:i interface systems function and software performs the tasks specified in the Statement of V)r'kc. tMtOD OF IENALUATION The project evaluation will be conducted or: two levels. Both Levels of evaluation will be implemented by %:ity Persoruiel. level I will be a short term asseasur ant. of the system functions in relation to the Initial D__t:ailed Analysis and Statement of Work. Level II will be a long term (two year follow-up) assessment of the inplerneritation of the prx)ject in regard to the primary objective:_ setforth in the Project Description. A detailed analysis will be made in refermnce to all quantitative measures referring to each primary objective. The Level I evaluation will be included in the projects final report. bevel II results will be forwarded to the Office of i`rafftc Safety approximately two years aria 60 days following tt"e completion of the pry-)ject. STATNEW OF 1F nlfI' We have considered the continuing operational costs of trg)lernenting this proLq�arn quid It is the intent of this community to continue the operation and rrt<ainten.,mce of th.h., program, -41th increased emrphasis on selective enforcement and traffic englrrecr hig u:,e of the resulting reports. nTS-r-1 (Rev. 6/73) rt � a Ask law& SCHEDULE A-1 Priority Statement - Explain what type of priority this project has in your jurisdiction. A r,(-?vi(-,w cif' Huntington Beach Police Pkpartment' In cia,r ent traffic safety activities; VeVeE l that there Nis been increasing attention given to traffic; enforcement:. In t:hr� fli-;t ten (10) rrnntlr, of the, 1078 year, the number of hazardous; citations written have hven Ineve-as e'd by 40%. Efforts have been made to correlate traffic safety a.ssigrinrents3 with t niffle accident patterns to insure the rraximn enforcemf-!nt during timt?s of high incident:, of accidents. The departrrrent has also created a Selective f�iforcement Team in an effort to reduce our accident rates. In spite of these efforts, we are continuing to experience a :317ii ficant increase in tt-Y, nurd)er of traffic accidents, and an alandng escalation of fatal accidents. An cTialysis cf the problem indicates that our enforcennrit program does not specifically identify primary collision factors and locations in a timely manner. Because: of this, otir efforts ary not as effective as they should be. For this reason, we must designate as "top priority" this project: to inprove our traffic reporting and analyst., ability. It is throuLli these irrproverrents that vie will be able to rmke our enf'orcerrvent. efforts more affective. in the reduction of injury accidents and accidents in Frneral. 11 Aqency Contribution - Explain what services agency in support of this project. or funds are being contributed by your Police Captain - Project Coordinator 150 hours @ $25.25 per, }roue . . . . . . . . . . . . . . . . . . . . . $ 3,787 . 50 Police Department -- Project Staff 500 hours @ $15.75 per hourr . . . . . . . . . . . . . . . . . . . . . $ 7 , 875.00 Traffic; EnFrineer - Project Staff' 100 hours? @ $19.20 per hoiu•. . . . . . . . . . . . . . . . . . . . .$ 1,920.00 Data Processing - Project Staff 200 hour:, @ $ i U . 00 per hour . . . . . . . . . . . . . . . . . . . . . . $ 2 , 800.Oo Accounting - I"iscal Reportin ; 118 hour!; @ $8. 00 per hour' . . . . . . . . . . . . . . . . . . . . . $ 3811.00 'I17I'lll,. . $ 16,766.50 In adrittion, the City (,f Iluntirirton Beach wi l I provide rill 1'01, rrtect;inlr:: ruid project supplle:. t+ which tin o:,f; c st, irnrit.r, c try tx> n�ufc . I V i OTS-F-.1 (Rev. 6/73) ,►weeaau��.�a-=�s::�;....Mt... �Y.��Y.•..�..��� � , � . _ .�- ... , :�,• :�::car, ..;•....�txK.-.;^►�'.� +•�r.1s sec}.+;�}� r r 'St_�:.,�ri.:s.�i'�.::�.'�,i]....�.. t a ,'i(HIA)III,1: li I)vta:6 1r.c1 Budget I imil tH PART 1 - Item 7 Budget Detail, 1'a Cost Category fiscal Yeah Cstimates 'Total Cost To Project FY--1 FY- 2 FY- 3 FY-- 4 1978 - 79 1979 - 80 A. Personnel Costs POSITIONS AND SALARIES LMPLOYEr. 1iENEFITS Tot-tl Personnel Costs 0 0 1 0 H. Tv avel Ex ease To--[..i f Ti-,ivu l I:xpvn:;r_ 0 0 C. Contractual Services Contract, for System IMlem-ntation Tot :i L Contractual Services $ 0 $ 701000 i 70 oon 0 SCHEDULE B Detailed Budget Estimate PART 1 - Item 7 Budget Detail Pa ge 2 �- �a - Tota 1 Cost Cost Category FY-1 FY-2 FY-3 FY-4 To Pro'ect L . Non E:.pendable t'roperty 1978 - 79 1979 - 80 (2) Video Terminals 0 $2,200 $ 11 400 4,1100 (2) Printers $2 , 000 $ 11,000 $ 11, 000 (2) Ldne Adapters @ $1,200 $ 2,400 $ 2,1100 (2) Modems 0 $1,000 $ 2,000 $ 2,000 Miscellaneous cables and installation costs $ 12200 14, 1,200 Total Non FxT�endj3ble :$ 14,000 :; 141000 Property I:')ther W rec t Cus t:; AN ' `iI OtherI)it•c•ct O)St—, F. Indirect Gust., t -31 Indirect Costs 0 1' PTAI, BUDGET USTTMATI: A 1 1 "a t(!go v i $ 111,000 $ 70,000 OTa-F-1 (R,-v 10/78) ' SCHEDULL n-1 Budget Narvav ive P contract. or contmctn m-e to be negotiated !'or, the soi't:wa.rr development and system integration required for the i.mplemnitation (,f idle project. Tire City Data Proces:;i.rig staff has estimated the tirrre required to perform the individual rm iim, tasks. qh-. costs were estimated at the industry standard of $35 per hour which includm the contractee's associated overhead, benefits, clerical support and con4mter time. Systern study . . . . . . . . . . . . . . 12 man weeks Application programming CADS chit -put, rrom DEC . . . . . . . . t3 CADS in -put to Burroughs . . . . . . . 0 ATRS Modification . . . . . . . . . 16 Generalized retrieval prYoE;rarn . . . . 8 50 Imin w(,c.lc:; 2,000 hours @ $35 = $70,000 0TS-F-i ev.6/'7L3 SCHE")U .E C �rc�-Zt Time an' `=xpen�it::_-e Schedule x 17Y 1978 - 179 FY 1979 - '80 : Otect By Task JkN -MARCH 1979 APR - JU IE 1979 JULY - SEPT. 1979 OCT - EEC 1980 1 2 3 4 .0 0 z 8�,oco PJ 0 142000 70,000 Quarterly Costs 0 0 145000 70,000 C-�Sts o Q 14,000 84,000 OTS--F-1 (RP':. 5/7' ) . (1) Population (2) Roadway Miles (3) # Citations for Moving Violations (4 ) # Accidents All MV Accidents Motorcycle Bicycle Pedestrian (5) # Victims Motor veh. occ . Motorcyclist/pass. Bicyclist/pass. Pedestrian Total Victims See Instrt�ctiona P.everse Side SCHEDULE E 0. 3-Year Trai*ic Data Sunnary City of Huntington Beach —in/or County of Orange Last Year (19 77 ) 2 Years Ago (19 76 ) 3 Years Ago (19 75 ) OTS Use Jnl� 161,301 157,800 152,148 346.70 345.5 337.76 22)990 227243 162194 Fatal Injury Fatal Injury Fatal Injury 19 13150 19 961 13 650 4 103 11 87 2 66 1 109 2 95 0 113 0 48 .0 69 2 54 15 19269 17 1)185 10 N/A NIA 5 121 148 4 91 3 89 0 0 69 2 55 21 12602 23 12440 15 940 0TS--F-1 (Rev. 11/73) C7 s e. California Traffic Safety Program Application of the Hatch Act to State and Local Agencies Receiving Funds Under the Highway Safety Act of 1966 . This is to certify that all employees of this agency whose principal employment is in connection with any Highway Safety Project financed in whole or in part by loans or grants under the Highway Safety Act of L966 has been made aware of the pro -- visions of Section 12(a) of the Hatch Act (5.U.S.C. 118k(a)). SIGNATURE: • v-..) Project Direc r Hiniti.nf;ton Beach Police Department Agency OTS- F- 23 California Traffic Safety Program Equal Opportunity Assurance with Regard to the Highway Safety Program Pursuant to the requirements of Title VI provisions of the Civil. Rights Act of 1964, the State Agency/City/County of liwitington Beach acting, through its chief administrative officer, desiring to avail itself of the benefits of Chapter 1, Titl,- 23, United States Code, and as a condition to obtaining the approval of the Secretary of 'Transportation and Governor of California of any highway safety projects as provided for in Title 23, United States Code, Section 105(a), hereby gives its assurance that all provisions of Equal. Opportunity Assurance with regard to the Highway Safety Program stated in Exhibit G of the California Traffic Safety Program Grant program Manual Volume II will be complied with fully. r-'�SIGNATURE %'ATJQ' Tit le Chief of Police tale Agency/ City/County Clt.,y ul'�Hw)t Ing-tall lk'ach _ e OTS-F-214 RVv. 11 /76 r7 ti -, • C7 0 State of California 0 Business and Transportation Agency OFFICE OF TRAFFIC: SAFETY CERTIFICATION OF NON -DUPLICATION OF GRANT FUND EXPENDITURE This is to certify that the City of Huntington Beach ate Agency1City1CounEy1DiBtrfct, etc. has no ongoing or completed projects under, agreement with TOPICS, CCCJ (LEAA), HEW, or other federal fund sources, which duplicate or overlap any work contemplated or described in this Traffic Safety Project titled, Communications Integrated Traffic Records System It is further agreed that any pending or proposed request for other federal grant funds which would duplicate or overlap work under this Traffic Safety Project, will be revised to exclude any such duplication of grant fund expenditures. It is understood that any such duplication of federal fund expenditures subsequently determined by audit will be subject to recovery by the Office of Traffic Safety. CERTIFIED IN 116 1 0% zgnature Carle W. Robitaille, Chief' of Police Type Name and Title Z- atr_ OTS - F- 3 7 :�� "A