REQUEST FOR COUNCIL ACTION
C
SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
SUBMITTED BY: RAY SILVER, City Administratora� 71
' PREPARED BY OBERT F. BEARDSLEY, Director of Public Works -D
1
L
SUBJECT: Approve Contracts for On-call Testing and Inspection Services,
Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s)
Statement of Issue: The Public Works Department requires independent inspection and
testing services for a variety of projects. Services include geotechnical testing, material
testing, welding, and concrete inspection. Contracts with three qualified firms to perform
these functions on an on-call basis are proposed.
Funding Source: Funds are available within budgeted capital improvement projects.
Recommended Action: Approve and authorize the Mayor and City Clerk to execute
contracts for on-call testing and inspection services with PA and Associates, not to exceed
$350,000; with AESCO Technologies, not to exceed $350,000 and with Harrington
Geotechnical Engineering, Inc., not to exceed $350,000.
Alternative Action(s): Do not authorize the contracts. This action will delay capital project
completions.
�J16iiiI�-%ry 6 /NG_
v4� crn ('ate.
C.�
*QUEST FOR COUNCIL ACTIN
MEETING DATE: February 2, 2004 DEPARTMENT ID NUMBER: PW 04-006
Analysis: The Public Works Department contracts with several different firms to provide on-
call geotechnical testing, materials testing and other inspection services. The services are
necessary when the contract requires independent or specialty services. Occasionally,
inspection services will be requested if Public Works staff is not available. It is critical to
project schedules that these services be readily available. The on-call agreement provides
maximum flexibility when testing and inspection services are required on short notice.
The agreements are established for a not-to-exceed dollar amount over a three-year term.
Proposals were requested and submitted in compliance with Chapter 3.03 of the Huntington
Beach Municipal Code. Funding sources will be primarily capital project accounts, using the
approved project budget. Testing and inspection services are examples of supplemental
expenses that are budgeted in each project.
Public Works Commission Action: Not required.
Environmental Status: Not applicable
Attachment(s):
City Clerk's
. - Number No. Description Agreement with P.A. and Associates wl insurance certification
2 Agreement with AESCO Technologies wl insurance certification
3 Agreement with Harrington Geotechnical Engineering Inc. wl insurance
certification
4 Request for Proposals
RCA Author: L Daily x 5599
G:1R C A12004104-006 Feb 2 Daily(Contracts for on-call inspection services).doc -2-
11141200410:36 AM
CITY OF HUNTINGTON BEACH
2000 MAIN STREET CALIFORNIA 92648
OFFICE OF THE CITY CLERK
CONNIE BROCKWAY
CITY CLERK
LETTER OF TRANSMITTAL OF ITEM APPROVED BY THE CITY COUNCILI
REDEVELOPMENT AGENCY OF THE CITY OF E UNTINGTON BEACH
DATE: —Jr �O D
TO: `P /1. &-Si-0 A'I—E1 _ I�C'��� ATTENTION: 7�__eVla _
Name,-;t �,, � " �r
.1 1 I'1�L1 n N w V - DEPARTMENT:
st�et T
3 REGARDING:
City,State,zip
See Attached Action Agenda Item Date of Approval
Enclosed For Your Records Is An Executed Copy Of The Above Referenced Agenda Item.
Remarks:
Connie Brockway
City Clerk
Attachments: Action Agenda Page // Agreement Bonds Insurance ' ✓
RCA Deed Other
CC: '� ✓ ✓
L
Narpe L� arbrient i RCA Agreement bisurance Other✓ ✓ ✓
jJ 0T—(-0
✓RCA Agreement insutanyt Other
Name armwea RCA AVe+e L lrmutance Otk'a
Name Department RCA Agreement Insurance Other
gJfollowuplletters/coverlmdoc (Telephone:714.536.52Z7)
ATTACHMENT # 1
s s
PROFESSIONAL'SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
A. V A ssocaet es Inc
FOR
cak 4A,01cl cf A i n t '0
THIS AGREEMENT ("Agreement") is made and entered into this c;�116 day of
- „ 20 Q�, by and between the City of Huntington Beach, a municipal
corporation of the State II of California, hereinafter referred to as "CITY, and
�' A = -L�_f45Soc. 'F� In G , a efAZzfa&
hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the _- services of a consultant to
�,*I L a4-aaJ koklef VinsoeAoj &Lrvk'46 and
Pursuant to documentation file in the office of the City Clerk, the provisions of
the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of
professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services,
NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:.
1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A,"
which is attached hereto and incorporated into this Agreement by this reference. These
services shall sometimes hereinafter be referred to as'the�"PROJECT."
[ A-Zcllr wCONSULTANT hereby designates . I • he shall
t r
represent it and be its sole contact and agent in all consultations with CITY during the
performance of this Agreement.
agree/forms/profsery 10/15/01-A 1
2. CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT
in the performance of this Agreement.
3. TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT
are to commence as soon as practicable after the execution of this Agreement by CITY (the
",Commencement Date"). This Agreement shall expire on 6- a`I-0 5 , unless
sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be
7ttE-
completed no later than n'S.s -4mm the Commencement Date of this
Agreement. These times may be extended with the written permission of CITY. The:time
for performance of the tasks identified in Exhibit "A" are generally to be shown in
Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed
to in writing by CITY and CONSULTANT.
4. COMPENSATION
In consideration of the performance of the services described herein, CITY
agrees to pay CONSULTANT on a time and materials basis at the rates specified in
Exhibit "B," which is attached hereto and incorporated by reference into this Agreement,
a fee, including all costs and expenses, not to exceed
.a
TN/Zf I-,'&wbafb -Fifty TN.QuSf}-4j3 Dollars($ 3 50, 000 _ }.
S. EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A"
or changes in the scope of services described in Exhibit "A," CONSULTANT will
undertake such work only after receiving written authorization from CITY. Additional
agree/forms/profservE0115/0l-A 2
compensation for such extra work shall be allowed only if the prior written approval of
CITY is obtained.
6. METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B."
7. DISPOSITION OF PLANS,ESTIMATES AND OTHER_DOCL-MENTS
CONSULTANT agrees that title to all materials prepared hereunder,
including, without limitation, all original drawings, designs, reports, both field and office
notices, calculations, computer code, language, data or programs, maps, memoranda,
letters and other documents, shall belong to CITY, and CONSULTANT shall turn these
materials over to CITY upon expiration or termination of this Agreement or upon
PROJECT completion, whichever shall occur first. These materials may be used by CITY
as it sees fit.
8. HOLD HARMLESS
CONSULTANT hereby agrees to protect, defend, indemnify and hold
harmless CITY, its officers, elected or appointed officials, employees, agents and
volunteers from and against any and all claims, damages, losses, expenses, judgments,
demands and defense costs (including, without limitation, costs and fees of litigation of
every nature or liability of any kind or nature) arising out of or in connection with
CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent performance of
this Agreement or its failure to comply with any of its obligations contained in this
Agreement by CONSULTANT, its officers, agents or employees except such Ioss or
damage which was caused by the sole negligence or willful misconduct of CITY.
CONSULTANT will conduct all defense at its sole cost and expense and CITY shall
agreelformslprofsery 1 011 510 1-A 3
approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims
and liability regardless of whether any insurance policies are applicable. The policy limits
do not act as limitation upon the amount of indemnification to be provided by
CONSULTANT.
9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability
insurance policy covering the work performed by it hereunder. This policy shall provide
coverage for CONSULTANT's professional liability in an amount not less than One
Million Dollars (S1,000,000.00) per occurrence and in the aggregate. The above-
mentioned insurance shall not contain a self-insured retention, "deductible" or any other
similar form of limitation on the required coverage except with the express written consent
of CITY. A claims-made policy shall be acceptable if the policy further provides that:
A. The policy retroactive date coincides with.or precedes the initiation
of the scope of work (including subsequent policies purchased as
renewals or replacements).
B. CONSULTANT shall notify CITY of circumstances -or incidents
that might give rise to future claims.
CONSULTANT will make every effort to maintain similar insurance during
the required extended period of coverage following PROJECT completion. If insurance is
terminated for any reason, CONSULTANT agrees to purchase an extended reporting
provision of at least two (2) years to report claims arising from work performed in
connection with this Agreement.
agree/forms/profservl0115/01-A 4
i •
10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT
shall furnish to CITY a certificate of insurance subject to approval of the City Attorney
evidencing the foregoing insurance coverage as required by this Agreement; the certificate
shall:
A. provide the name and policy number of each carrier and policy;
B. shall state that the policy is currently in force; and
C. shall promise that such policy shall not be suspended, voided or
canceled by either party, reduced in coverage or in limits except
after thirty (30) days' prior written notice; however, ten (10) days'
prior written notice in the event of cancellation for nonpayment of
premium.
CONSULTANT shall maintain the foregoing insurance coverage in force
until the work under this Agreement is fully completed and accepted by CITY.
The requirement for carrying the foregoing insurance coverage shall not
derogate from CONSULTANT's defense, hold harmless and indemnification obligations as
set forth in this Agreement. CITY or its representative shall at all times have the right to
demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a
prompt and timely manner,the premiums on the insurance hereinabove required.
11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of
this Agreement as an independent contractor herein and not as an employee of CITY.
CONSULTANT shall secure at its own cost and expense, and be responsible for any and
agreelforms/pro£sery 10/1901-A 5
all payment of all taxes, social security, state disability insurance compensation,
unemployment compensation and other payroll deductions for CONSULTANT and its
officers, agents and employees and all business licenses, if any, in connection with the
PROJECT and/or the services to be performed hereunder.
12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike
manner. CITY may terminate CONSULTANT's services hereunder at any time with or
without cause, and whether or not the PROJECT is fully complete. Any termination of this
Agreement by CITY shall be made in writing, notice of which shall be delivered to
CONSULTANT as provided herein. In the event of termination, all finished and
unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become
its property and shall be promptly delivered to it by CONSULTANT.
13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall
not be assigned, delegated or subcontracted by CONSULTANT to any other person or
entity without the prior express written consent of CITY. If an'assignment, delegation or
subcontract is approved, all approved assignees, delegates and subconsultants must satisfy
the insurance requirements as set forth in Sections 9 and 10 hereinabove.
14. COPYRIGHTS/PATENTS
CITY shall.own all rights to any patent or copyright on any work, item or
material produced as a result of this Agreement.
agreelforms/proftery 10/15/01•A 6
15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any.regular CITY
employee in the work performed pursuant to this Agreement. No officer or employee of
CITY shall have any financial interest in this Agreement in violation of the applicable
provisions of the California Government Code.
16. NOTICES
Any notices, certificates, or other communications hereunder shall be given
either by personal delivery to CONSULTANT's agent (as designated in Section 1
hereinabove)or to CITY as the situation shall warrant, or by enclosing the same in a sealed
envelope, postage prepaid, and depositing the same in the United States Postal Service, to
the addresses specified below. CITY and CONSULTANT may designate different
addresses to which subsequent notices, certificates or other communications will be sent by
notifying the other party via personal delivery, a reputable overnight carrier or U. S.
certified mail-return receipt requested:
TO CITY: TO CONSULTANT:
City of Huntin ton Beach �- A S 5_0�:e! -e- a.<„.
ATTN: "J' a ca
So I k AA
2000 Main Street z w '
Huntington Beach, CA 92648
LOLPAL,Lmc,
17. CONSENT
When CITY's consent/approval is required under this Agreement, its
consent/approval for one transaction or event shall not be deemed to be a consent/approval
to any subsequent occurrence of the same or any other transaction or event.
nipe/rorms/proi'sery 10/15/01-A 7
18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid
unless in writing and duly executed by both parties.
a SECTION HEADINGS
The titles, captions, section,paragraph and subject headings, and descriptive
phrases at the beginning of the various sections.in this Agreement are merely descriptive
and are included solely for convenience of reference only and are not representative of
matters included or excluded from such provisions, and do not interpret, define, limit or
describe, or construe the intent of the parties or affect the construction or interpretation of
any provision of this Agreement.
20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed
as a whole, according to its fair meaning, and not strictly for or against any of the parties.
If any provision of this Agreement is held by an arbitrator or court of competent
jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate
or affect the remaining covenants and provisions of this Agreement. No-covenant or
provision shall be deemed dependent upon any other unless so expressly provided here.
As used in this Agreement, the masculine or neuter gender and singular or plural number
shall be deemed to include the other whenever the context so indicates or requires.
Nothing contained herein shall be construed so as to require the commission of any act
contrary to law, and wherever there is any conflict between any provision contained herein
and any present or future statute, law, ordinance or regulation contrary to which the parties
have no right to contract, then the latter shall prevail, and the provision of this Agreement
agreelformVprofsery]0/1510l-A 8
i •
which is hereby affected shall be curtailed and limited only to the extent necessary to bring
it within the requirements of the law.
21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been
prepared and signed in counterparts as duplicate originals, each of which so executed shall,
irrespective of the date of its execution and delivery, be deemed an original. Each
duplicate original shall be deemed an original instrument as against any party who has
signed it.
22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the
immigration and naturalization laws of the United States and shall, in particular, comply
with the provisions of the United States Code regarding employment verification.
23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any
subcontractor work involving legal services, and that such legal services are expressly
outside the scope of services contemplated hereunder. CONSULTANT understands that
pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive
legal counsel for CITY; and CITY shall not be liable for payment of any legal services
expenses incurred by CONSULTANT.
24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or
enforce the terms and/or provisions of this Agreement or to secure the performance hereof,
sgreelfanns/profsery 10/1 510l-A 9
• 0
each parry shall bear its own attorney's fees, such that the prevailing party shall not be
entitled to recover its attorney's fees from the non-prevailing party.
25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context
survive the expiration or termination of this Agreement, shall so survive.
26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the
laws of the State of California.
27. ENTIRETY
The parties acknowledge and agree that they are entering into this
Agreement freely and voluntarily following extensive arm's length negotiation, and that
each has had the opportunity to consult with legal counsel prior to executing this
Agreement. The parties also acknowledge and agree that no representations, inducements,
promises, agreements or warranties, oral or otherwise, have been made by that party or
anyone acting on that party's behalf, which are not embodied in this Agreement, and that
that party has not executed this Agreement in reliance on any representation,inducement,
promise, agreement, warranty, fact or circumstance not expressly set forth in this
Agreement. This Agreement, and the attached exhibits, contain the entire agreement
between the parties respecting the subject matter of this Agreement, and supercede all prior
understandings and agreements whether oral or in writing between the parties respecting
the subject matter hereof.
agree/forms/profserv!0/15101-A 10
• i
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed by and through their authorized offices the day, month and year first above
written..
CONSULTANT,
�1
CITY OF HUNTINGTON BEACH,
A S5 �:�,�e tii_�. a municipal corporation of the State of California
3 GY
( k 9 z 6 1
By: Mayor
print name
ITS: (circle one;Cheinna4ztsiden ice President ATTEST
AND
Ati ty C 1 e rk�/s/off By:
_ lA M�fiLleJMLL APPROVED AS TO FORM
' ma
ITS: (circle on Secretary hief Financial Officer/Asst.
VIP Secretary—Treasure 'i(' City Att rn y 9 63
Ig-
REVIEWED AND APPROVED IT TED PPROVED
/ r
Director Public Works
City Ainistrator
agrwlforms/profsery 10/15/01-A l l
PROFESSIONAL SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
FOR
Table of Contents
1 Scope of Services.....................................................................................................1
2 City Staff Assistance................................................................................................2
3 Term;Time of Performance.....................................................................................2
4 Compensation ...............................................................................:.......... ...........2
5 Extra Work..... ........................................................................................................2
6 Method of Payment..................................................................................................3
7 Disposition of Plans, Estimates and Other Documents ...........................................3
8 Hold Harmless .. ......................................................................................................3
9 Professional Liability Insurance..............................................................................4
10 Certificate of insurance............
.......................................................................5
11 Independent Contractor....:::::...:`........................................................... ......... .....6
12 Termination of Agreement.......................................................................................6
13 Assignment and Delegation......................................................................................6
14 Copyrights/Patents...................................................................................................7
15 City Employees and Officials...........................................................................:.:....7
16 Notices....................................................................................:......
17 Consent....................................................................................................................8
18 Modification... ........................................................................................................8
19 Section Headings ...................................................................................... ............8
20 Interpretation of this Agreement....................................
21 Duplicate Original...........................................................................................I........9.
22 Immigration. .... .. ........................................................................................... ......9
23 Legal Services Subcontracting Prohibited................................................................9
24 Attorney's Fees... ......................................................................................................10
25 Survival...... ... .. .................................................................................. ..................10
26 Governing Law.........................................................................................................10
27 Entirety....... ... ...................... .................................................................................10
EXHIBIT A
i
April 18, 2W2 GEOLOGY NEERING
' Proposal File No. B22125-1 MATERIAL TESTING
ENVIRONMENTAL
P.A.&ASSOCfATBS.INC.
Mr. Sudi Shoja, Construction Manager
City of Huntington Beach
Department of Public Works Engineering Division
2000 Main Street
P.O. Box 190, Huntington Beach, CA 92648
Subject: Professional Services Proposal
Testing and Inspection Services
Public Works-Capital Improvement Projects
City of Huntington Beach, California
Reference: Professional Consulting Services, On-Call Testing & Inspection Services
Bear Mrs. Shoja:
We :ire pleased to submit this Professional Services Proposal for testing and inspection services in
accordance with the referenced request for proposal. P. A. & Associates. Inc. provides mwxriai
resting, inspection, geotechnical. and- environmental consulting services to public and private
organivnions tluouzhout Southern California. The proceeding pages reveal information regarding
our quadfications, to assist you in your projects.
Widi Quality work, Integrity and Communication being key aspects in our link to a successful
working relatorship, we assure you that key personnel, as they are presented in this proposal, will
be committed to the Cir; of Huntington Beach's Public Works Department's projects. P. A. &
Associates is proud to be a part of the growing economy within Orange County and desire to work
with the City of Huntington Beach; being part of a technical and quality assurance team that
promotes and protects the engineering integrity of the city.
The only person, persons, company or parties interested in the proposal as principals, are named
herein and -the proposal is made without collusion with any other person, persons, company or
parties submitting a proposal. Furthermore, this proposal is in all respects fair and in good faith
without collusion or fraud, is a firm offer for dQ days, and that I, Parviz A. Azar, have full
authority to bind this firm.
The opportunity to be of service is greatly appreciated. Should questions arise pertaining to this
proposal, please contact the undersigned for clarification.
Respectfully Submitted,
P.A. & s ciat
CE
esident
:i -oLton ,'I(Y.'yy. �.i- ,_.'.g''_�12 i 15, C! 9 F;a �i 9,9 5
i 9G6i3. I� 9 hb_ -•47 ). =49 423
1'cJsl�w:
Client: City of Huntingtcweach •
Project: Public Works PMTects
Proposal No.: B22125-1
PROFESSIONAL SERVICES PROPOSAL
TESTING AND INSPECTION SERVICES
FOR THE CITY OF HUNTINGTON BEACH
11
V a �2v �lJ
P.A. & ASSOCIATES INC. l
23011 MOLTTON PARKWAY, SUITE G4
LAGUNA H EL S, CALIFOKNIA 92653-.
949-581-74741 FATS 949-588-54234� SIG
APRIL 18 2002
P.A. & Associates, Inc,
Client: City of Huntineach .
Project: Public Works jests
Proposal No.: B22125-1
'CABLE OF CONTENTS
I. P.A. & Associates' Quali ications ..................................................................1
;. : D. P.A. & Associates' Services...........................................................................1
M. Scheduling and Payment..............................................................................2
IN'. City's Responsibilities................................................................................. 2
V. P.A. & Associates' Key Pers'onnel ..................................................................
VI. Organization Chart..................................................................................4, 6
VH. P.A. & Associates' Sample of Project Expe.-ienre...............................................Y
P.A. & Associates' Quality Control ................................................................ i
IX. Certification of-on Discrimination................................................................7
X. P.A. & Associates' Insurance ....................................................................... 8
XI. Closure....................................................................................................8
Resumes.....................................................................................Appendix A
Fee Schedules......................................................Enclosed in Separate Envelope
5
P.A. & Associates, Inc.
Client: City of Huntingt�each •
Project: Public Works Projects
Proposal No.: B22125-1
I. P.A. & ASSOCIATES' QUALIFICATIONS
P.A. & Associates specializes in materials testing and inspection, geotechnical engineering,
earthwork monitoring and testing. To assure the highest professional standards, the firm
assesses each project individually, using experienced,personnel from several disciplines.
Engineering consulting services are provided to public and private organizations,
municipalities and governmental agencies and the land development industry throughout
Southern California. Our services are provided during all phases of construction, including
site acquisition, land planning, preliminary geotechical design, grading and material testing
and inspection during construction. Post-construction services include forensic investigation
of foundation, structural, pavement, slope or soil distress, as well as expert witness
+ ' testimony in public hearings and litigations.
P,'A. & Associates believes that its primary strength lies in the quality and diversity of its
staff and their extensive practical and academic experience. Incorporated in 1991, the
firm's Registered Engineer and Registered Engineering Geologist experience combined
encompasses over 40 years in Southern California.. Our entire staff is dedicated to
es to which our clients have become accustomed.providing ti"e quality professional sen,ic
E-Ecctive cctn_munication is aii essential tool bemetm our staff and clients to ensure a
productive'and prosperous ti.,orking telatiorship. With continuing education and training
encouraged at all personnel levels, we believe this actinide not only allows for individuai
growth but also for the benefit of the entire team.
Located in Laguna Bills, California, with an on-site testin; laboratory, utilizing advanced
computer technology and the professionalism of our. staff enables us to provide quality
service which is timely and cost effective.
H. P.A. & ASSOCIATES' SERVICES
F.A. & Associates provides a full range of material testing and inspection and earthwork
monitoring and inspection services involving: earthwork, base material and asphalt;
installation of precast and cast in-place concrete, post-tension construction, welding, high
strength bolts, structural steel, masonry, roofing, and fireproofing.
Our services shall include, but not be limited to:
L We will provide field inspections and compaction tests for grading and trench backfill
and asphalt concrete construction according to Standard Specification for Public Works
Construction (Green Book) and Caltrans Standard Specifications.. We will submit daily
field reports to the City and a final report after the work is completed.
P.A. & Associates, Inc. y
Client: City of HuntingtPeach •
Project: Public Works jects
Proposal No.: B22125-1
2. We will provide inspections for installation of precast and cast-in-place concrete, post-
tension construction, welding, high strength bolts, structural steel, masonry, roofing,
fireproofing and other types of work in accordance with the Uniform Building (UBC)
and the contract documents. We will submit daily field reports to the City and a final report
immediately after work is completed.
3. We will perform tests on various construction materials as required by the City.
4. We will recommend testing methods on defective work and advise the City of acceptance
standards.
5. We will provide other quality control services as requested by the City. These services
will be as follows: the result of sand equivalence, cleanness and sieve analysis of aggregate
samples from the source within 24 hours; aggregate samples from the job site within 72
hours; results of compaction and density tests taken from the job site within 24 hours.
When soils and asphalt concrete are sampled at the job site, R-values and asphalt extraction
results will be submitted within 96 hours.
6. We will submit and distribute typed inspection and testing reports to the City's Public
Works Agency, Planting and-Buildire Agency in accordar:ce with UBC requirements and
other concerned parties wi&;n a weer after the work is performed.
7. We will submit a firi21 report to the City upon completion of each prt+ject.
M. SCHEDULING AND PAYIVI N7
1. Our services will be performed on an as-needed basis by the City.
2. Monthly invoices will be submitted to the City for approval which will include a list of
services that have been provided and copies of field memos signed by the City's
representative.
IV. CITY IS RIESPGNSIBELIMS
1. The City will furnish construction plans and specifications to the consultant.
h
2. The City will coordinate with the contractor regarding work schedule and notify the
consultant-24 hours in advance for the required inspections and tests.
P.A. & Associates, Inc. 2
Client: City of Huntingtoench .
Project: Public Works ojects
Proposal No.: B22125-1
V. P.A. & ASSOCIATES' KEY PERSONNEL
Mr. Parviz Azar will be the project manager and Mr.- Binaei will be the alternate. Mr.
Azar will be in responsible charge from the notice to-proceed through completion. Any
changes or substitution of our representatives will be approved in writing by the City's
representative. The following key staff will be committed to the City's projects. Their
brief resumes are included in Appendix A. Additional qualified personnel will be readily
available, if needed.
Project Manager, Mr. Parviz Azar (Principal Engineer) will be managing the project
and be the City's contact person. He will supervise the testing and inspection personnel and
make conclusions and recommendations concerning the suitability and limitations for
development of the site.
Qualifications: M.S., Utah State University
California Registered Civil Engineer
21 years of experience
Senior Material Engineer, Mr. Sohail Binaei will supervise material testing and
inspection, including concrete. masonry, steel, fireproofing, roofing, mechanical, electrical,
plumbing, and visual welding inspections.
Qualifications: M.S., Long Beach State University
California Registered Civil Engineer
City of Los Angeles Testing Agency License
18 years of experience
Project Engineering Geologist, Mr. James M. Renfrew will supervise field operations
regarding geological concerns. He analyzes and documents geological conditions at the site,
Qualifications: M.S., Geology, University of California, Riverside
California Registered Geologist
California Certified Engineering Geologist
25 years of experience
Staff Engineer, Mr. Nader A. Kazemi compiles field and laboratory data and makes
calculations in assistance to the principal engineer.
Qualifications: B.S., Civil Engineering, Oklahoma University
Troxler, Use of Nuclear Testing Equipment
10 years of experience
Senior Soil Technician, Mr. Mike Mahajeran will supervise and collect soil samples and
perform tests per ASTM methods, records data and submits to staff engineer.
Qualifications: M.S., Engineering, Austria
Troxler, Use of Nuclear Testing Equipment
5 years of experience
Continued on next page
P.A. & Associates, Inc. 3
Client: City of Huntingtqoeach
Project: Public Works Pects
Proposal No.: B22125-1
Soil Technician, Mrs. Lea Yasbek will collect soil samples and perform tests per ASTM
methods, records data and submits to staff engineer.
Qualifications: B.S. Coursework
Troxler, Use of Nuclear Testing Equipment
2 years of experience
Material Inspector, .Mr. Frank Begg will perform material testing, including steel,
welding, bolting, masonry, concrete and fireproofing.
Qualifications: A.A., Construction, Cypress Collage, Cypress
ICBO Certified, 12 years of experience
VI. ORGANIZATION CYLAR i
See page 6
"YTl. P.A. &ASSOCIATES' SAMPLE OF PROJECT EXPEREEICE
Client: City of Chino F.M
Conract Person: Mr. Mike Kapanpour, Eng. Dept. 909-364-2804
Capital Projects Manager, City Of Chino Hills
City Yard, 14575 Pipeline Ave., Chino Hills, CA 91709
Task/Project: Earthwork Monitoring and material (asphalt) testing for most of the
City's 24 inch water line system for the fiscal years of 2001-2002.
Location: Monte Vista North Pipe line, Cities of Monte Clare, Chino and Chino Hills,
California.
Total Estimated Cost & Completion date: 5 M. 2002
Client: City of Azusa
Contact Person: Mr. Nasser Abbaszadeh, Eng. Dept. 626-812-5261
City Engineer, City of Azusa
213 East Foothill Blvd., P.O. Box 1395, Azusa, CA 91702-1395
Task/Project: Soil and Material Testing, Inspection and geotechnical consulting
for project improvements and construction for fiscal year of 1998-1999.
Location: Various locations within the City of Azusa California
.Total Estimated Cost& Completion date: 2.5 M, 2000
Continued on page 9
P.A. & Associates, Inc. 4
Client: City of Huntingtweach
Project: Public Works iects
Proposal No.: B22125-1
Client: City of La Puente
Contact Person: Mr. Sid Musavi, City Eng. Consultant. 626-657-7000
AAE Consultants, Public Works Services
333 City Blvd. West, Suite 2150, Orange, California. 92868
Task/Project: Geotechnical, environmental Consultant and material testing and inspection.
Location: Throughout the city of La Puente, California
Completion date: 2002
Client: Long Beach Unified School District
Contact Persons: Mr. John Oskoui, Construction Manager, 562-997-7510 & Mrs. Nancy
Chinchili, Project Manager 562-997-7513
Long Beach Unified School District
2425 Webster Ave., Long Beach, CA 90810
Task./Project: Preliminary.Geotechnical Investigation of existing school improvement:
Ertliwork and envirorunental mcni€oring during grading, quality assurance of asphalt
concrete.
Lot:stion: 5 to 10 schools each year, throughout the school district
Tctal Estimated Cost & Completion date: 5 M, 2002-2003
Client: E;sinor Valley IN•Iuuicipal Waier District
Contact ►'ersons: Nlr. Mlir Fattahi, Erg. Dept. 909-674-3146 Ext. 347
Senior Engineer, Elsinore Valley Municipal Water District
31315 Chaney Street
P.O. Box 3000, Lake Elsinore, CA 92531-3000
TaslJProject: Preliminary Soil Investigation and Earthwork Monitoring and Material
testing for pump stations and capital improvement projects, Fiscal year 2001-2002
T Locations: Throughout he EIsinor Valley California
Total Estimated Cost & Completion date: 6 M, 2002-2003
Client: City of Baldwin Park
Contact Person: Mr. Arjan Idnani, Eng. Dept. 626-9604011 Ext. 254
Engineering Manager, City of Baldwin Park
14403 E. Pacific Ave., Baldwin Park, CA 91706
Task/Project: Preliminary geotechnical investigation, approximately 6 miles of 48" sweet
storm drain improvement & Teen Center.
Location: Merced Street & Baldwin park Blvd., and Badillo St., Baldwin Park California
Total Estimated Cost & Completion date: 5 M, 2002-2003
P.A. &Associates, Inc. 5
P.A. & ASSOCIATES, INC.
i
ORGANIZATION CHART
Panu A. Azar
Prcject Manager
James M. Renfrew Sohaii Tony Bir aei
L-ngincenng Geologist Senior Matenal Inspector
Nader A. Kaic m
Field& Stal`f Engineer Mawmil Inspeci r
Mike M. Moha}eran
Sensor Soil Tec..nirian
[:Soil
harles Renfrew Lea Yashek
Technician Soil Technician
Client: City of Hunt' each
Project: Public Works Iects
Proposal No.: B22125-1
VM. F.A. & ASSOCIATES' QUALITY CONTROL
1. P.A. & Associates adheres.to standards set by the American Society for Testing and
Materials {ASTM} and with all applicable Federal and State regulations, local codes and
contract provisions.
2. Our employees are aware of the delineation of job limitations and areas of
responsibilities of each employee involved in testing or review of testing.
3. The laboratory operates under ASTM methods by our trained personnel. All equipment
is maintained and calibrated annually and the laboratory is certified by the City of Los
Angeles. Procedures of sample selection and protection information, including rules for
receipt, retention and disposal of the material testing are adhered to.
4. Daily Field/Office communication occurs to inform of updates, changes, or progress on
a-project. This allows for immediate feedback, if needed to assure the quality progression
of a project.
JX. CERTIICAT'ION OF'.vO-N D1SCRM0 AT1OTN
Ale agree specifically:
1.. To take affirmative steps to Dire minority employees with the company.
2. To establish and observe employment policies within affirmative promotion
opportunities for minority persons at all job levels.
3. To communicate this policy to all persons concerned, including all company employees,
outside recruiting services, especially those who serve minority communities, and to the
minority communities at large.
Y_.
FIRM: P.A. & Associates, Inc.
TITLE OF PERSON SIGNING: President, Parviz A. Azar
SIGNA
P.A. & Associates, Inc. 7
Client: City of Huntingt1reach
Project: Public Works Pffjects
Proposal No.: B22125-1
X. P.A. & ASSOCIATES' INSURANCE
Our coverage of Workers Compensation Insurance through State Compensation Insurance
Fund, Policy No.1315311-01. General Liability Insurance & Professional Liability
Coverage with DPIC Companies through Security Insurance Company of Hartford, Policy
No. AEF0302880. The coverage compatible or surpasses city insurance coverage
requirements. Certificate of the insurance policies will be provided to the City at the
initiation of the contract awarding procedure.
M. CLOSURE
The opportunity to be of service is greatly appreciated. We trust that the information
provided states our credentials in a manner that expresses our commitment to eacb.
individual proiect and reveals our dedication toward quality assurance. If you desire further
information regarding P. A. & Associates, pie.we conracr Parviz Azar at 949-581-7474.
s .
Respectfully submitted:
P.A. & ,Jks'. ciates, Inc.
AarvizA.
President
Distribution (5) Original to addressee
P.A. & Associates, Inc. 8
Client: City of Huntingtgweach
Project: Public Works PINJects
Proposal No.: B22125-1
"PENDIX A
P.A. &Associates, Inc.
Client: City of Huntingt each
Project: Public Works Pffljbcts
Proposal No.: B22125-1
PERSOI\'NEL
PARVIZ A. AZAR
Principal Engineer
EXPERIENCE
Experienced in geotechnical engineering, material testing & inspection, and environmental
consulting Mr. Azar .has performed geotechnical investigations and provided geotechnical
consulting services during large scale grading projects, slope stability analysis, deep foundations
studies, as well as geoenvironmental site evaluations, site remediation and cleanup. Mr. Azar's
expertise has also been utilized in forensic engineering studies, as well as expert witness testimony
in arbitration hearings. His experience is practically oriented, having served as field and principal
engineer for challenging large scale projects throughout southern California. Mr. Azar's
educational background and expertise provide a sound basis for Geotechnical, material testing &
inspection, and environmental consulting services.
PROFESSIONAL LICFNSE
California, Registered Civil Engineer 37818.
Count.), of San Diego Certified Environrnenral Consultant.
Ciry of Los Angeles, Registered Professional Soils Engineer.
PROFESSIONAL HISTORY
P.A. & ASSOCIATES, Inc.
Geowest Soils Consultants, Inc., Executive Vice President
Earth Research Associates, Inc., Project Engineer
EDUCATION
M.S. Soil Mechanics and Structural Engineering, Utah State University, Logan.
B.S. Civil and Environmental Engineering, Utah State university, Logan.
CONTINuING EDUCATION AND AFFILIATIONS
Earthquake Engineering Research Institute, Strong Ground Motion, Seismic Analysis, Design end
Code Issues (at California Institute of Technology, Pasadena).
Down to Earth Soil Engineering, California State Polytechnic University, Pomona.
ASCE, American Society of Civil Engineers
ASTM, American Society for Testing and Materials
P.A. & Association, Inc.
Client: City of Runtingto ach
Project: Public Works Puts
Proposal No.: B22125-1
PERSONNEL
SORAIL BINAEI
Principal Engineer
EXPERIENCE
Experience material testing, inspection, and civil engineering design throughout southern
California. Mr. Binaei has performed material testing consulting services during large scale and
small projects. His experience is practically oriented, having served as field and principal engineer
for challenging large scale projects throughout southern California. Mr. Binaei's educational
background and expertise provide a sound basis for material testing & inspection, and civil
engineering consulting services.
PROFESSIONAL LICENSE
California Registered Civil Engineer, License No.50018.
City of Los Angeles Testing Agency, License No. 10011.
PROFESSIONAL HISTORY
Civil Engineering and Material Testing Laberatory, CEM Lab., President.
Optimum Design Inc., Project
EDUCATION
M.S. Civil Engineering, Long Beach State, Long Beach, California
B.S. Civii Engineering, University of Kentucky, Lexington Kentucky
CONTINUING EDUCATION AND AFFILIATIONS
ASCE, American Society of Civil Engineers
ASTM, American Society for Testing and Materials
i
P.A. &Association, Inc.
Client: City of Huntingtoeach
Project: Public Works Protects
Proposal No.: B22125-1
PERSONNEL
JAIVI.ES M. RENFREW
Principal Engineering Geologist
EXPERIENCE
Mr. Renfrew s expertise is environmentally and technically related. Numerous projects have
utilized his expertise in these fields which include: Phase I-III Environmental Site Assessments.
landslide and slope stability investigations, supervision of hillside grading, in-grading mapping and
inspection, surface and subsurface geologic investigation, and investigation of distressed property.
Mr. Renfrew is responsible for supervision of engineering geologic research and investigation for
P.A. & ASSOCIATES.
PROFESSIO:ti AL LICENSE
California, Certified Engineering Geologist 1970
California. Registered xeologist 5929
California, Registered Environmental- Assessor 062832
Cer.ificate: Hazardous Materials Handling &. Response
PROFESSIONAL HISTORY
P.A. & ASSOCIATES, Inc., Principal Geologist/Envirormental Manager
Balker Hughes, Western Geophysical - Latin America Division
Kleinfelder, Inc., Consulting Engineering Geologist
Nolte & Associates, Inc.. Engineering Geologist/Environmental Assessor
IT Corporarion, Project Geologist
EDUCATION
M.S_. G.ological Sciences, University of California, Riverside
B.A., Geology, University of California, Santa Barbara
CONTLNiJNG EDUCATION AND AFFILIATIONS
Western Geophysical, Seismic Processing Certificate
South Coast Geologic Society
P.A. c& Association, Inc.
Client: City of Huntingtapeach
Project: Public Works Projects
Proposal No.: B22125-1
PERSONNEL
ALEX NADER KAZEAU
Staff Engineer
EXTERMNCE
Mr. Kazemi's experience is geotechnically and environmentally related. Numerous projects have
utilized his expertise in these fields which includes: soil mechanics, foundations, project
management, structural analysis and reinforced concrete. Geotechnically, he has conducted
landslide and slope stability analyses, been involved with in-grading mapping and inspection,
surface and subsurface geotechnical investigation. Furthermore, Mr. Kazemi has proven himself to
be a technical expert at P. A. & ASSOCLATES.
PROFESSIONAL HISTORY
P.A. & ASSOCIATES, L-ic.
EDUCATION .
B.S., Civil Engineering, Oklahoma State University, Oklahoma
CERTIFICATION
Troxler, Use of Nuclear Gauge Testing Equipment, Pacific Nuclear Technology Co.
CONTEVM-'G EDUCATION AND AFFILIATIONS
American Society of Civil Engineering
Associated General Contractors
P.A. c4c Association, Inc.
Client: City of Huntingto a ch
Project: Public Works Pr
Proposal No.: B22125-1
PERSONNEL
FRANK BEGG
Senior Deputy Inspector
EXPERIENCE
With extensive experience in the fields of construction inspection and materials inspection and
testing, Mr. Begg has performed .large and small scale material testing and inspection projects,
public agencies, residential developments, commercial centers, industrial projects, and multi-story
buildings. With his strong experience in engineering inspection coupled with his 'technical
background, Mr. Begg provides a valuable resource in field project management, on-site
consulting, problem-solving and quality control inspection of materials.
MU CATION
Associate of Art in Construction, Cypress College @ Cypress California
CERTIICATION
International Conference of Building Official
Structural Ssee.. Masoruy, Concrete, Welding, Fire Proofing
'LEA YASBEK
Senior Soil Technician
EXPERIENCE
Over two years of experience in earthwork monitoring, slope repair, foundation inspection and
engineering supervision of multi-phased projects in Southern California. Mrs. Yasbek's extensive
experience L in laboratory testing such as, but not limited to, consolidation, expansion, direct
shear, moisture and density, maximum dry density and sieve analysis. She has assisted in
inspection of retaining walls, footings and foundations of various projects including both residential
and commercial. On each project, Mrs. Yasbek assures quality in field testing and laboratory work
through her detailed documentation and thorough testing per ASTM standards.
P.A. & Association, Inc.
1
1..IICIIIM. UV7U rNNJJ1IY{.
CERTIFIC E OF LIABILITY INS U NCE 1DATE
0/30/03Om)
PRODUCER // THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Dealey;Renton &Associates C)c) 0 ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
P. 0. Box 10550 �( � �--b s1 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
Santa Ana, CA 92711-0550 L
i`-r\ ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
n I
714 427.6810 -((_L7��Q 7'� INSURERS AFFORDING COVERAGE
INSURED INSURER A.- United States Fidelity&Guaranty
PA&Associates Inc �D P� ;INSURER B: Security Ins.Co.of Hartford
23011 Moulton Pkwy G-4 1QI4.1L M(M7- I INSURERC:
Laguna Hills, CA 92653 oZ --5 -0 I INSURERD:
I INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATIONTR DATE(MMIDDIYYI DATE(MMIDDIYYI LIMITS
A _GENERAL LIABILITY �BI<013801165 1 05130/03 105130104 EACH OCCURRENCE $1,000,000
X kOMMERCIAL GENERAL LIABILITY i I FIRE DAMAGE(Any one fire) $1,000,000
i C`AI:iS MADE i_. OCCUR i 5,1ED EXP(Any one person) $10 000
PERSONAL A ADV INJURY $1,000,000
,X IOCP GENERAL AGGREGATE 12 000 000
I GEN'L AGGREGATE LiMITAPPLIES PER: PRODUCTS -COMPIOP AGG ,$2 000 00a
POL:CY. -- JE O --_- .CI LOC
A M
OMOBILE LIABILITY BKO1380165 '05130/03 '05130104 COMBINED SINGLE LIMIT
ANY AUTO , (Ea accident) $1,000,000
I
A°.L OW-NED AUTOS BODILY INJURY $
_ SCHEDULED AUTOS I(Per person)
X I HIRED AUTOS AP F VE RM I I BODILY INJURY $
X NON-OWNED AUTOS I 1"Ir1 (Per accident)
By: Lw 4 1Z yQ�L� 4
DE ITY `�� i PROPERTY DAMAGE $
I I (Per accident)
GARAGE LIABILITY IICA— I AUTO ONLY-EA ACCIDENT S
�I ANY AUTO I 'OTHER THAN EA ACC $
AUTO ONLY: AGG $
�EXCESS LIABILITY I EACH OCCURRENCE $
I I OCCUR I CLAIMS MADE I I I AGGREGATE $
$
DEDUCTIBLE I $
`r RETENTION S I $
WORKERS COMPENSATION AND I WC STATU- OTH•
_ITORY_LIMITS '
EMPLOYERS'LIABILITY
j E.L.EACH ACCIDENT S
E.L.DISEASE-EA EMPL OYEE $
I
E.L.DISEASE -POLICY LIMIT.S
B OTHER Professional JAEE0229994 05/30/03 05/30/04 $1,000,000 per claim
.Liability $2.000,000 annl aggr.
DESCRIPTION OF OPERATIONSILOCATIONS/VEHICLESIE£XCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS
RE: All operations as pertains to named Insured
Geotechnlcal,Material Testing and Inspection
CITY OF HUNTINGTON BEACH, ITS AGENTS, OFFICERS&EMPLOYEES ARE ADDITIONAL
INSURED AS RESPECTS TO GENERAL.LIABILITY
CERTIFICATE HOLDER ADDlTIONALINSURED INSURER LETTER: CANCELLATION Ton Day Notice for Non-Pi1xinent of P mium
SHOULD ANYOFTH E ABOVE D ESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
CITY OF HUNTINGTON BEACH DATE THEREOF, THE ISSUING INSURER WILLS MMAIL30_DAYSWRITTEN
Dept of Public Works NOTICETOTHE CERTIFICATE HOLDERNAMED TOTHE LEFT,BKF3ALV=X'1Qjn9EIQXK1d1tXX
Attn: Sudi Shoja e x (I(MKXXRXKXMNX1Plp11XXX )M
2000 Main St. P O BOX 190
Huntington Beach, CA 92648 AUTHORIZED REPRESENTATIVE
112, e-4 / " i
ACORD 25-S(7197)1 of 1 #M88143 JMC 0 ACORD CORPORATION 1988
t
Policy Number: BK01380165
Owners Lessees or Contractors (Form B)
ADDITIbNAL INSURED
Change(s) Effective: 10/30/03
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT
CAREFULLY. This endorsement modifies insurance policy under the following:
LIABILITY COVERAGE PART:
Schedule
Name of Person or Organization:
CITY OF HUNTINGTON BEACH
Dept of Public Works
Attn: Sudi Shcja
2000 Main St . P 0 BOX 190
Huntington Beach, CA 92648
SECTION II - WHO IS AN INSURED is amended to include as an insured the
person or organization shown in the Schedule, but only with respect to liability
arising out of "your work" for that insured by or for you.
CITY OF HUNTINGTON BEACH, ITS AGENTS, OFFICERS & EMPLOYEES
PRIMARY INSURANCE:
IT IS UNDERSTOOD AND AGREED THAT THIS INSURANCE IS PRIMARY
AND ANY OTHER INSURANCE MAINTAINED BY THE ADDITIONAL INSURED
SHALL BE EXCESS ONLY AND NOT CONTRIBUTING WITH THIS
INSURANCE .
CL/BF 22 40 03 95
EXHIBIT B
Client: City of Ffuntingt 9weach
Project: Public Works PrWcts
Proposal No.: B22 25-3A
PROPOSED FEES & INFORMATION
Our billing schedule and current regular hourly billing rates for our personnel are as follows:
Professional Service Fees (Hourly Rate)
1. Transportation of Samples within a 30-mile radius, Soils Technician ....................................60.00
2. Soils Technician ......................................................................................................60.00
2A. Soils Technician with Nuclear Gauge............................................................................65.00
3. Masonry Inspection..................................................................................................65.00
4. Reinforced Concrete Inspection. .................................................................................65.00
5. Prestressed Concrete Inspection...................................................................................65.00
6. Post-Tensioned Concrete Inspection ......................................I......................................65.00
7. Batch Plant Inspection..............................................................................................65.00
8. Roofing inspection ............................................................. .......................... ..... ...65.00
9, Roofing Inspection ..................................................................................................65.00
10. Fireproofing Inspection.............................................................................................65.00
IL. Asphalt Inspection...................................................................................................65.00
12. Mechanical Inspection..............................................................................................65.00
13. Electrical Inspection.................................................................................................65.00
14. Plumbing Inspection ................................................................................................65.00
15. Visual Welding Inspection.........................................................................................65.00
16. Non-destructive Testing............................................................................................65.00
17. Staff Engineer........................................................................................................75.00
18. Principal Engineer...................................................................................................95.00
19. Diamond Bit Caring ............................................................................................. 120.00
20. Mix Design Review............................................................................................... 135.00
Laboratory Test Fees (Each Test Rate)
1. Compaction Test................................................... ................................:.................22.00
2. Maximum Density Test using Dry Method................. ................. 120.00
3. Sieve Analysis............................................................. ...........................................65.00
4. "R,' Value................................. ........................................................................225.00
5. Moisture Content Determination..................................................................................20.00
6. Specific Gravity of Coarse Aggregate........................................................................... 65.00
7. Hollow Block Compression Test..................................................................................25.00
8 Mortar Cylinder, 2"x4" Compression Teat.....................................................................25.00
9. Density of Sprayed-on Fireproofing..............................................................................45.on
10A. High Strength Bolts. Nuts &Washers (Hardness).................... ...55.00
......................................
10B. High Strength Bolts, Nuts &Washers (Chemical)............................................................50.00
10C. High Strength Bolts (Tensile for 0.5 inch)......................................................................35.00
10D. High Strength Bolts (Tensile for up to 300,000 lb torque)..................................................85.00
11. Pull outtTorque Tests (empbedded bolts/anchors/dowels)...................................................65.00
Overtime will be charged at the basic rack plus 50%. Overtime is defined as the excess above 8 hours on
weekdays. time before 7 a.m. or after 5 p.m., and all Saturdays, Sundays; vnd holidays. Minimum charge
is 2 hours for show-up time, if not canceled prior to arrival, and 4 hours if inspecton time is equal or less
than 4 hours.
P.A. A A"vrimes. Ine.
5u 4 PROFESSIONAL SERVICE CONTRACTS
Hun' /Bmhe PURCHASING CERTIFICATION
1. Requested by: L Daily
2. Date: November 19, 2003
3. Name of consultant: PA & Associates
4. Description of work to be performed: On Call testing and inspection services
5. Amount of the contract: $350,000.00
6. Are sufficient funds available to fund this contract?' ® Yeqg ❑ No
7. Company number and object code where funds are budgeted: VARIOUS.CIP
8. Is this contract generally described on the list of professional service contracts
approved by the City Council'? ® Yet ❑ No
9. Is this contract within $25,000 or 25% (whichever is less) of the amount stated on
the list of professional service contracts approved by the City Council?'
® Yeso ❑ No
10. Were (at least) informal written proposals requested of three consultants?
® Yer, ❑ No
11. Attach list of consultants from whom proposals were requested (including a
contact telephone number),
12. Attach proposed scope of work.
13. Attach proposed payment schedule.
hi Ns�' tes 0 Akf//)94S 1,,J,'s
' /� AR A RIL, Manage
Aolf�-�„�,� D A s�'ucvR &S Purchasing/Central Services
a 7-t&1Z f z
r ,.�Ns3
` If the answer to any these questions is"No,"the conthict will require approval from the City Council.
Documentl 11/19/2003 4:58 Phi
RCAROUTING
INITIATING DEPARTMENT: Public Works
SUBJECT: Approve Contracts for On-call Testing and inspection
Services
COUNCIL MEETING DATE: February 2, 2004
RCA ATTACHMENTS STATUS
Ordinance (w/exhibits & legislative draft if applicable) Not Applicable
Resolution (wlexhibits & legislative draft if applicable) Not Applicable
Tract Map, Location Map and/or other Exhibits Not Applicable
Contract/Agreement (w/exhibits if applicable)
(Signed in full by the City Attome Attached
Subleases, Third Party Agreements, etc.
(Approved as to form by City Attome Not Applicable
Certificates of Insurance (Approved by the Cit Attome Attached
Financial Impact Statement Unbud et, over $5,000 Not Applicable
Bonds If applicable) Not Applicable
Staff Report if applicable) Not Applicable
Commission, Board or Committee Report If applicable) Not Applicable
Findings/Conditions for Approval and/or Denial Not Applicable
EXPLANATION FOR MISSING ATTACHMENTS
REVIEWED RETURNED FORW DED
Administrative Staff
Assistant City Administrator Initial 711
J
City Administrator Initial
City Clerk
EXPLANATION FOR RETURN OF ITEM:
Space . Only)
RCA Author: L. Daily x 5599