Loading...
HomeMy WebLinkAboutVTN Orange County - 1972-12-040 AGREEMENT THIS AGREEMENT, made and entered into this 5th day of December 1972, by and betw en the CITY OF HUNT MGTON BEACH, a municipal corpora- tion, hereinafter referred to as "City" and VTN ORANGE COUNTY, a pro - fessional engineering firm located in Irvine, California, hereinafter referred to as "Engineer W I T N E S S E T H WHEREAS, City desires to engage the services of a professional e.ngi neeri.ng firm to provide the City with engineering services for the preparation of a project report, design plans, specifications, and cngi- neeri.ng esti mates for the construction of a traffic s.i gnat interconnect system along Beach Boulevard (State Route 39), between Pacific Coast Highway and Edinger Avenue, all in the City of Huntington Beach; and WHEREAS, Engineer is qualified and willi.ng to provide such services as more fully described hereinafter and in accordance with'the terms and conrditions as herein stated; NOW THEREFORE, IT IS AGREED by the parties hereto as follows: 1. Engineer shall furnish and perform the following services: (a) Prepare a protect report for review and approval by the City or its designated staff and transmittal of the City approved report to the California State Division of Highways, District VII, Los Angeles, for its review and approval. It shall be Engineer's responsibility to make such modifications as appropriate to obtain approval from the City, State Division of Highways, and FHWA (Federal Highway Administration). (b) Prepare P.S. and E.s (plans, specifications, and engineering estimates) for the project which basically consists of providing a centrally located master con- troller/computer; an interconnect system consisting of either a City owned "hard wire" system or leased tele- phone wires reserved for City use; replacement of intersection controllers with equipment compatible with the master controller/computer; providing longer mast arms and dual signal heads on Beach Boulevard; installation of internally lighted street name signs at each leg of each signalized intersection; installa- tion of speed progression s.igns; improvement of inter- section traffic safety lighting; and consideration of other ancillary features such as surveillance by video tape camera, telemetry for fire reporting and water system operation. (c) Provide sufficient copies of the project report and P.S. and E.s to the City and State as required for review and checking; provide the number of final pro- ject reports and approved sets of P.S. and E.s as required by State and provide City with five copies of final project report and five sets of final P.S. and E.s together with the originals of the project report and P.S. and E.s. 0 . 0 (d') prepare all plans and specifications in a manner acceptable to the City and to the California State Division of Highways. (e) Provide above described services and other basic services as described in ASCE Manual 453 ('1972)2 a guide for the Engagement of Engi neeri.ng Services. 2. The basic services included in this agreement to be provided 3. 4. by Engineer do not include special services such as: (a) Field surveys for preliminary engi neeri_ng. (b) Field location of underground structures and utilities. (c) Soils or materials testing. (d ) Construction staking. (e) Construction supervision or inspection. (f) Verification of equipment operation. (9) Operation of Traffic Control System. (h ) Trai ni.ng of operating personnel. The City shall cooperate with the Engineer and assist in making available such information as the City may have in its files which would assist the Engineer in providing the required professional services to the City. The Engineer will provide the City with a project report and substantially complete P.S. and E.s by January 15, 1973, for review and return to Engineer by January 22. Engineer will make necessary modifications and submit the completed 5. 6. 7. project reploart and'P.S. and E.s to the State by February 1, 1973.* Engineer will subsequently continue liaison with the City and the State so that the State will be able to authorize advertising of the project by June 30, 1973. The City will then have until June 30, 1974, to initiate construction. In consideration of the basic professional engineering services as described, City shall reimburse Engineer a fee equal to six (6) percent of the approved engineering estimate. Based on a preliminary engineering estimate of $374,300 (including $262,000 FAU funds), the engineering fee will be $22,450. City shall make payment to Engineer as follows: (a) City will pay Engineer 75% of the total fee upon submittal to the City of the completed project report and substantially completed P.S. and E.s within the established time schedule. (b) City will pay Engineer on additional 15% of the total fee upon submittal to the State Division of Highways of the completed project report and completed P.S. and E.s for State review within the established time schedule. (c) City will pay Engineer the balance of his fee, 10% of the total fee, a: such time as the State indicates its final approval of the project report and P.S. and F.s. Redesign or redrafting necessitated by conditions beyond the control of Engineer will be considered as extra work and will constitute a basis for negotiation of additional fee. No claim for said additional work shall be made onl ess speci- fically au thori zed in wri ti_ng by authoH zed �,epresentati ve of City. 8. Special services by Engineer such as those indicated in paragraph 3., will be provided on a time and materials basis in accordance with Engineer's standard rate schedule as adopted August 1, 1972, and subject to modification August 1 of each subsequent year. A copy of the present rate schedule is attached. Any special services not pro- vided by Engineer, such as materials or soils testing, will be billed to City as invoiced to Engineer plus a 10% administrative overhead fee. Cost of reproductions in excess of those included within the scope of basic engineering services will be billed as invoiced to Engineer. The parties hereto cause this Agreement to be executed on the day and year first above written. VTN ORANGE COUNTY I 0 CITY OF HUNTINGTON BEACH ATTEST Paul C. Jones, City Clerk i B r.93. y�.DC3�ittaut ity er Mayor APF3 VED AS TO FOR-Q,% U�t P F�JIiF.(A� Ci % A� rj7I_.107, By: e ty Cit Attorney, City of Huntington Beach P.O. Box 190 CALIFORNIA 92643 ENGINEERING DEPARTMENT November 22, 1972 Honorable Mayor and City.Council City of Huntington Beach Attention: David D. Rowlands City Administrator Subject: Proposed Agreement for Consulting Engineer - Beach Blvd. F.A.U. Projects Gentlemen: Attached is a copy of the proposed agreement to cover the engineering for the above -named projects. Gas Tax Engineering Funds will be used until such time as the Project Report is approved for the use of F.A.U. and State funds. It is recommended that your Honorable Body enter into an agreement with Voorheis-Trindle-Nelson to produce the plans, specifications and estimate. Very truly yours, James R. Wheeler Director of Public Works JRW:RRL:ae Attach. December 6, 1972 VTN Orange County 2301 Campus Drive (� Irvine, CA 9 2.6 64 i Attention: David Baron Project Manager UJI � Dear Mr. Baron: • The,City Codncil of Huntington Beach, at its regular � meeting held Monday, December 4, 1.972, approved agree- ments ._.� ments with VTN Orange Country for professional engineer- ing services for FAU Beach Boulevard Traffic Signal. Interconnect . System. Enclosed is. one 'duly executed copy of each agreement C1 approved, for your records. . 1 Sincerely yours, Paul C. Jones City Clerk PCJ:aw Encs. (2) ft VT I; orange county „i �✓ i tip} ENGINEERS ARCHITECTS PLANNERS 2301 CAMPUS DRIVE, IRVINE, CALIFORNIA 92664 (714) 833-2450 (P.O. BOX 1890, NEWPORT BEACH, CALIFORNIA 92660) November 22, 1972 Mr. James R. !-theel er . Director of P;Ab1 i c: Works City of Huntington Beach P.O. Box 190 Huntington Beach, CA 92648 Subject: Agreement for Professional EnSineeri.ng Services for FAU Beach Boulevard Traffic Signal Interconnect System Dear Mr. Wheeler: 11 In response to your l e titer of November 10, 1972, advising us that our proposal of October 27 has been favorably considered and that we have been selected as your consultant, we wish to Submit the attached agreement which, upon approval by you, will constitute -a formal agreement between the City of Huntington Beach and VTN Orange'County of Irvine, California. Sincerely yours, David Baron, P.E. Project Manager DB:ntt Attachment