Loading...
HomeMy WebLinkAboutLEROY COLLINS AND SERGE ZWEIBEL - 1977-10-17 (6)REIMBURSEMENT AGREEMENT 77-D2 STORM DRAIN CONSTRUCTION THIS AGREEMENT entered into by and between the City OF HUNTINGTON BEACH, a municipal corporation, hereinafter called "CITY," and LEROY COLLINS and SERGE ZWEIBEL, hereinafter called "BUILDER." W I T N E S S E T H: WHEREAS, BUILDER, pursuant to its agreement with 'CITY, has, at its own cost and expense constructed one 14' wide catch basin, at the southwest corner of Beach Boulevard and Talbert Avenue, hereinafter called "FACILITIES," to serve BUILDER'S Development located at 18011 - 18051 Beach Boulevard and adjacent properties and FACILITIES have been constructed in conformance with the plans and specifi,,3tions approved by the Director of Public Works of CITY, and FACILITIES have been dedicated to CITY, and CITY now desires to reimburse BUILDER for a portion of the cost of the construction of FACILITIES as provided by CITY'S Municipal Code, Section 14.48.070. NOW, THEREFORE, in consideration of the covenants and agreements herein contained, the parties hereto agree as follows: BUILDER has constructed, at a total cost of $2,589.00, a catch basin, to serve Drainage District No. 3. Exhibit "A", attached: hereto and made a part hereof, is a map of the area served. BUILDER has dedicated FACILITIES to CITY. The maximum refund to be paid to BUILDER under this Agreement is as follows: Total job cost of FACILITIES $ 2,589.J0 Less ten percent (10%) per Code Section 14.,48.070 (c) 259.00 Maximum.refund 2rS30.00 Refunds shall be payable for a period of five (5) years from the l date of applicant's application and shall bear no interest. Refunds shall not exceed ninety percent (90%) of off -site construction costs. Fees shall be collected, deposited and expended pursuant to Sections 66483 and 66487 of the government rode of the State of California and all other laws of the State of California. No refund shall be made by CITY to BUILDER until the Di -rector of Public Works shall certify in writing to tkie Fin- -e Director that fees have been collected in the drainage area served by FACILITIES and that there is a positive balance in said District #3 to refund BUILDER. The parties agree that previous developers within the district shall have their claims liquidated prior to the obligation established by this agreement so long as funds are available within District #3. If a developer �eho develops property served by the facility constructed by BUILDER is required as a condition of development to construct additional facilities, CITY may allow said developer credit toward the per acreage fee consistent with this said agreement; and no fees shall be due BUILDER by reason of such construction and cred.`. The CITY shall not be liable for payment of any refund by reason of its failure to collect or receive from any person the service fee for connecting into the facilities paid for by BUILDER. The CITY`s refusal to allow any connection or connections into the facilities paid for by BUILDER shall not make the CITY liable for any refund which might have accrued to BUILDER if such connection had been permitted. The CITY retains the right to allow a connection by a public agency e-empted from payment of cennection fees and shall not Nit liable to BUILDER for refund because of said connection. 2 The CITY shall not be required to pay attorney s fees or court costs for any breach of this agreement. The CITY shall not be required to make reimbursement to any person until all drainage construction projects in a drainage area served by FACILITIES are completed. (P.EST OF THIS PAGE NOT USED) EXECUTED in Huntington Beach, California , on this the 1.7th day of October , 1977 .ATTEST Clerk _ Mayor Pro-Tempore REVIEWED AND APPROVED: APPROVED AS TO FORM 41 City inistrator .Ci Attorne INITIATED AND APPROVED AS TO CONTENT: Director of Pub1' Works LEROY COLLINS AND SERGE ZWEIBEL (BUILDER) -. ■ 5 f 4 C e r � Y a A V L. ids October 1.8, 1977 Mr. LeRoy Collins Mr. Serge Zweibel. 3504 East Century Bcuelvard Lynwood, CA 90267 Gentlemen: The City Council of. the City of Huntington Beach at its regular meeting held Monday, October 17, 1977, approved Reimbursement Agreement No. 77-D2 for a catch basin in Beach Boulevard. We are encl.osi_.g two copies of said agreement for your records. Siuerely yours„ Alicia M. Wentworth City Clerk A/ sh gndlosures_ 9 W s _Huntington 5. y y` .. Beach Poo. BOX 190 CALIFORNIA 92648 ENGINEERING DEPARTMENT p � � � � � E D 1977 CITY OF FUNTINGTON BEACH TO: Honorable Mayor and City Council AU�/lln,!STRA?4�It UrNUt ATTN: Floyd G. Belsito, City Administrator FROM: H. E. Hartge, Director of public. Works DATE: September 29, 1977 SUBJECT: Reimbursement Agreement 77-D2 STATEMENT: Transmitted herewith is a reimbursement agreement between the City and Leroy Collins and Serge Zweibel for a catch basin built in Beach Boulevard at their expense. Fee:- will be collected from the area served to pay the reimbursable amount to these developers. RECOMMENDED ACTION: Approve the agreement and authorize the Mayor and City Clerk to execute same ANALYSIS: Messrs. Collins and Zweibel have constructed a catch basin to serve their development at the southwest corner of Beach and Talbert and adjacent proper-ies for a total cost of $2,589.00. This facility is part of the City's master plan of drainage. The amount that the developers are entitled to have reimbursed is calculated as follows: Total Job Cost of Facilities $2,589.00 Less Ten Percent (10%) per 259.00 Code Section. 14.48.070 (c) Reimbursable Amount $2,330.00 Payment of the above amount will be made from fees collected from the area served by r.he subject facility. FUNDING SOURCE: Drainage District No. 3 Fund HEH z M,7W lea