Loading...
HomeMy WebLinkAboutMichael Baker International formerly Pacific Municipal Consultants - PMC - 2013-10-07Dept. ID CD 16-018 Page 1 of 2 Meeting Date: 12/19/2016 ;"6 v&-b 7 MEETING DATE: 12/19/2016 SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Scott Hess, AICP, Director of Community Development SUBJECT: Approve extension for the update to the City of Huntington Beach General Plan contract with Michael Baker International, formerly Pacific Municipal Consultants, DBA PMC through October 6, 2017; and, authorize execution of Contract Amendment No.1 Statement of Issue: The City and Michael Baker International, formerly PMC, entered into a Professional Services Contract to provide consulting services regarding updating the City's General Plan. The Professional Services agreement needs to be extended for an additional period, until October 6, 2017, to cover existing services and finish the project. The existing Professional Services agreement lapsed and Staff is requesting extending the term to cover existing services and finish the project. The City Council already provided budgetary authority so no additional funds are required. Financial Impact: Funds for this service are budgeted in General Plan contract services account 10060601.69365. Recommended Action: A) Approve an extension for the update to the City of Huntington Beach General Plan contract between Michael Baker International from October 7, 2016, to October 6, 2017; and, B) Authorize the Mayor and City Clerk to execute "Amendment No. 1 to Professional Services Contract Between the City of Huntington Beach and Michael Baker International, Inc. (formerly Pacific Municipal Consultants, dba PMC, an S-California Corporation) to Prepare a Comprehensive Update of the City of Huntington Beach General Plan" for this extension in a form approved by the City Attorney. Alternative Action(s): Do not approve an extension to the existing agreement and direct staff accordingly. Analysis: The City of Huntington Beach entered into a three (3) year professional Service Contract with PMC October 7, 2013, for preparation of a comprehensive update of the City's General Plan. The term of the Professional Services agreement inadvertently expired before the project was completed. Currently, 70% of the project is complete and this amendment will allow the Consultants to finish the work in accordance with the budgeted amount that was already approved by City Council. Item 12. - 1 K - 4- Dept. ID CD 16-018 Page 2 of 2 Meeting Date: 12/19/2016 Environmental Status: The request is exempt pursuant to Section 15061(b)(3) of the California Environmental Quality Act. Strategic Plan Goal: Strengthen Economic and Financial Sustainability Attachment(s): 1. Amendment No. 1 to Professional Services contract between the City of Huntington Beach and Michael Baker International, Inc. (formerly Pacific Municipal Consultants, DBA PMC, an S- Corporation) to prepare a comprehensive update of the City of Huntington Beach General Plan. 2. Original professional services contract between the City of Huntington Beach and Pacific Municipal Consultants for Preparation of a Comprehensive Update to the City of Huntington Beach General Plan. SH:JJ:DG:kdc HB -85- Item 12. - 2 ATTACHMENT #1 AMENDMENT NO. 1 TO PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND MICHAEL BAKER INTERNATIONAL, INC. (FORMERLY PACIFIC MUNICIPAL CONSULTANTS, DBA PMC, ANT S-CALIFORNIA CORPORATION) TO PREPARE A COMPREHENSIVE UPDATE OF THE CITY OF HUNTINGTON BEACH GENERAL PLAN THIS AMENDMENT is made and entered into by and between the CITY OF HUNTINGTON BEACH, a California municipal corporation, hereinafter referred to as "City," and MICHAEL BAKER INTERNATIONAL, INC., a Pennsylvania corporation hereinafter referred to as "CONSULTANT." WHEREAS, City and Consultant are parties to that certain agreement, dated October 7, 2013, entitled "Professional Services Contract Between the City of Huntington Beach and Pacific Municipal Consultants to Prepare a Comprehensive Update of the City of Huntington Beach General Plan," which agreement shall hereinafter be referred to as the "Original Agreement," and City and Consultant wish to amend the Original Agreement to extend the term of the Original Agreement, NOW, THEREFORE, it is agreed by City and Consultant as follows: ADDITIONAL TIME The term of the Original Agreement is extended to October 7, 2017. REAFFIRMATION Except as specifically modified herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. [SIG RTATURES ON FOLLOWING PAGE] 16-55031147669-mv CONSULTANT, MICHAEL BAKER INTERNATIONAL, INC., a Pennsylvania corporation 11 ihi I 162 b• Car der print name ITS: (circle one) Chairman/Presiden ice President AND By: print name ITS: circle one) Secretary/Chief Financial Officer Asst_ SecretaryTreasurer CITY OF HUNTINGTON BEACH, a municipal corporation of the State of California Mayor City INITIATED AND APPROVED: id&�� Director of Community Development APPROVED AS TO FORM: � r _ l. City Attorney w . Date c7- — � g — RECEIVE AND FILE: �&hw&lltj City Clerk, 16-5503/147669/mv 2 CONSULTANT, MICHAEL BAKER INTERNATIONAL, INC., a Pennsylvania corporation By: 12 h C' print name =President ITS: (circle one) Chairman/Presiden AND By:_ AAA '- (1 4, Alichael print name ITS: circle one) Secretary/Chief Financial Office Asst. Secretor} Treasurer CITY OF HUNTINGTON BEACH, a municipal corporation of the State of California Mayor City Clerk INITIATED AND APPROVED: Director of Community Development APPROVED AS TO FORM: City Attorney *-V Date RECEIVE AND FILE: City Clerk Date 16-5503/147669/mv 2 City of Huntington Beach 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ www.huntingtonbeachca.gov Office of the City Clerk Robin Estanislau, City Clerk December 20, 2016 Michael Baker International, Inc. ATTN: Pam Warfield 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 Dear Ms. Warfield: Enclosed for your records is a copy of the fully executed "Amendment No. 1 to Professional Services Contract Between the City of Huntington Beach and Michael Baker International, Inc. (Formerly Pacific Municipal Consultants, dba PMC, an S-California Corporation) to Prepare a Comprehensive Update of the City of Huntington Beach General Plan." Sincerely, W4 C, a OEM, i Robin Estanislau, CIVIC City Clerk RE:pe Enclosure Sister Cities: Anjo, Japan ♦ Waitakere, New Zealand We Make o Difference INTERNATIONAL December 14, 2016 E C E I V E ru" DEC 7. 9 2016 Ms. Debra Gilbert Community Development Department Dept. of Planning & Building CITY OF HUNTINGTON BEACH 2000 Main Street, 3,d Floor Huntington Beach, CA 92648 RE: AMENDMENT I TO THE AGREEMENT FOR THE CITY OF HUNTINGTON BEACH GENERAL PLAN UPDATE PROJECT Dear Ms. Gilbert: Enclosed please find the signed amendments to the above project contract for processing. Upon final approval and signature, kindly return a copy to us via email or mail to: Pam Warfield Michael Baker International, Inc. 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 If by email: To Pam Warfield at pwarfieldambakerintl.com. Thank you for allowing Michael Baker International to continue to be of service to the City of Huntington Beach under this amendment. We greatly appreciate the opportunity. If we may be of assistance in any way, please contact Pam Warfield at email address pwarfield(aDmbakerintl.com or by telephone at (916) 231-3353. Sincerely, Cindy Okamoto Executive Secretary Michael Baker International I Irvine •w ATTACHMENT #2 � coc"y Dept. ID PPage 7 of 3 Meeting Date: 10J7J2013 JVPRo _ a MEETING DATE: 10/7/2013 SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Scott Hess, AICP, Director of Planning and Building SUBJECT: Approve and authorize execution of a Professional Services Contract between the City of Huntington Beach and Pacific Municipal Consultants to prepare a comprehensive update of the City of Huntington Beach General Plan. Statement of Issue: This is a request to enter into a three (3) year Professional Services Contract between the City and Pacific Municipal Consultants for preparation of a comprehensive update of the City's General Plan. The project will encompass the associated program level environmental impact report and various technical studies, including the equivalent of a climate action plan, a sea level rise study, a fire and police department service level analysis and a targeted update of the citywide urban runoff management plan. Financial Impact: Total appropriations of $1,978,174 in the General Fund to the Planning and Building Department Professional Services Account 10060201.69365 are requested for the three year term of the contract. It is anticipated these funds will be offset by revenue collected in accounts 100.35660 Assigned General Plan Maintenance and 10000100.42825 General Plan Maintenance Fee Account. The FY13/14 Adopted Budget currently includes $500,000 for the General Plan Update. The remaining appropriations of $1,478,174 will be used to cover the current and/or future year's budgets, as needed to execute the contract. Recommended Action: A) Approve and authorize the Mayor and City Clerk to execute a three (3) year Professional Services Contract not to exceed $1,978,174 between the City of Huntington Beach and Pacific Municipal Consultants, to prepare a comprehensive update of the City of Huntington Beach General Plan (Attachment No.1); and, B) Appropriate funds in the total amount of $1,978,174 over a three year period from the General Fund to the Planning and Building Department Professional Services Account 10060201.69365. Alternative Action(s): The City Council may make the following alternative motion(s): 1) Deny the Contract between the City and Pacific Municipal Consultants. 2) Continue the item and direct staff accordingly. Item 12. - 5 HB -88- Dept. ID PL 13-022 Page 2 of 3 Meeting Date: 10/7/2013 Analysis: A. PROJECT BACKGROUND The City's General Plan was last comprehensively updated in 1996. Since that time there have been notable physical changes in the city, amendments to State laws that require analysis and data that the General Plan does not currently have, and a growing interest to incorporate sustainability into city functions. As a result, the City has identified the need to update the General Plan. The City Council held two study sessions, in March and August, regarding potential scope, budget and timeline of a General Plan update and provided direction to staff. The update of the General Plan would include a number of separate technical studies and plans, as follows: sea level rise study, coastal resiliency plan, sustainability/climate action plan, urban runoff impact study, market trend and fiscal analysis, biological report and service level study for fire and police. These studies will be used to update the General Plan and the subsequent update of the City's Local Coastal Program. However, they will also provide information that supports the City's compliance with National Pollutant Discharge Elimination System (NPDES) requirements, the City's Insurance Services Office (ISO) ratings and prioritization of Capital Improvement Program (CIP) projects. The update would also include community outreach. Based on City Council direction, there would be a General Plan Advisory Committee. In preparation for the need to update the General Plan, the City Council adopted a General Plan Maintenance Fee in 2004. This fee is assessed on all new construction and is intended to pay for the City's consultant costs. The existing fund balance in this account is approximately $665,000, and over $800,000 is expected to accrue in the next couple of years, which will coincide with the length of time needed to complete the project (approximately 2 '/2-3 years). The City will continue to receive these revenues to fully pay back any General Fund monies that may be used and to complete other General Plan related projects, i.e. subsequent update of the City's Coastal Element, which will occur after the General Plan update. In addition, the City has applied for two grants related to the technical studies and will continue to seek out other sources of funds. B. CONSULTANT SELECTION PROCESS Staff issued a Request for Proposals (RFP) in May, which was sent to 13 firms of varying specialty due to the range of work associated with the City's project. Five of the firms are considered general planning consultants, four are primarily environmental consultants, two are economic firms, one is a management consultant and one is an engineering firm. The City received proposals from four qualified consultant teams, comprised of many of the firms that the City sent the RFP to, led by the following consultants: - The Chambers Group - MIG - The Planning Center/DC&E - Pacific Municipal Consultants (PMC) Proposals were reviewed by nine staff members from various departments: Administration, Fire, Planning and Building, Police, and Public Works. Staff from Fire, Planning and Building, and Public Works then conducted interviews with each of the four teams. The PMC team and proposal was rated as superior by staff due to their high level of technical expertise and experience with the City of Huntington Beach. The PMC project manager was the H B -89- . Item 12. - 6 : Dept. ID PL 13-022 Page 3 of 3 Meeting Date: 10/7/2013 author of the City's recent Circulation Element update and most recently has been the project manager for the award winning General Plan Update for the City of Orange and the City of Burbank General Plan Update. In addition, he has significant experience preparing climate and sustainability action plans; his plans for the City of West Hollywood and County of Yolo are award winning. The depth and knowledge of PMC staff is excellent. They have a successful track record for meaningful outreach, coastal experience and strong sustainability credentials. The subconsultants on the PMC team have significant experience in Huntington Beach and/or are known for their outstanding work. Of note, Atkins has prepared numerous EIRs for the City; Stantec staff completed the recent update of the City's traffic model; Moffat & Nichol has worked on numerous coastal projects including the Bolsa Chica and Huntington Beach Wetlands and is currently completing work for the Huntington Harbour area; Stanley R. Hoffman Associates is preparing the City's Economic Development Strategy; and Matrix has done work related to Fire and Police Dispatch. Another factor in staff's recommendation for the General Plan consultant was which team would be the best fit for the community. Staff believes the PMC team will be very effective in working with the various interest groups, appointed and elected officials and staff. The other three proposals were adequate and the lead firms have very good reputations in the planning field. However, staff does not believe that the depth of the assembled teams proposed by these firms is as strong, nor did all of the team members appear to be as good a fit for the community. From a cost perspective, the PMC proposal was the third lowest; however, three of the proposals were fairly close. There was variation amongst the proposals in terms of approach to some of the technical studies and once this was adjusted for a better comparison, there was little cost difference between the firms (less than $100,000). Therefore, staff believes that the PMC cost proposal is a reasonable and responsible one that anticipates significant community participation and solid technical research. C. STAFF RECOMMENDATION: A Professional Services Contract between the City and PMC is recommended to prepare a comprehensive update of the General Plan, the associated Program EIR and technical studies as discussed above. The scope of work is expected to cost $1,720,151. Due to the complexity of the project, staff is recommending a 15 percent contingency budget, which would only be used if needed. Therefore, staff recommends the City Council approve the contract with PMC, in the amount of $1,978,174, and authorize the City Manager and City Clerk to execute the documents. Environmental Status: The request is exempt pursuant to Section 15061(b)(3) of the California Environmental Quality Act. Strategic Plan Goal: Improve the City's infrastructure Attachment(s): 1) Professional Services Contract Between the City of Huntington Beach and Pacific Municipal Consultants for Preparation of a Comprehensive update to the City of Huntington Beach General Plan 2) Insurance Certificate and Waiver SH:MBB:DG:kdc Item 12. - 7 HB -90- A 0 min w T 'Am "rmim M N I` flB -91- Item 12. - 8 PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND PACIFIC MUNICIPAL CONSULTANTS FOR PREPARATION OF A COMPREHENSIVE UPDATE TO THE CITY OF HUNTINGTON BEACH GENERAL PLAN THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and Pacific Municipal Consultants, dba PMC, a S-California Corporation hereinafter referred to as "CONSULTANT." WHEREAS, CITY desires to engage the services of a consultant to prepare a comprehensive update to the the City of Huntington Beach General Plan; and Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows: SCOPE OF SERVICES CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the 'PROJECT." CONSULTANT hereby designates Philip O. Carter, President who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement. agree/ surfnet/professional svcs mayor I of l l 10/12 Item 12. - 9 HB -92- qG,/ 2. CITY STAFF ASSISTANCE CITY shall assign a staff coordinator to work directly with CONSULTANT iri the performance of this Agreement. 3. TERM: TIME OF PERFORMANCE Time is of the essence of this Agreement. The services of CONSULTANT are to commence on 617" 3, 20/3 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT. In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein. 4. COMPENSATION In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed One million seven hundred twenty thousand one hundred fifty one dollars ($1,720,151) with a fifteen percent (15%) contingency, for a contract total amount, not to exceed one million nine hundred seventy eight thousand one hundred seventy four Dollars ($1,978,174). 5. EXTRA WORK In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such agree/ surfnet/professiaLU svcs mayor 2 of 11 10/12 HB -93- Item 12. - 10 work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 6. METHOD OF PAYMENT CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 7. DISPOSITION OF PLANS. ESTIMATES AND OTHER DOCUMENTS CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit. 8. . HOLD HARMLESS CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT. agree/ surfnet/professional sves mayor 3 of I 1 10/12 Item 12. - 11 HB -94- gin;.,, 9. PROFESSIONAL LIABILITY INSURANCE CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above -mentioned insurance shall not contain a self -insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims -made policy shall be acceptable if the policy further provides that: A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements). B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims. CONSULTANT will make every effort to maintain ,similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement. If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY. agree/ surfnet/professional sves mayor 4 of 11 10/ 12 HB -9-5- Item 12. - 12 10. CERTIFICATE OF INSURANCE Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall: . A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium. CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required. 11. INDEPENDENT CONTRACTOR CONSULTANT is, and shall be, acting at all times in the performance of this f Agreement as an independent contractor -herein and not as an employee of CITY. CONSULTANT shall secure at its own cost. and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder. agree/ surfnet/professional svcs mayor 5 of 11 10/12 Item 12. - 13 HB -96- P? - 12. TERMINATION OF AGREEMENT All work required hereunder shall be performed in a good and workmanlike manner. CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT. 13. ASSIGNMENT AND DELEGATION This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove. 14. COPYRIGHTS/PATENTS CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement. 15. CITY EMPLOYEES AND OFFICIALS CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code. 16. NOTICES Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as agree/ surfnet/professional sves mayor 6 of 11 10/12 HB -97- Item 12. - 14 the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail -return receipt requested: TO CITY: TO CONSULTANT: City of Huntington Beach ATTN: Mary Beth Broeren 2000 Main Street Huntington Beach, CA 92648 17. CONSENT Philip O. Carter, President Pacific Municipal Consultants 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event. 18. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 19. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. agree/ surfnet/professional Svcs mayor 10112 7oflt Item 12. - 15 HB -98- j%, 20. INTERPRETATION OF THIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 21. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 22. IMMIGRATION CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification. agree/ surfnet/professional svcs mayor 8 of 11 10/12 H13 -99- Item 12. - 16 23. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of . services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT. 24. ATTORNEY' S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party. 25. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive. 26. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. 27. SIGNATORIES Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. agree/ surfnet/professional svcs mayor 9 Of 11 10/12 Item 12. - 17 HB -100- nw 28. ENTIRETY The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which, are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. 29. EFFECTIVE DATE This Agreement shall be effective on the date of its approval by the City Council. This Agreement shall expire when terminated as provided herein. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers. agree/ surfnet/professional svcs mayor 10 Of 11 10/12 H _ 1 O 1 - Item 12. - 18 CONSULTANT, Pacific Municipal Consultants, dba PMC COMPANY NAME By: `' -- t(i(� O Car print name„_ ITS: (circle one) Chairm resides ice President AND By: 4& e t. _r 1_ �e,,-f— print name ITS: (circle one ecret /-hiefFinancialOfficer/Asst. Secretary - Treasurer agree/ surfnet/professional sves mayor 10/12 CITY OF HUNTINGTON BEACH, a municipal corporation of the State of ; G mia Mayor sty Clerk TLD AW , PYiROVED: INITd cotMess, Egreftdr of Planning & Building APPROVED AS TO FORW �iAttomey� 11 of 11 Item 12. - 19 HB -102- (�� EXHIBIT "A" A. STATEMENT OF WORK: (Narrative of work to be performed) Please refer to PMC Project Understanding and Aproach, Attachment A, pages 1-16 Please refer to PMC Work Plan and Schedule, Attachment B, pages 1-58 B. CONSULTANT'S DUTIES AND RESPONSIBILITIES: Refer to PMC Project Understanding and Approach and Work Plan and Schedule attachments. C. CITY'S DUTIES AND RESPONSIBILITIES: 1. City will provide requested documents in a timely manner 2. City will make timely payments as outlined in Exhibit "B" and Budget Schedule D. WORK PROGRAM/PROJECT SCHEDULE: Please refer to PMC Budget Schedule, Attachment C, pages 1-4 EXHIBIT A HB -103- Item 12. - 20 ATTACHMENT A Por many of the individuals and organizations that call Huntington Beach home, quality of life has always been a high priority. The City of Huntington Beach is a Bader in sustainability, prese^vation, and finding solutions to civic challenges. As a constantly evolving city, an updated General ,plan will help Huntington Beach to define a more sustainable model for growth and development. Huntington Beach led the last energy revolution by providing a reliable source of oil. The City,has an opportunity to also lead the next energy revolution through effective and sustainable planning that arnbraces and confronts the realities, challenges: and opportunities presented by climate change. The updated General Plan will solidify the City's vision for maintaining and improving neighborhoods and districts, while a.11nu, ing areas to maintain a distinct sense o7 place. Throughout this proposal, we highlight FT C's experience developing sustainable, reatl`ve: and useful general plan$, climate actlo;, clans i,CAPs, and program environmentai impact reports (EIRs), and identify how we will use This experience to provide long-term value to Huntington Beach. We detail hove our approach will keep sustainability at the forefront by placing tf,e development of the Su$Lainability Action Plan (SAP) and sea level rise (SLR) studies at the beginning of the work program, allowing findings from 'these analyses to guide the formation of the General Plana We also detail how the general plans we develop er:,phasize implementation, rooted in our experience in front of and behind the planning counter, and are formed to serve as a useful tool Tor city staff for years to come. Through our deep commitment to involve stakeholders and the community in the process, we will meet the City s objectives to develop an updated vision for growth and development while maintaining sustainability, economic vitality, and continued high quality of life as key priorities for all community members. Project Understanding Surf City's Past and Present Huntington Beach is a desirable and diverse community known primarily for its pristine beaches, but also as the leading force in the development of Southern California beach culture. Surf City USA provides a unique mixture of coastal resources, protected open spaces, diverse residential neighborhoods, shopping opportunities; and a longstanding commitment to environmental stewardship. It is often regarded as one of Orange County s most progressive communities, yet it maintains strong connections to conservative principles, allowing for pendulum swings that often balance differing opinions on urban development .and Item 12. - 21 HB -104- 1P conservation. The community prides itself on being unpretentious and places a high value on preserving and enhancing recreation opportunities. From its early origins as a stop along the Pacific Electric Railway corridor to recent and possible future land acquisitions. Huntington Beach has a long history of leveraging its physical location and building on surrounding resources. Huntington Beach's defining coastline, scenic viewsheds, and diverse neighborhoods create a unique sense of place and quality of life that the City and its stakeholders wish to protect. . Key Issues Affecting Surf City's Future Although Huntington Beach has been successful in creating a strong community fabric; there are also unrealized opportunities that the City's General Plan does not currently address. The City wishes to modernize the General Plan to integrate current planning concepts and techniques such as smart growth, livability, and sustainable development. Educating residents about how these concepts can be best incorporated into the General Plan in a manner that helps the City achieve its economic and environmental goals, while also protecting the qualities of Huntington Beach that are so cherished, is key to a successful General Plan update. Effective planning for the future of Huntington Beach must also integrate regional, national, and global issues such as demand for limited energy and water resources, potential sea level rise, ecological resource conservation, solid waste reduction, and the effects of climate change. The City's General Plan and SAP must also respond to recent state legislation, including .Assembly Bill (AB) 32 and Senate Bill (SB) 375 targeting greenhouse gas emissions and climate change. Recent legislation related to complete streets, hazard mitigation planning, and floodplain management must also be integrated. In addition to updating the City's General Plan to advance its overall objectives, the new plan must be developed in a way that is user-friendly, illustrative, internally consistent; and addresses the most important- issues facing Huntington Beach over the next 20 years. Specific issues for consideration in the updated General Plan include: ® Consistency between the General Plan and the City's 15 specific plans, Zoning Ordinance, and recent updates to the Housing Element, Historic and Cultural Resources Element, and Circulation Element. M Integration of the new Sunset Beach and Brightwater Specific Plans, as well as the recently adopted Beach and Edinger Corridors Specific Plan. f-f.13 - t 05- Item 12. - 22 ® Positioning industrial areas in the McDonnell Centre Business Park Specific Plan and elsewhere in the city to be competitive in the regional market. ® Community concern for wetlands and other sensitive resources. E Additional modifications to the Circulation Element addressing complete streets, a new bicycle master plan, a new base year, and Sustainability Action Plan. • Possible lack of sufficient and suitable industrial lands, which requires a market study for resolution. ® Opportunity for Low Impact Development (LID) demonstration areas, to serve as a model for the region and future development. • Identifying opportunities to address contributions to and effects of climate change. • Recycling of school sites and identification of community -preferred solutions. ® Developing a General Plan that will allow for easy updating of the Local Coastal Plan. PMC is providing an outstanding team of experts to assist the City with the General Plan update, SAP, and EIR. We have significant experience working with communities as they transition from traditional planning to sustainable planning; and we are recognized and award -winning leaders in developing action plans to achieve the sustainability goals set by clients. Project Approach The RFP provides a thoughtful description of the current condition of the General Plan, as well as the tools available to assist in the update. We have not attempted to repeat all of the RFP background information in our proposal. Instead, we offer a philosophy and approach to organizing the work to maximize resources, control costs, build community ownership in the General Plan and supporting studies, and provide for environmental analysis that accounts for the citywide and cumulative effects of the General Plan and SAP. Our approach establishes a collaborative effort between the City and PMC, and we are excited about the prospect to partner with you in this effort. We recognize that your desired consultant will be one that can relate to both staff and the local community. We bring a professional style consistent with the. Southern California beach culture cultivated by Huntington Beach that is professional but relaxed and friendly. PMC offers integrated public outreach, land use planning, urban design, sustainability, and environmental expertise that allows our team to identify context- n zs arc: r a� Ap oa:h €1, Item 12. - 23 HB - 06- P sensitive solutions to enhance the community and help the City achieve its vision for the future. Community Engagement For the General Plan to clarify a long-range vision and establish policy guidelines for growth management, growing circulation challenges, and maintaining the characteristics that define individual neighborhoods and the community as a whole, it must reflect the values, priorities, and concerns of Huntington Beach residents and stakeholders. Ensuring effective public involvement in the update is thus a critical component of the overall project and one of the keys to developing community buy -in. In cities with active community involvement, PMC has been particularly successful working with clients to actively lister to the community and translate technical information into meaningful policies. Five objectives stand out for the Huntington Beach General Plan update community engagement process, based on the City's RFP, the pre -proposal meeting, and our local knowledge: ® Establishing a framework for focused policy discussions rather than broad "visioning.` ® Providing transparency in the process. ® Working collaboratively with a General Plan Advisory Committee and other City -sponsored groups which will have a vested interest In plan development. ® Utilizing cost-effective and innovative techniques. ® Respecting the unique attributes and needs of Huntington Beach communities while unifying citywide identity. Our public participation program will respond to these objectives using specialized outreach techniques that are woven together with the fundamental steps of the planning process. Our experience has demonstrated that flexibility concerning community engagement is essential, as this is the task item most likely to change through the process. As such, we have developed a flexible approach to allow as -needed adjustments as we proceed. As part of the project initiation process, PIrtIC will conduct an outreach assessment with City staff. This will provide time for staff and the consultant team to discuss past outreach efforts, confirm goals for this program, generally discuss details such as venues and materials, and discuss the project's key stakeholders. It provides an opportunity to identify the depth of the strategy and a menu of outreach options related to the overall project schedule. The community engagement program is scalable and can be tailored to meet the City's objectives and budget. FrO iosa� f?I" CiN, 0' Hunimom bcauri HB -107- Item 12. - 24 Following the assessment, PMC staff will prepare a more refined draft community engagement strategy for staff review and approval. This memorandum will include the goals, purpose, and desired outcome of the process, an outline of each technique to be used, a timeline:, and an outline of responsibility for PMC and City staff. It is anticipated that the community engagement strategy will include a combination of the following "menu" of techniques and activities. The ultimate depth of the outreach effort will be determined by City staff. Our menu of engagement techniques includes: ® Facilitation of a GPAC and topic -specific task forces ® Stakeholder interviews • Project branding ® Community workshops and open houses ® Project website and e-mail updates ® Media outreach (both traditional and social) ® "Pop-up" workshops at community events Participatory photography ® Charrettes ® Presentations to local boards and community organizations ® Presentations at all legally required hearings Our budget for community engagement is considered a not -to -exceed limit. To keep the program flexible to project needs while staying within budget, we assume the same level of effort will be anticipated for any adjustments to the approach. Sustainability Action Plan While many communities have struggled to make distinct and measurable progress toward sustainability goals, Huntington Beach's commitment to sustainability can be seen in action through the City's and the community's day- to-day activities and long-term planning. We recognize the City's objective to prepare a stand-alone SAP concurrent with the update to the General Plan, which will build on ongoing efforts, reflect state guidance for addressing climate change, and provide a strategic course to achieve near -term (5-10 years) sustainability goals. This approach provides the following clear benefits to the City and community: ® Ensures long-range sustainability vision, goals, and policies are integrated consistently through the General Plan. aP:'ii';: Item 12. - 25 HB - t cs- ot-1 ® Provides near -term specific, measurable actions, programs, and projects and supports implementation through performance indicators, interim milestones, and a monitoring tool. ® Allows environmental review of sustainability actions and programs. ® Provides the City with an equivalent climate action plan or qualified greenhouse gas reduction plan consistent with the State CEQA Guidelines. Our. approach to developing sustainability plans and climate action plans relies on robust and transparent technical analyses; target setting for GHGs and other reductions as. applicable; tailored engagement techniques for staff, key stakeholders, and the community; preparation of strategic, specific; and measurable actions, programs, and projects that support achievement of the target(s); and a clear implementation program that identifies time frames, responsible parties, indicators, potential costs and benefits, funding sources, and monitoring. Our approach to preparing action plans relies on best practices, existing progress and activities, community engagement, and quantitative analysis. Most important to our approach is an emphasis on balancing state and regional guidelines and regulations with local characteristics, using a bottom -up approach that relies on education, engagement, and incentives before recommending top - down solutions that rely on new regulations and mandates. We also seek to learn, understand, and respect ongoing activities, such as the Huntington Beach Goes Green program, the Surf and Sun Program. the annual Green Expo: the activities of the Environmental Board and the Tree Society, and progress of the Steps Toward a Sustainable Huntington Beach plan. The success stories and lessons learned from these efforts are often the best starting points for a strategic action plan. Greenhouse Gas Emissions AB 32 directs statewide reduction of greenhouse gas (GHG) emissions to 1990 emission levels by 2020. The AB 32 Scoping Plan provides guidance that a local government equivalent target would be to reduce to emissions 15% below current (defined as 2005-2008) levels by 2020. Given this guidance, most local governments prepare a GHG inventory using a 2005 baseline year, forecast emissions to 2020, and identify GHG emissions reduction measures to achieve a 15% reduction below baseline. While this approach is sound, it may not provide comprehensive information needed to provide a current year baseline for the EIR. We also recognize the value of confirming changes since 2005 based on the performance of sustainable City programs that have reduced GHGs since 2005. Assessing changes from 2005 to the current year supports.a robust SAP. We recommend preparing both a 2005 GHG inventory and a current year (2010- 2012) GHG inventory. The exact year for the current inventory will be determined based on data availability. The inventories will adhere to established protocols, including the U.S. Community Protocol for Accounting and Reporting of -C i PrOfi S i f^IC v C)',' Hlir ir,,.Tfon HB -10 - Item 12. - 26 Greenhouse Gas Emissions released by ICLEI-USA and recommended by the Governor's Office of Planning and Research; the Local Government Operations Protocol, and methodologies approved by the California Air Resources Board, The Climate Registry, and the Association of Environmental Professionals. We anticipate that the inventories will include emissions from key sectors, including energy, transportation, waste, water, wastewater, and other sectors as applicable. We also anticipate coordinating with the City's Energy Program Manager, Southern California Edison, the Southern California Gas Company, and other service providers while preparing the inventories. Following the inventories, we will forecast GHG emissions to 2020, the General Plan horizon year, and 2050 for consistency with AB 32 guidance from the Governor's Office Planning and Research and the State CEOA Guidelines. Forecasting will allow identification of a 2020 GHG reduction target consistent with AB 32 and provide an opportunity to select an additional GHG reduction target (or targets) consistent with the community's vision for the General Plan and SAP. Coastal Resiliency Using state, regional, and local resources, expert understanding, and feedback from local experts, PMC will evaluate resiliency and adaptation strategies and policies to address anticipated climate change effects, particularly those affecting Huntington Beach's coastline. Our approach will include research and assessment of state; regional, and local resources, preparation of a vulnerability assessment; sea level rise —specific analyses, and preparation of adaptation strategies and resiliency measures. Excellent resources are readily available to provide guidance and background information, including: ® California Adaptation Planning Guide (2012, Cal EMA) ® Cal -Adapt Local Profiles (2013, CEC) ® City planning documents including, but not limited to, the draft Local Hazard Mitigation Plan, demographic projections, Infrastructure Master Plans, and the Emergency Management Plan ® Project -specific technical SLR analysis (presented below) ® Cal EMA My Hazard Mapping tool Sea Level Rise The latest State of California guidance for SLR is summarized in the State of California Sea -Level Rise Guidance Document (March 2013 update), which was based on the final report from the National Research Council (NRC), Sea Level Rise for the Coasts of California, Oregon and Washington (June 2012). Item 12. - 27 HB - l 10- 0w The diaarams below show the past and future tide levels for the Los Angeles tide gauge (the longest record in the region). The future tide levels are based on the NRC III SLR scenario. Similar analysis can be performed for any SLR scenario. With additional analysis; similar results can be developed that show how return periods for various tide levels change over time. Essentially, what is a 100-year tide level today will be less than a 5-year event by 2060 under this scenario.. Such information is very important for a broad range of City infrastructure elements. Figure 1.1. Tide Gauge Analysis for the Port of Los Angeles Gauge Figure 1.2. Probability of Tides Exceeding Mean Sea Level -._..__.._.......... .... .. - Los Angeles CA (MO-2011) tiE i I i V m 1 � Ewry]Te`R --Ewmmban f 7.:. • o-ant as �- - ♦ - -.._ _ +mw � i 4 frra.Tfd. Ma.e /JY. Tnnd Ky Vulnerability Assessment In order to understand the city's vulnerability: it will be important to involve organizations that manage resources and facilities to identify risks and strategies to reduce risks. Because the number of groups and organizations that are affected by climate change is large, we recommend forming a task force made up of i 8 Pr: pv sa* f�l Ciry of Hur':imm-O,; 5ea'l B -1111- Item 12. - 28 organizations actively engaged in the management of resources and facilities. The task force could also include representatives of the GPAC, at the City's discretion. A vulnerability assessment is critical to identify adaptation strategies that effectively increase resiliency to hazards and a changing climate over time. The vulnerability assessment provides a spatial assessment of (1) the exposure to hazards, (2) sensitivity to effects, (3) potential effects of those hazards (including certainty and timing), and (4) the current ability to adapt to those effects. Exposure. The first step in assessing climate change vulnerability is identifying exposure, or which climate change effects will occur in the city. Early analysis from the California Adaptation Planning Guide suggests the following primary. exposure: • Sea level rise — up to 55-inch sea level rise by 2100 ® Extreme heat — 3 to 5 more annual heat waves by 2050;12 to 14 by 2100 ® Increases in average annual temperature and the number of extreme heat days ® Changes in precipitation patterns (increase in extreme events and drought) — up to 2-inch decrease by 2050, 3- to 5-inch decrease by 2090 ® Increases in average annual temperature and the.number of extreme heat days PMC and M&N will build from this initial analysis using existing resources, technical expertise, discussions with City staff, and input from local stakeholders. Exposure will be assessed in terms of expected severity and likelihood. Sensitivity. The second step in the process is identifying the functions, structures, and populations that will be affected by the exposures listed above. Given the extensive resources already available for Huntington Beach; this task will utilize a sensitivity checklist to determine the degree to which a system would be impaired by climate change effects for each exposure. Through discussions with City staff and the local steering committee and further research, the sensitivity rankings will be refined to identify the most vulnerable systems, infrastructure, and communities. Effects. Climate change effects occur at the intersection of exposure and sensitivity. PMC will identify specific impacts such as flooding (from anticipated changes in sea level and/or precipitation), negative public health outcomes from heat -related events, damage to infrastructure and homes due to flooding and reduced water availability, and economic changes resulting from anticipated changes to natural resources that support tourism. These effects will be assessed for severity, certainty, and onset (time frame). Projeci Understanding and Approach 1 ?-9 Item 12. - 29 f fB - 1 1 2_ I ® Threats to built infrastructure in the coastal zone from sea level rise • Threats to coastal ecosystems from sea level rise t Public health threats from increased temperatures ® Water supply effects PMC will build from this initial analysis using existing resources, technical expertise, and discussions with City staff and the task force. Exposure risks will be assessed in terms of expected severity and likelihood. Resource Conservation and Wetland Protection The City's Coastal Element was comprehensively updated in 2001. It includes an exhibit of `environmentally sensitive habitats as depicted by the Department of Fish and Game" that is based on information from the 1970s and only includes the southeast portion of the city. As part of the General Plan update. PMC will conduct a biological survey to update exhibits that consider such natural resources. The majority of sensitive habitats are along the coast; however, there is one created wetland inland in the Seacliff community, and there are other areas that may warrant recognition, such as the eucalyptus grove at Norma Gibbs Park created for monarch butterflies. in addition, the City is studying the annexation of the unincorporated Bolsa Chin Wetlands and surrounding vicinity, totaling about 1,500 acres, for the purpose of ensuring long-term protection and restoration of the area. Urban Runoff and Low Impact Development Identifying opportunities for appropriate drainage control and runoff improvement opportunities will be performed collectively between the consultant team, City staff, and the local community. Moffatt & Nichol will develop a Citywide Urban Runoff Management Plan (CURMP) that will detail how Huntington Beach plans to protect and improve water quality of local, coastal resources. Moffatt & Nichol's extensive experience in the city will allow for the easy identification of areas in need of special attention. Moffatt & Nichol will work with City staff to develop a program rooted in sustainable solutions that focus on eliminating additional flow, maximizing on -site retention/infiltration, and incorporating bio-retention features which offer opportunities for runoff treatment and enhancement of local landscaping. As detailed in Section 2, Moffat & Nichol will complete an extensive research program properly documenting existing conditions, develop a list of water quality improvement projects, and identify funding sources to help develop needed system enhancements. The CURMP developed in 2005 will be revised to meet or exceed the requirements of the local NPDES permit. Information developed by Moffat & Nichol will also be used in the Genera; Plan update process to create polices that will promote water -sensitive techniques for .. U�`erz. arcnq z Au^ oach Item 12. - 31 H 13 -1 14- � flood control and stormwater management, helping the City to improve water quality and comply with its stormwater permits and state law while reducing flood risks. Market Trends and Fiscal Considerations Changes in public policies can have both direct and indirect impacts to the economic conditions and vitality in a city. Before developing alternative scenarios for a general plan, we conduct economic research and analysis to help ensure policy decisions take into consideration market and financial feasibility and risk, and we provide estimations on the economic and fiscal benefits of the alternative choices. These types of analyses lead to more informed policies, plans, and actions. The Huntington Beach General Plan Market Analysis will address the major forces that drive change in the community: (1) residential population and labor force growth; (2) overall economic trends that influence the future composition of jobs in Orange County; and (3) Huntington Beach's market position to capture a competitive share of growing sectors while maintaining strength in its existing key employment sectors. Stanley R. Hoffman Associates will complete a market analysis focusing on specific issues identified in Section 2. Stanley R. Hoffman Associates will also prepare a Fiscal Impact Analysis for the preferred General Plan land uses and up to two alternatives based on the analysis of current fiscal conditions. The focus of the analysis will be on General Fund revenues and costs, but may include other funds, such as the Gas Tax Road Fund, based on discussion with City staff. Circulation Huntington Beach's citywide traffic model has been used in numerous transportation planning applications over the past several years, including the recently adopted Circulation Element update. The model was certified by the Orange County Transportation Authority (OCTA) as meeting the consistency requirements for sub -area models in Orange County. The circulation work effort for the General Plan update involves updating the citywide traffic study completed in 2011 and using the information to assist in updating the Circulation Element as part of the overall General Plan update. Additionally, estimates of vehicle miles traveled (VMT) will inform both the existing GHG inventory and the Sustainability Action Plan (SAP). As described in the Work Plan in Section 2, Stantec will perform the following steps: -12 Pr•u sal fcr City;- ` min•, r: erg . Item 12. - 32 ® Update the citywide traffic model for regional and local consistency, and incorporate special analysis procedures into the modeling process. ® Analyze future land use and circulation plan alternatives and work with staff to update the highway component of the Circulation Element. ® Address specific transportation issues and prepare technical materials relative to the Circulation Element update. ® Provide estimates of VMT for existing and future business -as -usual conditions, and estimate VMT reductions attributable to proposed General Plan policies and SAP measures. The first of these steps will result in refinements to the current model, which was developed in 2007, and involves updating the baseline 2030 General Plan to reflect recently approved projects in the city. The refined model will then be used to analyze land use alternatives for the General Plan update and to identify mitigation measures needed to serve future traffic demand. Refinements will assist in evaluating the type of climate change strategies being considered in the General Plan update. The primary transportation metric for GHG emissions is vehicle miles traveled, and reductions in VMT from specific land use and transportation strategies result in commensurate reductions in GHG emissions. Three major travel demand components are involved: ® Trip generation ® Trip length ® Travel mode change The first pertains to the number of vehicle trips generated by specific types of land use. Density can be a factor, as can the mix of land uses (e.g., mixed -use development featuring residential and nonresidential land uses). Strategies that use communications technology (e.g., telecommuting) to actually reduce the number of trips are an important emerging factor in this component. The trip length component pertains to the actual trip patterns in an area, which are influenced by factors such as proximity between residential and nonresidential land uses (jobs/housing balance; for example) and citywide geographic relationships between different types of land uses. Travel mode changes occur when walking, cycling, and transit ridership trips replace vehicle trips. These three factors tend to be somewhat interdependent, as for example when reductions in vehicle trip generation are due to more walking trips, and changes in trip patterns affect both trip length and travel mode. The most effective VMT reduction strategies involve transit -oriented development (TOD), high -density planning or smart growth policies. increased bicycle infrastructure, mode -share increase goals, and encouragement to increase transit r4=�- : r r i' z ... Amman Item 12. - 33 HB -116- e,I,- ridership. For example, in Long Beach; the green shared arrow (sharrow) lane on Second Street, which is over half a mile long, resulted in a doubling of the bike ridership in the area. These types of strategies will be considered first because they are relatively easy to achieve in comparison to other alternatives and the City of Huntington Beach is currently pursuing some through the Bike Master Plan update. Another example is the approved Beach and Edinger Corridors Specific Plan, which would decrease UMT by increasing the residential density along commercial corridors, thereby encouraging shorter trips and placing future residents closer to transit stations and within walking distance of commercial uses. Fire and Police Services The PMC Teams approach to service level studies is to evaluate historic data, map relevant data. and discuss patterns with the departments and service providers. Matrix Consulting Group will use existing report information to map calls and service areas for the past several years. Throughout the effort, we will collaborate with the departments and focus on solutions. In our experience, emergency services personnel are focused on bringing needed resources to a call as quickly as possible and have most likely identified the things that slow them down. These sage service providers are often the best source of recommendations, as they know the community and the demands on their services. Our task will be to ensure their ideas are represented in General Plan goals, policies, and programs. General Plan Update The City's current General Plan provides a sound basis for the update; however, it does not fully describe a community that is at the forefront of sustainability and environmental stewardship. PMC will lead an extraordinary team of planners, designers; and sustainability specialists to develop a plan that reflects, the community's goals for the future. PMC will create a streamlined, illustrative plan that is easy to use during budgeting, capital improvement planning, and decision - making for discretionary projects. Key organizational and content changes will be made that make the General Plan more readable and internally consistent. Our work plan begins with a review of the existing plans and resources identified in the RFP, identification of data needs, and research to fill any information gaps. We will prepare a Technical Background Report and update the existing land use survey, then facilitate a land use and circulation alternatives process grounded in research describing market opportunities. The alternatives process enables the public to directly influence physical and policy decisions, which we will summarize and vet with decision -makers as key policies. Only when staff and the F n ea:. $Sj 1Ui+li'il'''.,t� Item 12. - 3 4 community approve of key policy direction will we write draft goals and policies. Along the way, we will identify potential inconsistencies with City design guidelines and zoning requirements. This transparent approach ensures that City staff, the City Council, and the entire community understand where the plan's vision and direction came from, and the reasoning behind the development standards and design guidelines that will implement the plan. During the course of the work program, PMC will prepare two administrative review drafts of the General Plan, a public review draft, a public hearing draft, and a final General Plan. We understand that City staff will prepare most General Plan exhibits and conduct most GIS analysis, though our staff will update GIS datasets as requested in the RFP and can be available to assist in exhibit production. Environmental Impact Report We understand that the City seeks to prepare a comprehensive program environmental impact report (EIR) for the General Plan update. The EIR should be just as user-friendly and accessible as the General Plan itself to promote maximum use of CEQA tiering and streamlining provisions in the future. We recommend crafting a self -mitigating EIR, and our approach embraces the practice of integrating the planning and CEQA processes, accommodates streamlined review of future projects, and identifies the environmental benefits of adopting the General Plan. As indicated in the RFP, a program EIR would be the most effective tool under CEQA to allow the City to achieve the goals identified above. Consistent with State CEQA Guidelines Section 15168, a general plan update falls within the types of projects that are considered appropriate to be evaluated in a program EIR. A program EIR is considered appropriate for "a series of actions that can be characterized as one large project and are related either: geographically; as logical parts in a chain of contemplated actions; in connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program; or as individual activities carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways" (Section 15168(a)(1-4)). The advantage of a program EIR over a master EIR is that it does not need to identify specific projects at this time and does not require recertification every five years. Atkins, under the supervision of PMC, will lead preparation of the program EIR. Through previous work with the City on a variety of projects, Atkins has a comprehensive understanding of City needs and issues. The approach to the General Plan update EIR is designed to: ® Complement the General Plan community engagement process by informing the public debate of alternative General Plan policies or strategies. roin,t 11 nde,,aaro rig an.,: kp oach Item 12. - 3 5 f1B -118- /� ® Create a basis for an environmentally sound and self -mitigating General Plan update. ® Provide for streamlined environmental review for future projects consistent with the General Plan's and SAP's goals, policies, designations, measures, and actions. ® Achieve the highest standards for legal defensibility. Atkins will prepare all required environmental documentation in accordance with CEQA, including a program -level FIR and any required technical studies in consultation with other members of the PMC team. The EIR will discuss environmental effects in terms of their severity and probability of occurrence. It will identify mitigation measures, as necessary, appropriate to a program -level EIR to minimize the significant effects of the recommended General Plan and SAP and will include an alternatives analysis. In addition to Atkins' experience, PMC has extensive experience preparing program EIRs. for General Plan updates, providing our team with a deep understanding of how to design the planning documents and the EIR to work well together. Our collaborative approach will provide efficiencies in our individual work efforts, while maintaining the added benefit of an FIR consultant with extensive project experience in Huntington Beach. Our joint contributions in preparing both the planning documents and the program FIR will allow us to gain a more comprehensive understanding of the environmental issues to be addressed in the FIR. At the same time, our team's collective knowledge of developing program level analyses and mitigation allows us to provide valuable input into the programs and regulations in the General Plan and SAP, allowing the plans to become as self -mitigating as possible. -i� ` r'�;;r�^sai f;r;rite ct Hrrirat�;n &� act: Item 12. - 3 6 ATTACHMENT B Our proposed work program is presented below. For each task, products associated with the work to be performed are specified. We understand that the City expects to complete the General Plan update and EIR by April 201E (30 months from project initiation), A schedule to complete this work program is provided at the conclusion of this section. Work Plan Task 1: Initiate the Project and Refine the Work Program 1.1 Kickoff Pvteeting, Bus Tour, and GIs Orientation Key members of the PMC team will attend a halt -day kickoff meeting. The kickoff Delivera=L=fes. iraf<.oif rneetiltt, meeting provides an opportunity for all key City staff and consultant team bus tots. anJ GdS oriel - _ ion vv i�= members to get together and identify data sources and other resources to be used r in the program, to brainstorm ideas, and to allow the consultant team to enhance our knowledge of Huntington Beach. Following the kickoff meeting, key members agenda, sur;nr^a ;, and bts tour of the consultant team and City staff will tour the city to visit potential future itinerary} "ci5:' ri'al ,cl rrrric=. development sites, verify existing planning and environmental conditions, and identify other locations that staff would like to address in the General Plan update, SAP, and EIR. Following the kickoff meeting, PMC GIS staff and City GIS staff will meet to discuss abilities, resources, and mapping protocols for the project. 1.2 Develop General Plan Visual Identity PMCs graphic designers will create a unique graphic format and project branding cliverables: draft and fir —al to create a recognizable identity for the project and garner enthusiasm and unity. r„ ,,, ; ;r„ •;, t 'L'3'1 �:, y __ . ly. This involves a process of translating community personality, local culture, and unique environmental attributes into a graphic language of fonts, images, colors, (eiectroric;. and layout concepts. This template is then used for all project products, including the w•ebsite• meeting materials, and planning documents. 1.3 Prepare Outreach Assessment and Engagement strategy PMC can provide community engagement support that fits the needs and available ueliv','tables: Outre ,i resources of the City of Huntington Beach_ PMC will create a community assessnne!nttnrrni; drat` -;,,.-id final engagement strategy based on an outreach assessment with City staff. This strategy will outline the time -line and scope of outreach and engagement activities, engagerneiri s.rategies including the type, order, purpose, and desired outcome of each phase of;1; °tronici. outreach. At project kickoff. PMC outreach staff will provide City staff with an outreach assessment form that will gather key information from staff about past outreach successes and challenges in Huntington Beach, identify desired outcomes of the engagement process, and initiate identification of key k ,ar ai ~ ched -!e 2- Item 12. - 37 1113 -120- Q,;, stakeholders. The strategy will comprise proven outreach and engagement techniques, which could include the following, depending on consultation with staff and within the scope of the proposed budget: ® Press releases to key local media ® Social media (support to staff for City or project Facebook or Twitter sites) ® A project website or a web page on the City's website (text support to City for project web page hosted on City website) ® Online survey as part of City website ® Project fact sheets ® Project boards, banners, or similar materials that can be used at City events and facilities ® Key messaging for City staff and other City -identified project representatives • Stakeholder interviews and industry roundtables ® Facilitated small -group stakeholder discussions ® Open houses, community workshops, or special events • Opinion/editorial pieces for local newspapers ® Speaker's bureau training for GPAC members and key community leaders The strategy will also include a comprehensive list of project stakeholders and stakeholder groups: identified by working with City staff. The list of stakeholders will be used throughout the project as a basis for formation of any outreach efforts. This task addresses the outreach assessment and community engagement strategy. Outreach techniques and activities identified in the community engagement strategy will be completed as described in Task 10.2 of this work program. Task 2: Prepare Vision and Guiding Principles 2.1 Stakeholder Interviews/Key Community Themes Deliverables: Qraft and I PMC will conduct up to 16 one -hour stakeholder interviews with at least one discussion questions ;electronic;_ consultant team member present at each interview. These interviews will allow for one-on-one in -person meetings or telephone interviews with stakeholders Participation in up to sixieen (16) identified by City staff. When interviewees represent similar community one -hour stakeholder interviews; perspectives, interviews can also be conducted in small groups. Potential draft and final community themes interviewees include members of the GPAC, members of the Environmental Board, community leaders, property and business owners, relevant City staff, and others memora;sdur (electronic.). as needed. We also strongly encourage interviewing elected officials as part of the stakeholder interview process. PMC will work with City staff to identify potential 2 i Frericsai for 0'itti of Hjimir.oton B ac . 1113 -121- Item 12. - 3 8 questions prior to conducting stakeholder interviews. Final candidates will be identified in the community engagement strategy. Based on the results of the interview process, PMC will identify key community themes for the General Plan update in a technical memorandum to City staff. These themes represent the beginning stages of issues, goals, and policies for the General Plan. 2.2 Develop Community Vision PMC will coordinate with City staff to plan and facilitate a series of two visioning workshops to acquire community input on a vision for Huntington Beach's future. Participants will be provided with handouts and materials as needed to provide complete information and to facilitate meaningful participation. Workshops will be planned at two distinctly different venues in the community. Visioning input will be summarized in the form of a vision book. The vision book can serve as a statement of the direction that the community is moving toward and will help guide subsequent policy discussions. Task 3: Identify Community Issues 3.1 Collect and Review Existing Plans and Policies This subtask involves a coordinated data collection effort to ensure that all materials completed by City staff to date relative to the General Plan update are provided to the PMC team and to understand the sources, strengths, and weaknesses of the data. This data will provide the background information necessary to complete the General Plan, Sustainability Action Plan (SAP), and related technical studies. We will review the numerous documents, plans, and reports that describe and discuss the City's efforts in management, planning, and improvement in the recent past. This subtask allows the team to assimilate completed work, ideas, and efforts into the remaining portions of the General Plan update without duplicating past work. To support preparation of the SAP and the related elements of the General Plan, PMC will identify, collect, and review plans, projects, programs, activities, and accomplishments led by the City and/or key partners to achieve GHG reductions and/or sustainabiliy goals. To support the GHG inventory analysis, we will review recent activities but go back to accomplishments since 2005 to the greatest extent feasible. We will quantify the GHG reduction benefits of programs, projects, and completed activities since 2010 consistent with standard practice for the SAP. 3.2 Identify Key Issues Based on work completed in previous tasks and preliminary findings of the technical studies outlined in Task 4, PMC will prepare a summary of key issues to be addressed in the General Plan update and in the SAP. Issues will be identified generally by General Plan element, beginning with an assessment of issues Oel ve�ables: Participation in two (2 visioningvisioninig wc,,Ykshops; draft and final vision boo"', ;electronic). De-,Nilva ables: Nbliography and refererrle list of key data sources iel cE rric);t echrical tneniorandr t describing existing <icuwmpiish menk -a for the SAP Deffverables: D=aft and final key issues .Mr?moranda (electronic). Item 12. - 39 11-1B -122- �u' presented in the current General Plan. PMC will dedicate several General Plan Advisory Committee (GPAC) and issue -based task force meetings and Environmental Board meetings; to developing and vetting these issues prior to drafting General Plan goals, policies, and actions and SAP measures and actions. Key issues will be presented in a technical memorandum to City staff; suitable for use as agenda material for the GPAC, the Environmental Board, and task forces. Task 4: Prepare Technical Background Studies and Report This task describes steps the PMC team will take to prepare various technical studies and a comprehensive Technical Background Report (TBR) to guide preparation of the General Plan, SAP, and Environmental Impact Report. The reports listed below include all those identified by the City in the RFP, as well as a number of additional reports needed to complete the General Plan update. The overall goal of this effort is to identify and document baseline conditions and prompt discussion regarding development opportunities and constraints that inform General Plan policies. This goal will be achieved in a way that guarantees easy readability by any interested party. Information will be extracted from the TBR and presented in summary fashion in the appropriate chapters of the General Plan and/or EIR. As requested in the RFP, this task assumes consultation and collaboration with City GIS staff to prepare the majority of figures needed for the General Plan update and TBR. Our working scope assumes that an administrative draft of each peer review memo or working paper will be submitted to City staff for review and that PMC will produce a final product reflecting staff comments. We further assume that the City's General Plan project manager will provide one set of consolidated comments and that any conflicts among comments from multiple reviewers will be resolved by the City prior to providing comments. 4.1 Existing Land Use Survey Deliverables: Lair: use, su,-t,: v. PMC will update the 2005 existing land use survey prepared as part of the update work plan 1feIec ronir; ; Circulation Element update. Our proposed project manager (Jeff Henderson} draft and final existino 1.,Sworked extensively with City staff to design and complete the original survey, and he will be integrally involved in the update. The update will consist of analysis of survey database and recent aerial photography; assessor parcel data, and ground-truthing via a documentation updates windshield survey aided by use of mobile GIS applications. (electronic'. Results of iv;'j PMC will develop a work plan for updating the survey and will review the work plan use survey �ifi be sun r arize i in with City staff prior to beginning the update. PMC staff will review the contents of the Technical Background ReY=o11 the existing survey and update residential land use types based on available* development permit data from the City and review of recent aerial photography. described in Tasks 4.12 thro tgh For commercial and industrial land uses, two PMC staff will conduct afield survey 4.14. of major commercial corridors and industrial areas. Existing land use codes, the 2- ` Ptn oral lot" CiN o"ru i ct r _,eac HR -123- Item 12. - 40 number of stories, and estimated building square footages will be updated using an iPad-based mobile GIS application. PMC staff will assemble the updated data and forward a draft database to City staff for review and approval. The work scope assumes one round of revisions to the draft database in response to City comments. The resulting database will be returned to the City for use in the same projection and coordinate system as other City GIS data. PMC will also update the survey documentation to reflect changes to the database. 4.2 Biological Resources Survey PMC will update and expand the exhibit of "environmentally sensitive habitats as Delh_era les: PAC will document depicted by the Department of Fish and Game" that accompanies the existing tie €a=ic,4ciogias and findings of Coastal Element. As an initial step, PMC will work with City staff to define the t e t ioiocic::;,l resources survey in scope of environmentally sensitive habitats. PMCU will then conduct an inventory and assessment of environmentally sensitive habitats that occur within the = tecfinicai r;pc:,_ The technical municipal boundaries, with a particular focus on the coastal wetlands. r p = will be incorporated in the PMC will undertake an intensive field evaluation of biological resources in the city. Tc,OOn icai 1? cl ciound Report Sensitive resources will be mapped using Tremble GPS units with sub -meter *,'Timed iE. Tasks 4.12 through accuracy. PMC will use aerial photos and existing GIS data to inform the field t evaluation. Preliminary -identified GIS data includes: ® California Natural Diversity Database (CNDDB) for threatened and endangered species ® Geology ® Soils • Hydrology (lakes and streams) • Topographic maps (United States Geological Survey (USGS) quadrangles) ® National Wetlands Inventory ® Federal Emergency Management Agency (FEMA) floodplains ® Aerial imagery PMC will contact appropriate regulatory agencies to identify any additional biological baseline information not identified in previous studies. PMC will prepare a biological resources technical report. The report will describe the regulatory context of sensitive biological resources, environmentally sensitive habitats, and other sensitive resources in the city; including wildlife and plant species. The report will also present opportunities available to the City to protect and improve identified resources, including wetlands. Maps presented in the report will also be provided to the City as shape files in the projection of the City's GIS system. 4`01'iar, and . due ± 2 E Item 12. - 41 HB -1224- I&V GeNvcrab°..es: 1`00 will summarize analysis and conclusions for he SLR VL(lt1PrRbil;.''{ ,.JSesS:l,er(: in a tdcitnicai .report. The technical re pot will be Incorporated in the Technical Ract:ground Report described in Tasks 4.12 through 4.3 Sea Level Rise Vulnerability Assessment Moffatt & Nichol (M&N) will prepare a Huntington Beach —specific sea level rise (SLR) vulnerability assessment to support the General Plan update. The SLR study will be prepared as an early item in the work program, so that it can support development of land use and. circulation alternatives. A scope of work for a related Coastal Resiliency Plan is provided as Task 11.1. Gather/Review Existing Data. The first step in the SLR vulnerability assessment will be to gather the best available topographic and bathymetric survey data. The following data types/sources have been identified and would be used to create a seamless digital elevation model (DEM) for the study area: m Coastal Zone topography: 2009-2011 California Coastal LIDAR Project DEM ® Bathymetry: 2009 USACE Southern California Bathy LIDAR ® Upland topography: 2008 USGS National Elevation Dataset (NED) In addition to near -shore bathymetry, measurements of recent profiles along the city's 9.5 miles of coastline will provide a critical data set for assessment of shoreline vulnerability to wave attack for various water level scenarios. The most recent beach profiles (40 total along the city shoreline) were surveyed in 2010 under a contract from the US Army Corps of Engineers — Los Angeles District. M&N has this survey data on file. M&N will review maps, surveys, drainage reports, and land use plans and will conduct a visual assessment of existing conditions to identify potential vulnerabilities for different reaches of the city's shoreline. Summarize Current Scientific Guidance for Sea Level Rise Projections Over Next 100 Years. M&N will review relevant SLR scenarios, including those prepared by the National Academy of Sciences; California Climate Action Team, US Army Corps of Engineers, State of California, IPCC, Rahmstorf (2007, 2009), Canada, England, and the Netherlands (Delta Commissie). These scenarios will be compared and contrasted in a report that culminates with recommendations of SLR scenarios for use in planning, with an emphasis on State of California requirements to be used in subsequent tasks. Other climate change parameters will include potential changes in precipitation, frequency of storms, ocean temperature, and wave climate. Prepare Geo-Referenced Inventory of Infrastructure Potentially Affected by SLR. Working in collaboration with City GIS staff, M&N will prepare a geo-referenced inventory that will include, though may not be limited to, beaches, the pier, roadways, pedestrian and bike paths, parking lots, buildings, the small -craft harbors, shoreline protective devices including seawalls and bulkheads, utilities (e.g., flood control channels and storm drains, sewer), and wetlands. M&N will � ^. � i'�,;�,.s:c is � . � , ? �,. it-•_ , El �5G ._. JIB -125- Item 12. - 42 add available attribute data relevant to future SLR vulnerabilities to infrastructure (e.g., critical elevations, structure types, year built; replacement cost, and condition). This analysis will use and build on existing GIS data provided by the City and will be prepared using a consistent horizontal and vertical coordinate system. M&N will prepare metadata for each feature class to allow data to be efficiently used in the future. Using this information. M&N will prepare a baseline assessment of coastal conditions alona the shoreline reaches, including specific evaluation of beaches, hardened shoreline, structures, and other environmentally sensitive areas. Model SLR Scenarios in Conjunction with Other Coastal Flooding Factors. Using the scientific basis developed in previous tasks, M&N will evaluate the impact of projected climatic changes on each planning area. The evaluation will be based on guidance provided in the State of California Sea -Level Rise Guidance Document and as recommended by the California Ocean Protection Council on Sea Level Rise. The current approach, which is consistent with California Coastal Commission guidance, is to evaluate impacts for three scenarios of future sea level rise (low, medium -projected, and high) under three planning horizons (2030, 2050 and 2100). At the outset of this task, M&N will review SLR and coastal flooding models prepared by others (i.e., NOAA, USGS) and use data from these studies as appropriate. M&N will apply publicly available shoreline evolution models, in both the alongshore and cross -shore directions, to model ranges of coastal erosion and flooding along the study area considering a number of synthetic total future water levels. Our work will begin with an initial planning -level model that evaluates the erosional or accretional tendencies of a beach in the cross -shore direction (i.e., onshore, offshore) which is a function of the wave conditions and the amount of energy delivered to the beach. A recent Shoreline Equilibrium Model developed by Yates (Scripps Institution of Oceanography 2009) is an informative and powerful tool to predict shoreline position based on the incoming wave field and the potential shoreline response associated with rising sea levels. M&N will use this model to identify vulnerabilities associated with both changes in wave climate and SLR. On a more refined scale, M&N will model flooding and inundation within identified planning areas using a combined suite of models that transform offshore storm conditions (e.g., wind field, waves) into the nearshore zone, applying various SLR water level scenarios. To analyze realistic storm and erosion scenarios, M&N will use a nested -model approach. The Wave Watch III model will be used to generate offshore wave conditions from meteorological data. The resulting deep water wave field is then transferred to the nearshore zone using the SWAN or Delft3D nested models. Nearshore wave boundary conditions are then applied to nearshore ''Norr and S-1t=edu:e j 2-7 Item 12. - 43 f-fB -126- Pw surfzone and swash zone conditions using the XBeach model, which assesses nearshore erosion and ;flooding potential. XBeach models wave propagation, long waves and mean flow, sediment transport and morphological changes of the nearshore area, beaches, dunes and any back -barrier during storms in two dimensions. This nested model approach is similar to that applied by the USGS for regional SLR vulnerability assessments. Our approach will include greater detail at a citywide scale based on our knowledge and experience with coastal processes along the Huntington Beach shoreline. Synthetic future water levels would include various sea level rise scenarios, coastal storm waves; astronomical tides, and nonfidal residuals (wave setup, storm surge, and decadal water level anomalies including El Nino. and ENSO events). M&N will "calibrate" these results based on anecdotal and/or photographic records of coastal erosion and flooding and run queries of infrastructure data to determine the number and estimated cost of various synthetic total water level scenarios. In addition to vulnerabilities along the City ocean shoreline, other existing flooding vulnerabilities will be exacerbated under future SLR scenarios. M&N will analyze flooding along Huntington Harbour and Pacific Coast Highway during high tides and high rainfall events. Low-lying areas within the City are also vulnerable to high rainfall events and limited storm drain pump capacity into the flood control channels. To analyze potential effects in these areas, M&N will use the XP-SWMM linked "xp2D' numerical model. X,P-SWMM uses a two-dimensional (21D) analytical module to route surface flood flows based on the TUFLOW program, which then links dynamically to the 1-dimensional (1D) EPA SWMM5 module to estimate flows within pipe networks and drainage structures. The xp2D model has been approved by FEMA for 2D flood modeling and mapping for the NFIP since 2011. M&N will use this model to map flooding vulnerabilities for various future SLR and storm combination scenarios. M&N will also review tsunami inundation results from existing studies (e.g., California Geological Survey, FEMA) and correlate results with recent publicly available tsunami -inundation model studies conducted in the region by M&N. M&N will also consider upland flooding from heavy precipitation and related storm drainage, in coordination with Task 4.4. This effort will identify impacted stormwater infrastructure for the various water level scenarios. Conduct SLR Vulnerability Assessment In consultation with City staff: M&N will prepare SLR vulnerability assessments for the city as a whole or focused sensitivity and risk analyses for specific areas. The SLR vulnerability assessment will build on efforts described above and will be performed in accordance with the State of California SLR Guidance Document. SLR vulnerabiiity assessments will be conducted for each of the infrastructure elements identified in previous tasks. xB _ t 7_ Item 12. - 44 Sensitivity assessments will consider how sensitive a planning area is to projected effects, as well as its capacity to adapt to those effects. Finally, risk assessments will consider the consequence and probability of a given effect for each planning area. Based on .the vulnerability of each planning area to projected climatic changes, priority planning areas will be identified per the procedure described in the SLR Guidance document. Idenf fy Appropriate Adaptation Policies. A key part of the vulnerability assessment will be the identification of appropriate adaptation policies that may be considered for inclusion in the updated General Plan and/or Coastal Land. Use Plan. Key elements of this task include reviewing existing studies and adaptation policies implemented elsewhere; providing examples of adaptation strategies for the vulnerable infrastructure categories identified in the study area; ensuring that policies are appropriate for inclusion in the GP and Coastal Land Use Plan; and ensuring consistency with California Coastal Commission criteria. 4.4 Urban Runoff Impact Study M&N will prepare an urban runoff impact study to support the General Plan update. Steps to complete the study are outlined below. Gather/Review Existing Reports and Data. M&N will review existing reports and data relevant to the Citywide Urban Runoff Management Plan (CURMP, 2005). A tentative list of review items includes the CURMP; Storm Drain Master Plan (2005); Urban Water Management Plan (2010); Urban Stormwater Runoff NPDES Permit Local Implementation Plan (2011); NPDES Permit No. CAS618030, Orders No. R8-2002-0010, R8-2009-0030 (amended R8-2010-0062); the 1996 General Plan; GIS data; and maps, surveys, and land use plans. M&N will conduct a visual assessment of existing conditions of potential large- or small-scale water quality projects based on the CURMP recommendations and revised development plans in and around the city. M&N will meet with City staff and interested stakeholders to download updates on projects, developments, and water quality or water use initiatives, and will meet with OCSD to identify viable alternatives to the current Dry Weather Urban Runoff Diversion program. Identify Water Quality Projects and Funding Opportunities. Drawing on the data gathered above, M&N will identify water quality projects on a small- and large- scale and propose revisions to the CURMP consistent with the updated list of projects. As part of this analysis, M&N will identify funding opportunities for the proposed water quality projects and propose revisions to the CURMP to modify or adjust the current list of possible funding sources. Revise CURMP to Meet NPDES Permit. M&N will revise the 2005 CURMP to meet or exceed the requirements of NPDES Permit No. CAS618030, Order No. R8- DeflverabEes: i.1&4J will prepare admit i str tiro dr, —, draft, and =-al re;ti: ions c type CURMP. w T V;si0 1 S be siji—n:,sL+,r,zedaiETechnical Sack;.;round R,eDoft described in Tasks 4.'' 2 t ; ough 4.14. Item 12. - 45 14113 -1218- /' ' Deliverables: PMC will summarize the GHG inventory, forecasts, and reduction target recommendation in a technical report. The technical report will be incorporated in the Technical Background Report described in Tasks 4.12 through 4.14. 2009-0030 (as amended by R8-2010-0062). This will include a revision to the Water Quality Element of the CURMP to include: ® Regulatory environment updates. ® Revisions to Citywide Source Control Programs, as applicable. ® Revisions for major projects, and.applicable NPDES requirements for those developments. ® Revisions to phasing/program implementation/monitoring of program elements as necessary. ® Revisions to funding opportunities. 4.5 Greenhouse Gas Emissions PMC will prepare a community baseline GHG emissions analysis, forecast GHG emissions, and recommend a GHG reduction target. These items will serve as the technical foundation for the SAP and will support technical analyses for the General Plan update and EIR. The baseline inventories will adhere to established protocols, including but not limited to the California Air Resources Board (CARB) Local Government Operations Protocol (LGOP), the US Community Protocol for Accounting and Reporting of Greenhouse Gas Emissions, and methodologies recommended by The Climate Registry. We will use PMC's MS Excel -based Decision Support Tool for this task, The Tool integrates the baseline inventory, emissions forecasts; reduction targets, reduction measure quantification,, and reduction measure implementation, monitoring and reporting. The Tool is the repository for all activity.data, calculations, emission coefficients: sources, and assumptions used in the calculation of greenhouse gas emissions. We have designed a tool that allows for the transparent calculation of GHG emissions in a manner that is accurate and accessible to City staff. This approach eliminates the 'black -box" risks of proprietary tools since Excel is common software used by municipalities. Our Tool is consistent with the current industry protocols and practices and allows modification in response to unique existing conditions. For example, the analysis of GHG emissions for the transportation sector of the inventory will follow the industry preferred practice of analyzing vehicle miles traveled (UMT) with consideration of origin and destination of trips (relying on Stantec's update to the traffic model), which accurately present emissions attributed to activities within the City's control and excludes through travel on freeways and major roadways. Baseline Greenhouse Gas Emissions Inventory. The purpose of the community inventory is to present the major sources and quantities of GHG emissions caused by activities within the city. The inventory will provide a baseline against which future progress can be measured. ('rcncsal lol 'it'r' 0,. iLnlli ;;rs 7L?C;. HB -129- Item 12. - 46 The community inventory will use a jurisdictional approach to identify community emissions caused by activities within the City boundary and those within the City's jurisdictional control, Consistent with industry practices, this allows the City to account for GHG emissions that are caused by activity within the jurisdictional boundary where the direct combustion of fuels or emission of GHGs takes place outside of the boundary. We will prepare a 2005 and current year (2010-2012) GHG inventory, and forecast emissions to 2020, the General Plan horizon year, and 2050. The 2005 inventory will provide a baseline year that is consistent with analysis of statewide emissions and forecasts as directed by Assembly Bill 32 (AB 32). The current year inventory will provide existing emissions for consistency with the baseline year of the EIR. We will also benefit from the comparison of bath years during policy and GHG reduction measure development. The inventories will include emissions from key sectors, including energy, transportation, waste, water: wastewater, stationary sources: and other sectors as applicable. The three most common GHGs presented in community inventories are carbon dioxide (CO2), methane (CH;), and nitrous oxide (N20). In addition to these three GHGs, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF,) may be identified if sufficient use data is available. All GHGs analyzed are converted to equivalent carbon dioxide units, or CC,e, based on global warming potential (GWP). Equalizing GHG emissions as CO2e allows for the consideration of different GHGs in comparable terms. We will collect and analyze activity data for all sectors; using data consistent with other sections of the TBR. PMC anticipates assistance from City staff to confirm emissions sectors, provide sources of information, and confirm the jurisdictional boundary of the inventory, FIMC will lead data collection and analysis. Sectors and their associated activity data, provider, and scope are summarized in the following table. 1 Item 12. - 47 H -130- Ow Residential Commercial/ Industrial Transportation Waste Water Off -Road Equipment and Vehicles Stationary Sources Electricity i Southern California Edison 1 Natural Gas—_—~---�--- ' Southern California Gas v ` 2 Electricity Southern California Edison 1 Natural Gas Southern Califomia Gas 2 On -Road VMT Citywide traffic model 1 --............ ...........-- - _..--._........ ._.... Community Waste CalRecycle 3 Community Alternative Daily Cover ' CalRecycle j 3 Direct Landfill Emissions CalRecycle ! ^ 1 _..----......_._....................... _..._... -----................ ......... ... ............. City Water Division Gallons Metropolitan Water District 3 Municipal Water District -Orange County Diesel GARB OFF-ROAD2007 1 Gasoline GARB OFF-ROAD2007 1 South Coast Air Quality Major Industry Management District, Air Resources ; 1 Board Results will be presented in the Technical Background Report. In addition, PMC will summarize statewide and regional GHG inventories and present the federal, state, and local regulatory framework related to climate change and GHG emissions. GHG Emissions Forecast. PMC will develop business -as -usual (BAU) emissions forecasts for 2020 and for the General Plan horizon year across. all sectors contained in the inventory. These forecasts will allow the City to demonstrate consistency with AB 32 (by 2020) and can support preparation of the GHG section of the General Plan CEQA documentation. Future year forecasts will rely on population, jobs, and household projections consistent with the General Plan update and EIR. GHG Reduction Target(s). PMC will recommend feasible GHG reduction targets for 2020 and the General Plan buildout or horizon year that respond to the emissions profiles identified in the inventory and forecasts. The targets will reflect guidance from CARB, the Governor's Office of Planning and Research, the South Coast Air Quality Management District, the AB 32 Guidelines and Scoping Plan, and State CEQA Guidelines Section 15183.5. PMC anticipates coordination with City staff, HB -131- Item 12. - 48 the GPAC, and the Environmental Board during the selection of GHG reduction targets as part of Task 5. 4.6 Market Trends Analysis Stanley R. Hoffman Associates (SRHA) will prepare a market trends analysis addressing the following major forces that drive change in the community: (1) residential population and labor force growth; (2) overall economic trends that influence the future composition of jobs in Orange County; and (3) the market position of Huntington Beach to capture a competitive share of growing sectors while maintaining strength in its existing key employment sectors. The market analysis will include the following steps: ® Prepare a baseline target industry and demographic analysis. ® Analyze current and projected market conditions for new development. and Huntinaton Beach's competitive position in Orange County. m Define and analyze economic zones within Huntington Beach that exhibit clusters of economic strength and job growth potential. ® Define the criteria that will provide the benchmarks and economic indicators to evaluate future performance and success of General Plan economic development policies, such as an increase in certain types of employment and wages, better jobs/housing balance, and fiscal revenue benefits. Stakeholder/Key Leaders Interviews. SRHA will conduct interviews with key stakeholders and community leaders to help prioritize the major economic issues that should be addressed during the study. Many of these interviews may be conducted in conjunction with those specified under Task 2.1. Stakeholders may include members of the Chamber of Commerce and representatives of the Automobile Dealers Association, the Association of Realtors, the Visitors and Conference Bureau, and other key organizations and leaders. Target Industry and Projections Analysis. SRHA will conduct a target industry analysis, working closely with City planning and economic development staff. This will include analysis of strong, medium, and weak sectors of the community and the regional economic base. Economic Development Key Industry Analysis. This subtask will address the level of job base diversification in the city and will build on the latest wage and employment information for Huntington Beach, Orange County, and the west Orange County subregion. Real Estate Market Study. SRHA will contact knowledgeable brokers, developers, expert practitioners, and selected representatives to ascertain their experience in the local real estate market and their view of future economic development Deliverable}:. SRHA will suE arize the market trends analysis in a t&chnical report. The t d'mical report will be inccr _crated Ir he Technical Background Report described in r x:.. _, �.14, 3 L S;.h'Cuie ) 4 Item 12. - 49 H13 -1321- (Al opportunities. The market study will analyze the potential mix of supportable residential (both single- and multi -family units) uses, commercial/industrial and retail uses; professional and medical office uses; and local services. Identification of Economic Zones for Analysis. In coordination with economic and planning staff, SRHA will identify the major economic zones of the city. To the extent that the city has a vacant or underutilized land inventory, this information would be summarized by economic zones to identify the possible locations of potential development opportunity sites. The existing land use survey described in Task 4.1 can be used to identify vacant sites by zoning district for this purpose. Preliminary Range of General Plan Projections. Since the most recent forecast of growth was completed in 2010, SRHA will prepare a range of preliminary residential, population, and nonresidential forecasts for use in preparing the General Plan update. SRHA will work closely with the demographic research being conducted by the Center for Demographic Research and the most recently adopted SCAG 2012 RTP forecasts Retail Capture. Analysis. SRHA will prepare a retail capture analysis where the existing and historic household expenditure potential will be compared with historic taxable retail sales data for Huntington Beach. A capture analysis compares the retail sales potential of different retail categories by local retailers with the household expenditure power of local residents. The retail capture analysis will establish Huntington Beach's strengths or weaknesses relative to particular retail categories. 4.7 Circulation System Modeling ne€iueEab=es; S)t i I vvi i Stantec will update the citywide traffic model for use in the General Plan update summar`ze existing-;rcrlation and to support preparation of the SAP. Steps to update the model are outlined below, corditions and provide doc me;:tarion foF ne zdated Develop Analysis Procedures. This task will establish.the context for the traffic {,f�ic „''Dde' as a technical repent. study and define the methodology and procedures to update the traffic model in order to provide data consistent with the environmental consultant's needs for Tht tecl nir�ai rn"O `�`;'i;l be addressing the GHG legislation (AB 32 and SB 97) and in updating the 2030 traffic incorporated In the Tecs:nicai model to the desired future horizon year (2035 or 2040). Bactkground Re'o described in Update 2030 Model. This task involves updating the future baseline version of the Tasks 4.12 Throug`; 4.1li. model to a 2035/2040 forecast year. N/linor updates to the model include incorporating the latest approved projects into the land use database and performing network changes to achieve consistency with the latest version of OCTAM and the MPAH. A check will also be made on the regional highway forecasts against the latest OCTAM forecasts. The updates and refinements will be documented in a supplement to the traffic model description report (Austin -roust HB -131- Item 12. - 50 Associates 2009). The work product from this task will be the refined baseline data for the current General Plan. Refinements to the traffic model will address the type of strategies being considered for reducing GHG emissions, with specific emphasis on trip generation, trip length, and travel mode change. Inputs will be specified at the trip generation and trip distribution stages of the model, resulting in changes to outputs from the vehicle assignment stage in which roadway traffic volumes and VMT data is produced. The assumptions and methodology used in this update and refinement will be documented as a supplement to the existing comprehensive traffic model description report. Develop Future Modeling Scenarios. In this task, Stantec will work with City staff to define three land use/circulation alternatives for testing and use the HBTM to evaluate the traffic impacts and benefits of each alternative: Stantec will evaluate the vehicle trip generation of each alternative, incorporate the land use and circulation alternatives into the traffic model, and produce the forecast data using the procedures defined above. Preliminary ADT and ICU analysis will be performed and the results shared with the consultant team to allow for refinement of the alternatives. 4.8 Fire and Police Service Study Matrix will prepare a service level study for fire and police services that examines existing levels of service, response times, and response time goals, and will identify any changes needed to accommodate future growth. Fire Services Study The following paragraphs describe tasks Matrix will complete to support the fire services study. identity Key Issues, The purpose of this first task is to develop an initial understanding of the major staffing, operating, management and programmatic issues facing the Huntington Beach Fire Department. Matrix will develop this initial understanding of key study issues by conducting individual interviews with the City Administrator, the Fire Chief and top management staff in the Department, and representatives from the collective bargaining unit. These initial interviews will focus on perceptions related to service levels, costs, programmatic and management issues within the Department. Issues reviewed will include key service or operating issues facing the Department and the City, and the impacts of growth in the city as they relate to changing service level expectations and demands. Matrix will also document key population, demographic and economic characteristics and trends in the city. Based on the results of these interviews and Dullverabtas: 'via; ix will ar-;'s;s and c, me : sla—''or the fire and police ser'dirce level s"--=dy as a technical rep Dr. Th, technical report will be irorpora'11 i the Technical "uc,O.?=.;und ReDDrt described in :sf;s 4.1 f t' r?g;i 4.14. t Item 12. - 51 HB -134- f9J initial data collection, Matrix will prepare an issues list to guide subsequent analytical steps. Fire Department Profile. To provide a basis for subsequent analysis, Matrix will develop a detailed understanding of all aspects of the current organization and operations of the Fire Department. The principal focus of this informational foundation will be the functions included within the scope of this study. Following are the nature and type of data we will collect in developing this initial detailed inventory. Develop an understanding of the risks facing the Department and their approaches to dealing with them Matrix will interview Fire Department management staff to develop an understanding of the level of fire and other emergency risks that are targeted and tolerated by the City. Concurrently, Matrix will develop an understanding of the service levels targeted by the Fire Department. At a minimum. these measures would include targeted response times, company staffing and standard response policies by type of call, historical fire losses, levels of training needed to support the effective response to various emergency incidents, and the extent to which risks are formally addressed through enhanced codes and ordinances. Document the overall departmental plan of organization and staffing Through interviews with the Fire Chief, command and support staff, and review of available organization charts.. shift schedules, and other relevant documents, Matrix will develop a detailed understanding of the cunent.plan of organization and staffing to include organization structure: number and type of staff assigned to each engine and truck company; approaches to scheduling; current staffing philosophies and review of the employee contract to include approaches to minimum staffing by station, unit and shift; basic job responsibilities and work time allocations of all administrative and command staff and other administrative and support personnel; and basic lines of responsibility and authority running through the organization. Develop a detailed understanding of the current fire suppression and emergency medical services network Through interviews and review of key operating and response policy documents, Matrix will develop a detailed understanding of the existing fire suppression network and service structure to include location and related response area for each station and unit; age, basic characteristics, and any capital improvement needs associated with each of the stations in the existing network. any plans to adjust the deployment of staff or unit resources or locations; assignment of staf" and apparatus; and basic response policies to each type of call received by the Fire Department. This would include the number and type of apparatus dispatched HB -135- Item 12. - 52 by call type; staff resources dispatched by call type; and involvement in emergency medical responses. Matrix will also evaluate response characteristics and deployment of staff resources to provide emergency medical services in the city; current approaches to handle fire dispatch and communications, including the use of emergency medical dispatch protocols; and the most recent ISO rating, together with developing an understanding of deficiency points assessed. Document the City's and the Department's approach to fire prevention services Through interviews with Fire Department staff, analysis of existing codes and ordinances, and discussions with planning and building representatives of the City, we will focus on understanding all aspects of the Department's current approach to fire prevention related services. This will include developing a detailed understanding of the organization and responsibilities of the Department's fire prevention services to include staff time allocations and assigned responsibilities involving inspections; plan checking; public education, and other fire prevention related activities, as well as responsibilities for fire investigation. Matrix will evaluate current philosophies and contents of codes and ordinances related to "building in" fire protection in the city to moderate future demands for fire suppression resources; the role of fire suppression personnel in the Department's overall fire prevention program to include company inspection policies and inspection frequencies, and other relevant activities in the fire prevention areas accomplished by fire suppression personnel; and assess the integration of fire prevention and other programming into the City's overall risk management program. Document the nature and scope of internal training programs and philosophies as well as the Department's personnel management systems Matrix will document the basic assignment of training responsibilities for training personnel and unit officers; the Departmental training philosophy; approaches currently employed to evaluate individual staff member and company proficiency as part of the overall training program; and approaches utilized to attract, recruit and retain employees in the Fire Department. Document characteristics of current departmental hazardous materials control and response capabilities Matrix will document any issues related to how City and regional activities are coordinated with the Fire Department (e.g., permitting and regional response capabilities); how the Department's initial response units are utilized, trained and supported; and how the response and planning functions are regionalized and supported by the Department. Item 12. - 5 3 HB _ 6_ ('�' Develop a detailed inventory of facilities, departmental apparatus and thoroughly document existing approaches and philosophies related to apparatus replacement Matrix will develop a detailed inventory of existing facilities and apparatus; thoroughly document existing departmental and City approaches to replacing fire apparatus to include financing approaches, timing, and other relevant information; and document vehicle replacement/purchase needs over the next ten years to include vehicle type, timing, anticipated cost and, as noted above, current financing provisions. Develop a detailed portrait of fire and emergency medical services workloads and service levels in Huntington Beach , To provide a basis for analysis of the efficiency and effectiveness of current fire suppression, EMS and support operations, Matrix will develop a detailed understanding of both service levels and demand for service currently experienced by the Department. On a city-wide and station -by -station basis, Matrix will develop indicators of call and unit response volume by major call type over the last five years. Once collected, these data will be analyzed to assess the extent to which various types of demand for service are changing in Huntington Beach. Matrix will develop a detailed understanding of the response requirements and plan of the Fire Department, including the number of units dispatched by type of call, how units cover each other when multiple units are required and the deployment and use of staff in support of ambulances. Through analysis of dispatch records, incident reports, and other appropriate documents; Matrix will develop a detailed profile of calls handled by the Department to include response times for all calls, by type of call and priority; amount of clock and staff time required to handle each call type; the number of units dispatched by type of call; the incidence of automatic and mutual aid in responses; and how runs are distributed, by unit, by time of day and day of week. Matrix will also document the workloads of other functions included in the scope of this study, including fire prevention and education, training, and administrative functions. Once these initial data collection activities have been completed; the Matrix will prepare a detailed written profile which presents our understanding of the Department's current approaches to operations as defined by each of the areas listed above. This profile will be circulated among departmental management and other personnel, as appropriate, for comment and to ensure the accuracy of our understanding. HB -1137- Item 12. - 54 Compare to Best Practices and Peer Cities. The use of "best management practices" analysis is topical in the analysis of public and private sector agencies today. Matrix will develop a detailed list of best management practices for use in a diagnostic assessment of each service function in the Fire Department. This diagnostic assessment would be developed to identify those areas in which the organization was meeting targeted service delivery objectives or standards of service efficiency or effectiveness. Matrix will use the data collection activities conducted in previous tasks to assess the degree to which services or service levels conformed to the benchmark. Each service area diagnostic element would consist of a definition of the service level, efficiency or deployment target, a description of the current performance, Identification of areas which meet or exceeded the target(s), and identification of areas which represent improvement opportunities. As part of the professional standards assessment, Matrix will review the current professional literature describing various performance standards and objectives in Fire Departments across the country including, but not limited to standards from the Commission on Accreditation of Ambulance Services (CAAS), Commission on Fire Accreditation International (Cl Insurance Services Office (ISO), and National Fire Protection Association (NFPA). Matrix will also develop a list of at least six benchmark communities against which to compare the Fire Department's management, organization, staffing and operations. Evaluate Service Level and Resource Issues. Matrix will evaluate a full range of issues impacting the effectiveness and efficiency in the Fire Department using the following approaches. Matrix will compare projected call and service demand for the existing field units and isolate: (1) any current low volume areas where growth in the future is expected to be relatively minimal; (2) current high volume areas where service and workload demand may increase in future years (out through a 10-year projected planning period); and (3) low volume areas which may expect significant increases in service demand in future years. Based on the analysis, Matrix will identify opportunities for changes in resource deployment and assess their cost and service Impact in terms of current staffing: apparatus, and station requirements. Matrix will use a GIS location model in conjunction with the analysis. Matrix will evaluate existing response and service level policies In light of actual service demand faced by the Fire Department. We will identify opportunities to modify service policies (response time for selected types of calls and selected areas; response to non -emergency calls, etc.) and evaluate the impact of Item 12. - 5 5 xB - 1 3 $_ P,�- modification on costs and departmental demands. We will evaluate trade-offs between modification of current service levels or projected future service level targets and operating costs. Based on an understanding of demand and field unit deployment, Matrix will evaluate existing company staffing policies, unit deployment and response approaches, identify opportunities to reduce costs or improve staff utilization or service through adjustments in those policies, and analyze opportunities to adjust the mutual aid and automatic aid response system in the region. We will assess the impacts of any changes recommended as a result of this analysis upon fire ground management and the ability to effectively respond to simultaneous suppression calls. Matrix has a comprehensive analytical, statistical and GIS-based approach for assessing the impact of various station locations. Matrix uses a process that examines the ramifications of station locations and unit deployments across a wide range of potential deciding factors, including ability of the system to place at least one unit on -scene everywhere in the City within defined performance standards, level of station coverage overlap; level of personnel overlap, and impact on average travel time for the first -due unit. Matrix will also assess the following programs and activities in this task through interviews, data collection, and review of policies and practices: Fire prevention and code enforcement policies and programs Fire prevention -related codes and ordinances and fire prevention activities of the Department can have a major impact on resource requirements. The purposes of this portion of the task are to thoroughly evaluate existing fire prevention policies, plans and operations, and to identify improvement opportunities. Evaluate hazardous materials management programs This analysis includes alternative level responses, capabilities and equipment / apparatus, as well as planning issues, program management, and coordination with other agencies. This will include an assessment of the City's participation in the regional service delivery network. Evaluate emergency management issues and opportunities This will include an assessment of the Department's ability to provide services under the City's emergency preparedness plans, and to assess the Department's current efforts for seeking available grants from federal and state providers. This will include an assessment of current emergency plans, "their comprehensiveness, coverage of weather; emergency, hazardous materials, nuclear plant and other foreseeable events. °r-rx s?d i:ir C iti of If , n ° Cri HB -139- Item 12. - 56 Evaluate fleet and apparatus replacement plans The project team will focus on evaluating the cost-effectiveness of the current approach to maintenance of fire apparatus. In addition, the project team will assess current fire apparatus replacement planning — specifically as it relates to the current Capital Improvement Plan. The product of this work will be a detailed review of current approaches, staff utilization, programs and coordination approaches relating to each of the support and program areas listed above. Current performance levels would be described in each service area, issues identified and alternatives assessed. Reporting. Completion of all the tasks listed above will result in the preparation of a technical background report summarizing issues and study recommendations. The report and the associated implementation plan will consist of the following: ® An executive summary of all key findings and recommendations, including the assessments of current and projected staffing needs. ® A detailed set of recommendations addressing each are of the study; specific work steps required to implement each recommendation; recommended timing for implementation; recommended responsibility for implementation; and any costs or savings. ® A detailed capital improvement plan addressing any recommendations regarding changes/additions. Police Services Study The following paragraphs describe tasks Matrix will complete to support the police services study. Identify Attitudes Toward Fisting Programs, Services, and Needs. To fully evaluate the issues facing the Police Department, as well as to identify the needs related to the delivery of law enforcement services in Huntington Beach, Matrix will need develop an in-depth understanding of attitudes towards existing service levels and the unique characteristics of policing programs and community protection needs. To provide this level of understanding, Matrix will interview the City Administrator, top management in the Police Department, and members of the collective bargaining group. These initial interviews will focus on determining individual attitudes toward current law enforcement service levels, programs, and community protection needs, including adequacy of existing service levels, responsiveness to basic community public protection needs, perceived gaps in existing service levels, and` attitudes toward enforcement philosophies. Matrix will also document key population, demographic and economic characteristics and trends in the city. Item 12. - 57 HB -140- PL& Matrix will prepare an issues list that will provide the basis for subsequent analytical steps. Police Department Profile. A key to this analysis is development of a detailed understanding of workloads and service levels. To develop this level of understanding, Matrix will document and analyze workload and service levels as described below. (Please note that in the following task narrative not all law enforcement functions are described.) Patrol Programs and Services Employing data extracted from dispatch information and available reports, Matrix will profile and analyze field patrol workloads and service levels, including community -generated calls for service demand by time of day and day of meek for the last 12 months; response times by priority of call for services handled; number and type of calls handled by other means including use of non -sworn community service officers, and other forms of differential response. Matrix will document and analyze officer -initiated activity using various quantitative indicators including field stops/field interrogations, traffic stops, other self -initiated activity, and activities resulting from directed patrols. For a sample period, Matrix will examine the scope and content of any patrol plans prepared for field patrol staff, including. time required to execute patrol plans, performance expectations, community -oriented goals and action plans, and other factors, as appropriate. Matrix will document actual field patrol deployment practices with existing staffing levels in field patrol. Through analysis of rosters and other appropriate documents, Matrix will document scheduled deployment by time of day and day of week, factors impacting units actually deployed compared to the number scheduled (e.g., on -shift court appearance requirements, sick leave, special assignments, training), and factors involved in the utilization and need for overtime. Matrix will evaluate field patrol staff utilization at existing staffing levels given actual deployment and workload demands. The model employed. Includes determination of the time available for preventive patrol and other proactive activities given actual deployment and call for service demand by time of day and day of the week. Concurrently, Matrix will interview staff at all levels in patrol services to develop a detailed understanding of how the patrol program works from a number of. perspectives including: (1) preferred level of uncommitted time necessary to allow field officers to direct patrol to such activities as traffic enforcement, (2) the extent to which patrol officers are involved in follow-up investigations, (3) level and content of patrol plans based on review of any existing plans targeting community- Hf3-f4t- Item 12. - 58 oriented activities by officers, and (4) problems associated with implementing and maintaining targeted patrol levels at existing staffing levels and workloads. Matrix will document the uses; availability and deployment of command and supervisory personnel by time of day and day of week. Through interviews, we will develop a detailed understanding of the mixture of command and supervisory responsibilities and associated issues. Based on this information, Matrix will define existing field patrol service levels. Traffic Enforcement Matrix will document scheduled .and actual deployment of traffic enforcement personnel by time of day and day of week, current workload including accident investigations, and the extent to which traffic enforcement personnel are being assigned calls for service as primary units and/or back-up of other field patrol activities. Matrix will describe how traffic enforcement and accident investigation workloads are planned, prioritized and handled. We will discuss the level of patrol officer -initiated activity related to traffic enforcement including citation production on a per officer basis, and how traffic enforcement officer activities are targeted by Traffic Enforcement. Matrix will evaluate service levels, as measured by the current Traffic Enforcement Index.. Based on these items, Matrix will develop a set of measures to clearly define traffic enforcement approaches. Investigative Services Matrix will analyze current investigative policies, including case screening approaches; types of cases "worked" by case type; and other policies which impact time utilization and workload of investigative personnel. Based on interviews, we will document current caseloads and case status by case type, and evaluate existing investigative service levels from the perspectives of.. (1) current caseloads compared to patterns observed in other law enforcement agencies with effective case management approaches; (2) the extent to which cases with "leads" can be worked with a relatively high likelihood of solvability given existing staffing levels and case management approaches; (3) elapsed time between initial report, assignment of a case to a detective, and actual working of that case by a detective; (4) coordination of cases with patrol personnel; and (5) mission, workload, and results achieved by pro -active investigative units. Based on the above, Matrix will define existing investigative services. Dispatch and Records Services Matrix will analyze workloads and service levels associated with the other support units in the Police Department by documenting records processing flows by document type and volume, identifying and quantifying processing turnaround times and backlogs, reviewing systems currently available to support records processing activities, reviewing internal information processing procedures and Item 12. - 59 1-1B _t2_ controls, and employing a computer model to calculate the use of communications staff by dispatch function and time of day / day of week. Results of this task will be documented in the form of a narrative and statistical profile of the Police Department workload and service 'levels, which will provide the basis for subsequent analysis. This profile would be circulated among HBPD staff to ensure accuracy. Compare to Best Practices and Peer Cities. The use of "best management practices" analysis is topical in the analysis of public and private sector agencies today. Matrix will develop a detailed list of best management practices for use in a diagnostic assessment of each service function in the Police Department to identify those areas in which the organization was meeting targeted service delivery objectives or standards of service efficiency or effectiveness. Matrix will use the data collection activities conducted in previous tasks to assess the degree to which services or service levels conformed to the benchmark. Each service area diagnostic element would consist of a definition of the service level, efficiency or deployment target; a description of the current performance, Identification of areas which meet or exceeded the target(s), and Identification of areas which represent improvement opportunities. Matrix will develop a list of at least 6 benchmark communities against which to compare the HBPD`s management, organization, staffing and operations. The focus of the comparison would include quantitative comparisons of workload and service levels (e.g., calls, proactivity levels, cases): and qualitative comparisons of management practices (e.g., approaches to managing field and investigative services). Evaluate Service Level and Resource Issues. Matrix will analyze the current staffing levels necessary to achieve the service objectives associated with each service level, and provide the Police Department with a modei/tool to project and assess future staffing needs. We will employ a computer model to calculate field patrol deployment necessary to achieve identified alternative service level objectives. The model provides the capability to calculate field patrol deployment requirements by shift and day of week based on workload and specific service level objectives associated with target response times and preferred levels of time available for proactive activities in an area. Matrix wili evaluate investigative staffing needs based on an assessment of case management techniques (including how cases are screened, assigned and monitored) as well as caseloads on an investigative specialty basis. We will also define staffing alternatives and requirements for all other functions and services in the Department consistent with alternative service levels including management ;fit,.S ,;'r.., Jr. r 5� � '`J G3 vlt H, - a 3_ Item 12. - 60 and supervisory staffing; communications and records; and other support functions (e.g., crime analysis, property and evidence, field evidence collection, special operations and investigative units). Once staffing plans associated with each service level are defined, Matrix will compare them to current staffing levels, identify staffing gaps, and identify the number of staff required to meet service level objectives. Matrix will provide the analytical tools necessary for the City and Police Department to assess and project staffing needs. This will include patrol staffing formulas, benchmarks for investigator caseloads and staffing levels, and communications personnel. Matrix will evaluate alternative schedules, opportunities for civilianization, and the organizational structure of the Department. Reporting. Completion of all the tasks listed above will result in the preparation of a technical background report summarizing issues and study recommendations. The report and the associated implementation plan will consist of the following: IN An executive summary of all key findings and recommendations, including the assessments of current and projected staffing needs. ® A detailed analysis of operations and staffing needs for each function at alternative service level targets, including analytical methodologies. • A detailed analysis of current operating issues in the Department. ® Detailed recommendations for addressing any identified issues and improving the efficiency and effectiveness of all components of operations. ® Detailed plans for implementing all recommended changes to include work steps necessary to implement; recommend responsibilities; and timing. 4.10 Natural and Environmental Hazards PMC will describe natural and human -created hazards and hazardous materials Dehvera 'es: `ff will affecting Huntington Beach. Based on available resources, including the Local surirnairdze anafiysis and Hazard Mitigation Plan; the Emergency Operations Plan, and Cal -Adapt, we will include maps of known flooding, seismic, geologic, and other hazards as part of ncitisi� s t' natural and the technical report. PMC will describe existing conditions and hazards related to in a seismic and geologic activity, flooding, fire, and hazardous and toxic materials. E,echnicc,d report. Tfie technical We will also describe existing emergency management and safety plans and standards in consultation with the local, county, regional, state, and federal ;; ===Jri v,,ill be it arporated in the agencies responsible for public facilities and circulation, fire suppression, law T, e`; ;i:-; <i Ba.cl:'?r jnd Report enforcement, and emergency services. Issues to be addressed include: descrir d,' in Tasf's 4.12 thrc—,.0 ® Seismically induced surface rupture, ground shaking; ground failure, tsunami. =.14, seiche, and dam failure Item 12. - 61 H B - l 44- q'_/ ® Slope instability leading to mudslides and landslides ® Subsidence, liquefaction, and other seismic hazards identified on seismic hazard maps ® Other known geologic hazards ® Flooding ® Urban fires ® Evacuation routes and signage ® Peak load water supply requirements ® Minimum road widths and turnouts required by emergency agencies As part of this technical report, PMC will also identify and characterize geologic conditions in the planning area. Available information describing soil types and characteristics and regional geologic structures and lithology will be reviewed. We will describe soil conditions (including erosion hazards and shrink -swell potential) on the basis of Soil Conservation Survey mapping, expected maximum ground shaking, and conditions that may promote soil erosion during development and will identify control measures for grading and excavation activities. The characterizations of geology and soils will focus on mineral resources, natural earth materials. and soil types and conditions (including soils within the planning area that can support agricultural uses). We will describe the locations and types of economically significant mineral resources in the planning area, if present. 4.11 Noise Monitoring and Modeling Defiverabies: Atkins will Atkins will use the results of the traffic analysis (prepared by Stantec), along with summarize analysis and available information about potential noise sources in the planning area, to model potential noise impacts. This task will be conducted during the same time that conclusions from noise other technical background studies and reports are being prepared. The noise monitoring and modeling in a impact analysis cannot be conducted until the traffic study data has been technical report. The technical completed. report will be incorporates in the Existing ambient daytime noise levels will be measured at eight short-term and Technical Background Report seven 24-hour locations (to be selected in coordination with City staff) to establlsh� and map baseline noise levels. All daytime noise levels will be measured using a described in Tasks 4.12 through Larson -Davis precision sound level meter, which satisfies the American National �.1:. Standards Institute (ANSI) requirements for general environmental noise measurement instrumentation. Noise will be characterized using the following terms: ® L, , the equivalent energy noise level, is the average acoustic energy content of noise for a stated period of time; for evaluating community impacts, this PicP,;,sa f ;; vity o- inon Be ,, . H-B -145- Item 12. - 62 rating scale does not vary; regardless of whether the noise occurs during the day or the night ® Lmi , the minimum instantaneous noise level experienced during a given period of time E Lm,, the maximum instantaneous noise level experienced during a given period of time Existing 24-hour noise levels will be calculated for various roadway segments in the project vicinity using the FHWA Traffic Noise Model (TNM 2.5) and current traffic counts from the traffic report prepared for the project. Because Huntington Beach is located adjacent to Interstate 405, Atkins will obtain roadway volumes for 1-405 from Caltrans, if required. The model will calculate the average noise level at specific locations based on traffic volumes, average speeds, roadway geometry, and area environmental conditions. Vehicle noise energy rates in the TNM 2.5 will be modified to incorporate rates used by Caltrans, which better represent vehicle noise levels in California. The analysis of operational noise impacts will address future noise levels. Future noise levels along key roadway segments will be calculated to determine whether traffic generated by buildout with implementation of the General Plan: update causes a substantial increase in noise at nearby locations. Noise levels generated during construction will be qualitatively evaluated for their potential to affect existing noise -sensitive uses, as no specific development projects are contemplated under the General Plan update. The potential for construction noise to impact nearby noise -sensitive land uses (if any) will be characterized based on the potential for new development to occur in the vicinity of existing noise -sensitive uses. Atkins will also prepare a new noise contour map of the city to support preparation of noise standards and policies for the hazards chapter of the General Plan. 4.12 Administrative Draft Technical Background Report PMC will consolidate the findings and results of technical studies completed in Tasks 4.1 through 4.11 into a Technical Background Report (TBR) similar to the current TBR. Our approach anticipates incorporating the TBR as an appendix to the General Plan EIR, allowing the EIR document itself to focus appropriately on impact analysis and mitigation. Thus, the TBR will be organized by EIR topical section and will provide full discussion of the existing setting and regulatory setting for each EIR section. A full list of sources consulted will be provided. PMC will prepare an administrative draft TBR in advance of the administrative draft EIR to confirm the content of the existing setting and regulatory setting sections Delivexa ia, �dlrninilstrative draft T :;a' 0 r�':_1 ? Repot11 Item 12. - 63 HB -146- ('"' prior to preparation of the balance of the EIR. Public review draft and final TBRs will be delivered in tandem with the corresponding drafts of the EIR. 4.13 Draft Technical Background Report Deliverable: Public review draft Based on City staff comments, PMC will prepare a public review draft TBR for Technical Background Report (30 review in conjunction with the public review draft General Plan, SAP; and EIR. copies + electronic). 4.14 Final Technical Background Report Deliverable: Final Technical PMC will prepare a final TBR that incorporates City Council —directed revisions Background Report (25 copies + following public hearings. electronic). Task 5: Identify Key Policy Approaches and Consider . Alternatives 5.1 Develop Key Policy Approaches for General Plan and Sustainability Action Plan Deliverables: Preliminary GP Key General Plan Policies. This task focuses on drafting the goals and policies to goals -and -policies and SAP be incorporated into each General Plan element. PMC will prepare a preliminary General Plan goals and policies working paper based on policy direction received measures and implementation during the community engagement process. Proposed policies will be prepared matrix; presented as working for each of the General Plan elements and presented for discussion with the GPAC, papers for use with the Planning Planning Commission, City Council, and general public. Commission, City Council, GPAC, Key SAP Measures. Recognizing Huntington Beach's commitment to become a Envirammntai Board, and general sustainable and resilient community that enhances quality of life and local control, the SAP will integrate economic development, water and energy conservation, pi�bGc (electronic). waste reduction and recycling, alternative and active transportation, open space preservation, and GHG emissions from both new development and existing uses. We anticipate the SAP will be a strategic implementation plan that will implement General Plan sustainability goals and policies, emphasizing actions, programs, and projects with measurable GHG reduction benefits (reduction or SAP measures) to allow the SAP to serve as a qualified GHG reduction plan consistent with the State CEQA Guidelines. Climate change adaptation will be addressed as part of the Coastal Resiliency Plan (CRP) though the SAP General Plan and CRP will be consistent and consider the inherent relationships between GHG reduction and adaptation measures and projects. SAP measures will be developed based on community and staff input through the outreach and GPAC processes, our experience in similar communities, guidance from the State of California, and best practices. PMC will review existing accomplishments to reduce GHG emissions, and assess the local benefits of statewide and regional GHG reduction programs and regulations, including renewable energy portfolio standards, vehicle fuel efficiency and fuel carbon H_ - 147_ Item 12. - 64 standards, current and future building energy efficiency standards, appliance efficiency standards, federal and state lighting efficiency standards, state water conservation mandates, and the regional Sustainable Communities Strategy (SCS) adopted by the Southern California Association of Governments (SCAG). PMC will then work to develop a list of SAP topic areas and recommended candidate measures based on the _ preliminary list of general plan policies to ensure consistency. PMC will provide candidate measures to staff in a matrix format prior to distribution and review with the GPAC SAP Task Force. We will review candidate measures with the Task Force prior to confirming and quantifying the measures. PMC will quantify emissions reduction measures and actions, presenting estimated reductions in energy use, water use, waste, VMT, and GHG emissions as applicable. The baseline GHG inventory and forecast will serve as the foundation for the quantification of the SAP s GHG reduction measures. Activity data forms the basis of measure quantification; including VMT, kilowatt-hours (kWh) of electricity or therms of natural gas consumed, and tons of waste disposed. This approach ensures that GHG reductions are tied to the baseline and future activities occurring within the city. Whenever possible; emissions reduction estimates will be based on tools and reports provided by government agencies such as the US Environmental Protection Agency (EPA), California EPA, California Energy Commission (CEC), CARB, California Air Pollution Control Officers Association (CAPCOA), and local air districts. If accurate reduction estimates are not available using these tools, a case study may be used if the study's conditions are comparable to those found in the city. Finally, for more long-range reduction measures that lack actual monitoring or analysis, current scholarly and peer -reviewed research is combined with knowledge of existing City practices to create a defensible estimate of future emissions reductions. PMC will provide the City with a framework for prioritizing each measure that includes the following: ® Effectiveness (as measured by): GHG reductions in metric tons of carbon dioxide equivalent (MTCO,e) Reductions in electricity (kWh), natural gas (therms), waste (tons), traffic (VMT), vehicle fuel (gallons), and water (gallons) ® Cost (as measured by): Cost to the City Cost to the private sector Potential cost savings Item 12. - 65 HB -14_ ® Potential funding sources (e.g,, City sources, grants, rebates, low -interest financing) ® Feasibility (as measured by): The implementing agency (e.g., City, developer, site operators) Level of City control Extent of coordination needed Implementation timeline to ensure GHG reduction targets are met ® Secondary benefits (as measured by): Cost savings Emissions reduction co -benefits (e.g., health benefits, implements state policies, improved mobility) Adaptation co -benefits PMC will also provide an implementation matrix for SAP measures that includes performance indicators to monitor reduction progress, timing, responsibility, co - benefits, potential funding sources, and cost estimates. All of PMC's sustainability and climate action plans transparently describe our methods for estimating GHG reductions, allowing our process to be easily followed and replicated. We believe quantification should not occur in a "black box" proprietary software tool, but rather should include all data and sources necessary to create an independent analysis tool for use by the City in the future. We engage and partner with staff throughout the quantification process to ensure our approaches and tools are accessible and feasible. Stantec's role in developing GHG reduction measures will be to evaluate the proposed measures and provide the resulting forecast data and VMT resulting from implementation of the measures. Using the mode splits published in the 2010 Census data as a baseline, Stantec will adjust the mode percentages atthe traffic zone level based on data for areas exhibiting characteristics (i.e., TOD or bike infrastructure) in the target areas. This method will allow for the testing of integrated strategies, as various parts of the city may have different VMT objectives. 5.2 Define Land Use and Circulation Alternatives (up to 3) Deliverables: Draft and final land Based on the identification of key policy approaches (as outlined above), PMC will use and circulation alternatives provide a short outline of up to three alternatives for each Identified focus area from the market trends analysis (Task 4.6). We anticipate a page of bulleted text report (electronic). outlining the components of up to three distinct alternatives addressing each focus L-SG P i�vusal for GiN of Hu Ir ,'orl H -149- Item 12. - 66 area. We also propose including concepts that would be a part of all alternatives, based on consensus among staff, decision -makers, and the public. The alternatives for land use will focus on selected areas where future development or land use redesignation is expected to occur. Through this process, the City will ultimately define a preferred land use and circulation plan that becomes the basis for preparing the draft General Plan. The alternatives will include a range of options that focus on identified reinvestment/reuse opportunities. PMC will present options that seek to achieve; to varying degrees and in different ways, the OCCOG Sustainable Communities Strategy, smart growth, LEED Neighborhood Development, complete streets, and walkable communities principles. Following City staff review and comment, PMC will develop up to three distinct land use and circulation alternatives for review and deliberation by staff: decision - makers, and the public. The public process of evaluating these conceptual alternatives will enable the selection of a preferred land use and circulation plan; which will become the basis for the updated General Plan. In order to achieve consensus on a preferred plan, it Is important that the alternatives discussion remain conceptual. As a result, this work program does not propose to deal with policy ideas for any single project site as a part of the alternatives process. Each alternative will include a description of land use categories, buildout assumptions, and conceptual diagrams illustrating concepts related to land use and circulation for each identified focus area. The alternatives will be summarized in a report with full -color maps and illustrations of key concepts, as appropriate. 5.3 Evaluate and Compare Alternatives (land use, circulation, GHG, fiscal) This task involves working with City staff to develop up to three land use and and final land circulation plan alternatives for review with the community and decision -makers, s rr ir3 Ulati,�r alternatives Determining a future land use plan for Huntington Beach has many implications for future environmental, fiscal, and quality of life conditions. Forecasting the potential vai=ati,�'i f3er�z'"�<ndum results of particular land use alternatives will help decision -makers answer fJ' e'% questions like: ® What kind of impact will this plan have on traffic conditions? ® What kind of impact will this plan have on future City revenues and expenditures? ® How does this plan compare to others in terms of impacts to air quality, GHG emissions, water quality, and energy resources? ® How does this plan compare to others in terms of anticipated climate change effects and natural and human -caused hazards? xdr -.1;an and Seri ! , 2-3 Item 12. - 67 f M _ t 50_ („'/ ® What kind of housing is created by this plan, and is it affordable? M What kind of employment can be expected under this plan? ® What would development under the General Plan like this look on the ground? We propose to work with the GPAC to answer many of these questions as we consider alternative land use plans for key underdeveloped and vacant areas of the community. We propose to conduct interactive "what if?" sessions exploring potential land use combinations and determining the answers to these and other critical economic; housing, and aesthetics questions in the community. Conceptual alternatives will be presented using a combination of two-dimensional diagrams, three-dimensional illustrations and graphic representations, photographs, and accompanying narrative. The alternatives to be analyzed in the traffic study will be formalized in this step, incorporating minor changes as directed by the consultant team. This analysis will address the proposed plan. and two alternatives, as needed for the EIR. Formal ADT diagrams and ICU/HCM analysis will be performed at this stage, and potential mitigation measures will be developed to mitigate the impacts. 5.4 Develop Preferred Land Use and Circulation Alternative Deliverable: Draft and final Following GPAC consideration of the alternatives, PMC will prepare a working paper for use with the Planning Commission and City Council in study session preferred alternative working paper to arrive at a preferred land use and circulation plan. The working paper will papers (electronic). summarize key content for each alternative, along with GPAC preferences and comments concernina each alternative. We envision that the GPAC and City staff will recommend a preferred alternative based on community and stakeholder input, which will be the primary subject of the study sessions devoted to this task. Task 6: Prepare Administrative Draft Planning Documents Delliverables: Draft and final 6.1 Prepare General Plan and SAP Outlines and Formats outlines for the General Plan and As a first step to updating the General Plan and preparing the SAP, PMC will SAP electronic;; up t1 three (3j prepare an annotated outline of each document for City staff review; along with up to three page layout formats for each document for City staff review and approval. draft page layout formats for the Following staff review, PMC will prepare a final outline and document template for General Plan. each document. -32 Prop for Ciiy Of - -151- Item 12. - 68 6.2 Prepare Administrative Draft General Plan PMC will prepare an administrative draft General Plan for review by City staff. The plan will be organized in a fashion similar to the 1996 General Plan. with elements organized into four distinct chapters. We understand that the City seeks to reduce the overall number of elements downward from the existing 16. Each chapter will include its own introduction; issues identification, goals and policies, and a plan narrative describing the basis for and application of the policies. We propose to organize each chapter using key issues that cut across multiple topics, while maintaining or exceeding state requirements. In addition, a comprehensive implementation program will be prepared identifying specific programs designed to achieve goals and carry out policies across chapters. The format described below may be modified to reflect agreements reached during previous tasks. The scope and budget anticipate two rounds of review for the administrative draft. Introduction to the General Plan. This section will describe the overall organization of the plan and how it is to be used. This section will also provide a practical guide to the General Plan and a clear description of how the plan will help the City achieve its vision for the future. Community Development Chapter. This chapter will incorporate state requirements for the land use and housing elements, as well as the OCTA-required growth management element. It will also present optional goals, policies, and implementation programs for urban design, historic and cultural resources, and economic development. The land use portion of this chapter will address current planning and sustainability concepts desired by the City, such as infill, green building, place - making, mixed uses, and transit -oriented development. Land use goals and policies will be highlighted with the use of improved graphics and concept plans. It will also address community design issues. Appropriate land use designations will be modified or created that will help achieve desired uses in identified focus areas. These General Plan land use designations will be described and mapped, and assigned specific measures of density or intensity of use as appropriate. They will also be illustrated with photos and renderings showing expected development in these categories. Where appropriate, areas of distinct community character and design will also be identified. A color land use policy map of the planning area will be generated as well as other illustrative graphics. A matrix will identify the projected population, housing density, and nonresidential intensities of development based on the proposed land use policy map. Information developed by PMC during the alternatives task will form the basis of the land use and design concepts and development information. Deis-= rabies: First administrative ,.az, General un 20 copies + elet Second administrative _raf` Gen v <xi ?Is.n 20 copies + "�utr'Jtliv PI; c'iG'Sere];liE: 2 Item 12. - 69 11B -f ;2- 141,1 Community character and design policies will direct the overall urban form of the community and its unique characteristics and landmarks. Policies will focus on the design of new development, including techniques to achieve more pedestrian - friendly, walkable communities oriented around basic activities, such as parks, schools, community centers, and local -serving commercial activities. The element will also include recommendations for improving the character of certain established portions of the city, as identified through existing conditions research and public outreach. Economic development goals, policies, and programs will be updated based on recent economic and demographic trends and development conditions, building on recently completed or planned projects. Key economic issues may include defining Huntington Beach's economic vision; retaining and attracting businesses; maximizing growth potential of key economic sectors; developing effective linkages with governmental, educational; and quasi -governmental institutions; maximizing Huntington Beach's competitive position in the green economy; maintaining a sustainable jobs/housing balance; establishing priorities for community financing; and establishing economic incentives for development consistent with the General Plan. Both short-range and long-range economic development programs will be recommended. PNIIC will incorporate the _ongoing historic preservation element update in this chapter and will prepare policies and programs recommending preservation strategies for cultural landscapes and archaeological resources. . Infrastructure and Community Services Chapter. This chapter will incorporate state requirements for the circulation element, along with optional goals, policies, and implementation programs for public facilities and services, recreation and community services, and utilities. We propose to organize this chapter using key issues that cut across these topics, while maintaining or exceeding state requirements for these topics, and anticipate that SLR effects on key infrastructure will be a key new component of the chapter. Stantec will assist in reviewing the goals, policies, and programs for the circulation portion of this chapter. The circulation portion of this chapter will reflect a balanced, multimodal approach to serving existing and anticipated growth projections and will be updated to comply with the Complete Streets Act. it will be derived in large part from the recent Circulation Element update, addressing regional and local transportation issues, congestion management, transit, bicycle circulation, and truck routes. Proposed policies and analysis will also address legislation relating to AB 32 and SB 375. The public facilities and services portion of this chapter will address public infrastructure and services such as water, sewage collection and treatment, storm -�� Pi;;p�aai f:;r City of H:ni; � �r: oeaa 1413 -153- Item 12. - 70 drains, other utilities, and solid waste. disposal. It will also incorporate the findings of the fire and police services study completed in Task 4.8. Standards for the availability of these facilities will be included in the element to assist decision - makers in assessing the impacts of proposed development and redevelopment in the community. This part of the General Plan will also identify changes to thresholds and capital project timing that could result from proposed land use changes. In keeping pace with continued growth, the City has made it a priority to continue to.provide varied parks and recreational activities in the community, but recent struggles regarding the closure of school sites and the future use of related ball fields underscore a need to revisit recreation policies in this chapter. The current General Plan does not properly reflect the dynamics of these struggles given the city's current demographics and recent development profile or the continuous effort needed to maintain and upgrade facilities. The updated plan will comprehensively address parks and recreational needs of all ages and users; identifying park, facility, special use facilities, pedestrian -friendly connections, trails, and open space needs in the city for each park classification. Future needs will be projected based on projected population growth. Natural Resources Chapter. This chapter will incorporate state requirements for the open space and conservation elements, as well as Coastal Act requirements in a coastal element. It will also present optional goals, policies, and implementation programs for air quality, as well as state -recommended policies for climate change, GHG emissions; and sustainability. Substantial revisions are anticipated to this chapter based on findings of the technical studies identified in Task 4. Huntington Beach is located in an iconic coastal setting with abundant natural resources, protected open spaces, and coastal viewsheds. In this chapter, we will identify both coastal and inland natural resources, including but not limited to biological communities, valued open spaces; wetlands, and viewsheds, We will define strategies to protect these resources and propose ways for public and Private development to conserve water and energy and make the community sustainable for generations to come. Opportunities for reducing waste and impacts on the environment, such as low impact development and green building, will be identified. This chapter will also address energy conservation opportunities and other regional resources such as water, solid waste management, and mineral and paleontological resources. PMC will prepare an air quality section that will integrate the relationship between land use, transportation and mobility, public health and safety, and energy issues. This section will additionally focus on climate change and GHG emissions. Providing a clear approach to conservation of resources in the General. Plan will help satisfy state requirements for addressing climate change and GHGs Aloi k P l,,r Frid S-Ihed:.J, , i 2- c Item 12. - 71 HB -154- ew consistent with AB 32 and SB 375. This section will also contain Huntington Beach's GHG reduction goal, expressed as a City General Plan policy, coupled with a discussion of the broad strategies the City will employ to achieve the reduction target. Specific GHG reduction measures and sustainability actions will be established in the SAP. Hazards Chapter. This chapter will incorporate state requirements for the safety and noise elements, as well as optional goals, policies, and implementation programs addressing hazardous materials. Substantial revisions are anticipated to this chapter based on findings of the technical studies identified in Task 4. PMC will update the safety portion of this chapter to cover similar issue areas as those contained in the existing element. Natural hazards such as sea level rise, tsunamis, wildfires, geotechnical and seismic hazards, and flooding will be addressed, including climate change effects and vulnerabilities, The plan will also address neighborhood safety, crime prevention, and emergency preparedness and response. Hazardous materials use; handling, transportation, disposal, and management. information will be updated and incorporated into the new chapter. In the noise portion of this chapter, PMC will identify noise associated with transportation (ground and air) and other sources, as well as sensitive noise receptors, such as residential development, schools, and medical facilities. Primary noise sources to be considered include 1-405, SR 1 (Pacific Coast Highway), primary arterials, and other local streets; light industrial and manufacturing uses; and other stationary noise sources or problem areas identified by the City. General levels of noise and land use compatibility will be included in matrix form. Projected noise based on future conditions will be documented and mapped to identify areas that will be subjected to significant noise in the future, along with methods to reduce the effects of noise. The noise portion of this chapter will include policies and standards addressing noise in -nixed-use areas. Implementation Program. A comprehensive implementation program will be presented in a manner that facilitates budgeting, capital improvement planning, and annual reporting. The implementation program may be presented in matrix form and will include a description of actions to be taken: responsible parties, potential funding sources, and time frames for achievement. Where necessary and feasible, programs will also act as CEQA mitigation measures to reduce significant environmental impacts identified in the General Plan EIR. 6.3 Prepare Administrative Draft Sustainabilo Action Plan Deliverable: Administrative draft PMC will prepare an administrative draft SAP using simple language, graphics, SnP (20 copies electronic). and other features that make the document easy to read and accessible. The document will convey goals and SAP/GHG reduction measures and actions, along 36 PI"'iiiCSFt= fol City o ....' H-B -155- Item 12. - 72 with associated costs, benefits, implementation strategies, and forecast reductions as its primary content. The SAP will provide an introduction that outlines its purpose, contents, and role, including its relationship to the General Plan and Coastal Resiliency Plan, The SAP will incorporate a summary of the GHG emissions inventory and forecast to provide context for the GHG reduction target and SAP measures. The SAP will integrate the General Plan vision, goals, and policies as applicable to ensure consistency and demonstrate the relationship of the SAP to the General Plan as a strategic implementation plan, The General Plan will provide the City's long-term vision for the community, while the horizon year of the SAP is expected to be more near term, presenting measurable strategies for the next 5 to 10 years. The outline, contents, and format of the SAP will be confirmed in Task 6.1 in collaboration with staff, the GPAC, and the Environmental Board. Task 7: Prepare Administrative Draft Environmental Documents 7.1 Initial Study,/Notice of Preparation and Scoping Meeting Atkins will submit a draft project description for the EIR to City staff for review and approval prior to public distribution of the Notice of Preparation (NOP), The project description must include all of the elements required under State CEQA Guideiines Section 15124. This task will require close coordination among the planners preparing the General Plan update and SAP, City staff, and the authors of the EIR to ensure an integrated effort toward a final product and consistency between the General Plan update, Sustainabllity Action Plan, and General Plan EIR. Internal consistency is paramount to a legally defensible EIR. Atkins will prepare and distribute the IS,/NOP in accordance with the provisions of CEQA and the State CEQA Guidelines; as amended. The consultant team believes publication of the IS/NOP should fulfill three goals: (1) to provide agencies and the public an early notification of the City's intent to prepare an EIR for the General Plan update; (2) to provide the public and agencies sufficient information about the project so that they may provide informed comments on the scope of the EIR; and f?j to streamline preparation of the EIR by scoping out impacts that require no further analysis in the EIR. The General Plan update will center on infiil development, which will likely limit the analysis required in the EIR. For example, as there are no agricultural lands in Huntington Beach, it is assumed that agricultural resources will be scoped out in the IS and will require no further analysis in the EIR. As many issues as possible will be scoped out in the Initial Study. As indicated in the RFP, the City will be responsible for internal distribution of the ISJNOP, as well as to groups located within the city. Atkins will also prepare Oefivere,bies: A=Edr inistrative draft ISINCIP screencheck dir w `` iltGr , ' ccp.es ele : crE ^,, cr e ,check draft IS NOP : r ',nicl;screencheck i; OC (1 c,00y -7, electronic' fiat i:, €LOP ' :1 copies), final IS/NOP ,or = :ate Cie. rir ghouse (15 cvpivs . =,r,nal 1.S. NOP for on 2.. copies as req: iced e :tr E ic;< <mial NOC (1 copy r`JOV 'r a"" S-,ion 2-J Item 12. - 73 FfB _1;6_ rU' and file the Notice of Completion (NOC) for the IS. The City will be responsible for all filing fees. 7.2 Contact and Consult with Regulatory Agencies Deliverable: As -needed meetings As part of preparing the environmental analyses for the General Plan update, as necessary, Atkins will confer and meet with regulatory agencies (Orange County with regulatory agencies. Sanitation District, California Department of Transportation (Caltrans), South Coast Air Quality Management District, Santa Ana Regional Water Quality Control Board, etc.) and advisory agencies (OPR, CARB, neighboring communities, and SCAG) regarding results of the technical studies, and preliminary approaches to impact analysis. These meetings will be attended by Atkins' project manager and/or a representative of Atkins with expertise in the technical discipline that is the focus of the meeting. 7.3 Prepare Administrative Draft EIR Deliverable: Administrative Draft This task describes steps to prepare the administrative draft EIR for the General Plan update and SAP. These tasks would be completed by either Atkins or PMC, as EIR (electronic;. described below. Existing Setting. Atkins will compile a description of existing conditions (or setting) information from the updated General Plan and Technical Background Report, as well as existing City documents, maps, and other available resources as needed. Atkins will compile a list of requested information that will] need to be verified and/or updated to reflect current existing conditions. Per the RFP, the City will make available to Atkins all previously prepared reports for this project (including those noted in the RFP) as well as related projects. Other documents will be made available upon request. Identify Impacts and Mitigation Measures. Impact analysis will be conducted in compliance with the requirements of Section 15126 of the CEQA Guidelines. The standards of significance will be used to clearly identify the significance of environmental effects and determine the need for mitigation measures. To reduce or eliminate any significant adverse impacts identified during the analysis, the Draft EIR will recommend appropriate, feasible mitigation measures. It is intended that the mitigation measures will be specified early in the planning process as alternatives are identified and evaluated and as policies are formulated in response to key issues that have been identified. In this manner, the General Plan update and SAP can function as `self -mitigating" documents. However, we recognize that residual impacts may remain and further mitigation may be warranted. The Administrative Draft EIR will include the following technical sections, Please note that some of the following subjects may be scoped out in the IS. However. even if scoped out from further analysis in the IS, the same basic analytical NB - 1 a 7_ Item 12. - 74 method will be used in accordance with the CEQA Guidelines and with City and. Appendix G thresholds of significance. Since it is unknown at this time which of these resource areas may be scoped out in the IS, they are all presented here. Atkins will conduct a complete evaluation of the proposed General Plan update from an environmental perspective, including an alternatives analysis. Aesthetics and Visual Resources. In conjunction with the Zoning Code, the City's Design Guidelines are integral in shaping the development of the built environment in Huntington Beach. The current Design Guidelines were approved by the City Council in 2000. Atkins will describe, with photographs and text, the character of any areas of Huntington Beach that are targeted for development which could alter the physical appearance of the area, and will provide an index map illustrating scenic areas; scenic routes, open space concerns, etc. Based on the characterization of the City's urban form, we will identify physical and visual features that contribute significantly to community character as well as key design elements and characteristics that define the range of development patterns. Atkins will evaluate any potential changes to these key physical and visual features and will also summarize the Design Guidelines as appropriate in this section of the ElR. Air Quality. Atkins' air quality scientists will document existing air quality conditions, identify sensitive receptors and use the United States Environmental Protection Agency's (EPA) guidance for evaluation of construction impacts on air quality. Construction impacts will be addressed in a generalized manner because project -specific information will not be available. The overall growth levels will be converted to estimate the amount of construction that would occur annually. From these estimates, daily construction emissions will be calculated using procedures contained in EPA AP-42 or the SCAQMD CEQA Air Quality Handbook. Daily mobile and stationary emissions will be calculated for criteria pollutants using the CalEEMod (or the latest model available from SCAQMD at the time of analysis) model, based on trip generation data and the growth estimates for the different land uses. Cumulative air quality impacts will be evaluated using the methodology provided in the SCAQMD CEQA Air Quality Handbook, The CALINE4 carbon monoxide dispersion model will be used to calculate carbon monoxide concentrations at intersections/roadways that may be substantially affected by the proposed General Plan update. Based on the findings of the previous tasks, Atkins will assess the consistency of the General Plan update with the attainment objectives of the Air Quality Management Plan (AQMP). We will determine whether there will be an increase in the number and severity of air quality violations in the city. Atkins will also determine whether the land use and socioeconomic assumptions of the General i4� N r. e d..:.: I =-o Item 12. - 75 NB -158- ��' Plan update are consistent with the land use and socioeconomic assumptions of the AQMP and SAP (being prepared concurrently with the General Plan update). Biological Resources. PMC will prepare the biological resources section. The majority of sensitive habitats are along the coast; however; there is one created wetland inland in the Seacliff community, and there are other areas that may warrant recognition, such as the eucalyptus grove at Norma Gibbs Park created for monarch butterflies. The biological resources portion of the TBR will be summarized as the project's biological setting. Impact analysis and mitigation will focus on implementation of General Plan goals, policies, and programs relating to biological resources. The analysis will address the effectiveness of the proposed plan in maintaining or improving the biological integrity of the planning area and will identify measures that would lessen potential impacts. This proposed scope does not include protocol -level surveys for endangered wildlife and fisheries resources or on -site wetland assessment or delineation. Cultural Resources. Atkins will discuss the known existing cultural resources in the city and will identify resources that are currently listed on, or are potentially eligible for listing on, the National Register of Historic Places. We will describe important archaeological resources types and the potential for finding additional cultural resources during development of undeveloped and underutilized parcels. Atkins will describe the policies and programs in the existing General Plan that serve to protect the city's cultural resources, along with any other programs through regional, state, or federal agencies. We will examine the impacts of proposed General Plan update buildout on cultural resources in the city. It is our understanding that the City is actively working on an update to the contents of the Historic and Cultural Resources Element pertaining to historic resources with the consultant Galvin Preservation Associates. This project includes an updated Historic Resources Survey, completed in 2009 with additional field work in 2011. The City has had active participation by the City's Historic Resources Board with respect to this project. The results of the work effort thus far were presented at a City Council study session on May 20, 2013. It is anticipated that hearings and adoption could occur this fail. Additionally, the City's Allied Arts Board has expressed strong interest in participating in the update of the cultural component of the element. It is expected that the General Plan update will include this, along with any minor updates to the historic component if necessary. The results of all updates to the element will be discussed in the cultural resources section of the EIR. �- .,, . ?r;�cs: per i✓i�,. ,,� Nw€ir ur:. �_ ,... HB -159- Item 12. - 76 Energy. Atkins will assess the significance of the use of energy, including electricity, natural gas, and gasoline and diesel fuels; as a result,of development proposed under the General Plan update. We will discuss existing energy use patterns in the city and examine whether the project would result in the consumption of large amounts of fuel or energy, or use of such resources in a wasteful manner. In addition, Atkins will review the.City's Energy Action Plan and include it as applicable in the EIR. A number of factors are considered when weighing whether a project would use a proportionately large amount of energy or whether the use of energy would be wasteful in comparison to other projects. Factors such as the use of on -site renewable energy features (such as photovoltaics) or energy conservation features or programs are considered. The benefits in energy and fuel savings that can be realized by transit -oriented development will also be analyzed, as applicable. Geology and Soils, and Mineral Resources. All buildings in California are subject to the strict requirements of the California Building Code to reduce risks from seismic activity and other geologic hazards. Atkins will briefly describe the existing geology, geologic hazards, and mineral resources in the city based on existing information available from the existing General Plan, from the State Division of Mining and Geology, and from other existing published reports. Atkins will assess the potential impacts on population, development, and infrastructure from geologic hazards. The City of Huntington Beach is one of two pilot cities participating with the California Geological Survey in the development of Tsunami Land Use Planning maps. The maps are intended to depict a probabilistic scenario of tsunami threat, as opposed to the 2009 Evacuation Maps that were produced which are a compilation of all possible tsunami events. Our understanding is that the map is expected to be complete in 2013. Atkins will review the map and incorporate information as applicable from the map and SLR study into the geology and soils section of the EIR. Greenhouse Gas Emissions. PMC will prepare the GHG emissions section. The emissions evaluation will provide a brief discussion of existing conditions and environmental setting in a global, federal, state, regional, and local context, including the state of the science and state, regional, and local inventories, drawing heavily on materials completed as part of the General Plan update. We will summarize federal; state; and local greenhouse gas -related regulations, policies, and programs, and identify General Plan policies and implementation programs and SAP measures and actions that can reduce GHG emissions. With City staff, PMC will consult with the SCAQMD regarding appropriate methodologies to assess impacts. Item 12. — 77 1413 - t coca_ /fw The analysis will use plan -level thresholds of significance currently being proposed and discussed by a SCAQMD working group or the most applicable related threshold in place at the time the NOP is released. The determination of significance will be based on whether the level of GHG emissions generated with implementation of the General Plan update would constitute a substantial contribution. to the significant adverse cumulative impacts of global climate change. If the construction or operation of projects cons!stent with the General Plan would violate the applicable thresholds of significance, mitigation measures (quantitative and best management practices) that clearly identify timing, responsibility, and performance standards to avoid or fully reduce adverse and potentially adverse effects will be developed and applied; where necessary, using the following CAPCOA document: Quantifying Greenhouse Gas Mitigation Measures: A Resource for Local Government to Assess Emission Reductions from Greenhouse Gas Mitigation Measures. To the extent practical, PMC will recommend incorporating these measures as General Plan policies or implementation programs. Hazards and Hazardous Materials. The hazardous materials section will characterize the type and level of known hazardous materials sites in the city through searches of the relevant regulatory agency databases. Atkins will briefly summarize relevant current laws, regulations, and standards relating to hazardous materials. The City has a FEMA-approved hazard mitigation plan (HMP) completed in 2012. The plan identifies and focuses on mitigating the potential for damage to people; property, and resources through long-term strategic planning. The City, with the CEC as part of the. California Local Energy Assurance Planning (CalEAP) program, is currently in the process of developing an Energy Annex, to the HMP to identify potential issues as they relate to prolonged disruption to power, natural gas and carbon based fuels. The City is also updating its Emergency Operations Plan (EOP), which should be completed this fall ( prepared by PMC planner Aaron Pfannenstiel at a previous firm). This will ultimately include components that address tsunamis and power disruption. The HMP and EOP will be summarized in the EIR. Hydrology and Water Quality. Atkins will describe all areas subject to flood and drainage hazards, based on information developed for the General Plan update, the Army Corps of Engineers, FEMA, and the City of Huntington Beach Department of Public Works. We will describe the potential impacts on flood hazards of land use patterns that could be expected due to the General Plan update. We will assess the potential for new and amended flood protection policies to affect public safety and decrease the potential for flood damage in the city. We will review and incorporate the considerations for future development identified in the City's Flood Insurance Rate Map (FIRM). We know that flooding remains an important historical challenge, first recorded in 1825 and most recently occurring in 1998, With x -161- Item 12. - 78 substantial coastal access connecting inland waterways to the Pacific Ocean; the Federal Emergency Management Agency (FEMA) has identified significant areas of Huntington Beach as being located within the floodplain. FEMA is currently working on an update to the FIRMs for Southern California. The update will take into account storm surge and is expected to result in changes in the flood designations within the city. FEMA does not expect to complete the update until 2016. Atkins will incorporate as much available information as available regarding flooding into the hydrology and water quality section of the EIR. The water quality setting for surface water and groundwater, utilizing information developed as part of the General Plan update process, will be described. We will supplement that information with available data from the Regional Water Quality Control Board. the City Department of Public Works, and other relevant agencies. The setting will focus on the quality of surface water and groundwater resources. Impacts to water quality that may result from the proposed General Plan update will be evaluated. Land Use and Planning. Atkins will describe the existing land use patterns throughout the city based on the analysis completed in the General Plan update work program. For any areas in which the General Plan update preferred land use alternative proposes redevelopment, we will describe in detail the amounts and distribution of land uses by type, where the information is available. Atkins will establish the context for cumulative changes in land use in the future by identifying levels of growth projected in other general plans in the area. These levels of growth will be added to any growth anticipated under the General Plan update to provide the context for cumulative land use changes in the region. Noise and Vibration. The noise and groundborne vibration analysis will assess potential impacts of the General Plan update on background noise levels and the population's exposure to noise levels, The results of Task 4.11 (Noise Monitoring and Modeling) will be used to prepare the noise section of the EIR. The noise analysis will be based on approximations of noise levels and associated changes in the ambient noise level that are likely to occur based on implementation of the General Plan update. Atkins will characterize the existing noise environment in the city, including noise measurements at various locations within the city and identifying major noise sources in Huntington Beach. Construction impacts will be addressed in a generalized manner because project -specific information will not be available. Construction noise levels at various distances from a typical construction site will be evaluated to determine areas of potential noise impact. Atkins will evaluate on -road vehicle and stationary noise sources. Vehicular noise will be calculated for "no project" and "project" conditions to determine whether the General Plan update will affect sensitive receptor locations in the city. On -road vehicular noise will be evaluated using the Federal Highway Administration (FHWA) RD-77-108 noise calculation formulas. Noise contours created for the i `t`'r v, 'Ian an ! 2-43 Item 12. - 79 NB -1€ 2- ,nw General Plan hazards chapter will be incorporated into the noise impact analysis to determine areas that would be exposed to excessive noise levels. Noise contributions from the General Plan update will be compared to City noise standards to determine significance levels. Population, Housing, and Employment . Based on the population and demographics information prepared during the General Plan update process and on other City documents, Atkins will describe the existing population, employment, and housing setting and recent trends for the city. Atkins will describe the potential "holding capacity," or ultimate population, with implementation of the General Plan update. The analysis will consider implications for growth in future housing supply and demand based on the availability of land and the designated densities on the General Plan land use policy map. It is our understanding that the City has an HOD -approved Housing Element (contracted with Karen Warner Associates) for the 2013-2021 update. Several study sessions have been held, and the City is on target to meet the October 1, 2013, deadline for completion. The draft Housing Element has been released for a 60-day public review period. Atkins will use the Housing Element to prepare the population, housing, and employment section of the EIR. We will assess the potential growth in employment with implementation of the General Plan update and will place this growth within the context of total employment growth in the region. A brief analysis of the potential impacts on housing and the jobs/housing balance with implementation of the General Plan update will be included. Public Services. Atkins will describe the existing provision of police, fire protection, school, library, emergency services, and utilities. We will assess the potential impacts of proposed land use changes and the changes in the description of land use categories on the provision of police, fire, school, and library services in portions of the planning- area that are planned for redevelopment. The analysis will address changes in the levels of service needed for potential areas of opportunity for reuse. It is our understanding that the City adopted updated and new impact fees for various City functions in 2011, including police, fire, library, parks, and traffic. In association with the fees, a Master Facilities Plan was adopted, which identifies capital improvements necessary to serve expected development. The public services section of the EIR will summarize the new fee structure and Master Facilities Plan, as appropriate. The results of the service level study for fire and police services (Task 4.8) will be included in the public services section of the EIR. Recreation. As an extension to the analysis of land use impacts, Atkins will document the existing parks, open space, and recreational resources in Huntington Beach. Updated Genera! Plan open space and conservation policies will be reviewed. The impacts of the General Plan update on parks, open space, and 11B -163- Item 12. - 80 recreational resources will be evaluated. Standards for the provision of such resources, as established in the existing General Plan and as provided for in the General Plan update and in the Quimby Act, will be compared and evaluated. TransportatiorJ affie. The City Council approved a comprehensive update to the Circulation Element of the General Plan on February 4, 2013, including a new traffic model prepared by Austin Foust Associates (now Stantec). As part of our team, Stantec will update the 2011 citywide traffic study. It will focus on the highway component of the Circulation Element, providing information for both the General Plan update and the EIR. The technical documentation will be prepared using the City's tiered performance criteria and will address both City and Caltrans facilities (i.e., Beach Boulevard and Pacific Coast Highway). Stantec staff will provide the environmental consultant with the technical model data (VMTNHT, etc.) for use in the air quality and noise studies. Other special issues will be addressed here, including potential MPAH Amendments and the 1-405 widening project. The analyses will be incorporated into the traffic study. The traffic impact report will provide quantitative documentation, based on capabilities of the travel demand forecasting tool (presently focusing on daily travel volumes on roadway segments), for the project, no project, and up to two alternatives. Mitigation measures will be documented for the project, while a qualitative discussion will be prepared for the no project alternative and up to two alternatives. This effort will be based on results available through the travel demand forecasting process, which will at a minimum include motor vehicles but could be expanded to include additional modes if added to the model's predictive capabilities. Impacts of the proposed project on the regional transportation system will be evaluated in accordance with the Transportation Impact Analysis requirements of the latest Congestion Management Program (CMP) for Orange County. This includes analysis of potential impacts on CMP arterial monitoring intersections and freeway monitoring segments, as well as the public transportation system. Utilities and Service Systems. It is our understanding that the City has the following plans related to infrastructure available: Storm Drain Master Plan (2005); Sewer Master Plan (2003); Water Master Plan (2012); Citywide Urban Runoff Management Plan (2005); Urban Water Management Plan (2010); and Urban Stormwater Runoff NPDES Permit Local Implementation Plan (2011). Atkins will evaluate potential impacts of the General Plan update on the water supply. Atkins will analyze future water demand based on General Plan buildout versus the projected availability of water from the 2010 Urban Water Management Plan and 2012 Water Master Plan. Atkins will evaluate potential impacts of growth allowed under the General Plan update on wastewater generation and treatment capacity. Atkins will qualitatively describe the increased demand for stormwater drainage Item 12. - 81 HJ3 -164- (�� and sewer facilities that could result from implementation of new growth areas and areas of opportunity for reuse within the service area. We will identify potential impacts of growth under the General Plan update on solid waste generation and disposal capacity. We will examine the relation of projected land uses and growth under the General Plan update to the capacity and expected lifespan of the local landfills. The results of the urban runoff impact study (Task 4.4) will also be included as part of the utilities and service systems section of the EIR. Other MA -Required Sections. Atkins will prepare other CEQA-required sections of the EIR, including growth -inducing impacts, irreversible environmental effects, cumulative impacts, and a summary of significant and unavoidable impacts. Alternatives. Atkins will lead preparation and analysis of the CEQA alternatives. As part of the planning process, land use alternatives will be developed that can later form the basis of the project alternatives which will satisfy CEQA requirements and respond to public interest and concerns. Additional alternatives that would serve to reduce any significant impacts of the project will also be considered. The final alternatives to be analyzed in the EIR will be determined in consultation with City staff. The EIR will include a separate chapter that will analyze up to four alternatives, including the no project alternative, and identify an environmentally ,superior alternative. The land use and circulation alternatives considered in Task 5 will be considered when developing the alternatives analysis for the EIR. Task 8: Prepare Public Review Draft Documents 8.1 Prepare Public Review Draft General Plan Deliverable: ?ubiic review draft Following City review of the administrative draft General Plan and receipt of a General Play, (30 copies + single set of consolidated comments, PMC' will meet with City staff to review electronic',. comments. PMC will then incorporate City staff comments on the administrative draft General Plan to create a public review draft General Plan. 8.2 Prepare Public Review Draft Sustainability Action Plan DeS6verabfe: Public rewie:v draft Following City review of the administrative draft SAP and receipt of a single set of consolidated comments, PMC will meet with City staff to review comments. PMC SAP (30 copies +electronic). will then incorporate City staff comments on the administrative draft SAP to create a public review draft SAP. v llu'Io.. f:;r Ciiy o NB - l 65- Item 12. - 82 8.3 Prepare Public Review Draft EIR Based on one consolidated set of comments on the Administrative Draft EIR; Atkins will revise the Administrative Draft EIR and prepare a screencheck Draft EIR for City staff review, Atkins' project manager will meet with City staff to discuss approaches to addressing Administrative Draft EIR comments and then make revisions.to the document as appropriate. After City review of the screencheck draft EIR, Atkins will prepare the public review Draft EIR, based on one set of consolidated comments on the screencheck Draft EIR, It is assumed that preparation of the public review Draft EIR will not result in any new technical analyses or substantial text revisions and can be accomplished within the allocated budget. The public review Draft EIR will be prepared and distributed in accordance with provisions of CEQA and the State CEQA Guidelines, as amended. All graphics, charts, maps, and tables will be on 8Yz x 11 white paper. All studies, survey results, and data will be included in the technical appendices. Atkins will also prepare the NOC and file fifteen copies of the Draft EIR and the NOC with the State Clearinghouse. The City will be responsible for internal distribution of the public review Draft EIR, as well as distribution to groups located within the city. Atkins will also be responsible for preparation of the Notice of Availability (NOA) and NOC for the public review Draft EIR. Per the RFP, Atkins will distribute the notices to the appropriate county, state, and federal agencies and provide the City with the list. The City will be responsible for distribution of notices to area property owners and organizations within the city, publication in newspapers, and transmitting notices to the County for posting. The City will be responsible for all filina fees, 8.4 Prepare Fiscal Analysis SRHA will prepare a fiscal impact analysis for the preferred General Plan land uses and up to two alternatives based on the analysis of current fiscal conditions. The focus of the analysis will be on General Fund revenues and costs, but may include other funds, such as the Gas Tax Road Fund, based on discussion with City staff. Fiscal Methodology/Assumptions. SHRA will assemble the land uses for the alternatives and preferred General Plan into a database for fiscal analysis. including acres, square feet, and valuation of nonresidential development; housing units by type, persons per household, and household income; and infrastructure assumptions for public works, public buildings, parks: recreation facilities, open space, fire stations, and other public facilities. Public revenue and cost fiscal factors will be developed through a current budget analysis and interviews with key departmental staff based on the current level of service standards. Defivera les: Screencheck Draft Eli,and t.ecf;nic.a:l Appendices (10 copies,. electrcm'4 screencheck NO and NOC (1 copy -+- eiectronicl, public review Draft EIR '50 copies + :eytr>ni'. It ',1k, review Draft EIB tenhnica upPendices (25 :,opie electronic` public D' _ft -:R and technical aPj.;, dices ;gin CD) (35 copies 5 copies for Jtate € alnFirmhouse + ;trorli ` nal N.-DA and r:lpC (, copy . ec or, c. €fie iverable: SP -1, will document i,L fis in a drat. i4 n a rR ,r E summarizing key `n `mdingz a u St :ni ISSucS ;JQ co-ies � . tropic). Following ofOIty° st..fs comments on . lc, di . epo i, SRHA will prepare R ;i; 2i tect=nir:ai >.wpo L ;25 copies k?ianandSc..d!e 2 -A Item 12. - 83 1-IB -166- i^I- Fiscal Impact Analysis. SRHA will identify the major sources of public revenues and costs, and project the annual fiscal balance and revenue/cost ratios for the alternatives and preferred General Plan land uses. The fiscal analysis will be projected for up to two alternatives and a preferred General Plan at buildout. Key fiscal indicators will be presented, including surplus (deficit), revenue/ cost ratio, and the distribution of revenue sources by various land uses. Task 9: Prepare Final Documents and Conduct Public Hearings 9.1 Prepare Hearing Draft General Plan Deliverable: Public nearing draft Following public review of the draft General Plan; PMC will meet with City staff to General Plan (30 copies + identify desired changes to the draft plan based on community engagement electronic). activities conducted during public review and comments and responses on the Draft FIR. Following identification of desired changes: PMC will revise the draft General Plan to create a public hearing draft General Plan for Planning Commission and City Council review. Revisions to the General Plan at this stage are limited to changes identified in public comments or through the EIR process. No additional chapters or sections would be added. 9.2 Prepare Hearing Draft Sustainability Action Plan Deliverable: Public hearing draft Following public review of the draft SAP, PMC will meet with City staff to identify General Plan (39 copies + desired changes to the draft plan based on community engagement activities conducted during public review and comments and responses on the draft DR. electronic). Following identification of desired changes, PMC will revise the draft SAP to create a public hearing draft SAP for Planning Commission and City Council review. Revisions to the SAP at this stage are limited to changes identified in public comments or through the EIR process. No additional chapters or sections would be added. 9.3 Prepare Responses to Comments and Administrative Final EIR Deliverable: Administrative Final Atkins will prepare an Administrative Final EIR for City review. It is assumed that EIR (electronic;preparation of the Administrative Final EIR will not result in any new technical analyses or substantial text revisions. We will prepare written responses to oral and written comments received on the Draft EIR and will distribute responses to commenting parties, as deemed necessary. We understand that contract augmentation for "excessive" numbers of responses is not typically considered by the City. Therefore, our proposal is conservative in this regard. Atkins will also prepare any other written responses to letters or verbal comments received during the preparation and processing of the EIR document (as deemed necessary by the City). Where necessary; the text of the Draft EIR will be revised in a format to indicate text -that has been deleted (by strikeout) or new text has been inserted (by -44 € "l'i}p! sal ?olvli, of, ui', i41c;f)r': b t fB -167- Item 12. - 84 double underline). A chapter on text changes will note any revisions to the Draft EIR made in response to comments. 9.4 Prepare Final EIR Atkins' project manager will meet with City staff to review comments on the Administrative Final EIR. Based on one consolidated set of comments on the Administrative Final EIR, Atkins will revise the Administrative Final EIR for City review prior to publication. Based on one set of consolidated comments on the screencheck Final EIR, Atkins will incorporate all final City comments and prepare the Final EIR. It is assumed that preparation of the Final EIR will not result in any new technical analyses or substantial text revisions. The Final EIR will be distributed by Atkins to all commenting agencies at least ten days prior to the EIR certification hearings. Section 21081.6 of the Public Resources Code requires all state and local agencies to establish monitoring or reporting programs whenever approval of a project relies upon a mitigated negative declaration or an environmental impact report. The monitoring or reporting program must ensure implementation of the measures being imposed to mitigate or avoid the significant adverse environmental impacts identified in the EIR. In conjunction with the EIR, Atkins will prepare a MMP if needed) that clearly identifies mitigation measures identified in the Draft EIR, mitigation implementation responsibility, implementation timing; and reporting procedures in a format effectively and efficiently implemented and monitored by the team. The MMP will follow standard City format and will be bound separately. 9.5 Prepare CEOA Findings and Statement of Overriding Considerations Atkins will prepare findings for each significant effect identified in the FIR, and a statement of overr6no considerations, if unavoidable significant impacts occur. Atkins will also prepare any draft resolutions (if required) and the Notice of Determination (NOD) within four days of certification of the Final EIR. The City will be responsible for all filing fees. 9.6 Prepare Final General Plan Following public hearings before the Planning Commission and City Council, and confirmation with City staff of desired changes, PMC will revise the draft General Plan to create a final General Plan. Revisions to the General Plan at this stage are limited to changes identified in the public hearing process. DeffvruraWans: Screencheck Final EIR 00 .copies -, electronic), individua € coniments, and res;:t:Fnses tc'Y a :htribution to c >r,,r.°erEtinu _ 9encies 0 copy + electr7Jnic4, Final EIR (50 copies eIv trc= .ic`. administrative draft IuE=#zi "eiertrr=r f. screencheck draft NAMIP (2 Yes + --i c'ronic). f -,al 'POMP (1 copy + ei. "tronic) Oe€ltieraes: Screencheck ve! ific ti- diocurnent (2 copies 'IF --heck NOD N 'i—t€oni,c), final NOD vr1p, ,3pr Deliverable; = r,a= ;General Plan V`vwkPlan Smedl._ 1 2-49 Item 12. - 85 HB - 68- �� 9,7 Prepare Final Sustainability Action Plan Deliverable: Final SAP r50 copies Following public hearings before the Planning Commission and City Council, and + electronic). confirmation with City staff of desired changes, PMC will revise the draft SAP to create a final SAP. Revisions to the SAP at this stage are limited to changes identified in the public hearing process. Task 10: Project Meetings, Management, and Coordination 10.1 City Staff Meetings (20) and Public Works Ombudsman Deliverables: Up to two 2' P To maintain a local presence and ensure project momentum, PMC staff will staff pa icipating in up toj tt4e ty participate in project management meetings with City staff. The budget provides for up to 20 in -person project meetings, which will be timed with key milestones. (20) in -person project Up to two PMC staff members, including the project manager, will attend each management meetings; ° tiro meeting to discuss progress on the project schedule, engagement approach, and agendas and summaries evolving project priorities. PMC will prepare an agenda for and summary notes from each meeting. Subconsultant staff budgets identified in this proposal include (electronic). time dedicated to participation in some of these meetings, as needed. In particular, M&N has allocated resources to attend up to 4 City staff meetings; and Matrix has allocated resources to attend up to 3 City staff meetings, in addition to numerous interviews identified in the scope for the fire and police services study. As a part of this task, PMC Principal Mark Teague will assist the Public Works Department as an ombudsman for the General Plan update and SAP. in this capacity, Mark will provide technical assistance, recommendations; regulatory input and assist with review, interpretation; and editing of draft documents. Approximately 60 hours of Mark's time have been identified for this task. 10.2 Engagement Activities Identified in Outreach Assessment Dellverables: Support 4 = 'w Flexibility concerning community engagement is essential, as this is the task item for identified communi �= orar-', �J[ that is most likely to change through the process. We have programmed flexibility into this approach to allow adjustments as we proceed through the planning techniques and process. PMC will implement the community engagement strategy identified in events, as identified in V�!e Task 1.3 in close coordination with the City project management team in assessment accordance with the budget identified for this task. All materials prepared by PMC outreach will be reviewed and approved by City staff prior to public distribution. prepared in Task 1.3. t u :Lid -_ identified for this task iE PMC's project manager; public engagement specialists, and City staff will confirm that the outreach strategy prepared in Task 1.3 includes the most appropriate considered a not-to-exw e l ii ; = outreach and engagement techniques for the duration of the project and proceed to complete selected c: re <_ E with subsequent outreach and engagement to key stakeholders as directed by the tasks and formats, outreach strategy. fig; C?tv 1113 -169- Item 12. - 86 10.3 GPAC and Task Force Meetings (17) We understand that the City Council has determined that a General Plan Advisory Committee (GPAC) will be appointed to support the General Plan update. While the size and composition of the GPAC have not been determined at this time, City staff anticipates the group would consist of between 25 and 30 members. Furthermore, the GPAC may be split into multiple subgroups or task forces consisting of GPAC members, Environmental Board members, and other community experts to review technical studies. PMC will facilitate up to 17 meetings of the full GPAC or GPAC task forces throughout the project. Subject to refinement within the community engagement strategy, approximately seven (7) of these meetings will be dedicated to the GPAC, eight (8) will be dedicated to task forces, and two (2) would be reserved for either the GPAC or task forces as needed. Task force meetings may include dedicated Environmental Board meetings for discussion and preparation of the SAP. We will kick off the GPAC at the first meeting by reviewing the project purpose; discussing the contents and state requirements for the General Plan, SAP, and EIR; establishing the committee's ground rules and role in the process; and reviewing the community engagement program and project timeline. We anticipate meeting with the GPAC to obtain feedback regarding the following key project milestones: ® Project kickoff (within Task 1) ® Community vision (within Task 2) ® Key issues (within Task 3) ® Task force review of technical background studies (within Task 4) ® Key policy approaches (within Task 5) • Land use and circulation alternatives (within Task 5) • Public review draft General Plan and SAP (within Task 8) We also anticipate that task forces would be appointed by the GPAC and City staff to review the following technical studies: • Biological resources (Task 4.2) • Sea level rise vulnerability assessment (Task 4.3) (2 meetings) • GHG emissions (Task 4.5) and Sustainability Action Plan (2 meetings) ® Market trends analysis (Task 4.6) • Circulation system (Task 4.7) Deliverab,fw . Up to two (2) PMC s ,a €?dinc. u .= to seventeen s�.; tt I i GPLC tac-' force r eti "_g agendas; resenta ons, aru summaries ect Item 12. - 87 11B -170- /lw ® Fire and police services (Task 4.8) ® Two (2) additional task force meetings (to be determined) These task force meetinas would occur following preparation of technical studies, but prior to initiation of the alternatives analysis. For all GPAC and task force meetings, PMC will provide a facilitator and the project manager, in addition to other needed technical staff for presentations. PMC will prepare meeting agendas, presentations, and summaries for each meeting. PMC Team subconsultants will attend task force meetings related to SLR, market trends, circulation, and police and fire services. 10.4 EIR Scoping Meetings (Day and Evening) Deliverable: PMC and Atkins Scoping Meeting: The PMC and Atkins project managers will be available to attend one EIR scoping meeting, to be held after the issuance of the ISMOP. We project managers attending one recommend conducting this meeting as a two-part event with an agency (1) CEQA scoping meeting to be roundtable in the afternoon, followed by a presentation and public'comment before conducted in two parts as the Planning Commission the same evening. Atkins will be responsible for described above; meeting preparing any required materials for the scoping meeting (i.e., graphic exhibits _ and handouts, as necessary); as well as making a brief presentation on the CEQA presentation and summary process and project overview. Scheduling, noticing, and conducting the scoping (electronic). meeting are assumed to be the responsibility of the City. The City will make available any GIS prepared graphics associated with the project. 10.5 Planning Commission or City Council Study Sessions (8) Deliverables: Up to two (2j PMC PMC will conduct study sessions before the Planning Commission and City Council at key points in the General Plan update process. Specifically, PMC will staff at ending up to eight (8) facilitate two study sessions (one before the Commission and one before the Planning Commission or City Council) at the following key points in the process: Council study sessions: meeting ® Community vision and key issues (within Tasks 2 and 3) agendas, presentations, and ® Key policy approaches (within Task 5) summaries (electronic). ® Preferred land use and circulation plan (within Task 5) ® Public review draft General Plan and SAP (within Task 8) PMC will provide a facilitator and the project manager, in addition to other needed technical staff for presentations, including subconsultants as needed. PMC will prepare meeting agendas, presentations,.and summaries for each study session. -Ji Pror:osa. iui LIr' "al f!lii� �f' �_...,. f B _11-11_ Item 12. - 88 10.6 Planning Commission or City Council Hearings (4) After the public hearing draft General Plan, public hearing draft SAP, and Final EIR are released; the PMC team will participate in four hearings before either the Planning Commission or the City Council. City staff will determine the number of hearings to be held before each decision -making body. Key members of the PMC team and subconsultants will be available to attend and to respond to public and Commission/council comments and questions. The work scope assumes that up to two PMC staff members; including the project manager, and representatives from each subconsultant firm will be present at these public hearings. PMC will collaborate with City staff as directed to assist with preparation and delivery of presentations for each public hearing. 10.7 Ongoing Project Management and Coordination Ongoing and active project management is essential to ensure a successful project. This task provides for project management by the PMC project team throughout the project, including overall project management, coordination of team members and tasks, preparation of invoices and project updates, general consultation with the City, and team meetings. We recommend conference calls every other week throughout the project, with periods during public review or holidays that spread team meetings out to once every few weeks. The biweekly calls are an opportunity for the PMC project team and the City to review tasks in progress, share information, review key milestones, and provide updates. This approach allows the entire team to stay up. to speed on the project. As a component of this task, PMC will generate agendas and notes for each team meeting for the Cq's records and use in updates to the City Council or interested parties. The budget for this task recognizes that the PMC project team will also communicate with the City team by e-mail and phone throughout the project. Task 11: Coastal Resiliency Plan The following tasks describe a Coastal Resiliency Plan that is included in the project scope of work, as well as optional additional modeling to support the Coastal Resiliency Plan. The optional modeling could be added to the scope of the General Plan update at the City's discretion. 11.1 Coastal Resiliency Plan M&N and PMC will prepare a Coastal Resiliency Plan for Huntington Beach using findings of the SLR vulnerability assessment described in Task 4.3 as a starting point and following the approach presented in Section 1 of this proposal. In preparing the Coastal Resiliency Plan, we will consult with other entities with coastal -dependent facilities including OCSC, AES, the State of California, other resource agencies, and non -governmental organizations (NGOs) that manage ecosystem restoration areas. De iverables: Up to two (2) PMC staff a; d subce ;sultanas (as nee ed atter,^ir,g up to four (4) Piari rin Ca: ? i €is`a'iun or City, Counc,li hearings: public hearing pr.=�­. =tat ons: a; directed IeleCtTonic) Deliverables: C `going project `n—­tf _ And coordination; up o oG p�ofecr Management rice r;-Jis 0th agendas and , .. utng .cAes (electronic). rx'eiivelmbies: Adn—lnistrative draft, __ a . final C,-astal Resiliency Piar; ,:;leCtronic). 4' rl, Plan a„d Cc edu`le 'c�3 Item 12. - 89 11B -t72- (Y The Coastal Resiliency Plan could be a stand-alone plan or could be presented as a chapter of the SAP, at the City's discretion. Elements of the plan may include: ® A climate -resilient vision for the city ® Guiding principles for resilience (i.e., engineering resilience, ecological resilience, community resilience) ® Preparedness goals for each planning area (e.g., beach and beach infrastructure (parking lots, lifeguard facilities, pier)., roads and pedestrian/bike access ways, utilities, recreational harbor infrastructure, residences, ecological habitat areas, new development areas) ® Preparedness actions for each planning area We will identify potential adaptation measures for the various elements of infrastructure affected by sea level rise. Potential measures may include: ® Engineering resilience: multiple levels of protection, anticipate failure modes and stockpile resources, storm recovery plans, pre-existing problem areas m Ecological resilience: water and sediment management, planting plans and maintenance ® Community resilience` communicate resilience strategies and outreach to public, need for maintaining beaches, establish evacuation routes, rebuild now versus later, considerations for tourism We will also identify an implementation strategy for the Coastal Resiliency Plan consisting of phasing (i.e., stair -step approach), economics (i.e., do it now versus later), cost estimates, and regulatory, resource, and other impacts (e.g., loss of land due to adaptations). 11.2 Coastal Resiliency Planning — Additional Modeling Option Deliverables: Additional as- M&N can add great value to the presented scoped effort through focused needed modeling to suppo L modeling efforts to identifyeffective adaptive measures to improve coastal resiliency, emphasizing a solution -based approach. Two primary focus areas for Coastal ResHiency Plan. the Coastal Resiliency Plan include: (1) the City's ocean shoreline, vulnerable to coastal storm waves and high ocean water levels; and (2) coastal and low-lying inland areas subject to coastal and/or rainfall related flooding. Ocean. Shoreline Adaptation Strategy Modeling. Potential adaptation strategies to enhance coastal resiliency include preserving/maintaining the federal Surfside- Sunset beach nourishment program. The City's beaches, and all sandy beaches from Surfside to Newport Beach, rely on this program for periodic nourishment. This program will become even more critical under future SLR scenarios. M&N will use the very powerful modeling tools created to support the vulnerability 1 t13-173- Item 12. - 90 assessment to develop effective adaptation strategies that maintain the beach width necessary to effectively manage coastal erosion. These modeling tools provide a quantitative assessment of potential future adaptation strategies including additional beach nourishment, alternative sand sources, sand retention structures such as nearshore reefs, and shoreline armoring. If desired, our effort can augmented with an assessment of the economic benefit associated with City management of the public trust beach resource, We have collaborated on numerous such investigations with Dr. Philip King (San Francisco State University), a recognized expert in the area of the economic benefits of beaches. Dr. King has previously studied Huntington Beach in detail and that work can be updated and applied to this effort as appropriate. Powerful arguments can be made that support the City maintaining its beaches, and oftentimes the benefits significantly exceed the costs. Such a message is critical in these times of fiscal prudence. Combined Coastal and Upland Flood Mitigation Strategy Modeling. M&N proposes to develop a coastal resiliency planning model that will help the City identify risks and options for mitigating coastal flooding caused by high rainfall events in combination with coastal storms, extreme astronomical tides, and under various scenarios of SLR. While the preceding vulnerability assessment focuses on existing flood defenses, the adaptation strategy focuses on identification and evaluation of conceptual flood mitigation alternatives including structural flood barriers or elevated flood control channel walls, augmented/upgraded pumping systems; and gates to allow tidal exchange during normal conditions. M&N will use historical data and new measurements, along with design rainfall hydrographs, within calibrated models of the storm water collection system and overland flow areas to predict flooding for a range of both rainfall and tidal tailwater events. We will incorporate results into a GIS geodatabase and maps, along with information on property and infrastructure values, historical flood damage claims, and potential impacts to transportation corridors. The geodatabase approach allows for efficient, repeatable, and easily presentable calculations to characterize the benefits of various mitigation alternatives. The storm water system, open water, and overland flow simulations will be conducted using the XPSWMM model, which will be applied in the vulnerability assessment using the EPA SWMM5 dimensional (1-D) model for pipe, channel, and structure flows, linked with the TUFLOW 2-dimensional (2-D) model for open water and overland flows. This 1-D/2-D dynamically -linked approach will create a more accurate simulation of the effects that oceanwater levels have on the storm water system's ability to convey rainfall runoff during coastal storm events (e.g., El Nino). The grid -based 2-D overland model will allow seamless integration of XPSWMM model results with the property, infrastructure, and elevation data in the Item 12. - 91 H13 -174- /1W project geodatabase, allowing us to calculate flood damages for both existing and proposed conditions. M&N will develop XPSWMM 1-D/2-D models for two large and separate watersheds within the City's lowland historic floodplains: the Bolsa gap and Santa Ana River, We will calibrate the models using City GIS information and historical data, and run matrices of predictive simulations for several design alternatives over several design storms. This work will provide expanded knowledge of tidal conditions within the city and create models that produce more accurate flood predictions. M&N and PMC will develop conceptual flood mitigation alternatives by assessing of City design requirements, and identifying those in need of update: prioritizing flood improvements; and the formulating funding strategies to implement these improvements. M&N will develop risk analysis and design conditions using results from the integrated stormwater system, open water, and overland flow simulations. At each level of design; we will evaluate probable construction and operations and maintenance costs alongside estimated benefits from flood damage reduction. We will estimate damages will be estimated based on high -resolution, GIS-based calculations using FEMA and U.S. Army Corps of Engineers methods and depth - damage functions. Schedule The schedule shown on the next page presents completion of the General Plan update project in approximately two -and -a -half years (30 months) from contract initiation. The schedule is flexible, based on our project understanding and the City's needs and resources, and can be refined as needed at the project kickoff meeting. x _17;_ Item 12. - 92 AA Sti I 's I Item 12. - 93 HB - 176- tv HB - 1 77_ Item 12. - 94 ATTACHMENT C FMC's proposed cost estimate is provided at the end of this section and identifies team member levels, hourly rates, estimated hours per task, total number of. hours and cost; and subconsuitant and direct costs. As identified in the attached budget, PMC proposes to complete the General Plan update work program for a budget of $1,720,151, Considering a 15% contingency, the total amount would be $1,978,174. if identified as a desired task by the City, optional modeling to support the Coastal Resiliency Plan (Task 11.2) would add $91,540 to the project fee. Our objective in assembling the budget is to provide a realistic assessment of the effort required to complete the work items identified in, the RFP. We understand that City staff will be consulting with the City Council prior to consultant interviews to identify the priority items to be included in the work program in light of the proposed budget for each work item. Therefore, the work program and budget remain flexible at this time and will be adjusted as needed to meet City needs and priorities. Cost Assumptions With the objective of ensuring clarity about the proposal, PMC has prepared the follovving assumptions for our scope of iwcrk that explain the basis for the cost and effort to implement the work scope. • The topics and scope of technical studies will be confirmed through an initial meeting with City staff. PMC has scoped and budgeted for the technical studies described in the RFP. ® For each deliverable, our work plan assumes that the City's General Plan project manager will provide PMC with one set of consolidated comments and that any conflicts among comments from multiple reviewers will be resolved by the City prior to providing comments to PMC. We further assume that the technical reports will be presented to the GPAC and task forces for discussion and that the GPAC and task forces will advise staff regarding content of the reports. City staff will direct any revisions to the contents of the reports (i.e., the GPAC will not provide independent direction to PMC). ® Our work scope assumes that City staff will conduct the required SB 18 tribal consultation process, with PMC as a technical advisor. We will provide sample letters and other documents required for the consultation process. • Our scope and budget do not specify costs for mass printing and distribution of General Plan newsletters. PMC will work with the City to determine the zi 4-1 Item 12. - 95 HB -178- On) most efficient and cost-effective means of distributing a community newsletter. The work scope assumes up to 17 GPAC and task force meetings, with each meeting to be attended by two PMC staff members: 0) the project manager, who will serve as the meeting moderator, and (2) a note taker or technical expert. PMC will prepare meeting agendas, presentations, and summaries. We will also provide the City with examples of bylaws or rules of order adopted by other general plan advisory committees for consideration by the GPAC. PMC assumes that the City will be responsible for securing meeting locations, logistics, and noticing. The work scope assumes that two PMC staff members and one representative of each of the consultant team members will be present at public hearings before the Planning Commission and City Council. We will assist City staff in preparing a presentation for the public hearings. PMC further assumes that Planning Commission comments and recommended revisions to the General Plan, SAP, and EIR will be presented as an addendum in the staff report to the Council, not as revised documents. The scope of work assumes up to 20 project management meetings with City staff. The budget for direct costs represents our best estimate of internal costs for travel, reproduction, supplies and materials, communications, postage/delivery, and other miscellaneous costs. We have included a cost estimate for printing or reproduction of the City's desired number of the technical background report, and the public review draft and final General Plan, SAP, and EIR. For most other work products, a single electronic copy is assumed. The cost of such documents will depend on the number of pages, number of color pages, graphic content, number of oversized pages (11 x 14, 11 x 17, etc.), use of section dividers, and other factors. Because we cannot predict, in advance, the cost per document, we will charge for the actual cost of copying plus 5% for our handling costs. These costs will be limited to the maximum amount identified in the budget proposal, as required by the RFP. Our cost estimate is based on the proposed 30-month schedule included in this proposal. Should significant delay (more than 120 days) occur for reasons beyond our control, additional charges may apply to the remaining work, based on labor rates in effect at the time of the delay. 11LB -179- Item 12. - 96 Item 12. - 97 FIB - 180- . /k, 9 1 Ri P4 .... . ... .. Is ......... ....... cis zii ! -� ...... .... .... . . . ....... lo's "g. .. . A v n.. •IIa ...... . . ..... ...... ........ ........ .... .. .......... 41 T t9 -!Rim c7 f -;s .. ..... ... .... el iK si 72 Se -21 � � i � 5 i I . i - . A1 - & 8 Rl! E E cl F C6, ol Item 12. - 98, EXHIBIT "B" Payment Schedule (Hourly Payment) A. Hourly Rate CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule: B. Travel Charges for time during travel are not reimbursable. C. Billin 1. All billing shall be done monthl in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it. 2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks: In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. 4. CONSULTANT shall submit to CITY an invoice for each monthly payment due. Such invoice shall: A) Reference this Agreement; B) Describe the services performed; C) Show the total amount of the payment due; D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and E) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non -approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein. 1 Exhibit B Item 12. - 99 HI3 -182- 11LA. EXHIBIT "B" Payment Schedule (Hourly Payment) A. Hourly Rate CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule: Project Director/Prin. Planner $180.00/hr. Bio Services Director $175/hr. Project Manager $160/hr. Assistant Project Manager $140/hr. Principal Planner $160/hr. Senior Planner/Facilitator $130/hr. Senior GHG Analyst $115/hr. Associate Planner/Biologist $100/hr. Assitant Planner $90/hr. GIS,Tech Editor, Graphics $85/hr. Admin Support $65/hr. B. Travel. Charges for time during travel are not reimbursable C. Billing 1. All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it. 2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project. 3. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. 4. CONSULTANT shall submit to CITY an invoice for each monthly payment due. Such invoice shall: A) Reference this Agreement; B) Describe the services performed; C) Show the total amount of the payment due; D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and E) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this 1 Exhibit B 1B -183- Item 12. - 100 Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate. Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement. 2 Exhibit B Item 12. - 101 1-113-184- P/ LIST OF CONSULTANTS THAT SUBMITTED PROPOSALS The Planning Center/DC&E 3 MacArthur Place, Suite 1100 Santa Ana, California 92707 ATTN: Brian Judd (714) 966-9220 PMC 2729 Prospect Park Drive, Suite 220 Rancho Cordova, California 95670 Attn: Jeff Henderson (949) 361-8384 MIG/Hogle-Ireland 169 N. Marengo Avenue Pasadena, CA 91101-1703 Attn: Lisa Brownfield The Chambers Group 5 Hutton Center Dr., Suite 750 Santa Ana, CA 92707 (949) 261-5414 HB-1€:5-- Item 12. - 102) ATTACHMENT #2 Item 12. - 103 HB - 186- • CERTIFICATE OF LIABILITY INSURANCE �4�®rd Da�8M13 R, THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies require an endorsement A Statement on this certificate does not confer rights to the certificate holder in Neu of such endorsemert s . PRODUCER Risk Sbategies Company 2040 Main Street, Suite 580 CONTACT Sherry Young NAM: (A/CNNEo d 9492A2.e24o (FAX. . 949.b98.0886 Irvine, CA 92614 Lic. #OF08675 EMAIL you g@rlat strategles.can ADDRESS: s n INSURERS AFFORDING COVERAGE NAIC # INSURED INSURERA: Cit¢ens Insurance Co. of America 31534 Pacific Municipal Consultants INSURER B: Hanover American Insurance Co. 36034 DBA: PMC 2729 Prospect Park Dr., Ste 220 Rancho Cordova, CA 95670 INSURERC: Massachusetts Bay Insurance Co. 22306 INSURER Or Continental CasualtyCo. 2D443 INSURER E: INSURER R COVERAGES CERTIFICATE NUMBER: REVISION NUMBER. Ties IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FORTHE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TOALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF NSL02AtICE ADDL INSR SUER WVD POLICY POLICY EFF POLICY EXP L91US6 GENERAL L UABJL" EACH OCCURRENCE 32�DA00 A X COMMMERCIALGENERAL LIABILITY DAMAGE TO RENTED PREMISES ocamenoe) S'1A00.000 CLAMtaAOE FEDT = sr� OB3914e6e102 07101I13 07/01114 MAED E* (Any— P—) $101wo PERSONAL & ADV NJURY 62400= GENERAL AGGREGATE 64AD4000 GENL AGGREGATE LIMIT APPLIES PER PRDDUCTS-COMPIDP AGG $4A00A00 POLICY 7X I PROJECT F7 LOC 6 AUTOMOBILE LIABILITY COMSNED SINGLE LSW (Ea accwwo = BODILY NAM (Per person) $ A ANYAUTO ALL OWNED AUTOS SCHEDULED MIRED AUTOS X OWNED OB3914866102 07/01/13 07/01114 eODILY NJURY (Per eeaderly 6 X � DAMAGE $ AUTOS arm S X UMBRELLA LIAB X OCCUR EACH OCCURRENCE S2=,DM A EXCESS LLAB 063914666102 07/01/13 07/01114 AGGREGATE 62.CW= Dim I X I RETENTION $1o.mo 6 IRIOWMaPENSATIOH X WC STATLI- TORY OTH- B AND EMPLOYERS' LIABILTY YIN WZ391274DO03 (CA, AZ 07/01/13 07/01/14 I ER ���� 6+AOOA00 ANYPROPRE70waRrnIERADSCumv pFt-yCF-AAQp(CLiYt NIA E-L.Do�E-EA 6+AooA00 C y (Nmnda+Drr In N.H.) WZ391274SOM (OR) 07/01/13 07/01/14 d yes, deafte under DESCRIPTION OF E.L. DISEASE -POLICY LIMIT S+00,000 OPERATIONS below D PROFESSIONAL LIABILITY MCH288307507 07/01/13 07/01114 PaCub+I A re ate 62ADOIM BSA�.o00 DESCRIPTION OF OPERATIONS I LOCATIONS r VEHICLES eh ACORD 101, Addu)onal Remarks Schedule, I more apace is required) Projects as on file with the insured including but not limited to Genera( Plan Comprehensive Update. The City of Huntington Beach, its offioers, elected or appokMted officials, employees, agents and volunteers are named as additional insureds on the general liability polcy-see attached endorsement. Prof Llab Ded: M.000 per claim. 'The above policies contain a 30-day notice provision for non -renewal and cancellation wmapit for cancellation due In non-payment of premium, -in which a 10-day notice lies.' . .. I I . . -.. __- . City of Huntington Beach 2000 Main St. Huntington Beach, CA 92648 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. fWN. An rigt City Attorney Item 5. - 97 11B -i 87-- Item 12. - 104 the rendering of or the failure to render any professional services. This includes but is not limted to any professional services as an architect or engineer arising out of any construction agreement or actiutiesunder which any insured or anyone acting on any insured's behalf provides or provided service, advice, expertise or work_ Construction Includes, but is not limited to, the plan, conception, design, build, construct, assembly, development, safety, erection, formation, reconstruct, rehabilitation, repair, or any Improvement made to real property. Construction also includes the hiring, supervision or management of any of these activities. However. this exclusion does not apply to Ilability arising out of an insured's presence at a Jobsite that was not caused by professional activities listed in the above paragraph c. Additional insured coverage provided by this provision will not be broader than coverage provided to any other insured. d. All other insuring agreements, exclusions, and conditions of the policy apply- 1 1. Additional Insured by Contract, Agreementor Permit — Primary and Non-contrt butory The following Is added to SECTION III — COMMON POLICY CONDITIONS: M. Other I nsurance 1. Add tional Insureds If you agree in a written contract, written agreement or permit that the insurance provided to any person or organization included as. an Additional Insured under SECTION it LIABILITY, Part C — Who is An I nsured, is primary and non-contributory, the following applies: If other valid and collectible insurance is available to the Addtional Insured for a loss we cover under SECTION II — LIABILITY, Part A. Coverages, Paragraph 1., Business Liability our obligations are limited as follows: a. Primary Insur-ante This insurance is primary to other insurance that Is available to the Additional hsured which covers the Additional Insured as a Named Insured. We will not seek contribution from any other insurance available to the Additional Insured except: (1) For the sole negligence of the Additional nsured; (2D When the Additional Insured is an Additional Insured under another primary liability policy; or (3) When b.(2) below applies. if this insurance is primary, our obligations are not affected unless any of the other insurance is also primary. Then, we will share with all that other insurance by the method described in b.(3) below. b. Excess Insurance This insurance is excess over. (1) Any of the other insurance, whether primary, excess, contingent or on any other basis: (a) That is Fire, Extended Coverage, Bulder's Risk, I nstallation Risk or similar coverage for "your work' ; 391-1586 02 11 1 ndudescopyrightedmatmiabflr>surance ServicesOfflces, Inc. -vft its Page 2 of 4 Item 12. - 105 HB -188-. Item 5. - 98 b. For purposes of the coverage provided by this endorsement F. Liability And Medical Expenses Definitions under Section II - Liability is amended by adding the following: a.- vour protect" means: i. Any premises, site or location at, on, or in which "your work' is not yet completed; and ii. Does not include any location listed In the Declarations. IV: Blanket Waiver of Subrogation Paragraph K. Transfer Of Rights Of Recovery Against Others To Us in Section III — Common Pol i cy Conditions is amended by the addition of the following: We will waive any right of recovery we may have against any person or organization when you have agreed in a written contract, permit or agreement to waive any rights of recovery against such person or organization because of payments we make for injury or damage arising out of your ongohg operations or .your work" done under a contract with that person or organization and included in the "products -completed operations hazard". 391. 1586 0211 Ind.ides copyrighted material of Insurance Services Offices, Inc., with itsperrnission Page 4 of4 Item 5. - 99 t tB -1 9- - Item 12. - 106 su ity INSURANCE AND INDEMNIFICATION WAIVER m MODIFICATION REQUEST n Beach 1. Requested by: Debra Gilbert 2. Date: 8/22/2013 3. Name of contractor/permittee: Pacific Municipal Consultants, dba PMC 4. Description of work to be performed: General Plan Update 5. Value and length of contract: $1,900,000 6. Waiver/modification request: $50,000 deductible on Professional Liabiltiy 7. Reason for request and why it should be granted: PMC privately owned company, due to strong growth and financial stabitility has carried the $50K deductible for the last five years. They do not consider this to be a substantial amount. Company financials are attached, consider confidential and are to be return to the vendor at the listed address. 8. Identify the risks to the City in approving this waiver/modification: very minimul Department Head Signatu 8/22/13 Date: APPROVALS Approvals must be obtained in the order listed on this form. Two approvals are required for a request to be granted. Approval from the City Administrators Officers only required if Risk Management rtdt a City Attomey's ffice disagree. 1. isC Management �r 1 ._Approved ❑ Denied` Signature D to 2. City A►ttorney's Office r ❑ Approved ❑ Denied ! z:°' C1 j Signiature Date 3. City Manager's Office ❑ Approved ❑ Denied Signature Date If approved, the completed waiver/modification request is to be submittedto the City Attorney's Office along with the contract for approval. Once the contract has .been approved, this form is to be filed with the Risk Management Division of :Human Resources Item 12. - 107 1113 -190- Item 5. - 100 Insurance Waiver Form.doc 8/22/2013 4:u-i:uu rrvi City Of Huntington Beach 2000 Main Street ® Huntington Beach, CA 92648 (714) 536-5227 ® www.huntingtonbeachca.gov Office of the City Clerk Joan L. Flynn, City Clerk October 9, 2013 Philip O. Carter; President Pacific Municipal Consultants 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 Dear Mr. Carter: Enclosed for your records is a copy of the fully executed "Professional Services Contract Between the City of Huntington Beach and Pacific Municipal Consultants for Preparation of Comprehensive Update to the City of Huntington Beach General Plan." Sincerely, Jodn$L. Flynn; CIVIC City Clerk JF:pe Enclosure Sister Cities: Anio, Japan ® Waital ere, New Zealand RB -191- Item 12. - 108 r 00, �• ,f'�G,�i'a�j,�1 ,Fr f"�� Dept. ID PL 1X-022 Page 1 of 3 0 Meeting Date: 10/7/2013 MP4J&-b :7 -a CITY OF HUNTINGTON BEACH REQUEST FOR CITY COUNCIL ACTION MEETING DATE: 10/7/2013 SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Scott Hess, AICP, Director of Planning and Building SUBJECT: Approve and authorize execution of a Professional Services Contract between the City of Huntington Beach and Pacific Municipal Consultants to prepare a comprehensive update of the City of Huntington Beach General Plan. Statement of Issue: This is a request to enter into a three (3) year Professional Services Contract between the City and Pacific Municipal Consultants for preparation of a comprehensive update of the City's General Plan. The project will encompass the associated program level environmental impact report and various technical studies, including the equivalent of a climate action plan, a sea level rise study, a fire and police department service level analysis and a targeted update of the citywide urban runoff management plan. Financial Impact: Total appropriations of $1,978,174 in the General Fund to the Planning and Building Department Professional Services Account 10060201.69365 are requested for the three year term of the contract. It is anticipated these funds will be offset by revenue collected in accounts 100.35660 Assigned General Plan Maintenance and 10000100.42825 General Plan Maintenance Fee Account. The FY13/14 Adopted Budget currently includes $500,000 for the General Plan Update. The remaining appropriations of $1,478,174 will be used to cover the current and/or future year's budgets, as needed to execute the contract. Recommended Action: A) Approve and authorize the Mayor and City Clerk to execute a three (3) year Professional Services Contract not to exceed $1,978,174 between the City of Huntington Beach and Pacific Municipal Consultants, to prepare a comprehensive update of the City of Huntington Beach General Plan (Attachment No.1); and, B) Appropriate funds in the total amount of $1,978,174 over a three year period from the General Fund to the Planning and Building Department Professional Services Account 10060201.69365. Alternative Action(s): The City Council may make the following alternative motion(s): 1) Deny the Contract between the City and Pacific Municipal Consultants. 2) Continue the item and direct staff accordingly. Item 5. - 1 HB -60- Dept. ID PL 13-022 Page 2 of 3 Meeting Date: 10/7/2013 Analysis: A. PROJECT BACKGROUND The City's General Plan was last comprehensively updated in 1996. Since that time there have been notable physical changes in the city, amendments to State laws that require analysis and data that the General Plan does not currently have, and a growing interest to incorporate sustainability into city functions. As a result, the City has identified the need to update the General Plan. The City Council held two study sessions, in March and August, regarding potential scope, budget and timeline of a General Plan update and provided direction to staff. The update of the General Plan would include a number of separate technical studies and plans, as follows: sea level rise study, coastal resiliency plan, sustainability/climate action plan, urban runoff impact study, market trend and fiscal analysis, biological report and service level study for fire and police. These studies will be used to update the General Plan and the subsequent update of the City's Local Coastal Program. However, they will also provide information that supports the City's compliance with National Pollutant Discharge Elimination System (NPDES) requirements, the City's Insurance Services Office (ISO) ratings and prioritization of Capital Improvement Program (CIP) projects. The update would also include community outreach. Based on City Council direction, there would be a General Plan Advisory Committee. In preparation for the need to update the General Plan, the City Council adopted a General Plan Maintenance Fee in 2004. This fee is assessed on all new construction and is intended to pay for the City's consultant costs. The existing fund balance in this account is approximately $665,000, and over $800,000 is expected to accrue in the next couple of years, which will coincide with the length of time needed to complete the project (approximately 2 %-3 years). The City will continue to receive these revenues to fully pay back any General Fund monies that may be used and to complete other General Plan related projects, i.e. subsequent update of the City's Coastal Element, which will occur after the General Plan update. In addition, the City has applied for two grants related to the technical studies and will continue to seek out other sources of funds. B. CONSULTANT SELECTION PROCESS Staff issued a Request for Proposals (RFP) in May, which was sent to 13 firms of varying specialty due to the range of work associated with the City's project. Five of the firms are considered general planning consultants, four are primarily environmental consultants, two are economic firms, one is a management consultant and one is an engineering firm. The City received proposals from four qualified consultant teams, comprised of many of the firms that the City sent the RFP to, led by the following consultants: - The Chambers Group - MIG - The Planning Center/DC&E - Pacific Municipal Consultants (PMC) Proposals were reviewed by nine staff members from various departments: Administration, Fire, Planning and Building, Police, and Public Works. Staff from Fire, Planning and Building, and Public Works then conducted interviews with each of the four teams. The PMC team and proposal was rated as superior by staff due to their high level of technical expertise and experience with the City of Huntington Beach. The PMC project manager was the HB -61- Item 5. - 2 Dept. ID PL 13-022 Page 3 of 3 Meeting Date: 10/7/2013 author of the City's recent Circulation Element update and most recently has been the project manager for the award winning General Plan Update for the City of Orange and the City of Burbank General Plan Update. In addition, he has significant experience preparing climate and sustainability action plans; his plans for the City of West Hollywood and County of Yolo are award winning. The depth and knowledge of PMC staff is excellent. They have a successful track record for meaningful outreach, coastal experience and strong sustainability credentials. The subconsultants on the PMC team have significant experience in Huntington Beach and/or are known for their outstanding work. Of note, Atkins has prepared numerous EIRs for the City; Stantec staff completed the recent update of the City's traffic model; Moffat & Nichol has worked on numerous coastal projects including the Bolsa Chica and Huntington Beach Wetlands and is currently completing work for the Huntington Harbour area; Stanley R. Hoffman Associates is preparing the City's Economic Development Strategy; and Matrix has done work related to Fire and Police Dispatch. Another factor in staff's recommendation for the General Plan consultant was which team would be the best fit for the community. Staff believes the PMC team will be very effective in working with the various interest groups, appointed and elected officials and staff. The other three proposals were adequate and the lead firms have very good reputations in the planning field. However, staff does not believe that the depth of the assembled teams proposed by these firms is as strong, nor did all of the team members appear to be as good a fit for the community. From a cost perspective, the PMC proposal was the third lowest; however, three of the proposals were fairly close. There was variation amongst the proposals in terms of approach to some of the technical studies and once this was adjusted for a better comparison, there was little cost difference between the firms (less than $100,000). Therefore, staff believes that the PMC cost proposal is a reasonable and responsible one that anticipates significant community participation and solid technical research. C. STAFF RECOMMENDATION: A Professional Services Contract between the City and PMC is recommended to prepare a comprehensive update of the General Plan, the associated Program EIR and technical studies as discussed above. The scope of work is expected to cost $1,720,151. Due to the complexity of the project, staff is recommending a 15 percent contingency budget, which would only be used if needed. Therefore, staff recommends the City Council approve the contract with PMC, in the amount of $1,978,174, and authorize the City Manager and City Clerk to execute the documents. Environmental Status: The request is exempt pursuant to Section 15061(b)(3) of the California Environmental Quality Act. Strategic Plan Goal: Improve the City's infrastructure Attachment(s): 1) Professional Services Contract Between the City of Huntington Beach and Pacific Municipal Consultants for Preparation of a Comprehensive update to the City of Huntington Beach General Plan 2) Insurance Certificate and Waiver SH:MBB:DG:kdc Item 5. - 3 HB -62- ATTACHMENT ' PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND PACIFIC MUNICIPAL CONSULTANTS FOR PREPARATION OF A COMPREHENSIVE UPDATE TO THE CITY OF HUNTINGTON BEACH GENERAL PLAN THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and Pacific Municipal Consultants, dba PMC, a S-California Corporation hereinafter referred to as "CONSULTANT." WHEREAS, CITY desires to engage the services of a consultant to prepare a comprehensive update to the the City of Huntington Beach General Plan; and Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows: 1. SCOPE OF SERVICES CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT." CONSULTANT hereby designates Philip O. Carter, President who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement. agree/ surfnet/professional svcs mayor I of 11 10/12 Q(,✓ 2. CITY STAFF ASSISTANCE CITY shall assign a staff coordinator to work directly with CONSULTANT in'the performance of this Agreement. 3. TERM: TIME OF PERFORMANCE Time is of the essence of this Agreement. The services of CONSULTANT are to commence on �--jjeB �Q � , 20/3 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT. In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein. 4. COMPENSATION In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed One million seven hundred twenty thousand one hundred fifty one dollars ($1,720,151) with a fifteen percent (15%) contingency, for a contract total amount, not to exceed one million nine hundred seventy eight thousand one hundred seventy four Dollars ($1,978,174). 5. EXTRA WORK In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such agree/ surfnet/professional svcs mayor 2 of 11 10/12 (IW work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 6. METHOD OF PAYMENT CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 7. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit. 8. HOLD HARMLESS CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT. agree/ surfnet/professional svcs mayor 3 of 11 10/12 P/ 9. PROFESSIONAL LIABILITY INSURANCE CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above -mentioned insurance shall not contain a self -insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims -made policy shall be acceptable if the policy further provides that: A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements). B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims. CONSULTANT will make every effort to maintain ,similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement. If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY. agree/ surfnet/professional sves mayor 4 of 11 10/12 ell, 10. CERTIFICATE OF INSURANCE Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall: . A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium. CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required. 11. INDEPENDENT CONTRACTOR CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost. and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder. agree/ surfnet/professional sves mayor 5 of 11 10/12 rib- 12. TERMINATION OF AGREEMENT All work required hereunder shall be performed in a good and workmanlike manner. CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT. 13. ASSIGNMENT AND DELEGATION This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates ' and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove. 14. COPYRIGHTS/PATENTS CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement. 15. CITY EMPLOYEES AND OFFICIALS CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code. 16. NOTICES Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as agree/ surfnet/professional Svcs mayor 6 of 11 10/12 nkv the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail -return receipt requested: TO CITY: TO CONSULTANT: City of Huntington Beach ATTN: Mary Beth Broeren 2000 Main Street Huntington Beach, CA 92648 17. CONSENT Philip O. Carter, President Pacific Municipal Consultants 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event. 18. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 19. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. agree/ surfnet/professional svcs mayor 10/12 7 of 11 �G" 20. INTERPRETATION OF THIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 21. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 22. IMMIGRATION CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification. agree/ surfnet/professional svcs mayor 8 of 11 10/12 23. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of . services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the .exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT. 24. ATTORNEY' S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party. 25. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive. 26. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. 27. SIGNATORIES Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. agree/ surfnet/professional svcs mayor 9 of 11 10/12 1°w 28. ENTIRETY The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. 29. EFFECTIVE DATE This Agreement shall be effective on the date of its approval by the City Council. This Agreement shall expire when terminated as provided herein. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers. agree/ surfiiet/professional svcs mayor 10 of 11 10/12 CONSULTANT, Pacific Municipal Consultants, dba PMC COMPANY NAME By: A,`�-- � print name ITS: (circle one) Chairm residen ice President AND By: P._ i . _r print name ITS: (circle one ecretary/ - hief Financial Officer/Asst. Secretary - Treasurer CITY OF HUNTINGTON BEACH, a municipal corporation of the State of C rnia Mayor tIty Clerk INITId Q) AND ,,WYiROVED: cotWess, Dfireftdr of Planning & Building APPROVED AS TO FO ity Attorney MV =�i lya J agree/ surfnet/professional Svcs mayor 11 of 1 1 10/12 EXIIIBIT "A" A. STATEMENT OF WORK: (Narrative of work to be performed) Please refer to PMC Project Understanding and Aproach, Attachment A, pages 1-16 Please refer to PMC Work Plan and Schedule, Attachment B, pages 1-58 B. CONSULTANT'S DUTIES AND RESPONSIBILITIES: Refer to PMC Project Understanding and Approach and Work Plan and Schedule attachments. C. CITY'S DUTIES AND RESPONSIBILITIES: 1. City will provide requested documents in a timely manner 2. City will make timely payments as outlined in Exhibit "B" and Budget Schedule D. WORK PROGRAM/PROJECT SCHEDULE: Please refer to PMC Budget Schedule, Attachment C, pages 1-4 EXHIBIT A Ov` ATTACHMENT A =or many of the Ind.viduals and organizations that calf Huntington Beach home. quality of life has always been a high priority. The City of Huntington Beach is a leader in sustainability, preservation, and finding solutions to civic challenges. As a constantly evolving city, an updated General Plan will help Hun: ngton Beach to define a more sustainable model for growth and development, Huntington Beach led the fast energy revolution by providing a reliable source of oil. The City has an opportunity to also lead the next energy revolution through effective and sustainable planning that en?praces and confronts the realities, challenges, and opportunities presented by climate change. The updated General Plan will solidify the City's visioh for maintaining and improving neighborhoods and districts, :-chile al owing areas to maintain a distinct sense of place. Throughout this proposal, we highlight PMC's experience developing sustainable, creative; anu usegeneral clans, climate action plans ,CAPS , and program environmental impact reports (EIRs}, and Identify how we will use this experience fo provide long-term value to Huntington Beach. We detail how our approach w If keep sustainability at the forefront by placing the development of the Sustainabdity Action Flan (SAP) and sea level rise (SLR` studies at the beginning of the work program, allowing findings from these analyses to guide the formation of the General Plana We also detail how fhe general plans we develop emphasize implementation, rooted in our experience in front of and behind the planning counter, and are formed to serve as a useful tool for city staff for years to came. Through our deep commitment to Involve stakeholders and the conirTiunity in the process, we will meet the Cify's objectives to develop an updated vision for growth and development while maintaining sustainability, economic vitality, and continued high quality of life as key priorities for all community members. Huntington Beach is a desirable and diverse community known primarily for its pristine beaches, but also as the reading force in the development of Southern California beach culture. Surf City USA provides a unique rriixture of coastal resources, protected open spaces, diverse residential neighborhoods, shopping opportunities; and a longstanding commitment fo environmental stewardship. It is often regarded as one of Orange County's most progressive communities, yet it maintains strong connections to conservative principles: allowing for pendulum swings that often balance differing opinions on urban development .and 3t x � � Rg v, s a conservation. The community prides itself on being unpretentious and places a high value on preserving and enhancing recreation opportunities. From its early origins as a stop along the Pacific Electric Railway corridor to recent and possible future land acquisitions. Huntington Beach has a long history of leveraging its physical location and building on surrounding resources. Huntington Beach's defining coastline, scenic viewsheds, and diverse neighborhoods create a unique sense of place and quality of life that the City and its stakeholders wish to ,protect.. Key Issues Affecting Surf City's Future Although Huntington Beach has been successful in creating a strong community fabric; there are also unrealized opportunities that the City's General Plan does not currently address. The City wishes to modernize the General Plan to integrate current planning concepts and techniques such as smart growth, livability, and sustainable development. Educating residents about how these concepts can be best incorporated into the General Plan in a manner that helps the City achieve its economic and environmental goals, while also protecting the qualities of Huntington Beach that are so cherished, is key to a successful General Plan update. Effective planning for the future of Huntington Beach must also integrate regional, national, and global issues such as demand for limited energy and water resources, potential sea level rise, ecological resource conservation, solid waste reduction, and the effects of climate change. The City's General Plan and SAP must also respond to recent state legislation, including Assembly Bill (AB) 32 and Senate Bill (SB) 375 targeting greenhouse gas emissions and climate change. Recent legislation related to complete streets, hazard mitigation planning, and floodplain management must also be integrated. In addition to updating the City's General Plan to advance its overall objectives, the new plan must be developed in a way that is user-friendly, illustrative, internally consistent; and addresses the most important- issues facing Huntington Beach over the next 20 years. Specific issues for consideration in the updated General Plan include: Consistency between the General Plan and the City's 15 specific plans, Zoning Ordinance, and recent updates to the Housing Element, Historic and Cultural Resources Element, and Circulation Element. Integration of the new Sunset Beach and Brightwater Specific Plans, as well as the recently adopted Beach and Edinger Corridors Specific Plan. E r p3sa for City of Hur dsr u-' n (I"J Positioning industrial areas in the McDonnell Centre Business Park Specific Plan and elsewhere in the city to be competitive in the regional market. Community concern for wetlands and other sensitive resources. Additional modifications to the Circulation Element addressing complete streets, a new bicycle master plan, a new base year, and Sustainability Action Plan. • Possible lack of sufficient and suitable industrial lands, which requires a market study for resolution. • Opportunity for Low Impact Development (LID) demonstration areas, to serve as a model for the region and future development. • Identifying opportunities to address contributions to and effects of climate change. • Recycling of school sites and identification of community -preferred solutions. ® Developing a General Plan that will allow for easy updating of the Local Coastal Plan. PMC is providing an outstanding team of experts to assist the City with the General Plan update, SAP, and EIR. We have significant experience working with communities as they transition from traditional planning to sustainable planning; and we are recognized and award -winning leaders in developing action plans to achieve the sustainability goals set by clients. Project Approach The RFP provides a thoughtful description of the current condition of the General Plan, as well as the tools available to assist in the update. We have not attempted to repeat all of the RFP background information in our proposal. Instead, we offer a philosophy and approach to organizing the work to maximize resources; control costs, build community ownership in the General Plan and supporting studies, and provide for environmental analysis that accounts for the citywide and cumulative effects of the General Plan and SAP. Our approach establishes a collaborative effort between the City and PMC, and we are excited about the prospect to partner with you in this effort. We recognize that your desired consultant will be one that can relate to both staff and the local community. We bring a professional style consistent with the. Southern California beach culture cultivated by Huntington Beach that is professional but relaxed and friendly. PMC offers integrated public outreach, land use planning, urban design, sustainability; and environmental expertise that allows our team to identify context- miec, , nGeri m';r;K. a^.. Apploach E P sensitive solutions to enhance the community and help the City achieve its vision for the future. Community Engagement For the General Plan to clarify a long-range vision and establish policy guidelines for growth management, growing circulation challenges, and maintaining the characteristics that define individual neighborhoods and the community as a whole; it must reflect the values, priorities, and concerns of Huntington Beach residents and stakeholders. Ensuring effective public involvement in the update is thus a critical component of the overall project and one of the keys to developing community buy -in. In cities with active community involvement, PMC has been particularly successful working with clients to actively listen to the community and translate technical information into meaningful policies. Five objectives stand out for the Huntington Beach General Plan update community engagement process, based on the City's RFP, the pre -proposal meeting, and our local knowledge: • Establishing a framework for focused policy discussions rather than broad °visioning." ® Providing transparency in the process. • Working collaboratively with a General Plan Advisory Committee and other City -sponsored groups which will have a vested interest in plan development. • Utilizing cost-effective and innovative techniques. • Respecting the unique attributes and needs of Huntington Beach communities while unifying citywide identity. Our public participation program will respond to these objectives using specialized outreach techniques that are woven together with the fundamental steps of the planning process. Our experience has demonstrated that flexibility concerning community engagement is essential, as this is the task item most likely to change through the process. As such, we have developed a flexible approach to allow as -needed adjustments as we proceed. As part of the project initiation process, PMC will conduct an outreach assessment with City staff. This will provide time for staff and the consultant team to discuss past outreach efforts, confirm goals for this program; generally discuss details such as venues and materials, and discuss the project's key stakeholders. It provides an opportunity to identify the depth of the strategy and a menu of outreach options related to the overall project schedule. The community engagement program is scalable and can be tailored to meet the City's objectives and budget. -4 Prjrx sad fo;r City .' Hunfinamon Beni: Following the assessment, PMC staff will prepare a more refined draft community engagement strategy for staff review and approval. This memorandum will include the goals, purpose, and desired outcome of the process, an outline of each technique to be used, a timeline, and an outline of responsibility for PMC and City staff. It is anticipated that the community engagement strategy will include a combination of the following "menu" of techniques and activities. The ultimate depth of the outreach effort will be determined by City staff. Our menu of engagement techniques includes: • Facilitation of a GPAC and topic -specific task forces • Stakeholder interviews ® Project branding • Community workshops and open houses • Project website and e-mail updates • Media outreach (both traditional and social) • "Pop-up" workshops at community events • Participatory photography • C harrettes • Presentations to local boards and community organizations • Presentations at all legally required hearings Our budget for community engagement is considered a not -to -exceed limit. To keep the program flexible to project needs while staying within budget, we assume the same level of effort will be anticipated for any adjustments to the approach, Sustainability Action Plan While many communities have struggled to make distinct and measurable progress toward sustainability goals, Huntington Beach's commitment to sustainability can be seen in action through the City's and the community's day- to-day activities and long-term planning. We recognize the City's objective to prepare a stand-alone SAP concurrent with the update to the General Plan, which will build on ongoing efforts, reflect state guidance for addressing climate change, and provide a strategic course to achieve near -term (5-10 years) sustainability goals. This approach provides the following clear benefits to the City and community: Ensures long-range sustainability vision, goals, and policies are integrated consistently through the General Plan. i!'W ® Provides near -term specific, measurable actions, programs, and projects and supports implementation through performance indicators, interim milestones, and a monitoring tool. Allows environmental review of sustainability actions and programs. Provides the City with an equivalent climate action plan or qualified greenhouse gas reduction plan consistent with the State CEQA Guidelines. Our. approach to developing sustainability plans and climate action plans relies on robust and transparent technical analyses; target setting for GHGs and other reductions as applicable; tailored engagement techniques for staff, key stakeholders, and the community; preparation of strategic, specific, and measurable actions, programs, and projects that support achievement of the target(s); and a clear implementation program that identifies time frames, responsible parties, indicators; potential costs and benefits, funding sources, and monitoring. Our approach to preparing action plans relies on best practices, existing progress and activities, community engagement, and quantitative analysis. Most important to our approach is an emphasis on balancing state and regional guidelines and regulations with local characteristics, using a bottom -up approach that relies on education, engagement, and incentives before recommending top - down solutions that rely on new regulations and mandates. We also seek to learn, understand, and respect ongoing activities, such as the Huntington Beach Goes Green program, the Surf and Sun Program, the annual Green Expo, the activities of the Environmental Board and the Tree Society, and progress of the Steps Toward a Sustainable Huntington Beach plan. The success stories and lessons learned from these efforts are often the best starting points for a strategic action plan. Greenhouse Gas Emissions AB 32 directs statewide reduction of greenhouse gas (GHG) emissions to 1990 emission levels by 2020. The :AB 32 Scoping Plan provides guidance that a local government equivalent target would be to reduce to emissions 15% below current (defined as 2005-2008) levels by 2020. Given this guidance, most local governments prepare a GHG inventory using a 2005 baseline year, forecast emissions to 2020, and identify GHG emissions reduction measures to achieve a 15% reduction below baseline. While this approach is sound, it may not provide comprehensive information needed to provide a current year baseline for the EIR. We also recognize the value of confirming changes since 2005 based on the performance of sustainable City programs that have reduced GHGs since 2005. Assessing changes from 2005 to the current year supports.a robust SAP. We recommend preparing both a 2005 GHG inventory and a current year (2010- 2012) GHG inventory. The exact year for the current inventory will be determined based on data availability. The inventories will adhere to established protocols, including the U.S. Community Protocol for Accounting and Reporting of -t Pr ti%S<i i si" vl `v t�' 1ur':flrla'c i `Sea", pt'l Greenhouse Gas Emissions released by ICLEI-USA and recommended by the Governor's Office of Planning and Research, the Local Government Operations Protocol, and methodologies approved by the California Air Resources Board, The Climate Registry, and the Association of Environmental Professionals. We anticipate that the inventories will include emissions from key sectors, including energy, transportation, waste, water, wastewater, and other sectors as applicable. We also anticipate coordinating with the City's Energy Program Manager, Southern California Edison, the Southern California Gas Company; and other service providers while preparing the inventories. Following the inventories, we will forecast GNG emissions to 2020, the General Plan horizon year, and 2050 for consistency with AB 32 guidance from the Governor's Office Planning and Research and the State CEOA Guidelines. Forecasting will allow identification of a 2020 GNG reduction target consistent with AB 32 and provide an opportunity to select an additional GNG reduction target (or targets) consistent with the community's vision for the General Plan and SAP. Coastal Resiliency Using state, regional, and local resources, expert understanding, and feedback from local experts, PMC will evaluate resiliency and adaptation strategies and policies to address anticipated climate change effects, particularly those affecting Huntington Beach's coastline. Our approach will include research and assessment of state, regional, and local resources, preparation of a vulnerability assessment; sea level rise —specific analyses, and preparation of adaptation strategies and resiliency measures. Excellent resources are readily available to provide guidance and background information, including: California Adaptation Planning Guide (2012, Cal EMA) Cal -Adapt Local Profiles (2013, CEC) City planning documents including, but not limited to, the draft Local Hazard Mitigation Plan, demographic projections, Infrastructure Master Plans, and the Emergency Management Plan Project -specific technical SLR analysis (presented below) Cal EMA My Hazard Mapping tool Sea Level Rise The latest State of California guidance for SLR is summarized in the State of California Sea -Level Rise Guidance Document, (March 2013 update), which was based on the final report from the National Research Council (NRC), Sea Level Rise for the Coasts of California, Oregon and Washington (June 2012). The diagrams below show the past and future tide levels for the Los Angeles tide gauge (the longest record in the region). The future tide levels are based on the NRC III SLR scenario, Similar analysis can be performed for any SLR scenario. With additional analysis, similar results can be developed that show how return periods for various tide levels change over time. Essentially, what is a 100-year tide level today will be less than a 5-year event by 2060 under this scenario. Such information is very important for a broad range of City infrastructure elements. Figure 1.1. Tide Gauge Analysis for the Part of Las Angeles Gauge Figure 1.2. Probability of Tides Exceeding Mean Sea Level { .......... . .. ........... _. _.._ ._._...................... _-__......... _...... _........ ._......__..._. __......_.. Los AnVies CA (1928-2011) ....................._.__.....___ .. _ ..... F E S g i � P i S ,, •.••.• •,. ..< w.M�.: ¢ i�Rat xboiitldy Tdc Abwr MSL v .........., .�'., i '< ,,•,•• —&rtryS Mehrt f i b i - .. -.i_ t } rA ---€uerx*iETYaan 7 � .� .serx 5xxyean 3 � lW bean _ ♦ -i -o-amz CA + _2W zttvF ( ( $ qT.,j x; r e v xtt a xx xi .xe xs j SwvmW. Mow MU Trwd i t2 Vulnerability Assessment In order to understand the city's vulnerability, it will be important to involve organizations that manage resources and facilities to identify risks and strategies to reduce risks. Because the number of groups and organizations that are affected by climate change is large, we recommend forming a task force made up of i 8 'to.r)osal f r City ru, rumirs;tor 5e ,,,,h organizations actively engaged in the management of resources and facilities. The task force could also include representatives of the GPAC, at the City's discretion. A vulnerability assessment is critical to identify adaptation strategies that effectively increase resiliency to hazards and a changing climate over time. The vulnerability assessment provides a spatial assessment of (1) the exposure to hazards, (2) sensitivity to effects, (3) potential effects of those hazards (including certainty and timing). and (4) the current ability to adapt to those effects. Exposure. The first step in assessing climate change vulnerability is identifying exposure, or which climate change effects will occur in the city. Early analysis from the California Adaptation Planning Guide suggests the following primary. exposure: • Sea level rise - up to 55-inch sea level rise by 2100 • Extreme heat — 3 to 5 more annual heat waves by 2050; 12 to 14 by 2100 • Increases in average annual temperature and the number of extreme heat days • Changes in precipitation patterns (increase in extreme events and drought) — up to 2-inch decrease by 2050, 3- to 5-inch decrease by 2090 111 Increases in average annual temperature and the.number of extreme heat days PMC and M&N will build from this initial analysis using existing resources, technical expertise, discussions with City staff, and input from local stakeholders. Exposure will be assessed in terms of expected severity and likelihood. Sensitivity. The second step in the process is identifying the functions, structures, and populations that will be affected by the exposures listed above. Given the extensive resources already available for Huntington Beach, this task will utilize a sensitivity checklist to determine the degree to which a system would be impaired by climate change effects for each exposure. Through discussions with City staff and the local steering committee and further research, the sensitivity rankings will be refined to identify the most vulnerable systems, infrastructure, and communities. Effects. Climate change effects occur at the intersection of exposure and sensitivity. PMC will identify specific impacts such as flooding (from anticipated changes in sea level and/or precipitation), negative public health outcomes from heat -related events, damage to infrastructure and homes due to flooding and reduced water availability, and economic changes resulting from anticipated changes to natural resources that support tourism. These effects will be assessed for severity, certainty, and onset (time frame). Project Understanding and Approach 1 1-9 4P&_/ Adaptive Capacity. The City has existing policies, plans, programs, resources, or institutions that will help functions, structures, and populations adapt to climate change. PMC will work with City staff and a local steering committee to identify the ability of a function; structure, or community to maintain its functions while experiencing the effects of climate change. This task will identify those functions and qualitatively assess their ability to reduce climate change effects to key assets over time. Vulnerability. Vulnerability is identified by assessing the interaction of exposure, sensitivity, impact, and adaptive capacity. The functions, structures, and communities identified as the most vulnerable will be priority topics for adaptation policy. After conducting initial analysis for each of the steps, PMC will perform a series of qualitative assessments, as illustrated in the diagram below, to identify vulnerability. PMC's assessment'will be vetted and refined by input from outreach events, discussion with City staff, expert analysis, and the task force. Figure 1.3. Vulnerability Matrix Low Medium High Adaptive Capacity f Adaptive Capacity Adaptive Capacity High Impact Medium Impact Low Impact Through the vulnerability assessment, PMC will work with City staff and stakeholders to identify the most vulnerable functions, structures, and communities and to identify adaptation strategies (policies and implementation actions) to ensure these assets adapt to and are resilient in a changing climate. These strategies will include opportunistic (e.g., relocating assets through land use changes), defensive (e.g.,, protecting assets with infrastructure improvements when they are not easily moved), and passive (e.g., investment in education or social infrastructure to encourage community resiliency) approaches. Following the vulnerability assessment, we will prepare an adaptation and resiliency strategy. Early analysis based on the risk of the impact (likelihood and potential consequences) and the extent of the City's jurisdiction or influence over the affected system suggests the following primary effects should be evaluated: -1; E P',,r.,,)itSit� �4"- • Threats h]built infrastructure iOthe coastal zone from sea level hS8 • Threats to C08Sta| ecosystems from sea level hS9 • Public health threats from increased temperatures 00 Water supply effects PN1CwU| build from this initial analysis using existing resources, t8ChOiC8| expertise, and discussions with City staff and the taSkf0rce, Fxn[sVO5 risks will be assessed in terms ofexpected severity and likelihood. Resource Conservation and Wetland Protection The City'SCoastal Element was comprehensively updated iO2001. It includes an exhibit of "environmental Iv SeO8it|V8 habit ts as depicted by the Department of Fish and Game" that is based OO information from the 197OSand only includes the southeast portion Ofthe city. AS part O[the G8ntC2| P|8O update, PK4C will conduct 8 b|0|0g|C8| survey to update exhibits that, consider such natural resources. �OUrCtS� Th3 majority of S9OSiUY8 habitats are G(OOg the CO8S� however, 1ht[8 is one created wetland inland iOthe S88diffcommunity, and there are other areas that may warrant recognition, such 8sthe eucalyptus grove 8tNorma Gibbs Park created for 00D8[Ch bU88d\ieS, in addition, the City is studying the 8OD8Xat}OO 01 the UOi000[p0[at8d B0|S8 Ch|C8 YVe#8Dd3 and SU[[0UOdiOg vicinity, totaling. about 1.500 8C[tS, for "he purpose 0fensuring long-term protection and restoration Of the area. Identifying opportunities for appropriate drainage control and runoff improvement opportunities will be performed C0U8CtiV9|y between the DOOsU|k0t team, Q1v Sta#, and the |008| C000UOity. K4O88tt & Nichol will develop 8 Citywide Urban Runoff K8sO8ge08nt P|8O (CURyNP) Mat will detail how HUOtiqgt0O 888Ch p|GOS to protect and improve water quality Of |Ood C083ta| resources. Moffatt & NiCh0[S 8*9OSiv9 8XptritOC8 in the city will 8U0w for the 98Sy id3ObUQatiOD of Grt8S in Ot9d of Sp9Si8| attention. K80ff8M & Nichol will work with City staff to d8V8|Op 8 program [00t9d in sustainable solutions that focus on di0|O8tiDg 8ddiMOO8| flow, 08xi0iZ|Og 0O-S|t3 n3ttntiOD/|OU|t[8UOD. and |qCOqpOnat|Og biO-retention features which offer Opp0rtUOiM8S for [U0Off 1re808O1 and 8Oh8OCe0tOt Of |008| |8OdSC8piOg. As detailed in Section 2. Moffat & Nichol will complete an extensive research program properly documenting existing C0OdiUOnS. develop 8 list of water quality improvement projects, and identify funding sources to help develop D99d9d system enhancements, Th8 CURN1Pdeve|0p8U in 2005wiU be revised 02 meet 0rexceed the requirements 0ithe |008| NPDES ptnDiL Information developed by Moffat & Nichol will also be used in the Genera' P|8D update process to -create polices that will p0000e water -sensitive techniques for flood control and stormwater management, helping the City to improve water quality and comply with its stormwater permits and state law while reducing flood risks. Market Trends and Fiscal Considerations Changes in public policies can have both direct and indirect impacts to the economic conditions and vitality in a city. Before developing alternative scenarios for a general plan, we conduct economic research and analysis to help ensure policy decisions take into consideration market and financial feasibility and risk, and we provide estimations on the economic and fiscal benefits of the alternative choices. These types of analyses lead to more informed policies, plans, and actions. The Huntington Beach General Plan Market Analysis will address the major forces that drive change in the community: (1) residential population and labor force growth; (2) overall economic trends that influence the future composition of jobs in Orange County; and (3) Huntington Beach's market position to capture a competitive share of growing sectors while maintaining strength in its existing key employment sectors. Stanley R. Hoffman Associates will complete a market analysis focusing on specific issues identified in Section 2. Stanley R. Hoffman Associates will also prepare a Fiscal Impact Analysis for the preferred General Plan land uses and up to two alternatives based on the analysis of current fiscal conditions. The focus of the analysis will be on General Fund revenues and costs, but may include other funds, such as the Gas Tax Road Fund, based on discussion with City staff. Circulation Huntington Beach's citywide traffic model has been used in numerous transportation planning applications over the past several years, including the recently adopted Circulation Element update. The model was certified by the Orange County Transportation Authority (OCTA) as meeting the consistency requirements for sub -area models in Orange County. The circulation work effort for the General Plan update involves updating the citywide traffic study completed in 2011 and using the information to assist in updating the Circulation Element as part of the overall General Plan update. Additionally, estimates of vehicle miles traveled (VMIT) will inform both the existing GHG inventory and the Sustainability Action Plan (SAP). As described in the Work Plan in Section 2, Stantec will perform the following steps: r' 1-12 Pr;( Sc for vl�j i,"''u;li•C,i tr Bead, pw • Update the citywide traffic model for regional and local consistency, and incorporate special analysis procedures into the modeling process. • Analyze future land use and circulation plan alternatives and work with staff to update the highway component of the Circulation Element. • Address specific transportation issues and prepare technical materials relative to the Circulation Element update. Provide estimates of VMT for existing and future business -as -usual conditions, and estimate VMT reductions attributable to proposed General Plan policies and SAP measures. The first of these steps will result in refinements to the current model. which was developed in 2007, and involves updating the baseline 2030 General Plan to reflect recently approved -projects in the city. The refined model will then be used to analyze land use alternatives for the General Plan update and to identify mitigation measures needed to serve future traffic demand. Refinements will assist in evaluating the type of climate change strategies being considered in the General Plan update. The primary transportation metric for GHG emissions is vehicle miles traveled, and reductions in VMT from specific land use and transportation strategies result in commensurate reductions in GHG emissions. Three major travel demand components are involved: • Trip generation • Trip length is Travel mode change The first pertains to the number of vehicle trips generated by specific types of land use. Density can be a factor, as can the mix of land uses (e.g., mixed -use development featuring residential and nonresidential land uses;, Strategies that use communications technology (e,g., telecommuting) to actually reduce the number of trips are an important emerging factor in this component. The trip length component pertains to the actual trip patterns in an area, which are influenced by factors such as proximity between residential and nonresidential land uses (jobs/housing balance, for example) and citywide geographic relationships between different types of land uses. Travel mode changes occur when walking, cycling, and transit ridership trips replace vehicle trips. These three factors tend to be somewhat interdependent, as for example when reductions in vehicle trip generation are due to more walking trips, and changes in trip patterns affect both trip length and travel mode. The most effective VMT reduction strategies involve transit -oriented development (TOD), high -density planning or smart growth policies, increased bicycle infrastructure, mode -share increase goals, and encouragement to increase transit ridership. For example, in Long Beach, the green shared arrow (sharrow) lane on Second Street, which is over half a mile long, resulted in a doubling of the bike ridership in the area. These types of strategies will be considered first because they are relatively easy to achieve in comparison to other alternatives and the City of Huntington Beach is currently pursuing some through the Bike Master Plan update. Another example is the approved Beach and Edinger Corridors Specific Plan, which would decrease 'EMT by increasing the residential density along commercial corridors, thereby encouraging shorter trips and placing future residents closer to transit stations and within walking distance of commercial uses. Fire and Police Services The PMC Team's approach to service level studies is to evaluate historic data, map relevant data, and discuss patterns with the departments and service providers. Matrix Consulting Group will use existing report information to map calls and service areas for the past several years. Throughout the effort, we will collaborate with the departments and focus on solutions. In our experience, emergency services personnel are focused on bringing needed resources to a call as quickly as possible and have most likely identified the things that slow them down. These same service providers are often the best source of recommendations; as they know the community and the demands on their services. Our task will be to ensure their ideas are represented in General Plan goals, policies, and programs. The City's current General Plan provides a sound basis for the update; however, it does not fully describe a community that is at the forefront of sustainability and environmental stewardship. PMC will lead an extraordinary team of planners, designers, and sustainability specialists to develop a plan that reflects the community s goals for the future. PMC will create a streamlined, illustrative plan that is easy to use during budgeting, capital improvement planning, and decision - making for discretionary projects. Key organizational and content changes will be ;rude that make the General Plan more readable and internally consistent. Our work plan begins with a review of the existing plans and resources identified in the RFP, identification of data needs, and research to fill any information gaps. We will prepare a Technical Background Report and update the existing land use survey, then facilitate a land use and circulation alternatives process grounded in research describing market opportunities. The alternatives process enables the public to directly influence physical and policy decisions, which we will summarize and vet with decision -makers as key policies. Only when staff and the '`r iof l;h o' Hundi ru!o(i B'eac P community approve of key policy direction will we write draft goals and policies. Along the way, we will identify potential inconsistencies with City design guidelines and zoning requirements. This transparent approach ensures that City staff, the City Council, and the entire community understand where the plan's vision and direction came from, and the reasoning behind the development standards and design guidelines that will implement the plan. During the course of the work program, PMC will prepare two administrative review drafts of the General Plan, a public review draft, a public hearing draft, and a final General Plan. We understand that City staff will prepare most General Plan exhibits and conduct most GIS analysis, though our staff will update GIS datasets as requested in the RFP and can be available to assist in exhibit production. Environmental Impact Report We understand that the City seeks to prepare a comprehensive program environmental impact report (EIR) for the General Plan update. The EIR should be just as user-friendly and accessible as the General Plan itself to promote maximum use of CEQA tiering and streamlining provisions in the future. We recommend crafting a self -mitigating EIR, and our approach embraces the practice of integrating the planning and CEQA processes, accommodates streamlined review of future projects, and identifies the environmental benefits of adopting the General Plan. As indicated in the RFP, a program EIR would be the most effective tool under CEQA to allow the City to achieve the goals identified above. Consistent with State CEQA Guidelines Section 15168, a general plan update falls within the types of projects that are considered appropriate to be evaluated in a program EIR. A program EIR is considered appropriate for "a series of actions that can be characterized as one large project and are related either: geographically; as logical parts in a chain of contemplated actions; in connection with issuance of rules; regulations, plans, or other general criteria to govern the conduct of a continuing program; or as individual activities carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways" (Section 15168(a)(1-4)). The advantage of a program EIR over a master EIR is that it does not need to identify specific projects at this time and does not require recertification every five years. Atkins, under the supervision of PMC, will lead preparation of the program EIR. Through previous work with the City on a variety of projects, Atkins has a comprehensive understanding of City needs and issues. The approach to the General Plan update EIR is designed to: Complement the General Plan community engagement process by informing the public debate of alternative General Plan policies or strategies. ; c' . na,'s.mr,"win. an .1 Ax_no ach Create a basis for an environmentally sound and self -mitigating General Plan update. ® Provide for streamlined environmental review for future projects consistent with the General Plan's and SAP's goals, policies, designations, measures, and actions. Achieve the highest standards for legal defensibility. Atkins will, prepare all required environmental documentation in accordance with CEQA, including a program -level EIR and any required technical studies in consultation with other members of the PMC team. The EIR will discuss environmental effects in terms of their severity and probability of occurrence. It will identify mitigation measures, as necessary, appropriate to a program -level EIR to minimize the significant effects of the recommended General Plan and SAP and will include an alternatives analysis. In addition to Atkins` experience, PMC has extensive experience preparing program EIRs. for General Plan updates, providing our team with a deep understanding of how to design the planning documents and the EIR to work well together. Our collaborative approach will provide efficiencies in our individual work efforts, while maintaining the added benefit of an EIR consultant with extensive project experience in Huntington Beach. Our joint contributions in preparing both the planning documents and the program EIR will allow us to gain a more comprehensive understanding of the environmental issues to be addressed in the EIR. At the same time, our team's collective knowledge of developing program level analyses and mitigation allows us to provide valuable input into the programs and regulations in the General Plan and SAP, allowing the plans to become as self -mitigating as possible. ATTACHMENT B Our proposed work program is presented below. For each task, products associated with the work to be performed are specified. We understand that the City expects to complete the General Plan update and EIR by April 2016 (30 months from project initiation). A schedule to complete this work program is provided at the conclusion of this section. NT111 11 a Task 1: Initiate the Project and Refine the Work Program 11 Kickoff Meeting, Bus Tour, and GIS Orientation Key members of the PMC team will! attend a half -day kickoff meeting. The 'Kickoff naliveraul,,fPes: K:f% uff me-` meeting provides an opportunity for all key City staff and consultant tearri bus tour, �na `GJS vv'ith members to get together and identify data Sources and other resources to be used 1'�!,�y '�,W,; in the prograrn, to brainstorm ideas, and to allow the Consultant team to enliance if the kickoff meeting, key members a n d a, v and bus tour our knowiedge of Hilluntington Beach. Following I ag of the consultant team and City staff will four the city to visit potential future itinerw-v n a s (e I e r i c development sites, verify existing planning and environmental conditions, and identify other locations that staff would like to address in the Genera, Plan update, SAP, and ElB. Following the kickoff meeting, PMC GIS staff and City GIS staff will meet to discuss abilities, resources, and mapping protocols for the project. 1,2 Develop General Plan Visual Identity PMC's graphic designers will create a unique graphic format and project branding eliverabms: Draft and fim to create a recognizable 'Identity for the project and garner enthusiasm and unity. This involves a process of translating community personality, local culture, and ,notify 0c, (electrunic). unique environmental attributes into a graphic language of fonts, images, colors, and layout concepts. This template is then used for all project products, including the website, meeting materials, and planning documents. 1.3 Prepare Outreach Assessment and Engagement Strategy PMC can provide community engagement support that fits the needs and available belfivutables: Outrea�,ii resources of the City of Huntington Beach. PWIC will create a community fio;,mn, draf" and engagement strategy based on an outreach assessment with City staff. This engagement strategies strategy will outline the timeline and scope of outreach and engagement activities, including the type, order, purpose, and desired outcome of each phase of outreach. At project kickoff, PMC outreach staff will provide City staff with an outreach assessment form that will gather key information from staff about past outreach successes and challenges in Huntington Beach, identify desired outcomes of the engagement process, and initiate identification of key VV dlAa j I quo stakeholders. The strategy will comprise proven outreach and engagement techniques, which could include the following, depending on consultation with staff and within the scope of the proposed budget: • Press releases to key local media ® Social media (support to staff for City or project Facebook or Twitter sites) A project website or a web page on the City's website (text support to City for project web page hosted on City website) • Online survey as part of City website • Project fact sheets ® Project boards, banners, or similar materials that can be used at City events and facilities • Key messaging for City staff and other City -identified project representatives • Stakeholder interviews and industry roundtables ® Facilitated small -group stakeholder discussions • Open houses, community workshops, or special events • Opinion/editorial pieces for local newspapers • Speaker's bureau training for GPAC members and key community leaders The strategy will also include a comprehensive list of project stakeholders and stakeholder groups, identified by working with City staff. The list of stakeholders will be used throughout the project as a basis for formation of any outreach efforts. This task addresses the outreach assessment and community engagement strategy. Outreach techniques and activities identified in the community engagement strategy will be completed as described in Task 10.2 of this work program. Task 2: Prepare Vision and Guiding Principles 2.1 Stakeholder Interviews/Key Community Themes Deliverables: Draft and final PMC will conduct up to 16 one -hour stakeholder interviews with at least one discussion questions "electronic;, consultant team member present at each interview. These interviews will allow for one-on-one in -person meetings or telephone interviews with stakeholders Participation in up to sixteen (16) identified by City staff. When interviewees represent similar community one -hour stakeholder Interviews; perspectives, interviews can also be conducted in small groups. Potential draft and final community themes interviewees include members of the GPAC, members of the Environmental Board, community leaders, property and business owners, relevant City staff, and others memorandum (electronic;). as needed. We also strongly encourage interviewing elected officials as part of the stakeholder interview process: PIVIC will work with City staff to identify potential 1 C j Prcr)csa; for City of cur din ton Beiad" questions prior to conducting stakeholder interviews. Final candidates will be identified in the community engagement strategy, Based on the results of the interview process, PMC will identify key community themes for the General Plan update in a technical memorandum to City staff. These themes represent the beginning stages of issues, goals, and policies for the General Plan. 2.2 Develop Community Vision PMC will coordinate with City staff to plan and facilitate a series of hvo visioning workshops to acquire community input on a vision for Huntington Beach's future. Participants will be provided with handouts and materials as needed to provide complete information and to facilitate meaningful participation. Workshops will be planned at two distinctly different venues in the community. Visioning input will be summarized in the form of a vision book. The vision book can serve as a statement of the direction that the community is moving toward and will help guide subsequent policy discussions. Task 3: Identify Community Issues 3.1 Collect and Review Existing Plans and Policies This subtask involves a coordinated data collection effort to ensure that all materials completed by City staff to date relative to the General Plan update are provided to the PMC team and to understand the sources, strengths, and weaknesses of the data. This data will provide the background information necessary to complete the General Plan, Sustainability Action Plan (SAP), and related technical studies. We will review the numerous documents, plans, and reports that describe and discuss the City's efforts in management, planning, and improvement in the recent past. This subtask allows the team to assimilate completed work, ideas, and efforts into the remaining portions of the General Plan update without duplicating past work. To support preparation of the SAP and the related elements of the General Plan, PMC will identify; collect, and review plans, projects, programs, activities, and accomplishments led by the City and/or key partners to achieve GHG reductions and/or sustainability goals. To support the GHG inventory analysis, we will review recent activities but go back to accomplishments since 2005 to the greatest extent feasible. We will quantify the GHG reduction benefits of programs, projects, and completed activities since 2010 consistent with standard practice for the SAP. 3.2 Identify Key Issues Based on work completed in previous tasks and preliminary findings of the technical studies outlined in Task 4, PMC will prepare a summary of key issues to be addressed in the General Plan update and in the SAP. Issues will be identified generally by General Plan element, beginning with an assessment of issues Dellvek ablees: Participation in two (2 visioning woorkshops; draft and final vision book i;electronic). Dterales: B; 'liography and refere U I'- of key data sources fe CAU- ici: `echnical rn,emorand� nF describing existing ac mplishmer t£ for the SAP ea�tr=„i�uj. Defrvera les: Doft and final key issues r iemi- randa (electronic). 2-3 presented in the current General Plan. PMC will dedicate several General Plan Advisory Committee (GPAC) and issue -based task force meetings and Environmental Board meetings, to developing and vetting these issues prior to drafting General Plan goals, policies, and actions and SAP measures and actions. Key issues will be presented in a technical memorandum to City staff; suitable for use as agenda material for the GPAC, the Environmental Board, and task forces. Task 4: Prepare Technical Background Studies and Report This task describes steps the PMC team will take to prepare various technical studies and a comprehensive Technical Background Report (TBR) to guide preparation of the General Plan, SAP, and Environmental Impact Report. The reports fisted below include all those identified by the City in the RFP, as well as a number of additional reports needed to complete the General Plan update. The overall goal of this effort is to identify and document baseline conditions and prompt discussion regarding development opportunities and constraints that inform General Plan policies. This goal will be achieved in a way that guarantees easy readability by any interested party. Information will be extracted from the TBR and presented in summary fashion in the appropriate chapters of the General Plan and/or EIR• As requested in the RFP, this task assumes consultation and collaboration with City GIS staff to prepare the majority of figures needed for the General Plan update and TBR. Our working scope assumes that an administrative draft of each peer review memo or working paper will be submitted to City staff for review and that PMC will produce a final product reflecting staff comments. We further assume that the City's General Plan project manager will provide one set of consolidated comments and that any conflicts among comments from multiple reviewers will be resolved by the City prior to providing comments. 4.1 Existing Land Use Survey Ueiivelabies: Lannd use sun,-Iy PMC will update the 2005 existing land use survey prepared as part of the Gpdate work plan (eleciF:.; Circulation Element update. Our proposed project manager (Jeff Henderson) daft and final existing i worked extensively with City staff to design and complete the original survey, and he will be integrally involved in the update. The update will consist of analysis of survey database and recent aerial photography; assessor parcel data, and ground-truthing via a documentation updates windshield survey aided by use of mobile GIS applications. (electronic,. Results o1 z => 1-wO n Pwill develop a wor MC, k plan for updating the survey and will review the work plan use survey will be summarized in with City staff prior to beginning the update. PMC staff will review the contents of the Technical Background RePoft the existing survey and update residential land use types based on available* development permit data from the City and review of recent aerial photography. descriLied in Tasks 41 through For commercial and industrial land uses, two PMC staff will conduct a field survey 4,114 of major commercial corridors and industrial areas. Existing land use codes, the 2 t''! u.,osQ for ,it'v o" j- u..initor, Fie,,Gt' number of stories, and estimated building square footages will be updated using an iPad-based mobile GIS application. PMC staff will assemble the updated data and forward a draft database to City staff for review and approval. The work scope assumes one round of revisions to the draft database in response to City comments. The resulting database will be returned to the City for use in the same projection and coordinate system as other City GIS data. PMC' will also update the survey documentation to reflect changes to the database. 4.2 Biological Resources Survey PMC will update and expand the exhibit of "environmentally sensitive habitats as depicted by the Department of Fish and Game" that accompanies the existing Coastal Element. As an initial step; PMC will work with City staff to define the scope of environmentally sensitive habitats. PMC will then conduct an inventory and assessment of environmentally sensitive habitats that occur within the municipal boundaries, with a particular focus on the coastal wetlands. PMC will undertake an intensive field evaluation of biological resources in the city. Sensitive resources will be mapped using Tremble GPS units with sub -meter accuracy. PMC will use aerial photos and existing GIS data to inform the field evaluation. Preliminary -identified GIS data includes: • California Natural Diversity Database (CNDDB) for threatened and endangered species • Geology • Soils • Hydrology (lakes and streams) • Topographic maps (United States Geological Survey (USGS) quadrangles) • National Wetlands Inventory • Federal Emergency Management Agency (FEMA) floodplains • Aerial imagery PMC will contact appropriate regulatory agencies to identify any additional biological baseline information not identified in previous studies. PMC will prepare a biological resources technical report. The report will describe the regulatory context of sensitive biological resources, environmentally sensitive habitats, and other sensitive resources in the city, including wildlife and plant species. The report will also present opportunities available to the City to protect and improve identified resources, including wetlands. Maps presented in the report will also be provided to the City as shape files in the projection of the City's GIS system. DeF ambles; F 1C will document "'Ne ='ieh,,)del„g€,s and fincngs o e Diologic = resources survey in u: zerJnnicai -=poi, The technical ;ep , will be incorporated in the T,lechnir:c:1 Background Report ,s,._-Fbed Tasks 14i.12 through r1 1W Delliv rables, S1V & N L ill summarise analysis and conclusions for fine SLR l€saraf i `t,' h-,sess,s en in a tec€ inical report, The technical report will be Incorporated in The Technical Bac ".ground Report described in Tasks 4.12 through 4.14. 4.3 Sea Level Rise Vulnerability Assessment Moffatt & Nichol (M&N) will prepare a Huntington Beach —specific sea level rise (SLR) vulnerability assessment to support the General Plan update. The SLR study will be prepared as an early item in the work program, so that it can support development of land use and circulation alternatives. A scope of work for a related Coastal Resiliency Plan is provided as Task 11.1. Gather/Review Existing Data. The first step in the SLR vulnerability assessment will be to gather the best available topographic and bathymetric survey data. The following data types/sources have been identified and would be used to create a seamless digital elevation model (DEM) for the study area: Coastal Zone topography: 2009-2011 California Coastal LIDAR Project DEM Bathymetry: 2009 USACE Southern California'Bathy LIDAR Upland topography: 2008 USGS National Elevation Dataset (NED) In addition to near -shore bathymetry, measurements of recent profiles along the city s 9.5 miles of coastline will provide a critical data set for assessment of shoreline vulnerability to wave attack for various water level scenarios. The most recent beach profiles (40 total along the city shoreline) were surveyed in 2010 under a contract from the US Army Corps of Engineers — Los Angeles District. M&N has this survey data on file. M&N will review maps, surveys, drainage reports, and land use plans and will conduct a visual assessment of existing conditions to identify potential vulnerabilities for different reaches of the city°s shoreline. Summarize Current Scientific Guidance for Sea Level Rise Projections Over Next 100 Years. M&N will review relevant SLR scenarios, including those prepared by the National Academy of Sciences, California Climate Action Team, US Army Corps of Engineers, State of California, IPCC, Rahmstorf (2007, 2009), Canada, England, and the Netherlands (Delta Commissie). These scenarios will be compared and contrasted in a report that culminates with recommendations of SLR scenarios for use in planning, with an emphasis on State of California requirements to be used in subsequent tasks. Other climate change parameters will include potential changes in precipitation, frequency of storms, ocean temperature, and wave climate. Prepare Geo-Referenced Inventory of infrastructure Potentially Affected by SLR. Working in collaboration with City GIS staff, M&N will prepare a geo-referenced inventory that will include, though may not be limited to, beaches, the pier, roadways, pedestrian and bike paths, parking lots, buildings, the small -craft harbors, shoreline protective devices including seawalls and bulkheads, utilities (e.g., flood control channels and storm drains, sewer), and wetlands. M&N will add available attribute data relevant to future SLR vulnerabilities to infrastructure (e.g., critical elevations, structure types, year built, replacement cost, and condition). This analysis will use and build on existing GIS data provided by the City and will be prepared using a consistent horizontal and vertical coordinate system. M&N will prepare rnetadata for each feature class to allow data to be efficiently used in the future. Using this information. M&N will prepare a baseline assessment of coastal conditions alona the shoreline reaches, including specific evaluation of beaches, hardened shoreline, structures, and other environmentally sensitive areas. Model SLR Scenarios in Conjunction with Other Coastal Flooding Factors. Using the scientific basis developed in previous tasks, M&N will evaluate the impact of projected climatic changes on each planning area. The evaluation will be based on guidance provided in the State of California Sea -Level Rise Guidance Document and as recommended by the California Ocean Protection Council on Sea Level Rise. The current approach, which is consistent with California Coastal Commission guidance, is to evaluate impacts for three scenarios of future sea level rise (low, medium -projected, and high) under three planning horizons (2030, 2050 and 2100). At the outset of this task, M&N will review SLR and coastal flooding models prepared by others (i.e., NOAA, USGS) and use data from these studies as appropriate. M&N will apply publicly available shoreline evolution models, in both the alongshore and cross -shore directions, to model ranges of coastal erosion and flooding along the study area considering a number of synthetic total future water levels. Our work will begin with an initial planning -level model that evaluates the erosional or accretional tendencies of a beach in the cross -shore direction (i.e., onshore, offshore) which is a function of the wave conditions and the amount of energy delivered to the beach. A recent Shoreline Equilibrium Model developed by Yates (Scripps Institution of Oceanography 2009) is an informative and powerful tool to predict shoreline position based on the incoming wave field and the potential shoreline response associated with rising sea levels. M&N will use this model to identify vulnerabilities associated with both changes in wave climate and SLR. On a more refined scale, M&N will model flooding and inundation within identified planning areas using a combined suite of models that transform offshore storm conditions (e.g., wind field, waves) into the nearshore zone, applying various SLR water level scenarios. To analyze realistic storm and erosion scenarios, M&N will use a nested -model approach. The Wave Watch III model will be used to generate offshore wave conditions from meteorological data. The resulting deep water wave field is then transferred to the nearshore zone using the SWAN or Delft3D nested models. Nearshore wave boundary conditions are then applied to nearshore Work .' ai': r :' SC! odu f, 2 P�- surfzone and swash zone conditions using the XBeach model, which assesses nearshore erosion and flooding potential. XBeach models wave propagation, long waves and mean flow, sediment transport and morphological changes of the nearshore area, beaches, dunes and any back -barrier during storms in two dimensions. This nested model approach is similar to that applied by the USGS for regional SLR vulnerability assessments. Our approach will include greater detail at a citywide scale based on our knowledge and experience with coastal processes along the Huntington Beach shoreline. Synthetic future water levels would include various sea level rise scenarios, coastal storm waves; astronomical tides, and noritidal residuals (wave setup, storm surge, and decadal water level anomalies including El Piing and ENSO events). M&N will "calibrate" these results based on anecdotal and/or photographic records of coastal erosion and flooding and run queries of infrastructure data to determine the number and estimated cost of various synthetic total water level scenarios. In addition to vulnerabilities along the City ocean shoreline, other existing flooding vulnerabilities will be exacerbated under future SLR scenarios. M&N will analyze flooding along Huntington Harbour and Pacific Coast Highway during high tides and high rainfall events. Low-lying areas within the City are also vulnerable to high rainfall events and limited storm drain pump capacity into the flood control channels. To analyze potential effects in these areas, M&N will use the XP-SWMM linked "xp2D" numerical model. XP-SWMM uses a two-dimensional (2D) analytical module to route surface flood flows based on the TUFLOW program, which then links dynamically to the 1-dimensional (11D) EPA SWMM5 module to estimate flows within pipe networks and drainage structures. The xp2D model has been approved by FEMA for 2D flood modeling and mapping for the NFIP since 2011. M&N will use this model to map flooding vulnerabilities for various future SLR and storm combination scenarios. M&N will also review tsunami inundation results from existing studies (e.g., California Geological Survey, FEMA) and correlate results with recent publicly available tsunami -inundation model studies conducted in the region by M&N. M&N will also consider upland flooding from heavy precipitation and related storm drainage, in coordination with Task 4.4. This effort will identify impacted stormwater infrastructure for the various :eater level scenarios, Conduct SLR Vulnerability Assessment. In consultation with City staff, M&N will prepare SLR vulnerability assessments for the city as a whole or focused sensitivity and risk analyses for specific areas. The SLR vulnerability assessment will build on efforts described above and will be performed in accordance with the State of California SLR Guidance Document. SLR vulnerability assessments will be conducted for each of the infrastructure elements identified in previous tasks. 1-8 Pro sad fo) iN oHun iri ur- ^ea,',h Aw Sensitivity assessments will consider how sensitive a planning area is to projected effects, as well as its capacity to adapt to those effects. Finally, risk assessments will consider the consequence and probability of a given effect for each planning area. Based on the vulnerability of each planning area to projected climatic changes, priority planning areas will be identified per the procedure described in the SLR Guidance document. Identify Appropriate Adaptation Policies. A key part of the vulnerability assessment will be the identification of appropriate adaptation policies that may be considered for inclusion in the updated General Plan and/or Coastal Land Use Plan. Key elements of this task include reviewing existing studies and adaptation policies implemented elsewhere; providing examples of adaptation strategies for the vulnerable infrastructure categories identified in the study area; ensuring that policies are appropriate for inclusion in the GP and Coastal Land Use Plan; and ensuring consistency with California Coastal Commission criteria. 4.4 Urban Runoff Impact Study M&N will prepare an urban runoff impact study to support the General Plan update. Steps to complete the study are outlined below. Gather/Review Existing Reports and Data. M&N will review existing reports and data relevant to the Citywide Urban Runoff Management Plan (CURMP, 2005). A tentative list of review items includes the CURMP; Storm Drain Master Plan (2005); Urban Water Management Plan (2010); Urban Stormwater Runoff NPDES Permit Local Implementation Plan (2011); NPDES Permit No. CAS618030, Orders No. R8-2002-0010, R8-2009-0030 (amended R8-2010-0062); the 1996 General Plan; GIS data; and maps, surveys, and land use plans. M&N will conduct a visual assessment of existing conditions of potential large- or small-scale water quality projects based on the CURMP recommendations and revised development plans in and around the city. M&N will meet with City staff and interested stakeholders to download updates on projects, developments, and water quality or water use initiatives, and will meet with OCSD to identify viable alternatives to the current Dry Weather Urban Runoff Diversion program. Identify 'Water Quality Projects and Funding Opportunities. Drawing on the data gathered above, M&N will identify water quality projects on a small- and large- scale and propose revisions to the CURMP consistent with the updated list of projects. As part of this analysis, M&N will identify funding opportunities for the proposed water quality projects and propose revisions to the CURMP to modify or adjust the current list of possible funding sources. Revise CURMP to Meet NPDES Permit. M&N will revise the 2005 CURMP to meet or exceed the requirements of NPDES Permit No. CAS618030, Order No. R8- ta6,=e; I;1:'J will prepare ad, � ..is trati ve dr£ =, draft, and aI a°f a CURf~u'`sP. ray s ;rill be s nrn $riw. sd in th, Technical F clv� ou d -,a1prjrt described in Task,112 t muq'i 4.14, v,%i.7 k . x" and Rc ;.',dfle '; %A — Deliverahies: PMC will summarize the GHG inventory, forecasts, and reduction target recommendation in a technical report. The technical repo3# will be incorporated in. the Technical Background Report described in Tasks 4.12 through 4.14. 2009-0030 (as amended by R8-2010-0062). This will include a revision to the Water Quality Element of the CURMP to include: II Regulatory environment updates. • Revisions to Citywide Source Control Programs, as applicable. • Revisions for major projects, and.applicable NPDES requirements for those developments. II Revisions to phasing/program implementation/monitoring of program elements as necessary. Revisions to funding opportunities. 4.5 Greenhouse Gas Emissions PMC will prepare a community baseline GHG emissions analysis, forecast GHG emissions, and recommend a GHG reduction target. These items will serve as the technical foundation for the SAP and will support technical analyses for the General Plan update and EIR. The baseline inventories will adhere to established protocols, including but not limited to the California Air Resources Board (CARB) Local Government Operations Protocol (LGOP), the US Community Protocol for Accounting and Reporting of Greenhouse Gas Emissions, and methodologies recommended by The Climate Registry. We will use PMC's MS Excel -based Decision Support Tool for this task. The Tool integrates the baseline inventory, emissions forecasts, reduction targets, reduction measure quantification,, and reduction measure implementation, monitoring and reporting. The Tool is the repository for all activity data, calculations, emission coefficients, sources, and assumptions used in the calculation of greenhouse gas emissions. We have designed a tool that a€lows for the transparent calculation of GHG emissions in a manner that is accurate and accessible to City staff. This approach eliminates the "black -box" risks of proprietary tools since Excel is common software used by municipalities. Our Tool is consistent with the current industry protocols and practices and allows modification in response to unique existing conditions. For example, the analysis of GHG emissions for the transportation sector of the inventory will follow the industry preferred practice of analyzing vehicle miles traveled (VMT) with consideration of origin and destination of trips (relying on Stantec's update to the traffic model), which accurately present emissions attributed to activities within the City's control and excludes through travel on freeways and major roadways, Baseline Greenhouse Gas Emissions inventory. The purpose of the community inventory is to present the major sources and quantities of GHG emissions caused by activities within the city. The inventory will provide a baseline against which future progress can be measured. The community inventory will use a jurisdictional approach to identify community emissions caused by activities within the City boundary and those within the City's jurisdictional control. Consistent with industry practices, this allows the City to account for GHG emissions that are caused by activity within the jurisdictional boundary where the direct combustion of fuels or emission of GHGs takes place outside of the boundary. We will prepare a 2005 and current year (2010-2012) GHG inventory, and forecast emissions to 2020, the General Plan horizon year, and 2050. The 2005 inventory will provide a baseline year that is consistent with analysis of statewide emissions and forecasts as directed by Assembly Bill 32 (AB 32). The current year inventory will provide existing emissions for consistency with the baseline year of the EIR. We will also benefit from the comparison of both years during policy and GHG reduction measure development. The inventories will include emissions from key sectors, including energy; transportation; waste, water; wastewater, stationary sources; and other sectors as applicable. The three most common GHGs presented in community inventories are carbon dioxide (CCL}; methane (CFI.), and nitrous oxide (N 01. [n addition to these three GHGs, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF,) may be identified if sufficient use data is available. All GHGs analyzed are converted to equivalent carbon dioxide units, or CC;e, based on global warming potential (GWP). Equalizing GHG emissions as CO;e allows for the consideration of different GHGs in comparable terms. We will collect and analyze activity data for all sectors, using data consistent with other sections of the TBR. PMC anticipates assistance from City staff to confirm emissions sectors, provide sources of information, and confirm the jurisdictional boundary of the inventory. PI IC will lead data collection and analysis. Sectors and their associated activity data, provider, and scope are summarized in the following table. Ovk) am S,,h ,, . e: - AV Electricity California Edison Residential - - - -- .,-Southern ..-__-...._..._._...._..j_..._....___1_._... Natural Gas Southern California Gas 2 ........ _........... _..... _ . _ __.... _ .._.._. _.... _..._. _. __ Electricity __.. ....._- Southern California Edison 1 Commercial/ Industrial .... ....... . ... _ . __....._ _..__. ___-._ ...... _...... ___ _.___.____..__..._ _ --.-._._.__. Natural Gas Southern California Gas ... _...... __...__- ............... ..___... __......__._---...-. 2 ...... _............ -.... _._.....__.__..... _._....... __...-__._...._......---.... Transportation _.__... ....._.__... _____ _.__. _____.__._____;__._ On -Road VMT - ... _.......... _.... ..... ........... _..... __................. ___ Citywide traffic model ? _.... ............... _...____..... _.......... _ ... .......... .......--- 1 _. __..... _..--_......_..... ...._.. __.... ...... ........ ............... Community Waste CalRecycle 3 Waste Community Alternative Daily Cover CalRecycle ............ ..... ___...__..._.__...__.._..... 3 —.r...._..._._._..._.__-_ Direct Landfill Emissions ___._._.......---.____......__..._.__....__...._ CalRecycle _........... _...__.....___..._ :. . _......__-..__..-.._..._E. .._...... 1 ....... _._...... ... .. ..............._.......... _.... __....._...__.._,._ _..._. ..... .. ._ .................... ........ .... ..........._ ._ ............_ _ ..... ....._.._._.... - ........ __.. City Water Division Water ' Gallons Metropolitan Water District 3 Municipal Water District -Orange County _...._................ .._. ..... . .............. ....... ... ... .... ..... ._............ _.... ......_.._.................. Off -Road Equipment and ._...__ _ _.... ..__..._...................................... Diesel CARB OFF-ROAD2007 __...__.._.._..._ __..______-__..._._._-__....... -...... ... 1 Vehicles Gasoline CARB OFF-ROAD2007 1 ....... __.....__.... _............ _----..__._.--------..._...-----.__ South Coast Air Quality Stationary Sources Major Industry Management District, Air Resources 1 Board i Results will be presented in the Technical Background Report. In addition, PMC will summarize statewide and regional GHG inventories and present the federal, state, and local regulatory framework related to climate change and GHG emissions. GHG Emissions Forecast. PMC will develop business -as -usual (BAU) emissions forecasts for 2020 and for the General Plan horizon year across all sectors contained in the inventory. These forecasts will allow the City to demonstrate consistency with AB 32 (by 2020) and can support preparation of the GHG section of the General Plan CEQA documentation. Future year forecasts will rely on population, jobs, and household projections consistent with the General Plan update and EIR. GHG Reduction Target(s). PMC will recommend feasible GHG reduction targets for 2020 and the General Plan buildout or horizon year that respond to the emissions profiles identified in the inventory and forecasts. The targets will reflect guidance from CARB; the Governor's Office of Planning and Research, the South Coast Air Quality Management District, the AB 32 Guidelines and Scoping Plan, and State CEQA Guidelines Section 15183.5. PMC anticipates coordination with City staff, E Pin-, s<r' fc itr ; iirri.;r W ,rr pl,/ the GPAC, and the Environmental Board during the selection of GHG reduction targets as part of Task 5. 4.6 Market Trends Analysis Stanley R. Hoffman Associates (SRHA) will prepare a market trends analysis addressing the following major forces that drive change in the community: (1) residential population and labor force growth; (2) overall economic trends that influence the future composition of jobs in Orange County; and (3) the market position of Huntington Beach to capture a competitive share of growing sectors while maintaining strength in its existing key employment sectors. The market analysis will include the following steps: ® Prepare a baseline target industry and demographic analysis. Analyze current and projected market conditions for new development. and Huntington Beach's competitive position in Orange County. ® Define and analyze economic zones within Huntington Beach that exhibit clusters of economic strength and job growth potential. ® Define the criteria that will provide the benchmarks and economic indicators to evaluate future performance and success of General Plan economic development policies, such as an increase in certain types of employment and wages, better jobs/housing balance, and fiscal revenue benefits. Stakeholder/Key Leaders Interviews. SRHA will conduct interviews with key stakeholders and community leaders to help prioritize the major economic issues that should be addressed during the study. Many of these interviews may be conducted in conjunction with those specified under Task 2.1. Stakeholders may include members of the Chamber of Commerce and representatives of the Automobile Dealers Association, the Association of Realtors, the Visitors and Conference Bureau, and other key organizations and leaders. Target Industry and Projections Analysis. SRHA will conduct a target industry analysis, working closely with City planning and economic development staff. This will include analysis of strong, medium, and weak sectors of the community and the regional economic base. Economic Development Key Industry Analysis. This subtask will address the level of job base diversification in the city and will build on the latest wage and employment information for Huntington Beach, Orange County, and the west Orange County subregion. Real Estate Market Study. SRHA will contact knowledgeable brokers, developers, expert practitioners, and selected representatives to ascertain their experience in the local real estate market and their view of future economic development 0 & -eJ'a lea, SlRHA will sz E .,rt rize s e market trends analysis in a . shnical report. The ,-,chh-iiCal will be ncnrM4=rated in the Technical Background ' ,port described in asks ', 4.14. rW opportunities. The market study will analyze the potential mix of supportable residential (both single- and multi -family units) uses, commercial/industrial and retail uses, professional and medical office uses, and local services. Identification of Economic Zones for Analysis. In coordination with economic and planning staff, SRHA will identify the major economic zones of the city. To the extent that the city has a vacant or underutilized land inventory, this information would be summarized by, economic zones to identify the possible locations of potential development opportunity sites. The existing land use survey described in Task 4.1 can be used to identify vacant sites by zoning district for this purpose. Preliminary Range of General Plan Projections. Since the most recent forecast of growth was completed in 2010, SRHA will prepare a range of preliminary residential, population, and nonresidential forecasts for use in preparing the General Plan update. SRHA will work closely with the demographic research being conducted by the Center for Demographic Research and the most recently adopted SCAG 2012 RTP forecasts Retail Capture Analysis. SRHA will prepare a retail capture analysis where the existing and historic household expenditure potential will be compared with historic taxable retail sales data for Huntington Beach. A capture analysis compares the retail sales potential of different retail categories by local retailers with the household expenditure power of local residents. The retail capture analysis will establish Huntington Beach's strengths or weaknesses relative to particular retail categories. 4.7 Circulation System Modeling Deli era fes, Stantec wih Stantec will update the citywide traffic model for use in the General Plan update summarze existing &-uilation and to support preparation of the SAP. Steps to update the model are outlined q!"� p be l ow. conditions axed pri,/:�Fd4* docureraation for the, updated Develop Analysis Procedures. This task will establish.the context for the traffic ;rz,ffic; model as a technical report. study and define the methodology and procedures to update the traffic model in order to provide data consistent with the environmental consultant's needs for The tee rni° i ref3;xiil be addressing the GHG legislation (AB 32 and SB 97) and in updating the 2030 traffic incrp_qrate l fF3 the Tecitr€ical model to the desired future horizon year (2035 or 2040). Backar ound RE'.-o: 4 de ci ibed in Update 2030 Model. This task involves updating the future baseline version of the Tasks 4.12 throng" 4. 4. model to a 2035/2040 forecast year. Minor updates to the model include incorporating the latest approved projects into the land use database and performing network changes to achieve consistency with the latest version of OCTAM and the MPAH. A check will also be made on the regional highway forecasts against the latest OCTAM forecasts. The updates and refinements will be documented in a supplement to the traffic model description report (Austin -Foust 2- i 4 Pt ;n«sak t i tilt if "iz: l' ' 4Al Associates 2009). The work product from this task will be the refined baseline data for the current General Plan. Refinements to the traffic model will address the type of strategies being considered for reducing GHG emissions, with specific emphasis on trip generation, trip length, and travel mode change. Inputs will be specified at the trip generation and trip distribution stages of the model, resulting in changes to outputs from the vehicle assignment stage in which roadway traffic volumes and VMT data is produced. The assumptions and methodology used in this update and refinement will be documented as a supplement to the existing comprehensive traffic model description report. Develop Future Modeling Scenarios. In this task, Stantec will work with City staff to define three land use/circulation alternatives for testing and use the HBTM to evaluate the traffic impacts and benefits of each alternative: Stantec will evaluate the vehicle trip generation of each alternative, incorporate the land use and circulation alternatives into the traffic model, and produce the forecast data using the procedures defined above. Preliminary ADT and ICU analysis will be performed and the results shared with the consultant team to allow for refinement of the alternatives. 4.8 Fire and Police Service Study Matrix will prepare a service level study for fire and police services that examines existing levels of service, response times, and response time goals, and will identify any changes needed to accommodate future growth. Fire Services Study The following paragraphs describe tasks Matrix will complete to support the fire services study. ldentlfy Key Issues. The purpose of this first task is to develop an initial understanding of the major staffing, operating, management and programmatic issues facing the Huntington Beach Fire Department. Matrix will develop this initial understanding of key study issues by conducting individual interviews with the City Administrator, the Fire Chief and top management staff in the Department, and representatives from the collective bargaining unit. These initial interviews will focus on perceptions related to service levels, costs, programmatic and management issues within the Department. Issues reviewed will include key service or operating issues facing the Department and the City, and the impacts of growth in the city as they relate to changing service level expectations and demands. Matrix will also document key population, demographic and economic characteristics and trends in the city. Based on the results of these interviews and D eflv r f �js..4,strix will and ic-s lar the fire and police servi-ce levei s�.-Jdy as a technical repo M.. T lie, technical report will be :orporm.ad in t e Technical Back -round Report described in srh- ugli4.14. 'ivrarY. -iCan and ScP'.'d i!: 2-15 fI✓ initial data collection, Matrix will' prepare an issues list to guide subsequent analytical steps. Fire Department Profile. To provide a basis for subsequent analysis, Matrix will develop a detailed understanding of all aspects of the current organization and operations of the Fire Department. The principal focus of this informational foundation will be the functions included within the scope of this study. Following are the nature and type of data we will collect in developing this initial detailed inventory. Develop an understanding of the risks facing the Department and their approaches to dealing with them Matrix will interview Fire Department management staff to develop an understanding of the level of fire and other emergency risks that are targeted and tolerated by the City. Concurrently, Matrix will develop an understanding of the service levels targeted by the Fire Department. At a minimum. these measures would include targeted response times, company staffing and standard response policies by type of call; historical fire losses, levels of training needed to support the effective response to various emergency incidents, and the extent to which risks are formally addressed through enhanced codes and ordinances. Document the overall departmental plan of organization and staffing Through interviews with the Fire Chief, command and support staff, and review of available organization charts, shift schedules, and other relevant documents, Matrix will develop a detailed understanding of the current plan of organization and staffing to include organization structure: number and type of staff assigned to each engine and truck company; approaches to scheduling, current staffing philosophies and review of the employee contract to include approaches to minimum staffing by station, unit and shift; basic job responsibilities and work time allocations of all administrative and command staff and other administrative and support personnel; and basic lines of responsibility and authority running through the organization. Develop a detailed understanding of the current fire suppression and emergency medical services network Through interviews and review of key operating and response policy documents, Matrix will develop a detailed understanding of the existing fire suppression network and service structure to include location and related response area for each station and unit; age, basic characteristics, and any capital improvement needs associated with each of the stations in the existing network: any plans to adjust the deployment of staff or unit resources or locations; assignment of staff and apparatus; and basic response policies to each type of call received by the Fire Department. This would include the number and type of apparatus dispatched pv,, by call type; staff resources dispatched by call type; and involvement in emergency medical responses. Matrix will also evaluate response characteristics and deployment of staff resources to provide emergency medical services in the city; current approaches to handle fire dispatch and communications, including the use of emergency medical dispatch protocols; and the most recent ISO rating, together with developing an understanding of deficiency points assessed. Document the City's and the Department's approach to fire prevention services Through interviews with Fire Department staff, analysis of existing codes and ordinances, and discussions with planning and building representatives of the City, we will focus on understanding all aspects of the Department's current approach to fire prevention related services. This will include developing a detailed understanding of the organization and responsibilities of the Department's fire prevention services to include staff time allocations and assigned responsibilities involving inspections; plan checking; public education, and other fire prevention related activities, as well as responsibilities for fire investigation. Matrix will evaluate current philosophies and contents of codes and ordinances related to "building in" fire protection in the city to moderate future demands for fire suppression resources; the role of fire suppression personnel in the Department's overall fire prevention program to include company inspection policies and inspection frequencies, and other relevant activities in the fire prevention areas accomplished by fire suppression personnel; and assess the integration of fire prevention and other programming into the City's overall risk management program. Document the nature and scope of internal training programs and philosophies as well as the Department's personnel management systems Matrix will document the basic assignment of training responsibilities for training personnel and unit officers; the Departmental training philosophy; approaches currently employed to evaluate individual staff member and company proficiency as part of the overall training program; and approaches utilized to attract, recruit and retain employees in the Fire Department. Document characteristics of current departmental hazardous materials control and response capabilities Matrix will document any issues related to how City and regional activities are coordinated with the Fire Department (e.g., permitting and regional response capabilities); how the Department's initial response units are utilized, trained and supported; and how the response and planning functions are regionalized and supported by the Department. d,,.,, D,an, SriC SC'r.,., pl,/ Develop a detailed inventory of facilities, departmental apparatus and thoroughly document existing approaches and philosophies related to apparatus replacement Matrix will develop a detailed inventory of existing facilities and apparatus; thoroughly document existing departmental and City approaches to replacing fire apparatus to include financing approaches, timing, and other relevant information; and document vehicle replacement/purchase needs over the next ten years to include vehicle type, timing, anticipated cost and, as noted above, current financing provisions. Develop a detailed portrait of fire and emergency medical services workloads and service levels in Huntington Beach , To provide a basis for analysis of the efficiency and effectiveness of current fire suppression, EMS and support operations, Matrix will develop a detailed understanding of both service levels and demand for service currently experienced by the Department. On a city-wide and station -by -station basis, Matrix will develop indicators of call and unit response volume by major call type over the last five years. Once collected, these data will be analyzed to assess the extent to which various types of demand for service are changing in Huntington Beach. Matrix will develop a detailed understanding of the response requirements and plan of the Fire Department, including the number of units dispatched by type of call, how units cover each other when multiple units are required and the deployment and use of staff in support of ambulances. Through analysis of dispatch records, incident reports, and other appropriate documents; Matrix will develop a detailed profile of calls handled by the Department to include response times for all calls, by type of call and priority; amount of clock and staff time required to handle each call type; the number of units dispatched by type of call; the incidence of automatic and mutual aid in responses; and how runs are distributed, by unit, by time of day and day of week. Matrix will also document the workloads of other functions included in the scope of this study, including fire prevention and education, training, and administrative functions. Once these initial data collection activities have been completed, the Matrix will prepare a detailed written profile which presents our understanding of the Department's current approaches to operations as defined by each of the areas listed above. This profile will be circulated among departmental management and other personnel, as appropriate, for comment and tc ensure the accuracy of our understanding. E r%i! .F;;d T ;3 i; CY i t Hur'i(n t'.F rl vet .<<. Compare to Best Practices and Peer Cities. The use of "best management practices" analysis is topical in the analysis of public and private sector agencies today. Matrix will develop a detailed list of best management practices for use in a diagnostic assessment of each service function in the Fire Department. This diagnostic assessment would be developed to identify those areas in which the organization was meeting targeted service delivery objectives or standards of service efficiency or effectiveness. Matrix will use the data collection activities conducted in previous tasks to assess the degree to which services or service levels conformed to the benchmark. Each service area diagnostic element would consist of a definition of the service level, efficiency or deployment target, a description of the current performance, Identification of areas which meet or exceeded the target(s), and identification of areas which represent improvement opportunities. As part of the professional standards assessment, Matrix will review the current professional literature describing various performance standards and objectives in Fire Departments across the country including, but not limited to standards from the Commission on Accreditation of Ambulance Services (CAAS), Commission on Fire Accreditation International (CFAI), Insurance Services Office (ISO), and National Fire Protection Association (NFPA). Matrix will also develop a list of at least six benchmark communities against which to compare the Fire Department's management, organization, staffing and operations. Evaluate Service Level and Resource Issues. Matrix will evaluate a full range of issues impacting the effectiveness and efficiency in the Fire Department using the following approaches. Matrix will compare projected call and service demand for the existing field units and isolate: (1) any current low volume areas where growth in the future is expected to be relatively minimal; (2) current high volume areas where service and workload demand may increase in future years (out through a 10-year projected planning period); and (3) low volume areas which may expect significant increases in service demand in future years. Based on the analysis, Matrix will identify opportunities for changes in resource deployment and assess their cost and service impact in terms of current staffing; apparatus, and station requirements. Matrix will use a GIS location model in conjunction with the analysis. Matrix will evaluate existing response and service level policies in light of actual service demand faced by the Fire Department. We will identify opportunities to modify service policies (response time for selected types of calls and selected areas; response to non -emergency calls, etc.) and evaluate the impact of p", modification on costs and departmental demands. We will evaluate trade-offs between modification of current service levels\ or projected future service level targets and operating costs. Based on an understanding of demand and field unit deployment, Matrix will evaluate existing company staffing policies, unit deployment and response approaches, identify opportunities to reduce costs or improve staff utilization or service through adjustments in those policies, and analyze opportunities to adjust the mutual aid and automatic aid response system in the region. We will assess the impacts of any changes recommended as a result of this analysis upon fire ground management and the ability to effectively respond to simultaneous suppression calls. Matrix has a comprehensive analytical, statistical and GIS-based approach for assessing the impact of various station locations. Matrix uses a process that examines the ramifications of station locations and unit deployments across a wide range of potential deciding factors, including ability of the system to place at least one unit on -scene everywhere in the City within defined performance standards, level of station coverage overlap, level of personnel overlap, and impact on average travel time for the first -due unit. Matrix will also assess the following programs and activities in this task through interviews, data collection, and review of policies and practices: Fire prevention and code enforcement policies and programs Fire prevention -related codes and ordinances and fire prevention activities of the Department can have a major impact on resource requirements. The purposes of this portion of the task are to thoroughly evaluate existing fire prevention policies, plans and operations, and to identify improvement opportunities. Evaluate hazardous materials management programs This analysis includes alternative level responses, capabilities and equipment / apparatus, as well as planning issues, program management; and coordination with other agencies. This will include an assessment of the City's participation in the regional service delivery network. Evaluate emergency management issues and opportunities This will include an assessment of the Department's ability to provide services under the City's emergency preparedness plans, and to assess the Department's current efforts for seeking available grants from federal and state providers. This will include an assessment of current emergency plans, their comprehensiveness, coverage of weather; emergency, hazardous materials; nuclear plant and other foreseeable events. PiN Evaluate fleet and apparatus replacement plans The project team will focus on evaluating the cost-effectiveness of the current approach to maintenance of fire apparatus. In addition, the project team will assess current fire apparatus replacement Planning — specifically as it relates to the current Capital Improvement Plan. The product of this work will be a detailed review of current approaches, staff utilization, programs and coordination approaches relating to each of the support and program areas listed above. Current performance levels would be described in each service area, issues identified and alternatives assessed. Reporting. Completion of all the tasks listed above will result in the preparation of a technical background report summarizing issues and study recommendations. The report and the associated implementation plan will consist of the following: An executive summary of all key findings and recommendations, including the assessments of current and projected staffing needs. A detailed set of recommendations addressing each are of the study; specific work steps required to implement each recommendation; recommended timing for implementation; recommended responsibility for implementation; and any costs or savings. A detailed capital improvement plan addressing any recommendations regarding changes / additions. Police Services Study The following paragraphs describe tasks Matrix will complete to support the police services study. identity Altitudes Toward Existing Programs, Services, and Needs. To fully evaluate the issues facing the Police Department, as well as to identify the needs related to the delivery of law enforcement services in Huntington Beach, Matrix will need develop an in-depth understanding of attitudes towards existing service levels and the unique characteristics of policing programs and community protection needs. To provide this level of understanding, Matrix will interview the City Administrator, top management in the Police Department, and members of the collective bargaining group. These initial interviews will focus on determining individual attitudes toward current law enforcement service levels, programs, and community protection needs, including adequacy of existing service levels, responsiveness to basic community public protection needs, perceived gaps in existing service levels, and, attitudes toward enforcement philosophies. Matrix will also document key population, demographic and economic characteristics and trends in the city. 'y ):,€c = ?,:-;a,d 5 hedi =: 1 2-21 PL& Matrix will prepare an issues list that will provide the basis for subsequent analytical steps. Police Department Profile. A key to this analysis is development of a detailed understanding of workloads and service levels. To develop this level of understanding, Matrix will document and analyze workload and service levels as described below. (Please note that in the following task narrative not all law enforcement functions are described.) Patrol Programs and Services Employing data extracted from dispatch information and available reports, Matrix will profile and analyze field patrol workloads and service levels, including community -generated. calls for service demand by time of day and day of week for the last 12 months; response times by priority of call for services handled; number and type of calls handled by other means including use of non -sworn community service officers, and other forms of differential response. Matrix will document and analyze officer -initiated activity using various quantitative indicators including field stops/field interrogations, traffic stops, other self -initiated activity, and activities resulting from directed patrols. For a sample period, Matrix will examine the scope and content of any patrol plans prepared for field patrol staff, including. time required to execute patrol plans, performance expectations, community -oriented goals and action plans, and other factors, as appropriate. Matrix will document actual field patrol deployment practices with existing staffing levels in field patrol. Through analysis of rosters and other appropriate documents, Matrix will document scheduled deployment by time of day and day of week, factors impacting units actually deployed compared to the number scheduled (e.g., on -shift court appearance requirements, sick leave, special assignments, training), and factors involved in the utilization and need for overtime. Matrix will evaluate field patrol staff utilization at existing staffing levels given actual deployment and workload demands. The model employed, includes determination of the time available for preventive patrol and other proactive activities given actual deployment and call for service demand by time of day and day of the week. Concurrently, Matrix will interview staff at all levels in patrol services to develop a detailed understanding of how the patrol, program works from a number of. perspectives including: (1) preferred level of uncommitted time necessary to allow field officers to direct patrol to such activities as traffic enforcement, (2) the extent to which patrol officers are involved in follow-up investigations, (3) level and content of patrol plans based on review of any existing plans targeting community- %2 t'rjr ;saa f ,r "'itt Hunndl a ,,`; 5e. c.. (41V oriented activities by officers, and (4) problems associated with implementing and maintaining targeted patrol levels at existing staffing levels and workloads. Matrix will document the uses, availability and deployment of command and supervisory personnel by time of day and day of week. Through interviews, we will develop a detailed understanding of the mixture of command and supervisory responsibilities and associated issues. Based on this information, Matrix will define existing field patrol service levels. Traffic Enforcement Matrix will document scheduled and actual deployment of traffic enforcement personnel by time of day and day of week, current workload including accident investigations, and the extent to which traffic enforcement personnel are being assigned calls for service as primary units and/or back-up of other field patrol activities. Matrix will describe how traffic enforcement and accident investigation workloads are planned, prioritized and handled. We will discuss the level of patrol officer -initiated activity related to traffic enforcement including citation production on a per officer basis, and how traffic enforcement officer activities are targeted by Traffic Enforcement. Matrix will evaluate service levels, as measured by the current Traffic Enforcement Index. Based on these items, Matrix will develop a set of measures to clearly define traffic enforcement approaches. Investigative Services Matrix will analyze current investigative policies, including case screening approaches; types of cases "worked" by case type; and other policies which impact time utilization and workload of investigative personnel. Based on interviews, we will document current caseloads and case status by case type, and evaluate existing investigative service levels from the perspectives of: (1) current caseloads compared to patterns observed in other law enforcement agencies with effective case management approaches; (2) the extent to which cases with 'leads" can be worked with a relatively high likelihood of solvability given existing staffing levels and case management approaches; (3) elapsed time between initial report, assignment of a case to a detective, and actual working of that case by a detective; (4) coordination of cases with patrol personnel; and (5) mission, workload, and results achieved by pro -active investigative units. Based on the above, Matrix will define existing investigative services. Dispatch and Records Services Matrix will analyze workloads and service levels associated with the other support units in the Police Department by documenting records processing flows by document type and volume, identifying and quantifying processing turnaround times and backlogs, reviewing systems currently available to support records processing activities, reviewing internal information processing procedures and 4° `V controls, and employing a computer model to calculate the use of communications staff by dispatch function and time of day / day of week. , Results of this task will be documented in the form of a narrative and statistical profile of the Police Department workload and service levels; which will provide the basis for subsequent analysis. This profile would be circulated among HBPD staff to ensure accuracy. Compare to Best Practices and Peer Cities. The use of "best management practices" analysis is topical in the analysis of public and private sector agencies today. Matrix will develop a detailed list of best management practices for use in a diagnostic assessment of each service function in the Police Department to identify those areas in which the organization was meeting targeted service delivery objectives or standards of service efficiency or effectiveness. Matrix will use the data collection activities conducted in previous tasks to assess the degree to which services or service levels conformed to the benchmark. Each service area diagnostic element would consist of a definition of the service level, efficiency or deployment target, a description of the current performance, Identification of areas which meet or exceeded the target(s), and identification of areas which represent improvement opportunities. Matrix will develop a list of at least 6 benchmark communities against which to compare the HBPD`s management, organization, staffing and operations. The focus of the comparison would include quantitative comparisons of workload and service levels (e.g., calls, proactivity levels, cases); and qualitative comparisons of management practices (e.g., approaches to managing field and investigative services). Evaluate Service Level and Resource Issues. Matrix will analyze the current staffing levels necessary to achieve the service objectives associated with each service level, and provide the Police Department with a model/tool to project and assess future staffing needs. We will employ a computer model to calculate field patrol deployment necessary to achieve identified alternative service level objectives. The model provides the capability to calculate field patrol deployment requirements by shift and day of week based on workload and specific service level objectives associated with target response times and preferred levels of time available for proactive activities in an area. Matrix will evaluate investigative staffing needs based on an assessment of case management techniques (including how cases are screened, assigned and monitored) as well as caseloads on an investigative specialty basis. We will also define staffing alternatives and requirements for all other functions and services in the Department consistent with alternative service levels including management Pionn;sa tc: p it; of Hu,,'k-aO, r Bean: p,v and supervisory staffing; communications and records; and other support functions (e.g., crime analysis, property and evidence, field evidence collection, special operations and investigative units). Once staffing plans associated with each service level are defined, Matrix will compare them to current staffing levels, identify staffing gaps, and identify the number of staff required to meet service level objectives. Matrix will provide the analytical tools necessary for the City and Police Department to assess and project staffing needs. This will include patrol staffing formulas, benchmarks for investigator caseloads and staffing levels, and communications personnel_ Matrix will evaluate alternative schedules, opportunities for civil ianization, and the organizational structure of the Department. Reporting. Completion of all the tasks listed above will result in the preparation of a technical background report summarizing issues and study recommendations. The report and the associated implementation plan will consist of the following: • An executive summary of all key findings and recommendations, including the assessments of current and projected staffing needs. • A detailed analysis of operations and staffing needs for each function at alternative service level targets, including analytical methodologies. • A detailed analysis of current operating issues in the Department. ® Detailed recommendations for addressing any identified issues and improving the efficiency and effectiveness of all components of operations. • Detailed plans for implementing all recommended changes to include work steps necessary to implement; recommend responsibilities; and timing. 4.10 Natural and Environmental Hazards PMC will describe natural and human -created hazards and hazardous materials f:af s =` ;will affecting Huntington Beach. Based on available resources, including the Local surer£.=, � $,r, na sis and Hazard Mitigation Plan, the Emergency Operations Plan, and Cal -Adapt, we will include maps of known flooding: seismic, geologic, and other hazards as part of = " ` '�- aural and the technical report. PMC will describe existing conditions and hazards related to=yards in a seismic and geologic activity, flooding, fire, and hazardous and toxic materials, UnirFaanort,Tietechnical We will also describe existing emergency management and safety plans and standards in consultation with the local, county, regional, state, and federal art wiil " €n,,'_ rporated in the agencies responsible for public facilities and circulation, fire suppression, law i eo t-i I i c',_, andReport enforcement, and emergency services. Issues to be addressed include: descr t ... n Tp is 4.1 £ through Seismically induced surface rupture, ground shaking, ground failure, tsunami. %. =4. seiche, and dam failure IN Slope instability leading to mudslides and landslides IN Subsidence, liquefaction, and other seismic hazards identified on seismic hazard maps IN Other known geologic hazards • Flooding • Urban fires • Evacuation routes and signage ® Peak load water supply requirements IN Minimum road widths and turnouts required by emergency agencies As part of this technical report, PMC will also identify and characterize geologic conditions in the planning area. Available information describing soil types and characteristics and regional geologic structures and lithology will be reviewed. We will describe soil conditions (including erosion hazards and shrink -swell potential) on the basis of Soil Conservation Survey mapping, expected maximum ground shaking, and conditions that may promote soil erosion during development and will identify control measures for grading and excavation activities. The characterizations of geology and soils will focus on mineral resources, natural earth materials, and soil types and conditions (including soils within the planning area that can support agricultural uses). We will describe the locations and types of economically significant mineral resources in the planning area, if present. 4.11 Noise Monitoring and Modeling eiiverabies; Atkins will Atkins will use the results of the traffic analysis (prepared by Stantec), along with summarize analysis and available information about potential noise sources in the planning area, to model potential noise impacts. This task will be conducted during the same time that conclusions from noise other technical background studies and reports are being prepared. The noise monitoring and modeling in a impact analysis cannot be conducted until the traffic study data has been +e.chnicai repo�'- Thle technical completed. report will be incorporated in the Existing ambient daytime noise levels will be measured at eight short-term and Technical Background Report seven 24-hour locations to be selected in coordination with City staff) to establish and map baseline noise levels. All daytime noise levels will be measured using a described in T asks 4.12 through Larson -Davis precision sound level meter; which satisfies the American National 4.14. Standards Institute (ANSI) requirements for general environmental noise measurement instrumentation. Noise will be characterized using the following terms: Leq, the equivalent energy noise level, is the average acoustic energy content of noise for a stated period of time: for evaluating community impacts, this o prop'.'Sal fu; ;ity 0' „un0r ;tor BF . ";r rating scale does not vary, regardless of whether the noise occurs during the day or the night ® LR,;,, the minimum instantaneous noise level experienced during a given period of time Lm,, the maximum instantaneous noise level experienced during a given period of time Existing 24-hour noise levels will be calculated for various roadway segments in the project vicinity using the FHWA Traffic Noise Model (TNM 2.5) and current traffic counts from the traffic report prepared for the project. Because Huntington Beach is located adjacent to Interstate 405, Atkins will obtain roadway volumes for 1-405 from Caltrans, if required. The model will calculate the average noise level at specific locations based on traffic volumes, average speeds, roadway geometry; and area environmental conditions. Vehicle noise energy rates in the TNM 2.5 will be modified to incorporate rates used by Caitrans, which better represent vehicle noise levels in California. The analysis of operational noise impacts will address future noise levels. Future noise levels along key roadway segments will be calculated to determine whether traffic generated by buddout with implementation of the General Plan update causes a substantial increase in noise at nearby locations. Noise levels generated during construction will be qualitatively evaluated for their potential to affect existing noise -sensitive uses, as no specific development projects are contemplated under the General Plan update. The potential for construction noise to impact nearby noise -sensitive land uses (if any) will be characterized based on the potential for new development to occur in the vicinity of existing noise -sensitive uses. Atkins will also prepare a new noise contour map of the city to support preparation of noise standards and policies for the hazards chapter of the General Plan. 4.12 Administrative Draft Technical Background Report PMC will consolidate the findings and results of technical studies completed in Tasks 4.1 through 4.11 into a Technical Background Report (TBR) similar to the current TBR. Our approach anticipates incorporating the TBR as an appendix to the General Plan EIR, allowing the EIR document itself to focus appropriately on impact analysis and mitigation. Thus, the TBR will be organized by EIR topical section and will provide full discussion of the existing setting and regulatory setting for each EIR section. A full list of sources consulted will be provided. PMC will prepare an administrative draft TBR in advance of the administrative draft EIR to confirm the content of the existing setting and regulatory setting sections AdministraL draft ,a ac'. �._tnd Report Ya Ow prior to preparation of the balance of the FIR. Public review draft and final TBRs will be delivered in tandem with the corresponding drafts of the FIR. 4.13 Draft Technical Background Report Deliverable: Public review draft Based on City staff comments, PMC will prepare a public review draft TBR for Technical Background Report {30 review in conjunction with the public review draft General Plan, SAP; and FIR. copies + electronic'). 4.14 Final Technical Background Report Deliverable: Final Technical PMC will prepare a final TBR that incorporates City Council —directed revisions Background Report (25 copies + following public hearings. electronic). Task 5: Identify Key Policy Approaches and Consider . Alternatives 5.1 Develop Key Policy Approaches for General Plan and Sustainability Action Plan Deliverables: Preliminary GP Key General Plan Policies. This task focuses on drafting the goals and policies to goals -and -policies and SAP be incorporated into each General Plan element. PMC will prepare a preliminary General Plan goals and policies working paper based on policy direction received measures and implementation during the community engagement process. Proposed policies will be prepared matrix, presented as workinG for each of the General Plan elements and presented for discussion with the GPAC, papers for use with the Planning Planning Commission, City Council, and general public. Commission, City Council, GPAC, Key SAP Measures. Recognizing Huntington Beach's commitment to become a Environmental Board, and general sustainable and resilient community that enhances quality of life and local control, the SAP will integrate economic development, water and energy conservation, public (electronic). waste reduction and recycling, alternative and active transportation, open space preservation, and GHG emissions from both new development and existing uses. We anticipate the SAP will be a strategic implementation plan that will implement General Plan sustainability goals and policies; emphasizing actions, programs, and projects with measurable GHG reduction benefits (reduction or SAP measures) to allow the SAP to serve as a qualified GHG reduction plan consistent with the State CEQA Guidelines. Climate change adaptation will be addressed as part of the Coastal, Resiliency Plan (CRP) though the SAP, General Plan and CRP will be consistent and consider the inherent relationships between GHG reduction and adaptation measures and projects. SAP measures will be developed based on community and staff input through the outreach and GPAC processes, our experience in similar communities, guidance from the State of California, and best practices. PMC will review existing accomplishments to reduce GHG emissions, and assess the local benefits of statewide and regional GHG reduction programs and regulations, including renewable energy portfolio standards, vehicle fuel efficiency and fuel carbon standards, current and future building energy efficiency standards, appliance efficiency standards, federal and state lighting efficiency standards, state water conservation mandates, and the regional Sustainable Communities Strategy (SCS) adopted by the Southern California Association of Governments (SCAG). PMC will then work to develop a list of SAP topic areas and recommended candidate measures based on the preliminary list of general plan policies to ensure consistency. PMC will provide candidate measures to staff in a matrix format prior to distribution and review with the GPAC SAP Task Force. We will review candidate measures with the Task Force prior to confirming and quantifying the measures. PMC will quantify emissions reduction measures and actions, presenting estimated reductions in energy use, water use; waste, VMT, and GHG emissions as applicable. The baseline GHG inventory and forecast will serve as the foundation for the quantification of the SAP's GHG reduction measures. Activity data forms the basis of measure quantification; including VMT, kilowatt-hours (kWh) of electricity or therms of natural gas consumed, and tons of waste disposed. This approach ensures that GHG reductions are tied to the baseline and future activities occurring within the city. Whenever possible; emissions reduction estimates will be based on tools and reports provided by government agencies such as the US Environmental Protection Agency (EPA), California EPA, California Energy Commission (CEC), CARB, California Air Pollution Control Officers Association (CAPCOA), and local air districts. If accurate reduction estimates are not available using these tools, a case study may be used if the study's conditions are comparable to those found in the city. Finally, for more long-range reduction measures that lack actual monitoring or analysis, current scholarly and peer -reviewed research is combined with knowledge of existing City practices to create a defensible estimate of future emissions reductions. PMC will provide the City with a framework for prioritizing each measure that includes the following: Effectiveness (as measured by): GHG reductions in metric tons of carbon dioxide equivalent (MTCO,e) Reductions in electricity (kWh), natural gas (therms), waste (tons), traffic (VMT), vehicle fuel (gallons), and water (gallons) Cost (as measured by): Cost to the City Cost to the private sector Potential cost savings ® Potential funding sources (e.g., City sources, grants, rebates, low -interest financing) Feasibility (as measured by): The implementing agency (e.g., City, developer, site operators) Level of City control Extent of coordination needed Implementation timeline to ensure GNG reduction targets are met 13 Secondary benefits (as measured by): Cost savings Emissions reduction co -benefits (e.g., health benefits, implements state policies, improved mobility) Adaptation co -benefits PMC will also provide an implementation matrix for SAP measures that includes performance indicators to monitor reduction progress, timing, responsibility, co - benefits, potential funding sources, and cost estimates. All of PMC's sustainability and climate action plans transparently describe our methods for estimating GNG reductions, allowing our process to be easily followed and replicated. We believe quantification should not occur in a "black box" proprietary software tool, but rather should include all data and sources necessary to create an independent analysis tool for use by the City in the future. We engage and partner with staff throughout the quantification process to ensure our approaches and tools are accessible and feasible. Stantec's role in developing GNG reduction measures will be to evaluate the proposed measures and provide the resulting forecast data and VIViT resulting from implementation of the measures. Using the mode splits published in the 2010 Census data as a baseline, Stantec will adiust the mode percentages at the traffic zone level based on data for areas exhibiting characteristics (i.e., TOD or bike infrastructure) in the target areas. This method will allow for the testing of integrated strategies, as various parts of the city may have different VMT objectives. 5.2 Define Land Use and Circulation Alternatives (up to 3) Deiiverabies: Draft and final land Based on the identification of key policy approaches (as outlined above), PMC will use and circulation alternatives provide a short outline of up to three alternatives for each identified focus area from the market trends analysis (Task 4.6). We anticipate a page of bulleted text report (electronic). outlining the components of up to three distinct alternatives addressing each focus 2- 0, Flmoos t, f ( Ch of Hurilnukn Bea ,. area. We also propose including concepts that would be a part of all alternatives, based on consensus among staff, decision -makers, and the public. The alternatives for land use will focus on selected areas where future development or land use redesignation is expected to occur. Through this process. the City will ultimately define a preferred land use and circulation plan that becomes the basis for preparing the draft General Plan. The alternatives will include a range of options that focus on identified reinvestment/reuse opportunities. PMC will present options that seek to achieve, to varying degrees and in different ways, the OCCOG Sustainable Communities Strategy, smart growth, LEED Neighborhood Development, complete streets, and walkable communities principles. Following City staff review and comment, PMC will develop up to three distinct land use and circulation alternatives for review and deliberation by staff; decision - makers, and the public. The public process of evaluating these conceptual alternatives will enable the selection of a preferred land use and circulation plan; which will become the basis for the updated General Plan. In order to achieve consensus on a preferred plan, it is important that the alternatives discussion remain conceptual. As a result, this work program does not propose to deal with policy ideas for any single project site as a part of the alternatives process. Each alternative will include a description of land use categories; buildout assumptions; and conceptual diagrams illustrating concepts related to land use and circulation for each identified focus area. The alternatives will be summarized in a report with full -color maps and illustrations of key concepts, as appropriate. 5.3 Evaluate and Compare Alternatives (land use, circulation, GHG, fiscal) This task involves working with City staff to develop up to three land use and D a arabdi& Dr aft and final land circulation plan alternatives for review with the community and decision-makers.�tin alternatives Determining a future land use plan for Huntington Beach has many implications for future environmental, fiscal, and quality of life conditions. Forecasting the potential�=hti"-'f,r;'-_-°ndum results of particular land use alternatives will help decision -makers answer questions like: ® What kind of impact will this plan have on traffic conditions? • What kind of impact will this plan have on future City revenues and expenditures? ® How does this plan compare to others in terms of impacts to air quality, GHG emissions, water quality, and energy resources? ® How does this plan compare to others in terms of anticipated climate change effects and natural and human -caused hazards? What kind of housing is created by this plan, and is it affordable? What kind of employment can be expected under this plan? What would development under the General Plan like this look on the ground? We propose to work with the GPAC to answer many of these questions as we consider alternative land use plans for key underdeveloped and vacant areas of the community. We propose to conduct interactive "what if?" sessions exploring potential land use combinations and determining the answers to these and other critical economic; housing, and aesthetics questions in the community. Conceptual alternatives will be presented using a combination of two-dimensional diagrams, three-dimensional illustrations and graphic representations, photographs, and accompanying narrative. The alternatives to be analyzed in the traffic study will be formalized in this step, incorporating minor changes as directed by the consultant team. This analysis will address the proposed plan. and two alternatives, as needed for the EIP. Formal ADT diagrams and ICU/HCM analysis will be performed at this stage, and potential mitigation measures will be developed to mitigate the impacts. 5.4 Develop Preferred Land Use and Circulation Alternative Deliverable: Draft an' final Following GPAC consideration of the alternatives, PMC will prepare a working paper for use with the Planning Commission and City Council in study session preferred alternative vrorking format to arrive at a preferred land use and circulation plan. The working paper will papers (electronic). summarize key content for each alternative, along with GPAC preferences and comments concerning each alternative. We envision that the GPAC and City staff will recommend a preferred alternative based on community and stakeholder input, which will be the primary subject of the study sessions devoted to this task. Deiiverables: Draft and find 6.1 Prepare General Plan and SAP Outlines and Formats outlines for the General Plan and As a first step to updating the General Plan and preparing the SAP, PMC will SAP (electronic); up to three 01 prepare an annotated outline of each document for City staff review, along with up to three page layout formats for each document for City staff review and approval. draft page layout formats for the Following staff review, PMC will prepare a final outline and document template for General Plan. each document. - 32 1 Pror) ;; Q zi f o i C i i Y or H i inQ t r B ea.'r Pw 6.2 Prepare Administrative Draft General Plan PIVIC will prepare an administrative draft General Plan for review by City staff. The plan will be organized in a fashion similar to the 1996 General Plan, with elements organized into four distinct chapters. We understand that the City seeks to reduce the overall number of elements downward from the existing 16. Each chapter will include its own introduction, issues identification, goals and policies, and a plan narrative describing the basis for and application of the policies. We propose to organize each chapter using key issues that cut across multiple topics, while maintaining or exceeding state requirements. In addition, a comprehensive implementation program will be prepared identifying specific programs designed to achieve goals and carry out policies across chapters. The format described below may be modified to reflect agreements reached during previous tasks. The scope and budget anticipate two rounds of review for the administrative draft. Introduction to the General Plan. This section will describe the overall organization of the plan and how it is to be used. This section will also provide a practical guide to the General Plan and a clear description of how the plan will help the City achieve its vision for the future. Community Development Chapter. This chapter will incorporate state requirements for the land use and housing elements, as well as the OCTA-required growth management element. It will also present optional goals, policies, and implementation programs for urban design, historic and cultural resources, and economic development. The land use portion of this chapter will address current planning and sustainability concepts desired by the City, such as infill, green building, place - making, mixed uses, and transit -oriented development. Land use goals and policies will be highlighted with the use of improved graphics and concept plans. It will also address community design issues. Appropriate land use designations will be modified or created that will help achieve desired uses in identified focus areas. These General Plan land use designations will be described and mapped, and assigned specific measures of density or intensity of use as appropriate. They will also be illustrated with photos and renderings showing expected development in these categories. Where appropriate, areas of distinct community character and design will also be identified. A color land use policy map of the planning area will be generated as well as other illustrative graphics. A matrix will identify the projected population, housing density, and nonresidential intensities of development based on the proposed land use policy map. Information developed by PMC during the alternatives task will form the basis of the land use and design concepts and development information. Der gables: First administrative Gene€al an 29 copies e ecti-osn c`Sef:;o€rd adminis-Uative £ _ "2 e�, a an ;O copies +� _. E €�iu Work Plan a�id 2-3" Community character and design policies will direct the overall urban form of the community and its unique characteristics and landmarks. Policies will focus on the design of new development, including techniques to achieve more pedestrian - friendly, walkable communities oriented around basic activities, such as parks, schools, community centers, and local -serving commercial activities. The element will also include recommendations for improving the character of certain established portions of the city, as identified through existing conditions research and public outreach. Economic development goals, policies, and programs will be updated based on recent economic and demographic trends and development conditions, building on recently completed or planned projects. Key economic issues may include defining Huntington Beach's economic vision; retaining and attracting businesses; maximizing growth potential of key economic sectors; developing effective linkages with governmental, educational, and quasi -governmental institutions; maximizing Huntington Beach's competitive position in the green economy; maintaining a sustainable jobs/housing balance, establishing priorities for community financing; and establishing economic incentives for development consistent with the General Plan. Both short-range and long-range economic development programs will be recommended. PMC will incorporate the -ongoing historic preservation element update in this chapter and will prepare policies and programs recommending preservation strategies for cultural landscapes and archaeological resources. Infrastructure and Community Services Chapter. This chapter will incorporate state requirements for the circulation element, along with optional goals, policies, and implementation programs for public facilities and services, recreation and community services, and utilities. We propose to organize this chapter using key issues that cut across these topics, while maintaining or exceeding state requirements for these topics, and anticipate that SLR effects on key infrastructure will be a key new component of the chapter. Stantec will assist in reviewing the goals, policies, and programs for the circulation portion of this chapter. The circulation portion of this chapter will reflect a balanced, multimodal approach to serving existing and anticipated growth projections and will be updated to comply with the Complete Streets Act. It will. be derived in large part from the recent Circulation Element update, addressing regional and local transportation issues, congestion management, transit, bicycle circulation, and truck routes. Proposed policies and analysis will also address legislation relating to AB 32 and SB 375, The public facilities and services portion of this chapter will address public infrastructure and services such as water, sewage collection and treatment, storm 2-34 Prorx sal far'City o Hunflngmn dea4,. PU drains, other utilities, and solid waste disposal. It will also incorporate the findings of the fire and police services study completed in Task 4.8. Standards for the availability of these facilities will be included in the element to assist decision - makers in assessing the impacts of proposed development and redevelopment in the community. This part of the General Plan will also identify changes to thresholds and capital project timing that could result from proposed land use changes. In keeping pace with continued growth, the City has made it a priority to continue to provide varied parks and recreational activities in the community, but recent struggles regarding the closure of school sites and the future use of related ball fields underscore a need to revisit recreation policies in this chapter. The current General Plan does not properly reflect the dynamics of these struggles given the city's current demographics and recent development profile or the continuous effort needed to maintain and upgrade facilities. The updated plan will comprehensively address parks and recreational needs of all ages and users, identifying park, facility, special use facilities, pedestrian -friendly connections, trails, and open space needs in the city for each park classification. Future needs will be projected based on projected population growth. Natural Resources Chapter. This chapter will incorporate state requirements for the open space and conservation elements, as well as Coastal Act requirements in a coastal element. It will also present optional goals, policies, and implementation programs for air quality, as well as state -recommended policies for climate change, GHG emissions, and sustainability. Substantial revisions are anticipated to this chapter based on findings of the technical studies identified in Task 4. Huntington Beach is located in an iconic coastal setting with abundant natural resources, protected open spaces, and coastal viewsheds. In this chapter, we will identify both coastal and inland natural resources, including but not limited to biological communities, valued open spaces, wetlands, and viewsheds, We will define strategies to protect these resources and propose ways for public and private development to conserve water and energy and make the community sustainable for generations to come. Opportunities for reducing waste and impacts on the environment, such as low impact development and green building, will be identified. This chapter will also address energy conservation opportunities and other regional resources such as water, solid waste management, and mineral and paleontological resources. PMC will prepare an air quality section that will integrate the relationship between land use, transportation and mobility, public health and safety, and energy issues. This section will additionally focus on climate change and GHG emissions. Providing a clear approach to conservation of resources in the General. Plan will help satisfy state requirements for addressing climate change and GHGs e1w consistent with AB 32 and SB 375. This section will also contain Huntington Beach's GHG reduction goal, expressed as a City General Plan policy, coupled with a discussion of the broad strategies the City will employ to achieve the reduction target. Specific GHG reduction measures and sustainability actions will be established in the SAP. Hazards Chapter. This chapter will incorporate state requirements for the safety and noise elements, as well as optional goals, policies, and implementation programs addressing hazardous materials. Substantial revisions are anticipated to this chapter based on findings of the technical studies identified in Task 4. PMC will update the safety portion of this chapter to cover similar issue areas as those contained in the existing element. Natural hazards such as sea level rise, tsunamis, wildfires, geotechnical and seismic hazards, and flooding will be addressed, including climate change effects and vulnerabilities. The plan will also address neighborhood safety, crime prevention, and emergency preparedness and response. Hazardous materials use, handling, transportation, disposal, and management information will be updated and incorporated into the new chapter. In the noise portion of this chapter, PMC will identify noise associated with transportation (ground and air) and other sources, as well as sensitive noise receptors, such as residential development, schools, and medical facilities. Primary noise sources to be considered include 1-405, SR 1 (Pacific Coast Highway), primary arterials, and other local streets; light industrial and manufacturing uses; and other stationary noise sources or problem areas identified by the City. General levels of noise and land use compatibility will be included in matrix form. Projected noise based on future conditions will be documented and mapped to identify areas that will be subjected to significant noise in the future, along with methods to reduce the effects of noise. The noise portion of this chapter will include policies and standards addressing noise in mixed -use areas. Implementation Program. A comprehensive implementation program will be presented in a manner that facilitates budgeting, capital improvement planning, and annual reporting. The implementation program may be presented in matrix form and will include a description of actions to be taken; responsible parties, potential funding sources, and time frames for achievement. Where necessary and feasible, programs will also act as CEQA mitigation measures to reduce significant environmental impacts identified in the General Plan EIR. 6.3 Prepare Administrative Draft Sustainability Action Plan Deliverable: Administrative draft PMC will prepare an administrative draft SAP using simple language, graphics, SAP (20 copies t electro is). and other features that make the document easy to read and accessible. The document will convey goals and SAP/GHG reduction measures and actions, along ,...., i.;,!;,,.z Zvi D it, o- H..''MIU•„r 1 `w with associated costs, benefits, implementation strategies, and forecast reductions as its primary content. The SAP will provide an introduction that outlines its purpose, contents, and role, including its relationship to the General Plan and Coastal Resiliency Plan. The SAP will incorporate a summary of the GHG emissions inventory and forecast to provide context for the GHG reduction target and SAP measures. The SAP will integrate the General Plan vision, goals, and policies as applicable to ensure consistency and demonstrate the relationship of the SAP to the General Plan as a strategic implementation plan. The General Plan will provide the City's long-term vision for the community, while the horizon year of the SAP is expected to be more near term, presenting measurable strategies for the next 5 to 10 years. The outline, contents, and format of the SAP will be confirmed in Task 6.1 in collaboration with staff, the GPAC, and the Environmental Board. Task 7: Prepare Administrative Documents 7.1 Initial Study,/Notice of Preparation and Scoping Meeting Atkins will submit a draft project description for the EIR to City staff for review and approval prior to public distribution of the Notice of Preparation (NOP), The project description must include all of the elements required under State CEQA Guidelines Section 15124. This task will require close coordination among the planners preparing the General Plan update and SAP, City staff, and the authors of the EIR to ensure an integrated effort toward a final product and consistency between the General Plan update, Sustainability Action Plan, and General Plan EIR. Internal consistency is paramount to a legally defensible EIR. Atkins will prepare and distribute the IS/NOP in accordance with the provisions of CEGA and the State CEQA Guidelines; as amended. The consultant team believes publication of the IS/NOP should fulfill three goals: (1 ) to provide agencies and the public an early notification of the City's intent to prepare an EIR for the General Plan update; (2) to provide the public and agencies sufficient information about the project so that they may provide informed comments on the scope of the EIR,- and (3) to streamline preparation of the EIR by Scoping out impacts that require no further analysis in the EIR. The General Plan update will center on infill development, which will likely limit the analysis required in the EIR. For example, as there are no agricultural lands in Huntington Beach, it is assumed that agricultural resources will be scoped out in the IS and will require no further analysis in the EIR. As many issues as possible will be scoped out in the Initial Study. As indicated in the RFP, the City will be responsible for internal distribution of the IS/NOP, as well as to groups located within the city. Atkins will also prepare eli e antes. Ad i3,istrative draft IS/NOF; : {4f'z, screencheck w r. i NOP = copies + scree =check draft 1SiNOP CE' ri :;; screencheck iJ 'C 1 0,spy electronic,?, final iS "NOP _ :; copies) , final IS/NOP ,or` fate C€esn6 ghDose 05 copies). r:a€ I , i' OP for dis ufi n S A copies as re-ired t `"ic`i -Imal ��OC (1 copy elV«sU,f.= x 1, Aw . and file the Notice of Completion (NOC) for the IS. The City will be responsible for all filing fees. 7.2 Contact and Consult with Regulatory Agencies Deliverable: As -needed meetings As part of preparing the environmental analyses for the General Plan update, as necessary, Atkins will, confer and meet with regulatory agencies (Orange County with regulatory agencies. Sanitation District, California Department of Transportation [Caltrans], South Coast Air Quality Management District, Santa Ana Regional Water Quality Control Board, etc.) and advisory agencies (OPR, CARB, neighboring communities, and SLAG) regarding results of the technical studies, and preliminary approaches to impact analysis. These meetings will be attended by Atkins' project manager and/or a representative of Atkins with expertise in the technical discipline that is the focus of the meeting. 7.3 Prepare Administrative Draft EIR Deliverable: Administrative Draft This task describes steps to prepare the administrative draft EIR for the General Plan update and SAP. These tasks would be completed by either Atkins or PMC, as EIR (electronic)• described below. Existing Setting. Atkins will compile a description of existing conditions (or setting) information from the updated General Plan and Technical Background Report, as well as existing City documents, maps, and other available resources as needed. Atkins will compile a list of requested information that will need to be verified and/or updated to reflect current existing conditions. Per the RFP, the City will make available to Atkins all previously prepared reports for this project (including those noted in the RFP) as well as related projects. Other documents will be made available upon request. Identify Impacts and Mitigation Measures. Impact analysis will be conducted in compliance with the requirements of Section 15126 of the CEQA Guidelines. The standards of significance will be used to clearly identify the significance of environmental effects and determine the need for mitigation measures. To reduce or eliminate any significant adverse impacts identified during the analysis, the Draft EIR will recommend appropriate, feasible mitigation measures. It is intended that the mitigation measures will be specified early in the planning process as alternatives are identified and evaluated and as policies are formulated in response to key issues that have been identified. In this manner, the General Plan update and SAP can function as `self -mitigating" documents. However, we recognize that residual impacts may remain and further mitigation may be warranted. The Administrative Draft EIR will include the following technical sections, Please note that some of the following subjects may be scoped out in the IS. However, even if scoped out from further analysis in the IS, the same basic analytical pk/ method will be used in accordance with the CEQA Guidelines and with City and. Appendix G thresholds of significance. Since it is unknown at this time which of these resource areas may be scoped out in the IS, they are all presented here. Atkins will conduct a complete evaluation of the proposed General Plan update from an environmental perspective, including an alternatives analysis. Aesthetics and Visual Resources. In conjunction with the Zoning Code, the City's Design Guidelines are integral in shaping the development of the built environment in Huntington Beach. The current Design Guidelines were approved by the City Council in 2000. Atkins will describe, with photographs and text, the character of any areas of Huntington Beach that are targeted for development which could alter the physical appearance of the area, and will provide an index map illustrating scenic areas, scenic routes, open space concerns, etc. Based on the characterization of the City's urban form, we will identify physical and visual features that contribute significantly to community character as well as key design elements and characteristics that define the range of development patterns. Atkins will evaluate any potential changes to these key physical and visual features and will also summarize the Design Guidelines as appropriate in this section of the EIR. Air Quality. Atkins' air quality scientists will document existing air quality conditions, identify sensitive receptors and use the United States Environmental Protection Agency's (EPA) guidance for evaluation of construction impacts on air quality. Construction impacts will be addressed in a generalized manner because project -specific information will not be available. The overall growth levels will be converted to estimate the amount of construction that would occur annually. From these estimates, daily construction emissions will be calculated using procedures contained in EPA AP-42 or the SCAQMD CEQA Air Quality Handbook. Daily mobile and stationary emissions will be calculated for criteria pollutants using the CaIEEMod (or the latest model available from SCAQMD at the time of analysis) model, based on trip generation data and the growth estimates for the different land uses. Cumulative air quality impacts will be evaluated using the methodology provided in the SCAQMD CEQA Air Quality Handbook, The CALINE4 carbon monoxide dispersion model will be used to calculate carbon monoxide concentrations at intersections/roadways that may be substantially affected by the proposed General Plan update. Based on the findings of the previous tasks, Atkins will assess the consistency of the General Plan update with the attainment objectives of the Air Quality Management Plan (AQMP). We will determine whether there will be an increase in the number and severity of air quality violations in the city. Atkins will also determine whether the land use and socioeconomic assumptions of the General 2-30 PN1:< Plan update are consistent with the land use and socioeconomic assumptions of the AQMP and SAP (being prepared concurrently with the General Plan update). Biological Resources. PMC will prepare the biological resources section. The majority of sensitive habitats are along the coast; however, there is one created wetland inland in the Seacliff community, and there are other areas that may warrant recognition, such as the eucalyptus grove at Norma Gibbs Park created for monarch butterflies. The biological resources portion of the TBR will be summarized as the project's biological setting. Impact analysis and mitigation will focus on implementation of General Plan goals, policies, and programs relating to biological resources. The analysis will address the effectiveness of the proposed plan in maintaining or improving the biological integrity of the planning area and will identify measures that would lessen potential impacts. This proposed scope does not include protocol -level surveys for endangered wildlife and fisheries resources or on -site wetland assessment or delineation. Cultural Resources. Atkins will discuss the known existing cultural resources in the city and will identify resources that are currently listed on, or are potentially eligible for listing on, the National Register of Historic Places. We will describe important archaeological resources types and the potential for finding additional cultural resources during development of undeveloped and underutilized parcels. Atkins will describe the policies and programs in the existing General Plan that serve to protect the city's cultural resources, along with any other programs through regional, state, or federal agencies. We will examine the impacts of proposed General Plan update buildout on cultural resources in the city. It is our understanding that the City is actively working on an update to the contents of the Historic and Cultural Resources Element pertaining to historic resources with the consultant Galvin Preservation Associates. This project includes an updated Historic Resources Survey, completed in 2009 with additional field work in 2011. The City has had active participation by the City's Historic Resources Board with respect to this project. The results of the work effort thus far were presented at a City Council study session on May 20, 2013, it is anticipated that hearings and adoption could occur this fall, Additionally, the City's Allied Arts Board has expressed strong interest in participating in the update of the cultural component of the element. It is expected that the General Plan update will include this, along with any minor updates to the historic component if necessary. The results of all updates to the element will be discussed in the cultural resources section of the EIR. °rurv,,sa for Olt, w Hurtimrkr B . IUk/ Energy. Atkins will assess the significance of the use of energy, including electricity, natural gas, and gasoline and diesel fuels, as a result,of development proposed under the General Plan update. We will discuss existing energy use patterns in the city and examine whether the project would result in the consumption of large amounts of fuel or energy, or use of such resources in a wasteful manner. In addition, Atkins will review the.City's Energy Action Plan and include it as applicable in the EIR. A number of factors are considered when weighing whether a project would use a proportionately large amount of energy or whether the use of energy would be wasteful in comparison to other projects. Factors such as the use of on -site renewable energy features (such as photovoltaics) or energy conservation features or programs are considered. The benefits in energy and fuel savings that can be realized by transit -oriented development will also be analyzed, as applicable. Geology and Soils, and Mineral Resources. All buildings in California are subject to the strict requirements of the California Building Code to reduce risks from seismic activity and other geologic hazards. Atkins will briefly describe the existing geology, geologic hazards, and mineral resources in the city based on existing information available from the existing General Plan, from the State Division of Mining and Geology, and from other existing published reports. Atkins will assess the potential impacts on population, development, and infrastructure from geologic hazards. The City of Huntington Beach is one of two pilot cities participating with the California Geological Survey in the development of Tsunami Land Use Planning maps. The maps are intended to depict a probabilistic scenario of tsunami threat, as opposed to the 2009 Evacuation Maps that were produced which are a compilation of all possible tsunami events. Our understanding is that the map is expected to be complete in 2013. Atkins will review the map and incorporate information as applicable from the map and SLR study into the geology and soils section of the EIR. Greenhouse Gas Emissions. PMC will prepare the GHG emissions section. The emissions evaluation will provide a brief discussion of existing conditions and environmental setting in a global, federal, state, regional, and local context, including the state of the science and state, regional, and local inventories, drawing heavily on materials completed as part of the General Plan update. We will summarize federal, state, and local greenhouse gas -related regulations, policies, and programs, and identify General Plan policies and implementation programs and SAP measures and actions that can reduce GHG emissions. With City staff, PMC will consult with the SCAQMD regarding appropriate methodologies to assess impacts. E ', r..irk :t 3'Id ;,fi Cjilc 2-d, /tw The analysis will use plan -level thresholds of significance currently being proposed and discussed by a SCAQMD working group or the most applicable related threshold in place at the time the NOP is released. The determination of significance will be based on whether the level of GHG emissions generated with implementation of the General Plan update would constitute a substantial contribution to the significant adverse cumulative impacts of global climate change. If the construction or operation of projects consistent with the General Plan would violate the applicable thresholds of significance, mitigation measures (quantitative and best management practices) that clearly identify timing, responsibility, and performance standards to avoid or fully reduce adverse and potentially adverse effects will be developed and applied, where necessary, using the following CAPCOA document: Quantifying Greenhouse Gas Mitigation Measures: A Resource for Local Government to Assess Emission Reductions from Greenhouse Gas Mitigation Measures, To the extent practical, PMC will recommend incorporating these measures as General Plan policies or implementation programs. Hazards and Hazardous Materials. The hazardous materials section will characterize the type and level of known hazardous materials sites in the city through searches of the relevant regulatory agency databases. Atkins will briefly summarize relevant current laws, regulations, and standards relating to hazardous materials. The City has a FEMA-approved hazard mitigation plan (HMP) completed in 2012. The plan identifies and focuses on mitigating the potential for damage to people, property, and resources through long-term strategic planning. The City, with the CEC as part of the. California Local Energy Assurance Planning (CalEAP) program, is currently in the process of developing an Energy Annex to the HMP to identify potential issues as they relate to prolonged disruption to power, natural gas and carbon based fuels. The City is also updating its Emergency Operations Plan (EOP), which should be completed this fall (prepared by PMC planner Aaron Pfannenstiel at a previous firm). This will ultimately include components that address tsunamis and power disruption. The HMP and EOP will be summarized in the EIR. Hydrology and Water Quality. Atkins will describe all areas subject to flood and drainage hazards, based on information developed for the General Plan update; the Army Corps of Engineers, FEMA, and the City of Huntington Beach Department of Public Works. We will describe the potential impacts on flood hazards of land use patterns that could be expected due to the Genera' Plan update. We will assess the potential for new and amended flood protection policies to affect public safety and decrease the potential for flood damage in the city. We will review and incorporate the considerations for future development identified in the City's Flood Insurance Rate Map (FIRM). We know that flooding remains an important historical challenge, first recorded in 1825 and most recently occurring in 1998. With substantial coastal access connecting inland waterways to the Pacific Ocean, the Federal Emergency Management Agency (FEMA) has identified significant areas of Huntington Beach as being located within the floodplain. FEMA is currently working on an update to the FIRMs for Southern California. The update will take into account storm surge and is expected to result in changes in the flood designations within the city. FEMA does not expect to complete the update until 2016. Atkins will incorporate as much available information as available regarding flooding into the hydrology and water quality section of the EIR. The water quality setting for surface water and groundwater, utilizing information developed as part of the General Plan update process, will be described. We will supplement that information with available data from the Regional Water Quality Control Board, the City Department of Public Works, and other relevant agencies. The setting will focus on the quality of surface water and groundwater resources. Impacts to water quality that may result from the proposed General Plan update will be evaluated. Land Use and Planning. Atkins will describe the existing land use patterns throughout the city based on the analysis completed in the General Plan update work program. For any areas in which the General Plan update preferred land use alternative proposes redevelopment, we will describe in detail the amounts and distribution of land uses by type, where the information is available. Atkins will establish the context for cumulative changes in land use in the future by identifying levels of growth projected in other general plans in the area. These levels of growth will be added to any growth anticipated under the General Plan update to provide the context for cumulative land use changes in the region. Noise and Vibration. The noise and groundborne vibration analysis will assess potential impacts of the General Plan update on background noise levels and the population's exposure to noise levels. The results of Task 4.11 (Noise Monitoring and Modeling) will be used to prepare the noise section of the EIR. The noise analysis will be based on approximations of noise levels and associated changes in the ambient noise level that are likely to occur based on implementation of the General Plan update. Atkins will characterize the existing noise environment in the city, including noise measurements at various locations within the city and identifying major noise sources in Huntington Beach. Construction impacts will be addressed in a generalized manner because project -specific information will not be available. Construction noise levels at various distances from a typical construction site will be evaluated to determine areas of potential noise impact. Atkins will evaluate on -road vehicle and stationary noise sources. Vehicular noise will be calculated for "no project" and "project" conditions to determine whether the General Plan update will affect sensitive receptor locations in the city. On -road vehicular noise will be evaluated using the Federal Highway Administration (FHWA) RD-77-108 noise calculation formulas. Noise contours created for the l 1(1w General Plan hazards chapter will be incorporated into the noise impact analysis to determine areas that would be exposed to excessive noise levels. Noise contributions from the General Plan update will be compared to City noise standards to determine significance levels. Population, Housing, and Employment. Based on the population and demographics information prepared during the General Plan update process and on other City documents, Atkins will describe the existing population, employment, and housing setting and recent trends for the city. Atkins will describe the potential "holding capacity," or ultimate population, with implementation of the General Plan update. The analysis will consider implications for growth in future housing supply and demand based on the availability of land and the designated densities on the General Plan land use policy map, It is our understanding that the City has an HCD-approved Housing Element (contracted with Karen Warner Associates) for the 2013-2021 update. Several study sessions have been held, and the City is on target to meet the October 1, 2013, deadline for completion. The draft Housing Element has been released for a 60-day public review period. Atkins will use the Housing Element to prepare the population, housing, and employment section of the EIR. We will assess the potential growth in employment with implementation of the General Plan update and will place this growth within the context of total employment growth in the region. A brief analysis of the potential impacts on housing and the jobs/housing balance with implementation of the General Plan update will be included. Public Services. Atkins will describe the existing provision of police, fire protection, school, library, emergency services, and utilities. We will assess the potential impacts of proposed land use changes and the changes in the description of land use categories on the provision of police, fire, school, and library services in portions of the planning- area that are planned for redevelopment. The analysis will address changes in the levels of service needed for potential areas of opportunity for reuse. It is our understanding that the City adopted updated and new impact fees for various City functions in 2011, including police, fire, library, parks, and traffic. In association with the fees, a Master Facilities Plan was adopted, which identifies capital improvements necessary to serve expected development. The public services section of the EIR will summarize the new fee structure and Master Facilities Plan, as appropriate. The results of the service level study for fire and police services (Task 4.8) will be included in the public services section of the EIR. Recreation. As an extension to the analysis of land use impacts, Atkins will document the existing parks, open space, and recreational resources in Huntington Beach. Updated General Plan open space and conservation policies will be reviewed. The impacts of the General Plan update on parks, open space, and re ?„sa foj :;itp . ; Hur, is 'u:r Bt;::h M recreational resources will be evaluated. Standards for the provision of such resources, as established in the existing General Plan and as provided for in the General Plan update and in the Quimby Act, will be compared and evaluated. Transportation/Traffic. The City Council approved a comprehensive update to the Circulation Element of the General Plan on February 4, 2013, including a new traffic model prepared by Austin Foust Associates (now Stantec. As part of our team, Stantec will update the 2011 citywide traffic study. It will focus on the highway component of the Circulation Element, providing information for both the General Plan update and the EIR. The technical documentation will be prepared using the City's tiered performance criteria and will address both City and Caltrans facilities (i.e., Beach Boulevard and Pacific Coast Highway). Stantec staff will provide the environmental consultant with the technical model data (VMT/VHT, etc.) for use in the air quality and noise studies. Other special issues will be addressed here, including potential MPAH Amendments and the I-405 widening project. The analyses will be incorporated into the traffic study. The traffic impact report will provide quantitative documentation, based on capabilities of the travel demand forecasting tool (presently focusing on daily travel volumes on roadway segments), for the project, no project, and up to two alternatives. Mitigation measures will be documented for the project, while a qualitative discussion will be prepared for the no project alternative and up to two alternatives. This effort will be based on results available through the travel demand forecasting process, which will at a minimum include motor vehicles but could be expanded to include additional modes if added to the model's predictive capabilities. Impacts of the proposed project on the regional transportation system will be evaluated in accordance with the Transportation Impact Analysis requirements of the latest Congestion Management Program (CMP) for Orange County. This includes analysis of potential impacts on CMP arterial monitoring intersections and freeway monitoring segments, as well as the public transportation system. Utilities and Service Systems. It is our understanding that the City has the following plans related to infrastructure available: Storm Drain Master Plan (2005), Sewer Master Plan (2003); Water Master Plan (2012); Citywide Urban Runoff Management Plan (2005); Urban Water Management Plan (2010); and Urban Stormwater Runoff NPDES Permit Local Implementation Plan (2011). Atkins will evaluate potential impacts of the General Plan update on the water supply. Atkins will analyze future water demand based on General Plan buildout versus the projected availability of water from the 2010 Urban Water Management Plan and 2012 Water Master Plan. Atkins will evaluate potential impacts of growth allowed under the General Plan update on wastewater generation and treatment capacity. Atkins will qualitatively describe the increased demand for stormwater drainage 1'w and sewer facilities that could result from implementation of new growth areas and areas of opportunity for reuse within the service area. We will identify potential impacts of growth under the General Plan update on solid waste generation and disposal capacity. We will examine the relation of projected land uses and growth under the General Plan update to the capacity and expected lifespan of the local landfills. The results of the urban runoff impact study (Task 4.4) will also be included as part of the utilities and service systems section of the EIR. Other CEQA-Required Sections. Atkins will prepare other CEQA-required sections of the EIR, including growth -inducing impacts, irreversible environmental effects, cumulative impacts, and a summary of significant and unavoidable impacts. Alternatives. Atkins will lead preparation and analysis of the CEQA alternatives. As part of the planning process, land use alternatives will be developed that can later form the basis of the project alternatives which will satisfy CEQA requirements and respond to public interest and concerns. Additional alternatives that would serve to reduce any significant impacts of the project will also be considered. The final alternatives to be analyzed in the EIR will be determined in consultation with City staff. The EIR will include a separate chapter that will analyze up to four alternatives, including the no project alternative, and identify an environmentally superior alternative. The land use and circulation alternatives considered in Task 5 will be considered when developing the alternatives analysis for the EIR. Task 8:. Prepare Public Review Draft Documents 8.1 Prepare Public Review Draft General Plan Deliverable: Public review draft Following City review of the administrative draft General Plan and receipt of a General Plan i30 copies + single set of consolidated comments, PMC will meet with City staff to review electronic;. comments. PMC will then incorporate City staff comments on the administrative draft General Plan to create a public review draft General Plan. 8.2 Prepare Public Review Draft Sustainability Action Plan Deliverable: Pubiiu review draft Following City review of the administrative draft SAP and receipt of a single set of consolidated comments, PMC will meet with City staff to revi�w comments. PMC SAP (33 Copies = electronic). will then incorporate City staff comments on the administrative draft SAP to create a public review draft SAP. Pr r) sa f r ity of H Ingimr bf C Pw 8.3 Prepare Public Review Draft EIR Based on one consolidated set of comments on the Administrative Draft EIR; Atkins will revise the Administrative Draft EIR and prepare a screencheck Draft EIR for City staff review. Atkins' project manager will meet with City staff to discuss approaches to addressing Administrative Draft EIR comments and then make revisions,to the document as appropriate. After City review of the screencheck draft EIR; Atkins will prepare the public review! Draft EIR, based on one set of consolidated comments on the screencheck Draft EIR, it is assumed that preparation of the public review Draft EIR will not result in any new technical analyses or substantial text revisions and can be accomplished within the allocated budget. The public review Draft EIR will be prepared and distributed in accordance with provisions of CEQA and the State CEQA Guidelines, as amended. All graphics; charts, maps, and tables will be on 812 x 11 white paper. All studies, survey results, and data will be included in the technical appendices. Atkins will also prepare the NOC and file fifteen copies of the Draft EIR and the NOC with the State Clearinghouse. The City will be responsible for internal distribution of the public review Draft EIR, as well as distribution to groups located within the city. Atkins will also be responsible for preparation of the Notice of Availability (NOA) and NOC for the publicreview Draft EIR. Per the RFP, Atkins will distribute the notices to the appropriate county, state, and federal agencies and provide the City with the list. The City will be responsible for distribution of notices to area property owners and organizations within the city, publication in newspapers, and transmitting notices to the County for posting. The City will be responsible for all fi€ina fees: 8.4 Prepare Fiscal Analysis SRHA will prepare a fiscal impact analysis for the preferred General Plan land uses and up to two alternatives based on the analysis of current fiscal conditions. The focus of the analysis will be on General Fund revenues and costs, but may include other funds, such as the Gas Tax Road Fund, based on discussion with City staff. Fiscal Methodology/Assumptions. SHRA will assemble the land uses for the alternatives and preferred General Plan into a database for fiscal analysis, including acres, square feet, and valuation of nonresidential development; housing units by type, persons per household, and household income; and infrastructure assumptions for public works, public buildings, parks, recreation facilities, open space, fire stations, and other public facilities. Public revenue and cost fiscal factors will be developed through a current budget analysis and interviews with key departmental staff based on the current level of service standards. De fi era ie ; Screenc peck Draft E I P ant teunic l appendices (tit copie- edectroiliu), sc<-eenchec;k NO. and NOC (1 copy + iectronic , public review Drat EIR (5 copies + enw c i r o n kc P s.IiPw review Draft EIR to-hnica appendices (25 copies, e ctrru sic;, public -6-��.u,E,g �,�:,,t E14 and technical apl-=endices ;,On GD) (35 copies t V E�i� fib" tdion, . ✓ copes for fate (31a_<. in�ghouse + eI.1 C (1 �;:;tr�ni f mine: t.;�A a, O� copy e.ect=r` . De i e fe; I I a will document a {, summarizing key `indirig, a iscal issues (30 tY iriic;E. Following e,ip; rv= pity s -ff comments on ntY;m ac Q 511RHA will prepare a final tec ri">a3 - -,,port (25 copies -IL fie-- -. 1 1 c 247 PL- Fiscal Impact Analysis. SRHA will identify the major sources of public revenues and costs, and project the annual fiscal balance and revenue/cost ratios for the alternatives and preferred General Plan land uses. The fiscal analysis will be projected for up to two alternatives and a preferred General Plan at buildout. Key fiscal indicators will be presented, including surplus (deficit), revenue/cost ratio, and the distribution of revenue sources by various land uses. Task 9: Prepare Final Documents and Conduct Public Hearings 9.1 Prepare Hearing Draft General Plan Deliverable: Public ~easing dram Following public review of the draft General Plan; PMC will meet with City staff to General Plan (30 copies + identify desired changes to the draft plan based on community engagement electronic;, activities conducted during public review and comments and responses on the Draft EIR. Following identification of desired changes, PMCU will revise the draft General Plan to create a public hearing draft General Plan for Planning Commission and City Council review. Revisions to the General Plan at this stage are limited to changes identified in public comments or through the EIR process. No additional chapters or sections would be added. 9.2 Prepare Hearing Draft Sustainability Action Plan Deliverable: Public hearing draft Following public review of the draft SAP. PIVIC will meet with City staff to identify Genera! Plan (30 copies + desired changes to the draft plan based on community engagement activities conducted during public review and comments and responses on the draft EIR. electronic). Following identification of desired changes, PMC will revise the draft SAP to create a public hearing draft SAP for Planning Commission and City Council review. Revisions to the SAP at this stage are limited to changes identified in public comments or through the EIR process. No additional chapters or sections would be added. 9.3 Prepare Responses to Comments and Administrative Final EIR Deliverable: Administrative Final Atkins will prepare an Administrative Final EIR for City review. It is assumed that EIS !electronic, preparation of the Administrative Final EIR will not result in any new technical analyses or substantial text revisions. We will prepare written responses to oral and written comments received on the Draft EIR and will distribute responses to commenting parties, as deemed necessary. We understand that contract augmentation for "excessive" numbers of responses is not typically considered by the City. Therefore, our proposal is conservative in this regard. Atkins will also prepare any other written responses to letters or verbal comments received during the preparation and processing of the EIR document (as deemed necessary by the City). Where necessary, the text of the Draft EIR will be revised in a format to indicate text -that has been deleted (by strikeout) or new text has been inserted (by double underline"). A chapter on text changes will note any revisions to the Draft EIR made in response to comments. 9.4 Prepare Final EIR Atkins' project manager will meet with City staff to review comments on the Administrative Final EIR. Based on one consolidated set of comments on the Administrative Final EIR, Atkins wilt revise the Administrative Final EIR for City review prior to publication. Based on one set of consolidated comments on the screencheck Final EIR, Atkins will incorporate all final City comments and prepare the Final EIR. It is assumed that preparation of the Final EIR will not result in any new technical analyses or substantial text revisions. The Final EIR will be distributed by Atkins to all commenting agencies at least ten days prior to the EIR certification hearings. Section 21081.6 of the Public Resources Code requires all state and local agencies to establish monitoring or reporting programs whenever approval of a project relies upon a mitigated negative declaration or an environmental impact report. The monitoring or reporting program must ensure implementation of the measures being imposed to mitigate or avoid the significant adverse environmental impacts identified in the EIR. In conjunction with the EIR, Atkins will prepare a MMP (if needed) that clearly identifies mitigation measures identified in the Draft EIR, mitigation implementation responsibility, implementation timing, and reporting procedures in a format effectively and efficiently implemented and monitored by the team. The MMP will follow standard City format and will be bound separately. 9.5 Prepare CEGA Findings and Statement of Overriding Considerations Atkins will prepare findings for each significant effect identified in the EIR, and a statement of overriding considerations, if unavoidable significant impacts occur. Atkins will also prepare any draft resolutions (if required) and the Notice of Determination (NOD) within four days of certification of the Final EIR, The City will be responsible for all filing fees. 9.6 Prepare Final General Plan Following public hearings before the Planning Commission and City Council, and confirmation with City staff of desired changes, PMC will revise the draft General Plan to create a final General Plan. Revisions to the General Plan at this stage are limited to changes identified in the public hearing process. D inierMes, S reencheck Final H"K, (1 g copie electronic}, indivi u ,onimants and respu-ses fc r di.,1ribution to c , ; .u,rtfingage,. cies (1 copy , electrn 0, Fina` EIR (50 copies u3Wwtr'„ E ad ninistrative draft 8'`>'.P :ale 'r,,,ni = sc h f�@��=� ,�€�, f� tia- �. �reenc �eck draft f Efy„- r2 codes + fi_ml WIMP (1 copy + e€ v;trn, nir;). Screer =check ce"ti{iutoie_�°�lent 1, 1,2 copies eencheck NOD --pv ei�lc " iiC}, final NODS gyp,, electric=, 0e[ivewa ta: F Inal General Plan cru Plan and S hedu. �2-49 If 9.7 Prepare Final Sustainability Action Plan Deliverable: Final SAF 1150 copes Following public hearings before the Planning Commission and City Council, and + electronic; confirmation with City staff of desired changes, PMC will revise the draft SAP to create a final SAP. Revisions to the SAP at this stage are limited to changes identified in the public hearing process. Task 10: Project Meetings, Management, and Coordination 10.1 City Staff Meetings (20) and Public Works Ombudsman Deliverables: Up to tv,o €,2 P`:'C To maintain a local presence and ensure project momentum, PMC staff will staff participating in up_� t��e, participate in project management meetings with City staff. The budget provides for up to 20 in -person project meetings, which will be timed with key milestones. (20; in -person project Up to two PMC staff members, including the project manager, will attend each management meetings: m--e tind meeting to discuss progress on the project schedule, engagement approach, and agendas and summaries evolving project priorities. PMC will prepare an agenda for and summary notes from each meeting. Subconsultant staff budgets identified in this proposal include (electronic}. time dedicated to participation in some of these meetings, as needed. In particular, M&N has allocated resources to attend up to 4 City staff meetings, and Matrix has allocated resources to attend up to 3 City staff meetings, in addition to numerous interviews identified in the scope for the fire and police services study. As a part of this task, PMC Principal Mark Teague will assist the Public Works Department as an ombudsman for the General Plan update and SAP. In this capacity, Mark will provide technical assistance, recommendations, regulatory input and assist with review, interpretation, and editing of draft documents. Approximately 60 hours of Mark's time have been identified for this task. 10.2 Engagement Activities Identified in Outreach Assessment Delis-ferables: Support Flexibility concerning community engagement is essential, as this is the task item for identified communn ou eac,11 that is most likely to change through the process. We have programmed flexibility into this approach to allow adjustments as we proceed through the planning techniques and paiicir;aJd -- in process, PMC will implement the community engagement strategy identified in events, as identifilec in the Task 1.3 in close coordination with the City project management team in outreach assessr�e :.:,;,it .: as =p accordance with the budget identified for this task. All materials prepared by PMC will be reviewed and approved by City staff prior to public distribution. prepared in Task 1.3.The bud E. identified for this task ir? PMC's project manager; public engagement specialists; and City staff will confirm that the outreach strategy prepared in Task 1.3 includes the most appropriate considered anot-toaexcse lir3�11it outreach and engagement techniques for the duration of the project and proceed to complete selected of;., earn with subsequent outreach and engagement to key stakeholders as directed by the tasks and formats. outreach strategy. e,v 10.3 GPAC and Task Farce Meetings (17) We understand that the City Council has determined that a General Plan Advisory Committee (GPAC) will be appointed to support the General Plan update. While the size and composition of the GPAC have not been determined at this time, City staff anticipates the group would consist of between 25 and 30 members. Furthermore, the GPAC may be split into multiple subgroups or task forces consisting of GPAC members, Environmental Board members, and other community experts to review technical studies. PMC will facilitate up to 17 meetings of the full GPAC or GPAC task forces throughout the project. Subject to refinement within the community engagement strategy, approximately seven (7) of these meetings will be dedicated to the GPAC, eight (8) will be dedicated to task forces, and two (2) would be reserved for either the GPAC or task forces as needed. Task force meetings may include dedicated Environmental Board meetings for discussion and preparation of the SAP. We will kick off the GPAC at the first meeting by reviewing the project purpose; discussing the contents and state requirements for the General Plan, SAP, and EIR; establishing the committee's ground rules and role in the process; and reviewing the community engagement program and project timeline. We anticipate meeting with the GPAC to obtain feedback regarding the following key project milestones: • Project kickoff (within Task 1) • Community vision (within Task 2) • Key issues (within Task 3) • Task force review of technical background studies (within Task 4) • Key policy approaches (within Task 5) • Land use and circulation alternatives (within Task 5) ® Public review draft General Plan and SAP (within Task 8) We also anticipate that task forces would be appointed by the GPAC and City staff to review the following technical studies: • Biological resources (Task 4.2) • Sea level rise vulnerability assessment (Task 4.3) (2 meetings) • GHG emissions (Task 4.5) and Sustainability Action Plan (2 meetings) • Market trends analysis (Task 4.6) • Circulation system (Task 4.7) Deliverables. tip to two (2) PIVIC sta-= .att-r, d'inr:, ;_; to seventeen I3PAC or to %force frog r - °et = w agendas, nresenta n , a d summaries e8evt£i?S siu�, 'Norly . li'. and / w Fire and police services (Task 4.8) ® Two (2) additional task force meetings (to be determined) These task force meetings would occur following preparation of technical studies, but prior to initiation of the alternatives analysis. For all GPAC and task force meetings, PMC will provide a facilitator and the project manager, in addition to other needed technical staff for presentations. PMC will prepare meeting agendas, presentations, and summaries for each meeting. PMC Team subconsultants will attend task force meetings related to SLR, market trends, circulation, and police and fire services. 10.4 EIR Scoping Meetings (Day and Evening) Deliverable: PMC and Atkins Scoping Meeting: The PMC and Atkins project managers will be available to attend one EIR Scoping meeting, to be held after the issuance of the IS/NCP. We project onagers attending one recommend conducting this meeting as a two-part event with an agency (1) CEQA Scoping meeting to be roundtable in the afternoon, followed by a presentation and public'comment before conducted in two parts as the Planning Commission the same evening. Atkins will be responsible for preparing any required materials for the scoping meeting (i.e., graphic exhibits described above: meeting and handouts, as necessary), as well as making a brief presentation on the CEQA presentation and summary process and project overview. Scheduling, noticing, and conducting the scoping (electronic). meeting are assumed to be the responsibility of the City. The City will make available any GIS prepared graphics associated with the project. 10.5 Planning Commission or City Council Study Sessions (8) Deliverabres: tip to two (2) PN C PMC will conduct study sessions before the Planning Commission and City Council at key points in the General Plan update process. Specifically, PMC will staff attending up to eight (8) facilitate two study sessions (one before the Commission and one before the Planning Commission or Cite Council) at the following key points in the process: Council study sessions: meeting Community vision and key issues (within Tasks 2 and 3) agendas, presentations, and Key policy approaches (within Task 5) St?ninnarieS (ei8Gtr6niC. ® Preferred land use and circulation plan (within Task 5) Public review draft General Plan and SAP (within Task 8) PMC will provide a facilitator and the project manager, in addition to other needed technical staff for presentations, including subconsultants as needed. PMC will prepare meeting agendas, presentations,.and summaries for each study session. J2 Promc sa t;r Ceity H r 'n, ion P�I_ 10.6 Planning Commission or City Council Hearings (4) After the public hearing draft General Plan, public hearing draft SAP, and Final EIR are released; the PMC team will participate in four hearings before either the Planning Commission or the City Council. City staff will determine the number of hearings to be held before each decision -making body. Key members of the PMC team and subconsultants will be available to attend and to respond to public and Commission,%Council comments and questions. The work scope assumes that up to two PMC staff members; including the project manager, and representatives from each subconsultant firm will be present at these public hearings. PMC will collaborate with City staff as directed to assist with preparation and delivery of presentations for each public hearing. 1U Ongoing Project Management and Coordination Ongoing and active project management is essential to ensure a successful project. This task provides for project management by the PMC project team throughout the project, including overall project management, coordination of team members and tasks, preparation of invoices and project updates, general consultation with the City, and team meetings. We recommend conference calls every other week throughout the project, with periods during public review or holidays that spread team meetings out to once every few weeks. The biweekly calls are an opportunity for the PMC project team and the City to review tasks in progress, share information, review key milestones, and provide updates. This approach allows the entire team to stay up. to speed on the project. As a component of this task, PMC will generate agendas and notes for each team meeting for the City's records and use in updates to the City Council or interested parties. The budget for this task recognizes that the PMC project team will also communicate with the City team by e-mail and phone throughout the project. Task 11: Coastal Resiliency Plan The following tasks describe a Coastal Resiliency Plan that is included in the project scope of work, as well as optional additional modeling to support the Coastal Resiliency Plan. The optional modeling could be added to the scope of the General Plan update at the City's discretion. 11.1 Coastal Resiliency Plan M&N and PMC will prepare a Coastal Resiliency Plan for Huntington Beach using findings of the SLR vulnerability assessment described in Task 4.3 as a starting point and following the approach presented in Section 1 of this proposal. In preparing the Coastal Resiliency Plan, we will consult with other entities with coastal -dependent facilities including OCSG, AES, the State of California, other resource agencies, and non -governmental organizations (NGOs) that manage ecosystem restoration areas, De'verabies Ud t to two (2) PMC staff ar d s,&&--i ;ultants (as ne=died) atte° ding up to four 1(4) Couroc: ` hearings., public hearing P,1e..,ntat on,., as directed Vela^tr�=nia. fi eraf tea Ongoing project Mar=_-,g ernen and coordination; up o 60 voiect management con .;yre, . -Jis °kith agendas and rE eting i , is (electronic). r e.va tes: 4;;-inistrative draft, inal ,'asral Resiliency liar d , u use '.s-Iectronic). The Coastal Resiliency Plan could be a stand-alone plan or could be presented as a chapter of the SAP, at the City's discretion. Elements of the plan may include: 12 A climate -resilient vision for the city Guiding principles for resilience (i.e., engineering resilience, ecological resilience, community resilience) Preparedness goals for each planning area (e.g., beach and beach infrastructure (parking lots, lifeguard facilities, pier)., roads and pedestrian/bike access ways, utilities, recreational harbor infrastructure, residences, ecological habitat areas, new development areas) ® Preparedness actions for each planning area We will identify potential adaptation measures for the various elements of infrastructure affected by sea level rise. Potential measures may include: ® Engineering resilience: multiple levels of protection, anticipate failure modes and stockpile resources, storm recovery plans, pre-existing problem areas Ecological resilience: water and sediment management, planting plans and maintenance Community resilience: communicate resilience strategies and outreach to public, need for maintaining beaches, establish evacuation routes, rebuild now versus later, considerations for tourism We will also identify an implementation strategy for the Coastal Resiliency Plan consisting of phasing (i.e., stair -step approach), economics (i.e., do it now versus later), cost estimates, and regulatory, resource, and other impacts (e.g., loss of land due to adaptations), 11.2 Coastal Resiliency Planning — Additional Modeling Option Deliverables: Additional as- M&N can add great value to the presented scoped effort through focused needed €` ode* . to suppo modeling efforts to identify. effective adaptive measures to improve coastal resiliency, emphasizing a solution -based approach. Two primary focus areas for Coastal Resiliency Plan. the Coastal Resiliency Plan include: (1) the City's ocean shoreline, vulnerable to coastal storm waves and high ocean water levels; and (2) coastal and low-lying inland areas subject to coastal and/or rainfall related flooding. Ocean. Shoreline Adaptation Strategy Modeling. Potential adaptation strategies to enhance coastal resiliency include preserving/maintaining the federal Surfside- Sunset beach nourishment program. The City's beaches, and all sandy beaches from Surfside to Newport Beach, rely on this program for periodic nourishment. This program will become even more critical under future SLR scenarios. M&N will use the very powerful modeling tools created to support the vulnerability pc�_ assessment to develop effective adaptation strategies that maintain the beach width necessary to effectively manage coastal erosion. These modeling tools provide a quantitative assessment of potential future adaptation strategies including additional beach nourishment, alternative sand sources, sand retention structures such as nearshore reefs, and shoreline armoring. If desired, our effort can augmented with an assessment of the economic benefit associated with City management of the public trust beach resource. We have collaborated on numerous such investigations with Dr. Philip King (San Francisco State University), a recognized expert in the area of the economic benefits of beaches. Dr. King has previously studied Huntington Beach in detail and that work can be updated and applied to this effort as appropriate. Powerful arguments can be made that support the City maintaining its beaches, and oftentimes the benefits significantly exceed the costs. Such a message is critical in these times of fiscal prudence. Combined Coastal and Upland Flood Mitigation Strategy Modeling. M&N proposes to develop a coastal resiliency planning model that will help the City identify risks and options for mitigating coastal flooding caused by high rainfall events in combination with coastal storms, extreme astronomical tides, and under various scenarios of SLR. While the preceding vulnerability assessment focuses on existing flood defenses, the adaptation strategy focuses on identification and evaluation of conceptual flood mitigation alternatives including structural flood barriers or elevated flood control channel walls, augmented/upgraded pumping systems, and gates to allow tidal exchange during normal conditions. M&N will use historical data and new measurements, along with design rainfall hydrographs, within calibrated models of the storm water collection system and overland flow areas to predict flooding for a range of both rainfall and tidal tailwater events. We will incorporate results into a GIS geodatabase and maps, along with information on property and infrastructure values, historical flood damage claims, and potential impacts to transportation corridors. The geodatabase approach allows for efficient, repeatable, and easily presentable calculations to characterize the benefits of various mitigation alternatives. The storm water system, open water, and overland flow simulations will be conducted using the XPSWMM model, which will be applied in the vulnerability assessment using the EPA SWNIM5 1-dimensional (1-D) model for pipe, channel, and structure flows, linked with the TUFLOW 2-dimensional (2-D) model for.open water and overland flows. This 1-D/2-D dynamically -linked approach will create a more accurate simulation of the effects that oceanwater levels have on the storm water system's ability to convey rainfall runoff during coastal storm events (e.g., El Nino). The grid -based 2-D overland model will allow seamless integration of XPSWMM model results with the property, infrastructure, and elevation data in the khij .lr t<.. tl ) and, ; [,�%�'U. 2'.JJ project geodatabase, allowing us to calculate flood damages for both existing and proposed conditions. M&N will develop XPSWMM 1-D/2-D models for two large and separate watersheds within the City's lowland historic floodplains: the Bolsa gap and Santa Ana River, We will calibrate the models using City GIS information and historical data, and run matrices of predictive simulations for several design alternatives over several design storms. This work will provide expanded knowledge of tidal conditions within the city and create models that produce more accurate flood predictions. M&N and PMC will develop conceptual flood mitigation alternatives by assessing of City design requirements; and identifying those in need of update; prioritizing flood improvements; and the formulating funding strategies to implement these improvements. M&N will develop risk analysis and design conditions using results from the integrated stormwater system, open water, and overland flow simulations. At each level of design; we will evaluate probable construction and operations and maintenance costs alongside estimated benefits from flood damage reduction. We will estimate damages will be estimated based on high -resolution, GIS-based calculations using FEMA and U.S. Army Corps of Engineers methods and depth - damage functions. Schedule The schedule shown on the next page presents completion. of the General Plan update project in approximately two -and -a -half years (30 months) from contract initiation. The schedule is flexible, based on our project understanding and the City's needs and resources, and can be refined as needed at the project kickoff meeting. 2-56 ProrxiSa for C;jtv," of iUr' l' w ^.f PCAI sillaWl"Sk WA� PubJu'ReviewPeniod ReviewPeriod . ..... ..... .. . 7.1 Initial Study/NOP ........... ....... .......................... ....................... .......... . . .. ........... IBM, .... ..... ... 7.2 Contact and Consult Agencies ... ....... .......... i ....................... .......... 7.3 Admin. Draft EIR 50 8.1 Public Review Draft General Plan 8.2 Public Review Draft SAP fi 8.3 Public Review Draft EIR ................. . . .. . .......... . ....... - 8.4 Fiscal Analysis .......... .......... "M 9.3 RTCs and Admin Final EIR .......... EIR .......... . ..... ............ - ........... 9.4 Final 9.5 CE'QA Findings & SOC ....................... - ............ - ............... -L. .......... i ...... ..... . .............. ...... . . . ......... . 9.6 Final General Plan 9.7 Final SAP 10.1 City Staff Meetings (20) and Public Works Ombudsman °" x -N Vilw� 10.5 PC or CC Study Sessions (8) ....................... — .................... 10.6 PC or CC Hearings (4) P, 10.7 Ongoing Project Management 11. 1 Coastal Resiliency Plan .......... ............ - 11.2 Coastal Resiliency Planning Additional Modeling Option Meetings Gonsiltan' T`sk Pulb';c Review Feikid Cily Staff Review Fe fina I ATTACHMENT C PMCs proposed cost estimate is provided at the end of this section and identifies teary, member levels, hourly rates, estimated hours per task, total number of hours and cost; and subconsultant and direct costs. As identified in the attached budget, PMC proposes to complete the General Plan update work program for a budget of $1,720,151. Considering a 15% contingency, the total amount would be $1,978,174. If identified as a desired task by the City, optional modeling to support the Coastal Resiliency Plan (Task 11,2) would add $91,540 to the project fee. Our objective in assembling the budget is to provide a realistic assessment of the effort required to complete the work items identified in, the RFP. We understand that City staff will be consulting with the City Council prior to consultant interviews to identify the priority items to be included in the work program in light of the proposed budget for each work item. Therefore, the work program and budget remain flexible at this time and will be adjusted as ,seeded to meet City needs and priorities. Cost Assumptions With the objective of ensuring clarity about the proposal, PMC has prepared the following assumptions for our scope of work that explain the basis for the cost and effort to implement the work scope. The topics and scope of technical studies will be confirmed through an initial meeting with City staff. PMC has scoped and budgeted for the technical studies described in the RFP. • For each deliverable, our work plan assumes that the City's General Plan project manager will provide PMC with one set of consolidated comments and that any conflicts among comments from multiple reviewers will be . resolved by the City prior to providing comments to PMC. We further assume that the technical reports will be presented to the GPAC and task forces for discussion and that the GPAC and task forces will advise staff regarding content of the reports. City staff will direct any revisions to the contents of the reports (i.e., the GPAC will not provide independent direction to PMC). • Our work scope assumes that City staff will conduct the required SB 18 tribal consultation process, with PMC as a technical advisor. We will provide sample letters and other documents required for the consultation process. • Our scope and budget do not specify costs for mass printing and distribution of General Plan newsletters. PMC will work with the City to determine the P v-I 11� 4-i most efficient and cost-effective means of distributing a community newsletter. The work scope assumes up to 17 GPAC and task force meetings, with each meeting to be attended by two PMC staff members: (1) the project manager, who will serve as the meeting moderator, and (2) a note taker or technical expert. PMC will prepare meeting agendas, presentations, and summaries. We will also provide the City with examples of bylaws or rules of order adopted by other general plan advisory committees for consideration by the GPAC. PMC assumes that the City will be responsible for securing meeting locations, logistics, and noticing. • The work scope assumes that two PMC staff members and one representative of each of the consultant team members will be present at public hearings before the Planning Commission and City Council. We will assist City staff in preparing a presentation for the public hearings. PMC further assumes that Planning Commission comments and recommended revisions to the General Plan, SAP, and EIR will be presented as an addendum in the staff report to the Council, not as revised documents. • The scope of work assumes up to 20 project management meetings with City staff. The budget for direct costs represents our best estimate of internal costs for travel, reproduction, supplies and materials, communications, postage/delivery, and other miscellaneous costs. We have included a cost estimate for printing or reproduction of the City's desired number of the technical background report, and the public review draft and final General Plan, SAP, and EIR. For most other work products, a single electronic copy is assumed. The cost of such documents will depend on the number of pages, number of color pages, graphic content, number of oversized pages (11 x 14, 11 x 17, etc.), use of section dividers, and other factors. Because we cannot predict, in advance, the cost per document, we will charge for the actual cost of copying plus 5% for our handling costs. These costs will be limited to the maximum amount identified in the budget proposal, as required by the RFP. Our cost estimate is based on the proposed 30-month schedule included in this proposal. Should significant delay (more than 120 days) occur for reasons beyond our control, additional charges may apply to the remaining work, based on labor rates in effect at the time of the delay. 4-2 riw ^0, ............ ... .. 2 4 19 $7 880 $1 60 51 r20 $3 070 $680 4,8 0....... 1.1 Kickoff Meeting, Bus Tout, Fuld GIS Orienialion 12 2 8 .. .. ... ......_ ..._ .�..._ c 6p... ...... _. ....- ...._..- ._......... ......_. 12 Develop General Plan Visual Identity � -...._. 2 ....... .....__ 2 8 . ,... f � ..32 6 � 50 $49�10���� $260 -.. -.. $5,170 3 Prepare Duheac h Assessment And Engagement Strategy 2 4 8 94 :� _. 2 7 • 42 $5,540 $6,540 .B 2.1 Stakeholder lnterviews!Key Community Themes 4 40 �0 2 $14,470-- 2 Devele Commumt vision 4 16 40 56 8 32 II 156 $19.400 $110 F $19,510 3.1 Collect And Rev ew (xistmg Plans An!i Pohnes 2 4 2 _.. ., 24 �..... ,... 4 ..... .....4 i ....... 3.2 Identify Key Issues a....,.. t l 1 - 8 16 2 16 4 4 4 4 62 $7.995...: $7.995 4.1 Existing Land Use Survey 2 i 2 16 32 l ... 100 ... .._. 40 .....4 i 196 $20,410 $1 580 ..... $21,990.,..,,, .___..._.... ...._... ............ ....__....... 4.2 Biological Resour os Survey .._..__.__ 24 l 1 i � �� 60 60 40 20 228 $25 340 $1 580 � _ _ $26920 .... p $104 310 ' $109,090 � �.....44 � � ....[-.$2.340 $158 620 $160,960...... Urban Runoff Impact Study 8 = ..... .. _. .... .. .. ,. ...... _.__._... .. .. ............ _.__._....... ....._...._ ......a....... e _......__ __._...E _ i 20 02 80 8 8 158 $17 , 70 $110 ! $15,880 4b C,HG Emissions o .. - .. ... .... .. ,. . _. _ ._.. ..... . ......,. -----..._. ... _, _..._ _.._� . ._._....... ..._.__� ... _............. ..._...___ ,..._._..._.. _ ... ..........._...__. ..,. ....___. ... .....�._ ._ .__.. 6 4 .14 $1 500._ 574 00 '......_.. $ 25,700 4.6 Marker kends F,naly.,rs a ....__ ._ . __ ...... .. ,... d. , ...____....... . ..... ...._.- ..... .......... ......... 2 ..._.. ........ 6 ` ...... 4 4 16 $1 980 $44 840 $46 8 0 4.7 Circulation System Modeling 4 ... 8 .... .. 2 16 $2 220 $110 ...... ' $81,400 $83,730 4.8 Hie And P(Ac•e Service Study ._._.._. —� .. _._ —.._ .._... ._... _. __E. ,... `'.._ I - ._. __- ....... ....... ......... $8,,...... G_ 4.9InfastructureAndPublicServices 2 6 4 40 8 4 ......,. 2 66 S8350 $110 .(. ,... ..,., .. f 4.10 Natural And Environmental Hazards (( 2 1 4 4 i 40 20 4 2 76 $9 230 $110 1 --, $9,340 6 2 10 $1 050 $10 860 $11,910,,,,,, 4.11 Noise Menitming And ModelingI - 2 .,,... 4.12 Administrative Draft Technical background Report 8 2 4 20 i 20 _.., 40 .._ 1L 12 146 .. _._ $16 >40 _ --- - $280 ;, _ r $18 't60 _ ..._ - -- $3a 230 --.._._.._.._ - ..._.�� ...—.-_ ---'- 0 -- 0 15 20 4 $7,995 S1 67 4.13 Draft Technical Bark9iound Report 4 1... 8 2 3a _ ___ _...... ... 3.. 1 0 $3.910 51,390 € $5,300 4.14Final Technica(Background Report ! 2_ .- .-- .Fom !�$73660....... 5.1 Develop Key Policy Approaches For GP And SAP 4 4 16 1 � II 16 4 - 40 -.. ...._ 80 ............ 4 . 4 _. _..... I ...96 $2 f :840 .... -_ ( ...t. ! $33,000 ,. _.518,820 _..- ..._.._._ .. .._._-... . . ....... ... ...... P......_...)_ 5.2 DeGne Land U e And Circulation Altematives (U To 3 ........... 8 ............_. 4 _....4 20 ....... 8 -_ -.... 8 k. 0 ....... 32 40 20 8 68 ..... 519,360 ... $ f 310 .I. _. .. $20,fa70 ..6 .... ......... ......... ......... ... _. 5.3 Eval &Compare Altematives (Land Use, Guc., GHG; Fiscaq _...... . 8 9 24 .__. 37 ... 8 E 40 16 80 100 32 8 € , 352 $39,020 _ :- $16.540 .-_-_ _ r 455,560_-,,, 5.4 Develo. Preferred Land Usa &Circulation Alternative 4 4 1� 16 1 16 4 32 40 12 .. 4 148 $16,840 $210 $17,050 8 20 40 $82,500 $91,540 11.2 Coastal Resiliency Planning - Additional Modeling Option 12 80 $9,040 me above Pei task costs "'0 based upoil ou" best estimate of firle lieedw A:Jua 1 time spli If on, Individol WA s rnay not nn es! o" ITIdy e;x6ee, .1 s UG"i esfin 18 Ass f1M., reserves "t; e "'ig fit to f(SlIsfer &I ased b uchfe? A'& p brie e ias K to a""ofliel Y aemsThe id,,i estmpted fiWiW n4lriot he exileeded mihoul proper EXHIBIT "B" Payment Schedule (Hourly Payment) A. Hourly CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule: B. Travel Charges for time during travel are not reimbursable. C. Billing All billing shall be done monthl in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it. 2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project. 3. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. 4. CONSULTANT shall submit to CITY an invoice for each monthly payment due. Such invoice shall: A) Reference this Agreement; B) Describe the services performed; C) Show the total amount of the payment due; D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and E) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non -approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein. 1 Exhibit B /4 EXHIBIT `B" Payment Schedule (Hourly Payment) A. Hourly. CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule: Project Director/Prin. Planner $180.00/hr. Bio Services Director $175/hr. Project Manager $160/hr. Assistant Project Manager $140/hr. Principal Planner $160/hr. Senior Planner/Facilitator $130/hr. Senior GHG Analyst $115/hr. Associate Planner/Biologist $100/hr. Assitant Planner $90/hr. GIS,Tech Editor, Graphics $85/hr. Admin Support $65/hr. B. Travel. Charges for time during travel are not reimbursable C. Billing 1. All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it. 2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project. 3. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. 4. CONSULTANT shall submit to CITY an invoice for each monthly payment due. Such invoice shall: A) Reference this Agreement; B) Describe the services performed; C) Show the total amount of the payment due; D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and E) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this 1 Exhibit B 5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate. Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement. 2 Exhibit B �L'l LIST OF CONSULTANTS THAT SUBMITTED PROPOSALS The Planning Center/DC&E 3 MacArthur Place, Suite 1100 Santa Ana, California 92707 ATTN: Brian Judd (714) 966-9220 PMC 2729 Prospect Park Drive, Suite 220 Rancho Cordova, California 95670 Attn: Jeff Henderson (949) 361-8384 MIG/Hogle-Ireland 169 N. Marengo Avenue Pasadena, CA 91101-1703 Attn: Lisa Brownfield The Chambers Group 5 Hutton Center Dr., Suite 750 Santa Ana, CA 92707 (949) 261-5414 HB -155- Item 5. - 96 p �I Acord CERTIFICATE F LIABILITY I Sly CE Date81� 013R) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terns and conditions of the policy, certain policies require an endorsement. A statement on this certificate does not confer rights to the Certificate holder in lieu of such endorsemert s . PRODUCER Risk Strategies Company 2040 Main Street, Suite 580 Irvine, CA 92614 LID. #OF06675 CONTACT Sherry Young NAB: No EXt 949.242.924o FIC.ND : 949.596.0965 N EMAIL ADDRESS; syoung@rlsk-strategles.Com INSURERS AFFORDING COVERAGE NAIC # INSURED Pacific Municipal Consultants DBA: PMC 2729 Prospect Park Dr., Ste 220 Rancho Cordova, CA 95670 INSURERA: Citizens Insurance Co. of America 31534 INSURER B: Hanover American Insurance Co. 36034 INSURER C: Massachusetts Bay Insurance Co. 22306 INSURER D: Continental Casualty Co. 20443 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECTTO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSR SUER, WVD POLICY EFF POLICY EXPO GENERAL L LIAaRITY EACH OCCURRENCE $2AK000 A X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES (Ea OCWrence) 11.000.000 CLAIMS -MADE OCCl02 son OB39146MI02 07/01/13 07101/14 MED EXP(Any one parson) $10'Wo PERSONAL & ADV INJURY $2,000.000 GENERAL AGGREGATE $4,000,0D0 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMPIOP AGG $4.0002DO $ POLICY X PROJECT LOC AUTOMOBILE LIABILITY COMBDIED SINGLE LIMIT (Ea accklenQ $ BODILY INJURY (Par person) $ A ANYAUTO ALL OWNED AUTOS A�DDULED NON. HIRED AUTOS X OWNED OB3914SW102 07/01 /13 07/01 M 4 BODILY INJURY (Per accident) $ X PROPERTY DAMAGE $ AUTOS $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $2.000,DDO A ExCESS LIAR CLALMS- MADE 083914666102 07/01/13 07/01114 AGGREGATE $2.000ADD OEO X I RETENTION $10.0W $ WORKERS COMPENSATION WC STATU• L OTH- B AND EMPLOYERS LIABILITY YIN WZ3912749003 (CA, AZ 07/01113 07/01/14 uMITs ER ELEACHACCIDENT $1AOOA00 ANYPRppM�,� ,(M NIA C OPRCFRr161HEREMt�? (MendatoryInN.H.) WZ39127496M(OR) 07/01/13 07/01/14 � E-EA 51,oW000 B yes, describe under DESCRIPTION OF YEE El. DISEASE - POLICY LIMIT $1,0W,0N OPERATIONS below D PROFESSIONAL LIABILITY MCH288307507 07101/13 07/01/14 Per Claim An re ate $2.DD0.OW $3,000.000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES ch ACORO 101, Addltlonal Rw m*s Schedule, if more apace is required Projects as on file With the insured including but not limited to General Plan Comprehensive Update. The City of Huntington Beach, its offloers, elected or appointed officials, employees, agents and volunteers are named as additional insureds on the general liability policy -see attached endorsement, Prof Liab Ded: W,000 per claim. "The above policies contain a 30-day notice provision for non -renewal and cancellation except for cancellation due to non-payment of premium, in which a 10-daynotice applies." - City of Huntington Beach 2000 Main St. Huntington Beach, CA 92M SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. i CityAttorney Item 5. - 97 xB -156- the rendering of or the failure to render any professional services. This includes but is not 1 imted to any professional services as an architect or engineer arising out of any construction agreement or actiltiesunder which any Insured or anyone acting on any insured's behalf provides or provided service, advice, expertise or work- Construction Includes, but is not limited to, the plan, conception, design, build, construct, assembly, development, safety, erection, formation, reconstruct, rehablitation, repair, or any improvement made to real Property. Construction also includes the hiring, supervision or management of any of these activities. However, this exclusion does not apply to 1 iability arising out of an insured's presence at a Jobsite that was not caused by professional activities listed in the above paragraph c. Additional insured coverage provided by this provision will not be broader than coverage provided to any other insured. d. All other insuring agreements, exclusions, and conditions of the policy apply- 11. Additional Insured by Contract, Agreementor Permit — Primary and Non-contributory The following Is added to SECTION III — COMMON POLICY CONDITIONS: M. Other Insurance 1. Add tionaI Insureds If you agree in a written contract, written agreement or permit that the insurance provided to any person or organization included as. an Additional Insured under SECTION II LIABILITY, Part C — Who is An I nsured, is primary and non-contributory, the following applies: If other valid and collectible insurance is available to the Additional Insured for a loss we cover under SECTION II — LIABILITY, Part A. Coverages, Paragraph 1., Business Liability our obligations are limited as follows: a. Primary Insur-ance This insurance is primary to other insurance that Is available to the Additional Insured which covers the Additional Insured as a Named Insured. We will not seek contribul ion from any other insurance available to the Additional Insured except: (1) For the sole negligence of the Additional nsured; (2) When the Additional Insured is an Additional Insured under another primary liability policy; or (3) When b.(2) below applies. If this insurance is primary, our obligations are not affected unless any of the other insurance is also primary. Then, we will share with all that other insurance by the method described in b.(3) below. b. Excess Insurance This insurance is excess over. (1) Any of the other insurance, whether primary, excess, contingent or on any other basis: (a) That is Fire, Extended Coverage, Bulder's Risk, 1 nstallation Risk or similar coverage for "your work', 391-1586 02 11 Includes copyrightedmatefiabRnsurance Services Offices. Inc. -with its Page 2 of 4 HB -157- Item 5. - 98 b. For purposes of the coverage provided by this endorsement F. Liability And Medical Expenses Definitions under Section II - Liability is amended by adding the following: a.- vour project" means: i. Any premises, site or location at on, or i n which "your work" is not yet completed; and ii. Does not include any location listed in the Declarations. IV: Blanket Waiver of Subrogation Paragraph K. Transfer Of Rights Of Recovery Against Others To Us in Section III — Common Policy Conditions Is amended by the addition of the following: We will waive any right of recovery we may have against any person or organization when you have agreed in a written contract, permit or agreement to waive any rights of recovery against such person or organization because of payments we make for injury or damage arising out of your ongoing operations or .your work" done under a contract with that person or organization and included in the "products -completed operations hazard". 391. 1586 0211 Ind ides copyrighted material of Instrance Services Offices. Inc., with its permission Page 4 of4 Item 5. - 99 HB -158- Su iiy INSURANCE AND INDEMNIFICATION WAIVER HunBeach. MODIFICATION REQUEST 1. Requested by: Debra Gilbert 2. Date: 8/22/2013 3. Name of contractor/permittee: Pacific Municipal Consultants, dba PMC 4. Description of work to be performed: General Plan Update 5. Value and length of contract: $1,900,000 6. Waiver/modification request: $50,000 deductible on Professional Liabiltiy 7. Reason for request and why it should be granted: PMC privately owned company, due to strong growth and financial stabitility has carried the $50K deductible for the last five years. They do not consider this to be a substantial amount. Company financials are attached consider confidential and are to be return to the vendor at the listed address. 8. Identify the risks to the City in approving this waiver/modification: very minimul Department Head Signatu 8/22/13 Date: APPROVALS Approvals must be obtained in the order listed on this form. Two.approvals are required for a request to be granted. Approval from the City Administrator's Office is only required if Risk Management nd-t a City Attorney's' ffice disagree. 1. Z-1 Management pproved El Denied �.�� Signature D to 2. City Attorney's Office a ❑ Approved ❑ Denied ! �.iJ",,.°°'��' =�iJ Signature Date 3. City Manager's Office ❑ Approved ❑ Denied Signature Date If approved, the completed waiver/modification request is to be submitted to the City Attorney's Office along with the contract for approval. Once the contract has been approved, this form is to be filed with the Risk Management Division of Human Resources JAR -159- Item 5. - IOC Insurance Waiver Form.doc 8/22/2013 4:u-i:uu rnm City Of Huntington Beach 2000 Main Street ® Huntington Beach, CA 92648 (714) 536-5227 o www.huntingtonbeachca.gov Office of the City Clerk Joan L. Flynn, City Clerk October 9, 2013 Philip O. Carter, President Pacific Municipal Consultants 2729 Prospect Park Drive, Suite 220 Rancho Cordova, CA 95670 Dear Mr. Carter: Enclosed for your records is a copy of the fully executed "Professional Services Contract Between the City of Huntington Beach and Pacific Municipal Consultants for Preparation of Comprehensive Update to the City of Huntington Beach General Plan." Sincerely, ` G" Join``L. Flynn, CIVIC k City Clerk JF:pe Enclosure Sister Cities: Anjo, Japan 0 Waitakere, New Zealand