Loading...
HomeMy WebLinkAboutOrange County Transportation Authority - 2017-02-06 L 0 S. Dept.ID pw 17-002 Page 1 of 2 Meeting Date:2/6/2017 A1110" i � 1 CITY OF HUNTINGTON BEACH "cJr.,�Exs_ REQUEST FOR, CITY COUNCIL ACTION ! v'� MEETING DATE: 2/6/2017 SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Travis K. Hopkins, PE, Director of Public Works SUBJECT: Approve and authorize execution of Cooperative Agreement with Orange County Transportation Authority (OCTA) for Project V Community-based Transit Circulator Grant Project; amend the 2016/17 Capital Improvement Program to add the Community-based Local Transit Circulator project; and authorize appropriation of funds for the Community-based Local Transit Circulator Grant Project; and, adopt Resolution No. 2017-07 adopting a revised CIP for the years 2016/17 through 2022/23 Statement of Issue: In June 2016, the City of Huntington Beach applied for and received funding to operate a seasonal local transit circulator service within the City under the OCTA Measure M Project V program. The City needs to enter into an agreement of terms with OCTA to receive and administer the grant and also add the project to our current Capital Improvement Program along with authorized matching funds. Financial Impact: An appropriation of $25,000 from the undesignated Air Quality Management District (201) fund balance is requested for the City's grant match for the project for the current fiscal year. The grant will provide a maximum of $917,770 over the seven-year term of the grant. In addition, Visit HB has agreed to provide up to$12,000 towards the project for the current fiscal year. Recommended Action: A) Authorize the Mayor and City Clerk to execute Cooperative Agreement No. C-6-1481 between OCTA and the City for Project V Community-based Transit Circulator Grant Project; and, B) Amend the 2016/17 Capital Improvement Program to add the Community-based Local Transit Circulator project; and, C) Appropriate$25,000 from the undesignated AQMD (201) fund balance to account 20185201.82800; and, D) Appropriate$159,812 in grant and contribution funds to a grant account established under Finance Department guidelines; and, E) Adopt Resolution No. 2017-07 "A Resolution of the City Council of the City of Huntington Beach Adopting a Revised Capital Improvement Program for the Years 2016/17 Through 2022/23." Alternative Action(s): Reject the cooperative agreement as presented and do not add project to the Capital Improvement Program. This action would result in forfeiture of the grant. Item 12. - 1 H -3 64- Dept.ID pw 17-002 Page 2 of 2 Meeting Date:2/6/2017 Analysis: In early 2016, the City submitted an application to receive transit grant funding to help develop and fund a local transit service that supplements current OCTA transit services. The vision for the grant was to provide a free transportation option to residents and guests, serving key local neighborhoods, business centers, resort and recreation areas during peak activity seasons in the City. The City Council supported the application and adopted Resolution 2016-13 formally stating the City's commitment and support for the application, which was submitted to OCTA. In the summer of 2016, the OCTA Board of Directors approved funding for the City's application. In order to be eligible to receive the funding the City must complete two steps. First, we must enter into an agreement with OCTA that presents the terms and conditions for the receipt of the funding. Second, the City must add the project to our Capital Improvement Program. The latter step also requires that we formally allocate funding for the City's portion of the project funding. The local transit service application identified a 15.4 mile route circulating between the Bella Terra area, Oak View neighborhood, Central Park and the coastal areas of downtown, Pacific City and the hotels. The service is proposed to run on weekdays from 10 a.m. to 10 p.m. from Memorial Day to Labor Day, and on additional weekends prior to that beginning April 1 and after that period through October 1. The overall operating cost of the service is approximately $130,000 per year with additional expenditures during the first year of$45,000. The grant will provide funding 90% of funding for up to seven-years of service operation, subject to achieving minimum performance standards and ridership requirements annually. The overall seven-year budget for the project is $1,019,744, with OCTA grants funding up to $917,770 of that amount. The remaining costs will be the responsibility of the City along with any costs beyond those covered by the program. The City has partnered with Visit HB in the effort. Visit HB has agreed to provide up to $12,000 in funding towards the project-match along with providing access to current Visit HB marketing and artwork for the service. The City anticipates a basic matching contribution to the project of$15,000 for the first year. However, due to many unknown factors at this time, staff is requesting that the City Council appropriate $25,000 in Air Quality Management District funds at this time to cover other potential expenses as a contingency. The Community-based Transit Circulator project was not included in the adopted 2016/17 Capital Improvement Program in August 2016 since it does not meet typical capital improvement program project characteristics. Due to requirements from OCTA to have all grant projects included in the CIP and the need to appropriate funds for the project, staff is requesting that the City Council formally amend the CIP to add the project and appropriate the $25,000 in AQMD funds from the fund balance. The City Council also adopts by resolution adopting a seven-year Capital Improvement Program submittal document for OCTA programming purposes. Since the recommended action would amend the City's 2016/17 Capital Improvement Program and the project could span up to seven- years, a separate resolution amending the seven-year Capital Improvement Program is also required for compliance with Renewed Measure M. Environmental Status: The project will be reviewed for environmental compliance as part of the implementation steps. Strategic Plan Goal: Improve quality of life Attachment(s): 1. Cooperative Agreement No. C-6-1481 2. Capital Improvement Program detailed project sheet 3. Resolution No. 2017-07 "A Resolution of the City Council of the City of Huntington Beach Adopting a Revised Capital Improvement Program for the Years 2016/17 Through 2022/23" 4. City Council Resolution 2016-13 supporting the submittal of the project application 5. Final Project Grant Application submittal package and revisions HB -365- Item 12. - 2 ATTACHMENT # 1 1 COOPERATIVE AGREEMENT NO. C-6-1481 2 BETWEEN 3 ORANGE COUNTY TRANSPORTATION AUTHORITY 4 AND 5 CITY OF HUNTINGTON BEACH 6 FOR 7 PROJECT V COMMUNITY- BASED TRANSIT/CIRCULATORS 8 THIS COOPERATIVE AGREEMENT, is effective this 11}day of 'e hru tir✓, 2011, by and between i 9 the Orange County Transportation Authority, 600 South Main Street, Orange, California 92863-1584, a 10 public corporation of the State of California (hereinafter referred to as "AUTHORITY" or "OCTA"), and 11 the City of Huntington Beach, 2000 Main Street, Huntington Beach, California 92648, a municipal 12 corporation (hereinafter referred to as "CITY") each individually known as "PARTY" and collectively 13 known as the"PARTIES". 14 RECITALS: 15 WHEREAS, AUTHORITY and CITY desire to enter into a Cooperative Agreement to define the 16 roles and responsibilities related to funding between AUTHORITY and CITY for the operating subsidy 17 funds for the Huntington Beach shuttle service (hereinafter referred to as "PROJECT") as further 18 defined in the project description section of the application for Measure M2, Project V Call for 19 Projects, received by OCTA on February 29, 2016; and 20 WHEREAS, AUTHORITY's Board of Directors (hereinafter referred to as "BOARD") approved 21 the Renewed Measure M2 Eligibility Guidelines - Local CITY Preparation Manual on 22 January 25, 2010 and subsequent amendments, most recently on April 11, 2016; and 23 WHEREAS, AUTHORITY's BOARD approved the Comprehensive Transportation Funding 24 Programs (CTFP) Guidelines on March 22, 2010; and 25 WHEREAS, AUTHORITY's BOARD approved the revised Project V- Community based Transit 26 Circulator Program Guidelines on November 23, 2015; and Page 1 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 WHEREAS, AUTHORITY will periodically update the Renewed Measure M2 Eligibility 2 Guidelines- Local CITY Preparation Manual and the CTFP Guidelines whereby the most recent update 3 is incorporated herein by reference; and 4 WHEREAS, AUTHORITY and CITY agree that M2 funding is subject to CITY fulfilling 5 M2 eligibility requirements; and 6 WHEREAS, AUTHORITY and CITY agree that PROJECT must adhere to the CTFP Guidelines 7 precepts except where specific more detailed instruction is provided through Project V Guidelines or 8 within this Cooperative Agreement; and 9 WHEREAS, CITY intends to execute a grant subrecipient agreement with Transportation 10 Concepts whereby Transportation Concepts will be the service provider to administer, operate, maintain 11 and manage PROJECT and the CITY will act as a pass-through agency for administering annual 12 reimbursements and AUTHORITY required data consistent with the program guidelines; and 13 WHEREAS, CITY's fixed-route shuttle service is open to the public, and fully accessible for 14 persons with disabilities, in compliance with the Americans with Disabilities Act; and 15 WHEREAS, AUTHORITY's BOARD has approved Project V funding for PROJECT for up to 16 seven (7) years in the total amount not-to-exceed Nine Hundred Seventeen Thousand Seven Hundred 17 Seventy Dollars ($917,770) and AUTHORITY and CITY agree that the capital amount to be provided by 18 AUTHORITY is One Hundred Forty-Five Thousand Seven Hundred Thirty-Nine Dollars ($145,739) and 19 the annual operating subsidy will be provided consistent with operating statistics as defined in the 20 Project V Guidelines in an uninflated amount of Seven Hundred Seventy-Two Thousand Thirty One 21 Dollars ($772,031). 22 WHEREAS, CITY has agreed to provide a minimum of ten percent (10%) local match for a 23 minimum capital purchases of Sixteen Thousand One Hundred Ninety-Three Dollars ($16,193) and 24 additional local match for operations and maintenance costs to meet operating expenses not covered 25 by AUTHORITY; and 26 / Page 2 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 WHEREAS, this Cooperative Agreement defines the specific terms, conditions, roles and 2 funding responsibilities between AUTHORITY and CITY for PROJECT(s); and 3 WHEREAS, AUTHORITY's BOARD approved this PROJECT on June 13, 2016; and 4 WHEREAS, CITY's Council approved this Cooperative Agreement on this 6 day of 5 - ;) ZD/-7- 6 NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and CITY as 7 follows: 8 ARTICLE 1. COMPLETE AGREEMENT 9 A. This Cooperative Agreement, including any attachments incorporated herein and 10 made applicable by reference, constitutes the complete and exclusive statement of the term(s) and 11 condition(s) of this Cooperative Agreement between PARTIES and it supersedes all prior 12 representations, understandings, and communications. The invalidity in whole or in part of any term 13 or condition of this Cooperative Agreement shall not affect the validity of other term(s) or condition(s) 14 of this Cooperative Agreement. The above referenced Recitals are true and correct and are 15 incorporated by reference herein. 16 B. AUTHORITY's failure to insist on any instance(s) of CITY's performance of any 17 term(s) or condition(s) of this Cooperative Agreement shall not be construed as a waiver or 18 relinquishment of AUTHORITY's right to such performance or to future performance of such term(s) 19 or condition(s), and CITY's obligation in respect thereto shall continue in full force and effect. 20 Changes to any portion of this Cooperative Agreement shall not be binding upon AUTHORITY 21 except when specifically confirmed in writing by an authorized representative of AUTHORITY by way 22 of a written amendment to this Cooperative Agreement and issued in accordance with the provisions 23 of this Cooperative Agreement. 24 C. CITY's failure to insist on any instance(s) of AUTHORITY's performance of any 25 term(s) or condition(s) of this Cooperative Agreement shall not be construed as a waiver or 26 relinquishment of CITY's right to such performance or to future performance of such term(s) or Page 3 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 condition(s), and AUTHORITY's obligation in respect thereto shall continue in full force and effect. 2 Changes to any portion of this Cooperative Agreement shall not be binding upon CITY except when 3 specifically confirmed in writing by an authorized representative of CITY by way of a written 4 amendment to this Cooperative Agreement and issued in accordance with the provisions of this 5 Cooperative Agreement. 6 ARTICLE 2. SCOPE OF AGREEMENT 7 This Cooperative Agreement specifies the roles and responsibilities of both AUTHORITY and 8 CITY as they pertain to the subject and PROJECT addressed herein. Both AUTHORITY and CITY 9 agree that each will cooperate and coordinate with the other in all activities covered by this Cooperative 10 Agreement and any other supplemental agreements, including Letter Agreements, which may be 11 required to facilitate purposes thereof. 12 ARTICLE 3. RESPONSIBILITIES OF AUTHORITY 13 AUTHORITY agrees to the following responsibilities toward CITY for PROJECT: 14 A. Upon invoice, AUTHORITY to provide CITY operating subsidy in the amount not-to- 15 exceed Seven Hundred Seventy-Two Thousand Thirty-One Dollars ($772,031) ("Funding Amount") for 16 up to seven (7) years consistent with Exhibit A: City of Huntington Beach Project V Estimated Funding 17 Schedule. Operating subsidy will be no more than Nine Dollars ($9.00) per boarding consistent with 18 Exhibit A or ninety percent (90%) of operations and maintenance costs whichever is lower. 19 B. AUTHORITY to provide PROJECT funding for capital purchases in the amount not-to- 20 exceed One Hundred Forty-Five Thousand Seven Hundred Thirty-Nine Dollars ($145,739). 21 C. AUTHORITY to provide funding in accordance with the BOARD-approved Revised 22 Project V Guidelines. Funding may be discontinued in the event that the Minimum Performance 23 Standards, as outlined in the Revised Project V Guidelines, are not met. 24 D. In the event that the Minimum Performance Standards are not met after first and second 25 year of service and maintained every year thereafter AUTHORITY shall provide sixty (60) days' notice 26 to CITY that support for service will be discontinued. Page 4 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 ARTICLE 4. RESPONSIBILITIES OF CITY 2 CITY agrees to the following responsibilities toward AUTHORITY for PROJECT: 3 A. CITY to provide eligible local match funds in the amount of ten percent(10%) of required 4 cost in accordance with Exhibit A: City of Huntington Beach Project V Estimated Funding Schedule OR 5 the balance of net operations and maintenance costs after AUTHORITY has paid Nine Dollars ($9.00) 6 per boarding and inflated annually consistent with Exhibit A, whichever is greater. 7 B. If CITY receives operating subsidy for PROJECT use from any other non-AUTHORITY 8 source, CITY will not invoice AUTHORITY for the amount received from the other non-AUTHORITY 9 source(s). 10 C. CITY will notify AUTHORITY regarding any non-OCTA revenues received for 11 PROJECT, and AUTHORITY funds may not pay for services already supported through these 12 non-OCTA revenues. 13 D. CITY shall provide to AUTHORITY actual revenue vehicle miles, boardings, and 14 operating and maintenance cost related to PROJECT service on a quarterly basis. 15 E. CITY to act as a pass-through agency for administering annual reimbursements and 16 AUTHORITY required data consistent with the program guidelines whereby Transportation Concepts 17 as party to a grant subrecipient agreement with the CITY will be the service provider to administer, 18 operate, maintain and manage PROJECT. 19 F. CITY service shall meet minimum standard of six (6) boardings per revenue vehicle 20 hour, which must be achieved within the first twelve (12) months of operation and ten (10) boardings 21 per revenue vehicle hour within twenty-four(24) months of operation and every year thereafter. 22 G. CITY shall provide separate and distinct cost accounting for all fixed route and special 23 event services. 24 H. CITY may request a time extension in accordance with the procedures identified in the 25 CTFP Guidelines to use any operating funds not used and available at the end of the initial seven (7) 26 year term. Page 5 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 I. CITY shall notify AUTHORITY of any non-AUTHORITY revenues received for the 2 PROJECT. 3 J. CITY shall include and identify any non-AUTHORITY or grant revenues received along 4 with any requirements associated with external fund sources for PROJECT in payment to AUTHORITY 5 for local match. 6 K. CITY will invoice AUTHORITY within sixty (60) days to receive annual reimbursement 7 per Exhibit A: City of Huntington Beach Project V Estimated Funding Schedule and consistent with 8 Article 5 below. 9 ARTICLE 5. REQUEST FOR REIMBURSEMENT 10 A. CITY shall contribute matching funds, as is specified within this Cooperative Agreement 11 in Article 4, Paragraph A, toward the actual costs of PROJECT. 12 B. CITY shall invoice AUTHORITY within sixty (60) days to receive annual reimbursement 13 per Exhibit A: City of Huntington Beach Project V Estimated Funding Schedule and shall provide 14 supporting documentation according to the payments procedures identified in the CTFP Guidelines and 15 incorporated into this Cooperative Agreement. CITY's invoice shall include allowable PROJECT costs 16 incurred and paid for by CITY consistent with the PROJECT's Scope of Work. The invoice submitted 17 by CITY shall be signed by an authorized agent who can duly certify the accuracy of the included 18 information. Advance payments by AUTHORITY are not allowed. 19 C. The invoice must be submitted on CITY's letterhead. 20 D. The invoice shall be submitted by CITY and in duplicate to AUTHORITY's Accounts 21 Payable Office. Each invoice shall include the following information: 22 a. Cooperative Agreement Number C-6-1481; 23 b. The total of PROJECT expenditures shall specify the percent and 24 amount to be reimbursed which shall not exceed ninety percent (90%) of the balance of net operations 25 and maintenance costs after AUTHORITY has paid Nine Dollars ($9.00) per boarding, in accordance 26 with Exhibit A: City of Huntington Beach Project V Estimated Funding Schedule. In addition, if CITY Page 6 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 receives operating subsidy from any other non-AUTHORITY source for PROJECT use, CITY shall not 2 invoice AUTHORITY for the amount received from the other non-AUTHORITY source(s). Supporting 3 documentation for all expenses must be provided including invoices. 4 C. Adequate detail describing all work completed. 5 d. Documentation providing evidence that Transportation Concepts has 6 been paid by CITY. 7 e. Each invoice for operation and maintenance subsidy shall include the 8 following operating statistics for the fiscal year (July 1 through June 30) to date: revenue vehicle hours, 9 total boardings, boardings per revenue vehicle hour, operating costs, net operating costs (Costs less 10 fares), reimbursement per net operating costs, and reimbursement per boarding. 11 f. Certification signed by CITY or his/her designated alternate that a) The 12 invoice is a true, complete and correct statement of reimbursable costs and progress; b) The backup 13 information included with the invoice is true, complete and correct in all material respects; c) All 14 payments due and owing to subcontractors and suppliers have been made; d) Timely payments will 15 be made to subcontractors and suppliers from the proceeds of the payments covered by the 16 certification and; e) The invoice does not include any amount which CITY intends to withhold or retain 17 from a subcontractor or supplier unless so identified on the invoice. 18 g. Such other information as requested by AUTHORITY. 19 E. Total payments shall not exceed the Funding Amount specified in Article 3, paragraph A. 20 F. CITY shall submit final invoice no later than one hundred eighty (180) days after 21 completion of PROJECT. 22 ARTICLE 6. DELEGATED AUTHORITY 23 The actions required to be taken by CITY in the implementation of this Cooperative Agreement 24 are delegated to its Director of Public Works, or his/her designee, and the actions required to be taken 25 by AUTHORITY in the implementation of this Cooperative Agreement are delegated to AUTHORITY's 26 Chief Executive Officer or his designee. Page 7 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 ARTICLE 7. AUDIT AND INSPECTION 2 AUTHORITY and CITY shall maintain a complete set of records in accordance with generally 3 accepted accounting principles. Upon reasonable notice, CITY shall permit the authorized 4 representatives of the AUTHORITY to inspect and audit all work, materials, payroll, books, accounts, 5 and other data and records of CITY for a period of five (5) years after final payment, or completion of 6 audit by the AUTHORITY, or after final payment of debt service, whichever is longer. For purposes of 7 audit, the date of completion of this Cooperative Agreement shall be the date of AUTHORITY's 8 payment of CITY's final billing under this Cooperative Agreement. AUTHORITY shall have the right to 9 reproduce any such books, records, and accounts. The above provision with respect to audits shall 10 extend to and/or be included in contracts with CITY's contractor(s). 11 ARTICLE 8. MUTUAL INDEMNIFICATION 12 A. To the fullest extent permitted by law, CITY shall defend (at CITY's sole cost and 13 expense with legal counsel reasonably acceptable to AUTHORITY), indemnify, protect, and hold 14 harmless AUTHORITY, its officers, directors, employees, and agents (collectively the "Indemnified 15 Parties"), from and against any and all liabilities, actions, suits, claims, demands, losses, costs, 16 judgments, arbitration awards, settlements, damages, demands, orders, penalties, and expenses 17 including legal costs and attorney fees (collectively "Claims"), including but not limited to Claims arising 18 from injuries to or death of persons (CITY's employees included), for damage to property, including 19 property owned by AUTHORITY, or from any violation of any federal, state, or local law or ordinance, 20 alleged to be caused by the negligent acts, omissions or willful misconduct of CITY, its officers, 21 directors, employees or agents in connection with or arising out of the performance of this Cooperative 22 Agreement. 23 B. To the fullest extent permitted by law, AUTHORITY shall defend (at AUTHORITY's sole 24 cost and expense with legal counsel reasonably acceptable to CITY), indemnify, protect, and hold 25 harmless CITY, its officers, directors, employees, and agents (collectively the "Indemnified Parties"), 26 from and against any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, Page 8 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 arbitration awards, settlements, damages, demands, orders, penalties, and expenses including legal 2 costs and attorney fees (collectively "Claims"), including but not limited to Claims arising from injuries to 3 or death of persons (AUTHORITY's employees included), for damage to property, including property 4 owned by CITY, or from any violation of any federal, state, or local law or ordinance, alleged to be 5 caused by the negligent acts, omissions or willful misconduct of AUTHORITY, its officers, directors, 6 employees or agents in connection with or arising out of the performance of this Cooperative 7 Agreement. 8 C. The indemnification and defense obligations of this Cooperative Agreement shall survive 9 its expiration or termination. 10 ARTICLE 9. ADDITIONAL PROVISIONS: 11 PARTIES agree to the following mutual responsibilities: 12 A. Term of Agreement: This Cooperative Agreement shall continue in full force and effect 13 on an annual basis, subject to meeting minimum performance standards of ridership or 14 December 31, 2023, whichever is earlier. This Cooperative Agreement may only be extended upon 15 mutual agreement by both PARTIES. 16 B. Termination: In the event either Party defaults in the performance of their obligations 17 under this Cooperative Agreement or breaches any of the provisions of this Cooperative Agreement, 18 the non-defaulting Party shall have the option to terminate this Cooperative Agreement upon thirty (30) 19 days' prior written notice to the other Party. 20 C. Termination for Convenience: Either Party may terminate this Cooperative Agreement 21 for its convenience by providing thirty (30) days' prior written notice of its intent to terminate for 22 convenience to the other Party. 23 D. Amendments: This Cooperative Agreement may be amended in writing at any time by 24 the mutual consent of all PARTIES. No amendment shall have any force or effect unless executed in 25 writing by all PARTIES. 26 E. PARTIES shall comply with all applicable federal, state, and local laws, statues, Page 9 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 ordinances and regulations of any governmental authority having jurisdiction over the PROJECT. 2 F. Legal Authority: PARTIES hereto consent that they are authorized to execute this 3 Cooperative Agreement on behalf of said PARTIES and that, by so executing this Cooperative 4 Agreement, the PARTIES hereto are formally bound to the provisions of this Cooperative Agreement. 5 G. Severability: If any term, provision, covenant or condition of this Cooperative Agreement 6 is held to be invalid, void or otherwise unenforceable, to any extent, by any court of competent 7 jurisdiction, the remainder of this Cooperative Agreement shall not be affected thereby, and each term, 8 provision, covenant or condition of this Cooperative Agreement shall be valid and enforceable to the 9 fullest extent permitted by law. 10 H. Counterparts of Agreement: This Cooperative Agreement may be executed and 11 delivered in any number of counterparts, each of which, when executed and delivered shall be deemed 12 an original and all of which together shall constitute the same agreement. Facsimile signatures will be 13 permitted. 14 I. Force Maleure: Each of the PARTIES shall be excused from performing its obligations 15 under this Cooperative Agreement during the time and to the extent that it is prevented from performing 16 by an unforeseeable cause beyond its control, including but not limited to; any incidence of fire, flood; 17 acts of God; commandeering of material, products, plants or facilities by the federal, state or local 18 government; national fuel shortage; or a material act or omission by the other PARTY; when 19 satisfactory evidence of such cause is presented to the other PARTY, and provided further that such 20 nonperformance is unforeseeable, beyond the control and is not due to the fault or negligence of the 21 PARTY not performing. 22 J. Assignment: Neither this Cooperative Agreement, nor any of the PARTIES' rights, 23 obligations, duties, or authority hereunder may be assigned in whole or in part by any PARTY without 24 the prior written consent of the other PARTIES in their sole and absolute discretion. Any such attempt 25 of assignment shall be deemed void and of no force and effect. Consent to one assignment shall not 26 be deemed consent to any subsequent assignment, nor the waiver of any right to consent to such Page 10 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 subsequent assignment. 2 K. Governing Law: The laws of the State of California and applicable local and federal 3 laws, regulations and guidelines shall govern this Cooperative Agreement. 4 L. Litigation fees: Should litigation arise out of this Cooperative Agreement for the 5 performance thereof, each PARTY shall bear its own fees and expenses, including attorneys' fees. 6 M. Notices: Any notices, requests, or demands made between the PARTIES pursuant to 7 this Cooperative Agreement are to be directed as follows: 8 To CITY: To AUTHORITY: 9 City of Huntington Beach Orange County Transportation Authority 10 2000 Main Street 550 South Main Street 11 Huntington Beach, California 92648 P. O. Box 14184 12 Orange, CA 92863-1584 13 Attention: Bob Stachelski Attention: Donald Herrera 14 City Transportation Manager Contracts Administrator 15 714-536-5523 Tel: 714-560-5644 16 bstachelski@surfcity-hb.org E-mail: dherrera@octa.net 17 With a copy that shall not constitute Notice to: 18 Cc: Sam Kaur 19 Section Manager, Measure M Local 20 Programs 21 skaur@octa.net 22 23 N. Successors and Assigns: The provisions of this Cooperative Agreement shall bind and 24 inure to the benefit of each of the PARTIES hereto, and all successors or assigns of the PARTIES 25 hereto. 26 This Cooperative Agreement shall be made effective upon execution by both PARTIES. Page 11 of 12 COOPERATIVE AGREEMENT NO. C-6-1481 1 IN WITNESS WHEREOF, the PARTIES hereto have caused this Cooperative Agreement 2 No. C-6-1481 to be executed on the date first above written. 3 CITY OF HUNTINGTON BEACH ORANGE COUNTY TRANSPORTATION AUTHORITY 4 A California municipal corporation 5 ~ 6 B B : Y Mayor Darrell Ahn, n 7 Chief Executive Officer 8 By: C� City Jerk 9 10 APPROVED AS TO FORM: APPROVED AS TO FORM: 11 12 By. By. ly Attorney James Donicli / 13 General Counsel 14 ([REVIEWED AND APPROVED: APPROVAL RECOM LADED: 15 16 By: kA BY: City page M Kia ortazavi 17 Executive Director, Planning 18 INITIATED AND APPROVED: Dated: 19 20 B � Director of Public Woks 21 22 Dated: W7 23 24 25 26 Page 12 of 12 ®CTA AFFILIATED AGENCIES March 13, 2017 Orange County Transit District Local Transportation Mr. Bob Stachelski Authority City of Huntington Beach Service Authority for 2000 Main Street Freeway Emergencies Huntington Beach, CA 92648 Consolidated Transportation Service Agency Congestion Management Agency SUBJECT: AGREEMENT NO. C-6-1481 Service Authority for Abandoned Vehicles Dear Mr. Stachelski: Enclosed for your records is your original of the above-referenced subject. If you have any questions, please call Donald Herrera at (714) 560-5644. Sincerely, Cathy Foreman Office Specialist Contracts Administration and Materials Management Enclosure Orange County Transportation Authority 550 South Main Street/P.0.Box 14184/Orange/California 92863-1584/(714)560-OCTA(6282) ATTACHMENT #2 PROJECT TITLE: Community-based Local PROJECT DESCRIPTION: Provide a free local transit shuttle service during the peak summer days Transit Service between Memorial Day and Labor Day,with additional services on weekends approximately f month before and after daily service period. Transit serves 11 15.4 mile loop within City. PROJECT NEED: This is a new service partially funded by OCTA to supplement current transit FUNDING DEPARTMENT: services. It provides a free option for residents and visitors to travel through Public Works many parts of the City without use of an automobile or the need for parking. DEPT.PROJECT MGR: SOURCE DOCUMENT: NA Bob Stachelski STRATEGIC PLAN GOAL: __Lip rave guality of life SCHEDULE: PROJECT COSTS FY 16117 FY 17118 FY 18119 FY 19120 FY 20121 Project Planning Complete: FY 2016/17 Planning $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 Annual Service Dates: FY 2016/17 Construction $ 45,000 $ - $ - $ - $ Project Management $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Operations $ 111,680 $ 115,030 $ 118,481 $ 122,036 $ 125,697 PROJECT LOCATION Other $ 8,132 $ 12,297 $ 11,952 $ 11,596 $ 11,230 v 142,327 $ 145,433' 4 ,632 151,927. I ......",A................., FY 16117 FY 17118 FY 18119 FY 19120 FY 20121 AQMD(201) T 25,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 Oc- r ---.•. �. *� 7Ai($73) $ 151,812 $ 114,327 $ 117,433 $ 120,632 $ 123,927 -v-+ Visit Hl3 $ 8,000 $ 8,000 $ 8,000 $ 8,000 $ 8,000 7 bTOTAL 184,812 142,327 145,433 148,fi32 151,927 ii Meewa k; m MAINTENANCE COST IMPACT: JEOTAL PROJECT COST: 773„131 Annual savings: $2,000 PROJECT TYPE: New !. CATEGORY: Transportation � COMMENTS ON GRANTS I OTHER FUNDS: N i streets&transportation Project V Transit Svc cT ATTACHMENT #3 RESOLUTION NO. 2017-07 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ADOPTING A REVISED CAPITAL IMPROVEMENT PROGRAM FOR THE YEARS 2016/2017 THROUGH 2O22/2023 WHEREAS, on November 6, 1990, the Orange County voters approved Measure M, the revised Traffic Improvement and Growth Management Ordinance, for twenty years (1991-2011); and In 2011 the County enacted Ordinance No. 3, renewed Measure M, a thirty year (2011- 2041), multi-billion dollar program extension of the original Measure M; and Ordinance No. 3, Renewed Measure M Net Revenues are funded from the transactions and use tax plus any interest or other earnings-after allowable deductions; and Net Revenues may be allocated to local jurisdictions for a variety of programs identified in Ordinance No. 3, Renewed Measure M; and Compliance with the eligibility requirements established in Ordinance No. 3, Renewed Measure M must be established and maintained in order for local jurisdictions to receive Net Revenues; and One of the eligibility requirements for Ordinance No. 3, Renewed Measure M is the adoption of a Capital Improvement Program for the years 2016/2017 through 2022/2023, On August 1, 2016, the City enacted Resolution 2016-46 in part adopting a Capital Improvement Program to participate in Ordinance No. 3, Renewed Measure M. Since adoption of Resolution 2016-46 the City has determined that additional projects need to be included in the Capital Improvement Program for funding. Exhibit"A" includes additional projects for funding. NOW, THEREFORE, the City Council of the City of Huntington Beach does hereby resolve as follows: That the Revised Capital Improvement Program for Ordinance No. 3, Renewed Measure M, as set forth in the attached Exhibit "A" and incorporated by this reference is hereby adopted; and That Resolution 2016-11 is repealed. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 6th day of February. 2017. &I"62J&- Ma r REVIE D APPROVED: APPROVED F ity Manager City Attorney mst ITIATED AND APPR VED: Director A P lic Works 15-4799/150264.doc EXHIBIT A � 12/13/2016 Measure M 1 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach AI O&T ,.._4Ptat7,lECTEDCOET '« Project Name: Adams Avenue Traffic Signal Synchronization and FUND PERCENT ESTIMATED C 'NOTES 2.68 $5,000 $5,000 Annual Maintenance Communication Equipment Upgrades Project Number: 13-OCTA-TSP-3663 AQMD 97.32 $181,495 $181,495 Project Limits: From Beach Boulevard to City Boundary(Multi $186,496 $186,496 Jurisdictional) Type of Work(TOW): Systems Management TOW Description: Communications intertie between agency and Caltrans to manage traffic Project Description: Provide operational and infrastructure improvements. Prc�j t tsF�haSm S111� ^1 � ti Fraleot�d Udi E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $181,495 $0 $0 $0 $0 $0 $0 $181,495 $181,495 O&M $0 $5,000 $0 $0 $0 $0 $0 $5,000 $5,000 $181,496 $6,000 $0 $0 $0 $0 $0 $186,496 $186,496 Agency: Huntington Beach " FUND NAME.,. ... PERCENT Es ruwATID CQ&T #sFtt3JEC7EQ.Cl�S .:'; NOTES' Project Name: Arterial Rehabilitation General Fund 22.73 $1,000,000 $1,000,000 Project Number: M2 Fairshare 45.45 $2,000,000 $2,000,000 Project Limits: Heil Ave(Edwards-Springdale), Atlanta Ave Other 27.27 $1,200,000 $1,200,000 Infrastructure Fund (Delaware-Beach),and Indianpolis Ave Prop 42 4.55 $200,000 $200,000 (Beach-Maonolia) $4,400,000 $4,400,000 Type of Work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate Artrerial's Heil Avenue,Atlanta Avenue, and Indianapolis Avenue cg Pnass: 16117 ( g� ..>, � jctea tat E $50,000 $0 $0 $0 $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $4,350,000 $0 $0 $0 $0 $0 $0 $4,350,000 $4,350,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,400,000 $0 $0 $0 $0 $0 $0 $4,400,000 $4,400,000 12/13/2016 Measure M 2 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: Arterial Rehabilitation Gothard Street and Center Funk Gas A E 100.00 3 STIMATEC COST 0 $1,400,000 $1,400,000 Avenue Project Number: $1,400,000 $1,400,000 Project Limits: Gothard St.(Edinger to McFadden)and Center Ave. (Gothard to Railroad Tracks) Type of Work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate Pavement including replacement of concrete and addition of ramps.This project was an amendment to FY 15/16 CIP. Estimated Cost Projected E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 Agency Huntington Beach Project Name: FUNUNAINIE E12C [ ESTIMATED COST PROJECTEr�OOST" I1�S�_. 1 Arterial Rehabilitation:Adams Ave(Beach to M2 Fairshare 63.80 $0 $0 Newland)and Atlanta Ave(Beach To Newland) Project Number: Other 36.20 $0 $0 Regional Surface Transportation Grant Project Limits: Adams Avenue(Beach to Newland)and Atlanta (RSTP) Avenue(Beach To Newland) $0 $0 Type of Work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Pavement rehabilitation for two arterial segments including replacement of concrete and trees. This project is a carryover from FY 15/16 CIP. d" Ptect Phase,.. 18/19 19/30 c .'•. •. ., '•III. _,� �..�;, :;,il.. .. - _ ':a..:- ', .,,,:+8 �.. �`.�"�� � ."""".,.< m��? .���'.�� .,...�ruua .+lr°`�,... E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 211 3/2 01 6 Measure M 3 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: FUND NAME 5i ESTIMA>EC►COST. PROJECTED COST Atlanta Avenue Widening M2 ACE 75.00 $0 $0 Project Number: 15-HBCH-ACE-3770 General Fund 25.00 $0 $0 25%Match to previously approved M2 ACE Project Limits: Atlanta Avenue(Huntington St.to Delaware St.) $0 $0 Type of work(TOW): Road Widening TOW Description: Add 1 lane to existing roadway in project limits Project Description: This project will widen the south side of Atlanta Avenue. This project is carryover from FY 15/16 CIP. Proieat Phase 18t17 17/t8 10/19 12 /22 i tee ti most Proiected ` s. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 CA $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach PUNi3.NAME .._. .. PERCENT" )E.571MAlCrt . NICC)JEt~7EbCDST ' N . ,_.. `ate. h. .. Project Name: Bridge Preventative Maitenance Gas Tax 16.94 $708,329 $708,329 Project Number: M2 Fairshare 1.08 $45,000 $45,000 Project Limits: Magnolia Street and Brookhurst Street Bridge at Other 72.74 $3,040,931 $3,040,931 Water Fund Pacific Coast Highway Prop 42 9.24 $386,273 $386,273 $4,180,633 $4,180,633 Type of Work(TOW): Road Maintenance TOW Description: Bridge Project Description: Provide Design and Construction of City Bridges including Roadway. This project was included as an amendment to FY 15/16 CIP. 3 eng, '1 11.8 �8 19 ��'• ',� f - §t13T1ateif i)St i�,��Ld3d. .,:34.,.33n. .. Waa,��',••''. .,. ,'. ..� .,.. ' ..:�:' .,...,.: .¢vr�y,x.�.. E $924,533 $0 $0 $0 $0 $0 $0 $924,533 $924,533 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $3,256,000 $0 $0 $0 $0 $0 $0 $3,256,000 $3,256,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,180,633 $0 $0 $0 $0 $0 $0 $4,180,633 $4,180,633 12/13/2016 Measure M 4 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: „ .. Huntington Beach FUNn NAMS:: PERCENT ESTI-AM COST P12bJECTEb C(?ST• s.. S' Project Name: Brookhurst Street and Adams Avenue Intersection Gas Tax 1.19 $84,604 $87,590 Improvement Project Number: 11-HBCH-ICE-3526(Eng only) M2 ICE 3.57 $253,809 $262,769 11-HBCH-ICE-3526 Project Limits: Intersection of Brookhurst Street and Adams Avenue Unfunded 95.23 $6,761,587 $7,000,274 $7,100,000 $7,360,633 Type of work(TOW): Intersection TOW Description: Add through and right turn lanes to intersection Project Description: Add through lanes and right turn pockets to intersection to improve traffic flow and reduce congestion. i�miect Phase 19120 � ,� Estimatetl G3 Pjected Qnst -,n F N<• E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $2,900,000 $0 $0 $0 $0 $0 $2,900,000 $2,963,800 C/I $0 $0 $4,200,000 $0 $0 $0 $0 $4,200,000 $4,386,833 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,900,000 $4,200,000 $0 $0 $0 $0 $7,100,000 $7,360,633 Agency: Huntington Beach - •• � � �,,, FUND NAME PERCENT ESTINAATED COST PROJECTEC� �� Project Name: Brookhurst Street Synchronization General Fund 1.19 $10,000 $10,440 Project Number: 16-OCTA-TSP-3794 M2 TSSP 73.36 $618,757 $645,955 Project Limits: Garfield Avenue to Pacific Coast Highway AQMD 25.46 $214,733 $224,172 $843,490 $880,667 Type of Work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to Improve coordination and communication Project Description: Provide operational and infrastructure improvements. This is a corridor project managed by OCTA and funding reflets planned improvements within Huntington Beach only. Pririect.l Mass 1?1 �' 19120 � i �f ost Prom ctett tw� Q E $0 $0 $0 $0 $0 - $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $833,490 $0 $0 $0 $0 $833,490 $870,567 O&M $0 $0 $0 $5,000 $5,000 $0 $0 $10,000 $10,000 $0 $0 $833,490 $6,000 $6,000 $0 $0 $843,490 $880,667 12/13/2016 Measure M 5 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach �ezaav .u.^*�:g ESTIMATED CO9 OJECTEb Project Name: Bushard/Adams Water Quality Project Gas Tax 35.28 $25,403 $25,403 Project Number: 14-HBCH-ECP-3732 General Fund 6.58 $4,739 $4,739 Project Limits: Frontage median on Bushard and Adams M2 ECP Tier II 58.14 $41,858 $41,858 $72,000 $72,000 Type of Work(TOW): Environmental Cleanup TOW Description: Irrigation system retrofits to reduce runoff Project Description: Retrofit asphalt frontage medians on Bushard Street and Adams Avenue with bio-retention swales for water quality. Rml- r� Protect Ph y i �/ � f Now ,,-E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $12,000 $12,000 $12,000 $12,000 $12,000 $12,000 $0 $72,000 $72,000 $12,000 $12,000 $12,000 $12,000 $12,000 $12,000 $0 $72,000 $72,000 Agency: Huntington Beach Project Name: Cityof Huntington Beach Seasonal Transit Circulator y E*CENT, $ IMATE�YCOST PROJECr�C►CLr� QTE$ 9 General Fund 10.00 $101,977 $101,977 Project Number: 16-HBCH-CBT-3826 M2 Transit-V 90.00 $917,770 $917,770 Project Limits: Citywide $1,019,747 $1,019,747 Type of Work(TOW): Transit TOW Description: New Service Project Description: Provide Seasonal Transit Service by adding additional free local shuttle service connections within the City from Memorial Day to Labor Day and selected weekends. Protect Phase ? 11 NNOM of 1 1' l +� P I t r` MA E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $161,932 $0 $0 $0 $0 $0 $0 $161,932 $161,932 O&M $122,545 $122,545 $122,545 $122,545 $122,545 $122,545 $122,545 $857,815 $857,815 $284,477 $122,646 $122,546 $122,646 $122,645 $122,546 $122,545 $1,019,747 $1,019,747 12/13/2016 Measure M 6 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beachk;.-u . FUND NAME PERGEN CESTIMATE Project Name: Concrete Replacements General Fund 100.00 $1,250,000 $1,306,223 Project Number: $1,260,000 $1,306,223 Project Limits: Citywide Type of Work(TOW): Pedestrian TOW Description: Reconstruction or rehabilitation of sidewalk Project Description: Replace damaged concrete sidewalks or curb and gutter throughout the City. This is annual program with locations selected throughout Huntington Beach at streets where an overlay is required by PMP. This project was an amendment to FY 15/16 CIP. 21/22 a a Esmafed GOs1 Prsitedsa4 .:;ikp?�'+`Jc4,t .'. ., : ,.,. ;. •' �.�..+.�..� •,.���.ae� x«',.„ . _ .F..;dam ,. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/1 $250,000 $250,000 $250,000 $250,000 $250,000 $0 $0 $1,250,000 $1,306,223 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $260,000 $260,000 $260,000 $260,000 $260,000 $0 $0 $1,260,000 $1,306,223 Agency: Huntington Beach '' trllt GENT ESrjMATED C(?5T +�tiBJED7EGl VFW`, Project Name: Edinger Avenue Traffic Signal Synchronization M2 TSSP 77.94 $1,669 $1,669 OCTA anticipated expenditures Project Number: 12-OCTA-TSP-3625 AQMD 22.06 $473 $473 AQMD Project Limits: Edinger Avenue from Bolsa Chica Street to State $2,142 $2,142 Route-55 Type of Work(TOW): Systems Management TOW Description: Communications intertie between agencies to manage traffic Project Description: Provide operational and infrastructure improvements (multijurisdictional project including Caltrans, Westminster,Fountain Valley,and Santa Ana) City work includes signal timing and traffic signal interconnect cable. Protect Pl1a6e7�7118 10119 1 / � ca� smated Oft ii$Df� Ez� E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $2,142 $0 $0 $0 $0 $0 $0 $2,142 $2,142 $2,142 $0 $0 $0 $0 $0 $0 $2,142 $2,142 12/13/2016 Measure M 7 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency, Huntington Beach Project Name: i�UNb NAME: PERCi NT,, EsTIMA7ELTCQST.,.... PROJECTED CC?3T NbTEB 1 Edinger Avenue Widening Impact Fees 100.00 $600,000 $600,000 Project Number: $600,000 $600,000 Project Limits: South Side of Edinger Avenue from Beach Boulevard to Parkside Lane Type of work(TOW): Road Widening TOW Description: Widen width of existing traffic lanes Project Description: Extend the Right Turn Lane on Southside of Edinger Avenue. This project was an amendment to the FY 15/16 CIP. ft �. Proiectetl Cast E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $600,000 $0 $0 $0 $0 $0 $0 $600,000 $600,000 0&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $0 $0 $600,000 $600,000 t Agency: Huntington Beach 3' v .... �• ' a WNC1IJAlill TIE C1Ca8T• PtcOJECTDCQT ��', Project Name: First Street Diversion General Fund 100.00 $7,548 $7,548 Project Number: 12-HBCH-ECP-3621 $7,648 $7,648 Project Limits: First Street near Pacific Coast Highway Type of work(TOW): Environmental Cleanup TOW Description: Runoff Diversion Project Description: Design and install a SCADA system and flow weir for the First Street Urban Runoff Discharge Permit with OCSD to protect water qualiity of City and Pacific Ocean. Pralee 7711$ 18/19 1 /'4 estimated Cost Proiected Cash E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/1 $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $1,258 $1,258 $1,258 $1,258 $1,258 $1,258 $0 $7,548 $7,548 $1,268 $1,268 $1,268 $1,268 $1,268 $1,268 $0 $7,648 $7,648 12/13/2016 Measure M 8 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach °1 r•• Protect Name: General Street Maintenance for Public Works t'UNf NA Mt... ...c .,,,•,•PERCENT E� iS.CL?sx Pf�t�,lEC`i°ECt oy Non. M2 Fairshare 100.00 $9,800,000 $10,471,045 Project Number: $9,800,000 $10,471,046 Project Limits: Citywide Type of Work(TOW): Pedestrian TOW Description: Reconstruction or rehabilitation of sidewalk Project Description: Annual maintenance work for concrete,potholes and failed asphalt;O&M of traffic signals, replacement of striping and signage,including engineering and inspection as needed on an annual basis.This Work was added as an amendment to FY 15/16 CIP. „ . Project Phase > 11 1 j 1$14 Estimated Coat Proieted Gosh' �r,, E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $9,800,000 $10,471,045 0&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $9,800,000 $10,471,046 Agency: Huntington Beach N "N' Project Name: Goldenwest Street Traffic Signal Synchronization FWND NAME pMrPRCi Nt j:S711111A1 t3,COf:' Pt70JE fEt9.CCl57. 9 Y M2 TSSP 78.02 $2,539 $2,539 and Communication Equipment Upgrades Project Number: 11-OCTA-TSP-3554 AQMD 21.98 $715 $715 Project Limits: Goldenwest St.from State Route 22 to Pacific Coast $3,264 $3,264 Highway Type of work(TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Provide operational and infrastructure upgrades including signal timing and installation of fiber optic cable along Goldenwest Street.Multijurisdictional project includes Caltrans and City of Westminster. Estimate g� 20/21 21/23 prj now., E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $3,254 $0 $0 $0 $0 $0 $0 $3,254 $3,254 $3,264 $0 $0 $0 $0 $0 $0 $3,264 $3,264 12/13/2016 Measure M 9 Seven Year Capital Improvement Program (Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach ,1`t Cyr ton Beach Catch Basin Retrofit Project t=1JItIItJi.#)+tlHjf y . . � � 'ES faRbJEGTD COST Project Name: Huntington 9 1 General Fund 100.00 $30,000 $30,000 Project Number: 14-HBCH-ECP-3742 $30,000 $30,000 Project Limits: City-wide Type of work(TOW): Environmental Cleanup TOW Description: Catchment Retrofit Project Description: Retrofit 84 existing catch basins with Bio Clean Round Curb Inlet Filters. ect phase s ` �z Esttmetitl Cyst Proiected Costi 1 .E,• $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $30,000 $6,000 $6,000 $5,000 $6,000 $6,000 $5,000 $0 $30,000 $30,000 Agency Huntington Beach `:" UWf3NAME pekttwC Project Name: F Huntington Beach Northwest Catch Basin Retrofit General Fund 100.00 $30,000 $30,000 Project Project Number: 13-HBCH-ECP-3687 $30,000 $30,000 Project Limits: City-wide in Northwest Part of City Type of Work(TOW): Environmental Cleanup TOW Description: Catchment Retrofit Project Description: Retrofit 126 existing catch basins with Bio Clean Round Curb Inlet Filters and Skimmer Box. proleot Phase 1.8/17 s 18119 1AJ20 "0121. � aE_s .� c >>� £� E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $30,000 $6,000 $6,000 $5,000 $6,000 $6,000 $5,000 $0 $30,000 $30,000 12/13/2016 Measure M 10 Seven Year Capital Improvement Program (Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach ton Harbour Marina Trash Skimmers FUNbNAME Project Name: Huntington pEjiCENT. 871M4rE9Q&r " 9 M2 ECP Tier 1 75.00 $73,118 $73,118 Project Number: 16-HBCH-ECP-3852 General Fund 12.50 $12,186 $12,186 Project Limits: Various Locations within Huntington Harbour Other 12.50 $12,186 $12,186 Donations County $97,490 $97,490 Type of work(TOW): Environmental Cleanup TOW Description: Marina Trash Skimmer Project Description: Marian Trash Skimmers will be installed in various locations Project Phasemated os Esroiectedi>st � E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $97,490 $0 $0 $0 $0 $0 $0 $97,490 $97,490 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $97,490 $0 $0 $0 $0 $0 $0 $97,490 $97,490 Agency: Huntington Beach Project Name: Magnolia NAME: jl"C. t $TIM C!AT Ct�ut"xi, 1 . NOTES' Magnolia Street Synchronization General Fund 1.36 $10,000 $10,439 Project Number: 16-OCTA-TSP-3795 M2 TSSP 71.42 $524,364 $547,372 Project Limits: from Garfield Avenue to Pacific Coast Highway AQMD 27.21 $199,789 $208,555 $734,163 $766,366 Type of Work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Provide operational and infrastructure improvements lRiecC PhaseL12@mil '' �z 2W R matad,0�01 �SSj ace`s.... ..,,, ✓w _ . E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $724,153 $0 $0 $0 $0 $724,153 $756,366 O&M $0 $0 $0 $5,000 $5,000 $0 $0 $10,000 $10,000 $0 $0 $724,163 $6,000 $6,000 $0 $0 $734,163 $766,366 12/13/2016 Measure M Seven Year Capital Improvement Program (Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach ,,,,. j ItUN I NAME '»IRCENT �ST1Mki tl COST PROJEMD.C4�ST NONE . Project Name: McFadden/Edwards and Heil/Algonquin Catch Basin General Fund 100.00 $30,450 $30,450 Retrofit Project Project Number: 11-HBCH-ECP-3573 $30,450 $30,450 Project Limits: City-wide Type of Work(TOW): Environmental Cleanup TOW Description: Automatic Retractable Screen and other debris screens or inserts Project Description: Provide maintenance for catch basin screens. Ptxi d1e { ,i a.n•:': „ .. �� .... .. cry..4, .y,rY.F,z .vd. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $5,075 $5,075 $5,075 $5,075 $5.075 $5,075 $0 $30,450 $30,450 $6,075 $5,075 $5,075 $5,075 $6,076 $5,075 $0 $30,460 $30,450 ` , i� m4Agency Huntington Beach FUNDNAM \ aTIMAnD COST PRO,JECTI C!C.(?ST NATf$', ...<. Project Name: Nichols Street Rehabilitation Gas Tax 100.00 $735,000 $735,000 Project Number: $736,000 $736,000 Project Limits: Slater Avenue to Warner Avenue Type of work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate asphalt pavement including sidewalk and curb and gutter removal.This project was added as as an Amendment to FY 15/16 CIP. t ON �,7/16 1,n�JQ a� ,' ��, ` .i'',. ?'tom,„' Estirtilst+3t!Gast �\ u- ,....., • „ MMA E $0 $0 $0 $0 $0,.� „$0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $735,000 $0 $0 $0 $0 $0 $0 $735,000 $735,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $735,000 $0 $0 $0 $0 $0 $0 $736,000 $735,000 12/13/2016 Measure M 12 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach FUND NAMg PiaBCm E81nMATEn CnBT PRWECTEt1 COST Project Name: Rehabilitation of Residential Tree Petition Projects Gas Tax 100.00 $2,025,000 $2,085,276 Project Number: $2,026,000 $2,086,276 Project Limits: Typically one to three Residential Streets Type of work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Street improvements including concrete and landscaping replacement. This annual project takes streets from the City's tree petition program and provides rehabilitation to streets.This project was an amendment to the FY 15/16 CIP. Protect 17 17/18Phase 1 / 101120 2/21 12 122 Eamafed Ct�st..:= j'rnit3cted.Casf E $25,000 $25,000 $25,000 $25,000 $0 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $575,000 $450,000 $450,000 $450,000 $0 $0 $0 $1,925,000 $1,985,276 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $476,000 $476,000 $476,000 $0 $0 $0 $2,026,000 $2,086,276 as Agency: Huntington Beach I"WND NANIf PERCENT ES r1MA7ECt Ct$ „. '"PfLAJECTE 1 COST Project Name: Residential Curb Ramp Project CDBG 100.00 $1,861,810 $1,991,226 Project Number: Gas Tax 0.00 $0 $0 Project Limits: Ramps to be installed throughout City $1,861,810 $1,991,226 Type of work(TOW): Pedestrian TOW Description: Installation of ADA access ramps Project Description: Install ADA Access Ramps. This is an annual project that will install Ramps at locations where we are providing an overlay to adjacent street. This project was an amendment to FY 15/16 CIP. Pro[ecf F�15ae 111124 L20 131d ast w.. .. E $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $35,000 $35,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $206,810 $270,000 $270,000 $270,000 $270,000 $270,000 $270,000 $1,826,810 $1,956,226 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $211,810 $276,000 $276,000 $276,000 $276,000 $276,000 $276,000 $1,861,810 $1,991,226 12/13/2016 Measure M 13 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beachzrs Project Name: Residential OverlaNChklll .... .. E.EL"Et •• -.;:...:ESTIMATED Cf?51.,< Y Gas Tax 100.00 $10,680,000 $11,150,027 Project Number: Other 0.00 $0 $0 Project Limits: Citywide Other 0.00 $0 $0 $10,680,000 $11,160,027 Type of work(TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Provide cold mill and overlay of various streets throughout Huntington Beach. This annual project will provide street overlay rehabiliation based on the PMP ratings. This project was an amendment to FY 15/16 CIP. Proiect Phase E $10,000 $10,000 $10,000 $10.000 $10,000 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,270,000 $2,090,000 $2,090,000 $2,090,000 $2,090,000 $0 $0 $10,630,000 $11,100,027 0&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,280,000 $2,100,000 $2,100,000 $2,100,000 $2,100,000 $0 $0 $10,680,000 $11,150,027 Agency: Huntington Beach .g FUND NAME PERCENT. ESTLiA tk l.tit S1.' 3_ Project Name: Signal Modification at Goldenwest Street and Heil General Fund 89.97 $0 $0 Avenue Project Number: HSIP 10.03 $0 $0 Project Limits: Intersection of Goldenwest Street and Heil Avenue $0 $0 Type of work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install left turn arrows at intersection including interconnect conduit and cable on Goldenwest from Heil Ave.to Warner Ave. This project is a carryover from previous year FY 15/16 CIP. 2/2 ,c�.,sr ,.:„mw,:a ..., '•' '9i ...•,, .a , ILI kF;''=�,, ... ;�,>� ., a,,a ,_- 1 ����i .. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 12/13/2016 Measure M 14 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: FUND NAME.• P T , l 9MIIAA'TED Cb87 mt'kc'T 'cosf• Signal Modification at Gothard St/Talbert Ave, Gas Tax 10.00 $0 $0 Gothard St/Heil Ave and Springdale St/McFadden Project Number: Ave HSIP 90.00 $0 $0 Project Limits: Intersections of Gothard/Talbert,Gothard/Heil,and $0 $0 Springdale/McFadden Type of Work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Add left turn signals and interconnect condiub and cable.This project is a carryover from previous FY 15/16 CIP. Protect Phase 16t1T 1711$ �a 22/23 Estimated Cost, Projected cosf E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach Project Name: FUND NAME i+EFtG ESTIMATED C Pap gBT lEC YED cD37 ;s, NOTES Traffic Channelization Modifications Gas Tax 100.00 $240,000 $240,000 Project Number: $240,000 $240,000 Project Limits: Main Street and Ellis Avenue Type of work(TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Median island modification along with removal of traffic signal �j E $60,000 $0 $0 $0 $0 $0 $0 $60,000 $60,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $180,000 $0 $0 $0 $0 $0 $0 $180,000 $180,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $240,000 $0 $0 $0 $0 $0 $0 $240,000 $240,000 12/13/2016 Measure M 15 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 A enc .. „ .,,., \Y 9 Y Huntington Beach 9 FUND NAME 100! ESTIMATED CgsT PROJECTED. v�>$ .. Project Name: Traffic Signal Modification at Brookhurst Street& p 0 $60,000 $60,000 Indianpolis Avenue Project Number: $60,000 $60,000 Project Limits: Intersection of Brookhurst Street and Indianapolis Avenue Type of Work(TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace conduit,wiring and signal heads at intersection 11ffectltj$ 16117 5 / f "<;' 12 /22 Estimta+ Colt Proi0ot0t i M,. :...... ;•,,'., r .': - .... .:;o„ ,,",',,,, .,c, ,,; „�r�,.,.,, �....: - - ,, -...._-- •v, ....� $, .rev„ E $5,000 $0 $0 $0 $0 $0 $0 $5,000 $5,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $55,000 $0 $0 $0 $0 $0 $0 $55,000 $55,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $60,000 $0 $0 $0 $0 $0 $0 $60,000 $60,000 A encRUN y. ;,+: ,' � : s 9 Y Huntington Beach �.. 1 ,I, � j; Project Name: I:IJND.NICME ..... ERG ESTIjiIlillTEDLCOST PFtOJacTlsl c08 ,l',n.�'"a,N+t, Traffic Signal Modification at Gothard Street and Gas Tax 10.02 $0 $0 Center Avenue Project Number: HSIP 89.98 $0 $0 Project Limits: Intersectoin of Gothard Avenue and Center Avenue $0 $0 Type of Work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install north/south left turn arrows and installation of interconnect conduit along Gothard between McFadden and Edinger. This project is a carryover from previous FY 15/16 CIP. t f 1Z(1$ ted as . . ctad Cost iffirmmossoi E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 12/13/2016 Measure M 16 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach PUNCH NAME PERMProject Name: �STljtiidTEC1 C+�fiT Pf��T.lEOTE[�Ct73T.....:.: v .,., Traffic Signal Modification at Gothard Street and Gas Tax 10.02 $0 $0 Slater Avenue Project Number: HSIP 89.98 $0 $0 Project Limits: Intersection of Gothard Street and Slater Avenue $0 $0 Type of work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install left turn arrows and interconnect conduit and cable on Slater Ave,from Goldwenwest to Gothard. This project is a carryover from previous FY 15/16 CIP. w r: • 12 /22 5stimated Cost W E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach Project Name: 0llbi,'46W PERCENT. ESTIMArSO COST P�it�JECTECI�cf?S r. -;� Traffic Signal Modification at Main Street and Florida Prop 42 100.00 $265,000 $265,000 Street Project Number: $266,000 $266,000 Project Limits: Intersection of Main Street and Florida Street Type of Work(TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace poles,conduit wiring and signal heads at intersection w Esfimafed Golf t olecf .' ;,,,E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $265,000 $0 $0 $0 $0 $0 $0 $265,000 $265,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $266,000 $0 $0 $0 $0 $0 $0 $266,000 $266,000 12/13/2016 Measure M 17 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: "y ,r..:. :.d:S1 :&c:. Ing\u.,. 9 Y Huntington Beach a v 3 Project Name: Traffic Signal Modification at Newland Street and Gas Tax 10.00 $0 $0 Slater Avenue Project Number: HSIP 90.00 $0 $0 Project Limits: Intersection of Newalnd Street $0 $0 Type of work(TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install left turn arrows and traffic signal controller and service for pedestrian signal. This project is a carryover from FY 15/16 CIP. Project Phi ��� � 12 /22 E Im � d0,il E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach a�'A FOND NAME ' ..,uY 4`V:� �tRK�J��7EC� Project Name: Traffic Signal Modification at Nichols Lane and Prop 42 100.00 $70,000 $71,430 Warner Avenue Project Number: $70,000 $71,430 Project Limits: Intersection of Nichols Lane and Warner Avenue Type of work(TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace conduit,wiring and signal heads s,. E $5,000 $0 $0 $0 $0 $0 $0 $5,000 $5,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $65,000 $0 $0 $0 $0 $0 $65,000 $66,430 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000 $66,000 $0 $0 $0 $0 $0 $70,000 $71,430 12/13/2016 Measure M 18 Seven Year Capital Improvement Program(Approved Projects Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach �<a• \ Project Name: Utica Bicycle Boulevard from Main Street to Beach FUND NAME PERCENT tr5TIMATEtl COST Y Prop 42 0.00 $0 $0 Boulevard Project Number: BCIP 100.00 $0 $0 Project Limits: Utica Avenue from Main Street to Beach Boulevard $0 $0 Type of Work(TOW): Bikeways TOW Description: Widening of existing bike route Project Description: Construct improvements to create a"Bicycle Boulevard",where bicycling is empasized over motor vehicle use.Project includes a new traffic signal,curb bulb-outs,signing&striping improvements. This project is a carryover from previous FY 15/16 CIP. Pra�eb#phase 1 1 a9J24 Qf 1 ,yam 'Estimated Cost t'r�ltct �4wtsst WIN E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach w, NAME FWWC3 PERCENT, ESTIMATED COST PROJECTELI.COST.. .NOTES :..: Project Name: Warner Avenue Traffic Signal Synchronization and M2 TSSP 79.17 $1,330 $1,330 OCTA anticipated expenditures Communication Equipment Upgrade AOMD 20.83 $350 $350 Project Number: 11-OCTA-TSP-3558 Project Limits: Warner Avenue from Pacific Coast Hwy to Red Hill $1,680 $1,680 Avenue Type of work(TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Provide operational and infrastructure upgrades including signal timing and installation of fiber optic along Warner Avenue. Multijurisdictional project includes Caltrans and Cities of Fountain Valley, Santa Ana and Tustin. 7/18 20121. . Pro 1frofc E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $1,680 $0 $0 $0 $0 $0 $0 $1,680 $1,680 $1,680 $0 $0 $0 $g $0 $0 $1,680 $1,680 Res. No. 2017-07 STATE OF CALIFORNIA COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, ROBIN ESTANISLAU the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a Regular meeting thereof held on February 6, 2017 by the following vote: AYES: O'Connell, Semeta, Posey, Delgleize, Hardy, Brenden, Peterson NOES: None ABSENT: None RECUSE: None City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach, California ATTACHMENT #4 RESOLUTION NO. 2016-13 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH AUTHORIZING SUBMISSION OF AN APPLICATION TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY FOR COMPETITIVE FUNDING UNDER THE MEASURE M-2 PROGRAM FOR PROJECT V TO PROVIDE COMMUNITY-BASED TRANSIT/CIRCULATORS WHEREAS, the Orange County Transportation Authority(OCTA)makes state,federal and local funding available to the 34 incorporated cities and the County of Orange for eligible projects through a competitive process to improve all modes of surface transportation; and The OCTA Board of Directors(Board) approved the release of a call for projects for the Renewed Measure M (M2)Project V Community Based Transit/Circulators Funding Program on November 23, 2015; and The M2 Program establishes a competitive process to enable local jurisdictions to compete for funding to develop local bus transit services that complement regional transit services, and meet needs in areas not adequately serviced by regional transit; and The City of Huntington Beach seeks to relieve congestion, improve access to local destinations and enhance access to regional transit services within the City, including special services during the U.S. Open of Surfing and 4rh of July holiday by providing local a local transit circulator; and The City of Huntington Beach will provide necessary matching fiends for the project through non-Measure M funding as required by the M2 program; and The program will supplement and expand,rather than supplant existing shuttle and transit services provided by OCTA and the City; NOW, THEREFORE,the City Council of the City of Huntington Beach does hereby resolve as follows: 1. That the Director of Public Works or his/her designee is hereby authorized to submit a grant application to the Orange County Transportation Authority under Measure M Project V Community-Based Transit/Circulators Funding Program to obtain fiends to contract for operations and maintenance services. "'/132801 1 Item 12. - 37 HB -40 - RESOLUTION NO. 2016-13 PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 21 st day of March 2016. Mayas , REVI ND APPROVED; APPROVE OFO City a a er 7 Attorney rr� INITIATED AND APPROVED: Director of Public Vdor cs I 16=5134/132801 2 HB -401- Item 12. - 3 8 Res. No. 2016-13 STATE OF CALIFORNIA COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a Regular meeting thereof held on March 21, 2016 by the following vote: AYES: Posey, O'Connell, Sullivan, Katapodis, Hardy, Delgleize, Peterson NOES: None ABSENT: None ABSTAIN: None City Cl rk and ex-offici Clerk of the City Council of the City of Huntington Beach, California Item 12. - 39 HB -402- ATTACHMENT #5 I HUNTINGTON BEACH Public Works Department N ish x9..; Travis K., Hopkias, PE Director of Public works February 29,2016 Orange County Transportation Authority Attention:Sam Kaur Section Manager Local Programs 2"d Floor—Planning 600 S.Main Street Orange,CA 92863 RE: Project V Call for Projects Application: City of Huntington Beach Seasonal Local Transit Circulator Dear Ms. Kaur: The City of Huntington Beach is pleased to present our application for your consideration in the award of grant funds under Project V for the City of Huntington Beach Seasonal Local Transit Circulator. The project will serve several local visitor and local resident attractions with key connections to transit oriented development and underserved areas with a free transit alternative during the peak summer months and some extended weekend coverage. The program incorporates and expands on some current local shuttle services provided on summer weekends, on 4d' of July and during the US Open of Surfing event weekends. The City Council will consider adoption of the resolution attached to our application at their March 21, 2016 meeting. We will provide you with the adopted and signed copy by April 1. Should you have any questions, please contact me or the City's Transportation Manager, Bob Stachelski at(714)536-5431. Sincerely, Travis K. Hopkins, PE Director of Public Works 2000 Maim Strut, California 92648# PbHB -403-36-5431 www.huntingtonbeachca Item 12. - 40 Orange County PROJECTY Transportation Authority Community-Based Transit/Circulators Project Application OCTA Perm tl I.APPLICANT INFORMATION II.FUNDING SUMMARY" Agency: City of Huntington Beach Total Project Cast: $ 196,080.00 Primary Contact Name: Bob Stachelski Capital Funding: $ 45,000.00 Title/Department: Transportation Manager Operating Reserve: $ 125,940.00 Phone: 714.536.5523 Applicant Match Rate: 100/0 Email: bstachelski&surFcity-hb.orq Describe Source of Agency Funds: Air Quality Management District funds and III.P03ECT DESCRIPTION private partner-Visit Huntington Beach (Local visitors Bureau) The proposed project will provide seasonal local transit service that will both supplement current OCTA services by providing additional connection opportunities to existing routes and provide local circulation connecting many of Level of Commitment: mmitment Lette the City's key destinations and target communities. Name of non applicants: visit,Huntington Beach APPLICATION CHECKLIST(guidelines) IV.MINIMUM ELIGIBILITY YES/NO :Complete Application A. Applicant eligible to receive M2 funding? 0 Y ❑ N p Operating Incentive(4.0) B Meet any one of the following: D Y ❑ N ❑ Commitment to 10 b/rvh Proposed project in Go Local Planning and/or 2011 Transit L7 Agree to collect 0&M data quarter) Study,or Supports Goals of Sustainable Communities Strategy? M, .Meets Minimum Eligibility(6.0) C. Supplement rather than supplant existing transit services? p Y ❑ N p (Funding Plan(8.0) D. Projects meet ADA requirements? p Y ❑ N "p O&M/Capital Financials E. Financial plan for ongoing operations&maintenance? ❑ Y ❑ N V Funding.Needs , F. Project approved by City Council and partner jurisdictions? El Y ❑ N [l Match Funding Availability G. Local funding meets minimum 10% match requirement? El Y ❑ N 0 Funding Assurances I. Applicant agrees to adhere to applicable FTA requirements? D Y [:1 N lM Partnership Arrangements City Council action to follow p Project Development Schedule Pi O&M.Facility Management V.COST EFFECTIVENESS [] Service Coordination Plan Operating Cost per Boarding Opening Year: $ 8.91 [ Financials(9.1) Annualized Operating&Capital Cost per Passenger: $ 13.87 E] Council Resolution(9 3.1) p Lease/Cost Agreements(9.3 2) VI.PROJECT READINESS El Project Documentation(9.3.3) Opening Year: By 2017 Phase Ready: ROW Acquired or Not Applicable p Operations Plan(9.3.4) El Route Map wJ existing transit service VII.COMMUNITY CONNECTIONS Q Draft Time Table Activity Centers Senior Center(s) p Headways Served: School(s) Q Stop Location Listing Retail Center(s) D Summary of Vehicle Types Special Event Venue(s) Speed Profile Connections to Existing Service ❑ Fleet Size Updated 11/1.9/2GI5 Item 12. - 41 H B -4 04_ PROJECT WAW Application r e OCTA Wage 2 Community-Based Transit/Circulators Project Application Farm VIII. FIXED-ROUTE BUSIRAIL CONNECTIONS AGENCY Number of fixed-route connections(w/in 1/4 mile): 20 City of Huntington Beach VIV.TRANSIT USAGE XIII.ADDITIONAL COMMENTS Projected Average Daily Boardings 1st Year: The planned service is anticipated to (total annual boardings/annual operating days) 14,000 operate 118 days a year and 12-14 hours per day depending on the day of the week. The shuttle will be free of charge and X. LOCAL REGIONAL BENS (OPENING YEAR) operate daily during the peak summer season. Planned Employment Densities per Sq.Mile: 5,300 Planned Population Densities per Sq. Mile: 6,300 Projected Annual Visitors Served by Seasonal Route: 6,000,000 XI.SPECIAL EVENT TRANSIT Description(s) 4th of July,US Open of Surfing Remote Parking and resident shuttle. Includes expanded service frequency. Date(s) July 4,July 30,31&August B,6,7 Time(s) 8amto10pm Location(s) US Open of Sung at HB Beach,4th of July service for beach access,downtown and parade route XII.AGENCY EXPERIENCE Previously Operated Service Shuttles or Trolleys (list all applicable w/description): tither service complimenting regional bus and rail I herby certify that the information provided herein this form is accurate and consistent with accompanying documentation. I further certify that the abme information has been approved by Council resolution and that awarded funds will not be used outside of their intended purpose. Signature Date HB -405- Item 12. - 42 City of Huntington Beach Seasonal Local Transit Circulator PROJECT DESCRIPTION The City of Huntington Beach proposes to develop a free summer local transit circulator route, to meet the needs of our seasonal coastal access visitors and the many changes that have occurred or planned within the City. The City has been enhancing our visitor serving coastal land uses in accordance with basic California Coastal Commission principles, creating an increased need for local circulation alternatives to serve these visitors effectively. Recent residential development within the City has primarily been medium density development with a greater orientation towards transit use. Over the past few years,the City has been successfully operating a special event shuttle service during 4 th of July and the U.S. Open of Surfing and our local visitor's bureau has operated a local shuttle service for several of the local hotel members and local businesses. The City is looking to combine and augment the services that have been provided with a single local route that would lead to expanded daily transit access while meeting the peak season weekday and weekend demands. The City has also developed a routing plan that helps connect key destinations and target riders at many locations within the City. The northern portion of the route will provide connections to high demand areas including Golden West College,the OCTA Transit Center, Bella Terra, new higher density residential developments,the Oak View neighborhood and the new Senior Center(opening Summer 2016) in Central Park. The southern portion of the route will link with key destinations and generators near the coast including Downtown Huntington Beach,the new Pacific City development,coastal hotels and the beach areas. This route also provides numerous opportunities for connections to OCTA's regional transit operations, including 8 existing routes. During two key summer event periods,the City proposes to replace and augment existing Project V services provided on 4 th of July and during the 2 weekends and one weekday of the U.S. Open of Surfing. Enhanced services during these key events will include additional bus deployment and a second route connecting parking at Edison High School with the event area. The success of this program will likely be tied to the quality and convenience of the service, both in terms of routing and travel time, and providing the right destinations and connections. To effectively initiate the program,the City is proposing a comprehensive marketing and branding program for the services. Building on the successes of the prior services,the City believes that a consistent and appealing branding approach will be extremely important, I I P a e Item 12. - 43 HB -406- OPERATIONS PLAN The City of Huntington Beach envisions a main service route with variations during key events. Figure 1 presents a graphic depiction of the main proposed route along with anticipated stop locations and the supplemental special event services during 4'h of July and the U.S. Open of Surfing and existing OCTA regional transit routes (excluding routes 172 and 173). The following presents a detailed description of the route. The route was designed to primarily serve as a visitor service while providing additional local circulation alternatives to residents,with connections to key destinations within the City and access to regional transit routes/facilities, and higher density residential areas. Key areas served within this route include: 0 Golden West College • 1,500 new multi-family residential units/transit oriented development • Golden West Transportation Center • Bella Terra commercial area • Huntington Hotel • Oak View neighborhood • New Senior Center in Central Park(scheduled to open Summer 2016) • Central Park Sports Complex, Library, nature center, Frisbee golf, equestrian center and open space • City Hall • Huntington Beach High School • More than 1,000 coastal hotel rooms (incl. Hyatt, Hilton, Shorebreak) with more than 350 additional rooms currently planned or under construction • Local beach and municipal pier • Downtown Huntington Beach shops and restaurants The local circulator route offers several connection points to regional transit services including routes 1, 25, 29, 66, 70,72, 76 and 178. Additionally,the circulator route proposes shared use of existing bus stops and amenities with several of these routes. Specific route stops include: • Northbound Gothard north of Edinger • Eastbound Center Ave. east of Gothard St. • Eastbound Center Ave. at Huntington Village Wy. • Southbound Beach Blvd.south of Edinger Ave. • Westbound Warner Ave. west of Beach Blvd. 2 HB -407- Item 12. - 44 • Westbound Warner Ave. • Northbound and Southbound Golden West St at Talbert/Central Library • Northbound and Southbound Main St. south of Yorktown Ave • Southbound PCH at 17 th St. • Northbound PCH north of 6 Ih St. • Northbound and Southbound PCH at Main St. • Southbound PCH at Transit Center(between 1st St and Huntington St.) The City expects the 15.4 mile route to operate with a single bus with an approximate 60 minute frequency(headway) with additional bus service added during 6e' vent days (4 th of July and 5 days for the US Open of Surfing event), The route is intended to be a seasonal route, focusing on the peak summer period between Memorial Day and Labor Day. Additional weekend services are planned on the summer "fringe" period when weekend visitors increase beginning with Spring Break. The following tables present a summary of the operating plan for the circulator service. Dates of Operation Days of Service Operating Hours April 1-Memorial Day Weekends (24 days) 10 am—10 pm Labor Day to October I Memorial Day to Labor Day Weekdays (63 days) 10 am—10 pm 11--....................... -..........— Memorial Day to Labor Day Weekends and Holidays (31) 8 am—10 pm Draft Time Table step. Time. rime 1 8:00 9:00 2 8:04 9:04 3 8:06 9:06 4 1 8:10 9:10 5 8:15 9:15 6 8:21 9:21 7 8:23 9:23 .......................---.......................... 8 8:26 9:26 9 l 8:30 9:30 10 8:34 9:34 11 8:37 9:37 12 8.42 9:42 13 8,47 9:47 14 8:52 9:52 is 8:55 9:55 3 g e JLLCM 12. - 45 HB -408- Service Provider The City intends to contract with a private service provider for the proposed transit services. It is expected that one 20-24 passenger shuttles will be used to provide the services augmented with 3 additional shuttles for use during the 6 special event days. The City has used this type of service in the past, on a limited basis under the existing Project V program. Expanding the service from the currents days to a total of 118 days will provide greatly improved opportunities for marketing and building ridership. Huntington Beach is committed to using all of the resources available within the project, monitoring performance and making service alterations as needed to meet the stated goal of 10 boardings/revenue hour. As part of the monitoring,the City and our transit provider partner will provide quarterly collection and reporting of operations and maintenance (or as frequently as needed for seasonal service). The vehicle envisioned for the circulator is the same as that used for services provided by the City and Visit HB. The 20 passenger, gas-powered, "cutaway" vehicle is fully compliant with all ADA accessibility requirements. Vehicles will be equipped with bike racks and branded specifically for the Huntington Beach circulator service utilizing the graphics developed by Visit HB. Photos of the proposed vehicle and prior graphic treatment is attached for reference. While the City has not selected a preferred vendor for the service at this time, and no agreements are in place, both the City and Visit HB have had positive experiences with Transportation Concepts with prior services provided. Budget information for hourly operations and detailed vehicle information is based on vehicles and services typically provided by Transportation Concepts. Transportation Concepts also maintains a fleet of approximately 100 vehicles and is fully capable of ensuring vehicle availability throughout the project service period. Transportation Concepts has provided a preliminary indication that they would be interested in engaging in the proposed service. Capital Investment The project includes capital improvements for the enhancement of shuttle stop areas the first year of operation. The route plan includes 15 stops at existing transit stops. Most of these stops have aging amenities in need of repair. Installation of shuttle specific signing and passenger information is also included in the plan. The proposed budget will provide for an average total expenditure of$3,000 per stop. Operations, Maintenance and Administration Operations and maintenance for the shuttles is included in the overall estimated operating costs. Maintenance of stops is included in current services provided through the City and no additional costs are anticipated with the proposed services. City staff will administer the 4 HB -409- Item 12. - 46 services provided and ensure that required performance information is collected, documented and reported to OCTA as required under the Project V program. The City will provide the administration costs associated with staff and are not included in the overall 10% match calculation per Project V program requirements. Fees associated with facility use agreements for additional remote parking at local schools have been programmed as additional costs under project administration with the same 10% match requirement. Marketing The seasonal nature and limited service area of the proposed route will require a focused marketing campaign to ensure that potential users are aware of the free transportation service available during the peak summer season. The marketing effort will build on current special event efforts and the work of Visit HB in developing a brand/graphics for the limited local services currently provided. Visit HB has authorized the City to use elements already developed through their private investment and to utilize their marketing resources that target visitors, visitor-serving commercial uses and residents within the City. By combining resources,the City is confident that a relatively minimal $10,000 annual marketing budget will be sufficient to ensure maximum success from the local circulator project. Printed material, social media and radio advertising will be the primary means of marketing. The City will also take advantage of available bus shelter/bench ad space and new amenities installed with the project to promote the service to the public. PROJECT FINANCIAL PLAN Funding for marketing, capital investment, operations and maintenance is proposed to be provided by a combination of OCTA M2 Project V funding, per capita annual funding provided to the City of Huntington Beach by the Air Quality Management District(AQMD) and private contribution from our local visitor's bureau-Visit HB. A detailed presentation of the financial plan with all pertinent assumptions and phases for the first year of operation are presented in Table 1. Table 2 presents a 7 year financial plan summary of expenditures for operations excluding capital vehicle costs. The table below presents a summary of the first year project funding. 5 1 P a g Item 12. - 47 HB -410- Total Project Total Project Match(10%) Total OCTA Project Element Cast City Contribution Private Contribution Request Fringe Season $23,040 $1,152 $1,152 $20,736 Weekends Summer season $88,640 $4,432 $4,432 $79,776 daily 4*'of July $2,240 $112 $112 $2,016 U.S.Open of $20,160 $1,008 $1,009 $18,144 Surfing Capital $45,000 $2,250 $2,250 $40,500 Marketing $10,000 $500 $500 $9,000 Administration $7,000 $5,100 $100 $1,800 Total $196,080 $14,554 $9,554 $171,972 The shuttle will be provided as a free service to the public and therefore, no revenue will be generated. The City understands the potential for the local match to increase significantly should the ridership fall below expected levels, limiting Project V OCTA funding to$9 per boarding (excluding capital costs). The City will program a budget allocation in our FY16/17 Budget sufficient to cover potential additional match as required to meet this contingency (estimated at$45,000), The City has ample reserves in Air Quality Management District Funds and other appropriate sources to meet this requirement. Project Schedule Some aspects of the proposed service have been running within the City over the past 2 years and generally follow existing OCTA transit routes. The proposed circulator significantly expands the services provided based on the number of days of operation. Staff has confirmed that the expanded services proposed do not require any additional environmental clearance due to categorical exemption for the program. Since the circulator primarily uses existing bus stops for service, builds on existing agreements and operations and proposes the use of a private transit service provider,the service can be made operational within four months of funding being available. However, based on anticipated funding availability through OCTA beginning in July 2016(with preliminary recommendations available in June 2016) and the seasonal schedule for the service, it is unlikely that the City would be able to implement this service during the summer of 2016. Therefore,the initial year costs would fund all of the Summer 2017 services and provide ample opportunity for the City to complete all initial phases of project initiation prier to the 6 ) 1-113 -411- Item 12. - 48 beginning of service on April 1, 2017. Based on this start date,the following represents a very conservative schedule for completing all tasks needed to bring the route into operation. July 1,2016 Year 1 funding available for approved projects Sept.—Nov.2016 Develop/refine marketing plan Feb-Aug 2017 Prepare and implement marketing materials,efforts Sept. 16—Jan'17 Transit service procurement Feb.-March 2017 Transit service vehicle prep. Sept.—Dec.2016 Bus stop improvement procurement Jan-March 2017 Bus stop improvement install/construction April l,2017 Begin seasonal service RIDERSHIP PROJECTIONS Accurate ridership projection for any new transit service is always challenging and requires some reasonable assumptions to be made based on a review of historic data and demographics. The Huntington Beach Circulator Route benefits from the availability of actual transit service experience, reliable visitor statistics and a key attraction that consistently draws a broad range of visitors, spanning virtually every demographic—the Pacific Ocean and the local beaches. Combined with the many special events hosted by the City each summer,there is significant potential for local circulator transit use just for the coastal attractions. In addition, the circulator route provides convenient connections to many other local attractions from residential areas and potential park-and-ride/drop off locations. The City beaches, Pacific Ocean and coastal amenities immediately adjacent to the proposed route attract more than 10 million visitors annually,with the bulk of those visitors during the peak summer months. Hotels, restaurants and shops attract many more visitors each year from within Huntington Beach, Orange County and beyond. If just 0.2%of the beach visitors used the circulator service ridership would reach more than 110 passengers per day and 13,000 passengers for the seasonal service. During special event days and during other peak summer days, coastal parking often restricts visitor access. During these days,the potential shuttle use has the potential to substantially exceed those totals. The biggest events already served by a shuttle program have demonstrated strong demand with more than 6,000 passengers using the service during just 5 service days—more than 1,200 passengers per day. While those days are exceptional, it does indicate there is a willingness for people to utilize local circulators under the right circumstances. The circulator route serves two of the highest residential density areas within the City—the Edinger Corridor(near Gothard St) and the Oak View neighborhood (generally bounded by 7 1 P a c e Item 12. - 49 HB -412- Slater Ave.to the south, Heil Ave.to the north, Beach Blvd to the east and Gothard St.to the west). While the socioeconomic conditions of the two areas are very different, both have excellent potential to generate use of the circulator by residents. Development along the Edinger Corridor includes 957 recently developed units, with 385 additional units expected to be completed in early 2017 and 510 more units to be completed in 2018, all immediately adjacent to the proposed circulator route (<1/8 mile). The developments were all conceived as transit oriented development and offer significant ridership potential. The Oak View neighborhood is a recognized environmental justice area with relatively high population densities combined with a population more inclined to use public transit for both commute trips and for recreational purposes. The free shuttle is expected to be especially attractive for recreational trips, making beach trips an easy and low cost recreation option. The circulator route traverses the Oak View neighborhood with two planned stops along Warner Avenue in the heart of the neighborhood. Lastly,the City is proposing stops in both travel directions on Golden West Street adjacent to Central Park. Central Park includes many recreational amenities including open space, picnic areas,the Sports Complex, Huntington Central Library, Disc golf,freshwater fishing, nature areas and the new Senior Center(opening Summer 2016). The free local circulator is expected to be very attractive to many potential park visitors living along the service corridor. Overall,the City has an average population density of 7,200 residents per square mile. Several areas along the proposed service route far exceed that average as noted above. However, the route also passes through some relatively low density areas, yielding an estimated population density along the route approximately equal to that of the overall City. The City boasts projected employment of 80,000 jobs by 2020. The proposed route passes near many of the higher employment density areas in the City, but also routes through lower employment density areas. The overall City employment density is 2,500 jobs per square mile. It is estimated that the proposed route would serve a similar employment density. The stated information is based on information contained within the City's General Plan Housing Element amended in 2013. A second analysis was completed using OCTA bus route planning software. Based on that data source there are approximately 18,900 people living within X mile of the 15 planned stops and 15,900 jobs. With an average service area per stop of 0.2 square miles (3 square miles for 15 stops),this yields an average population density of 6,300 residents/square mile and an average jobs density of 5,300 jobs/square mile within the service area of the proposed stops. agegl HB -413- Item 12. - 50 1 Huntington Beach Circulator Vehicle Example and Branding Graphics h� a f *Y',,+ate PdQ Y A1�r 3 x£ �.a a t N� ' i3 o, v_ a 9 Page Item 12. - 51 HB -414_ ................................................................................................................... ..__................... BOW Avp­ N W J` F' - e +f , k L. f } �9 r Legend h, ,L' F on&= Primary Shuttle Route G 3 Alternate of July Route 3 3 ; Additional 41''of July&US Open Route Bus Stop&Number + " ! Existing Bus Service& Route .. Number •rculator Figure Proposed CIIR -4 1 s- „Item 12. - 52 Table City nti ear N Local Circulator Year I Financial Plan 7ServWeekday Wee< ay Wee end eken Hourly Weekday ice Revenue Weekend Service Revenue Service 10% Ineligible OCTA Hrs Days Hours Mrs Days Hours Costs Total Costs Match Costs Funding Normal Summer weekday/weekend 12 62 744 14 24 336 $ 80 $ 86,400 $ 8,640 $ 77,760 Operations& Fringe Season Weekends 0 12 24 288 $ 80 $ 23,040 $ 2,304 $ 20,736 Memorial Day&Labor Day 14 2 28 0 $ 80 $ 2,240 $ 224 $ 2,016 Maintenance 4th ofJuly 0 28 1 28 $ 80 $ 2,240 $ 224 $ 2,016 US Open Week 28 1 28 56 4 224 $ 80 $ 20,160 $ 2,016 $ 18,144 Marketing $ 10,000 $ 11000 $ 9,000 Signs/posts(avg$175/stop) $ 2,2,50 $ 225 $ 2,025 Capital Benches(10 @$1,125 ea) $ 11,250 $ 1,125 $ 10,125 Year 1 only Trash Bins(15@$700 ea) $ 10,500 $ 1,050 $ 9,450 Shelters(5 @ 4,200 ea) $ 21,000 $ 2,100 $ 18,900 Project Admin&Reporting $ 5,000 $ 5,000 Adminstration Facility Use Fees $ 2,000 $ 200 $ 1,800 $ 196,080 $19,108 $ 5,000 $171,972 Huntingtonable 2 City of FinancialLocal Circulator 5 Year Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 $65/hr $67/hr $,69/hr $71/hr $73/hr $75/hr $77/hr O&M Shuttle Service $ 108,940 1 $ 112,292 1 $ 115,6441 $ 118,996 $ 122,348 $ 125,700 1 $ 129,.052 Marketing $ 10,000 $ 10,000 1 $ 10,0001 $ 10,000 Is 10,0001 $ 10,0001 $ 10,000 Administration Staff $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Facility Fees $ 2,000 $ 2,000 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 Total $ 125,940 $ 129,292 $ 132,644 $ 135,996 $ 139,348 $ 142,700 $ 146,052 OCTA $ 108,846 $ 111,863 $ 114,880 $ 117,896 $ 120,913 $ 123,930 $ 126,947 Huntington Beach $ 11,047 $ 11,215 $ 11,382 $ 11,550 $ 11,717 $ 11,885 $ 12,053 Visit HB $ 6,047 $ 6,215 $ 6,382 $ 6,550 $ 6,717 $ 6,885 $ 7,053 Local Share $ 17,094 $ 17,429 $ 17,764 $ 18,100 $ 18,435 $ 18,770 $ 19,105 Assumes$80/hr initial total contracted transit service fee; $15/hr capital-$65/hr O&M 3%CPI annual escalation assumed on transit costs N ch RESOLUTION NO. 2016-13 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTONT BEACH AUTHORIZING SUBMISSION OF AN APPLICATION TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY FOR COMPETITIVE FUNDING UNDER THE MEASURE M-2 PROGRAM FOR PROJECT V TO PROVIDE COMMUNITY-BASED TRANSIT/CIRCULATORS WHEREAS, the Orange County Transportation Authority(OCTA)makes state, federal and local funding available to the 34 incorporated cities and the County of Orange for eligible projects through a competitive process to improve all modes of surface transportation; and The OCTA Board of Dissectors(Board)approved the release of a call for projects for the Renewed Measure M (M2)Project V Community Based.Transit/Circulators Funding Program on November 23,2015; and The M2 Program establishes a competitive process to enable local jurisdictions to compete for funding to develop local bus transit services that complement regional transit services, and meet needs in areas not adequately serviced by regional transit; and The City of Huntington Beach seeps to relieve congestion, improve access to local destinations and enhance access to regional transit services within the City, including special services during the U.S, Open of Surfing and 4"' of July holiday by providing local a, local transit circulator;and The City of Huntington Beach will provide necessary matching funds for the project through non-Measure M funding as required by the M2 program; and The program will supplement and expand,rather than supplant existing shuttle and transit services provided by OCTA and the City; NOW,THEREFORE,the City Council of the City of Huntington Beach does hereby resolve as follows: 1. That the Director of Public Worms or his/her designee is hereby authorized to submit a grant application to the Orange County Transportation Authority under Measure M Project V Community-Based Transit/Circulators Funding Program to obtain funds to contract for operations and maintenance services. 16-51.34/132801 1 Item 12. - 55 HB -41 - RESOLUTION NO, 2016-13 PASSED AND ADOPTED by the,City Council of the City of Huntington.'Beach at a regular meeting thereof held on the day of 2016, Mayor REVIEWED AND APPROVED: APPROVE 40 FO City-TvTana.ger Attorney t, INITIATED AND APPROVED: Director of Public Works 16=5134l132801 2 HB 419- Item 12. - 56 1 IVISIT HUNTINGTON February 26,2016 SurfCltWU8A' Travis Hopkins Director of Public Works City of Huntington Beach 2000 Main Street Huntington Beach,CA 92648 Subject.- Project V Local Circulator Grant Application Commitment of Support Dear Mr.Hopkins: Visit Huntington Beach,the official Destination I'v1'arketing Organization (DMO)for SurfCity USA, is pleased to submit this letter in support of the City's request for grant funding for local transit circulator service. The proposed free seasonal service connects key commercial, residential and recreational centers within the City and provides a valuable transportation alternative to a broad range of people with varying needs. We strongly support the goals and objectives of this effort and wish to specifically pledge the following contributions from Visit HB: 1. Use of existing marketing,graphic/branding developed for use in current lim-ited seasonal shuttle service for vehicle branding and preparation of marketing materials for the new expanded service at no cost to the project. 2. Access to Visit HB administered marketing outlets such as visitor guides,social media, public relations assets,and the official www.surfcityusa.com website,as part of a targeted and integrated marketing effort funded by the project. 3, Annual contribution to the City's local match for the project not to exceed$12,000 annually, Visit HB anxiously anticipates the availability of this service to the community and will provide any assistance that we can through our mission to promote and support local businesses and the best possible experience for all visitors to Huntington Beach. If you or the Orange County Transportation Authority have any questions regarding our support for this project, please contact me,or our Executive Vice President of Sales and Administration,John Ehlenfeldt,at Visit HB at(714)969-3492. Sincerely, Kelly Mi far President&CEO Visit Huntington Beach Visit Huntington Beach 301 Main St., Ste. 212 Huntington Beach, CA 92648 Phone: (714) 969-3492 1 Fax: (714) 969-5592 Item 12. - 57 HB -420- Orange County PROJECTV Transportation Authority Community-Based Transit/Circulators Project Application GCTA Form I.APPLICANT INFORMATION Ii.mNDING SUMMARY., Agency: City of Huntington Beach Total Project Cost: $ 1,019,744.00 Primary Contact Name: Bob Stachelski Capital Funding: $ 161,932.00 Title/Department: Transportation Manager Operating Reserve: $ 857,812.00 Phone: 714.536.5523 Applicant Match Rate. 10%, Email: ielskiasurfcity-hb.prg Describe Source of Agency Funds: Air Quality Management District funds and II. PROJECT DESCRIPTION. private partner-Visit Huntington Beach I (Local visitors Bureau) The proposed project will provide seasonal local transit service that will both supplement current OCTA services by providing additional connection Level of Commitment: ommitment Lette opportunities to existing routes and provide local circulation connecting many of the City's key destinations and target communities. Name of non applicants: visit Huntington Beach APPLICATTONzCHECKLIST(guidelines) IV.MINIMUM ELIGIBILITY YES/NO: [D Complete Application A.JApplicant eligible to receive M2 funding? ❑ Y 17 N Pp Operating Incentive(4.0) B. Meet any one of the following: El Y El N p Commitment to 10 b1rvh CI & Proposed project in Go Local Planning and/or 2011 Transit Agree to collect 0 M data quarterl� Study,or Supports Goals of Sustainable Communities Strategy? El Meets Minimum Eligibility(6.0) C.ISupplement rather than supplant existing transit services? ❑ Y [__1 N El Funding Plan(8.0) D. Projects meet ADA requirements? [71 Y ❑ N El O&M/Capit6l Financials E. Financial plan for ongoing operations&maintenance? E Y El N El Funding Needs F. Project approved by City Council and partner jurisdictions? El Y El N El Match Funding Availability G. Local funding meets minimum 10%match requirement? El Y13 N R1 Fundina Assurances I. iApplicant agrees to adhere to applicable FTA requirements? ❑ Y ❑❑ N Partnership Arrangements City Council action to follow p Project Development Schedule O&M facility.Management V.COST EFFECTIVENESS ❑ Service Coordination Plan Operating Cost per Boarding Opening Year: 8.93 Q Financials(9.1) Annualized Operating&Capital Cost per Passenger: $ 15.44 F, Council Resolution(9.3.1) F, Lease/Cost Agreements(9.3,2) VI.PROJECT READINESS 0 Project'Documentation(9.3.3) Opening Year: --[iy 2017 Phase Ready: IROW Acquired or Not Applicable E] Operations Plan(9.3.4) ..................................... ........................................... .......... .......... ...................... ............................ -tran'sit serve w ...........-..................— vii.corolmuNrry CONNECTIONS Draft Time Table Activity Centers Senior Center(s) El Headways Served: School(s) Fz), Stop Location,Listing Retail Center(s) Summary of Vehicle Types Special Event Venue(s) p Speed Profile Connections to Existing Service F,1 Fleet Size L........ HB -42 1- `Item 12. - 58 Application PROJECTV Page 2 Community-Based Transit/Circulators Project Application OCTA Farm VIII.FIXE6-ROU'TE BUSIRAIL CONNECTIONS AGENCY Number of fixed-route connections(w/in 1/4 mile): 20 City of Huntington Beach VIV.TRANSIT USAGE XIII.ADDITIONAL COMMENTS Projected Average Daily Boardings 1st Year: The planned service is anticipated to (total annual boardings/annual operating days) 100 operate 112 days a year and 12-14 hours per day depending on the day of the week. The shuttle will be free of charge and X. LOCAL REGIONAL BENEFITS(OPENING YEAR) operate daily during the peak summer season. Planned Employment Densities per Sq.Mile: 5,300 Planned Population Densities per Sq.Mile: 6,300 Projected Annual Visitors Served by Seasonal Route: 6,000,000 XI.SPECIAL EVENT TRANSIT Description(s) Date(s) Ti me(s) Location(s) XII.AGENCY EXPERIENCE Previously Operated Service Shuttles or Trolleys (list all applicable Other service complimenting regional bus and rail w/description): consistent with accompanying documentation. I further certify that the above information has been approved by Council resolution and that awarded funds w111 not be used outside of their intended purpose, Signature Date Updated 11/19/2015 Item 12. - 59 HB -422- City of Huntington each —Seasonal Local Transit Circulator Supplemental Information May 5, 2016 The City of Huntington Beach has prepared the following supplemental information in response to the April 11, 2016 request from OCTA staff as part of the review of our Project V grant application submittal. Specifically, OCTA identified 10 items to be addressed by the City in support of our application. The following presents each question/request from OCTA and our response. 1. Please confirm that hourly costs of$80 includes capital/lease and operations. Provide vendor quote to support cost estimate. Response: The $801hr budget cost for the transit service does include the capital lease costs and the operations costs. Table 2 of our application provides some detail on the breakdown of these values. The information was originally obtained from a provider currently working with the City, but not as a formal quote. They indicated that, based on their current rates, the $80 cost($65 O&M, $15 capital) was a conservative budgeting value. We requested a more formal response from the vendor to include in our response (Attachment 1). We understand that the estimated budget values may be slightly different than what we could expect through a competitive bid process should the program be funded 2. Split the capital (vehicle lease) and operations cost if possible. Response: As noted above, we believe that we did provide separate costs as shown in Table 2 of our original application. However, we did not include a separate line item for capital in that table. In response to this request and costs identified in the response to item 6 below, we prepared Table 3. 3. Please revise route map and includeall streets. Response: A revised map has been prepared labeling each of the streets used along each route. (Figure 1) 4. Current timetable only has two trips shown. Submit a more detailed ............. __...........timeta.bLe for the.-en.fire day of-ga,ch ....................................................... Response; A complete timetable for each route has been developed and is included in this response. (Attachment 2) S. Please clarify headway for regular and special event service. Response: Special event services have been removed from the proposal. The headways will be 75 minutes. HB 423- Item 12. - 60 6. Section 11 reflects the cost for one year only, revise and resubmit project application reflecting the cost for the life of the project. Response: The City has recalculated the total costs for a 7 year project and a revised application is included in this packet. 7. Provide a turn-by-turn routing for the proposed route. Response: Attachment 3 presents the turn-by-turn routing. 8. Provide a more complete timetable and indication of headway for special events and regular service. Response: A complete timetable for each route on for each type of day in operation is provided(Attachment 2) 9. Operating speeds are very fast based on proposed frequency and route length. What is speed based on? Provide supporting surveys or other information that would support the speed. Alternatively, the City can propose a reduced headway. Response: The City did not perform a formal survey of the route as part of the application preparation. However, three key items went into our review of the average operating speed for the route. First, OCTA provided a route analysis for the City using their route performance software. This simulation yielded an average travel speed of 12.5 miles per hour and a roundtrip travel time of 74 minutes. Staff reviewed a composite of the typical travel speeds along the route, signal coordination and variations on congestion and believe that for most days that actual travel time is likely to be closer to 65 minutes. However, incorporation of a suitable layover time of 10 minutes, results in a 75 minute headway. We are submitting with this response revised timetables reflecting these assumptions. (Attachment 2) 10.Is the event-based 4h of July and US Open service proposed in the application an expansion to the existing service? Response: Based on discussions with OCTA staff, it was deemed that the event services originally proposed are not a true expansion and have been removed from our application with the provided information. .......................... ....................-...................................................................................................... ..................... Item 12. - 61 HB -424- Table 3 7 Year Financial Summary Iit tington Beach Seasonal Local Transit Circulator (revised Year I Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 $80/hr $82/hr $85/hr $88/hr $91/hr $94/hr $97/hr Total O&M $ 90,740 $ 93,532 $ 96,324 $ 99,116 $ 101,908 $ 104,700 $ 107,492 $ 693,812 Capital Bus $ 20,940 $ 21,498 $ 22,157 $ 22,920 $ 23,789 $ 24,768 $ 25,860 $ 161,932 Amenities, etc. $ = 45,000 $ $ - $ $ 45,000 Staff $ 5,000 $ 5,000 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 35,000 Facility Fee:- 2,600 $ 2,000 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,533 74,000 Marketing $ 10,000 $ 10,000 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 70,000 t-j Total �, 7 3,�68 0 $ 132,030 $ 135,481 $ 139,036 $ 142,697 $ 146,468 $ 150,352 $ 1,019,744 CD C Table , City of Huntingtonear Local N Circulator Year I Financial (revised / Weekday Weekday Weekend Weekend Hourly Weekday Service Revenue Weekend Service Revenue Service Ineligible OCTA Firs Days Hours Hrs Days Hours Costs Total Costs 10%Match Costs Funding Normal Summor weekday/weekend 12 62 744 14 24 336 $ 80 $ 86,400 $ 8,640 $ 77,760 Operations& Fringe Season eekends 01 121 24 288 $ 80 $ 23,040 $ 2,304 $ 20,736 Maintenance Memorial Day&Labor Day 14 2 28 0 $ 80 $ 2,240 $ 224 $ 2,016 $ $ $ $ $ $ Marketing $ 10,000 $ 1,000 $ 9,000 Signs/posts(a $175/stop) $ 2,250 $ 225 $ 2,025 4- Capital Benches(10 @1$1,125 ea) $ 11,250 $ 1,125 $ 10,125 Year 1 only Trash Bins(15 . $700 ea) $ 10,500 $ 1,050 $ 9,450 Shelters(5 @$ ,200 ea) $ 21,000 $ 2,100 $ 18,900 Project Admin Reporting $ 5,000 �$ 5,000 $ - Adrninstration Facility Use Fe t $s $ 2,000 $ 200 ,� 1,800 $ 173,680 $ 16,868 $ 5,000 $ 151,812 i Table 2 City of Huntington Beach Local Circulator 5 Year Financial Plan Summary (revised 5/5/16) 6 Year Year Year I Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 $ 5 r $65/hr $67/hr $69/hr $71/hr $73/hr $75/hr $77/hr O&M Shuttle Servicel $ 90,740 1 $ 93,532 96,324 $ 99,116 $ 101,908 $ 104,700 $ 107,492 Marketing $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 Administration Staff $ 5,000 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Facility Fees $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 Total $ 107,740 $ 110,532 $ 113,324 $ 116,116 $ 118,908 $ 121,700 $ 124,492 OCTA $ 92,466 $ 94,979 $ 97,492 $ 100,004 $ 102,517 $ 105,030 $ 107,543 Huntington Beach $ 10,137 $ 10,277 10,416 $ 10,556 $ 10,695 $ 10,835 $ 10,975 Visit 1-113 $ 5,137 $ 5,277 5,416 $ 5,556 $ 5,695 $ 5,835 $ 5,975 1Local Share $ 15,274 15,553 $ 15,832 $ 16,112 $ 16,391 $ 16,670 $ 16,949 Assumes$80/h�initial total contracted transit service fee; $15/hr capital-$65/hr O&M 3%CPI annual a calation assumed on transit costs CD Attachment I Shuttle Service Budgeting Detail City of Huntington Beach Seasonal Local Transit Circulator 2016 Project V Application (source Transportation Concepts) -Cost Breakdown Year I Cost Per Hour Explanation -Driver Wages $ 29,548 $ 18.54 Driver wages and fringe benefits , Fuel Cost $ 10,973 $ 6.88 Fuel expense for buses -Insurance Costs $ 4,700 $ 2.95 Insurance for buses -Operating Depreciation $ 19,932 $ 12.50 Capital cost for buses -Operating Expenses $ 4,423 $ 2.77 Training, D&A testing, Uniforms, Recruitment -Maintenance Costs $ 4,226 $ 2.65 Bus parts,tires,supplies -Facility Cost $ 1,800 $ 113 Storage of buses -Administrative Wages $ 18,720 $ 11,74 Supervision expenses -Payroll Based Expenses $ 13,775 $ 8.64 Work compensation insurance Administrative Expenses $ 2,040 $ 1.28 Clerical -Regional/District Overhead $ 3,930 $ 2.47 Regional and District Support Staff . Corporate Overhead $ 2,620 $ 1.64 Corporate support staff Management Fee $ 10,840 $ 6.80 Profit before taxes Capital Costs include: Operating depreciation&Facility Cost—$13.63/hr Operations and Maintenance include all other costs-$64.84/hr For budgeting purposes,the application assumes a$15/hr capital cost and$65/hr O&M cost .................................. ....... ..................................................... Item 12. - 65 HB -428- At tachment 2 Huntington Beach Project V Seasonal Local Transit Circulator Detailed Route Schedules Typical Weekend Route Schedule(8 am-10 pm) Stop 0 Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Time Time Time Time Time Time Time Time Time Time Time Time 1 8:46 10:01 11:16 12:31 13:46 151:01 16:16 17:31 18:46 Mol 2116 2 8:51 10:06 11:21 12,36 13;51 15M 16:21 17:36 18:51 20:06 21:21 31 8:53 10:08 11:23 12:38 13:53 15:08 16:23 17:38 18:53 20:08 21:23 41 8:58 10:13 11:29 12:43 13:58 15:13 16:28 17:43 18:58 20:13 21:28 5i 9:05 10:20. 11:35 12:50 14:05 115:20 16:35 17:50 19:05 20:20 21:35 q,1: 1 9:13 10:28 11!43 12:58 14:13 15:28 M43 17:58 19:13 20:28 21:43 7 8:00 9:15 103 M 0 11:45 13:00 15 15:30 16:45 18:00 19:15 20:30 21i45 1 8;02 9:17 1022 11:47 13:02 14:17 15:32 16:47 18:02 19:17 20:32 21;47 9 8:06 9:21 10:36 11:51 13:06 14:21 15:36 16:51 18!06 19:211, 20,36 2151 A i 8:10 9:25 10:40 11:55 13:10 14;25 15:40 16;55 18:10 19;25 20:40 21:55 Il 8:12 9:27 10A2 11:57 13:12 14:27 15:42 16;57 18:12 19:27 20:42 21:57 11 i 8:18 9:33 10:481 12:03 13:18 14:38 15:48 17:03 18:18 19:33 20:48 13 8:24 9:39 10:54j 14:391 15:54 17:091 18:24 19:39 20:54, 14 1 8:29 9:44 10:591 12:141 11291 14:44 15:59 17:14 18:Z9 19 44 ?0 591 tV 15 1 8:331 9:48 11:031 12:181 13:331 14:481 16:031 17:181 18:33 19:48 21;031 Stop #!I is the layover stop at the transit stop on PCIi Weekend Fringe Season and Weekday Summer Route Schedule(10 am-10 pm) Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Departure Stop# Time Time Time Time Time Time Time Time Time Time Time Time 10:46 12:01 13:16 14:31 15:46 17:01 18:16 19:31 20:46 2 10:51 12:06 13:21 14:36 1551 17:06 18:21 1.9:36 20:51 3: 10:53 12:08 13:23 14:38 15:53 17;08 18:23 19:38 20:53 C 10:58 12:13 1328 14:43 15:58 17:13 18:28 19:43 20:58 5i 11:05 12:20, 13:35 14:50, 16:05 17:20 18:35 19:50 21:05 6: 11A 12:28 13;43 14:58 16:13 17:28 18:43 19:58 21;L3 —71 10:001 11:15 12:3-0 1145 15f00 16:15 17;30MI8:45 20;00 21AS 81 10:02 11:17 1232 13:47 15:02 16:17 17:32 18:47 ME 21:17 91 10:06 11:21 1236 13:51 15:06 16:21 17;36 18:51 20:06 21:21 101 10:10 11:25 12:40 13:55 15:10 16:25 17:40 18:55 20:10 21:25 U 10:12 11:27 12;42 13:57 25;12 16:27 17:42 18:57 20:12 21:27 12i 19,0 10:18 11:33 12:48 14:03 15;18 16:33 17:48 19:03 20:18 131 10:24 11:39 12:54 14,09 15:24 16:39 17:54 19:091 2 :241 14: 10:29 16:44 1759 19:141 20:29 151 10:331 11:491 13:031 14:18 15:33 16:48, 18:03 19:181 20:331 1 CD Stop#1 is the layover stop at the transit stop on PCH Attachment 3 Detailed Route Descriptions Turn-by-turn Routing Main Route-beginning opposite Goldenwest Transit Center on Center Avenue 1. Eastbound Center Avenue east of Gothard Street-follow Center Avenue to Beach Blvd 2. Right turn on Beach Boulevard-continue south to Warner Avenue 3. Right turn on Warner Avenue-continue west to Goldenwest Street 4. Turn left on Goldenwest Street-continue south to Yorktown Avenue 5. Turn left on Yorktown Avenue-continue east to Main Street 6. Turn right on Main Street-continue south to 17 1h Street 7. Turn right on 17 th Street-continue southwest to Pacific Coast Highway S. Turn left on Pacific Coast Highway-continue southeast to Transit Stop on PCH southeast of I't Street Return Route 9. Exit bus stop onto southeast PCH to Huntington Street 10. Turn left on Huntington Street-continue north to Atlanta Avenue 11. Turn left on Atlanta Avenue-continue to 1t Street 12. Turn left on I't Street-continue southwest to Pacific Coast Highway 13. Turn right on Pacific Coast Highway-continue northwest to 17 th Street 14. Turn right on 17 th Street-continue northeast to Main Street 15. Turn left on Main Street-continue north to Yorktown Avenue 16. Turn left on Yorktown Avenue-continue west to Goldenwest Street 17. Turn right on Goldenwest Street-continue north of Goldenwest Street to Heil Avenue I& Turn right on Heil Avenue-continue east to Gothard Street 1-9. Turn left on Gothard Street-continue north to Center Avenue 20. Turn right on Center Avenue-return to start of route Route alterations during 4h of July 4. Turn left on Goldenwest Street-continue south to Garfield Avenue 5. Turn left on Garfield Avenue-continue east to Beach Boulevard 6. Turn right on Beach Boulevard-continue south to Yorktown Avenue a, Turn right on Yorktown Avenue-continue west to Lake Street b. Turn left on Lake Street-continue south to Orange Avenue c. Turn left on Orange Avenue-continue southeast to I't Street 7. Turn right on 15t Street-continue southwest to Pacific Coast Highway S. Turn left on Pacific Coast Highway-continue to transit stop on PCH southeast of 1st Street Return Trip 9. Exit bus stop onto southeast PCH to Huntington Street ................................. -10. Turn left on-Huntington Street--continue-to Atlanta Avenue . .............................................. .................................................. 11. Turn left on Atlanta Avenue-continue west to Lake Street 12. Turn right on Lake Street-continue north to Yorktown Avenue 13. Turn right on Yorktown Avenue-continue east to Beach Boulevard 14. Turn left on Beach Boulevard-continue north to Garfield Avenue 15. Turn left on Garfield Avenue-continue west to Goldenwest 16. Turn right on Goldenwest-resume normal route(step 17 above) Item 12. - 67 HB -430- Rol iva- a ............ r, erAve � e y H 3 I /5,& r E --FOtRf, h�e i - w43 d Legere Primary Shuttle Route , d Alternate 4"'of July Route AIg Additional 4"'of July&US Open Route 13 Bus Stop&Number ........... __ _ Existing Bus Service&Route r Number �� r f Proposed 1113 .43 1- Item 12. - 68 ' City of Huntington Beach ' 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ www.huntingtonbeachca.gov FFB•17 1949a� � Office of the City Clerk Robin Estanislau, City Clerk February 8, 2017 Donald Herrera, Contracts Administrator Orange County Transportation Authority 550 South Main Street P. O. Box 14184 Orange, CA 92863-1584 Dear Mr. Herrera: Enclosed is one original of the "Cooperative Agreement No. C-6-1481 Between Orange County Transportation Authority and City of Huntington Beach for Project V Community- Based Transit/Circulators." Upon complete execution, please return a fully executed copy of "Cooperative Agreement No. C-6-1481 Between Orange County Transportation Authority and City of Huntington Beach for Project V Community-Based Transit/Circulators." to us. Please mail the document to: Robin Estanislau City Clerk 2000 Main Street, 2nd Floor Huntington Beach CA 92648 Your attention to this matter is greatly appreciated. Sincerely, Robin Estanislau, CIVIC City Clerk RE:pe Sister Cities: Anjo, Japan ♦ Waitakere, New Zealand