Loading...
HomeMy WebLinkAboutTecta America Southern California, Inc. - 2012-06-28 PURCHASE ORDER Page: 1 City of Huntington Beach This number must (714) 536-5221 BillingInquiries: 714 374-1568 appear on q l ) Packages and Invoices Please send invoices Attn:Accounts Payable P.O. Box 784 18138-OP Date: 8/20/2012 Huntington Beach,CA 92648 Branch/Plant: 10085402 Supplier: Ship To: TECTA AMERICA CITY OF HB-DW KISER CORP YARD 1217 E WAKEHAM AVE BUILDING B SOUTH END SANTA ANA CA 92705-4145 17371 GOTHARD ST HUNTINGTON BEACH CA 92647-6202 Order Date: Delivery Date: Buyer: Freight: Terms: 6/28/2012 6/28/2012 GRIFFIN SHARON Net 10 Days Reroof Warner Fire Station,3831 Warner Ave,quote dated 5/24/12 per Rex Sounders. GSA Pricing,Contract#GS-07F-040SU. This job is Non-Prevailing wage rates. LINE QTY EXTENDED REQ NUMBER DESCRIPTION/SUPPLIER ITEM ORDERED UOM UNIT PRICE PRICE NUMBER 1.000 Reroof Warner Fire Station EA 110,000.0000 110,000.00 00090396.OR Order Subtotal 110,000.00 Sales Tax .00 Total Order 110,000.00 TERMS AND CONDITIONS ON REVERSE FORM A PART OF THIS ORDER Jlm Slobc,an, ;��41tyof Huntington Beach TE(_­TAAMERfCA License No.811111 May 24, 2012 Jerry Thompson City of Huntington Beach Public Works Dept, 17371 G3othard St. Huntington Beach, CA 92647 'erl rv.thoMpsonasurfcity-hb org RE: Reroof Warner Fire Station 3831 Warner Dear Mr. Thompson: Thank you for inviting Tecta America Roofing to attend to your roofing needs. Having examined the site and in accordance with specifications provided by the Garland Co., herewith is the scope of work and proposal. • Tear off existing metal roofing and flat slope built up roofing down to decking • Replace any defective decking. See unit pricing below • Replace low slope roofing with HPR glass base 1 ply of Garland Flex base 80 in hot asphalt and 1 ply of Stress ply plus FR smooth in hot asphalt • Built up roofing to be covered with White Star coating and white gravel • On sloped roofing, install 1 layer of underlayment manufactured by the Garland Co. • Install new shingles • Shingles to be dimensional strip shingles. Color to be chosen from manufacturer's standard colors. Drip edge will be made of copper to withstand the environment. • Furnish and install 3 new skylights PRICE: $ 110,000.00 (non-prevailing wages) Notes: Asbestos,abatement, if any, is extra Replace defective decking $6.00 per sq. ft. Up to 5 sheets included in base bid. Please call this office if we can be of further assistance. Yours truly, i Rex Souders Tecta America Southern California, Inc. i'acta America Southern California Inc.11217 E.Wakeham Ave. Santa Ana,CA 92705 T: 714.973.6233 F: 714.973.6214 tectaamerica.com ESTIMATE WORK SHEET PROJECT NAME: WARNER FIRE STATION-SHINGLES&BUR SPECIFICATIONS: T/O ROOFING--NEW SHINGLES AND BUR FEDERAL SUPPLY SCHEDULE: CONTRACT#GS-07F-0405U FIELD AREA(1 SQ=100SF) SHINGLES=76 SQ BUR= 11 SQ MODEL# GSA MATERIALS LIST UNIT QNTY PRICE COST AM-32 PREMIUM INTERPLY 1SQ 13 $ 286.65 $ 3,726,45 AM-34 PREMIUM MOD.CAP 1SQ 13 $ 429.72 $ 5,586.36 AM-33 PREMIUM TOP PLY 1SQ 80 $ 419.73 $ 33,578,40 AM-70 50-YR SHINGLES 1 SQ 80 $ 132.66 $ 10,612.80 IM-02 GRAVEL SURFACING SF 1100 $ 1.58 $ 1,738.00 AM-12 TYPE III ASPHALT TON 2 $ 1,852.13 $ 3,704.26 AM-66 ACRYLIC ROOF CEMENT 5GAL 6 $ 218.44 $ 1,310.64 AM-08 ASPHALT PRIMER 5GAL 3 $ 62.31 $ 186.93 BM-01 CAULKING TUBE 15 $ 8.50 $ 127.50 AM-93 4 LB LEAD SHEET SF 3 $ 24.23 $ 72.69 LM-26 PITCH POCKET-SCUPPR EACH 3 $ 134.57 $ 403.71 MM-15 CURN MOUNTED S/L SF 96 $ 59.03 $ 5,666.88 OM-07 FRAMING LUMBER BF 355 $ 4.19 $ 1,487.45 INSULATION--ALL ITEMS OTHER THAN LABOR+EQUIPMENT 7M-10 2"ISO MF--ACTUAL 1.5" ISF 1 1100 $ 2.12 $ 2,332.00 JM-25 TAPERED PERLITE JBF 1 255 $ 1.76 $ 448.80 METAL-ALL ITEMS OTHER THAN LABOR+EQUIPMENT LM-21 COUNTER-FLASHG SF 1420 $ 6.27 $ 1,649.01 LM-19 COPPER METAL EDGE SF $ 22.34 $ 9,382.80 LM-16 COPPER GUTTER SF $ 44.52 $ 2,671.20 LM-17 COPPER DOWNSPOUT LF $ 35.71 $ 1,928.34 LM-34 VTR--2"-3" EACH $ 58.18 $ 581.80 GSA LABOR TASK PRICE BL-01 REMOVE 1 BUR SF 1100 $ 0.80 $ 880.00 BL-03 REMOVE 1"INSULATION SF 1100 $ 0.37 $ 407.00 BL-09 REMOVE METAL ROOF SF 7600 $ 0.79 $ 6,004.00 JL-10 2"ISO MF--ACTUAL 1.5" SF 1100 $ 0.32 $ 352.00 FL-02 UNDERLAYMENT SF 7600 $ 0.15 $ 1,140.00 HL-77 50-YR SHINGLES SF 76001 $ 0.79 $ 6,004.00 HL-19 PREMIUM BASE+CAP SF 1100 $ 0.79 $ 869.00 IL-02 GRAVEL SURFACING SF 1100 $ 0.32 $ 352.00 JL-25 TAPERED PERLITE BF 255 $ 0.13 $ 33.15 LL-21 COUNTER-FLASHING SF 263 $ 1.60 $ 420.80 LL-19 COPPER EDGE SF 420 $ 1.33 $ 558.80 ML-08 CURB MOUNTED SIC SF 96 $ 9.97 $ 957.12 LL-32 PITCH POCKET-SCUPPR EACH 3 $ 9.97 $ 29.91 LL-37 4 LB LEAD SHEET SF 3 $ 9.97 $ 29.91 LL-34 VTR-2"-3" EACH 10 $ 9.97 $ 99.70 OL-07 FRAMING LUMBER BF 355 $ 1.99 $ 706.45 XL-01 CRANE--UP TO 100' DAY 2 $1,435.69 $ 2,871.38 TOTAL@ $ 108,911.04 YL-25 TASK MULTIPLIER CATEGORY 5 @ 1.01 1.00% $ 1,089.11 GRAND TOTAL is 110,000.15