Loading...
HomeMy WebLinkAboutTony Banzuelo, Architect - Professional Services Contract for Design Development of Beach Maintenance Facility - CC-812 4/5/99 - 1999-04-05 Council/Agency Meeting Held: - Deferred/Continued to: 53 Approved ❑ Conditionally Approved ❑ Denied 1-v City Clerk's Signature Council Meeting Date: 04/05/99 Department ID Number: CS 99-004 CITY OF HUNTINGTON BEACH REQUEST FOR COUNCIL ACTION %REQUEST FOR REDEVELOPMENT AGENCY ACTION SUBMITTED TO: HONORABLE MAYOR/CHAIRMAN AND CITY COUNCIL MEMBERS/REDEVELOPMENT AGENCY MEMBERS SUBMITTED BY: RAY SILVER, City Administrator/Executive Dir ctor PREPARED BY: RON HAGAN, Director, Community Services ROBERT F. BEARDSLEY, Director of Public Works` DAVID BIGGS, Director, Economic Development SUBJECT: APPROVE HIRING A BEACH MAINTENANCE FACILITY DESIGN CONSULTANT, CC-812. Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s) I# Statement of Issue: Due to the expansion of the Waterfront project, there is a need to hire a consultant to prepare plans and specifications with a cost estimate for the relocation of the Beach Maintenance Facility, City Cash Contract 812. Funding Source: Redevelopment Agency Capital Projects Fund. Developer will advance the money to the Redevelopment Agency. Agency Recommended Action: 1. Approve an amendment to the FY98/99 Redevelopment Agency budget for $171,350 for a professional service contract with Tony Banzuelo, Architect. City Recommended Action: 1. Approve and authorize the Mayor and City Clerk to execute the attached professional services contract with insurance modifications reviewed and approved by the City Attorney; and 2. Authorize the Director of Public Works to expend $171,360 to cover contract costs of $142,800, estimated contingency of $14,280, and supplemental projected expenditures of$14,280. Alternative Action(s): Do not hire an architect for the Beach Maintenance Facility at this point in time, thereby not meeting the requirement in the Waterfront Development Agreement for the relocation of the facility. i RRUEST FOR COUNCIL ACTIA MEETING DATE: 04/05/99 DEPARTMENT ID NUMBER: CS 99-004 Analysis: The Waterfront project was approved on September 14, 1998. Therefore, it is necessary to hire a consultant to move forward with the preparation of the plans and specifications for the Beach Maintenance Facility in order to expedite its relocation to make the site available for the next phase of the Waterfront project. The development agreement calls for the relocation of the maintenance facility to be a "turn-key" project so that there is no loss of service in providing maintenance for the City beach. The developer will advance the funding for the consultant. The developer's obligation, per the development agreement between the Redevelopment Agency and Mayer Corporation, is to pay up to $750,000 for the relocation of the Beach Maintenance Facility. Tony Banzuelo was originally hired by the City to provide plans for the relocation of the Beach Maintenance Facility from its current location within the Waterfront project site to the easterly end of Edison Way behind the former Edison power plant. The City conducted a formal competitive recruitment process at that time to select Mr. Banzuelo to provide consulting services. Since Mr. Banzuelo has performed the previous work and has the base documents, staff is recommending that he be hired to continue the process, including environmental review and the preparation of plans and specifications. The cost for these tasks and related expenses is as follows: Design Contract: $142,800 10% Contingencies $ 14,280 10% Supplementals $ 14,280* *Supplementals include miscellaneous expenses for printing, blueprints, soils testing, etc. The contract amount includes funding for the environmental assessment and negative declaration. If, after the initial environmental assessment, the site requires the development of a full Environmental Impact Report to be in compliance with the California Environmental Quality Act, staff will return to City Council for further recommended action. Environmental Status: Not applicable. Attachmentls]: City Clerk's Page Number No. Description 1 Professional Services Contract 2 Approved Certificate of Insurance CC 812-RCA Professional Sery -2- 03/29199 1:58 PM golne, S . 0 1040MAIXt 6 REQUEST FOR COUNCILACTION MEF-TING DATE: 04105/99 DEPARTMENT ID NUMBER: CS 99-004 Analysis: The Waterfront project was approved on September 14, 1998. Therefore, it is necessary to hire a consultant to move forward with the preparation of the plans and specifications for the Beach Maintenance Facility in order to expedite its relocation to make the site available for the next phase of the Waterfront project. The development agreement calls for the relocation of the maintenance facility to be a "turn-key" project so that there is no loss of service in providing maintenance for the City beach. The developer will advance the funding for the consultant. The developer's obligation, per the development agreement between the Redevelopment Agency and Mayer Corporation, is to pay up to $750,000 for the relocation of the Beach Maintenance Facility. Tony Banzuelo was originally hired by the City to provide plans for the relocation of the Beach Maintenance Facility from its current location within the Waterfront project site to the easterly end of Edison Way behind the former Edison power plant. The City conducted a' formal competitive recruitment process at that time to select Mr. Banzuelo to provide consulting services. Since Mr. Banzuelo has performed the previous work and has the base ' documents, staff is recommending that he be hired to continue the process, including environmental review and the preparation of plans and specifications. The cost for these tasks and related expenses is as follows: Design Contract: $142,800 10% Contingencies $ 14,280 10% Supplementals $ 14,280* *Supplementals include miscellaneous expenses for printing, blueprints, soils testing, etc. The contract amount includes funding for the environmental assessment and negative declaration. If, after the initial environmental assessment, the site requires the development of a full Environmental Impact Report to be in compliance with the California Environmental Quality Act, staff will return to City Council for further recommended action. Environmental Status: Not applicable. AAtt chment(s): City Clerk's . - NumberDescription 1 1 Professional Services Contract 2 Approved Certificate of insurance CC 812-RCA Professional sere -2- 03129/99 1:58 PM Cleary, Chris From: Stack, Doug Sent: Friday, April 02, 1999 11:41 AM To: Cleary, Chris Subject: Beach Maintenance Design Consultant- E5 Chris: Mr. Banzuelo is sole source for this project. The RCA analysis discusses the reasons for staff selection of Mr. Banzuelo. He originally developed the construction docs for the new bldg unfortunately the project was never built. Now, with the Water Front Hilton underway, the Beach Maintenance facility must be relocated and Mr. Banzuelo must bring his previous plans up to current standards and codes before we can move forward with this project. Any questions, please let me know. i ATTACHMENT # 1 PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND TONY BANZUELO, ARCHITECT FOR THE DESIGN DEVELOPMENT OF THE BEACH MAINTENANCE FACILITY (CC-312) Table of Contents 1 Work Statement.................................................................................................. 1 2 City Staff Assistance........................................................................................... 1 3 Time of Performance................................................................ 4 Compensation..................................................................................................... 2 5 Priorities.............................................................................................................. 2 6 Extra Work.......................................................................................................... 2 7 Method of Payment............................................................................................. 2 8 Disposition of Plans, Estimates and Other Documents....................................... 4 9 Hold Harmless..................................................................................................... 4 10 Workers' Compensation Insurance..................................................................... 4 11 General Liability Insurance.................................................................................. 5 12 Professional Liability Insurance............................................................................. 5 13 Certificates of Insurance..................................................................................... 7 14 Independent Contractor...................................................................................... 7 15 Termination of Agreement .................................................................................. 8 16 Assignment and Subcontracting .......................................... 8 17 Copyrights/Patents ............................................................................................. 8 18 City Employees and Officials .............................................................................. 8 19 Notices................................................................................................................ 8 20 Immigration........................................................................................ 21 Legal Services Subcontracting Prohibited........................................................... 9 22 Attorney's Fees...:................... ...... 9 . . .................................... 23 Entirety ............................................................................................................... 10 g:agrcc:j mp.'k--banzuclo'3:199 PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND TONY BANZUELO, ARCHITECT FOR THE DESIGN DEVELOPMENT OF THE BEACH MAINTENANCE FACILITY (CC-812) THIS AGREEMENT, made and entered into this Srh day of - Al2,11 1999, by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and TONY BANZUELO, ARCHITECT, a sole proprietorship, hereinafter referred to as "CONSULTANT." WHEREAS, CITY desires to engage the services of a consultant for the design development of the Beach Maintenance Facility in the City of Huntington Beach; and Pursuant to documentation on file in the office of the City Clerk, the provisions of HBMC Chapter 3.03 relating to procurement of professional service contracts has been complied with; and CONSULTANT has been selected to perform said services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows: 1. WORK STATEMENT CONSULTANT shall provide all services as described in the Request for Proposal, and CONSULTANT's proposal dated November 20, 1998, (hereinafter referred to as Exhibit "A"), which is attached hereto and incorporated into this Agreement by this reference. Said services shall sometimes hereinafter be referred to as "PROJECT." CONSULTANT hereby designates Tony Banzuelo who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement. 2. CITY STAFF ASSISTANCE CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement. 1 g:agree:jmp:1k1banzuelo/3!12/99 3. TIME OF PERFORMANCE Time is of the essence of this Agreement. The services of the CONSULTANT are to commence as soon as practicable after the execution of this Agreement and all tasks specified in Exhibit "A" shall be completed no later than one (1) year from the date of this Agreement. These times may be extended with the written permission of the CITY. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in the Scope of Services on the Work Program/Project Schedule. This schedule may be amended to benefit the PROJECT if mutually agreed by the CITY and CONSULTANT. 4. COMPENSATION In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT a fee not to exceed One Hundred Fifty-Seven Thousand Eighty Dollars ($157,080). 5. PRIORITIES In the event there are any conflicts or inconsistency between this Agreement, the CITY's RFP, or the CONSULTANT's proposal, the following order of precedence shall govern: 1) Agreement, 2) the CONSULTANT's proposal, and 3) the CITY's RFP. 6. EXTRA WORK In the event CITY requires additional services not included in Exhibit "A," or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 7 METHOD OF PAYMENT A. CONSULTANT shall be entitled to progress payments toward the fixed fee set forth herein in accordance with the progress and payment schedules set forth in Exhibit "A." 2 g:agree:imp.'kbanzuelo 3.`1:'99 B. Delivery of work product: A copy of every technical memo and report prepared by CONSULTANT shall be submitted to the CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. Any such product which has not been formally accepted or rejected by CITY shall be deemed accepted. C. The CONSULTANT shall submit to the CITY an invoice for each progress payment due. Such invoice shall: 1) Reference this Agreement; 2) Describe the services performed; 3) Show the total amount of the payment due; 4) Include a certification by a principal member of the CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and 5) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall promptly approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If the CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for nonapproval, within seven (7) calendar days of receipt of the invoice, and the schedule of performance set forth in Exhibit "A" shall be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement is terminated as provided herein. D. Any billings for extra work or additional services authorized by CITY shall be invoiced separately to the CITY. Such invoice shall contain all of the information required 3 g:agree:jmp k°banzuelo:311:99 above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate. Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement. 8. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS CONSULTANT agrees that all materials prepared hereunder, including all original drawings, designs, reports, both field and office notices, calculations, maps and other documents, shall be turned over to CITY upon termination of this Agreement or upon PROJECT completion, whichever shall occur first. -In the event this Agreement is terminated, said materials may be used by CITY in the completion of PROJECT or as it otherwise sees fit. Title to said materials shall pass to the CITY upon payment-of fees determined to be earned by CONSULTANT to the point of termination or completion of the PROJECT, whichever is applicable. CONSULTANT shall be entitled to retain copies of all data prepared hereunder. The CITY acknowledges the CONSULTANT's construction documents as instruments of professional service. Nevertheless, the plans and specifications prepared under this Agreement shall become the property of the CITY upon completion of the work and payment in full of all monies due to the CONSULTANT. The CITY shall not reuse or make any modification to the plans and specifications without the prior written authorization of the CONSULTANT. The CITY agrees, to the fullest extent permitted by law, to indemnify and hold the CONSULTANT harmless from any claim, liability or cost (including reasonable attorney's fees and defense costs) arising or allegedly arising out of any unauthorized reuse or modification of the construction documents by the CITY or any person or entity that acquires or obtains the plans and specifications from or through the CITY without the written authorization of the CONSULTANT. 4 g:agree:jmp.&Aanzuclo 3:]199 9. HOLD HARMLESS CONSULTANT shall protect, defend, indemnify and hold harmless CITY, its officers, officials, employees and agents from and against any and all liability, loss, damage, expenses, costs (including without limitation, costs and fees of litigation of every nature) arising-out of or in connection with CONSULTANT's performance of its services under this Agreement,or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employee, except such loss or damage which was caused by the sole negligence or willful misconduct of the CITY. ` 10. WORKERS' COMPENSATION INSURANCE Pursuant to Califomia Labor Code section 1861, CONSULTANT acknowledges awareness of section 3700 of seq. of said Code, which requires every employer to be insured against liability for workers compensation; CONSULTANT covenants that it will comply with such provisions prior to commencing performance of the work hereunder. CONSULTANT shall maintain workers' compensation insurance in an amount of not less than One Hundred Thousand Dollars ($100,000) bodily injury by accident, each occurrence, One Hundred Thousand Dollars ($100,000) bodily injury by disease, each employee, Two Hundred Fifty Thousand Dollars ($250,000) bodily injury by disease, policy limit. CONSULTANT shall require all subcontractors to provide such workers compensation insurance for all of the subcontractors' employees. CONSULTANT shall furnish to CITY a certificate of waiver of subrogation under the terms of the workers compensation insurance and CONSULTANT shall similarly require all subcontractors to waive subrogation. 11. GENERAL LIABILITY INSURANCE In addition to the workers compensation insurance and CONSULTANT's covenant to indemnify CITY, CONSULTANT shall obtain and furnish to CITY, a policy of general public liability insurance, including motor vehicle coverage covering the PROJECT. Said policy shall indemnify CONSULTANT, its officers, agents and employees, while acting 5 g:agree j mp!k/banzuelo!311/99 within the scope of their duties, against any and all claims of arising out of or in connection with the PROJECT, and shall provide coverage in not less than the following amount: combined single limit bodily injury and property damage, including productslcompleted operations liability and blanket contractual liability, of$1,000,000 per occurrence. If coverage is provided under a form which includes a designated general aggregate limit, the aggregate limit must be no less than $1,000,000. Said policy shall name CITY, its officers, and employees as Additional Insureds, and shall specifically provide that any other insurance coverage which may be applicable to the PROJECT shall be deemed excess coverage and that CONSULTANT's insurance shall be primary. 12. PROFESSIONAL LIABILITY INSURANCE CONSULTANT shall furnish a professional liability insurance policy-covering the -work performed by it hereunder. Said policy shall provide coverage for CONSULTANT's professional liability in an amount not less than $1,000,000 per claim and in the aggregate. A claims made policy shall be acceptable if the policy further provides that: A. The policy retroactive date coincides with or precedes the professional services contractor's start of work (including subsequent policies purchased as renewals or replacements). B. CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following project completion. C. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement, if available. D. The reporting of circumstances or incidents that might give rise to future claims. 6 g:agree:imp.'k'6anzuelo-'3:`I 199 • 13. CERTIFICATES OF INSURANCE Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY certificates of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverages as required by this Agreement; said certificates shall: A. provide the name and policy number of each carrier and policy; B. shall state that the policy is currently in force; and C. shall promise that such policies shall not be suspended, voided or canceled by either party, except after thirty days prior written notice; however, ten days prior written notice in the event of cancellation for nonpayment of premium. CONSULTANT shall maintain the foregoing insurance coverages in force until the work under this Agreement is fully completed and accepted by City. The requirement for carrying the foregoing insurance coverages shall not derogate from the provisions for indemnification of City by CONSULTANT under the Agreement. City or its representative shall at all times have the right to demand the original or a copy of all said policies of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on all insurance hereinabove required. 14. - INDEPENDENT CONTRACTOR CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor. CONSULTANT shall secure at its expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the services to be performed hereunder. 7 g:agree:j mp'k:banzuel o.;3:'1 99 15. TERMINATION OF AGREEMENT All work required hereunder shall be performed in a good and workmanlike manner. CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. 16. ASSIGNMENT AND SUBCONTRACTING This Agreement is a personal service contract and the supervisory work hereunder shall not be delegated by CONSULTANT to any other person or entity without the consent of CITY. 17. COPYRIGHTS/PATENTS CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement. 18. CITY EMPLOYEES AND OFFICIALS CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code. 19. NOTICES Any notice or special instructions required to be given in writing under this Agreement shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY's Director of Public Works as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, addressed as follows: 8 g:agree:jmp.:kibannelo-IN1/99 TO CITY: TO CONSULTANT: Robert Beardsley, Director of Public Works Tony Banzuelo, Architect City of Huntington Beach 3405 Ridgeway Road 2000 Main Street Orange, CA 92867 Huntington Beach, CA 92648 20. IMMIGRATION CONSULTANT shall be-responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification. 21. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal-services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive.legal counsel for CITY; and CITY shall not be liable for payment of any legal services-expenses-incurred by CONSULTANT. 22. ATTORNEY'S FEES In the event suit is brought by either party to enforce the terms and provisions of this agreement or to secure the performance hereof, each party shall bear its own attorney's fees. REST OF PAGE NOT USED 9 g:agree:jmpek`banzueIail'1;99 • • 23. ENTIRETY The foregoing, and Exhibit "A": attached hereto, set forth the entire Agreement between the parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized offices the day, month and year first above written. TONY BANZUELO, ARCHITECT AIA, a sole CITY OF HUNTINGTON BEACH, a propri orship municipal corporation of the State of California By: ozuelo ietropror ayor REVIEWED AND APPROVED: ATTEST: CitfAdministrator i y- e APPROVED AS TO FORM: 3"3_yS�it At=ey 3 � 1 � IN?rl APPROVED- 1r Director of Public Works 10 g:agree:j mp 1c banzuelol3/l i99 MEMBER AMERICAN INSTITUTE OF ARCHITECTS TONY BANZUELO, ARCHITECT AIA 3405 RIDGEWAY ROAD ORANGE,CA 92867 714/282-0186 FAX 714/282-9086 November 20,1998 REVISED PROPOSAL TBA PROJECT 90-37B Mr.Jim Engle Beach Maintenance Facility City of Huntington Beach 2000 Main Street Huntington Beach,CA 92646 RE: PROPOSAL FOR THE BEACH MAINTENANCE FACILITY, HUNTINGTON BEACH,CA Dear Mr.Engle: Thank you for the opportunity to present my Proposal to you. As per your request,I hereby submit my PROPOSAL for Architectural services for your new project. SCOPE OF WORK It Is my understanding that you desire to modify the existing plans of the Beach Maintenance Facility that I prepared in 1990. The.project will have to now conform to new federal Americans with Disabilities Act of 1991 and the current codes (1994 UBC,UPC&UFC). The new building will feature the same rooms as before;only with the accommodation of the handicapped accessible tolletlshower facilities . A new set of plans will be submitted for your review after incorporation your changes, revisions or additions.Any changes,revisions or additions requested after this second submittal will be considered additional services and will be started when a Work Order for Extra Services is signed by the Client. These drawings will also be utilized by the Estimator to provide a Probable Cost of Construction Estimate. Construction drawings will be processed for use In obtaining a building permit, construction costs,bidding and the construction of the buildings. Blueprinting and delivery of 40 sets of blueprints and specifications,for bidding purposes,shall be a part of these services. Any printing and delivery of consultant coordination sets are a part of these services. BEACH MAINTENANCE FACILITY PROPOSAL NOVEMBER 20,1998 PAGE TWO EXECUTION OF WORK I propose to provide fallowing Architectural Services: SCHEDULE OF EVENTS PRELIMINARY PLANS Prepare Preliminary Plans and adjust the Preliminary Site Plan,as necessary,with the Intention of complying with the City of Huntington Beach Zoning Ordinances, the Uniform Building Code(UBC)and The Americans with Disabilities Act(ADA).Submittal to City Planning Review and State Coastal Commisslon Review. Obtain upgraded Solis Report, Environmental Investigation and new Site Survey. CONSTRUCTION DRAWINGS The Architect, Design Team Consultants & Client shall prepare Construction Drawings, Structural calculations,and Title-24 Energy Reports for plan check submittal to the City of Huntington Beach,California. PLAN CHECK AND BIDDING Governmental Agencies for the purpose of obtaining a Building Permit. The Architect, Design Team Consultants&Client shall back-check all Construction Documents while the Documents are in Governmental Agency Plan Check. The Estimator shall an estimate of probable construction costs for competitive bid purposes. The Architect and Design Team Consultants shall make all applicable corrections, revisions and approved changes to the Construction Documents for re-submittal to the appropriate governmental agencies. The Architect shall assist the Client with Issuing Bid Addenda. CONTRACTOR AGREEMENTS The Architect shall review the Contractor Bids with the Client and Issue a recommendation for approval of the Contractor. The final approval of bids Is the full responsibility of the Client. CONSTRUCTION REVIEW The Architect shall perform a weekly jobsite visit(26 visits)to review the Contractor Work In progress, its substantial conformance to the plans and specifications and to answer Contractor questions and clarifications. Design Team members will perform one jobsite visit as part of their fee. Any extra visits by a Design Team member shall be billed at a flat rate of $400.00 per visit. Extra Visits requested by the Client for the Architect shall be charged as an extra reimbursable hourly expense. PRINTING &DELIVERY Printing and deliveries shall be given a not to exceed figure of Five Thousand Dollars ($5000.00). If an Inappropriate number of blueprint requests are made by the Client; this number shall be renegotiated prior to printing and delivery. ah BEACH MAINTENANCE FACILITY PROPOSAL NOVEMBER 20,1998 PAGE THREE COMPENSATION I propose to perform the above Architectectural Services for the lump sum figure of One Hundred Forty- Two Thousand Eight Hundred Dollars ($142,800.00). A retainer of $3,480.00 Is to be paid at the execution of Contract.The remainder shall be paid upon presentation of an Invoice at the Presentation of each Phase or billed monthly;whichever occurs first Invoices shall be paid within twenty(20)days upon presentation of Invoice and prior to the start of the next phase. PAYMENT SCHEDULE PHASE I - PLANNING DEPARTMENT DOCUMENTS $ 3,480.00 Retainer (at execution of Agreement) $ 5,000.00 GeotechnicalInvestigation $ 6,600.00 Phase II Environmental Investigation $ 3,320.00 Update Topographic Survey $ 2,000.00 Client Review of Architectural changes r $ 3,000.00 Planning 8r Coastal Commission Submittal $ 1,000.00 Final Client Review $24,400.00 TOTAL TWENTY-FOUR THOUSAND FOUR HUNDRED DOLLARS AND NO CENTS (To be paid In full prior to start of Construction Documents) PHASE 11 - CONSTRUCTION DOCUMENTS $ 32,000.00 Construction Documents 25%Complete (Consultants receive Architect's Design Development Dwgs) $32,000.00 Construction Documents 75%Complete (Design Team co-ordinates drawings prior to plan chock) $32,000.00 Ready for Submittal to Plan Check (When Doauments are Submlttable to Plan Cheek) $ 6,000.00 When Permittable or 45 days after Plan Check Submittal (Whichever occurs flrst) $ 6,000.00 Construction Administration&job site visits ., (To be Invoiced as Construction prognsa) $108,000.00 Total SEVENTY THOUSAND DOLLARS AND NO CENTS GRAND TOTAL $ 24,400.00 PHASE 1 $108,000.00 PHASE 11 $ 10,400.00 PRINTING & DELIVERY ALLOWANCE $142,souo GRAND TOTAL FEE BREAKDOWN Architect $ 35,000.00 $ 36,000.00 Includes,FAXes,Estimator,Owners List r3 Specificatlon Writer Civil Engineer $ 41,400.00(wl Street Plan) $ 39,300.00(w/o Street Plan) Soils Engineer $ 11,600.00 $ 11,600.00 Structural Engineer $ 10,400.00 $ 10,400.00 Mechanical Engineer $ 3,500.00 $ 3,500.00 Electrical Engineer $ 3,500.00 $ 3,500.00 andscag_e Architect S 2,600.00 ,$ 2.500.00 Total $108,000.00 $105,800.00 BEACH MAINTENANCE FACILITY PROPOSAL NOVEMBER 20,1998 PAGE FOUR SERVICES N-0j INCLUDED: 1. Interior Design and Furniture Space Planning. 2. Architectural Scale Models and Architectural Renderings. 3. Acoustical analysis, Feasibility studies and other special reports. 4. Signage(except for mandatory ADA/handicap signs and exit signs. 5. Client changes after start of construction drawings phase 6. Contractor changes or rectifying contractor mistakes. 7. Perm its,fees, taxes, assessments or other municipality, utility company costs. 8. Additional site visits beyond the scope of services. 9. Additional printing and deliveries beyond the scope of services. CONCLUSION Thank you again for the opportunity to offer you the Service of TONY BANZUELO,ARCHITECT. I hope that this Proposal will meet your immediate needs regarding the BEACH MAINTENANCE FACILITY. If you need further information,please do not hesitate to call. Sincerely, 4 lmi' nd elo; rchit t A.I.A. rofe Tonal rchitect 4C-11901 TB:ajb:PRcaw7s.Hsc CITY OF HUNTINGTON BEACH BEACH MAINTENANCE FACILITY 8669 EDISON WAY HUNTINGTON BEACH, CALIFORNIA 92646 ESTIMATED PRINTING AND DELIVERY EXPENSES PHASE PRELIMINARY PLANS ($600.00) 1. Twelve Preliminary sets for client&City staff review. ($120.00) 2. Two Preliminary sets for Soils Engineer and Civil Engineer review (one set each).($60.00) 3. One Preliminary set for Gas Company review. ($30.00) 4. One Preliminary set for Edison Company review. ($50.00) 5. Two Revised Preliminary sets for client review. ($60.00) 6. Two Revised Preliminary sets for City Planning review. ($60.00) 7. Two Revised Preliminary sets for Coastal Commission review. ($60.00) 8. One Revised Preliminary sets for specification writer review. ($150.00) PHASE II CONSTRUCTION DOCUMENTS ($9,800.00) 1. Two sets for client review. ($300.00) 2. Two sets for Soils Engineer and Civil Engineer review(one set each). ($300.00) 3. Two Plan Check sets for City review. ($300.00) 4. Four Plan Check sets for Consultants review&cross-checking with other disciplines. ($600.00) 5. Two Revised Plan Check sets for City review. ($300.00) 6 Four Revised Plan Check sets for Consultants review&cross-checking with other disciplines. ($600.00) 7. Forty sets for Contractor Bids. ($3600.00) 8. Twenty sets for Contractor Construction Sets. ($1800.00) 9. Sixty sets of Project Manuals($2000.00) TOTAL. ESTIMATED BLUEPRINTING &DELNERY COSTS ($10,400.00) ATTACHMENT #2 Cft�lh� A1 11f�1�® ..ERT _ a u E DATE .... L4SU (MMA PM) oi/osige PRODUCTR THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE Dooley, Renton B Associates POLICIES BELOW. / tloapse flo0S0739 .....................................................................................................................................................................• 3 Hutton Centre Suite 480 COMPANIES AFFORDING COVERAGE Santa Ana CA 92707 _.._....._..-..-..-..- COMPANY A St. Paul Fire B Marine LETTER ....LETTER............................................................. ................ COMPANY E Design Professionals Ins. INSURED ................................................................................................................................................................. COMPANY C LETTER TonyBonzuelo, Architect ...................................................................................................................................................................... 9405 Ridgeway Road COMPANY D Orange CA 92667 LETTER ............................................................................................................................................................ COMPANY LETTER L'Q11ERAG THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, N01WITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH TINS CERTIFICATE MAY BE ISSUED OR MAY PERTAN, THE INSURANCE AFFORDED BY THE POLIC!£S DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ..........................................................................................................................................................................................................................-..........................-............-.......... TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS DATE (MMMD/YYI DATE(MMMO/YY) ...............................................................................................................................................................................................................:........................................................................................ A DENERALLIABILIT' RP06647780 06/02/98 06/02/99 GENERAL AGGREGATE =-s 4,000,000. : . .. . .. ...x... 00 COMMERCIAL GENERAL LIABILITYLIABILITYNO DEDUCTIBLE PRODUCTS-COMP/OP AGO. 00 : ..........410 , 0...... CLAIMS MADE x :OCCUR. PERSONAL 3 ADV.INJURY 2,000,000 OWNER'S&CONTRACTOR'S PRAT. EACH OCCURRENCE i *Z,GOO,ODO ..... . .................. ....... FIRE DAMAGE(Any one fire) S *i n,C l U,ded ........................................................ ........ MED.EXPENSE(Any one perwn)i 5,000 ...0................................................................:..................................................................:......................................................................................... . A !u! BLE LIABILITY RP06647780 06/02/98 06/02/99 COMBINED SINGLE ANY AUTO :LIMIT :i 2,000,000 ALL OWNED AUTOS ` i i BODILY INJURY ................. ................. ............ B 'i SCHEDULED AUTOS APPROVED A S T n+O FORtd:r F (Per permny :..-.._..: ?...................................................................................... x HIRED AUTOS GALL HUYT011, C; .iy Attorney :BODILY INJURY x ;NON-OWNED AUTOS Ey.:i DeTslat: City Attorney :(Per aeeidenp 'i : ' LIABILITY ................... .GARAGE LIABIL PROPERTY DAMAGE i ...................................................................................... • ...... ........ / y..................... .... QA ................. ............. .................................. ............................ EXCESS LIABILITY } �W -4 Pr01��b VL :EACH OCCURRENCE i UMBRELLA FORM �, 1 1 'nv I I :�Cc��.Uk,6�G ;AGGREGATE ... OTHER THAN UMBRELLA FORM i tsce. ....... .. WORKER'S COMPENSATION STATUTORY LIMBS ...............................---.................................................. EACH ACCIDENT i ` AND '• '.. .... . ... ................. ....... ............ i DISEASE-POLICY LIMIT i EMPLOYERS'LIABILITY :................................................:....................................... DISEASE-EACH EMPLOYEE Ei OTHER B€ Professional tlpblllty* PL010776 06/02/98 06/02/99 :Per Claim 1,000,000 Claims Made :Annual Aggregate 1,000,000 Deducti6Le per Claim 5,000 DESCRIPTION OF OPERATIONBILOCATX]NSNEHICLr:WPECIAL ITEMS TBA PROJECT NO: 90-378 BEACH MAINTENANCE FACILITY *FOR PROFESSIONAL LIABILITY COVERAGE THE AGGREGATE ***THIS CERTIFICATE REPLACES CERTIFICATE ISSUED 12/16/98*** LIMIT IS THE TOTAL INSURANCE AVAILABLE FOR ALL CERTIFICATE HOLDER IS INCLUDED AS ADDITIONAL COVERED CLAIMS PRESENTED WITHIN THE POLICY PERIOD. INSURED FOR GENERAL LIABILITY. THE LIMIT WILL BE REDUCED BY PAYMENTS OF INDEMNITY (AI+ X) 8 EXPENSE. ... ...... v. k ...:.. t SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE.THE ry EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL XKZKXKWJMXXXYXX CITY OF HUNTINOTON BEACH MAIL o �S DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE ATTH: DOIIO STACK ' ' LEFT, EXXXXXX)ODOOCXDMXXCXXUMIKRXXWMMXBKKXXXENXDMLXMERXXXXXXxxxk 2000 U41M STREET p UIX)m 7B(»XXKH HUNTINGTON BEACH CA 92040 }<' }°"AUTHORIZED REPRESENTATIV &2 %6� un #ICOPtq' AA1'liQ> i<IR1# cos RISK MANA'GEMENIT CITY OF HUNTINGTON Br-AU .CA 1999 JAN -I A 11= 59 CITY OF HUNTINGTON BEACH APPLICATION FOR INSURANCE REQUIREMENTS WAIVER OR MODIFICATION I. Name/Title/Department of Requesting Staff Member Aye/d?-$ 4,� e,& 2. Date of Request 3-d rr 101 I 3. Name of Contractor/Permittee- __T/�( 644A,%e!� r Afe4h l feG f" 4. Description of work to be performed de 5. Length of Contract W 6. Type of Insurance Waiver or 14odification Requested:. AbAgMLMOL! OeAe dr �D O (a)Limits: (b) Coverage 7. Reason for Request for Waiver or Reduction of Limits 8. Identify the risks to the City if this request for«•aiN.er or modifications granted Department Head Signature his section to be completed by the Risk Manager) Recommendation-,- Approve_ U eny, Risk Manager's SignaturuDate i --7� I {This section to be completed by the City Attorne)) Recommendation: Ap Denv City Attorney's Signatur at Settlement Committee approv ' [is not) wired for this waiver. If Settlement Committee approval is required, submit form to City Attorney's Offi to be aced on the agenda. Recommendation: Approve Deny City Council appro% i [is not equuired for this waiver. If City Council approval is required, attach this form to the RCA after consideration y the S ement Committee. This insurance waiver [is) [is not) on City Council agenda. impAlresoutionfinsreg19111197 7 In consideration of an additional premium of NIA , it is hereby understood and agreed that the following applies: [ X ] ADDITIONAL_INSURED CITY OF HUNTINGTON BEACH, ITS AGENTS, OFFICERS AND EMPLOYEES is/are Additional Insured/s as respects to work done by or for Named Insured. [ ] PRIMARY COVERAGE With respect to claims arising out of the operation of the Named Insured, such insurance as afforded by this policy is primary and is not additional to or contributing with any other insurance carried by or for the benefit of the above Additional Insuredls. [ I WAIVER OF SUBROGA_TLQN It is understood and agreed that the Company waives the right of subrogation against the above Additional Insuredls for project described in certificate attached hereto. [ ] CROSS LIABILITY CLAUSE The naming of more than one person, firm or corporation as insureds under this policy shall not, for that reason alone, extinguish any rights of one insured against another, but this endorsement, and the naming of multiple insureds, shall not increase the total liability of the Company under this policy. [ X ] NOTICE OF CANCELLATION It is understood and agreed that in the event of cancellation of the Policy for any reason other than non-payment of premium, 30 days written notice will be sent to the following by mail CITY OF HUNTINGTON BEACH 2000 MAIN STRET HUNTINGTON BEACH, CA 92646 In the event the policy is canceled for non-payment of premium, 10 days written notice will be sent to the above. Policy No.: RP06647780 Effective Date: 12/16/98 Insurance Company: ST. PAUL FIRE & MARINE Issued to: TONY BANZUELO, ARCHITECT REVISED Issue Date: 1/5/99 Authorized Representative Elizabeth Franks k! 4 r R��� � 3�,�<t,1C tI ,ENT CITY OF HUNTINGTON BEACH.CA. Iqgq JAI -I A 115q ., y ^ 0 HUNTINGTpN BEACH 2000 Main Street California 92648 DECLARATION of NON-EMPLOYER STATUS In order to comply with City Council Resolution No. 6277, you are required to provide proof of Workers' Compensation insurance. If you have no employees, this form must be signed and returned tot City of Huntington Beach Risk Management Division 2000 Main Street Huntington Beach, CA 92648 I certify that in the performance of the activity or work for which this permit is issued, I shall not employ any person in any manner so as to become subject to California Workers' Compensation insurance requirements. I authorize the City of Huntington Beach to immediately and retroactively revoke the license or permit issued under this declaration if I hire any employee(s) or become subject to the provisions of the laws requiring Workers` Compensation Insurance. --�- f- Applicant/Company Name: � M_ _ W —U , Address: C- Applicant's Signature: Date: Title: �c Location Signed: 3'��_�►�� _ _ G °RZ Telephone Number: RCA ROUTING SHEET INITIATING DEPARTMENT: COMMUNITY SERVICES SUBJECT: APPROVE HIRING A BEACH MAINTENANCE FACILITY DESIGN CONSULTANT COUNCIL MEETING DATE: April 5, 1999 RCA°ATTACHMENTS , .STATUS Ordinance (w/exhibits & legislative draft if applicable) Not Applicable Resolution (w/exhibits & legislative draft if applicable) Not Applicable Tract Map, Location Map and/or other Exhibits Not Applicable Contract/Agreement (w/exhibits if applicable) (Signed in full by the City Attorney) Attached Subleases, Third Party Agreements, etc. (Approved as to form by City Attorney) Not Applicable Certificates of Insurance (Approved by the City Attorney) Attached Financial Impact Statement (Unbudget, over $5,000) Not Applicable Bonds (If applicable) Not Applicable Staff Report (If applicable) Not Applicable Commission, Board or Committee Report (If applicable) Not Applicable Findings/Conditions for Approval and/or Denial Not Applicable E.:..._ ...NA . = . T R MISSING ATTACH] MENTS'�. .... .,REVIEWED RETURNED :.FORW .,_DED:: Administrative Staff ( ) ( ) Assistant City Administrator (Initial) ( ) ( ) City Administrator (Initial) ( ) ( rze✓ ) City Clerk ( ) :;:EXPLANATION FOR"RETURN=OF ITEM (Below . . Only) RCA Author: JBE:DSS C 1+y CftvK CITY OF HUNTINGTON BEACH Inter-Office Communication Economic Development Department RECEIVED FROM - AND MADE A PART OF THE RECOR A TH COUNCIL MEETING OF - OFFICE OF THE CITY CLERK TO: Mayor and City Council CONNIE QROOKWAY,CITY CLERK VIA: Ray Silver, City Administrator p e ' FROM: David C. Biggs, Director of Economic Develont l� Ron Hagan, Director of Community Services DATE: April 5, 1999 SUBJECT: Beach Maintenance Facility Relocation to Temporary and Permanent Locations BACKGROUND The existing City Beach Maintenance facility, accessed off of Sunrise, is located on the Waterfront Expansion site. The Disposition and Development Agreement (DDA) with Meyer Financial, LLC, calls for the Redevelopment Agency to relocate the Beach Maintenance Facility. The City owns a site for the permanent relocation of the Beach Maintenance Facility on Edison Way, off of Newland. It will take approximately 18 months to design and construct the new Beach Maintenance Facility. In order to meet our contractual obligation for the hotel expansion project, the Beach Maintenance Facility will have be relocated on a temporary basis. TEMPORARY FACILITY Staff has identified the best-possible temporary facility site available. Recently, Caltrans closed its road maintenance facility on the west side of Beach Boulevard between Adams and Yorktown. This site is approximately two miles from the beach, straight up Beach Boulevard. The Economic Development staff is currently working with Caltrans to finalize a lease for the property. The lease payments will be $2,500 per month or $45,000 for 18 months, and we expect to present the lease to the City Council for approval on April 19, 1999. Improvements on the site lend themselves to our Beach Maintenance operation, and include a number of buildings which can accommodate the machinery maintenance and other operational needs associated with this use. However, there needs to be a minimal level of improvements made in order to allow for the temporary use of the site for beach maintenance. In addition, this temporary beach maintenance facility will require the lease of some additional equipment, additional staffing and other operational funding for the duration of the temporary relocation. Attached is a memorandum from Jim Engle, Community Services Deputy Director, detailing the costs associated with the temporary relocation of the Beach Maintenance Facility to the Caltrans property. It is estimated that this temporary relocation will cost approximately $250,000 in one-time costs and added expenses for an 18-month period. A small portion of these costs will be for equipment to be reused as part of the permanent facility. PERMANF,NT FACILITY This complex is proposed to be located on a City-owned site on Edison Way just east of Newland Avenue, behind the former Southern California Edison Power Plant. It will take approximately 1 year — 1%z years to entitle and construct the project. During that time, the City will have to develop conceptual plans, obtain entitlements, contract for working drawings, bid and construct the project. The City will also be contemplating a series of entitlement actions to construct the permanent Beach Maintenance Facility. This includes, preparing environmental reviews of the project, processing a Conditional Use Permit and Local Coastal Permit. These actions and process will take several months. The Community Services Department has conceptual plans for the permanent Beach Maintenance facility and is ready to proceed with a final design and working drawings. There is a Request for Council Action on the April 5, 1999, Council Agenda (Item E-5) to approve a contract with an architect to undertake this work. Design costs are estimated at $171,360. Cost of constructing the permanent Beach Maintenance Facility is estimated to be $1,570,750. Staff will be working through the entitlement and design process to ensure that a functional facility results at the lowest overall cost. FACILITY S FINANCING Mayer Financial, LLC, is obligated to advance 5750,000 to cover a portion of the costs associated with the relocation of the Beach Maintenance Facility. The Redevelopment Agency will repay this amount, together with other amounts advanced by the Developer, out of future project revenues generated by the Hilton Ocean Grand Resort. This $750,000 advance will cover the costs of the temporary relocation as well as some of the costs of the permanent relocation as illustrated below: t Temporary Relocation Caltrans Rent $ 45,000 Temporary Improvements:'Costs 250,000 Permanent Facility Design S 171,360 Construction 1,570,750 Total $ 2,037,110 Developer Advance 750,000 Costs Remaining S 1,287,110 The cost remaining of $1,287,110 is proposed to be added to the Certificate of Participation (COP) issue that will include the South Beach Improvements. Sufficient revenues in the form of lease parking revenues from the South Beach improvements are anticipated to be sufficient to pay for the COP debt service including those costs associated with the Beach Maintenance Facility. CONCLUSION The relocation of the Beach Maintenance Facility is the critical path item regarding the Waterfront Expansion. While the schedule for the Waterfront implementation necessitates the temporary relocation of the Beach Maintenance Facility and associated costs, the timely construction of the Hilton Ocean Grand Resort and the remainder of the project will ensure the timely generation of substantial public revenues. The Hilton Ocean Grand Resort and residential are expected to generate more than $4 million in public revenues annually shortly after completion. Within the next few weeks the staff of Economic Development and Community Services will bring to you a series of Council Action/Agency Action Requests to implement the various aspects of this project. Please feel free to contact us if we can answer any questions or provide additional information. Dcb:gd Attachment xc: Melanie Fallon, Assistant City Administrator Jim Engle, Community Services Deputy Director Gus Duran, Housing & Redevelopment Manager Stephen Kohler, Project Manager z J J MY Of HUNTI GTON BEACH HHNT[NOTON REACH DF-PARTMF-NT COMMUNICATION To: David Biggs, Economic Development Director From: Jim B. Engle, Director, Community Services Date: March 23, 1999 SUBJECT: COST ESTIMATE TO RELOCATE TO CALTRANS SITE The current Beach Maintenance Facility is located behind Driftwood Golf Course and is part of the property that the Mayer Corporation is developing as Phase II of the Waterfront Project. Therefore, there is a need for the Community Services Department to vacate that site immediately. The Caltrans Maintenance Facility south of Yorktown on Beach Boulevard will be the interim location for the Beach Maintenance Facility until the permanent site is developed on Edison Way, behind the Edison Power Plant. As you know, there are significant constraints to making an interim move rather than relocating immediately to the permanent site. Unfortunately, we were not able to construct the permanent Beach Maintenance Facility prior to approval of Phase II of Waterfront. The biggest challenge is the fact that the Caltrans site is two miles away from the beach. This requires the transporting of all the beach equipment for storage and maintenance along Beach Boulevard. This is a major concern to the Beach Operations because beach cleanup is done at night and there will have to be equipment in transit on Beach Boulevard after midnight when drivers travel at a rapid speed and at times are inebriated. The State Beach has had a couple of accidents in the past transporting on major arterial highways. This, coupled with the fact that the City Beach Maintenance operation at night consists primarily of part-time, recurrent workers, who have limited experience in driving equipment may cause problems. Use of recurrent staff makes for an effective, low cost beach operation, but creates potential hazards during this interim relocation. We currently stage our equipment behind the Edison Power Plant so it is only a short trip on Newland Street to get to the beach (less than '/, mile). The rest of the trek is over sand, not on major arterials. The other challenge is that the Caltrans facility is in significant disrepair with holes in walls, broken windows, no electrical, no security, etc. Listed below is the equipment and/or Caltrans modifications that need to be made whether they are one time costs or an annual rental cost and comments. Task One time cost Annual Cost Comments Relocate storage bin $600 0 The 8' x 40'storage bin at the Newland staging area will have to be relocated to the Caltrans site, followed by a second move to the permanent site. Mobile office building 0 $4,700 To provide power, security and repair to the Caltrans office building would cost$4,400. A more desirable option is to rent a mobile office building and place it adjacent to the garage. Truck&trailer rental Recurr. $53,000 0 Originally 4 truck and trailer units were going to be rented at a Rental $41,600 cost of$163,800. However, with some additional short-term Total: $80,600 1 recurrent staff, this cost is reduced to $80,600. CALTRANSDOC 1 Hoist & compressor $24,000 0 The permanent facility was to have two in-gound hoists and a compressor. By purchasing an above ground hoist and compressor now, and reutilizing this equipment in the permanent facility, the cost is transferred from the permanent site construction cost to the interim site cost. Equipment is needed for mechanical maintenance. Security fencing, $13,200 0 1 It would cost $12,000 to rent this fencing and security wire. ' barbed wire and razor The advantage of purchase is that$6,000 of the $13,200 is for wire the barbed wire and razor wire. This barbed wire and razor wire would be relocated to the permanent site and, therefore, I will be a significant net savings of$4,800 and reducing construction costs. Secure and repair $9,500 0 1 Community Services staff has worked with Public Works and Caltrans buildings contractors to determine the cost to secure the existing (walls, windows,etc.) Caltrans buildings, including repairing of holes, wails, doors & windows, etc. Trailer for transport of $9,500 0 Community Services staff checked with Public Works if there kickster, forklifts, was a trailer that could be"borrowed"for 1-112 years and none sweepers was available. The rental cost over the period would be approximately the same ($9,000). Therefore, it is determined to be better to purchase the trailer. It will be used at the new beach maintenance facility which is an added benefit. Extra personnel to Perm.OT $2,300 0 Existing personnel will be used to box all the items for moving move to interim and Recurr. $1,140 company and unloading and putting away all equipment. permanent site (two moves) Move by professional $18,300 0 ' In order to avoid Workers Comp injuries, it is more prudent to movers to interim and have professional movers actually lift and move the permanent sites (two equipment, parts, etc.from the current Beach Maintenance moves) site to the interim site and then to the permanent site. This is especially true since we have an aging beach maintenance crew. This will also avoid any potential time related problems so that the Beach Maintenance crew can continue to maintain their workload while the two relocations take place. This is especially important if it happens between Easter and the end of summer. Electrical $9,000 . 0 Electrical Building inspector, Public Works, and City's contract Electrician have reviewed the Caltrans electrical. It is grossly inadequate and in disrepair. In order to provide the minimum power required as well as to create a safe environment, the cost will be$9,000. Electrical costs have been saved by not providing electrical to the office building. Telephone service $3,000 0 The City has worked with the telephone company and the City's Telecommunications Section to determine what it would cost to relocate existing system to the Caltrans site. This relocation cost does not include the monthly service cost of $2,700 which has been eliminated. Subtotal $90,540 $85,300 15% Contingency* $13,581 $12,795 Totals $104,121 $97,095 TOTAL $201,216 *Note: 15% Contingency added due to the unknowns related to an interim relocation. JBE:gc cc: Ron Hagan Larry Neishi CALTRANSDOC 2