CITY OF HUNTINGTON BEAC
I
PUBLIC WORKS DEPARTMENT Norm,oi Mach-
it
FY 2014/ 2015
CAPITAL IMPROVEMENT PROGRAM (CIP)
SUPPLEMENTAL
+l, COMMUNICATION
A Meeting Cate; 9 �/l
i n r
b t Agenda Item No.
oLq
- t
3. _/ 14 MAJOR ACCOMPLISHMENTSSu iry Hunt t,of & 11-
a a n9Ari
COMPLETED OVER $ 25M IN INFRASTRUCTURE
IMPROVEMENTS! ! !
$ 1 M Emergency Sewer Siphon Re air
( Brookhurst/Indianapolis) "
•y.
National Public Works Week Open House
l � 1
�bN
f ity
13/ 14 MAJOR ACCOMPLISHMENTS Hunt w m P�h-
Algonquin Sewer
� IIN
Lift Station
Beach Parking Lot
Rehabilitation
7W
v r
7 _
Su f iry
13/ 14 MAJOR ACCOMPLISHMENTS
Hunt tF of Brach•
Sunset Beach Watermain Improvements
i
t
Beach Boulevard Sewer Replacement
r
Projects Under Construction :
Arterial Rehabilitation
Residential Overlay and Tree Petition
Warner Avenue Gravity Sewer
Su ity
CAPITAL IMPROVEMENT PROGRAM
Hunt I , Beach•
Budget
New Appropriations : $42 . 8M
Continuing Appropriations : 9 . 3M
Total $52 . 1 M
Funding sources include :
General Fund
Enterprise Funds (Water and Sewer)
Special Revenue Funds (Measure M, Gas Tax, Prop
427 AQMD, Park Development)
Grants (Federal, State, & OCTA)
Su ity
CIP PROJECTS BY CATEGORY Hw ,Fu ,,.
Drainage & Storm Water $200k
Facilities $ 1 . 5M
Neighborhood $3M
Parks and Beaches $22M
Sewer $2 . 5M
Streets & Transportation $9 . 1 M
Water $4 . 5M
Su f ity
FUNDING SOURCES
Hunt ie ai B7e
Grants/Donations/Other $ 18 . 9M
General Fund $6 . 3M
Water Funds $4. 5M
Gas Tax $2 . 9M
Sewer Funds $2 . 5M
Infrastructure Fund $ 1 . 2M
Measure M $2 . 2M
Proposition 42 $2 . 1 M
Park Funds $ 1 . 6M
*igoi
DRAINAGE & STORM WATER $ 200K
ch-
PW
/
Fact- Maintain over 130 miles of storm drain lines
and associated pumps stations and water quality
features Future Heil Pump Station
Heil Pump Station-$2 . 5M `
State/Federal Grant pending
(Currently in FY 15/16) ' , -
's
NW Catch Basin Retrofit, $200k f'
Install Filters to treat urban runoff. !��(
�i
Mil
FACILITIES $ 1.51VI PW Fact-Maintain over 2 .5 million square feet of
facilities such as City Hall , libraries , fire stations ,
community centers , senior centers , etc.
oe--
ft-
-
■■■■ ' � sib 9 aft
,ly
Central Library-Materials Handling System $ 125k
Central Library—Interior Renovation $75k
Downtown Parking Structure Improvements $ 100k
Facilities Needs Assessment $ 100k
Su ity
FACILITIES $ 1.5M Hunt ga &u6-
Fire Station 8 ( Heil) Renovation $200k
Lifeguard & Jr. Guard HQ Rollup Door Replacement $50k
Police Gun Range Feasibility Study $30k
Police Lobby Security Improvements $250k
Police Lobby ADA Improvements $75k
Pier Piling Maintenance $200k
$200k/year for 5 years for a total of $1 M
Various Roof Replacements $300k
Lake FS, Magnolia FS, and PTL Building
Heil Fire Station Pier Piling Maintenance
I
Wye {Yl
c
Su ity
NEIGHBORHOOD $3M Huntpo —
PW Fact—Maintain over 320 miles of residential streets
Concrete Replacement $250k
Residential Streets Overlay/Slurry — Zone 8 $2. 1 M
Tree Petition Streets (Angler Ln. & Palisade Dr.) $650k
Residential Street — Before Residential Street —After
Y
a
Su f ity
PARKS AND BEACHES $ 22 , 5M Hum igmBmh•
PW Fact—Maintain over 70 parks and 760 acres
Arena Soccer Turf Replacement $170k
Central Park Underground Electrical Upgrades $300k
Re-Use of Former Gun Range $50k
Huntington Harbour Dredging Study $40k
Lebard Park Property Acquisition $667k
Worthy Park Construction $ 1 .3M
Senior Center $19.5M
LeBard Park Worthy Park
s ;4te
�V
,
3
®kV�e 1� 5 yT
R III
Su ity
SENIOR CENTER FEATURES Hun ,p°l &-ah-
37,000 SF
Building
_tw rtcC M:u+ - iM KVC
Large Multi-
,,
Purpose Room
I:
Exercise Room
Classrooms
Staff Offices
' ' - Transportation
��, �► Office
Meals Program
: - Computer
Training Room
Ys.. ;. Game Room
�L
Su ity
SENIOR CENTER-GREEN ELEMENTS Hunt ip of Mch. %
Interior materials and finishes
Energy systems performance
Energy conservation in lighting and appliances
Indoor air quality
Drought tolerant landscaping and water efficient
irrigation system
Recycled construction materials
Exterior paint and roofing material
Compliance w/ CalGreen building code
LEED - 4 Levels of LEED Certification
Certified (26-32 points) , Silver (33-38 points) ,
Gold (39-51 points) , Platinum (52-69 points)
Certified at 27 points
Su ity
SENIOR CENTER - PROJECT COSTS Hunt ,F ui &
Soft Costs
Additional A&E; Testing/Inspection $8505000
Construction Management $6509000 '
Sub-Total: $19500,000 11
Direct Costs
Building & On-Site Construction $16,0009000
Off-Site Construction $8005000 l
FF&E $5005000
Sub-Total: $179300900
0
Contingencies $29700900
Project Total $2195009000
Su f ity
SENIOR CENTER - SCHEDULE Huntigoi &adi
• Public Works Commission Approved CIP
• With the recommendation to delay Senior Center and Gun Range Feasibility Study
until City addresses their unfunded liabilities
• Public Hearing and Council Authorization for Bonds
* Council Award Construction Management Contract
• Council Authorization to Advertise for Construction Bids
r
r
• Open Construction Bids/Bid Review
-------------
• November 11th Bond Closing and Financing Available
• November 171h Council Award Construction Contract (18 Month Contract)
Su f iry
SEWER IMPROVEMENTS $ 2 , 5M Hum IN Beach.
PW Fact—Maintain 360 miles of sewer lines and 28
lift stations
Sewer Lining — Various Locations $350k
Sewer Lift Station Improvements $2 . 1 M
Trinidad LS Construction
Edgewater LS Design
Sewer Lining Sewer Lift Station
r� 4
� i
K:
a#
Su f iry
STREETS & TRANSPORTATION $9. 1M H,,,, , „ & ,,
PW Fact—Maintain over 100 miles or arterial streets and over
150 signalized intersections and 3 , 700 street lights
Arterial Rehabilitation $3 .3M
Indianapolis(Mag to Brook) , Lake(Ind to Adams), & Main(York to Garfield)
Gothard St. and Center Ave. Rehab $ 1 .4M
Atlanta Ave . Widening $ 1 .6M
Bridge Rehabilitation Program $2 .3M
BPMP (Magnolia, and Brookhurst)
Arterial Rehab — Before Arterial Rehab —After
r
Su iry
STREETS & TRANSPORTATION Hunt igo1 Brach•
(CONTINUED)
Intersection Improvements $50k
Ellis/Main
Traffic Signal Interconnect Projects $ 12k
Newland arner to Ellis) (Design)
Traffic Signal Projects $369k
Bolsa Chica/Pearce (Design)
Main/Utica (Design)
Goldenwest/Heil (Design)
Gothard/Center (Design)
Gothard/Slater (Design)
Main/Adams (Design)
Main/Florida (construction)
Newland/Ellis (Design)
Newland/Slater (Design)
Utica Bicycle Boulevard $75k
Design
Su f .'iry
STREETS & TRANSPORTATION Agm Nadi- '
(CONTINUED)
How are we doing ?
Co tid it ion
PCI Range MPAH Locals Total W. % of Network
'Very Good : �86-1G+Oj 55.1 160.9 216.0 45°r'ra
............................ ...................................... ...........................................................
Good (75-85� 57.1 45. ...........:.........103. ......... ....................21°6..................
.................................................
Fair 60-74) 27.3 48.1 7 5.4 169�
............................... ...................................... ................................... .......................
Raar 141-53) 183 4q._ ........................62.3........... ....................1396..................
'Very Roar (0-40) 9.6 19.6 29.2 6%
" 16,�.4 318.5 485.9
muuuu r u..... nu8mnmmuum�uuuumuuu� uuuuu�nuuuuu uuunwuuuuu unn
Rank Fiscal Year
2003 2006 2008 2010 2012 2014
MPAH 54.1 64.2 . ....... 69.7 73.4 76.4 76.5
..........................;.....................................a.................................. .............. ........... ..................................,.................. .................. .......... .......
Local 68.1 64. 62.6 71.6 7z.1 7.9.7
. ....................................s................... 0.......... ......................... ...........................Citywide fs3.i 64.15.1 72.337.9
*fitry,�,\�STREETS & TRANSPORTATION
HERNAF p11'JG
I A HARRP J
ENEA r--^
-�JREA DI J{
How does our PCI
!=J1F 1� T'LACENT IA
PiFK �RI.VERS
I A
=:IAHEIM 1
compare to the _ _. PARK
:L
LOS SSTANTONPFRN.
1 ALAMITOS ��R-fj E
w GARUE31 GROVE
rest of the County b\¢STMIIISI'ER r-II
• 'SEAL BEACH
SANTA ANA
FOUNTAIN TUSTIN
VALLEY
n
HUPiTINGTON IRVINE
ep
Overall County — /7 /7 • 8/R BEACH .:ABTA MESA
LAKE
FOREST GP
RANCI
SANI
- 7 6 5 IIEkNPORT BEACH LAGUNA MISSION VARGA
City ++. D WDODS VIEJO
HILLS
LLLSS
- ALISO LAGUNA
OUTDATED GRAPHIC VIE}O H
FROM OCTA PMP. LAGUNA
UPDATED VERSION REACH
LAGUNA
NIGUEL
WOULD SHOW "GOOD" SAN JUAN
CAPISTRANO
Pavement Quality DANA
P INT
60.0-74.9(Fair) ^• SANCLEMENTI
75.0-85.9(Good)
86.0- 100.0(Very Good) i
I
WATER IMPROVEMENTS_ h $4n5M Su ity
Hunt iv,of &uh-
PW Fact - Deliver 9.5 billion gallons of water/year
( 72% from our 10 wells) and maintain 650 miles of
pipeline, 4 reservoirs and booster stations
Watermain Distribution - Var. Loc. $ 800k
Corrosion Control - Var. Loc. $ 100k
Water Production Imp . - Var. Loc $450k
Water Engineering Studies $ 200k
Water Facilities Security $ 750k
Water Main Replacement $ 1. 1M
Well No. 8 Irrigation Project $ 100k
Well No. 9 Treatment $ 1.OM
Su ity
UNFUNDED/ DEFERRED PROJECT LIST "°°` f &az''
Total of $ 58 million in project needs
Drainage/Stormwater $ 15M
Facilities $ 1M
Neighborhood $ 1M
Parks and Beaches $5M
Streets and Transportation $36M
TIMELINE OF PROPOSED BUDGET/CIP FOR FY
C#fit�y \
2014/15 Hunt ig
July
7/23 Public Works Commission Approved CIP
Approved with the recommendation to delay Senior Center and Gun Range
Feasibility Study until City addresses unfunded Liabilities
7/22 Conformance with GP finding by Planning Comm .
August
8/4 City Council Study Session
September
Budget Public Hearing September 2
QUESTIONS?
Suf"
MAINTENANCE ZONES Public Works
MNs.,X Maintenance Zones
City of Huntington Beach '.
I
SEBLBEICX _
—_ /-- '"L5 F;
EOUNiAIN VOLLEY
Maintenance Zone I Year
Zone 1/TBD
Zone 21 TBD
Zone 3/TBD
'\ Zone 412011-12
Zane 5/TBD
Zone 61 TBO
i Zone 712012-13
r.
—G. Zone 8/2074-15 �
Zone91TBD
_ Zone 10/TBD
Zone 11 12013-14 i
Zone 1212015-16
r 4
Li
0 CO- - .. .
COSTP ME90
l
T
sM� i
NEV.PoRieEAEX �� 25
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROGRAM
Fiscal Years 2014115 through 2018119
Introduction
The Capital Improvement Program (CIP) identifies
major public improvements to the city's infrastructure
over the next five yearsand includes new projects
and upgrades to existing facilities of $50,000 or
more. Funding will be authorized for the first year of "` J
the program upon adoption of the Fiscal Year ? n
2014/15 budget. Future years include planned +
programs and are described more generally. The I i„I
CIP is a comprehensive document that includes
projects with unexpended funds from the previous
year.
Organization of the CIP
The CIP is arranged in sections. The narrative identifies funding sources and
categories of projects. The second section summarizes the projects by year showing
total costs for each project. The final section contains individual project sheets for each
category, organized alphabetically by type of improvement. The project sheets identify
the estimated cost of the project design and construction. Staff hours for design, project
management, and inspection are included within the individual project budgets.
CIP Goals
The CIP is developed to address elements in the
°s City's General Plan, as well as City Council
adopted planning documents and master plans.
Projects correspond to the Strategic Plan Goals
adopted by the City Council. Specific Goals
identified in the CIP include Improving
Infrastructure, long-term Financial Sustainability,
and Economic Development.
CIP Preparation Process
The CIP is prepared with the annual budget. Proposed projects are submitted to the
Public Works Department and staff compiles the document and prepares the draft
program in conjunction with City Administration. The CIP is presented to the Public
Works Commission (PWC) for review. During the year, individual projects are taken to
the PWC prior to advertising for bids. The Planning Commission reviews the CIP to
ensure conformance with the General Plan. The final CIP is adopted by the City
Council with the budget.
��— CIP FUNDING SOURCES
Funds for capital improvement projects are provided
through a variety of sources. Two major sources for the
CIP are Special Revenue Funds and Enterprise Funds.
Both categories are restricted, with expenditures limited
to certain types of projects.
A Special Revenue Fund is used to account for
the proceeds of revenue sources that are
restricted to expenditure for specific purposes.
Special Revenue Funds include entitlement or
subvention funds and developer fee funds.
Examples of entitlement funds are Gas Tax or
Measure M whereby funds are distributed based
on population. Developer funds, such as Traffic
Impact Fee or Drainage Fee, must be used to
mitigate demands on the infrastructure from new
development in accordance with an adopted plan.
Enterprise Funds are proprietary funds used to
i account for activities with an associated user
charge. Enterprise Funds are maintained by
adopted rates and are not subsidized by the
_ General Fund. User rates support the full cost
` of operations, maintenance, capital, and
— reserve requirements. Water and Sewer
Service are the two enterprise funds most often
- %" used for CIP.
SPECIAL REVENUE FUNDS
Air Quality Fund 201
The Air Quality Fund revenue is from AB 2766 that apportions a percentage of the air
quality fee from motor vehicle registrations to local jurisdictions. Eligible expenditures
must show a quantifiable reduction in exhaust emissions. An annual report on
qualifying expenditures is submitted to the Southern California Air Quality
Management District (SCAQMD). Capital project expenditures must meet minimum
requirements for emission reductions. The Air Quality Program partially funds the
replacement of certain vehicles within the City's Fleet with alternate fuel vehicles.
Traffic Impact Fund 206
The Fair Share Traffic Impact Fee (TIF)
program was established to implement the
goals and objectives of the Circulation
Element of the General Plan. Revenues
ensure that the adopted Level of Service
standards for arterial roadways and signalized
intersections are maintained when new
development occurs. Fees are calculated on a
per trip generated basis. Projects eligible for
TIF funding include roadway widening, certain
new traffic signals, and signal modifications that improve traffic circulation.
Gas Tax Fund 207
Gas Tax funds support the overall planning, maintenance, and operation of the City's
transportation system. Funds may be used for development review, transportation
modeling, traffic signal operation and coordination, and streetlight system maintenance.
Gas Tax use complies with state regulations and is directly related to street construction
or maintenance. Revenue is distributed by the State according to established
percentages and based on population.
Park Acquisition and Development Fund 209
The Park Acquisition and Development (PAD) Fund
is comprised of developer fees to be used for
acquisition, development, and renovation of parks,
beaches, recreation facilities, and amenities. The
goal is to improve the quality of life in Huntington
Beach by creating facilities that meet the needs and
-' desires of the community. Fees are collected for
parkland and open space acquisition with the intent
of providing a variety of recreational opportunities
for all age groups. Funds cannot be used for
maintenance activities. State law requires annual
and special financial reports of fund expenditures.
Measure M2 Fund 213
Measure M2 expenditures are .
programmed for street and transportation
system enhancements. Costs include
engineering and construction for projects
such as street rehabilitation; pedestrian
concrete maintenance, and street tree
replacements. The use of Measure M2
funds must comply with County
regulations and directly relate to street
improvements. Measure M2 revenues
are from the '/z cent sales tax approved
by voters and levied by the County of
Orange. Funds are dispersed to cities on
a per capita basis. Annually, the city presents a seven year proposed project plan to the
Orange County Transportation Authority (OCTA) to maintain eligibility for Measure M2
funds. In addition to funds distributed directly to the city, the OCTA administers
competitive grant programs known as the Combined Transportation Funding Program
(CTFP) that has resulted in several million dollars for street improvement funds to
Huntington Beach.
Traffic Congestion Relief(Proposition 42) Fund 219
Assembly Bill 2928 established the Traffic Congestion Relief Fund to allocate funds to
cities and counties for roadway maintenance purposes. Allocations are calculated per
capita, in the proportion that the total population of a city bears to the total population of
all cities in the state.
ENTERPRISE FUNDS
Water Fund CIP Fund 506
Water user rates fund the Water Fund Capital Improvement Program. In addition to
operations and maintenance, water rates are committed for major maintenance and
rehabilitation of water facilities such as wells, reservoirs, water distribution lines, and
water meters. The water system operation is assisted by a sophisticated data
transmission program. System upgrades, water facility security improvements, and
water main replacement are anticipated capital expenditures.
Water Master Plan Fund 507
The Water Master Plan (WIMP), adopted in 1990 and updated in 2000 and 2005,
recommends new facilities to provide the city with adequate water production and
storage capabilities. The majority of projects included in the WMP are complete,
including three storage reservoirs, three water wells, and various pipeline
improvements. In the next two years, the WIMP focus is on corrosion control and
transmission main improvements. Design and construction of the Southeast Reservoir,
booster station and transmission lines is planned during the next ten years. The WIMP
was updated during Fiscal Year 12-13.
Sewer Service Fund Fund 511
The Sewer Service Fund was established _
to maintain, rehabilitate, and replace
sewer facilities. Revenue is derived from
user charges to residents and businesses
with connections to the city sewer lines.
Capital projects include rebuilding sewer
lift stations and lining or replacement of
sewer lines, as designated in the 2003
Sewer Master Plan. Facilities are
evaluated regularly to determine priorities
to repair or replace facilities. The capital
project program includes design,
engineering, and all aspects of
construction management.
General Fund Capital Project Funding
The General Fund Capital Improvement Reserve (CIR) is calculated after the final audit
for each fiscal year and allocated the following year. Funds in excess of required
reserves are distributed to the CIR and the Infrastructure Fund in accordance with the
City Council adopted financial policies. The use of CIR funds is discretionary as to the
type of activity; however proposed projects qualify as capital improvements. Typical
CIR projects are substantial facility improvements and studies. Infrastructure Funds are
used for capital projects that improve the various city systems and facilities.
GRANTS AND MINOR CIP FUNDS
Each year, Departments' staff apply for and receive various grant awards. The CIP
document includes only grant funds that assist in developing or improving the
infrastructure. By pursuing grant opportunities, the City is able to maximize local project
funds. The following grants are providing funding for this years CIP.
• Community Development Block Grant (CDBG) Sidewalk, curb, and gutter
construction in enhancement areas, community center renovations and citywide
Americans with Disabilities Act (ADA) improvements
• Safe Neighborhood, Parks, Clean Water, and Coastal Protection Bond Acts
Urban runoff diversion and water quality projects; park improvements
• OCTA Competitive Measure M2 Grants Capacity improvement projects of major
intersections
• Federal Hazard Mitigation Grant to mitigate flooding potential by reconstruction of a
storm drain pump station
• Federal Transit Authority Grant to improve multi-modal mobility of vehicles,
pedestrians and bicyclists
• Federal Hazard Elimination Safety (HES)
Traffic signal modifications to include left turn arrows at intersections
• Federal Highway Bridge Replacement Rehabilitation (HBRR) and Bridge
Preventative Maintenance Program (BPMP) Grants used to extend useful life of the
City's bridges.
• Safe Routes to Schools Grant to address traffic safety issues near schools
• Highway Safety Improvement Program (HSIP) to help fund traffic signal
modifications at several major intersections.
CIP CATEGORIES
Drainage and Water Quality: Drainage projects include storm drain line construction or
rehabilitation, drainage pump station construction, and drainage system facilities. The
water quality component addresses urban runoff, retention basins, and other facilities
that may improve the quality of water discharged to local water bodies as well as
comply with the Citywide Urban Runoff Management Plan (CURMP).
Facilities: Capital improvements to facilities
can be modifications to existing buildings or
new construction. Typical projects are those
that exceed the normal maintenance
budgets such as the replacements of roofs,
elevators, and climate control systems.
Upgrades include energy efficiency
conversions and improvements to meet
technological needs.
Neighborhood: Localized improvements to
" limited residential or other specific areas are
included in this category. Annual projects include residential pavement overlays,
concrete, and street tree replacement. Neighborhood projects may be in the
Enhancement Areas and eligible for CDBG funding.
Parks and Beaches: Parks and beaches projects include new park construction and
renovation, including improvements to city beach facilities. Funding may be Park
Acquisition and Development, state bond allocations, grants, or Capital Improvement
Reserve. The park system is developed in accordance with the Park Strategy Fee and
Nexus Study (2001), as well as the City General Plan, Community Services and
Recreation component. Parks and beaches contribute to the quality of living in
Huntington Beach by preserving open space and providing recreational opportunities for
residents and visitors.
Sewer: Improvements to the city sewer system consist of sewer line and sewer lift
station rehabilitation, as well as routine maintenance. Improvement projects are based
upon the 2003 Sewer Master Plan, as well as maintenance demands. The program to
replace sewer lift stations is on a two-year cycle, with design the first year and
construction the second year. Ten stations have been rebuilt since 2000.
Streets and Transportation: This category
highlights improvements to the City's arterial
streets and traffic control systems. Projects
may include street widening, pavement
rehabilitation, and traffic signal installation.
Funding sources are primarily Gas Tax,
Measure M, Federal grants and Traffic Impact
Fees. The Pavement Management Plan,
General Plan Circulation Element, and Traffic
Signal Priority List are source documents for
these projects. Typical street improvements
are pavement and concrete replacement, road
widening, and grade adjustments.
Improvements to the citywide transportation system include new traffic signals, signal
modifications, and signal communications upgrades. Projects are intended to improve
traffic flow throughout the city.
Water: Water projects include the rehabilitation of existing components, as well as, the
construction of new storage and production facilities. Water main replacements and
well rehabilitations are funded through the water rates as Water Fund CIP. Water
Master Plan Funds provide capacity upgrades and new facilities as recommended in the
Water Master Plan. The replacement, corrosion protection, and upgrade of steel water
distribution mains, and large water transmission lines throughout the city are ongoing
projects.
Capital Improvement Program
Fiscal Year 2014115
In Fiscal Year 2014/15, new improvements totaling approximately $43 million are
proposed, which includes $21.5 million estimated cost of constructing a new Senior
Center. It is anticipated that approximately $9.3 million in continuing appropriations for
projects approved last year will be brought forward into the new fiscal year. The primary
funding sources for capital projects remain restricted revenue funds and enterprise
funds such as water, sewer and street funds. The General Fund will provide $6.3 million
for infrastructure improvements in FY 2014/15.
Projects for the Water, Water Master Plan, and Sewer Service enterprises correspond
with the adopted master plans and major maintenance programs. Planned sewer
improvements include design of one lift station, reconstruction of another and the
annual sewer lining, replacement and rehabilitation. Water line replacements, corrosion
control, distribution and production system improvements, booster station improvements
and facility security improvements are included in the water capital improvement
program.
Measure M and CIR funds will be used to rehabilitate three arterial highway segments
consistent with the City's Pavement Management Plan. Gas Tax will provide funding for
arterial street design work, median improvements and local street rehabilitation. Other
transportation improvements, funded in part by grants, include intersection
improvements, bridge rehabilitation and preventive maintenance, and traffic signal
modifications.
Local neighborhood improvements will include replacement of sidewalks, including ADA
ramps where warranted, and residential street overlays. In addition, two streets will be
reconstructed, including sidewalk, curb and gutter, and roadway.
Park projects include replacement of the Arena Soccer artificial turf, replacement of high
voltage electrical transformers and high voltage wiring in Central Park, LeBard Park
acquisition, Huntington Harbour dredging study, conceptual plan for development of the
former gun range site and the aforementioned construction of the new Senior Center.
The CIP contains many projects that will further Huntington Beach as an inviting tourist
destination, as well as, serve the local community. Residents and visitors will benefit
from the infrastructure improvements that enhance our daily lives.
City of Huntington Beach Capital Improvement Program
New Appropriations Fiscal Year 2014115
Fiscal Year Infrastructure Grams/Other Sewer
2014/15 Park Funds General Fund Fund Funds Measure M Gas Tax TIF Prop 42 Funds water Funds
DRAINAGE 8 STORM WATER
Northwest Catch Basin Retrofit Project-Phase II 1 $200,0001 1 $200,000
TOTAL 1 $200,0001 1 $200,000
FACILITIES
Library Automated Materials Handling System
Replacement $125,600 $126,500
Central Library Interior Renovaton $75,000 $75,000
Downtown Parking Structure Improvements $100,000 $100,000
Facilities Needs Assessment $100,000 $100,000
Fire Station 8-Heil Renovation $190.900 $190,900
Gun Range Site Feasibility Study $30,000 $30,ODO
Police Department and Lobby Security Project $250,000 $250,000
Police Dept.Main Lobby ADA Improvements $75.000 $75,000
Pler Piling Inspection Cleaning and Maintenance $200,000 $200,000
u ua and Junior ifeguard eadquarters Rollup
Door Replacement $60.000 $50,000
Various Roof Replacements $300.000 $300,000
TOTAL $1,496,400 $1,421,400 $75,000
NEIGHBORHOOD
Concrete Replacement $250,000 S?50,000 _ _
Residential Overlay Zone 8 __ $2,100,000 $2,100,000
Residential Tree Petition $650,000 $850,000
TOTAL $3,000,000 $250,000 $650,000 $2,100,000
PARKS AND BEACHES
Arena Soccer Artificial Turf Field Replacement $170,000 _ $170,000
Replace Central Park Electrical Transformers and High
Voltage Wiring $300,000 $300,000
Gun Range Development Conceptual Plan $50'000 $50,000
Huntington Harbour Study $40.000 $40.000
LeBard Park Property Acquisition $667,000 $333,500 $333,500 _
New Senior Center $19,465,935 $3000,000, $18,465,935
Worthy Park Reconfiguration-PhaseI $1,300,o00 $1,300,000
TOTAL $21,992,935 $1,633,500 $3,673,500 $170,000 $16,515,935
SEWER
Sewer Lining $350,000 $350,OOD
Sewer Lift Station Reconstruction 52,100,000 $2,100,000
TOTAL $2,450,000 1 1 1 1 1 1 1 $2,450,000
7/7/2014 New 2014-15
City of Huntington Beach Capital Improvement Program
New Appro riations Fiscal Year 2014115
Fiscal Year Infrastructure Grants/Other Sewer
2014/15 Park Funds General Funtl Fund Funds Measure M Gas Tax TIF Prop 42 Funds Water Funds
STREETS& TRANSPORTATION
Arterial Rehabilitation_ _ $3,306,442 $1,000,000 $106,442 $2,200,000
Atlanta Avenue Widening $1,600,000 $1.000,000 $800,000
nstall Signal at o Chica/ earce&Modify sting
Signal at MairdUticall7th $24,000 $21,600 $2,400
Bridge Preventative Maintenance $2,336,000 $1,862,671 $473.329
Signal Modification at Goldenwest/Heil $12,000 $10,600 $1.200
Gothard St.and Center Ave.Rehabilitation $1,400,000 $1.400,000
Signal Modification at GothanHCenter _ $12,000 $10,800 $1,200
Signal Modification at GothardrSlater $12,000 $10,800 $1,200
Signal Replacement at Main/Adams $5,000 $5,000
Ellis/Main Traffic Channelization Modifications $50,000 $50,000
MairdFlodda Signal Equipment Replacement $286,000 $285,000
Signal Modification at Nev4and/Ellis $12,000 $10,800 $1,200
Install Signal Interconnect Conduit/Cable on Newlan
between Warner&Ellis _ $12,000 $10,800 $1,200
Signal Modification at NewlandlSlater $12,000 $10,800 $1,200 _
Utica Bicycle Boulevard from Mein to Beach $76,000 $75,000
TOTAL $9,153,442 $1,000,000 $1,000,000 $2,055,513 $2,200,000 $2,247,929 $650,000
WATER
Water Distribution System Improvements $800,000 _ _ _ $80o,000
Water System Corrosion Control $100,000 $100,000
Water Production System Improvements $450,000 $450,000
Water Engineering Studies $200,000 _ $SO,ODD $150,000
Water Facilities Security Improvements $760,000 $750,000
Water Main Replacements $1,100,000
$1,100,000
Well No.8 Irrigation $ 00,000 $100,000
Well No.9 Treatmentatment $1,0000,000 $1,000,000
TOTAL $4,500,000
$50,000 $4,450,000
CIP TOTAL 1 $42,792,777 $1,633,500 $6,344,900 $1,170,000 $18,846,446 $2,200,000 $2,897,929 $650,000 $2,100,000 $2,500,000 $4,450,000
7/7/2014
New 2014-15
City of Huntington Beach Capital Improvement Program
Continuing Appropriations Fiscal Year 2014115
Fiscal Year General Infrastructure Grants/Other Measure Sewer
2014/15 Park Funds Fund Fund Funds M Gas Tax TIF Prop 42 Funds Water Funds
DRAINAGE 6 STORM WATER
Heil Pump Station Relocation $2,352 3001 1 1 $2.352 300
TOTAL 1 $2,352,3001 1 1 $2,352,300
FACILITIES
Library Automated Materials Handling System Replacement $127,200 $127,200
Main Street Libra ADA Improvements $125,230 $125,230
TOTAL 1 $252,4301 1 $127,2001 1 $125,230
NEIGHBORHOOD
Pedestfian Crossing at Bella Terra/Boardwalk $100,'00 _ $100,000
Sunset Beach Improvements 510D,000 $100,000
TOTAL $ 1 $100,0001 1 $100,000
PARKS AND BEACHES
Bartlett Park Phase 1 $130,000 $130,000
Huntington central Park Permanent Parking Lot $270,000 $270,000
LeBard Park Design $20,000 $20,000
New Senior Center $1,745,115 $245,115 $1,500,000
Huntington Central Park Sports Complex Team Room $102.740 $162,740
Worthy Park Reconfiguration-Phase 1 $1,500 $1.500
TOTAL $2,329,355 $829,355 $1,500,000
STREETS 8 TRANSPORTATION
Adams Signal Synchronization and Communication Upgrades $181.495 $181.495
Atlanta Avenue Wdening _ -
Beach Boulevard and Warner Avenue Intersection Improvement $41,572 $6,497 $35,076
Bridge Rehabilitation -
Bridge Preventative Maintenance
Brookhurst Street and Adams Avenue Intersection Improvement $355,350 $286,512 $88,838
Edinger Signal Synchronization and Communication Upgrades $36,648 $36,846
Goklenwest Signal Synchronization and Communication Upgrades $57.785 $57,785
Signal Modifications at Gothard/Talbert,Gothard/Hell,8 $728 300 $673,200 $66,100
Spdngdale/McFadden.
Signal Modifications at Magnolia/Yorktown 8 Adams/Bushard $827,000 $762,300 $64,700
Ellis/Main Traffic Channelization Modifications $180,000 $180,000
Warner Signal Synchronization and Communication Upgrades $67,548 $87,848
Yorktown/Huntin ton Thai Channelization Modifications $50,000 $50,000
TOTAL $2,525,976 $2,052,263 $50,000 $303,913 $119,800
WATER
Peck Reservoir Dual Drive $1,500,000 $1,500,000
Well No.8 Irrigation $120000 $120,000
TOTAL 0001 $1,620,000
$9,280,0611 $829.3551227 200 3 852 3001 $2,277.4931 1 $50,0001303 913 119 800 $1 620 000
7/7/2014 Continuing 2014-15
Capital Improvement Program FY 2014/15
New Appropriations by Funding Source
$42,792,777
T Sewer Funds Infrastructure Fund Water Funds
6% 3% 10%
Measure M 1%
5% Prop 42
5%
Park Funds
4%
LGas Tax
7%
Grants/Other
44%
General Fund
15%
CITY OF HUNTINGTON BEACH
Capital Improvement Program FY 201412015 through 201812019
By Fiscal Year
Fiscal Year Fiscal Yee, Fi,ce,+ Fiscal Year Total 5 Year CIP
2014/15 2015/16 20: 2018119
DRAINAGE&STORM WATER
Hail Pm Station RaWation 52,352,3W S2,5W,000 $4,852,300
Nor0m9sl Cstch Benin Retrofit Project-Phase II 1 $200" $200,0W
TOTAL 1112,1132,3001 $2,6W.0110 $6,082,
FACILITIES
Ubrary Au rnaied Materiels Handing System Replxemere $252,TW S252.700
Central Library Fanain Renovation 320,OOD $442,075 $462,07
Central Library Interior Renovation $75,000 $70A00 $70,90D s3Q000 5245,
Lbrwy MadiarTeari Space C"arsion $130,OW $130,
Cenral Libra "Old Wi 'Remroom Rerwatbn $240,000 $240,ODO
Central Litirmy Theater Re stbn $117,000 5117,
Do 0,,,n Parking Slrsdvre Impirvarnents 11700,000 $2W,000 $2W,000 5500,000
Facilities Needs Assessment $10D,000 $1 W,OW
Fire Salon 8-Heil Renevation $190,900 11190,900
Man Street Library ADA Improvements $125,230 1 $125,230
Gut Range Sile Feasbility Study $30,000 S30,0W
Police Department and Lobby Securily Project $250,000 $250.000 35W,0DD
Police Dept.Mein Lobby ADA Im amens $75,000 5321,000 $396,OW
Pier Piling Ire ettbn Clean' ant Maintarerra 32D0.000 VM,000 $2W,000 $6W.OW
Lffegwrd and Junior Lifeguard Headquarlen,Rollup Door Repisoarrani $50.000 350,OW
Various Roof Replacement, 5300,000 $300,000
TOTAL $1,745,830 $1,548000 5912,07E s30.0W $4,238,90
NEIGHBORHOOD
Concrete Replacement sm,000 $250,000 $25g000 $250,000 $250,000 $1,25D,000
MOWS Street Rehabilitation 3700,0DO $700,000
Pedestrian Crossing at Bob Term I Boerdwak $1011,000 SM.000 $400,000
ResideMiel Overlay Zate 8 $2,100,0DO $2,100,000 $2,100,000 $2,100,000 $2,100,0100 S10,500,000
Residential Tree PMAW $650,000 $450,000 $450,0110 $450,000 $450,000 112,450,000
Sunset Beech lrn r erni $100,OW $100.000
TOTAL 53,200.000 $3,SKOOD S;8011,000 $2,BW.000 $;800.000 615,400,
PARKS&BEACHES
Arena S..,AmOnal TwiFieldReplacennert $170,0011 $170,000
Barren Park Pnase 1 $130,000 $1,175.000 $1.306.
Hun' on Gem.1 Park Permanent Parking Lot $270,ODO $270,
Replace Central Park Electrical Transformem and High Voling,Wiring $30D.ODD $3W,
G.Range DftwpmerA Conceptuil Plan $50,0W $50,
HWWQW Harbour Study $40,000 $40,
LeBard Park 0eii0n $20,000 $1,262.0W $1,282,OW
Lollard Perk Pro Acquisition $B67,000 $667,000 $667,000 $667,000 $667,000 $3,335,D00
New Senor Center $21,211,050 $21.211.050
Hurd Ion Cordial Park Sports Can lax Team Room $112,71 5162.740
Warltry Park Reoonipuration-Phew 1 51,301,SW $1,301,50D
TOTAL M322.290 113,104,0W $667,OW 5897,OW $667,OW $29,427,
5 yr CIP by year
CITY OF HUNTINGTON BEACH
Capital Improvement Program FY 2014/2015 through 2018/2019
By Fiscal Year
Fiscal Year Fiscal Year Fiscal Year Tole)5 Year CIP
2014115 2015/16 2018/19
SEWER
SewerLn $9m,o00 $350,000 1350,000 1350,000 $350,000 $1,750,000
Serer LiBSblion ReconsaWion $2.100.000 SZIOO.0001 $Z100,00101i $2,100,000 $ZID),00Dl 10,5001
TOTAL $2,410,000 $4460,000 52,410,000 SM10,000 $2,410,000 S1z,'An,
STREETS&TRANSPORTATION
Adams Signal S NEMIDn and Cornnim elon Upgrades $181.495 $181,495
Arterial Rehabilitation $3,306,442 $3,200.DW $3,2110,000 $3,200,000 $3,2DO.000 $18,105,442
At Me Avarua W $1,800,000 31,80Q
Install Sgnal M Soba ChicalPearce&Moddy Exist Signal at hUnUtiWl Ph $24,000 $724,400 $748,400
Beach Boubvare and Warner Avenue Intersection Improoenert Pro'ect $41,672 $41.572
Bridge Preventative Maintenance $2,335,000 $2,338,
Bridge Rehabilitation $3.645.000 $4,045,000 $7,690,000
11.1d unl Street and Adams Avenue Intersection Imp nurnenl P 'ed 5355,350 5365,350
Signal Equipment Replacement el Br.01,hurst/IndianaPD165 55.000 $55,000 $60,000
High Mesl Light Pole Replacement in Central Park 1 $10.000 5210,000 $220,Doo
Edinger Signal Synchronization artl Communication Upgrades $36.648 1 536,6,16
Wall Smahaast Area Signal Interconnect Fiber Backbore $30,OD0 $46D.000 $460,000 $430.01101 $1,380,DOO
Signal Modlication at Goldarnves"d $12.000 $301,10D $316,100
Godensest S- nal Syrclronwatbnand Communication U rades $57,765 $57,785
Gothard St.and Center Ave.Rehabi9allon $1,400,000 $1,400.0110
Signal Modification at Golhard/Cenler $12,0DD 5397,300 $409,3W
Signal Modlicetion at Golherd/Slatar $12,000 $309,300 $321,300
Signal Modifications at GothardfTabert,Gotherd/Heil,&Sprlrgdeb/MCFaddsn. $729.300 $728,
UVdkV Replacernent in Greer Park S5Q000 $50,000
Signal Modifications at wksfYorktown&Adamsl9uehard $827,ODD $827,
Signal Replacement at Man/Adams $6.000 $205,000 $210,000
Ellisl&lain Tragic Cher afueton Modifications $230,ODO $230.000
MaiNFonda Signal Equpment Replacement $285,000 $285,000
S" nal Modrficaton at NewbnfdlElu $12.ODO $398,400 $410,400
Install Signal Interconnect CondWCabb on Newland between Warner&Elio 11"Zoo0 8298,1D0 $310,100
S" nal Modification at NewlancUSlater $12p00 $339,D00 1351,0D0
Slater Inlerconnecl under Union Pacifk Railroad $5,00D $50,ODD 145,000
Utka Bicycle Boulevard from Main to Beach $75,000 $839.260 $914,290
Warren Signal S nation and Communicator Upgrades $671848 $67.8,1111
Norkto,NHunlhglon Taft Chamalization Modifications $60,000 $50,000
TOTAL $11,676A16 $10,704,610 $8.029,000 51,616,000 $3,680,000 SST,7p
Syr CIP by year
CITY OF HUNTINGTON BEACH
Capital Improvement Program FY 2014/2015 through 2018/2019
By Fiscal Year
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Total 5 Year CIP
2014/15 2015116 2016117 2017/18 2018/19
WA TER
Water DistrMionSystem IM Warlents $800,000 $700,000 $350,000 S2o0,000 $200,000 $2,250,000
Water System Corrosion CM.1 $100,000 $100,000 $100,000 S100.OD0 $100,000 $500.000
Weler ProauctionSystem lm mvamems _ 5450.000 $1,OOD,000 $1,9W,000 $200,000 $200.000 $3,750000
Pack ReservoF DuW Drive 61,500,000 $1,50O,DOD
Water Engineer' Stulies -� $200,000 $10D,ODO $10D,000 $100.000 $100,000 $600,000
Water Facilities SacuAy Improvements $750,000 V60,000 $750,OW $750,000 5750,000 $3,750,000
Water Main Replaomerls, $1,100,ODD S2,000,000 $5DD,OOD 4500,000 $600,000 S4.600,000
Well No.8lrr' ton $220.000 $500,000 $820,000
W.1 No.9 Treatmere $1.000,000 $1,000.DOD
TOTAL $6,120,0001 $5,250,000 $3,700,0001 $1,850,000 $1,850,000 $18,T/0.000
TOTAL1 $52,072,8381 $29,356,8601 $18,549,D751 $11M2,0001 $11.447,0001 $122.887,773
5 yr CIP by year
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Heil Pump Station PROJECT DESCRIPTION: Construct Heil Pump Station at new location
Relocation
PROJECT NEED: The old pump station is in need of replacement due to age and lack of sufficient
FUNDING DEPARTMENT: capacity.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: City-wide Urban Runoff Management Plan (2005)
Jim Wagner
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 344,300 $ 344,300
Construction Complete: FY 2015/16 Construction $ 1,352,300 $ 2,500,000
Project Management
Supplementals
Continuing $ 2,352,300
PROJECT LOCATION Other $ 1,000,000
TOTAL $ 2,696,600 $ 2,352,300 $ 2,500,000
FUNDING SOURCES Prior FY 14115 FY 15/16 FY 16117
InfrFund $ 2,696,600 $ 344,300
Other(Haz Mit) $ 2,500,000
0
a TOTAL $ 2,696,600 $ 2,500,000
0 New Station
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 5,196,600
o, ■ Additional annual cost. None
c
u, Heil FUND: 314
COMMENTS ON GRANTS t OTHER FUNDS:
PROJECT TYPE: New Construction
CATEGORY: Draina e
Drainage.xlsx Heil PS
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Northwest Catch Basin PROJECT DESCRIPTION: Retrofit existing catch basins with Bio Clean Round Curb Inlet Filters
Retrofit Project- Phase 11
PROJECT NEED: Protect water quality of the East Garden Grove Wintersburg and Westminster
FUNDING DEPARTMENT: Channels
Public Works
DEPT. PROJECT MGR: :SOURCE DOCUMENT: Citywide Urban Runoff Management Plan (2005)
Terri Elliott �STRATEGIC PLAN GOAL: Improve the City's infrastructure
SCHEDULE: PROJECT COSTS FY 14/16 FY 15/16
Design Complete: N/A Design/Environmental
Construction Complete: FY 2014/15 Construction $ 190,000
Project Management $ 8,000
Supplementals $ 2,000
RIW
1;
PROJECT LOCATION Other
TOTAL ......JLL 200,000J
L---------J
FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17/18 FY 10/19
L3 I McFadden Avenue' 1 OCTA Tier 1 $ 200,000
-6 Edliger Avenue
TOTAL $ 200,000
MAINTENANCE COST IMPACT: AL PKUJtL;I 170ST7—$ 2
75 dditional annual cost Non
if fl i eilAvenue 19 873
COMMENTS ON GRANTS I OTHER FUNDS:
WarmrAvenje Anticipate award in June.To be supplemented' 11 11 PROJECT TYPE: Rehabilitation
1 1 fill by in kind services. I
1 PROJECT
Water Oualft
Drainage.xlsx NW CB Phase 11
CITY OF HUNTINGTON BEACH
F� CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Library Automated PROJECT DESCRIPTION: Automated Materials Handling system re-engineering to replace outdated,
Materials Handling System existing system at the Central Library.
Replacement
PROJECT NEED: Automated Materials Handling will streamline and simplify the return and sorting
FUNDING DEPARTMENT: of library materials. Items will be back on shelf faster,service will be enhanced,
Library Services and staff time will be saved for other tasks.
DEPT.PROJECT MGR: SOURCE DOCUMENT: N/A
Stephanie Beverage, Director of Library
Services STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15/16 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 4,950
Construction Complete: FY 2014/15 Construction $ 137,100 $ 23,800 $ 125,500
Project Management $ 8,950
Supplementals
Continuing $ 127,200
PROJECT LOCATION Other
TOTAL $ 151,000 $ 23,600 $ 25$700
FUNDING SOURCES Prior FY 14/16 FY 15/16 FY 16117
General Fund $ 151,000 $ 23,800 $ 125,500
TOTAL $ 151,000 $ 125,500
i9petl Avenue
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 276,500
Additional annual cost: None
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library AMH
l
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Central Library Fountain PROJECT DESCRIPTION: Renovate and repair the Central Library Fountain system.
Renovation
PROJECT NEED: The Central Library Fountains are over 30 years old,and the system is failing.
FUNDING DEPARTMENT: The pumps need to be replaced and re-piped. The Fountain pools need to be
Library Services cleared, repaired and resurfaced. Fixtures and pipes need to be replaced.
DEPT.PROJECT MGR: SOURCE DOCUMENT:
Stephanie Beverage, Director of Library
Services STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 16116 FY 16/17 FY 17/16 FY i81i9
Design Complete: FY 2015/16 Design/Environmental $ 20,000
Construction Complete: FY 2016/17 Construction $ 442,075
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 20,000 $ 442,075
FUNDING SOURCES FY 14/15 FY 15/16 FY 16117 FY 17/16 FY 16/19
General Fund $ 20,000 $ 442,075
p§, TOTAL $ 20,000 $ 442,075
o MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 462,075
Additional annual cost: None
FUND: 100
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library Fountains
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION w...
PROJECT TITLE. Central Library Interior PROJECT DESCRIPTION: Replace the furniture and some flooring in the public areas of the Central
Renovation Library.
PROJECT NEED: The Central Library has over 515,000 visits annually. All public use furniture is 5
FUNDING DEPARTMENT: years of age or older,and is wearing out. Some areas have carpet that is over
Library Services 30 years old. This is both a safety and service issue. Seating and study table-
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Stephanie Beverage, Director of Library
Services STRATEGIC PLAN GOAL: Enhance Quality of Life
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 5,000
Construction Complete: FY 2014/15 Construction $ 70,000 $ 70,000 $ 70,000 $ 30,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 75,000 $ 70,000 $ 70,000 $ 30,000
FUNDING SOURCES FY 14/15 FY 15/16 FY 16/17 FY 17118 FY 1 B/19
General Fund $ 75,000 $ 70,000 $ 70,000 $ 30,000
� CenunU.,wary
y
TOTAL $ 75,000 $ 70,000 $ 70,000 $ 30,000
a
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 245,000
Additional annual cost: None
FUND: 100
COMMENTS ON GRANTS t OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library Int Renovation
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Library Media/Teen Space PROJECT DESCRIPTION: Create new Teen Space at the Central Library
Conversion
PROJECT NEED: RemodeVrework the Library Media Center to create a new, larger Teen Space at
FUNDING DEPARTMENT: Central Library. The current Teen area is far too small and can only
Library Services accommodate 5-7 Teens at a time in the area. The new space will more than
DEPT.PROJECT MGR: SOURCE DOCUMENT:
Stephanie Beverage, Director of Library
Services STRATEGIC PLAN GOAL: Enhance Quality of Life
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 5,000
Construction Complete, FY 2015/16 Construction $ 125,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 130,000
FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
General Fund $ 130,000
TOTAL $ 130,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 130,00011
Additional annual cost: None
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
- PROJECT TYPE: New 8 Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library Media
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Central Library"Old Wing" PROJECT DESCRIPTION: Renovate restrooms serving the Library's"Old Wing"to improve appearance and
Restroom Renovation accessibility.
PROJECT NEED: Restroom fixtures and surfaces are original,are worn from public use and are
FUNDING DEPARTMENT: unattractive.Accessibility improvements may be necessary for compliance with
Office of Business Development the Americans with Disabilities Act.
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2015/16 Design/Environmental $ 24,000
Construction Complete: FY 2015/16 Construction $ 216,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 240,000
FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17118 FY 18119
CDBG $ 240,000
_ TOTAL $ 240,000 III
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 240,000
Additional annual cost: None
FUND: 863
COMMENTS ON GRANTS/OTHER FUNDS:
To be considered for the 2015 CDBG grant cycle. PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library Old Wing Rest
I�IT/ IMP LI11\ITI\I/'.T11\I nnA nLI
U I i Or HUN I I14C, I MY BlzAQ I
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Central Library Theater PROJECT DESCRIPTION: Replace the flooring, repair/replace seating, and address ADA issues for the
Renovation Central Library Theater
PROJECT NEED: The Central Library Theater is a busy, heavily used space that generates
FUNDING DEPARTMENT: significant revenue for the City.The seating,flooring,walls and stage have not
Library Services had a major renovation in 20 years. Repairs and renovation will ensure that the
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Stephanie Beverage, Director of Library
Services STRATEGIC PLAN GOAL: Enhance Quality of Life
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16117 FY 1711B FY 18119
Design Complete: FY 2015/16 Design/Environmental
Construction Complete: FY 2015/16 Construction $ 117,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
i
TOTAL $ 117,000
FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18/19
General Fund $ 117,000
TOTAL $ 117,000
.,o.e
Pp,
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 117,000
ralo.,,Ao
I Additional annual cost: None
FUND: I100
COMMENTS ON GRANTS /OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Central Library Theater
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Downtown Parking PROJECT DESCRIPTION: Repair and/or replace worn, cracked concrete stairways and areas of decking.
Structure Improvements Improve the lighting and visibility in the downtown parking structure.
PROJECT NEED: The concrete stairwells and areas of decking have deteriorated with time and
FUNDING DEPARTMENT: heavy use. Strategic and new LED lighting will improve visibility and a safer
Community Services environment.
DEPT.PROJECT MGR: SOURCE DOCUMENT: N/A
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2016/1 Construction $ 100,000 $ 200,000 $ 200,000
Project Management
Supplementals
RAW
PROJECT LOCATION Other
_ or a TOTAL $ 100,000 $ 200,000 $ 200,000
FUNDING SOURCES FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
General Fund $ 100,000 $ 200,000 $ 200,000
* `-�� • -. ° TOTAL $ 100,000 $ 200,000 $ 200,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 500,000
Additional annual cost. None
\ • +4 FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
% PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Downtown Parking Improvements
rYTV ! c Ul 1\ITI\Ir�Tr%kl BEACH
Vll1 VI I.MIIW1VI\ LIAVII
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Facilities Needs PROJECT DESCRIPTION: Hire consultant to perform a comprehensive review and assessment of city
Assessment facilities to determine current condition and propose potential improvement
options.
PROJECT NEED: The city currently lacks a review and assessment of all of its facilities.This study
FUNDING DEPARTMENT: is necessary to provide effective planning for future maintenance and
Public Works improvements.
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18/19
Design Complete: N/A Design/Environmental
Construction Complete: N/A Construction $ 100,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL lis 1001,000
FUNDING SOURCES FY 14115 FY 16/16 FY 16117 FY 17118 FY 18119
1
General Fund $ 100,000
a
TOTAL $ 100,000
a g
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 100,000
Additional annual cost: TBD
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Studies
CATEGORY: Facilitiesil
Facilities.xlsx Facilities Assessment
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Fire Station 8-Heil PROJECT DESCRIPTION: Reconfiguration of Fire Station 8-Heil dorm rooms, library area and restroom.
Renovation
PROJECT NEED: Needed for gender accommodation and ADA compliance, in addition to better
FUNDING DEPARTMENT: use of space and upgrade of the interior of this 50 year old fire station.
Fire
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Eric Engberg, Division Chief/Operations
=J STRATEGIC PLAN GOAL: Enhance and maintain Dublic safety
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18/19
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 175,900
Project Management $ 15,000
Supp/ementa/s
RM
PROJECT LOCATION Other
TOTAL ILL 190,900
--'q Edln er Ave. FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
—00 J UU
_ General Fund $ 190,900
1._
St. #8I n
Heil ., _0 — TOTAL $ 190,900
v —
65-
MAINTENANCE COST IMPACT: 1TOTAL PROJECT COST: $ 190,900
E O
z g Additional annual cost: None
IL 2
71U I O FUND: 100
Mme ve.
—� COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Fire Station 8
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Main Street Library ADA PROJECT DESCRIPTION: Design and construct accessibility improvements at the Main Street Branch
Improvements Library,which was constructed in 1951. Improvements may include by are not
limited to restrooms, doors and doorways, signage and path of travel.
PROJECT NEED: This project is necessary for compliance with the Americans with Disabilities Act.
FUNDING DEPARTMENT:
Office of Business Development
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2008 ADA Survey and Transition Plan
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 24,000 $ 24,000
Construction Complete: FY 2014/15 Construction $ 125,230
Project Management
Supplementals
Continuing $ 125,230
PROJECT LOCATION Other
TOTAL ILL 149,230 ILL 24,000 $ 125,230
FUNDING SOURCES Prior FY 14115 FY 16/16 FY 16117
lie. CDBG $ 149,230 $ 24,000
C�
6.a 9Ds
TOTAL $ 149,230
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: _L_149,230JI
Additional annual cost None
FUND: 863
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Main St Library ADA
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Gun Range Site Feasibility PROJECT DESCRIPTION: Hire a consultant or contracting firm to conduct a site feasibility study for
Study construction of an indoor police gun range within the city limits.
PROJECT NEED: For efficiency of operations,the department is in need of a local range to
FUNDING DEPARTMENT: conduct their required firearms training.
Police
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Dave Bunetta
STRATEGIC PLAN GOAL: Enhance and maintain public safety
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16117 FY 17/18 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 30,000
Construction Complete: NIA Construction
Project Management
Supplementals
R/W
PROJECT LOCATION Other
Unknown at this time. TOTAL ILI 30,000
_ FUNDING SOURCES FY 14/15 FY 15/16 FY 16/17 FY 17118 FY 18119
General Fund $ 30,000
a
TOTAL $ 30,000
i d
.W.e._. : MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 30,000
Additional annual cost. None
FFUD: 100
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: Studies
CATEGORY: Facilities
Fadlities.xlsx PD Gun Range
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Police Department and PROJECT DESCRIPTION: This project will secure the front desk area and provide restricted access to the
Lobby Security Project inside area of the police department. The project is parceled out in phases,with
the initial phase addressing the security issue and some additional upgrades to
the lobby area. Funding for the next phase would be requested in subsequent
fiscal years. This project is a January 2014 Strategic Plan Goal.
PROJECT NEED: There is a need to secure the front desk and lobby of the police department to
FUNDING DEPARTMENT: assist in providing a safer working environment for the department employees
Police and others who use the building on a regular basis. Additionally, having the
DEPT. PROJECT MGR: SOURCE DOCUMENT: BOA Architecture
Dave Bunetta/Jerry Thompson
STRATEGIC PLAN GOAL: Enhance and maintain public safety
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2015/16 Construction $250,000 $250,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
Police Department Front Lobby TOTAL ILL 250,000 $ 011
FUNDING SOURCES FY 14/15 FY 15/16 FY 16117 FY 1711B FY 18/19
General Fund $ 250,000 $ 250,000
TOTAL $ 250,000 $ 250,000
Yorktown Ave
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 5001000
I`
tor, ::-_) Additional annual cost: None
F ,!,gg �
FUND: 100
Ullca Ave
COMMENTS ON GRANTS /OTHER FUNDS:
PROJECT TYPE: New& Rehabilitation
CATEGORY: Facilities
Facilities.xlsx PD Lobby
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Police Dept. Main Lobby PROJECT DESCRIPTION: Design and construct limited accessibility improvements to the building entry,
ADA Improvements main lobby, counters, restrooms and elevators at the Huntington Beach Police
Department.
PROJECT NEED: This project is necessary to further the city's compliance with the Americans with
FUNDING DEPARTMENT: Disabilities Act.
Office of Business Development
DEPT.PROJECT MGR: SOURCE DOCUMENT: Community Development Block Grant Application dated 2/20/14.
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16117 FY 17/18 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 50,000
Construction Complete: FY 2015/16 Construction $ 25,000 $ 300,000
Project Management $ 11,000
Supplementals $ 10,000
RAV
PROJECT LOCATION Other
TOTAL $ 75,000 $ 321,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18119
CDBG $ 75,000 $ 321,000
Ya,klown Nve
TOTAL $ 75,000 $ 321,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 396,000
v Additional annual cost: None
unw n.�
FUND: 1208
COMMENTS ON GRANTS/OTHER FUNDS:
CDBG application is under review. Funds will be PROJECT TYPE: Rehabilitation
awarded in July. Business Development requests
Business Unit from Finance CATEGORY: Facilities j
Facilities.xlsx PD Lobby ADA
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Pier Piling Inspection PROJECT DESCRIPTION: Provide underwater visual and video inspection of the Pier s concrete pilings;
Cleaning and Maintenance clean marine growth; repair cracks or spalling; and document any anomalies
found in the concrete pilings.
PROJECT NEED: This is a specialized, periodic major maintenance activity necessary to preserve
FUNDING DEPARTMENT: and extend the life of the pier structure.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18119
Design Complete: NIA Design/Environmental
Construction Complete: N/A Construction $ 200,000 $ 200,000 $ 200,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL LL 200,000 $ zoo,000 i 200,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18119
General Fund $ 200,000 $ 200,000 $ 200,000
j' TOTAL $ 200,000 $ 200,000 $ 200,000
44
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 600,000
-- - Additional annual cost: None
-�" F
D: 100
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: Rehabilitation
il
CATEGORY: Facilities
Facilities.xlsx Pier Inspections
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Lifeguard and Junior PROJECT DESCRIPTION: Replacement of building rollup doors for the Lifeguard and Junior Lifeguard
Lifeguard Headquarters Headquarters buildings.
PROJECT TITLE:
Rollup Door Replacement
PROJECT NEED: Replacement is required due to corrosion, sun and salt,which has greatly
FUNDING DEPARTMENT: weathered doors and made them inoperable at times.
Fire
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Mike Baumgartner, Marine Safety Division
Chief STRATEGIC PLAN GOAL: Enhance and maintain public safety
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 50,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 50,000
z roa ryo FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
General Fund $ 50,000
\mor Lif,uaM
Hea4goarter\
TOTAL $ 50,000
y 1 MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 50,000
,rf Additional annual cost: None
FUND: 100
Matlne Salery
Headquanere ,
\ COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Roll Up Door Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: various Roof Replacements PROJECT DESCRIPTION: Replace the existing roofs of various City buildings. The locations include: Lake
Fire Station, Magnolia Fire Station,and Parks Tree and Landscape Main
Building.
PROJECT NEED: The roofs are aged beyond useful life. Major maintenance is necessary to
FUNDING DEPARTMENT: repair/prevent leaks and damage to facility structural components and contents.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Roof Asset Management Program
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS Es ]
FY 15116 FY 16117 FY 17118 FY 18/19
Design Complete: N/A Design/Environmental
Construction Complete: FY 2014115 Construction
Project Management
Supplementals
RM
PROJECT LOCATION Other
TOTAL
dw�--
I FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
General Fund $ 300,000
a I
i --
I
TOTAL $ 300,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 300,000
Additional annual cost. None
r
100
COMMENTS ON GRANTS /OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Facilities
Facilities.xlsx Roofs
CITY OF HUNTINGTON BEACH --7m
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Concrete Replacement PROJECT DESCRIPTION: Replace worn, damaged, lifted and broken sections of concrete sidewalk, curb
and gutter,and ADA compliant curb ramps at various locations, in support of the
zone maintenance program.
PROJECT NEED: Identified concrete areas need replacement in order to provide safe pedestrian
FUNDING DEPARTMENT: walkways and facilitate drainage.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Public Works Service Management System Database
Denny Bacon
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17118 FY 18/19
Design Complete: N/A Design/Environmental
Construction Complete: FY2014/15 Construction $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ —011
FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18/19
General Fund $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000
TOTAL $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,250,000
a
Additional annual cost. None
i
r
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
' PROJECT TYPE: Rehabilitation
CATEGORY: Neighborhood
Neigh borhood.xlsx Concrete Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Nichols Street PROJECT DESCRIPTION: Rehabilitation of asphalt paving and miscellaneous sidewalk and curb &gutter.
Rehabilitation
PROJECT NEED: Nichols Street has reached its design life and is in need of rehabilitation.
FUNDING DEPARTMENT: -
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2014 Pavement Management Plan
Joseph Fuentes
STRATEGIC PLAN GOAL: Im rove the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 650,000
Project Management $ 25,000
Supplementals $ 25,000
R/W
PROJECT LOCATION Other
TOTAL $ 7001000
FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
Gas Tax $ 350,000
Other $ 350,000
Warner Avenue
y
s a y TOTAL $ 700,000
z m MAINTENANCE COST IMPACT: 1TOTAL PROJECT COST: $ 700,000
Additional annual cost: None
FUND: 207
COMMENTS ON GRANTS I OTHER FUNDS:
Working with Rainbow Disposal on other funding PROJECT TYPE: Rehabilitation
source
CATEGORY: Neighborhood
Neighborhood.xlsx Nichols Rehab
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Pedestrian Crossing at PROJECT DESCRIPTION: This project would provide a pedestrian crossing between the Bella Terra and
Bella Terra/Boardwalk Boardwalk projects to promote pedestrian mobility. The crossing would provide
safe access across an existing railroad and flood control channel.
PROJECT NEED: To promote pedestrian mobility, between the Bella Terra and Boardwalk projects.
FUNDING DEPARTMENT: The project is funded equally by each Developer
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: N/A
Todd Broussard
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: :::FY
Y 2014/15 Design/Environmental $ 200,000 $ 100,000
Construction Complete: 2015/16 Construction $ 250,000
Project Management $ 25,000
Supplementals $ 25,000
Continuing $ 100,000
PROJECT LOCATION Other
TOTAL $ 200,000 $ 100,000 $ 100,000 $ 300,000
FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
Developer $ 200,000 $ 100,000 $ 300,000
a TOTAL $ 200,000 $ 300,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 500,000
ewamx • eowa.e,w
Additional annual cost: None
Ea x1 A` FUND: 314
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New Construction
CATEGORY: Nei hborhood
Neighborhood.xlsx Ped Xing
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Residential Overlay Zone 8 PROJECT DESCRIPTION. Rehabilitation of residential streets with asphalt overlay in Maintenance Zone 8.
PROJECT NEED: Extend the useful life and improve the appearance and function of residential
FUNDING DEPARTMENT: streets.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2014 Pavement Management Plan
Joseph Fuentes
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
Construction Complete: FY 2014/15 Construction $ 1,980.000 $ 1,980,000 $ 1,980,000 $ 1,980,000 $ 1.980,000
Project Management $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
Supplementals $ 90.000 $ 90,000 $ 90,000 $ 90,000 $ 90,000
R/W
PROJECT LOCATION Other
TOTAL $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000
FUNDING SOURCES FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18119
Prop 42 $ 2.100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000
•�J r' TOTAL $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 10,500,000
• Additional annual cost: None
FUND: 219
i
/ COMMENTS ON GRANTS/OTHER FUNDS:
- -- - PROJECT TYPE: Rehabilitation
CATEGORY: Nei hborhood
Neighborhood.xlsx Residential Overlay
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Residential Tree Petition PROJECT DESCRIPTION: Rehabilitation of sidewalk, curb,gutter, and roadway in conjunction with street
tree removal and replacement. Streets are selected according to their rank on
the Tree Petition List. This project proposes to improve Angler Lane and
Palisade Drive.
PROJECT NEED: This project is necessary to provide safe,flat pedestrian walkways and eliminate
FUNDING DEPARTMENT: standing water in residential neighborhoods.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Tree Petition List
Joseph Fuentes
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17/18 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
Construction Complete: FY 2014/15 Construction $ 575,000 $ 375,000 $ 375,000 $ 375,000 $ 375,000
Project Management $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
Supplementals $ 25,000 $ 25,000 $ 25.000 $ 25,000 $ 25,000
R/W
PROJECT LOCATION Other
TOTAL ILL 650,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000
� W FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17/18 FY 18/19
Gas Tax $ 650,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000
TOTAL $ 650,000 $ 460,000 $ 450,000 $ 450,000 $ 450,000
P r MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 2,450,000
Additional annual cost. None
207
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Neighborhood
Neighborhood.xlsx Residential Tree Petition
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Sunset Beach PROJECT DESCRIPTION: this project will provide improvements to the Sunset Beach Community, including
Improvements Entry Sign and Landscape Improvements to the Warner Turnaround median.
PROJECT NEED: Improvements as part of the Sunset Beach annexation.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Todd Broussard
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15/16 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 15,000
Construction Complete: FY 2015/16 Construction $ 70,000
Project Management $ 15,000
Supplementals
Continuing $ 100,000
PROJECT LOCATION Other
TOTAL $ 100,000 $ 100,000
FUNDING SOURCES Prior FY 14115 FY 15/16 FY 16117
General Fund $ 100,000
eo,�aor m.
TOTAL $ 100,000
�k F:
._� MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 100,000
Additional annual cost: None
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New Construction
CATEGORY: Neighborhood
Neighborhood.xlsx Sunset Beach
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Arena Soccer Artificial Turf PROJECT DESCRIPTION: This project includes the replacement of the artificial turf on the Arena Soccer
Field Replacement field at the Huntington Central Park Sports Complex.The turf field was originally
installed in 2006 and is significantly worn. The average life span of a turf field is
B-10 years depending on use. The arena field is used 7 days a week and
experiences greater wear and tear due to the fact the turf is laid over concrete
PROJECT NEED: The soccer field is used for both Adult league play and Pee Wee Soccer.
FUNDING DEPARTMENT: Approximately 540 adult league games with 1,400 participants are played
Community Services annually, as well as almost 300 Pee Wees(ages 3-5).
DEPT. PROJECT MGR: SOURCE DOCUMENT: Huntington Central Park Master Plan
Dave Dominguez
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance the Quali of Life
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 170,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 170,000
FUNDING SOURCES FY 14/15 FY 15/16 FY 16117 FY 17118 FY 18119
_ InfrFund $ 170,000
TOTAL $ 170,000
. . : MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 170,000
Additional annual cost: None
PN0IEQ L=TION
a FUND: ==3]14
�. ql
NN - COMMENTS ON GRANTS I OTHER FUNDS:
Project cost is estimated. PROJECT TYPE: Rehabilitation
CATEGORY: Parks & Beaches
Parks & Beaches xlsx Arena Soccer Field
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Bartlett Park Phase 1 PROJECT DESCRIPTION: Phase I Construction Plans and Specifications to determine possible uses and
development of Bartlett Park for passive, recreation use, including preservation o
native habitat and vegetation.
PROJECT NEED: The 25-acre undeveloped parcel would provide available open space for the
FUNDING DEPARTMENT: neighborhood.
Community Services
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2000 Nexus Study; Community Services Commission recommendation may
Dave Dominguez 2008; Master Facilities Plan 2012
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15/16 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 430,000 $ 300,000 $ 25,000
Construction Complete: FY 2015/16 Construction $ 1,000,000
Project Management $ 100,000
Supplementals $ 50,000
Continuing $ 130,000
PROJECT LOCATION Other
TOTAL $ 430,000 $ 300,000 $ 130,000 $ 1,175,000
warvock ar. a `" FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
tixF, n Aga PA & D(Park Fees) $ 430,000 $ 300,000 $ 1,175,000
ko
rdie
°^=rr TOTAL $ 430,000 $ 1,175,000
Hur
+,_. A.e. F MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,605,000
Additional annual cost: None
D,banh or
9-1 Kin,d.l- DC FUND: 209
�Isxrgg Or
¢ COMMENTS ON GRANTS t OTHER FUNDS:
11C
ROJECT TYPE: New Construction
��µnnnlE No
ATEGORY: Parks $ Beaches
Parks& Beaches.xlsx Bartlett
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Huntington Central Park PROJECT DESCRIPTION: Design, architecture and engineering, including environmental design,to
Permanent Parking Lot construct a permanent parking lot in Huntington Central Pak to accommodate
programming at Shipley Nature Center, and preparation of plans for raptor
foraging habitat mitigation based on the 1999 Central Park EIR.
PROJECT NEED: Additional parking is needed to provide parking for Shipley Nature Center,
FUNDING DEPARTMENT: including ADA spaces and access to Shipley.
Community Services
DEPT. PROJECT MGR: SOURCE DOCUMENT: Central Park Master Plan of Uses,August 2, 1999.
Dave Dominguez
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15/16 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 389,000 $ 119,000
Construction Complete: FY 2015/16 Construction
Project Management
Supplementals
Continuing $ 270,000
PROJECT LOCATION Other
TOTAL $ 389,000 $ 119,000 $ 270,000
FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
PA B D(Park Fees) $ 389,000 $ 119,000
TOTAL $ 389,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 389,000
Additional annual cost: None
FUND: 209
COMMENTS ON GRANTS/OTHER FUNDS:
Construction costs will be updated following PROJECT TYPE: New Construction
— --- completion of conceptual design.
CATEGORY: Parks & Beaches
Parks & Beaches.xlsx Central Park Perm Lot
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Replace Central Park PROJECT DESCRIPTION: Replace 5 of 12 transformers in Central Park and associated high voltage
Electrical Transformers and underground wiring.
High Voltage Wiring
PROJECT NEED: Project is necessary to ensure safe,functional park.Existing transformers and
FUNDING DEPARTMENT: wiring are original equipment, beyond useful life expectancy and detriorated
Public Works beyond repair. Conditions are causing an increase in power failures at the park.
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Jerry Thompson
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18119
Design Complete: N/A Design/Environmental
Construction Complete: FY 2014/15 Construction $ 300,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 300,000
I FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17/18 FYI
---------- --- ------ - General Fund $ 300,000
TOTAL $ 300,000
Slalor hva
Central
P+rk Aobpl Am
r - MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 300,000
Additional annual cost: None
FUND: 100
i
COMMENTS ON GRANTS/OTHER FUNDS:
---- PROJECT TYPE: Rehabilitation
CATEGORY: Parks 8, Beaches
Parks & Beaches.xlsx Central Park Transformers
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Gun Range Development PROJECT DESCRIPTION: Preparation of a project scope and conceptual plan for the former Gun Range
Conceptual Plan site based upon development concepts included in the 2013 Environmental
Impact Report for Remediation and Reuse of the Former Gun Range.
PROJECT NEED: The EIR has been completed and there is a need to develop a plan in order to
FUNDING DEPARTMENT: identify costs.
Community Services
DEPT. PROJECT MGR: SOURCE DOCUMENT: Master Facilities Plan April 2012
Dave Dominguez
STRATEGIC PLAN GOAL: Im rove the Ci 's infrastructure and Enhance the Quali of Life.
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17/16 FY 16/19
Design Complete: FY 2014115 Design/Environmental
Construction Complete: N/A Construction $ 50,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 50,000
ni
-- FUNDING SOURCES FY 14/15 FY 15116 FY 16/17 FY 17116 FY 16/19
Gun Range Fund 225 $ 50,000
l
I
TOTAL $ 50,000
I L
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 50,000
_Eiu: { ' Additional annual cost. None
ii
FUND: 225
ill /
— COMMENTS ON GRANTS/OTHER FUNDS:
The Gun Range balance at 9/30/13 was$335,64 PROJECT TYPE: Studies
CATEGORY: Parks &Beaches
Parks & Beaches.xlsx Gun Range
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION`°
PROJECT TITLE: Huntington Harbour Study PROJECT DESCRIPTION: Based on 2013/14 bathymetric harbour water depth data, prepare a Preliminary
Design Report(PDR)to evaluate the necessity and cost to dredge various areas
within the Huntington Harbour.
PROJECT NEED: Huntington Harbour was built in the 60's and City channels have never been
FUNDING DEPARTMENT: dredged.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: N/A
Duncan Lee
STRATEGIC PLAN GOAL: Improve the Cit 's infrastructure.
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 40,000
Construction Complete: N/A Construction
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL is 40,000
_ Ar. FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18I19
General Fund $ 40,000
TOTAL $ 40,000
'y; g
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 40,00011
Additional annual cost: None
wyr.a. FUND: 100
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: Studies
CATEGORY: Parks & Beaches
Parks & Beaches.xlsx Huntington Harbour Study
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: LeBard Park Design PROJECT DESCRIPTION: Completion of construction plans and specifications for the undeveloped 2-acre
portion of LeBard Park within the Edison easement right of way currently leased
by the City.
PROJECT NEED: LeBard Park is 5 acres total,with 2 acres being undeveloped within the Edison
FUNDING DEPARTMENT: easement. The park is adjacent to school open space that is used as home
Community Services fields for Sea View Little League. Additional developed open space is needed for
DEPT.PROJECT MGR: SOURCE DOCUMENT: City General Plan; Recreation and Community Services Element; Master
Dave Dominguez Facilities Plan April 2012
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16/17
Design Complete: FY 2014115 Design/Environmental $ 225,650 $ 205,650
Construction Complete: FY 2015/16 Construction $ 1,262,000
Project Management
Supplementals
Continuing $ 20,000
PROJECT LOCATION Other
TOTAL $ 225,650 $ 205,650 $ 20,000 $ 1,262,000
aaam,.
FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
PA & D(Park Fees) $ 225,650 $ 205,650 $ 1,262,000
' : La6aaP„h TOTAL $ 225,650 $ 1,262,000
" MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,487,650
L Additional annual cost. None
FUND: 209
COMMENTS ON GRANTS I OTHER FUNDS:
" - PROJECT TYPE: Studies
CATEGORY: Parks & Beaches
Parks & Beaches.xlsx LeBard
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
4rtn
PROJECT TITLE: LeBard Park Property PROJECT DESCRIPTION: Acquisition of 6.6 acres of the Lebard School site for Park purposes. The
Acquisition Huntington Beach City School District intends to sell their property for re-
development. The City desires to purchase a portion of the property in order to
preserve the ball fields and add acreage to the Park.
PROJECT NEED: The Seaveiw Little League has used a portion of the Lebard School for ball fields
FUNDING DEPARTMENT: for several decades. This poperty acquisition would preserve this asset.
Community Services
DEPT.PROJECT MGR: SOURCE DOCUMENT: City General Plan; Recreation and Community Services Element; Master
David Dominguez Facilities Plan April 2012
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17118 FY 18119
Design Complete: N/A Design/Environmental
Construction Complete: N/A Construction
Project Management
Supplementals
RAN
PROJECT LOCATION Other $ 667,000 $ 667,000 $ 667,000 $ 667,000 $ 667,000
TOTAL $ 667,D00 $ 667,000 $ 667,000 $ 667,000 $ 667,000
�•�•� / FUNDING SOURCES FY 14/15 FY 15116 FY 16/17 FY 17118 FY 18119
General Fund $ 333,500 $ 333,500 $ 333,500 $ 333,500 $ 333,500
PA & D(Park Fees) $ 71,335 $ 333,500 $ 333,500 $ 333,500 $ 333,500
i Park Development $ 262,165
TOTAL $ 667,000 $ 667,000 $ 667,000 $ 667,000 $ 667,000
11
ZI MAINTENANCE COST IMPACT: ITOTAL PROJECT COST: $ 3,335,000
Additional annual cost: None
�,•„�,• FUND: 100, 209,235
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
il
CATEGORY: Parks& Beaches
Parks& Beaches.xlsx LeBard Park Acquisition
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: New Senior Center PROJECT DESCRIPTION. Completion of construction plans, specifications and construction of a new
senior center in Huntington Central Park and completion of an enhanced
raptor foraging habitat plan to comply with mitigation measures for the project.
PROJECT NEED: The current Senior Center at 17th Street and Orange Avenue is undersized to
FUNDING DEPARTMENT: effectively serve the needs of the growing senior population. More
Community Services programming space is needed to adequately serve the public.
DEPT.PROJECT MGR: SOURCE DOCUMENT: Huntington Beach Senior Center Feasibility Study-LPA 2007; Master
Dave Dominguez Facilities Plan April 2012
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16/17
Design Complete: FY 2014115 Design/Environmental $ 420,065 $ 2881950
Construction Complete: FY 2015/16 Construction $ 1,6141000 $ 18,340,935
Project Management $ 650,000
Supplementals $ 475,000
Continuing $ 1,745,115
PROJECT LOCATION Other
TOTAL $ 2,034,065 $ 288,950 $ 21,211,050
Y FUNDING SOURCES Prior FY 14115 FY 15116 FY 16/17
General Fund($2m Res, $lm New) $ 3,000,000
Infr Fund $ 1,500,000
PA & D(Park Fees) $ 300,000 $ 197,385
HUD EDI#90 and#130 Grants $ 234,065 $ 91,565
Donations $ 1,465,935
_ 1 u Potential Bond/Other Financing $ 15,DOO,000
TOTAL $ 2,034,065 $ 19,465,935
�. `M • MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $21,500,000
Additional annual cost: None
s FUND: 100, 209, 994, 314
� COMMENTS ON GRANTS/OTHER FUNDS:
Staff is researching potential bond financing.$1 m GF PROJECT TYPE: New Construction
(new) is for payment of Bonding Debt Service.
CATEGORY: Parks& Beaches
Parks& Beaches.xlsx Senior Center
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Huntington Central Park PROJECT DESCRIPTION: Construct Team Room at Huntington Cenfral Park Sporfs Complex.
Sports Complex Team
Room
PROJECT NEED: Many youth and adult teams use the Sports Complex for league and tournament
FUNDING DEPARTMENT: play and there is a need to provide accommodations for team assembly at the
Community Services site.
DEPT.PROJECT MGR: SOURCE DOCUMENT: Huntington Central Park Master Plan
Dave Dominguez
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 158,000
Project Management $ 4,740
Supplementals
Continuing $ 162,740
PROJECT LOCATION Other
TOTAL $ 162,740 $ 162,740
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
PA & D(Park Fees) $ 69,740
(Youth Sports Grant) $ 93,000
TOTAL $ 162,740
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 162,710
Additional annual cost: None
FUND: 209
COMMENTS ON GRANTS/OTHER FUNDS:
Youth Sports Grant previously approved. PROJECT TYPE: New Construction
CATEGORY: Parks & Beaches
Parks & Beaches.xlsx Sports Complex
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Worthy Park PROJECT DESCRIPTION: Demolition of the closed 10,000 square foot racquetball building and
Reconfiguration-Phase I reconfiguration of the park to include additional recreational amenities and a
public restroom.
PROJECT NEED: Reconfiguration of the park is needed due to the Huntington Beach Union High
FUNDING DEPARTMENT: School Sitrict reconfiguring a portion of its property that was once part of the
Community Services park. Demolition of the closed racquetball faclity is also needed.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Not applicable.
Dave Dominguez
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure and Enhance Quality of Life.
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior PY 14115 FY 15/16 FY 16/17
Design Complete: FY 2014/15 Design/Environmental $ 157,500 $ 156,000
Construction Complete: FY 2015/16 Construction $ 1,150,000
Project Management $ 100,000
Supp/ementals $ 50,000
Continuing $ 1,500
PROJECT LOCATION Other
11 TOTAL 56,000$ 157,500 $ 1 $ 1,301,500
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
-• PA &D(Park Fees) $ 157,500 $ 156,000
PA &D(Quimby Fees) $ 1,300,000
E � $
a i
TOTAL $ 157,500 $ 1,300,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,457,50011
Additional annual cost: None
F
ND: 209
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New Construction
CATEGORY: Parks & Beaches
Parks & Beaches.xlsx Worthy Park
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Sewer Lining PROJECT DESCRIPTION: Program to line various sewer mains as identified through Closed Circuit
Television(CCTV) inspection.
PROJECT NEED: Project will extend life of existing sewer main lines.
FUNDING DEPARTMENT:
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2003 Sewer Master Plan
Joseph Fuentes
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
Construction Complete: FY 2014/15 Construction $ 310,000 $ 310,000 $ 310,000 $ 310,000 $ 310.000
Project Management $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
Supplementals $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
R/W
PROJECT LOCATION Other
TOTAL $ 350,000 LL 350,000 $ 350,000 $ 350,000 $ 350,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17/18 FY 18119
!---.� Sewer Service Fund $ 350,000 $ 350,000 $ 350,000 $ 350,000 $ 350,000
h
TOTAL $ 350,000 $ 350,000 $ 350,000 $ 350,000 $ 350,000
�- �� -- - MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,750,000
Additional annual cost: None
511
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Sewer
Sewer.xlSx Sewer Lining
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Sewer Lift Station PROJECT DESCRIPTION: This program will design and construct the City's Sewer Lift Stations(LS).
Reconstruction Trinidad LS will be constructed in FY 14/15. Construction slated for outlying
years are Edgewater LS (FY15116),McFadden LS (FY 16/17) and Slater LS (FY
17/18).
PROJECT NEED: This program will increase capacity and rebuild or replace the City's sewer lift
FUNDING DEPARTMENT: stations,which are reaching their design life.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Andy Ferrigno
STRATEGIC PLAN GOAL: Improve the City's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17118 FY 18/19
Design Complete: FY 2014115 Design/Environmental $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000
Construction Complete: FY 2015/16 Construction $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000
Project Management $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Supplementa/s $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
R/W
PROJECT LOCATION Other
TOTAL $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000
FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18119
Sewer Service Fund $ 1,700,000 $ 1,700,000 $ 1,700,000 $ 1,700,000 $ 1,700,000
Sewer Development Fee $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000
TOTAL $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000 $ 2,100,000
a MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 10,500,000
Additional annual cost: None
^IyLu' C
•�. FUND: 210, 511
0
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Sewer
Sewer.xlsx Trinidad Sewer Lift Station
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Adams Signal PROJECT DESCRIPTION: Provide operational and infrastructure improvements along Adams Avenue from
Synchronization and Lake Street to Fairview Road. This is a multijurisdictional project including
Communication Upgrades Caltrans and the City of Costa Mesa. Work within Huntington Beach includes
signal timing and new interconnect conduit and fiber optic cable.
PROJECT NEED: Upgrading communication will provide for greater system reliability. Signal timing
FUNDING DEPARTMENT: will improve traffic flow and minimize stops and delays.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 57,600
Construction Complete: FY 2014/15 Construction $ 9,032
Project Management $ 88,383
Supp/ementals
Continuing $ 181,495
PROJECT LOCATION Other $ 26,480
TOTAL ILL 181,495 $ 181,495
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
AQMD $ 181,495
r—1 I
� I
TOTAL $ 181,495
I� m' MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 161,495
Additional annual cost: 5000
FUND: 201 II
COMMENTS ON GRANTS/OTHER FUNDS:
OCTA is managing the project and the schedule PROZIECT TYPE: ew
and contributing$726,978
CATEGORY: Trans ortation
Streets &Transportation.xlsx Adams Signals
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Arterial Rehabilitation PROJECT DESCRIPTION: Program to rehabilitate arterial highways. Arterials identified for FY 14/15
includes Main St.(Yorktown to Garfield), Lake St. (Indianapolis to Adams),and
Indianapolis Ave. (Magnolia to Brookhurst). Arterials identified for FY 15/16
include Main St. (Garfield to Beach), Indianapolis (Newland to Magnolia),Talbert
(Gothard to Beach).
PROJECT NEED: Required to meet the goals of the Pavement Management Plan
FUNDING DEPARTMENT:
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2014 Pavement Management Plan
Jim Wagner
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 200,000 $ 200.000 $ 200,000 $ 200,000 $ 200,000
Construction Complete: FY 2014/15 Construction $ 3,000,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 2,900,000
Project Management $ 56,442 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Supplementals $ 50,000 $ 50.000 $ 50,000 $ 50,000 $ 50,000
R/W
PROJECT LOCATION Other
TOTAL $ 3,306,442 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16W FY 17118 FY 18119
General Fund $ 1,000,000 $ 1,000,000 $ 1.000,000 $ 1,000.000 $ 1,000,000
Measure M $ 2,200,000 $ 2,200,000 $ 2,200,000 $ 2,200,000 $ 2,200,000
Prop 1B $ 106,442
TOTAL $ 3,306,442 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000
YOAu+.n fie^
MAINTENANCE COST IMPACT: 1TOTAL PROJECT COST: $ 16,106,442
Additional annual cost None
^°�^°%°^•^„ FUND: 100, 213,218
COMMENTS ON GRANTS/OTHER FUNDS:
. . j PROJECT TYPE: Rehabilitation
CATEGORY: Streets
Streets&Transportation.xlsx Arterial Rehabilitation
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Atlanta Avenue Widening PROJECT DESCRIPTION: Project will widen the south side of Atlanta Avenue from Huntington Street to
Delaware Street.
PROJECT NEED: This project is required to meet the goals of the General Plan
FUNDING DEPARTMENT:
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: General Plan Circulation Element, Master Plan of Arterial Highways
Jo Claudio
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Appioved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2015/16 Design/Environmental $ 396,000 $ 396,000
Construction Complete FY 2015/16 Construction $ 1,500,000
Project Management $ 50,000
Supplementals $ 50,000
Continuing
PROJECT LOCATION Other $ 4,759,364 $ 4,759,364
TOTAL $ 5,155,364 $ 5,155,364 $ 1,600,000
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
Measure M $ 600,000 $ 600,000
Atlanta Avenue _ Traffic Impact Fee(TIF) $ 296,000 $ 296,000 $ 600,000
Infr Fund $ 600,000 $ 600,000 $ 1,000,000
b Prop 42 $ 1,450,000 $ 1,450,000
cn MPAH $ 2,209,364 $ 2,209,364
TOTAL $ 5,155,364 $ 1,600,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 6,755,364
_ aecsf)
Additional annual cost: None
FUND: 213, 206, 965, 219, 314
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New Construction
il
CATEGORY: Streets
Streets &Transportation.xlsx Atlanta Widening
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Install Signal at Bolsa PROJECT DESCRIPTION: Install new traffic signal at the intersection of Bolsa Chica Street and Pearce
Chica/Pearce& Modify Drive. Modify existing traffic signal at the intersection of Main Street/Utica
Existing Signal at Avenue/17th Street to provide north-south left turn arrows. Project includes curb
Main/Utica/17th ramp and median island modifications to provide for improved pedestrian access
and safety. Project also includes new conduit,conductors and interconnect.
PROJECT NEED: Improve traffic safety by installing a new traffic signal at Bolsa Chica Street and
FUNDING DEPARTMENT: Pearce Drive and by installing left turn arrows and pedestrian improvements at
Public Works Main Street/Utica Avenue/17th Street.
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2011 Traffic Signal Priority List
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17/18 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 24,000
Construction Complete: FY 2015/16 Construction $ 724,400
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 24,000 1 $ 724,400
FUNDING SOURCES FY 14115 1 FY 15116 FY 16117 FY 17118 FY 18119
Gas Tax $ 2,400 $ 72,500
HSIP $ 21,600 $ 651,900
9
. A - TOTAL $ 24,000 $ 724,400
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 748,400
Additional annual cost. 2000
FUND: 207, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation
Streets &Transportation.xlsx BC Pearce
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Beach Boulevard and PROJECT DESCRIPTION: Widening Capacity Improvements- Beach Boulevard and Warner Avenue.
Warner Avenue Install westbound right turn pocket. Project is for PS&E, environmental studies
Intersection Improvement and right-of-way engineering only.
Project
PROJECT NEED: This project is required to meet the goals of the General Plan.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Circulation Element of the General Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 224,345 $ 182,773
Construction Complete: N/A Construction
Project Management
Supplementals
Continuing $ 41,572
PROJECT LOCATION Other
TOTAL Is 224,345 $ 182,773 $ 41,572
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
Traffic Impact Fee(TIF) $ 35,075
OCTA GMA $ 84,045 $ 84,045
OCTAICE $ 105,225 $ 98,728
Weini Pvfa
it
TOTAL $ 224,345
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 224,345
Additional annual cost: None
FUND: 878, 206
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets &Transportation.xlsx Beach Warner
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Bridge Preventative PROJECT DESCRIPTION: Design and construction to provide preventative maintenance for City bridges.
Maintenance Design continuing with construction of Magnolia Bridge and Brookhurst Bridge in
FY 14/15
PROJECT NEED: Many of the City's bridges are aged and need maintenance and minor
FUNDING DEPARTMENT: rehabilitation to extend their design life.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: City-wide Bridge Study(2007)
Jo Claudio
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 844,533 $ 844,533 $ 80,000
Construction Complete: FY 2015/16 Construction $ 700,000 $ 700,000 $ 1,856,000
Project Management $ 100,000 $ 100,000 $ 200,000
Supp/ementals $ 200.000 $ 200.000 $ 200,000
Continuing
PROJECT LOCATION Other
TOTAL $ 1,844,533 $ 1,844,533 $ 2,336,000
FUNDING SOURCES Prior FY 14115 FY 15/16 FY 16117
Gas Tax $ 235,000 $ 235,000 $ 473,329
--- Measure M $ 45,000 $ 45,000
Prop 42 $ 386,273 $ 386,273
BPMP $ 1,178,260 $ 1.178,260 $ 1,862,671
rwaixr Ave TOTAL $ 1,844,533 $ 2,336,000
_ MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 4,180,533
% Additional annual cost: None
� N
m
FUND: 219, 213, 970, 207
n
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Streets
Streets &Transportation.xlsx Bridge Prevent Maint
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Bridge Rehabilitation PROJECT DESCRIPTION: Design and rehabilitation of City Bridges, including Admiralty, Humboldt,
Davenport and Gilbert. Design is slated for FY 12/13 thru FY 15/16.
Construction is slated for outlying years.
PROJECT NEED: Many of the City's bridges are aged an need maintenance and minor repair to
FUNDING DEPARTMENT: extend their design life. Improvements may include replacement of rails,fencing,
Public Works and minor concrete patching.
DEPT. PROJECT Ii SOURCE DOCUMENT: City-wide Bridge Study(2007)
Jo Claudio
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 16116 El
Design Complete: FY 2014/15 Design/Environmental $ 780,000 $ 780,000 $ 425,000
Construction Complete: FY 2018/19 Construction $ 3,000,000
Project Management $ 70,000
Supp/ementals $ 150,000
Continuing
PROJECT LOCATION Other
TOTAL $ 780,000 $ 780,000 $ 3,645,000
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
Prop 42 $ 406.000 $ 340,000
HBP $ 780,000 $ 780,000 $ 3,239,000 $ 3.705,000
TOTAL $ 780,000 $ 3,645,000 $ 4,045,000
ry� MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ B,470,000
- « Additional annual cost: None
•
vra nor Ava FUND: 961,219
COMMENTS ON GRANTS /OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Streets
Streets &Transportation.xlsx Bridge Rehab
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Brookhurst Street and PROJECT DESCRIPTION: Widening Capacity Improvements-Add through lanes and right turn pockets.
Adams Avenue Project is for PS&E,environmental studies and right-of-way engineering only.
Intersection Improvement
Project
PROJECT NEED: Improve traffic flow and reduce congestion. These improvements were identified
FUNDING DEPARTMENT: in the cooperative study and interagency MOU regarding the Garfield/Gisler
Public Works overcrossing of the Santa Ana River.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Circulation Element
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16/17
Design Complete: FY 2014/15 Design/Environmental $ 806,845 $ 450,695
Construction Complete: N/A Construction
Project Management
Supp/ementals
Continuing $ 355,350
PROJECT LOCATION Other
pwcip TOTAL $ 806,845 $ 450,685 $ 355,350
FUNDING SOURCES Prior FY 14115 FY 15/16 FY 16117
Traffic Impact Fee(TIF) $ 88,838
OCTAGMA $ 450,695 $ 450,695
Vfd1.Avl OCTAICE $ 266,512
' � 1 AJams AM
/ w
vw�o�nm�s Avn'� TOTAL $ 806,045
a,
Atlnn,aAw 1 gl
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 806,046 Additional annual cost None
FUND: 873, 206
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Brookhurst Adams
-- CITY OF HUNT
CAPITAL IMPROVEMENT PROJECT 1NFORMAT f
PROJECT TITLE: Signal Equipment PROJECT DESCRIPTION: Replace conduit,wiring and signal heads at the intersection of Brookhurst Street
Replacement at and Indianapolis Avenue. The conduit and wiring have been experiencing
Brookhurst/Indianapolis service issues over the last several years and this project will provide for a more
reliable operation.
PROJECT NEED: The existing conduit and circuitry are deteriorated and experience a high
FUNDING DEPARTMENT: frequency of maintenance issues.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design Complete: FY 2015/16 Design/Environmental $ 5,000
Construction Complete: FY 2016117 Construction $ 50,000
Project Management $ 5,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 5,000 $ 55,000
FUNDING SOURCES FY 14115 FY 15116 FY 16/17 FY 17/18 FY 18/19
-, � Gas Tax $ 5,000 $ 55,000
ai
•a TOTAL $ 5,000 $ 55,000
Intl,enepsl�s Avp
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 60,000
Additional annual cost: 500
FUND: 207
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets& Trans portation.xlsx Brookhurst Indianapolis
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: High Mast Lighting Pole PROJECT DESCRIPTION: Replace fifteen existing high mast area lighting poles in Central Park with new
Replacement in Central poles. The existing poles, conduit and wiring have been experiencing service
Park issues over the last several years and this project will provide for a more reliable
operation.
PROJECT NEED: The existing poles, conduit and circuitry are deteriorated and experience a high
FUNDING DEPARTMENT: frequency of maintenance issues.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2015/16 Design/Environmental $ 10,000
Construction Complete: FY 2016/17 Construction $ 200,000
Project Management $ 10,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 101000 $ 210,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17/1B FY 18119
General Fund $ 10,000 $ 210,000
I _
•
TOTAL $ 10,000 $ 210,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 220,000
Additional annual cost: 500
FUND: 100
COMMENTS ON GRANTS/OTHER FUNDS:
F
JECT TYPE: NewEGORY: Trans ortation
Streets&Transportation.xlsx Central Park Lighting
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Edinger Signal PROJECT DESCRIPTION: Provide operational and infrastructure improvements along Edinger Avenue from
Synchronization and Bolsa Chica Street to SR 55. This is a multijurisdictional project including the
Communication Upgrades Cities of Fountain Valley,Westminster and Santa Ana and is managed by
OCTA. Work within Huntington Beach includes signal timing and interconnect
conduit.
PROJECT NEED: Upgrading communication will provide for greater system reliability. Signal timing
FUNDING DEPARTMENT: will improve traffic Flow and minimize stops and delays.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 33,225 $ 6,617
Construction Complete: FY 2014115 Construction
Project Management $ 11,000 $ 962
Supplementals
Continuing $ 36,646
PROJECT LOCATION Other
TOTAL $ 44,225 $ 7,579 $ 36,646J.
--- FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
AQMD $ 44,225 $ 7,579
--- TOTAL $ 44,225
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 44,225
Additional annual cost: 5000
FUND: 201
COMMENTS ON GRANTS I OTHER FUNDS:
OCTA is managing the project and the schedule PROJECT TYPE: New
and is contributing$176,900.
CATEGORY: Transportation
Streets&Transportation.xlsx Edinger Signals
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Install Southeast Area PROJECT DESCRIPTION: Install conduit with fiber optic cable to complete Southeast Area fiber backbone
Signal Interconnect Fiber for traffic signal communications and interconnect. Construction is distributed
Backbone over three consecutive fiscal years. While a portion of the existing conduit is
currently in place,this project will complete approximately five miles of conduit
construction and ultimately install the fiber optic cable.
PROJECT NEED: The Traffic Signal System master Plan identified the need for fiber optic cable to
FUNDING DEPARTMENT: be installed across the southeast area of the city in order to facility
Public Works communications with the traffic signals and provide the infrastructure for future
DEPT.PROJECT MGR: SOURCE DOCUMENT: Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16/17 FY 17118 FY 18119
Design Complete: FY 2017/18 Design/Environmental $ 30,000 $ 30,000 $ 30,000
Construction Complete: FY 2018/19 Construction $ 400,000 $ 400.000 $ 400,000
Project Management $ 30,000 $ 30,000 $ 30,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 30,000 $ 460,000 $ 460,000 $ 430,000
FUNDING SOURCES FY 14/15 FY 15116 FY 16/17 FY 17118 FY 18119
Gas Tax $ 30,000 $ 460,000 $ 460,000 $ 430,000
o
,.� _�• TOTAL $ 30,000 $ 460,000 $ 460,000 $ 430,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,380,000
_ Additional annual cost: None
FUND: 207
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Fiber Backbone
CITY OF HUNT
OIL,
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Signal Modification at PROJECT DESCRIPTION: Install left turn arrows at the intersection of Goldenwest Street and Heil Avenue.
Goldenwest/Heil Project will also include the installation of interconnect conduit and cable on
Goldenwest Street from Heil Avenue to Warner Avenue.
PROJECT NEED: Improve traffic safety by installing left turn arrows at the intersection of
FUNDING DEPARTMENT: Goldenwest Street and Heil Avenue.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2011 Left Turn Phasing Study&Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Im rove the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16117 FY 17/18 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 12,000
Construction Complete: FY 2015/16 Construction $ 304,100
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 12,000 $ 304,100
FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18/19
Gas Tax $ 1,200 $ 30,500
HSIP $ 10,800 $ 273,600
I TOTAL $ 12,000 $ 304,100
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 316,100
d "" Additional annual cost: 500
FUND: 2071996
COMMENTS ON GRANTS/OTHER FUNDS:
[PROJECT TYPE: NewTEGORY: Trans ortation
Streets&Transportation.xlsx Goldenwest Heil
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Goldenwest Signal PROJECT DESCRIPTIONS Provide operational and infrastructure improvements along Goldenwest Street
Synchronization and from SR 22 to PCH. This is a multijurisdictional project including the City of
Communication Upgrades Westminster and is managed by OCTA. Work within Huntington Beach includes
signal timing and fiber optic cable.
PROJECT NEED: Upgrading communication will provide for greater system reliability. Signal timing
FUNDING DEPARTMENT: will improve traffic flow and minimize stops and delays.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior I FY 14/15 FY 15/16 FY 16117
Design Complete: FY 2014115 Design/Environmental $ 77,083 $ 40,484
Construction Complete: FY 2014/15 Construction
Project Management $ 21,912 $ 746
Supplementals
Continuing $ 57,765
PROJECT LOCATION Other
TOTAL ILL 98,995 $ 41,230 $ 57,765
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
AQMD $ 98,995 $ 41,230
Wa//bAu'
C
S
TOTAL $ 98,995
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 98,995
Additional annual cost: 5000
FUND: 201
COMMENTS ON GRANTS I OTHER FUNDS:
OCTA is managing the project and the schedule PROJECT TYPE: New
and is contributing$236,335.
CATEGORY: Transportation
Streets&Transportation.xlsx Goldenwest Signals
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Gothard St.and Center PROJECT DESCRIPTION: This project will rehabilitate Gothard Street(Edinger to McFadden) and Center
Ave. Rehabilitation Avenue (Gothard to RR Tracks). Rehabilitation along the south and east
frontages will be funded by the adjacent Developments.
PROJECT NEED: Both Gothard and Center are in need of rehabilitation and have been put off
FUNDING DEPARTMENT: pending the adjacent developments.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2014 Pavement Management Plan
Jim Wagner
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16117 FY 17118 FY 18/19
Design Complete: FY 2014/15 Design/Environmental
Construction Complete: FY 2014/15 Construction $ 1,300,000
Project Management $ 60,000
Supplementals $ 40,000
R/W
PROJECT LOCATION Other
TOTAL $ 1,400,000
J FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
_ Gas Tax $ 1,400,000
'tl
0 TOTAL $ 1,400,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,400,000
Additional annual cost: None
FUND: 207
-JEC COMMENTS ON GRANTS I OTHER FUNDS:
$400,000 from Developer Fee PROJECT TYPE: Rehabilitation
CATEGORY: Streets
Streets &Transportation.xlsx Gothard and Center Rehab
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION.
PROJECT TITLE: Signal Modification at PROJECT DESCRIPTION: Install north-south left turn arrows at the intersection of Gothard Street and
Gothard/Center Center Avenue. Project includes the installation of interconnect conduit along
Gothard Street between McFadden Avenue and Edinger Avenue and along
Center Avenue from Gothard Street to Huntington Village Lane.
PROJECT NEED: Improve traffic safety by installing a north-south left turn arrows on Gothard
FUNDING DEPARTMENT: Street at Center Avenue.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 1711B FY 18119
Design Complete: FY 2014115 Design/Environmental $ 12,000
Construction Complete: FY 2015/16 Construction $ 397,300
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL ILL 12,000 $ 397,300
FUNDING SOURCES FY 14115 FY 15/i6 FY 16117 FY 17/18 FY 18119
Gas Tax $ 1,200 $ 39,800
HSIP $ 10,800 $ 357,500
I
TOTAL $ 12,000 $ 397,300
I
- —_I MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 409,300
L Additional annual cost: 2000
t
f i
FUND: 207, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation
Streets &Transportation.xlsx Gothard Center
CITY OF HUNTINGTON BEACH
E ILI;
CAPITAL IMPROVEMENT PROJECT INFORMATION
... ;.
PROJECT TITLE: Signal Modification at PROJECT DESCRIPTION: Install left turn arrows at the intersection of Gothard Street and Slater Avenue.
Gothard/Slater Project will also include the installation of interconnect conduit and cable on
Slater Avenue from Goldenwest Street to Gothard Street.
PROJECT NEED: Improve traffic safety by installing left turn arrows at the intersection of
FUNDING DEPARTMENT: Goldenwest Street and Heil Avenue.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2011 Left Turn Phasing Study&Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17/18 FY 18/19
Design Complete: FY 2014/15 Design/Environmental $ 12,000
Construction Complete: FY 2015/16 Construction $ 309,300
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL LL 12,000 $ 309,300
FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18119
Gas Tax $ 1,200 $ 31,000
HSIP $ 10,800 $ 278,300
7 _
-� TOTAL $ 12,000 $ 309,300
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 321,300
;6 Additional annual cost: 500
5%I.w Ave
9 FUND: 207, 995
L —
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortatton
Streets& Transportation.xlsx Gothard Slater
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Signal Modifications at PROJECT DESCRIPTION: Modify traffic signals to provide left turn arrows and other operational
Gothard/Talbert, improvements. Includes installation of interconnect conduit and cable. Traffic
Gothard/Heil, & Signal Modifications locations are at Gothard St.and Talbert Ave., Gothard St.
Springdale/McFadden. and Heil Ave.and at Springdale St.and McFadden Ave.
PROJECT NEED: Improve traffic safety by addressing left turn collision patterns at each
FUNDING DEPARTMENT: intersection.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2011 Left turn phasing study
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 36,000 $ 20,000
Construction Complete: FY 2014/15 Construction $ 652,300
Project Management $ 60,000
Supplementals
Continuing $ 728,300
PROJECT LOCATION Other
TOTAL $ 748,300 $ 20,000 $ 728,300
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
Prop 42 $ 75,100 $ 20,000
HSIP $ 673,200
TOTAL $ 748,300
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 748,300
Additional annual cost: None
^• FUND: 219,996
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Gothard Talbert
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Lighting Replacement in PROJECT DESCRIPTION: Replace lighting fixtures. The existing fixtures have been experiencing service
Greer Park issues over the last several years and this project will provide for a more reliable
operation.
PROJECT NEED: The existing fixtures are deteriorated and experience a high frequency of
FUNDING DEPARTMENT: maintenance issues.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2016/17 Design/Environmental
Construction Complete: FY 2016/17 Construction $ 50,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 50,000
FUNDING SOURCES FY 14115 FY 15116 FY 16/17 FY 17118 FY 1B/19
General Fund $ 50,000
G,ee,P.I I
TOTAL $ 50,000
Mc r3I40n Ave y
MAINTENANCE COST IMPACT: 1TOTAL PROJECT COST: $ 50,000
Annual savings: 500
100
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation!
Streets& Transportation.xlsx Greer Park Lighting
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Signal Modifications at PROJECT DESCRIPTION: Modify traffic signals to provide left turn arrows and other operational
Magnolia/Yorktown & improvements. Includes the installation of interconnect conduit and cable.
Adams/Bushard
PROJECT NEED: Improve traffic safety by addressing left turn collision patterns at each
FUNDING DEPARTMENT: intersection.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2011 Left turn phasing study
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15/16 FY 16117
Design Complete: Design/Environmental $ 24,000 $ 20,000
Construction Complete: FY 2014/15 Construction $ 783,000
Project Management $ 40,000
Supplementals
Continuing $ 827,000
PROJECT LOCATION Other
TOTAL $ 847,000 $ 20,000 $ 827,000
FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
Prop 42 $ 84,700 $ 20,000
HSIP $ 762,300
TOTAL $ 847,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 847,000
Additional annual cost: None
FUND: 219, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Magnolia Yorktown
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT/NFORMATfO ;
PROJECT TITLE: Signal Replacement at PROJECT DESCRIPTION: Replace conduit,wiring and signal heads at the intersection of Main Street and
Main/Adams Adams Avenue and at Nichols Street and Warner Avenue. The conduit and
wiring have been experiencing service issues over the last several years and
this project will provide for a more reliable operation.
PROJECT NEED: The existing conduit and circuitry are deteriorated and experience a high
FUNDING DEPARTMENT: frequency of maintenance issues.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14116 FY 15116 FY 16117 FY 17118 FV 18119
Design Complete: FY 2016/17 Design/Environmental $ 5,000
Construction Complete: FY 2017/18 Construction $ 200,000
Project Management $ 5,000
Supplementa/s
RNY
PROJECT LOCATION Other
TOTAL $ 5,D00 $ 205,000
--. FUNDING SOURCES FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18119
Gas Tax $ 5,000 $ 205,000
� M
TOTAL $ 5,000 $ 205,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 210,000
Additional annual cost: 500
. 5
FUND: 207
6
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation
Streets & Transportation.xlsx Main Adams
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Ellis/Main Traffic PROJECT DESCRIPTION: A study was performed in FY 2012/2013 which recommended the reconstruction
Channelization of the median island on Main Street to prohibit left turns to and from Ellis Avenue
Modifications in order to improve traffic flow and reduce congestion. This project will include
the construction of the median island modification along with the removal of the
traffic signal.
PROJECT NEED: Improve traffic flow and reduce congestion.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Beach-Edinger Corridor Specific Plan/Circulation Element
Darren Sam
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: Design/Environmental $ 60,000 $ 10,000
Construction Complete: FY 2014115 Construction $ 100,000 $ 50,000
Project Management $ 30,000
Supplementals
Continuing $ 180,000
PROJECT LOCATION Other
TOTAL $ 190,000 $ 10,000 $ 230,000
FUNDING SOURCES Prior FY 14115 FY 15116 FY 16117
Traffic Impact Fee(TIF) $ 190,000 $ 10,000 $ 50,000
TOTAL $ 190,000 $ 50,000
k MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 240,000
Annual savings: 1500
FUND: 206
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Main Ellis
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATIO
PROJECT TITLE: Main/Florida Signal PROJECT DESCRIPTION: Replace traffic signal poles,conduit and wiring at the intersection of Main Street
Equipment Replacement and Florida Avenue- The poles and wiring have been experiencing service
issues over the last several years and this project will provide for a more reliable
operation and will also allow for the installation of emergency vehicle
preemption. A median modification is included for improved pedestrian access.
PROJECT NEED: The existing poles and circuitry are deteriorated and experience a high
FUNDING DEPARTMENT: frequency of maintenance issues. The existing conduit and wiring will not
Public Works accommodate emergency vehicle preemption.
DEPT.PROJECT Ill SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16117 FY 17118 FY 18119
Design Complete: FY 2016/17 Design/Environmental
Construction Complete: FY 2017/18 Construction $ 275,000
Project Management $ 10,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 285,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
Gas Tax $ 285,000
i
i
/ TOTAL $ 285,000
s MAINTENANCE COST IMPACT: 1TOTAL PROJECT COST: $ 285,000
Additional annual cost: None
FEUD: 207
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets 8 Transportation.xlsx Main Florida
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Signal Modification at PROJECT DESCRIPTION: Install left turn arrows at the intersection of Newland Street and Ellis Avenue.
Newland/Ellis Project will also include the installation of interconnect conduit and cable on
Newland Street from Ellis Avenue to Garfield Avenue.
PROJECT NEED: Improve traffic safety by installing left turn arrows at the intersection of Newland
FUNDING DEPARTMENT: Street and Ellis Avenue.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: 2011 Left Turn Phasing Study&Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014115 Design/Environmental $ 12,000
Construction Complete: FY 2015/16 Construction $ 398,400
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 12,000 $ 398,400
FUNDING SOURCES FY 14115 FY 15116 FY 16/17 FY 17/18 FY 18119
Gas Tax $ 1,200 $ 39,900
HSIP $ 10,800 $ 358,500
I
TOTAL $ 12,000 $ 398,400
ewew I MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 410,400
3 Additional annual cost 500
FUND: 207, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation
Streets&Transportation.xlsx Newland Ellis
CITY OF HUNTINGTON BEACH
kL, CAPITAL IMPROVEMENT PROJECT INFORMATIO
PROJECT TITLE: Install Signal Interconnect PROJECT DESCRIPTION: Install interconnect conduit and cable on Newland Street between Warner
Conduit/Cable on Newland Avenue and Ellis Avenue. This will establish hardwire communication between
between Warner& Ellis the traffic signals along this segment and the City's Traffic Management center
located in City Hall.
PROJECT NEED: Improve traffic flow and safety by installing interconnect conduit and cable along
FUNDING DEPARTMENT: Newland Avenue. This will enable communications between the traffic signals
Public Works on Newland and the City Hall Traffic Management Center.
DEPT.PROJECT MGR: SOURCE DOCUMENT: Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 12,000
Construction Complete: FY 2015/16 Construction $ 298,100
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 12,000 $ 298,100
FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18119
Gas Tax $ 1,200 $ 29,900
HSIP $ 10,800 $ 268,200
1
TOTAL $ 12,000 $ 298,100
--- ! MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 310,100
i. Additional annual cost: 500
1
207, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
il
CATEGORY: Trans ortation
Streets& Transportation.xlsx Newland IC
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Signal Modification at PROJECT DESCRIPTION: Install left turn arrows at the intersection of Newland Street and Slater Avenue.
Newland/Slate Project will also include the installation of a separate traffic signal controller and
service for the pedestrian signal on Slater Avenue near Geraldine Lane.
PROJECT NEED: Improve traffic safety by installing left turn arrows at the intersection of Newland
FUNDING DEPARTMENT: Street and Slater Avenue.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2011 Left Turn Phasing Study
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14/15 FY 15/16 FY 16117 FY 17/18 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 12,000 '!
Construction Complete: FY 2015116 Construction $ 339,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL LL 12,000 $ 339,000
FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17118 FY 18/19
Gas Tax $ 1,200 $ 33,900
HSIP $ 10,800 $ 305,100
TOTAL $ 12,000 $ 339,000
!M..,r.c s
z
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 351,000
Additional annual cost. 500
FUND: 207, 995
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Transportation
Streets&Transportation.xlsx Newland Slater
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Slater Interconnect underPROJECT DESCRIPTION: Install Interconnect conduit on Slater Avenue under the Union Pacific Railroad
Union Pacific Railroad tracks. This will enable communication with the existing traffic signal at the
intersection of Slater Avenue and Nichols Street.
PROJECT NEED: Completing missing signal conduit will enable communications with the
FUNDING DEPARTMENT: intersection of Slater/Nichols, and will enable Slater to run coordinated signal
Public Works timing from Goldenwest to Newland.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Traffic Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17118 FY 18119
Design Complete: FY 2017/18 Design/Environmental $ 5,000
Construction Complete: FY 2018/19 Construction $ 40,000
Project Management $ 10,000
Supplementals
RM
PROJECT LOCATION Other
TOTAL $ 5,000 $ 50,000
FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Gas Tax $ 5,000 $ 50,000
TOTAL $ 5,000 $ 50,000
a
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 55,000
Additional annual cost: None
FUND: 207
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets&Transportation.xlsx Slater IC
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Utica Bicycle Boulevard PROJECT DESCRIPTION: Construct improvements to Utica Avenue from Main Street to Beach Boulevard
from Main to Beach to create a"Bicycle Boulevard". Improvements include the construction of a new
traffic signal at the intersection of Utica Avenue and lake street, curb bulb-outs
and bioswales at the intersection of Utica Avenue and Delaware Street,
pedestrian curb ramps and signing&striping improvements.
PROJECT NEED: The recently completed Bicycle Master Plan identified candidate streets for the
FUNDING DEPARTMENT: implementation of"Bicycle Boulevard"improvements. This creates street
Public Works system elements where bicycling is emphasized over motor vehicle traffic.
DEPT.PROJECT MGR: SOURCE DOCUMENT: Bicycle Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16117 FY 17118 FY 18119
Design Complete: FY 2014/15 Design/Environmental $ 75,000
Construction Complete: FY 2015/16 Construction $ 684,260
Project Management $ 75,000
Supplementals
R/W
PROJECT LOCATION Other $ 80,000
TOTAL $ 75,000 $ 839,260
FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17/18 FY 18/19
Gas Tax $ 75,000 $ 41,000
_j Prop 42 $ 116,000
OCTA $ 682,260
TOTAL $ 75,000 $ 839,260
3 MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 914,260
Additional annual cost: 1000
FUND: 207, 219, 873
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets &Transportation.xlsx Utica Bicycle
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Warner Signal PROJECT DESCRIPTION: Provide operational and infrastructure improvements along Warner Avenue from
Synchronization and PCH to Red Hill Avenue. This is a multijurisdictional project including the Cities
Communication Upgrades of Fountain Valley,Westminster, Santa Ana and Tustin and is managed by
OCTA. Work within Huntington Beach includes signal timing and fiber optic
cable.
PROJECT NEED: Upgrading communication will provide for greater system reliability. Signal timing
FUNDING DEPARTMENT: will improve traffic flow and minimize stops and delays.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Signal System Master Plan
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16/17
Design Complete: FY 2014/15 Design/Environmental $ 95,422 $ 44,520
Construction Complete: FY 2014/15 Construction
Project Management $ 24,552 $ 7,606
Supp/ementals
Continuing $ 67,848
PROJECT LOCATION Other
TOTAL $ 119,974 $ 52,126 $ 67,848
FUNDING SOURCES Prior FY 14/15 FY 15/16 FY 16117
AQMD $ 119,974 $ 52,126
TOTAL $ 119,974
_. MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 119,974
`II• --L Additional annual cost: 5000
201
COMMENTS ON GRANTS/OTHER FUNDS:
OCTA is managing the project and the schedule PROJECT TYPE: New
and is contributing$248,085.
CATEGORY: Transportation
Streets& Transportation.xlsx Warner Signals
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Yorktown/Huntington PROJECT DESCRIPTION: A study was performed in FY 2012/2013 which recommended the construction of
Traffic Channelization a median island on Yorktown Avenue to prohibit through and left turn movements
Modifications from Huntington Street across Main Street. This project will include the
construction of the median island and the necessary signing&striping
modifications.
PROJECT NEED: Identified collision pattern/frequency issue during the development of the 2011
FUNDING DEPARTMENT: Traffic Signal Priority List.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: NA
William Janusz
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 20,000 $ 15,000
Construction Complete: FY 2014/15 Construction $ 37,000
Project Management $ 3,000
Supp/ementals $ 5,000
Continuing $ 50,000
PROJECT LOCATION Other
TOTAL ILL 65,000 $ 15,000 $ 50,000
FUNDING SOURCES Prior FY 14/15 FY 15116 FY 16117
Gas Tax $ 65,000 $ 15,000
i
s , r
TOTAL $ 66,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 65,000
Additional annual cost: None
j FUND: ::2]07
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Trans ortation
Streets & Transportation.xlsx Yorktown Huntington
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION:.;
PROJECT TITLE: Water Distribution System PROJECT DESCRIPTION: Extensions of new mains at various locations throughout the City, such as
Improvements Dairyview/Wagon, Duello/Slater, Grass/Slater, Beach Blvd-Holt, Beach Blvd-
Baylock, Beach Blvd-Baylock to channel north of Warner.
PROJECT NEED: Install new distribution mains or distribution infrastructure to optimize system
FUNDING DEPARTMENT: redundancy, efficiency, reliability,and to extend infrastructure longevity.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Consistent with the 2012 Water Master Plan and routine water maintenance
Duncan Lee program
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18119
Design Complete: Varies/On-Going Design/Environmental $ 100,000 $ 100,000 $ 50,000 $ 30,000 $ 30,000
Construction Complete: Varies/On-Going Construction $ 600,000 $ 500,000 $ 250,000 $ 150,000 $ 150,000
Project Management $ 50,000 $ 50,000 $ 25,000 $ 10,000 $ 10,000
Supplementals $ 50,000 $ 50,000 $ 25,000 $ 10.000 $ 10,000
R/W
PROJECT LOCATION Other
TOTAL $ 800,000 $ 700,000 $ 350,000 7$ 2 00,000 $ 200,000
r4•. FUNDING SOURCES FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18119
."� Water Fund $ 100,000 $ 650,000 $ 200,000 $ 200,000 $ 200,000
Water Master Plan $ 700,000 $ 50,000 $ 150,000
x
TOTAL $ 800,000 $ 700,000 $ 350,000 $ 200,000 $ 200,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 2,250,000
Additional annual cost: None
e
FUND: 507, 506
COMMENTS ON GRANTS/OTHER FUNDS:
r
JECT TYPE: New& RehabilitationEGORY: Water
Water.xlsx Distribution Improvements
API AL ►N1PkOVC"NIEh�T'PROJ�CT INFORMATION
PROJECT TITLE: Water System Corrosion PROJECT DESCRIPTION: Corrosion control transmission mains, distribution mains, and other
Control appurtenances that are buried or above ground throughout the City. Projects
include feasibility/design to applying Cathodic Protection on existing jointly
owned transmission mains(OC-44)outside of City limits.
PROJECT NEED: Corrosion control protects facilities by transferring corrosion to a non valuable
FUNDING DEPARTMENT: metal placed in the ground.
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Consistent with the 2012 Water Master Plan and routine water maintenance
Duncan Lee program
STRATEGIC PLAN GOAL: Improve the Ci s infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design Complete: Varies/On-Going Design/Environmental $ 100,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
Construction Complete: Varies/On-Going Construction $ 60,000 $ 60,000 $ 60,000 $ 60,000
Project Management $ 10,000 $ 10,000 $ 10.000 $ 10.000
Supplementals $ 10,000 $ 10,000 $ 10,000 $ 10,000
R/W
PROJECT LOCATION Other
TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
FUNDING SOURCES FY 14115 FY 15/16 FY 16117 FY 17118 FY 18119
al Water Fund $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
I3 (
TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 500,000
Additional annual cost: None
•"re
FUND: 506
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Water
Water.xlsx Corrosion Control
CITY OF HUNTINGT
ENEWIL'. . CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Water Production System PROJECT DESCRIPTION: Improvements at various water production facilities located throughout the City,
Improvements such as studies and acquiring new sites to drill wells, developing a groundwater
master plan,and other system improvements at reservoirs, booster stations,
and wells.
PROJECT NEED: Install new or rehabilitate production infrastructure to optimize system
FUNDING DEPARTMENT: redundancy, efficiency, reliability,and to extend infrastructure longevity.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Consistent with the 2012 Water Master Plan and routine water maintenance
Duncan Lee program
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 44115 [FY 15/16EFY6/1 FFY 17118 FY 18/19
Design Complete: Varies/On-Going Design/Environmental $ 200,000 300,000 00,000 $ 200,000 $ 200,000
Construction Complete: Varies/On-Going Construction 500,000 00,000Project Management 100,000 00,000Supp/ementa/s 100,000 00,000R/W $ 250,000PROJECT LOCATION Other
TOTAL $ 450,1000000,00000,000 $ 200,000 $ 200,000
�..._.;
i FUNDING SOURCES FY 14115 FY 15116 FY 16117 FY 17/18 FY 18119
Water Fund $ 450,000 $ 1,000,000 $ 119001000 $ 200,000 $ 200,000
't' 'W'•°^LL - TOTAL $ 450,000 $ 1,000,000 $ 1,900,000 $ 200,000 $ 200,000
C ;
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 3,750,000
'+, �•y^• Additional annual cost. None
FUND: 506
COMMENTS ON GRANTS I OTHER FUNDS:
PROJECT TYPE: New& Rehabilitation
CATEGORY: Water
Water.xlsx Production Improvements
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Peck Reservoir Dual Drive PROJECT DESCRIPTION: Design and install dual drive capabilities at Peck Reservoir Booster station,along
with other adjacent facility modification to improve functionality.
PROJECT NEED: This booster station currently uses natural gas. Ever increasing mandates from
FUNDING DEPARTMENT: the South Coast Air Quality Management District requires more option to reduce
Public Works emissions dual capabilities to use the most economical power available.
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Jay Kleinheinz/Duncan Lee
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 300,000 $ 250,000
Construction Complete: FY 2014/15 Construction $ 1,350,000
Project Management $ 50,000
Supplementals $ 50,000
Continuing $ 1,500,000
PROJECT LOCATION Other
TOTAL $ 1,750,000 $ 250,000 $ 1,500,000
FUNDING SOURCES Prior FY 14115 FY 16117
Water Fund $ 1,750,000 $ 250,000
TOTAL $ 1,750,000
MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 1,750,000
Additional annual cost. ANone
FUND: 506
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New & Rehabilitation
CATEGORY: Water
Water.xlsx Peck Res. Dual Drive
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
PROJECT TITLE: Water Engineering Studies PROJECT DESCRIPTION: Perform modeling and various engineering studies to optimize system
redundancy, efficiency, reliability,and to extend infrastructure longevity. Also
includes improvement such as to install a new CNG Station at the Utilities Yard
to meet the needs of increasing number of CNG maintenance vehicles.
PROJECT NEED: Identify potential projects to optimize system redundancy,efficiency, reliability,
FUNDING DEPARTMENT: and to extend infrastructure longevity. In addition, enhance emergency
Public Works response by having a CNG Station at the Utilities Yard.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Consistent with the 2012 Water Master Plan and routine water maintenance
Duncan Lee program
STRATEGIC PLAN GOAL: Improve the Citys infrastructure
SCHEDULE: PROJECT COSTS FY 1ILLUD-01
FY 15/16 FY 16/17 FY 17118 FY 18119
Design Complete: Varies/On-Going Design/Environmental $ 2 $ 100,000 $ 100,000 $ 100,000 $ 100,000
Construction Complete: N/A Construction
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 2000 $ 1001000 $ 100,000 $ 100,000
j FUNDING SOURCES FY 14115 FY 15/16 FY 16/17 FY 17118 FY 18119
�;- - J Sewer Service Fund $ 50,000
- Water Fund $ 150,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
,"` '��"•� TOTAL $ 200,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
.�. MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 60Q,000
Additional annual cost: None
FUND: 506, 51111
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Studies
CATEGORY: Water
Water.xlsx Water Engineering Studies
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION`
PROJECT TITLE: Water Facilities Security PROJECT DESCRIPTION: Security upgrades at water production and storage facilities.
Improvements
PROJECT NEED: Based on a mandated Water System Vulnerability Assessment performed in
FUNDING DEPARTMENT: 2002-2003,the City's production and storage facilities are in need of security
Public Works improvements/enhancements.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Water System Vulnerability Assessment(2003)
Jay KleinheinLDuncan Lee
STRATEGIC PLAN GOAL: Maintain public safety
SCHEDULE: PROJECT COSTS FY 14/15 FY 15116 FY 16117 FY 17/18 FY 18/19
Design Complete: Design/Environmental $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Construction Complete: Multi-Yr Program Construction $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000
Project Management $ 50,000 $ 50.000 $ 50,000 $ 50,000 $ 50,000
Supplementals $ 50,000 $ 50,000 $ 50.000 $ 50,000 $ 50,000
RAN
PROJECT LOCATION Other
TOTAL $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000
u µ FUNDING SOURCES FY 14/15 FY 15116 FY W17 FY 17118 FY 18119
Water-Fund $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000
` s `�%•••-- - TOTAL $ 750,000 $ 7 00,000 $ 750,000 $ 750,000 $ 750,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 3,750,000
` �, ��-• Additional annual cost: None
FUND: 506
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New
CATEGORY: Water
Water.xlsx Water Facilities Security
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION ii.
PROJECT TITLE: Water Main Replacements PROJECT DESCRIPTION: Water main replacements in various locations in the downtown area,and OC-44
replacement reimbursement to Mesa Water District.
PROJECT NEED: To replace existing transmission and distribution mains due to corrosion,
FUNDING DEPARTMENT: excessive repair requirements, undersized, or other age related issue.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Consistent with routine water maintenance program.
Duncan Lee
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
SCHEDULE: PROJECT COSTS FY 14115 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design Complete: Varies/On-Going Design/Environmental $ 200,000 $ 400,000 $ 100,000 $ 100,000 $ 100,000
Construction Complete: Varies/On-Going Construction $ 700,000 $ 1,200,000 $ 300,000 $ 300,000 $ 300,000
Project Management $ 100,000 $ 200,000 $ 50,000 $ 50,000 $ 50,000
Supplementals $ 100,000 $ 200,000 $ 50,000 $ 50,000 $ 50,000
R/W
PROJECT LOCATION Other
TOTAL $ 1,1001000 $ 2,OD0,000 $ 5001000 $ 500,000 $ 5001000
r yY • FUNDING SOURCES FY 14116 FY 15116 FY 16/17 FY 17118 FY 18119
Water Fund $ 1,000,000 $ 2,000,000 $ 500,000 $ 500,000 $ 500,000
Water Master Plan $ 100,000
� . 3 ,' °�°°°"•• TOTAL $ 1,100,000 $ 2,000,000 $ 500,000 $ 500,000 $ 500,000
' , x
W aS� MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ 4,600,000
'�+� •••••�• s Additional annual cost: None
507,506
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: New& Rehabilitation
CATEGORY: Water
Water.xlsx Water Main Replacements
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Well No. 8 Irrigation PROJECT DESCRIPTION: To convert existing sub-potable water well facilities to deliver irrigation water to
City's Central Park, Sports Complex, Murdy Park, and landscape medians along
Goldenwest Street.
PROJECT NEED: To utilize sub-potable water in lieu of domestic water for large turf areas and
FUNDING DEPARTMENT: landscaping
Public Works
DEPT.PROJECT MGR: SOURCE DOCUMENT: Consistent with City's Water Conservation efforts
Duncan Lee
STRATEGIC PLAN GOAL: Improve the City's infrastructure
Approved Expended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14/15 FY 15116 FY 16/17
Design Complete: FY 2014115 Design/Environmental $ 200,000 $ 600,000 $ 100,000
Construction Complete: FY 2015/16 Construction $ 1,220,000 $ 785,000 $ 550,000
Project Management $ 25,000 $ 25,000
Supp/ementals $ 60,000 $ 25,000
Continuing $ 120,000
PROJECT LOCATION Other
TOTAL $ 1,505,000 $ 1,365,000 $ 220,000 $ 600,000
Heil Avenue' _ FUNDING SOURCES Prior FY 14/15 FY 15116 FY 16117
Water Fund $ 1,505,000 $ 1,385,000 $ 100,000 $ 600,000
iu • Murdy Park .._.
in
in
Central Park
o TOTAL $ 1,505,000 $ 100,000 $ 600,000
_`3„• Sports Complex
A Ellis Avenue MAINTENANCE COST IMPACT: 11TOTAL PROJECT COST: $ L205,000ji
Additional annual cost: None
s. •1 FUND: ]506
COMMENTS ON GRANTS/OTHER FUNDS:
PROJECT TYPE: Rehabilitation
CATEGORY: Water
W ater.xlsx Well 8 Irrigation
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION
Continuing Project
PROJECT TITLE: Well No. 9 Treatment PROJECT DESCRIPTION. Evaluate different potential treatment methods and operation scenarios to
maximum capacity of Well 9,while removing odor from dissolved Hydrogen
Sulfide.
PROJECT NEED: To remove odor from dissolved Hydrogen Sulfide
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Jay Kleinheinz/Duncan Lee
STRATEGIC PLAN GOAL: Improve the Ci 's infrastructure
Approved Ex ended/Enc. Requested
SCHEDULE: PROJECT COSTS Prior FY 14115 FY 15116 FY 16117
Design Complete: FY 2014/15 Design/Environmental $ 250,000 $ 250,000
Construction Complete: FY 2014/15 Construction $ 800,000
Project Management $ 100,000
Supplementals $ 100,000
Continuing
PROJECT LOCATION Other
TOTAL $ 250,000 $ 250,000 $ 1,000,000
r
f
FUNDING SOURCES Prior FV14/15 FY15/i6 FY16/17
r Water Fund $ 250,000 $ 250,000 $ 1,000,000
` t
II, a
TOTAL $ 250,000 $ 1,000,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,250,000
Additional annual cost: None
FUND: 506
I
COMMENTS ON GRANTS /OTHER FUNDS:
PROJECT TYPE:
CATEGORY:
Water.xlsx Well 9 Treatment
City of HB
FY 14/15 CIP
Unfunded Projects(General Fund)
Shelf Ready Energy Efficiency Comm Services Fire Library Services Police Public Works
Rank Rank Rank Rank Rank Rank Rank Rank
DRAINAGE&STORM WATER Eng Maint Fat
Burshard/Adams Water Quality $ 635,955
Pumo Stations
Heil Pump Station Yes $ 3,250,000
Slater PS Equipment Replacement N/A $ 1,600,000
Bolsa Chica PS Equipment Replacement N/A $ 300,000
Yorktown PS Equipment Replacement N/A $ 200,000
Other PS Equipment Replacement N/A $ 1,200,000
Pipe Joints Infiltration Repairs by Atlanta PS,Newland PS and Banning PS N/A $ 100,000
S-6-SC-1 Channel Reconstruction-Ph.2 Yes $ 500,000
S-6-SC-1 Channel Reconstruction $ 5,000,000
Beach Outlet@1st Street $ 250,000
Edinger Ave SD(Gothard To Moody Chan) $ 500,000
Christy Dr.SD $ 500,000
Bolsa Chica Drainage Repair $ 300,000
9th&Palm Yes $ 50,000
Storm Drain Master Plan $ 200,000
Beach Maintenance Yard $ 50,000
SWPPPS $ 25,000
Beach Showers $ 150,000
Cover for material storage $ 150,000
Canopies for fueling stations $ 250,000
FACILITIES
Banning Library Interior Renovation $5,000 3
Central Library Alarm Systems Upgrade $225,000 5
Central Library Elevator Modernization $80,000 6
Central Library Entry Doors $60,000 8
Central Library Fountain Renovation $ 100,000 9
Central Library Catering Kitchen Renovation 1 $90,000 1 4
Central Library Theater and Children's Wing Restroom Renovations $120,000 7
Fire Station 1-Gothard and Fire Station 2-Murdy Building Modifications $200,OOD 6
Fire Station 2-Murdy Apparatus and Equipment Storage Facility $232,000 3
Fire Station 4-Magnolia Block Wall Extension and Security Gate $57,400 5
Fire Station 5-Lake HVAC System Modification $50,000 4
Civic Center Pelican Sculpture Pole Restoration $ 90,000 4
Note:Not all projects have individual CIP sheets
7/9/2014 Page 1
City of HB
FY 14/15 CIP
Unfunded Projects(General Fund)
NEIGHBORHOOD
Nichols Street Rehabilitation 5, 100,000
PARKS AND BEACHES
Beach Parking Lot Rehabilitation $ 600,000
Bluff-Fop Park Renovations $ 500,000 4 4
Central Park East Trees and Pathways Rehabilitation $ 800,000 2 2
Central Park Parking Lot $ 150,DD0
Central Park West Trees and Pathways Rehabilitation $ 552,000 3 3
Park Bench Cafe Parking Lot Yes $ 150,000
South Beach Parking Lot-Phase 2 Yes I $ 800,000
Beach Bike Path Landscaping(Pier to Seapoint) $ 1,500,000
Beach Ped/Bike Path $ 175,000
Park Lights $ 200,000
STREETS&TRANSPORTATION
Delaware St.Rehab(Memphis-Atlanta) 90%Plans $ 1,000,000
Atlanta Ave.Rehab(Beach-Newland) 90%Plans $ 1,000,000
Nichols Street Paving $ 750,000
Arterial PMP Backlog $ 3,500,000
Graham St.Widening Prelim $ 1,000,000
SWC Adams/Bushard ADA 10% 1 1 $ 50,DD0
17171 Bolsa Chica Sidewalk Rehab Prelim $ 30,000
17th Street Sidewalk(1st Block) yes $ 5,000
SEC Alabama/Rochester Sidewalk Yes $ 50,000
Magnolia St.Sidewalk(Gar.-Adams) $ $0,000
Various ADA Ramps $ 250,000
Various Alleys $ 18,0001000
Tree Petition Streets
•Kamuela Drive FY 14/15$660k $ 101000,000
Median Islands on PCH In Sunset Beach $ 250,000
Tota s $ - $ - $ 539,400 $ 660,000 $ - $ 57,292,955
Total All Projects 5 58,512,355
Note:Not all projects have individual CIP sheets
7/9/2014 Page 2