HomeMy WebLinkAboutCity Council - 2014-75 RESOLUTION NO. 2014-75 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH APPROVING AN ENERGY SERVICE CONTRACT WITH SIEMENS INDUSTRY, INC. AND THE LEASE/PURCHASE FINANCING OF THE ENERGY CONSERVATION MEASURES WHEREAS, Government Code section 4217.12 authorizes cities to enter into an energy service contracts with any person or entity, pursuant to which that person or entity will provide conservation services to the city, if the anticipated cost to the city for conservation services provided under the contract is less than the anticipated marginal cost to the city of electrical energy that would have been consumed by the city in the absence of the energy service contract; and The City of Huntington Beach ("City") conducted an open and competitive Request for Qualifications "RFQ" for a comprehensive energy conservation program involving the instillation of certain maintenance measures to improve energy usage in the City street lights. One of the respondents to the RFQ was Siemens Industry, Inc. ("Siemens"); and City staff reviewed the qualifications presented by Siemens to conduct and provide assessment of city energy usage, energy needs and opportunities to reduce energy expenses through maintenance of existing lights and fixtures, and chose Siemens' based on those qualifications ; and Siemens presented an "Investment Grade Assessment — City Owned Streetlight and Parking Lot LED Upgrades" (the "Assessment ") to reduce energy consumption, provide energy efficient lighting technologies resulting in reduced energy costs, reduced maintenance costs, uniform lighting and a lesser carbon footprint; and In the Assessment , Siemens looked at the feasibility of various energy conservation measures to reduce the City's energy consumption and expense and recommended specific energy conservation measures based thereon upon which the City Council and City administration and staff have relied; and In performing the assessment, Siemens requested and was provided with electrical usage data from the City and Southern California Edison that was analyzed to produce a project proforma that demonstrates positive cash flow from the energy savings that is greater than the costs associated with the energy conservation measures contained in the Assessment; and City desires to proceed at the current time with certain of the energy conservation measures contained in the Assessment , in particular, the maintenance, repair, including upgrading, of the street lights in the City that are owned and operated by the City including the installation of LED lights and various underground wiring and circuitry improvements; and Siemens has offered to enter into the energy service contract attached hereto as Exhibit A (the "Service Contract") to provide energy conservation services to implement the energy conservation measures described in Exhibit A thereto (the "Improvements") for the price stated therein; and 14-4228/112563.docx 1 Resolution No. 2014-75 The Analysis and Exhibit D to the Service Contract demonstrate that the cost of the Service Contract to the City for the conservation services provided thereunder is less than the anticipated marginal cost to the City of the energy that would have been consumed by the City in the absence of the Service Contract; and Government Code section 4217.13 authorizes the City to enter into a facility financing contract with any person or entity, pursuant to which that person or entity will provide financing for energy conservation measures in exchange for repayment of the financing and all costs and expenses related thereto by the City, if funds for the repayment of the financing are projected to be available from revenues resulting from funding that otherwise would have been used for the purchase of electrical energy required by the City in the absence of the energy conservation measures; and The financing of the Improvements comprising the energy conservation measures will be accomplished by the City's entering into a facility financing contract in the form of a lease/purchase agreement (the "Lease Agreement") with Capital One Public Funding, LLC ("COPF"), whereby the City will lease the Improvements to COPF and then lease the Improvements back from COPF in exchange for rental payments; and The cost of the conservation measures will be paid for from amounts paid by the City and from amounts deposited by COPF into an escrow fund held by Deutsche Bank National Trust Company (the "Escrow Agent") under an escrow agreement (the "Escrow Agreement") between COPF, the City, and the Escrow Agent; and The Lease Agreement and the Escrow Agreement, which are incorporated herein by reference, are on file with the City Clerk; and On July 31 , 2014, the City published a notice of its intent its intent to consider entering into the Service Contract, the Lease Agreement and the Escrow Agreement, and, pursuant to Government Code sections 4217.12 and 4217.13, the City Council held a public hearing on September 15, 2014, to receive public comments on the Service Contract and the financing as described in the Lease Agreement and the Escrow Agreement; and The installation and financing of the Improvements is a project which is categorically exempt from review under the California Environmental Quality Act under Class 1 exemptions, NOW, THEREFORE, the City Council of the City of Huntington Beach does hereby resolve as follows: Section 1. Recitals. The foregoing recitals are true and correct and the City Council so finds and determines. Section 2. Energy Service Contract Findings. In accordance with Section 4217.12 of the California Government Code, the City Council finds that the anticipated cost to the City for the electrical energy conservation services provided by the conservation measures under the Service Contract will be less than the anticipated marginal cost to the City of electrical energy that would have been consumed by the City in the absence of those purchases and that the terms of the Service Contract are in the best interests of the City. 14-4228/112563.docx 2 Resolution No. 2014-75 Section 3. Facility Financing Contract Findings. In accordance with Section 4217.13 of the California Government Code, the City Council finds that funds for the repayment of the financing pursuant to the Lease Agreement are projected to be available from revenues resulting from funding that otherwise would have been used for the purchase of electrical energy required by the City in the absence of the Improvements and that the terms of the Lease Agreement are in the best interests of the City. Section 4. General Authorization. The City Council hereby authorizes and directs the City Manager or his designee and each of them individually, for and in the name of and on behalf of the City, to do any and all things and to execute and deliver any and all documents that they may deem necessary or advisable in order to complete the execution and delivery of the Service Contract, the Lease Agreement, the Escrow Agreement, and related documents and .otherwise to carry out, give effect to, and comply with the terms and intent of this resolution. All actions heretofore taken by such officers and agents that are in conformity with the purposes and intent of this resolution are hereby ratified, confirmed and approved in all respects. Section 6. Effective Date. This resolution shall take effect immediately upon its adoption. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting held on the 15th day of September , 2014. Mayor F REVIEWE AND APPROVED: APPROVED AS TO FORM: City a er ?vCity Attorney INITIATED AND APPROVED: ,X.---- - A I Director of Public Wo s 14-4228/112563.docx 3 AGREEMENT FOR THE PURCHASE AND 1NSTALLA OF ENERGY CONSERVING STREET LIGHTS This Performance Service Agreement (the "Agreement") is made and entered into on this, the ,�day of S22?725? ,2A/ by and between Siemens Industry, Inc., a Delaware Corporation, with offices at Cypress , CA 90630 (herein "Contractor"), and City of Huntington Beach a charter City and municipal corporation duly organized and existing under the Constitution and laws of the State of California, 2000 Main Street, Huntington Beach, CA 92648 (herein "City"), collectively, ("Parties"). RECITALS A. The City council declares its intention of reducing energy consumption, within the City. B. The City and Contractor entered into discussions with regard to reducing energy consumption in the City by way of street light repair, maintenance and replacement. Said discussions were memorialized in a letter of intent which was executed by Parties on February 4, 2013. By execution of this agreement, the letter of intent is terminated, except as provided in Section 2. A. 1. below. C. The City desires to retain a Contractor having special skill and knowledge in the field of furnishing, and installing energy conservation measures to minimize energy consumption within the City including the replacement and installation of street lights and area and drive aisle lighting in designated parking areas in the City and related equipment and materials. D. Contractor represents that Contractor is able and willing to provide such services to the City. E. Contractor represents that it has conducted energy efficiency tests of City street lights, utilizing best practice techniques available for verifying the results of energy efficiency, to determine the energy savings that the City will recognize as a result of implementing recommended energy efficiency measures. F. Contractor has been selected to perform these services pursuant to the Huntington Beach Charter, Municipal Code and California Government Code Section 4217.12. G. Contractor represents that it has complied with all City and State laws and regulations including, but not limited to, all applicable City contract bid requirements and prevailing wage requirements. H. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. 1 14-4228/112498.docx NOW, THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: SECTION 1. DEFINITIONS. The following definitions shall apply to this Agreement unless otherwise defined herein: "Acceptance"means the City has signed the Certificate of Substantial Completion. "Acceptance Date" means the date on which the City signs the Certificate of Substantial Completion. "Annual Debt Service" means the total amount of annual payments made by the City pursuant to the Lease Purchase Agreement authorized to finance the energy conservation measures. "Annual Performance Guaranteed Periods" means the periods of time beginning with the first day of the month following the Acceptance Date and continuing for one (1) year periods for Ten years or the date the City pays the debt incurred pursuant to this agreement whichever is earlier. "Annual Project Costs" means all costs incurred by City in one year relating to this Agreement. "Actual Annual Project Savings" means the measured amount of cash and energy savings City recognizes in one year as a result of Facility Improvement Measures and energy conservation measures. The calculations to arrive at the Actual Annual Project Savings are set forth in Exhibit C attached hereto and incorporated herein by reference and shall be updated annually during the Annual Performance Guaranteed Periods to reflect actual savings amounts. "Annual Guarantee" means Actual Annual Project Savings shall be an amount equal to or greater than the Annual Debt Service the City incurs annually. If the Actual Annual Project Savings is less than the Annual Debt Service, there is a Shortfall. In the case of a Shortfall, Contractor shall reimburse to City the amount of the Shortfall. Said Guarantee is set forth in Exhibit C attached hereto and incorporated herein by reference. "Commencement Date" means the effective date of this Agreement. "Construction Period" means the period from the Commencement Date of this Agreement to the Acceptance Date. "Construction Period Savings" means the actual amount of cash and energy savings the City recognizes as a result of Facility Improvements Measures during the Construction Period. 2 14-4228/112498.docx "Energy Escalation Factor" means an annual escalation percentage to be applied to the previous year's Energy Savings as set forth in Exhibit C. Each year during the Annual Performance Guarantee Periods, the escalation factor shall be adjusted on the Exhibit C Project Cashflow calculation to equal the actual escalation factor(s) for each annual period as per. SCEs applicable rate tables. "Facilities" means those street lights and parking garage lights as set forth in Exhibit A Scope of Services, attached hereto and incorporated herein by reference. "Facility Improvement Measures (FIM) or (FIM's)" means various items of equipment and lights repair or replacement by the Contractor at the Facilities, or as repaired by the City hereunder, for the purpose of improving the efficiency of utility consumption or otherwise to reduce utility costs of the Facilities as set forth in Exhibit A. "Projected Annual Project Savings" means the amount of cash and energy savings City is projected to recognize in one year as a result of Facility Improvement Measures. The calculations to arrive at the Projected Annual Savings have been conducted utilizing best practice techniques available for verifying the results of energy efficiency. "Scope of Work" means the implementation of the FIM's to be performed as fully set forth in Exhibit A attached hereto and incorporated herein by reference. SECTION 2. SCOPE OF SERVICES. A. Contractor's Responsibilities: 1. Contractor agrees to install, warrant and guarantee certain energy FIM's as fully set forth herein, including Exhibit A, Scope of Work, Special Provisions, as well as any unfinished provisions contained in the letter of intent dated February 4, 2013, attached hereto and incorporated herein by reference. 2. Contractor guarantees that the Annual Project Savings shall be an amount equal to or greater than the Annual Debt Service the City incurs annually. If the Actual Annual Project Savings is less than the Annual Debt Service, there is a Shortfall. In the case of a Shortfall, Contractor shall reimburse to City the amount of the Shortfall. Details of said guarantee are fully set forth in Exhibit C. 3. Contractor shall designate a person to be known as the Contractor Representative to act as a single point of contact on behalf of Contractor with respect to all matters under this Agreement. Contractor Representative will become familiar with the progress and quality of the completed work as set forth in this Agreement. 4. Contractor shall comply with all City, State and Federal laws related to waste disposal including disposal of fluorescent lights, ballast with PCB and regular ballast. Contractor shall provide disposal manifest if requested. 3 14-4228/112498.docx B. City Responsibilities: 1. City shall designate a City Representative as the point of contact to interact with Contractor regarding to the Scope of Work. 2. City shall furnish Contractor with blueprints, surveys, legal descriptions of the site, and other information regarding the Facilities as Contractor may reasonably request in order to complete Scope of Work and maintain the Annual Guarantee provided said documents are readily available to City. These shall not become the property of Contractor and shall be returned to City, unless otherwise requested by Contractor, in which case Contractor shall bear the cost of all blueprints and copies necessary to perform the Scope of Work in this Agreement. 3. City shall within ten (10) business days, respond to samples or documents submitted by Contractor to the City for review and approval under this Agreement. 4. City shall provide reasonable access to City facilities in order to accomplish the Scope of Work. 5. City shall operate equipment according to the manufacturer's recommendations. 6. City shall notify Contractor in writing of any City policies that may affect the Scope of Work. 7. City shall notify Contractor of any unusual operating conditions.. 8. City shall control and/or operate all equipment necessary to perform the services herein described as arranged with Contractor representative. SECTION 3. TERM. This Agreement shall commence on the date first written above and terminate 24 months from commencement date, unless terminated earlier in accordance with the provisions as set forth below except that the warranty and guarantees provided by Contractor herein which shall continue for ten (10) years or the date the City pays the debt incurred pursuant to this agreement whichever is earlier. SECTION 4. PAYMENT. A. TOTAL COST. Total installation job costs for complete scope of work, including any feasibility study is in an amount not to exceed $1,616,783.00. The City will make progress payments as provided herein. 4 14-4228/112498.docx B. ACCEPTANCE. 1. When Contractor believes that all of a definable phase, of the Scope of Work has been completed in accordance with the terms of this Agreement, Contractor will submit to the City a progress payment estimate. If the Scope of Work substantially conforms to the description of said Scope of Work the City will sign the progress payment estimate and submit to the City for payment to the Contractor. Progress payment estimates are submitted to the City monthly and paid within 30 days. If the Scope of Work does not substantially conform, then the City Representative shall so notify Contractor within ten (10) business days of receipt of the aforementioned progress payment estimate. Upon notification of the discrepancies the Contractor shall correct the discrepancies to conform with the Scope of Work and resubmit the the progress payment estimate to the City. The process will continue until the City determines the Scope of Work meets the City requirements. City will retain 10% of total project cost until City signs the first progress payment estimate. This process will continue until all independent or definable phases are complete as follows: when Contractor has, in the judgment of City, faithfully executed percent (50%) or more of the value of the work as determined from Scope of Work, and if the City finds that satisfactory progress has been and is being made, City will sign second progress payment estimate at which time Contractor may be paid such sum as will bring the payments of each month up to one hundred percent (100%) of the value of the work completed since the commencement of the Scope of Work, as determined in its sole discretion by City, less all previous payments and less all previous retained amounts. City's final payment to Contractor, if unencumbered, or any part thereof unencumbered, shall be made no later than thirty-five (35) calendar days after the acceptance of all work performed pursuant to the Scope of Work and the final Certificate of Substantial Completion is signed. Payments shall be made on demands drawn in the manner required by law, each payment to be accompanied by a progress payment estimate signed by City, affirming that the work for which payment is demanded has been performed in accordance with the terms of this Agreement and that the amount stated in the progress payment estimate is due under the terms of this Agreement. Partial payments on the contract price shall not be considered an acceptance of any part of the work. 2. Energy savings measurement and verification are to be completed within ninety(90) days of substantial completion of installation and testing phase. See Exhibit C 3. In the event City and Contractor do not agree on scope and/or quality, or acceptability, of the work completed, City may suspend payment and notify Contractor of failure to complete Scope of Work pursuant to this Agreement. Said non-payment will not constitute default. If the City becomes more than thirty (30) business days overdue on any progress payment, Contractor may elect to suspend working. If work is suspended due to non-payment all guarantees and warranties are extended in an equal time period from the original or last extended invoice date. If City fails to provide Contractor written notice within one hundred and twenty days (120) days to proceed with the Work, Contractor, may at its sole discretion, terminate the Agreement without liability. 4. When Contractor believes that all or an independent, definable phase, of the Scope of Work has been completed in accordance with the terms of this Agreement, 5 14-4228/112498.docx Contractor will submit a Certificate of Substantial Completion to the City. If the Scope of Work substantially conforms to the description of said Scope of Work the City will sign the Certificate of Substantial Completion and return it to Contractor. If the Scope of Work does not substantially conform, then the City Representative shall so notify Contractor within ten (10) business days of receipt the aforementioned certificate. Upon notification of the discrepancies the Contractor shall correct the discrepancies to conform with the Scope of Work and resubmit the Certificate of Substantial Completion to the City. 5. Contingency funds identified in Exhibit B Schedule of Values may be accessed and managed by Parties. Contingency funds may not be withdrawn or used without mutual written approval which shall not be unreasonably withheld. Unused contingency funds at project completion shall be deducted from the not to exceed price and/or returned to the City within thirty (30) days of project completion. C. ENERGY EFFICIENCY CREDIT. Contractor shall cooperate with the City and Southern California Edison (SCE) to assist the City.in obtaining the maximum energy efficiency incentives/credits and/or otherwise as named, offered by SCE. Any incentives shall be transferred by SCE to the City and Contactor shall not retain any such incentives/credits etc. D. Currently, Internal Revenue Code Section 179D (section "179D") does not provide tax incentives for this light replacement project as described herein. However, if Section 179D is amended to allow incentives such as accelerated depreciation benefits, the City may designate at its sole discretion, any eligible entity as the "Designer" of the energy efficient improvements for the purposes of allocating accelerated depreciation benefits pursuant to Section 179D. If the City designates the Contractor as the Designer or if Contractor shall otherwise benefit financially from the monetization of the accelerated depreciation benefit, Contractor shall discount this Contract price or provide a cash rebate to the City in an amount equal to 50% of the incremental financial benefit realized by Contractor as a result of the tax benefit or the monetization thereof.' The City may retain a third party consultant ("EP Act Coordinator") to calculate, manage and administer the process of obtaining and monetizing any IRS deductions resulting from this Agreement. Contractor will provide reasonable cooperation with regard to any effort to obtain and/or monetize IRS rebates, deprecation benefits etc. SECTION 5. FINANCING. At the City's sole discretion, as a condition precedent to this Agreement, an Escrow Fund shall be created and funded pursuant to a Lease/Purchase and Escrow Agreement. If the Escrow Fund is not funded or the City has not obtained credit approval within forty-five (45) days from the execution of this Agreement, this Agreement shall be voidable at the sole discretion of the City. This forty-five (45) day period may be extended as mutually agreed upon in writing by both parties. In the event that this Agreement becomes void as described in the preceding paragraph the City will reimburse for any work the City authorized in writing to be completed. ' The determination of rebate versus discount will be determined by City at its sole discretion. 6 144228/112498.docx SECTION 6. AUTHORITY AND AUTHORIZATION. City and Contractor each represent, warrant and covenant that each has done all things commercially reasonable necessary to preserve and keep in full force and effect the existence of this Agreement, all requirements have been met and procedures have been followed to ensure the enforceability of this Agreement and there is not any pending, or to the best of City's knowledge, threatened, suits or actions, litigation or proceedings against or affecting City that affects the validity or enforceability of this Agreement. SECTION 7. WARRANTY. A. Contractor expressly warrants that all electronic drivers are free from defect and will operate for ten years without failure provided said equipment is operated according to Contractor and manufacturer specifications. Contractor expressly warrants that all light fixtures are free from defect and will operate for ten years without failure provided said equipment is operated according to Contractor and manufacturer specifications. Contractor expressly warrants that all underground utilities are free from defect and will operate for ten years without failure provided said equipment is operated according to Contractor and manufacturer specifications. One (1) year labor warranty. B. Contractor warrants for one year from Acceptance Date, that all equipment manufactured by Contractor or nameplate shall be free from defects in material and workmanship which arise from normal use or service, provided the equipment is properly operated in accordance with Contractor's instructions. If any equipment should prove defective in this warranty, Contractor will at Contractor's option, repair, replace, or issue credit for any such item. For materials furnished but not manufactured by Contractor nor bearing Contractor's nameplate, Contractor will extend the same warranty Contractor received from the manufacturer. C. This express warranty is in lieu of and excludes all other warranties, guarantees, or representations, expressed, or implied including warranties of merchantability or of fitness for a particular purpose. SECTION 8. LIMITATION OF WARRANTIES. Contractor has provided City with certain written warranties with respect to the FIM's. Except for such warranties in this Agreement, Contractor makes no warranty of any kind or nature, express or implied, relating to the FIM's or its performance or the installation and service thereof. No assignee(s) of the Contractor to this Agreement may make warranties of any kind or nature, express or implied, relating to the FIM's or the performance or the installation and service thereof. THE FOREGOING IS THE SOLE AND EXCLUSIVE WARRANTY PROVIDED BY CONTRACTOR. CONTRACTOR EXPRESSLY DISCLAIMS THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE IN RELATION TO THIS AGREEMENT. SECTION 9. INDEMNIFICATION AND HOLD HARMLESS. 7 14-4228/112498.docx Contractor hereby agrees to protect, defend, indemnify and hold harmless City, its officers, elected or appointed officials, employees, agents and volunteers from and against any claims, damages, losses expenses, judgments, demands and defense costs including without limitation costs and fees of litigation of every nature or liability of any kind or nature arising out of or in connection with Contractor's or Contractor's sub-Contractors, if any, negligent or alleged negligent performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement including any failure by its officers, agents or employees except such loss or damage which is caused by the negligence or willful misconduct of CITY. Contractor will conduct all defense at its sole cost and expense. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by Contractor. SECTION 10. FORCE MAJEURE. Except for any obligation to pay money under this Agreement, if either party shall be delayed in or prevented from the performance of any of the terms, covenants and conditions of this Agreement, by reason of restrictive governmental laws or regulations, riots, insurrections, war, sabotage, act of nature, or any other reason of a similar or dissimilar nature not the fault of the party delayed in or prevented from performance, then performance shall be excused for the period of the delay or prevention of performance and the time for performance shall be extended for an equivalent period not to exceed six (6) months otherwise this Agreement will be null and void and Contractor shall be reimbursed for all costs. SECTION 11. TITLE. Title to the FIM's implemented at City's facilities is deemed to be free and clear of any liens created by Contractor. Should it become necessary, at the request of the City, Contractor or its Assignee agrees to execute any appropriate documents submitted by the City to the Contractor or its Assignee evidencing such right,title and interest in the FIM's. SECTION 12. USE, REPAIRS. City, except as warranted herein, at its sole cost and expense, shall maintain the FIM's according to the manufacturers recommended guidelines or the equivalent and meet any and all re-certification requirements and shall furnish proof of such maintenance, if requested by Contractor. City shall furnish all needed servicing and parts, which parts shall become part of the FIM's. This section refers to standard manufacturers recommended electrical equipment maintenance as is normally performed by City personnel on existing mechanical equipment during regular business operations. SECTION 13. INSURANCE. Prior to undertaking performance of work under this Agreement, Contractor shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below: 8 14-4228/112498.docx A. Commercial General Liability Insurance: Contractor shall maintain commercial general liability insurance adding the City its officer, agents, volunteers, and employees as additional insured(s) and shall include, but not be limited to protection against claims arising from bodily and personal injury, including death resulting there from and damage to property, resulting from any act or occurrence arising out of Contractor's operations in the performance of this Agreement, including, without limitation, acts involving vehicles. The amounts of insurance shall be not less than the following: single limit coverage applying to bodily and personal injury, including death resulting there from, and property damage, in the total amount of$1,000.000 per occurrence. Contractor shall supply City with a Certificate of Insurance adding language substantially in the form attached hereto as Exhibit C and incorporated herein by reference upon execution of this Agreement shall to be approved in form by the City Attorney. B. Business automobile liability insurance, or equivalent from, with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired, and non-owned automobiles. C. Worker's Compensation Insurance. In accordance with the provisions of Section 3300 of the Labor Code, Contractor, if Contractor has any employees, is required to be insured against liability for worker's compensation or to undertake self-insurance. Prior to commencing the performance of the work under this Agreement, Contractor agrees to obtain and maintain any employer's liability insurance with limits not less than $1,000,000 per accident. D. If Contractor is or employs a licensed professional, such as an architect or engineer: Professional liability (errors and omissions) insurance, with a combined single limit of not less than $1,000,000 per claim. E. The following requirements apply to the insurance to be provided by Contractor pursuant to this section: 1. Contractor shall maintain all insurance required above in full force and effect for the entire period covered by this Agreement. 2. Certificates of insurance shall be furnished to the City upon execution of this Agreement and shall be approved in form by the City Attorney. 3. Certificates and policies shall stale that the policies shall not be canceled or reduced in coverage or changed in any other material aspect without thirty (30) days prior to written notice to the City. F. If Contractor fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the City with required proof that insurance has been procured and is in full force and paid for, the City shall have the right, at the City's election, to forthwith terminate this Agreement. Such termination shall not affect Contractor's right to be paid for its time and materials expended prior to notification of termination. Contractor waives the right to receive compensation and agrees to indemnify the City for any work performed prior to approval on insurance by the City. 9 14-4228/112498.docx SECTION 14. TERMINATION. A. This entire Agreement may be terminated by the City at its sole discretion, including breach of contract upon thirty (30) days written notice of termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor for all services performed by Contractor prior to receipt of such notice of termination, subject to the following conditions: 1. As a condition of such payment, the City Manager may require Contractor to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Contractor consents to the City's use thereof for such purposes as the City deems appropriate. 2. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. B. This Agreement may be terminated for convenience at the sole discretion of either party (City or Contractor) by mutual agreement. Termination for convenience shall entitle Contractor to be paid for all services performed prior to such termination. As a condition of such payment, the Executive Director may require Contractor to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Contractor consents to the City's use thereof for such purposes as the City deems appropriate. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. SECTION 15. ASSIGNMENT Without City prior written consent, or except in the context of a lease financing, Contractor shall not assign, transfer, pledge, hypothecate or grant any security interest in, or otherwise dispose of this Agreement or any interest in this Agreement or the FIM's, sublet or lend the FIM's or permit the FIM's to be used by anyone other than City or City's employees. Contractor assignment or transfer of any rights, duties or obligations under this Agreement, shall be subject to the prior written approval of the City, which shall not be unreasonably withheld, conditioned or delayed. As a reasonable condition of approval of assignment, prior to any assignment, or transfer of any rights, duties or obligations by Contractor under this Agreement,to any party or parties to whom all or any portion of the interest herein, is conveyed, the Contractor shall present such information to the City as shall reasonably be necessary to demonstrate to the City's reasonable satisfaction that the proposed assignee has the financial ability and experience to fulfill those specific rights, duties and obligations under this Agreement that the transferee will assume. City may at its sole and absolute discretion withhold approval of assignment if at City's sole discretions finds the proposed assignee does not have the financial ability and experience to fulfill those specific rights, duties and obligations under this Agreement. 10 14-4228/112498.docx SECTION 16. AMENDMENTS. All amendments or modification of the terms of this Agreement must be accomplished by written consent of City and Contractor, and its Assignee, if any. SECTION 17. NOTICES. Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONTRACTOR or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONTRACTOR may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested: TO CITY: TO CONTRACTOR: City of Huntington Beach Siemens Industry. Inc. ATTN: Travis Hopkins Attn. Michael Diaz& Steven Teal 2000 Main Street 1266 North La Loma Circle Huntington Beach, CA 92648 Anaheim, CA 92806 SECTION 18. GOVERNING LAW. This Agreement shall be governed by the provisions hereof and by the laws of the State of California. SECTION 19. CONFLICTS In the event there is a conflict between the terms contained in the Letter of Intent or any Exhibits or attachments and the terms and conditions contained herein, the terms and conditions of this Agreement supersede and take precedent over any other terms and conditions.. SECTION 20. INDEPENDENT CONTRACTOR Nothing contained in this Agreement will be deemed or construed for any purpose to establish between the parties a partnership or joint venture, a principal-agent relationship, employee-employer relationship, or any relationship other than City and supplier. SECTION 21. ENTIRE AGREEMENT. This Agreement together with the attachments and exhibits attached hereto and made a part hereof and other attachments hereto, and other documents or instruments executed by City and Contractor in connection herewith, constitute the entire Agreement between the parties with respect to the purchase of the FIM's. All previous proposals, oral or written communication, engineering information or written communication are superseded by this Agreement. 11 14-4228/112498.docx r SECTION 22. SEVERABILITY. Any provision of this Agreement found to be prohibited, shall be ineffective to the extent of such prohibition without invalidating the remainder of this Agreement and all other provisions shall remain in full force and effect. SECTION 23. WAIVER. The waiver by a Party of any breach by the other Party of any term, covenant or condition hereof shall not operate as a waiver of any subsequent breach hereof. SECTION 24. BONDS. A. Before Contractor performs any work pursuant to this Agreement Contractor shall cause to be filed with City four ( 4) duplicates of each Performance Bond and Payment Bond, in the form attached hereto as Exhibits D and E, respectively, and incorporated herein by this reference, required under this section. These bonds shall be in the amounts and for the purposes specified below. The surety bonds shall be issued by a California Admitted Surety; and, either a current A.M. Best A:VIII rated Surety or an admitted surety insurer which complies with the provisions of the California Code of Civil Procedure §995.660. B. Should any surety or sureties upon said bonds or any of them become insufficient, Contractor shall obtain replacement bonds with good and sufficient sureties within ten (10) days after receiving notice from City that the surety or sureties are insufficient. C. Performance Bond. Contractor shall deliver to City an executed Performance Bond in favor of City on a form reasonably acceptable to City and equal in amount to 100% of the contract sum of such Contractor's Construction Contract, as security for the faithful performance by such Contractor including the warranty period of one-year. D. Payment Bond. Contractor shall deliver to City an executed Payment Bond in favor of City in an amount equal to 100% of the contract sum of such Contractor's Construction Contract as security for the payment of all persons performing labor and furnishing materials under such Contractor's Construction Contract. SECTION 25. SPECIFIC EXCLUSION OF REMEDIES. Contractor waives any claim or right to damages either in law or equity against the City regarding the enforceability of the process to award this Agreement to Contractor. SECTION 26. WAIVER OF CONSEQUENTIAL DAMAGES. In no event shall Contractor be liable for business interruption losses or consequential or speculative damages, but this sentence shall not relieve Contractor of liability for damage to property or injury to persons resulting from accidents caused directly by its negligence in performance or failure to perform its obligations under this Agreement. 12 14-4228/112498.docx SECTION 27. ATTORNEY'S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the non-prevailing party. SECTION 28. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive. SECTION 29. REMEDIES. Upon the occurrence of an Event of Default, either party may, at its option, exercise any right, remedy, or privilege which may be available to it under applicable law, including the right to (i) proceed by appropriate Contractor's action to enforce the terms of this Agreement, or (ii) recover damages for the breach of this Agreement. In addition, the parties shall remain liable for all covenants and indemnities under this Agreement. SECTION 30. SAFETY AND HAZARDOUS MATERIALS. It is Contractor's intent to perform all work in a clean, safe professional manner, causing no hazards to Contractor's staff, facility, the environment or Contractor's service personnel. Contractor shall not be required to make safety tests, install new devices or make modifications to any equipment beyond the scope of the original Agreement in order to comply with recommendations or directives of insurance companies, governmental bodies, or for other reasons. However, this provision shall not relieve Contractor from its responsibly to install all equipment in compliance with any and all applicable, City, County, State and Federal laws, regulations, and guidelines, including but not limited to building code requirements, in effect at the time of the installation of said equipment. This Agreement pre-supposes hazardous materials are not present at the jobsite, including but not limited to asbestos. If in providing service, Contractor discovers or suspects the presence of hazardous material Contractor will notify City. City shall be responsible for the cost and performance of testing, abating, encapsulating, cleaning up,removing, or rendering such materials non-hazardous. Contractor has the right to stop work until the jobsite is free from hazardous materials. City agree to notify Contractor in writing of any hazardous materials on the jobsite and any jobsite safety policies including but not limited to lock-out and tag procedures, laboratory procedures, biological hazards and other items covered by right to know regulations or which may pose a hazard to Contractor's employee's and equipment. SECTION 31. MISCELLANEOUS PROVISIONS A. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement. B. All Exhibits and RECITALS referenced herein and attached hereto shall be 13 14-4228/112498.docx incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. SIEMENS INDUSTRY, INC. CITY OF HUNTINGTON BEACH, a municipal corporation of the State of P California By: , . Ma r 5►M�'� �0� print name AM Aj ITS' (c cle one)Chairman/Preside ice President CiO17Clerk � PaTMED D RO . By: ?A,l HS 4y 6mi Assistant t Manager print name —� ITS: (circle one)Secret Chief Financial Office REVIEWED AND APPROVED AS TO Asst. Secretary—Treasurer CONTEN �&yWnager APPROVED AS TO FORM: P City Attorne M V 14 14-4228/112498.docx City of Huntington Beach Investment Grade Assessment City Owned Streetlight and Parking Lot LED Upgrades Exhibit A: Scope of Work i Irk iM G . I� `r September 8, 2014 Table of Contents Tableof Contents....................................................................................................................................................................1 ExecutiveSummary................................................................................................................................................................3 InvestmentGrade Assessment Goals.................................................................................................................................5 Summaryof IGA Findings ...................................................................................................................................................6 Table1-1:Financial Summary......................................................................................................................................7 Energy Conservation Measures..............................................................................................................................................8 Introduction..........................................................................................................................................................................8 Evaluation of Results and Presentation of Findings............................................................................................................8 RecommendedECM Descriptions......................................................................................................................................8 ECM-1: Citywide City Procured and Installed,Area and Pole Lighting LED Upgrade........................................................8 LS-2 Street Lights..........................................................................................................................................................9 TC-1 Traffic Control.......................................................................................................................................................9 LS-3 Street Lights........................................................................................................................................................10 GS-1 General Service Area Lighting..........................................................................................................................10 GS-2 General Service Area Lighting..........................................................................................................................11 AL-2-A Outdoor Area Lighting Metered.....................................................................................................................12 AL-2-B Outdoor Area Lighting Metered, Seasonal...................................................................................................12 Summaryof ECM-1 Savings.......................................................................................................................................13 ECM-2: Central Library......................................................................................................................................................13 Summaryof ECM-2 Savings.......................................................................................................................................13 ECM-3: Pier Plaza.............................................................................................................................................................15 Summaryof ECM-3 Savings.......................................................................................................................................15 ECM-4: TOU Rate Change Savings..................................................................................................................................16 Summaryof ECM-4 Savings.......................................................................................................................................16 ECM-5: 7th. St. Series Circuit Conversion........................................................................................................................17 Summaryof ECM-5 Savings.......................................................................................................................................17 ECM-6: Local Government Direct Install...........................................................................................................................17 Summaryof ECM-6 Savings.......................................................................................................................................17 Facility Improvement Measures............................................................................................................................................18 FIM1 Main St. LED Upgrade............................................................................................................................................18 FIM 2 Walnut St. Series Circuit Conversion......................................................................................................................18 FIM 3 Olive St. Series Circuit Conversion.........................................................................................................................19 FIM 4—CIM/Shorebreak Parking Garage.........................................................................................................................20 Summaryof FIM-4 Savings.........................................................................................................................................21 FIM 5—Terminates and Replaces the Letter of Intent(LOI).............................................................................................22 City of Huntington Beach City Owned Lights Cash Flow Model .......................................................................................24 AppendixA-TEN Group ECM-1 Summary..........................................................................................................................25 Appendix B—ECM 1 Bid Documents for City Procured Material.........................................................................................26 LEDAcorn Globe replacement..........................................................................................................................................26 Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA www.usa.siemens.com 1 LED cobra head street light replacement..........................................................................................................................33 Long-life LED retrofit kit for 6ft., 120 (2x60)waft Internally Illuminated Street Name Sign...............................................42 LEDpost-top replacement.................................................................................................................................................49 Appendix C—CIM Group Parking Garage Scope................................................................................................................55 Appendix D—Series Circuit Conversion Scope....................................................................................................................57 Appendix E—71h St. Series Circuit Conversion Specifications Template.............................................................................61 Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA w ww.usa.siemens.com 2 Executive Summary The City of Huntington Beach is taking the first step in acquiring and maintaining their entire streetlight system; a portion of which is currently owned and maintained by the Southern California Edison (SCE) energy company under the LS-1 (utility owned/unmetered)tariff rate. Currently,the city owns approximately 2,305 street, parking lot and area lights under various tariff rates and desires to accelerate the conversion of these city-owned street lights to LED technology. The energy savings from converting High Pressure Sodium(HPS) streetlights to Light Emitting Diodes(LED) is an Energy Conservation Measure(ECM)that can help fund other energy savings and infrastructure projects within the City.As well as helping to meet the City's sustainability goals, the implementation of a comprehensive Energy Savings Performance Contract(ESPC)that includes the conversion of HPS streetlights to LED, will help facilitate addressing some of the City's deferred maintenance backlog and improve infrastructure. Funding for these projects is anticipated to be debt financing that is repaid from the energy&tariff rate savings found in these energy conservation measures such as upgrading streetlights, identifying billing errors and aggregating accounts into less expensive tariffs. The city's Platinum status with SCE earns the highest level of incentives from SCE and will further buy down the cost of the measures. This project is combining multiple ECM's that produce a budget neutral set of improvements that allows the City to achieve its objectives with Siemens as a partner. Siemens RCM Founded over 165 years ago, Siemens is a global powerhouse in energy technologies and electrical engineering. Siemens stands for technological excellence, innovation, quality and reliability. The company is the world's largest provider of environmental technologies with worldwide revenues of over$120 billion in FY2012. Siemens has the long-term stability and access to the extensive resources required to complete these types of complex projects with multi-year maintenance commitments. In the last decade Siemens has implemented over 3,000 energy projects valued over$1.4 billion, including$135 million in lighting-only energy contracts. The Energy Network The Energy Network Program was created by the California Public Utilities Commission to help public agencies and their communities save energy. This program offers unbiased third-party expertise to help agencies implement the right measures to maximize energy cost savings. The Energy Network provides a full turnkey solution that takes energy efficiency projects from start to finish, or can provide a range of technical services tailored to meet Agencies' specific project needs. The City of Huntington Beach enrolled in The Energy Network in October 2013 for customized assistance supporting its city-owned street lighting LED upgrade project. The Energy Network is supporting the City with following services: • Street light inventory verification/auditing • Replacement fixture bill of materials preparation • Utility incentive application support Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+l 714-630-2828 Road&City Mobility USA wwwusa.siemens.com 3 Customer Overview The City of Huntington Beach is located in the SCE territory where dedicated street lighting has an annual cost of$2,020,420 and represents 50%of the city's expenditures with SCE. The energy use, and associated environmental and air quality impacts from street lighting represent 37%of all energy used in the city. This single largest energy use type in city operations. This Investment Grade Assessment specifically focuses on the LS-2 (customer owned—unmetered) &LS-3 (customer owned—metered)tariff streetlights which represent I I%of the total expenditures on dedicated streetlights rates. Additionally,the area and pole lighting costs on other tariff rates(AL-2, GS-1, GS-2, TOU-8, GS-3TOU...) are bundled in with other energy uses. Siemens analysis of these mixed loads yielded an area and pole lighting cost of approximately$76,036 annually. Annual Streetlight Energy LS1 Utility Expenditure Owned, LS2 City $1,813,747.77 Owned, r y $163,711.60 LS3 City Owned, $42,961.55 Area Lighting, $76,036.35 The focus of this Investment Grade Assessment(IGA) is to identify all near-term viable street and area lighting ECM's that will generate sufficient positive cash flow from energy savings to allow for additional Facility Improvement Measures (FIM) (infrastructure) prioritized by the city. Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA wwwusa.siemens.com 4 Investment Grade Assessment Goals The City of Huntington Beach has made significant progress in reaching its long term energy savings goals and been recognized as a Platinum partner by SCE. City staff has engaged Siemens to develop a set of budget neutral energy and infrastructure improvements from the following Energy Conservation Measures: NN Useful e —Ww� Life 1 Citywide City Procured and Remove and Replace all older, inefficient street 24 years Installed, Area And Pole Lighting lights, internally illuminated street name LED Upgrade sgns(IISNS), area and pole lighting with long -life, i energy efficient LED technology ! 2 Central :Library Convert parking lot lights to LED 24 years 3 Pier Plaza Convert decorative lights to LED, increase light 24 years level to improve public safety 4 Citywide Time Of Use Rate Saves the city money by moving to metered time of 100 years Change Savings use 5 7 . St. Series Circuit Conversion Capture utility bill savings from CIP project that 50+ years Utility Bill Savings converted antiquated, dangerous & inefficient circuits to safe, modern, efficient circuits 6 Direct Install Savings Harness utility bill savings from SCE funded 10 years program that installed energy efficient fixtures at no cost to city As a result of capturing these energy savings, the City will be able to perform the following Facility Improvement Measures: Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 5 FIM Name Description - �- - Expected Useful Life 1 Main St. Lam? Upgrade ,Address significant R,iblic Safety concerns by upgrading 24 years the 2nd block of Main St. to newer brighter LID fixtures 2 Walnut St. Series Circuit Fbplace antiquated & dangerous series circuits on 50+Years Conversion Walnut from 51h to 11 tr, 3 Olive St. Series Circuit Fbplace antiquated & dangerous series circuits on Olive 50+years Conversion St. from Main to 8tn 4 CIM Group Fhrking Garage Fbplace and add long -life energy efficient lighting that 24 years will lower maintenance costs as well as reduce excessive energy use (using restricted enterprise funds) 5 Investment Grade Payment for the completed LOI task costs to date and 24 years Assessment (Exhibit A) for update of the LOI tasks necessary to create a viable and LS-1 buyback, L® mutually agreeable Investment Grade Assessment for upgrade, long term the buyback, L®upgrade, long term maintenance and maintenance and series series circuit replacements described in the city's FAQ circuit replacement and Siemens response to the WQ. Weighted Average Expected'' Useful Life 36.3Q ears Summary of IGA Findings Through several meetings with city staff, The Energy Network staff and in depth analysis of streetlight utility invoices performed by Siemens, the ECM's listed in Table 1-1 were aggregated into this IGA effort. The ECM's represent a combination of billing errors found in streetlight invoicing, tariff changes, upgrading city owned street lights from High Pressure Sodium lighting to energy efficient LED lighting and conversion of the IISNS to LED. The result is maintenance to infrastructure and better system performance with higher efficiencies resulting in reduced energy costs, environmental impacts and maintenance costs. The savings presented in this IGA utilize only utility bill savings for debt service and the reduced operations and maintenance (O&M) savings will accrue to the city from the implementation of these ECM's. Some of these measures have significant non -energy savings that include: improved accuracy in billing from SCE and more efficient utilization of city staff time. These savings are not allocated to proposed additional facility improvement measures but could be held in reserve to provide a greater coverage ratio for the repayment of the debt. Table 14 below provides a financial summary of the recommended ECM's evaluated as part of this IGA. This summary is based on current SCE streetlight tariff rates. In keeping with the goal of this IGA, the ECM's provide a positive cash flow model that could be used to fund the proposed FIM's. Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens_com Table 1-1: Financial Sunman, Coverage Ratio Estimated Greenhouse ID Description Funding Source Project Costs Total Net Project Total Annual Enhancement Energy Gas Savings Incentives Cost Savings ($) (maintenance) Savings (kWh) (Ibs/CO2) ECM-1 Citywide City Owned Street, Area and Pole Financing $ 950,000 $ 271,737 $ 678,263 $ 134,494 $ 114,730 1,339,419 918,460 Lightin LED Upgrade ECM-2 Central Library AECOM** $ 4,486 $ 2,264 $ 1,178 21,362 14,953 ECM-3 Per Rana AECOM* * $ 5,152 $ 722 $ 1,638 12,267 8,586 ECM-4 TOU Rate Change Savings SCE* $ - $ - $ 20,960 $ - ECM-5 7th. St. Series Circuit Conversion Previous CIF'* * $ 505 $ 2,965 $ 870 3,360 2,352 ECM-6 Local Government Direct Install SCE* $ - $ - $ 11,400 $ 95,000 66,500 FIM-1 Main St, LED Upgrade Financing $ 45,000 $ 45,000 FIM-2 iftlnut St. Series Conversion Financing $ 258,164 $ 258,164 $ 1,315 $ 870 FIM-3 Olive St. Series Conversion Financing $ 804,760 $ 804,760 $ 3,391 $ 1,331 Totals $ 2,067 924 $ 281,880 $1 776 044 $ 177 611 $ 120,617 1,471,408 ` 1,010,861 FIM-4 CIM/Shorebreak Parking Garage Pestricted Fund $ 317,860 $ 22,190 $ 295,670 $ 18,959 $ 13,722 175,331 122,732 Investment Grade Assessment (Exhibit A) for LS- Appropriated RM-5 1 buyback, LED Upgrade, long term Fundin $ 187,434 maintenance and series circuit replacement Funding Grand Totals 2 663 2 1 8T s 304,070 2,071,714 196,470 134,339 1,646,739 1,133 5$3 * Southern California Edison Savings come at no cost to the city * * Funding came from previous AECOM ECM's residual enrgy savings dollars * * * Project was completed from a previously awarded CIP project GHG Savings equivalent to removing 260 cars from the road Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com Energy Conservation Measures Introduction Siemens has identified six Energy Conservation Measures that provide substantial economic savings as well as improved lighting to the City of Huntington Beach. Evaluation of Results and Presentation of Findings The information presented below is the outcome of our auditing, engineering, and analysis efforts and offers the solutions we believe are the most cost effective for Huntington Beach to fulfill its energy program objectives while addressing critical facility and infrastructure maintenance needs. The Siemens Team has determined that the ECM's described in detail below are the opportunities that can and should be implemented. These ECMs were determined by a combination of meetings and interviews with Huntington Beach staff along with assessments of site conditions during our project-walks. Recommended ECM Descriptions The following section provides the details of the energy conservation opportunities identified by our team of engineers,the TEN group and City staff who visited numerous streetlight locations and analyzed many years of SCE invoicing. Siemens staff then gathered all of the information provided by city staff along with physical audits around the city to generate the recommended ECMs. ECM-1: Citywide City Procured and Installed, Area and Pole Lighting LED Upgrade The city has been proactively upgrading outdoor street and area lighting to energy efficient LED fixtures as funds have become available. The remaining fixtures utilize older inefficient technologies. Accelerating the replacement of them with modern, efficient lighting fixtures would greatly benefit the city by reducing energy consumption, improving light quality, reducing environmental impacts and produce substantial savings which can pay for the accelerated upgrade schedule. These lights are billed by Southern California Edison under various tariff rates: • LS-2—Customer Owned Unmetered Street Lights,typically intersection safety lamps • LS-3 —Customer Owned Metered Street Lights—PCH, Main St. • GS-1 —General Service Non-demand - Smaller facilities with parking lots (fire stations, community centers) • GS-2—General Service Demand • AL-2-A—Outdoor Area Lighting Metered • AL-2-B-Outdoor Area Lighting Metered, Seasonal • TC-1 —Traffic Control Service Schedule—City Crews anticipate installing the following phases sequentially: 1. LS-2 and TC-1 upgrades in 16 weeks Siemens Industry,Ine. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA www.usa.siemens.com 8 2. LS-3 upgrades in 16 weeks 3. AL-2 upgrades in 16 weeks 4. GS-1 and GS-2 upgrades in 8 weeks The proposed conversions are discussed by tariff rate: LS-2 Street Lights The HPS (High Pressure Sodium) light fixtures charged under the LS-2 rate are predominantly the safety lights that are found throughout the city and are attached to the poles at signalized intersections. These HPS fixtures are outdated and inefficient. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 44% and improves light quality at the intersection. The LS2 LED Streetlight Retrofit phase of the project consists of replacing 553 street light luminaries of various wattages with appropriate, energy- efficient LED luminaries. The current utility expenditures for all LS-2 lights in the city totals $163,711. This includes approximately 426 high voltage series streetlights that are excluded in this ECM. The current annual utility expenditures for the 553 City owned LS-2 fixtures are calculated to be $77,102 per year. Converting these fixtures to LED produces a savings of$43,178 per year. The annual energy reduction is approximately 589,174 kWh with a Greenhouse Gas reduction of 412,422 lbs of CO2 and a calculated SCE rebate totals$117,835 bringing the net measure cost down to $160,923. City staff will procure the fixtures and Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that may be used to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours(approximately 24 years). Existing HPS fixtures require a significant investment in routine and periodic maintenance. HPS bulbs require replacement every two to three years;the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not proposed to be allocated to additional facility improvement measures. TC-1 Traffic Control The TC-1 tariff is used by SCE to bill for traffic control devices and associated devices at the intersection. This includes the Internally Illuminated Street Name Signs(IISNS). These fixtures are illuminated every night with an annual run time of approximately 4340 hours. The TC-1 tariff is based on a class average load profile. Electric costs for cities without IISNS are subsidized by cities with IISNS. The city owns 394 IISNS that use older, less energy efficient fluorescent T12 bulbs. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 66%. The LED upgrade will also provide a significantly better light quality that is more uniform and effective. The appearance of these signs will be greatly improved while reducing energy use and maintenance expenditures. The city spends approximately $22,916 on energizing these lights on an annual basis. By retrofitting these lights to more efficient LED technology, the city will realize an annual savings of$15,010. Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA Hww.usa.siemens.com 9 The annual energy reduction is approximately 122,333 kWh with a Greenhouse Gas reduction of 50,401 lbs of CO2 and a calculated SCE rebate of$24,467 bringing down the net measure costs to $195,382. Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that could be used to finance additional streetlight Facilities Improvement Measures. (See Appendix B) Existing fluorescent street name signs require considerable maintenance.Re-lamping must be done at a minimum of every two years. This requires closing lanes of traffic during daytime travel hours. The proposed LED retrofit kits require no re-lamping or maintenance during the expected service life of 100,000 hours (approximately 24 years).By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below.These operations&maintenance (O&M) savings are not allocated to additional facility improvement measures. LS-3 Street Lights The city owns 534 standalone street lights in various locations throughout the city. These street lights, by city standard, are on metered circuits. Any reduction in energy usage is immediately reflected on the bills. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 49% and improves light quality. The LED Streetlight Retrofit phase of the project consists of replacing 534 HPS street light luminaries of various wattages with appropriate, energy-efficient LED luminaries. The city's utility budget spends approximately $37,568 on energizing these lights on an annual basis. This is a metered service that is based on actual use. By retrofitting these lights to more efficient LED technology, the city will realize an annual savings of$19,124. The annual energy reduction is approximately 279,465 kWh with a Greenhouse Gas reduction of 195,626 lbs of CO2 and a calculated SCE rebate of$55,893 bringing the net measure cost down to $171,154. Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that will be harnessed to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours(approximately 24 years). Existing HPS fixtures require a significant investment in routine and periodic maintenance. HPS bulbs require replacement every two to three years;the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not proposed to be allocated to additional facility improvement measures. GS-I General Service Area Li-h tin ti The GS-1 tariff is used by SCE to bill for General Service area lighting in several city parks, e.g. Zee Park, Central Park, Norma Gibbs Park, etc. as well as parking lots, pathways and general outdoor areas. The city owns 285 of these older, inefficient HPS fixtures. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 49%. The LED upgrade will also provide a significantly better light Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure R Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road R City Mobility USA www.usa.siemens.com 10 quality that is more uniform and effective. The appearance of these high traffic areas will be greatly improved and provide a safer environment for pedestrians while reducing energy use and maintenance expenditures. The city spends approximately$19,599 on energizing these lights on an annual basis. By retrofitting these lights to more efficient LED technology, the city will realize an annual savings of$11,783. The annual energy reduction is approximately 133,168 kWh with a Greenhouse Gas reduction of 93,218 lbs of CO2 and a calculated SCE rebate of$26,634 bringing down the net measure costs to $153,345. Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that will be harnessed to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours(approximately 24 years).Existing BPS fixtures require a significant investment in routine and periodic maintenance. BPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not allocated to additional facility improvement measures. GS-2 General Service Area Lighting The GS-2 tariff is used by SCE to bill for General Service area lighting in several City parks, e.g. Edison Community Center, Central Park Frisbee Course, etc. as well as beach area parking lots, pathways and general outdoor areas. The city owns 112 of these older, inefficient BPS fixtures. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 45%. The LED upgrade will also provide a significantly better light quality that is more uniform and effective. The appearance of these high traffic areas will be greatly improved and provide a safer environment for pedestrians while reducing energy use and maintenance expenditures. The city spends approximately $6,842 on energizing these lights on an annual basis. By retrofitting these lights to more efficient LED technology,the city will realize an annual savings of$3,106. The annual energy reduction is approximately 46,259 kWh with a Greenhouse Gas reduction of 32,381 lbs of CO2 and a calculated SCE rebate of$9,252 bringing down the net measure costs to $44,384. Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that will be harnessed to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours(approximately 24 years). Existing BPS fixtures require a significant investment in routine and periodic maintenance. BPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA krww.usa siemens.com 11 modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not allocated to additional facility improvement measures. AL-2-A Outdoor Area LizhtinQ Metered The AL-2-A tariff is used by SCE to bill for Area Lighting in the Beach parking lots, the Pier, Edison Park pathways and Sports Complex parking lots among other areas. The city owns 379 of these older, inefficient HPS fixtures. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 37%. The LED upgrade will also provide a significantly better light quality that is more uniform and effective. The appearance of these high traffic areas will be greatly improved and provide a safer environment for pedestrians while reducing energy use and maintenance expenditures. The city spends approximately $1,543 on energizing these lights on an annual basis. By retrofitting these lights to more efficient LED technology, the city will realize an annual savings of$565. The annual energy reduction is approximately 9,022 kWh with a Greenhouse Gas reduction of 6,315 lbs of CO2 and a calculated SCE rebate of$1,804 bringing down the net measure costs to $14,734. Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that will be harnessed to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours(approximately 24 years). Existing HPS fixtures require a significant investment in routine and periodic maintenance. HPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below.These operations&maintenance(O&M) savings are not allocated to additional facility improvement measures. AL-2-B Outdoor Area Liehtine Metered,Seasonal The AL-2-13 tariff is used by SCE to bill for Area Lighting in several City parks Worthy Park and a Beach parking lot as well as parking lots, pathways and general outdoor areas and varies by Time of Day and Season (Summer/Winter). However, the entire inventory of city owned lights on this tariff operate exclusively at night and are this billed at the same rate as the AL-2-A tariff. The city owns 29 of these older, inefficient HPS fixtures. Replacing them with new, proposed energy efficient LED fixtures reduces energy consumption by 52%. The LED upgrade will also provide a significantly better light quality that is more uniform and effective. The appearance of these high traffic areas will be greatly improved and provide a safer environment for pedestrians while reducing energy use and maintenance expenditures. The city spends approximately$19,321 on energizing these lights on an annual basis. By retrofitting these lights to more efficient LED technology, the city will realize an annual savings of$10,013. The annual energy reduction is approximately 159,998 kWh with a Greenhouse Gas reduction of 111,999 lbs of CO2 and a calculated SCE rebate of$32,000 bringing down the net measure costs to$176,833. Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA www.usa.siemens com 12 Public Works crews as part of their normal maintenance duties will install the proposed new fixtures. This implementation approach creates additional savings that will be harnessed to finance additional streetlight Facilities Improvement Measures. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours (approximately 24 years). Existing HPS fixtures require a significant investment in routine and periodic maintenance. HPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not allocated to additional facility improvement measures. Summary of ECM-1 Savings ACM 1_Citywide Czty Owned Stree4-Area and Pole Lighting LED Upgrade Total Project Cost" $ 950,000.00 .SCE Calculated Rebate $ 271,737.00 Net Project Cost $ 678,263.00 Total Annual Cost Savings $ $ 134,494.00 RETURN ON INVESTMENT* 275% Mar in of Safe Maintenance Savings) $114,739 Additional Benefits Electric Consutn tion Savings(kWh) 1,339,41.9 Green.House Gas Savings Ibs CO; 9-18,460. *ROI Based on a 20 Year Lifecycle **Estimated from TEN results ECM-2: Central Library At the Central Library 48 parking lot light fixtures were purchased using contingency funding from an earlier energy efficiency project. These energy savings are new and have not been accounted for in any previous project. The fixtures were converted from High Pressure Sodium Lighting to more energy efficient, long life LED fixtures. This will increase the quality and appearance of the parking lot lighting system while reducing energy use and utility and maintenance expenditures. These savings could be used to further reduce the City's energy use and expenditures by upgrading additional components of the City's street lighting infrastructure in a budget neutral manner. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours (approximately 24 years). Existing HPS fixtures require a significant investment in routine and periodic maintenance. HPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations&maintenance(O&M) savings are not allocated to additional facility improvement measures. Summary of ECM-2 Savings ECM 2. .Central Library ti Siemens Industry,Inc. 1266 N.La Loma Cir. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA www.usa.siemens.com 13 Total Project Cost** $ 8,671.86 Total Annual Cost Savings ($)*** $ 2,264.41 RETURN ON INVESTMENT* 627% Additional Benefits Electric Consumption Savings (kWh) 0 Green House Gas Savings (lbs CO2) 14,953 *ROI Based on a 24 Year Lifecycle **AECOM Contingency Funding *** Energy Savings used in Lease Agreement Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com ECM-3: Pier Plaza The Pier Plaza area is a high visibility, high pedestrian traffic portion of downtown Huntington Beach that is overly lit with older inefficient HPS lighting. Forty-eight decorative fixtures were purchased using contingency funding from an earlier City energy efficiency project. The energy savings from this measure have not been used to finance any improvements. The fixtures will be converted from High Pressure Sodium Lighting to more energy efficient, long life LED fixtures. This will increase the quality and appearance of the lighting system while reducing energy use and utility and maintenance expenditures. These savings could be used to further reduce the City's energy use and expenditures by upgrading additional components of the City's street lighting infrastructure in a budget neutral manner. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours (approximately 24 years). Existing UPS fixtures require a significant investment in routine and periodic maintenance. UPS bulbs require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs as summarized in the table below. These operations & maintenance (O&M) savings are not allocated to additional facility improvement measures. Summary of ECM-3 Savinzs ECM-3: Pier Plaza Total Project Cost $ 25,676.75 Total Annual Cost Savings 722.00 RETURN ON INVESTMENT* 67% Additional Benefits - Electric Consumption Savings (kWh) 12.267 Green house Gas Savings (lbs CO,) 8.586 *ROI Based on a 24 Year Lifecycle **AECOM Contingency Funding *** Energy Savings used in Lease Agreement Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 15 ECM-4: TOU Rate Change Savings Southern California Edison has provided the city with a summary of energy accounts that will be transitioning to Time of Use (TOU) rate as part of a statewide initiative enabled by SCE's smart connect meters. The GS-1 and GS-2 Rate Schedules are "Non Demand" and "Demand" tariffs that SCE previously billed as a class average load profile, lumping city facilities in with all small commercial customers. As a result of SCE's Smart Connect meters, city facilities can now be billed based on its actual time of use and related grid costs. The City's commitment to energy efficiency results in lower bills when billed on actual usage as enabled by SCE's smart connect meters. By changing to the Time -of -Use Plan, Options A or B (TOU) the city will realize these utility bill savings. SCE has provided an in depth analysis of the city service account numbers that this rate change will benefit from. See Appendix D for the SCE analysis. !-4Z-1 trancfxr to TnTT Rate Tariff Cnmmary Current Tariff Rate Current Annual Cost Total of Accounts New 2014 Tariff Rate New 2014 Annual Cost Total of Accounts Projected Annual Savings {{ J 1 GS-1 $79.080 TOU-GS-1-A $77.1530 $1.550 GS-2 $316.550 TOU-GS-2-13 $310.480 $6.070 PA-2 $3,860 TOU-PA-2-B $2,990 $870 TOU-GS-1-A $51,440 TOU-GS- I -B $36.560 $14.880 Minus Enterprise fund Savings -$2,410 Total Projected Annual Savings $20,960 These utility bill savings could be used to further reduce the city's energy use and costs by improving the City's antiquated series circuit street lighting infrastructure in the downtown area. Summary of ECM-4 Savinms ECM-4: TOU Rate Change ,Savings Total Project Cast N/A Total Annual CostSavings ($) $ 20.960 RETURN ON INVESTMENT N/A Additional Benefits Electric Consumption Savings (kWh) N/A Green Ilouse Gas Savings (1bs CO,) N/.A Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 16 ECM-5: 7th. St. Series Circuit Conversion The City, through a recent CIP project, has upgraded the antiquated and dangerous series circuits on 7th street to modern loop fed circuits with LED fixtures. This improves light quality, eliminates antiquated and potentially hazardous voltage, reduces maintenance costs and reduces the energy spend for these circuits. These savings can be harnessed to further reduce the City's energy use and expenditures by upgrading the City's street lighting infrastructure in a budget neutral manner. Summary of ECM-5 Savinrs ECM-S: 7th. St. Series Circuit Conversion } Total Project Cost $ 17ti.000.00 "Total Annual Cost Savings 2.964.56 RETURN ON INVESTMENT* 41% Margin of Safety `Maintenance Savings) S 922 Additional Benefits Electric Consumption Savings (kWh) 3.360 Green House Gas Savings (lbs CO,) 2,352 *ROI Based on a 24 Year Lifecycle ROI = ((savings*24)-costycost ECM-6: Local Government Direct Install As part of the City's longstanding Energy Leadership Partnership with Southern California Edison, the City has received energy upgrades for smaller facilities completely funded by SCE. For local government partners like HB, SCE adapted their small commercial direct install program for small government facilities like Fire Stations, Community Centers and the City's Heliport. SCE's contractor audited and installed approximately $35,000 in energy upgrades at no cost to the city. The upgrades will save a minimum of 95,000 kWh and $11,400 dollars. These savings could be used to further reduce the City's energy use and expenditures to upgrade the City's street lighting infrastructure. Summary of ECM-6 Savings Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 17 Facility Improvement Measures FIM 1 Main St. LED Upgrade Main St.between Olive and Walnut is a high visibility, pedestrian heavy, revenue producing portion of the downtown area. The Downtown Task Force and the police department have identified this area as in need of a lighting upgrade to produce greater illumination. It is currently lit by older LED fixtures. The lighting industry has advanced since these fixtures were installed four years ago. Replacing them with newer LED fixtures will increase light levels and support public safety. The existing fixtures will be repurposed to replace older inefficient UPS fixtures elsewhere in the city. Main St. Scope • Replace 24 decorative fixtures with new brighter 100w LED Acorn Globes fixtures • Old fixtures to be re-used in ECM-1 on Main Street above Orange Ave. FIM 2 Walnut St. Series Circuit Conversion A large portion of downtown residential neighborhoods adjacent to Main St. are lit with antiquated and potentially dangerous series circuits. Many of these circuits date back to the 1930's and 40's. These series circuits are high voltage and thus pose a significant safety risk. Additionally, these streets are not lit to modern standards and have been noted by the Police Department as an area that could benefit from improved night lighting. The Police Department and City staff have identified several of these circuits as high priority upgrades. Removing the series circuits and replacing them with modern loop-fed circuits and energy efficient LED lights will reduce utility expenditures, increase light levels,reduce the city's liability and support public safety. FIM 2 has been reviewed by Planning and has been found to be in compliance with the Downtown Specific Plan streetscape guidelines. These guidelines call for the addition of Acorn Globe pedestrian lights and existing street lights to remain. Upgrading the existing street lights does not require the addition of pedestrian lights for this project. Walnut Scope—10 Street Lights • Convert series circuit from 6th to I lth using plans and specifications from 71h St. project documents as a template(see Appendix E) • Signed and stamped drawings including as-built plans at project completion • So Cal Edison Fees included • Close the loop on 8th to preserve functionality on the side streets • Install new service at or adjacent to loth or I Ith street • Model photometrics to determine lighting levels with existing pole locations • Keep existing pole locations (pending photometrics) Pull existing foundations • Install 10 new 21 ft poles and foundations with LED fixtures • Call George Ruff to inspect poles for potential re-use in future projects, deliver re-usable poles to city yard Siemens Industrv,Inc. 1266 N.La Loma Cit. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA wwwusa.siemens.com 18 FIM 3 Olive St. Series Circuit Conversion Olive (South Circuit) Scope — 7 Street Lights • Convert series circuit from 1" to Main using plans and specifications from 7th St. as a template (see Appendix E) • Signed and stamped drawings including as -built plans at project completion • So Cal Edison Fees included • Re -use existing service at 301 Olive Ave. A. south of Main • Keep existing pole locations • Pull existing foundations • Install 7 new 21 ft poles and foundations with LED fixtures • Supply two additional —70w LED fixtures for city use • Call George Ruff to inspect poles for potential re -use in future projects, deliver re -usable poles to city yard FIM 3 has been reviewed by Planning and has been found to be in compliance with the Downtown Specific Plan streetscape guidelines. These guidelines call for the addition of Acorn Globe pedestrian lights and existing street lights to remain. Upgrading the existing street lights does not require the addition of pedestrian lights for this project. Olive (North Circuit) Scope — 26 Street Lights • Convert series circuit from Main to 17th using plans and specifications from 7th St. as a template (see Appendix E) • Signed and stamped drawings including as -built plans at project completion • So Cal Edison Fees Included • Install new service at or adjacent to loth or 1 lth street • Model photometrics to determine lighting levels with existing pole locations • Keep existing pole locations pending the results from the photometric study • Pull existing foundations • Install 26 new 21 ft poles and foundations with LED fixtures • Call George Ruff to inspect poles for potential re -use in future projects, deliver re -usable poles to city yard FIM 3 has been reviewed by Planning and has been found to be in compliance with the Downtown Specific Plan streetscape guidelines. These guidelines call for the addition of Acorn Globe pedestrian lights and existing street lights to remain. Upgrading the existing street lights does not require the addition of pedestrian lights for this project. City of Huntington Beach Series Circuit Conversion Project Item Item Description Unit Quantity Unit Price Tota'1 1 Walnut from 6th to 11th LS 1 $276,356.00 $ 276,356.00 2 Olive from 1st to Main St South. LS 1 $185,543.00 $ 185,543.00 3 Olive from Main St to 17th North LS 1 $ 601, 025.00 $ 601, 025.00 Total1 $1,062,924.00 Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 19 High voltage series circuits are inherently inefficient. By converting these circuits to modern loop-fed circuits the city will create additional savings that can be harnessed to further reduce the City's energy use and expenditures to upgrade the City's street lighting infrastructure in a budget neutral manner. The city spends approximately $7,498 on energizing these lights on an annual basis. By retrofitting these lights to more efficient, metered LED technology,the city will realize perpetual annual savings of$4,706. FIM 4 —CIM/Shorebreak Parking Garage The City has identified the City owned Shorebreak underground parking structure managed by the CIM Group as an area in need of an energy efficient lighting retrofit. The parking structure is operated as a city owned enterprise fund. The parking structure is currently lit by fluorescent lights and requires lighting 24 hours a day. This very long run time of 8,760 hours annually makes the structure an ideal candidate for an energy savings upgrade. Even a small reduction in energy use produces a substantial corresponding dollar savings which will accrue exclusively to the enterprise fund. The existing lights, while somewhat efficient, require substantial maintenance and upkeep. Converting to energy efficient LED lighting will lower energy consumption, reduce maintenance, reduce environmental impacts and improve the facility lighting. The proposed LED fixtures will be installed with bi-level occupancy sensors. These sensors will allow the lights to go into a 50% reduced light mode when there is no movement in the adjacent area. When cars and pedestrians move about the lights return to full brightness. As the structure is closed at night but still needs to be lit to prevent crime,this will allow a dramatic reduction in overnight energy costs. CIM Garage Scoae The CIM Group parking garage is currently lit with 268 dual 8ft fluorescent fixtures. These fixtures are moderately efficient but require ongoing maintenance. The fixtures themselves are industrial, unattractive and produce a typical fluorescent light. Replacing them with the new, proposed energy efficient LED fixtures reduces energy consumption by 49% and significantly improves light quality by providing bright, white light. The facility improvement measure consists of replacing 268 dual 8ft fluorescent fixtures with energy-efficient Relume ParkVue LED luminaries. See Appendix C for fixture details. The current annual utility expenditures for lighting the garage is approximately $23,471. Converting;these fixtures to LED produces a savings of$18,959 per year. The annual energy reduction is approximately 153,990 kWh with a Greenhouse Gas reduction of 63,444 lbs of CO2 and a calculated SCE rebate totals $22,190 bringing the net measure cost down to $295,699. Siemens will perform a full turnkey replacement of all fixtures. See Appendix B for detailed scope. LED fixtures do not require any routine maintenance. The proposed fixtures include a 10 year warranty with an expected service life of over 100,000 hours (approximately 11.4 years at full output, actual life with 50% dimming is projected to be significantly longer). Existing fluorescent fixtures require a significant investment in routine and periodic maintenance. Fluorescent bulbs that burn 24 hours a day require replacement every two to three years; the ballasts need to be replaced every seven years and the entire fixture every ten years. By installing modern LED fixtures the city will avoid these maintenance costs. These operations & maintenance (O&M) savings are not allocated to additional facility improvement. Siemens Industry,Inc. 1266 N.La Loma Cit. Tel.:+1-714-630-2100 Infrastructure&Cities Sector Anaheim,CA 92806 Fax:+1 714-630-2828 Road&City Mobility USA www.usa.siemens.com 20 City of Huntington Beach Shorebreak Hotel Parking Structure Item . ` Item Description Unit Qua ntity Unit Price Total 1 Parking structure P1 LS 1 $157,222.00 $ 157,222.00 2 Parking structure P2 LS 1 $137,131.00 $ 137,131.00 3 Stairwell Lighting LS 1 $ 25,506.00 $ 25,506.00 Total $ 319,859.00 Implementation Plan Following an executed contract and a notice to proceed, Siemens will begin material acquisition and construction will commence. Siemens plans to furnish and install 268 deck mounted LED garage lights and 25 wall mounted stairwell lights to replace existing fluorescent fixtures. The one for one replacement portion of this project will take approximately 25 working days with a two man crew. To facilitate proper installation and commissioning, manufacturer's representatives will be onsite as a resource for Siemens crews and City personnel. They will also provide training on system maintenance and the proper operation of controls, including occupancy sensors and photo -electric sensors. Following training and commissioning, a walkthrough will be done with Siemens and The City to obtain City acceptance and to begin the system warranty. As this project is an in -place energy efficiency project it is currently exempt from certain Title 24 requirements, namely required daylight & occupancy controls. However, the city must furnish or waive permits prior to July 1 st 2014 as changes to Title 24 law become effective after that date and will significantly increase the cost of the project. The 2008 Title 24, Part 6, Section 131 code provides an exception for parking garages to the mandatory installation of daylight controls and occupancy sensors. The 2013 Title 24, Part 6 code provides no such exemption. CIM Funding This parking garage is part of a restricted fund. The fund balance is approximately $1.5M. The project costs will be paid for out of this fund with all of the energy cost savings accruing exclusively to this fund. Summary of FIM-4 Sayings Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 21 FIM-4: Sth Street Paring Garage Lighting Upgrade Electric Consumption Savings (loth) 175331 Green House Gas Savings (lbs CO ,) 122.732 Total Annual Cost Savings Total Project Cost $ 319,859.00 Margin of Safteyy / Maintenance Savings $ 13,722.00 RETURN ON INVESTMENT* 125% *ROI Based on a 20 Year Lifecycle FIM 5 — Terminates and Replaces the Letter of Intent (LOI) As a result of the competitively solicited RFQ for street light purchase support, upgrades, operations and maintenance the City of Huntington Beach previously entered into an LOI with the Mobility and Logistics Division of Siemens Industry, Inc for the implementation of a street light conversion program to decrease total expenditures and maintenance costs of Huntington Beach's current street light infrastructure ("Streetlight Project") using the Siemens final proposal to the city of Huntington Beach as a guide which is incorporated herein by reference. The Streetlight project will be comprised of the purchase and transfer of street light assets from SCE to Huntington Beach, procurement and installation of LED street light fixtures and the conversion of existing series circuits and long term maintenance that provides at least $200,000 of annual cost savings. In the event of grant funding being secured the savings to the city will increase commensurate with the avoided debt service costs of the amount of grant funding. Phase 1 activities are deemed complete with recorded costs of $50,280. The city will pay Siemens for this work 30 days after at the close of financing of the City Owned Streetlight and Parking Lot LED Upgrades IGA. No further obligation or exclusivity will apply to either party for Phase 1. Phase 2 activities are to be completed on a Time and Material basis, not to exceed $183,720 ($166,000 plus $17,720 carried over from Phase 1 not to exceed amount) and the activities have commenced. A Siemens subcontractor has completed the data collection and compilation of data assessing the field condition of each pole, at a cost of $137,153.62 .Total costs to date under Phase 2 are $154,873.62. The remaining outstanding activities under FIM-5 are to develop a final, executable scope of work for Phase 2, also known as an Investment Grade Assessment (IGA), including but not limited to firm, executable pricing and project contracts (series circuit conversion, maintenance, energy efficiency upgrades). The Phase 2 IGA shall include the following: • Finalize, in cooperation with the city and SCE, the precise street light assets to be purchased, • Create a program to manage knock -downs and pursue successful recovery of those costs with a guaranteed service level requirement for cost recovery, • Energy efficient white light LED upgrades for every street light purchased • Equipment replacement program to replace street lights in poor or very poor condition or poles nearing the end of their useful life Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax: +1 714-630-2828 Road & City Mobility USA www.usa.siemens.com 22 • Defined service levels for maintenance agreement including system for managing the street light asset, knockdown and outage calls. • Validate and optimize cut over costs and scheduling from the SCE system • The City reserves all wireless and telecommunication rights to itself from the purchase of utility owned street lights. The Phase 2 IGA shall follow the services as described in the RFQ and Siemens response to the RFQ. The Phase 2 IGA shall contain an additive alternate option to include a comprehensive lighting re -design and upgrade of the Main Street parking garage including compliance with Title 24 2013 standards. The city is seeking Capital Improvement Program funding in Fiscal Year 2014/2015 to complete this upgrade. Alternatively, the city reserves the option dependent on Council direction to finance the improvement from the $200,000 in annual savings cash flow. The Phase 2 IGA shall be presented to the city in no more than 9 drafts. City shall provide comments on each draft. The final draft IGA shall be submitted to the city within 90 days of the executed Phase 1 contract. The IGA shall be peer reviewed and approved by CA Energy Commission (CEC) Technical Assistance provider on behalf of the city prior to presentation to Council for consideration. No further duties or obligations shall be owed by either party. However, if a third party fails to perform the city agrees to pay Siemens on a T&M basis not to exceed $91,860 and Siemens shall have exclusive right to develop and implement any future utility streetlight purchase project for a period of seven (7) years. Time and Material Rates Job Category Hourly Rate Energy Engineer $ 180.00 Project Manager $ 130.00 Field Su eNsor $ 110.00 General Foreman $ 98.00 Service Vehicle $ 20.00 Bucket Truck $ 30.00 Siemens Industry, Inc. 1266 N. La Loma Cir. Tel.: +1-714-630-2100 Infrastructure & Cities Sector Anaheim, CA 92806 Fax. +1 714-630-2828 Road & City Mobility USA wwwusa.siemens.com 23 City of Iluntineton Beach City Owned Lialits Cash Flow Model SIEMENS Project Cashf low Street Light Project - City of Huntington Beach Total Lease Program for 10 Years Confidential Year 1 2 3 4 5 1 6 7 A 9 10 11 12 13 14 15 16-20' Totals ECMICity Owned Lights Savings ECM 2 Library $134494 $141,219 $148.2B0 $155.694 $163,478 $171,652 $180235 5189247 S198,709 $206644 $219,077 $230,030 $241,532 $253.608 $266,289 $ 1,544,985 $4,447;172 $2,264 52 317 $2,496 $2 621 $2,752 $2,890 53,034 $3,188 $3,345 $3 512 $3,688 $3,872 $4,066 $4,269 $4,483 $ 26.007 $74,861 ECM 3 Pier Plaza $722 $758 $796 $836 $878 S921 $908 $1,015 $1,067 $1,120 $1,176 $1,235 $1297 $1,361 $1,430 5 8,294 $23,874 ECM4TOUSavings ECM 57th St Series Savings $20,960 $22,008 $23,108 $24.264 $25,477 $26,751 $28,088 $29,493 $30,967 $32,516 $34,142 $35,849 $37,641 $39,523 $41,499 $ 240,T76 $693,062 $2,965 $3,113 $3,269 $3,432 $3,604 $3 784 $3,973 $4 172 $4,381 $4,600 $4 830 $5,071 $5,325 S5,591 $5,870 $ 34,060 $98,041 ECM 6 Direct Install Savings $11,400 $11,970 $12,569 $13 197 $13,857 $14 550 $15.277 $16 041 $16,843 $17 685 $18.569 $19,498 $20.473 $21,496 $22,571 $ 130,956 $376,952 FIM 2.3Series Circuit Savings $4,706 $4,941 $5,188 $5,448 $5,720 $6,006 56,306 $6,522 $6,953 57301 $7,666 $8,049 58,451 58,874 $9,318 $ 54060 $155,608 Energy Savings Subtotal Isumnf ECM 1•6 and FIM xai $177,511 $186,387 $195,700 $205,491 $215,766 $220,654 $237,882 $249,776 $262,265 $215,378 $289,147 $303,604 $318,784 $334,723 $351,460 $2,039,138 $5,869,571 Lease Payment h .tepl I I n,' ., -1 --, : I 1 "! %; I1,111 p- -- --, 1 149T1 a134.97r I 134 0"71 $0 $0 $0 $0 $0 $0 3n1.2?21 Total Annual Cash Flow Pro ct savings IguLease Payment) $91,071 $51,410 $60,T29 170,514 $60,789 $91,57T $102,905 $114,799 $127,288 $140,401 $289,147 -$303,604 $318,T84 $334,723 $351,460 $ 2,039,138 $4,668,338 Cumulative Cash Flow $91,0?1 $142,461 $203,209 $273,724 $354,512 $446089 $548,994 $663,793 $791,080 $931481 $1,220,628 $1,524,232 $1843,016 $2,177,740 $2529,199 $ 4,568,336 Street Light Acquisition & Fixture Replacement Lease Installation Cost $ 2,012,924 City Contribution S 950,000 Principal' $ 1,052,924 Interest 13 5v) $ 218,308 Total Debt Service' $ 1,301,232 Term of Lease 10.0 Years Payments per year 2.0 Annual Lease Payment First Year Energy Savings Simple PaybacklCalc,.lated fromfirst year proiect savings) $ 177,511 T3 Years MMEREU�l= Potential SCE Rebate Annual Energy Savings (kWh) 1,646,739 Rebate Rate per kwh $ 0.20 Total Rebate* $ 329,348 FIM Costs Walnut Series Conversion $ 276,356 Olive Series Conversion $ 766,568 Fixtures for ECM 1 $ 950.000 Strand Parking Garage" $ 319.659 FIM 5 - IGA Phase 1 & 2' $ 234,000 'Costs not Included in lease terms. City to use a!tern a se funding Siemens Industry, Inc. 1266 N. La Loma Cir. TeL +1-714630-2100 Infrasinichire & Cities Sector Anaheim, CA 92806 Fax: +1 714630-2828 Road & City Mobility USA www usa.sietnens.com 24 Appendix B — ECM 1 Bid Documents for City Procured Material PURCHASING DEPARTMENT SO Q.t1fQuotation Number EB CITY OF HUNTINGTON BEACH Show this number on outside of 2000 MAIN STREET your envelope. HUNTINGTON BEACH, CA 92648-2702 REQUEST FOR QUOTATION Date Released: Please enter your company name and Bids will be received until address 4:00pm at the office of the Purchasing Division V Floor City Hall All LED Acorn fixtures shall be DLC Listed, 4000K CCT± 5% (200K), with a 10 year warranty. Fixtures shall include a fitter designed for a 2 7/8" OD by 3"tall tenon. The fitter set screws shall have anti-seize compound applied. Awards will be made on a best value basis under Government Code 4217. Staff rating of the long-term durability of the fixture construction, lumens/watt, lumen depreciation factor and cost will be the relevant factors. All bids to be accompanied by cut sheets clearly showing system watts, DLC listing, lumens/watt and lumen depreciation factors in addition to cost. UNIT PRICE—��QUNTMRk:: LED Acorn Globe replacement for 70W HPSV Acorn Globe: (Check one) ❑ Holophane AWDE 40 4K AS MRAL9005 3 FTRDC;or ❑ Sternberg A850ASRLED/5PPT/2ARC4T5/MDL05/BKT; or ❑ Spring City;ALMKYW-LE040/EVX/X2-40-YS11-CN5-FDL-CU; or 19 EA. Or citv approved equivalent LED Acorn Globe replacement for 150W HPSV Acorn Globe and 20OW HPSV Acorn Globes to LED equivalent for 80W HPSV at Beach Parking B: (Check one) ❑ Holophane AWDE 80 4K AS MRAL9005 5 FTRDC;or ❑ Sternberg A850ASRLED/5PPT/4ARC4T5/MDL03/BKT; or ❑ Spring City ALMKYW-LE080/EV8/X2-40-YS11-CN5-FDL-CU or Or city approved equivalent 20 EA. LED Acorn Globe replacement for 20OW HPSV Acorn Globe and 150W HPSV Acorn Globes to LED equivalent for 100W HPSV at Beach Parking B: (Check one) ❑ Holophane AWDE 100 4K AS MRAL9005 5 FTRDC; or ❑ Sternberg A850ASRLED/5PPT/6ARC4T5/MDL05/BKT; or ❑ Spring City ALMKYW-LE100/EV8/X2-40-YS11-CN5-FDL-CU;or City approved equivalent 57 1 EA. LED Acorn Globe replacement for 150W HPSV Acorn Globe(Type 5)on Main St from 14"St.-17'St.: ❑ Sternberg A850ASRLED/5PPT/6ARC4T5 MDL03/BKT; or ❑ Holophane AWDE 80 4K AS MRAL9005 5 FTRDC;or ❑ Spring City ALMKYW-LE80/EV2/X2-40-YS11-CN5-FDL-CU; or City approved equivalent 18 EA. Acorn Globe LED replacement for 150W HPSV Acorn Globe(Type 3)on Main St from Orange-6th,Acacia-Palm and 150W HPSV Acom Globe(Type 3)in Pattinson Park: (Check one) ❑ Holophane AWDE 80 4K AS MRAL9005 3 FTRDC;or ❑ Sternberg A850ASRLED/5PPT/4ARCT3R/MDL03/BKT or ❑Spring City ALM KYW-LE080/EV2/X2-40-YS 11-CN5-FDL-CU;or Or city approved equivalent 32 EA. Acorn Globe LED replacement for 150W HPSV Acorn Globe to LED equivalent for 100W HPSV on Main St from 6th-Acacia: (Check one) ❑ Holophane AWDE 60 4K AS MRAL9005 3 FTRDC;or ❑ Sternberg A850ASRLED/5PPT/4ARC4T3R/MDL03/BKT; or ❑ Spring City ALM KYW-LE060/EV4/X2-40-YS 1 1-CN5-FDL-CU; or Or city approved equivalent 4 EA. Acorn Globe LED replacement for 200W HPSV Acorn Globes(480 volt,Type 5) to LED equivalent for 150W HPSV at Pier: (Check one) ❑ Holophane AWDE 80 4K AH MRAL9005 3 FTRDC; or ❑ Sternberg A850ASRLED/5PPT/4ARC4T5/MDH03/BKT;or ❑ Spring City ALMKYW-LE080/EV4/X2-40-YS11-CN5-FDL-CU or City approved equivalent 54 EA. Acorn Globe LED replacement for 150W HPSV Acorn Globes to LED equivalent for 70W HPSV at Beach Parking B: (Check one) ❑ Holophane AWDE 60 4K AS MRAL9005 3 FTRDC; or ❑ Sternberg A850ASRLED/5PPT/4ARC4T3R/MDL03/BKT; or ❑ Spring City ALM KYW-LE060/EV8/X2-40-YS 1 1-CN5-FDL-CU; or Or city approved equivalent 2 EA. Acorn Globe House side shields(shall be field installable in less than 30 1 EA. minutes Acorn Globe adaptor plates Holophane—PIERMTBKH MOD HH SCREWS RFD 159332—spec sheet attached; Or city approved equivalent 210 EA. ALL ADDENDUMS WILL BE POSTED ON THE CITY WEBSITE www.huntingtonbeachca.gov Bidder shall signify receipt of all Addendum here if any: Addendum Number Date Received Bidder's Signature Page 27 Please quote your most competitive pricing, INCLUDING ANY GOVERNMENT OR CO-OPERATIVE AGREEMENT PRICING. "PIGGYBACK" CLAUSE. Bidder shall indicate below if he will extend the same prices, terms, and conditions of his bid to other public agencies: Yes _No. Bidder's response to this question will not be considered in award of bid. When the Bidder extends the prices, terms, and conditions of this bid to other public agencies, the contract shall be between Bidder and the other agencies, and the City of Huntington Beach shall bear no responsibility or liability for the contracts. Submission of Responses: Each submittal shall be in a sealed package marked"BID#. Bids must be submitted not later than 4:00 pm to: Buyer: City of Huntington Beach /Purchasing Division, 2000 Main Street, P.O. Box 190, Huntington Beach, CA 92648-0190 All quotations must be signed Total: Signature Sales Tax: Total: Delivery to be made on or before: Print Name Terms: % days Company Name Email: or days from receipt of Title EMAIL AND FAXED order. BIDS ARE NOT ACCEPTED Date Phone Number Page 28 CITY OF HUNTINGTON BEACH INSTRUCTION TO BIDDERS ALL PAGES OF THE BID MUST BE RETURNED Quotations are requested for furnishing the items described in accordance with terms set forth herein. All quotations must be F.O.B. delivered. The detailed specifications or brand names or numbers given herein is descriptive and indicates quality and style of item required. Offer to supply articles substantially the same as those described herein will be considered provided the articles offered are equal in quality, durability, and fitness for the purpose intended. Acceptability of alternates will be determined solely by the City of Huntington Beach EXAMINATION OF BID Each bidder is responsible for examining the invitation to bid and submitting its bid complete and in conformance with these instructions. DISCREPANCIES IN BID DOCUMENTS Should bidder find discrepancies in, or omissions from the invitation to bid, or if the intent of the invitation is not clear, and if provisions of the specifications restrict bidder from bidding, they may request in writing that the deficiency(s) be modified. Such request must be received by the Buyer five (5) business days before bid opening date. All bidders will be notified by addendum of any approved changes in the invitation to bid documents. ORAL STATEMENTS The City of Huntington is not responsible for oral statements made by any of their employees or agents concerning this invitation to bid. If the bidder required specific information, bidder must request that it be supplied in writing by the City of Huntington Beach. BRAND NAMES AND SPECIFICATIONS The detailed specifications and/or brand names stated are descriptive only and indicate quality, design, and construction of items required. Offers will be considered to supply articles substantially the same as those described herein provided the articles are equal in quality, durability, and fitness from the variation in the bid. Acceptability of alternate will be determined solely by the City of Huntington Beach. Bidder must submit specifications when bidding alternative equipment. RIGHT TO REJECT City reserves the right to reject at any time any or all bids, or parts thereof, and to waive any variances, technicalities and informalities which do not impair the quality, utility, durability, or performance of the items. SAMPLES Samples if items, when requested or required, must be furnished to the city free of expense to the city and, if not destroyed by tests will, upon request, be returned at the bidder's expense. PRICES Individual item pricing must be shown for each line item. In case of error in extension of prices, unit price will govern. All prices must be firm for the contract term unless the city specifically provides for adjustment. Any proposed pricing adjustment shall be submitted to the City Representative in writing at least thirty (30) days prior to the proposed date of increase. All quotations must be FOB delivered. FORM OF BID AND SIGNATURE The bid must be made on this form only. Bid should be enclosed in a sealed envelope, showing the Request for Quotation Number in the lower left corner, and addressed to the City of Huntington Beach, 2000 Main street, Huntington Beach CA 92648-2702 , Attn: Purchasing. This bid must be signed by an officer or authorized employee. Bids may be rejected if this form is not signed. SUBMISSION DATE AND WITHDRAWAL OF BIDS Each bid must be delivered to the location and received on or before the due date and time stated. Bids may be withdrawn without prejudice, providing the Central Service Division receives the written request no later than the time set for opening bids. Withdrawals will be returned to bidder unopened. FAXED BID IS NOT ACCEPTABLE. AWARD OF CONTRACT The City reserves the right to award this Contract by item or in its entirety, whichever is in the best interest of the City Page 29 Insurance Certificate is not required with submittal of Request for Quotation. Awarding vendor will be required to submit for approval before commencement of work. CITY OF HUNTINGTON BEACH Email: Justin.Wessels(cDsurfcity-hb.org Phone: 714-374-5378 Fax: 714-536-5212 Insurance Requirements vary for different applicants. Please see the below listed applicant types followed by the insurance requirements. City of Huntington Beach Resolution 2008-63 requires that contractors, permittees, licensees/lessees and vendors have an approved Certificate of Insurance on file with the City of Huntington Beach for the issuance of any permit or city contract. The insurance certificate must be approved by the City Attorney's Office as to meeting all of the city's insurance requirements. An original certificate is required or a PDF version attached to an email may be forwarded. If the insurance certificate is faxed, it must come directly from the insurance provider to the City of Huntington Beach. All insurance must be from a California admitted carrier with a current A.M. Best's Rating of no less than A:VII 1. CONTRACTORS—Any persons or entities or Contract with the City and/or provide service to the City which are readily available and efficiently procured by competitive bidding. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 2. DESIGN PROFESSIONALS- Professional Service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Requirements: Errors and Emissions(Professional Liability) $1,000,000 coverage 3. LICENSEES/LESSEES—any person or entities who make contract with the city for the use of public property. Requirements: General Liability, Workers'Compensation, Property Insurance, Additional Insured Endorsement 4. PERMITEES—any persons or entities who make application to the City for any use of encroachment upon any street, waterway, pier, or City property. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 5. Professional Services—means those services, which involve the exercise of professional discretion and independent judgment on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to Huntington Beach Municipal Code Section 3.02. Such Services shall include but not be limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. Requirements: Errors and Emissions (Professional Liability) $1,000,000 coverage Private Property Work Permit Requirements—If the planned work does not involve public property or its right-of-way(e.g. sidewalk/street), the Workers' Compensation Certificate is the only insurance requirement. However, if the work site is adjacent or attached to public property, the City Attorney's Office must be informed for consideration of liability and decides whether or not to approve the certificate with a specific"Private Property Only" approval stamp. Page 30 ➢ General Liability(GIL)—The general liability requirement is for$1,000,000 with "per occurrence"type claims coverage and a separate"Additional Insured Endorsement" page listing both the policy number and naming the"City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers" as additional insured on the endorsement. (see below for Additional Insured requirements) ➢ Additional Insured Endorsement Requirements—The City, its officers, elected or appointed officials, employees, agents and volunteers are to be specifically named and covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its agents, officers and employees. The endorsement should include the policy number it correlates to. ➢ Primary Insurance—General Liability Insurance coverage shall be primary insurance as respects the City, its agents, officers, and employees. Any insurance or self-insurance maintained by the City, its agents, officers, and employees shall be excess of the submitted insurance and shall not contribute with it. ➢ Description of work—The staff contact and purpose of the evidence of coverage must be identified on the certificate of insurance. ➢ Automotive Insurance—Automobile insurance requirement is for$1,000,000 and a separate "Additional Insured Endorsement" page listing both the policy number and naming the"City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers" as additional insured on the endorsement. The City of Huntington Beach has a zero deductible/SIR requirement. ➢ Worker's Compensation Insurance (W/C)—The Worker's Compensation insurance requirement is the State statutory limits of$250,000 bodily injury by disease, policy limit, and $100,000 bodily infury each employee for accident or disease per occurrence. Certificate holder listed on the certificate is: City of Huntington Beach, 2000 Main St., Huntington Beach, CA 92648. If your organization/company has no compensated employees working on the project, you may complete and return a "Non-Employer Status"form to be used in lieu of a W/C insurance certificate. ➢ Cancellation Clause Notice—The cancellation clause must contain a thirty(30) day notice. A ten (10) day notice for non-payment of premium is acceptable in combination with 30 day notice. ➢ Professional Liability— Coverage must be provided at a minimum of$1,000,000 per occurrence and in the aggregate. ➢ Deductibles—The following deductibles are acceptable and all others must be removed from the insurance policy or a waiver can be requested (see below) o General Liability- $5,000 o Auto Liability -$1,000 o Professional Liability/Errors & Emissions -$10,000 ➢ Waiver Procedure— If unable to comply with a requirement, the"INSURED" may request a waiver of a specific requirement. The Insurance Waiver form is an internal form that the City of Huntington Beach will complete. (see following page for waiver form) The exception to the waiver is the GIL &Auto "Additional Insured Endorsement"page. 0 Page 31 Waiver Procedure To request a waiver, indicate here[] and provide a brief description ( 1 —2 sentences) of the proposed work/project, its dollar value (if not a specific dollar amount, use an average, annual estimate or non- profit) and projected timeframe (per job or as-needed basis). For substantial dollar deductible/SIR amounts, a financial statement is required (Balance Sheet, Budget Reports, Dun & Bradstreet Report, etc.). Waiver Requested: Encroachment Permit[] Private Property Work Permit[] Consultant Services[] Other: Proposed Work: Dollar Value: Projected Timeframe: Page 32 S PURCHASING DEPARTMENT 'Ty Quotation Number CITY OF HUNTINGTON BEACH Show this number on outside of t ,: 2000 MAIN STREET your envelope. HUNTINGTON BEACH, CA 92648-2702 REQUEST FOR QUOTATION Date Released: Please enter your company name and Bids will be received until 4:00pm address at the office of the Purchasing Division 15t Floor City Hall All LED Cobra head replacement fixtures shall be DLC Listed, have 4000K CCT± 5% (200K), and include a standard 10 year warranty. All LED cobra head replacement fixtures shall be on LA City or CalTrans qualified product lists. All LED cobra head fixtures shall include a utility wattage label that is viewable from the ground. The fixture drive supply voltage shall be 120-277. All fixtures shall accept a field installable House Side Shield with a install time of 30 minutes or less and accept a 2 3/8"tenon. All fixtures on un-metered circuits (LS-2) shall have fixed drive current that prevents field adjustment of drive current/energy use. Awards will be made on a best value basis under Government Code 4217. Staff rating of the long-term durability of the fixture construction, lumens/watt, lumen depreciation factor and cost will be the relevant factors. All bids to be accompanied by cut sheets clearly showing system watts, DLC listing, lumens/watt and lumen depreciation factors in addition to cost. _QUANE�:">`UNIT::M - �� a DESCRIP,.TION_ w',UNMPRlCE. ....,.��OUNT LED cobra head street light replacement for 70W HPSV cobra head ❑ Leotek-EC1-4M-MV-NW-3-GY-WL; or ❑ Leotek—GC1-20E-MV-NW-3-GY-530-WL;or ❑ Cree—BXSPR-A-0-3-C--U-S-U;or ❑ AEL—ATB020ALEDE35MVOLTR3NR;or 48 EA. City approved equivalent LED cobra head street light replacement for 150W HPSV cobra head: ❑ Leotek EC3-10M-MV-NW-3-GY-WL;or ❑ Leotek—GC1-40E-MV-NW-3-GY-700-WL;or ❑ Cree—BXSPS-A-0-3-H-A-U-S-U;or ❑ AEL-ATB020BLEDE1OMVOLTR3NR;or 185 EA. City approved equivalent LED cobra head street light replacement for 200W HPSV cobra head: ❑ Leotek EC4-14M-MV-NW-3-GY-WL; or ❑ Leotek—GC 1-60E-MV-NW-3-GY-530-WL-FDC; or ❑ Cree—BXSP2-A-0-3-H-A-U-S-U; or ❑ AEL—ATB240BLEDE70MVOLTR3NR; or X24 EA. I City approved equivalent Page 33 LED cobra head street light replacement for 250W HPSV cobra head: ❑ Leotek EC7-18M-MV-NW-3-GY-WL; or ❑ Leotek-GC1-60E-MW-NW-3-700-GY-FDC-WL;or ❑ Cree-BXSP-A-0-3-H-L-U-S-U;or ❑ AEL-ATB240BLEDE10MVOLTR3NR; or 648 EA. City approved equivalent DLC Listed, Caltrans and/or City of LA qualified,4000K CCT±5%(200K), LED cobra head street light replacement for 400W HPSV cobra head and 250W HPSV cobra head to 400W equivalent LED: ❑ Leotek EC7-24M-MV-NW-3-GY-WL;or ❑ Leotek-GC2-90E-MV-NW-3-GY-700-WL-FDC;or ❑ Cree-BXSP2L-A-0-3-H-L-U-S-U; or ❑ AEL-ATB280BLEDE10MVOLTR3NR; or X459 EA. Or citv approved equivalent DLC Listed, Caltrans and/or City of LA qualified,4000K CCT±5%(200K), LED cobra head street light replacement for 150 W HPSV safety light at Huntington/Atlanta and 150W HPSV Kim SAR at Sports Complex: ❑ Leotek EC3-10M-MV-NW-2-GY-WL;or ❑ Leotek-GC1-40E-MV-NW-2-GY-530-WL;or ❑ Cree-BXSP2-A-0-3-H-A-U-S-U; or ❑ AEL-ATB020BLEDE1OMVOLTR2NR;or X80 EA. Orequivalent DLC Listed, Caltrans and/or City of LA qualified,4000K CCT±5%(200K), LED cobra head street light replacement for 400W HPSV safety light at Heil @ Del Mar/Plaza: ❑ Leotek EC7-18M-MV-NW-2-GY-WL; or ❑ Leotek-GC1-60E-MW-NW-2-GY-700-WL-FDC ❑ Cree-BXSP2L-A-O-3-H-L-U-S-U;or ❑ AEL-ATB240BLEDE10MVOLTR2NR; or X2 EA. Orequivalent DLC Listed, Caltrans and/or City of LA qualified,4000K CCT±5%(200K), LED cobra head street light replacement for(Type 2) 100W HPSV shoe box at McCallen Park: ❑ Leotek EC1-4M-MV-NW-2-GY-WL; or ❑ Leotek-GC1-20E-MV-NW-2-GY-530-WL;or ❑ Cree-BXSPR-A-0-3-F-C-U-S-U;or ❑ AEL-ATB020BLEDE10MVOLTR2NR; or 3 EA. Orequivalent LED post-top light replacement for 70 W HPSV cobra head at Magnolia Walkway and 70W HPSV for 150W HPSV Kim SAR at Seabridge Park: ❑ Leotek GC1-20E-MV-NW-2-GY-530-WL; or ❑ Cree-BXSPR-A-0-2-F-C-U-S-U; or ❑ AEL-ATBO-20ALEDE35-MVOLT-R2-NL-NR; or City approved equivalent X28 EA. Page 34 LED post-top replacement for 70W HPSV Pumpkin Head Post-Top at Ocean View Trailer Park: ❑ Leotek GC1-20E-MV-NW-2-GY-530-HSS-WL;or ❑ Cree—BXSPR-A-0-2-F-C-U-S-U-HSS;or ❑ AEL—ATBO-ATBO-20ALEDE35-MVOLT-R2-NL-NR-HSS; or City approved equivalent X33 EA. LED cobra head street light replacement for Kim SAR,Type 3, 150W HPSV on East Stairs of Civic Center, 10 year warranty: ❑ Leotek Arieta AR18-6M-MV-NW-3-DB-350-WL; or City approved equivalent 1 EA. LED cobra head street light replacement for Kim SAR,Type 5, 150W HPSV on East Stairs of Civic Center, 10 year warranty: ❑ Leotek Arieta AR18-6M-MV-NW-5-DB-350-WL; or city approved equivalent 1 EA. LED SAR light replacement for Kim SAR,Type 2 150W HPSV at Central Library: ❑ Leotek Arieta AR18-6M-HV-NW-2-DB-RPA-350-WL;or City approved equivalent 6 EA. LED SAR light replacement for Kim SAR,Type 3 150W HPSV at Central Library: ❑ Leotek Arieta AR18-6M-HV-NW-3-DB-530-RPA-WL;or City approved equivalent 1 EA. 27 EA. EC7-HSS for EC7 orequivalent must be field installable 2 EA. EC1-HSS for EC1 orequivalent must be field installable ALL ADDENDUMS WILL BE POSTED ON THE CITY WEBSITE www.huntinc]tonbeachca.gov Bidder shall signify receipt of all Addendum here, if any: Addendum Number Date Received Bidder's Signature Please quote your most competitive pricing,INCLUDING ANY GOVERNMENT OR CO-OPERATIVE AGREEMENT PRICING. "PIGGYBACK" CLAUSE. Bidder shall indicate below if he will extend the same prices, terms, and conditions of his bid to other public agencies:_Yes_No. Bidder's response to this question will not be considered in award of bid. When the Bidder extends the prices, terms, and conditions of this bid to other public agencies, the contract shall be between Bidder and the other agencies, and the City of Huntington Beach shall bear no responsibility or liability for the contracts. Submission of Responses: Each submittal shall be in a sealed package marked"BID#. Bids must be submitted not later than 4:00 pm to: Buyer. City of Huntington Beach/Purchasing Division, 2000 Main Street, P.O. Box 190, Huntington Beach, CA 92648-0190 Page 35 All quotations must be signed Total: Signature Sales Tax: Total: Delivery to be made on or before: Print Name Terms: % days Company Name Email: or days from receipt of Title EMAIL AND FAXED order. BIDS ARE NOT ACCEPTED Date Phone Number <"THIS IS NOT AN ORDER Page 36 CITY OF HUNTINGTON BEACH INSTRUCTION TO BIDDERS ALL PAGES OF THE BID MUST BE RETURNED Quotations are requested for furnishing the items described in accordance with terms set forth herein. All quotations must be F.O.B. delivered. The detailed specifications or brand names or numbers given herein is descriptive and indicates quality and style of item required. Offer to supply articles substantially the same as those described herein will be considered provided the articles offered are equal in quality, durability, and fitness for the purpose intended. Acceptability of alternates will be determined solely by the City of Huntington Beach EXAMINATION OF BID Each bidder is responsible for examining the invitation to bid and submitting its bid complete and in conformance with these instructions. DISCREPANCIES IN BID DOCUMENTS Should bidder find discrepancies in, or omissions from the invitation to bid, or if the intent of the invitation is not clear, and if provisions of the specifications restrict bidder from bidding, they may request in writing that the deficiency(s) be modified. Such request must be received by the Buyer five (5) business days before bid opening date. All bidders will be notified by addendum of any approved changes in the invitation to bid documents. ORAL STATEMENTS The City of Huntington is not responsible for oral statements made by any of their employees or agents concerning this invitation to bid. If the bidder required specific information, bidder must request that it be supplied in writing by the City of Huntington Beach. BRAND NAMES AND SPECIFICATIONS The detailed specifications and/or brand names stated are descriptive only and indicate quality, design, and construction of items required. Offers will be considered to supply articles substantially the same as those described herein provided the articles are equal in quality, durability, and fitness from the variation in the bid. Acceptability of alternate will be determined solely by the City of Huntington Beach. Bidder must submit specifications when bidding alternative equipment. RIGHT TO REJECT City reserves the right to reject at any time any or all bids, or parts thereof, and to waive any variances, technicalities and informalities which do not impair the quality, utility, durability, or performance of the items. SAMPLES Samples if items, when requested or required, must be furnished to the city free of expense to the city and, if not destroyed by tests will, upon request, be returned at the bidder's expense. PRICES Individual item pricing must be shown for each line item. In case of error in extension of prices, unit price will govern. All prices must be firm for the contract term unless the city specifically provides for adjustment. Any proposed pricing adjustment shall be submitted to the City Representative in writing at least thirty (30) days prior to the proposed date of increase. All quotations must be FOB delivered. FORM OF BID AND SIGNATURE The bid must be made on this form only. Bid should be enclosed in a sealed envelope, showing the Request for Quotation Number in the lower left corner, and addressed to the City of Huntington Beach, 2000 Main street, Huntington Beach CA 92648-2702 , Attn: Purchasing. This bid must be signed by an officer or authorized employee. Bids may be rejected if this form is not signed. SUBMISSION DATE AND WITHDRAWAL OF BIDS Each bid must be delivered to the location and received on or before the due date and time stated. Bids may be withdrawn without prejudice, providing the Central Service Division receives the written request no later than the time set for opening bids. Withdrawals will be returned to bidder unopened. FAXED BID IS NOT ACCEPTABLE. AWARD OF CONTRACT The City reserves the right to award this Contract by item or in its entirety, whichever is in the best interest of the.City Page 37 Insurance Certificate is not required with submittal of Request for Quotation.Awarding vendor will be required to submit for approval before commencement of work. CITY OF HUNTINGTON BEACH Email: Justin.Wessels(cDsurfcity-hb.orq Phone: 714-374-5378 Fax: 714-536-5212 Insurance Requirements vary for different applicants. Please see the below listed applicant types followed by the insurance requirements. City of Huntington Beach Resolution 2008-63 requires that contractors, permittees, licensees/lessees and vendors have an approved Certificate of Insurance on file with the City of Huntington Beach for the issuance of any permit or city contract. The insurance certificate must be approved by the City Attorney's Office as to meeting all of the city's insurance requirements. An original certificate is required or a PDF version attached to an email may be forwarded. If the insurance certificate is faxed, it must come directly from the insurance provider to the City of Huntington Beach.All insurance must be from a California admitted carrier with a current A.M. Best's Rating of no less than A:VII 1. CONTRACTORS—Any persons or entities or Contract with the City and/or provide service to the City which are readily available and efficiently procured by competitive bidding. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 2. DESIGN PROFESSIONALS-Professional Service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Requirements:Errors and Emissions(Professional Liability)$1,000,000 coverage 3. LICENSEES/LESSEES—any person or entities who make contract with the city for the use of public property. Requirements: General Liability, Workers'Compensation, Property Insurance, Additional Insured Endorsement 4. PERMITEES—any persons or entities who make application to the City for any use of encroachment upon any street, waterway, pier, or City property. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 5. Professional Services—means those services,which involve the exercise of professional discretion and independent judgment on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to Huntington Beach Municipal Code Section 3.02. Such Services shall include but not be limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. Requirements:Errors and Emissions(Professional Liability)$1,000,000 coverage Private Property Work Permit Requirements—If the planned work does not involve public property or its right-of-way (e.g. sidewalk/street), the Workers' Compensation Certificate is the only insurance requirement. However, if the work site is adjacent or attached to public property, the City Attorney's Office must be informed for consideration of liability and decides whether or not to approve the certificate with a specific"Private Property Only"approval stamp. Page 38 ➢ General Liability (G/L)—The general liability requirement is for$1,000,000 with"per occurrence"type claims coverage and a separate"Additional Insured Endorsement" page listing both the policy number and naming the "City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers"as additional insured on the endorsement. (see below for Additional Insured requirements) ➢ Additional Insured Endorsement Requirements—The City, its officers, elected or appointed officials, employees, agents and volunteers are to be specifically named and covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor.The coverage shall contain no special limitations on the scope of protection afforded to the City, its agents, officers and employees. The endorsement should include the policy number it correlates to. ➢ Primary Insurance—General Liability Insurance coverage shall be primary insurance as respects the City, its agents, officers, and employees. Any insurance or self-insurance maintained by the City, its agents, officers, and employees shall be excess of the submitted insurance and shall not contribute with it. ➢ Description of work—The staff contact and purpose of the evidence of coverage must be identified on the certificate of insurance. ➢ Automotive Insurance—Automobile insurance requirement is for$1,000,000 and a separate"Additional Insured Endorsement"page listing both the policy number and naming the"City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers" as additional insured on the endorsement. The City of Huntington Beach has a zero deductible/SIR requirement. ➢ Worker's Compensation Insurance(W/C)—The Worker's Compensation insurance requirement is the State statutory limits of$250,000 bodily injury by disease, policy limit, and $100,000 bodily infury each employee for accident or disease per occurrence. Certificate holder listed on the certificate is: City of Huntington Beach, 2000 Main St., Huntington Beach, CA 92648. If your organization/company has no compensated employees working on the project, you may complete and return a"Non-Employer Status"form to be used in lieu of a W/C insurance certificate. ➢ Cancellation Clause Notice—The cancellation clause must contain a thirty(30) day notice. A ten (10)day notice for non-payment of premium is acceptable in combination with 30 day notice. ➢ Professional Liability—Coverage must be provided at a minimum of$1,000,000 per occurrence and in the aggregate. ➢ Deductibles—The following deductibles are acceptable and all others must be removed from the insurance policy or a waiver can be requested (see below) : o General Liability-$5,000 o Auto Liability -$1,000 o Professional Liability/Errors&Emissions -$10,000 ➢ Waiver Procedure—If unable to comply with a requirement,the"INSURED" may request a waiver of a specific requirement. The Insurance Waiver form is an internal form that the City of Huntington Beach will complete. (see following page for waiver form) The exception to the waiver is the GIL &Auto "Additional Insured Endorsement"page. Page 39 Waiver Procedure To request a waiver, indicate here❑ and provide a brief description ( 1 —2 sentences)of the proposed work/project, its dollar value (if not a specific dollar amount, use an average, annual estimate or non-profit) and projected timeframe(per job or as-needed basis). For substantial dollar deductible/SIR amounts, a financial statement is required (Balance Sheet, Budget Reports, Dun& Bradstreet Report, etc.). Waiver Requested: Encroachment Permit❑ Private Property Work Permit❑ Consultant Services❑ Other: Proposed Work: Dollar Value: Projected Timeframe: Page 40 Page 41 PURCHASING DEPARTMENT S rty Quotation Number CITY OF HUNTINGTON BEACH Show this number on outside of : 2000 MAIN STREET your envelope. HUNTINGTON BEACH, CA 92648-2702 REQUEST FOR QUOTATION Date Released: Please enter your company name and Bids will be received until 4:00pm address at the office of the Purchasing Division 1st Floor City Hall uUNIT � __, '- DESCRIPTION F_UNITPRICE , ;,AMOUNT. Long-life LED retrofit kit for 6ft.,120(2x60)watt Internally Illuminated Street Name Sign (IISNS). Equipment shall be aluminum frame, pin based. Illumecon model 1072FGF or City approved equivalent with documented installation times of 30 minutes or less. 396 Fro. Long-life LED retrofit kit for 8ft., 150(2x75)watt Internally Illuminated Street Name Sign (IISNS). Equipment shall be aluminum frame, pin based. Illumecon model 1096FGF or City approved equivalent with documented installation times of 30 minutes or less. 2 Fr4. ALL ADDENDUMS WILL BE POSTED ON THE CITY WEBSITE www.huntingtonbeachca.ciov Bidder shall signify receipt of all Addendum here, if any: Addendum Number Date Received Bidder's Signature Please quote your most competitive pricing,INCLUDING ANY GOVERNMENT OR CO-OPERATIVE AGREEMENT PRICING. "PIGGYBACK" CLAUSE. Bidder shall indicate below if he will extend the same prices, terms, and conditions of his bid to other public agencies:_Yes_No. Bidder's response to this question will not be considered in award of bid. When the Bidder extends the prices, terms, and conditions of this bid to other public agencies, the contract shall be between Bidder and the other agencies, and the City of Huntington Beach shall bear no responsibility or liability for the contracts. Submission of Responses: Each submittal shall be in a sealed package marked"BID#. Bids must be submitted not later than 4:00 pm to: Buyer. City of Huntington Beach/Purchasing Division, 2000 Main Street, P.O.Box 190, Huntington Beach, CA 92648-0190 Page 42 All quotations must be signed Total: Signature Sales Tax: Total: Delivery to be made on or before: Print Name Terms: % days Company Name Email: or days from receipt of Title EMAIL AND FAXED order. BIDS ARE NOT ACCEPTED Date Phone Number hTHIS;ISnNOT'A;N";ORDER Page 43 CITY OF HUNTINGTON BEACH INSTRUCTION TO BIDDERS ALL PAGES OF THE BID MUST BE RETURNED Quotations are requested for furnishing the items described in accordance with terms set forth herein. All quotations must be F.O.B. delivered. The detailed specifications or brand names or numbers given herein is descriptive and indicates quality and style of item required. Offer to supply articles substantially the same as those described herein will be considered provided the articles offered are equal in quality, durability, and fitness for the purpose intended. Acceptability of alternates will be determined solely by the City of Huntington Beach EXAMINATION OF BID Each bidder is responsible for examining the invitation to bid and submitting its bid complete and in conformance with these instructions. DISCREPANCIES IN BID DOCUMENTS Should bidder find discrepancies in, or omissions from the invitation to bid, or if the intent of the invitation is not clear, and if provisions of the specifications restrict bidder from bidding, they may request in writing that the deficiency(s) be modified. Such request must be received by the Buyer five (5) business days before bid opening date. All bidders will be notified by addendum of any approved changes in the invitation to bid documents. ORAL STATEMENTS The City of Huntington is not responsible for oral statements made by any of their employees or agents concerning this invitation to bid. If the bidder required specific information, bidder must request that it be supplied in writing by the City of Huntington Beach. BRAND NAMES AND SPECIFICATIONS The detailed specifications and/or brand names stated are descriptive only and indicate quality, design, and construction of items required. Offers will be considered to supply articles substantially the same as those described herein provided the articles are equal in quality, durability, and fitness from the variation in the bid. Acceptability of alternate will be determined solely by the City of Huntington Beach. Bidder must submit specifications when bidding alternative equipment. RIGHT TO REJECT City reserves the right to reject at any time any or all bids, or parts thereof, and to waive any variances, technicalities and informalities which do not impair the quality, utility, durability, or performance of the items. SAMPLES Samples if items,when requested or required, must be furnished to the city free of expense to the city and, if not destroyed by tests will, upon request, be returned at the bidder's expense. PRICES Individual item pricing must be shown for each line item. In case of error in extension of prices, unit price will govern. All prices must be firm for the contract term unless the city specifically provides for adjustment. Any proposed pricing adjustment shall be submitted to the City Representative in writing at least thirty(30)days prior to the proposed date of increase. All quotations must be FOB delivered. FORM OF BID AND SIGNATURE The bid must be made on this form only. Bid should be enclosed in a sealed envelope, showing the Request for Quotation Number in the lower left corner, and addressed to the City of Huntington Beach, 2000 Main street, Huntington Beach CA 92648-2702 , Attn: Purchasing. This bid must be signed by an officer or authorized employee. Bids may be rejected if this form is not signed. SUBMISSION DATE AND WITHDRAWAL OF BIDS Each bid must be delivered to the location and received on or before the due date and time stated. Bids may be withdrawn without prejudice, providing the Central Service Division receives the written request no later than the time set for opening bids. Withdrawals will be returned to bidder unopened. FAXED BID IS NOT ACCEPTABLE. AWARD OF CONTRACT The City reserves the right to award this Contract by item or in its entirety,whichever is in the best interest of the City Page 44 Insurance Certificate is not required with submittal of Request for Quotation.Awarding vendor will be required to submit for approval before commencement of work. CITY OF HUNTINGTON BEACH Email: Justin.Wessels(absurfcity-hb.org Phone: 714-374-5378 Fax: 714-536-5212 Insurance Requirements vary for different applicants. Please see the below listed applicant types followed by the insurance requirements. City of Huntington Beach Resolution 2008-63 requires that contractors, permittees, licensees/lessees and vendors have an approved Certificate of Insurance on file with the City of Huntington Beach for the issuance of any permit or city contract. The insurance certificate must be approved by the City Attorney's Office as to meeting all of the city's insurance requirements. An original certificate is required or a PDF version attached to an email may be forwarded. If the insurance certificate is faxed, it must come directly from the insurance provider to the City of Huntington Beach. All insurance must be from a California admitted carrier with a current A.M. Best's Rating of no less than A:VII 1. CONTRACTORS—Any persons or entities or Contract with the City and/or provide service to the City which are readily available and efficiently procured by competitive bidding. Requirements:General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 2. DESIGN PROFESSIONALS-Professional Service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Requirements.Errors and Emissions(Professional Liability) $1,000,000 coverage 3. LICENSEES/LESSEES—any person or entities who make contract with the city for the use of public property. Requirements: General Liability, Workers'Compensation, Property Insurance, Additional Insured Endorsement 4. PERMITEES—any persons or entities who make application to the City for any use of encroachment upon any street, waterway, pier, or City property. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 5. Professional Services—means those services, which involve the exercise of professional discretion and independent judgment on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to Huntington Beach Municipal Code Section 3.02. Such Services shall include but not be limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. Requirements: Errors and Emissions(Professional Liability) $1,000,000 coverage Private Property Work Permit Requirements—If the planned work does not involve public property or its right-of-way (e.g. sidewalk/street), the Workers' Compensation Certificate is the only insurance requirement. However, if the work site is adjacent or attached to public property, the City Attorney's Office must be informed for consideration of liability and decides whether or not to approve the certificate with a specific"Private Property Only"approval stamp. Page 45 ➢ General Liability(G/L)—The general liability requirement is for$1,000,000 with"per occurrence"type claims coverage and a separate"Additional Insured Endorsement" page listing both the policy number and naming the "City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers"as additional insured on the endorsement. (see below for Additional Insured requirements) ➢ Additional Insured Endorsement Requirements—The City, its officers, elected or appointed officials, employees, agents and volunteers are to be specifically named and covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its agents, officers and employees. The endorsement should include the policy number it correlates to. ➢ Primary Insurance—General Liability Insurance coverage shall be primary insurance as respects the City, its agents, officers, and employees. Any insurance or self-insurance maintained by the City, its agents, officers, and employees shall be excess of the submitted insurance and shall not contribute with it. ➢ Description of work—The staff contact and purpose of the evidence of coverage must be identified on the certificate of insurance. ➢ Automotive Insurance—Automobile insurance requirement is for$1,000,000 and a separate"Additional Insured Endorsement" page listing both the policy number and naming the"City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers"as additional insured on the endorsement. The City of Huntington Beach has a zero deductible/SIR requirement. ➢ Worker's Compensation Insurance (W/C)—The Worker's Compensation insurance requirement is the State statutory limits of$250,000 bodily injury by disease, policy limit, and $100,000 bodily injury each employee for accident or disease per occurrence. Certificate holder listed on the certificate is: City of Huntington Beach, 2000 Main St., Huntington Beach, CA 92648. If your organization/company has no compensated employees working on the project, you may complete and return a"Non-Employer Status"form to be used in lieu of a W/C insurance certificate. ➢ Cancellation Clause Notice—The cancellation clause must contain a thirty(30)day notice. A ten (10)day notice for non-payment of premium is acceptable in combination with 30 day notice. ➢ Professional Liability—Coverage must be provided at a minimum of$1,000,000 per occurrence and in the aggregate. ➢ Deductibles—The following deductibles are acceptable and all others must be removed from the insurance policy or a waiver can be requested (see below) : o General Liability-$5,000 o Auto Liability -$1,000 o Professional Liability/Errors& Emissions -$10,000 ➢ Waiver Procedure—If unable to comply with a requirement, the"INSURED" may request a waiver of a specific requirement. The Insurance Waiver form is an internal form that the City of Huntington Beach will complete. (see following page for waiver form) The exception to the waiver is the GIL &Auto "Additional Insured Endorsement'page. Page 46 Waiver Procedure To request a waiver, indicate here❑ and provide a brief description ( 1 —2 sentences)of the proposed work/project, its dollar value (if not a specific dollar amount, use an average, annual estimate or non-profit) and projected timeframe(per job or as-needed basis). For substantial dollar deductible/SIR amounts, a financial statement is required (Balance Sheet, Budget Reports, Dun& Bradstreet Report, etc.). Waiver Requested.- Encroachment Permit❑ Private Property Work Permit❑ Consultant Services❑ Other: Proposed Work: Dollar Value: Projected Timeframe: Page 47 Page 48 PURCHASING DEPARTMENT S itY Quotation Number CITY OF HUNTINGTON BEACH Show this number on outside of }{ 2000 MAIN STREET your envelope. HUNTINGTON BEACH, CA 92648-2702 REQUEST FOR QUOTATION Date Released: Please enter your company name and Bids will be received until 4:00pm address at the office of the Purchasing Division 1s`Floor City Hall All Post top replacement fixtures shall be DLC Listed. If fixture family is DLC listed but specific fixture is not listed, fixture should be 15-20% less expensive than explicitly listed DLC fixtures. All post top replacement fixtures shall be 4000K CCT ± 5% (200K), and include a standard 10 year warranty. Fixtures shall weigh less than 36 lbs. Awards will be made on a best value basis under Government Code 4217. Staff rating of the long- term durability of the fixture construction, lumens/watt, lumen depreciation factor and cost will be the relevant factors. All bids to be accompanied by cut sheets clearly showing system watts, DLC listing, lumens/watt and lumen depreciation factors in addition to cost. c-QUAN�F UNIT == --- ....:- _ _DESCRIPTION .. -_. - ..,.«. ;;UNITiP.RICE s-_AMOUNTS i LED post-top replacement for 150W HPSV Clear Globe Post-Top, Post top fixtures shall fit on top of an existing 4"OD pole. Post fitter set screws shall have anti—seize compound applied: ❑ Levanto Cyclone CLE17T4-GAL-5-80W-4K-120-PX-XXTX;or ❑ Philips Slenderform SFP-T4-5-80LA-NW-UNIV-BRP;or ❑ Lumecon Ball of Fire—60 Watts;or City approved equivalent 4 1 EA. LED post-top replacement for 70W HPSV Pumpkin Head Post-Top,fixtures shall fit on top of an existing 4.5"OD pole. Post fitter set screws shall have anti-seize compound applied.: ❑ Philips Slenderform SFP-T3-2-30LA-NW-UNIV-WP;or ❑ Levanto Cyclone CLE17T4-GAL-2-40W-277-PX-RAL9003TX;or Or city approved equivalent 87 EA. ALL ADDENDUMS WILL BE POSTED ON THE CITY WEBSITE www.huntingtonbeachca.gov Bidder shall signify receipt of all Addendum here, if any: Addendum Number Date Received Bidder's Signature Please quote your most competitive pricing,INCLUDING ANY GOVERNMENT OR CO-OPERATIVE AGREEMENT PRICING. Page 49 "PIGGYBACK" CLAUSE. Bidder shall indicate below if he will extend the same prices, terms, and conditions of his bid to other public agencies:_Yes_No. Bidders response to this question will not be considered in award of bid. When the Bidder extends the prices, terms, and conditions of this bid to other public agencies, the contract shall be between Bidder and the other agencies, and the City of Huntington Beach shall bear no responsibility or liability for the contracts. Submission of Responses: Each submittal shall be in a sealed package marked"BID#. Bids must be submitted not later than 4:00 pm to: Buyer: City of Huntington Beach/Purchasing Division, 2000 Main Street, P.O.Box 190, Huntington Beach, CA 92648-0190 All quotations must be signed Total: Signature Sales Tax: Total: Delivery to be made on or before: Print Name Terms: % days Company Name Email: or days from receipt of Title EMAIL AND FAXED order. BIDS ARE NOT ACCEPTED Date Phone Number THIS ISN OVA N ORDER CITY OF HUNTINGTON BEACH INSTRUCTION TO BIDDERS Page 50 ALL PAGES OF THE BID MUST BE RETURNED Quotations are requested for furnishing the items described in accordance with terms set forth herein. All quotations must be F.O.B. delivered. The detailed specifications or brand names or numbers given herein is descriptive and indicates quality and style of item required. Offer to supply articles substantially the same as those described herein will be considered provided the articles offered are equal in quality, durability, and fitness for the purpose intended. Acceptability of alternates will be determined solely by the City of Huntington Beach EXAMINATION OF BID Each bidder is responsible for examining the invitation to bid and submitting its bid complete and in conformance with these instructions. DISCREPANCIES IN BID DOCUMENTS Should bidder find discrepancies in, or omissions from the invitation to bid, or if the intent of the invitation is not clear, and if provisions of the specifications restrict bidder from bidding, they may request in writing that the deficiency(s) be modified. Such request must be received by the Buyer five (5) business days before bid opening date. All bidders will be notified by addendum of any approved changes in the invitation to bid documents. ORAL STATEMENTS The City of Huntington is not responsible for oral statements made by any of their employees or agents concerning this invitation to bid. If the bidder required specific information, bidder must request that it be supplied in writing by the City of Huntington Beach. BRAND NAMES AND SPECIFICATIONS The detailed specifications and/or brand names stated are descriptive only and indicate quality, design, and construction of items required. Offers will be considered to supply articles substantially the same as those described herein provided the articles are equal in quality, durability, and fitness from the variation in the bid. Acceptability of alternate will be determined solely by the City of Huntington Beach. Bidder must submit specifications when bidding alternative equipment. RIGHT TO REJECT City reserves the right to reject at any time any or all bids, or parts thereof, and to waive any variances, technicalities and informalities which do not impair the quality, utility, durability, or performance of the items. SAMPLES Samples if items,when requested or required, must be furnished to the city free of expense to the city and, if not destroyed by tests will, upon request, be returned at the bidder's expense. PRICES Individual item pricing must be shown for each line item. In case of error in extension of prices, unit price will govern. All prices must be firm for the contract term unless the city specifically provides for adjustment. Any proposed pricing adjustment shall be submitted to the City Representative in writing at least thirty(30)days prior to the proposed date of increase. All quotations must be FOB delivered. FORM OF BID AND SIGNATURE The bid must be made on this form only. Bid should be enclosed in a sealed envelope, showing the Request for Quotation Number in the lower left corner, and addressed to the City of Huntington Beach, 2000 Main street, Huntington Beach CA 92648-2702 ,Attn: Purchasing. This bid must be signed by an officer or authorized employee. Bids may be rejected if this form is not signed. SUBMISSION DATE AND WITHDRAWAL OF BIDS Each bid must be delivered to the location and received on or before the due date and time stated. Bids may be withdrawn without prejudice, providing the Central Service Division receives the written request no later than the time set for opening bids. Withdrawals will be returned to bidder unopened. FAXED BID IS NOT ACCEPTABLE. AWARD OF CONTRACT The City reserves the right to award this Contract by item or in its entirety, whichever is in the best interest of the City Insurance Certificate is not required with submittal of Request for Quotation.Awarding vendor will be required to submit for approval before commencement of work. Page 51 CITY OF HUNTINGTON BEACH Email: Justin.Wesselsasurfcity-hb.orq Phone: 714-374-5378 Fax: 714-536-5212 Insurance Requirements vary for different applicants. Please see the below listed applicant types followed by the insurance requirements. City of Huntington Beach Resolution 2008-63 requires that contractors, permittees, licensees/lessees and vendors have an approved Certificate of Insurance on file with the City of Huntington Beach for the issuance of any permit or city contract. The insurance certificate must be approved by the City Attorney's Office as to meeting all of the city's insurance requirements. An original certificate is required or a PDF version attached to an email may be forwarded. If the insurance certificate is faxed, it must come directly from the insurance provider to the City of Huntington Beach. All insurance must be from a California admitted carrier with a current A.M. Best's Rating of no less than A:VII 1. CONTRACTORS—Any persons or entities or Contract with the City and/or provide service to the City which are readily available and efficiently procured by competitive bidding. Requirements: General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 2. DESIGN PROFESSIONALS- Professional Service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Requirements:Errors and Emissions(Professional Liability)$1,000,000 coverage 3. LICENSEESILESSEES—any person or entities who make contract with the city for the use of public property. Requirements: General Liability, Workers'Compensation, Property Insurance, Additional Insured Endorsement 4. PERMITEES—any persons or entities who make application to the City for any use of encroachment upon any street, waterway, pier, or City property. Requirements:General Liability, Workers'Compensation, Auto Liability, Additional Insured Endorsements 5. Professional Services —means those services, which involve the exercise of professional discretion and independent judgment on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to Huntington Beach Municipal Code Section 3.02. Such Services shall include but not be limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. Requirements:Errors and Emissions(Professional Liability)$1,000,000 coverage Private Property Work Permit Requirements—If the planned work does not involve public property or its right-of-way (e.g. sidewalk/street), the Workers' Compensation Certificate is the only insurance requirement. However, if the work site is adjacent or attached to public property, the City Attorney's Office must be informed for consideration of liability and decides whether or not to approve the certificate with a specific"Private Property Only" approval stamp. ➢ General Liability(G/L)—The general liability requirement is for$1,000,000 with "per occurrence"type claims coverage and a separate"Additional Insured Endorsement" page listing both the policy number and naming the Page 52 "City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers"as additional insured on the endorsement. (see below for Additional Insured requirements) ➢ Additional Insured Endorsement Requirements—The City, its officers, elected or appointed officials, employees, agents and volunteers are to be specifically named and covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its agents, officers and employees. The endorsement should include the policy number it correlates to. ➢ Primary Insurance—General Liability Insurance coverage shall be primary insurance as respects the City, its agents, officers, and employees. Any insurance or self-insurance maintained by the City, its agents, officers, and employees shall be excess of the submitted insurance and shall not contribute with it. ➢ Description of work—The staff contact and purpose of the evidence of coverage must be identified on the certificate of insurance. ➢ Automotive Insurance—Automobile insurance requirement is for$1,000,000 and a separate"Additional Insured Endorsement"page listing both the policy number and naming the"City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers"as additional insured on the endorsement. The City of Huntington Beach has a zero deductible/SIR requirement. ➢ Worker's Compensation Insurance(W/C)—The Worker's Compensation insurance requirement is the State statutory limits of$250,000 bodily injury by disease, policy limit, and $100,000 bodily infury each employee for accident or disease per occurrence. Certificate holder listed on the certificate is: City of Huntington Beach, 2000 Main St., Huntington Beach, CA 92648. If your organization/company has no compensated employees working on the project, you may complete and return a"Non-Employer Status"form to be used in lieu of a W/C insurance certificate. ➢ Cancellation Clause Notice—The cancellation clause must contain a thirty(30) day notice. A ten (10) day notice for non-payment of premium is acceptable in combination with 30 day notice. ➢ Professional Liability—Coverage must be provided at a minimum of$1,000,000 per occurrence and in the aggregate. ➢ Deductibles—The following deductibles are acceptable and all others must be removed from the insurance policy or a waiver can be requested (see below) : o General Liability-$5,000 o Auto Liability -$1,000 o Professional Liability/Errors&Emissions-$10,000 ➢ Waiver Procedure—If unable to comply with a requirement, the"INSURED" may request a waiver of a specific requirement. The Insurance Waiver form is an internal form that the City of Huntington Beach will complete. (see following page for waiver form) The exception to the waiver is the GIL &Auto "Additional Insured Endorsement"page. Waiver Procedure Page 53 To request a waiver, indicate here❑ and provide a brief description ( 1 —2 sentences)of the proposed work/project, its dollar value(if not a specific dollar amount, use an average, annual estimate or non-profit) and projected timeframe (per job or as-needed basis). For substantial dollar deductible/SIR amounts, a financial statement is required (Balance Sheet, Budget Reports, Dun & Bradstreet Report, etc.). Waiver Requested: Encroachment Permit❑ Private Property Work Permit❑ Consultant Services❑ Other: Proposed Work: Dollar Value: Projected Timeframe: Page 54 Appendix C — CIM Group Parking Garage Scope Sll RCM CS - Southwest Client: City of Huntington Beach Description: Shorebreak hotel parking structure Date: 12-18-13 MATERIAUDESCRIPTION QTY Total number of Parking Structure fixtures 172 Total number of Parking Structure fixtures w/ BBS 96 Total 268 Parking structure P1 Scope 1 Staging 1 Remove existing fixture 138 Dispose of existing fixture 138 Install new LED fixture PV-50 Relume 79 Install new LED fixture PV-50 w/ BBS Relume) 25 Install new LED fixture PV-70 w/ BBS Relume 34 Bracket for new LED fixture 138 Hardware to bolt fixture to surface 138 Paint underside of ceiling where existing fixtures were 138 Parking structure P2 Scope 1 Staging 1 Remove existing fixture 130 Dispose of existing fixture 130 Install new LED fixture PV-50 Relume 93 Install new LED fixture PV-50 w/ BBS (Relume) 25 Install new LED fixture PV-70 w/ BBS Relume 12 Bracket for new LED fixture 130 Hardware to bolt fixture to surface 130 Paint underside of ceiling where existing fixtures were 130 Stairwell Linhtinca Page 55 Scope 1 Staging 1 Remove existing fixture 25 Dispose of existing fixture 25 Install new LED fixture w/ BBS Lithonia 25 Bracket for new LED fixture 25 Hardware to bolt fixture to surface 25 Paint underside of wall where existing fixtures were 25 5th Street Decorative Fixtures Total of 9 poles w/ 2 fixtures per pole Staging 0 Remove existing 150w metal halide fixtures 0 Dispose of existing fixture 0 Install new LED fixtures 0 Photocell 0 Page 56 Appendix D —.Series Circuit Conversion Scope SH RCM CS - Southwest Client: City of Huntington Beach Description: Series Circuit Conversion Date: 1-19-14 MATERIAUDESCRIPTION QTY Walnut St from 6th to 11 th Scope and USA 1 Traffic Control 1 Remove Conductors 2000 Disconnect 1 Demo and Dispose of Sidewalk Replace Sidewalk Pothole 36 Patch Pothole 36 Crossings 50' ea) 5 Bore 1910 2" Sch 80 PVC Conduit 1810 2" PVC 90's 24 2" PVC End Bells 24 3" Sch 80 PVC Conduit 100 3" PVC 90's 2 3" PVC End Bells 2 # 5 Pullbox 10 # 8 Wire 6000 # 8 Bond wire 2000 # 10 Wire(pole) 900 Single fuse kit 10 Splice 10 Tie into Edison Pole 1 Riser 1 # 5 Pullbox 1 Type III -BF Service Foundation 1 Type III bf Service 1 Page 57 Close Existing Circuit off 1 Demo and Dispose of Sidewalk 10 Replace Sidewalk 10 Foundation Type (36" x 4') Auger Foundation 10 Dispose of Spoils CY 10 Conduit 10 Anchor Bolts- Included I 10 Forms 10 Concrete 10 Grout 10 Install pole 10 Install arm and fixture 10 Remove existing pole & Equipment 10 Remove existing foundation 10 Restore area 10 Olive from 9st to Main St (South) M Scope and USA 1 Traffic Control 1 Remove Conductors 1200 Disconnect 1 Demo and Dispose of Sidewalk Replace Sidewalk Pothole 20 Patch Pothole 20 Crossings {50' ea} 4 Bore 1040 2" Sch 80 PVC Conduit 1040 2" PVC 90's 20 2" PVC End Bells 20 # 5 :Pullbox 7 # 8 Wire 3500 # 8 Bond wire 1200 # 10 Wire(pole) 630 Single fuse kit 7 Splice 7 Page 58 Demo and Dispose of Sidewalk for service tie in 1 Replace Sidewalk 1 Tie into existing Type III bf Service 1 # 5 Pullbox 1 Close Existing Circuit off 1 Demo and Dispose of Sidewalk 7 Replace Sidewalk 7 Foundation 36" x 4' Auger Foundation 7 Dispose of Spoils CY 7 Conduit 7 Anchor Bolts - Included 7 Forms 7 Concrete 7 Grout 7 Install pole 7 Install arm and fixture 7 Remove existing pole & Equipment 7 Remove existing foundation 7 Restore area 7 Supply City w/ 70watt LED fixtures 2 Olive from Main St to 17th North' Scope and USA 1 Traffic Control 1 Remove Conductors 4000 Disconnect 1 Demo and Dispose of Sidewalk Replace Sidewalk Pothole 93 Patch Pothole 93 Crossings 50' ea 13 Bore 4650 2" Sch 80 PVC Conduit 4550 2" PVC 90's 62 2" PVC End Bells 62 3" Sch 80 PVC Conduit 100 Page 59 3" PVC 90's 2 3" PVC End Bells 2 # 5 Pullbox 26 # 8 Wire 15350 # 8 Bond wire 5000 # 10 Wire(pole) 2350 Single fuse kit 26 Splice 26 Tie into Edison Pole 1 Riser 1 # 5 Pullbox 1 Type III -BF Service Foundation 1 Type III bf Service 1 Close Existing Circuit off 1 Demo and Dispose of Sidewalk 26 Replace Sidewalk 26 Foundation (36" x 4' Auger Foundation 26 Dispose of Spoils CY 26 Conduit 26 Anchor Bolts - Included 26 Forms 26 Concrete 26 Grout 26 Install pole 26 Install arm and fixture 26 Remove existing pole & Equipment 26 Remove existing foundation 26 Restore area 26 Page 60 Appendix E — 7th St. Series Circuit Conversion Specifications Template Plans and Specifications will be included in hard copy of this IGA. Page 61 i - I i City of Huntington Beach City Owned Street light and Parking Lot LED upgrades:Schedule of Valu Exhlhit«B« PROJECT: City Owned IGA PROJECT NO: City Owned DESIGN-BUILDER: Siemens CONTRACT NO: CONSULTANT: Siemens DATE: 5/29/2014 DESCRIPTION PERCENT VALUE OF PREVIOUSLY AMOUNT FIM OF WORK COST COMPLETE COMPLETE WORK INVOICED DUE 2 Walnut St Series Circuit Conversion $ 270 856.00 0-00% $0.00 $0.00 S0.00 2 Contingency $5 600.00 0.00% $0-00 $0.00 $0.00 0.00% $0.00 $0.00 $0.00 3 00ve St.Series Circuit Conversion $771 568.00 0.00% $0.00 $0.00 $0.00 3 Contingency $15.000.00 0.00% $0.00 $0 00 S0.00 0.00% $0.00 $0 00 $0.00 4 COWShorebreak Parking Garage $314,859.00 0.00% $0-00 $0.00 S0.00 ; 4 Contingency $5.000.00 0.00%, $0.00 $0.00 S0.00 i 0.00% $0.00 $0.00 $0.00 FIM 5-Utility owned street tight buyback Investment Grade 5 Assessment $234 000.00 0.00% $0.00 $0.00 $0.00 TOTAL $ 1,616,783.00 0.00% $0.00 $0.00 $0.00 I Page 1 of 1 Exhibit C Guarantees and Measurement and Verification of Energy Savings The Savings and escalation factors below are derived from Table 1-1 Financial Summary(page 7 of Exhibit A)and cash flow model (page 28) are as follows: Actual Annual Savings Energy Cost Escalation $192,177 5% Street lights and other outdoor lighting such as parking lots,safety lights and pedestrian lighting fall into two general billing categories un-metered and metered. Un-metered street lights are billed at Public Utilities Commission approved rates with stipulated energy consumption based on the efficiency of the light source,e.g. High Pressure Sodium, Mercury Vapor, Induction, LED, etc. Metered street and outdoor lights are also very simple in operation. A photocell controls the operation from dusk to dawn with no occupant influence on energy consumption. The lab tested energy consumption values and SCE's validation of the energy savings through payment of incentives are the normal extent of lighting project savings guarantees. The guarantee for the un-metered LED upgrades shall be satisfied by completion of two actions:Submittal of SCE form C505—Notice of Lamp Changes for LS-2 and verification that the lamp changes are reflected on the subsequent utility invoices and submittal of Installation Reports (IR)to SCE and SCE's subsequent payment of the energy efficiency incentives will initially satisfy the savings guarantee. The guarantee measures will be periodically reviewed by the City to assure energy savings continue as warranted through the term of the financing. The table below describes responsibility for the completion and submittal of these forms. Measure Responsibility Required Activity to complete Measurement&Verification of Savings ECM-1 City wide city City of City staff and/or Regional Energy Network Staff will complete owned Street,Area Huntington incentive application installation reports and SCE form C505- and Pole Lighting LED Beach Notice of lamp changes for LS-2 and subsequent verification of upgrades the billing changes on the actual utility invoices. FIM-2—Walnut Siemens At the completion of this measure Siemens will complete SCE Street Series Form C505—Notice of lamp changes for LS-2 and submit to conversion SCE with a copy to city staff. City staff will verify the removal of the appropriate number of series circuit poles from the month end invoices. FIM-3 Olive Street Siemens At the completion of this measure Siemens will complete SCE Conversion Form C505—Notice of lamp changes for LS-2 and submit to SCE with a copy to city staff. City staff will verify the removal of the appropriate number of series circuit poles from the month end invoices. Cite of Huntington Beach City Owned Lights Cash Flow Model Co nfidential SIEMENS Street Light Project - City of Huntington Beac Total Lease Program for 10 Years Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16-20' Totals ECM 1 City Owned Lights Savings ECM 2 Library ECM 3 Pier Plaza $134,494 $141,219 $146,280 $155,694 $163,478 $171,652 $180,235 S189,247 $198,709 $208,644 $219,077 $230,030 $241,532 $253,608 $266,289 $ 1,544,985 $4,447,172 $2,264 $2,377 $2,496 $2,621 $2,752 $2,890 $3,034 $3,186 $3,345 $3,512 $3,688 $3,872 $4,066 $4,269 $4,483 $ 26,007 3744861 $722 $758 $796 $836 $878 $921 $968 $1,016 $1,067 $1,120 $1,176 $1,235 $1,297 $1,361 $1,430 3 8,294 $23,874 ECM 4 TOU Savings $20,960 $22,008 $23,108 $24,264 $25,477 $26,751 $28,088 $29,493 $30,967 $32.516 $34,142 $35.849 $37,641 $39,523 $41,499 240,776 $593,062 ECM 5 7th St Series Savings ECM 6 Direct Install Savings $2,965 $3,113 S3,269 $3,432 $3,604 $3,784 $3,973 $4,172 $4,381 $4,600 $4,830 $5,071 $5,325 $5,591 $5,870 S 34,060 $987041 $11.400 $11,970 $12,569 $13,197 $13,857 $14,550 $15,277 $16,041 $16,843 $17,685 $18,569 $19,498 $20,473 $21,496 $22,571 $ 130,956 $3162952 FIM 2-3 Series Circuit Savings $4,706 $4,941 $5,188 $5,448 $5,720 $6,006 $6,306 $6,622 $6,953 $7,301 $7,666 $8,049 $8.451 $8,874 $9,318 $ 54,060 $155,608 Energy Savings Subtotal (sum of ECM 1-6 and FIM 2-31 $177 611 $186,387 $196,706 $205,491 $216,766 $226,554 $237,882 $249,776 $262,266 $275,378 $238,147 $303,604 $318,784 $334,723 $351,460 $2,039,138 $5,869,671 Lease Payment (586,440) ($134,977) (5134,9771 (S134,977) (3134,977) ($134,977) (3134.977) ($134,977) (9134,977) i,' l 34,977)1 $0 $0 SO $0 SO $O ($1,301.232) Total Annual Cash Flow lProlect Savings less Lease Payment( $01,071 $51,410 $60,729 $70,514 $60,789 $91,577 $102,905 $114,799 $127,288 $140,401 $289,147 $303,804 $318,784 $334,723 $351,460 $ 2,039,138 $4,568,338 Cumulative Cash Flow 1 $91,071 $142,481 $203,209 $273,724 $354,512 $446,089 $548,994 3-663,793 1 $791,080 $931,481 $1,220.626 1 $1,524,232-1 $1,843,016 $2,177,740 $2,529,199 S 4,568,338 summary or years io-tu '•Erergy Escalation Factor 5% Street Light Acquisition R Fixture Replacement Lease Installation Cost $ 2,012,924 City Contribution 8 950,000 Principal' 3 1,082,924 Interest(3.5h1 3 218,308 Total Debt Service" $ 1,301,232 Term of Lease 10.0 Years Payments per year 2.0 Annual Lease Payment First Year Energy Savings Simple Payback (Calculated from Fr5tyear project sav'ngc $ 177.511 7,3 Years Potential SCE Rebate FIM Costs EXH I BIT D Bond No. {� PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: WHEREAS, City of Huntington Beach(hereinafter referred to as"City")has,by written agreement dated 20_, entered into a contract with (name and address of Contractor) (hereinafter referred to as"Principar'),for performance of the work described as follows: (Project Title) WHEREAS, said contract, and all documents referenced therein(hereinafter collectively "Contract"), are incorporated herein by this reference made a part hereof as though set forth herein in full_ WHEREAS,said Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt,full and faithful performance of said Contract NOW THEREFORE,we, the undersigned,as Principal, and (name and address of Surety) (a duly admitted surety insurer under the laws of the State of California and hereinafter referred to as "Surety"), as Surety, are held and firmly bound unto City in the penal sum of Dollars($ ),this amount being not less than one hundred percent of the price set forth in the Contract,in lawful money of the United States,for the payment of which sum,well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally,firmly by these presents. I THE CONDITION OF THIS OBLIGATION IS SUCH THAT if the Principal shall promptly, fully and faithfully perform each and all of the covenants,obligations and things to be done and performed by the Principal in strict accordance with the terms of the Contract as said contract may be altered,amended or modified from time to time; and if the Principal shall indemnify and save harmless City and all of I City'sofficers,agents and employees(hereinafter collectively referred to as"Obligees")from any and ; all losses,liability and damages, claims,judgments, stop notices,fees and costs of every description, whether imposed by law or in equity,which may be incurred by the Obligees by reason of the failure or i default on the part of the Principal in the performance of any or all of the terms or the obligations of the Contract, including all alterations, amendments and modifications thereto, and any warranties or I guarantees required thereunder, then this obligation shall be void; otherwise, it shall be and shall remain in full force and effect f Surety stipulates and agrees,for value received,that no adjustment of the time or price in the Contract or any alteration, change, deletion, addition or other modification to the Contract, or the work to be I performed thereunder, shall in any way affect, limit, restrict, impair or release the obligations of the i ( Surety under this Bond. Surety waives notice of any adjustment of contract time or contract price,and I t' 277591.1 PERFORMANCE BOND Pagel of 2 r Bond No. any other alteration,change,deletion,addition or other modification to the Contract,or the work to be performed thereunder, and agrees to automatically adjust the penal sum of this Bond to reflect such adjustments,alterations,changes,deletions,additions or other modifications. Surety agrees to provide written confirmation of such adjustments in the penal sum to City on not less than a quarterly basis. Surety also waives the provisions of Civil Code§§2W and 2849. i The obrigations of this Bond shall survive the completion of the work described in the Contract as to all j obligations and liabilities of the Principal which survive completion of the work. IN WITNESS WHEREOF, each party represents and warrants that this instrument has been duly j executed by Principal and Surety, on the date set forth below,that the name of each corporate party { being affixed hereto is such party's proper legal name and that the individuals signing this instrument 1 have been duly authorized pursuant to the authority of its governing body. Surety,by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: {a ATTEST (Corporate Seal) (Principal Name) yt By: ! Name: t i Tide: f S f ATTEST [ I (Corporate Seal) (Surety Name) ' s By: Name: (Signature of Attorney-in-Fact for Surety) i (Attach Attorney-in-Fact Certificate) U (Area Code&Telephone Number of Surety) APPROVED AS TO FORM: CITY 0 UNTINGTON BEACH I By c ennif ityttorn � Attorney ��� s[t f Note. This bond must be executed in duplicate and dated,all signatures must be notarized,and evidence of the authority of any person signing as attorney in-fact must be attached. f 277591.1 PERFORMANCE BOND Page 2 of 2 f I f° Ff f EXHIBIT E Bond No. PAYMENT BOND (LABOR AND MATERIALS) KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS,the City of Huntington Beach (hereinafter referred to as"City")has awarded to 3 (name and address of Contractor) (hereinafter referred to as"Principal"),a contract("Contract")for the work described as follows: (project title) f WHEREAS, Principal is required under the terms of the Contract and the California Civil Code to f secure the payment of claims of laborers, mechanics, materialmen, and other persons as provided by law. NOW THEREFORE,we,the undersigned Principal, and i i i i I (name and address of Surety) (a duly admitted surety insurer under the laws of the State of California and hereinafter referred to as"Surety'), as Surety,are held and firmly bound unto City in the penal sum of { i dollars, ($ } this amount being not less than one hundred percent(100%) of the total price set forth in the Contract, in lawful money of i the United States of America, for the payment of which sum, well and truly to be made, we bind ourselves, and each of our heirs, executors, administrators, successors, and assigns, jointly and 3 severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal, his, her, or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the it persons named in Section 3181 of the California Civil Code('Claimants') for all labor, materials or services used or reasonably required for use in performance of the work described in the Contract, or any amounts due under the Unemployment Insurance Code with respect to work or labor E performed by any such Claimant, or prevailing wages due and penalties incurred pursuant to Sections 1774, 1775, 1813 or 1815 of the Labor Code, or any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees i of the Principal and Subcontractors pursuant to Section 13020 of the Unemployment Insurance { Code with respect to the work or labor performed under the Contract, Surety will pay for the same, in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall be null and void. This bond shall inure to the benefit of any of the persons named in Section 3181 of the California i Civil Code so as to give a right of action to such persons or their assigns. In case any action is brought upon this bond, Surety further agrees to pay all court costs and a reasonable attorney's fee in an amount fixed by the court. Surety stipulates and agrees, for value received, that no change, extension of time, alteration, addition or modification to the terms of the Contract, or any contract document or any work to be . l ° performed thereunder, whether made after notice or not, shall in any way affect, impair or release am.` the obligations of Surety under this bond. Surety hereby waives notice of any such change, 277589.1 PAYMENT BOND Page 1 of 2 i i Bond No. extension of time, alteration, addition, or modification to the terms of the Contract, the contract documents or the work thereunder. Surety also waives the provisions of California Civil Code §§ ( . 2845 and 2849. IN WITNESS WHEROF, each party represents and warrants that this instrument has been duly executed by Principal and Surety,on the date set forth below,that the name of each corporate party being affixed hereto is such party's proper legal name and that the individuals signing this 4 instrument have been duly authorized pursuant to the authority of its governing body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure S of the Principal to execute or properly execute this bond. ! Dated: ATTEST i (Corporate Seal) i (Principal Name) i f By: Name: Its: ! f Y ATTEST I (Corporate Seal) (Surety Name) By- Name- (Signature of Attorney-in-Fact for Surety) k (Attach Attorney-in-Fact Certificate) (Area Code&Telephone Number of Surety) }, i i APPROVED AS TO FORM: CITY OF HUNTINGTON BEACH f t By• P1 ennifer Mc rath ity Attorney SI!5166 f i F Note: This bond must be executed in duplicate and dated,all signatures must be notarized,and evidence of the authority of any person signing as attorney-in-fact must be attached. t t i 27750.1 PAYMENT BOND ` Page 2 of 2 i I 1.. ( Res. No. 2014-75 STATE OF CALIFORNIA COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, JOAN L. FLYNN the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a Regular meeting thereof held on September 15, 2014 by the following vote: AYES: Katapodis, Hardy, Shaw, Harper, Boardman, Sullivan, Carchio NOES: None ABSENT: None ABSTAIN: None City Cfrk and ex-officio, irk of the City Council of the City of ' Huntington Beach, California