Loading...
HomeMy WebLinkAboutRepair of Damaged and Broken Wastewater Pipeline - Eagle LanD p�c1 CITY OF HUNTINGTON BEACH A MEETING DATE: May 19, 1997 Council/Agency Meeting Held: 5,LiqI47 Deferred/Continued to: id Approved ❑ Conditionally Approved ❑ Denied DEPARTMENT ID NUMBER:PW-97- 410 City Cle 's Signature .3ao.y5 Council Meeting Date: May 19, 1997 1 Department ID Number: PW-97- 410 1 CITY OF HUNTINGTON BEACH REQUEST FOR ACTION SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS 4 S ITTED BY: MICHAEL T. UBERUAGA, CITY ADMINISTRATO rt � qj+ PREPARED BY: LES M. JONES II, DIRECTOR OF PUBLIC WORKS'`, SUBJECT: REPAIR OF DAMAGED AND BROKEN WASTEWATER LINE Statement of Issue, Funding Source, Recommended Action, Alternative Action(s), Analysis, Environmental Status, Attachment(s) Statement of Issue: A City wastewater line crossing private properties at 16332 Eagle Lane and 16331 Birdie Lane is seriously damaged and requires immediate repair. Funding Source: Funds for these repairs are not included in the wastewater line maintenance budget. Therefore, $18,200 must be transferred from the City's unappropriated General Fund balance to fiscal account E-AA-PW-530-3-90-00 (Wastewater Line Maintenance Contractual Services). Recommended Action: Authorize the Director of Finance to transfer $18,200 from the City's unappropriated General Fund balance to fiscal account E-AA-PW-530-3-90-00 (Wastewater Line Maintenance Contractual Services). IWe-I'VGa Id63 -2- 04/29/97 12:13 PM REQUEST FOR ACTION MEETING DATE: May 19, 1997 DEPARTMENT ID NUMBER:PW-97- 410 Alternative Action(s): Take no action until line becomes blocked and inoperable. Analysis: The City wastewater line, servicing homes fronting Eagle and Birdie Lanes, crosses private property at 16332 Eagle and 16331 Birdie Lanes (see Attachment #1 - Location Map). Pursuant to the City's ongoing program of inspecting wastewater lines, this 280' section of 33 year old 10" diameter line was filmed on March 20, 1997. The film reveals the need to repair a number of serious cracks and breaks (see Attachment #2 - Line Photos). Although these repairs could be postponed, staff is concerned that such a delay may result in a blockage of the line; thereby necessitating the excavation and replacement of this line. This would be extremely costly. Therefore, this section of pipe should be immediately slip lined. The estimated cost of these repairs is $18,200 (i.e. 280 feet x $65/ft = $18,200). ' The approved 1996/1997 Wastewater Budget does not include funds for these type of repairs; therefore, staff recommends that the Director of Finance be authorized to transfer $18,200 from the City's unappropriated General Fund balance to fiscal account E-AA-530-3- 90-00 (Wastewater Line Contractual Services). Environmental Status: W_1 Attachment(sl: 1. Attachment #1 - Location Map 2. Attachment #2 - Line Photos 3. Financial Impact Statement RCA10.DOC -3- 04/29/97 12:13 PM LEGEND t SEWER FLOW DIRECTION MANHOLE ­011— PUMP STATION �+D PLUfi OR CAP 0 DEPTH TO PIPE INVERT (FEET) F.M. FORCE MAIN !00 s00 G00 ow1� S SLOPE (FEET PER FOOT) {6 s!, �[ IN FEET �22 rwE SEWER& E 0.20. ^� 1 1� C. f C OMilo vcp _ 1s•vcr T d�. CASTLE DR. i }' ;V INS SHQPPIN a CENTER) 1 1 ! d 1 MANGRUM DR. moo' �O. < 1 bo o y SNEAD DR. i o LITTLER DR. 1 y' • . - -- CLARK DR. I 1 U , I y _a CF— E ;Mr y. t � u w (MEADOW VIEW SCHOOL) ` MEADOWLARK DR. ... .iT:..l t ( ! I t 1 I I 1 T. t r 1 { T I t ....T....� 1. 10" •M VENTURI DR. �� \ Pj►R CR. i MARSHALL DR. Z r� ........ _ .............. �d , 1 �........ ... { I f BRASSIE i... E MIDDLECOFF DR. (Q�rT U d W 1 �' b..... o �' '•v - LANGPORT CA. Iz vcr oHEIL AVE. v' d` cc dam`' j..� W `~b r> p d d N ~ ~ FERNHILL CR. �`''�'� jl" / ) J I i f 1 i W < MEADOWBROOK TREETOP CA, Eagle Ln. to Birdie Ln. Wastewater Pieline Located Under 16332 Eagle and 16331 Birdie Ln. Total Length = 280 feet Age = 33 years Date Televised = 3/20/97 Estimated Daily Flow=12,400 gallons per day. Estimated Slip Line Cost = $18,200.00 Estimated Excavation Cost = Not possible because of two homes located directly over the pipeline. This pipeline has begun to collapse and is posing an immediate threat to the two residences directly above the line. Severe structural damage could be sustained by these residences if a total collapse occurs. In addition, 52 other homes depend on this line to transport their daily wastewater flow. V. CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICA TION To: Michael T. Uberuaga, City Administrator From: Robert J. Franz, Deputy City Administrator Subject: FIS 97- 35 Repair of Damaged and Broken Wastewater Line Date: May 1, 1997 As required by Resolution 4832, a Fiscal Impact Statement has been prepared for the Repair of Damaged and Broken Wastewater Line. If the City Council approves this request, the estimated unreserved, undesignated fund alance of the General Fund at September 30, 1997 w)I oe.reduq�to $5,725,380. Robert J. Fr{anz, Deputy City Administ fis9735 Adopted Current Fund Balance - General Fund Budget Estimate Beginning Fund Balance $ 3,227,959 $ 6,847,000 Plus Budget Surplus 356,590 1,017,310 Plus One Time Revenue (Estimated) 1,130,000 PERS Refund 456,000 Less Approved One -Time Costs (1,350,197) Less Transfer of PERS Refund (2,199,627) Less: Pending Budget Amendments (156,906) Less FIS 97-35 (18,200) Estimated 9/30/97 Balance $ 3,584,549 $ 5,725,380 Fund Balance - General Fund $6,000,000- $5,500,000 - $5,000,000 - $4,500,000 - $4,000,000 - $5,725,380 $3,500,000 - $3,000,000 - $3,584,549 $2,500,000 - $2,000,000 -, Adopted Revised Budget Estimate Page 1