MEETING DATE: April 2, 2001 DEPARTMENT ID NUMBER: PW 01-033
Council/Agency Meeting Held: 04--o2.-0)
Deferred/Continued to: 11-�A
Approved ❑ Conditio Ily Approved ❑ Denied - Cle 's Signature
Council Meeting Date: April 2, 2001 Department ID Number: PW 01-033
CITY OF HUNTINGTON BEACH
REQUEST FOR ACTION
SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL
SUBMITTED BY: RAY SILVER, CITY ADMINISTRATORPO&/
PREPARED BY: ROBERT F. BEARDSLEY, DIRECTOR OF PUBLIC WORKS
MICHAEL P. DOLDER, FIRE CHIEF df-9 fat.--PW
SUBJECT: APPROVE ADDITIONAL FUNDING FOR THE REMOVAL OF CITY
HALL FIRST FLOOR ASBESTOS
Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s)
Statement of Issue: Should the current scope of work for the renovation of the first floor
be.expanded to include the removal of first floor asbestos?
Funding Source: Funds of $990,000 need to be transferred from the City's
Unappropriated General Fund Balance to the City Hall Rehabilitation Account No.
30187012.82200.
Recommended Action: Motion to: Approve an appropriation of $990,000 from the
City's Unappropriated General Fund balance to the City Hall Rehabilitation Account No.
30187511.82200 cover the cost of removing asbestos from the first floor of City Hall.
Alternative Action(s): Postpone removing asbestos in the areas occupied by
Administrative Services and the City Treasurer's Office. This action will prohibit retrofitting
the heating, ventilation and air conditioning (HVAC) systems included in the Energy Retrofit
Project currently underway and will also prohibit the planned and funded installation of a new
Fire Sprinkler Alarm Protection system in these areas.
The estimated cost of decontaminating the entire first floor, removing the asbestos from only
Public Works and re-spraying the protective coating on the steel supporting roof beams, is
$660,800.
01-033 April 2 Asbestos Removal -2- 3/27/01 2:13 PM
REQUEST FOR ACTION
MEETING DATE: April 2, 2001 DEPARTMENT ID NUMBER: PW 01-033
Analysis: In January of 2001, the Engineering Division area of City Hall was undergoing
planned, permitted renovation by the Public Works Department on a portion of the first floor.
An asbestos survey report conducted in 1988 did not detect asbestos-containing materials in
the first floor construction area. Previously concealed, sprayed-on fireproofing material was
exposed by interior demolition activities of the suspended acoustic ceiling tile and above-
ceiling HVAC ductwork. Ceiling tile demolition was performed on January 21 and 22, 2001,
followed by demolition of portions of HVAC ductwork that were located above the suspended
ceiling. On January 23, 2001, following up on concern expressed by the Public Works
Building Maintenance Supervisor and the subcontractor, Mesa Energy Systems, which was
working in the area, steps were initiated to contact an environmental testing firm. On
January 24, arrangements were made with national ECON Corporation to perform testing the
next day. On January 25, samples of the fireproofing material were collected and submitted
for analysis of asbestos. City staff received verbal laboratory results the evening of January
26, indicating that the fireproofing material tested positive for asbestos. Independently, and
unknowingly to the City staff, an employee working in an adjacent area had personally
collected two samples, reportedly from the fireproofing in the construction area of the first
floor, and submitted them to a laboratory for analysis of asbestos. These samples contained
greater than one percent asbestos.
Subsequently, Forensic Analytical was contacted and collected five fireproofing samples
from the construction area of the first floor on January 30. Laboratory results indicated ten
percent Chrysotile asbestos in all five samples, with one sample also containing a trace
amount of Actinolite asbestos.
Upon verbal receipt of positive results from the City's sampling firm, the renovation operation
on the first floor of the City Hall building was halted on January 26, 2001 (coincidentally, the
entire City Hall building operation was shut down the same day due to the City's electrical
power interruption agreement). On the evening of January 28, Forensic Analytical was
contacted regarding the situation on the first floor. Information obtained verbally at that time
was unclear as to the nature and extent of materials that had been disturbed. A meeting at
the site was arranged for the morning of January 29 involving various representatives of the
City staff at City Hall. Based on the information presented, and an inspection of the affected
area, all personnel working on the first floor of the City Hall building were relocated. The
elevators, which pass through the first floor, were also shut down.
The City notified both SCAQMD and Cal/OSHA by telephone on January 29 of the asbestos
disturbance and the City's response. Mr. Dan Russell of SCAQMD and Mr. Paul Bartek of
Cal/OSHA inspected the site the same day.
The decontamination work, completed to date, has allowed the public and staff full access to
the First Floor Lobby, Treasurer's Office and Administrative Services. General access to
engineering area will not occur until this portion of the first floor has been completely
renovated.
01-033 April 2 Asbestos Removal -3- 3126/01 3:14 PM
REQUEST FOR ACTION
MEETING DATE: April 2, 2001 DEPARTMENT ID NUMBER: PW 01-033
The abatement of asbestos in the engineering area began on February 27, 2001 and will
take approximately four weeks to complete. The entire process will be done in accordance
with our approved plan. When the abatement is complete, renovation of the area will be
resumed.
The actual and/or estimated cost of this additional work is summarized below:
Estimated Cost Summary
Description of Work Recommended Alternative
Action Recommendation
First Floor Decontamination $ 251,000 $251,000
Forensic Testing $115,000 $85,000
Asbestos Containment $10,000 $10,000
Air Handlers and Heat Unit Rentals $56,800 $56,800
Furniture Storage Costs $9,000 $9,000
Public Works Asbestos Removal $ 203,000 $ 203,000
Public Works Re-Spray of Fireproofing $ 46,000 $46,000
Asbestos Abatement in Administration Services/City $195,885
Treasurer's Office Including Lobby
Re-Spray of Fire Proofing in Ad min istrationServices/ $44,315
City Treasurer's Office including Lobby
Treasury Vault Relocation $ 5,000
Telecommunication and Information Systems Wiring $54,000
and Switches
Total Additional Cost $990,000 $ 660,800
Environmental Status: N/A
Attachment(s):
City Clerk's
Page Number No. Description
1 Fiscal Impact Statement
RCA Author: RFB: MD/Id
01-033 April 2 Asbestos Removal -4- 3126101 3:14 PM
ATTACHMENT # 1
•� CITY OF HUNTINGTON BEACH
INTERDEPARTMENTAL COMMUNICATION
To: Ray Silver, City Administrator
From: Clay Martin, Director of Administrative Services
Subject: FIS 2001-30 Approve Additional Funding for the Removal of
All First Floor Asbestos and the Renovation of the First Floor Areas
Occupied by the Administrative Services and City Treasurer's Office
Date: March 7, 2001
As required by Resolution 4832, this Fiscal Impact Statement has
been prepared for "Approve Additional Funding for the Removal of All
First Floor Asbestos and the Renovation of the First Floor Areas
Occupied by the Administrative Services and City Treasurer's Office."
If the City Council approves this request (total appropriation $990,000
the estimated unreserved General Fund Balance at September 30,
2001 will reduced to $9,544,921 .
Clay Ma ,
Direct r of Administrative Services
Fund Balance-General Fund Adopted Budget Current Estimate
Beginning Fund Balance 10/1/2000(unaudited) $ 11,727,000 $ 11,727,000
Plus:Estimated Revenue 127,315,000 130,815,000
Less:Estimated Expenditures (130,660,000) (129,986,000)
Pending/Approved FIS's: (1,812,079) (2,021,079)
Less: FIS 2001-30 (990,000) (990,000)
Estimated 9/30/2001 Unreserved Balance $ 5,579,921 $ 9,544,921
Less Reserve for Economic Uncertainty (6,100,000) (6,100,000)
Amt Unreserved, Undesignated (520,079)1 3,444,921
General Fund Balance 2000/2001
$10,500,000- y
$9 000 00010,
e1 3,444,921
$7 500 000 ,.. .
,• Unreserved
$6'000'000 Undesignated
$4 500 000
$3'000,000 $6,100,000 El Reserved for
/ r ,, Y r
,=
xfa• PI Economic Uncertainity
$1 500 000
$O
-$1 ,500,000-
Adopted Current
Budget Estimate
RCA *ROUTING 9HEET
INITIATING DEPARTMENT: Public Works
SUBJECT: APPROVE ADDITIONAL FUNDING FOR THE REMOVAL
OF CITY HALL FIRST FLOOR ASBESTOS
COUNCIL MEETING DATE: April 2, 2001
RCA ATTACHMENTS STATUS
Ordinance (w/exhibits & legislative draft if applicable) Not Applicable
Resolution (w/exhibits & legislative draft if applicable) Not Applicable
Tract Map, Location Map and/or other Exhibits Not Applicable
Contract/Agreement (w/exhibits if applicable)
(Signed in full by the City Attorney) Not Applicable
Subleases, Third Party Agreements, etc.
(Approved as to form by City Attorne ) Not Applicable
Certificates of Insurance (Approved by the City Attorney) Not Applicable
Financial Impact Statement (Unbud et, over $5,000) Attached
Bonds (If applicable) Not Applicable
Staff Report (If applicable) Not Applicable
Commission, Board or Committee Report (If applicable) Not Applicable
Findings/Conditions for Approval and/or Denial Not Applicable
EXPLANATION FOR MISSING ATTACHMENTS
REVIEWED RETURNED FORWARDED
Administrative Staff ( ) ( )
Assistant City Administrator (Initial)
( ) ( )
City Administrator (initial)
City Clerk ( )
EXPLANATION FOR RETURN OF ITEM:
Only)(Below Space For City Clerk's Use
RCA Author: RFB:CM:SF:jm
hsbestos Removal Project
Asbestos Removal
First Floor Abatement
Expansion
4
Background
➢ Planned renovation of Public Works
Department area began in January
➢ Sprayed-on fireproofing material was
exposed during demolition activities
➢ The entire first floor was closed to the staff
and public until decontamination took place
➢ The Public Works section is closed off until
abatement work is complete
April 2, 2001
� 1
e ,
bestos Removal Project
Additional Work Requests
➢ Administrative Services and Treasurer's
Office were not scheduled to be
renovated this fiscal year
➢ Extending the renovation would allow
for removal of all asbestos containing
material from the first floor
);;. Affected departments would be
temporarily relocated
Required Unbudgeted Costs
➢ Decontamination $2511000
➢ Testing & containment 951000
➢ Air handlers & heat units 561800
➢ Miscellaneous items 91000
➢ PW asbestos removal 203,000
➢ Fireproofing 46,000
Total $660,800
April 2, 2001
2
f,sbestos Removal ProjLt
jAdditf�ion�alRenovat�ion Costs
➢ Asbestos abatement $196,000
(Administrative Services, Treasurer's
Office and Lobby Area)
➢ Additional testing 30,000
➢ Re-spray fireproofing 451000
➢ Telecommunications/ 54,000
& info systems wiring
➢ Vault relocation 5,000
Total $330,000
5
JRecommended Actfion
Appropriate $990,000 to complete
asbestos abatement on the first flood of
City Hall
April 2, 2001