Loading...
HomeMy WebLinkAboutUnbudgeted Expenditure - Repair of Damaged and Broken Wastew 1 CITY OF HUNTINGTON BEACH MEETING DATE: April 7, 1997 DEPARTMENT ID NUMBER:PW-97-407 Council/Agency Meeting Held: YI:Z °6'?S 9� 3 moo,V,5 Deferred/Continued to: 7YJ W(Approved ❑ Conditionally Approve ❑ Denied LV4 City Clerk' ignature Council Meeting Date: April 7, 1997 Department ID Number: PW-97-407 CITY OF HUNTINGTON BEACH REQUEST FOR ACTION UBMI ED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS MITTED BY: MICHAEL T. UBERUAGA, CITY ADMINISTRATOR PREPARED BY: LES M. JONES ll, DIRECTOR OF PUBLIC WORKS >L SUBJECT: REPAIR OF DAMAGED AND BROKEN WASTEWATER L Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status, Attachment(s) Statement of Issue: Funds must be appropriated for the emergency repair of a City wastewater line located under 16332 Nassau Lane and 16331 Fairway Lane. Funding Source: Funds for emergency repairs are not included in the wastewater line maintenance budget. Therefore, $19,500 must be transferred from the City's unappropriated General Fund balance to fiscal account E-AA-PW-530-3-90-00 (Wastewater Line Maintenance Contractual Services). Recommended Action: Authorize the Director of Finance to transfer $19,500 from the City's unappropriated General Fund balance to fiscal account E-AA-PW-530-3-90-00 (Wastewater Line Maintenance Contractual Services). RCA7.DOC 2- 03/26/97 2:58 PM — 1 REQUEST FOR ACTION MEETING DATE: April 7, 1997 DEPARTMENT ID NUMBER:PW-97-407 Alternative Action(s): Take no action until line becomes blocked and inoperable. Analysis: The wastewater line, servicing homes fronting Venturi Drive, crosses beneath residences:at 16332 Nassau and 16331 Fairway Lanes (see attached location map). Pursuant to the City's ongoing program of inspecting wastewater lines, this 300' section of 33 year old 10" diameter line was filmed on March 20, 1997. The film reveals the need to repair a number of serious cracks and offsets (see attached photos). Although these repairs could be postponed, staff is concerned that such a delay may result in a blockage of the line; thereby necessitating the excavation and replacement of this line. This would be extremely costly. Therefore, this section of pipe should be immediately slip lined. The estimated cost of these repairs is $19,500 (i.e. 300 feet x $65/ft = $19,500). The approved 1996/1997 Wastewater Budget does not include funds for these type of repairs; therefore, staff recommends that the Director of Finance be authorized to transfer $19,500 from the City's unappropriated General Fund balance to fiscal account E-AA-530-3- 90-00 (Wastewater Line Contractual Services). Environmental Status: N/A Attachment(s): City Clerk's Page Number 1. Location Map 2. Photos 3. Financial Impact Statement E_ . 7- RCA7.DOC -3- 03/26/97 3:35 PM _ ATTACHMENTE - 140# 1 3 3. SEWER INVERT SLOPES ARE 020% (002, FOOT) UNLESS OTHERWISE NOTED 4. SEWERS ARE LOCATED 5 FEET NORTH MEAST OF STREET CENTERLINE UNLESS NOTED. LEGEND =E` SEWER FLOW DIRECTION —�— MANHOLE —�--- PUMP STATION —�-+J PLUG OR CAP D DEPTH TO PIPE INVERT (FEET) F.M. FORCE MAIN G 200 400 000 sw 1000 S SLOPE(FEET PER FOOT) f f. SCALE IN FEET 41 EDINGER AVE.SEWERAGE D'1l.7 • ti LI T STATION MC S&I '`> 9 R AVE.D-zo. ti �� A, _moo C. F C o �/ 1 "~a.6 ......_.._.......... _.—._... o" 15..VcP u ♦1`� 14 i N i d o CASTLE DR. ' _.. �' SLPPiN v t....N._ I M N ANGRUM DR. vs - t n __._. 1•. ..._ ! C_ LITTLER DR. ;bo o• _ SNEAO DR. .. b' � i.. � .1 1 .) � j i i• I �... CLARK DR. I i tt J — �- cc W CL d db d = _. CF- E ITTI5• 5' (k1EADON: VIEW SCHOOL) ! MEADOWLARK DR. d i i CP ! b' VENTURI DR. i -to'"vcP PAR CR. `1 .J LLI +1uj --�_.. ........... Q i i ? E �b O, •+ I J -...... i 1 i -O W ..... j MARSHALL OR. i I W.. J cc . Q _ , T. : i �. -.... ......... 'a ,......r.�.... ° j �,..;,._;....1.... _j BRASSIE CR. b _ W �. MIDDLECOFF DR. m '. �' •� ti'L' 1 � i ti I � L>• I spy � d d~� d •: d d ' s U _ d.. 'i n y d "`° 0 .. NLLl 'VP f1' / VCPo"Pll Avg: ATTACHMENT # 2 Venturi Drive Wastewater Pipeline Located Under 16332 Nassau and 16331 Fairway Ln. _- - 7C&r.beUi'OM 12 .f_ .v E i L" s. .z-,.xM:.,i' K- �'�.9� -Yr,:�ti:a_ ^"-F Z'F`C`•�''nL�.�s.'._ _ • ��.'.: i---:lX i-,..5~ c._.:__ ...� _- :r.wa-a+.a.�.�....� _ '�:�. v..�a Y �'�, ,l ?. Total Length =300 feet Age=33 years Date Televised =3/20/97 Estimated Daily Flow = 64,000 gallons per day. Estimated Slip Line Cost = 519,500.00 Estimated Excavation Cost = Not possible because of two homes located directly over the pipeline. This pipeline has begun to collapse and is posing an immediate threat to the two residences directly above the line. Severe structural damage could be sustained by these residences if a total collapse occurs. In addition, 270 other homes and 1 school depend on this line to transport their daily wastewater flow. 7' ATTACHMENT # 3 F� BINTERDEPARTIVIENTAL CITY OF HUNTINGTON BEACH COMMUNICA TION To: Michael T. Uberuaga, City Administrator From: Robert J. Franz, Deputy City Administrator, Subject: FIS 97- 24 Repair of Damaged Wastewater Line Date: March 26, 1997 As required by Resolution 4832, a Fiscal Impact Statement has been prepared for Damaged and Broken Wastewater Line. If the City Council approves this request, the estimated unreserved, undesignated Fund Balance of the General Fund will be reduced to $5,332,780. ATTACHMENT #4 Adopted Currpt Fund Balance-General Fund Budget Estimate Beginning Fund Balance $3,227,959 $6,847,000 _ Budget Surplus/(Shortfall) 356,590 1,267,831 _ PERS Refund 1,140,000 _ Less Approved One-Time Costs (908,707) Less Approved Transfers (2,700,000) — _ Less: Pending Budget Amendments (294,344) — _ Less FIS 97-24 (19,000) _ Estimated 9/30/97 Balance $3,584,549 $5,332,780 Fund Balance-General Fund rc $5,500,000 $5,000,000 $4,500,000 - $4,000,000 " $5,332,780 $3,500,000 r' $3,000,000 $3,584,549 $2,500,000 - $2,000,000 - - - Adopted Revised Budget Estimate