Loading...
HomeMy WebLinkAboutOld Civic Center Site Project - Council Reports & Communicat zin I!rem 9149-1-1 s 4 FileOCC--.-I� i Subject o � MA d� - TIA •=� [j !_ •�, mot,. / • ®� .ARo M � CITY OF HUNTINGTON <~ ACH %b INTER-DEPARTMENT COMMUNIC TI N HUNTINGTON BEACH - To Floyd G. Belsito Fro J Gs W. Palin, Director a City Administrator elopment Services Subject Old Civic Center Project; Dat November 14 , 1979 City Council/Planning Commission Joint Study Session November 19 , 1979 , 6: 30 P.M. ; Specific Plan Zoning and Environmental Impact Report Transmitted herewith is the Old Civic Center Specific Plan Amendment to the Zoning Ordinance and the Final Environmental Impact Report for the Senior housing and recreation facilities planned for the Old Civic Center site. These are transmitted at this time for review prior to the subject study session. The Old Civic Center Specific Plan was prepared by Development Ser- vices' staff and has been reviewed and approved by the City Attorney in its current form. This specific plan will permit the construction of the 157 unit senior housing including the 4000 square foot commer- cial area on "Site 1" and the new Senior Citizens Recreation Center on "Site 2 . " This specific plan will also be consistent with the General Plan Amendment for the site previously adopted by the City Council (GPA 79-1; Adopted March 19 , .1979, Resolution No. 4728) . In addition to permitting these land uses, the specific plan establishes building height, set-backs and parking regulations, and requires land- scaping and -signage to be consistent with City ordinances. The Final Environmental Impact Report (EIR 79-1) was prepared by Pacific Environmental Services, Inc. of Santa Monica and has undergone the statutory review process (see attached memo) . The one issue identified as a result of the environmental review is 'that of parking. Although it is believed that the project plans and specific plan deal adequately with this issue, the William Lyon Company has prepared an alternative plan that would provide additional parking should it be required by either the California Coastal Commission or the California Housing Finance Agency. It should be emphasized, however, that during the pre- liminary review of this project, neither agency has indicated that additional parking would be required. The William Lyon Company' s development team for this project will be present at the -joint study session to review the above alternate plan and to bring the Council and Planning Commission up-to-date on the progress of the project. After the study session, the Old Civic Center Specific Plan and Final EIR will undergo public hearing before the Planning Commission on Decem- ber 4 , 1979 , and the Commission' s recommendations will be forwarded to the City Council for consideration in January 1980. JWP :SVK:jb 0/3 P_ tTY. OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH To Steve .Kohler, Senior Housing From James R. Barnes. � , & Community Development Specialist Associate Planner Subject DOWNTOWN SENIOR CITIZENS Date November 14, 1979 HOUSING/ACTIVITY CENTER - FINAL EIR (EIR 79-1) Copies of the final environmental impact report for the Downtown Senior Citizens Housing/Activity Center, prepared by. the environmental consulting firm of Pacific Environmental Services, are being forwarded to you for distribution to the Planning Commission and City 'Council. A draft EIR was circulated for a 45-day public review period ending September 27 , 1979. A list of the persons and agencies receiving copies of the draft EIR is attached. The final. EIR consists of the draft EIR, comments received from persons and agencies who received copies of the draft EIR, and responses to the comments prepared by the City in conjunction with Pacific Environmental Services. All persons and agencies who commented on the draft EIR have been sent a copy of the final EIR. In your transmittal to the discretionary body with the final jurisdiction over the project, it should be recommended that the EIR be certified as being adequate and in conformance with the California Environmental . Quality Act and with State EIR Guidelines. JRB:df Attached: Distribution List Final EIR huntington beach develop services department STA f f REPORT TO: Planning Commission FROM: Department of Development Services DATE: November 14 , 1979 SUBJECT: OLD CIVIC CENTER PROJECT; CITY. COUNCIL/PLANNING COMMISSION JOINT STUDY SESSION NOVEMBER 19 , 1979 , 6 : 30 PM; SPECIFIC - PLAN ZONING AND ENVIRONMENTAL IMPACT REPORT. Transmitted herewith is the Old Civic Center Specific Plan Amendment to the Zoning Ordinance and the final environmental impact report for the Senior housing and recreation facilities planned for the Old .Civic Center site. These are transmitted at this time for review prior to the subject study session. The Old Civic Center Specific Plan was prepared by Development Ser- vices ' staff and has been reviewed and approved by the City Attorney in its current form. . This specific plan will permit the construction on the 157-unit senior housing, including the 4 , 000 square foot. com- mercial area on ''Site 1" and the new Senior Citizens Recreation Center on "Site 2 . " This specific plan will also be consistent with the general plan amendment for the site previously adopted by the City Council (GPA 79-1, adopted March 19 , 1979 , Resolution No. 4728) . In addition to permitting these land uses, the specific plan estab- lishes building height, setbacks and parking regulations , and requires landscaping and signage to be consistent with City ordinances . The final environmental impact report (EIR 79-1) was prepared by Pacific Environmental Services, Inc. of Santa Monica and has undergone the statutory review process (see attached memo) . The one issue identified as a result of the environmental review is that of parking. Although it is believed that the project plans and specific plan deal adequately with this issue, the William Lyon Company has prepared an alternative plan that would provide additional parking should it be required by either the California Coastal Commission or the California Housing Finance Agency. It should be emphasized, however, that during ' the preliminary review of this project neither agency has indicated that additional parking would be required. The William Lyon Company' s development ream for this project will be present at the joint .study session to review the above alternate plan and to bring the Council and Planning. Commission up to date on the progress of the project. After the study session, the Old Civic Center Specific Plan and final EIR will undergo public hearing before the Planning Commission on December 4 , 1979 and the Commission' s recommendations will be for- warded to the City Council for consideration in January, 1980 . �aWPrSvk: - A92bk Attachments g ' A-FM-23A _ 0 CITY OF HUNTINGTON BEACH %! INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH To Steve .Kohler, Senior Housing From James R. Barnes & Community Development Specialist Associate Planner Subject DOWNTOWN SENIOR CITIZENS Date November 14, 1979 HOUSING/ACTIVITY CENTER - FINAL EIR (EIR 79-1)- Copies of the final environmental impact report for the Downtown Senior Citizens Housing/Activity Center, prepared by. the environmental consulting firm of Pacific Environmental Services, are being- forwarded to you for distribution to the Planning Commission and City Council. A draft EIR was circulated for a 45-day public review period ending September 27, 1979 . A list of the persons and agencies receiving copies of the draft EIR is attached. The final EIR consists of the draft EIR, comments received from persons and agencies who received copies of the draft EIR, and responses to the comments prepared by the City in conjunction with Pacific Environmental Services. All persons and agencies who commented on the draft EIR have been sent a copy of the final EIR. In your transmittal to the discretionary body with the final jurisdiction over the project, it should be recommended that the EIR be certified as being adequate and in conformance with the California Environmental . Quality Act and with State EIR Guidelines. JRB:df Attached: Distribution List Final EIR REQUEST FOR CITY COUNCIL ACTION Submitted by .games W. Palin. Director Department Development Services Date Prepared 7A . , 1912_ Backup Material Attached Xl Yea No Subject Construction Bids; Bushard Community Center & -Oakview Day C_arp Canter; RenroQrammiag of HCD Funds City Administrator's Comments Statement of Issue, Recommendation; Analysis, Funding Source,Alternative Actions: STATEMENT OF ISSUE:, 'On October 17, . 1979, construction bids for the Bushard Community Cen- ' ter' and Oakview Day Care Center were received`. Bids for both projects exceeded ,the amount currently budgeted and there follows recommendations for the disposition of these projects as well as the reprogramming of other HCD funds. RECOMMENDATION: 1. Reject the sole bid of $537,380 by the Magnus Corp. for the Bushard Community Center by reason of insufficient bid bond and do not re-bid the project. 2.. Accept the low bid of $2.14,900 by the D & B- Enterprises, Inc. for the Oakview Day Care Center, reject all other bids, and reprogram additional $96,587 for the implementation of the Day Care Center (see attached) 3. Reprogram additional surplus or residual funds to fund library improvements, repay the Wycliffe Gardens land acquisition loan, and build a contingency fund for the Senior Housing and Recrea tion Facility on the Old Civic Center site. ANALYSIS: 1. Bushard Community Center This project was originally budgeted a total of $305,000 from the second and third year Block Grants and was to provide a 5800 square foot recreation facility on a portion of the Bushard Elementary P;o 3ne �� Page 2 School site leased by the City from the Fountain Valley School District and to be operated by the Boys' Club of Huntington Beach. . Subsequent to the execution of the ground lease, it was discovered that the site was severely impacted by peat soil conditions. This situation dictated are-design of the facility .to include an elaborate and expensive foundation system. In anticipation . of cost increases resulting from the proposed facility's re- design, the Boys' Club has entered an independent agreement with the Fountain Valley School District to. lease existing surplus classroom space at the Bushard Elementary School. The Boys' Club intends to operate the juvenile recreation program planned for the new building within this leased space and has also received approval of. the $10,000 Grant . from the -Anderson Foundation for equipment .and plans additional fund raising activities: There- fore, the objective of this project will be accomplished without expenditure of the Block Grant funds. . Therefore, because of. the insufficient bid bond, the sole bid for the construction of the Bushard. Community Center should be re jected,' and it is further recommended that due to the increased costs and alternative arrangements stated above, that the Bushard Community Center Project not be implemented. 2. Oakview Day Care Center This project was originally funded with .$165,000 from the third year Housing and .Community Development Block Grant and is to pro- vide a- 3000 square . foot facility on a portion of the. Oakview 'Elementary School site leased ,by the City from the Ocean View School District and to be operated by the Orange County Superin- tendent of Schools. After payment of architectural services, soils reports, and State of California. plan check fees, there remains approximately $151,000 for this project. The low bid for this project .of $214,900 by D & B Enterprises, Inc. is consistent with the architect' s estimate of $115,250. The continuing need for day care center in the Oakview neigh- borhood warrants the completion of this. project and, therefore, it is recommended that surplus HCD funds be reprogrammed to this project in accordance with the attached .schedule. 3. Disposition of Additional Funds Through the course of the first five years. of. the .Housing and Community Development Program, • certain projects have been com- pleted for less than the amount budgeted and other projects have been deemed ineligible by HUD. As a result, .approximately $40, 000 of these funds. plus the approxima-tely. $280,000 diverted from the Bushard Community. Center. are available for reprogram- ming at this time. It is recommended that these funds be re- programmed to the Oakview Day Care Center and Old Civic Center project in accordance with the attached schedule. This will accomplish several objectives: 1. Permit the implementation of the Day Care Center; Page 3 2. Repay the funds appropriated from the Old Civic Center to assist with the Wycliffe Gardens land acquisition; 3. Fund the planned improvements to the Main Street Branch Library for which no funds have been previously committed; 4. Build a contingency fund for both the Day Care Center and Old Civic -Center projects to help off-set the inflation of construction costs. In addition, it is recommended that the third, fourth,. and fifth years' local option funds be earmarked as contingency . funds for the O1d :Civic Center project. This would further build the contingency fund for this project and help assure that inflation does not make the project infeasible by the time construction begins. These local option funds, however, should not be reprogrammed at this time, but should be drawn upon . only if needed. ALTERNATIVES: Without the reprogramming of funds, the. Oakview Day Care Center can- not move forward, nor can the additional funds -for the- Library improvements and Wycliffe loan repayment be allocated to the Old Civic Center project. Attached for .Council's reference are alternative budgets for._old Civic Center project previously transmitted to Council August 24, 1979. FUNDING: U. S. Department of Housing and Urban Development, Housing and Community Development Program. Respectfully Submitted, 'V James�W Palin Director, Development Services JWP:jb HOUSING AND COMMUNITY DEVELOPMENT PROGRAM Reprogram Funds Report October 18, 1979 OAKVIEW DAY CARE CENTER Funds Needed Funds Available $ 214,900 Construction Bid $ 150,978 Current Budget 10,000 Inspection 74 ,631 lst Year Bushard 22,000 Contingency . (approx. 10%) 6,706 Oakview Outreach (residual) 250 Oakview Community. $ 246,900 Total Needed Center (residual). 15, 000 Code Enfmrcement {residual) Program $ 247,565 New Budget with Reprogrammed Funds OLD CIVIC CENTER. PROJECT Funds Needed Funds.Available $ 450,000 Senior Center $ 550,000 Original Budget 106,000 Off-Sites - '58, 500 Wycliffe. Loan (Incl. escrow & 100,000 Library appraisal fees) 137,760 Contingency @ 21% $ 491, 500 Current Net Available $ 793,760 Total Needed Plus 205,300 2nd Year Bushard . 2,158 Senior Recreation Improvements (residual) 918 Comm. Analysis (residual) 8,625 Redevelopment Studies (residual) 502. Smoke Detectors (residual) . . 5,500 "Emergency Medical Information (residual) 24,946 3rd Year Local Option 120,000. 4th Year Local Option 45,000 5th Year Local Option $ 796, 449 New Budget with Reprogrammed Funds LLD CIVIC CENTER PROJECT ALTERNATIVE BUDGET A BUDGETED ITEM �� COST FUNDS SOURCE 1; Site Preparation a. street improvements 65, 250 0 ----- b. curb & •gutter 15, 600 0 ----- c. sidewalk 9, 813 0 ----- d. water. mains (for fire hydrants) 21,00.0 20, 000 11CD e . fire- hydrants 6, 000 .0 ----- f. hot tahs. : 4, 500 y! ----- d. demolition 60#000 60,060 HCD I.,. landscape alterations 7, 500 20,b00 11CD i. EIR and site survey 7,0.42 0 ----- TOTAL $196, 705 100,000 ----- SHORTAGE $96, 705 2. Senior Citizens Center a . architectural fees 33, 333 33 , 333 11CD b. construction 416, 667 416 , 661 11CD C. maintenance 10.,0.00* 2, 700** HBP & R d. operation 5, 000 .5,.000 11BP & R e. furnishing unknown unknown 11BP & R $465, 000 $457,000 SHORTAGE $ 73, 000 3 . Branch Li.brizry a . architectural fees 10,714 ----- b. remodeling 89, 286 ----- 100,000 SIIOR'_T'AGE: $100,000 4 . 'Total Cost $761, 705 $557, 700 TOTAL SHORTAGE $204 , 005 * IIrised on industrial standard ** Cost for current center in FY 79-80 ALTERNATIVL_ BUDGET II iiUDGL'`1'I•:D rmm cus'r FUNDS SOURCE: 1. Site Preparation a . street improvements (use existing) ---- h. curb & .gutter 0 (use existing) ---- c. Sldewatk 0 (use existing) ---- d. water .mains 21, 000 20,000 IICD Cl . fire hydrants 6 , 000 0 ---- f. . hot taps 4 , 500 0 ---- q. demolition 60, 000 60,000 IICD h. landscape .alterations 7, 500 20, 000 HCD i . EIR & site survey. 7, 042 0 TOTAL $1060042 $100,000 it{ORTAGL'' 6, 042 2 . Senior Citizens Center a. architectural fees . 33, 333 33, 333 HCD b. construction 416, 667 416, 667 HCD 450,000 450,000 . c. maintenance 10, 000* 27, 000** IIBP & R d. onerat.ion 5,.000 5, 0.00 HBP & R e. furnishings .unknown unknown ---- 465,000 457, 700 3 . Branch Library SHORTAGE $ 73,000 (I . architectural fees . 10, 71.4. 0 ---- b. remodeling 89,.286 ---- 100 ,000 �! SHORTAGE $100,000 4 . Total Cost $671,042 $557, 700 TOTAL SHORTAGE $113, 342 * Based on industrail standard ** Cost for current center in FY 79-80 0 [ �"J& C1�'�f ®� HIJi�TINGTO EACHINTER DEPARTMENT COMMUN CA ION HUNTINGTON BEACH U To Floyd G. Belsito Fr pes W. Palin, Director City Administrator 8evelopment Services Subject Sixth Year Housing & Community Da e October 25, 1979 Development Program; Old Civic Center Specific Plan & EIR Joint Council & Planning Commission Study Session November 19 , 1979, 6 : 00 P.M. The progress on both the Sixth Year Housing and Community Development Program and the implementation of the Senior Housing and Recreation Facilities on the old Civic Center site has reached a point when a joint study session of the City Council and Planning Commission is necessary. Such a study session is respectfully requested for the above date and time for the following reasons: 1. Sixth Year Housing and Community Development Program Each year the City Council and Planning Commission meet to review the recommended HCD program prior to the required public hearings by each body. By November 19 , 1979 , a Draft Sixth Year Housing and Community Development Block Grant Application will be prepared and will incor- porate the recommendations of the Council-appointed Citizens Advisory Board. To facilitate a coordinated and comprehensive review of the Application, and to expedite the approval process, it is recommended that a joint study session be scheduled for that date. 2. Old Civic Center Project The Old Civic Center. Specific Plan amendment to the Zoning Ordinance has been approved by the City Attorney and the comment period on the Environmental Impact Report has closed; therefore, both of these documents are ready for public hearing by the City Council and Plan- ning Commission. Prior to the formal public hearing required on these documents, it is suggested that both the Council and the Plan- ning Commission have the opportunity to review and study them. For this reason it is recommended that a joint study session regarding these items as well be scheduled for November 19 , 1979. Simultaneous review of these two related subjects should provide for a thorough and timely consideration of the issues. JWP:SVK:jb T Steve- Kohler, Housing To and Community Development Date 7/18/79 At the study. session of July 16 , 1979 , the City ; Council requested a report which would detail all the costs which will be incurred as a result of the Downtown Civic Center, Project. This would include moving costs, construction; demolition, etc.- In addition, :they "requested information as to W}1at- 1-be battam ling- will hP can all arrhitg-nt Tral cost and fees. This information was requested to be retuned to thtzm wi thin •Gi x wPgkG_ Pl AaGP have this report prepared. and to me by s' Aur�ust 9'A 1979 at the latest Thank you, PLEASE REPLY Y8 Signed Jeri Chenelle w t Adm . .Analyst--- cc: Vince Moorhouse Jim a in Date Signed Rodifirm SEND PARTS I AND 3 WITH CARBONS INTACT. > - 45,.465- ,--, PART 3 WILL BE RETURNED WITH REPLY Steve Kohler,, Housing To and Community Development Date 7/18/79 At the study session of July 16, 1979, the Ctty Council requested a report which would detail all the costs which will be incurred as a result of the Sowntown Civic Center Project. This would include moving costs., construction, demolition, etc. In addition, they requested information as to hat thA hnttnm l ;n _ will he on all architectural cost and fees. This information was requested to be 'returned t hc-m w'f-h'n nix week- Please have this report prepared and to me by. August 93 1979 at the latest. Thank you, RETURN TO `> - Signed Jeri Chenelle Adm. Analyst cc: Vince Mloorhouse im Falin m Date Signed Redifp►m SEND PARTS 1 AND 3 WITH CARBONS INTACT. - 4S 4165 PART 3 WILL BE RETURNED WITH REPLY. f' CITY OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINCrON BEACH To Floyd G. Belsito From James W. Palin, Director City Administrator Development Services Subject OLD CIVIC CENTER PROJECT: Date August 24 , 1979 COST REPORT At the City Council study session of July 16, 1979, the Council requested that staff prepare a cost report for all components of the subject project and present such.. report to the Council within six weeks. Attached is this report forwarded . to you for presentation to the Council . Specifically, attached are two alternative budgets each representing a different level of public infrastructure improvement to accommodate or compliment the proposed project. 1 . Alternative Budget A This budget represents the costs of public infrastructure improvements necessary to accommodate the project and represents the complete re- placement of right-of-way improvements surrounding the site; including reconstruction of street sub-surface and paving, curbs , gutters, and sidewalks. While this might be desirable, it adds substantially to . the development costs ($90, 000 approx.. ) and creates a serious deficiency in budgeted funds ($204 , 000) . Since a comprehensive revitalization plan is underway for the Downtown Area, perhaps these infrastructure improvements should be deferred until that plan and its funding sources are identified. In addition, this budget includes the underground utility improvements necessary to .accommodate the housing project, architectural fees and construction costs for the Senior Center, and maintenance and operating costs for the center for one year, and improvements to the Library. C 1- '.page Two 2. Alternative Budget B This budget is identical to the above, except that the costs for reconstruction of streets, curbs, gutters, and sidewalks are ex- cluded. Under this budget the existing streets, curbs, gutters, and sidewalkis would be retained. Where damage occurs during con- struction, the improvements would be repaired and where new curb cuts are needed these would be provided. These repairs or alter- ations would be paid by the Lyon Company on the housing site and would be incorporated into the total construction costs on the public - facilities site. 3 . Senior Center Narrative Report In addition, attached is a narrative report regarding maintenance operation and furnishing costs for the new senior center as prepared by the Department of Harbors, Beaches, Recreation, and Parks. This report reveals that staffing and operational costs for the new center are anticipated to be similar to the costs currently ex- peri•enced at the existing center. However, calculation of maintenance and furnishing costs for the new center are tentative at this time. The maintenance costs des- cribed in the following budgets are based on the industrial standard of one dollar per square foot. These costs greatly exceed the costs currently experienced in other similar City facilities. For example, the entire maintenance budget for Recreation and Parks buildings for FY 79-80 is $15, 725, and this should be adequate to maintain . five clubhouses, four community centers, and the City Gym. The FY 79-80 maintenance budget for the existing senior center is $2, 700- approximately. Therefore, the application of the industrial standard to the proposed facility appears to result in an inflated maintenance figure. The narrative report also shows a range of $0 - $50, 000 for furnishing the new center. This range depicts using only existing furniture to acquisition of all new furniture. Since this range is so broad, no figure is included in the attached budgets. 4. Project Revenue To accurately judge the net cost of these new facilities, it is help- ful to review the revenue generated by the improvements . The develop- ment fees for the housing component of theproject are also attached. This analysis reveals that this project will generate $109, 000 in development fees to the City with an additional $39, 000 in fees to the County Sanitation District . This , of course, does not consider the tax revenues that would be generated by the housing component. For a more complete analysis, the total project could be subjected to evaluation under the Fiscal Impact Model when it becomes fully operational. I Page Three 5. Conclusion Both of the alternative budgets show a deficiency of capital outlay funding for the Old Civic Center Project . However, the deficiency varies greatly (from $113, 000 - $204, 000) . Additional funding to fill this deficiency is available through uncommitted, reprogramable, or future years ' Housing and Community Development Funds (staff will return to Council with a complete report on repr_ogramable HCD funds within 60 days) . In addition, this deficiency is diminished sub- stantially by the development fees that will be assessed on the housing component of the project, and perhaps this income should be ear-marked for the public facility to be provided on the site. Respectfully submitted, d mes W. Palin, Director Development Services JWP: SVK:gc r , 5 JLD CIVIC CENTER PROJECT ALTERNATIVE-: BUDGET A BUDGETED ITEM COST FUNDS SOURCE 1. Site Preparation a. street improvements 65, 250 ----- b. curb & •gutter 15 , 600 - ---- c: sidewalk 9 , 813 ----- d, water mains (for fire hydrants) 21, 000 20 , 000 IICD e . fire hydrants 6 , 000 ----- f, hot taps 4 , 500 ----- g. demolition 60 , 000 60 , 000 HCD h. landscape alterations 7, 500 20 ,.000 EICD i. EIR and site survey 7, 042 0 ----- TOTAL $196 , 705 100 , 000 ----- SHORTAGE $96, 705 2. Senior Citizens Center a. architectural fees 33 , 333 33 , 333 HCD b. construction 416 , 667 416 , 667 HCD C. maintenance 10 , 000* 2 , 700** HBP & R d. operation 5 , 000 5 , 000 HBP & R e . furnishing unknown unknown HBP & R $465, 000 $457 , 000 SHORTAGE $ 73 , 000 3 . Branch Library a. architectural fees 10 , 714 ----- b. remodeling 89 , 286 ----= 100 , 000 SHORTAGE : 1$100, 000 4 . Total Cost $761, 705 $557 , 700 TOTAL SHORTAGE $204 , 005 * Based on industrial standard ** Cost for current center in FY 79-80 OLD CIVIC CI_ NTER PROJECT ALTERNATIVE BUDGET B BUDGETED ITEM COST FUNDS SOURCE 1. Site Preparation a. street improvements p (use existing) ---- b. curb & gutter pl (use existing) ---- c. sidewalk (use existing) ---- d. water mains 21 , 000 20 , 000 HCD e . fire hydrants 6 , 000 ---- f. hot taps 4 , 500 ---- g. demolition 60, 000 60 , 000 HCD h. landscape alterations 7,500 20 , 000 HCD i . EIR & site survey 7 , 042 ---- TOTAL $106 , 042 $100 , 000 0HORTAGE 6 , 042 2 . Senior Citizens Center a. architectural fees 33, 333 33, 333 HCD b. construction 416 , 667 416 , 667 HCD 450 , 000 450 , 000 C. maintenance 10 , 000* 27 , 000** HBP & R . d. oneration 5 , 000 5 , 000 HBP & R e. f_urnis.hings unknown unknown ---- 465 , 000 457, 700 3 . Branch Library SHORTAGE $ 73 , 000 a. architectural fees 10 , 714 ---- b. remodeling 89, 286 pl ---- 100 , 000 SHORTAGE $100 , 000 4 . Total Cost $671, 042 $557, 700 TOTAL SHORTAGE $113 , 342 * Based on industrail standard ** Cost for current center in FY 79-80 - r ; ( ANALYSIS FOR NEW SENIORS ' CEi Staff The Center Director/Coordinator position will most likely be funded by CETA (if in January of 1982 CETA still exists) . Also possibility of field work student from state colleges is one idea to fill this position so there is no cost .to the city. The cost for the full-time maintenance man and the temporary positions total $26,839* (includes benefits) . This figure reflects the costs for the 79-80 fiscal year. Obviously inflation factors would have to be built in to determine the costs in January 1982. One alternative might be to use volunteers entirely rather than paid employees. Running a facility of this type with minimal staff requires close supervision by the supervisor of Human Services. *The Seniors ' Outreach staff costs are not included in this figure as this has always been a separate function. Maintenance and The Building Maintenance division has stated that they Operating cannot give accurate, realistic figures for the maintenance of the new center without being able to look at some working drawings (available approximately April 1980) . They did say that we could use the industrial standard which is one- dollar ($1 .00) a square foot per year. If the building is 10,000 square feet, the cost for maintenance would be $10,000 a year. They stated generally that for the first five years of a new building the maintenance costs are high due to the fact that the. "bugs" are being taken care of. There is a drop in costs for the next ten years and then a sharp increase in maintenance costs for the five years after that. They also recommended that duality hardware be used as in the long run you save money and they felt that "soft" finishes should be avoided. The cost for operating the present center which is approximately the same size as the proposed center is $4,883*. This figure reflects the 79-80 fiscal year and again inflation factors would have to be built in to determine the costs in January 1982. *Seniors ' Outreach costs not included. Furnishing Center There are any number of alternatives that the city could use in furnishing the new center. If the new center were to be furnished completely with new furnishings , then the total costs would be $48,604. See attached list for a list of items at today's prices. Obviously, if the furniture is purchased sometime in 1981 for a move in of January 1982 , inflation factors would have to be built in. The other extreme would be of course to move Page Two all the old furniture from the old center to the new one. This would result in no cost to the city, but depending on the future usage of the old center, there might have to be expenditures involved in furnishing the old center in some way. It is likely that in two years not all of the present furniture, etc. at the old center will be in sufficient condition to realistically expect to use it in the new center. It is most likely that the cost of furnishing the new center will be somewhere between NO COST and the $48,604 (plus inflation) figure. Naturally, it is anyone's guess at this point as to what that cost might be. PI�LJt_111 DAY CUJi W i UNNIJ11 NLIii yUJL t - Cushion Chairs 29 @ $145 = $ 4205 Plastic Chairs 300 @ $22 = $ 6600 Typing Chairs 5 @ $103 = $ 515 Wall Pictures 3 @ $10 = $ 30 Typewriters (rented) 2 @ $30 = $ 60/month rental x 12 months = $720 for one year Adler Typewriter 3 @ $700 = $ 2100 Manual Typewriter 1 @ $650 = $ 650 IBM Selectric 1 @ $950 = $ 950 Typewriter Tables 5 @ $142 = $ 710 Typewriter Stands 3 @ $ 70 = $ 210 Coat Racks 3 @ $ 78 = $ 234 Podium 1 @ $110 = $ 110 TV Set 1 @ $600 = $ 600 Hi Fi Set 1 @ $200 = $ 200 Snooker Table 1 @ $1500 = $ 1500 Pool Tables 3 @ $1000 = $ 3000 Table Cabinet 1 @ $145 = $ 145 Overstuffed Chair 1 @ $250 = $ 250 Hanging Wall Scorers 2 @ $ 50 = $ 100 5-Drawer Filing Cabinet 1 @ $311 = $ 311 4-Drawer Filing Cabinet 11 @ $260 = $ 2860 2-Drawer Filing Cabinet 1 @ $150 = $ 150 Black Cush. Side Chair 3 @ $200 = $ 600 Record Player 1 @ $ 75 = $ 75 Refrigerator 1 @ $700 = $ 700 Card Tables 12 @ $ 50 = $ 600 Electric Clock 2 @ $ 45 = $ 90 6-Foot Tables 62 @ $ 80 = $ 4960 Flanging Wall Bul . Br.d. 4 @ $ 27 = $ 108 Desks 20 @ $320 = $ 6400 Desk Arm Chairs 16 @ $145 = $ 2320 Swag Lamp 1 @ $100 = $ 100 Blackboards 3 @ $ 56 = $ 168 .Index Card Files 4 @ $ 7 = $ 28 Book Cases 3 @ $300 = $ 900 Water Cooler 2 @ $6.50 = $ 13/month rental x 12 months = $156 for one year Page Two Rollers for moving 6-Foot Tables 6 @ $ 80 = $ 480 Wastebaskets_ 26 @ $ 46 = $ 1196 . Square Coffee Table, 1 @ $150 = $ 150 Desk File Box 4 @ $ 9 = $ 36 8-Foot Tables 2 @ $ 95 = $ 190 10-Foot Tables 1 @ $110 = $ 110 3MVQC Copier Machine 1 @ $ 50 = $ 50/month rental x 12 months = $600 for one year Large Round Table 1 @ $150 = $ 150 Couch 2-Cushion 1 @ $522 = $ 522 Aluminum 10-Foot Ladder 1 @ $ 50 = $ 50 Chairs Upholstered 14 @ $ 75 = $ 1050 Pull Down Projector Screen 1 @ $ 60 = $ 60 Portable Projector Screen 2 @ $ 90 = $ 180 Bell & Howell Projector, 16mm . . 1 @ $475 = $ 475 TOTAL *$48,604.00 *NOTE: Amount includes total cost of rental items for one year. OLD CIVIC CENTLR PROJECT HOUSING COMPONENT -DEVELOPMENT FEE REVENUE- ITEM FEE RATE TOTAL 1. Conditional. Use Permit $75 . 00/application $ 75 . 00 2 . Drainage Fee N/A ------- 3. Water Fee $30. 00/unit 4710 . 00 4 . Sewer Fee $60 . 00/unit 9420 . 00 5 . Cultural Enrichment Fee $ . 05 sq. ft. 6668 . 35 6 . Street Improvement Fee $50 . 00/unimproved N/A feet frontage 7 . Park & Recreation 0 bdr_m. $389 (unit 3890 . 00 (10 un. ) 1 bdrm. $492 (138 unit) 67 , 896 . 00 2 bdrm. $759 (9 unit) 6 , 831 . 00 B . Building Permit and $5 million valuation 9 , 679 . 00 Plan Check CITY FEE TOTAL $109 , 169 . 35 9 . Co. Sanitation Fee $250 ./unit 39 , 250 . TOTAL FEES $148 , 419 . 35 HNCITY OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH - To Floyd G. Belsito ,, , ..;,- From Stephen V. Kohler, Se for .City-,.Administrator Community Development Specialist Subject. PROGRESS REPORT. SENIOR _CITIZENS Date July 16, 1979 ps HOUSING AND RECREATION FACILITY r r ON. OL_ D CIVIC ,CENTER SITE. x would like to take this opportunity to provide the following information regarding .the. progress. of..the .subject project. ;.1. PERFORMANCE SCHEDULE -.' Attached is the Performance Schedule for the Senior Housing and ,aY ;- Recreation Facility on the Old Civic Center Site. This schedule _,:•<•�a _...,�•.' will become apart of the Participation Agreement, . when approved . by Council, and depicts the actions necessary .and time required to implement the project. 2 PARTICIPATION AGREEMENT-• This Agreement will become the basis for establishing the responsi- bilities and financial commitments of both the. developer and the City. A draft of this Agreement and a summary of its contents was trans- '� " s mitted to Council on July 12, 1979, and the study .session of Monday, . July 16, 1979, will offer the Council the opportunity to ask questions regarding its contents. A'.final form of the Agreement wi11 be transmitted. to Council prior to the August 6, 1979 meeting and, if the Council concurs, --the Agreement may be. executed at that meeting. 3. CALIFORNIA HOUSING FINANCE AGENCY -;= In addition to the approval of the developer' s "Stage I" application to the California' Housing Finance Agency, which was reported to Council on June 14, 1979 the developer has also received verbal commitment from the CHFA to :provide subsidy funds for 49 .percent of the planned ..;., apartment. units. The CH_ FA has also expressed support for. the irk vative ' concept of the project...." 4 . ARCHITECTURAL SERVICES CONTRACTS Copies of -proposed Architectural Services contracts for both the new Senior Citizens. Recreation Center and for the remodel of the Main Street Branch Library were transmitted to Council on July 12, 1979 . These agreements will also. be discussed at the July 16, 1979 study session, and if Council concurs, . may be scheduled for .execution by " ` the. Council on Au ust 6 1979. t t Floyd G Belsito ; { Page Two } 4 k 7 5 ENVIRONMENTAL IMPACT REPORT j " The data collection phase of the EIR being prepared by Pacific r c Environmental Services is scheduled to be complete by July 20 1979 11, The Draft EIR will then be prepared and after City screening, transmitted to outside agencies for a review and comment period of 45 days The Planninq Commission public hearing on this document isr tentatively scheduled for October, 1979 (see Performance Schedule) } 6 SPECIFIC PLAN AMENDMENT TO THE ZONING ORDINANCE t al The staff review of the Draft Old Civic Center Specific Plan is nearly complete The document will shortly be transmitted to the City Attorney' s Office for review prior to a Planning Commission public hearing tentatively scheduled to occur concurrently with ,r t , the EIR hearing in October, 1979 f 7 RESOLUTION OF INTENT - VACATION OF A PORTION OF PECAN AVENUE A` Resolution of Intent to vacate a portion of Pecan Avenue public th right-of-way, was transmitted to Council on July 12, 1979 With Council concurrence, this item may be included on the August 6, 1979 Council Agenda At that time, the Council may set a date and time for a public hearing on the vacation not sooner than fifteen (15) days after the adoption of the Resolution of Intent (suggested public hearing date September 4, 1979) ti SVK � h 1 h 3 1 � � t t t 1 4 r i r- js y G 2 t r } y , r � i t , 4 r i S � � 1 4 t �Z 1 S { HUNTINGTON BEACH SCHEDULE - JU'NE 26, 1979 JAN. FEB. � MAR. AP MAY JU'NE JULY- AUG SEPT.. OCT.. NOV. DEC. City. 7/16 Selection City Council 10/17 11/5 Planning City site Survey, Part. Agreement Commission Council 1979 Specific Plan Amending Zoning Ord. 30-day Waiting and EIR. Approval Period CHFA- Stage i Lease Agreement4 C.U.P. Approval FA Stages 2 & 3 Castai .Commission 6 Weeks 1980 i 'orking Drawings C1oLoanHFA 3 Months Citv Plan Check Jjemo.. Clea 8 Weeks 4 Weeks Bid Plans Onsite 6..Weeks Offsites Constructioi 4 Weeks-1' On Site Construction 1981 14 Months- Marketing Period 1982 OLD CIVIC CENTER SENIOR HOUSING PROJECT, Rent Up 3 Months AGENDA CITY COUNCIL CITY OF HUNTINGTON BEACH Council Chamber, Civic. Center Monday, July 16, 1979 7:30 P.M. A. PLEDGE OF ALLEGIANCE INVOCATION - Mr. Don Koester - St. Bonaventure Catholic Church ROLL CALL - Pattinson, Thomas, Mandic, MacAllister, Bailey, Yoder (Request from Thomas to be excused from meeting. ) B. PRESENTATIONS - COMMENDATIONS - PROCLAMATIONS B-l . COMMENDATION - To Lucy Heydon for her work as a Whitecapper in the Civil Defense Office and to Lynn Ross, a volunteer of the American Red Cross, for her work in the Civil Defense Office. George Thyden, Civil Defense Director, will make the presentations. B=2. PRESENTATION - Plaque to John Long for his service on the Meadowlark Airport Board. NOTICE TO PUBLIC All matters listed under consent calendar are considered by the Council to be routine and will be enacted by one motion in the form listed below. The Mayor . has requested that any Councilperson with a question on Consent Calendar Items or any other agenda _item please contact the appropriate Department Head or the. City Administrator prior to the meeting. C. CONSENT CALENDAR Action: Approve all items on the consent calendar by affirmative roll call vote. C-1 . MINUTES ---.Approve minutes of the adjourned regular meetings of 6/25/79 and 7/2/79 and the regular meeting of 7/2/79. Recommended by the City Clerk. (7/16/79) (1 ) Page #2 - Council Agenda - 7/16/79 C-2. WARNER AVENUE FIRE STATION/PUBLIC DOCK & VESSEL PUMP-OUT FACILITY NOTICE OF C014PLETION - CC-438 - Accept the work on the completion of the public dock and vessel pump-out facility at the Warner Avenue Fire Station completed by Ye Dock Master for $35,000 and instruct the Clerk to file a Notice of Completion. Recommended by the DPW. C-3. WARNER AVENUE FIRE STATION/PUBLIC DOCK & VESSEL PUMP-OUT FACILITY - ADDENDUM TO AGREEMENT Approve and authorize execution of an addendum to the 6/6/78 agreement between the City and the County which would extend the time of completion of the public dock and vessel pump-out facility to 7/21/79. Recommended by the DPW. C-4. 0 C HEALTH PLANNING COUNCIL APPOINTMENT - Confirm the appointment of Robert J. Smith as a delegate to the Orange County Health Planning Council . Recommended by. the City Administrator. - (RCA 79-58) C-5. SIXTH YEAR HCD CITIZENS ADVISORY COMMITTEE APPOINTMENTS - Appoint the volunteer candidates to the Sixth Year Housing and Community Develop- ment Citizens Advisory Committee as submitted. Recommended by the Director of Development Services. D-1 . PUBLIC HEARINGS - OPENED & CONTINUED TO THIS DATE - (NONE) D-2. PUBLIC HEARING D-2a. VACATION OF STREET RIGHT-OF-WAY ADJACENT TO CENTER DRIVE Hearing pursuant to Resolution of Intention No. 4764 adopted 6/18/79 to vacate the street right-of-way adjacent to Center Drive. RA: After reading by title, adopt Resolution'No. 4773 - "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ORDERING THE VACATION OF THE STREET RIGHT-OF-WAY ADJACENT TO CENTER DRIVE." (2) (7/16/79) r Page #3 - Council Agenda 7/16/79 E. ORAL COMMUNICATIONS (3 minute time limit per speaker) F: REDEVELOPMENT AGENCY & PARKING AUTHORITY -'(NONE) G. RESOLUTIONS Action: After reading by title, adopt by roll call vote: There will be no separate discussion of these items Wets cause is shown prior to the time the Council votes on the motion to adopt. G=1 : RESQLUTION. NO 4774 - "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH REQUESTING THE COUNTY OF ORAtIGE TO UNDERTAKE THE DEFENSE OF THE CITY IN THE MATTER OF LUCKY STORES, .INC: V. COUNTY OF .ORANGE, ET AL. Prepared at the request .of .the City Attorney. G-2. RESOLUTION NO 47,75 - "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH AUTHORIZING PAYMENT OF SALARIES AND BENEFITS TO MEMBERS OF THE HUNTINGTON BEACH FIREMEN'S ASSOCIATION. " Prepared at the request of the Personnel .Di.rector. (1/16/79) (3) 1 Page. #4 - Council Agenda 1/16179 H. ADMINISTRATIVE ITEMS H-1 . CITY COUNCIL BUDGET LIAISON COMMITTEE - (RCA 79-60) Communication from the City Administrator regarding the need to establish a City Council Budget Liaison Committee. (a) Appoint a standing Budget Liaison Committee for one year; or (b) Rotate Councilmember participation in budget activities based on time (such as every two months) or based on issues (such as by. department). (c) Establish no formal appointments or process and, instead, any Councilmember may participate at any time as desired. H-2. H B PLAYHOUSE REVENUE SHARING GRANT - (RCA 79-61) Transmittal from the City Administrator of an amendment to the 5/77 agreement between the City and the Huntington Beach Playhouse which deletes reference to specific time periods relative to the expenditure- of the Revenue Sharing Funds, RA: Approve and authorize execution of said agreement. H-3. REPLACEMENT OF CITY'S B2771 COMPUTER EQUIPMENT & CADS PDP 11-35 - RCA 79-62 Communication from the City Administrator relative to upgrading the City's % year old central city computer as well as the 7 year old Computer Aided Dispatching System POP 11-35 computer. RA: Approve in concept the recommended direction of the Data Processing Steering Committee and Data Processing.Alanager , as outlined in the Analysis Section of this request'and ' approve the Lease Contract and Installation/Sale Contract. ACTION ITEMS FROM CITY ADMINISTRATOR'S CA (4) (7/16/79) w Page #5 - Council Agenda 7/16/79 I. WRITTEN COMMUNICATIONS I-1 . HUNTINGTON LANDMARK ADULT COMMUNITY ASSOC - REQUEST FOR TRAFFIC REGULATION ENFORCEINENT Communication from the Huntington Landmark Adult Community Association requesting Police Department enforcement of traffic regulations in the condominium complex. RA: Deny request as City has no authority to cite on private streets. J: ORDINANCES J-1 . FOvADOPTION Action: After reading by title, adopt by roll call vote J=1a. ORDINANCE. NO 2387 - "AN ORDINANCE OF THE CITY OF HUNTINGTON BEACH AMENDING THE HUNTINGTON BEACH ORDINANCE CODE BY REPEALING SECTIONS 9003.1 THROUGH 9003.3; BY AMENDING SECTION 9002, AND ADDING THERETO NEW SECTIONS 9003.1 THROUGH 9003.3 RELATIVE TO THE APPOINTMENT OF PLANNING COMMISSIONERS." Prepared at the direction of Council . Introduced 7/2/79. Memorandum from- Mayor MacAllister requesting continuance of said ordinance to 8/6/79. J-2: FOR INTRODUCTION Action: After reading by title, approve introduction. J=2a. ORDINANCE NO 2373 - "AN ORDINANCE OF THE CITY OF HUNTINGTON BEACH AMENDING THE HUNTINGTON BEACH ORDINANCE CODE BY REPEALING CERTAIN SECTIONS RELATING -TO BUILDING SITES, AMENDING SECTIONS 5102.1 .1 .1 , 9162.1 :1 :1 , 9202.1 1•.1 , 9232.1 .1 .1 AND 9602.1 .1 .1 , AND ADDING THERETO SECTIONS 9960.3 THROUGH 9960.7 ESTABLISHING MERGER OF CERTAIN PREVIOUSLY SUBDIVIDED LOTS. " Prepared at the request of the Department of Development Services. Introduced 7/2/79. Resubmitted for introduction due to Modification of certain sections. J-2b. ORDINANCE NO 2388 - "AN ORDINANCE OF THE CITY OF HUNTINGTON BEACH AMENDING THE HUNTINGTON BEACH MUNICIPAL CODE BY AMENDING SECTIONS 10.12.020 AND 10.•12.050, LOWERING THE SPEED LIMIT ON HUNTINGTON STREET." Prepared at the request of the DP41. (7%16/79) (5) Page #6 - Council Agendz 7/16/79 K. DEFERRED ITEMS K-1 . PARKING METER CITATION PROGRAM Communication from the Director of Harbors, Beaches, Recreation and Parks recommending that Council authorize the implementation of a parking meter citation program with Science Application, Inc. , and direct the preparation of an agreement. (Deferred from 7/2/79) RA: Approve as recommended K-2. AMENDMENT TO REAL PROPERTY AGENT AGREEMENT Communication from the Director of Harbors, Beaches, Recreation and Parks recommending an amendment to the contract between the City and the Real Property Agent. (Deferred from 7/2/79) RA: Approve proposal to amend the Real Property Agent Contract for its remaining three months to include an amount not to exceed $5,850 to allow the necessary park property acquisition to proceed and to allow for renegotiation when existing contract with DPW expires. L. NEW BUSINESS L-1 . CITY COUNCIL: L-2. SUBMITTED BY MAYOR MacALLISTER: L-3. SUBMITTED BY MAYOR PRO TEM MANDIC: L-4. SUBMITTED BY COUNCILWOMAN BAILEY: L-5. SUBMITTED BY COUNCILMAN PATTINSON: (6) (7/16/79) Page #7 - Council Agenda - 7/16/79 L-6. SUBMITTED BY COUNCILMAN THOMAS: L-6a. Request permission to miss 7/16/79 meeting due to business out of state. L-7. SUBMITTED BY COUNCILMAN YODER: L-8. SUBMITTED BY COUNCILWOMAN FINLEY: M. COMMUNICATIONS - DEPARTMENTS - BOARDS - COMMISSIONS - COUNCILS M-1 . PLANNING COMMISSION COMPENSATION Communication from the Deve opment Services Department recommending that the Council adopt a resolution setting forth compensation for Planning Commission members at or above their present schedule of compensation. RA: Direct the .preparation of a resolution setting forth compensation for Planning Commission members at or above the presently existing schedule of compensation.. M-2. PLANNING COMMISSION APPOINTMENTS Communication from the Director of Development Services recommending that Council make interim appointments to the Planning Commission until such time as appointments can be made pursuant to Ordinance No. 2387. RA: Approve recommended action. N. BIDS N-1 . TRAFFIC SIGNAL CONSTRUCTION - CC 427/428/449 Bids for the construction of traffic signals at Goldenwest and Goldenwest College entrance, Edinger Avenue at Goldenwest College/ Gemco entrance and modify Goldenwest at McFadden. Bids opened 7/5/79. RA: Accept the low bid of Grissom & Johnson, Inc. , in the amount of $188,338 and reject all other bids. 0. ITEMS DISTRIBUTED TO THE CITY COUNCIL - (NONE) P. ADJOURNMENT (7/16/79) ALICIA M. WENTWORTH, CITY CLERK (7) CITY OF HUNTINGTON BEACH CITY COUNCIL ADJOURNED SESSION JULY 16 , 11979 6 : 30 PM ORDER OF CONSIDERATION OLD CIVIC CENTER PROJECT 1. Roll Call 2 . Progress Report on Senior Housing and Recreation Facilities on Old Civic Center Site (Kohler) . • 3. Summary of Participation Agreement 4 . Summary of Architectural Services Agree- ments for both New Senior Citizens Center and Remodel of Main Street Branch Library 5. Review of Resolution of Intent: Vacation of Pecan Avenue Right-of-Way 6 . . Council Determination Regarding Design Review Board Consideration of Old Civic Center Project 7 . Adjourn to 7 : 30 PM Meeting i; c� _� _ 2 • �i � -_ � _ � � � � � 1 - �� _ ��-� _ _ _ _---- `� 1 �. �, `�`� --- --- -- �., HUNTINGTON BEACH \ OLD CIVIC CENTER SENIOR HOUSINGI-ACTIVITY CENTER PROTECT conF¢nFs: L site pbn 2.utif pk)n 3.housing plan 4-elewtbn 8 work schedule ULY AA AA • �AAV� / v �� .�a17!4' S EE ,( '1�y 0 - - I r i 1 - - - •I .. '� \::...ram. .i � t-. _ .. . ' I NA It Ll a WA I r __._..__ -.. w-✓.� ,..ram.' --~' � Y • "� . u1-`, --ram' la " — ._.. ,;,: lil;� 1.i1� III rl ,II!I`IID• , -� _ ti ' 1 L cai ; 1 I Y Al � 4 r I R :mghn {Tr- _'..J �1•�.IrLii i'� i . � r II q F- {I \ ZF L uu LLI IA .. ..� ,> :,« � III) -: �► t ' � I 1� �f I I � • 1 I Q� � � n � o rl f•r•.�"' rl v rl n n 1.3 I ri n r^ m L m a) —n n n n n q rn n • 1 ri rr r •• IW� ^W N m ■ Il ED rn v mn r n W m r f 7 L i' }j�jz '`�..,y ,.,i r-' Tom— ��, �.� r i ' � I �,i..�� � � �`� _s �!• ! � i I I: E 3 ��_ - -?� � ::�-+Lt_ y � ��-"_� I '�/fG'��� I ��•� r I � r �.-! I f� � f J�`;n��t�. �• t � � Y'W �i ' 71 ' r y r`- •3--_: �� � r t I 1 I i �l �/• 1 / � i at'.tWA I � �, ��/i„Irr r�>>r� � �, � �LtrP :•x��-r t . � 1 t I F i � ✓\� - �� t �, 2'r:s' r,�'y� as-�-xa«c.�-s•,rv�� k'1 .�5�'v - - - ,'r , , `� - Ell -�'�� �� � +� ' � �� � � I 1 :�4 t _ 1 � � I �• 1 � iii 9R►/!!��(rjL1�f�� � 4 - 4. Elewtion I/i6'_i ' III 11111111,11151111111 118 UNION 1111111111 III III��11■111�1 IIII.�Y� I 1111111I 111111111111111 MINIMUM 1 1111 ,11 111111 NMI d�WNYI 6 1 I�IIN�I IN NOUN MINIMUM ■1 mass oil 111111111111 IN I111111II1111m11III� Ilp�llglll� NUNN III go "al NUNN 11111 dMl NMI AI IB OEM NIIII��I� A1111tlAAI 111111111 �I�III� Rol1 111 1111111111111111Q CITY OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH To Florid G. Belsito From Stephen V. Ko ee rt� �V City Administrator Senior Community Development ., Specialist Subject Date CITY COUNCIL STUDY SESSION; June 19 , 1979 RE: OLD CIVIC CENTER HOUSING AND RECREATION FACILITY JULY 16, 1979 , 6: 30 P.M. Since the City Council ' s selection of the William Lyon Company as developer of the subject project on April 2, 1979 , staff has met with the development team on a weekly basis. This effort has resulted in a number of documents that require the City Council ' s consideration. These documents are: T1. Participation Agreement:; specifying both the City' s and the developer' s responsibilities for the project, 2. Lease Agreement; for transferring the-right-of-use of the housing site to the developer; 3. resolution of Intention to abandon right-of-way; to abandon the �segment- of Pecan Avenue on the site; 4. Contract for Architectural Services; to facilitate the preparation of the plans and specifications for the new senior center and library remodeling. In addition, it would be beneficial to have the opportunity to more fully inform the Council of the status of this project and the antici- pated progress of pending governmental approvals. Therefore, I would like to request that a study session of the City Council be established for Monday, July 16, 1979 at 6: 30 p.m. so that the Council may consider action on these related items. I appreciate your consideration and assistance in this matter, and if you , should have any questions, please phone me at extension 5541. SVK:gc • CITY OF HU (1TIf1GTOfI BEACH DEPARTMENT OF PLANNING AND ENVIRONMENTAL RESOURCES P. O. BOX 190, HUNTINGTON BEACH, CALIFORNIA 92648 (714) 536-5271 TO: Floyd G. Belsito, City Administrator FROM: Stephen V. Kohler Senior Community Development Specialist DATE: June 14 , 1979 SUBJECT: PROGRESS REPORTS SENIOR CITIZENS HOUSING AND RECREATIONAL FACILITY ON OLD CIVIC CENTER SITE I would like to take this opportunity to provide the following informa- tion on the progress of the subject project and request your assistance in forwarding this information to the City Council. 1. PARTICIPATION AGREEMENT This agreement will be the primary mechanism for governing the actions of both the City and the development team. This agreement specifies the responsibilities and financial commitments of both parties and provides a schedule of performance for all actions through construction and occupancy of the facilities. The draft agreement has been reviewed by the City Attorney and a final document is being prepared. It is planned to present this agreement to the City Council for approval on July 16, 1979. 2 . CALIFORNIA HOUSING FINANCE AGENCY The development. team has submitted a "Stage I" application to the California Housing Finance Agency (CHFA) and has received notice of approval of both the site and the developer. This completes Stage I. .In addition, CHFA has ranked this project as a "Priority Two, " the highest priority assigned to any project. not of an emergency nature. The development team will submit a "Stage II" application within 30. to 60 days. 3. SITE SURVEY The City has contracted with the firm of Emerald Engineering of Huntington Beach to conduct a complete topographic survey of the site. This will provide precise information about the location of utilities, buildings, palm trees, and the current grading of the site. This information is necessary to prepare the working drawings for the new ' facilities. The survey will also provide a precise legal description of the por- tion of the site to be leased to the developers. The conditions of this lease will be handled by a subsequent lease agreement. :-i'I�oigress Report s ' June 14 , 1979 Page 2 4. SPECIFIC PLAN AMENDMENT TO THE ZONING ORDINANCE A draft of a specific plan amendment to the zoning ordinance has been prepared and is under review by City staff of the Planning and Building divisions of Development. Services; Public Works; Fire; Library; Harbors, Beaches, Recreation and Parks; and Administration. It is planned to schedule a Planning Commission public hearing on this amendment in September 1979. 5. ENVIRONMENTAL IMPACT REPORT The City has contracted with the firm of Pacific Environmental Services of Santa Monica to prepare the environmental impact report for this project. The document will assess the impacts of the zone change, demolition, and new construction components of the project and is in- tended to undergo public hearing before the Planning Commission in . September 1979 along with the Specific Plan.. The cost of this work will be shared on a pro-rata basis between the City and the development team. Each entity will pay that share of costs incurred by the consultant' s assessment of its actions. 6. COASTAL COMMISSION REVIEW The City staff and development team have met with the South Coast Regional Coastal Commission Director and staff and with the City' s Local Coastal Program Citizens Advisory Committee and have found the project favorably received by both groups. Formal review of the project by the Coastal Commission will not occur until all required City approvals are granted. It is planned to submit an application for a Coastal Permit. in October 1979. 7. ARCHITECTURAL SERVICES (CITY FACILITIES) City staff is negotiating for a separate contract -for architectural services with the firm of Kamnitzer, Cotton, Vreeland of Los Angeles for the preparation of working drawings for the City' s new senior center and library remodeling. Considerable cost savings should be accrued here since the development team prepared the design and schem- atic drawings for the projects as part of the competition submittal. This agreement will be submitted for Council consideration in August 1979. 8. CONSTRUCTION START If the various governmental approval processes go smoothly, it is hoped that construction could begin in the summer of 1980, with occupancy of the senior housing and recreational facilities in the Fall of 1981. As stated in No. 1 above, it is planned to present the Participation Agree- ment to the City Council at the Council' s meeting of July 16, 1979. Periodic progress reports to the Council will continue on an approximately bi-monthly basis. SVK:df