MINUTES
The meeting was called to order at 2 : 20 p.m. with the following
present:
Members Applicants
Ruth Bailey, Council Brian Norkaitis , Wm. Lyon Co.
Frank Higgins, Planning Comm. John Cotton, Kanmitzer, Cotton,
Vreeland
Jim Palin, Development Services Mike Casciola, Housing Concepts
Stephen Kohler, Development
Services
This meeting was scheduled for the review of the schematic drawings
for the Old Civic Center Project; John Cotton, architect for the
project, summarized the concept of the project.
The following points were of concern to the Design Review Board mem-
bers:
1-. Parking for housing project is not below grade, but bermed and
landscaped. This will qualify as "semi-subterranean" parking and
permit wood frame construction above. Lack of storm sewer in
area preempts depressed parking.
*DRB requests additional elevation or rendering of project
depicting view of structure from Fifth Street and details. of
berm and landscaping treatment. The DRB expressed concern regard-
ing turf-block parking at entrance to garage.
2. Some small changes to floor plans of handicapped apartment units
were required to meet CHFA standards . Ten percent of units will be
designated for handicapped persons and one-half of these will be
designed for physically disabled.
DRB questioned if two parking spaces would be sufficient for
planned handicapped population.
3. Screening wall of senior center and library was discussed.
*DRB requested additional design alternatives to wall treatment.
4 . Integration of right-of-way improvements at site with future
downtown theme was discussed.
*DRB endorsed extending any future theme for Main Street right-
of way treatment to the corner of Main and Sixth Streets .
Minutes, 'Ad Hoc DRB
August 24y 1979
Page 2
CONCLUSION:
The Design Review Board endorsed the structural and architectural
aspects of the housing and public facility components of the project
with the above-referenced concerns expressed. The Board also
concluded that the architect' s submission to the California Housing
Finance Agency conformed to the original proposal submitted to the
City.
Lastly, the DRB requested that the project be reviewed again when
CHFA review was complete and when a detailed plan for exterior building
colors and textures and landscaping was complete.
l
Step hler
Chairman . P Tem
1
AD HOC
DESIGN REVIEW BOARD
August 24, 1979
MINUTES
The meeting was called to order at 2:20 p.m. with the following
present:
Members Applicants
Ruth Bailey, Council Brian Norkaitis, Wm. Lyon' Co. '
Frank Higgins, Planning Comm. John Cotton, Kanmitzer, Cotton,
Vreeland .
Jim Palin, Development Services Mike Casciola, Housing Concepts
Stephen Kohler, Development
Services
This meeting was scheduled for the review of the schematic drawings
for the Old Civic :Center Project; John Cotton, architect for the
project, summarized the concept .of the project.
The following points were of concern to the Design. Review Board mem-
bers:
1. Parking for housing project is not below grade, but bermed and
landscaped. This will qualify as "semi-subterranean" parking and
permit wood frame construction above. Lack of storm sewer in
area preempts depressed parking.
*DRB requests additional elevation' or rendering of project
depicting vie w of structure from Fifth Street and details of
berm and .landscaping treatment. The DRB expressed concern regard-
ing turf-block parking at entrance to garage.
2. Some small changes to floor plans of handicapped apartment units
were required to meet CHFA standards. Ten percent of units will be
designated for handicapped persons and one-half of these will be
designed for physically disabled.
DRB questioned if two parking spaces would be sufficient for
planned handicapped population.
3. Screening wall of senior, center and library was discussed.
*DRB requested additional design alternatives to wall treatment.
4 . Integration of. right-of-way improvements at site with future
downtown theme was discussed.
*DRB endorsed extending any future .theme for Main Street right-
of
way treatment to the corner of Main and Sixth Streets .
Minutes, Ad Hoc DRB
August 24, 1979
Page 2
CONCLUSION:
The Design Review Board endorsed the structural and architectural
aspects of the housing and public facility components of the project
with the above-referenced concerns expressed. The Board also
concluded that the architect's submission to the California Housing
Finance Agency conformed to the original proposal submitted to the
City.
Lastly, the DRB .requested that the project be reviewed again when
CHFA review was complete and when a detailed plan for exterior. building
colors and. textures and landscaping was complete.
Step hler
Chairman P Tem.
AD HOC
DESIGN REVIEW. BOARD
August 24, 1979
MINUTES
The meeting was called to order at 2 :20 p.m: with the following
present:
Members. Applicants
Ruth Bailey,Council Brian Norkaitis, Wm. Lyon Co. .
Frank Higgins, Planning Comm. John Cotton, Kanmitzer, Cotton,
Vreeland
Jim Palin, Development Services Mike Casciola, Housing Concepts
Stephen. Kohler, Development
Services
This meeting was .scheduled for the review of the schematic drawings
for the Old Civic Center Project; John Cotton, architect for the
project, summarized the concept of the project.
The following points were of concern to the Design Review Board mem-
bers:
1. Parking for housing project is riot below grade, but bermed and
landscaped. This will qualify as "semi-subterranean" parking and
permit wood frame construction above. Lack of storm sewer in
area preempts dApressed parking.
*DRB requests additional elevation or rendering of project
depicting view of structure from Fifth Street and details of
berm and lands aping treatment. The DAB expressed concern regard-
ing turf-block parking at entrance to garage.
2. Some small changes to floor plans of handicapped. apartment units
were required '.o meet CHFA standards. Ten percent of units will be
designated for handicapped persons and one-half of these will be
designed for p'iysically disabled.
DRB questioned if two parking spaces would be sufficient for
planned handicapped population.
3. Screening wall of senior center and library was discussed.
*DAB requested additional design alternatives to. wall treatment.
4 . Integration of right-of-way- improvements at site with future
downtown theme was discussed.
*DRB endorsed extending any future theme for Main Street right-
of way treatment to the corner of Main and Sixth Streets .
Minutes , Ad Hoc DRB
August 24, 1979 .
Page 2
CONCLUSION:
The Design Review Board endorsed the structural and architectural
aspects of the housing and public facility components of the project
with the above-referenced concerns expressed. The Board also
concluded that the architect's submission to the California Housing
Finance' Agency conformed to the .original proposal submitted to the
City.
Lastly, the DRB requested that the project be reviewed again when
CHFA review was complete and when a detailed plan for exterior building
colors and textures .and landscaping was complete.
Step lie
Chairman PV6 Tem
LN
Ilk
_ CuSaalU---.
a be__�
CA
-�--
Ct►AL
U
000
uxt
es� 1a
ev
Y � L t �► `� - »- - --- - - ------- --- --
�C