HomeMy WebLinkAboutStudy Session Late Communication Immediate Infrastructure Ne '�. CITY OF HUNTINGTON BEACH
INTERDEPARTMENTAL COMMUNICATION
F70
i
z C=
TO: Joan Flynn, City Clerk ' t
FROM: Robert F. Beardsley, P.E., Dir�Publicorks
0-O
zr-
DATE: July 13, 2006 rlm
Mc
.mac
SUBJECT: Late Communication 0
City Council Agenda July 17, 2006—Study Session PowerPoint,PresentatioP I
Attached is the PowerPoint Presentation, Immediate Infrastructure Needs, for the July 17, 2006
Joint Study Session with the Public Works Commission.
RFB:jg
i
CXo�JlI �
� s��J
City Council & Public Works
Commission Joint Study Session Public Works Commission
City of Huntington Beach Objectives for Today's Meeting
Infrastructure Needs
July 17, 2006
1 a
Public Works Commission — Public Works Commission —
Focus on Infrastructure Focus on Infrastructure
♦Review significant awareness made by IIMP ♦Dedicate efforts toward development of long-
effort since 1998 term funding solutions for existing
Reaffirm existing infrastructure maintenance is a infrastructure needs
top priority
+Recognize substantial unfunded maintenance& +Ensure Council's awareness of the Public
replacement backlog Works Commission's willingness to assist in
Request new,surplus&discretionary funding be these goals
directed toward the backlog, to the maximum
extent practicable
g 4
March 2006
1
Preparatory Work
♦Tour of selected infrastructure
Public Works Staff Overview . Participants: PWc,council,Finance Board,Public
. Representative areas of unmet needs
.Types of projects proposed in FY 2006/07 CIP
♦PWC review of draft FY 2006/07 CIP budget
5 6
June 2006 Infrastructure Tour June 2006 Infrastructure Tour
Illy
7 6
March 2006
2
June 2006 Infrastructure Tour June 2006 Infrastructure Tour
s.
r�
9 �
Community Involvement in
June 2006 Infrastructure Tour Infrastructure Improvement
Infrastructure Advisory Committee(IAC)
Began in 1998 to document infrastructure needs and
strategies to address funding shortfall
■ 60+citizen representatives from across the
;r community
. Final IAC report to Council -July 2000
u 12
March 2006
3
IAC - Identified Issues IAC - Identified Priorities
+Significant aging and deterioration of City's 1. Sewers
infrastructure 2. Drainage and Pump Stations
*Low public awareness of infrastructure needs 3. Residential sidewalks/curbs/gutters
-increased communication essential 4. Residential streets—Pavement resurfacing
®Adequate preventive maintenance funding 5. Traffic Signals&Lighting
essential to reduce future costs 6. Beach Facilities
®Additional ongoing,dedicated funding 7. Street Lighting
sources needed for maintenance and
replacement
13 14
LAC - Identified Priorities
8. Arterial Streets and bridges
9. Alleys/Parking Lots Infrastructure Needs
10. Parks/Playgrounds
11. Buildings/Facilities
12. Parks Examples
13. Block Walls
14. Fleet and Equipment
15. Street Trees
1s 16
March 2006
4
• i
Drainage Pump Stations Local Drainage
� 11
17 is
Sidewalks/Concrete Street Trees
. 4
19 20
March 2006
5
• i
Alleys Bridges
E
U V
i
2y 22
Unfunded/Underfunded Needs
Water Quality/Urban Runoff Examples
*Drainage pump stations rebuilds = 14
(average age 42 ywrs)
+Tree-petition list backlog = 75 streets
(exduding greets in need but pApetitioned)
+Non-tree-related concrete repair backlog
(resident complaints) = 150+
Residential streets overlay backlog(2005&
2006) = 100+
Bridge inspection and maintenance backlog = 37
(average age 40 years)
23 24
March 2006
6
Project Priority Considerations Project Priority Considerations
1. Reduce potential or impending health& 3. Comply with regulatory agency mandates
safety concerns ■ SRWQCB,OSHA,AQMD,EPA
• Rood control facilities 4. Enhance property values&local economy
■ Street pavement ■ Street capacity&circulation enhancement
• Bridge maintenance and repair 5. Improve quality of life&reduce blight
• Pier inspection and preventive maintenance Block walls
2. Reduce liability exposure&property damage . Graffiti vandalism abatement
• Tree&concrete sidewalk repairs . Street and park lighting
• Pothole patching . Community buildings
• Local drainage repairs . Harbour dredging
25 26
Infrastructure Needs —
Recommended Current Strategy
®Adhere to IAC report and infrastructure
Summary and Discussion replacement/maintenance priorities
during budgeting
*Allocate new, surplus&discretionary
funding toward infrastructure backlog to
the maximum extent practicable
*Formulate savings plan for large dollar
cost projects
27 26
March 2006
7
Infrastructure Needs - Public Works Commission -
Recommended Forward Strategy Ready to Assist
i Direct available funding priorities toward IAC Final Report alluded to a strong
maintenance&replacement backlog over "three-legged stool"partnership:
new facilities and programs +City Council —Enhance current
+Drainage/water quality fee(requiring 2/3 voter revenues/develop new sources
approval per Proposition 218) *City Staff—Implement Cost-Savings
+Build 2„d tier budget reserve as bank for programs
major pay-as-you-go projects
Other possibilities? Community—Approve appropriate new
revenue sources
30
Public Works Commission -
Ready to Assist
How may the Public Works Commission assist
Council proactively with infrastructure
solutions? Questions and Discussion
♦Public awareness through media and
presentations
Resource for Council and staff in developing
strategies
♦Teamwork in concert with Council and Public
Works staff
31 32
March 2006
8
City of Huntington Beach Capital Improvement Program
Draft Fiscal Years 200612007 through 2010111
Unfunded Requests
Unfunded
Total Project Fiscal Year Fiscal Year
Budget 2006/07 2007/08
• DRAINAGE & STORM WATER QUALITY
Heil Pump Station Rebuild $9 800 000i $975,0001 1 $70850,0001
TOTAL 1 $9,800,0001 $976,000 4
FACILITIES
Building Dept Workspace __ $200,145 $200,145
Central Library Remodel _ _ $500,000 $300,000
Entry Node Sign age $330,000" $330,000
Fire Station Renovations $972,980`; $168,215
Info Sys Offices Remodel $140,000 $140,000
Paint Central Library/Civic Center $630 000 $230,0001 $400,000
TOTAL 1 $2,773,1251 $1,138,3601 $230,000 4 'o
PARKS & BEACHES
Trash Compactor _ $350,000' $50,000 $300,000
Play Equipment Matting 2 arks $250 000 $125,0001 $125,000
TOTAL j $350,000 $50,000i $300,500
;,III TOTALS ! $12,923,1261 $2,163,360 $530,000 - 8-
7/13/2006 060717-GenFundCIPCuts �� Unfunded 06-07 Requests
0 City of Huntington Beach 0
UnfundecWnderfunded Infrastructure Needs
Estimated Cost
Drainage
Heil Pump Station Property Acq&Construction $9,800,000
Replace Existing Drainage Pump Stations 13 $166,200,000
Storm Drain Improvements $25,000,000
TOTAL $201,000,000
Residential Concrete
Petition Streets as of June 2006 $12,400,000
Non-tree related concrete requests 150 $1,125,000
Non-petition residential streets known problems 30%of city $75,000,000
TOTAL $88,526,000
Residential Pavement
Overlay/Reconstruction Backlo 2004 $1,750,000
Overlay/Reconstruction Backlog 2005 $800 000
Overlay/Reconstruction Backlog 2006 $800,000
TOTAL $3,350,000
Arterial Highways Including Bridges
Rehabilitation 2006 $1,000,000
Arterial Slurry Backlog 2006 $750,000
City Owned Bridges 27 2 M each $54,000,000
TOTAL $65,750,000
Additional Priority Capital Infrastructure Needs
Alleys/Parking Lots
Traffic Signals/Park&Street Lighting
Beach Facilities
Parks/Playgrounds
Buildings/Facilities
Block Walls
Cost estimates do not include unfunded or underfunded annual maintenance
7/13/2006 060717-UnfundedNeeds SiZc-,d f/viu 1