PARKING HISTORY
SOUTH BEACH PARKING AREA
YEAR NUMBER OF AUTOS INCOME
1986 285,736 x $4 $1,142,944
1987 261,332 x $4 $1,045,328
1988 236,930 x $4 $ 947,720
1989 208,022 x $5 $1,040,110
1990 206,126 x $5 $1,030,630
1991 197,870 x $5 $ 989,350
1992 208,620 x $5 $1,043,100
1993 202,110 x $6 $1,212,660
BEACH CONCESSION INCOME HISTORY
SOUTH BEACH AREA
YEAR CITY INCOME
1986 $92,460
1987 $90,320
1988 $90,540
1989 $89,210
1990 $82,190
1991 $74,620
1992 $79,840
1993 $68,950
SUNSET VISTA CAMPING INCOME HISTORY
SOUTH BEACH AREA
YEAR CITY INCOME
1986 $129,724
1987 $13%025
1988 $145,591
1989 $143,757
1990 $ 97,834
1991 $ 851440
1992 $ 88,860
1993 $ 71,220
ALTERNATES
PRIORITIES
1. Signage (partial) $ 30,000.00
2. Planting and Irrigation
in plazas $ 141,215.00
3. Planting and Irrigation
in general area $ 124,800.00
4. Junior Lifeguard Station $ 200,000.00
S. Electrical $ 500,000.00
■ Parking lighting $ 350,000.00
■ Low level lighting $ 150,000.00
6. Redo of remaining parking, $1,478,843.00
Includes demolition
7. Palms $ 595,500.00
Additional palm planting and
palm tree lighting
Sub Total $3,070,358.00
10% Contingency $ 307,035.80
Total $3,377,393.80
Total of Phase x
and Alternates
and A/E Fees $6,873,900.55
Items for each phase can be interchanged. Once priorities are confirmed and approved,
we will proceed with construction documents from wbicb we can prepare more specific
cost estimates.
BLUFF TOP/BOTTOM MASTER PLAN
PROJECTED ANNUAL MAINTENANCE COSTS
Amount
1992/93 Projected
Department Actual after Imp'ts
Public Works- Park, Tree & Landscaping $53,153 $55,000
Public Works $ 5,650 $12,500
Community Services 2,404 5,716
TOTAL $61,207 $73,216
NOTE: Community Services Marine Safety, Police and Fire costs will remain the
same.
FECITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
MEMORANDUM
TO: Ron Hagan, Director of Community Services
FROM: Daryl D. Smith, Superintendent of Park, Tree and Landscape Division
DATE: April 14, 1994
SUBJECT: Bluff Top Landscape
Per our meeting of 4/12/94 regarding subject matter and maintenance cost of existing
and proposed landscape from about Ninth (9th) Street to Goldenwest Street, please
find below our estimated costs:
1. Maintenance cost for FYB 1992/93 was $53,153.00 or$6,644.12 per acre.
2. Maintenance cost for the proposed re-landscape/reconstructed area should .be
approximately the same as existing say 55 000.00.
Should you have any questions regarding the above please give me a call.
DDS:ss
cc: Louis F. Sandoval, Director of Public Works
James Jones, Supervisor of Park Maintenance
John Van Oeffelen, Supervisor of Tree and Landscape Maintenance
Chuck Davis, Landscape Architect
CITY OF HUNTINGTON BEACH TO : Ron Haga
Community Services Department FROM : Jim Way
DATE : ,
April 11 199
p
SUBJECT : LOWER BLUFF-TOP
PARKING LOT
MEMORANDUM
The development of the lower bluff-top parking lot would bring the
following extra beach maintenance costs:
Capital Outlay
1 . 4 Park-Ur-Self System IV multi-space
parking machine @ $18, 125 each . . . . . . . . . . . . . . . . . . $72, 500
2. Installation & Lighting @ $5,000 each . . . . . . . . . . . $20,000
TOTAL CAPITAL OUTLAY . . . . . . $92, 500
Operational Costs
1 . Sweeping, labor - 200 hours @ $15 per hour . . . . . . $3 ,000
2. Additional handpicking of trash
150 hours @ $8. 11 per hour 1 216
ANNUAL LABOR COST . . . . . . . . . $4,216
Material - paint, bumpers, etc. . . . . . . . . . . . . . . . . . $1 ,500
ANNUAL OPERATIMG COST . . . . . $5,716
LA J]Oft CITY OF HUNTINttTON BRACH
L9VLV INTER-DEPARTMENT COMMUNICATION
HUNTINGTON!EACH
TO: Ron Hagan
Community Services Director
FROM: Don Noble
Maintenance Operations Manager
DATE: April 14, 1994
SUBJECT: BLUFF TOP IMPROVEMENTS - NINTH STREET TO GOLDEN WEST
Here is the information you requested regarding the estimated costs of maintaining the
bluff improvements between Ninth and Golden West Streets.
.:: ..........e:e.e.:de6r...:..:a.>x,. px•.. x.,:::5;>::;K; 'j'' ?;si>i;i;ify
Se&ew .>. SfS: f•x a. Tit' '•`i��i
K§f`
<:x•i
S•.:
Paving $2,000 $ 2,000 (1)
Railing 2,200 (2) 500
Lighting 750 5,000
Signing & Stripping -0- 5,000
Graffiti 700 should zero out
TOTAL COSH'S $5,850 $12,600
(1) The cost of maintaining a new parking lot, below the bluffs, should be minimal the
first ten years. Costs will Increase thereafter.
(2) Not a maintenance expenditure. This is the cost of replacing failed railing.
Don Noble > -•• -��^�
Maintenance Operations Manager
DN:bh
u4-15-94 0=: 58PM F,A
SOUTH BEACH PARKING IMPROVEMENT AREA
Phase I
Listed in order of priority:
1. Bike Path separation and pedestrian avenue. $ 610,000.00
Includes:
■ Access to the beach (without concrete columns).
■ Retaining walls and seat walls.
■ Handrail and guardrails.
■ Chain link fence separation between parking and bike trail.
Excludes:
■ Lighting (includes some wiring)
■ Planting
■ Irrigation
2. Plazas around concessions $ 513,000.00
Includes:
■ Hardscape
■ Site furnishing (not to include
tables and chairs; to be furnished
by each concessionaire.)
Excludes:
■ Planting
■ Irrigation
■ Basketball court
■ Lighting
■ Restrooms
3. Restroom buildings $ 615,002.00
Includes:
■ Building Shell
■ All amenities
■ Electricity
■ Showers
■ Demo of old buildings
4. ■ Lifeguard headquarters remodel $ 100,000.00
and addition
5. Parking entrance retrofit at Beach $ 70,000.00
Includes:
■ Demo and redo
■ Re-using old A/C at certain places
and slurry coating
■ Entrance itself and short term parking with
new A/C with base
Excludes:
■ Lighting
■ Short term parking panel
6. Parking entrance retrofit at Huntington $ 107,884.00
Includes and excludes same as above.
7. Parking entrance retrofit at Lake Street $ 260,000.00
Includes same as above.
8. Services:
■ Water service
■ Fire hydrant relocation
■ Sewer
■ Drainage structures $ 40,000.00
9. Electrical $ 245,000.00
■ Include stub-ups for future lighting
10. Sand Wall $ 184,800.00
Sub Total $29745,686.00
Contingency 10% $ 274,568.60
Total Construction Cost $3,0209254.60
A/E Fee 6.5% of entire project $ 415,847.15
Construction Administration $ 609405.00
Total of Phase One $3,496,506.75
Professional fees for project staking by the civil engineer of record and participation by
the landscape architect, architect, electrical engineer and soil engineer during the bidding
and construction phase is estimated to be 2% of construction cost. This cost for
construction administration based on a construction budget of $3,020,254.00 is
$60,405.00.
Purkiss Rose-RS(
' 219 N. Harbor Boulevard
Fullerton, CA 92632
Tel. (714) 871-3638
Fax (714) 872-1198
Job Name: BLUFF TOP NORTH, HUNTINGTON BEACH (93-111)
Date: March 2, 1994
Preliminary Cost Estimate
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
MOBILIZATION
Trailer 1 L.S. 1,000.00 1, 000. 00
Temporary fencing 12,964 L.F. 2 .00 25,928. 00
Toilet 1 L.S. 500.00 500. 00
Phone 1 L.S. 500.00 500. 00
Electrical 1 L.S. 1000.00 1, 000.00
Project manager 1 L.S. 4000.00 4, 000. 00
32 , 928. 00 32 , 928. 00
CLEARING/GRUBBING
Clearing/Grubbing• 204856 S.F. .15 30,728.40
30,728.40 30,728.40
DEMOLITION
Saw cut 120 L.F. 1.00 120. 00
AC Paving 30140 S.F. .50 15, 070. 00
Wall Removal 1 L.S. 100000.00 100, 000.00
Posts 138 EA. 10.00 1, 380. 00
Conc. Steps 2840 S.F. . 50 1, 420. 00
Adjust Utility 19 EA. 50.00 950. 00
Boxes
118,940. 00 118,940. 00
EARTHWORK / GRADING
Finish grading 204856 S.F. .10 20,485. 60
Imported soil 5550 C.Y. 10.00 55, 500. 00
1
Preliminary Cost Estimate `
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
Relocated beach 1486 S.F. 2.00 2,972 . 00
sand
78,957. 60 78,957. 60
DRAINAGE
ABS 4" 1500 L.F. 8.50 12,750. 00
ABS 6" 1500 L.F. 10.00 15, 000. 00
8" Area drain 10 EA. 80.00 800. 00
12" Area drain 30 EA. 125.00 3 ,750. 00
Conc. drain box 200 L.F. 40.00 8, 000. 00
40, 300. 00 40, 300.00
HARDSCAPE
Curb 370 L.F. 10. 00 3 ,700. 00
Curb & Gutter 4086 L.F. 15.00 61,290. 00
Concrete paving 4" 15138 S.F. 2.00 30,276. 00
Concrete step 1187 L.F. 6.50 7,715.50
Mow strip 86 L.F. 6.00 516. 00
Interlocking 11144 S.F. 6.50 72,436. 00
Pavers
Conc. banding 2154 L.F. 25. 00 53 ,850. 00
Repair & cap 4071 L.F. 20. 00 81,420. 00
seawall
Rolled conc. curb 3648 L.F. 12.00 43 ,776. 00
A.C. paving for 160209 S.F. 4.00 640,836. 00
parking lot
995, 815. 50 995, 815. 50
MASONRY
Retaining wall at 1045 L.F. 33.00 34,485. 00
undercrossings
Retaining wallS at 1 L.s. 505050.00 505, 050. 00
pedestrian trail
539,535. 00 539, 535. 00
2
Preliminary Cost Estimate
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
PARKING LOT
Handicap ramp 11 EA. 1000.00 11,000.00
Drive approach 2 EA. 2000.00 4, 000. 00
Striping 7435 L.S. 1.00 7,435. 00
AC pedestrian 23515 S.F. 1.50 35,272 .50
trail
AC bike trail 17148 S.F. 1.50 25,722. 00
Bike trail 65516 S.F. .40 26,206.40
.resurfacing
109, 635.90 109, 635.90
FENCING AND 7RAILING
Step handrails 418 L.F. 40.00 16,720. 00
Bridge handrails 267 L.F. 40.00 10, 680. 00
Handrail at 3778 L.F. 30. 00 113, 340. 00
pedestrian trail
140,740.00 140,740. 00
SITE AMENITIES
Concrete benches 6 EA. 450.00 2,700. 00
Drinking fountain 5 EA. 2400.00 12, 000.00
Trash receptacles 30 EA. 1000.00 30, 000. 00
Conc. bollards 36 EA. 300.00 10,800. 00
Overcrossings 2 EA. 50,000.00 100, 000. 00
Bike racks 40 EA. 150.00 6, 000. 00
161, 500. 00 161, 500.00
BUILDINGS AND STRUCTURES
Portable restroom 3 EA. 15, 000. 00 45, 000. 00
facilities
Bus stop shelters 2 EA. 3,500.00 7, 000.00
52, 000.00 52 ,000. 00
ELECTRICAL
3
Preliminary Cost Estimate
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST TSUB TOTAL
Bluff Top North 1 L.S. 292418.00 292,418 . 00
electrical
PCH Lighting (9th .1 L.S. 180000.00 180, 000.00
to Goldenwest)
.. Utility Company 1 L.S. 20, 000.00 20,000. 00
charges
Traffic signals at 1 L.S. 120000.00 120, 000. 00
PCH and lath St.
Traffic signal 1 L.S. 40000.00 40,000.00
renovation at PCH
and Goldwesth Ave.
7 652, 418.00 652 ,418. 00
UTILITIES
Domestic water 2 EA. 1,500. 00 3;000. 00
connection
Electric stubouts 10 EA. 500.00 5, 000. 00
Fire Hydrants 7 EA. 5, 000.00 35,000.00
4"- Water line 3500 L.F. 2.50 8,750. 00
51,750. 00 51, 750. 00
PLANTING AND IRRIGATION
Soil preparation 204856 S.F. .30 61,456. 80
Groundcover 885 FLATS 15.00 13,275.00
Turf 148274 S.F. .50 74, 137. 00
Palms (new) 150 EA. 500.00 75, 000. 00
1 Gal shrub 1000 EA. 4.50 4,500. 00
5 Gal shrub 500 EA. 18.00 9, 000. 00
.Irrigation system 204856 S.F. .50 102,428.00
90 day maintenance 1 L.S. 6, 500.00 6, 500.00
Relocated palms 41 EA. 400.00 16,400. 00
Irrigation pump 1 L.S. 25, 000.00 25, 000.00
387, 696.80 387,'696.80
TOTAL 3,392,945.20
4
• LANDSCAPE AREA RENOVATION
NORTH OF GOLDENWEST AVENUE
Preliminary Cost Estimate
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
DEMOLITION
Saw cut 565 L.F. 1.00 565. 00
Removal A/C paving 8984 S.F. .50 41, 492 . 00
base included
Relocate bench 1 EA. 550.00 550.00
Relocate trash 2 EA. 300.00 600. 00
receptacles
Relocated palsm 4 EA. 600. 00 2 ,400. 00
8, 607. 00 8, 607. 00
EARTHWORK / GRADING
Finish grading 91035 S.F. .20 18,207 . 00
18,207. 00 18, 207. 00
CONCRETE
Concrete paving at 50 S.F. 2.00 100. 00
existing telephone
Mow strip 190 L.F. 6.50 1,235. 00
A.C. paving 12930 S.F. 1. 50 19, 395:00
Concrete paving at 700 S.F. 2. 00 1,400. 00
picnic table
22, 130. 00 22 , 130. 00
GUARDRAILING
Guardrail 42" high 170 L.F 42 .00 7, 140. 00
Refinishing the 4000 L.F. 3 .50 14, 000. 00
existing guardrail
21, 140. 00 21, 140.00
ELECTRICAL
Lighting north of 1 L.S. 171233.00 171,233 .00
Goldenwest Ave.
5
Preliminary Cost Estimate
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
171,233 . 00 171, 233 . 00
SITE AMENITIES
Picnic tables 9 EA. 1,200. 00 10,800. 00
One way traffic 1 EA. 1,200.00 1, 200. 00
control device
12 , 000. 00 12 , 000. 00
PLANTING AND IRRIGATION
Soil preparation 91, 035 S.F. .30 27, 310. 50
Groundcover 220 FLATS 15. 00 3, 300. 00
Redwood header 1,445 L.F. 3 .25 4 , 696. 25
Turf (hydroseeded) 68620 S.F. .50 34, 310. 00
Palms B.T.H. 50 EA. 500.00 25, 000. 00
5 Gal shrub 500 EA. 18.00 9, 000. 00
Irrigation system. 91035 S.F. .50 45,517 . 50
•149, 134. 25 149, 134 . 25
TOTAL 402,451.25
SUB-TOTAL FOR NORTH OF
GOLDENWEST AVE. . . . . . . . . $ 402,451.25
SUB-TOTAL FOR BLUFF TOP
NORTH . . . . . . . . . . . $3 , 392 .945.20
SUB-TOTAL $3,795,396.45
3% INFLATION . . . . . . . . . . . . $ 113 ,862 . 00
SUB-TOTAL $3,909,258.45
6%, INCIDENTALS . . . . . . . . . . . $ 245, 556. 00
SUB-TOTAL $4, 154,814.95
10% CONTIGENCY . . . . . . . . . . $ 415, 481. 00
TOTAL . . . . $4,570,295.45
6
ClVC H 4
PARKI UTHORITY ACTION � 9 �eo"``�G
REQUEST FOR
Date September 3 , 1991
Submitted to: Honorable Mayor and City Council
Submitted by: Michael T. Uberuaga, City Administrator- \
Prepared by: Ron Hagan, Director, Community Services ;t
►►`JJJ
Subject: Bluff Top Parking Lots
�f3n I
Consistent with Council Policy? [ ] Yes [ ] New Policy or Exception
Statement of Issue, Recommendation,Analysis, Funding Source, Alternative Actions,Attachments:
STATEMENT OF ISSUE
There is a need to provide gates, traffic vaults, warning signs
and stanchions at the two new bluff top metered parking lots
along Pacific Coast Highway.
RECOMMENDATION
That the Parking Authority appropriate $7,400 for the
installation of two gates, four traffic vaults, and two warning
signs and stanchions at the bluff top parking lots.
ANALYSIS
The city completed two parking lots along Pacific Coast Highway
just north of Goldenwest in the spring of 1991 . Meters have been
installed in both of these lots. The city has been experiencing
an extensive amount of vandalism to the meters and the parking
lots. An investigation by both Community Services and the Police
Department indicates that almost all of the vandalism is taking
place late at night. The city has also had numerous complaints
from residents in the area about late night activity at these two
parking lots. Consequently, staff is recommending that the city
install gates and traffic vaults so we can close the parking lot
at night and not allow access. The parking lots would be open
daylight to midnight for community access.
The need for this appropriation came up after Council adopted the
budget.
t FUNDING SOURCE
Parking Authority Fund Balance
P10 5/85
ALTERNATIVE ACTION
Do not install gates and traffic spikes and allow the late night
vandalism to continue.
RH: sf
Attachmments:
Memo from the -Police Department
Memo from Beach Maintenance
J.
COMMUNITY SERVICES
HUNTINGTON BEACH
Departmental Memorandum
TO Ron Hagan ,/{��
FROM Jim Way G"f
GATE August 16, 1991
SUBJECT BLUFFTOP PARKING LOTS
To secure the two blufftop parking lots we will need two 23' gates,
(gates and posts will have to be hot dip galvanized) , four traffic
control exit vaults and two warning signs and stanchions. I will
order the equipment from account E AA CS 346 4 34 00:
Cost:
2 Gates . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000
4 Traffic Vaults . . . . . . . . . . . . . . . . . . . $3,000
2 Warning Signs & Stanchions . . . . . . . $1 ,400
Total . . . . . . . . . . $7,400
JBW/p
3
AJ 4@ CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH -
TO: Ron Hagan FROM: Lt . R . L . Parker
Director , Community Services Traffic/Aero Bureau
RE: Bluff parking lots DATE: 8-8-91
Earlier this year , while the bluff parking lots wer-e under
construction , I had a conversation with Captain Richardson
regarding closing of the lots in the evening . The gist of the
conversation was that the lots should be secured in some manner
during the hours that they were supposed to be closed . We felt
that a cable or a gate on one end and spikes on the other was the
best solution.
I had my parking control supervisor , Karen Peterson, contact Jim '
Way regarding this potential solution. Way advised that he had
this in his budget , but it was cut . He agreed that the parking
lot is a problem for police , lifeguards and parking meter
maintenance , but he did not have the funds available at this
time .
The police department is experiencing an increase in crime on the
bluffs and would strongly recommend that the above solution be
implemented . This would save all of us money and time in the
long-run , especially considering the damage and officer salaries
involved .
FISCAL IMPACT STATEMENT
I . Why is this item not in the budget?
The need was not known at budget preparation time because
lots were not built until Spring, 1991 .
II . What will be the cost?
Direct: $7 , 400
1. Current Fiscal Year: $7 , 400
2. Future Years: -0-
Indirect: None - will save police call out costs
III . Funding Source
Parking Authority
IV. History
Identify funding sources previously used for the project:
Not applicable - new project
Indicate whether the suggested funding source is normally
used for this type of project. Yes. These are beach
parking lot improvements which is the purpose of the
Parking Authority funds.
Y
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To MICHAEL T. UBERUAGA From ROBERT J. FRANZ
City Administrator Deputy City Administrator
Subject REQUEST FOR APPROPRIATION Date AUGUST 22, 1991
TO CONTROL VANDALISM PROBLEM
AT BLUFF TOP PARKING LOTS
FIS 91-26
As required under the authority of Resolution 4832, a Fiscal Impact Statement
has been prepared and submitted relative to the proposed funding for the
purchase and installation of preventative vandalism equipment at the Bluff Top
parking lots. An appropriation of $7,400 would be adequate for this purpose.
Upon approval of the City Council , the balance of the unaudited, esignated
Parking Authority Fund would be reduced to $271 ,
ROBERT J.
Deputy City Administrator
RJF:skd
WPADSERT:500
I, -�-9s -
r ��. '• REQUEST FOR CITY COUNCIL ACTION �APT
Date August 2, 1993
The Honorable Mayor and City Council
Submitted to:
Michael Uberuaga, City Administrator
Submitted by:
Prepared by: Ron Hagan, Director, Community Services OVED BY CITY COUNCIL
Subject: BEACH BLUFF AREA IMPROVEMENTS
crrY c
Consistent with Council Policy? [ ] Yes [ ] New Policy or Exception
Statement of Issue, Recommendation,Analysis, Funding Source,Alternative Actions,Attachments:
STATEMENT OF ISSUE
Staff is seeking Council direction on whether to proceed with improvement plans
for the below the bluffs parking area between 11 th and Goldenwest Streets.
RECOMMENDATION
Direct staff to proceed with the approval process of the below the bluffs parking
area improvements per the direction outlined herein.
ANALYSIS
The city is in the process of completing the final phase of the bluff top park im-
provements. When finished, the city can proceed with improvements below the
bluffs, commonly known as the oil service road or the walls. Staff had prepared
an improvement plan for this area, which included 437 parking spaces along with
landscaping improvements. This plan was presented to the Planning Commis-
sion and denied. The commission was concerned about views. The residents
attending the commission meeting spoke about the impact of more people
'coming into this beach area.
Prior to staff expending funds on consultant fees for alternative designs, Council
direction is being sought for the design concept as to what improvements
Council desires for this area. Although the parking lot issue has been tied to
replacement parking needed for Pacific Coast Highway, it is staffs opinion that
the below the bluffs parking project should proceed whether any changes are
made to Pacific Coast Highway with regard to on-street parking. The bluff top
improvements and the beach improvements that have taken place in this area in
the past few years have made it an extremely popular beach for both residents
PI O 5/85
1
REQUEST FOR COUNCIL ACTION August 2, 1993
Page two
and tourists. Some of the best surfing on the coast can be found in this area,
and it also plays host to the city's "dog" beach. which is also very popular.
Staff believes the city should proceed with improvements to the service road
area, including installation of parking spaces, stair and handicapped access to
the beach, and removal and replacement of the bluff retaining walls. The current
retaining walls were built to hold the bluffs back and provide access to the oil
operations. Over the years, the concrete has deteriorated, rodents have un-
dermined the banks behind the walls, and graffiti has abounded on the walls'
surface. Within the proposed improvement project, staff is recommending that
the retaining walls be removed, and the slope stabilized with a keystone retain-
ing system. This system consists of octagon-shaped, rough surface stones,
terraced upon the slope with rods running perpendicular into the slope for stabi-
lization. Within the center of each stone is a planting area where creeping vines
will be planted. The net result would be almost a mile of terraced, landscaped
area which would provide for quite a spectacular site.
On the service road itself, staff would propose doing landscaped entry areas to
the beach, decreasing the number of parking spaces to approximately 350, and
including a pedestrian walkway within the parking improvements. Staff is confi-
dent that the project can be designed so that no automobile parking in the below
the bluffs parking lot would be visible from any residential unit along Pacific
Coast Highway.
The city currently leases this area from the state beach and is required by law to
make it accessible to all California residents. Additional parking on the beach,
along with installation of parking meters in the residential areas, will insure that
beachgoers park in beach parking lots, not in the adjacent residential areas.
In summary, the below the bluffs improvement project will resolve the wall issue,
aesthetically improve the entire area between 11 th and Goldenwest Streets,
provide for improved access to this beach area, and generate parking revenue
to construct and pay for the improvements. Cost estimates have yet to be pre-
pared for this project as they will be dependent upon final design direction given
to staff by Council.
FUNDING SOURCE
Grants and unappropriated COPs
;r
s
REQUEST FOR COUNCIL ACTION August 2, 1993
Page three
ALTERNATIVES
1. Direct staff not to proceed with the below the bluffs improvement project
and leave the service road and wall area as is.
2. Give staff alternative design guidelines
ATTACHMENT
Location map
RH:cs
ti ZONING DM 10
9-6-II &
) NAL DISTRICT MAP - 10-6-11
LEGEND:
CITY OF �SRd ELIAE DISTRICT
ADOPTED MARCH 7, 1960 ®COASTAL I E SUFEIA
L�]DUALR1[D fiAS5liKdrgN
CITY COUNCIL ORDINANCE NO 754 QCOYMNIITY FA(ILI TIE
S(EOUCATgNAIJ DISTRICT
�CONMUNITY—L1TES lRECREATIO—IO15i R_
41ENDED—ISSASE OR ANENOED }y(✓`E ORD."o ®SINGLE FAMILY AE31DFNCE DISTRICT
['INGTON BEACH - B ]2 ®TUD fLE F IIESIOENCEILOISTRICT
5-a�G2 ]•-,"w 0 LIaII TEO MULTIPLE FAMILY PESIDEHCE O
I}-J62 28L2B2H� 1].6
}-A-E6 AS.S r36 -]2 ISIB} 1]9 ®N LTIPLE GAMILY PE31pENGE pSTwICT
9-b 6] )-16 I�AB ]-TI ]]}-'] I]6J ®GENEPAL OUSINC52 DISTRICT
2-1}-A9 6B-l1 ]2 2.i0]3 '-55 1819 AlIMOUSTPI OISTPICT
)O TO-q IGOS 6-3-]] T 19BB
C 0 U N T�', CALIFORNIA _ ,I-�I 'M `2 �°;;�3COMMERCIAL ESS ICT
} ]I-vr01 2-.3 ;:, x]w SUFFIX LEGEND
j-'-'} ]•-]i21 �i1iBC a5 REY NOAB2B COMBINED WITH OIL PRODUCTION
2- } T'Slwl . -IB-62 KSA•� 2536
2-T-T2 lIN. I) O•]B> ES-2-A 26A6-a
O•}-B] F!-.-P GAGS ® COMBINED WITH OIL PRODUCTION IN ARE:
O-?C^ ?IT A6--BJ � 26C BOUNDED BY 1MLM lvE-ONE.G MNE OLDES}
HOa `t% 21-N 2682 ST.ON NW,OCEAN AVE-ON SW,B SEVENTH:
.�•L ^ i h/' CEMIA,ATES PRECISE PLAN Oa STREET ALIfMMENT
V /\�_' ? �COL9wE0 NrtN ql eROd}CTpN
® caMeNm WITH DR.mopucTgN�
4 �� V\ ��•J - I��S�T-- --COASTAL ZONE BOUNDARY ,}
G�oD-M2'0-CZ N�'Pry j G�E�` �' RI-0 ;Q�' RI-0
�s
u R' /,
\ R4-0-CZ f . RIo- -
3 P� E_-/'_ ,E'/y ao-r .N / RID
S, M 2-01-C2
\
N y ♦N' CF-E
4C �v- t 04
AREA ME
pm
O
\ OO N
A,ZR ��sccsc iLlw
r �}, AREA DIE
tsEcrEW rl
ti
r
AC�ti�
PROJECT SITE 0\
llst Street to Goldenwest Street °c,F
4y
D qoo '
xALE IN FEET
NOTE:
ALL DINER INS ARE IN FEET
ANY ZONE ADU RIG ANY RI.-Of WAY
IS HIT[NDCD TO EXTEND TO THE CENTER
Of SUCH RIGHT Of WAY