HomeMy WebLinkAboutBluff Top Park/Below Bluff Parking and Camping Master Plan r
Council/Agency Meeting Held: 5-!7 l 9
Deferred/Continued to:
Of Approved ❑ Conditionally Approved ❑ Denied City Clerk'if Signature 4'-/�'.20 � y
S- . 471 ma'7 a sF.c—
Council Meeting Date: May 17, 1999 Department ID Number: CS99-015
CITY OF HUNTINGTON BEACH
REQUEST FOR COUNCIL ACTION
SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
SUBMITTED BY: RAY SILVER, City Administrator�'�' F`�- ` '*
PREPARED BY: RON HAGAN, Director, Community Services
MELANIE FALLON, Assistant City Administrator �--,&'�--. -4i
JOHN REEKSTIN, Director, Administrative Services
DAVID BIGGS, Director, Economic Development
SUBJECT: APPROVE CONCEPTUAL PLAN AND AUTHORIZATION TO PROCEED
WITH ENTITLEMENT PROCESS FOR BLUFF TOP PARK/BELOW
BLUFFS PARKING AND CAMPING MASTER PLAN
Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s)
Statement of Issue: Should the city proceed with the Coastal Development Permit process
to implement the Bluff Top Park/Below Bluffs Parking and Camping Master Plan?
Funding Source: General Fund; projected revenues cover projected expenses (see
Attachment 1)
Recommended Action: Motion to:
1. Approve the conceptual plan for the Bluff Top Park/Below Bluffs Parking and Camping
Master Plan;
2. Direct staff to submit the Bluff Top Park/Below Bluffs Parking and Camping Master Plan
for entitlements through the public hearing process; and
3. Approve an amendment to the current year budget by appropriating $68,000 for
architectural, engineering, and entitlement costs for the Bluff Top Park/Below Bluffs
Parking and Camping Master Plan.
Alternative Action(s): Do not proceed with the Bluff Top Park/Below Bluffs Parking and
Camping Master Plan at this time.
Analysis: At its April 5, 1999 study session on the Bluff Top Park/Below Bluffs Parking and
Camping Master Plan, Council directed staff to return with a recommendation on how to
proceed with the entitlement process to implement the project. The Bluff Top Park/Below
Bluffs Parking and Camping Master Plan is one of three beach master plans previously
approved by City Council. It encompasses the area between 11 th Street north to
r- I
Goldenwest. The Bluff Top Park includes turf, landscaping, pedestrian path, and a separate
bicycle (wheeled traffic) path. The project also includes new stairways and beach access
from the bluff top to the beach below the bluffs, and vehicle accessoing one way from
Goldenwest onto the former-oil drilling area and service road south to 11 Street with access
back to Pacific Coast Highway.
The project area below the bluffs includes replacing the former oil operation retaining walls
with a tri-lock, block stabilization system, new public rest rooms, beach concessions, day-use
parking, and RV camping. This area currently presents a number of problems for the city.
The existing site is a liability and hazard to the city caused by failing retaining walls,
deterioration of the bicycle/pedestrian paths, bluff top rails, and beach access stairways, and
the lack of public rest rooms, concession facilities, showers, and security lighting. In addition,
this area experiences significant antisocial behavior, such as vandalism, graffiti, and alcohol-
related activities.
The Bluff Top Park/Below Bluffs Parking and Camping Master Plan has been designed to
address all of the above problems and to create a public beach consistent with the design of
Pier Plaza and the South Beach Improvement Master Plan. The Bluff Top Park landscaping
improvements will correct the bicycle and pedestrian path problems, eliminate the hazardous
slope and railing problems, visually improve the area with new turf and palm trees, and
provide a connection to Pier Plaza. The Below Bluffs Parking and Camping portion will
eliminate the liability problems caused by the deteriorating oil service road retaining walls;
improve beach access with all new stairways; correct storm drain runoff erosion problems;
provide vehicle access for day use parking and RV camping; and provide public rest rooms
and showers, as well as new beach concessions. Revenue generated from day use parking
and RV camping will be sufficient to offset the annual debt for construction and annual
operating costs. See Attachment 1. RV camping at the beach has become extremely
popular. The Community Services Department has looked at RV camping in Long Beach
and Newport Beach and found that the demand has been phenomenal and is projected to
grow in the future. As more families and senior citizens travel in RVs, there is a need to
accommodate this segment of the hospitality industry if the city is going to accomplish its
goal as a complete tourist destination attraction.
In analyzing the options for the Bluff Top Park/Below Bluffs Parking and Camping Master
Plan, staff was also concerned with the issue of replacement parking that is needed to
change Pacific Coast Highway to three traffic lanes in each direction instead of two traffic
lanes and a parking lane in each direction. This is necessary to accommodate potential
projects under the downtown specific plan. In addition, in order to preserve over $1 million of
Measure M funds, the city will have to implement a plan that will provide parking replacement
on a one-to-one basis for the 464 metered parking spaces on Pacific Coast Highway. To
provide this, staff is recommending the following projects:
• Bluff Top Park/Below Bluffs Parking and Camping Master Plan 213 spaces
South BeachImprovement Master Plan, Phase 1 30 compact spaces
• South Beach Improvement Master Plan, Phase 11 15 compact spaces
• New Parking Lot at-Atlanta and First 55 spaces
• Future Downtown Redevelopment Projects and/or
Transportation Shuttle Systems 151 spaces
TOTAL REPLACEMENT SPACES 464
In 1988 City Council and the State Department of Parks and Recreation actually,approved a
concept plan for a 458-space parking lot below the bluffs. Subsequent City Councils found
this plan to be too intense and directed staff to redesign the project. It is.anticipated that the
city will receive additional revenue from the remaining downtown specific plan projects to be
developed, such as the 31 acres, which it would not receive if such .projects could not
proceed due to the city's inability to restripe_ Pacific Coast Highway. Therefore, in the
financial pro forma for the Bluff Top Park/Below Bluffs Parking and Camping Master Plan,
staff did not include a line item for the Pacific Coast Highway meter revenue loss when the
parking on Pacific Coast Highway is removed to go to three lanes in each direction.
If Council approves the conceptual plan for Bluff Top Park/Below -Bluffs Parking and
Camping Master Plan, staff will prepare the final plan to submit fora Coastal Development
Permit. It is anticipated that this process may take six to nine months. If the project can be
entitled at the same time as the South Beach Improvement Master Plan, Phase 11, staff
would recommend that both projects be constructed at the same time. if the entitlement
process does not occur at the same time, it is recommended the South Beach Improvement
Master Plan be completed first with the Bluff Top Park/Below Bluffs Parking and Camping
Master Plan to follow.
During the above process, staff will work with Cal Trans, OCTA, and the California Coastal
Commission to -obtain approval of the parking replacement plan enabling Pacific Coast
Highway to change to three traffic lanes in each direction. If this approval is obtained by
December 31 of this year, staff has been advised by OCTA that it will return the Measure M
funds it is currently withholding from the city to pay for the Pacific Coast Highway restriping
project. In any event, the Bluff Top Park/Below Bluffs Parking and Camping Master Plan is
needed to not only deal with the :Pacific Coast Highway restriping issue, but also to address
all of the liability, maintenance, and access problems that the city is currently experiencing
at this site.
Environmental Status: Project will require a CEQA process, which will be fast tracked
along with the public hearing,process.
Council Policy on Appropriation of Funds- There are sufficient new revenue streams
projected to cover the debt and annual operating costs for the Bluff Top Park/Below Bluffs
Parking and Camping Master Plan
Attachment(s):
1 Projected Pro Forma
2 Preliminary Cost Estimate from Purkiss-Rose RSI
3 Bluff Top Park Conceptual Plan
4 Photographs of Existing Oil Service Road and Retaining Walls
5 FIS
ATTACHMENT # 1
BLUFF TOP PARK/BELOW BLUFFS PARKING
CAMPING MASTER PLAN
PROJECTED PRO FORMA
THE FOLLOWING IS THE PROJECTED PRO FORMA BASED ON COMPLETING ALL OF THE IMPROVEMENTS EXCEPT THE PACIFIC
COAST HIGHWAY STREET LIGHT REPLACEMENTS.
CONSTRUCTION COST ESTIMATE . $495009000
ANNUAL EXPENSES
DEBT SERVICE ON $495009000 $ 3759000
ANNUAL OPERATING & MAINTENANCE 175,000'
TOTAL ANNUAL ESTIMATED EXPENSES = $ 5509000
ANNUAL REVENUE
DAY PARKING FEES (142 SPACES X $7/DAY X 365 X 40% OCCUPANCY) $ 145,000
RV CAMPING FEES (70 SPACES X $40/DAY X 365 X 40% OCCUPANCY) 409,000
TOTAL ANNUAL ESTIMATED REVENUE $ 554,000
REVENUE LESS EXPENSES $ 4000
ATTACHMENT #2
r !
r '
A PROPOSAL FOR
LANDSCAPE ARCHITECTURAL SERVICES
LOWER BLUFF PROJECT
CITY OF HUNTINGTON BEACH
urkiss-rose-rsi
Landscape Architecture, Recreation & Park Planning
801 N.Harbor Boulevard
Fullerton,CA 92832
FAX: (714) 871-1188
(714) 871-3638
APRIL,30, 1999
i
Purkiss Rose-RSI
801 N. Harbor Boulevard
Fullerton,CA 92832
Tel. (714) 871-3638
Fax(714) 871-1188
Job Name: Bluff Top North, Huntington Beach
Job Number: 93-111
Date: April 30, 1999
REVISED PRELEMINARY COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
MOBILIZATION
Trailer 1 L.S. 1,000.00 1,000.00
Temporary fencing 12,964 L.F. 2.00 25,928.00
Toilet 1 L.S. 500.00 500.00
Phone 1 L.S. 500.00 500.00
Electrical 1 L.S. 1,000.00 1,000.00
Project manager 1 L.S. 4,000.00 4,000.00
Sub-Total 32,928.00 32,928.00
CLEARING/GRUBBING
Clearing/Grubbing 204,856 S.F. 0.15 30,728.40
Sub-Total 30,728.40 30,728.40
DEMOLITION
Saw cut 120 L.F. 2.00 240.00
AC Paving 30,140 S.F. 0.50 15,070.00
Wall removal 1 L.S. 100,000.00 100,000.00
Posts 138 EA. 10.00 1,380.00
Conc. steps 2,840 S.F. 0.50 1,420.00
Adjust utility boxes 19 EA. 1 50.00 950.00
Sub-Total 119,060.00 119,060.00
EARTHWORK/GRADING
Finish grading 204,856 S.F. 0.20 40,971.20
1
REVISED - PRELEW NARY COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
Imported soil 5,550 C.Y. 10.00 55,500.00
Relocated beach sand 1,486 S.F. 2.00 2,972.00
Sub-Total 99,443.20 99,443.20
DRAINAGE
ABS 4" 1,500 L.F. 9.00 13,500.00
ABS 6" 1,500 L.F. 12.00 18,000.00
8" Area drain 10 EA. 80.00 800.00
12" Area drain 30 EA. 150.00 4,500.00
Conc. drain box 200 L.F. 45.00 9,000.00
Sub-Total 45,800.00 45,800.00
HARDSCAPE
Curb 370 L.F. 10.00 3,700.00
Curb&Gutter 4,086 L.F. 15.00 61,290.00
Concrete paving 4" 15,138 S.F. 3.25 49,198.50
Concrete step 1,187 L.F. 6.50 7,715.50
Mow strip 86 L.F. 6.00 516.00
Interlocking pavers 11,144 S.F. 7.50 83,580.00
Conc. banding 2,154 L.F. 25.00 53,850.00
Repair &cap seawall 4,071 L.F. 20.00 81,420.00
Rolled conc. curb 3,648 L.F. 12.00 43,776.00
A.C. paving for parking lot 160,209 S.F. 4.00 640,836.00
Sub-Total 1,025,882.00 1,025,882.00
MASONRY
Retaining wall at 1,045 L.F. 40.00 41,800.00
undercrossings
Retaining walls at pedestrian 1 L.S. 600,000.00 600,000.00
trail
2
REVISED - PRELEMINARY COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
PARKING LOT
Handicap ramp 11 EA. 2,000.00 22,000.00
Drive approach 2 EA. 2,000.00 4,000.00
Striping 7,435 L.S. 1.00 7,435.00
AC pedestrian trail 23,515 S.F. 1.50 35,272.50
AC bike trail 17,148 S.F. 1.50 25,722.00
Bike trail resurfacing L 65,516 S.F. 0.40 26,206.40
Sub-Total 120,635.90 120,635.90
FENCING AND RAILING
Step handrails 418 L.F. 40.00 16,720.00
Bridge handrails 267 L.F. 40.00 10,680.00
Handrail at pedestrian trail 3,778 L.F. 50.00 188,900.00
Sub-Total 216,300.00 216,300.00
SITE AMENITIES
Concrete benches 6 EA. 550.00 3,300.00
Drinking fountain 5 EA. 3,500.00 17,500.00
Trash receptacles 30 EA. 1,000.00 30,000.00
Conc. bollards 36 EA. 300.00 10,800.00
Overcrossings 2 EA. 65,000.00 130,000.00
Bike racks 40 EA. 150.00 6,000.00
Sub-Total 197,600.00 197,600.00
BUILDINGS AND STRUCTURES
Portable restroom facilities 3 EA. 20,000.00 60,000.00
Bus stop shelters 2 EA. 6,000.00 12,000.00
Sub-Total 72,000.00 72,000.00
3
REVISED - PRELEVIINARY COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
ELECTRICAL
Bluff Top North electrical 1 L.S. 310,000.00 310,000.00.
Utility Company charges 1 L.S. 25,000.00 25,000.00
Traffic signals at PCH and IPh 1 L.S. 130,000.00 130,000.00
St.
Traffic signal renovation at 1 L.S. 45,000.00 45,000.00
PCH and Goldwest Ave.
Sub-Total 510,000.00 510,000.00
UTILITIES
Domestic water connection 2 EA. 1,500.00 3,000.00 (;
Electrical stubouts 10 EA. 1,000.00 10,000.00
Fire hydrants 7 EA. 7,500.00 52,500.00
4" Water line 3,500 L.F. 3.00 10,500.00
Sub-Total 76,000.00 76,000.00
PLANTING AND IRRIGATION
Soil preparation 204,856 S.F. 0.30 61,456.80
Groundcover 885 FLATS 15.00 13,275.00
Turf 148,274 S.F. 0.65 96,378.10
Palms(new) 150 EA. 850.00 127,500.00
1 Gal shrub 1,000 EA. 6.00 6,000.00
5 Gal shrub 500 EA. 20.00 10,000.00
Irrigation system 204,856 S.F. 0.85 174,127.60
90 Day maintenance 1 L.S. 12,000.00 12,000.00
Relocated palms 41 EA. 600.00 24,600.00
Irrigation pump 1 L.S. 25,000.00 25,000.00
Sub-Total 550,337.50 550,337.50
4
REVISED — PRELEMINARY COST ESTIMATE
-7 DESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB TOTAL
TOTALS
SUB-TOTAL FOR BLUFF TOP NORTH 3,738,515.00
----------------
3% INFLATION 112,155.45
SUB-TOTAL 3,850,670.45
3,850,670.45
6% INCIDENTALS 224,310.90
----------------
SUB-TOTAL 3,962,825.90
----------------
10% CONTINGENCY 373,851.50
TOTAL 4,448,832.85
4,448,832.85
----------------
P. C. H. Street Lighting (From 9'Street to Goldenwest) (Additive Altemate) 232,050.00
TOTAL WITH ADDITIVE ALTERNATE 4,680,882.85
Purkiss Rose-RSI has no control over the cost of labor,materials, equipment or the contractor's methods of determining costs. These
opinions ofprobable costs represent our best judgement as design professionals familiar with the construction industry and public works
contracts. Purkiss Rose-RSI cannot and does not guarantee that proposals,bids or construction costs will not vary from our opinion
of probable construction costs. Opinion of Probable Cost shall not be used as a bid form or for any bidding purposes.
5
ATTACHMENT #3
BLUFF TOP PARK t
14'Drop
BLUFFS'
A'qTTYPWAIX
Auto 9'X 20'
52' Old OR Service Road 20' ONE WAY �F'' Old Oil Service Road
RV Camping 9'X 40' 1o' mom
Sea Wall Sea Wall
BEACH
y _
w
ATTACH MEN T #4
o
..T
lot
v a.',;
n ,
-�n kk h M b I �� ,� �r f.t ,1,� rr+r. ,i I � j, ,�4 'o,9u,`t�Y.�``�•^
�.rylt�� r� I
r it r �i al r f
r�'�( � �
'Y�'r
-W � r-: y- i.r h ry:t ,('s ir.i��� �f f�I V+f 'r �', � 1!j� �Y�; Y•".�`��`,'.��ur'tu �
Y(F'S5
� rfl
y�
rlh 7 3h �ryf ^ r .j fii
h p .,•�.1� r 1 Y.. '
�����,uk ��'tl r � r' � �� V +'�: 1 - p>•R+ a� �M��� �1
'�yr ydrl�A MAT�ll .,.
sMl� s R
Yi 4`rF
".ti�Ri �1 y lyf h j
44 �t y 1 tia' w
r 1 ( fir;. I d, h ���;; �:, at� , .Rye ���� r, .a. • y � i"� ,�, h.
all,
d r) 4, t':.
e'kr:
1'7wF^^f'!1 yj"tsY F6 � �L"•��Q� y LC� ♦ � �� � - �
r _ }, 1^•y�,„j;�� �, 1 s ', ,c°"4',;i�,: .��,9k� i{'�t Ir �� ;t��, 1 ;�
���`.,;t 1 ter h�f: ���li ��""��ye/Yf.e. •I•
VA—
rk
r.i , i .-t�•iµ?{"•. r,Ir't;y -�t�yl �� jM
-14
1�;4,�1 ,a�",�a3•K' .gip; / ,. ... � �ar .` � ,,r�i,..,d1:r� I I
�,7• Q fi t� yPo t r
x`f(
x f
kr r
n
J r
4 �
Vmr
S�
1
4
loll
N
�, r �7 t �•. uP�'"�� � r �f h a
i
7 „dytJIM
,
" j� •r` �� t�,v �:� fir: r� r r r � rf' � "�� .I '�y""'°�MJ � '
K '
d: � s
J'�`;,� �, � ��:. , yr,•� �� � ,.
ATTAC H M E N T #5
CITY OF HUNTINGTON BEACH
' INTERDEPARTMENTAL COMMUNICA TION
To: Ray Silver, City Administrator
From: John Reekstin, Director of Administrative Services
Subject: FIS 98-37 Approve Conceptual Plan and Authorization to
Proceed with Entitlement Process for Bluff Top Park Below Bluffs
Camping Master Plan
Date: May 3, 1999
As required by Resolution 4832, this Fiscal Impact Statement has
been prepared for "Approve Conceptual Plan and Authorization to
Proceed with Entitlement Process for Bluff Top Park Below Bluffs
Camping Master Plan."
If the City Council approves this action, (total appropriation $68,000),
the City's unreserved, undesignated General Fund Balance at
September 30, 1999 will be reduced to $7,705,401 .
Jo n Reekstin,
Director of Administrative Services
Adopted. C urrent
Fund Ba.l.ance-General_Fund Budget; Estimate;
Beginning Fund Balance 10/1/98(unaudited) $ 8,987,000 $ 8,987,000
Plus: Estimated Revenue 107,860,642 109,524,481
Less: Estimated Expenditures (109,890,397) (109,399,000)
Less Pending/Approved FIS's (1,339,080)
Less: FIS 99-37 - (68,000)
Estimated 9/30/99 Balance $ 6,957;245 $ 7,706,401
Estimated General Fund Balance at September 30,1999
$9,000,000
i
I
$8,000,000
I
$6,000,000
R
$5,000,000
sr�
$4,000,000 $6,957,245
$7,705,401
$3,000,000
$2,000,000 sr�t
f
$1,000,000
i
$-
ADOPTED BUDGET CURRENT ESTIMATE
RCA ROUTING SHEET
INITIATING DEPARTMENT: COMMUNITY SERVICES
SUBJECT: APPROVE CONCEPTUAL PLAN AND AUTHORIZATION
TO PROCEED WITH ENTITLEMENT PROCESS FOR
BLUFF TOP PARKIBELOW BLUFFS CAMPING MASTER
PLAN
COUNCIL MEETING DATE: May 17, 1999
.....
.... .. ....... ...........
A TT,�C : MENTS -vv :::::: : ::...:...: ..: ..STATU . .
Ordinance (w/exhibits & legislative draft if applicable) Not Applicable
Resolution (w/exhibits & legislative draft if applicable) Not Applicable
Tract Map, Location Map and/or other Exhibits Attached
Contract/Agreement (w/exhibits if applicable)
(Signed in full by the City Attorney) Not Applicable
Subleases, Third Party Agreements, etc.
(Approved as to form by City Attorney) Not Applicable
Certificates of Insurance (Approved by the City Attorney) Not Applicable
Financial Impact Statement Unbud et, over $5,000 Attached
Bonds If applicable) Not Applicable
Staff Report If applicable) Not Applicable
Commission, Board or Committee Report If applicable) Not Applicable
Findings/Conditions for Approval and/or Denial Not Applicable
............................................................................................. ................................................................... .................................................................................
..... .
AOM :NG. ACHMESI * TS ...
Colored pictures will be ready on Thursday AM
. . ......
REVIEVI►ED...... . . . : .... .: RETURNED;
Administrative Staff
Assistant City Administrator Initial
City Administrator Initial Q-�
City Clerk
................................ .......................................... ..................................................................................................................................................................................
EXPLANATIO.N..F...OR.RETURN OF ITEM..::::
RCA Author:
fi C-*
C u ,I-
BLUFF TOP PARK
14 Drop
BLUFFS'
Auto 9'X 20'
52' Old Oil Service Road ?p' ONE'WAY Old Oil Service Road
RV Camping 9'X 40' 10' am
�
V XSIDEWALK
Sea Wall Sea Wall
BEACH
PCH REPLACEMENT PARKING PLAN
TO RESTRIPE PCH FROM 2 LANES TO 3 LANES IN EACH DIRECTION
COASTAL COMMISSION REQUIRES A ONE FOR ONE PARKING SPACE REPLACEMENT OF THE
464 PCH PARKING SPACES WHEN PARKING IS TAKEN OFF PCH TO RESTRIPE
Bluff Top Park/Below Bluffs Parking & Camping 213 spaces
South Beach Phase I Improvements 30 spaces
South Beach Phase II Improvements 15 spaces
New Parking Lot at First & Atlanta 55 spaces
Future Downtown Redevelopment Projects
and/or Transportation Shuttle Systems 151 spaces
Total Replacement Spaces 464 spaces
BLUFF TOP PARK/BELOW BLUFFS PARKING &
CAMPING MASTER PLAN
PROJECTED PRO FORMA
THE FOLLOWING IS THE PROJECTED PRO FORMA BASED ON COMPLETING ALL OF THE IMPROVEMENTS
EXCEPT THE PACIFIC COAST HIGHWAY STREET LIGHT REPLACEMENTS.
CONSTRUCTION COST ESTIMATE $495009000
ANNUAL EXPENSES -
DEBT SERVICE ON $495009000 $ 3759000
ANNUAL OPERATING & MAINTENANCE 175,000
TOTAL ANNUAL ESTIMATED EXPENSES $ 5509000
ANNUAL REVENUE
DAY PARKING FEES (142 SPACES X $7/DAY X 365 X 40%OCCUPANCY) $ 1459000
RV CAMPING FEES (70 SPACES X $40/DAY X 365 X 40% OCCUPANCY) 409,000
TOTAL ANNUAL ESTIMATED REVENUE $ 554,000
REVENUE LESS EXPENSES $ 4000
RECOMMENDED ACTION
1 . Approve conceptual plan.
2. Direct staff to submit the project for
entitlements through the public hearing
process.
3. Approve an amendment to the current
year budget by appropriating $68,000 for
the architectural, engineering, and
entitlement costs.