HomeMy WebLinkAboutDraft Bicycle Master Plan Overview - Study Session 08-19-201 8/19/2013
Bicycle Master Plan Overview
fs!
Introduction
Existing Conditions
�1r i
Funding- Recommendations
- Bikeway
City of Huntington Reach
Bicycle Master Plan
SUPPLEMENTAL
COMMUNICATION
Meeting Dater () 3
Agenda Item No.,
1
8/19/2013
Facility Types
v Examas Mu1te Path:,
L �%
•8'Paved+T graded edge min.each side _
•More width recommended where highvim
bicycle or mixed use volumes occur -
_ - �
i i
'•Minimum 5'where curb occurs(4'without
curb) a •�'�.6�" �•
•Wider lane recommended with high bike
volumes
•Signed only or can Include'•Sharrows"
•Wider than standard outside lane
recommendedrit-01 City y� :aiJ AP L97.:C l�lll
of r
2
8/19/2013
FEzample Class 2 Bicycle Lane Class 3 Bicycle Route
' F4wlift
- - - -
ai #
.r IJJ
» I
3
®�� Reco a atio
��� • Facilities -Improvements & New
'I
; • Bicycle Programs
... 1� / Other (bike map, events, signage)
6 " • PCH Alternatives f�
Existing
Bikeways
• 9
8/19/2013
Bicycle Maser Plan
City of Huntington Beach Bicycle Master Plan
8/19/2013
Facility Recommendations • • ' •
Class 1
`Improve existing' facilities " I
Paths
• Fill remaining bicycle lane gaps
• Add more separated facilities, such as � I
multi-use paths along canals - -'--.
• Add bicycle boulevards
• Add more bicycle parking, especially at the
beach and downtown �
Bicycle Master Plan
o City of Huntington Beach Bicycle Master Plan
8/19/2013
Recommended I _ Recommended - `
Class 2 �` Bicycle
Bicycle — 1 Boulevards I
Lanes ' - - _
..e
i. O i. rd y'
Bicycle Master Plan
6
8/19/2013
Recommended Boulevards
I 1
Example: Orange Avenue � ���� ��� ��`� '" '_ ,� ;�. •.
Bicycle8/19/2013
In-Street Parking (Bike Corral)
1
"J
o City of Huntington Beach Bicycle Master Plan
8/19/2013
Oth
Program • • • Recommendations
1. Institute public education campaign aimed • Provide a regularly updated network
at cyclist, pedestrian and driver behavior map
2. Promote "Bicycle Trains" to and from • Support business incentive programs
school
• Host more bicycle promotion events
1- 3. Integrate cycling network improvements
into land use planning and development • Improve bicycle way-finding signage -
8 City of Huntington Beach Bicycle Master Plan o City of Huntington Beach Bicycle Master Plan
8/19/2013
PCH: Bikeway Alternatives • -
ikeway Alternatives
Brcycle Lanes ffered is es
rP rka g retainetl, but min i al ufferingi) oss spaces on east sitle)
1
City of Huntington Beach Bicycle Master Plan a City of Huntington Beach Bicycle Master Plan
8/19/2013
PCH: Bikeway Alternatives Draft
- Review Process
One-way Cycle Track and Bicycle Lane Hybritl Steps Completed
(Parking retained, but requires 11' lanes) -
�,; _ • Internal Draft BMP reviewed by staff
Bike Committee
�, � i�il�I ■ • Draft BMP Public Review complete
• ; �. including public workshop
' I , � � _ • Presented BMP to Public Works �
- � \ Commission & Community Services
Commission
o City of Huntington Beach Bicycle Master Plan o City of Huntington Beach Bicycle Master Plan
Steps8/19/2013
Next
• Collect Comments and Final Plan
12
Questions or Comments?
• City Council for Adoption
• Caltrans Certification
o City of Huntington Beach Bicycle Master Plan o City of Huntington Beach Bicycle Master Plan
8/19/2013
Awn
ewv..ws.l••aiy Community
' 1
- - City of Huntingto"Ow
Bicycle Master yam'
. � y Plan
13