Loading...
HomeMy WebLinkAboutCommunity Facilities Element of the Huntington Beach General fi B � •, e r A A e� ■ O Sb M-UNIT* om, F A�C L 'T ES I I I ELEMENT J - A I I I El - C7 n �flO :Dqsa • �-)(. rna (LD) CITY OF HUNTINGTON BEACH CITY COUNCIL RUTH S.BAILEY,Mayor RUTH FINLEY,Mayor Pro Tem JACK KELLY DON MacALLISTER BOB MANDIC , RON PATTINSON JOHN THOMAS CHARLES W.THOMPSON,City Administrator PLANNING COMMISSION MARK PORTER,Chairman GRACE H.WINCHELL,Vice-Chairman WESLEY BANNISTER RALPH H.BAUER BEVERLY J.KENEFICK JEAN SCHUMACHER COMMUNITY FACILITIES ELEMENT HUNTINGTON BEACH GENERAL PLAN � James W. Palin, Director Department of Development Services ' CUa��o�g�o� Table of Contents Page 1. INTRODUCTION 1 1.1 State Policy and Authorization 3 1.2 Scope and Organization 3 1.3 Relationship to Other General Plan Elements 4 1.3.1 Land Use 4 1.3.2 Circulation 4 1.3.3 Open Space and Conservation 5 1.3.4 Seismic Safety 5 1.3.5 Scenic Highways 5 1.3.6 No ise 5 1.3.7 Housing 5 1.3.8 Coastal 5 2. SEWER SYSTEM 7 2.1 Introduction 7 2.2 Analysis 9 2.2.1 County Facilities 9 2.2.2 City Facilities 13 2.2.3 Design Criteria 15 2.2.4 Infiltration 17 2.2.5 Maintenance 17 2.3 Project Funding 19 3. DRAINAGE SYSTEM 21 3.1 Introduction 21 3.2 Analysis 23 3.2.1 County Facilities 25 3.2.2 City Facilities 25 3.2.3 Maintenance 29 3.2.4 National Flood Insurance Program 29 3.3 Project Funding 31 4. WATER SYSTEM 35 4.1 Introduction 35 4.2 Analysis 37 4.2.1 Existing Facilities 37 4.2.2 Proposed Projects 43 4.2.3 Fire Flow 44 4.2.4 Private Water Companies 45 4.2.5 Water Service to Other Jurisdictions 45 4.2.6 Maintenance 45 4.2.7 Water Quality 45 4.3 Project Funding 47 TABLE OF CONTENTS (continued) Page 5. PUBLIC BUILDINGS 49 5.1 Introduction 49 5.2 Analysis 51 5.2.1 Civic Center 51 5.2.2 Public Works Maintenance Facilities 51 5.2.3 Fire Facilities 53 5.2.4 Police Facilities 56 5.2.5 Central Library and Annexes 57 5.2.6 Water Operations Building 58 5.2.7 Central Warehouse 59 5.2.8 Recreation Facilities 59 5.2.9 Maintenance 59 5.2.10 Leasing Activities 61 5.4 Project Funding 61 6. UTILITIES 63 6.1 Introduction 63 6.1.1 Electricity 63 6.1.2 Natural Gas 67 6.1.3 Telephone 67 6.1.4 Cable Television 67 6.1.5 Refuse Collection and Disposal 69 6.1.6 Undergrounding 71 7. CONCLUDING ISSUES 73 7.1 Status Summary 73 7.2 Maintenance Costs 75 7.3 Operating Costs 77 7.4 Capital Improvements Program 77 8. POLICIES 79 8.1 Adequacy of Facilities 79 8.2 Financing 80 8.3 Siting and Design 81 , 8.4 Conservation 82 8.5 Coordination 82 9. APPENDICES A. Inventory of City - Owned Structures A-1 B. Inventory of Buildings Leased by City B-1 C. Selected Bibliography C-1 Ta ble .of Figures Page 1.1 Relationship of the Community Facilities Element to the Planning Process 2 2.1 Diagram of a Typical Sewerage System 8 2.2 County Sanitation Districts in the City of'Huntington Beach 10 2.3 City Sewer Pump Stations - 12 2.4 City and County Sewage Facilities 13 I 2.5 Potential Capacity'Problems in City Sewerage Facilities at Ultimate Development 14, 2.6 Areas of Potential Saltwater Infiltration into Sewers 16 2.7 City Sewer Fund Projected Revenues 18 3.1 Facilities for Conveying Storm Water,Runoff 22 3.2 Drainage Channels and Pump Stations 25 3.3 City Drainage Districts 24 3.4 Baffled Catch Basin for Debris Control 28 3.5 Preliminary Flood Hazard Boundaries 30 3.6 City Drainage Fund Projected Revenues 32 4.1 Water Supply Sources 36 4.2 Available City Water Withdrawal Rates and Storage Volumes 38 4.3 Existing Water Storage Volume and Withdrawal Rate Requirements 40 4.4 City Water System Transmission Water Mains,'Reservoirs, and Wells 42 4.5 City Water Fund Projected Revenues 46 5.1 General Layout of Huntington Beach Civic Center Site 50 5.2 General Layout of Huntington Beach City Yard 52 5.3 Current Fire Stations 54 5.4 Existing and Potential City Public Building Needs 60 6.1 Location of Principal Electrical Facilities in Huntington Beach 64 6.2 Approximate Location of High Pressure Gas Pipelines and District Regulator Stations 66 6.3 General Telephone Company Offices located in Huntington Beach 68. 6.4 City Underground Utility Districts 70 6.5 Potential City Undergrounding Districts 72 7.1 Maintenance Expenditures for City Sewerage, Drainage and Public Building Faciities 76 . ��1� � o DMC��0��1 • DEFINITIONS CAPITAL IMPROVEMENT: Any major project requiring the expenditure of public funds, over and above annual operating expenses, including the purchase, construction and replacement of the physical assets of the community such as land, public buildings, streets, bridges, trunk sewers, storm drains, channels and parks. • CAPITAL IMPROVEMENT PROGRAM: A schedule of public physical improvements to be implemented over a period of time. The priority of such projects is based on the need for or importance of such improvements and the community's present and anticipated financial standing. COMMUNITY FACILITIES: • The combination of structures and equipment that perform services to City residents such as sewerage, drainage, water supply, etc. • • • • • • • 1. Introduction The Community Facilities Element is intended to provide direction for the provision of community facilities needed to serve existing and_pzop sad development in the City in a coordinated and cost efficient manner. It is also intended as a basic informational document, containing pertinent data regarding the status of the City's major capital facilities. Capital improvement decisions can represent significant policy choices for the City. Community facilities, particularly those related to health and safety, are .a prerequisite to any new development. By directing the location and timing of new cape a aci i ies, t e ity can impact the location and timing of new development. For example, investing public money in existing neighborhoods, such as the Downtown, may help stabilize and revitalize these areas, while investing in undeveloped areas may stimulate new development. The availability and condition of existing community facilities may also impact f the ability of the City to provide for additional affordable housing opportunities. One method of encouraging the provision of affordable housing is to allow a developer to build at some density above existing zoning in return for the provision of low or moderate cost housing. Under State law (Chapter 4.3 of California Planning and Zoning Statutes) a City must grant a density bonus of at least 25 percent more units than existing zoning allows or offer two other incentives if a developer agrees to construct at least 25 percent of the total units of a housing project for persons of low or moderate income. It is important that permitted increases in density not adversely impact the capacities of existing and planned community facilities. It should also be noted that the other incentives a City may provide to developers under this law include, among other things, the construction of public improvements such as sewers and storm drains to serve the proposed housing project and/or the waiver of utility connection charges (e.g. for sewer and water hookups). 1. 1 1 1 , � i COMMUNITY NEEDS 1 1 1 1 General Plan Document 1 1 1 — Permitted Elements Mandated Elements i 1 Community Facilities 1 Element • sewer system .-drainage system • water system • public buildings • utilities 1 1 1 1 1 1 — Capital Improvements Operating Program Budget 1 1 1 1 1 Community Projects 1 1 � 1 � Source: Huntington Beach Planning Division, 1980. HUNTINGTON BEACH C4LIFORNIA RelatlOnslip of tt* PLANNING DIVISION Colynunity Facftes Element Figure 1.1 to the Planning Process 2. Community facilities are costly and require continual maintenance if they are to function adequately an a icient y. 5inceTFe public monies available for construction and maintenance of community facilities are limite , t ey. must be. distributed among competing projects with careful consideration given to priorities established by the City. This element will influence the provision and maintenance of capital facilities in several ways. Most importantly, it is intended to provide direction for_- capital improvement- expenditures b '(1) assessing the overall cond' of existing taci hies, iscussing the need for future ►m rovements, and (3) setting forth policies regarding the re ative priorities of future facilities. An important tool that may be used to implement the policies,set forth in this element is a Capital Improvement Program (CIP). A CIP is a schedule of physical improvement projects for the community, usually over a five-year period, with consideration given to the priorities and financial capabilities of the-City. The amount of funds allocated to community facilities in the City's budget for any given year can be guided by the list of recommended projects -in the CIP for that year. A more extensive discussion .of how the CIP links the Community Facilities Element to the Budget is contained in Section 7. The Community Facilities Element can be used by public utilities and other agencies that provide p is improvemen s in Huntington Beach. The in orma ion and policies contained in t Fs a ement may, these agencies to better coordinate their plans and projects with City-initiated_-��ts This element will ' also provide a ,basis for ' determining General Plan conformance of proposed capital improvements as required by the California Government Code (Sections 65401 and 65402).. 1.1 STATE POLICY AND AUTHORIZATION Section 65303 of the California Government Code authorizes the preparation of optional general plan elements, two of which have been combined to form this Community Facilities Element: (1) A Public Services and Facilities Element showing, general plans for sewerage, refuse disposal, drainage, and local utilities. (2) A Public Building Element showing locations and arrangements of civic and community centers, libraries, police and fire stations, and other public buildings. 1.2 SCOPE AND ORGANIZATION The Community Facilities Element encompasses those public structures and improvements which: (1) involve major capital expenditures e c osely related to land use decisions, and (3) are not addressed elsewhere i 's eneral an. nc u ec—Tare: 3. SeweraQe facilities Qrainage facilities Water supply facilities u �c u i ings Utilities and contractural services Sections 2 through 6 of this element address each of these facilities individually and include a description of each system, identification of any deficiencies in the system, and an analysis of issues that might impact the timing and implementation of corrective actions. Section 7 briefly summarizes the proceeding sections and discusses implementation of community facility policies and the long term maintenance costs of additional improvements. Section 8 presents a coordinated set of policies to guide the provision of adequate facilities to serve existing and future development. The capital improvements associated with the Cit 's transportation and recreation facilities will be discussed in separate elements o e enera an: the Circulation Element will be revise to inc u e in-de—pth�iscussion�trtte City's transportation facilities and their relationship to other community facilities, and a Recreation Element will be prepared which will discuss the acquisition and location of parks and other recreational facilities. 1.3 RELATIONSHIP TO OTHER GENERAL PLAN ELEMENTS The California Government Code requires that general plans contain an integrated, internally consistent set of policies. The following examines the relationship between the provision of adequate community facilities and the implementation of policies contained in the other elements of the Huntington , Beach General'Plan: 1.3.1 Land Use Land use and community facilities are closely linked. It is important that new development not occur unless adequate public facilities can be provided to , serve that development. The expected location and density of future development determines, in large part, where and when new community facilities will be needed. Conversely, the ability of the City to provide new community facilities impacts the planning of new development. The locations and densities of land uses set forth in the Land Use Element are the guide to the location of new facilities and the capacities they must be designed to , serve. However, the pattern of development proposed in the Land Use Element should not exceed the ability of the City to provide public improvements as set forth in the Community Facilities Element. 1.3.2 Circulation Sewers, storm drains, water mains and electrical lines are generally located underneath the City's streets. It is efficient, where possible, to coordinate improvements to community facilities with street improvements. In constructing new community facilities it is also important that disruption to traffic be minimized. In addition, the location of public buildings, e.g. fire stations and civic buildings, must be coordinated with the existing and future status of the City's circulation system so that adequate access to these important centers is provided. 4 . 1.3.3 Open Space and Conservation ! The design, location and construction of community facilities can adversely impact the biological and visual value of open space areas. The extension of community facilities with surplus capacities to open space areas may also encourage new development detrimental to those areas. Although opportunities are limited in Huntington Beach, natural open space areas can sometimes be utilized as community facilities. For example, 9 natural ravine may be ! incorporated into the total drainage system. 1.3.4 Seismic Safety The Seismic Safety Element recognizes that community facilities are particularly important to community well being and that their ability, to survive ! disasters is a fundamental factor in insuring public health, safety and welfare. Several policies in the Seismic Safety Element address the need to locate and construct community facilities in a manner that minimizes their susceptability to geologic hazards. 1.3.5 Scenic Highways The intent of the Scenic Highways Element is to establish and maintain visual resources along appropriate transportation routes. Arterials identified 'in the element should be considered in assigning priorities for the under-grounding-of utility wires. Above ground facilities along-these routes should be designed or screened to enhance views. 1.3.6 Noise Most community facilities are not major sources of noise. Sewer, water and storm drain pumps as well as electrical generation and transmission facilities do generate some noise and should be located and designed in conformance with ! Noise Element policies. Public buildings, particularly libraries, need to be buffered from surrounding noise sources where possible. 1.3.7 Housing Adequate community facilities are a prerequisite to new housing development. ! One of the City's goals as set forth in the Housing Element is to provide a variety of housing opportunities by type, tenure, and cost for households throughout the City. The element emphasizes the provision of housing to meet the needs of low and moderate income households. As discussed earlier in this section, the City may choose to grant density bonuses to developers in order to encourage the provision of affordable housing. The ability to increase housing ! densities may depend upon the adequacy of existing and proposed community facilities, particularly sewerage, water and drainage systems. 1.3.8 Coastal The Coastal Element delineates the type, location and density of land uses in ! the City's coastal zone and, thus guides the provision of facilities necessary to serve this development. Special policies related to the dredging and filling of coastal wetlands place restrictions on the location of community facilities in these areas. 5. owe��Ll V lJ 0� DEFINITIONS INFILTRATION: Movement of water into soil or other porous material (e.g. clay sewer pipes). INTERCEPTOR SEWER: A sewer facility constructed to divert flow from an existing sewer line to relieve overloaded conditions. LOCAL COLLECTOR SEWERAGE FACILITIES: Small sewers (generally eight inches in diameter) which serve individual buldings and developments. MASTER PLANNED SEWERAGE FACILITIES: All City pump stations and trunk sewers (not including local collector facilities) expected to be needed at ultimate development of the City under the existing General Plan. PRIMARY TREATMENT: A multi-step process to purify wastewater resulting in the removal of between 30 and 35 percent of the organic pollutants and up to one half of the suspended solids. SECONDARY TREATMENT: A multi-step process to purify wastewater which removes between 80 and 90 percent of the organic materials and over 80 percent of the suspended solids. RELIEF SEWER: (See "Interceptor Sewer") • SEPTIC TANK: A concrete or steel tank that receives waste from the home and provides a period of settling, during which a significant portion of the suspended matter settles out and is decomposed by bacteria; the remaining sewage is discharged from the tank into a drainage field where it is purified by micro-organisms and absorption. • SEWAGE: Wastewater flow from residential, commercial, and industrial establishments which flows through sewers to a treatment plant. SEWER: The pipe, conduit or other physical facility used to carry off wastewater. • SEWERAGE: The system of sewers; physical facilities employed to transport, treat and discharge sewage. TRUNK: • One of a set of large pipes which form the branches of the sewerage system and receive flow from many smaller sewers. ULTIMATE DEVELOPMENT (OF THE GENERAL PLAN): Also called "Ultimate Buiidout"; The state in which all land in the City is developed at the maximum densities permitted by the City's General Plan. • • 2. Sewerage System 2.1 INTRODUCTION The provision of adequate public sewerage facilities in the City of Huntington Beach is an important prerequisite to residential as well as other types of development. Since private systems for individual lots (e.g., septic tanks) are not appropriate in the City, a public system must be provided. The major functions of this system are to collect and transport wastewater away from individual homes and other establishments, to treat this wastewater, and to dispose of it in a manner that is not detrimental to the public health or to the environment. The purpose of this section is ,to describe the existing sewerage system that serves the City of Huntington Beach, to indicate the nature of needed improvements, and to discuss issues that the City must address regarding the provision of future sewerage facilities. This section (along with the policies contained in Section 8) is also intended to serve as the City's Master Plan of Sewers and to fulfill the requirements of Chapter 66483 of the California Government Code which states that sewer fees for new development cannot be imposed without an adopted sanitary sewer plan. The code requires that this plan contain a map showing the location of required sanitary sewer facilities and an estimate of the total costs of constructing these facilities. In 1978, the City retained the engineering firm of Lowry and Associates to analyze the ability of the City and County sewer systems to accommodate the sewage generated by existing and future development in the City. This study formed the basis of an interim Master Plan of Sewers which was adopted by the City Council on July 8, 1980. This element incorporates and supersedes the interim master plan. The Lowry Study, completed in July of 1979, is incorporated as a Technical Appendix to this element and is available under separate cover. 7. House Connection Local Collector r— Facility Industry & Commerce City Trunk Sewage From Other Jurisdictions 0 Regional Trunk �"— Regional Wastewater Treatment Plant ,� Ocean sour,.�e: 1�ichard Tabors, et al, Land Use and the Pipe, 1976. r HUNTINGTON BEACH C4LIFORNIA Diagram Of a 131 PLANNING DIVISION Typical Sewerage System Figure 2.1 8 . 2.2 ANALYSIS Collection and treatment of wastewater in Huntington Beach is accomplished by a combination of City and County facilities which includes sewer, pipes; pump stations and a treatment plant. Small sewer pipes collect wastewater from individual buildings. The sewage is then transported through a series of consecutively larger pipelines to a treatment plant where it is treated and discharged into the ocean. The larger pipelines which receive flow from many smaller sewers are called trunk sewers or trunk lines. (See Figure 2.1.) i Ideally, a sewerage system will utilize the natural force of gravity to collect and transport wastewater. _Portions of Huntington Beach are relatively flat, however, and in some areas it is necessary for sewer pipes to have a steeper slope than that of the natural terrain in order to maintain adequate flow..,Pipes which are located relatively close to the surface must, with distance, be placed . deeper in the ground. At a certain point the cost of digging the trench and installing the.pipe become so great that it is more economical to install a pump station to raise the sewage to a level where gravity sewers "can again .be economically utilized. Nonetheless, it is desireable to minimize the number of pump stations in the total sewerage system since these facilities incur costs for power supply and for regular maintenance. In general, the County assumes responsibility for, providing and maintaining facilities which: 1) serve more than one local entity; and 2) serve a drainage area of not less then 3,000 acres. It is the City's responsibility to provide .for facilities to collect sewage from local development and to transport it to County.sewers., These are not hard and fast rules, however, and the ,ultimate decision as to which jurisdiction will have the responsibility for provision of a new sewer often depends upon a. negotiating process-between the County" and the City. 2.2.1 County Facilities The County Sanitation Districts of Orange County (CSDOC) are responsible for the financing, construction and operation of regional wastewater collection, treatment, and disposal, facilities for the northwestern portion of Orange County. The CSDOC are comprised of seven districts, two of which serve the City. (See Figure -2.2.) District 11 is wholly contained within the City and serves the. major portion of the City's sewage flow while District 3 serves only a small portion of the City. Each district is financed separately through taxation of those properties being sewered. The _Districts also charge a sewer connection fee to new development. Treatment of sewage generated in northwest Orange County is accomplished at two CSDOC treatment plants: Treatment Plant No. 1 located in Fountain Valley on Ellis Avenue and Treatment Plant No. 2 located in Huntington Beach, south of Banning Street between Brookhurst Street and the Santa Ana River. A pipeline connects the two plants so that sewage from both plants can be discharged through an outfall pipeline extending from Treatment Plant No. 2 five miles out to sea. The locations of County Sanitation District facilities in the City of Huntington Beach are shown in Figure 2.4 and include three pump stations, a network of trunklines ranging from 12" to 78" in diameter and a treatment plant (No. 2) as previously mentioned. 9. C :i•i:•:1:::::::::•::::•:::::•iii:•ii:i•}:•iii:<{{•i?:•}:•:?:•7:•}>:•: }:•ii::•ii?}:•ii:•i:•iii}:•i:.}}:•}:•i:i•i:•iii:•iii:}:•:{•}:•iii}i:• A 4 • Y r.h •:LL h•• YY ,pptr h ✓:•:•:•:'.• :�:'i:�'y::}:::{<:ji:�'r:�:{�':�?:f:�:�i:�:��$:'�i::�:'.�:::�i;{:}'r'r:�:�::�:�:�i:�'r�:�>.:.:<�:�i7:�:�ii: Y•• Y: • 4. • L :•h •h• hp. •••:b• i LLL L f'L n :•hYY •h h. ,rf '4 Y• •Y: h•• '1• ::........ f.Y :L '•Jf '•A '✓✓l •h• ••4 r. . •:•r h�• L .•.Y Y A• •'JY•'6�f❖' h .•:Y y ••J •Y` •••.l is Y4 •7 :Y• t.: i7• :. :7t7: 'N T TML:s.: tii A ..:.......:: :.. PLANT ........... . o.1 .s:s 'N Eeie6 •s s.......s :'sE:. • s..•. :::sr:: y.,{.. Y•• ff L 1•h J• •.r :. [[,,-- ••h• :h tih• :':•'•hi h•' is=;. .r. Y ro IfMMiF• can •}• , :;L, :fi•' h•• 1 ww. h •4 YY.•.:SEt :. :•? Y t L A•• •.•.,, '•:ti• :0. 7...... CL37 J••• 1Y• ) ' wawuan 1 t , h ?1, •Yh•:: , •. h h•Y•r:: : ji '7:: 4Y:• �•i ":. ::LsE •�•r:rl. .h• I. kie County Sanitation� r:•••• f•:: h�' •:r•,-.• District Ao. CI '...✓.r. S ..+e:�b:•: i •t '. Coun t Y Sanita tion ion •Yh. . .•Y.•. District ' TREATMEN T PLANT NO. 2 Source: County Sanitation Districts of Orange Count 1980. ......R-1:.....`UN County, HUNTINGTON BEACH CALIFORNIA Count Sanitation Districts • - � PLANNING DIVISION y in the City of Huntington Beach Figure 2.2 10. In some instances flows that originate in District'11 must flow into the pipes of District 3 or vice versa before reaching the treatment plant. When this occurs, agreements between the two districts must be negotiated to share the costs of ! providing and maintaining the sewer on the basis of amount of flow. Sewage generated in the City ,of Huntington Beach is. treated at Treatment Plant No. 2. The facility is currently treating approximately 160 million gallons of sewage per day. Sewage at this plant is receiving primary treatment, only, which involves screening out large debris and settling out grit and some organic ! solids. It is currently being upgraded to provide secondary treatment for approximately 90 million gallons of sewage 'per , day which will remove additional pollutants. The. 1979 Lowry Study identified a number of County sewerage facilities serving the City which may be unable to safely carry the wastewater flows generated ! by land uses at ultimate development of the City's General Plan.1 The County's Slater Avenue pump station, located adjacent to Central Park, is currently overloaded and needs substantial rehabilitation due to its age. The Hamilton Avenue Pump Station and force main may also be overloaded at ultimate development. County trunk facilities which may be overloaded at ultimate development of the General Plan are: Atlanta Avenue Interceptor sewer, Bolsa Chica Street Trunk sewer, Edinger Avenue Trunk sewer, Goldenwest Street Trunk sewer, Newland-Delaware Trunk sewer, Ocean Avenue Trunk sewer and Slater Avenue Trunk sewer. Sanitation District No. 11 has an adopted sewer plan which shows a number of proposed sewer trunks and pump stations located . in Huntington Beach. ! Construction of these facilities would eliminate potential capacity problems in the County sewers which serve the City *.and may reduce operating costs for both the District and the City by eliminating the need for several pump stations including three operated by the City. The Coast Trunk sewer, shown on the County's.Master Plan as a proposed-sewer extending north along the coast from .Treatment Plant'No. 2, is the major facility needed to alleviate overloading of County trunk facilities in the City. Phases I and II of the Coast Trunk sewer (from County Treatment Plant No. 2 to Lake Street) were constructed in 1980. Phase III of the project, to extend the trunk line from Lake Street. to Goldenwest Street, is scheduled for` construction in 1981 pending adequate funding. These Phases of the Coast Trunk sewer will alleviate problems in r portions of the existing Ocean Avenue Trunk sewer. Additional phases, proposed by the County, would extend the Coast Trunk sewer in a' northwest direction to the Warner Avenue Relief Trunk sewer.- The District No. 11 Master Plan.of Sewers also includes several lines branching off the Coast Trunk including the Newland Street Interceptor, the Lake Avenue r Relief, the Edwards Avenue Trunk, and the Springdale Street Trunk sewers. . 1 Ultimate development of the General Plan, synonomous with ultimate buildout, is used r in this element to refer to a state in which all land in the City is developed at the maximurn'densities permitted in the City's General Plan. r - - 11. CITY SEWER PUMP STATIONS , 1. Graham St. South of Warner Avenue at Kenilworth 2. Humboldt Drive and Wayfarer Lane (J) 3. Gilbert Lane (E) 4. Pacific Coast Highway (A) 5. Finisterre Drive (F) 6. Davenport Drive (G) 7. Pacific Coast Highway and Warner Avenue (B) 8. Warner Avenue West of Weatherly Lane (C) 9. Warner Avenue and Edgewater Lane (D) 10. Algonquin Street and Pearce Street 11. Lark Lane and Warner Avenue "Meadowlark" 12. Heil Avenue and Mycroft Lane 13. Slater Avenue and Springdale Street 14. Gothard Street and Ellis Avenue 1 15. Delaware Street and Franklin 16. Adams Avenue east of Brookhurst Street 17. Brookhurst Street south of Atlanta Avenue at Effingham 18. Atlanta Avenue east of Beach Blvd. 19. Pier l & 2 20. Edwards Street and Balmoral 21. McFadden and Dawson 22. Saybrook Lane (H) 23. Seer and Crabb Lane 24. Bushard north of Adams 25. New Britain at Adams 26. Edinger Avenue and Santa Barbara Lane (K) 27. Brighton Lane at Shoreham Lane 28. Sharkfin Lane Track No. 8040 29. Talbert Avenue east of S.P.R.R 30. Trinidad Lane 31. Adams/Beach Figure 2.3 12. e LEGEND Fo °20 ��P° Y�°i,+ COUNTY TRUNK SEWER (EXIST.) c°�oFti r `r !csG,°r�j� ■■■■■■■■■ COUNTY TRUNK SEWER (PROP.) sA Fr, O y+4o p ` osF ` ' ❑ COUNTY PUMP STATION (EXIST.) 4,tic ao p� o- fir ` ;aJF,pOE.A �a�•'� 0 COUNTY PUMP STATION (PROP.) 1\lie �y: �y» � o,P CITY TRUNK SEWER (EXIST.) < ;. ,t•. A q ``+p ••••••••• CITY TRUNK SEWER (PROP.) '°, &rysa.pF FryFF` e 50 CITY PUMP STATION (EXIST.) y0 ,p cy0 , hh, ' 'a *1' CITY PUMP STATION (PROP.) OF AQPO y,C 1 Q Q9 g s iFgL 'bs Ov`G" J4i�. Ov�y� ee " tisF P Ph v h 0 Fty r' F,e•`0''d '• ��Fc sFs>` i F by K Q Fi J yPy� y ey. c'sOFA,OOF'D P Or' J R �' � t1'h Fi � rir�`Eh �•5 c~°� ,�� y,� � �6� Q°��5 °4 S � QJ v °`+,*`: Q�FqL �OhK�O• F FgFy p K4,0�0. F'y 6` a.+:. �J Q t Q Q P Q O "y INTERPLANT JOINT OUTFACE OQK O' Sp y �C'•�F "PP O' ey`� KPjQ�� Q GFia: 1 Jy�� BG <9y SF�<y'fis, r Fiv h. rc Q yry SFO G q S S h O �/� Q P �v S A SEWER F,Qq•9:t. .�` `� ,� s.ti � F�iyq y'r�0s•a rT h`Gy R�L�h� ti° yq .tip �.P sF�gL'LQ qG , ••i � �,C � <F h y y y0, < ::;. .P s ' ' o < �c s F E` ,iJ1' `•+ J4i'g �(, ♦ J GFti r` Al F S 9L 9 • 9 h Q p �P F� y0 OPt�,a Q RG 7 Co •`.:.:; 00 �� J �•Q Q F �' !r, • O �� e �''r JyQ 4yG P� yQ. (,� ti0�y P" �c�; y�Fi q 4i O F F��o J Q-4.��1�-��F'�K ,�^ NSF ��Gy� ��00 ♦�♦ ••w O Jr'� 4 y�' � ,ti`�, �,QG �: ��c. 'Q�"`�„ , `°? `GAh t :tr�t'" c�,� o'y� hc '� � � F Q � ♦♦ w>,�F O,�Q- _ +,c° „¢ O?h� � �� q- vP �O��,1��.1 ti ♦♦ ••�tiS'jf.e F0 b �.•". • � r Q �L q 1.0 F F•9oc F< Fj,s F� Jy('F� y.�F •s ,I,,�> .�'yo yIs, ti cI r o O�O�h • .(,st. O SF LO F G< 'P O ^< P��. K� O ,k. t�,�; C Jam'•(-� Q`h• V' • !y O • O �y F � 'D ti q /C .� �j �y;>: v P P Pv h' �Q�' �' I P J� hK ' G' 0< • F q w• r` < • F 'r�O •S J ° Q�C Ca v .c P / .. ;';ry'�`�//^ 'LO j�■r A 1>hQyQ1��FQ.� lGyyQP�y 0P 1i�� ■'Pr SA•O�S''5��•G/� F�Y S sy9F 9 A< p 1 0C O? v 94' ` fF /c( Q �rv�C PP G •9 , O Pp O- Jit sFt1i g 4 1 IV ♦ O !y F q FoFO 3 7'O O 0 ,[ ♦♦ COAST TRUNK SEWER ♦♦ 1 4" FCS ,y0 ` t //--♦ (C.S.D.NO.11) ♦ 9 �+FF 01'� 0 Glv��1 c2 I■ F oy FA�\ OO lb ■■ �� PAIM OyPC-1 9 • O V O O ■■ • RANGE w ,a xr. Qh� P 0. COAST TRUNK SEWER >i;::::;;>:::;;::.::.::;<:;:::::.:::,<,:/►li�►/�Ir/��J./�/ :.:.: x m. ■ F y (C.S.D.NO. 11) y l ■■■■■■■ ■■■■■ �m■■■■■■ NEW ■ PCH TRUNK SEWER PARALLEL PCH TRUNK SEWER _._ ' 0 PACIFIC COAST HWY 4 INTERCEPTOR AN ..00E AVE. � $ LAKE AVE. SEW RELIEF SEWER ORANGE AVE. TRUNK SEWER (C.S.D.No.11) (C.S.D. NO-11) 22ND ST.SEWER (C.S.D.NO. II) MAY 1981 m HUNTINGTON BEACH C4LIFORNIN lop PLANNING DIVISION City And County Sewage Facilities C-R M-92A Figure 2.4 i P ti The interceptor sewer line along Newland Street between Pacific Coast Highway and Hamilton Avenue is scheduled for construction by the County in late 1980 and will eliminate the Hamilton Avenue Pump Station. The Lake Avenue Relief Sewer will alleviate potential overloading of the Newland-Delaware and Atlanta Avenue Interceptor sewers. The Edwards Avenue and Springdale Street Trunk sewers will alleviate problems in the City's sewers in the vicinity of Heil Avenue and Gothard Street and in the County's Bolsa Chica Street Trunk sewer, respectively. r A proposed Goldenwest Street Interceptor sewer will permit relocation of the Slater Avenue Pump station and relieve the existing Goldenwest Street trunk sewer. Other proposed sewers shown on the District No. 11 Master Plan include the McFadden Avenue Relief, the Edinger Avenue Interceptor and the Heil Avenue Relief sewers. These facilities would eliminate potential capacity problems in the remaining County sewers in the City. 2.2.2 City Facilities City" sewerage facilities include 31 pump stations and roughly 300 miles of ' sewer pipe. Sewers are generally located in arterials, local streets, or in the case of the Downtown area, in alleys. Sewerage facilities can be classified into two types: master planned and local collector. Master planned facilities include all pump stations and City trunk sewers (excluding local collector facilities) expected to be needed at ultimate development under the City's General Plan. In general, City trunk sewers are ten inches or larger in diameter, are located in major arterials and receive flow from many smaller sewers serving a particular area. The City's master planned sewerage facilities are shown on Figure 2.4. Design and construction of master planned facilities (trunk lines and pump stations) are the responsibility of the City subject to the availability of monies in the City's sewer fund. Developers who provide these facilities are eligible for reimbursement from the City. Section 14.44.090 of the City's Municipal Code outlines the refund conditions applicable to such reimbursement. Local collector facilities (generally eight inches in diameter) are those which serve individual units and developments. The City requires private developers to provide these local sewer pipes. In some instances, however, deficiencies have been identified in existing local collection facilities located in areas which are completely developed. In these areas the City may have to provide for the necessary improvements. Figure 2.5 lists the City sewerage facilities which were identified as potentially overloaded at ultimate development of the General Plan by the engineering firm of Lowry and Associates in its 1979 analysis of the City's Sewerage System. Most City sewers are expected to be adequate at ultimate development. However, a number of sewers and pump stations have been identified as potentially undersized. New facilities to serve areas of future development will also be necessary. 1�_ POTENTIAL CAPACITY PROBLEMS IN EXISTING CITY SEWER FACILITIES AT ULTIMATE DEVELOPMENT Trunk Sewers Beach Boulevard Trunk Sewer Edgewater Lane Sewer Edwards Avenue Trunk Sewer Orange/22nd Street Sewer Warner Avenue Trunk Sewer Local Collector Facilities Warren Lane Sewer Oakmont/Edgemont/Howland Sewer Delaware Street Sewer Garfield Avenue Sewer McFadden Avenue Sewer Monroe Lane/Brush Avenue Sewer Newland Street Sewer Utica Avenue/Beach Boulevard Sewer Gothard Street Heil Avenue Sewer Ellis Avenue Sewer Pump Stations Pump Station A Pump Station B Pump Station D Pump Station G j Atlanta Avenue Pump Station New Britain Pump Station SOURCE: Lowry and Associates, 1979. , Figure 2.5 14 . The 1979 Lowry Study includes a list of recommended capital improvement projects for City sewers and pump stations to avoid overloaded conditions at ultimate development and to provide adequate service to new development. The total cost of constructing these improvements is estimated at approximately $3.9 million. City sewers in the Downtown, Townlot, and Oldtown areas were not identified as potentially deficient in the Lowry Study. Nonetheless, it must be recognized that these facilities are approximately 70 years old and in a deteriorating condition. An analysis of the sewers in the Downtown was made by the City in the .spring of 1980, through the use of a specially equipped camera which photographs the insides of sewer pipes. No major obstructions or immediate problem spots were identified by this method. In digging the trench for the installation of Reach Three of the proposed coastal trunk sewer, however, the County will intercept City sewers in the Downtown. Substantial reconstruction of these pipes may be necessary before connections to the new coastal trunk can be made. Any significant new development in the Downtown may require similar pipe reconstruction activities. Construction of mid-rise buildings on consolidated parcels may require relocation of sewer pipes from the alleys into the streets. The Public Works Department estimates that necessary replacement projects may ultimately cost in excess of four million dollars. The priority of sewer projects can be based upon a number of considerations. High priority is generally given to overloaded sewer pump stations since these are vital links in the total system and can impact sewage flow over a large area. Sewer pipeline failures and sewers flowing at near or full capacity also require immediate attention since they can pose direct hazards to public health and safety. Sewer projects that coincide with street improvement projects should be undertaken whenever possible and given a high priority. This avoids the need to redig trenches in the street again at a later date. Another objective of sewer projects is often to "bypass" and eliminate existing pump stations where it is possible to utilize the natural force of gravity. As discussed previously, pump stations are expensive to operate and maintain and raise the cost of the total system. Lower priority can be given to sewers and pump stations that may reach full capacity at ultimate buildout of the tributary area. Although these projects might be listed in a capital improvements program, a more detailed study of their capacity at the time of projected improvement would be recommended. Low priority can also be given to new sewers to serve currently vacant property although they should be constructed at the time that development of the area occurs. 2.2.3 Design Criteria The City Council has adopted, by resolution, standard plans for use by the Public Works Department in analyzing and designing public works facilities. Improvements provided for by private developers must also conform to these standards. The criteria in the City's Standard Plans are based on the 15. n E FLLi3 r -r xro. /�uxnwc Source: Lowry and Associates, Sewer Study, 1979. HUNTINGTON BEACH C4LIFORNIA Areas of Potential Saltwater PLANNING DIVISION Infiltration Into Sewers Figure 2.6 16. requirements used by other jurisdictions, on professional manuals and on staff knowledge of local conditions. The standards for sewers include numerical values and formulas for the determination of average and peak sewage flow quantities from various land uses. It is important that criteria accurately reflect sewage generation rates in the City and provide for adequate safety margins to accommodate peak flow conditions. The sewer study by Lowry and Associates includes a current set of design criteria developed specifically for the City of Huntington Beach. These criteria are being utilized in addition to those contained in City's Standard Plans. In designing sewers to serve industrial areas the City uses a factor of 3000 gallons per day per acre to estimate wastewater flow. There may be several industrial facilities in the City that exceed this estimation. The City may wish to investigate the feasibility of establishing a per volume fee for handling excess wastewater discharges from these industries. 2.2.4 Inf iltration Infiltration is a term used to indicate a condition occuring when groundwater seeps into a sewer system through loose joints, cracks, and porous pipe material. This groundwater increases the flow that must be carried 'by the sewer pipes and ultimately treated by the treatment plant. Figure 2.6 shows the areas of the City where infiltration is most probable. These areas include all of Huntington Harbour and a section of coastline between Beach Boulevard and the Santa Ana River. Saltwater intrusion could be a problem in these areas because of their present or original status as tidal marshland with high soil permeability and groundwater levels affected by tidal variations. The City's Public Works Department has determined that current levels of infiltration in City sewers are generally at normally acceptable levels. However, the City should continue to periodically monitor sewers in these areas to look for unusually high flows which might indicate excessive infiltration. 2.2.5 Maintenance The City is responsible for the maintenance of all City sewers and pump stations. City sewers are relatively flat, causing solids such as coffee grounds, eggshells and grease to settle to the bottom of the pipes. The City cleans all of its sewer lines once each year to prevent clogging. The 31 pump stations also require regular maintenance such as oiling the motors and pumps and replacing worn parts. Maintenance personnel visit each station daily. Maintenance and repair of City sewers and pump stations are performed by City employees with monies from the General Fund. Current levels of personnel and funding are adequate to perform required maintenance. As new facilities are constructed, particularly additional sewer pumps, however, it may be necessary to increase maintenance personnel or else reduce regular maintenance of existing sewer facilities. 17• 1 CITY SEWER FUND PROJECTED REVENUES Year Projected Revenues 1980-81 $ 370,000 1981-82 407,000 1982-83 447,700 1983-84 492,500 1984-85 541,700 Sub Total $2,258,900 Balance as of 6/30/80 1,500,000 Total $3,758,900 1 SOURCE: City of Huntington Beach, Finance Department, 1980. Figure 2.7 18. 2.3 PROJECT FUNDING County As mentioned previously, County Sanitation Districts are financed individually through taxation of the properties in each district and through sewer connection fees for new development. There is currently a lack of funds in County Sanitation District No. 11 to complete all the projects shown on that district's Master Plan. The inability of the County to make all the necessary improvements in District No. 11 could cause problems in local sewers and / impact development in certain areas of the City. The City may have to restudy its sewerage plans in the future as more information about the timing and extent of County sewer projects is known. County Sanitation No. 11 is currently studying the need to establish increased fees in order to fund needed capital improvements. City The sewer connection fee is the primary source of funding for proposed sewerage projects. The Public Works Department, as a condition to approving an application for sewer connections, is authorized to collect a fee for the purpose of reimbursing the City for the cost of upgrading the sewer system and future replacements and extensions to this system. This fee is placed into the City's sewer fund. The current amount of the sewer fee is given in Section 14.40 of the Municipal Code and is charged on a per unit or per acreage basis depending on the size of the parcels involved. It is important that the City evaluate the sewer fee on an on-going basis and make necessary adjustments to reflect current sewer needs and construction costs. The City's sewer fund balance as of June 1980 was approximately $1.5 million. Projected revenues from sewer connection fees over the next five years, as shown in Figure 2.7, total approximately $2.3 million. Combined, these monies will provide approximately $3.8 million for.sewer projects in the next five years. These monies are expected to be adequate to,fund the majority of the projects identified in the 1979 Lowry Study as being necessary to correct existing and potential capacity deficiencies and to provide adequate service to new development at ultimate buildout. As mentioned previously, the estimated cost of constructing these projects is approximately $3.9 million. It should be noted that these projects will have to be spaced out over a period of at least five years. Also, projects identified in the Lowry Study did not include replacement of deteriorating sewers in the Downtown. The Public Works Department does not expect major problems to occur in Downtown sewers during the next five years (1980-1985). Should major problems arise during this period, additional sources of funding would most likely be required. 19. . DG�QO �]aC�C� 1 DEFINITIONS BAFFLE: An obstructing device such as a wall or screen which, when constructed in a catch basin, 1 holds back the flow of runoff long enough for debris to settle out and be trapped. CATCH BASIN: A chamber or well, usually built at the curb line of a street, for the admission of water. (See Figure 3.1) LOCAL COLLECTOR DRAINAGE FACILITIES: Storm drains less than 39" in diameter. MASTER PLANNED DRAINAGE FACILITIES: Storm drains 39" or more in diameter and all pump stations which are expected to be 1 necessary at ultimate development of the General Plan. ONE HUNDRED-YEAR STORM: The size of storm that occurs on average once every 100 years, or in other words, has a one percent chance of occurring in any given year. RUNOFF: 1 Water from rain that flows over the surface of the land and ultimately reaches flood control channels or the ocean. STORM DRAIN: A pipe or conduit which carries storm water, surface water, street wash, etc., but 1 excludes sewage and industrial wastes. STREET CAPACITY: The volume of runoff that can flow down a street without overflowing the curb onto the sidewalk or other property. SUMP: 1 A pit or low lying area in which runoff collects. TEN-YEAR STORM: The size of storm that occurs on average once every ten years or, in other words, has a ten percent chance of occurring in any given year. 1 TRIBUTARY: A stream or flow of liquid feeding a larger stream or flow. 1 1 3. Drainage System 3.1 INTRODUCTION The purpose of the City's drainage system is to convey water away from property and streets. The biggest source of water runoff is rainfall, however, runoff from activities such as watering lawns and washing cars is also conveyed by drainage facilities. These facilities are also part of the City's flood control system. By conveying runoff away from streets and property, drainage facilities help prevent the flooding of these areas during heavy storms. / In general, runoff volumes vary according to the ground surface characteristics of the surrounding area. For example, asphalt, concrete and rooftop surfaces characteristic of urban development do not readily absorb water and produce higher volumes of runoff during a storm than natural open space and vegetated surfaces. Runoff volumes also depend upon the size of the storm. It is useful to understand the classification system often used by engineers and planners which describes storms in terms of their magnitude and frequency. A storm that produces an amount of rainfall that is expected to occur only once every ten ' years is called a ten-year storm. A ten-year storm has a one in ten (ten percent) chance of occurring in any year. Similarly, a 100-year storm is the size of storm that is expected to occur once every 100 years and has a one percent chance of occurring in any year. Large storms occur infrequently but have greater runoff and potential for causing flooding and damage. The determination of what constitutes a 10-, 25-, 100-year storm, etc., for Orange 1 County is based on statistical analysis of past rainfall records for this area. 21. STREET WATER CARRYING CAPACITY Storm Water Runoff � t • 1` � •• °off ��.. � �. 0 Sidewalk Curb & Gutter Typical Street Section STORM DRAIN & CATCH BASIN Curb Sidewalk Street �• o `� •� o ' Catch Basin . Storm Drains • Storm Water Runoff 1 JD ` D Hur.' '.,igton Beach Pubs is Works DepartrnFr ; i9Fi0. HUNTINGTON BEACH C4IFORNIA Facilities For Conveying PLANNING DIVISION Storm Water Runoff Figure 3.1 22. Drainage facilities control stormwater runoff in order to (1) eliminate or minimize inconvenience and disruption of daily activity as a result of runoff from small storms; and (2) prevent property damage and personal injury ` resulting from an infrequent, unusually large storm. It would be impractical to design a system to eliminate all minor flooding which will occur during the largest storms. The system should, however, prevent flooding or undermining of buildings and essential facilities. In the early development of the City of Huntington Beach few, if any, drainage facilities were constructed and grading did not usually elevate land improvements above the surrounding ground. Drainage facilities that were installed were generally designed with insufficient engineering and planning to correlate the facility size with expected rainfall runoff. Little attention was paid to the role of these facilities in the total system. This gave rise to conditions of potential flood damage from the relatively infrequent but large storms which occur in the Southern California area. This section (along with the policies contained in Section 8) is intended to serve as the City's Master Plan of Drainage and to fulfill the requirements of Chapter 66483 of the California Government Code which states that drainage fees for new development cannot be imposed without an adopted drainage plan with a map showing the location of required drainage facilities and an estimate of the total costs of constructing these facilities. In 1979, the City retained the engineering firm of L.D. King to study and update the City's existing Master Plan of Drainage. The major task of the study was to identify storm drain and street capacity deficiencies and recommend corrective improvements. This section incorporates and supercedes the existing Master Plan of Drainage. The L.D. King' Study completed in October, 1979, is incorporated as a Technical Appendix to this element and is available under separate cover. 3.2 ANALYSIS Storm drainage and flood control for the City is accomplished by a combination of local and regional facilities. As illustrated in Figures 3.1, City streets and arterials are designed to carry certain volumes of stormwater runoff. Catch basins and storm drains are constructed underneath these arterials where additional capacity is needed. Discharge from City streets and storm drains flows primarily into City or County open channels which ultimately drain into the ocean. Ideally, a drainage system will utilize the natural force of gravity to collect and transport runoff. Because of the relatively level topography and low elevation of much of the City, however, water in most storm drains must be pumped up to the level of the open channels where it then flows by gravity into the ocean. Both the City and the County operate pump stations for this purpose. Pump stations are a vital link in the City's drainage system and require a power supply and regular maintenance in order to operate. 23. t ! BOLSA _. 2A _ 5 EDWUR 2 5A .......... 4 SC ............................... .......................... ............................ ............... � . i 12 5B •,,�`�`. 10 NYWNFF �\?� :................................................... ............ ...._...... -.. ..... 3... SLAM 9 uuFxT f` a..,......... ......... ... ... RUS 6A' GARFIELD � \ 8pG�j 71 ' 6C 6B 6A 8E -7p_ AWMS AH 8C., Drainage District Boundary 7Fj .;t. 8A.: 8B '�` 7E •:•:•i`:O:•P}:6:•i:•}::ei}i:•:•: Undistricted Areas O `\ 7 ATI.ANTA '\. .� _... 1 7G .J \ \�• 14AMLTON MANING X. o aao r«r Source. Huntington Beach Public Works Department, 1981. HUNTINGTON BEACH CALIFORNIN City Drainage Mstrrcts ' PLANNING DIVISION Figure 3.3 24 . a� LEGEND CITY CHANNELS r ♦ sA4% 110. i•`♦ •',•' fr�ln`♦ �'� Ior ph ° CITY PUMP STATIONS 1,E ,' �� ♦ J���GO G.j.Q' PS��'��t�,� ° COUNTY CHANNELS Ili "y9� ♦,♦` �C� oG Q$� 6i C,� s • COUNTY PUMP STATION 110 ♦ �PGOb � pb QO�G G�' , ' S,r 4sf ♦♦ �QCO ♦♦ '♦ ,♦ `'�cy ����� ��G�J .r9 `Q, ``J91, �` `Q. , �p ,y94O `♦ pJ ♦' POP�r 110 Q ♦P � /� SG J� � �p � ��' ♦. Pam? i '�! `�,P`ti �PyO �t.� r�` G`Z`Pp`ti �'��Q ♦-♦'♦ ,d .j• Gp t�0 O� C� ��C c, O G Q ♦ P i �9� o �oPQ,�J yQ5 , �� g gQ� ��� ♦,♦ �``�°? PP�c� Gb+ o QOQOv\ G� d`P�Q�. �•'.♦r S�`�Q' o 0 ��P �`. - -� l �`��`, OPT '.♦ i SJ PALM j' ORANGE _ I i PACIFIC COAST HWY MAY 1981 I 1iHUNTINGTON BEACH CALIFORNIA in a Drains Channels & Pumping PLANNING DIVISION g p g C-R M-93A Figure 3.2 I j 3.2.1 County Facilities The Orange County Flood Control District is responsible for maintaining a system of regional flood control channels, generally defined as those which serve more than one jurisdiction and/or areas of 500 acres or greater. The county's regional facilities are designed- to carry greater quantities of storm water runoff than the local facilities, which serve smaller drainage areas. The county flood control system in Huntington Beach consists of the Santa Ana River channel, nine open earthen channels and one pump station, shown in Figure 3.2. The large open channels ultimately drain at four general locations: the mouth of the Santa Ana 'River, Bolsa Bay, Huntington Harbour and Anaheim/Sunset Bay. ' The County's drainage facilities are master planned to accommodate a 100-year flood. According to the County's Environmental Management Agency (EMA), _ however, these facilities as currently designed will only protect streets and structures from a 25-year flood.. The inability of regional facilities to accommodate runoff from a 100-year storm places those areas of .the City which are adjacent to these channels in danger of flooding in the -event of such a storm. Major improvements to the nine earthen county channels in the City are not planned for the near future. The . United States Army Corps of Engineers, which is responsible for the planning, design, construction and maintenance of major flood control projects, is planning large-scale improvements._to the Santa Ana River to enable it to accommodate flood waters in excess of a 100-year storm. As proposed by the Corps of Engineers, the project would involve construction and 'impacts in three counties with a total price of approximately $870 million.1 In the City of Huntington Beach, this project would involve, widening the mouth of the Santa Ana River and relocating the southernmost portion of the County's Talbert flood control channel. The Corps has prepared a comprehensive report on the Santa Ana River project which has 'been submitted to the U.S. Congress for approval and funding. Under optimistic predictions, the improvements as recommended could be completed by the mid 19901s. 3.2.2 City Facilities Drainage facilities which serve approximately 500 acres or less .and are tributary to regional facilities are generally considered local in nature and are the responsibility of the City. The City is divided into 34 drainage'districts which, represent local runoff areas with different drainage characteristics and needs. Several vacant areas of the City are not currently in any district. (See Figure 3.3.) The City's drainage facilities include approximately 35 miles of storm drains, over 800 catch basins, 15 pump stations and four open channels. (See Figure 3.2.) City storm drains and channels flow primarily into County channels. In the Downtown and Townlot areas, however, City drainpipes pass underneath Pacific Coast Highway, and empty directly onto the beach. In Huntington Harbour, stormwater drains into Harbour waterways. The Talbert and Huntington Lakes in Central Park and nearby Sully - Miller Lake act as large retention basins holding water during heavy rains to prevent large influxes of water from overloading the City's Slater Channel and pump station. U.S. Army Corps of Engineers, Los Angeles District, Santa Ana River, Draft Main Report, July 1980, p. 127. 25. City drainage facilities are divided into two types: master planned and local. Storm drains 39" in diameter or larger and all pump stations which are expected to be necessary at ultimate development under the existing General Plan are considered to be master-planned facilities. Design and construction of these y facilities is the responsibility of the City. All storm drains less than 39" in diameter are considered to be local facilities and are the responsibility of private developers and property owners. Developers who provide master planned facilities are eligible for reimbursement from the City. Section 14.48.070 of the City's municipal code outlines the refund conditions applicable to such reimbursements. These terms provide that the City must make reimbursement if adequate funds are available within five years after construction of the improvement. In general, the City's Public Works Department designs new drainage facilities so that during a ten-year storm: (1) one lane of travel in both directions is open on all City arterials; and (2) flood waters do not exceed the top of the curb on local streets. In "sump" or low areas where water naturally collects, new drainage facilities are designed to accommodate a 25-year storm. It is economically impractical for the City to design its local drainage facilities to accommodate runoff from a 100-year storm, which is the minimum criteria for flood safety set by the Federal Insurance Administration. This can be accomplished, however, by elevating dwelling units so that the lower level of the structure is above the level of flooding expected during a 100-year storm. The City currently reviews the grading plans of new subdivisions and other large developments and requires that units be elevated above the level of a 100-year storm. Adequate drainage facilities should be installed as an area is developed so that no drainage deficiencies exist at ultimate build-out. The majority of existing storm drains in the City of Huntington Beach, however, were designed'for the runoff volumes predicted by formulas and criteria which reflected the state of the art at that time. The City and the surrounding drainage areas urbanized more extensively than anticipated by County and City agencies, and the paved urban surfaces created larger runoff volumes than originally predicted. In 1973, the Orange County Flood Control District published a revised Hydrology Manual to reflect these higher rainfall runoff conditions. However, because many drainage improvements in the City were built prior to this revised document, the City has a number of drainage deficiencies. In addition, it is important to note that City drainage facilities are designed to accommodate only the water that falls in Huntington Beach. Similarly the City calculates the water level of a 100-year storm for the water which would fall in Huntington Beach only. The City is part of a larger drainage basin which covers 3,200 square miles and includes much of Orange County. It is the responsibility of regional agencies including the U.S. Army Corps of Engineers and the Orange County Flood Control District to provide drainage facilities which are adequate to accommodate runoff from all sections of this drainage basin. Rain falling outside the City of Huntington Beach is expected to flow into these regional facilities and be carried through the City into the ocean. Unfortunately; 26. regional facilities, including the Santa Ana River, are not adequate to accommodate desired flows. Because of this discrepancy portions of the City adjacent to regional channels may experience flooding during a 100-year storm. Street and storm drain deficiencies have been identified in 24 out of the City's 34 drainage districts and in two areas of the City that are not currently within a drainage district. By deficiencies, this section refers to the inability of a street or storm drain to convey the amount of runoff necessary to meet the City's flood protection standards discussed above for 10 and 25-year storms. These deficiencies are discussed in detail in the 1979 drainage study by L. D. King. Some of the deficiencies are more critical than others depending upon whether they pose a potential hazard'to streets, property, or structures. The Downtown, Townlot and Oldtown areas of the City contain serious deficiencies. Recommended improvements to these areas are estimated to cost over five million dollars. These districts are predominently developed and existing drainage fund balances are low. It is the intent of the City to encourage revitalization of the Downtown and surrounding areas, but serious drainage problems could impair City efforts in this regard. All of the City's storm drain pump stations, except the Atlanta Station, require 1 replacement of the control systems that regulate engine and pump speed. The outmoded controls now in place put undue stress on engine parts and increase the possibility of flooding in the event of a storm. In addition, ten pump stations do not have adequate pumping capacity to accommodate existing and/or projected future runoff from a 25-year storm. These are the Shields, Newland, Marilyn, Adams, Hamilton, Banning, Bolsa Chica, Slater, Scenario and 1 Meredith pump stations. Improvements to the first four stations are particularly needed. Significant erosion is occurring along the banks of the City's Slater Avenue open drainage channel, posing hazards to adjacent properties. Concrete lining of this dirt channel is needed to correct the erosion problem. 1 The 1979 L. D. King Study includes a list of capital improvement projects for City storm drains and pump stations to provide adequate drainage for the City at ultimate development of the General Plan. Proposed master planned facilities (storm drains 39 inches or larger in diameter and pump stations) are mapped in the L. D. King Study. 1 The priority of drainage projects can be based upon a number of considerations. High priority is generally given to pump stations, which are critical facilities in the total drainage system. Storm drains are only effective if the pump stations are adequate to accommodate existing runoff and are operating at optimum levels. 1 High priority is also given to projects which eliminate flood hazard potential to existing structures and property during 10 to 25-year storms. Storm drain improvements are undertaken in conjunction with street improvements, when possible, to avoid tearing up the street again at a later / date. A lower priority is given to projects which eliminate minor flooding of streets. Low priority can also be given to storm drains to serve vacant property although they should be constructed at the time that development of the area occurs. 1 27. Curb Street Baffle ro Storm Water Runoff-� Baffle Debris-H �: •• • :•�1;;'�'!�� � o Catch Basin Source: Huntington Beach Public works Department, 1980. Aggtk HUNTINGTON BE4CH C4LIFORNIN Baffled Catch Basin 191 PLANNING DIVISION For Debris Control Figure 3.4 28. 3.2.3 Maintenance Storm drains and catch basins collect a wide variety of debris including grass clippings, branches, leaves, oil, litter, and large discarded items. Catch basins are cleaned at least once each year prior to the winter rainy season. Storm drains are checked before the rainy season and cleaned out if necessary. The pumps and motors which run the City's 15 storm drain pump stations are also serviced periodically. A small number of the City's catch basins are equipped with gratings which help prevent debris from entering the storm drains. These gratings can pose hazards to cyclists and require extra maintenance since they naturally collect debris and must�be cleaned periodically. Catch basins with a baffled compartment (see Figure 3.4) can also be used to trap debris without posing hazards to cyclists, although they too, must be cleaned out periodically. Their use may be most appropriate where it is desirable to keep receiving waters free of debris. Baffled catch basins have been used in the Huntington Harbour area and are successful in trapping debris if adequately maintained. 3.2.4 National Flood Insurance Program The federal government has mandated that the City participate in the National Flood Insurance Program in order to continue to receive federally related financing for projects in identified flood prone areas. Under this program, federally subsidized flood insurance is available to City residents and must be purchased by persons taking out any federally insured loans (e.g., new home loan, second mortgage) on properties in identified areas. The Flood Insurance Program consists of two phases, Emergency, under which the City is now operating, and Regular. In the Emergency phase, a uniform subsidized insurance rate was set for all flood hazard areas. (See Figure 3.5.) In the regular phase of the program, special rate maps will be issued setting different insurance rates based on varying levels of predicted flood depth and damage. The City must, at that time, adopt flood plain development criteria for new construction in identified areas to help avoid future flood damage.2 According to these criteria, new residential development within the identified flood hazard boundaries will be required to have first habitable floors that are elevated above the level of a 100-year frequency flood as determined by the U.S. Army Corps of Engineers.3 Units may be built over garages, basements / or other non-living areas or they may be raised on fill to meet' this criteria. 1 1 2 The City expects to receive final flood insurance rate maps by spring of 1981 at which time it will have approximately six months to adopt flood plain development criteria. 3 In determining the level of a 100-year flood in Huntington Beach, the U.S. Army Corps of Engineers includes any water which may overflow into the City from the Santa Ana 1 River. This differs from the City's method which has not included this regional overflow. 29 . L.. i S^—j wss. o osr F r�� r.aafr, E 4 � foMff ,fa `. aran. .,.�.r ourmo X. X. •rarm 4 l4♦ C I�o.Mf i O .muwuao , .n,wu :• •s `• ran X unnuo X. •. X. X. '•Y Source: U.S. Army Corps of Engineers, 1980. HUNTINGTON BEACH caLIFORNIA Preliminary Flood Hazard PLANNING DIVISION Boundaries Figure 3.5 30. New commercial development may be raised above the 100-year flood level or may be designed so that structures are watertight with walls substantially impermeable to the passage of water. The costs of meeting these criteria may be prohibitive for some new developments. Large developments raised on fill may create adverse, visual impacts and may also increase flooding of immediately adjacent low lying areas during storms. When the Santa Ana River Improvement Project currently proposed by the U.S. Army Corps of Engineers is complete, the Federal government will issue new . flood insurance rate maps. At that time, it is expected that Huntington Beach will no longer fall within a flood hazard boundary and flood plain development criteria will no longer apply 4 3.3 PROJECT FUNDING Drainage projects are funded primarily through drainage fees. The City collects drainage fees from property owners prior to issuing a building permit or recording a subdivision map in any drainage district and deposits this fee into a "planned local drainage fund" for the purpose of defraying the costs of constructing master-planned facilities in that district. It is important that the drainage fees accurately reflect current drainage needs and costs. As mentioned previously, the City's 34 drainage districts represent local runoff areas with different drainage characteristics and needs. The amount of the drainage fee is based on the estimated costs of master-planned facilities and varies for each drainage district. According to state law (Government Code Section 66483) fees collected from development activities in any one district can only be used to construct facilities in that district. The City faces a serious problem in the funding of needed drainage facilities. The total amount of projected revenues from drainage fees over the next five years is approximately five million dollars. (See Figure 3.6.) The approximate cost of completing the projects identified in the 1979 L. D. King Study as being necessary to provide adequate drainage to the City at ultimate development is approximately 30 million dollars. The fact that drainage fees cannot be transferred among districts poses additional problems. Lower priority projects in one area of the City may be constructed due to availability of monies while higher priority projects in other districts may go unfunded. 1 As mentioned earlier in this section, the Santa Ana River Project has not been approved by Congress as of this writing and improvements are not expected to be complete until after the mid 1990's. 31. CITY DRAINAGE FUND PROJECTED REVENUES Year Projected Revenues 1980-81 $700,000 1981-82 770,000 1982-83 847,000 1983-84 931,700 1984-85 1,024,870 Sub Total 4,273,570 Balance as of 6/30/80 1,011,971 Total $5,285,541 SOURCE: City of Huntington Beach, Finance Department, 1980. Figure 3.6 32. In many districts, current funds are inadequate to cover needed improvements. If little or no vacant acreage remains, only a small amount of additional adrainage fees can be expected from new development. In approximately 19' of the City's drainage districts, development of the remaining vacant acreage will not generate sufficient fees to cover needed improvements for the district. 1 r r 33. M�Q�C�G� DEFINITIONS ACRE - FOOT: The volume of water that would cover one acre of land to a depth of one foot. AQUEDUCT: A man-made channel for carrying a large quantity of flowing water. EMERGENCY RESERVE: Reservoir and groundwater capacity required to supply the City in the event that water from outside sources is interrupted. FIRE FLOW: Rate of flow in gallons per minute needed to confine and control a major fire in a building or the physical confines of an area. , FIRE RESERVE: That portion of the total water reserve intended to supply water f or fighting a serious f ire. GRID: A network of uniformly spaced perpendicular lines. This is the basic pattern used for , layout of the City's water pipelines. GROUNDWATER: Fresh water beneath the surface of the earth that supplies wells and springs. OPERATING STORAGE: Reservoir capacity required for acquisition of water at a steady rate from supply sources and to release it at variable rates during the day. PERCOLATE: To flow at a slow rate through a permeable substance. RESERVOIR: An artificial lake where water is collected and kept in quantity for use by a community. 4 ! ! 4. Water System 4.1 INTRODUCTION The provision of an adequate supply of water is a prerequisite to any ! development in the City. The water supply system must serve the demands of residents, commercial establishments, industrial processes, and fire fighting activities when necessary. Much of Southern California, including the City of Huntington Beach, has a ! semi-arid climate. The region lacks large bodies of fresh water and free flowing rivers; natural rainfall makes only a small contribution to the local water supply. For these reasons, much of the water supply for the region and the City is imported into the area from distant sources. The Southern California Metropolitan Water District (MWD), created in 1920, ' imports water from the Colorado River via the 242-mile-long Colorado Aquaduct and from the Feather River in northern California via the 240-mile-long California Aquaduct. The City of Huntington Beach is not a member agency of MWD but does obtain water from this source through other ag enc ies. 1 From 1930 to the mid-1950's, the majority of the City's water needs were provided for by a private entity called the Southern California Water Company. In 1955, the citizens of Huntington Beach approved a bond issue which enabled the City to purchase the private water company. Soon thereafter, with the passage of additional bonds, the City undertook major improvements to the system to enable it to accommodate anticipated future growth. Most notably 1 the City helped to construct pipelines to bring water from Metropolitan Water District (MWD) reservoirs into the City, thereby enlarging the potential supply. 1 35_ 1 1 - 1 California Aquaduct 1 ' 1 1 Colorado River City of Huntington Beach �( Aquaduct Underground Supply Source: Huntington Beach Water Division, 1980. 1 HUNTINGTON BEACH 04LIFORNIN Water Supply Sources 4 PLANNING DIVISION Figure 4.1 1 36 . Today the water system is owned by the City and operated through the Water Division of the Public Works Department. Customers are charged for water use at a rate approved by the City Council and set at the level necessary to cover operating expenses (water purchase and treatment, power supply, personnel salaries) and capital improvements. There are also 14 small private water companies in the City that serve older residential developments. The largest of these, Boulevard Garden Water Company, serves 83 residences. Water supply for these companies is by private wells. The intent of this section is to describe the existing City water system, indicate the nature of desired improvements and discuss issues that need to be addressed regarding the provision of future water supply facilities. In 1978, the City retained the consulting firm of Engineering Science to develop a computer model of the City's water system to analyze the existing performance of the water system and to recommend improvements. This study, completed in May 1979, is incorporated as a Technical Appendix to this element and is available under separate cover. The computer model can also be used to analyze the performance of the City's water system at ultimate development of the City's General Plan; however, this analysis has not been performed to date. 4.2 ANALYSIS 4.2.1 Existing Facilities Unlike sewerage and drainage systems, the City's water system does not depend upon the force of gravity to move water through the pipes. Rather, water entering the system (i.e., from wells and reservoirs) is pumped or "boosted" into the system at the point of entry. Water pipes are designed to flow at full capacity and at a constant pressure of 70-75 pounds per square inch (psi) at all times. One area of the City (Reservoir Hill, in the vicinity of Goldenwest Street and Clay Avenue) is at a substantially higher elevation than the rest of the City and additional pumping is utilized to maintain the required water pressure in this area. The City's water system can be described in terms of three major components: (1) supply, including wells and purchased water; (2) storage, including reservoirs and groundwater reserves; and (3) distribution, including transmission lines and other water pipes. In general, the City provides for supply and storage facilities and those distribution pipes which transmit water from these facilities to large areas of the City. The City requires developers to provide for the water facilities that serve individual developments. Supply The City obtains approximately 75 percent of its water from a large groundwater reserve which extends underneath the City. Eight wells varying in depth from 250 to 950 feet presently pump from this groundwater reserve into the City's system. One of these wells, HB8, is no longer in service due to poor 37 . AVAILABLE CITY WATER WITHDRAWAL RATES AND STORAGE VOLUMES Water Source Maximum Withdrawal Rate Storage Volume (gallons per minute) (million gallons) Peck Reservoir 13,900 16.0 Overmyer Reservoirs I and II 14,300 24.5 Groundwater Reservoir 1 17,700 3,000.01 San Joaquin Resevoir 6,700 130.0 1 For the purposes of this analysis, groundwater storage may be considered to be very large (in excess of 3,000 million gallons). SOURCE: Engineering Science, Computer Model of City Water System, 1979. f Figure 4.2 38. water quality. The combined pumping capacity of the remaining seven wells is 17,700 gallons per minute. The City's wells are tapping a common groundwater basin which approximately 1,000 wells from other jurisdictions are also utilizing as a water source. This groundwater reserve is replenished partly by natural percolation of surface waters and by deep underground transfer from upstream water sources. This groundwater is also replenished by the Orange County Water District which purchases water from MWD and conveys it into spreading basins where it percolates into the earth. The Orange County Water District was formed in 1933 to protect the County from upstream water interests and to manage water quantity and quality within the basin. The District's operations are financed primarily by a replenishment assessment which is applied to all pumping wells and is currently at a level of $30 per acre-foot of water. The 'City meets its remaining water needs by purchasing water from MWD via the West Orange County Water Board and the Mesa Consolidated Water District. The West Orange County Water Board, which is comprised of the cities of Huntington Beach, Westminster, Garden Grove, and Seal Beach, maintains and operates interconnecting pipelines from MWD's Diemer Treatment Plant to the participating cities. These pipelines connect with the Huntington Beach Water system at two locations: one connection (OC 9) located at the intersection of Newland and Edinger Streets, and a second connection (OC 35) located at the intersection of Springdale and Glenwood Streets. (See Figure 4.4). A third pipeline owned jointly by the City and the Mesa County Water District delivers water to the City from the San Joaquin Reservoir operated by MWD as trustee for the City and other owners. The connection of this line (OC 44) to the City water system is at the Santa Ana River and Adams Avenue. , For economic reasons, the City currently prefers to meet increases in water demand through the drilling of new wells rather than. through increased reliance on imported water. The cost of well water, including power costs, the pump tax and well amortization, is approximately $60 per acre-foot. Water from outside sources currently costs approximately $115 per acre-foot. The cost of imported water is expected to rise sharply in the near future due primarily to the pending renegotiation of existing water purchase agreements to reflect current electric power rates. It is becoming increasingly difficult to find good well sites in the City and the cost of drilling and equiping a new well can exceed $250,000, excluding land costs. The City currently has plans to construct two new water wells in 1981, one located in Sunview Park on Sher Lane south of Edinger Avenue and one located near the county flood control channel on Warner Avenue west of Magnolia Street. A third additional well is planned for construction in 1982. Storage Storage facilities are necessary for the functioning of a municipal water system and are used for three major purposes: (1) operating storage; (2) fire reserve; and (3) emergency reserve. Water is used by City residents at varying rates during the course of a day. Wells and other sources generally supply water at a fairly constant rate. Rather than match water supply and use directly, the City stores water in reservoirs for efficient daily operation and to meet peak demands. The amount stored for this purpose is called operating storage and is the reserve required to enable acquisition of water at a steady rate from supply sources and permit its release at variable rates during the day to users. 39. EXISTING CITY WATER STORAGE VOLUME AND WITHDRAWAL RATE REQUIREMENTS Type of Criteria Required Required , Storage Withdrawal Rate -Storage Volume (gallons per minute) (million gallons) Operating Volume equals 20% 12,900 9.32 Storage of maximum day demand Rate equals volume divided by 12 hours (720 minutes) Fire Re- Volume equals rate 3,000 0.72 serve times four hours (240 minutes) Rate equals 3,000 gpm Emergency Rate equals maximum 32,400 233 Reserve day demand Volume equals rate times five days SOURCE: Engineering Science, Computer Model of City Water System, 1979. Figure 4.3 40. Fire reserve is that portion of the total storage intended to supply water for fighting a serious fire. Emergency reserve is the storage required to supply the service area in the event that usual water supply is interrupted. Water storage for the City of Huntington Beach is provided for by three reservoirs located in the City (Overmyer I and II and Peck Reservoirs), one reservoir located in the City of Irvine (San Joaquin Reservoir), and local groundwater reserves. (See Figure 4.2). Overmyer Resevoirs I and II, located near the intersection of Garfield Avenue and Huntington Street, have a combined storage capacity of 24.5 million gallons. Peck Resevoir, located at Springdale Street and Glenwood Drive, has a capacity of 16 million gallons. Total combined capacity from these three reservoirs is 40.5 million gallons. The City owns approximately 15 percent (130 million gallons) of the total reservoir capacity in the San Joaquin Reservoir located on Irvine Company property in Newport Beach. Use of water from this reservoir is for emergency purposes only, such as a well outage or a period of unusually high water demand. Although the groundwater reservoir is not a reservoir "facility" in the usual sense, it functions in a manner analagous to manmade water storage facilities. The groundwater itself may be considered to be the reservoir, and the wells may be considered to be supply lines from the reservoir to the distribution system. Along with the ability to store adequate amounts of water, the City must be able to withdraw, pump and transport this water to users at adequate rates. For each type of storage need there is a corresponding withdrawal rate requirement. In its 1978 analysis of the City's water system, Engineering Science compared the City's storage and withdrawal rate needs with existing capabilities. Figure 4.3 shows the storage volume and withdrawal rates that Engineering Science considered necessary to serve the City at its present size. The City's existing facilities are generally adequate to meet current requirements. Operating storage and fire reserve needs can be met by either the Peck or Overmyer Resevoirs. In the event of a major emergency the Peck, Overmyer, and San Joaquin reservoirs in combination with the groundwater reserves can supply adequate water for the City. The City's Water Division anticipates that a greater withdrawal capacity from existing reservoirs will be necessary to meet future peak day water requirements. This could be accomplished by improving withdrawal facilities at either Peck or Overmeyer Resevoirs or both. Before proceding with such improvements, a detailed study of future storage needs and methods of meeting those needs will have to be undertaken. Distribution The City's water distribution system is designed and analyzed according to Public Works Department criteria which address per capita demand, pressure and flow characteristics, location and spacing of fire hydrants and other design considerations. 41. / HB 7 MWD OC 35 HB4•� PECK arm s Q •HB1 r • HB2 • HB 6 MWD OC 9 • HB 8 •HB5 •DYKE Ew, VERMYER IBII 2 4 /r r� MWD OC 44 .o.r., ■ Resevoir • Well Trunk Water Main �E Connection To Metropolitan Water District Source: Huntington Beach Water Division, 1980.Adft , HUNTINGTON BEACH CALIFORNIA City Waters stem PLANNING DIVISION y Transmission Mains, Reservoirs and Wells Figure 4.4 42 . The City's 415 miles of pipeline, ranging in size from two to 42 inches in diameter, carry water from supply sources to individual water users. Transmission water mains (larger than 12" in diameter) carry water from the ! two MWD interconnecting pipelines, the San Joaquin Reservoir interconnecting pipeline and the City's reservoirs to large areas of the City. (See Figure 4.4.) A distribution system of water lines branches off of these large trunk mains laid out in a basic grid pattern according to a "Master Plan" originally developed by the City's Public Works Department in the 1960's. This plan provided for 12-inch water mains in all of the City's arterials. ! In general, the relatively large water mains located in the City's arterials are adequate. There are, however, a few specific problem areas in the water distribution system. Water pipes in the City's Downtown are old, undersized, and in a deteriorating condition. Many of these pipes will have to be upgraded or replaced in order to meet the demands of significant new development. The City is annually upgrading older mains (several thousand feet of pipe per year) as part of an ongoing program. However, depending on the densities of new development in this area, further improvements will be necessary. ` The City's distribution system also contains a number of "dead ends". or uncontinuous loops. It is desireable for all water mains to be part of a continuous loop enabling water to approach any point in the system from two different directions. This increases the water flow and pressure throughout the system. To complete an uncontinuous loop a new water main is installed connecting the two dead ends. Providing adequate water service to properties fronting along Beach Boulevard requires special considerations. In most arterials, water mains run underneath and along one side of the roadway. To provide new water service connections to properties fronting along the opposite side of the arterial an open trench must be cut across the roadway or a hole bored underneath it. The open cut method can disrupt traffic and leave patches of repaved surface. The bore method can only be used when it is feasible to avoid existing oil, gas and electric pipelines also located underneath City arterials. Beach Boulevard is a comparatively wide State Highway with paved surface width in excess of 96 feet. In order to eliminate the need to open cut across the highway or bore underneath for long distances, the City's policy is to provide for installation of water mains on both sides of Beach Boulevard ultimately forming a continuious parallel line between Pacific Coast Highway and Edinger Avenue. 4.2.2 Proposed Projects The Water Division of the City's Public Works Department has compiled a list of water projects for implementation over a five year period to improve water supply, storage and distribution. These projects include, among other things, construction of a new water operations building and two new wells, replacement of old cast iron pipes in the Downtown, and completion of a number of 1 1 43. discontinuous loops in the distribution system-1 The projected total cost of these improvements is approximately 4 million dollars. The priority of projects can be based upon a number of considerations. High priority is generally given to projects which provide for adequate water supply such as the drilling of new wells. Eliminating fire flow deficiencies and other improvements to upgrade facilities that serve existing development should also be given high priority. Water projects that coincide with street improvements or the provision of other utilities should be. undertaken whenever possible. This avoids the need to redig trenches in the street again at a later date. Completion of loops in the water system can be given priority based on the types of facilities and number of people served by that portion of the system. i Lower priority can be given to improvements which may be needed only at ultimate development of the General Plan or to new pipes which would provide service to currently undeveloped areas. 4.2.3 Fire Flow Fire flow is the rate of flow in gallons per minute needed to confine and control a major fire in a building or within physical confines of an area. Requirements can vary according to building size and height, construction materials, proximity to other buildings, use of sprinkler and other fire prevention methods in the design of the building, and use of the building. Preliminary studies by the City's Fire Department have indicated numerous instances where water available in the system at a given point does not appear adequate to meet fire flow requirements of nearby buildings. This may be particularly true for the few older residential developments which are still served by private water companies and private wells.. The Fire Department is currently analyzing the entire City to determine the potential for fires and its ability to cope with these events. This will include a detailed report of areas and buildings which have severe fire flow deficiencies. Two basic approaches can be taken to correct existing fire flow deficiencies: (1) retrofit existing buildings and homes to render them more fire resistant (e.g., install water sprinkling systems), and (2) improve the City's water system 1 to carry greater flows in identified areas. If serious fire flow deficiencies are documented, improvements to the City's water system to correct these deficiencies may take precedence over other projects currently listed in the C.I.P. It is also important that the City review all new developments to ensure that future fire flow deficiencies are not ' created. 1 The new water operations building is discussed in Section S, Public Buildings. 44. 4.2.4 Private Water Companies As mentioned at the beginning of this section, there are 14 private water companies operating in Huntington Beach all supplied by private wells. In general, these private systems serve only a small number of users , and are cooperatively owned. The private systems contain substandard pipe sizes and are, for the most part, inadequate to meet the City's fire flow requirements. Because of these inadequacies, these systems have virtually no value to the City. More importantly, large expenditures would be required to bring the 1 pipelines up to City standards. The City may wish to consider providing water service to areas now served by private water companies on the condition that the companies or the affected property owners first upgrade the systems to meet City standards and to provide adequate fire flow. 4.2.5 Water Service to Other Jurisdictions i The City currently provides water service to several areas which are outside its jurisdiction. In 1965, the City bought the Sunset and Surfside Beach Water Company. A possible consideration may have been the potential City annexation of the service 'area. Today, the Surfside area is in the City of Seal Beach while Sunset Beach remains in the unincorporated area of Orange County. Facilities in the Surfside area currently require improvements. Because this area is in the City of Seal Beach, it would be more appropriate for that city to authorize and provide for facilities to serve its residents by purchasing the Surfside water facilities for their appraised value. In the case of Sunset Beach, there is no entity that could purchase and adequately maintain water supply facilities for this area, necessitating continuation of City water service to this area. 4.2.6 Maintenance The City cleans its entire water distribution system once a year by flushing water through the pipes to remove accumulation of debris and algae. Reservoir walls are also washed each year to remove mud and algae. Fire hydrants are repaired as necessary. The biggest on-going maintenance activity is servicing the large natural gas engines that run the water well pumps which require tune-ups, oiling, and replacement of worn parts. Maintenance and repair of the City's water system are performed by City employees with monies from the water fund. Current levels of personnel and funding are adequate.to perform required maintenance. / 4.2.7 Water Quality Although water quality is not a direct community facility concern it can impact the nature and location of water services. For example, new water wells cannot be located in certain areas of the City (e.g., close to the ocean) because of poor water quality. 1 1 45. CITY WATER FUND PROJECTED REVENUES Year Projected Projected Revenue Total Revenues Available for Capital Improvements) 1980-81 $ 6,657,000 $ 1,811,000 1981-82 6,779,000 565,000 1982-83 7,118,000 745,000 1983-84 7,474,000 750,000 1984-85 7,848,000 800,000 Sub-total $35,876,000 $4,671,000 Existing Balance 5,686,100 5,686,100 (as of 6/30/80) Total $412562,100 $10,357,100 i 1 Water Fund Revenues must cover the operating expenses (water purchase, power supply, personnel) as well as capital improvements. Approximately 10 to 20 percent of total water revenues can generally be allocated for capital improvements in any given year. i SOURCE:City of Huntington Beach Water Division, 1981. Figure 4.5 46. The City's drinking water currently meets applicable State standards. The U.S. Environmental Protection Agency (EPA), however, can and has adopted additional standards. For example, EPA recently adopted a new standard ! governing the allowable concentrations of a substance known as "Trihalomethane" in drinking water, and the City is currently testing its well water to determine if this standard is being met. In the event that water quality falls below some established standard, the City may have to decrease its use of groundwater or construct treatment facilities ! at individual well sites. Lack of space at existing well sites could be a constraint on the use of this latter option. 4.3 PROJECT FUNDING Improvements to the City's water system are funded primarily out of revenues ! generated by the sale of water to City residents. A smaller amount of money is also collected from water connection fees charged to new development based on acreage and/or number of units. Projected City water fund revenues for the years 1980-1985 are shown in Figure 4.5. Only a part of the total revenues can be used for capital improvements with the remainder necessary for operational costs such as personnel, water purchase, power supply, and system maintenance. The amount available for capital improvements varies each year depending upon total water sales, the price of purchased water and other factors. The City's Water Division estimates that approximately 4.6 million will be available for capital improvements during the years 1980 to 1985. The Water Fund also has an existing balance as of June, 1980 of approximately 5.7 million dollars. This amount of funds is expected to be adequate for water projects currently recommended by the Water Division. This does not include funds for extensive replacement of pipes in the Downtwon area which may be necessary depending on new development proposals nor funds for correcting all fire flow deficiencies that may be identified in the system. I / 1 1 47. Cl DEFINITIONS 1 ANNEX: A subsidiary or supplementary structure to the main service center such as a branch library. HELIPAD: A small landing and takeoff area for a helicopter. 1 HELIPORT: A landing and takeoff area for a helicopter which also includes facilities for maintenance, f ueling and storage of the aircraft. LEASE: 1 To convey or hold property under a contract by which one conveys real estate, equipment, or f acilities f or a specified term and f or a specified f ee. ROLLING STOCK: Vehicles including cars, trucks, fire engines, street sweepers, etc. 1 REVENUE SHARING: Federal revenue that is redistributed back to cities based on population, total taxes collected and relative income; the monies are not earmarked by the federal government f or specific programs and can be spent by the City f or a variety of purposes. 4 4 4 4 4 4 5. Public Buildings 5.1 INTRODUCTION The City owns 152 structures which provide space for a variety of activities such as government meetings, City staff functions, equipment storage and operation, recreation and cultural and educational services. The City incurs considerable costs in maintaining existing structures, and the construction of additional facilities can be a major expense. It is important that the space available in existing facilities be used efficiently and that all structures be provided adequate maintenance to avoid unnecessary repairs and premature deterioration. Appendix A. contains an inventory of City-owned buildings and structures including their location and approximate size. The majority of these structures are used for City functions and are maintained by City personnel. Several buildings, however, are leased to private entities for a variety of purposes with the tenants responsible for regular maintenance. The City also leases two buildings from other agencies for municipal use. 1 49. Yorktown Avenue De ..:.: eF ng :.... Ad : iq ilding ,. Poli 0 ncil I ' Hmbers c 'v � 0 y�J -N- Source: Huntington Beach Planning Division, 1981. 191 HUNTINGTON BEACH CAL IFORNIA General Layout of PLANNING DIVISION Huntington Beach Civic Center Site Figure 5.1 50 . 5.2 ANALYSIS 5.2.1 Civic Center The majority of the City's legislative and administrative activities take place in a modern 15-acre Civic Center complex which consists of four buildings, a large plaza, parking areas, and landscaped grounds. (See Figure 5.1.) The complex was constructed in 1973 to replace the old Civic Center at Orange and Main Streets which was deteriorating' and did not provide adequate space for governmental functions. To obtain funds for construction of the Civic Center, the Huntington Beach Public Facilities Corporation was formed in 1970 to issue bonds. These bonds, in contrast to the City's general obligation bonds, do not require voter approval and are not backed by City revenues. The original issue of the corporation's bonds was $11 million of which $9.5 million remained outstanding as of June, 1980. The Public Facilities Corporation leases the Civic Center to the City for an annual rental of $854,900. The lease commenced July, 1974, and extends for thirty years or until the bonded indebtedness of the Corporation has been paid. At the conclusion of the lease agreement, title to the Civic Center will be transferred to the City. The largest structure in the Civic Center is a five-story Administration Building containing government offices. The basement level connects to the adjacent Council Chambers and committee hearing rooms. A third building, the Development Wing, is also connected to the Administration Building. The fourth structure is a two-story Police building with jail facilities located on the basement level. A concrete plaza connecting the Police and Administration buildings is designed to resemble a large outdoor amphitheater and can be used for ceremonies, concerts, or other activities. The parking lots adjacent to the buildings contain approximately 470 parking spaces with special areas designated for visitor, employee and police parking. Building facilities at the Civic Center are currently adequate to meet the City's needs, and the site contains space for additional structures if necessary. Several additions have been suggested by City departments to meet anticipated future needs, including a third story addition to the Police Building and a mini-garage for maintenance of vehicles. These potential additions are discussed in more detail later in this section. An expansion of the Development Wing has also been proposed in the past to provide space for all development permit counters (building, planning, public works) on one floor. The need for this extension has not been clearly established. Parking facilities for the Civic Center are generally adequate. Several factors could contribute to the overloading of these parking lots in the future, however, such as increased use of the Council Chambers and meeting rooms by outside agencies during the day and increased numbers of City employees. Residential development of adjacent vacant lands may also eliminate parking spaces on local streets currently used for overflow employee parking. The City may wish to consider expanding its parking facilities in the future. Increased carpooling by City employees could help mitigate future parking needs. 51. i -• �- - r-� I I I I I 1 I 1 I 1 I I I I I 1 I i 1 I I I I I I I I I I 1 I I I I I I I I 0 Proposed Garages Ma ..`'` .`.' ce a. I 1 I N I 1 1 I I A i I 1 1 I I � I I 1 I I rt I 1 1 I I I I I I I I I I 1 I I I ,; fi n Fu 1 Isl nds Source: Huntington Beach Planning Division, 1981. Aeftk HUNTINGTON BEACH CALIFORNIA General Layout Of PLANNING DIVISION Huntington Beach City Yard Figure 5.2 52. 5.2.2 Public Works Maintenance Facilities City Yard The City Yard, also called the Municipal Yard or the Corporation Yard, was constructed in 1973. It is located on Gothard Street north of Slater Avenue and functions as the central maintenance, repair, and storage facility for City vehicles, equipment, and materials. (See Figure 5.2.) Facilities at the Yard include: (1) an administration building providing office space and facilities for emergency communications; _ (2) a mechanical maintenance building providing space for welding, machinery, street sweeper repair, vehicle washing, light and heavy vehicle maintenance, and storage of light tools, parts and paint; (3) a shop building housing personnel and equipment for sign painting and maintenance, carpentry, tree maintenance, sewer maintenance, plumbing, masonry, and supply storage; (4) two fuel islands; and (5) a garage providing storage for two paint operations and 16 vehicles. According to the Public Works Department, the work space in the mechanical maintenance building is underutilized and could accommodate additional activity. The utilization of this maintenance and repair facility could be ` increased by shifts working additional daily hours or days of the week. The Public Works Department has identified a need for additional covered storage space for equipment and supplies at the City Yard. The absence of such space requires that equipment be left outside where it is exposed to the elements and subject to rust and corrosion. One 7200-square foot storage building was completed in 1980 at a cost of approximately $275,000. Six additional buildings will be needed as soon as possible. These include a carport/warehouse facility estimated to cost approximately $450,000, three carports estimated to cost $275,000 each, and two carports estimated to cost $350,000 each. The addition of seven new buildings at the City Yard, however, will displace outside storage space. When the additional buildings are constructed an alternate outdoor storage space may have to be rented or acquired by the City. Parks Maintenance Yard The City's park maintenance yard is located on Gothard Street south of Slater Avenue and functions as the central facility for landscaping maintenance for all City parks, streets, public facilities and public rights-of-way. The site currently contains three older buildings (including a farm house and a recreation room) which have been converted into offices and maintenance and storage facilities. The free clinic located in the old Downtown Civic Center site will be relocated to the park maintenance yard in 1981 and used for additional office space. The Public Works Department has identified the need for a new building to replace the older converted facilities. Approximately 7,000 square feet of space is desired for offices and storage of maintenance equipment. Cost of the new facility is estimated at $600,000. 53. j. ' , � MURD � H611 �. WAR s� ...� g cGOTH RD Joint Powers Training Center owu. •uMs 0 / xowwoin 4A E 8�aintenare arage 11 uWln. /ur.w0 Source: Huntington Beach Planning Division, 1980. HUNTINGTON BEACH CALIFORNIA Current Fire Stations g Wha PLANNING DIVISION Figure 5.3 54 . 5.2.3 Fire Facilities Figure 5.3 shows the location of the City's fire facilities including seven fire stations, the Lake Street maintenance garage which serves both fire and police vehicles, and the Joint Powers Training Center. The existing Lake Street Fire Station and the maintenance garage have been declared unsafe under the City's 1979 earthquake ordinance and will be abandoned. The Fire Station will be rebuilt at 530 Lake Street at a cost of approximately $900,000. Construction is expected to be complete by 1982. The maintenance garage will not be relocated to the new Lake Street site. Alternative locations for this facility are discussed later in this section. A fire station consists of a large apparatus room for the fire-fighting vehicles and dormitory, kitchen, dining, and exercise facilities for the firemen. The City's fire stations are generally in good condition and adequate to house current levels of personnel and equipment. The Gothard, Magnolia, Murdy, Warner, and proposed Lake Stations are large enough to accommodate additional fire trucks and staff if necessary. The Bushard and Heil Stations would experience some overcrowding of dormitory facilities if personnel were added. The Joint Powers Training Facility located on Gothard Street north of Ellis Avenue, is a modern structure containing a Fire Operations (Communications) Center and a Training Center. It was constructed jointly by the four cities of Huntington Beach, Fountain Valley, Seal Beach, and Westminster to coordinate dispatching of fire-fighting units and training of personnel. Under a 1973 joint powers agreement, all fire calls for the four cities are received by computer at the communications center, which dispatches the closest fire-fighting units regardless of City boundaries. Fire-fighting personnel from the four cities receive training at the training center, which contains classrooms, fire-fighting equipment and a laboratory. The Center also contains a simulator room in which the responses and attack plans of fire-fighting personnel are tested against the projected image of a fire with conditions controlled by a programmer. The modern communications system and training equipment at the Joint Powers Facility are adequate for the needs of the four cities. The location of fire stations defines the basic fire protection coverage of any area within the City. Of prime importance is response time, which is basically a function of the distance from the fire station to the fire location and the p average speed of travel by fire apparatus. The Fire Department's goal is at least 90 percent of the time to reach the scene of a fire within five minutes after receiving a call. The current number and location of fire stations, along with the Joint Powers Agreement, generally can provide this level of service. There are two areas of the City where response times are frequently longer than the five minute response goal of the Fire Department. These are the northwest section of Huntington Harbour and, to a lesser degree, the area between Edwards and Goldenwest Streets, just north of the County's Bolsa Chica lowlands. i 1 55. These deficiencies could be eliminated by the construction of two new fire stations, one located north of the Bolsa Chica and one located at Graham Street and Edinger Avenue to replace the existing Heil Station. The cost of providing the Bolsa Chica station is estimated at $.1.25 million. The Graham Street A station (to replace the Heil Station) could be provided at slightly less cost, $900,000, since the City already owns a site at the desired location. At the present time, the deficiencies are not serious enough to justify construction of either facility. The Heil Street Station will not be relocated northward without construction of the Bolsa Chica Station since this would further reduce coverage to a deficient area. The need for the Bolsa Chica Station depends upon the future development plans for the lowlands which are now in the jurisdiction of the County of Orange. Options for the Bolsa Chica range from complete preservation as a wetland to dense development as a residential-oriented marina. If the northeastern section of the Bolsa Chica is extensively developed and is annexed by the City, then a new fire station will be required. At this time the Heil Station could also be relocated to the north. If a large number of high rise buildings are constructed in the City's Downtown or other location, additional personnel and equipment may be required. These additions, however, could most likely be accommodated at the City's existing fire stations. As discussed previously new facilities will be is needed to service fire and police vehicles that are currently serviced at the Lake Street Maintenance Garage. Alternative location for these facilities are being considered by the City. The most likely solution at this time is to provide special facilities at the City Yard in the existing mechanical maintenance building. Modification to the mechanical maintenance building to serve fire and police vehicles will cost approximately $78,000. 5.2.4 Police Facilities Capital facilities associated with City police activities include the police station, the jail, parking facilities, a helipad, heliport facilities, and a maintenance garage. As discussed previously, the police station is a two-story structure with a third basement level located in the Civic Center complex at Main Street and Yorktown Avenue. The two upper levels provide space for a main public service 4 area, records storage, traffic bureau, investigative division, administrative offices and other activities. The basement level contains jail facilities, an emergency operations center, the police library, and an exercise room. The building is designed to accommodate a third story. According to the Police Department, the Police Station at the Civic Center is adequate for existing levels of activity; however, the Investigation Division on the second floor is slightly crowded. The Department foresees the need for additional police personnel as the City's population increases and recommends that a third story be added to the station within the next five years to provide required working space. The approximate cost of adding this third story is $1.36 million. 56. Police vehicles are serviced at the Lake Street Maintenance Garage which is also used for maintenance of firefighting vehicles. The status of this garage . and the need for a new maintenance facility is discussed in Section 5.2.3, Fire Facilities. The City utilizes three helicopters for police patrol. A helistop, located on the roof of the Civic Center's Administration Building, can be used for brief stops, but does not provide necessary refueling, storage and maintenance facilities for . the three helicopters. The City owns a heliport with refueling and storage facilities near Gothard Street south of Talbert Avenue. Subsidence and unstable soil conditions at the site, however, have rendered it unsuitable for refueling and maintenance activities. The City is currently leasing facilities at Orange County Airport to . provide these services. The helicopters must refuel frequently while in use and the regular trips to the distant airport site require considerable amounts of flight time and gasoline. The City has recognized the need for a heliport located in or close to the City. One option is to provide refueling facilities within the City and to continue to . lease maintenance and storage space at the Orange County Airport. Another alternative is to provide complete heliport facilities at one location in or close to the City. For this latter option, acquisition of three acres of land and construction of heliport facilities is necessary at an estimated cost of $1.4 million. One likely site is the Joint Powers Training Centers and adjacent land on Gothard Street. A committee formed by the City Council has investigated . alternative heliport sites including Los Alamitos Air Station, McDonnell Douglas, Kaiser Aetna industrial area, industrial properties in Westminster, an Orange County Sanitation District site and other locations. A joint venture with a private developer has also been considered. No decision has been made to date. 5.2.5 Central Library and Annexes The Huntington Beach Library and Cultural Resource Center, located on a 10-acre site overlooking Central Park was constructed in 1975 and funded under a lease arrangement with the Public Facilities Corporation. It is a modern facility capable of holding 350,000 books, magazines, cassettes and other . materials. It also contains reading/study areas, a children's center, a large room for cultural events, a small bookstore and gift shop, administrative offices and a basement storage area. It functions as the City's main library and is centrally located to serve all residents. The City owns three smaller library facilities, or annexes, at the following locations: Main Street/Orange Avenue, Banning Avenue/Bushard Street, and Graham Street/Edinger Avenue. These annexes are intended to be neighborhood facilities providing more casual and personalized services than the Central Library. The Main Street Annex is located in an older structure that was formerly the ' City's main library. It is adjacent to the old Civic Center which will be removed to make way for a senior citizen housing and activity center. Both the Graham and Banning Street annexes are housed in small buildings that originally served as tract sales offices for residential subdivisions. The buildings were intended to serve as libraries on a temporary basis only. 57. The City Librarian has identified improvements which would enhance the City's library and cultural facilities. At the Central Library a need has been expressed for additional parking located adjacent to the building. Overflow parking for the library is currently accommodated by a parking lot located across `Talbert Avenue,. Additional parking is estimated to cost approximately $1509000. The existing pools and fountains both within and outside the library, are considered prohibitively costly to operate and maintain. An expenditure of . approximately $5,000 to modify and cut off some of the fountains will reduce these costs. The Central Library was designed to permit the addition of a learning resource center (children's wing). This wing has not been constructed and the existing children's center is occupying space in the library originally intended for book storage. Construction of the learning resource center as originally planned would cost an estimated $700,000. The addition of a small auditorium would enhance the main library as a cultural facility by providing a space for children's programs, lectures,, and other events. The existing all-purpose room, called the Talbert Room, at the library can be used for such events, however, the use of folding chairs and lack of graduated seating detract from its suitability for these functions. The cost of a 350-seat auditorium is estimated at $700,000. Improvements to the Talbert Room itself, such as new carpeting and interior decorating (at a cost of approximately $20,000) might increase .this facility's use by community organizations for meetings and social functions. The City 'Librarian also suggests that a 300-seat playhouse be constructed at the Library site, at a cost of approximately $300,000, to provide a forum for community theatre. The three library annexes also require capital improvements. The Main Street facility needs approximately $100,000 worth of interior remodeling and repair. Eventually, both the Banning and Graham Street facilities could also be enlarged and upgraded. There also exists a need for small annexes in other areas of the City to provide neighborhood library services in areas not currently served. Possible locations for additional annexes include the following areas: 1) Warner Avenue and Bolsa Chica Street, 2) Warner Avenue and Beach Boulevard, and 3) Magnolia Street and Yorktown Avenue. The cost of constructing these additional branch libraries is approximately $180,000 each. 5.2.6 Water Operations Building Operation and maintenance of the City's water system is performed by the Water Division which is part of the Public Works Department. Water Division operations are currently housed in several City buildings including the 58. Water Warehouse, the City Yard and the Civic Center. The City Council has approved the construction of a Water Operations Building to consolidate the Division's activities. The building will be located at the southwest corner of Garfield Avenue and Huntington Street adjacent to the Overmyer Reservoir and will contain offices, laboratory facilities, a meter shop and telemetering equipment. The proposed 8300 square foot structure is expected to be constructed by 1981 at a total cost of approximately $590,000. 5.2.7 Central Warehouse City departments store a variety of surplus and seasonal items in a number of City' buildings, many of which were not originally designed as warehouse facilities. For example, the old City Yard is used by the Public Works Department for storage of Christmas decorations, voting booths, extra light fixtures and other miscellaneous supplies. The Community Services Department stores sporting goods, athletic equipment, craft supplies, games, old furniture and other items in the Memorial Hall located at the Old Civic Center site. (This building is scheduled to be torn down when the senior citizen housing and activity center is constructed; recreation equipment will have to be moved elsewhere.) A sheet metal building at the recently abandoned Police heliport currently houses spare helicopter parts. Other facilities being used for storage include the current City Yard, the City Gym, and the Beach Maintenance buildings. The City is currently investigating the possibility of storing all supplies and equipment in a central warehouse. This could facilitate the purchase, receipt and distribution of supplies to all departments in a coordinated manner. A central warehouse facility of approximately 20,000 square feet in size would be desirable and could be located in the City Yard in place of some of the proposed covered equipment storage buildings. A cost estimate for including the facility in the City yard proposal is $450,000. If constructed separately, the central warehouse could cost considerably more depending upon land and improvement costs. 5.2.8 Recreation Facilities Prior to assessing the adequacy of recreation buildings it is desirable to evaluate the recreation needs of the community. A Recreation Element to the City's General Plan is being prepared which will discuss the appropriate number and location of recreation facilities including buildings. 5.2.9 Maintenance Maintenance of City-owned buildings encompasses such activities as painting, carpentry, plumbing, repairing broken windows, electrical work, janitorial service and indoor and .outdoor landscaping. The majority of the City's 152 structures are maintained by the City. The exceptions are City-owned buildings which are leased out to private entities for various purposes. In these cases the tenants are generally responsible for providing at least indoor maintenance, although the arrangements vary according to the individual leases. 59. EXISTING AND POTENTIAL CITY PUBLIC BUILDING NEEDS1 Project Cost Six storage buildings at City Yard $1,975,000 (including a central warehouse) Landscape Maintenance Building 600,000 (at Park Maintenance Yard) Lake Street Fire Station 1,039,500 Graham Street Fire Station (relocation of Heil Station) 900,000 Bolsa Chica Fire Station 1,250,000 Third story on Police Department building 1,360,000 (i) Police Heliport 1,400,000 Modification of Mechanical Maintenance Building at City Yard (for Fire and Police vehicle maintenance) 78,000 (5 Additional Parking for Central Library 150,000 Redesign Talbert Room at Central Library 20,000 Modify existing pools at Central Library 100,000 Remodel Main Street Library Annex 100,000 Construct 350-seat auditorium at Central Library 700,000 Construct learning resource center at Central Library 700,000 Branch Library (Beach Boulevard and Warner Avenue) 180,000 Branch Library (Springdale Street and Warner Avenue) 180,000 Branch Library (Adams Avenue and Bushard Street) 180,000 Redesign Heil Fire Station to a Library Annex 100,000 Biology Research Lab 1007000 Construct a 300 seat playhouse at Central Library 800,000 Total $11,912,500 1 This list does not include recreation buildings. These facilities will be discussed in a Recreation Element. Source: Huntington Beach Planning Division, 1981. Figure 5.4 60. Routine maintenance, when provided by the City, is generally performed by Public Works Department employees. The City's Civic Center and Central . Library, however, require certain specialized services on a regular basis which are contracted out to private companies. These are: monitoring and maintenance of the heating and cooling systems, janitorial service, indoor landscaping, and elevator maintenance. Major repairs such as reroofing a building may also be contracted for on an as needed basis. The Public Works Department is not budgeted adequately to perform major repairs or unanticipated maintenance on City Buildings. Monies are appropriated to individual Departments to cover these expenses and are shown in the budget as Maintenance, Buildings and Grounds Accounts ("440 accounts"). When utilizing their own 11440" account funds, City departments have the option to "contract" either with the Public Works Department or an outside firm to perform the special maintenance activities. According to the Public Works Department, personnel available for routine building maintenance (as well as special maintenance activities) are currently inadequate for existing need. Any addition of building space or maintenance responsibilities without an appropriate increase in maintenance personnel will further decrease service to all structures. 5.2.10 Leasing Activities The City owns several buildings which are leased to private parties. Food concessions on the Municipal Pier and in Central Park fall into this category, as does Maxwell's Restaurant located at the base of the Pier. The City also owns and leases out a residence located on a Downtown lot dedicated to the City as a future park site. Two commercial buildings and a residence located in the Downtown were acquired by the City through past redevelopment efforts and are leased to private parties. Coordination of these leasing activities is currently handled by the Community Services Department. 5.4 PROJECT FUNDING The estimated cost of the building needs identified in this section exceeds $11 million dollars as shown in Figure 5.4. Construction of public buildings and structures can be funded through a variety of sources. The Huntington Beach Civic Center and Central Library, for example, were funded through the sale of bonds. Construction of the new Water Operations Building is being accomplished using Water Utility funds. Monies for a new Lake Street Fire Station are expected to come, in part, out of the City's Housing and Community Development (HCD) Grant. An additional source of funding for public buildings is the revenue sharing monies that the City receives from the federal government which total approximately $1.6 million per year.1 However, the City generally transfers 1 The U.S. Congress has authorized the payment of revenue sharing monies to the City through October 1983. Beyond that date, the City may receive a greater or lesser amount (or no amount) of revenue sharing monies depending upon congressional actions. 61. most of its general revenue sharing monies into a capital outlay fund which is used primarily for the purchase of a wide variety of items such as automobiles, , trucks, furniture, data processing equipment, office machines, carpet replacement, paint, library books and many other items. In short, there is no one method for obtaining funds to construct public buildings. It is highly unlikely that construction of all the buildings identified in this section can be adequately funded in the near future. The City will have to , establish priorities for its building needs and/or agressively seek outside sources of funding. i 62. lop R Oo DEFINITIONS CABLE TELEVISION: A system of television reception in which signals from distant stations are picked up by a tall or elevated antenna and sent by cable to individual homes. FOSSIL - FUEL Fuel originally derived from living things, for example, coal, oil and natural gas. QUASI- PUBLIC Essentially public (as in services rendered) although under private ownership or control. SANITARY LANDFILL A facility for trash and garbage disposal in which the waste is compacted and covered daily with a layer of dirt to control odors, rodents, and insects. STEAM TURBINE: A rotary engine actuated by a current of steam. TRANSFER STATION (for refuse disposal): A facility where many individual refuse trucks can transfer their loads into larger trucks which then travel to a sanitary landfill for ultimate disposal. UNDERGROUNDING: Burying utility wires underground to eliminate unsightly poles and cables. 6. Utilities 6.1 INTRODUCTION The City of Huntington Beach is served by a number of quasi-public utilities and private companies which provide needed services to the community. This section briefly describes the entities that provide electricity, natural gas, telephone, cable television, and refuse collection services to the City and the location of associated buildings and equipment. 6.1.1 Electricity The Southern California Edison Company supplies electric power to the City of Huntington Beach. The primary electric facilities that Edison operates in the ` City are the Huntington Beach generating station, the Ellis transmission substation, and the Bolsa, Oceanview, Slater, Wave, Recovery and Hamilton distribution substations. (See Figure 6.1.) The generating station produces high voltage power which is reduced by the transmission and distribution substations to a lower voltage level for consumer use. 63. r i s ` 1 _ 1 -r--I a 1 - � - 1 .u„ 44 .WM! 66 KV. Line 220KV. Line • �� ■ � Generation Plant .....� © Transmission Substation Distribution Substation Source: Huntington Beach Planning Division, 1980. HUNTINGTON BE4CH C4LIFORNIA Location Of PLANNING DIVISION Principal Electrical Facilities In Huntington Beach Figure 6.1 64. Generating Station The Edison generating station is located on 103 acres of Edison-owned land fronting on Pacific Coast Highway between Newland and Magnolia Streets. It is the major source of electric power in Orange County and contains four large fossil-fueled steam turbine generating units and one gas-turbine peaking unit, giving it a total generating capacity of approximately 991,000 kilowatts.1 A recent proposal to construct additional major generating facilities at the site of the Huntington Beach plant was rejected by the California Energy Commission because of air quality rules in effect for this area and the site's proximity to coastal wetlands. Edison, however, continues to regard the site as potentially viable for expansion if future circumstances so warrant. Of all the utilities located in the City, the Huntington Beach generating station has perhaps the most significant impacts on the environment. The facility releases pollutants into the atmosphere, including sulpher dioxide, oxides of nitrogen, carbon monoxide, rust particles, acid mist and dark smoke. The intake and discharge of seawater for the plant's cooling system may adversely impact water quality and marine life. Visual appearance and noise are additional impacts associated with the plant. It should be noted, however, that the generating station is currently operating within the guidelines established by all applicable air quality rules and regulations. Also, offshore marine monitoring has been conducted in accordance with specifications outlined in NPDES Permit No. CA 0001163 and administered by the California Regional Water Quality Control Board, Santa Ana Region and the data shows there has been no apparent adverse environmental impact from the operation of the station. Substations The Ellis transmission substation provides electric power to the distribution substations in the City so that local electric needs can be met. The Bolsa, Slater, and Wave substations service the western portions of the city, including Huntington Harbour and the Oldtown and Townlot portions of the coastal zone. The Recovery substation specifically serves the Aminoil facilities located in the resource production area of the coastal zone. The Hamilton substation serves the southeastern portion of the City and the western portion of Costa Mesa; Oceanview substation serves the northeastern section of the City, the southern portion of Westminster, and the northwestern portion of Fountain Valley. Ability of Present System to Serve The City In terms of power supply, Edison's main concern is provision of the necessary generating capacity to satisfy demand. Power supply is planned on a regional rather than specific area or city basis. An Edison Company representative indicates the Company anticipates no difficulty in providing service to present or future customers in the City; however, supply could be constrained by an unexpected fuel shortage or an increase in demand which exceeds current estimates. The Edison generating plant in Huntington Beach is part of a 15-county network whose transmission lines are interconnected, forming a complex system which functions beyond the basic task of carrying power in one direction. If line interruptions occur, alternate routes carry the power flow. When local demand exceeds the generating capability of the Huntington Beach plant, additional capacity can be called upon from outside the County. 1 Kilowatt = 1,000 watts 65. L-- i � R F...FN [IIN161f � a Nfll \ f FllFfF ILLK wumo � /, •*owN AMMS E \ J / moun.F'oui V 1FlNL wpnvn� High Pressure Pipeline A 0— District Regulator Station /..NN G Note: Regulator stations are shown by the closest intersecting streets and may be on any corner of that intersection, not necessarily where shown. Source: Southern California Gas Company, 1980. ,Approximate Location Of HUNTINGTON BEACH C4LIFORNIA High Pressure Gas Pipelines And PLANNING DIVISION District Regulator Stations Figure 6.2 66 . 6.1.2 Natural Gas The Southern California Gas Company supplies natural gas to the City of Huntington Beach. The primary gas facilities in the City are located underground and include gas pipelines and distribution regulator stations. (See Figure 6.3.) Over ninety percent of the natural gas used by City residents is produced in Texas. Large transmission lines carry this gas under high pressure to California where it is transmitted to individual cities through a network of high pressure lines. Distribution regulator stations eventually reduce the gas pressure to a level appropriate for consumer use. The Gas Company has plans to locate one additional regulator station in Huntington Beach in the vicinity of Yorktown Avenue and Brookhurst Street. A company representative has indicated that, with the addition of this facility, existing major gas lines and regulator stations in the City will be adequate to meet current and expected future demand for natural gas. 6.1.3 Telephone The General Telephone Company provides telephone service to the City of Huntington Beach. The Company's Orange Division Headquarters are located in the City at Slater Avenue and Gothard Street and contain a business office, service office, construction office, switching room and maintenance yard. There are also three central offices in the City housing the switching room facilities which distribute and connect individual calls. (See Figure 6.2.) Telephone poles and cables throughout the City transmit calls to individual users. The Telephone Company's Forecast and Marketing Division evaluates monthly reports of the City's building activity and development plans which it combines with region wide economic trends to project telephone service needs. These projections are forwarded to the engineering section in the Huntington Beach office which determines the location and type of facilities such as cables and switching equipment that will be needed to provide adequate service. 6.1.4 Cable Television Cable television began in the late 1940's when television salesmen in mountainous regions built large master antennas on top of mountains for better reception and extended cables downhill, often attached to trees, to connect to subscribers homes. Today, cable television is of widespread interest and has the potential to be part of an intricate communication system. Dickinson Pacific Cab.lesystems is currently constructing cable television facilities in the City under a franchise agreement with the Public Cable Television Authority of which the City is a member. Construction of the City's system began in early 1980 with the first subscriber being "switched on" in July of that same year. Cablesystems anticipates that construction of the entire system will require an additional two years. In approximately 20 years, ownership of the System will revert to the City at no cost. 67. GENERAL TELEPHONE COMPANY OFFICES IN HUNTINGTON BEACH Facility Location Business Office 7352 Slater Employment Service Construction Switching Room 17551 Gothard Huntington Beach Central Office 6th & Main (Switching Room) Warner Central Office 17111 Bolsa Chica (Switching Room) Bushard Central Office 19111 Bushard (Switching Room) Phone Mart 10106 Adams Phone Mart 77 Huntington Center SOURCE: General Telephone Company, 1981. Figure 6.3 68. The most visible cable television facility located in Huntington Beach is a 100-foot T.V. antenna tower located on Talbert Avenue between Beach Boulevard and Gothard Street. This tower receives the,signals of local stations in Orange and Los Angeles counties. A large, dish-shaped structure, located adjacent to the tower, receives signals from orbiting satellites to pick up stations throughout the country. These signals are processed by electronic equipment housed in a building at this same site known as the "head-end" facility and transmitted through insulated cables to individual homes. The cables are buried underground or located above ground alongside existing utility wires. The cable television system that serves Huntington Beach provides for a 35-channel service, including a community access channel for locally generated programs. Cablesystems plans to construct a production studio at the Talbert Avenue location which will be available to community groups. The system is also being built with the ability to incorporate two-way communication programs, such as home security systems, which transmit burglar, fire or medical alarms to the appropriate emergency service. 6.1.5 Refuse Collection and Disposal The City recently signed a ten-year franchise agreement with the Rainbow Disposal Company to collect trash from residential, commercial and industrial properties in Huntington Beach. The City pays for collection service from single family, duplex, triplex and four-plex residential units with individual trash cans at a monthly rate on a per unit basis. Four-plex residential units with trash bins, multi-family residences of five or more units, and commercial and industrial units contract with Rainbow Disposal on.an individual basis. Rainbow Disposal owns and utilizes a maintenance garage and yard in Huntington Beach located at 17121 Nichols Street, east of Gothard Street, south of Warner Avenue. The City identified this site as requiring screening to improve its visual appearance. Rainbow Disposal recently aquired additional _ land immediately adjacent to the existing site and has plans to construct 'new maintenance facilities and offices, including off-street parking for refuse trucks and employees. Rainbow Disposal is also considering the development of a recycling center and a private transfer station at this same location. Refuse collected from City residents contains many materials which can be recycled rather than discarded, such as paper, tin, aluminum and glass. Rainbow Disposal is seeking funds to develop a recycling center at its Nichols Street facility which will buy these materials separately from citizens and also contain equipment to separate these resources out of normal refuse after it has been collected. Another method is for City residents to separate materials at the household level before it is collected. Refuse generated in the City of Huntington Beach is ultimately disposed of in the Orange County Coyote Canyon Sanitary Landfill located in the City of Irvine. This facility is almost full and is expected to close in 1983. At that time, plans call for waste to be disposed of in the Bee Canyon Landfill located adjacent to the El Toro Marine Base. 69. CITY UNDERGROUND UTILITY DISTRICTS District Location Approximate Approximate Number Date Cost Completed 71-1 Goldenwest St., Slater Ave. to Taylor St. 1-1-73 $145,000 72-1 Mansion Ave., Goldenwest to 500 feet east 7-1-73 85,000 thereof 72-2 Newland St., Adams Ave. to 2000 feet 7-1-72 80,000 southerly thereof 72-3 Warner Ave., Algonquin to Sims St. 12-31-72 25,500 72-4 Goldenwest St., McFadden Ave. to 1/4 12-31-72 40,000 mile southerly thereof 72-5 Magnolia St., Atlanta Ave. to Hamilton 12-31-72 75,000 Ave. 73-1 Magnolia St., Atlanta Ave. to 500 feet Dropped ----- northerly 73-2 Goldenwest St., Slater Ave. to Heil Ave. Dropped ----- 73-3 Goldenwest St., Edinger to Bolsa Ave. Dropped ----- 73-4 Mansion-Yorktown, 500 feet east of Main Estimated 180,000 to Delaware completion June, 1981 74-1 Warner Ave., Graham Ave. to Goldenwest 12-31-76 550,000 St., Goldenwest St., Warner Ave. to Norma Dr. 75-1 Warner Ave., Goldenwest St. to 100 feet 6-30-77 80,000 east of Gothard St. 78-1 Warner Ave., Graham Street to Pacific Estimated 1,000,000 Coast Highway completion May, 1981 SOURCE: City of Huntington Beach, Public Works Department, 1981. Figure 6.4 70. The County operates a transfer station located in Huntington Beach on Gothard Street, south of Talbert Avenue. At this facility, many individual trucks from Huntington Beach and adjacent municipalities transfer their loads to larger county trucks which make the trip to the Coyote Canyon Landfill. Hauling larger loads to the landfill as opposed to numerous small loads is a more efficient use of personnel, trucks and fuel. At present, facilities at the transfer station are inadequate to accommodate the total amount of wastes generated in Huntington Beach and surrounding communities. A representative from Rainbow Disposal indicated that the transfer station was accepting only 45 percent of the refuse collected in the City. Rainbow Disposal hauls the remaining 55 percent- to Coyote Canyon Landfill in its own trucks. When this landfill closes in 1983, Rainbow may have to haul refuse approximately ten miles further one-way on congested arterials, to the Bee Canyon Landfill which may cause refuse collection rates to increase in Huntington Beach. The County has no plans to upgrade the transfer station P in the near future. 6.1.6 Undergrounding The technology exists to bury most utility lines and cables underground to eliminate unsightly overhead wires and utility poles. The City of Huntington Beach requires that new utility lines and distribution facilities be installed underground according to the specifications outlined in Chapter 17.64 of the Municipal Code. The City can, by ordinance and after public hearing, designate undergrounding e districts in which it is unlawful to employ or operate existing poles, overhead wires and associated overhead structures after a specified date. An underground utilities coordinating committee comprised of City staff and utility representatives is responsible for recommending to Council the location, priority and completion time for conversion work within the City. The Edison Company allocates approximately $280,000 per year to the City for undergrounding projects in these designated districts. The General Telephone Company has agreed to underground telephone wires in conjunction with Edison conversion projects. Private property owners in undergrounding districts are responsible for the costs of conversion work on their premises. Figure 6.4 shows the City's existing utility undergrounding districts along with the date conversion work was completed and 'the approximate cost. Undergrounding is currently in progress in District 78-1, Warner Avenue from Graham Street to Pacific Coast Highway. Edison allocations through the year 1982 will he advanced to fund this project which will have a total ro.st of approximately one million dollars. Estimated r.omplotlon datd fair th18 pf0joct is June, 1981. A second undergrounding project is currently under construction along Yorktown Avenue from Main Street to Delaware Street. Conversion of overhead utilities in this district (73-4) has been coordinated with the realignment of Yorktown Avenue and 17th Street with an expected completion date of June, 1981. In 1977, the City's Underground Utilities Coordinating Committee recommended priorities for establishing future undergrounding districts as shown in Figure 6.5. The City may wish to update these priorities and related project costs prior to establishing any additional Undergrounding Districts. 71. POTENTIAL CITY UNDERGROUNDING DISTRICTSI Approximate Cost Location (in 1978 dollars) Magnolia Street - Atlanta to Adams $216,000 Warner Avenue - Gothard to Beach 136,000 Yorktown - Newland to Delaware 162,000 Downtown Area bounded by Pacific Coast Highway, Orange, Third, Fifth Indeterminate Edinger - Beach to Goldenwest ($200 per foot, 66 KV 1,080,000 and 12 KV) 1 Recommended by the City Underground Coordinating Committee - 1977. SOURCE: City of Huntington Beach, Public Works Department, 1981. Figure 6.5 72. . co D�MES a, �c�c��oo� � 7. Concluding Issues This section briefly summarizes the status of the City's sewerage, drainage, ` water, public building and utility systems with respect to existing condition and funds available for improvements. Following-this summary is a discussion of the City's ability to adequately maintain and operate its community facilities. Lastly, this section discusses the role of the Capital Improvements Program in implementing the policies contained in this Community Facilities Clement. ' 7.1. Status Summary As the preceding sections have indicated, the community facility systems that serve the City are in various states of adequacy with various amounts of funding available for improvements. The City's sewerage system is functioning adequately to serve existing development, although a number of facilities are nearing capacity or are expected to exceed capacity at ultimate development of the General Plan. Vacant areas must be sewered before development can occur. There are also several County sewers and pump stations that have been identified as potentially undersized. City sewers in the Downtown area generally have r adequate capacities but are in a deteriorated condition and may have to be replaced or relocated as existing land uses in the area are recycled. The City expects to have adequate funds over the next five years to construct the majority of sewer projects which have been identified as necessary. This does not include improvements to Downtown area sewers which, although deteriorating, are not expected to cause major problems within the next five years. 73. The City's drainage system is not adequate to meet the City's goal of carrying runoff volumes during 10- to 25-year storms. Numerous drainage deficiencies exist throughout the City including the Downtown area. County flood control facilities which traverse the City are also inadequate to carry desired flows. Because drainage facilities are not heavily utilized on a day-to-day basis, the problems may not be as apparent or seem as important as sewerage and water deficiencies. However, when a large rain storm does occur, inadequate drainage facilities, particularly pump stations, can result in extensive flooding of streets, property and even structures. Projected revenues from the City's drainage fees are not expected to adequately fund needed improvements. Furthermore, state .law greatly limits the ability of the City to transfer drainage fees from one district to another or from master planned to non-master planned facilities in order to fund most needed projects first. The City's water system is functioning adequately to meet the day-to-day needs of City residents. There are indications, however, that the system contains fire flow deficiencies and might not provide adequate water to fight a major fire in certain buildings or developments. The City's Downtown area contains water pipes which are corroding and are potentially undersized to serve new development. The City expects to collect adequate monies from the sale of water to fund projects which the City's Water Division recommends to increase overall water supply and system efficiency. This includes a limited program of pipe , replacement in the Downtown area but not extensive improvements which may be required if new development is intense. This also does not include projects to correct fire flow deficiencies. The City's public structures are generally adequate to meet current needs but do contain some deficiencies. Some activities are taking place in older structures not originally designed for their current use. There is also a need for more covered storage space to prevent unnecessary exposure of vehicles and equipment. Two facilities, the City's heliport and the fire/police maintenance garage, have been or will soon be vacated due to poor condition. Alternate space for these functions will have to be provided. There is no single established source of funds for public building improvements and it is unlikely that adequate monies can be obtained in the near future to construct all the improvements and new structures suggested by City departments. Electricity', natural gas, telephone, refuse collection and cable television services for the City are all provided by outside agencies. The opportunity for direct City input into the planning and design activities of these agencies is limited. The City can, however, promote as much voluntary coordination and exchange of information between these agencies as possible to help insure adequate facilities and avoid repeated improvement projects in the same City arterials. 74 . 7.2 Maintenance Costs All community facilities require regular maintenance. Pipelines must be cleaned to prevent clogging and buildup of corrosive residues. Motors which run pumps must be oiled and checked for worn parts. Structures must be cleaned, painted, reroofed and otherwise repaired. If not adequately- maintained, community facilities are likely to function improperly, break down frequently and deteriorate rapidly posing a threat to public health and safety and requiring large expenditures to correct. Maintenance of the City's sewerage, drainage and water facilities is currently adequate to keep these systems in good repair and prevent unnecessary deterioration. As new facilities are constructed, however, it will be necessary to increase maintenance expenditures or existing levels of maintenance will be significantly reduced. Personnel available for maintenance of the City-owned structures are not adequate to serve existing need. Any addition of building space or maintenance responsibilities without an appropriate increase in maintenance personnel will further decrease service to all structures. As shown in Figure 7.1, over $1.9 million was spent from the City's General Fund in fiscal year 1979/80 on maintenance of sewerage, drainage and public building facilities. This does not include maintenance of water facilities which is funded through water revenues nor maintenance of City streets and parks which were not addressed in this element. Figure 7.1 also does not include major capital outlays for new maintenance equipment and buildings since the cost of these durable items cannot meaningfully be assigned to any one year.- As Figure 7.1 also shows, maintenance expenditures for City sewerage, drainage and public building facilities represent approximately five percent of the total general fund budget. These costs have been increasing over the past five years and the City can expect this trend to continue as the cost of salaries and materials rise, as existing facilities age, and as additional new facilities are constructed. Funds for construction of most new facilities occur as a one-time fixed cost. The cost of adequately maintaining these facilities, however, will recur year after year and most likely increase. It is important that the City consider its ability to adequately maintain existing and proposed new facilities prior to approving construction of new facilities. Otherwise, the City may end up with extensive public works systems and structures which it cannot afford to service and repair. 1 In order to provide acceptable levels of maintenance for community facilities the City will have to appropriate adequate monies from the City budget or seek sources of additional funds (e.g. assessment districts). 1 I 75. MAINTENANCE EXPENDITURES FOR CITY SEWERAGE, DRAINAGE AND PUBLIC BUILDING FACILITIES - 1975 TO 1980. FISCAL MAINTENANCE PERCENT TOTAL PERCENT OF YEAR EXPENDITURES CHANGE GENERAL FUND GENERAL FUND EXPENDITURES SPENT ON MAINTENANCE 1975/76 1,229,782 -- 23,991,101 5.1 1976/77 1,559,599 26.8 27,933,705 5.6 1977/78 1,660,631 6.5 29,931,474 5.5 1978/79 1,809,146 8.9 33,594,546 5.4 1979/80 1,975,756 9.2 37,864,532 5.2 NOTE: The above expenditures do not include utility costs. SOURCE: Huntington Beach Planning Division, 1981. Figure 7.1 76 . One method of ensuring that maintenance costs are considered is to include an estimate of these costs for each project listed in the City's Capital Improvements Program. Another method is to require that a "maintenance impact assessment" report be prepared for all proposed capital improvement projects prior to their review by the City Council and/or Planning Commission. The issue of adequate maintenance for community facilities deserves a more detailed analysis than has been presented in this brief discussion. Such an analysis could include a discussion of total maintenance costs for all facilities including the street, park and water systems, a historical comparison of maintenance expenditures to the total stock of community facilities, a cost benefit analysis of increased maintenance activities, measures of maintenance costs per unit (e.g. maintenance cost per square foot of building space), and alternative sources of funds for maintenance activities. 7.3 Operating Costs Once constructed, some community facilities operate with no cost to the City except for regular maintenance. Examples of such facilities include water pipes, gravity flow sewers and storm drainage catch basins. Other facilities, however, require additional costs in order to function. Pump stations, for example, require a power supply in order to operate. Building space, depending upon its use, may require heating, lighting, telephone and water services and even additional personnel in order to serve its intended function. It is important that the City assess its ability to provide for these operating expenses as well as for maintenance costs prior to approving a new community facility. Like maintenance costs, an estimate of operating costs for each project could be listed in the City's Capital Improvements Program or included in a special report to be prepared for all proposed projects prior to their review by the City Council and/or Planning Commission. 7.4 Capital Improvements Program The Capital Improvements Program (CIP) is a major tool for implementing the policies contained in this Element. A CIP is a long-range schedule of specific projects along with their estimated costs (including annual maintenance and operation) to be built or purchased by the City during the next five to ten years. In the program, all future projects are listed in order of, priority. Proposed funding sources and estimates of available monies are included so that decision makers are aware of which projects the City can realistically expect to implement within the given time period. A five-year programming period is generally considered to be most suitable. Two or three years is too short for effective programming because planning and financing of major facilities usually takes a longer period of time. Conversely, a period of seven or more years may project the program too far into the future to be of practical value. I 77. Projects listed in the CIP involve the purchase, construction or replacement of the physical assets of the community such as a civic center, fire station, library, park, parking area, playground, flood control channel, water well, sewer pipe, and street lighting system. The benefits of preparing a CIP are several: (1) it requires departments to consider their future needs; (2) it provides a means for scheduling expenditures so that the City can maintain a sound financial position; (3) it provides for the purchase of land in advance of actual need; (4) it schedules the timing of public improvements so that the City can make economical use of personnel and equipment; and (5) it balances competing pressures for limited funds. State law (Section 65400 of the California Government Code) requires that public works projects be reviewed for conformance with the City's General Plan. The policies and general priorities contained in this Community Facilities Element will be the basis for determining this conformance. In order to make a meaningful assessment, the exact nature and purpose of each proposed project must be clearly stated in the CIP. The entire CIP can then be judged as to whether it successfully carries out City policy as expressed in this element. It is the intent of this Element to provide for transition from the General Plan to the CIP and the subsequent one-year City budget thus providing a vital link ' between long range policy and yearly City expenditures. 78. _ Do lop $. Policies This section presents the City's policies regarding the provision of community facilities. These policies are grouped around five issue areas: (1) Adequacy of Facilities, (2) Financing, (3) Siting and Design, (4) Conservation, and (5) Coordination. Implementation of these policies will occur primarily through the implementation of the City's capital improvements program. Additional implementating actions will be required, however, such as preparation of feasibility studies, revision of standards, and increased coordination with other entities. 8.1 ADEQUACY OF FACILITIES This Element has identified a number of deficiencies in the City's existing community facilities systems. Additional deficiencies may be expected to occur when the City is developed to ultimate buildout under the General Plan unless corrective actions are taken. The following policies state the City's intent to correct existing deficiencies where funding permits and to ensure that new development is adequately served. 1. Promote the provision of adequate community facilities within the City of Huntington Beach. 2. Pursue funding for projects to correct existing deficiencies in community facility systems. 79 . 3. Prior to issuance of a development entitlement, the City shall make the finding that adequate services can be provided to serve the proposed development, consistent with policies contained in the plan, at the time of occupancy. 4. Prior to constructing new community facilities, consider the impact of those facilities on annual maintenance and operating costs and staffing requirements for maintenance. 8.2 FINANCING The City will not have sufficient revenues in any one year to complete all the improvements identified in this Element. Rather, these projectsvill have to be initiated over a period of at least five years. For some facilities, such as the City's drainage system, regular sources of revenue are not expected to be sufficient over the next five years to complete all necessary projects. In these cases, projects must be postponed or additional sources of funding must be obtained. The following policies outline the general criteria that will be used by the City to establish priorities for future projects and set forth the City's intent to pursue additional funding where necessary. 5. Use the following priorities as the primary basis for allocating sewer , funds: (1) Overloaded pump stations. (2) Overloaded sewer pipes in developed areas. (3) Improved facilities in areas of infill, where needed. (4) Facilities to serve new development in primarily vacant areas. 6. Evaluate the City sewer fees annually and adjust them as required to reflect current sewer needs and construction costs. 7. Investigate the feasibility of establishing a per volume fee for handling all industrial waste water discharges in excess of 3,000 gallons per day per acre of industrial use into the City's sewerage system. B. Use the following priorities as the primary basis for allocating drainage . funds within individual districts: (1) Facilities which are unable to adequately carry runoff from 10-25 year storms and pose hazards to structures. (2) Facilities which are unable to carry runoff from 10-25 year storms and pose hazards only to streets and lawns. (3) Facilities to serve new development in vacant areas. 80. 9. Evaluate drainage fees annually and adjust them as required to reflect current drainage needs and construction costs. 10. Investigate additional sources of funding for drainage improvements where critical projects have been identified and it is expected that drainage fees will be inadequate. 11. Establish drainage districts and fees for areas of the City not currently in a district where such action will serve community needs. 12. Use the following priorities as the primary basis for allocating water funds: (1) Maintaining adequate water supply . (2) Eliminating fire flow deficiencies (3) Improvements to facilities serving existing development (4) Reservoir capacity and withdrawal capability \ (5) Facilities to serve new development in primarily vacant areas. 13. To minimize costs, emphasize the drilling of new wells to increase water supply where necessary as opposed to increased utilization of purchased water. . 14. Pursue actions to discontinue the provision of City-owned water service to the Surfside beach area, if feasible. 15. Provide sufficient maintenance funds to protect the City's investment in its community facilities. 16. Study the feasibility of alternative methods of financing maintenance activities. 8.3 SITING AND DESIGN A basic concern regarding the design and location of any component of a . community facility system is that it adequately perform its intended function. There are additional concerns beyond this basic requirement, however, including the efficiency of the total system, its impact on the environment, ease of maintenance and coordination of improvements so that individual sites are not repeatedly impacted. The following policies address these concerns: 17. Coordinate the installation of community facilities with street improvements where possible. 18. Minimize repetitive open trenching of the City's arterials for the installation of community facilities. 19. Design new sewer facilities in accordance with the design criteria contained in the Lowry Sewer Study; design new drainage facilities in accordance with the design criteria contained in the L. D. King drainage study. 20. Design and route new sewers to eliminate the need for pump stations where possible. 81. 21. Where feasible, utilize natural overland flows, open channels and swale routings as preferred alignments for components of the drainage system. 22. Require that new developments in areas of known subsidence construct low flow storm drains and minimize the use of cross gutters. 23. Require that new development employ catch basins and storm drains with baffled compartments where uncontrolled drainage could damage sensitive areas. 24. Site new City buildings and facilities in areas where existing and planned land uses are compatible with the facility that is being proposed. 25. Where appropriate, consolidate and centralize City functions into a minimum number of buildings located on a minimum number of sites. 26. Incorporate energy-saving measures and devices in the design of new City buildings. 27. Avoid extending community facilities to designated or proposed open space areas when surplus capacities could encourage new development detrimental to those areas. 8.4 CONSERVATION The intent of the following policies is to prolong the life of the City's community facility systems by minimizing unnecessary exposure to the elements and encouraging efficient use. 28. Provide for adequate covered storage space to protect equipment and supplies from prolonged exposure to the outdoors. 29. Institute actions to minimize infiltration of saltwater into the City sewerage system when such problems occur. 30. Investigate the feasibility of requiring additional water conservation measures for new development to reduce waste water flow. 31. Investigate opportunities for City involvement in resource recycling activities. 8.5 COORDINATION The City of Huntington Beach is served by a number of regional facilities which are the responsibility of County agencies and private utility companies. It is important that City concerns be incorporated into the planning processes of these other entities. The following policies aim to achieve proper and timely coordination between the City and other responsible agencies to ensure that local concerns are being addressed. 32. Encourage improved coordination between the City and the utility companies with respect to planned community facility projects; provide the utility companies with adequate information regarding the City's general plan. 82. 33. Request that the utility companies (e.g., gas, electricity, telephone) provide the City with information regarding the type of improvements that will be necessary to provide service to proposed development in the City. 34. Encourage the County Sanitation Districts of Orange County to align and construct county facilities in a manner that minimizes the need for City facilities. 35. Encourage the County of Orange to allocate funds to adequately staff and equip the County's solid waste transfer station located in Huntington Beach. 36. Encourage the County to make improvements necessary to bring regional drainage facilities up to the level of a 100-year flood. 37. Support the U.S. Army Corps of Engineer's Santa Ana River improvement project. 83 Q�[�C��JD�C�I�� APPENDIX A: INVENTORY OF CITY-OWNED STRUCTURES - 1981. Building Location Square Footage Comments GENERAL ADMINISTRATION AND MAINTENANCE Civic Center 2000 Main Street 187,419 Administrative Building and Council Chambers (excluding basement level) (46,796) Development Wing (18,602) Police Building (excluding jail & basement level) (36,375) Basement Level (85,646) (jail, meeting rooms, snack bar, tunnel) City Yard 17371 Gothard Street 67,058 Mechanical Maintenance Building (30,426) Shop Building (23,108) Administration Building (6,304) Building "C" Garage (7,220) Park Maintenance Yard Gothard Street South Buildings (4 buildings) of Slater Avenue 3,854 LIBRARY Central Library Talbert Avenue West of Gothard Street 75,000 Banning Street Annex Banning Avenue West of Bushard Street 3,600 Graham Street Annex Graham Street north of Edinger Avenue 2,500 Main Street Annex Main Street and Orange Avenue 8,000 D D N INVENTORY OF CITY-OWNED STRUCTURES - 1981. Building Location Square Footage Comments FIRE Joint Powers Training Center 18301 Gothard Street 21,075 Bushard Street Station 19711 Bushard Street 5,712 Magnolia Street Station 21441 Magnolia Street 5,702 Lake Street Station and Maintenance Garage 704 Lake Street 20,556 Gothard Street Station 18311 Gothard Street 6,800 Murdy Circle Station 16221 Gothard Street 6,800 Heil Avenue 5891 Heil Avenue 5,702 Warner Avenue Station 3831 Warner Avenue 5,700 RECREATION City Gym and Pool 17th Street and Palm Avenue 23,637 Beach Operations and Maintenance Yard 44 Huntington Avenue West Maintenance Building 4,000 North Maintenance Building 4,000 Lifeguard Headquarters City Beach 13,300 Junior Guard Headquarters City Beach 1,700 Lifeguard Towers (9 buildings) City Beach 10 each Beach Restrooms (6 buildings) City Beach 800 Parking Attendant Offices (2 building) City Beach 15 each Parking Attendant Office (1 building) City Beach 32 Camper Office City Beach 135 Pier Buildings Municipal Pier Food Concession-Neptunes Locker 528 Leased to private entity. Food Concession-Captain's Galley 528 Leased to private entity. Food Concession-End Cafe 780 Leased to private entity. Bait and Tackle Shop 540 Leased to private entity. Live Bait Stand 312 Utility Room 253 • • • • • • • • • • • • • • • • • • • • • • INVENTORY OF CITY-OWNED STRUCTURES - 1981. Building Location Square Footage Comments Restroom on Pier 200 Restroom underneath Pier 200 Lifeguard Tower Zero 128 Senior Citizens Center 17th Street and Orange Avenue 8,000 Murdy Community Center Goldenwest Street and Norma Drive 11,065 Lake Park Clubhouse Lake and 12th Streets 3,000 Boy Scout Troop One Clubhouse Lake and 12th Streets 1,200 Edison Community Center Magnolia Street and Hamilton Avenue 11,065 Harbor View Clubhouse Saybrook Lane south of Heil Avenue 1,980 Lakeview Clubhouse Slater Avenue and Zeider Lane 2,000 Lebard Clubhouse 20461 Craimer Lane 800 Oak View Center Oak Street 3,000 Terry Park Clubhouse 7701 Taylor. 900 Huntington Central Park Central Park 600 each Restrooms (6) Food Concession-Mary Beths 1,620 Leased to private entity. Food Concession-Breakfast in the Park 3,200 Leased to private entity. Shipley Nature Center 1,508 Utility Room/Snack Bar Greer Park 150 Restroom Trinidad Park 300 Restroom Greer Park 500 Closed; may be demolished Restroom/Snack Bar Marina Park 500 Restroom/Snack Bar Seabridge Park 500 Under construction. D w D INVENTORY OF CITY-OWNED STRUCTURES - 1981. - Building Location Square Footage Comments MISCELLANEOUS Meadowlark Airport Buildings Meadowlark Airport 3,000 Leased to private entity. Maxwells Restaurant Foot of Municipal Pier 19,500 Leased to private entity; lease expires March, 1987. Residence 2318 Huntington Street 1,430 House located on land aquired for future park site; rented on month-to-month basis to private party. Retail Store (Beach Buddies) 220 Main Street 2,000 Former site of the Southern California Water Company which the City bought in 1955; one year lease to private entity; lease expires February, 1981. Retail Store and three-car 520 Pacific Coast Acquired by the City for garage (Wind & Sea Surf Shop) Highway 1,600 Downtown revitalizaton effort; three-year lease to private entity; lease expires March 1983. Residence 520 B Pacific Coast Acquired by City for Downtown Highway 1,800 revitalization effort; leased to private entity on month to month basis. Old Civic Center Complex Main Street and Orange Avenue Memorial Hall 9,020 To be demolished; future site of senior citizens housing project. Old City Hall (2 buildings) 10,412 To be demolished; future site of senior citizens housing project. Old City Yard Buildings Huntington Street 19,000 Currently used for storage. and Memphis Avenue Police Heliport (Sheet Metal) Gothard Street south 9,020 Structure on unstable ground; used of Talbert Avenue for storage. • • • • • • • • • • • f t W W INVENTORY OF CITY-OWNED STRUCTURES - 1981. Building Location Square Footage Comments WATER FACILITIES Water Operations Building Garfield Ave. & 8,300 Under construction. Huntington Street Water Warehouse 19051 Huntington 4,500 Water Well #1 15041 Capetown NA Water Well #2 15991 Springdale Water Well #4 14561 Springdale Water Well #5 8651 Warner Water Well #6 16221 Gothard Water Well #7 14561 Springdale Water Well Dyke 18232 Hartland Water Well #8 Murdy Park Overmyer Booster Stn. 19051 Huntington Overmyer Booster Stn. 19051 Huntington Peck Pump Stn. 14561 Springdale Reservoir Hill Booster Stn. Goldenwest and Clay DRAINAGE PUMP STATIONS Adams Pump Stn. 19961 Chesapeake 500 Indianapolis Pump Stn. 9221 Indianapolis 500 Yorktown Pump Stn. 9211 Yorktown 500 Hamilton Pump Stn. 10101 Hamilton 500 Banning Pump Stn. 22011 Malibu 500 Atlanta Pump Stn. 8151 Atlanta 500 Heil Pump Stn. 7231 Heil 500 Flounder Pump Stn. 9731 Flounder 500 Marilyn Pump Stn. 6742 Marilyn 500 Meredith Pump Stn. 20192 Midland 500 Newland Pump Stn. 8612 Hamilton 500 Scenario Pump Stn. 4742 Scenario 500 Shields Pump Stn. 6252 Shields 500 Slater Pump Stn. 5250 Slater 500 Bolsa Chica Pump Stn. 18401 Springdale 900 D v+ INVENTORY OF CITY-OWNED STRUCTURES - 1981. D o\ Building Location Square Footage Comments SEWER PUMP STATIONS Sewer Pump Station Graham St. S/Warner Ave. @ Kenilworth 300 Sewer Pump Station Humboldt Dr. & Wayfarer Ln. (J) 300 Sewer Pump Station Gilbert Ln. (E) 300 Sewer Pump Station Pacific Coast Highway (A) 300 Sewer Pump Station Davenport Dr. (G) 300 Sewer Pump Station Finisterre Dr. (F) 300 Sewer Pump Station PCH and Warner Ave. (B) 300 Sewer Pump Station Warner Ave. W/Weatherly Ln. (C) 300 Sewer Pump Station Warner Ave. & Edgewater Ln (D� 300 Sewer Pump Station Algonquin St. & Pearce St. 300 Sewer Pump Station Lark Ln. & Warner Ave. "Meadowlark" 300 Sewer Pump Station Heil Ave. & Mycroft Ln. 300 Sewer Pump Station Slater Ave. & Springdale St. 300 Sewer Pump Station Gothard St. & Ellis Ave. 300 Sewer Pump Station Delaware Si. & Franklin 300 Sewer Pump Station Adams Ave. E/Brookhurst St. 300 Sewer Pump Station Brookhurst St. S/Atlanta Ave. [al Effingham 300 Sewer Pump Station Atlanta Ave. E/Beach Blvd. 300 Sewer Pump Station Bushard N Adams 300 Sewer Pump Station Speer & Crabb Ln. 300 Sewer Pump Station McFadden & Dawson 300 Sewer Pump Station Saybrook Ln. (H) 300 Sewer Pump Station New Britain Cla Adams 300 Sewer Pump Station Edwards St. & Balmoral 300 Sewer Pump Station Edinger Ave. & Santa Barbara Ln. (K) 300 Sewer Pump Station Brighton Ln. (al Shoreham Ln. 300 Sewer Pump Station Talbert Ave. E/S.P.R.R 300 Sewer Pump Station Sharkfin Ln. Tr. No. 8040 300 Sewer Pump Station Trinidad Ln. 300 Sewer Pump Station Pier 1 & 2 300 Sewer Pump Station Adams/Beach 300 • • • • • • • • • • • • W W • W W • • INVENTORY OF CITY-OWNED STRUCTURES - 1981. Building Location Square Footage Comments TOTAL 152 Buildings City-wide 638,341 D • • • • • • • • • • • APPENDIX B: INVENTORY OF BUILDINGS LEASED BY CITY - 1981. Building Location Square Footage Comments Building Regional Employment 538 Main Street 8,000 City leases from Southern Office California Edison Company for CETA Program offices; lease expires March 1981. Newland House Beach Boulevard and Adams Avenue 2,750 House built in 1898 restored and maintained by the Huntington Beach Historical Society; leased by Signal Landmark Company and assigned to the City. APPENDIX C: Selected Bibliography American Society of Planning Officials, Local Capital Improvements and Development Management Literature Synthesis, July, 1977. ! Engineering Science, Computer Model of City Water System, May, 1979. L.D. King, Master Plan of Drainage for the City of Huntington Beach, October, 1979. Lowry and Associates, Sewer Master Plan, July, 1979. ! Parker, Homer W., Wastewater Systems Engineering, Prentice-Hall, Inc., New Jersey, 1975. Tabors, Richard D. et al., Land Use and the Pipe, Lexington Books, Lexington, ! Massachusetts,1976. Urban Land Institute, Storm Water Management, 1975. ! ! f ! r_i DEPARTMENT OF DEVELOPMENT SERVICES PARTICIPATING STAFF JUNE CATALANO;'Deputy Director,Planning Division CAROL INGE,Assistant Planner SPECIAL ASSISTANCE FRANK B.ARGUELLO,Chief of Adininisfrative Services RICHAR'D BARNARMAssistapt to the Cj�ty Administrator PAUL COOK,Director,Pibhe Works'Department EDWARD ELEVATOASKF,Water Superintendent VINCENT G._MOORHOUSE,jBirector,Community Services Department DON NOBLE,Engineering Planner RAYMOND C.PICARD,Fire Chief EARLE ROBITAILLE,Chief of Police GEORGE L.TINDALL City Engineer GRAPHICS ROBERT SIGMON,Planning Draftsman CAROL INGE,Assistant Planner I COVER DESIGN AND SECTION DIVIDERS MICHAEL ADAMS,Assistant Planner WORD PROCESSING/PRINTING PATTI SCHWARTZ,Word Processing Coordinator SHARO'N HOJO,IN.or Processing,Specialist DEBORAH PLEDGER,Word Processing Senior CAREN WINANT,Word Processing Senior DEBORAH ESPINOZA,Word Processor RON CAMPBELL,Duplicating Printer JEFF FRANKEL,Duplicating Aide LORNA ETTER,Duplicating Aide . 1 CITY OF HUNTINGTON BEACH t CALIFORNIA 92648 P.O. BOX 190 DEPARTMENT OF DEVELOPMENT SERVICES s r