HomeMy WebLinkAboutSouth Beach Parking Improvement Area Master Plan (prepared b I-R-4Al Z- fl r)rn iA✓
e y-,DPn/
R-0,61 ✓SON- (20rn•bee✓
Council/Agency Meeting Held: q-110,
Deferred/Continued to:
Approved ❑ Conditionally Approved ❑ Denied 22� Cit erk's Signature
Council Meeting Date: October 19, 1998 Department ID Number: 98-027
CITY OF HUNTINGTON BEACH
REQUEST FOR COUNCIL ACTION
SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
SUBMITTED BY: RAY SILVER, City AdministratorG?a-,A cl
W �-•C C7 fir;
PREPARED BY: RON HAGAN, Director, Community Service TJ "MM
ROBERT FRANZ, Director, Administrative Service -�
ROBERT BEARDSLEY, Director, Public Wore
c
SUBJECT: APPROVE PROCEEDING WITH PHASE I OF THE SOUTH BEACH
IMPROVEMENT MASTER PLAN
Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s)
Statement of Issue: Should the city proceed with Phase I of the South Beach Improvement
Master Plan?
Funding Source: Pier Fund.
Recommended Action:
1. Motion to authorize staff to proceed with Phase I of the South Beach Improvement
Master Plan; and
2. Motion to approve the funding method presented herein, and authorize staff to prepare
tax exempt Certificates of Participation for City Council approval to fund the South
Beach Improvement Master Plan and repay the pier debt to the Water Fund, and
3. Motion to direct staff to prepare an agreement with Purkiss-Rose-RSI for City Council
approval and appropriate $450,068 from the Pier Fund for Purkiss Rose-RSI to prepare
plans and specifications, bid documents, and construction supervision for the Phase I
South Beach Improvement Master Plan.
Alternative Action(s):
1. Proceed with both Phase I and Phase II of the South Beach Improvement Master Plan
as one project, and appropriate $750,000 from the Pier Fund to prepare plans and
specifications for both phases; or
2. Do not approve proceeding with the South Beach Improvement Master Plan at this time.
Analysis: The city has completed the Pier Plaza master plan which is the first of three
master plans City Council has adopted for beach improvements. The next priority for the city
to accomplish is the South Beach Improvement Master Plan. This area encompasses the
/ � I
REQUEST FOR COUNCIL ACTION
MEETING DATE: October 19, 1998 DEPARTMENT ID NUMBER: 98-027
municipal pier from First Street south to Beach Boulevard. (Attachment 1) Originally it was
staffs intention to recommend to City Council that this area be completed in one phase.
However, due to the logistics and cost of the project, staff is now recommending that the
South Beach Improvement Master Plan be divided into two phases. The first phase would
provide for improvements pursuant to the City Council adopted master plan from Beach
Boulevard north to the Huntington Street entrance. The second phase of improvements
would encompass the area from Huntington Street north to First Street. (See Attachment 1)
With the recent approval of the Waterfront Ocean Grand Resort project, it is highly desirable
that the city proceed with the first phase of the South Beach Improvements so that both sides
of Pacific Coast Highway are completed at the same time. The total estimated cost for both
phases of the South Beach Improvement Master Plan is $8 million ($4 million each phase).
By phasing the South Beach Improvement Master Plan, staff is confident that there will be
minimum impact to parking revenue and beach access during the construction process. The
idea is to provide parking between First and Huntington Streets while the area between
Huntington Street and Beach Boulevard is under construction, and then to provide parking
between Beach Boulevard and Huntington Street while the area between Huntington and
First Streets is under construction. With the opening of the Pier Plaza parking lots, along
with the phasing of construction, staff is confident that parking occupancy will remain
constant throughout the construction periods.
The South Beach Improvement Master Plan will carry the same theme and architectural
design as well as the style of landscaping and parking that the city used with the Pier Plaza
master plan. The project will include the demolition of the thirty-five year old rest rooms that
currently exist within the south beach area and complete replacement with full service
comfort stations. Also included will be the widening and replacement of the Huntington
Beach Ocean Strand (bicycle/pedestrian beach trail). New parking entryways, landscaping,
security lighting, sand walls, and parking lots will also be included.
The timeline for construction of Phase I is as follows:
October, 1998 . ........................................Council approval of project
November, 1998 — January, 1999 ......Preparation of plans and specifications
February— March, 1999.......................,Plan check and approval
March —April, 1999 Bid process
May, 1999............................................... Award of bid and issuance of debt (COPs)
June, 1999 — March 2000 .................. Construction
April, 2000 ...............................................,Completion of Phase
During this construction period, it will be necessary to continue the closure of the city's
Sunset Vista Camping Facility so that the parking spaces may be used for daily beach
access. It is staffs recommendation to reestablish camping at Sunset Vista during the period
of October 1 — March 31 of each year when both phases of the South Beach Improvement
Master Plan are completed. This issue, however, will be brought to City Council for final
consideration when Phase II is presented to City Council.
RCA SBIMP Phase I.doc -2- 10/06/98 2:30 PM
REQUEST FOR COUNCIL ACTION
MEETING DATE: October 19, 1998 DEPARTMENT ID NUMBER: 98-027
Phase II of the South Beach Improvement Master Plan will include development of the junior
guard headquarters and the refurbishment of Moorhouse Lifeguard Headquarters as well as
parking lot lighting, landscaping, and Huntington Beach Ocean Strand improvements along
with replacement of rest rooms. Staff anticipates that the second phase will follow after
Phase I is completed, if additional funding of$4 million (estimated) can be identified.
Staff is proposing the following method of funding to accomplish Phase I South Beach
Improvements:
PHASE I PROJECT COST:
Construction $3,000,000
10% Contingency $300,000
10% Supplementals 300,000
A & E 450,068
TOTAL ESTIMATED COST $4,050 068
RECOMMENDED PROJECT FUNDING
Existing Fund Balance (Pier Fund) $1,700,000
New 30 Year Debt Issue
(South Beach COPs) 2,400,000
4,100.000
ANNUAL EXPENSES (post construction)
Ruby's Building COPs $90,000
Repayment to Water Fund 158,000
Debt Service South Beach COPs 220,000
TOTAL ANNUAL EXPENSE $468,000
ANNUAL REVENUE (post construction)
Ruby's Lease $250,000
$1 Increase Beach Parking
(March 1-Sept. 30) 250,000
TOTAL ANNUAL REVENUE $500,000
The above plan will provide for the repayment of debt to the Water Fund and the payment of
annual debt service for the Phase I improvements. Ongoing maintenance of the South
Beach Improvement Master Plan will be paid for from the existing parking revenue as it is
now. The project is projected to have no impact on the city's General Fund. (Maintenance
costs are projected to decrease compared to the current high costs due to the poor condition
of existing parking lots, lights, etc.)
RCA SBIMP Phase Woc -3- 10/06/98 2:30 PM
REQUEST FOR COUNCIL ACTION
MEETING DATE: October 19, 1998 DEPARTMENT ID NUMBER: 98-027
In summary, staff believes that Phase I is the most important part of the South Beach
Improvement Master Plan to.accomplish immediately. The financing plan will repay the
Water Fund loan to the Pier Fund with no impact on the city's General Fund. If City Council
approves this approach staff is confident that the timeline can be accomplished so that the
improvements are completed simultaneously with the Hilton Ocean Grand Resort
improvements.
Environmental Status: Not applicable.
Attachment(s):
City Clerk's
P. • - NumberDescription
...................................................
...................................................
...................................................
...................................................
...................................................
. ......... ..
1. South Beach Improvement Master Plan Phasing Diagram
2 Purkiss Rose rsi Proposal
3. Multi-year Financing Plan
RCA Author: RH:cr
RCA SBIMP Phase I.doc -4- 10/06/98 2:30 PM
ATTACHMENT # 1
I 1.
KNCXV LLF
WATERSPRAY M,
n � O
JOLIE r w
L 0
I NDIAN APO UlS `L ° o
�X\ HAR FORD D FTWOOD RE
z GEN VA EBBTIDF
Y C PF-ERSON s
Q III= FRANOHUNT. AII ;'GN.
` M RMAtD v+
3
•— tir a ELMIR ��LIFFS SUNSET
,
D E TIRC f L4A!��;Jl
0 CHICA 0 = a SE IRD
SHELLu. a EV LYNE ��
{o 2°F BALTI ORE B Y t Y < w <
h� a > A " W " SNOWBIRD v
aV u In o COMBER ^ x IR
s�Ffl tiC ATLANTA S POCLSIDE
HELL A
NEPT
\�\ AC/F/C I 3 s wAu 4)7i15W
Zpp TR. PK I z �j�j((����tt��jj^((�F
F- I 'D^ a SOUTWIND !E
MAIN�T
< MOOMMIST Z cp
` 9 Z S ILBOAT.
2 1 L.
I I ' SEA�EZE GROVE
N i
f ! \..\ / I _ - SUNRISE _
GULF QN .
FAR M
A Cr O 7--
NUN
Tr
t 7 --A
—I
'S ATTACHMENT 1
).O
F91
ATTACHMENT #2
A PROPOSAL FOR
DESIGN SERVICES
FOR
THE
SOUTH BEACH PROJECT
PHASE ONE/PHASE TWO
CITY OF HLJNTINGTON BEACH
PURKISS ROSE-RSI
801 N. HARBOR BOULEVARD
FULLERTON, CA 92832
FAX: (714) 871-1188
(714) 871-3638
SEPTEMBER 8, 1998
South Beach Project Phase On&Thase Two, City of Huntington Beach
TABLE OF CONTENTS
Project Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Project Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 7
Exhibit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Exhibit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Exhibit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Purkiss Rose-RSI
South Beach Project Phase One/Phase Two, City of Huntington Beach
PROJECT TEAM
Effective organization of the total planning effort is the key to the successful accomplishment
of our intended objectives. Purkiss Rose-RSI Landscape Architecture, Recreation and Park
Planning presents the following team based on our interpretation of the project requirements.
As the prime consultant, we will assume full responsibility for coordination of the total project.
Services will include: assignment of planning responsibilities, City meetings, South Beach Task
Force meetings, scheduling of project tasks, site evaluation, refinement of South Beach Master
Plan, design development, development of construction documents, plan check approvals, and
construction administrative services.
Purkiss Rose-RSI Landscape Architecture, Recreation and Park Planning
Prime Design Consultants
Stephan Rose, Principal-in-Charge of Purkiss Rose-RSI, will act as facilitator and contractual
representative of the firm and participate on the design team. Steve contributes over 27 years
experience in all facets of landscape architecture and park planning as well as in a wide range
of public and private recreation developments.
Jim Pickel, Principal at Purkiss Rose-RSI, is another member of the team and will be Project
Manager. Jim will be involved in the design and refinement of the Master Plan. He will be
responsible for the day to day liaison with City staff and the Task Force, project development,
site evaluation and coordination with our design team subconsultants. Jim was the Project
Manager for the Pier Plaza Project in Huntington Beach.
Studio 7
Architects
Kim Quon, Principal, will serve as project Architect. Kim managed and designed the
Restroom/Concession Building and Kiosk Building for the Pier Plaza Project and South Beach
Restroom Number One.
Walden and Associates
Civil Engineers
Dave Bacon, Civil Engineer, will coordinate all civil engineering and utility research. Dave
has many years of experience in public works projects. He will also address the utilities,
easements, future utility expansion and right-of-way issues.
3 Purkiss Rose-RSI
South Beach Project Phase OneThase Two, City of Huntington Beach
PROJECT TEAM
Toft Wolff Farrow Inc. (formerly Enteg Inc.)
Electrical Engineers
Jim Miller, Electrical Engineer, will design the electrical service/lighting service for the
proposed South Beach improvements and provide other electrical design needs. Jim will also
be involved in the electrical requirements for the new restrooms.
Correia Consulting and Design
Structural Engineers
Willie Correia, Structural Engineer, will provide all the structural engineering requirements for
the project. Willie has been involved with many structural design projects for public works
agencies.
Converse Consultants, Orange County
Geotechnical Services
Thomas Scheil, Principal Engineer, will be providing the geotechnical testing and reporting for
the foundation and footing requirements for the project area.
RPW Services, Inc.
Agronomist
Paul Webb has worked with the design team on many public works projects. Some of these
projects have had unique challenges that had to be overcome. Paul will be looking at and
analyzing the project area and making recommendations for treatment of the soil including soil
conditioning, fertilization programs, etc.
Public An Management
An Consultant
Ann Thorne was the design team's art consultant for the Pier Plaza project. Ann will be
reviewing potential development sites for future art work along the South Beach development.
4 Purkiss Rose-RSI
South Beach Project Phase One/Phase Two, City of Huntington Beach
PROJECT DEFINITION PHASE ONE/PHASE TWO
The South Beach Project in Huntington Beach is located between the existing Lifeguard
Headquarters and Beach Blvd. South Beach is the next phase of the City's vision for the beach
front improvements which will reflect the design standards established at the recently completed
Pier Plaza Project. In 1990, Purkiss Rose-RSI began meeting with the City staff and the South
Beach Task Force to gather input, program requirements, site requirements and preliminary
design standards for the South Beach Project. After receiving a general consensus regarding
design requirements and programming from the City staff and the Beach Task Force, Purkiss
Rose-RSI prepared the South Beach Master Plan. The Master Plan was presented to the City
staff and the Beach Task Force for review, comments and approval. The City staff and Beach
Task Force approved the Master Plan in preliminary form knowing that the plan would require
minor revisions, finalization and approval by the Task Force, the City of Huntington Beach, the
State of California and the Coastal Commission. The original scope of work which was shown
on the South Beach Master Plan included newly designed entries at Second Street and Beach
Blvd., newly configured parking lots, new parking area lighting, an overlook area at the end of
the Second Street entry, four new restroom buildings, new plaza areas between the existing
concession buildings and the new restroom buildings, new bike trail and pedestrian pathways
which would be separated, new bike trail/pedestrian pathway lighting, sandwalls, new handicap
access ramps and stairway systems in each plaza area, new Junior Lifeguard Headquarters and
new landscape and irrigation systems for the proposed planting areas.
In June 1998, Purkiss Rose-RSI and the City have had meetings regarding the South Beach
Project, the scope of work and the budget. The City has informed our office that, due to budget
constraints, the scope of work would require some revising. Purkiss Rose-RSI has received the
City's input and direction for reducing the amount of site improvements. The first revision to
the scope of work would be to omit the new parking area paving and new lighting from the
project. The revised scope would note that the existing parking and lighting would remain with
some minor modifications to the asphalt surfacing, the parking area striping and the existing light
standards. However, upon reevaluating the existing parking area lighting, the City's electrical
maintenance department has requested that the existing lighting systems receive a higher level
of modification. These modifications involve the addition of new cobra head type light fixtures
to the parking area to supplement and improve the current light levels. The additional light
fixtures will require new conduits, wiring and cutting and patching of existing asphalt.
More recently, the City of Huntington Beach has requested that the South Beach proposal be
separated into Phase One and Phase Two. The first phase (Phase One) would include the South
Beach area from Huntington Drive and Pacific Coast Highway to the beach entry at Beach
Boulevard and Pacific Coast Highway. The project scope of work would include two new
Restroom buildings, new bike route and pedestrian walkways, security lighting, public plaza
areas between the new restrooms and the existing concession buildings, an art program, parking
area lighting, parking area resurfacing, restriping the parking areas, landscape and irrigation.
The second phase (Phase Two) includes the South Beach area from Huntington Drive and Pacific
Coast Highway to the existing Lifeguard Headquarters building. The project scope of work
5 Purkiss Rose-RSI
South Beach Project Phase One/Phase Two, City of Huntington Beach
PROJECT DEFINITION PHASE ONE/PHASE TWO
would include two new restroom buildings, new bike route and pedestrian walkways, security
lighting, public plaza areas between the new restrooms and the existing concession buildings,
parking area lighting, parking area resurfacing, restriping the parking areas, landscape and
irrigation. Purkiss Rose-RSI is presenting this proposal to the City of Huntington Beach as two,
separate scopes of services and two, separate fee schedules. We have separately defined the
Phase One and Phase Two design services, construction document preparation, construction
administration services and reproduction allowance.
Purkiss Rose-RSI has prepared a summary of preliminary construction costs for the Phase One
portion of the South Beach Project using general construction categories as follows:
1. Two, new Restroom buildings $600,000.00
2.* Electrical and Lighting $1,200,000.00
(Lighting for buildings included in building costs)
3. Site Improvements $1,200,000.00
PHASE ONE
SUBTOTAL: $3,000,000.00
10% CONTINGENCY: 300,000.00
TOTAL: $3,300,000.00
Purkiss Rose-RSI has based the South Beach Design Services and Fee Schedule on the project's
program, City and Task Force requests and the preliminary construction budget for the project
improvements. Purkiss Rose-RSI is available at the City's request to discuss the South Beach
budget, project improvements, construction costs and any revisions required to this proposal to
meet the City's needs and vision for the South Beach project.
* The electrical construction costs do not include new Kim fixtures for the parking
area, Phase One. The construction costs noted include adding and supplementing
the existing parking area electrical system with new cobra head lighting.
6 Purkiss Rose-RSI
South Beach Project Phase On&Phase Two, City of Huntington Beach
SCOPE OF WORK
PHASE ONE
This Scope of Services is being suggested with full recognition that a more detailed and accurate
program can be developed after input by the South Beach Task Force and City staff. The
specific tasks and their sequence are based on our experience with the design of the Huntington
Beach Coast Master Plan and the Pier Plaza. As requested we have included suggestions in our
scope of work that, through experience,we have found to expedite the project, staff and public
multi agency support and complete the project on time and within the construction budget. The
scope of services for Phase One is based on $3,300,000.00 of construction/site improvements.
PHASE I - SITE EVALUATION AND REVISE MASTER PLAN
Task 1 - Refinement of Project Definition
The project team will meet with the South Beach Task Force and City staff for refinement
of project, review programs and goals for.both South Beach Phase One and Phase Two.
We will learn about special interest groups that will be involved in the project along with
the South Beach Task Force and the City. We will gather information on the City
programs, special events, maintenance and operations input, program and event schedules
in relation to proposed construction periods, equipment standards, design parameters, etc.
All parties must agree on the project approach, program, future development adjacent the
South Beach Project and how that development will interface with South Beach, scope
and schedule of work, and meeting calendar. Review Coastal commission requirements
and goals.
Task 2 - Data Collection
The design team will evaluate Phases One and Two of the project site for accessibility,
pedestrian (non-wheeled) and wheeled users, trail access, parking, adaption to the
proposed improvements, potential construction costs, surrounding land use, accessibility
of utilities, location of restroom buildings, plazas, maintenance facilities,adjacent beach
access and other important factors.
Review and refine Phases One and Two of the Preliminary Master Plan improvements
and prepare preliminary construction costs. Preliminary construction costs will be
separated into Phase One and Phase Two. Prepare two parking lot striping plans to
evaluate the number of parking stalls obtainable within the existing parking area. We will
review, revise and refine the current master plan using information collected from the
South Beach Task Force, City staff and any special interest groups or future development
projects. A consensus will be agreed to for the revised design concepts.
7 Purkiss Rose-RSI
South Beach Project Phase On&Pha�e Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
Using the existing 1" = 20' scale photogrammetric topographic mapping completed in
1991, the Design Team will provide field surveying services for Phase One and Phase
Two to locate and plot all existing facilities and to determine join elevations in.those areas
to be reconstructed.
Task 3 - Task Force Input/City Meetings
The design team will work closely with the South Beach Task Force and the City to shape
the approach of all meetings. The project team will present the revised Master Plan for
Phases One and Two at scheduled meetings to reach a consensus on the preferred layout
and selection of amenities, materials and equipment. Site design concepts will be
thoroughly reviewed and discussed. Programmatic, operational, safety and maintenance
issues will be discussed. Future utility service needs will also be reviewed. The revised
Master Plan for Phases One and Two will then be presented to City staff, Task Force,
Design Review Board, Planning Commission, and City Council for approval.
Task 4 - Art Consultant:
Consultation with Purkiss Rose-RSI.-
Task 1: Review project intent, scope, approach, and schedule with lead consulting
firm of Purkiss Rose-RSI.
Task 2; Review physical limitations and opportunities of existing site including
configurations, external influences, access and relationships with adjacent
developments.
Task 3: Prepare preliminary site maps specifying artist work areas.
Consultation with City of Huntington Beach:
Task 1: Conduct interviews with community art board, Community Services and
Cultural Services to understand levels of community participation, City
Council involvement, contractual approaches and issues, methods of artist
selection and presentation of slides for review of potential artist
candidates.
g Purkiss Rose-RSI
South Beach Project Phase On&Ph—e Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
Preparation of Work Plan:
Task 5: Recommend preliminary budgets and schedules.
Task 6: Present a project summary to Purkiss Rose-RSI and Cultural Services
outlining work plan. This plan will generate an artist's prospectus for the
recruitment of artists.
Upon approval of the revised South Beach Master Plan, the Design Team will prepare
a Presentation Site Plan of the project for the City's use. The presentation site plan will
reflect improvement to both phases and will be colored and mounted.
Purkiss Rose-RSI will prepare the coastal development permit application for City staff s
review.
Task 5 - Cost Estimates
The design team will prepare a final preliminary construction cost estimate for the revised
Phase One portion of the Master Plan improvements. For,clarification, we shall itemize
the preliminary construction cost estimate for a complete understanding of project
improvement costs.
PHASE H - RESEARCH AND FACT FINDING
Task 1 - Preliminary Project Planning for Utilities
The location of existing electrical services, electrical, sewer, domestic water and existing
storm drain lines will be obtained from the City. The proposed locations of all site
improvements will be indicated on the same base sheets. The design team will provide
utility planning for electrical service, electrical, sewer, domestic water, gas, and site
storm drain lines/laterals to serve the proposed South Beach Phase One site
improvements.
We will schedule (for the proposed project site):
• Site analysis
• Agronomy/Horticultural testing and report findings and recommendations
9 Purkiss Rose-RSI
South Beach Project Phase OneJPh—e Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
Task 2 - Base Map
We shall utilize the topographic map and survey prepared as part of this work for our site
evaluation and refinement of the Master Plan. We shall prepare 24" x 36" base sheets
at a site plan scale of I" = 20' indicating topographic features, utilities, right-of-ways,
property/boundary lines and easement lines using an Autocad release 14 format.
PHASE III - DESIGN DEVELOPMENT APPROVAL
Gain preliminary approval from the City staff, South Beach Task Force and City Council
to proceed with the recommended site improvements. The Design Development plans
which will include "in progress" demolition plans, grading and drainage plans, utilities
plans, construction layout plans, architectural plans, electrical plans, landscape and
irrigation plans, and appropriate construction details for Phase One only and will be
submitted to the City for review and approval. Conduct site soil testing and analysis for
preparation of geotechnical investigation for foundation and soils engineering. Material
boards and product information for site amenities will be submitted as part of the Design
Development plans. The design-materials and site amenities for the South Beach Project
will reflect the approved standards established for the Pier Plaza Project.
PHASE IV - DEVELOPMENT OF CONSTRUCTION DOCUMENTS
Once the Design Development plans have been reviewed and approved by City staff, the
team will develop final construction documents and specifications for implementation of
the Phase One portion of the project. All construction documents will be developed on
Autocad (Rel 14) format on 24" x 36" sheets. The plans and specifications for South
Beach Phase One will take into account future phased development.
Task 1 - Construction Documents
The construction documents will include:
• Project Title Sheet
• Existing Condition Plans
• Site Clearing, Demolition and Removal Plans
• Grading and Drainage Plans
• Drainage System Details
10 Purkiss Rose-RSI
South Beach Project Phase OnelPi.—e Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
• Utility plans including sewer, water, electrical and gas
• Architectural Plans for the two new Restroom Buildings.
• Architectural Details
• Horizontal Control Plans
• Site Construction Layout Plans
• Construction Details
• Structural details and Calculations
• Irrigation Plans
• Irrigation Watering Schedules/Pressure Calculations
• Planting Plans
• Planting and Irrigation Details
• Electrical and Lighting Plans for two new restrooms.
• Electrical and Lighting Plans (modify existing lighting and supplement with new
fixtures for parking areas
• Electrical service to parking attendant booths
• Electrical Service Plans
• Electrical Details
• Technical Specifications
• Geotechnical Soils Investigation Report
All calculations for structural items, electrical service and loads, etc. are included as part
of the Phase One construction document package.
The design team will work with the City staff in preparing all required forms and
application requests to obtain State and Coastal Commission approvals. Purkiss Rose-RSI
will submit forms and applications to the State and Coastal Commission for approval.
Task 2 - Art Plan Development Services for Phase One
Phase 1: Art Plan Development
Task 1: Identify project scope and intent with client, City and public
groups
Task 2: Begin site analysis
Task 3: Conduct community interviews/research
Task 4: Identify contracts
Task 5: Scope of work, budgets, schedules established
Task 6: Artist selection methods and objectives established
Task 7. Present and prepare artist prospectus as plan presented to
Purkiss Rose-RSI
11 Purkiss Rose-RSI
I
South Beach Project Phase One/Ph.se Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
Phase 2: Artist Selection/Proposal Development and Contracting
Part 1
Task 1: Develop artist selection methods
Task 2: Identify advisory participants, artists to interview and select
artists
Task 3: Review and develop proposal agreements with Purkiss Rose-
RSI and artists
Task 4: Arrange site visit with artists and Purkiss Rose-RSI
Task 5: Develop and review artists' contracts with Purkiss Rose-RSI
Task 6: Contract with artist and Purkiss Rose RSI for proposal
development
Part 2
Task 1: Negotiate artists' contracts and scope of services
Task 2: Review and gain approval for scope of services with Purkiss
Rose-RSI
Task 3: Sign and process artists' contracts
Task 4: Inform art community and other agencies of art project
through Purkiss Rose-RSI
Task 5: Facilitate introduction at design team meeting
Phase 3: Project Management/Construction Administration
Task 1: Facilitate artists' design drawings
Task 2: Submit plans to Purkiss Rose-RSI
Task 3: Facilitate meetings between artists and Purkiss Rose RSI
Task 4: Inform public agencies and City groups
Task 5: Receive monthly status reports from artist and report to
Purkiss Rose-RSI
Phase 4: Project Management/Construction Observation
Task 1: Oversee artwork fabrication
Task 2: Monitor budgets
Task 3: Process change orders
Task 4: Prepare agendas for artists meeting the public
Task 5: Receive monthly status reports from artist and report to
Purkiss Rose-RSI
12 Purkiss Rose-RSI
South Beach Project Phase One1R.-se Two, City of Huntington Beach
SCOPE OF WORK PHASE ONE
Phase 5: Project management/Construction Completion
Task l: Final Inspection and approval by City
Task 2: Provide.documentation/information to publicize
Task 3 - Final Cost Estimates
Prepare final itemized construction cost.estimates with quantities and unit prices.
PHASE V - BIDDING PHASE AND CONSTRUCTION PHASE
Task 1 - Bidding Phase
The design team will be available during the bid process to assist, provide clarification, review
and comment on the bids.
Task 2 - Construction Administrative Services
We will review and approve addenda,. change orders, material submittals, shop drawings,
clarifications to plans and specifications, requests for information (RFIs), provide thirty (30) site
visits and report on construction process. We will conduct a pre-construction meeting with the
awarded contractor and City staff. We will meet on a regular basis at the job site and review
installation. Reports will be prepared on construction progress and observations by a construction
management company whose services have been obtained by the City. We will assist in
determining and processing change orders. Likewise we will participate in the preliminary and
final reviews as required. Inspections will be performed by the public service agency inspectors
representing the City of Huntington Beach.
Also provided will be one complete set of diazo mylar reproductions of record construction
documents from field information provided by the contractor.
The City shall receive the Phase One construction document package on computer diskette in
Autocad Rel 14.
13 Purkiss Rose-RSI
South Beach Project Phase On&Ph..se Two, City of Huntington Beach
EXHIBIT A
FOR SOUTH BEACH PHASE ONE
South Beach Project, Huntington Beach
Professional Fee Schedule
September 8, 1998
The following Fee Schedule is based on $3,300,000.00 of Construction/Site Improvements for
the first phase of South Beach:
Phase I - Site Evaluation and Revise Master Plan
Task 1 - Refinement of Project Definition
Task 2 - Data Collection
Task 3 - Beach Task Force Input/City Meetings
Task 4 - Art Consultant
Task 5 - Cost Estimates
Sub-Total $ 619000.00
Phase H - Research and Fact Finding
Task 1 - Preliminary Project Planning for Utilities
Task 2 - Base Map
Sub-Total $ 2000.00
Phase III - Design Development
Sub-Total $77,150.00
Phase IV - Development of Construction Documents
Task 1 - Construction Documents/Specifications
Task 2 - Art Plan Development
Task 3 - Final Cost Estimates
Sub-Total $182,170.00
TOTAL $340,320.00
14 Purkiss Rose-RSI
South Beach Project Phase On&Pnuse Two, City of Huntington Beach
EXHIBIT A - SOUTH BEACH PHASE ONE
If the City wishes Purkiss Rose-RSI and the design team to participate in the bidding and
construction administration portion of the South Beach Project, the following fee would apply.
Phase V - Bidding Phase and Construction Phase
Task 1 - Bidding Phase
Task 2 - Construction.Administrative Services
Sub-Total $58,000.00
Reproduction/delivery charge allowance of: $20,000.00
The fees indicated within Exhibit "A" for.South Beach, Phase One valid for 12 full months from
the date of this proposal. . At. the end of the 12-month period, the design team would need to
renegotiate the Phase One Fee.Schedule with the City.
15 Purkiss Rose-RSI
South Beach Project Phase One/Pn"se Two, City of Huntington Beach
EXHIBIT B r
PHASE ONE AND PHASE TWO
HOURLY RATES
Additional services which may be requested, including modifications to the scope of services,
detailed cost estimates, changes.to.plans and specifications after completion.of the construction
documents, additional site visits/reports, etc., will be computed at hourly charge rates according
to the service rates.schedule below. The rates set forth for additional services below shall be
annually adjusted in.accordance with normal salary review practices of the design team:
Purkiss Rose-RSI Landscape Architecture, Recreation and Park Planning
Principal $110.00/hour
Project Manager $ 75.00/hour
Project Captain $ 65.00/hour
Draftsperson $ 60.00/hour
Clerical/Word Processing Staff $ 35.00/hour
Walden and Associates
Principal $141.00/hour
Associate $110.00/hour
Project Manager $ 95.00/hour
Project Engineer/Land Surveyor $ 84.00/hour
Design Engineer/Land Surveyor $ 79.00/hour
Engineer/Land Surveyor $ 74.00/hour
Assistant Eng./Designer/Land Surveyor $ 67.00/hour
Senior Draftsman $ 58.00/hour
2-Man Survey Crew $152.00/hour
3-Man Survey Crew $191.00/hour
Toft Wolff Farrow Inc. (formerly Enteg, Inc.)
Project Engineering $ 96.00/hour
Designing/CADD $ 72.00/hour
Clerical $ 42.00/hour
Principal $130.00/hour
Associate $105.00/hour
Project Managing $ 96.00/hour
Engineering $ 84.00/hour
16 Purkiss Rose-RSI
South Beach Project Phase Onall--.se Two, City of Huntington Beach
EXHIBIT B - PHASE ONE AND PHASE TWO
Drafting/Technician $ 48.00/hour
Inspector $ 72.00/hour
Studio 7
Principal Proj. Architect .$100.00/hour
Civil Engineer $ 75.00/hour
Project.Manager/Designer $ 55.00/hour
Drafter $ 35.00/hour
Clerical $ 35.00/hour
2-Man Survey Crew $110.00/hour
Converse Consultants, Orange County
Junior Technician (Drafting, Field, Lab) $ 30-48/hour
Technician (Drafting, Field, Lab) $ 50-58/hour
Senior Technician (Drafting, Field, Lab) $ 50-68/hour
Supervisory Technician (Drafting, Field, Lab) $ 55-78/hour
Superintendent $ 40-88/hour
CAD Operator $ 40-60/hour
Word Processor $ 40-55/hour
Staff Support $ 30-55/hour
Staff Professional $ 50-74/hour
Senior Staff Professional $ 65-78/hour
Project Professional $ 70-94/hour
Senior Professional $ 85-116/hour
Principal Professional $100-140/hour
Principals/Consultants $125-175/hour
Correia Consulting and Design
Principal $120.00/hour
Senior Project Engineer $ 90.00/hour
Project Engineer $ 70.00/hour
Staff Engineer $ 60.00/hour
Jr. Engineer/Designer $ 55.00/hour
Draftsman $ 45.00/hour
Clerical $ 35.00/hour
17 Purkiss Rose-RSI
South Beach Project Phase On&Ph.se Two, City of Huntington Beach
EXHIBIT B - PHASE ONE AND PHASE TWO
RPW Services, Inc.
Principal $ 75.00/hour
Tests $ 50-125/ea.
Public Art Management
Principal $ 65.00/hour
18 Purkiss Rose-RSI
South Beach Project Phase One/Phase Two, City of Huntington Beach
EXHIBIT C FOR PHASE ONE
EXCLUSIONS
Consulting services relating to any of the following items are specifically..excluded from this
Phase One scope of services/fee schedule:
• Aerial flyover
• New photogrammetric topographic mapping
• Hydrology Study/Report
• Preparing record drawings for existing conditions or buildings that will remain or be
modified
• Design or renovation of the existing concession buildings
• Design or construction document preparation for pedestrian bridges at Pacific Coast Highway
• Environmental Impact Study/Negative Declarations
• Environmental Study/Reports
• Sewer lift stations or ejection pump design if gravity sewers are not available or appropriate
• Easements or legal description for.any facilities or dedications
• Potholing to locate underground facilities
• Design surveys for any work not specifically stated in the Scope of Work
• Signal, signing, striping, street lighting or traffic control plans for Pacific Coast Highway
• Application, plan check, permit fees or.bonds
• Models
ASSUMPTIONS
Consultant's obligations hereunder are based upon the following understandings:
• The project construction budget for the City's program requests is $3,300,000.00 plus
Architect/Engineer fees, construction supplementals, application and permit fees, etc.
• Most of the existing pavement parking areas will be maintained "as-is" with modifications
done for the three proposed access points.
• Sewer connections for new restroom facilities may be connected to adjacent concession
building sewer lines.
• The existing water line through the project will remain and will not require relocation.
• The electrical amenities, light fixtures, etc. in the existing parking areas modified to include
relocating a number of the existing "Cobra Head" light fixtures and supplementing the
existing park area with new "Cobra Head" fixtures. (The "new" fixtures are actually at the
City Storage Yard.) The modification to the existing parking area lighting would include
new cable and conduits.
19 Purkiss Rose-RSI
SOUTH BEACH PROJECT PHASE TWO
South Beach Pibject Phase One/1-rase Two, City of Huntington Beach
PROJECT DEFINITION PHASE ONE/PHASE TWO
The second phase (Phase Two) includes the South Beach area from Huntington Drive and Pacific
Coast Highway to the existing Lifeguard Headquarters building. The project scope of work
would include two new restroom buildings, renovation of the existing Junior Lifeguard
Headquarters to offices and meeting room for special events, new bike route and pedestrian
walkways, security lighting, public plaza areas between the new restrooms and the existing
concession buildings, parking area lighting, parking area resurfacing, restriping the parking
areas, landscape and irrigation. Purkiss Rose-RSI is presenting this proposal to the City of
Huntington Beach as two, separate scopes of services and two, separate.fee schedules. We have
defined the Phase One and.Phase Two design services, construction document preparation,
construction administration services and reproduction allowance.
Purkiss Rose-RSI has prepared a summary of preliminary construction costs for the Phase Two
portion of the South Beach Project using general construction categories as follows:
1. Two new Restroom buildings $600,000.00
2. Renovation of the existing $130,000.00
Junior Lifeguard Headquarters
3.* Electrical and Lighting . $500,000.00
(Lighting for buildings included in building costs)
4. Site Improvements $500,000.00
PHASE ONE
SUBTOTAL: $1,730,000.00
10% CONTINGENCY: 173,000.00
TOTAL: $1,903,000.00
Purkiss Rose-RSI has based the South Beach Design Services and Fee Schedule on the project's
program, City and Task Force requests and the preliminary construction budget for the project
improvements. Purkiss Rose-RSI is available at the City's request to discuss the South Beach
budget, project improvements, construction costs and any revisions required to this proposal to
meet the City's needs and vision for the South Beach project.
* The electrical construction costs do not include new Kim fixtures for the parking
area, Phase Two. The construction costs noted include adding and supplementing
the existing parking area electrical system with new cobra head lighting.
21 Purkiss Rose-RSI
South Beach Project Phase One/Pr...se Two, City of Huntington Beach
SCOPE OF WORK
PHASE TWO
This Scope of Services is being suggested with full recognition that a more detailed and accurate
program can be developed after input by the South Beach Task Force and City staff. The
specific tasks and their sequence are based on our experience with the design of the Huntington
Beach Coast Master Plan and the Pier Plaza. As requested we have included suggestions in our
scope of work that, through experience we have found to expedite the project, staff and public
multi agency support and complete the project on time and within the construction budget. The
scope of services for Phase Two is based on $1,903,000.00 of construction/site improvements.
PHASE I - SITE EVALUATION AND REVISE MASTER PLAN
Task 1 - Refinement of Project Definition
The project team will meet with the South Beach Task Force and City staff for refinement
of project, review.programs and goals for both South Beach Phase One and Phase Two.
We will learn about special interest groups that will be involved in the project along with
the South Beach Task Force and the City. We will gather information on the City
programs, special events, maintenance and operations input, program and event schedules
in relation to proposed construction periods, equipment standards, design parameters, etc.
All parties must agree on the project approach;-program, future development adjacent the
South Beach Project and how that development will interface with South Beach, scope
and schedule of work, and meeting calendar. Review Coastal commission requirements
and goals.
Task 2 - Data Collection
The design team will evaluate Phases One and Two of the project site for accessibility,
pedestrian (non-wheeled) and wheeled users, trail access, parking, adaption to the
proposed improvements, potential construction costs, surrounding land use, accessibility
of utilities, location of restroom buildings, plazas, maintenance facilities, adjacent beach
access and other important factors.
Review and refine Phases One and Two of the Preliminary Master Plan improvements
and prepare preliminary construction costs. Preliminary construction costs will be
separated into Phase One and Phase Two. Prepare two parking lot striping plans to
evaluate the number of parking stalls obtainable within the existing parking area. We will
review, revise and refine the current master plan using information collected from the
South Beach Task Force, City staff and any special interest groups or future development
projects. A consensus will be agreed to for the revised design concepts.
22 Purkiss Rose-RSI
South Beach Project Phase One/Ph..,e Two, City of Huntington Beach
SCOPE OF WORK PHASE TWO
Using the existing 1" = 20' scale photogrammetric topographic mapping completed in
1991, the Design Team will provide field surveying services for Phase One and Phase
Two to.locate and plot all existing facilities-and to determine join elevations in those areas
to be reconstructed.
Task 3 - Task Force Input/City Meetings
The design team will work closely with the South Beach Task Force and the City to shape
the approach of all meetings. The project team will present the revised Master Plan for
Phases One and Two at scheduled meetings to reach a consensus on the preferred layout
and selection of amenities, materials and equipment. Site design concepts will be
thoroughly reviewed and discussed. Programmatic, operational, safety and maintenance
issues will be discussed. Future utility service needs will also be reviewed. The revised
Master Plan for Phases One and Two will then be presented to City staff, Task Force,
Design Review Board, Planning Commission, and City Council for approval.
Upon approval of the revised South Beach Master Plan, the Design Team will prepare
a Presentation Site Plan of the.project for the City's use. The presentation site plan will
reflect improvements to both phases and will be colored-and mounted.
Purkiss Rose-RSI will prepare the coastal development permit application for City staffs
review.
Task 4 - Cost Estimates
The design team will prepare a final preliminary construction cost estimate for the revised
Phase Two portion of the Master Plan improvements. For clarification, we shall itemize
the preliminary construction cost estimate for a complete understanding of project
improvement costs.
PHASE H - RESEARCH AND FACT FINDING
Task 1 - Preliminary Project Planning for Utilities
The location of existing electrical services, electrical, sewer, domestic water and existing
storm drain lines will be obtained from the City. The proposed locations of all site
improvements will be indicated on the same base sheets. The design team will provide
utility planning for electrical service, electrical, sewer, domestic water, gas, and site
23 Purkiss Rose-RSI
South Beach Project Phase On&Phase Two, City of Huntington Beach
SCOPE OF WORK PHASE TWO
storm drain lines/laterals to serve the proposed South Beach Phase Two site
improvements.
We will schedule (for the proposed project site):
• Site analysis
Task 2 - Base Map
We shall utilize the topographic map and survey prepared as part of this work for our site
evaluation and refinement of the Master Plan. We shall prepare 24" x 36" base sheets
at a site plan scale of 1" = 20' indicating topographic features, utilities, right-of-ways,
property/boundary lines and easement lines using an Autocad release 14 format.
PHASE III - DESIGN DEVELOPMENT APPROVAL
Gain preliminary approval from the.City staff, South Beach Task Force and City Council
to proceed with the recommended site improvements. The Design Development plans
which will include "in progress" demolition plans, grading and.drainage plans, utilities
plans, construction layout plans, architectural plans, electrical plans, landscape and
irrigation plans, and appropriate construction details for Phase Two only and will be
submitted to the City for review and approval. The design materials and site amenities
for the South Beach Phase Two Project will reflect the approved standards established for
the Pier Plaza Project and South Beach Phase One Project.
PHASE IV - DEVELOPMENT OF CONSTRUCTION DOCUMENTS
Once the Design Development plans have been reviewed and approved by City staff, the
team will develop final construction documents and specifications for implementation of
the Phase Two portion of the project. All construction documents will be developed on
Autocad (Rel 14) format on 24" x 36" sheets.
Task 1 - Construction Documents
The construction documents will include:
• Project Title Sheet
24 Purkiss Rose RSI
South Beach Project Phase One_lPhase Two, City of Huntington Beach
SCOPE OF WORK PHASE TWO
• Existing Condition Plans
• Site Clearing, Demolition and Removal Plans
• Grading and Drainage Plans
• Drainage System Details
• Utility plans including sewer, water, electrical and gas
• Architectural Plans for the two new Restroom Buildings.
• Architectural Plans for Renovation of.the Junior Lifeguard Headquarters
• Architectural Details
• Horizontal Control Plans
• Site Construction Layout Plans
• Construction Details
• Structural details and Calculations
• Irrigation Plans
• Irrigation Watering Schedules/Pressure Calculations
• Planting Plans
• Planting and Irrigation Details
• Electrical and Lighting Plans for two new restrooms.
• Electrical and Lighting Plans (modify existing lighting and supplement with new
fixtures for parking areas
• Electrical service. to parking attendant booths
• Electrical Service Plans
• Electrical Details
• Technical Specifications
All calculations for structural items, electrical service and loads, etc. are included as part
of the Phase Two construction document package.
The design team will work with the City staff in preparing all required forms and
application requests to obtain State and Coastal Commission approvals. Purkiss Rose-RSI
will submit forms and applications to the State and Coastal Commission for approval.
Task 2 - Art Plan Development Services for Phase Two
Phase 1: Art Plan Development
Task 1: Identify project scope and intent with client, City and public
groups
Task 2: Begin site analysis
Task 3: Conduct community interviews/research
Task 4: Identify contracts
25 Purkiss Rose-RSI
South Beach Project Phase OneThase Two, City of Huntington Beach
SCOPE OF WORK PHASE TWO
Task 5: Scope of work, budgets, schedules established
Task 6: Artist selection methods and objectives established
Task 7. Present and prepare artist prospectus as plan presented to
Purkiss Rose RSI
Phase 2: Artist Selection/Proposal Development and Contracting
Part 1
Task 1: Develop artist selection methods
Task 2: Identify advisory participants, artists to interview and select
artists
Task 3: Review and develop proposal agreements with Purkiss Rose-
RSI and artists
Task 4: . Arrange site visit with artists and Purkiss Rose-RSI
Task 5: Develop and review artists' contracts with Purkiss Rose-RSI
Task 6: Contract with artist and Purkiss Rose-RSI for proposal
development
Part 2
Task 1: Negotiate artists' contracts and scope of services
Task 2: Review.and gain approval for scope of services with Purkiss
Rose-RSI
Task 3: Sign and process artists' contracts
Task 4: Inform art community and other agencies of art project
through Purkiss Rose-RSI
Task 5: Facilitate introduction at design team meeting
Phase 3: Project Management/Construction Administration
Task 1: Facilitate artists' design drawings
Task 2: Submit plans to Purkiss Rose RSI
Task 3: Facilitate meetings between artists and Purkiss Rose-RSI
Task 4: Inform public agencies and City groups
Task 5: Receive monthly status reports from artist and report to
Purkiss Rose-RSI
Phase 4: Project Management/Construction Observation
Task 1: Oversee artwork fabrication
Task 2: Monitor budgets
Task 3: Process change orders
Task 4: Prepare agendas for artists meeting the public
26 Purkiss Rose RSI
South Beach Project Phase OnelPhase Two, City of Huntington Beach
SCOPE OF WORK PHASE TWO
Task 5: Receive monthly status reports from artist and report to
Purkiss Rose-RSI
Phase 5: Project management/Construction Completion
Task 1: Final Inspection and approval by City
Task 2: Provide.documentation/information to publicize
Task 3 - Final Cost Estimates
Prepare final itemized construction cost.estimates with quantities and unit prices.
PHASE V - BIDDING PHASE AND CONSTRUCTION PHASE
Task 1 - Bidding Phase
The design team will be available during the.bid process to assist, provide clarification, review
and comment on the bids.
Task 2 - Construction Administrative Services
We will review and approve addenda, change orders, material submittals, shop drawings,
clarifications to plans and specifications, requests for information(RFIs), provide twenty(20) site
visits and report on construction process. We will conduct a pre-construction meeting with the
awarded contractor and City staff. We will meet on a regular basis at the job site and review
installation. Reports will be prepared on construction progress and observations by a construction
management company whose services have been obtained by the City. We will assist in
determining and processing change orders. Likewise we will participate in the preliminary and
final reviews as required. Inspections will be performed by the public service agency inspectors
representing the City of Huntington Beach.
Also provided will be one complete set of diazo mylar reproductions of record construction
documents from field information provided by the contractor.
The City shall receive the Phase Two construction document package on computer diskette in
Autocad Rel 14.
27 Purkiss Rose-RSI
South Beach Project Phase OnalPhase Two, City of Huntington Beach
EXHIBIT A
FOR SOUTH BEACH PHASE TWO
South Beach Project, Huntington Beach
Professional Fee Schedule
September 8, 1998
The following Fee Schedule is.based on.$1,903,000.00 of Construction/Site Improvements for
the first phase of South Beach:
Phase I - Site Evaluation-and Revise Master Plan
Task 1 - Refinement of Project Definition
Task 2 - Data Collection
Task 3 - Beach Task Force Input/City Meetings
Task 4 - Cost Estimates
Sub-Total $ 10,000.00
Phase H - Research and Fact Finding
Task 1 - Preliminary Project Planning for Utilities
Task 2 - Base Map
Sub-Total $ 5,000.00
Phase III - Design Development
Sub-Total $27,700.00
Phase IV - Development of Construction Documents
Task 1 - Construction Documents/Specifications
Task 2 - Art Plan Development
Task 3 - Final Cost Estimates
Sub-Total $120,000.00
TOTAL $162,700.00
If the City wishes Purkiss Rose-RSI and the design team to participate in the bidding and
construction administration portion of the South Beach-Projects the following fee would apply.
28 Purkiss Rose-RSI
South Beach Project Phase OnelPhase Two, City of Huntington Beach
EXHIBIT A - SOUTH BEACH PHASE TWO
Phase V - Bidding Phase and Construction Phase
Task 1 - Bidding Phase
Task 2 - Construction Administrative Services
Sub-Total $34,000.00
Reproduction/delivery charge allowance of: $13,000.00
The fees indicated within Exhibit "A" for South Beach, Phase Two are valid for 12 full months
from the date of this proposal. At the end of the 12-month period, the design team would need
to renegotiate the Phase Two Fee Schedule with the City.
29 Purkiss Rose-RSI
South Beach Project Phase One/Phase Two, City of Huntington Beach
EXHIBIT C FOR PHASE TWO
EXCLUSIONS
Consulting services relating to.any of the following items are.specifically.excluded from this
Phase Two scope of services/fee schedule:
• Aerial flyover
• New photogrammetric topographic mapping
• Hydrology Study/Report
• Preparing record drawings for existing conditions or buildings that will remain or be
modified
• Design or renovation of the existing concession buildings
• Design or construction document preparation for pedestrian bridges at Pacific Coast Highway
• Environmental Impact Study/Negative Declarations
• Environmental Study/Reports
• Sewer lift stations or ejection pump design if gravity sewers are not available or appropriate
• Easements or legal description for any facilities or dedications
• Potholing to locate underground facilities
• Design surveys for any work not specifically stated in the Scope of Work
• Signal, signing, striping, street lighting or traffic control plans for Pacific Coast Highway
• Application, plan check,.permit fees or bonds
• Models
ASSUMPTIONS
Consultant's obligations hereunder are based upon the following understandings:
• The project construction budget for the City's program requests is $1,903,000.00 plus
Architect/Engineer fees, construction supplementals, application and permit fees, etc.
• Most of the existing pavement parking areas will be maintained "as-is" with modifications
done for the proposed access points off Pacific Coast Highway.
• Sewer connections for new restroom facilities may be connected to adjacent concession
building sewer lines.
• The existing water line through the project will remain and will not require relocation.
• The electrical amenities, light fixtures, etc. in the existing parking areas modified to include
relocating a number of the existing "Cobra Head" light fixtures and supplementing the
existing park area with new "Cobra Head" fixtures. (The "new" fixtures are actually at the
City Storage Yard.) The modification to the existing parking area lighting would include
new cable and conduits.
30 Purkiss Rose-RSI
ATTACHMENT #3
City of Huntington Beach
INTER-DEPARTMENT COMMMUNICATION
HUNTINGTON BEACH
TO: RAY SILVER, City Administrator
FROM: ROBERT J. FRANZ, Deputy City Administrato %'
SUBJECT: MULTI-YEAR FINANCING PLAN - PHASE 1 OF SOUTH AC
IMPROVEMENT MASTER PLAN
DATE: October 6, 1998
Community Services Director Ron Hagan and I have reviewed numerous alternative
approaches to finance the estimated $4.1 million cost for Phase I of the South Beach
Improvement Project. Our recommended approach is:
1. Use the existing fund balance in the Pier Fund.
2. Issue long term debt to finance the balance, or "gap" of Project costs.
3. Repay the long-term debt and the prior loan from the Water Fund over a 30-
year timeframe.
4. Use the Ruby's lease revenue and a $1 beach parking fee increase to repay
the long term debt and Water Fund loan.
Our preliminary projections show that this approach will work with the recommended
funding sources paying all the project costs.
Annual Expenditures -- All of the estimated recurring costs are fixed costs. They will not
increase because they are for debt service that is calculated on a "level annual debt
service" basis.
Estimated
Annual Cost
Ruby's Construction C.O.P.'s $ 90,000
Repayment to Water Fund 158,000
Debt Service - New Debt 220,000
Total $ 468,000
Ruby's Construction C.O.P.'s -- The City issued C.O.P.'s in 1986 and 1989, a
portion of which were used for the construction of the Ruby's Restaurant building.
Multi-Year Financial Plan - Phase I
South Beach Improvement Master Plan
Repayment to Water Fund -- The $12 million cost of rebuilding of the Pier was
financed, in part, by a $2.5 million loan from the Water Fund. The loan was to be
repaid from private fund raising and FEMA reimbursements. $1.7 million is
available for a partial repayment but the $1.7 million is being recommended to be
used to finance Phase I of the South Beach Improvement Project. A 30-year
repayment to the Water Fund, including interest payments of 3% per annum, is
proposed to provide full repayment to the Water Fund.
Debt Service - New Debt -- A 30-year debt issue to finance $2.4 million for
construction has been assumed in this analysis.
Annual Revenues -- Since annual expenses are $468,000, at least that amount of
recurring annual revenues are needed. Following are the estimated revenues from the
recommended funding sources:
Estimated
Annual Revenue
Ruby's Lease Revenue $ 250,000
Increase - Beach Parking 250,000
Total $ 500,000
Ruby's Lease Revenue -- Ruby's opened in June of 1996 and has been a huge
success. All previous staff (and Ruby's) projections of lease revenue have been
exceeded. The current projected annual lease revenue is over twice the annual
debt service for the construction of the Ruby's Restaurant building.
$1 Increase - Beach Parking Fee -- A $1 per automobile increase in the beach
parking fee during the peak season will generate an estimated $250,000 per year.
Since the South Beach Project will improve the parking lot and beach facilities, it
is logical to have beach visitors pay these costs through a parking fee.
The Ruby's lease revenue is expected to increase over time due to the impact of inflation
on food prices, etc. While the initial years' after the completion of the present
improvements will generate small surpluses, later years' surpluses will be available for
maintenance projects, repairs, or other improvements. Attached is an estimate of the
cumulative surplus if no additional expenses occurred.
Summary - Annual Cost and Revenues
Annual Revenues $ 500,000
Annual Costs 468,000
Estimated Annual Surpluses $ 32,000
0033093.01 -2- 10/07/98 11:29 AM
Pier Fund
30 year Revenue and Expense Estimates
Revenues Expenses" Surplus
Year Ruby's Parking Total Annual Cumulative
1999 $ 250,000 $ 250,000 $ 500,000 $ 468,000 $ 32,000 $ 32,000
2000 278,000 250,000 528,000 468,000 60,000 92,000
2001 289,000 250,000 539,000 468,000 71,000 163,000
2002 300,000 250,000 550,000 468,000 82,000 245,000
2003 311,000 250,000 561,000 468,000 93,000 338,000
2004 323,000 250,000 573,000 468,000 105,000 443,000
2005 335,000 250,000 585,000 468,000 117,000 560,000
2006 347,000 250,000 597,000 468,000 129,000 689,000
2007 360,000 250,000 610,000 468,000 142,000 831,000
2008 373,000 250,000 623,000 468,000 155,000 986,000
2009 386,000 250,000 636,000 468,000 168,000 1,154,000
2010 400,000 250,000 650,000 468,000 182,000 1,336,000
2011 414,000 250,000 664,000 468,000 196,000 1,532,000
2012 429,000 250,000 679,000 468,000 211,000 1,743,000
2013 444,000 250,000 694,000 468,000 226,000 1,969,000
2014 460,000 250,000 710,000 468,000 242,000 2,211,000
2015 476,000 250,000 726,000 468,000 258,000 2,469,000
2016 492,000 250,000 742,000 468,000 274,000 2,743,000
2017 509,000 250,000 759,000 468,000 291,000 3,034,000
2018 527,000 250,000 777,000 468,000 309,000 3,343,000
2019 545,000 250,000 795,000 468,000 327,000 3,670,000
2020 563,000 250,000 813,000 378,000 435,000 4,105,000
2021 582,000 250,000 832,000 378,000 454,000 4,559,000
2022 602,000 250,000 852,000 378,000 474,000 5,033,000
2023 622,000 250,000 872,000 378,000 494,000 5,527,000
2024 643,000 250,000 893,000 378,000 515,000 6,042,000
2025 665,000 250,000 915,000 378,000 537,000 6,579,000
2026 687,000 250,000 937,000 378,000 559,000 7,138,000
2027 710,000 250,000 960,000 378,000 582,000 7,720,000
2028 733,000 250,000 983,000 378,000 605,000 8,325,000
*Annual Expenses:
Ruby's Construction C.O.P's $ 90,000 Debt will be paid off in 2019
Repayment to Water Fund 158,000 Debt will be paid off in 2028
Debt Service- New Debt 220,000 Debt will be paid off in 2028
$ 468,000
Sobeach 10/5/98
Analysis of Repayments of Water Fund Loan to the Pier fund
Original Principal Amt $ 2,500,000
Accrued Interest to 9/30/98 (3% from 7/1/91) 597,490
Total Loan Amount $ 3,097,490
Loan Period in Years 30
Annual Payment
Interest Rate 3% $158,032
Annual Payments
Year FLoan Balance Principal Interest Total
1999 $ 3,097,490 $ 65,107 $ 92,925 $ 158,032
2000 3,032,383 67,060 90,971 158,032
2001 2,965,323 69,072 88,960 158,032
2002 2,896,251 71,144 86,888 158,032
2003 2,825,107 73,278 84,753 158,032
2004 2,751,828 75,477 82,555 158,032
2005 2,676,352 77,741 80,291 158,032
2006 2,598,610 80,073 77,958 158,032
2007 2,518,537 82,476 75,556 158,032
2008 2,436,062 84,950 73,082 158,032
2009 2,351,112 87,498 70,533 158,032
2010 2,263,614 90,123 67,908 158,032
2011 2,173,490 92,827 65,205 158,032
2012 2,080,663 95,612 62,420 158,032
2013 1,985,052 98,480 59,552 158,032
2014 1,886,572 101,434 56,597 158,032
2015 1,785,137 104,478 53,554 158,032
2016 1,680,659 107,612 50,420 158,032
2017 1,573,048 110,840 47,191 158,032
2018 1,462,207 114,165 43,866 158,032
2019 1,348,042 117,590 40,441 158,032
2020 1,230,452 121,118 36,914 158,032
2021 1,109,334 124,752 33,280 158,032
2022 984,582 128,494 29,537 158,032
2023 856,088 132,349 25,683 158,032
2024 723,739 136,319 21,712 158,032
2025 587,419 140,409 17,623 158,032
2026 447,010 144,621 13,410 158,032
2027 302,389 148,960 9,072 158,032
2028 153,429 153,429 4,603 158,032
2029 -
. �
'
RCAROUTING
`
INITIATING DEPARTMENT: Community Services/Administrative
Services/Public Works
SUBJECT: Approve Proceeding with Phase I of the South Beach
Improvements Master Plan
COUNCIL MEETING DATE: October 19, 1998
Ordinance (w/exhibits & legislative draft if applicable) Not Applicable
Resolution (w/exhibits & legislative draft if applicable) Not Applicable
Tract Map, Location Map a6d/or other Exhibits Attached
Contract/Agreement (w/exhibits if applicable)
(Signed Ln full by the City Attomey) Not Applicable
Subleases, Third Party Agreements, etc.
(Approved as to form by City Attomey) Not Applicable
Certificates of Insurance (Approved by the City Attomey) Not Alp'pllicalblle4
Financial Impact Statement (Unbudget, over $5,000) Not Applicable
Bonds (If applicable) Not Applicable
Staff Report (if applicable) Not Applicable
Commission, Board or Committee Report (if applicable) Not Applicable
Findings/Conditions for Approval and/or Denial I Not Applicable _j
-Administrative Staff
.Assistant City Administrator (Initial)
City Administrator (Initial)
City Cler
(Below Space For City Clerk's Use Only)
RCA Author: // \
�
ray-9/9/
REQUE..- � FOR CITY COUNCh- ACTION
Date October 7 , 1991
Submitted to: The Honorable Mayor and Parking Authority Members
Submitted by: Michael Uberuaga, City Administrator��- �--
Prepared by: Ron Hagan, Director, Community Services
Subject: SOUTH BEACH PARKING IMPROVEMENT AREA MASTER PLAN
Consistent with Council Policy? [ ] Yes [ ] New Policy or Exception
Statement of Issue, Recommendation,Analysis, Funding Source,Alternative Actions, Attachments:
CEMENT OF ISSUE
J
The South Beach Parking Improvement Area Task Force has completed
its work and prepared a master plan for Council approval .
RE_COMMENDATI Ra
1 . Thank the South Beach Parking Improvement Area Task Force
members for their diligent work in preparing the proposed master
plan;
2 . Approve the recommended master plan for the south beach
parking area improvements;
�3 . Approve a change order to the design contract of Purkiss-Rose
Associates in the amount of $35 , 350 from Parking Authority funds
to provide for a photogrammetically topographic map of the beach
area from Beach Boulevard to llth Street to be used for the
construction drawings for the south beach parking improvement
area and for the master plan design for north of the pier parking
area improvements; and
4. Direct staff to continue to use the South Beach Parking
Improvement Area Task Force for development and recommendation for
the north of the pier parking area -improvements.
ALVA.Y-SJ.R
In March of this year, the City Council established the South
Beach Parking Improvement Area Task Force and gave it the charge
of developing a master plan for improvements to the south beach
area. Over the past ten years , numerous suggestions have been
made for improvements to the south beach area, however, none of
these suggestions took place in the context of an overall master
plan. Numerous issues such as the separation of wheeled and non-
wheeled traffic , replacement of rest rooms, improvement of
parking lot entrances, improved utilization of parking space,
i
PIO 4/84
REQUEST FOR COUNCIL ACTION Page two
relocation of the junior guard headquarters, renovation of
landscaping and lighting, establishment of a sand wall , etc . ,
were all discussed but in an isolated environment by themselves.
The task force was the first time that all of the issues were
discussed in relation to each other and a final master plan to
address them developed.
The task force membership consisted of several city departments,
including Community Development, Public Works, Economic Develop-
ment, Police, Fire, Administrative Services, and Community
Services . In addition, representatives of the beach concession-
aires, Conference & Visitors Bureau, Chamber of Commerce, Down-
town Business Association, H. B. Tomorrow, Marine Safety Officers
Association, Amigos de Bolsa Chica, The Waterfront Development
Corporation, and interested community members were part of the
task force.
Purkiss-Rose Associates were hired as the landscape architects to
help the task force design its master plan. The first meeting
was spent on-site, walking the entire south beach area from First
Street to Beach Boulevard. This was followed by each task force
member submitting their concerns and recommended improvements to
the area. A matrix was then developed with all of these issues
and each task force member rated the issues on a scale of one to
five, with one being most important, and five least. With this
information in hand, the task force began designing solutions to
the top priority issues .
After several months of work, the task force was able to come to
agreement on just about every issue listed as a concern. The
group did a very diligent job in not only providing a master plan
design that addressed the issues and would work operationally,
but also, it was very cost conscious and designed a very simple
approach to a very aesthetic-looking improvement program.
Since the final master plan is 36 feet long, it cannot be con-
tained as an attachment to this RCA. Consequently, staff will
make a presentation of the design at the Council meeting .
Staff would like to use both the consultant and the existing task
force to do the same process on the north of the pier parking
area. This is a much similar area and should require only a few
meetings to complete the master plan. In addition, staff would
like to develop a photogrammetically topographic map to use as
base sheets to do the construction drawings for the beach
improvements. By doing this, the city will be insured of con-
struction drawings that are accurate and, thus, avoid costly
change orders in the future.
REQUEST FOR COUNCIL ACTION Page three
To accomplish this, staff is recommending a change order to
Purkiss-Rose Associates ' contract in the amount of $35 , 350 . If
Council approves the south beach parking improvement area master
plan, and the topographic map is completed, a final cost estimate
for the south beach improvements will be developed and presented
to Council prior to awarding Purkiss-Rose a contract for
construction drawings . The preliminary estimate for the south
beach improvements without the actual survey is $4 .1 million. At
the completion of the topographic survey, staff will return to
Council with accurate cost estimates for both the construction
drawings and actual development of the south beach improvements,
also a phasing plan, if required.
F-M-ING SOURCE
Unappropriated Parking Authority .fund balance
ALTERNATLV_F_ T214
1 . Do not approve the south beach parking improvement area
master plan and leave the area in its present condition.
2 . Do not approve the contract with Purkiss-Rose Associates for
the north of the pier parking area improvements, and select
another method of accomplishing the improvements.
3 . Do not use the South Beach Parking Improvement Area Task
Force to review the north of the pier parking area master plan.
ATTACHMEN.T3-
September 10, 1991 letter from Purkiss-Rose
September 11, 1991 minutes of the South Beach Parking Improvement
Area Task Force
RH:cs
e
purk,
September 24, 1991
Ron Hagan
_ City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
Subject: Proposal to Provide Professional Landscape Architectural Services
for North Beach (First Street to Sixth Street Incorporating the
Pier Plaza Design) Improvements and Topographic Survey
Dear Ron:
We have;!+greatly enjoyed our involvement with your staff and the task force
on the South Beach Project. We propose to carry our enthusiasm on to this
next area of concern which involves the Maxwell site and it's parking lot,
the parking lot to the north of the Pier and the incorporation of the Pier
Plaza into the overall concept. Working with staff and Jim Adams, the Pier
Plaza designer, we propose to develop an overall design concept which ties
into the adjacent projects and concepts. This will include pedestrian and
bike paths, restrooms, parking, vehicle access, site amenities, planting and
all other related design items. We shall attend all meetings as directed.
Our fee to provide these services is based on the estimated number of hours
it will take to complete the task. We propose a fee not to exceed
$20,500.00. Please add this additional cost to our contract for South Beach
improvements. We have received a proposal from Walden and Associates, Civil
Engineers to develop the photogrammetically topographic map for our base
sheets. This plan will include the area from 7th Street to Beach Blvd.
His fee to provide this service is $13,500.00 plus our 10% fee makes the
total cost $14,850.00. It will take approximately three (3) to four (4)
weeks to get this work done. We would like to schedule the work now so we
can proceed right into the construction document phase upon City Council
approval of the South and North Improvement Plan.
We look forward to our further involvement of the beach projects. Please
call if you have any questions.
Sincerely,
Stephan D. Rose, ASLA
Landscape Architect t�111i
SR/hs
Landscape Architectzx e ATTACHMENT
219 Nor'h Halhor Boulevard
Fullerion.California 92622
FP.X(714)871-1188
(714(871 IiM
SOUTH BEACH PARKING IMPROVEMENT AREA
TASK FORCE
Wednesday, September. 11 , 1991
5 : 00 p.m. , Council Chambers
Purkiss-Rose representatives displayed a conceptual master plan
comprising the recommendations of the task force. Pointed out
were the four emergency vehicle routes ( Beach, Huntington, First
and Sixth) providing access to the beach and through the entire
facility without going onto Pacific Coast Highway .
Across from the junior guard headquarters , a bus stop area was
added and stairways provided to better accommodate entry to the
beach. Handicapped access has also been provided at both ends of
the bus stop area . In addition, a drop off/pick up area has been
provided in the parking lot adjacent to the junior guard
headquarters.
A small parking lot has been added north of Sixth Street to
replace parking spaces lost as a result of master planning .
Short-term parking areas have been provided in the lot for either
metering or toll booths . It was pointed out that, while short-
term areas would expect to have a high turnover rate, if metered,
people may elect to feed the meter and stay.
Three concrete paths have been extended into the sand to
accommodate wheelchairs . The path shown adjacent to The Beach
Hut will be moved further south.
Locations for trash bins have been added at all concessions .
Concessionaires noted that the area between the bins and the
service road must be kept clear for times when the bins are
pushed out for pick up.
Cross sections were provided to show the varying grades of the
bicycle roadway adjacent to the parking lot and behind the
concessions .
Four volleyball courts have been placed in front of each
concession; however, the concessionaires felt that the courts
should be placed southerly of the buildings .
It was the consensus that the Beach Boulevard city/state entrance
problem had not been solved. The turn into the city beach is
still too hidden and narrow, causing vehicles to go into the more
ATTACHMENT
Page two
accessible state entrance. The city traffic engineer will be
asked to address the problem. There is a proposal to put a large
reader board at the entryway providing beach information and
making the entrance more visible. In addition, there was
agreement to place signs on the city owned property at the
northeast corner of Pacific Coast Highway and Beach Boulevard
advising vehicles how to access the city beach.
MOT ID
Mr. Nitzkowski made a motion that the South Beach Parking
Improvement Area Task Force accept the conceptual master plan,
with the changes outlined above, for the south beach.
Mr. Wohl seconded the motion.
The motion passed unanimously.
Mr. Hagan advised that the conceptual master plan for the south
beach is tentatively scheduled to go to the City Council on
October 7 .
The meeting ended at 6 : 20 p.m.
/cs
kCA - ROUTING SHEET/CHECKLIST
WHITE - REMAINS WITH RCA
GREEN - ADMINISTRATION COPY
CANARY - CITY ATTORNEY'S COPY
PINK - CITY CLERK'S COPY
GOLD - DEPARTMENT COPY
INITIATING DEPARTMENT Community Services DATE 9/23/91
SUBJECT-South Beach Parking Im2rovemen% Area Master Plan
MEETING DATE 10/7/91 AGENDA DEADLINE 9/25/91
(TO ADMINISTRATION)
YES NO
PUBLIC NOTICE [ ] [x] PUBLICATION DATE
LEGAL DEPARTMENT(with Exhibits)
Date In Date Out
INITIATING DEPARTMENT REVIEW/CHECKLIST:
YES NO N/A
[ ] [ ] [X] Ordinance [/], �Exhibit 1
[ ] [ ] [X] Resolution ( Exhibit 2
[ ] [ ) [X] Signed contract [ ] Exhibit 3
( ] [ ] [X] Signed Agreement [ ] Exhibit 4
[ ] [ ] [X] Neg. Dec/EIR
[ ] [ ] [x] Insurance Required Additional [ ]
Exhibits Nbr.
[ ] [ ] [x] Bonds Required
[ ] [ ] [X] Financial Impact Statement
(Unbudgeted Items over $1,000)
[X] [ ) [ ] RCA - City Council
[ ] [ ] [ ] RCA - Redevelopment Age
INITIATING DEPARTMENT APPROVAL BY: