HomeMy WebLinkAboutHB Energy Project - Visual Enhancement Plan - AES Huntington HUNTINGTON BEACH
Visual Enhancement Plan
AES Huntington Beach Energy Project
4/10/2014
Existing & New- Scale Comparison
New Plant with Landscape Enhancement
WOW
21
« .
2
4/10/2014
Existing View from Magnolia
-pop
New Plant with Landscape Enhancement
3
4/10/2014
Existing KOP-5
+.I
Landscape Enhancement KOP-5
4
4/10/2014
Project Attributes
(*
w,.��....
Height Stack—202ft Stack—120h Preliminary AES
(feet)
Units 1 and 2 HRSG-92ft
Boiler—152 it
ACC—104 ft
Units 3 and 4
Boiler-138 It Archapprox 125I — f
approx 125 k �4
5
4/10/2014
MIN, 11
w
morm
Huralinom llasi�h Generation Station
Malta
R
4/10/2014
Y
8
4/10/2014
i Mimi
r '
4/10/2014
Huntington Beach Energy Project
Resolution
• Building Height
— Maximum 50 ft height in Public Semi-Public zone
— Approximately 120 ft for six stacks
— Approximately 125 ft for three surfboards
Architectural Improvements: Recommended Revisions
— Surfboards:substantially three-dimensional and of sufficient
size and proportion for realistic representation of a surfboard
— Trompe I'oeil painting on ACC: more reflective of resort hotel
— Entire HBEP: painted combination of tans and browns on lower
portions and light blues on upper portion
— No signs or other identifying features on stacks,ACCs, or HRSGs
10