Loading...
HomeMy WebLinkAboutHB Energy Project - Visual Enhancement Plan - AES Huntington HUNTINGTON BEACH Visual Enhancement Plan AES Huntington Beach Energy Project 4/10/2014 Existing & New- Scale Comparison New Plant with Landscape Enhancement WOW 21 « . 2 4/10/2014 Existing View from Magnolia -pop New Plant with Landscape Enhancement 3 4/10/2014 Existing KOP-5 +.I Landscape Enhancement KOP-5 4 4/10/2014 Project Attributes (* w,.��.... Height Stack—202ft Stack—120h Preliminary AES (feet) Units 1 and 2 HRSG-92ft Boiler—152 it ACC—104 ft Units 3 and 4 Boiler-138 It Archapprox 125I — f approx 125 k �4 5 4/10/2014 MIN, 11 w morm Huralinom llasi�h Generation Station Malta R 4/10/2014 Y 8 4/10/2014 i Mimi r ' 4/10/2014 Huntington Beach Energy Project Resolution • Building Height — Maximum 50 ft height in Public Semi-Public zone — Approximately 120 ft for six stacks — Approximately 125 ft for three surfboards Architectural Improvements: Recommended Revisions — Surfboards:substantially three-dimensional and of sufficient size and proportion for realistic representation of a surfboard — Trompe I'oeil painting on ACC: more reflective of resort hotel — Entire HBEP: painted combination of tans and browns on lower portions and light blues on upper portion — No signs or other identifying features on stacks,ACCs, or HRSGs 10