HomeMy WebLinkAboutCONCEPTUAL DEVELOPMENT PLAN PIERSIDE RESTAURANT 2-20-9 :•:- ' 'r.' REQUEST FOR REDEVELOPMENT AGENCY ACTION A"ROVED BY CITY COUNCIL ��2 PH 90-11 P, �v 19 February 20, 1990 Date CITY CLERK 0 / -0.13S ' Submitted to: Honorable Chairman and Redevelopment Agen A :D BY CITY COUNCIL .0 Submitted by: Paul E. Cook, Executive Director 19�- Prepared by: Keith B. Bohr, Redevelopment Specialist ! My c K f Subject: APPROVAL OF OOTCEPIUAL EEVF'LOPMENT PiAN Consistent with Council Policy? [ ] Yes [ ] New Policy or Exception Statement of Issue, Recommendation,Analysis, Funding Source, Alternative Actions, Attachments STATEMENT OF ISSUE- On January 17, 1989, the Agency directed staff to prepare an amended Pierside Village plan to eliminate the specialty/retail uses while retaining the. restaurant uses (staff report attached) . Additionally, staff was authorized to negotiate with its operators for the rehabilitation of Maxwell's Restaurant. CST• Approve the conceptual plan for development of the "Pierside Restaurants" which includes: The development of two new restaurant pads - (25,000 sq.ft.) ; . Accommodations for the relocation of. the existing Maxwell's Restaurant - (15,000 sq.ft.) ; . The development of a parking structure, including surface and subsurface parking for both beachgoers and restaurant patrons; . The development of beach-related concessions, including approximately 6,000 sq.ft. of casual dining space; and Authorize staff and the developer of Pierside to negotiate for the relocation and integration of Maxwell's into the Pierside plan. S4*' -f t C-� Cl- n--� AMUSIS On September 18, 1988, the City Council adopted a a "Pier Plaza" concept that calls for the development of a 2.1 acre "Pier Plaza" to be located between the base of the Pier and Pacific Coast Highway. Approximately one-half of Maxwell's Restaurant as it exists today lies within the adopted 2.1 acre footprint of this plan. As a result, the negotiations for the rehabilitation P 1 O/1/85 of Maxwell's has shifted to negotiations for the demolition and relocation of a new Maxwell's within the proposed Pierside Restaurant development. The history of the Pierside project dates back to 1984 and is more specifically outlined in the analysis of the attached staff report dated January 17, 1989. Briefly, the originally approved "Pierside Village" plan called for an 87,500 sq.ft. specialty/retail ccuplex to be located on the ocean side of Pacific Coast Highway between the existing Maxwell's Restaurant and the Lifeguard Headquarters. Ultimately, the plan received all necessary approvals, including the California Coastal Ccumission. However, as the Main-Pier Redevelopment Plan further evolved and approved development heights and densities were scaled down, staff re-analyzed the need for a specialty/retail complex of the scope and magnitude originally envisioned for Pierside Village. As planning efforts continued, potential conflicts between the Pierside Village concept and the retail activity along Main Street began to be a source of concern. Ultimately, it was concluded that the Pierside Village concept should be downscaled and directed away fran a focus on retail activity and more towards food services. The currently proposed plans are the result of that shift in focus and reflect a refinement of that concept. FUNDING SOURCE: None as a result of this action. ALTERNATIVE ACTIONS' 1) Deny approval of the Pierside Restaurants conceptual development plan, and direct staff accordingly. ATTACUMENIS 1) Staff report of January 17, 1989. 2) Conceptual Plan. PEC/KBB:lp 0139h -APPtZ BY CITY CUU UEST FOR CITY COUNCIL/ f .._ 17 REDS ELOPMENT AGENCY ACTION RH 89-U9 i9_1. _..... � Date January 17, 1989 r ITV, LE Submitted to: Honorable Mayor/Chairman and City Council/Agency Members or Submitted b : Paul E. Cook, City Administrator/Executive Direct o � y Prepared by: Douglas N. La Belle, Deputy City Administrator/Economic Devel me Michael C. Adams, Acting Director of.Community Developmen Subject: PIERSIDE VILLAGE STATUS REPORT AND RECOMMENDED ACTIONS Consistent with Council Policy? ( ] Yes j>Q New Policy or Exception Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions, Attachments: STATEMENT OF ISSUE: Pursuant to your direction, staff has.placed on the agenda for discussion purposes and direction a Status Report on the Pierside Village portion of the Main-Pier Phase I Project. In 1984, the Agency began its first implementation efforts in the Main-Pier Project Area, and as a part of those efforts an initial development entity was selected for the project that has become known as Main-Pier Phase I. The site was bounded by Lake Street, Walnut, Main Street, a portion of the Pier, and the.Pacific Coast .Highway frontage from the Lifeguard Headquarters to the Pier, bounded by the beach frontage road on the ocean side. RECOMMENDATIONS: 1) Direct staff to prepare an amended Pierside Village plan utilizing the "cluster of restaurants" concept, eliminating all other.specialty retail uses; and 2) Receive and file.this report. ANALYSIS: The initial development entity selected to work exclusively with the Agency, Huntington Pacifica Development Group, included four principals. Negotiations took place from late-1984 through mid-1985. The negotiations concluded in August of 1985, with the adoption by the Redevelopment Agency of the Main-Pier Phase I DDA. This Disposition and.Development Agreement provided for an initial scope of development that included in part a 300-room, first-class hotel and related retail uses, and a 75,000 sq.ft. specialty commercial complex. With the Disposition and Development Agreement being approved, the developer spent an extensive period of time seeking to obtain financing and develop a final Land Use Plan for implementation. In October of 1986, these efforts resulted in a revised development concept that was approved along with the First Amended Disposition and Development Agreement, and the initial Pierside Lease in October, 1986. Final entitlement project approvals were obtained in December, 1986, through the Coastal Commission and efforts continued to develop a viable Phase I plan for implementation. Din Alan Through 1987,.the planning efforts continued and a change of direction began_o ern with respect to our Main Street redevelopment efforts. The 3DI Plan previously. apt-in concept began to evolve into which has become the "Village Concept." Thi= khan direction was finalized with conceptual approval by the Agency of the entertEln-iment= complex in lieu of the hotel in March of-1988, and Agency approval of the "Vick=ge Concept" in April of 1988. It is important to note that in the first several years of our implementation e :urts a visitor.-serving corridor essentially from Main to Beach, Walnut to Pacific Coast Him was envisioned. Under the visitor-serving concept Pierside Village was a key evelo= component and served to provide a needed specialty/retail use as an importan �leme- the visitor-serving concept. With a shift in direction and removal of that visi-w-c-ser-- core, we began to re-think the need for a specialty/retail village of the scope 2-id magnitude originally envisioned for Pierside Village. .As the Village planning e_-orts: continued, land use conflicts began to occur in terms of Pierside Village drawi. the.-_— life for Main Street to that area rather than becoming the specialty/retail as mice envisioned. Throughout this period of time, the economics of this project w.er= being continually evaluated by Agency staff, our consultants, and developer represe_ative Ultimately, a point was reached where the viability not only from a land use an economic standpoint brought us to the conclusion that the Pierside Village con_ept sh== be modified to achieve a more desirable land use, as well as an economically X.- ble project. Thus, the decision to proceed with a cluster of restaurants rather tha_ to attempt a specialty/retail center that would be in direct competition with the 7 vital-.— Main Street retail core that we were attempting to create. Staff has reviewed this matter with various Agency consultants and our recornmenda- _ is as outlined above to proceed with the preparation.of an Amended Pierside + age E� -_ In our analysis, this action is appropriate based upon project economics and the appro modified development concept as now being implemented for the Main Street Care. FUNDING SOURCE: _ Available Agency Contractual Services funds. ALTERNATIVE ACTIONS: Continue with original Pierside Village concept. PEC/DLB:lp 4230r STATEMENT OF THE ACTION OF THE CITY COUNCIL Council Chamber, City Hall Huntington Beach, California Tuesday, January 17, 1989 Mayor Bannister called the regular City Council meeting of the City of Huntington Beach to order at 7 p.m. ROLL CALL Present: MacAllister, Green, Winchell , Bannister, Mays, Silva, Erskine Absent: None (City Council/Redevelopment Agency) PIERSIDE VILLAGE STATUS REPORT - RECEIVED AND FILED - STAFF DIRECTED TO PREPARE AN AMENDED PIERSIDE VILLAGE PLAN TO ELIMINATE SPECIALTY RETAIL USES OTHER THAN RESTAURANTS - STAFF TO NEGOTIATE WITH MAXWELL'S RESTAURANT RE REHABILITATION The City Clerk/Clerk presented a communication from the Deputy City Adminis- trator/Economic Development, transmitting pursuant to Council /Agency direction a Status Report on the Pierside Village portion of the Main-Pier Phase I Project. The site is bounded by Lake/Walnut/Main/a portion of the Pier and the Pacific Coast Highway frontage from the Lifeguard Headquarters to the Pier, bounded by the beach frontage road on the ocean side. The City Administrator/Executive Officer presented a staff report. A motion was made by MacAllister, seconded by Mays, to direct staff to prepare an amended Pierside Village plan which eliminates all specialty retail uses other than restaurants, -to receive and file the Pierside Village Status Report and to authorize City staff to discuss and negotiate with the owner of Maxwell ' s for a rehabilitation of that restaurant. The motion carried by the following roll call vote: AYES: MacAllister, Green, Winchell , Bannister, Mays, Silva, Erskine NOES: None ABSENT: None Councilman Mays requested staff to talk to potential restaurant users of the pads and get specific required square footage before developing a plan. Page 2 - Statement of Action - 1/17/89 Mayor Bannister adjourned the regular meeting of the City Council and the regular meeting of the Redevelopment Agency of the City of Huntington Beach to 8:30 a.m. , Friday, January 20, 1989, to Ben Brown' s Restaurant, Laguna Beach. ATTEST: Connie Brockway City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach, California Connie Brockway City Clerk STATE OF CALIFORNIA ) Wes Bannister County of Orange ) Mayor City of Huntington Beach) I, CONNIE BROCKWAY, the duly elected and qualified City Clerk of the City of Huntington Beach, California, do hereby certify that the above and foregoing is a true and correct Statement of Action of the City Council of said City at their regular meeting held on the 17th day of January 1989. WITNESS my hand and seal of the said City of Huntington Beach this the 7th day of February 1990. Connie Brockway City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach, California Deputy T a c IL : ��IInIII 1 i r L1 co f Hon . Chairman and Members of the Redevelopment Agency City of Huntington Beach 2000 Main Street Huntington. Beach, CA 92648 Re : Pierside Restaurant Project Concept Approval Hon . Chairman and Members of the Redevelopment Agency, In anticipation of our presentation. to you on Tuesday, February 20, 1990, I felt it would be appropriate to discuss the basic concept we will be proposing. As all of you know, the Pierside project has had a long history. Starting as a Greek oriented retail village of over 85, 00 sf, with a focus on retail stores, it was followed by an even more intensive, but West Coast oriented proposal by Enterprise Development Co . Although the Agency origin.a lv supported i:he Greek Village plan, it ultimately concluded that the successor Enterprise plan was too intense and voted to down scale the project and shift the focus to restaurants . Our original proposal was geared to this end, and had less than .10, 000 sf of retail on the Plaza level . Upon viewing the plan, however, the Agency/Council sub-committee concluded that all retail should be removed from the Plaza level, and that only restaurants should be found in this l.ccation . The conceptual plan before you reflects that further change in direction. Dramatically simpler than a.11 prior plans, it is limited to three new buildings : the reconstructed Maxwell' s, and t,, o r:ew b--iildi n_gs totalling25, 000 sf . Pursuant to the sub-committee' s reccmme :dat_ons,. the boardwalk level contains a 6, 000 sf casua:'j_ din _nq establishment, a reconstructed Dwight' s, and approximately 7 , 500 sf of beach related cor:cessicr:s %food services . A combination of limited sur-[&ce parking, and two subterranean levels will provide approximately 500 parking spaces for project visitors and beach goers . It is our intention to maintain the Lowest level of parking, constituting approximately 225 spaces, free for self-parking and beach goer use . The middlze parking level, which has a self-parking design capacity of approxinlately 225 spaces, will, through the use of tandem and 'va';_et :management probably house well in excess of 300 cars . in ligt:t of the -fact that restaurants' have their highest re,Yic:d ofactivity inthe r late afternoon and evening; we belie,:-e that this mix will provide high use of .the parking lot t-:ruughout the day. As the attached di_1g:r.ar�s i.1. usr_rare,. ttie current proposal has tremendous edestx _aT: .es..�. a.r.o mi.ni::al view obstruction . In the vi ewL shed t11.v. ifi the Uark.ened areas, are views of the Ocean .'_ockec:. In all other areas, and along the entire length of PC:i, a Lunge of Ocean view opportunities is available . Pedestrians access the . project at Mai:_ and Lake Streets, and can walk across the entire cf the Ocean side of the project for free and with a totally unobstructed view of the Beach, - Ocean and Pier, thereby elf ectively extending tr.e Pier Plaza 800 feet to the South no cost to the community . Access to the Beach is by ., huge staircases that . double as observation areas . Furthermore, elevator access for the frail and handicapped will be provided . It is our conviction that the instant proposal fully integrates the objectives set. ..fc!rth in the. . Downtown Specific Plan for District 10, a copy- a{. Wl_ch is attached for your review. Your approval of this c-r vvp _ will allow us to proceed with further refinement of t..e , pearl and submission to the Planning Commission. I look forward to receiving yoll 7 unanimous support . Sincere]_v yours, Jonathan_ P . Chodos PIERSIDE RESTAURANT PR.OvECT DESCRIP IO:Ij Pacific Coast Highway Level : Three separate buildings, restaurants only: Maxwells 15, 000 sf Reconstruction Building No. 2 10, OGO sf} New Construction 25, 000 sf Building No. 3 15, 000 sf} it Boardwalk Level fronting on Beach Access Road: Casual Dining 6, 000 sf Dwight' s 2 , 500 sf Food Services sf Beach Related Concessions 5, 00.0. sf Parking spaces 500+ District Seven is a consolidated parcel under one ownership and is - approximately 13 gross acres. District Seven should be master planned as a primarily visitor-serving commercial project, which could be implemented over a number of phases. Hotel, motel, restaurant and specialty commercial would be appropriate uses. Development in this District is not intended to compete with the Downtown commercial core, therefore, major incentives for development would not be necessary. The commercial uses in this District would be of a more seasonal variety with the District serving as a connecting link between the Downtown area and District Nine. The Plan anticipates__ visitor-serving commercial can be accommodated with a 20 room el. (:District Ten incl es the area on the ocean side of Pacific Coast Highway most suited f commercial development. This District includes the pier sting parking areas on either side, comprising approximately 15 =w gross acres. The visitor-serving commercial uses most appropriate for this District are beach-related and complementary to activities which occur around the pier, such as fishing, surfing and sun bathing. Additional parking in structures would also be appropriate provided that they do not extend above the level of Pacific Coast Highway and block views.. This provision should still provide for the option of multi-level commercial activities in this District. The pier is a prime location for restaurants, which can take advantage of the panoramic views. Equally important as the new Ok commercial activities which may be accommodated is to insure that the major emphasis in this District is public open space. The pier and beach area must remain accessible to the public for free recreational pursuits. District Ten is part of the pier-head node as described previously. This commercial/recreational activity node is of primary importance in the revitalization effort of the City. Development within this District will probably be initiated with City efforts. The extent and intensity of clevelopment in District Three and further inland will directly determine the amount of revitalization which can occur -to the pier and the beach-related commercial uses which can be accommodated. In addition, the. present amount of parking can be approximately doubled without obstructing views or drastically changing the overall character of the District. 3.2.4 Residential (High Density) i�. The residential designation includes two Districts (District Two and Eight) exclusively for residential uses. District Two extends from Goldenwest Street to 6th Street between Pacific Coast Highway to Walnut Avenue. District Two is subdivided into numerous twenty-five foot wide lots with very ldiverse ownerships encompassing approximately 44 gross acres. District Two is intended to develop as a continuation of the type and variety of residential development which exists in the adjacent Townlot area. The development regulations should be similar and compatible with those in the Townlot area, with the exception that larger projects (one full block or more)' should be provided with additional incentives to encourage lot consolidation. Consolidation of the numerous small lots which are spread throughout the District is one of the objectives of the Plan. In order to accomplish this, the allowed density in 35 MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS =-------------------------------------------------------------------- 126 39 137 01/04/88 RELOCATION GUIDELINES & REPLACEMENT HOUSING PLAN - MAIN-PIER PROJ AREA - CONT TO 2/1/88 61 39 137 01/04/88 RELOCATION GUIDELINES & REPLACEMENT HOOUSING PLAN - MAIN-PIER PROJ AREA - CONT TO 2/1/88 49 39 137 01/04/88 CONSULT AGRMT BTWN AGENCY/B L EVANS - APPRVD SUBJ APPROVAL CITY ATTY-VALUATION OIL INT - MAIN-PIER 48 39 137 01/04/88 CONSULT AGRMT BTWN AGENCY/B L EVANS - APPRVD SUBJ APPROVAL CITY ATTY - VALUATION OIL INT - MAIN-PIER 126 39 137 01/04/88 CONSULT AGRMT BTWN AGENCY/B L, EVANS - APPRVD SUBJ APPROVAL CITY ATTY - VALUATION OIL INT - MAIN-PIER 72 39 137 01/04/88 CONSULT AGRMT BTWN AGENCY/B L EVANS - APPRVD SUBJ APPRVAL CITY ATTY - VALUATION OIL INT - MAIN-PIER 126 39 147 01/19/88 CLO SES AGENCY NEGO ROBERT MAYER CORP DRIFTWOOD MH PK - HB INN - MAIN-PIER AREA - WATERFRONT PROJ 90 39 147 01/19/88 CLO SES AGENCY NEGO ROBERT MAYER CORP DRIFTWOOD MH PK - HB INN - MAIN-PIER AREA - WATERFRNT PROD 126 39 1.47 01/19/88 AGENCY CLO SES - MAIN-PIER PHASE I - HUNTINGTON PACIFICA I AND PIERSIDE DEVELOPMENT - NEGO RE PROP 90 39 147 01/19/88 AGENCY CLO SES - MAIN-PIER PHASE I - HUNTINGTON PACIFICA I AND PIERSIDE DEVELOPMENT - NEGO RE PROP 126 39 166 01/25/88 MAIN-PIER REDEVELOPMENT PROJECT - DIRECTION GIVEN TO STAFF 126 39 • 166 01/25/88 MAIN-PIER POLICY ISSUES AND PROGRAM OPTIONS 126 39 169 01/25/88 MAIN-PIER HOUSING PROGRAM REPORT 85 39 169 01/25/88 MAIN-PIER HOUSING PROGRAM REPORT 126 39 169 01/25/88 MAIN-PIER PROJECT OVERVIEW 126 39 170 01/25/88 MAIN-PIER PHASE II PROJECT MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 126 39 171 01/25/88 DWNTWN SPECIIC PLAN DISTRICTS 1 THRU 11 AND MAIN-PIER REDEVELOPMENT SUBAREAS 85 39 171 01/25/88 DWNTWN SPECIFIC PLAN DISTRICTS 1 THRU 11 AND MAIN-PIER REDEVELOPMENT SUBVAREAS 126 39 173 01/25/88 SUMMARIZATION OF MAIN-PIER PROJECT AREA 126 39 177 0-0/01/88 REAPPOINTMENT- MAIN-PIER COMMITTEE -GALLEGOS , GOODRICH, GUZZARDO, HAYWARD, KOTSCH , MCCLAIN, MULLIGAN 42 39 192 02/16/88 SM - CLO SES - PROP NEGO - MAIN-PIER RDVLPMT - WATERFRONT PROJ - MAYER CORP - DRIFTWOOD MH PK 112 39 192 02/16/88 SM - CLO SES - PROP NEGO - MAIN-PIER RDVLPMT - WATERFRONT PROJ - MAYER CORP - DRIFTWOOD MH PK 90 39 192 02/16/88 SM - CLO SES - PROP NEGO - MAIN-PIER RDVLPMT - WATERFRONT PROJ - MAYER CORP - DRIFTWOOD MH PK 61 39 192 02/16/88 SM - CLO SES - PROP NEGO - MAIN-PIER RDVLPMT - WATERFRONT PROJ - MAYER CORP DRIFTWOOD MH PK 90 39 198 02/16/88 AUTHORIZATION FOR APPRAISALS & ACQUISITION OF PARCELS IN THIRD BLOCK MAIN-PIER PROJ AREA 126 39 198 02/16/88 AUTHORIZATION FOR APPRAISALS & ACQUISITION OF PARCELS IN THIRD BLOCK - MAIN-PIER PROD AREA 85 39 200 02/16/88 SEISMIC & FACADE IMPROVEMENT LOAN PROGRAM MAIN-PIER PROJECT AREA 124 39 •201 02/16/88 SEISMIC . & FACADE IMPROVEMENT LOAN PROGRAM MAIN-PIER PROJECT AREA 126 39- 201 02/16/88 SEISMIC & FACADE IMPROVEMENT LOAN PROGRAM MAIN-PIER PROJECT AREA 114 39 201 02/16/88 SEISMIC & FACADE IMPROVEMENT LOAN PROGRAM MAIN-PIER PROJECT AREA i.26 183 02 22i88 AGENCY MIN BK - CLO SES - NEGO ROBERT KOURY - MAIN-EMIR SUBAREA - PKING V01, -PiN C;,E: F KEYWORDS ---------------------------------------------------------------------- 81 AGENCY ;0 R'l)RF.,pT 2 01.1 1__:Y M A 1-.N I? I 1','R S('13 A! EA P K 1-NG 1216 4 2 THE' IAS A R F'A Plf.EJ, P. k" A l.' S IT 10 N I PROJ AIN',L 126 40 12 0 3 21 88 MA 1.N-Pl P 1-1 AS F' f _)N 1 DEVELOPMEN"L' PLAN A T RN A ,"T\.E'S' ALTERNATIVE B APPRVD AS 85 40 12 03/21/88 MAIN-PIER PHASE I - CONCEPTIL'Al, DEVELOPMENT PLAN ALTERNATIVES ALTERNATIVE B APPRVD AS AMEND 19 40 12 03/21/88 PUB COM MAIN-PIER PH I - CONCPT DEV PLAN ALT SCHULZE - UNDERGROUND PKING/GOLDEN BEAR/SURF MUSEUM 126 40 23 03/28/88 PUB HEAR - RES 5860 - ADPTD - ACQUIS PROP BY EMINENT DOMAIN PKING STRUC - MAIN-PIER REDEV PROJ AREA 90 40 23 03/28/88 PUB HEAR - RES 5860 - ADPTD - AQUIS PROP BY EMINENT DOMAIN PKING STRUC -MAIN-PIER REDEV PROJ AREA 126 40 24 03/28/88 PUB HEAR - RES 5861-ADPTD-ACQUIS PROP . BY EMINENT DOMAIN PKING STRUC - MAIN-PIER REDEV PROJ AREA 90 40 24 03/28/88 PUB HEAR - RES 5861-ADPTD-ACQUIS PROP BY EMINENT DOMAIN PKING STRUC- MAIN-PIER REDEV PROJ AREA 90 40 25 03/28/88 PUB HEAR - RES 5862-ADPTD-ACQUIS PROP BY EMINENT DOMAIN PKING STRUC- MAIN-PIER REDEV PROJ AREA 126 40- 26 03/28/88 PUB HEAR - RES 5863-ADPTD-ACQUIS PROP BY EMINENT DOMAIN PKING STRUC-MAIN-PIER REDEV PROJ AREA 126 40 28 03/28/88 PUB HEAR - RES 5864-ADPTD-ACQUIS PROP BY EMINENT DOMAIN PKING STRUC-MAIN-PIER REDEV PROJ AREA MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 90 40 28 03/28/88 PUB HEAR — RES 5864—ADPTD—ACCQUIS PROP BY EMINENT DOMAIN PKING STRUC—MAIN—PIER REDEV PROJ AREA 126 40 31 03/28/88 CLO SES — MAIN—PIER REDEV PROJ AREA — MAIN—PIER PHASE II 90 40 31 03/28/88 CLO SES — MAIN—PIER REDEV PROJ AREA MAIN—PIER PHASE II 126 40 25 03/28/88 PUB HEAR — RES 5862 — ADPTD — ACQUIS PROP BY EMINENT DOMAIN PKING STRUC — MAIN—PIER REDEV PROD AREA 42 40 44 04/18/88 CLO SES — MAIN—PIER REDEV PRO, AREA — REAL PROP NEGO — HUNTINGTON PAC:IFICA I/PIERSIDE DEVLPMT 126 40 44 04/18/88 CLO SES — MAIN—PIER REDEV PROJ AREA — REAL PROP NEGO — HUNTINGTON PACIFICA I/PIERSIDE DEVLPMT 42 40 44 04/.18/88 CLO SES — MAIN—PIER REDEV PROD AREA — TOWNSQUARE — NEGO REAL PROP 126 40 44 04/18/88 CLO SES — MAIN—PIER REDEV PROJ AREA — TOWNSQUARE — NEGO REAL PROP 90 !'! 44 04/18/88 CLO SES — MAIN—PIER REDEV PROD AREA — TOWNSQUARE — NEGO REAL PROP 1.26 40 51 04; 1 t;/88 TRANSFER PUB IMPRVMNTS FUNDS FROM OAKVIEInl < ''.: �.% PROJ AREA TO MAIN—P I?R REDEV PROJ AREA—APt'„V(, 32 40 51 04/18/88 TRANSFER CDBG PUB IMPRVMtiI'S FUNDS FROM OAKVIEW REDEV PRO,1 AREA TO MAIN—PIER REDEV PROJ AREA—APPRVD 85 40 51. 04/18/88 TRANSFER CDBG PUB IMPRVMNTS FUNDS FROM OAKVIEW REDEV PROD AREA TO MAIN—PIER REDEV PRO,7 AREA—APPRVD 114 40 •• 51 04/18/88 TRANSFER CDBG PUB IMPRVMNTS FUNDS FROM OAKVIEW REDEV PROD AREA TO MAIN—PIER REDEV PROJ AREA—APPRVD 48 40 51 04/18/88 AUTH RETAIN CONSULTANT — MAIN—PIER PROJ AREA IMPLEMENTATION PROG/ AGRMT W/PMW ASSOC INC—APPRVD 126 40 51 04/18/88 AUTH RETAIN CONSULTANT — MAIN—PIER PROJ AREA IMPLEMENTATION PROG/ AGRM'I' W/PMW ASSOC INC—APPRVD MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 49 40 51 04/18/88 AUTH RETAIN CONSULTANT - MAIN-PIER PROJ AREA IMPLEMENTATION PROG/ AGRMT W/PMW ASSOC INC-APPRVD 90 40 51 04/18/88 AUTH ACQUISITION & APPRVD AGRMT OF SALE TEBERG-5TH ST BTWN OLIVE/WALNUT - MAIN_-PIER REDEV PROJ AREA 126 40 51 04/18/88 AUTH ACQUISITION & APPRVD AGRMT SALE FOR TEBERG-5TH ST BTWN OLIVE/WALNUT - MAIN-PIER REDEV PROJ AREA 126 40 52 04/18/88 MAIN-PIER PHASE II STATUS REPORT- EXTENDED TIME TO 7/1/88 FOR NEGO AGRMT- GRIFFIN REALTY 96 40 52 04/18/88 MAIN-PIER PHASE II STATUS REPORT- EXTENDED TIME TO 7/1/88 FOR NEGO AGRMT- GRIFFIN REALTY 49 40 52 04/18/88 MAIN-PIER PHASE II STATUS REPORT- EXTENDED TIME TO 7/1/88 FOR NEGO AGRMT- GRIFFIN REALTY 121 40 52 04/18/88 MAIN-PIER PHASE II STATUS REPORT- EXTENDED TIME TO 7/1/88 FOR NEGO AGRMT- GRIFFIN REALTY 85 40 52 04/18/88 MAIN-PIER PHASE II STATUS REPORT- EXTENDED TIME " TO 7/1/88 FOR NEGO AGRMT- GRIFFIN REALTY 90 40 52 04/18/88 AUTH ACQUISITION & APPRVD AGRMT OF SALE-TAHMISIAN PROP-3RD ST AREA- MAIN-PIER REDEV PROJ AREA 49 40 52 04/18/88 AUTH ACQUISITION & APPRVD AGRMT OF SALE - TAHMISIAN PROP - 3RD ST AREA - MAIN-PIER REDEV PROJ AREA 126 40 52 04/18/88 AUTH ACQUISITION & APPRVD AGRMT OF SALE - TAHMISIAN PROP - 3RD ST AREA - MAIN-PIER REDEV PROJ AREA 90 40 55 04/18/88 PUB HEAR CONT OPEN 5/2/88- RES NECESSITY/ ACQUISITION PROP EMINENT DOMAIN-MAIN-PIER REDEV PROJ AREA 126 40 55 04/18/88 PUB HEAR CONT OPEN 5/2/88-RES NECESSITY/ ACQUISITION PROP EMINENT DOMAIN-MAIN-PIER REDEV PROJ AREA 90 40 44 04/18/88 CLO SES - MAIN-PIER REDEV PROJ AREA - REAL PROP NEGO - HUNTINGTON PACIFICA I/PIERSIDE DEVLPMT MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 20 40 73 05/02/88 RES 150 - ADTPD - APPRVL OF RELOCATION GUIDELINES MAIN-PIER REDEV PROJ AREA & OTHER PROJ AREAS 126 40 73 05/02/88 RES 150 - ADPTD - APPRVL OF RELOCATION GUIDELINES MAIN-PIER REDEV PROD AREA & OTHER PROJ AREAS 87 40 73 05/02/88 RES 150 - ADPTD - APPRVL OF RELOCATION GUIDELINES MAIN-PIER REDEV PROJ AREA & OTHER PROJ AREAS 90 40 76 05/02/88 PUB HEAR-CONT OPEN 5/16/88-ACQUISITION/PROP-MAIN-PIER REDEV PROJ AREA-RES/NECESSITY-EMINENT DOMAIN 126 40 76 05/02/88 PUB HEAR-CONT 5/16/88-ACQUISITION/PROP-MAIN-PIER REDEV PROJ AREA-RES/NECESSITY-EMINENT DOMAIN 90 40 90 05/16/88 OPEN PUB HEAR-CONT 7/5/88-ACQUISITION PROP - MAIN-PIER REDEV PROJ AREA- RES/NECESSITY-EMINENT DOMAIN 126 40 90 05/16/88 OPEN PUB HEAR-CONT 7/5/88-ACQUISITION PROP- MAIN-PIER REDEV PROJ AREA-.RES/NECESSITY-EMINENT DOMAIN 42 40 96 05/23/88 CLO SES-DIRECT AGENCY NEGOT RE:MAIN-PIER REDEV PROD/ROBERT MAYER CORP-DRIFTWOOD MOBILEHOME PK-HB INN 90 40 96 05/23/88 CLO SES-DIRECT AGENCY NEGOT RE :MAIN-PIER REDEV PROJ/ROBERT MAYER CORP-DRIFTWOOD MOBILEHOME PK-HB INN 126 40 96 05/23/88 CLO SES-DIRECT AGENCY HEGOT REMAIN-PIER REDEV PROJ/ROBERT MAYER CORP-DRIFTWOOD MOBILEHOME PK-HB INN 19 40 97 05/23/88 PUB COM-HAYWARD-MEMBER MAIN-PIER PROJ AREA COM-THANKED PEOPLE FOR HELP ON CLEAN-UP DAY DWNTN AREA 126 40 98 05/23/88 JT PUB HEAR-COUNCIL/REDEV AGENCY-OWNER PARTICIPATE AGRMT-MOLA-MAIN-PIER REDEV PROJ-OPEN CONT 6/6/88 49 40 98 05/23/88 JT PUB HEAR-COU-INC'I:L/REDEV AGENCY-OWNER PARTICIPATE AGRMT-MOLA-MAI:N-PIER REDEV PROJ-CONT OPEN 6/6/88 MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 85 40 98 05/23/88 JT PUB HEAR-COUNCIL/REDEV AGENCY-OWNER PARTICIPATE AGRMT-MOLA-MAIN-PIER REDEV PROJ-CONT OPEN 6/6/88 126 40 ill 06/06/88 APPRVD REPLACEMENT HOUSING PLAN FOR MAIN-PIER REDEV PROJ 87 40 ill 06 06/88 APPRVD REPLACEMENT HOUSING PLAN FOR MAIN-PIER REDEV PROJ 49 40 115- 06/06/88 JT PUB HEAR-RES 5886-ADPTD-RES 153-ADPTD-OWNER PARTICIPATION AGRMT-MOLA-MAIN-PIER REDEV PROJ AREA 126 40 115 06/06/88 JT PUB HEAR-RES 5886-ADPTD-RES 153-ADPTD-OWNER PARTICIPATI:ON AGRMT-MOLA-MAIN-PIER REDEV PROJ AREA 61 40 134 06/20/88 APPRVD 50 , 000 APPROP APPRAISALS-DRIFTWOOD/PACIFIC/OAKVIEW MHPKS-WATERFRONT-PHASE I-MAIN-PIER REDEV 49 40 134 06/20/88 APPRVD 50 , 000 APPROP APPRAISALS-DRIFTWOOD/PACIFIC/OAKVIEW MHPKS-WATERFRONT-PHASE I-MAIN-PIER REDEV 126 40 134 06/20/88 APPRVD 50 , 000 APPROP APPRAISALS-DRIFTWOOD/PACIFIC/OAKVIEW MHPKS-WATERFRONT-PHASE I-MAIN-PIER REDEV 85 40 134 06/20/88 APPRVD 50 , 000 APPROP APPRAISALS-DRIFTWOOD/PACIFIC/OAKVIEW MHPKS-WATERFRONT-PHASE I-MAIN-PIER REDEV 126 40 143 06/27/88 JT PUB HEAR-RES 5895/154/ADPTD-2ND AMEND DISPOSITION/DEVLPMT AGRMT AGENCY/CA RESORTS-MAIN-PIER REDEV 126 40 ,146 06/27/88 CLO SES-TOWNSQUARE-MAIN-PIER REDEV PROJ AREA-NEGO ACQUISITION/PROP-NICCOLE AND SMITH 85 40 146 06/27/88 CLO SES - TOWNSQUARE - MAIN-PIER REDEV PROJ AREA - NEGO ACUISITION OF PROP - NICOLE AND SMITH 42 40 146 06/27/88 CLO SES - TOWNSQUARE - MAIN-PIER REDEV PROJ AREA - NEGO ACQUISITION OF PROP - NICCOLE AND SMITH MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 90 40 146 06/27/88 CLO SES - TOWNSQUARE - MAIN-PIER REDEV PROJ AREA - NEGO ACQUISITION OF PROP - NICCOLE AND SMITH 126 40 146 06/27/88 CLO SES-SECURITY NATIONAL BANK-MAIN-PIER REDEV-NEGO ACQUISITION/PROP-PACIFIC SOUTHWEST REALTY CO 90 40 146 06/27/88 CLO SES-SECURITY NATIONAL BANK-MAIN-PIER REDEV-NEGO ACQUISITION/PROP PACIFIC SOUTHWEST REALTY CO 126 40 152 07/05/88 MAIN-PIER PROJECT AREA COM - REMOVAL OF MEMBER - APPRVD - MULLIGAN - REPLACEMENT TO BE SOLICITED 31 40 152 07/05/88 MAIN-PIER PROJECT AREA COM - REMOVAL OF MEMBER - APPRVD - MULLIGAN - REPLACEMENT TO BE SOLICITED 90 40 157 07/05/88 PUB HEAR-ACQUISITION/PROP-CONT 9/6/88-GOSNEY PROP-MAIN-PIER REDEV PROJ-RES/NECESS-EMINENT DOMAIN 126 40 157 07/05/88 PUB HEAR-ACQUISITION/ROP-CONT 9/6/88-GOSNEY PROP-MAIN-PIER REDEV PROJ-RES/NECESS-EMINENT DOMAIN 90 40 157 07/05/88 PUB HEAR-ACQUISITION/PROP/EMINENT DOMAIN-CHILLCUT/SCHWARTZ-MAIN-PIER REDEV-CLARK HOTEL-CONT 7/18/88 126 40 157 07/05/88 PUB HEAR-ACQUISITION/PROP/EMINENT DOMAIN-CHILLCUT/SCHWARTZ-MAIN-PIER REDEV-CLARK HOTEL-CONT 7/18/88 90 40 158 07/05/88 PUB HEAR-RES 156 ADPTD-ACQUISITION/PROP/EMINENT DOMAIN-ZEIDAN-MAIN-PIER REDEV PROJ AREA 126 40 -- 158 07/05/88 PUB HEAR-RES 156-ADPTD-ACQUISITION/PROP/EMINENT DOMAIN-ZEIDAN-MAIN-PIER REDEV PROJ AREA 126 40 172 07/18/88 APPRVD AUTHORIZE FILE ENTITLEMENT APPLICATION W/OUT PROP OWNER CONSENT MAIN-PIER REDEV PROJ AREA 85 40 172 07/18/88 APPRVD AUTHORIZE FILE ENTITLEMENT APPLICATION W/OUT PROP OWNER CONSENT - MAIN-PIER REDEV PROJ AREA MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 49 40 173 07/18/88 APPRVD EXTENSION OF TIME FOR NEGO AGRMT TO 7/1/89 - GRIFFIN REALTY - MAIN-PIER REDEV PROJ 90 40 173 07/18/88 APPRVD EXTENSION OF TIME FOR NEGO AGRMT TO 7/1/89 - GRIFFIN REALTY - MAIN-PIER REDEV PROJ 126 40 173 07/18/88 APPRVD EXTENSION OF TIME FOR NEGO AGRMT TO 7/1/89 - GRIFFFIN REALTY - MAIN-PIER REDEV PROJ 90 40 177 07/18/88 PUB HEAR-CONT OPEN 8/1/88-EMINENT DOMAIN-CLARK HOTEL-CHILLCUT/SCHWARTZ-MAIN-PIER REDEV PROJ AREA 126 40 177 07/18/88 PUB HEAR-CONT OPEN 8/l/88-EMINENT DOMAIN-CLARK HOTEL-CHILLCUT/SCHWARTZ-MAIN-PIER REDEV PROJ AREA 42 40 32 04/04/88 CLO SES - NEGO - ROBERT MAYER CORP - DRIFTWOOD MH PK/HB INN - MAIN-PIER REDEV PROJ AREA 126 40 32 04/04/88 CLO SES - NEGO - ROBERT MAYER CORP - DRIFTWOOD MH PK/HB INN - MAIN-PIER REDEV PROJ AREA 90 40 32 04/04/88 CLO SES - NEGO - ROBERT MAYER CORP - DRIFTWOOD MH PK/HB INN - MAIN-PIER REDEV PROJ AREA 126 40 35 04/04/88 SUPPLEMENTAL APPTMTS - APPRVD - MAIN-PIER REDEV PROJ AREA COM - MADRIGAL/OPPERMAN 90 40 199 08/01/88 PUB HEAR-RES 155-CONT 8/15/88-ACQUIS PROP EMINENT DOMAIN(.CLARK HOTEL) -MAIN-PIER REDEV PROJ/MAIN ST 85 40 . .199 08/01/88 PUB HEAR-RES 1_55-CONT 8/15/88-AQUIS PROP EMINENT DOMAIN(CLARK HOTEL) -MAIN-PIER REDEV PROJ-MAIN ST 126 40 199 08/15/88 PUB HEAR-RES 155-CONT 8/15/88-ACQUIS PROP EMINENT DOMAIN( CLARK HOTEL) -MAIN-PIER REDEV PROJ-MAIN ST 49 41 5 08/15/88 APPRVD AUTH FOR ACQUISITION/PROP-CONTRACT/SALE-SHANDRI CK-SW CORNER MAIN/OLIVE-MAIN-PIER REDEV PROJ MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS -------------------------------------7------------------------------- 90 41 5 08/15/88 APPRVD AUTH FOR ACQUISITION/PROP-CONTRACT/SALE-SHANDRI CK-SW CORNER MAIN/OLIVE-MAIN-PIER REDEV PROJ 126 41 5 08/15/88 APPRVD AUTH FOR ACQUISITION/PROP-CONTRACT/SALE-SHANDRI CK-SW CORNER MAIN/OLIVE-MAIN-PIER REDEV PROJ 90 41 6 08/15/88 AQUISITION PROP- APPRVD- CONTRACT/SALE- CONLEY- 6TH ST BTWN PCH & WALNUT- MAIN-PIER REDEV PROJ AREA 49 41 6 08/15/88 ACUISITION PROP- APPRVD- CONTRACT/SALE- CONLEY- 6TH ST BTWN PCH & WALNUT- MAIN-PIER REDEV PROJ AREA 126 41 6 08/15/88 ACQUISITION PROP- APPRVD- CONTRACT/SALE- CONLEY- 6TH ST BTWN PCH & WALNUT- MAIN-PIER REDEV PROJ AREA 126 41 9 08/15/88 PUB HEAR- AGENCY RES 155- ADPTD- ACQUIS PROP EMINENT DOMAIN- CLARK HOTEL- MAIN-PIER REDEV PROJ AREA 90 41 9 08/15/88 PUB HEAR- AGENCY RES 155- ADPTD- ACQUIS PROP EMINENT DOMAIN- CLARK HOTEL- MAIN-PIER REDEV PROJ AREA 49 41 49 09/19/88 AUTH FOR ACQUISITION AND CONTRACT OF SALE - (WULLNER PROP ) - MAIN-PIER PROJ AREA - APPRVD - 5TH/WALNUT 90 41 49 09/19/88 AUTH FOR ACQUISITION AND CONTRACT OF SALE-(WULLNER PROP) - MAIN-PIER PROJ AREA - APPRVD - 5TH/WALNUT 126 41 49 09/19/88 AUTH FOR ACQUISITION AND CONTRACT OF SALE- (WULLNER PROP) - MAIN-PIER PROJ AREA - APPRVD - 5TH/WALNUT 49 41 , . 50 09/19/88 AUTH/ACQUISITTON/APPRVL CONTRACT/SALE-APPRVD (THARP PROP) MAIN-PIER PROJ AREA-6TH ST BTWN PCH/WALNUT 126 41 50 09/19/88 AUTH/ACQUISITION/APPRVL CONTRACT/SALE-APPRVD (THARP PROP ) MAIN-PIER PROJ AREA-6TH ST BTWN PCH/WALNUT MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS -----------------------------------------------------------------•---- 90 41 50 09/19/88 AUTH/ACQUISITION/APPRVL CONTRACT/SALE-APPRVD (THARP PROP) MAIN-PIER PROJ AREA-6TH BTWN PCH/WALNUT 49 41 56 09/19/88 RES 5927/159- ADPTD- COUNCIL/REDEV PURCHASE AGR.MT APPRVD- WATERFRONT PROJ- MAIN-PIER REDEV PROJ AREA 126 41 56 09/19/88 RES 5927/159- ADPTD- COUNCIL/REDEV PURCHASE AGRMT APPRVD- WATERFRONT PROJ- MAIN-PIER REDEV PROJ AREA 61 41 56 09/19/88 RES 5927/159- ADPTD- COUNCIL/REDEV PURCHASE AGRMT APPRVD- WATERFRONT PROJ- MAIN-PIER REDEV PROJ AREA 85 41 56 09/19/88 RES 5927/159- ADPTD- COUNCIL/REDEV PURCHASE AGRMT APPRVD- WATERFRONT PROJ- MAIN-PIER REDEV PROJ AREA .61 41 57 09/19/88 RES 5928/160 ADPTD-AGENCY REIMBURS AGRMT PUB IMPROV COSTS-APPRVD-MAIN-PIER REDEV (PACIFIC) RL MAYER 49 41 57 09/19/88 RES 5928/160 ADPTD-AGENCY REIMBURS AGRMT PUB IMPROV COSTS-APPRVD-MAIN-PIER REDEV(PACIFIC)RL MAYER 126 41 57 09/19/88 RES 5928/160 ADPTD-AGENCY REIMBURS AGRMT PUB IMIPROV COSTS-APPRVD-MAIN-PIER REDEV (PACIFIC)RL MAYER 85 41 57 09/19/88 RES 5928/160 ADPTD-AGENCY REIMBURS AGRMT PUB IMPROV COSTS-APPRVD-MAIN-PIER REDEV (PACIFIC) RL MAYER 106 41 93 10/24/88 ORD 1 - ADPTD - TAX ON OCCUPYING LODGING WITHIN MAIN-PIER REDEV PROJ AREA 70 41' 93 10/24/88 ORD 1 - ADPTD - TAX ON OCCUPYING LODGING WITHIN MAIN-PIER REDEV PROJ AREA 126 41 93 10/24/88 ORD 1 - ADPTD - TAX ON OCCUPYING LODGING WITHIN MAIN-PIER REDEV PROJ AREA MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 85 41 93 10/24/88 ORD 1 - ADPTD - TAX ON OCCUPYING LODGING WITHIN MAIN-PIER REDEV PROJ AREA 90 41 102 10/24/88 PUB HEAR-RES/NECESS-MAIN-PIER PROJ-PH 1 OIL INTEREST-EMINENT DOMAIN-CAPRO/H&O OIL CO/CONT 11/7/88 126 41 102 10/24/88 PUB HEAR-RES/NECESS-MAIN-PIER PROJ-PH 1 OIL INTEREST-EMINENT DOMAIN-CAPRO/H&O OIL CO-CONT 11/7/88 85 41 102 10/24/88 PUB HEAR-RES/NECESS-MAIN-PIER PROJ-PHASE 1 OIL INTEREST-EMINENT DOMAIN-CAPRO/H&O OIL CO-CONT 11/7/88 31 41 107 11/07/88 APPTMT TO MAIN-PIER PROJ AREA COM - APPRVD - VILLEROT 126 41 107 11/07/88 APPTMT TO MAIN-PIER PROJ AREA COM - APPRVD - VILLEROT 69 41 110 11/07/88 APPRVD PROPOSED USE/FUND-BOND PROCEED/HB PUB FINANCE AUTH-HUNT CTR/MAIN-PIER/OAKVIEW/TALBERT-BEACH 54 41 110 11/07/88 APPRVD PROPOSED USE/FUND-BOND PROCEED/HB PUB FINANCE AUTH-HUNT CTR/MAIN-PIER/OAKVIEW/TAI,BERT-BEACH 126 41 110 11/07/88 APPRVD PROPSED USE/FUND-BOND PROCEED/HB PUB FINANCE AUTH-HUNT CTR/MAIN-PIER/OAKVIEW/TALBERT-BEACH 85 41 110 11/07/88 APPRVD PROP USE/FUND-BOND PROCEED/HB PUB FINANCE AUTH-HUNT CTR/MAIN-PIER/OAKVIEW/TALBERT-BEACH 90 41 120 11/07/88 PUB HEAR-RES 161-CONT 11/21/88-ACQUIS/PROP/EMINENT DOMAIN-H&O OIL CO-MAIN-PIER PROJ-PH1 OIL INTEREST 85 41 '. 120 11/07/88 PUB HEAR-RES 161-CONT 11/21/88-AQUIS/PROP/EMINENT DOMAIN/H&O OIL CO-MAIN-PIER PROJ-PH1 OIL INTERESTS 72 41 120 ' 11/07/88 PUB HEAR-RES 161-CONT 11/21/88-ACQUIS/PROP/EMINENT DOMAIN/H&O OIL CO-MAIN-PIER PROJ-PH1 OIL INTEREST MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 126 41 120 11/07/88 PUB HEAR-RES 161-CONT 11/21/88-ACQUIS/PROP/EMININENT DOMAIN/H&O OIL-MAIN-PIER PROJ-PH1 OIL INTERESTS 126 41 121 11/07/88 PUB HEAR-RES 162-ADPTD-ACQUISITION/PROP/EMINENT DOMAIN-CAPRO OIL-MAIN-PIER PROJ-PHI OIL INTERESTS 90 41 121 11/07/88 PUB HEAR-RES 162-ADPTD-ACQUISITION/PROP/EMINENT DOMAIN-CAPRO OIL-MAIN-PIER PROJ-PHI OIL INTERESTS 72 41 121 11/07/88 PUB HEAR-RES 162-ADPTD-ACQUIS/PROPERTY/EMINENT DOMAIN-CAPRO OIL-MAIN-PIER PROJ-PH1 OIL INTERESTS 85 41 121 11/07/88 PUB HEAR-RES 162-ADPTD-ACQUIS/PROPERTY/EMINENT DOMAIN/CAPRO OIL-MAIN-PIER PROJ-PH1 OIL INTERESTS 19 41 136 11/21/88 PUB COM- PICARD- RE PROPOSED PURCH MAIN-PIER PH I OIL INTERESTS- CONCERN ESTABLISH FAIR MARKET VALUE 49 41 138 11/21/88 AGRMT FOR SALE OF REAL PROP - APPRVD - MAIN-PIER PHASE II PROJ AREA - STUART OMOHUNDRO - 121 5TH ST 90 41 138 11/21/88 AGRMT FOR SALE OF REAL PROP - APPRVD - MAIN-PIER PHASE II PROJ AREA - STUART OMOHUNDRO - 121 5TH ST 126 41 138 11/21/88 AGRMT FOR SALE REAL PROP - APPRVD - MAIN-PIER PHASE II PROJ AREA - STUART OMOHUNDRO - 121 5TH ST 85 41 138 11/21/88 AGRMT FOR SALE OF REAL PROP - APPRVD - MAIN-PIER PHASE II PROJ AREA - STUART OMOHUNDRO - 121 5TH ST 49 41' 140 11/21/88 HASEKO/CALIF RESORTS INTERNATIONAL-MAIN-PIER PH I ENTERTAINMENT COMPLEX DEVLPMT-DELETED FROM AGENDA 126 41 140 11/21/88 HASEKO/CALIF RESORTS INTERNATIONAL-MAIN-PIER PH I ENTERTAINMENT COMLEX DEVLPMT-DELETED FROM AGENDA ' MINUTES INDEX SUBJECT VOL PAGE DATE KEYWORDS --------------------------------------------------------------------- 85 41 140 11/21/88 HASEKO/CALIF RESORTS INTERNATIONAL-MAIN-PIER PH 1 ENTERTAINMENT COMPLEX DEVLPMT-DELETED FROM AGENDA The foregoing instrument is a correct copy of the original on file in this office. Attest -2 C-; i9.fit CONNIE BRQCKyyAt City Clerk and Ex-officio Clerk of the City Council of the Cfty of Huntington Beach, Cat. Deputy � NI ` `UI T^K s I I � 03 i �OPi hYA I I i i i 6EACH ACCESS Lr-VEL i I 7 2M /7 T .f D L L CR.CARNF.Y C I G [.�s��nG c t.i silo[nun. _n Lei Col cos'I1� Cs �— [.i s:•nG 5u�i ui�Gs !. m 2 ci F i,}—III �--L� _7=Xi Pacific Coast Highway ....................--_._ ��.. O WOW /awt+ �— a . ....... fore go ing i.rtstrument is a correcc t ........................................_.................................... .......... .............. .... .............. ......,............. ....... copy of the original on file in thisoffice. II Attest �2-- a---L ig 9 v j CONN. IJE BROCKWAY City Clerk and Ex-off icio Clerk of the City Council of the Clty of Huntington Beach, Cal. By � Deputy Site Plan0 U ll 11" •IU R S I !Ll L !L LL1 LG 'L.d" E CRmCARNEY E—;:.G P.......P—Ili En QET co _:s.rnG.ran.�nG•.on P:e::al nnv I I Eai slinG BYIIEI^Ce o mi Pacific Coast Highway ------- --� �� -- -- C I I tleac:: access FoaE ����•� �•�� .................. .. ..... .. .......... ...... . .................. ...TI* Jo.regaing instrument is a correct copy of the original on file in this office. Attest a (1 19 — CONNIE BROCKWAY City C le rk and Ex-officio Clerk of the City j Council of the Clfy of Huntington Beach, Ca I. Bye —EJ Deputy • ,E Site Plan 11 . E Illl S .1 .L.l• 1_e I !Le LLa 4 `l.l" 1L" CR CARNEY 0 0 ................. a, 0 'D 7Z ------------------- jI. saix IVIZ A F, Existing Max fell's . ....... ........ ...... Existing D w I g h t S. View Corridors Site Plan foregoing instrument is a correct y of the original on file in this office. P I E R S I D E I L L 4 G E CFLCARNEY ........... ist rnninnF Ppnr%VIAI A V d ......................... . ..... .... .......... ... ......... ................. ar ................ . ........ S ............. ... ......... Pacih-, Coac- Hignway .... ....... ............. ................... ........ ... ........ ..... ............................ . ............ ... .......... ........ .......... .......... .......... ........... 7777"77777777771 ... .......... ... ....... . ........ ----------- -W/I-- ;PF X-A v AGYr; Ant Pedestrian Access Site Plan .4e, foregoing instrument is a correct E IL I L L 4 C E CCARNfY C, PI RSID LH: apy of the original on file in this office. �ttpst 4 • � CITY OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH tg�Z) : . /tI4/ To City Council From Charles W. Thompson City Administrator Subject DOWNTOWN ARCHITECTURAL Date January 25, 1985 DESIGN GUIDELINES AND SLIDE PRESENTATION Please find attached for your review and comment a very preliminary draft of the Downtown Architectural Design Guidelines. Inside the booklet you will find a few samples of the illustrations which are currently being prepared by an artist . Asterisks mark the places where drawings will appear in the final draft. A fifteen minute.-slide presentation is also being developed which illustrates and introduces the Guideline booklet. Eventually it will be a ' canned' , two screen show that will be available for presentations to developers and civic groups showing what we envision for the downtown area. A preliminary version of this slide presentation will be given at the Study Session on Monday evening, January 28, 1985 to show the direction in which we are heading. Both the booklet and the presentation cover only private improvements to be made in the downtown area. Upon completion we will begin preparing a second phase covering public improvements . Any comments you wish to submit on both the booklet and presentation would be appreciated. CWT:PP: jr Attachments Cone-►�� 4. T..4.4 •1 CO)n DRAFT - JANUARY 24, 1935 DOWNTOWN ARCHITECTURAL DESIGN GUIDELINES _ CITY OF HUNTINGTON BEACH r . rPURPOSE The purpose of . this booklet is to present This booklet is intended to n and siting give the architectural design 9 designer a clear idea of the guidelines which apply to all development architectural elements which should be within the boundaries of the Huntington incorporated into the proposed design. Beach Downtown Specific Plan. It will also serve as a tool for review of development proposals within the The Downtown Architectural Design Specific Plan area. All projects must guidelines are intended to promote high also conform to the Development Standards standards in architectural design and the contained in the Downtown Specific Plan construction of aesthetically pleasing and other applicable Sections of the buildings which reflect the contemporary Huntington Beach Ordinance . Mediterranean design theme of the area. The guidelines strive to incorporate into the downtown area a strong, recognizable physical image and identity. ; I !j it���Kf^=� ••" - ti�l41"�f' - .r _'• r; �� _ 'Z- - � . .yy �_ T _ - .:1 E ! 'ONTENTS 1.0 INTRODUCTION 4.0 SIGNS 2.0 ARCHITECTURAL CRITERIA 4.1 General Design Guidelines 4.2 Awning Signs 2.1 General Design and Siting .4.3 Banners Guidelines 4.4 Canopy Signs Building Form and Mass 4.5 Freestanding Signs The Pedestrian 4.6 Wall Signs Experience 4. 7 Window Signs Views Environment 2.2 Building Materials 2. 3 Building Colors 2.4 Roofs 2. 5 Windows 2.6 Doorways and Entrances 2. 7 Stairways 2.8 Balconies 2.9 Arches and Arcades 2.10 Low Walls and Fences 2.11 Building Details 2.12 Focal Elements Gateways Towers Fountains 3.0 LANDSCAPING 3.1 Design Principals 3.2 Landscape Standards 3 .3 Materials INTRODUCTION 9N.TRODUCTION The City of Huntington Beach has evolved The adopted theme is an expression of the with the ocean as the core and center of coastal influence and image of Huntington its vitality. The Downtown Specific Plan Beach. The design theme will be carried takes advantage of the ocean as a out not only in building design, but resource and beach-related amenities and through signage, landscape, lighting and draws from the rich history of the area streetscape design. as the early focal point of the city's civic, recreational, and business activities . The adopted design theme for the downtown area is contemporary Mediterranean architecture, a style responsive to the . climate and location of the city. The contemporary Mediterranean style is comprised of many influences--images from the coastal portions of Spain , Italy, Portugal and Greece, mixed with elements of contemporary Mexican and Southern Californian architecture. Arches, deeply recessed windows, courtyards, tile roofs, balconies and stucco walls are common elements. The climate and ocean proximity dictate orientation to the prevailing breezes, protection from the sun and wind and views of the ocean. Light-colored building materials reflect the sunlight and become a background to the brighter accent colors of the building trim and other architectural details. The aesign concept of the Downtown Specific Plan focuses on the municipal LAKE STRIEErBLOCKS pier and seeks to craw the pedestrian up TRAWHON ti : .. .L. Main Street to the Town Square, a retail anchor at the head of Main Street which will include office, residential and a TOWN SOUAREI major plaza. The level of energy and BLOqC ,.::.. excitement generated at the pier-head :;::• �, should be capitalized upon and spread throughout the Downtown core . �:�� : Development should be scaled to a v pedestrian level with passive activities :... e such as strolling and viewing given equal �,.b.•, ,,,t...•_ •,.....,,, �. . consideration with more vigorous — �r~ activities such as surfing, swimming and - TRANS"ION ; bicycling. The overall form and shape of c. BLOCKS .. ►; ', .+ _ 4 ��. all development in the downtown area •c ;. ,: : ,�J x : MXED MANST� should provide view, light and air � sIt AREA corridors to the ocean wherever possible. The pier will continue to S , • _, i sl: serve as the main attraction in the city RESIDE USES JJ` �. and should become .the catalyst for the USES � 4i � r +� - � -- I j • ; V revitalization effort . .f, NO- � .f+ •• ( �• t_�,`°'° ,, IF 01 RESCENTIAL � ,'. PER HEAD MIXED USE BOARDWALK Bomb DEVELOPMENT HeetavmnY � K• . r3ENERAL DESIGN AND SITING GUIDELINES BUILDING FORM AND MASS THE PEDESTRIAN EXPERIENCE The relationship of buildings to New development within the downtown pedestrian spaces is the key to a lively should be oriented towards pedestrians . and exciting outdoor environment in down The way that buildings are sited creates town Huntington Beach. Because the pedestrian spaces. The uses that they overall scale of the downtown is to be of house contribute to a varied and lively a "human scale", care must be taken to streetscape. keep the buildings from becoming too massive and thus imposing. o Buildings facing pedestrian streets and plazas should incorporate o Tall buildings should be made less design features that provide visual imposing by physically stepping interest at the street level . In them back from the street level . adaition, the buildings are required to provide street level o building facades should be detailed uses such as shops, restaurants and in such a way to make them appear services that cater to pedestrians. shorter. This can be done with the use. of horizontal bands or by o Where appropriate in commercial and increasing the level of detail on mixed-use areas, buildings should the buildings at the street level. accommodate several levels of pedestrian activity. o New buildings should be designed in such a way to create pleasing o Building setbacks along major transitions to surrounding pedestrian streets should be varied development. whenever possible to create small courtyards or plaza-like areas which attract pedestrians. VIEWS ENVIRONMENT Ocean views provide an added benefit to In site and building design, an area. The downtown area offers many environmental factors such as wind, sun, spectacular views with the opportunity noise, shadow and reflection on buildings for additional views to be revealed. and on .outdoor spaces must be addressed. o Buildings should be designed and o both building design and the design sited to provide ocean views of open space areas along the first block inland from Pacific Coast o New structures should be designed Highway should take into account to respect the views of existing the strong prevailing westerly buildings. winds. o Rooftops should be designed to be o The effect of shadowing that a new visually attractive when viewed building will have upon adjacent from. adjacent buildings. development should be considered. o Additional sunlight should be . brought into large developments through the use of courtyards, atriums and skylights . o The effects of shadowing in open areas such as courtyards should be studied and buildings should be designed to provide adequate sunlight for pedestrian use. rr r t r r ARCHITECTURAL CRITERIA -BUILDING MATERIALS. BUILDING COLOR BUILDING COLORS Buildings should demonstrate uniformity in materials and consistency in style Colors can greatly affect the imagery and through all exterior elevations . mood of the downtown area. Use of a harmonious color scheme with bright Buildings should have one primary accents will produce a lively atmosphere material . The dominant exterior encouraging year-round use. material of a building should be one of BACKGROUND COLOR the following : Base walls of buildings and other large o Stucco ( smooth ana rough) expanses should be lightly-colored. Soft o Smooth Block o Granite tones ranging from whiteto pastel tints o Marble are encouraged. Neutrals such as off-whites, beige and sand are also The use of reflective glass as a primary acceptable colors . Salmon and other material is discouraged. muted colors give a pleasing contemporary appearance. ACCENT MATERIALS ACCENT COLOR Secondary materials should be used to Some graphic elements should be brightly highlight building features or provide colored to contrast with the interest . light-colored background architecture in order to produce a lively streetscape. o Wood o Glass Building details such as doors, chimneys, o Tile window framing, trim, railings, awnings o Brick light fixtures or planters may be used to o Concrete carry the bright accent color . Care o Painted Metal should be taken not to use too many o Wrought Iron bright colors or too many different types of details so as to avoid an overwhelming building ROOFS Appropriate and simple forms include the shed, gable, and hip roofs which may be Flat roofs should be avoided. used in combination to achieve the varying roofline characteristic .of Mediterranean villages. Shed Gable Chimneys, roof flashing, rain gutters, downspouts, vents and other roof protrusions should be finished to complement or accent the adjacent materials and colors . This can be accomplished by using materials similar to those used on the building or by Hip painting the detail in an accent color . These details enhance the Mediterranean appearance of a building. Roof materials most indicative of Zhe design and screening of rooftop Mediterranean architecture include clay mechanical equipment should be incorporated into the building design. shingle tile, concrete shingle tile, Mission tile and other the-like Mechanical equipment should not be visible from any angle or any height designs . Other appropriate roof outside of the building. materials include copper and painted metal . ,WINDOWS Windows in the Mediterranean style are Accented with window boxes. typically multi-paned. Surrounding window treatments can create variations of this style as seen in the following examples. Arched openings. Tile highlights. Small paned windows with shutters.. Iron or wood grill. Brightly colored cloth or painted metal awnings can enhance the visual appearance Projecting bay windows. of a building . Awnings should be of a solid color and be designed to coordinate with the architectural divisions of the building rather than being long and continuous. . "DOORWAYS AND ENTRANCES Doors are a major focal element in the Mediterranean style. Traditionally they are ornate and highly detailed. Doors are generally wooden and accented by an —� arch or eave. o Building entries should be protected from the elements and Ij it . !I, provide a "sense of shelter' ���I i through the use of an overhang or a simple recess. illy!,. o Building entries should afford a "sense of entry" for the structure. Door designs can range from the more detailed traditional style to a simplified contemporary variation. . (T. • Highlighted with brightly colored cloth awnings. I The use of a wall or eave can contribute to the importance of an entrance. - — Stucco arch surrounding wood door . .STAIRWAYS Stairways, while functional often become a major focal point in the design of a , building . They can create effects ranging from majestic entry ways to understated level changes As a- design element , stairways create visual r transitions from one level to another . People are drawn to stairs as a place to -`- -, sit and view the surrounding plazas, ' w` people and buildings . ter- An ornate stairway can identify a major i I entrance to a building . FA , i I i Risers can be highlighted with colorful tile and rails. ARCHES AND ARCADES. Arches are the most clearly recognizable feature of Mediterranean architecture. They originally developed as the way to provide structural support for a doorway. o Care should be taken that arches appear authentic. The integrity of an arch is lost when its mass is not proportional to its size. The columns should relate in scale to that which they visually support When arches are repeated along the length of a building , an arcade is created. Arcades are especially appropriate in the commercial and mixed use areas to protect pedestrians from sun and inclement weather . Arcades create cool shaded spaces and pedestrian scaled walkways . . They can also create a protected area for the temporary outdoor expansion for displays and outdoor dining. •BALCONIES Balconies create additional outdoor living areas and serve to break up blank walls on the upper levels of buildings . Balconies allow people to take advantage of the ocean breezes, views and mild climate almost year-round. A balcony. can be designed as a deep inset on the building form, highlighted by the use of tile or contemporary railings. A balcony can also be designed as a projection from a building. Decorative iron grills can be used to give the illusion of a balcony. Roof tops can be used to provide usable outdoor space in both residential and commercial developments. LOW WALLS AND FENCES Low walls and fences are an appropriate �L Wrought iron can be used with .stucco or architectural element for incorporating 7C- brick pilasters. color , tile, and iron accents which are characteristic of Mediterranean architecture. They mark entrances and define the space around buildings , ,. Simple walls can be accented with an iron especially those setback from the entry gate. street. They give a sense of privacy and separation and screen public places from A planter can be incorporated into a wall pedestrian traffic. They can also be thus allowing the landscape materials to transparent allowing the passerby to enjoy the views without permitting soften the walls impact . intrusion. o Walls should be integrated with the Simple stucco walls can be highlighted overall building design and not with the use of tile. look like an afterthought. o Where scenic views are available to the community, walls of the type that obstruct views should not be constructed. o The use of solid concrete block walls, grape stake or chain link fencing is strongly discouraged. BUILDING DETAILS An overhead awning or trellis can provide Building and site details are also protection for a bank of mailboxes . important in creating new developments which are of high design quality. Security gates or buildings can be integrated into the Mediterranean theme. o building and site details should be integrated into the overall design of the building or development. o The elements which can be unsightly, such as utility boxes and air conditioning units, should be screened from view. o Accessory elements such as mailboxes, trash enclosures, and security gates should be designed to be compatible with the architectural style of the project. Utility boxes can be screened from view, yet remair. accessible to the utility companies . Trash containers can be screened from view within an enclosure designed to be compatible with the building. by using similar materials and accents which appear on the building, the enclosure can be made to appear as an integral part of the project . .. FOCAL ELEMENTS GATEWAYS Gateways are a visual element which create a sense of entry. Gateways can range in scale. They may identify an entrance to the downtown or on a smaller scale, they may mark the entrance into a development or a single building. TOWERS, SPIRES AND DOMES Towers, spires and domes are often viewed from a distance. They become landmarks and serve to provide orientation for people within the downtown area. A clock tower for example, can be used as a theme for a particular development. t��lr/111A%i��f� � a.u•p� '+ - —1 '.q•/'III �,. '� i may" ri - i LANDSCAPING GENERAL LANDSCAPE PRINCIPLES Emphasis should be placed on Californian biany areas within the downtown area have and Mediterranean landscapes and been used in the past for oil operations gardens . Californian and Mexican native or have been subject to adverse impacts . plantings, courtyards, courtyard gardens, from the oil operations on nearby sites. vines , flowering plants and the use of Therefore, soil testing for agricultural fountains, arbors, trellises and suitability is required for each site. container plantings are encouraged. Any laboratory recommendations which result from such a test must be followed. Expansive horizontal or vertical surfaces comprised of a single material can be broken up or interrupted through the use of vines or foliage. Vines can be used to dramatize a building 's architecture or soften hard materials . Vines can also be used to enhance or screen fences and trash enclosures. • The landscaping within courtyards, both public and private, should include a balance of hard and softscape materials, and provide shaded seating areas . Boxed and tubbed plants in decorative clay, wood, or stucco and tile planters can be used for the enhancement of sidewalk shops . Large planters may. also be incorporated into seating areas. Such planters should be open to the earth below and be provided with a permanent irrigation system. - LANDSCAPE MATERIALS FIRST ZONE OF EXPOSURE Dodonea viscosa Hopseed Bush All property within the Downtown area which lies between the high tide line and Griselina spp. None Walnut Avenue lies within the "first zone of exposure. " Landscape materials within Juniperus spp. Juniper this area are subject to strong prevailing winds and salt laden air . The Leptospermum Australian Tea Tree appropriate landscape materials for this laevigatum area are listed below: Malaleuca spp. None TREES Metrosideros None Brahea armata Mexican Blue Palm villosus Brahea edulis Guadalupe Palm . Myoporum laetum None Butia capitata Pindo Palm Pittosporum Karo crassifoloum Chamaerops humilis Mediterranean Fan Palm Pittosporum Dwarf Karo Metrosideros New Zealand Christmas crassifolium nana execelsus Tree Pittosporum tobira Tobira Pittosporum Karo (std. ) crassifolium Pittosporum tobira Wheeler 's Dwarf Tobira Wheeleri Pittosporum tobira Tobira (std . ) Raphiolepis spp. Indian Hawthorne Washingtonia Mexican Fan Palm robusta Rhamnus alaternus Italian Buckthorn SHRUBS Rhus integrifolia Lemonade Bush Carissa spp. Natal Plum PERENNIALS Ceanothus spp. Wild Lilac Euryops pectinatus None Coprosma spp. Mirror Plant Felician amelloids Blue Marguerite Limonium perezii Sea Lavendar Osteospermum Trailing African Daisy fruticosum GROUNDCOVERS Arctostaphylos Bearberry Vinca rosea Madagascar Periwinkle uva-ursi VINES Arctotheca Cape Weed Muehlenbeckia Wire Vine calenciula complexa Baccharis Prostrate Coyote Bush Solandra maxima Cup-of-Gold Vine pilularis Tecomaria capensis Cape Honeysuckle Carissa prostrata Prostrate Natal Plum Carpobrotus edules Sea Fig GRASS AND LILY-LIKE PLANTS Ceanothus Point Reyes Ceanothus Agave spp. Century Plant gloriosus y Aloe vera None Ceanothus griseus Carmel Creeper horizontalis Cortaderia Pampas Grass selloana Delosperma alba White Trailing Ice Plant Dracaena spp. None Drosanthemum Festuca rubra Red Fescue floribundum Rosea Ice 'Plant Pandanus utilis Screw Pine Gazania spp. None Hedera canariensis Algerian Ivy Paspalum spp. None Juniperus conferta Shore Juniper Pennisetum Kikuyu Grass clandestinum Lampranthus Purple Iceplant Phormium tens New Zealand Flax productus Lantana None Yucca aloifolia Spanish Bayonet montevidensis Korean Grass Zoysia japonica r SECOND ZONE OF EXPOSURE *Melaleuca quinquenervia None The land located north of Walnut Avenue is within the "second zone of exposure. " Pinus spp. Pine Tree Wind and salt air again affect the Pittosporum. spp. None vegetation, however, not to the extent as in the first zone. Appropriate landscape materials include all species listed for Podocarpus spp. None the first zone as well as the following: *prunus pissardi Flowering TREES Plum Agonis flexuosa Peppermint *Prunus spp. None Tree *Quercus spp. Oak Tree *Arbutus unedo Strawberry Raphiolepis None Tree "Magestic Beauty" *Callistemon spp. Bottlebrush *Tristania conferta Brisbane Box *Ca.lodendrum capense Cape Chestnut *Indicates street tree *Cupaniopsis anacardiodes Carrotwood SHRUBS Eriobotrya spp. Loquat Abelia grandiflora Glossy Abelia Erythrina caffra Coral Tree Baccharis spp. Coyote Bush *Eucalyptus spp. Gum Trees Callistemon spp. Bottlebrush Ficus spp. Fig Trees Ceanothus spp. Wild Lilac *Harpephyllum caffrum Kaffir Plum Cotoneaster spp. None *Hymenosporum flavum Wedding Tree Choisya ternata Mexican *Magnolia grandiflora Southern Orange Magnolia Cistus spp. Rock Rose Eleagnum spp. None VINES Escallonia spp. None Beaumontia grandiflora Easter Lily Vine Feijoa sellowiana Pineapple Guave Bougainvillea None Garrya elliptica Tassel Bush Ficus pumila Creeping Fig Grevillea spp. None Gelsemium .sempervirens Carolina Jessamin Hibiscus spp. None Hibbertia scandens Guinea Gold Lantana spp. None Vine Letospermum spp. Tea Trees Jasminum spp. None Leucophyllum texanum Texas Ranger Lonicera spp. Honeysuckle Ligustrum spp. Privets Macfadyena unguis-cati Cat 's Claw Trumpet Nerium oleander None Vine Parthenocissus Boston Ivy tricuspidata PERENNIALS Rhoicissus capensis Evergreen Centranthus ruber Red Valarian Grape Coreopsis spp. None Trachelospermum jasminoides Star Jasmine Echium fatuosum Pride of GRASS AND LILY-LIKE PLANTS Madeira Agapanthus africanus Lily of the Pelargonium domesticum Lady Nile Washington Geranium Beaucarnea recurvata Elephants Foot Veronica spp. Speedwell Cordyline australis Cabbage Tree Phyla nodiflora Lippia Grass Cynodon spp. Bermuda Grass Thymus spp. Thyme Festuca elatior Meadow Fescue Vinca spp. Periwinkle Hemerocallis spp. Daylily Liriope spp. Creeping Lily Turf Sansevieria spp. Mother-in-laws Tongue NOTES: All trees in paved areas are to be provided with "Deep Root" barriers and a 4 ' diameter tree Strelitzia reginae BirParradise well with automatic irrigation and metal grates. Yucca recurvifolia Curve-leaf Yucca Soils testing for agricultural suitability is to be required on GROL'NDCOVERS each site with laboratory recommendations followed. Arenaria spp. Sandwort Cotoneaster horizontalis None Juniperus horizontalis None Lantana spp. None Liriope spicata Lily Turf Lonicera japonica Japanese Honeysuckle Ophiopogon spp. Mando Grass Pachysandra terminalis Japanese Spurge LIGHTING Lighting within the Downtown area will serve to create a festive atomsphere and encourage night time use of the area by pedestrians. Lighting fixtures should be attractively designed to complement the architecture of the project. Lighting should also improve the visual identification of residences and businesses. Lighting should be focussed to avoid disturbance in living and sleeping areas in adjacent residential projects. All parking lots should be lighted adequately for safety and theft protection. Night time lighting of buildings within the commercial areas is encouraged. Lights which outline. the buildings create a festive atmosphere and encourage the use of open spaces and plazas. SIGNS SIGNS Signage in downtown Huntington Beach should advertise a place of business or provide directions or information and should contribute to the contemporary Mediterranean theme. Design, color , materials and placement are all important aspects in creating signs that are architecturally attractive and integrated with the overall site design . The City ' s goal is to promote a quality visual environment by allowing only signs which are compatible with their surroundings and which effectively communicate their message. Due to the unique nature of the downtown area there are some special provisions and restrictions with respect to permitted signs . The purpose of this section of the Design Guidelines is to set forth design standards which may be more restrictive than those outlined in the huntington Beach Sign Code, Article 976. Unless specifically allowed or restricted within this section, all signs are subject to Article 976 of the Sign Code. GENERAL DESIGN GUIDELINES Good signs communicate their message well, are easily seen by people and o Ground level signs should be relate harmoniously with the building smaller than those above ground they are placed on or near. The level. Pedestrian-oriented signs following guidelines give criteria for should be smaller than automobile creating well-designed signs. oriented signs. COLOR - Sign color should relate to O Signs should establish rhythm, . building colors. A light background with scale and proportion in facades and dark lettering is best visually. Bright arcades. colors should be used for accent . No more than two or three colors should be o Placement on a facade should used on a sign. complement building elements rather than block them. WORDS/SYMBOLS Fewer words make a more effective message. Use symbols only if ILLUMINATION - There are two methods of they are easily recognizable. illuminating signs : internal with the. light source inside the sign and external SHAPE - Keep the overall shape simple so with an outside light directed at the as not to detract from the message. sign. PROPORTION - As . a general rule, letters o Internal illumination is permitted should not appear to occupy more than 75% on channel letters only. of sign panel area. o All other signs must be illuminated LETTERING - Avoid hard-to-read and overly externally. intricate typefaces. The letter style choosen should be appropriate to the o Signs should be lighted with business and the building. continuous light sources. SIZE/LOCATION - Signs should be Following are definitions and examples of consistent with the proportion and scale the different types of allowable signs. of building elements within the facade. The following examples are provided to The placement of signs gives visual clues stimulate ideas. to business location and affects the design integrity of the entire building. SIGN STANDARDS FOR COMMERCIAL USES • � LL nn��XX rr,,UUcc XX II pp EE USE OF SIGN TYPE MJUMBER SI1GiV IA & 0 GHT STANDARDS BUINESS FREESTANDING ONE PER SITE 15 SO. FT,. G FT. 1. ALL FREESTANDING SIGNS SHALL BE IDENTIFICATION PROVIDED THE OR LOCATED IN A LANDSCAPED PLANTER STRUCTURE ON 40 SO. FT, WITH P10 PORTION OF THE SIGN EX- THE SITE IS FOR WOODEN TENDING BEYOND THE PERIMETER OF SETBACK A SANDBLASTED THE PLANTER, MINIMUM QQF SIGNS 2. ALL FREESTANDING SIGNS MUST BE TWENTY (10) OF THE MONUMENT TYPE, FT, AND THAT THE SITE HAS 3. COPY SHALL BE LIMITED TO CENTER A MINIMUM OF IDENTIFICATION AND/OR MAJOR 100 FT. OF TENANT IDENTIFICATION, FRONTAGE, 4. INTERNAL ILLUMINATION IS PERMIT- TED FOR CHANNEL LETTERS ONLY, WALL ONE PER 1.0 SO. FT, u FT, 1. SIGNS SHALL BE CHANNEL LETTERS OR STREET OR PER LINEAR FOR WALL SIGNS. AWNING PARKING LOT FOOT.OF Z. INTERNAL ILLUMINATION IS PERMIT- FRONTAGE BUILDING TED FOR CHANNEL LETTERS ONLY. FOR EACH FRONTAGE 3. NO PAINTED SIGNS PERMITTED, SEPARATE BUSINESS 4, MAXIMUM LETTER HEIGHT IS 18 INCHES. UNDER ONE PER 4 SO. FT. 1. 0 INTERNAL ILLUMINATION PERMITTED. CANOPY BUSINESSOR MINIMUM PROJECTING GROUND LEARANCE FT, IENANT WALL ONE PER SITE 12 SQ. FT, H FT, 1. SIGN SHALL BE UNILLUMINATED, DIRECTORY Z. SIGN SHALL BE LOCATED AND ORIENTED TO THE PEDESTRIAN RATHER THAN TO THE STREET. 3. ALL FREESTANDING SIGNS. SHALL BE LOCATED IN A LANDSCAPED PLANTER WITH NO PORTION EXTENDING BEYOND THE PERIMETER OF THE PLANTER, SPECIAL FLAGS UNSPECIFIED UNSPECIFIED UNSPECIFIED FLAGS, BANNERS, AND PENNANTS BANNERS ARE PERMITTED AS TEMPORARY PENNANTS SIGNS PURSUANT TO THE SIGN CODE, This chart summarizes sign criteria for commercial signs within the downtown area. signs for residential uses shall follow the Huntington Beach Sign Code. For mixed uses commercial signs shall follow the above chart and signs for the residential uses shall follow the sign code as stated above. •' 'AWNING SIGNS Definition: An awning sign is a sign on or attached to a temporary retractable shelter that is supported from the _.;; -" ; exterior wall of a building. These signs are permitted in the downtown area r pursuant to the Sign Standards chart. o Sign copy should be centered on the on awning to achieve symmetry. o Message should be limited to the ' business name and logo and sized to be proportional with the awning. BANNERS Definition: Banners and flags include any cloth, plastic, paper or similar material used for advertising purposes attached to or suspended from any structure, staff, pole, line, framing, or vehicle. These are permitted subject to the discretion of the. Design Review Board. A flag of the nation or state of California shall be exempt from these regulations. Bright colors are appropriate because they stand out against light-colored backgrounds. Banners and flags add motion and promote pedestrian activity in the area. :x �a NMI _ �•�t�•7 'ysc r,'3 sy �+'`A ,+.' a C•_r .,,:p...r,.aF: ��:a7t:j +��•w his.. ..� �k i P}`:� i:.!y:.:.:*.:., g i. '�. `>M1:_ '^✓F�; /ems+ 3:- '='. .��i+ t. ::3,-.<�'.:�Y,. _"r i�,..s f`it.�='::y:._•�.',':.a?p:.t.i. : y:�:. .�,-�,i 2._;t'S,:Y. '•'=:.c � 4 :'p ::�.. a.; � 5.ti:.:.:;.', r...;.:,-..":1,^G•`>}'a�".:,::, =.5:v�•.t"' •{r, ..1:,3� 2 F' .l`.ii:r ':ii�. 'fir^' f'lin'•'r- S r 0 CANOPY SIGNS Definition : A canopy sign is any sign attached to the underside of a projecting canopy or protruding over a sidewalk or right-of-way. Canopy signs provide pedestrian scale and can enhance building fronts. Projecting signs are permitted as a special type of canopy sign. 4. OCEAN vn ; tl FREESTANDING SIGNS Definition: A freestanding sign is any sign where the primary structural support is not a building and which is permanently anchored or attached on the ground. The mediterranean theme can be suggested through the use of materials such as stucco and tile. Pole signs are not permitted in the downtown area. ®e. l. . •` } •`WALL SIGNS Definition: Any sign which is attached or erected on the exterior wall of a building including the parapet, with the display surface of the sign parallel to i the building wall, and which does not project more than eighteen (18 ) inches - from the building or project above the height of the wall or parapet . Brightly colored channel letters add to the festive atmosphere and may be illuminated internally. Wall murals can brighten and add interest to the downtown area. Wall murals should be done to enhance the area rather than for advertising . Wall murals shall be permitted. subject to the discretion of the Design Review Board. . ." WINDOW SIGNS Definition: A window sign is any sign in which the name, address, hours and/or logo of a business are applied directly to the window. Letters may be vinyl or painted. Interior signs should be within 36" of the °window so as to be readable from the exterior . Sign area must be less than 20% of the total window area. Window signs should be geared to the pedestrian and should be at eye level . Window signs, if aesthetically designed, can enhance fronts of shops. Q� I � N ITHM MOAN �Q, r D D `13Ht° .... .... .... .... ............. .... .... ..... ... ... ... .. ... . ... ..... .... X, :•i f o 77t;9" REQUEAFOR CITY COUNCIL CTION May 10 1989 /04 Date Y � Submitted to: Mayor and City Council Submitted by: Paul E. Cook, City Administrator l� c APPROVED BY CITY COUNCIL ^` a Prepared by: Paul E. Cook, City Administrator c� Subject: Pierside Village Restaurant Pro'e L - 19 -�-<� Ln nCP CITY CLERIC Consistent with Council Policy? ( ] Yes [ ] New Policy or E ception . Statement of Issue, Recommendation,Analysis, Funding Source,Alternative Actions,Attachments: Statement of Issuer There is the need to determine further direction toward the development of the Pierside Village restaurant project. Recommendation: Authorize staff to negotiate a lease with Stanley M. Bloom to develop the Pierside Village . restaurant project which will generally consist of three new restaurants in addition to the existing Maxwells.Restaurant. Analysis: Since the City Council approved,the concept of restaurants in Pierside .Village with no other retail uses, staff has been communicating with StanleyM. Bloom who was to be a partner with Bryant Morris in the original Pierside Village project regarding this revised project. Mr. Bloom bought out Mr. Morris' interests in the project and desires to lease the city's land, construct approximately-300 parking space in a two—level structure, and develop around 30,000 square feet of restaurant use which would result in 3 first—class restaurants in the city's Main—Pier redevelopment area. Staff and the city's financial and legal consultants have been meeting with Mr. Bloom and reviewing his pro forma for this project. It is felt that it is in the Redevelopment Agency's best financial interest to lease their property and receive a percentage of the gross sales over the life of the project rather than risk around $9 million'of the city's money and proceed with the project on our own. Preliminary deal.points have been discussed with Mr. Bloom, and it appears that a revised Pierside Village lease which will be satisfactory to both parties can be.negotiated rather quickly. Funding Source: No funds are necessary at this time: PI O 5/85 Pierside Village Restaurant Project May 10, 1989 Page -2- Alternative Actions: 1. Proceed with this project with the Redevelopment Agency acting as the developer; 2. Solicit another developer for the project; 3. Do not proceed with the project. Attachments: None. PEC:pf #0510q-94 6N, y MINUTES Council Chamber, Civic Center Huntington Beach, California Monday, March 24, 1986 A tape recording of this meeting is on file in the City Clerk's Office Mayor Mandic called the adjourned regular meeting of the City Council of the City of Huntington Beach to order at 7:30 P.M. ROLL CALL Present: Kelly, MacAllister, Finley, Mandic, Bailey, Green Thomas (arrived 7:42 P.M. ) Absent: None JOINT MEETING OF THE CITY COUNCIL AND REDEVELOPMENT AGENCY Mayor Mandic announced that a joint meeting of the City Council and the Rede- velopment Agency had been called. } ROLL CALL Present: Kelly, MacAllister, Finley, Mandic, Bailey, Green Thomas (arrived 7:42 P.M. ) Absent: None PUBLIC HEARING - RESOLUTION OF NECESSITY 129 - DEFERRED TO LATER IN THE MEET- ING - MAIN-PIER REDEVELOPMENT PROJECT AREA The Mayor/Chairman announced that this was the day and hour set for a public h_a-ing continued open from March 17, 1986 on Resolution of Necessity which delineates parcels in the Main-Pier Redevelopment Subarea which may poten- tially require public acquisition. The City Attorney/legal advisor to the Agency introduced documents into evi- dence into the record as follows: 1. Redevelopment Plan for the Main-Pier Redevelopment Project and Ordinance No. 2634 adopting the plan. 2. Proposed Resolution of Public Interest and Necessity with attached maps and descriptions. -a i 3. Letter to Huntington Beach Company dated February 27, 1986 making offer to purchase. Page 2 - Council Minutes - 3/24/86 4. Notice of Eminent Domain Proceedings with attached Proof of Service. , :1 5. Letter from Lawler, Felix & Hall dated March 13, 1986, on behalf of the Huntington Beach Company. 6. Letter from Green Burrito Restaurant dated March 5, 1986. 7. Planning and Negotiating Agreement with Huntington Pacifica Development Group dated August 20, 1984. 8. Proposed Disposition and Development Agreement with the Huntington Paci- fica Development Group. 9. Restated First Implementation Agreement dated February 21, 1986. 10. Declaration of Appraiser dated February 26, 1986. 11. Copy of Assessor's Rolls from Assessor Parcel numbers 24-281-03, 24-281-04 and 24-281-12. 12. Copy of deed to the City of Huntington Beach dated January 15, 1932, set- ting forth the interest of the city. There being no one present to speak on the matter and there being no further protests filed, either oral or written, the hearing was closed by the Mayor/- Chairman. Following discussion, by consensus . of Agency consideration of Resolution of 'I Necessity for Main-Pier Redevelopment Project Area was deferred to later in ' the meeting after a Closed Session of Council/Redevelopment Agency. MAIN-PIER PHASE I - HUNTINGTON PACIFIC DEVELOPMENT GROUP STATUS REPORT Doug LaBelle, Deputy City Administrator/Redevelopment, presented a staff report. Discussion was held regarding retail space, decking and pier improvements. Discussion was held regarding the proposed Pier Side Village developer/opera- tor Bryant L. Morris Development Company; and Paragon Hotels Corporation as the developer/operator of the Main-Pier Phase 1 hotel. Mr. LaBelle referred to two draft letters dated March 25, 1986 recommending terms and conditions to the acceptance of both of the proposed developer/operators. Following discussion, a motion was made by MacAllister, seconded by Kelly, to accept as Pier Side Village Developer/Operator Bryant A. Morris Company with conditions as set forth in a draft letter dated March 25, 1986 from the City Administrator to Mr. Stanley Bloom, Randall Foods, as follows: 1. That formal entitlement plans be prepared and submitted for this portion of the project, pursuant to the First Implekentation Agreement, by the May 1, deadline. That includes the total development concept for Pier Side Village Phase I & II. 2. No later than Monday, March 31, you must provide to us a copy of an Agreement that you have entered into with Bryant L. Morris Development ,YY' ! Page 3 - Council Minutes - 3/24/86 for the "Pier Side Village" project. The project must also be constructed in accordance with the scope and quality and as an integral part of the total development as provided for in the Disposition and Development Agreement, pre- viously entered into. I with the caveat that there is a tie together between the developmental dates of both the pier side village and hotel portions of the project and that the I� project be completed in a time frame which is of economic benefit to the City/ Agency. The motion carried by the following roll call vote: AYES: Kelly, MacAllister, Finley, Mandic, Bailey, Green, Thomas NOES: None ABSENT: None A motion was made by MacAllister, seconded by Kelly, to accept Paragon Hotels Corporation as the developer/operator of the Main-Pier Phase 1 hotel, subject to the following terms and conditions as outlined in the letter from the City Administrator to Mr. Stanley Bloom, Randall Foods, as follows: 1. That formal entitlement plans be prepared and submitted for this portion of the project, pursuant to the First Implementation Agreement, by the May 1 deadline. 2. The hotel must be of the scope and quality of that intended within the original Disposition and Development Agreement (Irvine Marriott quality) . 3. The hotel franchise is subject to the approval of the City/Agency. 4. The hotel must provide for restaurant(s) and public meeting areas with banquet facilities the scope of which are subject to the approval of the City/Agency. 5. No later than Monday, March 31, you must provide to us a letter from the Huntington Pacifica Development Group indicating that Paragon Hotels is both the operator and developer you have selected to develop and operate this portion of the project. with the caveat that there is a tie together between the developmental dates of both the pier side village and hotel portions of the project and that the project be completed in a time frame which is of economic benefit to the City/ Agency. The motion carried by the following roll call vote: AYES: Kelly, MacAllister, Mandic, Green, Thomas NOES: Finley, Bailey ABSENT: None NEGOTIATION AGREEMENT - APPROVED - MAIN-PIER PHASE II PROJECT - MAIN-PACIFIC PROPERTY OWNERS The Deputy City Clerk/Deputy Clerk presented a communication from Deputy City Administrator/Redevelopment transmitting a Negotiation Agreement between the I Huntington Beach Redevelopment Agency and Main Pacific Property Owners rela- tive to the six-acre site bounded by Main, 6th, Walnut and Pacific Coast High- way.