Loading...
HomeMy WebLinkAboutSoutheast Coastal Redevelopment Preliminary Plan for Project Council/Agency Meeting Held: n l b-0 I Deferred/Continued to: A roved ❑ Conditionally Approved ❑ i Denied - Cle Signature Council Meeting Date: July 16, 2001 Department ID Number: ED 01-02 REDEVELOPMENT AGENCY OF THE CITY OF HUNTINGTON BEACH REQUEST FOR REDEVELOPMENT AGENCY ACTION SUBMITTED TO: CHAIRMAN AND REDEVELOPMENT AGENCY MEMBERS SUBMITTED BY: RAY SILVER, EXECUTIVE DIRECTOR PREPARED BY: DAVID C. BIGGS, DIRECTOR OF ECONOMIC DEVELOPMENT SUBJECT: Adopt Resolution 3aa Approving The Preliminary Plan For The Southeast Coastal Redevelopment Project Statement of Issue,Funding Source,Recommended Action,Alternative Action(s),Analysis,Environmental Status,Attachment(s Statement of Issue: The Agency will consider a resolution approving the Preliminary Plan for the Southeast Coastal Redevelopment Project. The Preliminary Plan describes the boundaries and scope of the proposed redevelopment. In principle, it defines the Redevelopment Agency's authorities and limitations for this project area. Funding Source: Not Applicable Recommended Action: Motion to: Adopt the attached Resolution 3a a (Attachment 1) of the Redevelopment Agency of the City of Huntington Beach approving the Preliminary Plan for the Southeast Coastal Redevelopment Project. Alternative Action(s): IV G o o � 1. Do not adopt the resolution. _r_ C 2. Provide staff with further direction. ' o-�-�EE r Worms -0 o w c-) w n I REQUEAOR REDEVELOPMENT AGACY ACTION MEETING DATE: July 16, 2001 DEPARTMENT ID NUMBER: ED 01-02 Analysis: Over the past several years, the City has been actively pursuing the remediation and reuse of the contaminated sites, such as the Ascon/Nesi site located at Magnolia Street and Hamilton Avenue. The City has also contemplated community development initiatives for surrounding uses including abandoned oil storage facilities and the AES generating plant. In the effort to address these issues, the City of Huntington Beach Redevelopment Agency ("Agency") is initiating an effort to prepare and consider the formation of a redevelopment project area, known as the Southeast Coastal Redevelopment Project ("Project Area"). The process began on February 5, 2001 when the City adopted the survey area generally located north of Pacific Coast Highway between Beach Boulevard and Magnolia Streets and south of Lomond Drive and Hamilton Avenue. On February 13t" the Planning Commission approved Resolution No. 1559 that delineated the boundaries for the Preliminary Plan. Subsequently, due to discussions with community representatives, dialogue at community meetings, and recommendations from the Planning Commission, the City Attorney, and the Council's Southeast Council Committee, the initial Preliminary Plan was revised by the Planning Commission on June 12th by Resolution 1563. The revised boundaries are now generally north of Pacific Coast Highway between Newland and Magnolia Streets and south of Hamilton Avenue. The revised boundaries exclude all property west of Newland Avenue, including the Cabrillo Mobile Home Park. Conclusively, the revised Project Area does not contain residential uses; therefore, not requiring Project Area Committee formation. In addition, non-urbanized parcels located at the northwest corner of Magnolia and Pacific Coast Highway were also deleted from the project area to meet the 80% to 20% urbanized to non-urbanized ratio required by California Redevelopment Law. The California Community Redevelopment Law, Health and Safety Code Section 33000 et seq. ("Redevelopment Law"), provides a legal framework for adopting and implementing redevelopment projects. The first official document describing the proposed redevelopment initiative is a Preliminary Plan, delineating the proposed boundaries and scope of the redevelopment project. The Preliminary Plan itself does not initiate redevelopment activities in the Project Area; instead, it outlines redevelopment policies that are ultimately incorporated into a final Redevelopment Plan. The Preliminary Plan includes: (1) a description of the proposed boundaries; (2) a description of the layout of principal streets; (3) a general statement of the land uses, population densities, building intensities, and standards proposed for the Project Area; (4) a statement that the proposed Redevelopment Plan would conform to the City's General Plan; (5) a statement to how the project will attain the purposes of Redevelopment Law; and (6) a general description of the impact of the project upon area residents and the surrounding community. As described in the attached Preliminary Plan, redevelopment of the Project Area would provide the Agency the authority to assist property owners with improvements consistent with the City's General Plan. All proposed redevelopment programs included in the final Redevelopment Plan are to be consistent with General Plan policies. This includes land uses, population densities, and building intensities and standards. ED01-02 -2- 6/21/01 10:43 AM REQUES%OR REDEVELOPMENT AGACY ACTION MEETING DATE: July 16, 2001 DEPARTMENT ID NUMBER: ED 01-02 The proposed project boundaries shown in the Preliminary Plan may be changed as a result of input received during the adoption process. Please note that Project Area boundaries can contract but cannot be expanded without restarting the Redevelopment Plan adoption process. By approving the attached resolution, the Redevelopment Agency will direct and authorize staff to prepare and transmit the required documentation to establish the Project Area's base year valuation roll. Following, the Agency will continue to solicit community input in preparing the Southeast Coastal Redevelopment Plan and other pertinent documents. A noticed public hearing is tentatively scheduled for May 2002, in which the Redevelopment Agency and City Council will consider approval of the final Redevelopment Plan. Environmental Status: Preparation of a Redevelopment Plan for the Southeast Coastal Area Redevelopment Project has resulted in the formulation of an Environmental Impact Report. This document will be prepared pursuant to Redevelopment Law and the California Environmental Quality Act. Attachment(s): City Clerk's Page Number No. Description 1. Resolution Approving The Preliminary Plan For The Southeast Coastal Redevelopment Project. Runzel at 5224 ED01-02 -3- 6/21/01 10:43 AM RESOLUTION APPROVING THE PRELIMINARY PLAN FOR THE SOUTHEAST COASTAL REDEVELOPMENT PROJECT ATTACH N E N �T #'I RESOLUTION NO. 322 A RESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF HUNTINGTON BEACH APPROVING THE PRELIMINARY PLAN FOR THE SOUTHEAST COASTAL REDEVELOPMENT PROJECT WHEREAS, on February 5, 2001, the City Council of the City of Huntington Beach adopted Resolution No. 2001-3, designating a survey area for redevelopment study purposes; and On June 12, 2001, the Planning Commission of the City of Huntington Beach selected the boundaries of the Southeast Coastal Redevelopment Project Area, adopted a Preliminary Plan for the Southeast Coastal Redevelopment Project ("Preliminary Plan"), and authorized submission of the Preliminary Plan to the Redevelopment Agency of the City of Huntington Beach by Resolution No. 1563; and The public health, safety, and welfare would be furthered by the redevelopment of the proposed Southeast Coastal Redevelopment Project. NOW, THEREFORE, the Redevelopment Agency of the City of Huntington Beach hereby accepts and approves the Preliminary Plan for the Southeast Coastal Redevelopment Project as submitted herewith and attached hereto as Exhibit A; and Staff is authorized and directed to make such transmittals as may be required pursuant to Sections 33327 and 33328 of the California Community Redevelopment Law (Health and Safety Code Section 33000 et seq.), including advising appropriate officials and agencies that it proposes to use the 2001-02 equalized assessment roll as the base year assessment roll for the Southeast Coastal Redevelopment Project; and Staff is authorized and directed to prepare a proposed Redevelopment Plan for the Southeast Coastal Redevelopment Project. 1 SF-2001 Resolutions: Agency—So Coastal RLS 2001-0062 MK 6/21/01 8:38 AM • • Res. No. 322 PASSED AND ADOPTED by the Redevelopment Agency of the City of Huntington Beach at the meeting of the 16th day of July, 2001. Chairman ATTEST: APPROVED AS TO FORM: �wJrl.� Agency Clerk ��" Age cy General 44_- � unsel �� REVIEWED AND PR MT TED AND APPROVED: Executive Director Dire for of Economic Development 2 SF-2001 Resolutions: Agency—So Coastal RLS 2001-0062 M K 6/21/01 8:38 AM • • Res. No. 322 EXHIBIT A PRELIMINARY PLAN FOR THE SOUTHEAST COASTAL REDEVELOPMENT PROJECT 3 SF-2001 Resolutions: Agency—So Coastal RLS 2001-0062 MK 6/21/01 8:38 AM • • Res. No. 322 Southeast Coastal Redevelopment Project Prell Inary Plan June 12, 2001 Redevelopment Agency of the City of Huntington Beach 2000 Main Street, 5th Floor Huntington Beach, Califomia 92648 MINE L ► i `� Rosenow Spevacek Group, Inc. 540 North Golden Circle,Suite 305 Santa Ana,California 92705 Phone:(714)541-4585 Fax: (714)836-1748 E-Mail: info@webrsg.com • •Res. No. 322 Preliminary Plan Southeast Coastal Redevelopment Project Table of Contents Introduction...............................................................................I ProjectArea Location and Description .....................................2 General Statement of Proposed Planning Elements.................3 LandUses........................................................................................................3 General Statement of Proposed Layout of Principal Streets.....................3 General Statement of Proposed Population Densities...............................4 General Statement of Proposed Building Intensities.................................4 General Statement of Proposed Building Standards.................................4 Attainment of The Purposes of the Redevelopment Law..........4 Conformance to the General Plan of the City............................5 General Impact of the Proposed Project Upon the Residents of the Project Area and Surrounding Neighborhoods....................5 Exhibit A- Proposed Project Area Boundaries .........................7 G:\CAROL\PROJECTS\SECOAST\PRELIMINARY PLANI.DOC • • Res. No. 322 Preliminary Plan Southeast Coastal Redevelopment Project Introduction This document is the Preliminary Plan ("Plan")for the proposed Southeast Coastal Redevelopment Project("Project"). Its purpose is to designate the boundaries of the proposed Southeast Coastal Redevelopment Project Area ('Project Area"), and provide a general description of the contemplated redevelopment initiative. This Plan supercedes and replaces an earlier version approved by the City of Huntington Beach Planning Commission on February 13, 2001. This Plan has been revised to exclude from the proposed Project Area boundaries properties that include a mobile home park, industrial uses, and other properties west of Newland Street, as well as four parcels located at the northwest comer of Magnolia Street and Pacific Coast Highway. If this Plan is approved by the Planning Commission and Redevelopment Agency of the City of Huntington Beach ("Agency"), the Agency will commence a 12-month process to prepare and adopt a Redevelopment Plan for the Project Area. The Project Area is comprised of approximately 170 acres. It is generally bound to the north by Hamilton Avenue, to the south by Pacific Coast Highway, to the west by Newland Street, and to the east by Magnolia Street. The Agency is considering the Project for the following reasons: ■ To assist with screening, design, or environmental improvements to mitigate impacts on adjoining neighborhoods and environmentally sensitive areas associated with modernization and reconstruction of the power generating plant; ■ To advance the cleanup of environmentally contaminated properties; ■ To facilitate the reuse of other Project Area properties including the Edison and tank farm properties, by monitoring and assisting hazardous material cleanup activities and ensuring that any ultimate development is compatible with surrounding neighborhoods and properties; ■ To facilitate the protection and restoration of environmentally sensitive wetlands in connection with proposed redevelopment activities; ROSENOW SPEVACEK GROUP,INC. PAGE 1 Res- Nn_ 322 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT ■ To permit the Agency to assist with park and trail improvements if any Project Area properties are designated for such uses; ■ To ensure that Project Area revenues are pledged to projects that directly benefit the area, and that the Project Area remains separate and distinct from the Agency's existing Huntington Beach Redevelopment Project Area; and ■ To restrict the use of eminent domain to any non-fee ownership interests such as oil and gas leases. In accordance with Section 33324 of the California Community Redevelopment Law ("CRL"), this Plan must: ■ Describe the boundaries of the Project Area; ■ Contain a general statement of land uses and of the layout of principal streets, population densities, building intensities and standards proposed as the basis for the redevelopment of the Project Area; ■ Show how the purpose of the Preliminary Plan would be attained by redevelopment; ■ Show how the Preliminary Plan conforms to the community's General Plan; and ■ Describe, generally, the impact of the Project upon residents of the Project Area and surrounding neighborhoods. For the past several months, Agency staff has maintained an ongoing dialogue with Project Area property owners, as well as neighboring residents and homeowners associations. During the Redevelopment Plan preparation process, the Agency will continue these discussions as a means to inform the public about the development of the Redevelopment Plan, and to solicit input from the community about potential redevelopment activities. It is anticipated that a final Redevelopment Plan could be considered by the City Council and Agency at a joint public hearing in May 2002. Project - Description The Project Area is located entirely within the corporate boundaries the City of Huntington Beach, Orange County, California. The City is located in west Orange County, and is the third largest city in Orange County, with a population of approximately 189,594 persons, according to the 2000 ROSENOW SPEVACEK GROUP,INC. PAGE 2 Res. No. 322 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT Census. The City incorporates a total of 27.7 square miles(approximately 17,700 acres) within its boundaries, and is adjoined by the City of Seal Beach to the northwest, the City of Westminster to the north, the City of Fountain Valley to the northeast, the Cities of Costa Mesa and Newport Beach to the east and the Pacific Ocean to the south and west. The proposed Project Area is located in the southeastern part of the City, near the Pacific Ocean. The Project Area includes the area generally located northeast of Pacific Coast Highway, between Newland and Magnolia Streets, and south of Hamilton Avenue. (Exhibit A presents a map depicting the boundaries of the proposed Project Area.) Preliminary estimates place the total size of the Project Area at 170 acres, which is approximately 1.0% of the entire City. Project Area land uses include the AES power generating plant, the Ascon/NESI Landfill Superfund site, County Flood Control property, the Edison tank farms, undeveloped wetlands, and light industrial uses. The physical and economic blighting conditions include substandard design, obsolete buildings and facilities, impaired investments, and inadequate public improvements. These conditions will be further studied and documented over the ensuing months to determine the nature and extent of potential redevelopment activities in the Project Area. ProposedGeneral Statement of - This Plan envisions that planning elements to be contained in the redevelopment plan will be identical to the applicable provisions of the City of Huntington Beach General Plan ("General Plan") and all other state and local codes and guidelines, as they may be amended from time to time. Land Uses Within the proposed Project Area, land uses shall be those permitted by the General Plan, as they exist today or are hereafter amended. Currently, the General Plan permits the following uses in the Project Area: Public, Industrial, and Residential Medium Density. General Statement of Proposed Layout of Principal Streets Exhibit A presents the principal streets within the Project Area; these include Pacific Coast Highway, Magnolia Street, Newland Street, and Hamilton Avenue. If a Redevelopment Plan is adopted for the Project Area, existing streets within the Project Area may be widened or otherwise ROSENOW SPEVACEK GROUP,INC. PAGE 3 Ah Res. No. 322 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT modified and additional streets may be created as necessary for proper pedestrian and/or vehicular circulation pursuant to the General Plan. The layout of principal streets and those that may be developed in the future shall conform to the General Plan as currently adopted or hereafter amended. General Statement of Proposed Population Densities If the Redevelopment Plan is adopted, permitted densities within the Project Area will conform to the General Plan and Zoning Code, as currently adopted or as hereafter amended, and other applicable codes and ordinances. This Plan and the Project do not propose any changes to population densities, development densities, or land use designations. General Statement of Proposed Building Intensities Building intensity shall be controlled by limits on the: ■ Percentage of the building site covered by the building (land coverage); ■ Size and location of the buildable area on the building site; and ■ Height of the building. The limits on building intensity shall be established in accordance with the provisions of the General Plan and Zoning Code, as they now exist or are hereafter amended. This Plan and the Project do not propose any changes to population densities, land use designations, or building intensities. General Statement of Proposed Building Standards Building standards shall conform to the building requirements of applicable codes and ordinances. PurposesAttainment of The - . . - The properties included in the proposed Project Area were selected because a preliminary review of these properties in October 1999 indicated the existence of blight, as defined by the Community Redevelopment Law (CRL). (These conditions will be more extensively evaluated and documented during the redevelopment plan adoption process.) Redevelopment of the Project Area would attain the purposes of ROSENOW SPEVACEK GROUP,INC. PAGE 4 i Res. No. 322 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT the CRL by alleviating blighting conditions that to date the private sector, acting alone, has not remedied. Blighting conditions include: ■ Structural deterioration and dilapidation; ■ Defective design; ■ Substandard design; ■ Incompatible adjacent uses; ■ Stagnating property values; and ■ Impaired investments. Additionally, public infrastructure such as streets, curbs, gutters, and sidewalks are substandard and existing capacity is insufficient. The purposes of the CRL would be attained by the proposed Project through the: ■ Encourage modem, integrated development with improved pedestrian and vehicular circulation; ■ Replanning, redesign and development of undeveloped or underdeveloped areas which are stagnant or improperly utilized; and ■ Participation of owners and tenants in the revitalization of their properties. Conformance to the General Plan of the City Because land uses, transportation, and other development standards incorporate existing General Plan policies, this Plan conforms to the General Plan. This Plan does not propose to institute additional land use policies not otherwise permitted by the General Plan, or other applicable codes and guidelines. ProposedGeneral Impact of the . . Project Area and Surrounding Neighborhoods Project impacts on residents within, and adjacent to, the proposed Project Area will generally be improved environmental conditions. Through the ROSENOW SPEVACEK GROUP,INC. PAGE 5 - Res. No. 322 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT Project, the Agency desires to facilitate the redevelopment of existing uses to better suit surrounding areas. Project development and implementation will be subject to further review and approval by the City Council, Agency, Planning Commission, and other non-City environmental and taxing agencies. Further, the Commission will conduct a community outreach process during the Project formation and implementation phases to gain the insight and perspectives of affected property owners, business owners, residents, and other interested parties. ROSENOW SPEVACEK GROUP,INC. PAGE 6 • Res. No. 322 Preliminary Plan Southeast Coastal Redevelopment Project Proposed Mill Rolf— u a i OI M 11 a 1w,1 NN Dart v I _. .�fool% 14 1. VY 0 700 1400 2100 Feet ROSENOW SPEVACEK GROUP,INC. Res. No. 322 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF HUNTINGTON BEACH ) I, CONNIE BROCKWAY, Clerk of the Redevelopment Agency of the City of Huntington Beach, California, DO HEREBY CERTIFY that the foregoing resolution was duly adopted by the Redevelopment Agency of the City of Huntington Beach at a regular meeting of said Redevelopment Agency held on the 16th day of July, 2001 and that it was so adopted by the following vote: AYES: Green, Boardman, Cook, Julien Houchen, Garofalo, Dettloff, Bauer NOES: None ABSENT: None ABSTAIN: None Clerk of the Redevelopment/Agency of the City of Huntington Beach, CA Southeast Coastal Redevelopment Project Prrelimi Plan June 12, 2001 Redevelopment Agency of the City of Huntington Beach 2000 Main Street, 5th Floor Huntington Beach, California 92648 :4 Rosenow Spevacek Group, Inc. 540 North Golden Circle,Suite 305 Santa Ana,California 92705 Phone:(714)541-4585 Fax: (714)836-1748 E-Mail: info@webrsg.com Preliminary Plan Southeast Coastal Redevelopment Project Table of Contents Introduction...............................................................................I Project Area Location and Description .....................................2 General Statement of Proposed Planning Elements.................3 LandUses........................................................................................................3 General Statement of Proposed Layout of Principal Streets.....................3 General Statement of Proposed Population Densities...............................4 General Statement of Proposed Building Intensities.................................4 General Statement of Proposed Building Standards.................................4 Attainment of The Purposes of the Redevelopment Law..........4 Conformance to the General Plan of the City............................5 General Impact of the Proposed Project Upon the Residents of the Project Area and Surrounding Neighborhoods....................5 Exhibit A - Proposed Project Area Boundaries .........................7 G:\CAROL\PROJECTS\SECOAST\PRELIMINARY PLAM DOC Preliminary Plan Southeast Coastal Redevelopment Project Introduction This document is the Preliminary Plan ("Plan")for the proposed Southeast Coastal Redevelopment Project("Project"). Its purpose is to designate the boundaries of the proposed Southeast Coastal Redevelopment Project Area (`Project Area"), and provide a general description of the contemplated redevelopment initiative. This Plan supercedes and replaces an earlier version approved by the City of Huntington Beach Planning Commission on February 13, 2001. This Plan has been revised to exclude from the proposed Project Area boundaries properties that include a mobile home park, industrial uses, and other properties west of Newland Street, as well as four parcels located at the northwest corner of Magnolia Street and Pacific Coast Highway. If this Plan is approved by the Planning Commission and Redevelopment Agency of the City of Huntington Beach ("Agency"), the Agency will commence a 12-month process to prepare and adopt a Redevelopment Plan for the Project Area. The Project Area is comprised of approximately 170 acres. It is generally bound to the north by Hamilton Avenue, to the south by Pacific Coast Highway, to the west by Newland Street, and to the east by Magnolia Street. The Agency is considering the Project for the following reasons: ■ To assist with screening, design, or environmental improvements to mitigate impacts on adjoining neighborhoods and environmentally sensitive areas associated with modernization and reconstruction of the power generating plant; ■ To advance the cleanup of environmentally contaminated properties; ■ To facilitate the reuse of other Project Area properties including the Edison and tank farm properties, by monitoring and assisting hazardous material cleanup activities and ensuring that any ultimate development is compatible with surrounding neighborhoods and properties; ■ To facilitate the protection and restoration of environmentally sensitive wetlands in connection with proposed redevelopment activities; ROSENOW SPEVACEK GROUP,INC. PAGE 1 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT ■ To permit the Agency to assist with park and trail improvements if any Project Area properties are designated for such uses; ■ To ensure that Project Area revenues are pledged to projects that directly benefit the area, and that the Project Area remains separate and distinct from the Agency's existing Huntington Beach Redevelopment Project Area; and ■ To restrict the use of eminent domain to any non-fee ownership interests such as oil and gas leases. In accordance with Section 33324 of the California Community Redevelopment Law ("CRL"), this Plan must: ■ Describe the boundaries of the Project Area; ■ Contain a general statement of land uses and of the layout of principal streets, population densities, building intensities and standards proposed as the basis for the redevelopment of the Project Area; ■ Show how the purpose of the Preliminary Plan would be attained by redevelopment; ■ Show how the Preliminary Plan conforms to the community's General Plan; and ■ Describe, generally, the impact of the Project upon residents of the Project Area and surrounding neighborhoods. For the past several months, Agency staff has maintained an ongoing dialogue with Project Area property owners, as well as neighboring residents and homeowners associations. During the Redevelopment Plan preparation process, the Agency will continue these discussions as a means to inform the public about the development of the Redevelopment Plan, and to solicit input from the community about potential redevelopment activities. It is anticipated that a final Redevelopment Plan could be considered by the City Council and Agency at a joint public hearing in May 2002. !' Project Area Location and Description The Project Area is located entirely within the corporate boundaries the City of Huntington Beach, Orange County, California. The City is located in west Orange County, and is the third largest city in Orange County, with a population of approximately 189,594 persons, according to the 2000 ROSENOW SPEVACEK GROUP,INC. PAGE 2 Now PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT Census. The City incorporates a total of 27.7 square miles (approximately 17,700 acres) within its boundaries, and is adjoined by the City of Seal Beach to the northwest, the City of Westminster to the north, the City of Fountain Valley to the northeast, the Cities of Costa Mesa and Newport Beach to the east and the Pacific Ocean to the south and west. The proposed Project Area is located in the southeastern part of the City, near the Pacific Ocean. The Project Area includes the area generally located northeast of Pacific Coast Highway, between Newland and Magnolia Streets, and south of Hamilton Avenue. (Exhibit A presents a map depicting the boundaries of the proposed Project Area.) Preliminary estimates place the total size of the Project Area at 170 acres, which is approximately 1.0% of the entire City. Project Area land uses include the AES power generating plant, the Ascon/NEST Landfill Superfund site, County Flood Control property, the Edison tank farms, undeveloped wetlands, and light industrial uses. The physical and economic blighting conditions include substandard design, obsolete buildings and facilities, impaired investments, and inadequate public improvements. These conditions will be further studied and documented over the ensuing months to determine the nature and extent of potential redevelopment activities in the Project Area. General . . . Elements This Plan envisions that planning elements to be contained in the redevelopment plan will be identical to the applicable provisions of the City of Huntington Beach General Plan ("General Plan") and all other state and local codes and guidelines, as they may be amended from time to time. Land Uses Within the proposed Project Area, land uses shall be those permitted by the General Plan, as they exist today or are hereafter amended. Currently, the General Plan permits the following uses in the Project Area: Public, Industrial, and Residential Medium Density. General Statement of Proposed Layout of Principal Streets Exhibit A presents the principal streets within the Project Area; these include Pacific Coast Highway, Magnolia Street, Newland Street, and Hamilton Avenue. If a Redevelopment Plan is adopted for the Project Area, existing streets within the Project Area may be widened or otherwise ROSENOW SPEVACEK GROUP,INC. PAGE 3 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT modified and additional streets may be created as necessary for proper pedestrian and/or vehicular circulation pursuant to the General Plan. The layout of principal streets and those that may be developed in the future shall conform to the General Plan as currently adopted or hereafter amended. General Statement of Proposed Population Densities If the Redevelopment Plan is adopted, permitted densities within the Project Area will conform to the General Plan and Zoning Code, as currently adopted or as hereafter amended, and other applicable codes and ordinances. This Plan and the Project do not propose any changes to population densities, development densities, or land use designations. General Statement of Proposed Building Intensities Building intensity shall be controlled by limits on the: ■ Percentage of the building site covered by the building (land coverage); ■ Size and location of the buildable area on the building site; and ■ Height of the building. The limits on building intensity shall be established in accordance with the provisions of the General Plan and Zoning Code, as they now exist or are hereafter amended. This Plan and the Project do not propose any changes to population densities, land use designations, or building intensities. General Statement of Proposed Building Standards Building standards shall conform to the building requirements of applicable codes and ordinances. Attainment of - Purposes of the Redevelopment The properties included in the proposed Project Area were selected because a preliminary review of these properties in October 1999 indicated the existence of blight, as defined by the Community Redevelopment Law (CRL). (These conditions will be more extensively evaluated and documented during the redevelopment plan adoption process.) Redevelopment of the Project Area would attain the purposes of ROSENOW SPEVACEK GROUP,INC. PAGE 4 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT the CRL by alleviating blighting conditions that to date the private sector, acting alone, has not remedied. Blighting conditions include: ■ Structural deterioration and dilapidation; ■ Defective design; ■ Substandard design; ■ Incompatible adjacent uses; ■ Stagnating property values; and ■ Impaired investments. Additionally, public infrastructure such as streets, curbs, gutters, and sidewalks are substandard and existing Capacity is insufficient. The purposes of the CRL would be attained by the proposed Project through the: ■ Encourage modern, integrated development with improved pedestrian and vehicular circulation; ■ Replanning, redesign and development of undeveloped or underdeveloped areas which are stagnant or improperly utilized; and ■ Participation of owners and tenants in the revitalization of their properties. Conformance to the General Plan of the City Because land uses, transportation, and other development standards incorporate existing General Plan policies, this Plan conforms to the General Plan. This Plan does not propose to institute additional land use policies not otherwise permitted by the General Plan, or other applicable codes and guidelines. ProposedGeneral Impact of the . . ResidentsProject Area and Surrounding Neighborhoods Project impacts on residents within, and adjacent to, the proposed Project Area will generally be improved environmental conditions. Through the ROSENOW SPEVACEK GROUP,INC. PAGE 5 PRELIMINARY PLAN SOUTHEAST COASTAL REDEVELOPMENT PROJECT Project, the Agency desires to facilitate the redevelopment of existing uses to better suit surrounding areas. Project development and implementation will be subject to further review and approval by the City Council, Agency, Planning Commission, and other non-City environmental and taxing agencies. Further, the Commission will conduct a community outreach process during the Project formation and implementation phases to gain the insight and perspectives of affected property owners, business owners, residents, and other interested parties. ROSENOW SPEVACEK GROUP,INC. PAGE 6 Preliminary Plan Southeast Coastal Redevelopment Project . Proposed 17,777 ._ y.. ....,.,..- sue.-.-. f - b � ij r ^' .A 00 1400 2100earl € ROSENOW SPEVACEK GROUP,INC. 0 0 RCA ROUTING SHEET INITIATING DEPARTMENT: ECONOMIC DEVELOPMENT SUBJECT: RESOLUTION APPROVING THE PRELIMINARY PLAN FOR THE SOUTHEAST COASTAL REDEVELOPMENT PROJECT COUNCIL MEETING DATE: July 16, 2001 RCA ATTACHMENTS STATUS Ordinance (w/exhibits & legislative draft if applicable) Not Applicable Resolution (w/exhibits & legislative draft if applicable) Attached Tract Map, Location Map and/or other Exhibits Not Applicable Contract/Agreement (w/exhibits if applicable) (Signed in full by the City Attorney) Not Applicable Subleases, Third Party Agreements, etc. (Approved as to form by City Attorney) Not Applicable Certificates of Insurance (Approved by the City Attorney) Not Applicable Financial Impact Statement (Unbudget, over $5,000) Not Applicable Bonds (If applicable) Not Applicable Staff Report (If applicable) Not Applicable Commission, Board or Committee Report (If applicable) Not Applicable Find in s/Conditions for Approval and/or Denial Not Applicable EXPLANATION FOR MISSING ATTACHMENTS REVIEWED RETURNED FORWARDED Administrative Staff Assistant City Administrator (Initial) ) City Administrator Initial �. City Clerk ( ) EXPLANATION FOR RETURN OF ITEM: SpaceOnly) RCA Author: Runzel @ 5224 ;ul 16 01 03: 22p Scott Business Associates (714) 962-1746 p. 2 6 • Southeast Huntington Beach Neighborhood Association 22032 Capistrano Lane—Huntington Beach,CA 92646-8309 Websitc:schhna.org Phone:(714)962-1746-Fax:(714)962-1746- email:sehbna@socal.rr.com July 16, 2001 N c Honorable Mayor Pam Julien Houchen City of Huntington Beach c _C-� 2000 Main Street Huntington Beach, CA 92648 r- rn o r� Dear Mayor Houchen and City Counciipersons: w = Southeast Huntington Beach Neighborhood Association conditionally agreed to take a� n "Wait and See" approach to a proposal by the Huntington Beach City Council to implement a redevelopment Zone in our area. The agreement was to involve SEHBNA at every step of the process. SEHBNA's Executive Board has completed this initial draft of a statement of its policy on this redevelopment area. SEHBNA considers it important to get this to the City Council at this time because of the scheduled redevelopment hearing. It has been almost six months since we last met on this matter. Our position has changed during that time and obviously there are changes in the redevelopment plan. During the public hearings conducted months ago no resident expressed any support for an industrial land use designation. Nonetheless,the agency seems to have proceeded in that direction. A storage yard is under construction, a public storage facility has been proposed, a NOP has been done for a desalinization plant and some would like to build a gun range there. SEHBNA has yet to hear of any tourism related use for the land in question as the residents requested. It seems to many that we are forgetting the extremely valuable resource of land this close to the ocean. We are between Newport Beach and downtown Huntington Beach. This property is perfect for recreation, tourism, entertainment, retail establishments, and scenic beauty. There is no urgent need to suddenly settle for light industrial usage when people from all over the world pay huge sums to come to the Southern California beaches. The area is made even more attractive by the presence of wetlands. Residents here, as elsewhere in the city, are concerned about their home's value. There is no support here for light industry. We live here, raise our children here, and want this area to improve. We already have more than our share of issues in this neighborhood. Adding more industry here does not serve either the interest of residents or the interest of Huntington Beach. Beach property is extremely valuable in an expanding population. iS 01 03: 22p Sot Business Associates (714) SG2-1746 p. 3 Honorable Mayor Pam Julien Houchen Page 2 July 16, 2001 1. Professional project and construction management is absolutely mandatory. These are engineering, construction, project management, and maintenance programs. It is totally inappropriate for long term projects to be managed by local governments that change every few years. Nor is it appropriate to be managed by small consulting firms of limited resources who are paid by the local administration. An experienced and financially strong company that specializes in these projects, and can put guarantees and completion bonds in place must manage this. 2_ The oversight of any Redevelopment Zone on a continuing basis must be properly divided between citizen groups, professionals in that area, local government, and experienced financial professionals. No group should be allowed to dominate this oversight, and this oversight must be diverse enough to avoid the daily political winds of change. Elections cause dramatic changes in philosophy, while projects must stay their course above the changes. 3. This redevelopment zone must remain independent. It is absolutely unacceptable to turn our neighborhood into a Redevelopment Zone so it can support other Redevelopment Zones in other areas. The funds must stay in our area. If this cannot be done under the by laws, then it can be done through the project.contract limitations and financial studies. The money must be spent here, period. This cannot be merged into or used to bail out other Redevelopment Zones. 4_ A formal and accurate financial study must be prepared by a nationally recognized financial professional organization with malpractice insurance, an excellent reputation in the financial and investment community, and a totally independent organization. Financial forecasts must be realistic, and we must be certain a project is financially secure and able to service its debt with an excess of available funds to cover surprises. The debt must be retired. 5. Personal liability must be attached to contracts signed, completion bonds and other financial security must be obtained. Any contracts signed outside of these conditions must transfer a personal liability to those signing them. There are far too many individuals who have negotiated and approved problem contracts, only to walk away with no recourse. 6. NESI would likely use the majority of the entire redevelopment fund. Any offers of assistance would need to be secured by completion bonds and enforceable and collectable contracts. Please remember it was a year ago that the site owners told SEHBNA that the funding was in place, the numbers penciled out, and they would absolutely move forward. If that view has now changed,then the Redevelopment Project should also share in the profits of their real estate sales. They are looking for a profit, and want our subsidy. We should share in profits when complete. Jul 16 01 03: 22p Stt Business Associates (714) 962-1746 p. 4 Honorable Mayor Pam Julien Houchen Page 3 July 16, 2001 7. AES is a profitable Corporation listed in the Stock Exchange in a wonderful situation. The energy crisis has allowed them to expand their operations, avoid EPA problems, get fast track approvals, and hold the State of California hostage to their wishes. They have not yet become a good neighbor, and continually circumvent the Huntington Beach City Council and other regulatory agencies. They fight every condition, revise their plans as it pleases them, and appear completely uninterested in Huntington Beach. Now they have won a battle that allows them to sell their power outside California. If we enter into any agreement with AES we must be represented by an independent nationally ranked law firm, because those are the attorneys representing AES. 8. Light Commercial often comes up, but nobody has defined potential projects better than that vague definition_ A gun range was mentioned; storage tanks and yards were mentioned. Have planners forgotten that this is oceanfront property? Such property is an extremely limited resource. 9. Tank Farm demolition and cleanup was mentioned as a possible use of the Redevelopment Zone funds so that it can be done"sooner rather than later." We are assured that a legally enforceable set of contracts exist with CENCO and that they have the resources to perform. The City must take a strong and determined position in this matter and make those responsible for fouling the area, responsible for restoring it. This is not a burden for taxpayers to bear. Respectfully, , 1 g John F. Scott Chairperson vj1 16 01 03: 21p S tt Business Associates (714) 962-1746 p. 1 FAX COVER SHEET FAX NUMBER TRANSMITTED TO: (714) 374-1557 To: City Clerk From: Southeast Huntington Beach Neighborhood Association Date: July 16, 2001 Re: Letter for Public Comment on Redevelopment (Item F2) «t.. yi,y-.r µ:f'76::<9�'S,:',3:4 '_fin n. r ";:fir... w. •,! A' ��Z� f Attached is a 3-Page letter 1 would like read into the record regarding Item F2. Thank You, vlr Cc,� John Scott • • 0 o Preliminary Plan Southeast Coastal Redevelopment Project DQ J D July 16, 2001 Item F-2 Background ■ Nov 2000 &Jan 2001, Community Workshops ■ Feb 5, 2001, City Council adopts the Survey Area ■ Feb 13, 2001, Planning Commission approved a Preliminary Plan for the original larger area ■ April 27, 2001, Southeast Area Council Committee recommends reducing the area (due to issues an ? uncertainties regarding areas west of Newland) ■ June 12, 2001, Planning Commission approves the revised Preliminary Plan Ike- UMMANI cATaN 1 • 0 ==EBenchmarks DO ■ Agency receives the revised Preliminary Plan, July 16, 2001 ■ Environmental and Feasibility Studies ■ Community Meetings 19 ■ Draft Redevelopment Plan ■ Final Redevelopment Plan - 2002 Purpose of the Preliminary Plan ■ Initiates Plan Adoption Process (Starting Point) ■ Designates the Proposed Boundaries ■ Describes Proposed Land Uses, Population Densities, and Building Intensities and Standards ■ Policies and Guidelines 19 ■ Summarizes Impacts on Community ■ General Plan Conformity 2 Rat Proposed hw to Boundaries � � .. E. Southea Coastal Area 3 Issues to be Addressed ■ Physical and Economic Blight ■ Urbanization Issues ■ Wetland Issues 9Southeast Coastal Goals ■ Screening & Environmental Improvements at Power Plant ■ Ascon/NESI Cleanup ■ Other Project Area Properties ■ Wetlands 19 Protect and Restore et ■ Park and Trail Improvements ■ Stand Alone Project Area ■ Provide Financial Resources 4 Redevelopment Plan ■ Adheres to the General Plan, Zoning and Specific Plans ■ Will describe potential projects and tools ■ Outline the rights of owners and [� tenants ■ 30 year implementation ■ Fund projects with Tax Increment financing EFRecommendation Approve Resolution 322 approving the Preliminary Plan for the Southeast Coastal Redevelopment Project 5