Loading...
HomeMy WebLinkAboutStudy Session - Public Works Department Report - increase in Page 15 - Council/Agency Minutes- 6/5/95 A motion was made by Green, second Garofalo to accept the one year Ambulance Report-with net revenues of $287,519 and to direct staff to place $55,600 into the Ambulance Equipment Replacement Account and apply $51,895 towards replacement of the General Fund startup costs. Leaving a General Fund unpaid balance of $396,008. The motion carried by the following roll call vote: ` �VU AYES: Harman, Bauer, Sullivan, Green, Garofalo RECEIVED FROM AND MADE A PART OF THE RECO D A HE NOES: None COUNCIL MEETING OF OFFICE OF THE CITY CLERK ABSENT: Leipzig CONNIE 13ROOKWAY,CITY CLERK t Pc hY (CITY COUNCIL) WATER MASTER PLAN CAPITAL IMPROVEMENTS FINANCING - PAY-AS- YOU GO FINANCING PLAN -APPROVED (1000.50) The City Clerk earlier in the meeting had announced the following late communication: Communication from William Holman, Seacliff Partners Project Manager, dated June 5, 1995, in regard to the Water Master Plan Capital Improvements Financing. The City Clerk presented a communication from Director of Public Works regarding the 1995 Water Master Plan which identifies necessary capital improvements with an estimated cost of $42.9 million. Two separate charges are recommended to finance the projects and the proposed fees require adoption by ordinance and resolution through the public hearing process. The Director of Public Works presented a detailed report and presented slides. Discussion was held regarding the plan. William R. Everest, Boyle Engineering, reported. Discussion was held. A motion was made by Dettloff, second Green to approve the following recommended actions: (1) . Approve the Water Task Force recommendation to utilize the Pay-As-You-Go financing plan when the Monthly Capital Surcharge is implemented. (2) Approve the Water Task Force recommendation of an increased Capital Facilities Charge for new residential development as presented in the Task Force Report. (3) Direct staff to prepare the necessary ordinances and resolutions to implement the Monthly Capital Surcharge and the increased Capital Facilities Charge. I (4) Accept the proposed public hearing schedule related to the charges. The motion carried by the following roll call vote: i AYES: Harman, Bauer, Dettloff, Green, Garofalo NOES: Sullivan ABSENT: Leipzig 295 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ADJUSTING WATER RATES RELATING TO SECTION 14.12.040 OF THE HUNTINGTON BEACH MUNICIPAL CODE WHEREAS, pursuant to Huntington Beach Municipal Code, Section 14.12.045,the City Council shall adjust water rates in order to maintain a balanced budget; NOW, THEREFORE,BE IT RESOLVED by the City Council of the City of Huntington Beach as follows: Effective December 1, 1995,water customers shall pay a minimum charge based upon size of service,plus $0.88 per 100 cubic feet of water, per month, for domestic, commercial and industrial service. The minimum charges shall be: Size of Service Minimum Charge Per Month 5/8"or 3/4" $ 5.30 1" $ 10.60 1 1/2" $ 15.90 2" $26.50 3 $58.30 4"Compound $ 90.10 4"FM $174.90 6"Compound $174.90 6"FM $355.10 8"FM $620.00 water/jmm/9/13/95 6/� l' Cod • jja, )Ora' : Council/Agency Meeting Held: � 95 Deferred/Continued to: �� — I-IfApproved O Conditionally Approved ❑ Denied City Clerk's Signqofe Council Meeting Date: June 5, 1995 Department ID Number: PW-95-041 REQUEST FOR COUNCIL ACTION SUBMITTED TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS SUBMITTED BY: MICHAEL T. UBERUAGA, City Administrato PREPARED BY: LES M. JONES, II, Director of Public Works SUBJECT: Water Master Plan Capital Improvements Financing Statement of Issue,Funding Source,Recommended Action,Alternative Action,Analysis,Environmental Status,Attachment(s) Statement of Issue: The 1995 Water Master Plan identifies necessary capital improvements with an estimated cost of $42.9 million. Two separate charges are recommended to finance the projects. The proposed fees require adoption by ordinance and resolution through the public hearing process. Funding Source: Funding will be provided through a Monthly Capital Surcharge on the Municipal Services bill; and an increased Capital Facilities Charge for new residential development . Recommended Action: 1. Approve the Water Task Force recommendation to utilize the Pay-As-You-Go financing plan when the Monthly Capital Surcharge is implemented. 2. Approve the Water Task Force recommendation of an increased Capital Facilities Charge for new residential development as presented in the Task Force Report 3. Direct staff to prepare the necessary ordinances and resolutions to implement the Monthly Capital Surcharge and the increased Capital Facilities Charge. 4. Accept the proposed public hearing schedule related to the charges. Alternative Action(s): 1. Approve an alternative financing method. 2. Direct revisions to the proposed public hearing schedule. 3. Do not implement a financing plan for the water capital improvements. Construction will be deferred until a funding method is determined. dV RtQUEST FOR COUNCIL ACTION MEETING DATE: June 5, 1995 DEPARTMENT ID NUMBER:PW-95-041 Analysis: In December 1993, the Water Task Force was appointed by Council to review the updated 1988 Water Master Plan, and evaluate financing options. In March 1995, the Water Task Force presented its report to the City Council. The report included a prioritized project list, eleven year construction schedule and a recommended financing plan. The financing plan consists of two elements: 1) a new Monthly Capital Surcharge for all water customers; and, 2) an increased Capital Facilities Charge for new residential development. The recommended fee schedule for the Monthly Capital Surcharge provides revenue concurrent with the project construction phases. The Task Force supports the "pay-as-you-go" method because it avoids the long term debt and financing costs of bonds or Certificates of Participation. Alternative financing options were prepared and presented to the Council, but not recommended by the Task Force. One option considered financing the improvements over thirty-five years with Certificates of Participation. Another financing option combined "pay- as-you-go" and twenty year Certificates of Participation. Expanding the construction schedule from 11 years to 15 years was suggested as a way to keep rate costs to a minimum. This approach does not agree with the recommendation of the Task Force. In addition, it has also been discouraged by the consultant, Boyle Engineering in a May 16 letter which is attached. If this approach were adopted, however, it would be first necessary for the consultant to reprioritize and regroup the construction schedule to a 15 year duration and amend the Master Plan update. Once completed, a pay- as-you go option could then be developed to finance the new construction schedule. As an alternative to extending the construction schedule, a modest fee($2.00) may be implemented in 1995 with the construction schedule delayed to begin until 1998. This would expand the funding schedule but maintain the 11 year construction schedule. Delaying start of the construction would allow impounding of the initial funding which would produce a lower initial rate. It would also increase the risks associated with further delay of the construction as explained in the Boyle letter and the recommendation of the Task Force. The increased Capital Facilities Charge will be assessed to new residential developments. The charge is calculated by the number of "equivalent dwelling units" served. The formula includes the value of the existing water system and the cost of future capital needs. This fee change requires modification of Municipal Code Section 14.12.010. The Task Force recommends prompt implementation of the Capital Facilities Charge. A rate increase to meet the operational expenses of the Water Enterprise will be presented with the 1995/96 Budget, and adopted concurrent with the budget. The Monthly Capital Surcharge can be included in the water rate adjustment resolution, or a separate public hearing can be arranged after October 1, 1995. A proposed schedule is attached. Environmental Status: Not applicable. 0012284.01 -2- 05/31/95 5:25 PM RLQUEST FOR COUNCIL ACTION MEETING DATE: June 5, 1995 DEPARTMENT ID NUMBER:PW-95-041 Attachment(s): City Clerk's Page Number Proposed Public Hearing Schedule 2 Capital Facilities Charge 3 Standard Connection Fees 4 Comparison of Financing Options; Source of Funding 5 Letter from Boyle Engineering re: Extension of Construction Schedule 6 Memorandum from Councilmember Garofalo re:Financing Alternatives 0012284.01 -3- 05/31/95 5:25 PM REQUEST FOR COUNCIL ACTION MEETING DATE: June 5, 1995 DEPARTMENT ID NUMBER:PW-95-041 Proposed Implementation and Public Hearing Schedule August 7, 1995 Introduction of Ordinance to modify Capital Facilities Charge August 14, 1995 Budget Study Session. Operational water rate increase included with the proposed 1995196 Water Fund budget. Council to provide direction for Monthly Capital Surcharge implementation, either with 1995/96 Budget or separately. August 21, 1995 Adoption of Ordinance to modify Capital Facilities Charge (Public Hearing) Adoption of Resolution to increase Capital Facilities Charge Requires 45 day notification; new charge effective 9/21/95. September 5, 1995 Operations & Maintenance water rate increase to be adopted (Public Hearing) with the 1995/96 budget. September 18, 1995 Adoption of 1995/96 Budget resolution and water rate increase resolution. Additional public hearings for the Monthly Capital Surcharge may be scheduled per Council direction. 0012284.01 -4- 05/31/95 5:25 PM CAPITAL FACILITIES CHARGE METER FLOW CAPACITY EQUIVALENT CAPITAL SIZE (gallons per DWELLING FACILITIES inches minute) UNITS CHARGE 3/4 30 1 $ 2,400 1 50 2 4,800 1 -1 /2 100 3 7,200 2 160 5 12,000 3 320 11 26,400 4 500 17 40,800 6 1000 33 79,200 Compound 6 1400 47 112,800 Fire Meter 8 2400 80 192,000 Fire Meter 10 3800 127 304,800 Fire Meter 05/18/95 STANDARD CONNECTION FEES City 3/4-Inch Meter 1-Inch Meter 2-Inch Meter 6-Inch Meter 6-Inch Fire Service Anaheim Carlos Bustos $2,305.00* $2,355.00* $2,620.00* $2,710.00* Not Available (714) 254-4231 Costa Mesa (MCWD) $1,200.00 $1,300.00 $6,600.00 Over 3" based on Ron Briles usage x $4.90 '714) 631-1291 Fountain Valley $304.02 $507.07 $1,622.21 $10,142.37 Not Available Romero Alvarez (714) 965-4433 x250 Garden Grove Marion Dan $585.00 $615.00 $1,800.00 $7,500.00 Not Available (714) 741-5396 $17.55** $18.45** $54.00** $225.00** Irvine Ranch Water Dist. Janet [ray Fees based on area of development/density. (714) 453-5300 Range $400.00 (low density) to $12,000 (high density) '.aguna Beach Water Dist. iom Eastman $500.00 $500.00 $1,000.00 Not Available (714) 494-1041 $250.00 (meter) $300.00 (meter) $600.00 (meter) Los Alisos Water Dist. Phyllis Cottingham $1,100.00 + $1,100 + $1,100 + (714) 830-0580 $ 80.00 (meter) $120.00 (meter) $340.00 (meter) Not Available Not Available Moulton Niguel Carlo Habash $1,400.00 (all sizes for Laguna Niguel)(water and sewer combined) (714) 643-2584 $1 ,200.00 (all sizes for Mission Viejo, Laguna Hills, etc) Standard Connection Fees Page 2 City 3/4-Inch Meter 1-Inch Meter 2-Inch Meter 6-Inch Meter 6-Inch Fire Service Newport Beach (City) $195.00 $260.00 $605.00 $2,805.00 $2,850.00 Sheila O'Brian (714) 644-3141 Santa Ana (City) $735.00 $760.00 $1,510.00 Not Available $5,258 to $5,800 Tai Koon (Dependant on location) 1714) 647-5837 Santa Margarita (WD) $1,200.00 (all sizes)(Rancho Santa Margarita, Coto de Caza) Eddie Bolton $2,600.00 (all sizes)(Mission Viejo) (714) 582-2330 $116.00 (meter) $172.00 (meter) $829.O0(meter) Not Available Not Available Westminster (City) Huyen Nguyen $1 ,560.00+ $1,560.00+ $1,560.00+ $3,450.00+ $4,700.00 (714) 898-3311 material material material material • Includes $2,225.00 Assessment Fee Compiled by: Janie Alba `•Processing Fee 5/19195 COMPARISON OF FINANCING OPTIONS SOURCE OF FUNDING PLAN PAY AS YOU GO I BONDS TOTAL TERM OF BONDS $ 55 Million 0 $55 Million Not Applicable • • $ 4 Million $51 Million $55 Million 30 Years $ 33 Million $22 Million $55 Million 20 Years Description of Financing Options "Pay as You Go" This plan uses a maximum rate increase of $5.50 per month per residential meter to pay for all construction costs within an eleven year period of time. An initial rate increase of $3.00 per month in 1995 is increased annually by 50 cents per month to the maximum of $5.50 in 1999/2000, then drops to $2.00 per month in fiscal year 2005/2006. Bonds/COP's Bonds/COP's would result in payment for the facilities with three separate 30 year bond issues compared to the eleven year financing of the " Pay As You Go" Plan (Construction of the improvements would be on the same eleven year schedule, however). Residential monthly rate increases would be $1.50 in 1996, increased progressively to $5.00 in 2003. The $5.00 rate would continue until the first bond issue is retired in 2026. New connection fees would be the same as the " Pay As You Go" Plan. Alternative Same construction schedule as above plans. Two separate 20 year bond issues would be issued in combination with ° Pay As You Go" financing. Residential monthly rate increases would be $1.90 in 1995, increased progressively to $5.50 in fiscal year 2001/2002. The $5.50 rate would drop to $4.00 in fiscal year 2005/2006 and continue at $4.00 until the first bond issue is retired in 2016. See Attached Graph summarizing monthly rates. 0011549.01 04120/95 4:07 PM Comparison of Financing Options Monthly Capital Surcharge Requirements BondsICOP's v55 _....._............_._.._.. .......... .......... _._............................._........ `m t u rn Alternativ mbination 9 U T o "Pay as You Go" $0 94 95 96 97 98 99 00 01 02 03 04 05 M 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Fiscal Year Capital Projects Fee -Alternative Financing Plans Fiscal Monthly Rate($) Year Pay as You Go BondsICOP's Alternative 1994 $0.00 $0.00 $0.00 1995 $3.00 $0.00 $1.90 1996 $3.50 $1.50 $2.25 1997 $4.00 $1.50 $3.00 1998 $4.50 $1.50 $3.35 1999 $5.00 $2.50 $3.65 2000 $5.50 $2.50 $4.00 2001 $5.50 $2.60 $5.00 2002 $5.50 $4.00 $5.50 2003 $6.50 $5.00 $5.50 2004 $5.50 $5.00 $5.50 2005 $5.50 $5.00 $5.60 2006 $2.00 $5.00 $4.00 - 2007 $2.00 $5.00 $4.00 2008 $2.00 $5.00 $4.00 2009 $2.00 $5.00 $4.00 2010 $2.00 $5.00 $4.00 2011 $2.00 $5.00 $4.00 2012 $2.00 $5.00 $4.00 2013 $2.00 $5.00 $4.00 2014 $2.00 $5.00 $4.00 2016 $2.00 $5.00 $4.00 2016 $2.00 $5.00 $3.00 2017 $2.00 $5.00 $3.00 2018 $2.00 $6.00 $3.00 2019 $2.00 $5.00 $3.00 2020 $2.00 $5.00 $2.00 2021 $2.00 $5.00 $2.00 2022 $2.00 $5.00 $2.00 2023 $2.00 $6.00 $2.00 2024 $2.00 $6.00 $2.00 2025 $2.00 $5.00 $2.00 2026 $2.00 $4.00 $2.00 2027 $2.00 $4.00 $2.00 2028 $2.00 $4.00 $2.00 2029 $2.00 $3.00 $2.00 2030 $2.00 $3.00 $2.00 2031 $2.00 $3.00 $2.00 2032 1 $2.00 1 $2.00 1 $2.00 FEECOMP.XLS 4120195 BoLpe Enqineerinq Corporation consumno engineers ! arcnrtects 1501 Quail street P.O. Boh 3030 714 / 476-3300 Newport Beach. CA 92658.9020 FAX 714 / 721 7142 Mr. Les Jones, Director of Public Works May 16, 1995 CITY OF HUNTINGTON BEACH Post Office Box 190 Huntington Beach, California 92648 Water System Master Plan/Financing Plan Capital Improvement Program -Implementation Period Since 1987 when Boyle initially became involved with the Water System Master Plan, the construction period for the recommended program has changed. In our 1988 Master Plan we recommended the CIP be implemented over a six-year period,based on a realistic engineering construction period, which was the basis of the CIP until 1993. During the last two years, the implementation period has been extended to 11 years, based on the desire and need to minimize the financial impact of the program. It was felt that this extended duration was acceptable, even though there was some increased risk to public safety because of seismic damage vulnerability. Structural retrofit improvements to existing city reservoirs are required for the facilities to successfully withstand a major earthquake. In addition,the city has no emergency water storage, which would be invaluable following a major earthquake. It has been recently suggested that the CIP implementation period be further extended, say to 15 years. We believe that such an extension would: 1) be more characteristic of a long-term maintenance program rather than a critically-needed capital improvement program,2) unduly increase the public safety risk in the city, and 3) not significantly reduce the financial impact of the program. East Bay Municipal Utility District in Oakland is undertaking a major water system seismic upgrading program. Because of public concern for the immediacy of providing protection, the District voted to have the program completed in 10 years rather than 15 as originally proposed. Similar action is justified in Huntington Beach. We cannot recommend nor support an extension of the CIP beyond 11 years, which is the basis for our recently adopted 1995 Update. Boy a En ineering Corporation William R. Everest, I } Principal Engineer L-\- cc: Jeff Renna- Water Operations Manager OC-H 10-250.20/joncs.oMht CITY OF HUNTINGTON BEACH INTER-DEPARTMENT COMMUNICATION HUNTINGTON BEACH TO: CITY COUNCIL FROM: LES M. JONES II Director of Public Works DATE: MAY 22, 1995 SUBJECT: 1995 WATER MASTER PLAN OPERATION AND MAINTENANCE COSTS At the Council Study Session on May 8, 1995, a question was raised regarding the $2 . 00 per month operation and maintenance fee that would be assessed at the conclusion of the payoff of the capital projects in all financing proposals presented. The information below should answer this question. QUESTION: How does the $2 . 00 per month fee for operation and maintenance compare to the current cost of operation and maintenance based on the current year' s budget? ANSWER: The $2. 00 fee compares favorably, as it is based on the current year budget costs for the operation and maintenance of similar facilities . In Table 8 of the "Water System Master Plan/Financing Plan - 1995 Update, " dated March, 1995, page 22, the total annual O & M cost for all the proposed facilities is shown to be $1 . 632 million (estimated in 1995 dollars) . This figure represents what the annual 0 & M cost would be for these facilities if they were currently in operation, having just been completed. The estimated 1995 0 & M cost of $1 .632 million is based on the current average costs for operating similar facilities in the existing Huntington Beach water system, in addition to current maintenance costs. Since the facilities would be new at the completion of the construction period, this was taken into account when estimating these costs, as initial year O & M efforts are typically lower than in later years. Additionally, annual depreciation costs are included in the estimates . When compared against the existing water system' s 20+ year old facilities, the actual costs for the existing facilities are currently on the order of 50% higher. In determining the $2 . 00 per month O & M fee shown in the 1995 Water Master Plan proposal, the $1 . 632 million 0 & M cost estimate was divided by the estimated 72, 900 equivalent dwelling units (EDU) estimated to exist in the years following the construction period. The numbers of EDU' s are shown in Tables 16, 17, and 18 in the 1995 Water Master Plan document (see pages 35, 36, and 37 on the first line entitled, "Customer Data") . Dividing the $1 . 632 million by 72, 900 EDU' s yields approximately $24 per year, or $2 . 00 per month. If you should have any additional questions or need more clarification, please contact me. LMJ: jr cc: Michael T. Uberuaga, City Administrator Ray Silver, Ass' t . City Administrator I. Nt4 CITY OF HUNTINGTON BEACH CITY COUNCIL COMMUNICATION HU NGTOH 8UC TO: Michael T. Uberuaga, City Administrator FROM: Dave Garofalo, City Council Member DATE: May 26, 1995 SUBJECT: WATER CAPITAL IMPROVEMENTS FINANCING As we discussed, I am concerned over several rate increases this Council will be acting on yet this year. One is clearly in the area of"Water" and another in "Refuse Collection". There will probably be yet others as we attempt to manage in the 1990's. Water Department - I would like to request that your staff prepare an alternative financing and improvement program that utilizes a pay-as-you-go approach with the rates being incrementally increased in a manner necessary to finance a phased implementation of the acknowledged necessary capital improvements. Specifically, there is no reason this eleven year program could not be a 15 year plan. We build and pay-as-we-go for one third at a time. In fact, if we were to immediately institute a new$2.00 per month fee on the water bill and did so for 36 months, we would then have accumulated over$3 million. That would be pay-as-you-go then stating construction and payment for one third of the project over three, five year periods.-While this may be longer, in my opinion it is more affordable. I believe we will have several major capital projects that need to be looked at and instead of ignoring and delaying, I would rather be responsible for planning and truly paying-as-we-went! understand that most of this analysis is already available, therefore it should not require very much additional staff time. Thank you in advance for your attention to this matter. DG:paj xc: Honorable Mayor and City Council Seacliff Partners Ajemr.nuua u(Plufic Cnssl noxs and UlY.C.D.volepm:rt Corp. HUr;ru.- - June 5, 1995 Jiil ti , The Honorable Victor Leipzig, Mayor Huntington Beach City Council 2000 Main Street Huntington Beach, CA 92648 Subject: Agenda Item F-2; Water Master Plan Capital Improvements Financing Mayor Leipzig and City Council: Seacliff Partners has reviewed the materials for the above item and generally supports the recommendations of the Water Task Force to adopt a financing plan to support citywide water system improvements, with one major exception. While we agree that a proposed new Capital Facilities Charge is warranted, we disagree with the Task Force recommendation that the fees be charged only to new residential development, with no associated fees for non-residential development. We believe this proposal is unfair for the following reasons: Non-residential uses have a significant impact_,_ onnc wide water use In the 1990 Bartle Wells Associates Water Master Plan Financing Plan Study, the City reported that 27 percent of all metered water usage in the City was by commercial (i.e. non- residential) uses. This information is consistent with the water demand factors used by the City in designing the master plan of water facilities for the Holly Seacliff Area. As indicated on pages 36-38 of the Holly Seacliff Specific Plan Technical Appendix, non-residential uses (commercial, industrial, mixed development and open space uses) account for approximately 30 percent of the overall water demand in the area. Developers of non-residential properties should be required to pay for their fair share of new system improvements Under the fee schedule as recommended by the Task Force, developers would pay widely varying capital facilities fees for new development, as shown on the following table indicating fees applicable to four typical development scenarios on a ten acre site: Capital Land Use Demand Factor Total Demand Facilities Charge 60 single family dwellings 1.2 Gal/Min/Acre 12 Gal/Min $144,000 (@ 6 du/ac) 100 townhomes 2.2 Gal/Min/Acre 22 Gal/Min $240,000 (@ 10 du/ac) Retail (109,000 sf) 1.3 Gal/Min/Acre 13 Gal/Min $ 3,000 (@ 0.25 FAR) Industrial (178,000 so 3.7 Gal/Min/Acre 37 Gal/Min $ 3,000 (a 0.41 FAR) U/520 Broadway, Suite 100, Santa Monica, CA 90401 (310) 394-3379 Fax(310) 394-6872 1Y 23 Corporate Plaza, Suite 250, Newport Beach, CA 92660 (714) 721-9777 Fax (714) 729-1214� 06/05/95 15:50 $714 729 1215 CUD PCH HBCO -OL- As the table illustrates, even though the total water demand from residential development is lower, the proposed fees are significantly and disproportionately higher for residential development. The City's General Plan and Holly Seacliff Specific Plan require the City to charge developers for public infrastructure improvements on a "fair-share" basis. The proposed water capital facilities fee, if applicable only to new residential development but not to non-residential development, does not conform with adopted City policies and ordinances. Further, if the City does not impose fees on non-residential development in the Holly Seacliff area to pay for public water system improvements financed and constructed by Seacliff Partners, the City is not using its best efforts to obtain maximum reimbursements for Seacliff Partners, as required by the terms of Development Agreement No. 90-1. We respectfully request the City Council to address these issues prior to adoption of the Water Master Plan and Capital Improvements Financing Plan. Sincerely, William D. Holman Project Manager cc: Michael Uberuaga, City Administrator Les Jones, Public Works Director Gail Hutton, City Attorney Connie Brockway, City Clerk Melanie Fallon, Community Development Director Tom Zanic RCA ROUTING SHEET INITIATING DEPARTMENT: Public Works SUBJECT: Water Capital Improvements Financing COUNCIL MEETING DATE: June 5, 1995 RCA ATTACHMENTS STATUS Ordinance (w/exhibits & legislative draft if applicable) Not Applicable Resolution (w/exhibits & legislative draft if applicable) Not Applicable Tract Map, Location Map and/or other Exhibits Not Applicable Contract/Agreement (w/exhibits if applicable) (Signed in full by the City Attorney) Not Applicable Subleases, Third Party Agreements, etc. (Appoved as to form by City Attorneyj Not Applicable Certificates of Insurance (Approved by the City Attorney) Not Applicable Financial Impact Statement (Unbudget, over $5,000) Not Applicable Bonds (If applicable) Not Applicable Staff Report (If applicable) Not Applicable Commission, Board or Committee Report (If applicable) Not Applicable Findings/Conditions for Approval and/or Denial Not Applicable EXPLANATION FOR MISSING ATTACHMENTS REVIEWS''D RETURNED FOR DED Administrative Staff Assistant City Administrator Initial City Administrator Initial City Clerk EXPLANATION FOR RETURN.OF ITEM: . . Only) k11i�C tAOM w dNF1MAbEAPAR v P TOFT{i1 EF._.T �!E COUNOIL MEETING OF dPFIBE OF THE C cC) ITYCLEgK(S NNfE BF?OOKWAY C17YCLEIJK Water Master Plan Task Force Report Council Update 5/8/95 Master Plan Improvements Total Cost: $42.9 Million *Add new water supplies *Increase water storage capacity *Improve delivery system * Protect public health & safety Water Task Force Report Council Actions 4/27/95 ♦ Acceptedar.. ✓ Prioritized project list ✓ 1 1 yr construction schedule ✓ Increased Capital Facilities Charge for new residential development ♦ Requested further information ✓ Emergency storage needs ✓Alternative financing plan with lower initial rate & shorter bond term Water Task Force Report Council Update 5/8/95 ♦Amount of Emergency Water Storage ✓ Comparable to other agencies ✓ Realistic to meet anticipated need ♦ Financing Alternative with Lower Initial Rate & Shorter Bond Term ✓ Combines 20 yr COPS & Pay As You Go ✓ Lower initial rate; higher long term costs Emergency Water Storage W[iN.i^.NK% A encv # of av2 days Anaheim 4.9 Brea 7 Fullerton 1.4 Garden Grove 0.85 Moulton Niguel Water District 0.56 South Coast Water District 2.3 Yorba Linda Water District 1.2 Water Task Force Financing Alternative to Pay As You Go Monthly Surcharge (Residential 3/4" Meter) Method Term Initial Maximum Rate Rate Pay As You Go 11 Yr $3.00 $5.50 Bonds/COPS 30 Yr $1 .50 $5.00 Alternative/ 20 Yr $1 .90 $5.50 Combination Monthly Rate Increase Alternative Financing Methods ..:.:....:..:.:... $6 Pay as You Go $5 Alternative $4 $3 $2 Bonds/COP' $'I $0 94 96 93 0 2 4 6 6 10 12 14 16 16 20 22 24 26 26 30 32 Fiscal Year Cost per Residence (3/4" Meter) Method 1 st yr Full Cost 1995 2031 Pay As You Go $36 $ 1 ,284 COPS $ 0 $ 1 ,848 Alternative $23 $ 1 ,478 Full Cost per Residence 1995-2031 aeuuxaa•::uazuu wxx $2,000 $1,800 $1,600 T $1,200 - 's Total New Revenue: 1995-2031 Alternative Financing Methods New Revenue to Finance Water Master Plan Total Net Revenue Present Value Pay as You Go $ 144. 5 $65.0 Bonds/COP's $214.7 $67.6 Alternative $ 172.9 $67.8 .S in Millions Total New Revenue: 1995-2031 Alternative Financing Methods S in Millions ®Total $200 $172.9 ®NPV $144.5 $150 $100 67.6 67.8 65.0 $50 $0 Bonds Alternative Pay as You Go NPV-Net Present Value Water Task Force Recommendation ♦Support Pay As You Go Financing ✓ Lowest total costs ✓Avoids long term debt ✓ Retains bonding option ♦Support Capital Facilities Charge ✓ Pays for existing system & new demands ✓ On new residential development Huntington Beach Municipal Code 14.12.010-14.12.010(d) Chapter 14.12 FEES,RATES AND DEPOSITS (674-12/57.723-6159.7 3 8-1 215 9,7514160,792-10/60.892-4/62, 1001-10/63. 1100.12/64, 1217-7/66,Urg 1343-A-8/67, 1344-9/67, 19014174. 1996-8175,2020-12175,2022-1/76,2205-7177,2218-11177.2400-11/79,2535-3/82,2589-1/83.2709-6/84,2826-5/86, 2948.8/88,3119-7/91,3302-11/95.3404-10/98) Sections: 14.12.010 Service fee 14.12.020 Installation and meter fees 14.12.030 Installation by applicant 14.12.040 Water rates--Designated 14.12.045 Water rates--Budget 14.12.050 Water rates--Construction purposes 14.12.060 Water rates--Other usds 14.12.070 Private fire service rates 14.12.080 (Repealed Urg Ord 2709-6/84) 14.12.090 Water service--Applications 14.12.100 Water service--Turn-on charges 14.12.110 Water rates--Turn on 14.12.120 Water billing 14.12.130 Vacating premises 14.12.140 Change of address 14.12.150 Renewing service 14.12.160 Adjustment of rates 14.12.170 Water fund 14.12.010 Service fee. For uses zoned commercial or industrial,the Water Department, as a condition to granting the application and furnishing water service to the premises, is authorized to charge and shall collect in advance the following sums for the purpose of reimbursing the City for the cost of the system and future replacements and extensions thereof (3302-11/95) (a) The sum of sixty dollars($60) for each usable unit on parcels containing less than ten i thousand (10,000) square feet. A "usable unit' shall be each residential quarter in hotels and motels. (3302-11/95) b( ) For any parcel containing ten thousand(10,000) square feet of area or more,three hundred dollars ($300)per acre or fraction thereof,or sixty dollars ($60)per usable unit,whichever is greater. (3302-11/95) - A "usable unit" shall be any unit defined in subsection(a) above. The charge,of three hundred dollars($300)per acre shall apply to all commercial and manufacturing developments. (3302-11195) (c) Those areas served by a water main constructed and charged as determined by another ordinance or executed agreement may be exempt from the usable unit charge in subsection (a) if said other ordinance or agreement charge is greater than the charge per subsection(a). (3302-11/95) (d) All necessary service fees established.by the City shall be deposited with the City prior to approval of the final subdivision map or issuance of a building permit if a subdivision map is, not required. (674-12/57,723-6/69,1001-10/63,1100-12/64,2022-1776,2535-3/82). , For uses zoned other than commercial or industrial,the Water Department,as a condition to granting the application and furnishing water service to the premises,is authorized to charge 10198 14.12.010(d)--14.12.045 Huntington Beach Municipal Code and shall collect in advance the Capital Facilities Charge for the purpose of reimbursing the City for the cost of the rystem and future replacements and extensions thereof. The Capital Facilities Charge is based on the cost per equivalent dwelling unit(EDU) of existing facilities and the proposed expansion facilities which shall be set by a resolution of the City Council. All monies collected as the Capital Facilities Charge shall be used only for projects identified in the 1995 Water Master Plan to mitigate new water demands resulting from the development paying the Capital Facilities Charge. (3302-11/95) 14.12.020 Installation and meter fees. In addition to the fee set forth in Section 14.12.010(a), the Water Department shall charge and collect in advance the following amount for the installation of water connections and meters: a sum equal to the actual cost of labor and material in laying such service line, including the cost of the meters,the cost of replacing pavement,plus fifteen(15%)percent for overhead. The cost of such installation shall be estimated by the Water Department, and such estimated cost shall be paid by the applicant to the Water Department before the work of connecting the main with the property is commenced. Whenever the estimated cost is not sufficient to cover the total expense for labor,material,meters and overhead,the deficit shall be charged to the property for which such installation was made and paid by the owner thereof. Any excess payment shall be returned to the person applying for installation. (674-12/67, 1996-8/75) 14.12.030 Installation by applicant. The Water Superintendent may in his discretion authorize an applicant to make the installation at applicant's own cost, and in conformity with the specifications set forth by the Water Department. (674-12/57) 14.12.040 Water rates--Designated. The water rates to be charged monthly and collected monthly or bimonthly, as may be determined by the City, shall be set by a resolution of the City Council. A Capital Surcharge to be charged monthly as may be determined by the City shall be set by resolution of the City Council. All monies collected as the Capital Surcharge shall be used only for projects identified in the 1995 Water Master Plan. (3302A 1/95) The water rates,plus a ten(10%)percent surcharge, shall be applicable to areas outside the boundaries of the City of Huntington Beach,wherever the City serves water,including Sunset Beach, an unincorporated area, and Surfside, located within the City of Seal Beach. (674-12/57, 7514160.892-4162,1100-12/64.1217-7166,Urg 1343-A-8/67, 1344-9167,19014/74,1996-8t75,2205-7177,2218-11/77,Urg 2709-6/84,2826-5/86,2948-8188.3119-7/91) 14.12.045 Water rates--Budeet. It shall be the policy of the City that a balanced budget shall be maintained for the water fund. Pursuant to Section 602 of the Charter of the City of Huntington Beach,the City Administrator shall be required to submit said water fund budget in a balanced condition to the City Council,together with the other budget submittals. The water rate adjustment necessary to maintain a balanced budget shall be incorporated as part of the annual budget which shall modify the rates as set forth in Section 14.12.040 of the Huntington Beach Municipal Code upon adoption of the budget. For the purpose of this Section, "balanced budget" shall mean that total appropriations for operating expenses do not exceed total estimated revenues in the annual budget of the water fund. Operating expenses shall include appropriations for the depreciation cost of those capital improvements customarily provided for in the operating budget and in accordance with generally accepted accounting principles. Revenues shall exclude bond proceeds, if any,but include interest earnings and other nonoperating revenue in accordance with generally accepted accounting principles. (Urg 2709.6/84) 10/98 Huntington Beach Municipal Code 14.12.090-14.12.150 14.12.090 Water service—Applications. All applications for water must be made out on forms provided by the Water Department and must be signed by the applicant or his or her agent. All applicants must deposit with the Water Department a fee established by resolution of the City Council as a guarantee that all water bills, fines and penalties shall be paid by the applicant. The deposit shall be returned to the applicant at the time water service is discontinued provided that applicant has not left unpaid any water bill,fine or penalty. Such unpaid water bill;fine or penalty shall be deducted from the applicant's deposit and the balance thereof, if any, shall be refunded to the applicant at his or her last known address. (674-12/57,2020-12/75,25U8-11/81) 14.12.100 Water service—Turn-on charges. No charge shall be made for the transfer due to change of ownership or occupancy. Where the owner or occupant requests temporary turnoff of water service, a charge of five dollars ($5) shall be made for restoring the water service to the premises. (697-12/57, 1996-8n5) 14.12.110 Water rates--Turn on. Whenever the distribution line of the municipal water system shall be duly connected with the premises of any person, and the water turned on such premises, the charge for water shall be a charge against the person in possession of the premises who used the water, and the charges shall continue so long as the water is turned on to the premises, whether the same is actually used or not. (674-12157) 14.12.120 Water billing, All water bills are due upon presentation and are payable at the Office of the Treasurer of the City of Huntington Beach, or his authorized agent. Bills are deemed presented if addressed to the water customer at the address shown on the records of the City Treasurer and deposited with the United States mail service,postage prepaid. Accounts which remain unpaid thirty(30)days thereafter are delinquent. A notice of final billing shall be mailed to each delinquent account specifying a date by which full payment is due. Said final billing shall include a late fee imposed to recover billing and mailing costs, set by resolution of the City Council. Water service for delinquent accounts shall be shut off until all outstanding bills, fees, utility taxes and penalties have been paid. When the supply of water has been shut off for nonpayment or a violation of any ordinance or of any rule or regulation, service shall not be resumed until a turn-on fee, as set by resolution of the City Council,has been paid. (674-12/57, 1996-8n5,2400- 11n9, 2589-1/83) 14.12.130 Vacating premises. Whenever a consumer shall vacate any premises, he shall immediately give written notice thereof to the Water Department. Upon the receipt of such notice,the department shall read the water meter, shut off the water from the premises and immediately present the consumer all unpaid bills for water famished by the City to him up to that time...Thereupon the consumer shall pay said bills to the Water Department. In the event that the consumer shall have made a deposit with the department, as required in Section 14.12.090, the balance,if any, of such deposit shall be returned to the consumer after deducting therefrom the amount of said bills. Until such notice and payments shall have been made, the premises shall be deemed occupied by the consumer and his liability continued. (674-12157) 14.12.140 Change of address. Failure to receive mail will not be recognized as a valid excuse for failure to pay water rates when due. Change in occupancy of property supplied with City water, and changes in mailing addresses of consumers of City water must be filed in writing at the Water Department on forms provided for that purpose. (674-12157) 14.12.150 Renewing service. Each owner or occupant of any premises previously connected with the City water system desiring to renew the use of water shall make application for renewal of water service and upon payment of all unpaid charges, if any,together with any turn-on charge imposed by Section 14.12.100, the water will be turned on. (674-12/57) 7/91 14.12.160-14.12.170 Huntington Beach Municipal Code 14.12.160 Adjustment of rates. The Council shall have the sole power to grant rebates from the rates specified in this chapter to indigent persons, and in the event of any dispute as to the water rate to be paid by any consumer,it shall determine the same. (674-12/57) 14,12.170 Water fund. All moneys collected from fees and charges under Chapters 14.04 through 14.20 of the Huntington Beach Municipal Code shall be deposited in the treasury of the City in a water fund and annually there shall be disbursed from said water fund to the general fund, an amount equal to fifteen(15%)percent of the gross revenue received from the sale of water by the Water Department in lieu of franchige and property taxes. (73e-12/59) 7191 10" FM $969.00 A charge of three dollars, fifty($3.50) shall be made for each unit in excess of one connected to each meter. "Unit"means any building or a portion of a building consisting of one or more rooms separated from the rest of the building by a partition, occupied independently of the other parts of the building, or another building. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the Iathlay of September 1995. ATTES �j�,Q�ir e-11 Mayor / City Clerk 94- APPROVED AS TO FORM: RE D APPROVED:01 �a_.yS rl � City Attome rty Administrator IN D APPR VED: Dir o P r s water/jmm/9/12195 Res.No. 6712 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, CONNIE BROCKWAY, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a regular meeting thereof held on the 18th of September, 1995 the following vote: AYES: Councilmembers: Harman, Bauer, Sullivan, Leipzig, Dettloff, Green, Garofalo NOES: Councilmembers: None ABSENT: Councilmembers: None City Clerk and ex-offacio Clerk of the City Council of the City of Huntington Beach, California 01reso1utVresbkpg 0E-07-98 11 : 34AM FROM CITY CLERK ruc RESOLUTION NO. 6713 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH ESTABLISHING THE CAPITAL FACILITIES CHARGE AND THE CAPITAL SURCHARGE UNDER THE HUNTINGTON BEACH WATER MASTER PLAN WHEREAS, in September, 1988, the City adopted as Water Master Plan for the City of Huntington Beach which did not include a financing plan;and The Water Master PIan was updated to include financing in 1993 and City appointed a Water Task Force to review the Water Master Plan; and The Water Task Force presented an updated Water Master Plan for adoption by the City which included the means of financing the 1995 Water Master Plan; and The City Council desires to establish new rates and change existing rates charged to the public for new and existing water services to finance the Water System Master Plan Capital Improvement Program,- NOW, THEREFORE,BE IT RESOLVED by the City Council of the City of Huntington Beach that, effective December 1, 1995, the following Capital Facilities Charges under Huntington Beach Municipal Code Section 14.12.010 be applicable. METER SIZE FLOW CAPACITY EQUIVALENT CAPITAL (inches) (gal. per min.) DWELLING UNITS FACILITIES CHARGE 3/4 30 1 $2,400 1 so 2 4,800 1-1/2 100 3 7,200 2 160 5 12,000 3 320 11 26,400 4 Soo 17 40,800 Compound 4 1000 33 79,200 FM* 6 1000 33 79,200 Compound 6 2000 67 160,800 FM* 8 3500 117 280,800 FM* 1 mo 1412/jmM9/12,95 UU Ui Jv Ii .jiAW fLVkl �,I11 l,LCal1 fUJ 10 5500 183 439,200 FM* "A Fireline meter is a type of high capacity meter approved for domestic or fire protection service. BE IT FURTHER RESOLVED that, effective December 1, 1995, the Capital Surcharge under Huntington Beach Municipal Code Section 14.12.040 shall have an initial rate of$3.00 per month per equivalent dwelling unit and per each additional unit connected to the meter with an annual increase of$.50 per year. The maximum rate increase will be$5.50 per month per equivalent dwelling unit per residential meter and per each additional unit connected to the meter in the sixth year. The rate shall decrease to $2.00 per month per equivalent dwelling unit and per each additional unit connected to the meter at the end of twelve years. PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on the 18thday of Septembgr1995. ATTEST: // 4 Mayor City Clerk fr APPROVED AS TO FORM: RE APPROVED: gr/�� �- ity Attorney ity,Adnunis rat r TI E AND PROVED; _ Director o Works 2 rea1412rjmm/9/12,95 vu-u ryu tt .,i4nm rr.vtn �ttt �ycnn ruq Res. No. 6713 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss: CITY OF HUNTINGTON BEACH ) I, CONNIE BROCKWAY, the duly elected, qualified City Clerk of the City of Huntington Beach, and ex-officio Clerk of the City Council of said City, do hereby certify that the whole number of members of the City Council of the City of Huntington Beach is seven; that the foregoing resolution was passed and adopted by the affirmative vote of at least a majority of all the members of said City Council at a regular meeting thereof held on the I8th of September, 1995 the following vote: AYES: Councilmembers: Haman,Bauer, Leipzig, Dettloff, Green NOES: Councilmembers: Sullivan, Garofalo ABSENT: Councilmembers: None 4 4n4�: 2�1"^ City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach, California t G/mealutVrmbkyy Public Works Department R g IDPAOM mow A EIlN.A MART OF THE RECORD AT E ��1TING OF -9 004,E09RO9KWAY,CITYOELORK fiublic Works - Water Division Proposed Water Rate Increase May 1999 Water Bill Distribution Water Bill W afar Usage and Meter Charge Water Master Plan Surcharge W aLr Fund Capital Operations and Maintenance Master Plan Projects Existing System Personnel Capacity Enhancements Replacements and Upgrades I Routine/Preventive Tasks OCW D and MW D Costs Equlpm enl fleplacement PublicWorks Department C�l1�it�il Improvethents Wtltcr f�unrl M1sGe�tiP']Ir�mi � R��+�;ICC7 Cpgrade Additional Capacity I .�i.ting Facilities - Fz>zr.++;cs — o-V_i.n:�Water Mains — E3oozrzr Sruion: — 2e�ruUU Wells — Lramortis.ion VEaet; - Vlc+mitur;ne systems -.Deficiency Corrections — Winter treatment — Lion 41p�¢adas — Lz:tf. R<reaion — l oRe�ion C+xttr�d 3 Projec�edl Reserves. - Curre � �� l��u��� • 3. is AI illiuns nt5 t• i • 98f99 9'/lUll IIIlllll Er endilures S'_3.119 5?S.IIS S?N.119 Resenue S'_1.75 S?2.65 S'_?.7J Resenec S7.3R S3.7fi SILJd 4 Public Works Department ProjeC��dl �ewelva��� avnd � �;�c��vdlIl���r��; - C'aurr �. ' Ge • ul 15 �� Improvements 111 �Replacement s O Operating � 15 E �Personnel Ip Revenue Reserves 11 YS/99 9Y/IIII 1111/III 5 �c��ccezv�,�, ur<u �x���uu��s, - �o,U�,dln�r•��uo,�n • :. Chlorine: a`,�n�annlnent u[luaa ae�wirecf Cny Vua�a� �p^QOI�^� .-fin anten�rwAG�,e�eaunulutit;e ��h'D �V7/�Ia�,Qe;- �� �j ^ foot inerEase Va-V 3�',. ) in GVne: �e�VensBnnn�anG .�ve,s,rtuaLG yVtAt in the aexG nk.o.y:e:us \e« n�anV�Ga�mj aeportin�* ��aaurement�. -��1,�) \evti tnaaa�laaGr�oy� water anal�fili"ar enc�� �rc���Gauti ��^� E>timateei znvc.cn�e ?S�z iiaDG��Gion on a�caaGoen� ���� bud_e[ 6 Public Works Department Increase i,n Expenses - discretionary • Non-Nester Plcn Improvements $6,000.000 Utility Bilfing System I ,000A00 Adcbtiond in-lieu from increcsed 120.000 water s d es T otd' $7,120,000 Pro o�ecl Rate Water Usage (per billing unit) Date Flom To Increase 7/1/00 $1.04 $L12 8� '1 billing unit=748ga1. Public • Department Proposed Rate • Basic SFR* 3/4" Meter Charge Date From To Increase 2/1/00 $5.70 $6.10 40 7/1/00 $6. 10 $6.50 40r� 'Single Family Residence 9 Typical SFR Bill Example • � 15 billing units, 3/4" meter Current - $23.50 � Last Rate Increase - 12fIf9�5 o Public Works Department Projec�edl � eserves - Proposeci Rate • i 35 311 2$ 20 - 15 \lillionsof� III 5 0 9NPA/ 1911111 INlllll 1!e •mlilures S23.U9 529.�11 529.24 Nrrenur S2L1 526.111 328.U7 Ne.�rne� 57.77 S4.N0 31.19 Proposed �Zate Projected Rever���e� and Expendit«res • 35 30 � I 5 0 9S/99 99/1111 1111/111 i[ Public • Department lMultipLc Dwelling Unit/Commercial Bi]ling Equity • Proposed r€tte srrtuet�tre: Addresses concerns raised by apartment owners Recommended by the City Attorney �Nluiti-unidCommercial basic meter charge to eyual meter rate times number of units 13 �ie�ouzl�mendatic�n 'evise gate structure and phase increases • Date Water Meter Months Usage Charge 12/1/y5 �0.88 $5.30 2/1/00 $lA4 �6.10 7 7/1/00 $1.12 $6.50 5