HomeMy WebLinkAboutCorporation of the Presiding Bishop of the Church of Jesus C T111CHURCHa
JESUS CHRIST
°F LATTER DAY
SAINTS
OFFICE OF GENERAL COUNSEL
330 South Third East
Salt Lake City, Utah 84111
October 2, 1979.
City of Huntington Beach
P.O. BOX 190
Huntington Beach, California 92648
ATTENTION: John W. Whipple
RE: Huntington Beach 2nd 5th & 6th
Huntington Beach California North Stake
Property #500-5892--50
Dear Mr. Whipple:
Enclosed please find the signed Reimbursement Agreement
per your request dated June 28 , 1979. I hope that this
is satisfactory.
Upon approval by the City Council, please forward
a copy of the approved agreement, along with the reimbursement
to my attention. We will then close our file on this
matter.
Thank you for your cooperation. If you have any
questions, please feel free to cont ct me at (_801) 521-3680 .
Si ce ely,
P�
dA
2
g7nl
J. S ders
Co
RJS :po
Enclosure
(F)
City o Huntington Hunti ton Beach
1 P.O. BOX 190 CALIFORNIA 92648
OFFICE OF THE CITY CLERK
November 6, 1979
I
The Corp. of the Presiding Bishop of
the Church of Jesus Christ of Latter
Day Saints
5302 Heil Avenue
I
Huntington Beach, California, 92647
Gentlemen:
The City Council of the City of Huntington Beach at its regular
meeting held Monday, November 5, 1979, approved Reimbursement
Agreement No. 79-W2 for the construction of a water main and
other minor facilities in Graham Place.
Enclosed is an executed copy for your records.
Sincerely,
Alicia M. Wentworth
City Clerk
AMW:cb
enc.
bPw
REQUEST FOR CITY COUNCIL ACTION L-Ds
C
Submitted by Department Paul E. Cook `� Public Works
Date Prepared October 16 , 1979 Backup Material Attached ® Yet No
Subject Approval of Reimbursement Agreement 79-W2 - Corporation of
Latter Day Saints
City Administrator's Comments
14Y CITY COUNCIL
Approve as recommended
CITY CLERK
Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions:
Statement of Issue: rl
The Builder, known as The Corporation of the Presiding Bishop of the Church
of Jesus Christ of Latter Day Saints, seeks approval of Reimbursement
Agreement 79-W2 for the construction of a water main and other minor
facilities in Graham Place.
Recommendation:
Approve the agreement which establishes a maximum possible reimbursement
of $7 , 803. 00.
Analysis:
The Corporation of Latter Day Saints has constructed 397 lineal feet of
67A.C.P. water main, one (1) fire hydrant, and one (1) 2" blow-off assembly
in Graham Place and seeks reimbursement under Section 14 . 48 . 070 of the
City' s Municipal Code. The attached Agreement, No. 79-W2, complies with
Code and sets the maximum possible reimbursement at $7 , 803. 00.
Funding Source:
Reimbursement will be from Drainage District 12 funds as service charges
are collected.
PEC:JS: jy
P1O VIR
,j
• REIMBURSEMENT AGREEMENT BETWEEN THE CORPORATION
OF THE PRESIDING BISHOP OF THE CHURCH OF JESUS
CHRIST OF LATTER DAY SAINTS AND THE CITY OF
HUNTINGTON BEACH FOR WATER MAIN CONSTRUCTION , (79-W2)
THIS AGREEMENT entered into by and between the CITY OF
HUNTINGTON BEACH, a municipal corporation, hereinafter for con-
venience referred to as "CITY," and THE CORPORATION OF THE
PRESIDING BISHOP OF THE CHURCH -OF JESUS CHRIST OF LATTER DAY
SAINTS, a Utah corporation sole, hereinafter for convenience
referred to as "BUILDER. "
W I T N E S S E T H:
Recitals:
1. BUILDER, pursuant to agreement with CITY, has, at his
own cost and expense, constructed 397 lineal feet of 6" A.C.P..
water main, one (1) fire hydrant, and one 2" blow-off assembly
in Graham Place, hereinafter referred to as FACILITIES, to serve
BUILDER'S development known as 5302 Heil Avenue and adiacent
properties.
2. Said facilities are offsite and have been constructed
in conformity with the plans and specifications approved by the
Director of Public Works of CITY, and have been dedicated to CITY.
3. CITY desires to reimburse BUILDER for the cost of construc-
tion of said offsite facilities, less BUILDER'S portion, as
provided by the Huntington Beach Municipal Code Section 14 .20.060.
WHEREFORE, in consideration of the covenants and agreements
herein contained, the parties hereto agree as follows:
Cost of Facilities and Area Served:
BUILDER has constructed at a total cost of $20,940 a water
line and appurtenances to serve 5302 Heil Avenue and adjacent
properties. Exhibit "A, " attached hereto and made a part hereof,
1. J0L 0 2 1970
.r
is a map of the area served. BUILDER has dedicated said FACILITIES
to CITY.
Refund:
The refund to be paid to BUILDER, out of available funds,
under this agreement is as follows:
Total job cost of facilities $20,940.00
Less BUILDER'S portion 12,270.00
Gross refundable $ 8,670.00
Less 10% per 'Huntington Beach Muni-
cipal Code Section 14 .20.060 (c) 867.00
Net Refundable Amount $ 7 ,803.00
Conditions:
Refunds shall not exceed 90% of the offsite construction
costs.
No. refund shall be made by CITY to BUILDER until the Director
of Public Works shall certify in writing to the Finance Director .
that BUILDER is entitled to a refund by reason of connection
having been made to FACILITIES in accordance with the Huntington
Beach Municipal Code, and that CITY has received the water service
fees from .the area served.
Refunds shall be payable for a period .of five years only from
the date of applicant's application for main line extension.
Refunds shall be made from subsequent development as set forth
in Section . 14 . 20. 060 (i) of the Huntington Beach Municipal Code.
Refunds shall bear no interest.
Refunds shall be payable only to the original applicant or
applicants. Upon death of applicants, the right to refund shall
terminate.
CITY shall not be liable for payment of any refund by reason
of its failure to collect or receive from any person or entity the
water service fee. If a developer who develops property served
2. JUL 0 1979
by the FACILITIES constructed by BUILDER is required as a condition
of development to construct additional facilities, CITY may allow
said developer credit toward the water service fee, and no fees
shall be due BUILDER by reason of such construction.
In the event CITY does not require a developer to deposit the
water -service fees with the CITY prior to or concurrent with develop-
ment, CITY may enter into an agreement with said developer stating
that. said developer is obligated, not only to the CITY, but to
BUILDER, and to developers who have previously contributed to the
cost of construction of facilities constructed hereunder to deposit
said fee with CITY. - The CITY ,shall not be required to pay attorney's
fees or court costs for any breach of this agreement.
In the event this agreement conflicts with or contradicts any
City ordinances, such ordinances shall prevail over the terms of
this agreement.
WITNESS OUR HANDS AND SEALS the day, month and year appearing
below:
Dated this 4 day of 19-77
CITY OF 'HUNTINGTON BEACH
a municipal corporation
o
ATTEST.; n
s�•�"-:i
(...��aE �s' + ��T _ •� i APPROVED AS TO FORM:
�i ty C3�k
APPRO ED AS TO CONTENT:
. 4,� y XtEorney
Ci A ministrator The Corporation of the Presiding
Bishop of the Church of Jesus Christ
INITIATED AND APPROVED: of Latter Day Saints, a Utah
Corporation Sole
XBr� u
Director of Public Works Authorized gen By
3. JUL o 1979
� f
I
i
I
� I
I
1
.y
I
1
i
4
1
M
H '
1 ti � 1
• 4
i3i.4o
A
AREA SERVED -
ll
EXHIBIT "A" -- ---`'---
-. - JUL 0 ^ ta�a
%L=
M. L, HANSEN CO. INC.
December 27, 1978
Donald Peart & Associates
1022 South LaCienega Boulevard
Los Angeles, California 90035
RE: Huntington Beach 2nd, 5th and 6th Wards job
Dear Don:
In response to your inquiry regarding the above referenced job we
submit the following.
The boring of Heil Avenue relative to installing water lines and
fire hydrants, plus the cost of those water lines and fire hydrants
has amounted to a cost of $20,940.00.
These costs are included in the original contract plus various
change orders which have been added to that contract.
Sincerely,
M. L. Hansen, President
JAN 1 g 1979
986 WEST 1820 SOUTH / SALT LAKE CITY,UTAH 84104 / PHONE 972-3686 / MOBILE PHONE 486-9222,UNIT 6138
DONALD PEART & ASSOCIATES
ARCHITECTURE 6 PLANNING
1022 SOUTH LA CIENEGA BOULEVARD
LOS ANGELES. CALIFORNIA 90035
January 19, 1979 TELEPHONE 213 969-8294
John Whipple
Public Works
City of Huntington Beach
P.O. Box 190
Huntington Beach, California 92648
Re: Water Main, Graham Place
Huntington Beach 2nd, 5th and 6th Wards
Dear Mr. Whipple:
Confirming our conversation today, we would like to obtain a reimbursement agreement
for the water main that has been installed in Graham Place.
The Church went through the competitive bid process, a public bid opening was held
and it was determined that M. L. Hansen Company, Inc. was the low bidder. I believe
that the water main has been completed and is operable at this time.
Enclosed is a letter from M. L. Hansen regarding the cost of the water main. One of
the items that added greatly to the cost was the requirement that we tunnel under Heil
Avenue rather than use an open trench. I have enclosed a copy of the drawing showing
the improvements on Graham Place.
Should you need additional information or have any questions, please call me.
Sincerely,
D AL PEART ASSOCIATES
Donald Peart AIA
A
encl.
A.
T ESE' Cl � Q�F H WI