HomeMy WebLinkAboutHuntington Beach Estates - Reimbursement Agreement - C6-SC1CITY OF HUNTINGTON BEACH
UNGINEERINO DEPARTMENT
Muntinpon Beach, Cali ornta
Nonorablo� Mayor
tt and Cit.V Gome-VI
t;ity of blunt.nr�tnn ach
Runtinvton arFti, 4",nli rorr rt
4�aI-,.sect : 2m�►tr�r�em�^n`�
��iti1`��,t.Ly�itJll 1�SV"A►
bdet�it.wa
B"Y Zl T'` WLI NCI L
t3�ntl�rrsc*n
Noy 20 ?Rbe#�r .h� ty aS` iritnta tan►ful
tht Et tlttugton i, j ,.ontt.t.14 3
flaa b h a � ottd otr r da valapmoltit iol .,
;,ronr . i e ric►x 1 '' Opt6vet th6, x�4 rid t t on ? aoh
at mid monies',to b,e with4r i �trmv tb traina,°o Distri t
i ur is R fund,*
lf9C`
JL�i
CITY OF HUNTINGTON BEACH
ENGINEERING DEPARTMENT
Huntington Beach, Californi
A PpRoVr H
August 8, 1968 Y CITY GOUT
.9p
Honorable Mayor
and. city Council
City of Iiuntington Beach
Attention: Doyle Miller
City Administrator
Subject,: Reimbursement, Akreemont
Huntington Bo ach Est- ates
Drainage Areu No. 3
Gentlemen:
Huntington Beach Estateo constructed utorm drain
facilities in Drainage District No, 31 and por the condi-
tions of a reimbursement agreement they afro untitled to
reimbursement for costs as monies are collected. An
amount of $48,492.32 has been collected. It in .recom-
mended that your Honorable Body approve the refund of
said monies. Attached herewith is a resolution.
If approved, return the check to this office for
transmittal.
Very truly yours,
r
ames R. Wheeler
Director of Public Works
JIN : DGB : ae
Attach.
Finance Dept.
by and
REIP,:Bli.SE TIV; l :1G :
THIS tiGRi;.�EP �J'T dated this 20th rad c' November IIV) I
BETNEEN
If I T 1! E S S E i' H:
CITY OF Hi:` '-`1}11.rTC1
a municipal coxporation
.�ipreinafter for conven-
once referred to as,
.:Ify
T l,0-7--11GTOT1 BEACH
:itxahai.m, CaIJ £ornia
DEVELurF,7R
:MBL- 1S, Developer has filed appli.catior. -bith the City of
:Huntington Beach for construction of a Storm -"vain. as delineated on +;,e
improvement plans for "C b- SC 1 Channel".
and,
M-EREAS, Developer tas, at his own cost and e-,q-:•-nse constructed
said cork all in conformity with the plans, or-:cifications ar:.d prcv-�yions
as approved by the City En&p_neer, and,
ffl :, S, construction of said viork has bec r itc confor-d-t`, to .�.r.;;
applicable chapter of the ifuntin�rton 3cach Ord:nunc:� Code, ind
UIERE-AS, upon acceptance her the C -ty En inner !-;-Lid work J.s horefiy
deeded to the City of Huntington Bench, ard,
y'PEI� sAS; Developer is entitled in x-Qimburac%nt i or tl,e work
X., follcniin; thr= construction of thesc: works, raimncu —c rent:
to be made as agreed 'rxc:rain.
NOW T"r%?,UORM:, in consid--ration of the pnnmisee and the .+
herein contained, the :-sties agree as follmvs:
1. That upon cc•;.,ipletion of the work, herein desci Lbad,
r. aloper, to the full satisfaction of the City ',n-.ir_aar anfi on it
being deeded to the City Of Huntington .3sach, Devc-ioa32 shall t,,: er'lt:c.d
to reimbursement from drainaZe fees paid at the tine e� di :velop_ .snf -)t
lands tribxYtarS* to this storm drain; ,oz- snGci_fically, 4. i, Ual'te
r
e
to, the NW 1/1 and SK IA of Section 25, T5S RUW drainage fees Wood
F'.
on this area at the rate of 9930/ acre.
2. That the facility constructed by Developer for which
refunds are hereby agreed to to paid is described as follows:
Storm drain and appurtenances per ;plan of "C6-SC1 Channel".
3. That the cost to Developer for construction of the
channel to date is $111,501.71. n nd that the additional c :,istruct•ion
for the ultirate ,hannai Nvill increase this to an estimated total of
$189,720.00.
It. That the Lcvelo-er at t' c request o!' and in the best
interest of the City hews eor.r,tracted this facility sized to City
requirements, and for which they City has aoroed to participate in
amount of NONE.
5. That the refund to be paid the Dove:lopor uryiar this
agreement is as follows: Developer wil.l.he reimbursed in the w9bont
of $130,433.88 from, but not Id-nited to area of Tract 3953, zAr=?.z of
Tentative Tract 1,009, ,School. site in Tentative Tract 4009•and otlwr
areas in the MV 1/4 of said Section 25 which Rill' contri.buto drain pt
into the C6-SC1 Channel vlus areas. in the SN 1/14 of UAW Section ?�
which* will also contribute drai.nac-e into the r,iid Channel.
6. That. no refund ! }in! •i b-i ;ria ie by the Clerk of -the City
of Huntin ton Beach until the City ::�,;i nee r shad L have • csrtificd to
the Clerkk.
, in wri ti.n-, that the Builder is entitled to a refund f. ron,
fees collected for ,service by, th:i s facility.
7. As additional ujers ;2articipate in the C6-SC1 Channel
in the future, the drainare fees they pay will be distributed to those
individuals or entities, that have previously contributed to the cost
of the drain, in proportion to the cost borne by each such -Individual
or entity.
Dated: November 20th , 1961.