Loading...
HomeMy WebLinkAboutJoseph Capocciama - Reimbursement Agreement - Water Main - A t. J� City of Huntington Beach P.O. BOX 190 CALIFORNIA 62626 ENGINEERING DEPARTMENT July 5, 1973 Honorable Mayor and City Council City of Huntington Beach Attention: David D. Rowlands City Administrator Subject: Reimbursement for Construction of Off-Site Water Main Alhambra Street West of Beach Gentlemen: Joseph Capocciama constructed the subject water main. The amount of $3,040. 75 is refundable to the developer. It is requested that sum be reimbursed, the check be made payable to Joseph Capocciama, 19232 Beach Boulevard, Huntington Beach, and the check mailed to the above address. Very truly yours, C:Ze�sR. Wheeler Director of Public Works JRW:TM:ae a 7Y �• ra�lo sae city Comma UV of HustbIsMa 5ftch p, ©©,,u���pp.. ag��,,�..,. 4�-4( fir ASld:43..ticaa city Aeminutrator Subj ett ReArAmTowmat �o fole tmctlom of Off-al t® #lam .4/� �•r• .o�1` welt �• �® �� .� Is reftwoble to t e dowba�r —06 it is requested that am be roluburoads tM cha@h ba MOO pyable to le1222 8 o Same R. Whmler DI-mU ter ®f Mile VOrU musWout 1 lY �iZ• 7Z 9r Break' Down of Water Line 4-601 ft 91' ACP $ 6.1.0 2,8o6.-oo J U (`2) two - 1" services 222.50- ea. 445.00 X, 44sn!° Removing Blow-off Assembly (lump sum) ! 1�90 % One complete Fire Hydrant 579.00 T 5 -- S Obso One complete Blow-off assembly. 5—.Q:) ?s- /O j,Ov ' 43, Resurfaceing water trench . 573.OQ� � - , . 37:00 7qcl,L A` ` lGrl ESPINOSA AND MUNOZ.. INC. 79� GENERAL ENGINEE RING CONTRACTORS 19061 Aveni;:a Palmer Orange, Ca. S c'.; ) r zi:1ti F39-?.615 1 1, ROPOSAL and CONTRACT Date June 18 1973 , 19 To Joseph Capocciama — 19232 B each Blvd. Huntington Beach, Calif. Telephone 962 7?_95 Dear Sir: We propose to furnish all materials and perform all labor necessary to complete the following: Approximately 4609 of St' A C P for extension of water Main. The above line includes cutting and removing blacktop, Removing blow-off assembly and installing water line, Two (?.) 1" eerviaes, Installing Fire Hydrant and removing existing Fire. Hydrant. This proposal .also inoludes repaving water trenoh, and installing- new bloie-off assembly. Note: This .proposal does not include meters or meters boxes and soil engineers expense, Complete water main J.ob for $ 4,837.00 . All of the above work to be completed in a substantial and workmanlike manner according to standard practices-for the sum of _ ______. Dollars($ 837 00 ) Payments to be made in fu]1 after com�At tin 3r -dyIr as the work progresses to the value of per cent (_ °�).of all work completed. The entire amount of contract to be paid within days after completion. Any alteration or deviation from the. above specifications involving extra cost of material or labor will -only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. *!NOTICE TO OWNER" 'Respectfully submitted, (Section 70;ien Law, 'any contractor, law) ESPINOSA AND MUNOZ INC Under' the Mechanics' lien law, 'any contractor, subtontiector,. By J� • laborer, materialman.or other-person who helps to improve your property and is not ppaid for his labor, 'services or material, has ° ' GENERA - OMS righh to enforce his cl Aim'against.your property. Under the law, you inay protect yourself against such claims by 19061 Avenida Pi:lmar. filing, before commencing such work of improvement, an on f,inal nge s a g contract for the work-of•improvement of a modification thereo in the office of the county recorder of the county where the property is situated and requiring that a contractor's payment bond be recorded in such office. Said bond shall be in an amount not less then fifty TELEPHONE percent (50%) of the contract price.and shell, in addition to any conditions for the performance of the contract, be'conditioned for the payment in full of the claims of all persons furnishing labor, serv. ACCEPTANCE . ices, equipment or materials for the work described in said contract. You are hereby authorized to furnish all materials and labor required to 'complete the work- mentioned in the above proposal, for which agree to pay the amount mentioned in said proposal, and according to the terms thereof. ACCEPTED Date 19 PROPOSAL—Sue-eoNTRACTOR—WOLeoTTs FORM 884—REvisao 2-70 _'7 • `,�. - froposat Page No. of Pages S. E. EATON CO. Pipeline Installation of All Types 112 Del Mar Avenue Costa Mesa, California 92627 Phone 548-7451 548-3672 PROPOSAL SUBMITTED TO PHONE DATE Jo-e oc il- -i .9 2-- 7 -ZF� STREET JOB NAME 3 CITY, TE AND P CODE JOB LOCH 0 ead RC I DATE OF PLAtq- JOB PHONE We hereby submit specifications and estimates for: ---- --------------------------- -------- -------- -- ---- ----- --- -------------- _ PropD it hereby to furnish material and labor Lcomplete/in acc dance with above sp ifications, for the sum of: ee Payment to be made as follows: All material Is guaranteed to be as specified.All work to be completed In a workmanlike manner according to standard practices.Any alteration or deviation from above specifies- Authorized tions Involving extra costs will be executed only upon written orders,and will become an Signature �delays er and above the estimate.All agreements contingent upon strikes,accidents nd our control.Owner to carry fire,tomado and other necessary insurance. Note:This proposal may be fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. Aftlt;1 p Ot f rOttnfi�l—The above prices, specifications Cnd conditions are satisfactory and are hereby accepted. You are authorized Signature do the work as specified.Payment will be made as outlined above. ate of Acceptance: Signature FORM 116 COPYRIGHT 1900 7 NEW ENGLAND BUSIME88 SERVICE,INC.TOWNSEND.MAE&61469 PROPOSAL AND CONTRACT W 'WESTERN PAVING COMPANY, INC. P ASPHALT PAVING CONTRACTORS C P. O. BOX 2577 • BELL GARDENS, CALIFOPNIA 90202 0 (213) 583-6641 TELEPHONES (213) 927-1357 TO Cavocciana Construction Co. June 20 , 1q� 19232 Beach Blvd. Huntington Beach,, Calif. Telephone No. 714-962-7295 We hereby propose to furnish all labor, material and equipment to do the following Work loccited at: AL HA ORA STREET H 1NT NGTON MACH Install approximately 496 lin./ft. 811 tirans—site pipaq two water to the thickness of the existing asphaltic coneretee Price. . . . .$6,797.00 TERMS: Net Cash within 10 days from date of invoice. Any alterations or deviations from these specifieat'ions and/or terms involving extra cost of material or labor will become an extra charge over the sum mentioned in this contract. Acceptance (By Authorized Agent or Owner) I/we accept the within proposal. You are authorized to perform the work comprehended hereunder and I/we agree to pay the said ^� amount 'in accordance with the terms set forth. All provisions on WESTERN PAVING CO. l C. the reverse side hereof are incorporated herein, r...- Date By �� C . __ E. .lice GENERAL TERMS AND CONDITIONS Buyer agrees to give written notice of any shortage or defect within five days, after delivery of material or within five days after •the completion of the Contract if for both labor and materials and no claims will be allowed thereafter. No allowances will be made for labor, material, repairs or alterations without our written consent. Unless otherwise specified, the term grade or grading does not imply the movement of subgrade materials on or off the job site. The term fine grade shall mean that the preseni grades are within one tenth t of finish subgrade. An extra charge will be made for the excess dirt moved, hauled away or fill brought in. Any attorney's fees or other expenses which may be incurred in the collection of monies as may become due under this contract or enforcement of the terms of this contract, will be paid for by the customer. Permits are not included unless specifically stated. All agreements contingent upon strikes, accidents or delays beyond our control. Interest charged on past due accounts at the rate of 1% per month. Water shall be furnished by the customer at a site convenient to the work. In the event we are required to lay pavement on subgrade which is, in our opinion, not satisfactory, we assume no liability for unsatisfactory results. WESTERN PAVING CO, shall not be liable for any damage to underground pipes and/or conduits, etc. not visible from the surface of the ground; nor for any damage to approaches, including sidewalks, from the street to the property line. Not responsible for asphalt spray carried by the wind. Nor do we assume responsibil- ity for damages to surface by plant growth. This bid is subject to acceptance within 10 days from above date.