HomeMy WebLinkAboutMayfair Construction Company - Reimbursement Agreement 75-D1 �� U S r—) 2;/ 4
4- die'o L49
Gam.. L-"
I "
ti
Ia, ,STRIAE • COMMERCIAL • -RESIDEN- i -Zia
STATE LICENSR #B246M
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553
December 29, 1975 Ci 'e e p'
r � ®
• �F
pUB�,c w�RKB
DEC 31 1975
e
r.
City of Huntington Beach
Engineering Department
P.O. Box 190
Huntington Beach, California 92648
Re: Compensation for extra work
at the Storm Drain —
Ellis Avenue and Beach Blvd.
Huntington Beach, California
Gentlemen:
We repectfully submit this request for your consideration and
approval.
Upon proceeding with the installation of the above storm drain,
we were directed by the inspector to lower the storm drain an
additional 7 ft (approximately). This required additional ex—
cavation, backfill and compaction, additional forming and con—
crete work on the catch basin.
For this extra work, we quote the sum of $ 19175.00.
Very truly y rs,
MAYF IR UC -N COMPANY
D
President
WJR:erd
cc: Mark C. Bloome Jr.
5555 Sepulveda Blvd.
Culver City, California
SUBSIDIARY OF MAYFAIR HOMES, INC.
imj
77
qoo-
-� _-.`_- ' I2��i.-�c��3�� � -� O ri--i—�-I�i���'�— u (2��� 1J - • �. _�-1 �47-- -_-- _� --
' t.
--=-.-_�_ _-- ---
aoll
Ile
J
VAN WEST BROS., INC.
State License No. 157555
15305 S. Lakewood Blvd. — Paramount, Calif. 90723
ME 3-2835 NE 6-4286
Mayfair Construction PROPOSAL
716 E. Edna Place Suite "G" September 25, lg 75
Covina, Calif.
Dear Sir:
The undersigned proposes to furnish all materials and perform all labor necessary to complete the following:
REVISED BID DUE TO PLAN CHANGE
10 Ft . Extra 2711 R .C.P.
Extra Depth on Catch Basin
Larger pipe intering catch basin.
JOB: Mark C. Bloom
18405 Beach Blvd.
Huntington Reach , Calif -
We will install the 27 inch storm drain including 2 manholes
and 1 catch basin as shown on Revised Huntington Beach' s plans
for storm drain extension of the north west corner of Rl l i c
Ave, and Beach Blvd
All of the above work to be completed in a substantial and workmanlike manner for the sum of S psz en t e en
ThnncanCj Tun Httindxed ($ 17,200.00 ) Dollars
} } arvvu.-:-X-XX ,xX.G1.,nXX9& RS j0&3C# X1XXxXXx}rxxxxxSzxXXXXr
)pgrA tXcK ) r�AYcYrYY&&[. The entire amount of contract to be paid within 30 days after completion.
Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed
upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements
must be made in writing.
The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay all Sales Taxes,
Old Age Benefit and Unemployment Compensation Taxes upon the material and labor furnished under this contract, as
required by the United States Government and the State in which this work is performed.
Respectfully submitted,
Van Diest Bros.- Inc
Contra o r
Pres .
By
ACCEPTANCE
You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above
proposal, for which the undersigned agrees to pay the amount mentioned in said proposal, and according to the terms thereof.
Date 19
nt1 A /DTI r_
� ' Form 147
FRANK R.WALKER CO..PUBLISHERS.CHICAGO \
VAN DIEST BROS., INC.
State License No. 157555
15305 S. Lakewood Blvd. — Paramount, Calif. 90723
ME 3-2835 NE 6-4286
Mayfair Construction
PROPOSAL
716 E. Edna Place Suite "G" September 25, 19 75
Covina, Calif.
Dear Sir:
The undersigned proposes to furnish all materials and perform all labor necessary to complete the following:
REVISED BID DUE TO PLAN CHANGE
10 Ft . Extra 27" R.C_ P. '
Extra Devth on Catch Basin _
Larger pipe intering catch basin. {
JOB: Mark C. Bloom
18405 Beach Blvd.
Huntington Beach , CAlif
e will install the 27 inch storm drain including 2 manholes
and 1 catch basin as shown on Revised Huntington Beach' s plans
for storm drain extension of the north west corner of Fllig
Ave. and Beach Blvd.
All of the above work to be completed in a substantial and workmanlike manner for the sum of S Pv e n t o on x
Thnnsanrl ZATn jdundred 17, 200. 00 Dollars
} [ } c�}tyvuvvvvvvvvvv,e � � y 1dtXXXXXXXXXXXXXYYXVTa�SY
i
} KTio�ilfNc�'tx 'eld. The entire amount of contract to be paid within 30 days after completion.
Any alteration or deviation from-the above specifications involving extra cost of material or labor will only be executed
upon written orders for. same, and will become an extra charge over the sum mentioned in this contract. All agreements
must be made in writing.
The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay all Sales Taxes,
Old Age Benefit and Unemployment Compensation Taxes upon the material and labor furnished under this contract, as
required by the United States Government and the State in which this work is performed.
Respectfully submitted, -
Van Diest Bros. Inc.
Contra o
� - n Pres .
BY
ACCEPTANCE
You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above
proposal, for which the undersigned agrees to pay the amount mentioned in said proposal, and according to the terms thereof.
Date 19
..�.�
Form 147
� FIFD.IN,J.
NU.S.A.
- •.• - •• .- . t.. , FRANK R.W^LKM CO..PUlLISHMN&CHICA00
AMERICAN CONTRACTORS INC. No.
Proposal8020 E. Compton Blvd. ECIFICATIONS
Paramount, Calif. 90723 AND ESTIMATE
(213) 630-3179
Siaie Lic, #,:WW3 Page No. / of 1 Pages
PROPOSAL SUBMITTED TO PHONE DATE
C6WSTi7ICTION CO. 9-25 75
STREET JOB NAME
716 C &ace /nMA C. &WM
CITY, STATE AND ZIP CODE Covinju, Catij JOB LOCATION
/8405 /3each &wt flu2t .oR Each.
ARCHITECT DATE OF PLANS JOB PHONE
We hereby propose to furnish materials and labor necessary for the completion of:
ice #o cha ige in plane on. #6, .au&u; a hero pwplada 1.
TO;[LC &d.- $18,088.00
WE PROPOSE hereby to furnish-maate_�r-�ial-�a-�n—�d-�labor—complete in accordance with above specifications,for the sum of: nr�
_i— eA ;MouOf2rid a dollars(g 18j,M.w ).
Payment to be made as follows:
PAog1m"&e pacynew6d
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike
manner according to specifications submitted, per standard practices. Any alteration or deviation from Authorized
above specifications involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate. All agreements contingent upon strikes,accidents or delays
beyond our control. Owner to carry fire, tornado and other necessary insurance.Our workers are fully Note:This proposal may be
covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days.
ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are
satisfactory and are hereby accepted. You are atithorized to do the work as specified. Payment will be Signature
made as outlined above.
Date of Acceptance: Signature
Proposal No.
ECIFICATIONS
AND ESTIMATE
Page No. of Pages
PROPOSAL SUBMITTED TO PHONE DATE
n '
STREET JOB NAME
CITY, STATE AND ZIP CODE JOB LOCATION
ARCHITECT DATE OF PLANS JOB PHONE
We hereby propose to furnish materials and labor necessary for the completion of - - -- -
• A
WE PROPOSE hereby to furnish material and labor—complete in accordance with above specifications,for the sum of:
).
Payment to be-made as follows: dollars(S
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike
manner according to specifications submitted, per standard practices. Any alteration or deviation from Authorized
above specifications involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate. All agreements contingent upon strikes. accidents or delays
beyond our control. Owner to carry fire, tornado and other necessary insurance.Our workers are fully Note:This proposal may be
covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days.
ACCEPTANCE OF PROPOSAL_- The above prices,specifications and conditions are
satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be Signature
made as outlined above.
Date of Acceptance: Signature
INDUSTRIAL • COMMERCIAL • RESIDENTIAL
STATE LICENU #B246M
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553
September 25, 1975
City of Huntington Beach
P.O. Box 190
Huntington Beach, California
Re: Storm Drain, Beach Blvd.
at Main
Mark C. Bloome Facility
Gentlemen:
This proposal supercedes our proposal dated September 8, 1975,
to install above storm drain.
We propose to furnish labor, materials and equipment as required
to construct the above mentioned storm drain as per the latest
drawing and specifications for the total sum of Seventeen Thousand
and Two Hundred Dollars and 00/100 ($17,200.00) .
Changes includes lowering line and catch basin one and one—half
foot.
It is respectfully requested a purchase order be issued as soon as
possible.
Very truly yours,
MAYFAIR CONSTRUCT OMPANY
W. R
Pr sident
WJR:erd
SUBSIDIARY OF MAYFAIR HOMES,INC.
Vo61a W�l1�tE--
?w
City of Huntington Beach
P.O. BOX 190 CALIFORNIA 92M
OFFICE OF THE CITY CLERK
October 14, 1975
Mayfair Construction Company
716 Edna Place, Suite G
Covina, dijiifornii
Gentlemen:
The City Council of the City of Huntington Beach at its regular
meeting held Monday, October 6, 1975, approved a Reimbursement
Agreement between the. City and your firm for drainage facilities
to be built in Drainage District No. 9.
We are enclosing a duly executed copy of the agreement for .your
records.
Sincerely yours,
Alicia M. Wentworth
City Clerk
AMW:CB:tlo
Encl.
from the desk of
FAMES GEORGES
IWO
PETROLANE INCORPORATED
1600 EAST HILL STREET
LONG BEACH, CALIFORNIA 90806
. .. :,ti •a•i s ,... -z:• .a,. .- ., :_.;: : .:�;.••. '_ t. ."_;, . .:427-5471. .
VINCENT D, ASHBY/Corporate Counsel hCCf`r2'f_%E1 1.?., 1978 s+' N P,`�`''�
I.hr. Uar_r..en. Jr. 11a1.1
City Tr^wisur.cr � C
City of Nunti ngton P.Ctac1"
C. Pox. 711 !it.0
Uvn-ington .•ea&�I, C l.ifornie-�) �t26A� Q %
T"le: FIT T j;R.3 1. �1.':rj� �1-r_ YL`j.?�,�?*,. 0.To� 7�.�D 1
,o�,:r r3r. 34<:11
Ftirsuant, to your. letter of fiov crlber_ 21 , i"7 S and tha of..
,Taries Ccorgos datej. ! No.vem.ber 22, 1.978, wheroin you rc.q ucnted
.c ;°idenc e. cif ?^s yT,.ient- of the Y 4.5 0. 01) ma c: to t}-ie 10.r.anrlc
..0 t t i-:n7.'�,n ion District i 3, i':Ioni.,c I-iC1. the
fr.c^t Cit of ?'tt*:t i Anton �•cach
? tnvnice fro!Ti Chestor C. Sm-5 4). i?y� Ftii �,r_-•{+} c_
3. Cneci, i''t ucl.`.er _^:ror:t •cir}_ C. I:'-! Clo. tl
C-haSter C. i:l] th.
A s : ore .-cn csept.ecl I)- ^hicstcr-- c. S)!T.dt1,0s. of- ice" n`
rc>rt. it �.ir.cctly to tiiG t a.riotis a�}c�r,c Es, iI?C1.tIc?1.I?ij
trj the- Ci•i.17 of I`u tihatoh' L3c�-,c.h for t',.c 0-range Coun'.v San;_
.'i itz-lct r' in the amount of � 4.50. r"' Vr,1�s. 1:
cxr,ei�Y'_;E_r. car: Hho, Cash lRe.'«c=7_T t -fr..rin, your o.f"f:.t.co, ?otd-.e? t'!'C,
.. .� . l:;ci icvi✓ f. .«` ti:r.y u�.�:,Y:. .r�ecc,i �t:. si.a�s�iticx t}��,, �;,c�ni���= :.c.c_:i�r�.:�..
...-��-`i l.s f:• ;t"".C^ r . r'.� i '!'_L` 1 _:;�r. .i_C iti?�t `''.1.���:i1'_ `-1:.:- Ci'�.T.. `j..�..
l ocve�%e:, I `I_av< rc'cr�aetited.� from ter.' Sr?ith a�cor,y o"~the can- '
C`i l icil --Cchec , both sides, and 4eill forward `_'hat to ou as-
J.1' e::\-"i.?31 C:, i";E1.1.C::':% .-IJ'•.c i nrn.j car:
1 `' r' 1
_lr.
�:r: "" %•?��1C:� �f'� 1:''t r•..., _ ''O. � i+.. . .T�r'f':� h'�': `°I:; .. . :?Ca.�.!. .,°�_�. C':j'. .
I. NGTON BEACH I/
�' CITY OF HUN�1
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH -
To F. B. ARGUELLO From JAMES GEORGES
Director of Finance Deputy City Attorney
Subject REIMBURSEMENT AGREEMENT 75-Dl Date September 18 , 1978
Please make a payment in the amount of $12 ,319 to
Mark C . Bloome Co . , Petrolane, P. O. Drawer 1410 ,
1600 East Hill Street, Long Beach, California 90801 .
This amount represents payment due to Mark C . Bloome Co .
under Reimbursement Agreement No . 75-D1.
Attached is an assignment from Mayfair Construction Co .
to Mark C . Bloome Co . assigning all rights , title and
interest under Reimbursement Agreement No . 75-D1, dated
June 8, 1976 , to Mark C . Bloome Co.
Under the reimbursement agreement , the City owes
Mark C . Bloome Co. $16 ,537 . 50 . Subtracted from this
amount is $4 ,218 . 50 offset .in drainage , water and sewer
fees which Mark C . Bloome Co . owes the City . The net
therefore, is $12 ,319 .' Mr. Warren Hall ' s records indicate
that the offset should be $4 ,668 . 50 - in other words , an
additional $450 . However, the Public Works Department
has records indicating that Mark C . Bloome Co . .has paid
$450 with regard to the County Sanitation District #3 .
Therefore, the accurate offset is $43218 . 50 .
Other correspondence directly related to this subject matter
is a memo from Warren Hall to Gail .Hutton, dated July 11 , 1978.;
memorandum opinion, dated June 9 , 1978 , from James Georges
to Art De La Loza; a letter to Petrolane from James Georges ,
dated April 4 , 1978; a memo from Art De La Loza to Hutton
and Georges , dated June 27 , -1978; and a letter from Petrolane
to Warren Hall dated July 3 , 1978 .
1.
Attached is a copy of the assignment and Petrolane ' s letter
addressed to me , dated September 1, 1978 . Your department
already has a copy of Reimbursement 75-D1 .
Thank you for your cooperation.
YAM GEORGES
Assistant City Attorney
JG yr.
cc : Director, of Public Works
City Treasurer
John Whipple , Public Works
Art De. La Loza, Contracts Administrator
City Attorney
Vincent D. Ashby
E
2 . i
i
f
�� NCity of Huntington Beach
P.O. BOX 190 CALIFORNIA 92648
THE OFFICE OF THE CITY ATTORNEY
(714 ) 536-5555
July 18, 1.978
Petrblane
Mr. Vincent D. Ashby
P. O. Drawer 1419
1600 East Hill Street
Long Beach, CA 90801
Re : Reimbursement. Agreement No. 75-Dl
Dear Mr. Ashby :
This is a follow-up to my April 4, 1978 letter to you in
which I stated that as soon as the city receives a written
assignment from Mayfair to Bloome, then the city can expe-
dite payment to Bloome .
We have received the assignment that we requested. However,
the assignment makes reference to Reimbursement Agreement
75-Dl dated October 14 , 1975 . As you will recall, a new
Reimbursement Agreement again labeled 75-Dl dated June 8,
1976, was executed between Mayfair Construction Company and
the city in which at the end of the Reimbursement Agreement
specifically states that it rescinds the October 14 , 1975
Reimbursement Agreement 75-D1.
I am very sorry to trouble you with these legal technicalities ,
but the written assignment we have received which assigns
Mayfair rights to Bloome , is really assigning nothing, because
what it actually assigns is a rescinded reimbursement agree-
ment dated October 14 , 1975 . In actuality, there has been an
assignment of nonexisting rights .
Would you be so kind as to have Mayfair re-execute the identical
assignment of the copy that I have attached hereto and merely
change the date "October 14 , 1975" to , "June 8, 1976 . " In this
manner, Mayfair Construction will, in fact , actually be transfer-
ring its reimbursement rights under 757D1 dated June 8 , 1976 .
As soon as we receive this properly dated assignment, we will
Letter to Petrolane July 18, 1978
Attention: Mr. Vincent D. Ashby Page 2
Re : Reimbursement Agreement 75-Dl
expedite the payment to Mark C . Bloome, $12, 319 which
represents $16 , 537 . 50 under said reimbursement agreement
less $4 ,218. 50 offset in drainage , water and sewer fees
which MaPk C . Bloome owes the city . .
Mr. Warren Hall, City Treasurer, has records indicating
that the offset should. be $4 ,668 . 50 , in other words , an
additional $450 . However, the Public Works Department has
records indicating that Mark C. Bloome has paid $450 with
regard to the County Sanitation District No. 3. Our agree-
ment with the County Sanitation District is that the city
will forward to the County Sanitation District 95% of the
monies collected and the city keeps. 5% for collection serv-
ices . Ninety-Five percent of $450 is $427 . 50 , and 5% of
$450 is $22. 50 . Four-Hundred Twenty Seven Dollars ( $427. 50 )
plus .$22 . 50 equals $450 , which Mark C. Blooms has already _
paid. Therefore , the accurate offset. is $4 ,218 . 50..
Very truly yours ,
GAIL HUTTON
Ci Attorney
B
JAMES GEORGES
Deputy City Attorney
JG:bc
Encl:
cc : Bill Hartge , Public Works Director
John Whipple, Public Works Administrative Aide
Warren Hall, City Treasurer
Art De La Loza, Contracts Administrator
ASSIGNMI NT
T}IIS. ASSIGNP4ENT, made this 25th day of. April, 1978 ,E by
MAYFAIR CONSTRUCTION COMPANY ( "Assignor" ) to HARK C . }3LOOi-1L•'
CO. ( "Assignee" ) .
Fo*r valuable consideration, receipt of which is hereby
acknowledged, Assignor hereby assigns and transfers to
Assignee all of Assignor' s right, title and interest in and
to that certain Reimbursement Agreement No. 75-DI , by and
b ween the City of Huntington Beach and Assignor, as Builder,
dated October 14 , 1975 . A copy of the. said Agreement: is
attached hereto marked Exhibit "A" and. made part hereof .
("Reimbursement Agreement" ) .
o Assignor, by virtue of this Assignment, grants to
Assignee the right to the payment and recovery of any monies
due Assignor under the Reimbursement Agreement. Assignor,
further, to the best of its knowledge and belief, warrants
that the Reimbursement Agreement is assignable and is in full
force and effect at the time of this Assignment.
IN WITNESS WHEREOF, Assignor does hereby cause this
Assignment to be executed on the day first above written.
ASSIGNOR
MAYFAIR CONSTRUCTION COMPANY
By
W. J Reid, President
y
�� J/;O ' Neal , Vice President
STATE OF CAI IFORNIA,
jCOUNTY OF LOS ANGELES SS.
hetorc nu' the undi(sil;lld• i N01-Ir, Public in and for said Stale, personal) appeared
l Y
kno,vn to me to be the
-_-- _.--President, and G(-' -J' (' �jj/,•,y!
to be the_---4�,...(J Seem{ar,�f klvml to me
the Corporation that cxeculed the ttirithin Insfnnrlent, knm'rrl to me to be file persons �;ho
f' executed the �';ithin Insfrumenl, on behalf of III,, Corporation herein nam
to me )hat Such CorporalituJ executed the wllhin Inslnnnenf pursuan►r to pits c I iwsledf ed
- ='• =._
;i'�`'� 1(_:;, resolution of its bo,�rdof dircr.tors.
WIINESS my hand and official seal. '
it ` \\� �. `i. r, .I. •i. .' r 'i •• I.
ii `i ,.. °% ;t• ''rnrn. r�.ril;s fin 1`.;' r /• '
C ( / •.�
.01'• nllc inrni ))I krr
1 r�•I,u•�I'1;4dn: ut and fur !aid�Lrlr
1 r• :ri 1Vnh- 141 - � - '
City of Huntington Beach
P.O. BOX 711 CALIFORNIA 92648
CITY TREASURER—WARREN G.HALL
MEMO TO : John Whipple, Public Works Dept.
MEMO FROM: Warren G . Hall , City Treasurer
DATE: December 19 , 1978
SUBJECT: Payment or Duplicate Payment of Orange County
Sanitation District #3 Fees .
There has been a running discussion between the Attorney' s office
and my office over whether Mark C. Bloome has settled its account
in full for the fees due of $450 . 00 for the Mark C . Bloome location
on West side of Beach Blvd . near Main St. intersection.
Mr. Ashby, Counsel for the Developer now produces Treasurer 's Receipt
No . 021611 , paid by a Chester E. Smith on April 30 , 1975 , recording
a $450 . 00 payment for "O .C .S .D .#311 , recorded to Account No . A222
(received for payment to O .C .S .D.#3) with no mention of any location
or "Mark C . Bloome as a client.
In addition on March 29 , 1978 there was a billing (No . 33640T)
originated to Mark C . Bloome in which an additional amount of $427 . 50
was recorded as payable to O .C . S .D.#3 on this account.
I have 3 questions to be answered:
1 . Was the payment by Chester E. Smith (4/30/75) in fact recorded
as payment of O .C .S .D.#3 fees for the subject development.
2 . If so , why was it rebilled and presumably paid again in
March 1978 .
3 . If 1 and 2 above are both true then inform Finance Department
by written request to do the following :
a . Cancel the receivable balance of $450 . 00 still open in
name of Mark C . Bloome .
b . Deduct the duplicate payment from the next remittance to
O .C .S .D.#3 for the appropriate amount.
Please t y tolimplement this investigation so all files may be
closed.
Warren all
WGH/v,
cc : /Gail Hutton, City Atty
F. B . Arguello , Finance Director
USE BALL POINT PEN ONLY—PRESS FIRMLY..,_= ;rr
60%1 a
t CASH RECEIPT
CITY OF'HUNTINGTON BEACH
P.O. BOX 711
HUNTINGTON BEACH,CALIFORNIA 92648
(714)536-5511 "
CITY TREASURER-WARREN G. HALL "
.. DEPT. ISSUING J�ifrf/.:: /r!✓�1!�. 5 DATE •9!2 �_SJ
1
RECEIVED FROM
3 ADDRESS
F•
i :FOR --i
i
AMOUNT RECEIVED
i CASH O CHECK"�7 ds
�G t
RECEIVED BY
_t
ACCOUNT AMOUNT d�1
i
_ F
.R
V
TOTAL .
r.; NO. Q216
ISSUING DEPARTMENT_
F
Pl
tl - ,
�® City of Huntington Beach
P.O. BOX 711 CALIFORNIA 92648
CITY TREASURER -WARREN G. HALL
MEMO TO : F . B . Arguello , Finance Director
MEMO FROM : Warren G . Hall , City Treasurer
DATE : January 25 , 1979
SUBJECT: Mark C . Bloome - Invoice # 336463
I enclose all evidence submitted by Mr . Vincent Ashby for
Mark C . Bloome .
The summary of it is that we the City have probably paid
O .C . Sewer District #3 $427 . 50 twice and recorded the 5 per-
cent collection commission of $22 . 50 twice .
We billed Mark C . Bloome on subject invoice for above items
as well as other permits and fees . They had already paid
the O . C . Sewer District #3 fees -on April 30 , 1975 on
receipt # 021611 .
I recommend the unpaid invoice balance be reversed and the
next remittance to O .C . Sewer District #3 be reduced by the
amount of the duplicate payment.
There is als an unaccounted $ 0 . 50 amount which should be
written ` ff o clear this old April 1978 item.
Warre j Hall
City asurer
WGH/vt
Attachments /
cc : John Whipple , Public Works
Mr . Vincent D. Ashby, Petrolane
OFF!CE OF
CITY ATTORNEY
P.O.BOX 190
2000 MAIN STREET
HUNT NG ON BEACH
CALIFORNIA 92648
GAIL HUTTON TELEPHONE
City Attorney (714)536-5555
November 22, 1978
Petrolane
P.O. Drawer 1410
1600 E. Hill Street
Long Beach, California 90801
Attention: Mr. Vincent. D. Ashby
SUBJECT: MARK C. BLOOME COMPANY, HUNTINGTON BEACH LOCATION
Gentlemen:
With reference of your letter dated November 9, 1978, some subject, I talked
to Warren Hall, the City Treasurer, and he informs me that the $450.50
payment which allegedly was paid by Mark C. Bloome to Orange County
Sanitation District, was in fact never paid. It was in fact paid by the City
according to Mr. Hall's records.
If you have any evidence of payment, such as a canceled. check, please mail
proof of such a 'payment to Orange County Sanitation District in the amount
of $450 to either Mr. Warren Hall or to me. Thank you for your cooperation
in this matter.
Very truly yours,
GAIL HUTTON
City ttorney
by:
14
r
E GEORGES
/00 Deputy City Attorney
GH:JG:cw
cc: Warren Hall, City Treasurer
John Whipple, Public Works ,
1-
f
AJ city of 1 untington Beach
P.O. BOX 711 CALIFORNIA 92648
CITY TREASURER -WARREN G. HALL
November 21 , 1978
Petrolane
Mr . Vincent D. Ashby, Corporate Counsel
P.O . Drawer 1410
Long Beach, Ca. 90801
Dear Sir:
In reference to the Mark C . Bloom retail stone at 18455 Beach
Blvd . , Huntington Beach, and the . payment of the appropriate .
fees for a Certificate of .Occupancy.
As your letter . of July 3 , 1978 on this subject stated, you
relied on our Mr . James Georges , of the City Attorney ' s Office ,
figure for the fees of $4 , 218 . 50 and you recognized that my
receivable was $4 , 668 . 50 , a differance of $450 . 00 . The dif-
ference constitutes the Sewer Connection fee - to Orange County
Sanitation District #3 (Orange County Ordinance #303 )
Because .of the confused offset balances due , my records reflect
that the City paid. the $450 . 00 fee to Orance County Sanitation
District #3 , but have never collected our receivable from Mark
C . Bloom. This constituted the misunderstanding on the part of
Mr.. . Georges . . The bill is paid but we were not, and .still have
not been reimbursed.
If you can furnish evidence of payment of the $.450 . 00 fee
directly to the Orange County Sanitation District 741-3 , then I
will apply for refund of a duplicate payment made by -the City
of Huntington Beach on your account. If you did not make pay-
ment directly, then we are still owed _`450 . 00 and I would
expect your help in obtaining payment :
Please call me if you have any questions ( 714 ) 536-5200 .
NOTE : We have now applied the amount offset from. your payment
to the receivable and your subsequent billing will re-
flect $450 . 00 still due .
ty .
i
Petrolane -2- November 21 ,1978 .
Mark C . Bloom Fees .
Reimbursement Receivable
Reimbursement Agreement $ 16 , 537 . 50 full fees - - $ 4 , 668 . 50
Fees Offset ( 4 , 218 : 50 ) offset - - - (4 , 218 . 50 )
Balance Paid Your $ 12 , 319 . 00 Bal . due H. B. $ 450 . 00'
Sincere.
Warr Hall
Cit Treasurer
WGH%vt
Attach: Copy of letter - H.E.Hartge 2/9/78
(explaining fee of _$4 , 668 . 50 )
cc : Jim Georges Deputy City Attorney
John Whipple - Public Works ✓.
Wayne Lee - Finance Dept.
d
Eebruary 9, 1976.
Marl. C. I'1001:1e
5555 Sopulveda Ioulevard
Culver City, California 90230
Subject: Retail Store at 18455 Beach Boulevard-Public
Viorks Dent. Requirements for Approval of
Certificate of Occupancy
Dear Mr. Bloome:
This department }]t]a not approved the release of the Certificate
of Occupancy on the subject project for 'the following reasons:
1. Fees Due
a. Sewer fee: ✓,429. 00 Clu.nicinal Code 14 . 40. 020)
h. Slater fee: /$214 . 50 (Municipal Code 14 . 12 . 0100)
C. Drainage fc e: /$3, 575. 00 (ilunicipal. Code 14 . 48 050)
d. Orange Coul]ty Sanitil ion District 0 tee :. $450-. 0.0
(Orange County Ordinance d303)
It is important to note that the cost of the clrainace facilities,
which you built at your expense, will be refunded to Mayfair Construc-
tion as provided by reimbursement agreement.
2 . Street Imnrovements Refer to attached. Inspection Report crated
January '21 , 1976 (Ordinance S9730. 4) .
3. [-rater System - Refer to attached "Punch List" elated January 29 ,
197G (Ordinance S9730 . 4) .
The a}_)ov(3 fees and work are required by Municipal Cock and
Ordinance as noted.
Furthermore, nermits which were issued for the work on the State
highway are not complate because all conditions of said permits,. have
not been met.
We request that you contact this office as to your intent r^_gard-
i.ng completion of these items within ten (10) days of the receipt of
this letter.
Vory truly yours ,
111 I1:EDP:jy
P-,Icl . Director of PubAic Works
Cc : Don 13onfa, City Attorney
John Behrens, Dir. Building & .Community Development
I
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To F. B. ARGUELLO From JAMES GEORGES
Director of Finance Deputy City Attorney
Subject . REIMBURSEMENT AGREEMENT 75-Dl Date September 18 , 1978
Please make a payment in the amount of $12 ,319 to
Mark C . .Bloome Co . , Petrolane, P. 0 . Drawer 1410 ,
1600 East Hill Street , Long Beach, California 90801 .
This amount represents payment due to Mark C . Bloome Co .
under Reimbursement Agreement No . 75-D1.
Attached is an assignment from Mayfair Construction Co .
to Mark C . Bloome Co . .assigning all rights , title and
interest under Reimbursement Agreement No . 75-D1 , dated
June 8, 1976 , to Mark C . Bloome Co .
Under the reimbursement agreement , the City owes
Mark C . Bloome Co . $16 ,537 . 50 . Subtracted from this
amount is $4 ,218 . 50 offset in drainage , water and sewer
fees which Mark C . Bloome Co . owes the City . The net
therefore , is. $12;319 . Mr. Warren. Hall ' s .records indicate
that the offset should be $4 ,668 . 50 — in other words , an
additional $450 . However, the Public Works Department
has records indicating that Mark C . Bloome Co . has paid
$450 with regard to the County Sanitation District #3 .
Therefore, the accurate offset. is $4 ,218 . 50 .
Other correspondence directly -related to. this subject matter
is a memo from Warren Hall to Gail Hutton, dated July 11 , 1978;
memorandum opinion, dated June 9 , 1978 , from James Georges
to Art De La Loza; a letter to Petrolane from James Georges ,
dated April 4 , 1978; a memo from .Art De La Loza to Hutton
and Georges , dated June 27 , 1978 ; and a letter from Petrolane
to Warren Hall dated July 3 , 1978 .
1. .
t�
Attached is a copy of the assignment and Petrolane ' s letter
addressed to me , dated September 1 , 1978 . Your department
already has a copy of Reimbursement 75-D1 .
Thank you for your cooperation.
AMES GEORGES
i Assistant City Attorney
JG:yr .
cc : Director of Public Works
City Treasurer /
John Whipple , Public Works V
Art De La Loza, Contracts Administrator
City Attorney
Vincent D. Ashby
2 . I
i
U
City of Huntington Beach
C9 �- P.O. BOX 190 CALIFORNIA 92648
THE OFFICE OF THE CITY ATTORNEY
(714 ) 536-5555
July 18, 1978
•6
Petrolane RE C E IV F,
Mr. Vincent D: Ashby DEPT. OF PUSLIC WORKS
P.O. Drawer 1419
1600 East Hill Street
Long Beach, CA 90801 JUL 19 1978
Re : Reimbursement Agreement No. 75-Dl HUNTiNGTON BEACH, CALIF.
Dear Mr. Ashby :
This is a follow-up to my April 4 , 1978 letter to you in
which I stated that as soon as the city receives a written
assignment from Mayfair to Bloome, then the city can expe-
dite payment to Bloome .
We have received the assignment that we requested. However,
the assignment makes reference to Reimbursement Agreement
75-D1 dated. October 14 , 1975 . As you will recall, a new
..Reimbursement Agreement again labeled 75-Dl dated June 8,
1976, was executed between Mayfair Construction Company and
the city in which at the end of the Reimbursement Agreement
specifically states that it rescinds the October 14 , 1.975
Reimbursement Agreement 75-D1.
I am very sorry to trouble you with these legal technicalities ,
but the written assignment we have received which assigns
Mayfair rights to Bloome , is really assigning nothing, because
what it actually assigns is a rescinded reimbursement agree-
ment dated October 14 , 1975 . In actuality, there has been an
assignment of nonexisting rights .
Would you be so kind as to have Mayfair re-execute the identical
assignment of the copy that I have attached hereto and merely
change the date "October 14 , 1975" to "June 8, 1976 . " In this.
manner, Mayfair Construction will, in fact , actually. be transfer-
ring its reimbursement rights under 75-Dl dated June 8, 1976 .
As soon as we receive this properly dated assignment, we will
Letter to Petrolane July 18, 1978
Attention: Mr. Vincent D. Ashby Page 2
Re : Reimbursement Agreement 75-D1
expedite the payment to Mark C . Bloome, $12, 319 which
represents $16 , 537. 50 under said reimbursement agreement
less $4 ,218. 50 offset in drainage, water and sewer fees
which MaPk C . Bloome owes the city .
Mr. Warren Hall , City Treasurer, has records indicating
that the offset should be $4 ,668 . 50, in other words , an
additional $450 . However, the Public Works Department has
records indicating that Mark C. Bloome. has paid $450 with
regard to the County Sanitation District No. 3 . Our agree-
ment with the County Sanitation District is that the city
will forward to the County Sanitation District 95% of the
monies collected and the city keeps 5% for collection serv-
ices . Ninety-Five percent of $450 is $427 . 50 , and 5% of
$450 is $22 . 50 . Four-Hundred Twenty Seven Dollars ( $427. 50.)
plus $22 . 50 equals $450 , which Mark C. Blooms has already
paid. Therefore , the accurate offset is $4 ,218 . 50 .
Very truly yours ,
GAIL HUTTON
Ci
At torne
y
B
JAMES GEORGES d
Deputy City Attorney
JG:bc
Encl :
cc : Bill Hartge , Public Works Director
John. Whipple, Public Works Administrative Aide
Warren Hall, City Treasurer
Art De La Loza, Contracts Administrator
� I
• a
AS:_i IGNMLNT
THIS ASSIGNAIENT, made this 25th day of: April, 1978 ,E by
IIAYFAIR CONSTRUCTION COMPANY ( "Assignor" ) to 11AI:I� C . I3000i11,
CO. ( "Assignee" ) .
For valuable consideration, receipt of which is hereby
acknowledged, Assignor hereby assigns and transfers to
Assignee all of Assignor ' s right, title and interest in and
to that certain Reimbursement Agreement- No. 75-Dl, by and
b ween the City of IIuntington Beach and Assignor , as. Builder ,
dated October 14 , 1975. A copy of the said Agreement is
attached hereto marked Exhibit "A" and made part hereof
("Reimbursement Agreement" ) .
Assignor, by virtue of this Assignment, grants to
Assignee the right to the payment and recovery of any monies
due Assignor under the Reimbursement Agreement. Assignor,
further, to the best of its knowledge and belief, warrants
that the Reimbursement Agreement is assignable and is in full
force and effect at the time of this Assignment.
IN I.7ITNESS IMEREOF, Assignor does hereby cause this
Assignment to be executed on the day first above written.
ASSIGNOR
�KAYFAIR CONSTRUCTION COMPANY
By
42. J': Reid, President
,O' Neal , Vice President
STATE OF CAIIFORNIA,
it COUNTY OF LOS ANGELES -- ---- - — - - Ss. - - - -- - - - — -
ON
belore nlc, the unil�fsil;,lr d• iI N(II'lly flu!)
!Ic in and for said Stale, ers�nall 19
p y appeared
— Anown to me to be the
and.
to be the-_-- . 6n01t'rl to nle
a The Corporation that executed the tvilhin Inshurllenl, knrJlrn to me to be the persons who
exer.uled the within Inslruna nl on behalf of 1!lr. (;0rp0ralr0n herein named, and ackn0t,led�0d
10 rile Thal such Corporation ez0culerl Ih0 within hlSlrumerlt pursuant to its uhnu•., or a
resolution of its board of direr ors.
;s WITNESS my hand and official seal.
1'i r0111 n• r.j ir:S fill ,. lr-r:
AI I,?w I%I I ni.AEI NI -71 Ir,.I,u�1'cbh ..._•.!( _l--
r, m and lux �aid.`il,llr.: kry :I Lr
®� City of Huntington Beach
P.O. BOX 711 CALIFORNIA 92649
CITY TREASURER —WARREN G. HALL
MEMO TO : Gail Hutton - City Attorney
MEMO FROM: Warren G . Hall - City Treasurer
DATE: ' July 11 , 1978
SUBJECT: Mark C . Bloome Fees Receivable
In attempting to collect $4 , 668 . 50 in fees due the City from
Mark C . Bloome I have run into a supposed offset being handled
by Jim Georges . I wish to "officially" turn this receivable
over to your office for collection. Please note that the
amount billed is $4 , 668 . 50 , whereas Mr. Georges- is attempting
offset of only $4 , 218 . 50 .
Please -note these fees go back to 1976 and should be vigorously
pursued. or Te.. may havea Statute of Limitation problem.
I turn �� o er to your capable hands .
Warre,' Hall
WGH .vt
A tachment : Letter of 7/3/78 from Petrolane Counsel .- Ashby Re :
above subject
Copy of Billing Data M.C .B . Invoice # 336463
cc : Art DeLaLoza - Contract Administration
/ John Whipple - Public Works
Ti
R� V�it. r�;
P.O. Drawer 1410, 1600 E. Hill St.; Long Beach, Calif. 90801 Telephone: (213) 427-5471, Cable: PETROLANE
TWX 910-341-6812-
VINCENT D. ASHBY/Corporate Counsel
July 3, .1978
Warren G. Hall
City Treasurer
City of Hunting.ton_ Beach.
P. 0. Box 711
Huntington Beach, California 92648
Re! HUNTINGTON BEACH INVOICE 336463
Dear Mr. Hall:
Your letter of June 28, 1978 addressed to P3ark C. Bloome Co. ,
regarding the captioned invoice in the amount of $4,6.68. 50
being in default,' has been referred to my attention. This
amount was for sewer, water, drainage and sanitation fees for
Mark C. Bloome' s location at 18455 Beach Boulevard, Huntington
Beach.
Please be advised that I have been in contact for several
months with the Office of the City Attorney of the City of
Huntington Beach. regarding the payment by the City to- Mark C.
Bloome of the amount of $16, 537.50 under Reimbursement Agree-
ment No. 75-D1. My contact has been with Mr. James Georges,
and I enclose a copy of his April 4 , .1978 letter. for your fur-
ther information. You will note that in his letter, he states
that once they. have received a proper written assignment from
Mayfair Construction Company to Mark C. Bloome and the City has'
received the assignment, they would expedite the payment. From
this payment would be offset the amount of $4 , 2.18.50 that is
owed to the City for the drainage, water and sewer fees. It
is interesting that that particular amount does not agree with
the amount shown in your most recent letter of default.
My advice to. you is that. you cause .the expedition of the reim-
bursement to Mark C. Bloome and offset .the amount of $4 ,218.50
owed to the City. Unless you can show that your figure is
correct, we have relied .on the former number since we were .in-
formed by Mr. Georges ' office,
Warren G. Hall -2- July 3, 1978
Under the circumstances, we can only defend ourself in any suit
that would be filed by the City for the recovery of funds due
them. You have given us no choice by. your letter, but it would
appear that your payment of the reimbursement dollars would be
the most reasonable and sound a ternat've and r the circumstances.
e y t u y u
Vin hby
VDA%c.lg
Enclosure
cc: James Georges, Esq.
Mr. James Dwyer
Mr. Jack Wilson
Mr. Donald Pletke
OFFICE OF
°„Urn, CITY ATT' ORN EY
P.O.BOX 190
2000 MAIN STREET
Sri HUNTINGTON BEACH
CALIFORNIA 92648
DON P. BONFA TELEPHONE
CITY ATTORNEY (714)536-5261
April 4 , 1978
Petrolane
Mr. Vincent D. Ashby
P. 0. Drawer 1419
1600 East Hill Street
Long Beach, CA 90801
Re : Reimbursement Agreement .No . 75-D1
Dear Mr. Ashby :
Although I have answered by telephone your March 9 , 1978 letter
to Mr . John Whipple- of the Public Works Department , I am follow-
ing up such .response by this letter. In ord.er - for the City to
reimburse your client , Mark C . Bloome Company , through Reimburse-
ment Agreement No . 75-D1 , it is . necessary that Mayfair Construction ,
a party to said agreement , assign its rights under Reimbursement'
Agreement No .. .75-Dl to Mark C . Bloome Company . Mayfair ' s letter
to Mr . Whipple dated December 28 , 1976 , is not a written assign-
ment from Mayfair to Bloome . We have discussed this over the
telephone and we have- agreed .
My records further indicate that your client owes the City $4 ,218 . 50
in drainage, water and sewer fees, and any reimbursement under
Agreement No . 757D1 to Mark C . Bloome will be offset in the amount
of $4 ,218 ..50 . .
I am at a total loss as to how .Mark C . Bloome or Mayfair can obtain
the necessary permits to commence construction without having paid
drainage, water and sewer fees to the City . These fees must be paid
before any reimbursement payments can be made to Mark C . Bloome Co .
We will make all efforts -to pay. Bloome the $16 ,537 . 50 .under said
reimbursement agreement offset by the drainage , water and sewage
fees which our• .r.ecords indicate are .'.owed to the City .
Approximately three weeks ago, in our telephone. conversation you
stated that the City would receive a written assignment in proper
form from Mayfair to Bloome ; as soon as the City receives this assign-
ment , we can expedite the payment to Bloome . 'Thank ,you for ,your
cooperation.
Very truly yours ,
DON P . BONFA
City orney
J G : cs By. �.s' �,"
JAMES GEORGES
cc : Hartge 'Deputy City Attorney
De La Loza
. Whipple
CITY OF HUN'IINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
Gail Hutton, City Attorney A. De La. Loza
To James Georges, Dep. City Attorney From Contracts Administrator
. Through: F. .B. Arguello, Director of Finance.
Subject Storm Drain Reimbursement Date. June 27, 1978
Agreement 75-D1
The assignment executed by Mayfair Construction Company, Assignor, is an assignment
"of assignor's right, title and interest in and to that certain .Reimbursement Agree-
ment No. 75-D1 by and between the City of Huntington Beach and Assignor as Builder,
dated October 14, 1975." (See attached assignment) . That reimbursement agreement
of October 14th has been rescinded according to your memo of .June 9, 1978. There-
fore, the .assignment involves nonexistent rights and is of no value to the- assignee,
Mark C. Bloome Co.
Accordingly, no payment pursuant to your memo of June 9, 1978 can be made at this
time unless your office wishes to waive such a defect. Please advise.
A. De La Loza
Contracts Administrator
AD/cg
cc: H. E. Hartge.,�
J. Whipple
REQUEST Vi c:; b I LL I M;
TOt DIRECTOR OF FINUCE
FROKt H. E: Hartge, Director of Public Works
DAM March 28, 1978
BILL: Name Mark C. Bloom
Address 5555 Sepulvada Blvd.
Culver City, Ca. 90230
see detail below
Charge to t see detail below
Resolution 9 Contract 0
DESCRIPTION (Attach all backup information)
Sewer,Water,Drainacge, and Countv. Sanitati_nn fPPG fnr
18455 Beach Blvd. See attached letter.
Fee Amount Account No.
Sewer Fee $ 429. 00 L-2004
Water Fee 214 . 50 W-2414
Drainage 3 , 575. 00 M-2147
County Sanitation Dist. 427. 50 A-222
#3 - 22. 50 A-0725
►c iaL 4668- . 50
Approved: ..
Fin/4-11-71 Department Head'
A1)_ -
1 ti Vin A&
CITY OF HUNTINGTON BEACH
40
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH ++--
_V
9"8
Bill Amsbary A. De La Loza �4l�
To Asst. City Attorney From Contracts Administra!N�.-
Through : F. B. Arguello, Director of Finance �iw;
Subject- Mark C. Bloom Co. Date March 17, 1978
Request for Payment
Mark C. Bloom has now been assigned the right to collect funds due to Mayfair Con-
struction Co. pursuant to an agreement between Mayfair and the City.
Please review the attached memo of August 4, 1977 and advise on whether the City
should (1 ) pay Mark C. Bloom Co. and (2) deduct $4,000.00 due the City by Mark
C. Bloom.
A. De La Loza
Contracts Administrator
AD/cg /
cc: Public Works Director
� • INTER-DEPARTMENT COMMUNICATION
f UNIINGTON BEACH
H. E. Hartge A. De La Loza
To Director, Public Works From Contracts Administrator
Through: F. B. Arguello, Director of Finance
Subject R.A. 75-D-1 Date August 4, 1977
Mayfair Construction Company .
Pursuant to the request for payment from the above captioned builder., the undersigned,
Mr. Amsbary, Assistant City Attorney, and Mr. Whipple of the Public Works Department
met and. discussed What the City' s position should be in connection with the request..
It Was determined that the Municipal Code requires that applications for a reimburse-
ment agreement may be made only by "the subdivider or person to, whom a building permit
has been issued." (Municipal Code Section 14. 48.050) . The building permit in this
case .was issued to Mark C Bloom Co._ (Exhibit A) . Therefore, Mayfair Construction•,
should not have been a party to the agreement in question. Moreover, since the "real
party in interest", Mark C . Bloom, is still indebted to the City to the extent of
$4,000:00 in connection with .the same development, it -:could seem that this debt should
be collected before payment is made to any party. .
Please advise.
A. De La Loza
Contracts Administrator
AD/cg
cc: Assistant City Attorney
John Whipple
•r. �.: ..n I I i
1) 1 N G .1? EY N11 IT For Applicant to Ali fill in N o. 94851
7
'v DEPARTMENT OF CITY OF
fu' JOI)
�.: .. BUILDING HUNTINGTON BEACH
18455 Beach Blvd.
Address
{{ NOS- ICE
i".'. o I , 'Ik )
Lot �.( . TiTI •(.t f\�O. . Nc .
No framing inspection will. he made until the job has of KanCflo Las Bolsas I
t'Icase Attach M"Ios and Bo null(2 Cm)w- -_'._---
4 progressed in a satisfactory manner. Ali City Ordinances, —_ _---. _---
'y� re(Iu ironic nts, and imposed conditions shall he compiled Owner
�'� �,,,�..�• with prior to final inspection. A Certificate of Occupancy Mark C. Broome Co.
r't�r :•, ; will.be. issued only when all such conditions have been O,vnel"s h
n,et. Adclress 5555 Sepulveda,Culver City r
-------------------------..--tom"
Doscril-:Iion
of VJoI k
t_ Use Zone C-4 New
_—_--
--- --- ----- -------- ---- - --'---- Use of Retail 1 Sales
Zoning pprove Zing Ad by Da" Ruildin(1 e .
t: W. Lipps 4/30/7�
Aicaof 8,894 sq.ft. Valuation S 115,000
GrouP E 4 l ype 3 N Plan Ck. 5854 Building
,.yrr
rks:m Contractor
R
ea
- _— Mayfair Constructidn
)• Address
716_ E. Edna Place, id. Covina
-- State Lic. No ------ — 1213-530-6313 f"for r anc
246827
FEES INSPECTION RECORD
Building I Approval Date I I I)spccI ,r
Permit $ 241.50 -
-- � _ I 2 6 75 � —Folnulation
120.75 and Location _ !' J,
Plat, Paid --- /P/ G -
^:�� Check S I Misc. Rec. No.. Reimorcinu�l
• ��+ �;: --- " �ii=�G= _ �i-�. __/..-`_ fir'? �.,
005523f ,l' -4-
1iy Permit Prepared by bl Roof S:ity. T�
�p.aKatr.,aeI Permit Authorized by J. vogelsat. Date 4/30/75 Rcugi) Frame-
ti;.����• I hereby acknowledge that I hate read this ,appiwation and stale Lath or Dryt•lall
a,.,+"1• ' lhnt the 8l)UVC IS COI ICCt alld .11lree IO Comply Wilil all Ord lnallGCS ---�-�—�—�----- � ,
.••� .t W�;1: and State laves regarding huilding construction. Pl;is. Grob+;n CL
Cr_ h+-:5•,b: I herehy certify.that i'aroerly registered with and/or licensed
Final I )^ I
',ir,::• m pp
as Ie(urred by the CitV of Huntington Denr:h and/or Stale of
California, or that I am the legal bvvner of the above desUihed '
�r-�}':?,r:,• t property, and I certify that in the performance of the work for
which this permit is issued I shall not ernploy any person In
violation of the vvorkn)en's compensation laws of the State of VALIDATION BY CASHIER f.
' California.- j.� ..
Plan Chcd
_ ---_—= 241.50
„S?• '� .'. ..a Bldg. Pt.
y
0��7i...=Li/t!L G!zLi
• >a t Tel J//:%� _-G' C ��7��� al(y_ o—n
I T
Routing: (1) Bldg. Inspector (2) Office File (3) Statistics (i) Records (5) O�vi r.r
- ..c- ..aura'zone.*a•:sx.•nesnr.�:st;rc ?.'y^..•^,'�'rrs:,'�;,..._.^r ..f,^Grx?,'.:.�t"' .._-^.•.',."T'.'' :T'i..,....... - .
-
', EC1TY �} ,eF HuNMap on F. ile
T[�N TO�i'. BEACH;
■
with , City Clerk
1
City of Huntington Beach
�— P.O. BOX 190 CALIFORNIA 92648
OFFICE OF THE CITY ATTORNEY
(714) 536-5555
September 28, 1978
Mark C. Bloome Co .
c/o Vincent D. Ashby
Petrolane
P.O. Drawer 1410
Long Beach, California 90801
Re : Reimbursement Agreement No. 75-Dl
Dear Mr. Bloome :
Enclosed is our check No. 039989 in the amount
of $12 ,319 for full payment of Reimbursement
Agreement No . .75-D1 .
Thank you for your cooperation and patience .
This file is now closed.
Very truly yours ,
GAIL HUTTON
City rney
By ;000
AMES GEORGES
lleputy City Attorney
JG:bc
Encl:
� 47'
y rkF _
LR.r t.�e+,J�.� 7.�.:�,v',•'r+iA•• +.. ,y.-,,,7Wy.,..+., ,"'..y i- :•S.y, :°:.:4 -rls�e-,.••.,+, •�r,h .'��u;`=- ✓ v'.l"wy •t.,, �`' ++^���: -�+ ^t�9_,A�ir„`•.. 4 .��, '1- '.y.le J.:
i
CITY OF HUNTINGTON BEACH
P.O. BOX 190
HUNTINGTON BEACH, CALIFORNIA
II
DATE P.O. NUMBER GROSS AMOUNT DISCOUNT NET AMOUNT
12r319.00 000 12r319•0
I
TOTALS —* 0
90-3254
CITY OF HUNTINGTON BEACH 1222
P.O. BOX 190
HUNTINGTON BEACH,CALIFORNIA rNUMBER
0399 9
PAY TO THE OFDER OF
i - DATE NUMBER \ NET AMOUNT
MARK C BLOOME: CQ 09.271178 39989 $***12r319•,
P 0 DRAWER 1410
LONG BEACH CA 90801 r�lun�rtrl 'ti',^` ,ti 114114 I II i!�III�� 1 °h,.II'I; :I ..
CITY OF
�4H NN O NAB F "H
VOID UNLESS PRESENTED FOR ENCASHMENT II$;
WITHIN 90 DAYS FROM DATE OF ISSUE.
+'• 't'•':i:•:•�: is�f777
HUNTINGTON BEACH OFFICE
• �,GOLDEH STATE BANK
�j 6100 WARNER AVENUE
'~ HUNTINGTON BEACH.CALIF.92647 •'-'•-•"—�
11003998911' 1: 12 2 21113 2541: 09 00 2 09011'
7- 71
�'•.�,..f4�,H.?4.y,. .�.q^yHr..` v'G:14.1.d-"A a'+^N'.,�`'„ .N l"�.ti.�-�`�^1-. :•a-. r•.V,.�f�'�..:'���i..�l.'
P.O. Drawer 1410,1600 E. Hill St., Long Beach,Calif. 90801 Telephone: (213) 427-5471, Cable: PETROLANE
TWX 910-341-6812
VINCENT D. ASHBY/Corporate Counsel September 1, 1978
CD
James Georges, Esq.Deputy City Attorney
City of Huntington Beach P. O. Box 190'2000 Main StreetHuntington Beach, California 92648Re REIMBURSEMENT AGREEMENT NO. 75-D1
Dear Mr. Georges:
Please find enclosed the Assignment agreement from Mayfair
Construction Company to Mark C. Bloome Co. of all of Mayfair' s
rights to the above-captioned .Reimbursement Agreement. In
accordance with your letter: of July 18, 1978, it was neces-
sary that the agreement dated June 8, 1976 be referred to in
the Assignment as the latest of the Reimbursement Agreements
with the City of Huntington Beach. This has been done by way
of the enclosed Assignment.
I am now again requesting that you forward to me the payment
due Mark C. Bloome Co. in the amount of $16,537.50, ,less the
$4,218.50 offset for drainage, water and sewer fees. This
will .leave a balance due Mark C. Bloome Co. in the 'amount of
$12,319. 00. I would appreciate your expeditious handling of
this matter as I feel that it has gone on far too long.
I assume .that there will be no further dela s and that I will
be in receipt ,of the City' s check wit 1h th ' next five to. ten
days.
e y my. y, "s,
Vin by
VDA/clg
Enclosure
cc: Mr. Donald A. Metke
Mr. Jack P. Wilson
Mr. James Dwyer
STATE OF CALIFORNIA,
ss.
COUNTY OF LOS ANGELES
j ON August 18, 1978 Ig
before me, the undersigned, a Notary Public in and for said State, personally appeared
W_ T Reid , known to me to be the
——— President, and W. J. O'Neal , known to me
to be the ---------oft star¢s# Vice Presi(1en+- of
_ the Corporation that executea the within Instrument, known to me to be the persons who
OFFICIAL SEAL executed the within Instrument, on behalf of the Corporation herein named, and acknowledged
MARGARET R. ADDY to me that such Corporation executed the within Instrument pursuant to its by-laws or a
o NOTARY PUBLIC -CALIFORNIA resolution of its board of directors.
LOS ANGELES COUNTY WITNESS my hand and official seal.
My comm. expires JUL 12. 1981
Notary Public in and for said State.
ACKNOWLEDGMENT—Corp., Pres. & Sec.,Wolcotts Form 223--Rev.3-64
r
ASSIGNMENT
THIS ASSIGNMENT, made this 21st day of July, 1978, by
MAYFAIR CONSTRUCTION COMPANY ("Assignor") to MARK C. BLOOME
CO. ("Assignee") .
For valuable consideration, receipt of which is hereby
acknowledged, Assignor hereby assigns and transfers to
Assignee all of Assignor' s right, title and interest in and
to that certain Reimbursement Agreement No. 75-D1, by and
between the City of Huntington Beach and Assignor, as Builder,
dated June 8, 1976. A copy of the said Agreement is attached
hereto marked Exhibit "A" and made part hereof ("Reimbursement
Agreement") .
Assignor, by virtue of this Assignment, grants to
Assignee the right to the payment and recovery of any monies
due Assignor under the Reimbursement Agreement. Assignor,
further, to the best of its knowledge and belief, warrants
that the Reimbursement Agreement is assignable and is in full
force and effect at the time of this Assignment.
IN WITNESS WHEREOF, Assignor does hereby cause this
Assignment to be executed on the day first above written.
ASSIGNOR
14AYFAIR CONSTRUCTION COMPANY
1 t.
By _
J e , President
By
W. JV O Neal, Vice esident
1
1
1
ASSIGNMENT
THIS ASSIGNMENT, made this 25th day of April, 1978, by
14AYFAIR CONSTRUCTION COMPANY ( "Assignor_ " ) to MARK C . BLOOMS
CO. ( "Ass,ignee" ) .
For valuable consideration, receipt of which is hereby
acknowledged, Assignor hereby assigns and transfers to
Assignee all of Assignor' s right, title and interest in and
,to that certain Reimbursement Agreement No. 75-D1; by and
etwee�n, the City of Huntington Beach and Assignor, as Builder,
dated"October 14 , 1975 . A copy of the said Agreement is
attached hereto marked Exhibit "A" and made part hereof
d � ("Reimbursement Agreement" ) .
Assignor, by virtue of this Assignment, grants to
Assignee the right to the payment and recovery of any monies
due Assignor under the Reimbursement Agreement. Assignor,
further, to the best of its knowledge and belief , warrants
that the Reimbursement Agreement is assignable and is in full
force and effect at the time of this Assignment.
IN PdITNESS WHEREOF, Assignor does hereby cause this
Assignment to be executed on the day first above written.
ASSIGNOR
r
MAYFAIR CONSTRUCTION COMPANY
F� . t
.i By i
W. J=: Reid, President
I �
By
W. J%;O' Neal, Vice President
STATE OF CAI IFOMIA,
COUNTY OF LOS ANCELES Ss.
I ()N
1 brrlore me, the Undefsigncd, a Nol,lly Public in art Stale,for said Sty 19 ----
, personally appeared
___President, and._ known to rWe to be the
I to be the----
SeertlarrofkllewW to me
the Corporation that executed the within Instrument, known
executed the within Instrument, on behalf of the Corporation herein Warned, and acknowledged to me t0be the ps who
erson erson
t0 rile that such Corporation executed the within I
resolution of its board of directors. nsfrumen t pursuant to its by hnvs of a
WITNESS my hand and official s
eat.
t r • N\
nr.�,r�n�;i i n,her rri 777 Hry fq ary Ih;blic in and for said
Coip., Prr , ,S `r,c., Wokotls tnrn, 7 �
PETROLANE INCORPORATED
1600 EAST HILL STREET
LONG BEACH, CALIFORNIA 90806
427-5471
VINCENT D. ASHBY/Corporate Counsel
July 3® 1918
warren Gs Hall ]
City Treasurer
City of Huntington Beach '
Ps Os Box 711
r
Huntington Beach, California 92648 1
Res HUNTINGTON BEACH INVOICE 336463
jDear Mrs Halls
Your letter of June 28, 1978 addressed to Mark. C. Blooms Coo ,
regarding the captioned invoice in the amount of $4,668.50
being in default, has been referred to my attention. This
amount was for sewer, waters, drainage and sanitation fees for
Mark Cs Bloome°s location at 18455 Beach Boulevard, Huntington
Beach.
Please be advised that I have been in contact for several
months with the Office of the City Attorney of the City of
Huntington Beach regarding the payment by the City to bark C.
Blooms of the amount of $16,537.50 under Reimbursement Agree-
ment No. 75-Di. My contact has been with Mr. James Georges,
and I enclose a copy of his April 46, 1978 letter for your fur-
ther information. You will note that in his letters, he states
that once they have received a proper written assignment from
Mayfair Construction Company to Mark C. Blooms and the City has
received the assignment® they would expedite the payment. From
this payment would be offset the amount of $4,218.50 that is
owed to the City for the drainage, hater and sewer fees. It
is interesting that that particular amount does not agree with
the amount shown in your most recent letter of default.
My advice to you is that you cause the expedition of the reim-
bursement to bark C. Blooms and offset the amount of $4,218.50
j owed to the City. Unless you can show that your figure is
correct, we have relied on the former number since we were in-
formed by Mr. Georges' office.
O Q2
J>
1W
Warren G. -Hall -a- July 3, 1978
Under the circumstances, we can only defend ourself in any suit
that would be filed by the City for the recovery of funds due
them. You have given us no choice by your letter, but it would
appear that your payment of the .reimbursement dollars would be
the most reasonable and sound a tar a under the circumstances.
ry rul yo ,
Vi. t
VDA/clg
Enclosure
cc: James Georges, Esq,
Mr. James Dwyer
Mr. Jack Wilson
Mr. Donald Metke
OFFICE OF _
u= CITY ATTORNEY
_ P.O.BOX 190
2000 MAIN STREET
HUNTINGTON BEACH
CALIFORNIA 92648 -
DON P. BONFA TELEPHONE
CITY ATTORNEY A rll 4 1978 (714)536-5261
P
Y
Petrolane
Mr. Vincent D. Ashby
P. 0. Drawer 1419
1600 East Hill Street
Long Beach, CA 90801
Re : Reimbursement Agreement No . 75-Dl
Dear Mr. Ashby:
Although I have answered by telephone your March 9, 1978 letter
to Mr. John Whipple of the Public Works Department , I am follow-
ing up such response by this letter. In order for the City to
reimburse your client, Mark C. Bloome Company, through Reimburse-
ment Agreement No. 75-D1, it is necessary that Mayfair Construction,
a party to said agreement, assign its rights under Reimbursement
Agreement No . 75-Dl to Mark C . Bloome Company. Mayfair' s letter
to Mr. Whipple dated December 28 , 1976 , is not a written assign-
ment from Mayfair to Bloome . We have discussed this over the
telephone and we have agreed.
My records further indicate that your client owes the City $4 ,218 .50
in drainage, water and sewer fees, and any reimbursement under.
Agreement No . 75-Dl to Mark C . Bloome will be offset in the amount
of $4,218 . 50 . .
I am at a total loss as to how Mark C. Bloome or Mayfair can obtain
the necessary permits to commence construction without having paid
drainage, water and sewer fees to the City . These fees must be paid
before any reimbursement payments can be made to Mark C . Bloome Co.
We will make all efforts to pay Bloome the $16 ,537 .50 under said
reimbursement agreement offset by the drainage, water and sewage
fees which our records indicate are owed to the City .
Approximately three weeks ago, in our telephone conversation you
stated that the City would receive a written assignment in proper
form from Mayfair to Bloome; as soon as the City receives this assign-
ment, we can expedite the payment to Bloome . Thank you for your
cooperation.
Very truly yours ,
DON P. BONFA
City orney
JG :c s Bycc : Hartge ~r �` ,. y .• -
,rT' MES GEORGES
De La Loza 4.,beputy City Attorney
Whipple
1
. •-N
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH '
•To. ART DE LA LOZA From JAMES GEORGES
" ,Contract Administrator Deputy City Attorney
Subject STORM DRAIN REIMBURSEMENT; Date June .9; 1978
AGREEMENT 75-D1
MEMORANDUM OPINION
This is in response to your memo to me dated June 6 , 1978.
BACKGROUND:
Mayfair Construction Company entered into a reimbursement agree-
ment with the City on October 14 , 1975• On June 8, -1976, the
parties rescinded that agreement and entered into a new reimburse-
ment agreement No . 75-Dlo. Mayfair gave a written assignment of
�isrights to Mark Blome, with a copy to e Ci Mar
Bloom' ma e a eman forte of nu d, in the amount of
$16,537. 50, less $4,218. 50 in an off-set it .owes to the City .
QUESTION: Can the developer be reimbursed for installing a
storm drain. according to his reimbursement agreement where a
condition in his reimbursement agreement states :
"No refund shall be made by CITY to BUILDER until the
Director of Public Works shall certify in writing to
the Finance Director that fees have been collected in
drainage area to refund BUILDER for the cost of con-
.. structing FACILITIES."?
-The problem is : what is the definition' of a drainage area?
There has been a previous Memorandum Opinion, dated August 4,
1976, addressed to you on this very same subject matter (attached) :
Note that the last paragraph of the attached Opinion, in part ,
states , "It seems that ' drainage area' , in (g) above, is not
defined. ` Therefore, this section could not be used as a defense
for. payment .to Mayfair. " .
It. should also be noted that the drainage facilities installed
by Mayfair hook up to existing drainage facilities, so that
waters drained from the area flow through the drainage facilities
built by Mayfair and on through the attached existing drainage
facilities . Therefore, it may be argued that the "drainage area"
served by the facilities built by Mayfair is much larger than
originally defined.
MEMORANDUM OPINION
Page Two
It is the opinion of this office that Mark C . Bloome, as
assignee, should be paid $12,319, which represents the amount
in reimbursement agreement 35-D1, which is $16,537. 50 , less
an offset of $4,218. 50, which Mark C. Bloome owes to the . City.
JAMES GEORGES
Deputy City Attorney
JG.:ps
Attachment
cc : H. E . Hartge, Public Works_ Director
John Whipple, Administrative Aide
APPROVED:
GAIL HUTTON
City Attorney
P.O. Drawer 1410, 1600 E. Hill St., Long Beach, Calif. 90801 ■ Telephone: (213) 427-5471, Cable: PETROLANE
TWX 910-341-68'12
VINCENT D. ASHBY/Corporato Counsel
May 31, 1978
James Georges
Deputy City Attorney
City of Huntington Beach, California
,Regarding: Reimbursement Agreement #75-D1
Dear Mr. Georges :
PL11-suant to your request I forwarded on May 4 , 1978 an assignment
of the above captioned reimbursement agreement from Mayfair
Construction Company as assigner to Mark C. Bloome Company. You
had indicated that prior to that time that when you received this
assignment you would expedite the payment of the $16 ,537 . 50
roinibursement for the construction of the storm drain in Huntington
Beach. You were further advised that the city was authorized to
off set the amount of $4218. 50 owed to them by Mark C. Bloome
Company for their share of certain fees.
To date, I have not heard anything from you or the City. of Hunting-
ton Beach. I realize that the municipal wheels grind slowly, but
I was under the impression from your letters that the matter would
be handled as quickly as possible. I am again requesting that you
forward the check for the balance of the r imbur e ent ' rectly to
my attention for handling with the Mark C. 1 ome mpa
Ver ru yours
VinD. by
VDA/mli
cc: James Dwyer, Mark C. Bloome Co.
UlqTTORVk�'-�
Jack Wilson, Mark C. Bloome Co.Donald Metke
O �
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
H. E. Hartge A. De La Loza
To Director, Public Works From Contracts Administrator
Through: F. B. Arguello
Subject Mark C. Bloome Fees Date March 16, 1978
Attached please find a copy of your letter to Mark C. Bloome dated February 9, 1976.
It indicates that over $4,000.00 in fees was still due in connection with the retail
store located on Beach Blvd. If the City is obligated to pay Mark C. Bloome pur-
suant to the reimbursement agreement entered into with Mayfair Construction (see
v attached) , it would seem prudent that this $4,000.00 amount be subtracted from such
payment.
If these fees have not been paid to date, please arrange for a Request for Billing
at your earliest convenience.
A. De La Loza
Contracts Administrator
AD/cg
cc: City Attorney
City Treasurer
Eebruary 9, 1976
I lark C. Bloome
5555 Sepulveda Boulevard
Culver City, California 90230
Subject: Retail Store at 13455 Beach Boulevard-Public
V orks Dept. Requirements .for Approval of
Certificate of Occupancy
Dear I4r. Bloome:
This department has not approved the release of the Certificate
of Occupancy on the subject project for the following reasons:
1. fees Due
a. Se;aer Lce: ✓�429. 00 (Municipal Code 14 .40. 020)
b. I•later fee: 4,$214 . 50 (Municipal Code 14 . 12 . 0100)
C. Drainage fee: .-$3, 575. 00 (Municipal Code 14 .48 . 050)
d. Orange County Sanitation District D feu :. $450. 00
(Orange County Ordinance �303)
It is important to- note that the cost of the drainage facilities,
which you built at your expense, will be refunded to Mayfair Construc-
tion as provided by reimbursement agreement.
2 . Street Improvements - Refer to attaches] Inspection Report dated
January 21, 1976 (Ordinance S9730.4) .
3. Water System - Refer to attached "Punch List" dated January 29,
1976 (Ordinance S9730.4) .
The above, fees and work are required by Municipal Code and
Ordinance as noted.
furthermore, permit's which were issued for the work on the State
highway are not complete because all conditions of said permits have
not been met.
We request that you contact this office as to your intent regard-
ing completion of these items within tan (10) days of the receipt of
this letter.
Very truly yours,
IIE1T:EDP:jy ;I. E. Hartge
F-.nc] _ Director of Public Works
cc : Don Bon-fa, City Attorney
John Behrens, Dir. Building & Community Development
OFFICE OF
1lN6/p` CITY .ATTORNEY
V _ P.O.BOX 190
TA�Q 2000 MAIN STREET
HUNTINGTON BEACH
CALIFORNIA 92648
DON P. BONFA TELEPHONE
CITY ATTORNEY (714) 410 R201
April 4 , 19'rf3
Petrolane
Mr. Vincent D. Ashby
P. 0 . Drawer 1419
1600 East Hill Street
Long Beach, CA 90801
Re : Reimbursement Agreement No . 75-D1
Dear Mr . ,Ashby
Although I have ,answered by telephone ,your March 9 , 1978 letter
to Mr . John Whipple of the Pu.b1_a.e Wo.rkc; k)ef�,rrtrrrrllL , T r)rn f'clllclw
-
ing up such response by this letter. In order Cot, the Clt-.y to
reimburse ,your client , Mark C .. P,,looiric� �'�>rnf,,�r)y , 1;1)rrrl.l> ,h Ifllwlli.i)
ment Agreement No . 75-D1 , it is necessary that Mayfair Construction,
a party to said agreement , assign its rights under Reimbursement
Agreement No . 75-D1 to Mark C . Bloome Company . Mayfair ' s letter
to Mr . Whipple dated December 28 , 1976 , is not a w.r:Ltten a. >si_gn-
ment from Mayfair to Bloome . We have discussed this over the
telephone and we have agreed .
My records further indicate that ,your client owe,, the City $4 ,21.8 . 50
in drainage , water and sewer fees,, and ,a,rry i e:Lur[Jur„cnrerit r.u)rler
Agreement No . 75-Dl to Mark C . Bloome will be. offset in the amount
of $4 ,218 . 50 .
I am at a total loss as to how Mark C . Bloome or Ma.y.fair- can ohta._i.n
the necessary permits to commence construction without having paid
drainage , water and sewer fees to the City . These fees must be paid
before any reimbursement payments can be made to Mark C . Bloome Co .
We will make all efforts to pay Bloome the $1.6 ,537 . 50 under said
reimbursement agreement offset by the drainage , water and sewage
fees which our records indicate are owed to the City .
Approximately three weeks ago , in our telephone conversation ,you
stated that the City wo1.11 d rece.-i.ve :a: written 11110i,;,r1
form from Mayfair. to 13loome ; u:_c uoon r.r.: the CiL,y LIr_i :,
ment , we can expedite the payment to Bloome . Thank ,you for ,your
cooperation.
Very truly ,your:;.,
DON P. BONFA
City orney
JG : cs By
cc : Hartge .JAMES GEORGES
De La Loza �.:- D.eput,y City Attorney
Whipple
1
P.O. Drawer 1410,1600 E. Hill St., Long Beach,Calif. 90801 ■ Telephone: (213).427-5471, Cable: PETROLANE
TWX 910-341-6812
VINCENT D.ASHBY/Corporate Counsel March 9, 1978 .P C F. 8 E
EDO
DEPT. OF PU-31-1 Wnr4K9
MAR 13 1978
Mr. John Whipple HUNTINf3TON BEACH, CALIP,
Public Works Department _ CERTIFIED MAIL,
City of Huntington Beach RETURN RECEIPT REQUESTED
P. 0. Box 190 .
Huntington Beach, .California 92648
Re: REIMBURSEMENT. AGREEMENT 75-Dl
Dear Mr. Whipple: ,
This office represents Mark C. Bloome Co. We have been
requested by them to take whatever steps are necessary to
recover. the $16, 6.55. owed to them- by the City of. Huntington
Beach for the construction of a storm drain in 1975. This
was done in accordance with the above-captioned reimburse-
ment agreement, which was applied for by Mark C. Bloome' s
contractor, Mayfair Construction.
Your apparent reason for failure or refusal .to pay the re-
imbursement was due to the fact that the reimbursement
agreement was. entered into with _the contr.uction company
and the building permit with Mark C. Bloome Co. , and your
requirement was that the same name appear on both of these
filings. You are advised that no one was told of this at
the time that the construction took place. You are further
advised that your office has been told that "Mayfair Con-
struction Company has assigned all of their rights in the
aar_eement to Mark C. Bloome Co. This reason for failure
and refusal to reimburse the Company appears somewhat arbi-
trary, and capricious.
I am hereby making a formal demand upon the City of
Huntington Beach for full reimbursement of the $16,6.55.
If it is alleged by you that there are monies owed to the
City' by Mark C. Bloome Co. for other matters, my suggestion
is- .that these charges be properly invoiced and they will be
promptly paid. If I have- not heard from your office within
seven (7) days of receipt of this letter,. or if you con-
tinue to fail and refuse to make the reimbursement, .a for-
mal hearing before the City Council will be requested, and,
if necessary, any and all other_ legal action will be taken.
Mr. John Whipple -2- March 9, .1978
I trust .that ._the .City of. Huntington Beach will not con-
tinue in this course 'of. .conduct,.and will ma a immediate
payment so .that protracted action wi of b necessary.
e. 1 s,
Vin by
VDA/clg
cc: Mr. Floyd :G.: Belsito, ,
City. Administrator,
Huntington Beach
.Don Bonfa,. Es.q. ,
City- Attorney
Huntington Beach :
Mr. W. J. -Reid,
President, ,
Mayfair_ Construction .Co.
Mr. Jim Dwyer, .
Mark C. Bloome .Co.
Mr. Donald .A. Metke,. .
P.etrolane Incorporated
r
® .
-�® City ®f Huntington Beach
P.O. BOX 190 CALIFORNIA 92648
Ilk ENGINEERING DEPARTMENT
September 16, ,1977
I
Mark C. Bloome
5555 Sepulveda Boulevard
Culver City, California 9.0230
Subject: Reimbursement Agreement No. 75-D1
Mayfair Construction Company
Dear Mr. Bloome:
In response to a telephone conversation held today between Mr.
Reid of Mayfair Construction Co. and John Whipple of this office,
I would like to. explain the City's position regarding payment on the
subject agreement and offer a possible solution.
It has now been determined that the Huntington Beach Municipal_
Code requires that reimbursement payments be made to the person to
whom the building permit has been issued. The building permit in
question was issued to your company. That is the main reason why
this department has now been unable to. obtain approval for payment
from the City 's Finance Department.
The Municipal Code also provides that all fees established by.
the City shall be paid prior to issuance of building permits . Our
records indicate that .your company owes $4 , 218 . 50 in drainage, water,
and sewer fees to the City.. This matter must be resolved before any
reimbursement payments can be made.
As to a possible solution, I would like .to suggest that Mayfair
Construction Co. assign its rights to reimbursement under the subject
agreement to your company. I believe that then a check could be drawn
less the amount owed City in fees . This would allow us to satisfy
both obligations at the same time.
If you are in agreement with this proposal, please submit an
assignment of rights. so that .I may proceed with processing your request .
for payment.
Very truly yours,
H. E.. Hartge
Director of Public Works
HEH:JWW: jy
cc: Assistant City Attorney
Contracts Administrator
W. J. Reid
Mayfair Construction Co.
CITY OF HUNTINGTON BEACH �
INTER-DEPARTMENT COMMUNICATION
• HUNTINGTON BEACH -
To H. E. Hartge From A. De La Loza
Director, Public Works Contracts Administrator
Subject Mayfair Construction Co. Date August 13, 1976
R.A. #75-D1
Preliminary analysis reveals that Drainage District #9 currently has a negative
cash balance. Therefore, a refund cannot be recommended at this time.
A. De La Loza
Contracts Administrator
AD/cg
cc: John Whipple
From the desk of
7fir u"
tk
t
2/jpZv�
j
� sr�
From the desk of:
C-vZjGa
�v
,
rid L.L�t
t-4
r
14 CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
H. E. Hartge A. De La Loza
To Director, Public Works From Contracts Administrator
Through: F. B. Arguello, Director of FinancelM/
Subject R.A. 75-D-1 Date August 4, 1977
Mayfair Construction Company
Pursuant to the request for payment from the above captioned builder, the undersigned,
Mr. Amsbary, Assistant City Attorney, and Mr. Whipple of the Public Works Department
met and discussed what the City's position should be in connection with the request.
It was determined that the Municipal Code requires that applications for a reimburse-
ment agreement may be made only by "the subdivider or person to. whom a building permit
has been issued." (Municipal Code Section 14.48.050) . The building permit in this
case was issued to Mark C Bloom Co. (Exhibit A) . Therefore, Mayfair Construction
should not have been a party to the agreement in question. Moreover, since the "real
party in interest", Mark C. Bloom, is still indebted to the City to the extent of
$4,000.00 in connection with the same development, it would seem that this debt should
be collected before payment is made to any party.
Please advise.
A. De La Loza
Contracts Administrator
AD/cg
cc: Assistant City Attorney
John Whipple
,. -.
::
It'
F.
`�- U�7�{:�,• _�. •.,d •�. '.i' �i r� i "� ' 9 ° y��
B ILUING .QE,RMIT.
For Applicant to fill jn No. g 4 8 51
DEPARTMENT OF " CITY OF 1,:,t4
BUILDING HUNTINGTON BEACH. Job
18455 Beach Blvd.
Address
7
h NOTICE
Lot No. Tr ct �o Blk. No.
No framing inspection will be made until the job has r._of`Ranc�io Las Bolsas
progressed in a satisfactory manner. All City Ordinances, Please Attach Metes and Bounds(2 Copies)
requirements, and imposed conditions shall be compiled
I. Owner Mark C. Bloome Co.
ry -with prior to final inspection.A Certificate of Occupancy 1
will be,issued only when all such conditions have been nl Owner's '
met. Address 5555 Sepulveda,Culver City
Description
y` of Work
Use Zone C-4 New
Use of
Zoning Approved by W Lipps Date4/30/75 Buildingkz- Retail Sales
--- Area of • 8,894 s .f t Valuation $ 115,000
GroupType Plan Ck. `
= *� E 4 YP 3 N 5854 Building ' � s
Contractor
Remarks:
Mayfair Constructi n '
Address
-. 716 E. Edna Place W. Covina
State Lic. No. 213-530-6313%itorranc
i 246827
'-•--- -"-•• FEES INSPECTION RECORD
Building i Approval Date . Inspec r
t = Permit $ . 241.50
2 6 75 t Foundation
Plan Paid 120..75 t and Location �� . .3 ,
Check $ Misc. Rec. No. �' Reinforcin
+; r Permit Prepared by Ill005523 Roof Shtg.
` Permit Authorized by J. Vogelsan Date 4/30/75 ? Rough Frame _ ,_:,"
*� I hereby acknowledge that I have read this application and state Lath or Drywall
that the above is correct and agree to comply with all ordinances
; fC;i%.4 and State laws regarding building construction. [, Plas. Brown Ct.
ram.
u!►y.a?f''�f 1 hereby certify that I am properly registered with and/or licensed
f Final. t►';.-
as required by the City of Huntington Beach and/or State of
.. California, or that I am the legal owner of the.above described
c g Utility Release
j1W;:, A ,4 property, and I certify that in the performance of the work for 2
which. this permit is issued I shall not employ any person in
violation of the workmen's compensation laws of the State of VALIDATION BY CASHIER •
California. ,�q
Plan Check •-
,.., 241.50 Q3
Bldg. Pt.
Signature of 9 to
Permitee l/�C�Ff �t 5
/•
Routing: (1) Bldg. Inspector (2) Office File (3) Statistics (4) Records (5) Owner
i -
-+. :x-• .F c'� L. SA@y���������yY17Y�C�2������ �py��i'_,�c:.,ut y 1f •�•�� �,.,^'r.1��'."S••,.'r... :�F<<1 ,-_,;_,1z,,�,'r�j
� �I
�i
I
,i
�� ss�..�
,� _
a;
. -- - - - —
;, - -
.� � -
- — -- - -
- - -
,._ - -
�. — ---
''tW1,r � ` , `!q ti f t E -ay -r. •i , E iT
�; .C/RS' -+�-�. � tr.;L; �".+ ,;y ' q..:...�` d- t s°-r � o. 11 . . .,,'• ti'• , --}_ - -}'r ,�f. •tu�r_r"'3 3.d. +7N F'•t'.
BUILDING YE IT.. ';
~: For Applicant to fill in
.. DEPARTMENT OF CITY OF N O. 94851
,
BUILDING HUNTINGTON BEACH .lob
18455 Beach Blvd.
Address I
NOTICE
Lot No. Tract (� Blk. No.
No framing inspection will be made until the job has Of Rancrio L8s Bolsas
progressed:in a satisfactory manner. All City Ordinances, Please Attach Metes and Bounds 12 Copies)
requirements, and imposed conditions shall be compiled Owner Mark C. Bloome Co.
7 with prior to final inspection.A Certificate of Occupancy s' .,trr
°�• �f will be,issued only when all such conditions have been Owner's
met. Address 5555 Sepulveda,Culver City ''
Description
TVIT
Use Zone C-4 of Work New
[ _ Use of
Zoning Approved by W. Lipps Date4/30/75 Building Retail Sales
;r Group Type Plan Ck. Area of 8,894 sq..ft. Valuation S 115,000
-�` - E 4 y 3 N 5854 Building
IL
Remarks: Contractor ;
Mayfair Construction `5-�
r .,, _ '• - Address .
716 E. Edna Place W. Covina
I .., I
�. : • State Lic. No. 213-530-6313Vtorranc
x 246827
- - , FEES INSPECTION RECORD
Building i Approval Date Insprc r
Permit $ 241.50
2 6 75 Foundation G —,,`� t:G
Plan Paid 120.75 7 and Location _ -? S
Check Misc. Rec. No.,,:•..° . ; $ Reinforcin 1. -7 .
Permit Prepared by bl 005523 Roof Shtg. 7
Permit Authorized by J. Vo elsan Date 4/30/75 '. Rough Frame
• �JP+`'�?'� I hereby acknowledge that I have read this application and state t Lath or Drywall
rt.
..,
that the above is correct and agree to comply with all ordinances
and State laws regarding building construction. Plas. Brown Ct. ��
r•r.
I hereby certify that I am y registered with and/or licensed ," 'y y proper)
. ,,aar;•. •+ 9 Final
t ,o as required by the City of Huntington Beach and/or State offC••'-
•���'- + California, or that I am the legal owner of the above described
M°••• ` g 4"�;rt!Xr:,..-•; property, and I certify that in the performance of the work for S Utility Release
ry+a.v+t•�.?•; which this permit is issued I shall not employ any person in •�..
r r VALIDATION BY CASHIER violation of the workmen's compensation laws of the State of i:...-
f. .atry -- n '
I California.
Plan Check
L T.
.. � 241.50
ri f Bldg. Pt.
Signature of
A-0 'i<.:: Permitee
.:, Routing: . (1)-Bldg. Inspector (2) Office File 0) Statistics (4) Records (5) Owner
t
STRIAL • COMMERCIAL • RESIDE'
STATE LICENSE #B248827
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723 r-" E C E g,i7
AREA CODE 213/966-7553 DEPT. OF PUBLIC WORKS
December 28, 1976 0 E-C 2 9 1976
HUPCnNOTON- BE;AcH. CALIP.
Mr. John Whipple
Public Works Department
City of Huntington Beach
P.O. .Box 190
Huntington Beach, California 92648
Re: Reimbursement Agreement
75—D1
Dear Mr. Whipple:
Please be advised, we have of this date, designated the Mark
C. Bloome Company as collecting agent for all monies due on
subject agreement.
Very truly yours,
MAYFAIR CONS CTION COMPANY
�i
W J. REID
President
WJR:erd
SUBSIDIARY OF MAYFAIR HOMES, INC.
N6lVkc
the ae4p o6 . . .
BILL HARTGE
�,an/� S Ar..w
Te CITY OF HUNTINGTON BEAM( C E 9 V E 93
INTER-DEPARTMENT COMMUNICATION DEPT. OF PUB'L_IC WORKS
HUNTINGTON BEACH .
A"U 1976
To Art De La Loza, Contract From James GAgN-BagCpN BEACH, CALIF.
Administrator, Finance Dept. Deputy City Attorney
Subject Storm Drain Reimbursement Date August 4, 1976
Agreement 75-Dl
MEMORANDUM OPINION
You have requested an opinion regarding demand for payment on
Reimbursement Agreement 75-D1. The answer is, pay Mayfair Con-
struction Company according to the June 8, 1976 reimbursement
agreement.
For some strange reason, the reimbursement agreement was entered
into with Mayfair instead of Mark C. Bloom. In their June 8, 1976
reimbursement agreement, the city and Mayfair mutually rescinded
their October 14, 1975 reimbursement agreement. According to the
June 8, 1976 reimbursement agreement, the maximum refund to be paid to
Mayfair is $16 ,537. 50 , and refunds are payable only from a positive
balance available in Drainage District No. 9 .
Mark C. Bloom's failure to pay the city about $4,000 in fees cannot
be used as an offset in paying Mayfair. The reimbursement agreement
is with Mayfair and not with Bloom.
Mayfair is the builder and contractor and Bloom ia the owner. Payment
to one cannot be conditioned by the debts of the other unless agreed
to by the parties. -
"Subsequent development" defense is no longer available in storm
drain reimbursement agreements since amendment of Huntington Beach
Municipal Code Section 14. 48. 070 ; however, Section 14. 48.070 (g) states :
"The city shall not be required-to make reimbursement to any
person until� all drainage construction projects in a drainage
area are completed. "
I am informed by the Department of Public Works that the "drainage
area" served by this storm drain is completed, but Storm Drain
District No. 9 is not completed. It seems that "drainage area," in
(g) above, . is not defined. Therefore, this section could not be used
as a defense for payment to Mayfair.
JAM GEORGES APPROVED:
Deputy City Att ney
JG:cs DON P. BONFA
cc: Bill Hartge City Attorney
John Whipple
4e �
/ STRIAL • COMMERCIAL • RESIDEI
STATE LICENSE #B248827
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553 ER E � E 8 V E D
July 22, 1977 DEPT. OF PUBLIC WORKS
JUL 2G 1977
Mr. John Whipple
Public Works Department 1-lu is ro BEACR,'CAOO.
City of Huntington Beach
P.O. Box 190
Huntington Beach, CA 92648
Re: Our Job #534
Dear Mr. Whipple:
Again we hereby request an immediate payment of Reimbursement
Agreement 75-D1.
The first invoice was submitted on January 27, 1976. It is
inconceivable that it would take 16 months to make payment
on an agreement or contract.
Enclosed are copies of correspondence regarding these dilin-
quent funds.
Your immediate attention and action on this payment is
respectfully requested.
Enclosure:
Letter June 18, 1976
Invoice January 27, 1976 Yours Truly;
Copies going to Mark C. Bloome Wi
President '
SUBSIDIARY OF MAYFAIR HOMES, INC.
s
Ju ie 18, i.
4
5i
,_ty ,f' `juntj:i,�ton Beach
Beach, -,&liforni- 7Yo48
:e: Our Job e534
request and dm.and itmeaiate payment of Reimbursement
-:�-tne a 75-711,
�•i; ir,�_ said Agreement, our reprur-4�ntatives were assured by
t:1N +d ,f the Public ::'orks :;epartmeat that payment wuld be .made
ut)(31,:i the completion of the project. .3aid project was completed in
Jan,..=.,ryy j 1976.
.ev,�r :l Wills to the ;;ity assured us that our payment was forth
after a -wait of about thirty 174") days, we still received
no 8)-*rnjent. Again our rc:-IrEsentntiv�: i:•__.i.'t: `•_.he city. We wore
toles. �:lat tei,:r vas a probl-r: in t:ir language of the Agremetnt :and
t:i .;,;; f::�^,' worked on. -ifter another thirty (3011 days we atill
did 1110 c L::z,�.ive our funds. Again our representative contacted the
city. �;,t: Spoke to Mr. .imsbariy. Mr. tr: carry explained that the
'. �,;uagc waa b:.>.ing amended by the City :council and .that it would take
t,•:o -,it-Elks to go to the Council and then thirty days to become law and
that we would recoi e our money the fir,t fear day_ in May.
jev!:ru.: weeks in May went by and we rE;c.e-ived no payment. 'rle called
th:: city again and Mr. Am5ba=- stated that there was a problem in
f:>zzcii ,,t an'. , meeting was going to be held on '.ay 27th to ascertain
thi- problem and further hit would contact a representative immediately
ter the meeting and ivt Ur-i a date �:h,-n payment would be forwarded
to us. This was never done.
On Lj:,i� 17, 1976t our representati•;-- contacted 'ir. Apple and he stated
that he :aa unable to tell us when the ,,• fund-; would be available.
.�..,�,,.�,....a..-,...�,,.....-..n�,•,•v.e.aa.�--asnn.,xnnsac�-r.��-�s.•,.--.__,._ ... .._�-•----
June 18, 1976
sr. JoUn .tipple
Pa e {
i
in addition to whlt has bean outlined aboval thorn are several.
inoidents involving our representative and tho am UWees of the
I.it;y of lhmtington Beach whereby ntatemmts aeare scads regarding
payment of this Agreement which Dive not been kopt.
The delay in payment already created several thousand of dollars
la eat in revrsnue to us.
We again hereby demand and request prompt peprue t.on this Rslm- .
bur,eraent .kgrceuenE.
Very tM4 yourat
MAYFA n CM"faUMCK OD WAXY
14, J, Ran
President
tlf and
cc s amity Karagar
'Itj of Huntln tM doh .
sty :thorned
•amity of Mantington Beach
Jan=7 27. 1976 1_ r
City of_ Huntington Beach
P.0. Baas 190 '` "
Huntington 'Bcaoh, California 92648
ATT23TI0?ic accounts Payable
Res Reimburs `r .
75-D1 Storm Drain
i. Mark C. Loomi'i A'' Unik `i -
"ity Ot O Naoh f �s�
Our Job #534
This invoice is for the Completion of the -4c0n.Oda so
Approximate Not Rett�ldlllle....................� ':1;; ..
Extra Work — 9tOrM Dr&IA. � ���4 �•'
Balance due thin- 1!lT 000•-s.+0.•s.....r.•�.a s�= ��. :` ;�F1.;
r} .•F�?sue,%�-.
Very tzar Y t;
0.
N. J. REID
Mi erd President
Q- _f
• Olaf�.
1
- _ .JDUSTRIAL • COMMERCIAL • RESI. -.IAL
\ STATE LICI3NSE #B246827 -
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553 '
July 22, 1977 qI•=P"f. OF
Mr. John Whipple
Public .Works Department HUNYING-rOIV BEACH. CALIF.
`i City of Huntington Beach
3 P.O. Box 190
Huntington Beach, CA 92648
Re: Our Job #534
Dear Mr. Whipple:
Again we hereby request an immediate.payment of Reimbursement
Agreement 75-D1.
The first invoice was submitted on January 27, 1976. It is
inconceivable that it would take 16 months to make payment
on an agreement or contract.
Enclosed. are copies of correspondence regarding these dilin-
quent funds.
j
Your immediate attention and action on this payment is
respectfully requested.
Enclosure:
Letter June 18, 1976
Invoice ,January 27, 1976 Yours Truly;
Copies going to Mark C. Bloome bL:J. ei
President
1
s
i
SUBSIDIARY OF MAYFAIR.IIOMES, INC.
CITY OF .HUNTINGTON BEACH
INTER DEPARTMENT COMMUNICATION
HUNTINGTON BEACH -
Frank Arguello
To Attn. Art DeLaLoza From H. E. Hartge
Subject Certification of Fees Date June 30, 1976
Received R/A 75-Dl
I hereby certify that fees in the amount of $1140.00 have
been received from areas served by . 75-D1 facility. The fees
received are as follows:
Area Served Fees Received Date
18400 Beach Blvd. $1140. 00 10-13-71
However, it is the intention of this department to refund
Mayfair Construction Co. from available funds in Drainage District
No. 9 Fund.
H. E. Hartge
Director of Public-Works
HEH:JWW:mc
I
CITY OF. HUNTINGTON BEACH
S� INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To Don Bonfa From A. De La Loza
City Attorney Contracts Administrator
Subject Demand for Payment on RA 75-D1 Date June 28, 1976
Request for Opinion
The holder of RA 75-D1 is Mayfair Construction Company. A demand for payment
was made by Mayfair on June 18, 1976 (see attached) .
Is the City obligated to make payment at this time if the following conditions
exist:
Part I -
A. RA 75-D1 was originally executed on October 14, 1975 and required payment
only from "Subsequent Development."
B. On April 5, 1976, the City Council amended the applicable code section
(14.48.070) by deleting the "Subsequent Development" requirement.
C.. A new contract was executed after that amendment and approved by the
City Council on June 7, 1976.
Part II :
A. Mayfaii-- Construction Company is not the developer or the "applicant"
in this development. Mark C. . Bloom Company is the applicant.
Part III :
A. Mark C. Bloom has failed to pay approximately $4,000.00 to the City in
fees in connection with the development (see attached) .
A. De La Loza
Contracts Administrator
AD/cg
cc: Director, Public Works V'
i a17
rf .�rh�' IRI E C E V [E-1 RID)
DEPT. OF PUBLIC: WORKS
iiA 2 81976
HUNTINGTOIV BEACH. CALIF.
Y
STATE Lam-.NsE #B24N27
Alayfair Construction Co.
SUITE Ci
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553 'RPF ' k.," V.
June 18, 1976 0-=P . Of-' Ply!!_IC VVO':?KG
191 I
HUNTINGTON EACH, CALIF.
Mr. John Wipple .
Public Works Department
City of Huntington Beach
P.O. Box 190
Huntington Beach, California 92648
Re: Our Job #534
Dear Mr. Wipple:
4
We hereby request and demand immediate payment of Reimbursement
Agreement 75—D1.
Upon signing- said Agreement, our representatives were assured by
the head of the Public I;iorks Department that payment would be made
upon the completion of the project. Said project was completed in
January, 1976.
Severalcalls to the City assured us that our payment was forth
coming. After a wait of about thirty (30) days, we still received
no payment. .Again our representative called the city. . e were
told that there was a problem in the language of the Agreement and
this was being worked on. After another thirty (30) days we still
did not receive our funds. Again our representative contacted the
city. He spoke to Mr. Amsbarryy. 1Ir. Amsbarryy explzi.ned that the
language was being amended by the City Council and that it would take
two creeks to go to the "ouncil and then thirty days to become law and
that we would receive our money the .first .few days in May.
Several weeks in l4ay went by and we received no payment. SIP called
the city again and Mr. Amsbarry stated that there was a problem in
funding and a meeting was going to be held on Mcay 27th to ascertain
this problem and further he would contact a representative immediately
after the meeting and give him a date when payment would be forwarded
to us. This was never done.
On June 17, 1976, our representative contacted Mr. [Tipple and he stated
that he was unable to tell us when these funds would be available.
SUBSIDIARY OF MAYFAIR HOMES, INC.
' STAT$ 1.Ic6N8E #B2M27
Mayfair Construction Cu.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553 p=P i. OF' F!J ''-IC WORK-c-;
June 18, 1976
Jul
I HUNTINGTOP! E=ACH, CALIF.
Mr. John Wipple
V� Page 2
+. ` In addition to what has been outlined above, there are several
incidents involving our representative and the employees of the
City of Huntington Beach whereby statements were made regarding
=-� payment of this Agreement which have not been kept.
The delay in payment already created several thousand of dollars
lost in revenue to us.
';1e again hereby demand and request prompt payment on this Reim-
bursement Agreement.
Very truly.yours,
-+ 1,UYFAIR CUNSTRUCTI 11 COMPANY
/%
T. REID
I President
WJR:erd
cc: Cit,, tlanarer
City of Huntington Beach
City Attorney
City of Huntington Beach
SUBSIDIARY OF MAYFAIR HOMES, INC.
,
s
A ICUCity of Huntington Beach
P.O. BOX 190 CALIFORNIA 92648
ENGINEERING DEPARTMENT r ,
May 27, 1976 �!
Honorable Mayor
and City Council
City of Huntington Beach
Attention: Floyd G. Belsito
Acting City Administrator
Subject: Amended Reimbursement
Agreement 75-Dl
Mayfair Construction Co:
Dear Council Members:
Transmitted herewith is a reimbursement agreement between
the City of Huntington Beach and Mayfair Construction Co. for
drainage facilities built in Drainage District #9 at Mayfair' s
expense. This agreement rescinds Reimbursement Agreement 75-Dl
dated October 14, 1975. Drainage fees have been collected in the
area to refund Mayfair Construction Co.
I recommend that your Honorable Body execute the agreement.
Very truly yours,
H. E. Hartgei/
Director of Public Works
HEH:JWW:.jy
Trans.
REIMBURSEMENT AGREEMENT 75-Dl
STORM DRAIN CONSTRUCTION
THIS AGREEMENT entered into by and between the CITY
OF HUNTINGTON BEACH, a municipal corporation, hereinafter called
"CITY, " and MAYFAIR CONSTRUCTION COMPANY, hereinafter called
"BUILDER, "
W I T N E S S E T H:
WHEREAS, BUILDER, pursuant to its agreement with CITY ,
hasat its own cost and expense constructed 386 feet of twenty-
seven inch RCP pipe, one ( 1). catch basin, and two ( 2) j-unction
structures , hereinafter called "FACILITIES. " FACILITIES have
Y
( been constructed in conformance with the plans an specifications
approved by the Director of Public Works of CITY , a d FACILITIES
have been dedicated to CITY, and CITY now desires to reimburse
BUILDER for a portion of the cost of the construction of FACILITIES
as provided by CITY' s Municipal Code ;
NOW, THEREFORE, in consideration of the covenants and
agreements herein contained, the parties hereto agree as follows :
BUILDER has constructed, at a total cost of $18 ,375 . 00
a storm drain and appurtenances to serve Drainage District No . 9
and adjacent properties . Exhibit "A, " attached hereto and made
a part hereof , is a map of the area served . BUILDER haz dedicated
FACILITIES to CITY .
The maximum refund to be paid to BUILDER under this
Agreement is as follows :
LTG : cs
Total ,job cost of FACILITIES : $18 ,375 . 00
Less ten percent (10%) per CITY' s
Municipal Code Section 14 . 48. 070(c) 1,837 . 50
Maximum refundable , conditioned on
funds being available in Drainage
District No . 9 fund 16,537 . 50
Refunds shall be payable for a period of five ( 5) years
from the date of applicant ' s application.
Refunds shall bear no interest .
/ Refunds shall not exceed ninety percent (90%) of off-
site construction costs .
Funds have been expended for Drainage District No . 9
in accordance with Government Code Sections 66483 and 66487 only.
l� (','Redsfun are payable only from a positive balance availa6_le i'7�� —
said district ' s fund. _ r_. •-
No refund shall be made by CITY to BUILDER until the
Director of Public Works .shall certify in writing to the Finance
Director that fees have been collected in drainage area to refund
BUILDER for the cost of constructing FACILITIES .
CITY shall not be liable for payment of refund by reason
of its failure to collect or receive from any person or entity
the drainage fee, or by reason of expenditures made pursuant to
Government Code Sections 66483 and 66487 . CITY agrees to use good
faith to protect the interest of developers , either individuals
or entities , who have previously constructed similar facilities ,
by collecting the fees , either prior to or concurrent with the
development of any property served by the facility constructed
' f
i
under this agreement . If a developer who develops property served
by the facility constructed by BUILDER is required as a .condition
of development to construct additional facilities , CITY may allow
said developer credit toward the per acreage fee consistent with
this said agreement ; and no fees shall be due BUILDER by reason
of such construction. CITY further agrees to furnish a copy of
this agreement to the developer of any properties served by the
FACILITIES described herein.
In the event CITY does not require a developer to deposit
the drainage fee with the CITY prior to or concurrent with develop-
ment , CITY will enter into an agreement with said developer stating
that said developer is obligated, not only to the CITY , but also to
BUILDER and to developers who have previously contributed to the
cost of construction of FACILITIES constructed hereunder to deposit
said fee with CITY. The CITY shall not be required to pay attorneys
fees or court costs for any breach of this agreement .
CITY and BUILDER hereby mutually rescind that certain
Reimbursement Agreement 75-D1 between these parties dated October 14 ,
1975 , and hereby enter into this .new Reimbursement Agreement 75-Dl
on the date first entered below.
EXECUTED in Huntington �Bcach California on this the
day of 1976 . ..
ATTEST: CITY OF HUNTINGTON BEACH (CITY)
y
C ty Clerk May-Ur
3 �;
APPROVED AS TO CONTENT: . APPROVED AS TO FORM:
Ci Administrator City At orn �G-
1
APPROVED, INITIATING DEPARTMENT
MAYFAIR CONSTRUCTION COMPANY
(BUILDER)
r _ _
ALM
flit-CC f __— ■�
1 i Iw RA
-1 •C 4 C F.E RI _
j
C4 "f N'
C F-R i AAI-CD { M I
i
ati. •- MI-CD �! 1p R RA RI Rt R+ t a-M' . ..
2
J ` I , —� ♦r
� i v
� RI Rl { 4 •�n . J
I PA-0-CD C 2
f 4 RI RI
i CF-C tom— Ow Ott it
1 l•
! f MI-CD Mt RI i RI iF RI fl ' R2 ,t Ri RI PO
S Ra
r 1 R♦ r{ R t
--J� l\.r• R'/' fl R Rt RZ i _ L__i — —J v. T ..�r�J
D c� R2 .... Rz Poa
m . .` WI's71' I` C 2
x RA-0-CD �Rs
x . , .� R3 4-,
F
s---� I i R�~ ! •RS MH
_O
_ t Raj I J R3 a
-. I RS
0-
MI t Rs
RA-0 4
Rl C i r �..._...
RR RJ , :--_• R3 R3 -�' .• , i
RA-0 MFOI MI-0 I� - z r RI
i. { { Its `: R2 R2 �4 `RI
.w s R2ii
T RA 0 FO-O 2
-
qo. r — — -------7 ,rr -- ----• r------1 —� r— r — — —
:...1.� •vf +
Sebruary 9, 1976
Park- C. Bloome
5555 Sepulveda Boulevard
Culver City, California 90230
Subject: Retail Store at 18455 Beach Boulevard-Public
Works Dept. Requirements for Approval of
Certificate of Occupancy
Dear Mr. Bloome:
This department has not approved the release of the Certificate
of Occupancy on the subject project for thb following reasons:
1. Fees Due
a. Sewer fee: $429. 00 (Municipal Code . 14 .40. 020)
b. Water fee: $214 . 50 (Municipal Code 14 . 12. 0100)
c. Drainage fee: $3,575. 00 (Municipal Code 14 .48. 050)
d. Orange County Sanitation District 03 fee:. $450. 00
(Orange County Ordinance #303)
It is important to note that the cost of the drainage facilities,
which you built at your expense, will be refunded to Mayfair Construc-
tion as provided .by reimbursement agreement.
2 . Street Improvements -- Refer to attached Inspection Report dated
January 21, 1976 (Ordinance 59730.4) .
3. Water System - Refer to attached "Punch List" dated January 29,
1976 (Ordinance S9730.4) .
The above fees and work are required by Municipal Code and
Ordinance as noted.
Furthermore, permits which were issued for the work on the State
highway are not complete because all conditions of said permits have
not been met.
We request that you contact this office as to your intent regard-
ing completion of these items within ten (10) days of the receipt of
this letter.
v� Very truly yours,
IlEli:EDP:j y 11. E. Hartge
Encl. . Director of Public Works
cc : Don Bon1a, City Attorney
John Behrens, Dir. Building & Community Development
CITY OF FIUNTINGTON BEACH
"•;. INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To Don Bonfa From A. De La Loza
City Attorney Contracts Administrator
Subject Demand for Payment on RA 75-D1 Date June 28, 1976
Request for Opinion
The holder of RA 75-Dl is Mayfair -Construction Company. A demand for payment
was made by Mayfair on June 18, 1976 (see attached) .
Is the City obligated to make payment at this time if the following conditions
exist:
Part I :
A. RA 75-D1 was originally executed on October 14, 1975 and required payment
only from "Subsequent Development."
B. On April 5, 1976, the City Council amended the applicable code section
(14.48.070) by deleting the "Subsequent Development" requirement.
C. A new contract was executed after that amendment and approved by the
City Council on June 7, 1976.
Part I-I :
A. Mayfair Construction Company is not the developer 'or the "applicant"
in this development. Mark C. Bloom Company is the applicant.
Part III :
A. Mark C. Bloom has failed to pay approximately $4,000.00 to the City in
fees in connection with the development (see attached) .
I
i
A. De La Loza
Contracts Administrator
AD/cg
cc: Director, Public Works
a'
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To Ben Arguello From H. E. Hartge
Director of finance I Director of Public Works
Subject Request for Payment on Date June 23, 1976
Reimbursement Agreement 75-Dl
This department has received a letter from Mayfair Construction
Co. demanding payment on Reimbursement Agreement 75-D1. A copy of
the letter is attached.
H. E. Hartge
Director of Public Works
HEH:JWWajy
Attach.
i'
( O
• �V
00,
Y /.S
9p
F �
�qT/G/T01 Li
Mr. John =Fipple
i Public 'Jerks terpartment
amity of Huntin on Bea&,
F.G. Box 19€3
Hunting ton Beachg CalifortUa 92648
he: Gur Job #534
Dear sir. ripples
tie hereby°-request, and d-rind immediate riayn-eat of nainbursament
Ii
ASreement
f Upon zi Ang sixid ,a €f:sventg our represnintatives r3€34-urod �y
the head of thci Public Works Department that Tmymient tirouuld be
D upon the completion of the pcxo ject. Said prow,�,ct jaa:' coaiiplet�d in Q
January, i lnb.
Several c L.s to the <�iity azure d us that our pmyment was foi th
coming. After _a wait of about 1- (30) dajs, we. still rec,- veO
no pWsxct. A our representc.tive walled the city. We
told that thrare wwam ,,; prob'!m in tho language of the: 'we-Teement and
this wtLs being worked on. After another thirty (30)i ys tie still
did not re alive cm." -1%=dt3. Ae-1Un our represeia ativa cont,-.--ted the
city. He spoke to Mr. Amsbarry. ter. Amsbarry cxpl* z th:t the.
language was being amended by he City Council and that it wake
Vqo weeks to go to the Council and than to rty &qs to 3 vo :, l'aw and
that we would receive our money the first feu days in_V 11Y.
Several weeks in May went by and we received no payment,- We called
the city again and Hr. Amsbarry,stated.that there-aaais_a-problem in
funding and a meeting was going to be held on MiV 27th to ascertain
this problem and further he could contact a representative immediately
after the meeting .and give him a date vhen payment would be forwarded
to us. This was nester done.
4n June 17, 19769 our representative, contacted ter. Wipple and he stated
that he was unable to tell us iineu these funds would be available.
5
June 18# 1976
Hro, John 14 ppl e
Page 2
In addition to whiat has,been outlined above# there are several
incidents involving our representative and the mployees of the
City of Huntington Beach whereby statemeots were made regarding
pt rrr a t of this Adreemerst whieh have not been kit.
The del&q in payroenti aready created several thousan4 of dollars ,
last in revenue to us.
We again hereby did and request prompt payment on this Reim-
bursement Agreement*
Verl, truly you t
President
�•l�a Ord
oos City Hanager
°Odity of Hunt Zeton Suach
City Attorney
City of Rmtingtczn Beach
i
Ho'j
' CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To H. E. Hartge From A. De La Loza
Director, Public Works Contracts Administrator
Subject RA 75-D1 Date June 28, 1976
Your attention is invited to the attached procedure. To date no certification
of fees has been received on the subject agreement. Please note that the
certification should state that the fees received are from areas served by the
facility in question and are applicable to RA 75-D1 . We will proceed with
verification as soon as the certification has been forwarded.
Q2&
A. De La Loza
Contracts Administrator
AD/cg
r
tj� 4CITY OF HUNTINGTON BEACH .
J0
Lo" INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH -
To H. E.. Hartge From A. De La Loza
Director, Public Works Departmental Analyst Sr.
Subject Reimbursement Agreement #114 Date January 26, 1976'
Kaufman and Broad
In order to correct deficiencies of .the past, the following requirements must be
met prior to payment on reimbursement agreements.
A. Certification from Public Works Director that fees have been received and
are applicable to the reimbursement agreement in question. . (This should,
be accompanied .by a list of payments received, the source, and the dates
paid since the execution of the agreement) .
B. Finance Department verification of
1 . Fees received to date.
2. Reimbursements made to date.
C. C.ity Attorney review of agreement for legal sufficiency (this has already
been requested) .
D. City Council approval
Please accomplish Step A so. that we may proceed with remainder of the system.
A. De La Loza
Departmental Analyst. Sr.
F. B. Arguello
Director of Finance
AD/cg
s
City of Huntington Beach
P.O. BOX 190 CALIFORNIA 92648
ENGINEERING DEPARTMENT
May 27, 1976
Honorable Mayor
and City Council
City of Huntington Beach
Attention: Floyd G. Belsito
Acting City Administrator
Subject: Amended Reimbursement
Agreement 75-Dl
Mayfair Construction Co.
Dear Council Members:
Transmitted herewith is a reimbursement agreement between
the City of - Huntington Beach and Mayfair Construction Co. for
drainage facilities built in Drainage District #9 at Mayfair' s
expense. This agreement rescinds Reimbursement Agreement 75-Dl
dated October 14, 1975. Drainage fees have been collected in
area to refund Mayfair Construction Co.
I recommend that your Honorable Body execute the agreement.
Very. truly yours,
H. E. Hartge
Director of Public Works
HEH:JWW:jy
Trans.
City of Huntington Beach
P.O. BOX 190 CALIFORNIA 92648
ENGINEERING DEPARTMENT
April 29, .1976
Mayfair Construction Co.
716 East Edna Place
Suite G
Covina, California 91723
Subject: Drainage. Reimbursement
Agreement 75-Dl
Gentlemen:
Enclosed please find an amended reimbursement agreement
between Mayfair Construction Co. and City of Huntington Beach
for the construction of drainage facilities built in conjunc-
tion with the Mark C. Bloone tire store.
Please sign the agreement and return to this office for
transmittal to the City Council for their approval. If you
have any questions on this matter, please call John Whipple
at 536-5431.
Very truly yours,
H. E. Hartge
Director of Public Works
HEH:JWW:mc
Encl.
'i
t
Gebruary 9, 1976
Mark C. Bloome `
5555 Sepulveda Boulevard
Culver- City, -California 90230 -
Subject: Retail Store at 18455 Beach-Boulevard-Public
Works Dept. Requirements -for Approval of
Certificate of Occupancy
Dear Mr. Bloome:
This department has not approved the release of the Certificate
of Occupancy on the subject project .for the-�following. reasons:
1. Fees Due
a. Serer fee: —$429.00 (Municipal Code 14.40. 020)
b. Water fee: ___$214.50 (Municipal Code 14.12. 0100)
� Drainage fee: .$3,575. 00 (Municipal Code 14.48.050)
. Orange County Sanitation District #3 fee.: $450. 00
(Orange County Ordinance #303).
It is important to note that the cost of-the drainage facilities,
which you built at your expense, will be refunded to Mayfair Construc-
tion as provided by reimbursement agreement.
2. Street Improvements - Refer to attached Inspection Report dated
January 21, 1976 (Ordinance S9730.4) .
3. 11ater- System - Refer to attached "Punch List" dated January 29,
1976 (Ordinance S9730.4) .
s
The above fees and work are required by Municipal Code and
Ordinance as noted.
r,
s` Furthermore, permits which were issued for the work on the State
highway are not complete because all conditions of said permits have
not been met.
We request that you contact this office as to your intent regard-
ing completion of these items within ten (10) days of the receipt of
this letter.
Very truly yours,
HEH:EDP:jy H. E. Hartge Encl Director of Public T rlorks
' CC: Don$on.fa, City Attorney
?— fi ^2rn. ^r. a
I
CITY OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To Don Bonfe, City Attorney From R. E. Rartga
Subject Reimbursement Agreement Date February 2, 1976
Please review attached reLmburserwnt agreement
and return to this office with any comr.-tents or
approval as to fora. This agreement is amending
Reimbursement Agreement 75-DI (attached) which was
executed by the City Council on October 14, 19751
to indicate acuta.l cost and completion of project.
ff.. rK. r R96
Director of Public works
��R r J";�i a a►a
Attach.
r
R�;..'ting-lton " „ch Sheet 1 of 1
� rtment of Public. erns
/r
INSPECT! -)N REPORT
Inspector `Thomas Blackburn Date of inspection January 21 , 1976
Tract No. Permit Commerc-; �� � Developer Mark C. Blooms
Work Inspected Concrete A/C Paving
Concrete, Paving, etc.
The required improvements indicated above have been inspected for
compliance with City requirements'. Correction of deficiencies listed
below is required for final approval by this Department
Location Deficiency Correction Required
Beach Blvd. sidewalk left out from
18455 Beach Blvd. driveway to end of catc
basin. Pour sidewalk.
Edges of A/C when paving Heat edge of' A/C .overla
installed are not strai ht and roll rum edges
plus edge overlay are a er eating.
breaking off.
Install protection bar.
catch basin.
Clean gutters for water check of flow lines.
City of Huntington Beach
0 P.O. BOX 190 CALIFORNIA 92648
3 ENGINEERING DEPARTMENT
September 11, 1975
Honorable Mayor
and City- Council
City of Huntington Beach
Attention: David D. Rowlands
City Administrator
Subject: Reimbursement Agreement 75-Dl
Mark C. Bloome Company
Dear Council Members:
Transmitted herewith is a reimbursement agreement be-
tween the City of Huntington Beach and Mark C. Bloome Co.
for drainage facilities to be built in Drainage District #9. a
Fees will be collected from subsequent development in the
area to refund the $10,375. 00 to Mark C. Bloome Company.
I recommend your Honorable Body execute the agreement.
Very truly yours,
H. E. Hart e
Director of Public Works
HEH:JWW:jy
Trans.
Am OF HUNTINGTON BEACH
INTER-DEPARTMENT COMMUNICATION
HUNTINGTON BEACH
To Ben Arguello From H. E. Hartge
Director of Finance Director of Public Works
Subject Request for Payment on Date June. 23; .1976
Reimbursement Agreement -75-Dl .
This department has received a letter from Mayfair Construction
Co. demanding payment on Reimbursement. Agreement: 75-D1. A copy of
the letter. is attached.
H. E. Hartge
Director of .Public Works
HEH:JWW:jy `
Attach..
r
JSTRIAL • COMMERCIAL • RESIDE,
.STATE I.1== #B246W
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553 M E C E IV E
June 18, 1976 DEPT. OF PUS!IC WORKS
1976
MUNTIINGTON GMACH. CALIF.
Mr. John Wipple
Public Works Department
City of Huntington Beach
P.O. Box 190
Huntington Beach, California 92648
Re: Our Job #534
Dear Mr. Wipple:
We hereby request and demand immediate payment of Reimbursement
Agreement 75-D1.
Upon signing said Agreement, our representatives were assured by
the head of the Public Works Department that payment would be made
upon the completion of the project. Said project was completed in
January, 1976.
Severalcalls to the City assured us that our payment was forth
coming. After a wait of about thirty (30) days, we still received
no payment. Again our representative called the city. We were
told that there was a problem in the language of the Agreement and
this was being worked on. After another thirty (30) days we still
did not receive our funds. Again our representative contacted the
city. He spoke to Mr. Amsbarry. Mr. Amsbarry explained that the
language was being amended by the City Council and that it would take
two weeks to go to the Council and then thirty days to become law and
that we would receive our money the first few days in May.
Several weeks in May went by and we received no payment. We called
the city again and Mr. Amsbarry stated that there was a problem in
funding and a meeting was going to be held on May 27th to ascertain
this problem and further he would contact a representative immediately
after the meeting and give him a date when payment would be forwarded
to us. This was never done.
On June 17, 1976, our representative contacted Mr. Wipple and he stated
that he was unable to tell us when these funds would be available.
SUBSIDIARY OF MAYFAIR HOMES,INC.
JSTRIAL • COMMERCIAL • RESIDE. L
STATE LJCENSS #B246W
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723 BE-1 E C E I rY E
AREA CODE 213/966-7553 DEPT. OF PUB+IC WORKS
June 18, 1976 ,►Ui'd 2 1 1976
HWM7 NCVTOI�BEACH. CALIF
Mr. John Wipple
Page 2
In addition to what has been outlined above, there are several
incidents involving our representative and the employees of the
City of Huntington Beach whereby statements were made regarding
payment of this Agreement which have not been kept.
The delay in payment already created several thousand -of dollars
lost in revenue to us.
We again hereby demand and request prompt payment on this Reim—
bursement Agreement.
Very truly yours,
MAYFAIR CONSTRU N COMPANY
r ,
W. D
President
WJR:erd
cc: City Manager
City of Huntington Beach
City Attorney
City of Huntington Beach
SUBSIDIARY OF MAYFAIR HOMES,INC.
o ,e*
�CAt®
`ekzC`
o rid 1
A 1A CITY A L3 F HUNTINGTON � 0
INTER-DEPARTMENT COMMUNICATION
�p��b _ 6
HUNTI GTON KACH
To H.E. HARTGE From FINANCE DIRECTOR
Subject Mark C. Bloome (Mayfair Const.) Date February 9, 1976
The attached management comments ( Item D-2) from our outside auditors
should answer your inquiry of 2-6-76. Also please find attached a
copy of sec. 14.48.070 of the Code which appears to be what they are
referring to in the comments.
F. B. Arquello
Director of Finance
AD/ad
i
C. PAYROLL
Management Comments - Payroll.
1, Personnel Files Are Not Maintained On -A Current Basis
Personnel files. in the Personnel Department did not
include currently authorized deductions and in one case
:the employee range and step indicated within the personnel
file had not been updated since 1968.
t The effect is to weaken control over payroll transactions,
and to- increase the amount of time needed to review
employee history.
We recommend . that an employee deduc.tions. summary card be
prepared indicating all authorized deductions signed . by
the employee and maintained in' the individual personnel .
file.: An. update., should. be performed at .least annually• with
a comparison of EDP output to ensure. that personnel files
and EDP runs agree.
Do . REIMBURSEMENT. CONTRACTS
Management Comments im r' sement Contracts
1. hncomplets Records
Detailed records for- reimbursement contracts are•' not .being - ,
maintained. -on a current basis. Subsidiary'. ze co' rd6 are•.not
complete and the general -ledger is' riot Adjusted 'to _
r lect
1 i abilities I of the City. The. lack of pro; uses . or- recording
"rursement contracts may result in aamisstatement)of .
liabilities and fund balances.
We again recommend the City develop procedures for• recordihq
activity in the reimbursement contracts on a timely basis.
We. understand• an individual is currently being, trained •to„
take. overall responsibility for contract control and review.
2. Timing Of -Payments- To Contractors
• We noted advances being paid to contractors for offsite-..and.
-+--`- oversize water development- P for to the Cit in" .reimb reed.
This procedure does not appear to be in accordance w t City
ode S. 3454 (b) which states that. refunds shall be made from
iU A ,.,esf deygl onment-J Payments made prior to_ the collection
by the City .causes negative cash flow and increases the
potential for loss to the. •City if. ihe full cost of the-
development is not subsequently collected.
4
. .3•: .. _r.. -�- '-t, ;- .'rl tip`: ...;:. ..- _... ..,--. . _ _ ._ _. .. .. .'r_
P
/We recommend that the City Attorney make an. interpretation
of the City Code regarding water development as was done
for sewer development and that the City comply with the
interpretation.
t "
t
E.. DATA PROCESSING
1. Improve Current. Data Processing Backup And Recovery
-rov s ons
i
Currently, the -client has backup for important master files
and source program decks. . However, this backup is-housed
in the same building as the computer center. In addition,
x
.no backup exists for operations or program documentation.
We again recommend .that transaction and master file .data
backup as well as operations and program- documentation.
should be stored at an offsite location.
2. Programming Work- Orders Should Be ,.Unddr. Numerical :Control'
The programming. work order form, used by .the EDP, Department
to authorize. and initiate new systems or program modifications,
is not maintained under numerical control. Without numerical
control, there can .be. no assurance that all : program changes
are implemented under an established authorization• procedure.
We recommend that the programming work order form be maintained
under sequential numerical- control. -In- addition, .'we_ recommend
that a control log -be established to record each request Arid
its assigned sequence number and- that the request: 'number .be
referenced in all .,documentation; _ all request forms should be
permanently filed with program documentation.
The implementation of .this .recommendation should in prove EDP
management control over programming requests. .
3. Implement-'A Manual Log .For Recording Computer Reruns
Production program reruns are listed in the daily •Time
Accounting Billing System reports. However, no documentation
exists as to the reason for these reruns:
We recommend that a. manual rerun log be .establiehed..and
implemented to document all production. program reruns,. A
rerun code. could be utilized to describe -there ason for reruns
(operator errors, data errors or program errors., . etc..).. This .
information would greatly assist EDP management - in identifying
problem systems and programs and would provide .a better audit
trail for production processing.
5
I
f
14. 48. 060--14. 48.070
i
Drainage District Fee Per Gross Acre
8D $ 1,650
8E 0
8F 2.,300
8G 3,500
8H 2,500
9 2,500
10 1,500
` 11 Completed 0
12 2$000
Said fee -shall be collected, deposited and expended pur
uant to Sections 66483 and .66487. of the -Goverhtent Code of',-
the state of California and all other applicable laws .of •the
'state of California.
i All necessary drainage fees established by the city shall
be deposited with. the city prior to recordation of* subdivision
map or issuance- of a building permit if a subdivision map is
not required. The -subdivider- or -person to .whom• a building
permit has been issued may make application for a reimbursement
agreement. (Ord. 1985, . 2 Jul 7-5) ._
1 14. 4.8. 060 Applicability. The.- provisions:.of_ this
chapter shall apply to all subdivisions of land .and. the. develop-
ment of all land within the drainage area unless the fees
were previously paid by prior development.
It shall be the responsibility of the applicant to con
struct all on-site_ improvements as may be required by .the city, .
including all off-site drainage facilities as are required .by
the city. The applicant shall be •reimbursed by .the .city for
all . required ofr -site constr on, in accordance with Section
14. 48. 070'. (Ord. . 1985, 4-Jul 1-51 .
14. 48. 070. Conditions governing reimbursements-.... .Not_
withstanding any other provisions of this chapter, .the payment of
refunds shall be governed as follows :
(a) Refunds . shall be payable for a period of five (5) .
years from date of applicant ' s application. /Oz_�
. (b ) Refunds shall be made from subsequent d.evelonment at
the rate p acre developed set forth in- Section 14. 48. 050 of
this chapter. .
(c ) Refunds shall not exceed 90 percent of off-site con-
struction costs.
(d) Refunds shall bear no interest•:"
422-1
14. 48. 070
.(e) The city shall not be liable for payment of any refund
by reason of its failure to collect or receive from any person
the service fee for connecting into the main line paid for by
applicant.
(f) The city ' s refusal to allow .any connection or .connections
into the mainline paid for by applicant shall not make the city
liable . to applicant for any refund which might have accrued to
applicant if such connection had been permitted. '
(g) The city retains• the right to allow a connection by
a public agency exempted from payment of connection fees and
shall not be liable to applicant for refund because of said
connection.
(h) Reimbursement agreements covering. the payment of refunds
shall be in writing._ (Ord. 1985, 2 Jul 75) .
422-2
i
.JJ ' City of Huntington Beach
P.O. BOX 190 CALIFORNIA 92649
ENGINEERING DEPARTMENT
May 27, 1976
Honorable Mayor -
and City Council
City of Huntington Beach
Attention: Floyd G: Belsito
Acting City Administrator
Subject: Amended .Reimbursement
Agreement 75-Dl �
Mayfair Construction Co.
Dear Council Members:
Transmitted herewith is a reimbursement agreement .between
the City of Huntington Beach and Mayfair Construction Co. for
drainage facilities built in Drainage. District #9 at Mayfair's.
expense. This agreement rescinds Reimbursement Agreement 75-Dl
dated October 14, 1975. Drainage fees have been collected in the
area to refund Mayfair Construction Co.
I recommend that your Honorable Body execute the agreement.
Very truly yours,
110
H. E. HartgVele-7
Director of Public Works
HEH:JWW:jy
Trans: R C E V
OEPT. OF PUBLJG WORKS
JUN 2 5 1976
HURMGTON BEACH. CALIF.
10
i
REIMBURSEMENT AGREEMENT 75-Dl
STORM DRAIN CONSTRUCTION
THIS AGREEMENT entered into by and between the CITY
OF HUNTINGTON BEACH, a municipal corporation, hereinafter called
"CITY," and MAYFAIR CONSTRUCTION COMPANY, hereinafter called
"BUILDER,"
W I T N E S S E T H:
WHEREAS, BUILDER, pursuant to its agreement with CITY,
has at its own cost and expense constructed386 feet of twenty-
seven inch RCP pipe, one (1) catch basin, and two (2) junction
i -
structures , hereinafter called "FACILITIES. ". FA ILITIES have
been constructed in conformance with the. plans an specifications
approved by the Director of Public Works of CITY, a d FACILITIES
have been dedicated to CITY, and CITY now desires to reimburse
BUILDER for a portion of the cost of the construction of FACILITIES
as provided by CITY' s Municipal Code;
NOW, THEREFORE, in consideration of the covenants and
agreements herein contained; the parties hereto. agree as follows :
BUILDER has constructed, at a total cost of $18,375 .00
a storm drain and appurtenances to serve Drainage District No. 9
. and adjacent properties . Exhibit "A," attached hereto and made
a part hereof, is a map of the area served. BUILDER has dedicated
FACILITIES to CITY.
The maximum refund to be paid to BUILDER under this
Agreement is as follows :
JG: cs
l• RECEI VEP 17'.!
' Total ,job cost of FACILITIES: $18,375.00
Less ten percent (10%) per CITY' s
Municipal Code Section 14 . 48. 070(c ) 1,837. 50
Maximum refundable, conditioned on
funds being available in Drainage
District No. 9 fund 16,537 . 50
Refunds shall be payable for a period of five (5) years
from the date of applicant ' s application.
Refunds shall bear no interest .
Refunds shall not exceed - ninety percent (90%) of off-
site construction costs .
Funds have been expended for Drainage District No. 9
in accordance with Government Code Sections 66483 and 66487 only.
Refunds are payable only from a positive balance available in
said district ' s fund.
No refund shall be made by CITY to BUILDER until the
Director of Public Works shall certify in writing to the Finance
Director that fees have been collected in drainage area to refund
BUILDER for the cost of constructing FACILITIES.
CITY shall not be liable for payment of refund by reason
of its failure to collect or receive from any person .or entity
the drainage fee, or by reason of expenditures made pursuant t•o
Government Code Sections 66483 and 66487 . CITY •agrees to use good
faith to protect the interest of developers, either individuals
or entities , who have previously constructed similar facilities,
by collecting the fees , either prior to or concurrent with the
development of any property served by the facility constructed
2. REECEI VEO 1-'Ay 4 191k
w
•r
under this agreement . If a developer who develops property served
by the facility constructed by BUILDER ' is required as a condition
of development to construct additional .facilities , CITY may allow
said developer credit toward the per acreage fee consistent with
this said agreement; and no fees shall be due BUILDER by reason
of such construction. CITY further agrees to furnish a copy of
this agreement to the developer of any properties served by the
FACILITIES described herein.
In the event CITY does not require .a developer to deposit
the drainage fee with the CITY prior to or concurrent with develop-
ment , CITY will enter into an agreement with said developer stating
that said developer is obligated, not only to the CITY, but also to
BUILDER and to developers who have previously contributed to the
cost of construction of FACILITIES constructed hereunder to deposit
said fee with CITY. The CITY shall not be required to pay attorneys
fees or court costs for any breach of this agreement .
CITY and BUILDER hereby mutually rescind that certain
Reimbursement Agreement 75-Dl between these parties dated October 14 ,
1975 , and hereby enter into this new Reimbursement Agreement 75-Dl
on the date first entered below.
EXECUTED in Huntington .Beach California on this the . .
day of % 1976• •
ATTEST: CITY OF HUNTINGTON BEACH (CITY)
7
Bya�&.
C ty Clerk a r.
3
�'. 4 fJ;
APPROVED AS TO CONTENT: APPROVED AS TO FORM:
Ci Administrator City At orn ��•
APPROVED, INITIATING DEPARTMENT
MAYFAIR CONSTRUCTION COMPANY
(BUILDER)
4 .
^ ; RA
I I ..• 1 �C4 CF.E
R/ k
C4MI-CD got al CP as'
CF
i r RAil
w, , R►�o
smi C2
i i 'r.
r i Ri I rr.
isRA-0-CD
c2. lot,Rt ^�
CF C
Mi
-CD 42
- i ! R! -RI-PO
' - :•f °' �=�1 :RIB fR� . .
-J �'r R'1' 1M At - • j Il _ ^3.- -J �w- �..��.
H ' ' C.2 �.ct !
RA-0
-CD RA
x � ' ISM •,► ' _ 3� . ,
MH '
M2-0
RA MI-0 R� R0 Its ` f
w.Y
'0 i I C 4 R, •��
.
f ... •c rya is+' A •. �_
l_ AMC -R 'c"
Ills
7.
• l / , I I R;
MF.p' MI-0 j�a . ),�-�'"� �- -AM, R 3
r i , .R i h y 4 v ..'
R' ' _ �RI
R4 0 RA-Oa 1 rRs,- P112
April 29, 1976
Mayfair Construction Co.
716 East Edna Place
Suite G
Covina;. California 91723
Subject: Drainage Reimbursement
Agreement 75-Dl
Gentlemen:
Enclosed please find an amended reimbursement agreement :
between Mayfair Construction Co. and City of Huntington Beach
for the construction of drainage facilities built in conjunc-
tion with the Mark C. Eloone tire store.
Please sign. the agreement and return to this office for
transmittal to the City Council for their approval. If you
have any questions on this Matter, please call John Whipple
at 536-5431.
Very truly yours,
H. E. Hartge
Director of Public Works
HEH:'n%V:me
Encl.
s
September 29, 1975
Honorable Mayor
and City Council
City of Huntington Beach
Attention: David D. Rowlands
City Administrator
Subject: Reimbursement Agreement 75-D1
Mayfair Construction Co.
Dear Council Members:
Transmitted herewith is a reimbursement agreement be-
tween the City of Huntington Beach and Mayfair Construction
Co. for drainage facilities to be built in Drainage District #9.
Fees i collected from subsequent development in the area
to iefund the $15,480.00 to Mayfair Construction Co.
I recommend your Honorable Body execute the agreement.
Very truly yours,
H. E. Hartge
Director of Public works
HEH:J"WW:jy
Trans.
J� City of Huntington Beach
P.O. BOX 190 CALIFORNIA 92640
ENGINEERING DEPARTMENT
September 29, 1975
Honorable Mayor
and City Council
City of Huntington Beach
Attention: 'bavid D. Rowlands .
City Administrator
Subject: Reimbursement Agreement 75-Dl
Mayfair Construction Co.
Dear Council Members:
Transmitted herewith is a reimbursement agreement be-
tween. the .City of Huntington Beach and Mayfair Construction
Co. for drainage facilities to be built in Drainage District #9.
Fees will be collected from subsequent development in the area
to refund the $15,480.00 to Mayfair Construction Co.
I recommend your Honorable Body execute the agreement.
Very truly yours,
H. E. Hartge
Director of Public Works
HEH:JWW:jy
Trans.
REIMBURSEMENT AGREEMENT 75-D1
STORM DRAIN CONSTRUCTION
RECEIVED OCT- .9 1975
THIS AGREEMENT entered into by and between the CITY OF HUNTINGTON
BEACH, a municipal corporation, hereinafter for convenience referred
to as "City" , and Mayfair Construction Co. , hereinafter for con-
venience referred to as "Builder" .
WHEREAS, Builder, pursuant to agreement with City will, at his
own cost. and expense, construct 386' of 27" RCP pipe, one (1) catch
basin, and two (2) junction structures, hereinafter referred to as
facilities, and said facilities will be constructed in conformity
with the plans and specifications approved by the Director. of Public
Works 'of City, and will be dedicated to City, and City desires to
reimburse. Builder for a portion of the cost of the construction of
said facilities as provided by the Municipal Code, at the completion
of construction:
NOW, THEREFORE, in consideration of the covenants and agreements
herein contained, the parties hereto agree as follows:
Builder. will. construct, at a total cost of $17:,200. 00 a storm
drain and appurtenances to serve Drainage District #9 and. adjacent
properties. (see Exhibit "A" attached hereto .and made a part hereof
for a map of the area served) and will dedicate said facilities to
City.
The approximate refund to be paid to Builder under this agree-
ment is as follows:
Total job cost of facilities $1.7;200. 00
Less 10% per Municipal Code Section $ 1,720. 00
14.48:070 (C)
Approximate Net Refundable. $15,480. 00
Refunds shall be payable for a period of five (5) years only
from the date 'of applicant's application to be filed subsequent to
completion of construction.
Refunds shall be made from subsequent development at the rate
per acre developed set forth in Section 14.48. 050 of the Municipal
Code.
Refunds shall bear no interest.
No refund shall be made by City to Builder until the Director
iting to the
of Public Works -shall certify in wr Finance Director
that Builder is entitled to a refund by reason of connection having
been made to facilities in accordance with the Huntington Beach
Municipal Code, and that City has received the fee for such connec
tion.
City shall not be liable for payment of refund by reason of
its failure to collect or .receive from any person or entity the '.
drainage fee. However, City agrees to use good faith to protect
the interest of developers, either individuals or entities, who have
previously constructed .similar facilities, by the collecting fees,
either prior to or concurrent with the development, of any property
j
served by the facility constructed under this agreement. . If a
developer who develops property served by the facility constructed
G
by Builder is required as a condition of development to construct
additional facilities, City may allow -said developer credit toward
E
the per acreage fee consistent with this said agreement; and- no fees
shall-be due Builder .by reason of such construction. City further
agrees to furnish .a copy of this a-greement to the developer of any
properties served by the facilities described herein.
In the event City does not require a developer to. deposit the
drainage fee with the City prior to or- concurrent with development,
? City will provide an agreement. with said developer that said- de-
veloper is obligated,. not only to the City, but. to Builder, and to
developers who have previously contributed to the 'cost of construc-
tion of facilities constructed hereunder to deposit said fee with
City; and said agreement will further provide that- in the event
that it becomes .necessary to institute legal proceedings,- either by
the City .or by Builder or developers, who have previously contributed
to the cost of such facilities, to enforce the rights of the parties
thereunder, that the City shall not be required to pay the attorney
fees for any of the parties.
i.
2
`.A . • - -
' RECEIVED U C f 9. 1975
WITNESS OUR HANDS AND SEALS the day, month and year appearing
below.
7 _
DATED this /y day of f : , 19
CITY OF HUNTINGTON BEACH,
a municipal corporation
• �FZiY}tiJ1,.
Mayor
ATTEST:
i
B
4 City Clerk
f
i APPROVED as to content:
By
o,a. ,
City Administrator
APPROVED AS TO FORM
By
City Attorney
APPROVED AS TO FORM: Builder
DON P. BONFA
City At rney .
47
Byt
n ity Ittorney
i
3
\fJ Ci[} cn. aranc. �
TALBERT AYR TAlEE#T A�fM
Mt-CO MI RI Rl
RA al 1h
C4 CF-E yt '
Y rxr. v�Y,oacu R} RI 1a
- - - CF-E . if
C4 (
CF-R MI-CD MI RI
RA R► Rl RI Rl�o
``2 ,a..,t....
M 1 rf '�:.;f „ i RI !tl .....PlS
I.t RI RI
A-0-CD'Ic r - Rw TAMRI = Ci 2 RI = M RI RI RI RhPp
RI
• CF-C c a RI Ri - RI
43 R3 r
' R3 S r
�� • - ItiKRL of > `• -
M1-CD RI RI RI RI 0.
R2 RI Rt D'' f
Do RI t
r► R2 R2
cc - RA- = ^
Q i N RI Rt RYELLIS
m`' _ R3 R3
N MI-O-CD M2 I
mi-ol I _i R2 C 2 ti C2 . i R2-PD 9
x RA:O-CDI__ ; .. � 3 R a
y� „Y R3 { 1 :.R3 MH W
M2-0 R3 lii I R3 s
+a` '
M1-0 Rs I ii O
R3 Rb t t 3
t RA-0 ; .. I C 4 R3 K,..m H
ARIM11 J Awl! R3
o- cdn t RI
w pa»rZ R3 R I ` {
' rwi=a R3 : pa
MMO MI-0
w
Rao' Rs R C 4 R� RI n !
L '
R2' ..�, RI
ag4- R b R2 g' g I R•I
RA-O-• . y Rho R5% ,. _ _.
GARFIELD AYi GARFIECD AVEMS
'•r
IN TRIAL • COMMERCIAL • RESIDENT.
STATE LxzNsE #B24M7 _-
Mayfair Construction Co.
SUITE G
716 EAST EDNA PLACE
COVINA, CALIFORNIA 91723
AREA CODE 213/966-7553
September 8, 1975
City of Huntington Beach
P.O. Box 190
Huntington Beach, California 92648
Gentlemen;
We propose to furnish all labor, materials and equipment as
required to install the storm drain at 'the Mark C. Bloome
property as per plans dated August 22, 1975, for the total
sum of Seventeen thousand and nine hundred dollars — —
$17,900.00).
Enclosed are bids from three Engineering Contractors. We have
used Van Diest Brothers bid in our proposal.
This proposal does not include installing the fire hydrant.
Very truly yours,
MAYFAIR CONSTRUCTION COMPANY
. t
W.VJE
President
WJR;erd
Enclosures (3)
DEPT. OF PUBLIC WORKS
S P 8 1975
Hu"NairoN BF-ACH. CALIF. -
SUBSIDIARY OF MAYFAIR HOMES, INC.
ROBERT G. CASTONGIA, INC.
OENMAL ENOINEMNO CONTRACTOR
12323% WOODRUFF AVENUE
DOWNEY, CALIFORNIA 90241
(213) TO 1-2228 • WA 3-1123
4ug udt 5, 1975
Nvn d;t uccti on
71 na Place
Suite 9
Cvvtna; Cali.
Re: 9mplwvement of Si.or,rr /)twin exienAion, �J-JZi /1ve. R Reach Nv('.
yen tl emen:
We. a e- pleaded ;to guo.te �h.e �fol. owing:
38o jt. 27" Sto un dAa.in .9na.taUa#.ion .inclurl.ing 2 monho)ed
and catch 6".cn 072-9). Aj pew, p. and Pa /Yla/?A (,. Bloome
784o5 Reach. Blvd. Hunt. Beach.
118,400.00
VAN DIEST BROS., INC.
State License No. 157555
15305 S. Lakewood Blvd. — Paramount, Calif. 90723
ME 3-2835 NE 6-4286
' Mayfair Construction PROPOSAL -
716 E.. . Edna Place Suite "G" September 5, 19 75
Covina, Calif.
Dear Sir: _The undersigned-proposes=to`=furnish all materials and perform all labor necessary to complete the-following:
Job : Mark C. Bloom
1846'5 Beach Blvd. —
Huntington Beach, Calif .
We will install the 27 inch storm drain including 2 manholes
and-_1 catch basin as shown on un ing on eac _ s p an for
storm drain extension on the north west corner of EllisAve.-
and Beach Blvd.
All of the above work to be completed in a substantial and workmanlike manner for the sum of Fifteen . >
_Thrn,_and Fi vP H 1ndrod (S 15,500.00 ) Dollars _
• �lE�i14��€si�s?EbC�3 a�i�)6 - _
)@(000)=)4X)q.X;4Xc}¢0�{The entire amount.of contract- to-be paid within 30 days after completion.-
Any alteration or-deviation from the above specifications involving extra cost of material or labor wHI•only be executed`
' upon written orders for same, and will become an extra charge over the sum mentioned.in this contract.-All agreements.
must be made in writing.
The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay.all'Sales Taxes,
Old Age Benefit and Unemployment Compensation Taxes upon the material and labor furnished under this contract, as
required by the United States Government and the State in which this work is performed.
Respectfully submitted,
Van Diest Bros . Inc.
4Con or }
ACCEPTANCE
You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above
proposal, for which the undersigned agrees to pay the amount mentioned in said proposal, and according to the terms thereof.
Date_ 1A
e.....� Form 1{7 - ...
_ 1AF0,IN U.S.A.
rear i wauxm Co._PUBL.ISH&W.CHICAGO
Pr000sal No.
(SPECIFICATIONS
AND ESTIMATE
Page No. of Pages
PROPOSAL SUBMITTED TO PHONE DATE
STREET JOB NAME
CITY, STATE AND ZIP CODE JOB LOCATION
ARCHITECT DATE OF PLANS JOB PHONE
We hereby propose to furnish materials and labor necessary for the completion of:
e ,
Contractors are required by law
,i_____d and regulated by the- Contrac.
tors' State License "1: and fie) ions
conicerning77- referred
- otio�tot -:rg� ad.
dress is:
Contractors' .a#e License Board
1020 N Street
-r1e11+eflig-Calffamia-9581 d
WE PROPOSE hereby to furnish material and labor—complete in accordance with above specifications,for the sum of:
dollars($ ).
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike
manner according to specifications submitted, per standard practices. Any alteration or deviation from Authorized it
above specifications involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate. All agreements contingent upon strikes,accidents or delays
beyond our control. Owner to carry fire, tornado and other necessary insurance.Our workers are fully Note:This proposal may be
covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days.
ACCEPTANCE OF PROPOSAL The above prices.specifications and conditions are
satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be Signature
made as outlined above.
Date of Acceptance: Signature